INSPECTION / TESTING - COMMISSIONING REQUEST "ITCR"

Project Name: Develpoment of ISF Camp at Al Duhail Project ID.: BIDPACK # CPC07e
CONTRACTOR: Al Ali Engineering CONSUTLANT: Engineering Consultants Group (ECG)
ITCR No. CPC07E-ITCR-ELC-0004-P Revision: 0 Date: Thursday, February 3, 2022
To be filled by The Contractor
INSPECTION DETAILS DISCIPLINE CODES
Date: 4/Feb/2022 Time: 11:30AM £ General £ Fire Fighting System
Location: WATCHMAN ROOM-02 GROUND FLOOR ¢ Electrical £ AV & Telecommunication
ITP No: Activity No.: £ Plumbing £ Drainage
MS No: CPC07e-MS-ELC-0034 Sub-Clasue No. £ HVAC £ Landscaping
ITC Procedure Ref.: Rev.: £Architectural £ Others
CPC07e-SD-WR-GN-ELC-0001-001 REV-00
Drawing No./Rev: CPC07e-SD-GN-GN-ELC-0047-001 REV-00
Attached

Activity: ¢ Pre-Commissioning £ Start-up £ Testing & Commissioning £ Integration


Detailed Description of Activity to be inspected :
EQUIPMENT TYPE: DISTRIBUTION BOARD (DB)
EQUIPMENT CODE: 24D2-EDB-GF-01

ISSUED BY
Sub-Contractor: M/s ElectroWatt

Date: 3/Feb/2022 Time: 09:00am Name:Eng Mohamed Abdin Signature:…........................

VERIFIED BY M/s AAE


Construction (MEP/CIVIL) Comments:

Date: Time: Name Wael Asaad Signature:…........................

HSE Comments - The works have been checked and are safe for Inspection:

Date: Time: Name Signature:…........................

Veriefied by M/s CSI (Third Party)


Testing and Commissioning Agency Comments:
Comments:- The work have been verified and are ready for inspection:

£ Approved £ Re-Schedule £ Rejected

Date: Time: Name Signature:…........................

RECEIVED BY ECG: Date: Time:

HSE: Are the wroks safe to inspect - (Proper access, suitable equipment provided etc.) £ Yes £ No

If No - OC (ECG, Observation Card) Must be completed and inspetion carried out only when the orks are made safe

£ Approved (A) £ Approved with Comments (B) £ Rejected (D)

Inspected by: Designation Date

Project Manager Comments:

Date: Time: Name Signature:…........................

Reference to the approved Testing & commissioning program, the ITRC to be submitted to ECG 24 hours in advance before commencing the activity.

Form No.: 2757-FRM-C021 Revision 0 April 11, 2021 PAGE # 1 OF 1