WORK INSPECTION REQUEST
Project: North Vas - Vas Living (NOYA) Date: 14-Jul-23
Client: Aldar Properties PJSC IR Ref. No.: NY2.NY-BW-FIB-T06-ZZ-XX-WI-AR-05772
Contractor: Fibrex LLC Rev.: 0
Consultant: ARCADIS
SECTION-A- DETAILS OF.INSPECTION
Work Package Discipline
Building � Civil / Structural LJ Mechanical LJ OTHERS (Specify) �
Infrastructure □ Architectural 0 Electrical □
Public Realm □ Interior Design DNatural Gas D
Early Works D Land Scaping / Hardscape 0 Telecommunication / IT D
Description of work to be inspected: (Attached high-lighted copy of relevant drawing)
Inspection for Installation of Car park canopy in Ground floor for Zone Z Cluster 6.20 (Unit-201 to 206) as per attached highlighted
layout drawing.

Location:
Relevant Drawing / Specs:
as per the attached drawing I
NY2.NY-BW-FIB-VP-ZZ-ZZ-PL-FC-3603 Rev 01
I
MSRA Ref: NY2.NY-BW-FIB-ZZ-ZZ-00-MS-AR-00019
Inspection Date: 16-Jul-23 Inspection Time: 10.00 AM
Submitted by: Fibrex LLC Date: Time:
Received by: Arcadis Date: Time:
Associated Discipline Inspection & Approval (Contractor)
lnsoection Comment Signature Date/Time
Civil & Survey 14-Jul-23

Mechnical

Electrical

Others (Aluminum) 1---------- ------f �k


SECTION B .·CONFORMATION OF CONTRACTOR'S·QA/QC INSPECTION
Confirmation of coordination & compliance with Specifications, approved drawings, Method Statement & Quality Control plan
Note: If 'NO', any departure from the specification, approved drawings, Method statement and Quality
Yes Q No O Control Ian to be r rded below
; ;
Non Conformity and/or reference to attached Nonco � �mity R ort (NCR)# _____________ Date:
Signed by Contrator QA/QC Engineer: 12-Jul-23
- SECTION C-· l:NGINEER'S INSPECTION/COMMENTS:
Position Commnets Signature Date /lime

Inspector

Surveyor

Material Engineer

Resident Engineer

Accepted 0 Accepted as noted n Not Acceptable f7 Photo Attached 0


Consultant Signature: Date Time:
Received By Contractor: Date Time:
Copy with Section A completed by Contractor to be submitted to Consultant by 16.00 hrs the day before planned timem of inspection
Original with Section B completed to be handed to Consultant prior to inspection
Engineer to complete Section C & return to Contractor
Checking & Approval by the Engineer shall r,ot rellt:Ve the Contractor from his obllgatlonto perform the work In accordance with the Copntract Documents, Requirement of
Safety & local Authority regualtiok
..t'IJ
ALDAR
=•·;,ctQ'\(lro.;l):(',:,?1/Ju
--------------------------====
1--- - -
WORK INSPECTION REQUEST
f1FiBREX
Project: North Vas - Vas Living (NOYA) Date: 14-Jul-23
Client: A ldar Properties PJSC IR Ref. No.: NY2.NY-BW-FIB-T06-ZZ-XX-WI-AR-05774
Contractor: Fibrex LLC Rev.: 0
Consultant: ARCADIS
SECTION A- DETAll:S OF-INSPECTION
Work Package Discipline
Building Q Civil/ Structural LJ Mechanical LJ OTHERS (Specify)
Infrastructure DArchitectural Q Electrical □
Public Realm OInterior Design D
Natural Gas □
Early Works DLand Scaping/ Hardscape Q Telecommunication/ IT □
Description of work to be inspected: (Attached high-lighted copy of relevant drawing)
Inspection for Installation of Car park canopy in Ground floor for Zone 2 Cluster 6.19 (Unit-211 to 216) as per attached highlighted
layout drawing.

Location: as per the attached drawing I I


Relevant Drawing/ Specs-: N¥2.NY-BW-FIB-\/.P-ZZ-ZZ-PL-FC-3603- REV 01
MSRA Ref: NY2.NY-BW-FIB-ZZ-ZZ-OO-MS-AR-00019
Inspection Date: 16-Jul-23 Inspection Time: 10.00AM
Submitted by: Fibrex LLC Date: Time:
Received by: Arcadis Date: Time:
Associated Discipline Inspection & Approval (Contractor)
.--___ln_ s_ _pe_ cti_ o_
n_ _
_-+-___ _ _ _ ___ _____ _ m
Co _ _ me_ n
_ t___________
_ ____ -+-�Signature Date /Time
Civil & Survey 14-Jul-23
t-------------+-------- ----- ---------------------+----·- +-----·-
-
Mechnical

