GA-CC002-R4-F11-0001

RECEPTION REQUEST
Revision Date : 20/05/2019

COMILOG 2020 GREENFIELDS PROJECT


EARTHWORKS BENEFICIATION AND RAILWAY STATION STOCKYARD
CONTRACT N° : H359304-CC002

Date of request
13 / 08 / 2020
nd rd
Element controlled : After Compaction 2 and 3 Layer Backfill Pisolite PK166-167
SAR
Request N° : RRT_0129
Material :

Type of work : Earthworks - Compaction

Controlled area : South Road PK166 - 167


.

Attachments : External reception request :


C2020-SAR-PE-PI-002 Done on : SAR
Made by :
Received by : Date:
Response requested for :
To :
Elements of assessment :
 Results of laboratory tests
 Visual recognition
 Topographic survey
 Other
The Engineer’s observations :

VISAS FOR RECEPTION


Contractor’s Representative The Engineer’s Topographer The Engineer’s Lab The Engineer
1 3

2 Test Zone

Compaction Monitoring table


South Road Layers Index Compactness (%) in situ Requirement (%) Remarks
PK166 2nd P01 95.5 ≥95 Conform
PK166 3rd P02 96.7 ≥95 Conform
PK167 3rd P03 96.5 ≥95 Conform

Remove the Unsuitable Materials