INSPECTION REQUEST

IR No.: CSCEC-WIR-ARCH-361 Date : 25.10.2022

Project: API-Barsha Residential Tower, Al Barsha First Dubai, UAE

The following elements of work will be available for inspection / witnessing of test on the date and time
mentioned below:

Discipline:
- Civil - Structural `` - Architectural - MEP - Others (Specify)

Description :
Inspection request for Block layout of Apartments 815 as per the attached highlighted
drawing

Location: L08

Drawing / Specification Reference: Attached

DRAWINGS :

Date of Inspection: 26.10.2022 Time of Inspection: 10.30 am

Work to follow:

Inventure Engineer - QA/QC Engineer:

Construction Manager - Safety Engineer:

Inspection Request Received by Engineer on (Date): ……../……../……… Time:…….:…….hrs

Approved Approved with Comments Rejected / Resubmit

Engineer's Comments:
………………………..……………………………………………………………………………………………………………………………………………………………...........................................................................
………………………..……………………………………………………………………………………………………………………………………………………………...........................................................................
………………………..……………………………………………………………………………………………………………………………………………………………...........................................................................
………………………..……………………………………………………………………………………………………………………………………………………………...........................................................................
………………………..……………………………………………………………………………………………………………………………………………………………............................................................................
………………………..……………………………………………………………………………………………………………………………………………………………...........................................................................

………………………..……………………………………………………………………………………………………………………………………………………………...........................................................................

………………………..……………………………………………………………………………………………………………………………………………………………............................................................................

………………………..……………………………………………………………………………………………………………………………………………………………............................................................................

………………………..……………………………………………………………………………………………………………………………………………………………............................................................................

………………………..……………………………………………………………………………………………………………………………………………………………............................................................................

………………………..……………………………………………………………………………………………………………………………………………………………............................................................................

………………………..……………………………………………………………………………………………………………………………………………………………............................................................................

………………………..……………………………………………………………………………………………………………………………………………………………............................................................................

………………………..……………………………………………………………………………………………………………………………………………………………............................................................................

Resident Engineer: ……………………………………………….. Date: ………. / ………. / …………..

Contractor Received by: Signature: Date:

Note: Engineer’s approval does not relieve the contractor from contract obligation and responsibilities.