Electrical

Others (Aluminum) 1-------


------------------< ��
SECTION B·- CONFORMATION Of CONTRACTOR'S QA/QC INSPECTION (

Confirmation of coordination & compliance with Specifications, approved drawings, Method Statement & Quality Control plan
Note: If 'NO', any departu from the specification, approved drawings, Method statement and Quality
Yes Q No D Control � to be r rded below
Non Conformity and/or reference to attached Nonconfptnjity R rt (NCR)# _____________ Date:
Signed by Contrator QA/QC Engineer: ( >' 14-Jul-23
SECTION_ C O ENGINEER'SJNSPECTIONJCOIVJMENTS:
Position Commnets Signature Date /Time

Inspector
,______ _ _
____ ____ ______ _____ _
_____
Surveyor

t-------- ----1------ -- ---- ------------- -


- ---- - --+-----+---- ---1

Material Engineer

Resident Engineer

Accepted D .,- Accepted as noted n Not Acceptable I I Photo-Attached I I


Consultant Signature: Date Time:
Received By Contractor: Date Time:
Copy with Section A completed by Contractor to be submitted to Consultant by 16.00 hrs the day before planned timem of inspection
Original with Section B completed to be handed to Consultant prior to inspection
Engineer to complete Section C & return to Contractor
Che!eklng & Apptt>vnl by the! Englne!O!t ohnll nt>t tdl..vO! the! Ct>nttHett>r fti,rn hi, i,bllgtttli,nti, perform the wi,rk In �cci,rd�nc" with the! Ci,pntr�ct Di,curn.,nt>, Requirement i,f
Safety & local Authority regualtiok
· a,.,,tee;.,�""
�'IJ � ARCADIS lt-.1r..1hd�d
Jb.at�.s
-
�i1FiBREXCtn,1,u:.:O'lG,o..n»oi.w1�n
ALDAR
WORK INSPECTION REQUEST
Project: North Vas - Vas Living (NOYA) Date: 14-Jul-23
Client: Aldar Properties PJSC IR Ref. No.: NY2.NY-BW-FIB-T04-ZZ-XX-WI-AR-05773
Contractor: Fibrex LLC Rev.: 0
Consultant: ARCADIS
SECllON A - DETAILS. QF INSPECTION
Work Package Discipline
0 Civil/ Structural LJ Mechanical l::'.J OTHERS (Specify) l::'.J
□ □
Building
0 Electrical
□ □ □
lnfrastructur-e Architectural

□ □
Public Realm Interior Design Natural Gas
Early Works Land Seaping/ Hardscape 0 Telecommunication/ IT
Description of work to be inspected: (Attached high-lighted copy of relevant drawing)
Inspection for Installation of Car park canopy in Ground floor for Zone 2 Cluster 4.16 (Unit-207 to 210) as per attached highlighted
layout drawing.
-- --
Location: as per the attached drawing I
Relevant Drawing/ Specs: NY2.NY-BW-FIB-VP-ZZ-ZZ-PL-FC-3603 Rev 01
MSRA Ref: NY2.NY-BW-FIB-ZZ-ZZ-OO-MS-AR-00019
Inspection Date: 16-Jul-23 Inspection Time: 10.00 AM
Submitted by: Fibrex LLC Date: Time:
Received by: Arcadis Date: Time:
Associated Discipline Inspection & Approval (Contractor)
·Inspection Comment Signature Date/Time
Civil & Survey 14-Jul-23

Mechnical

Electrical -

Others (Aluminum)
��
SECTION 8- CONFORMATION OF CONTRACTOR'S QA/QC INSPECTION
Confirmation of coordination & compliance with Specifications, approved drawings, Method Statement & Quality Control plan
Not om <he specifi�foo, app,o�d d,aw;ogs, Method s<.rtem,ot aod Q"altty
Yes 0 No D Control Ian to be r rded below

Non Conformity and/or reference to attached Nonco rmit ort (NCR)# Date:
Signed by Contrator QA/QC Engineer: 14-Jul-23
SECTION C - ENGINEER'S INSPECTION /_,C9MMl::NTS: ,,>
Position Commnets Signature Date /Time
-
Inspector

Surveyor

Material Engineer

Resident Engineer

Accepted □ Accepted as noted II Not Acceptable n Photo Attached J l


Consultant Signature: Date Time:
Received By Contractor: Date Time:
Copy with Section A completed by Contractor to be submitted to Consultant by 16.00 hrs the day before planned timem of inspection
Original with Section B completed to be handed to Consultant prior to inspection
Engineer to comolete Section C & return to Contractor
Check1ng & Approvt1\ by the Engineer :,;ht1II not relieve the Contrt1�or from hl:s obligt1tlontc perform the work In 1:1et:ordt1nt:e with the Copntrt1t:t Document:,;, Requirement t,f

Safety & local Authority regualtiok