PT BORNEO ALUMINA INDONESIA
•
1,000,000 TPA (EXPANDABLE) SMELTER GRADE
ALUMINA REFINERY MEMPAWAH PROJECT
CONTRACT NO :
PROJECT CODE:
DOC NO : F08941C-D02-01
CONSULTANT :
CONTRACTOR :
SUB-CONTRACTOR :
DISTRIBUTION ORDER
CONSTRUCTION MANAGER
PROCUREMENT MANAGER
SHE MANAGER
QC MANAGER
PROJECT CODE :
Table of Contents
1. Introduction .............................................................................................................................................. 6
2. Scope ........................................................................................................................................................ 6
3. Reference ..................................................................................................................................................6
3.1 Standards and Code ......................................................................................................................... 6
1. INTRODUCTION
The Project is designed with a capacity of 1,000 ktpa (expandable) located at Bukit Batu
Village, Sungai Kunyit District, Mempawah Regency, West Kalimantan, Indonesia and it will
be dedicated to fulfill the Owner's requirements in operation of an alumina refinery.
2. SCOPE
This document, in conjunction with the EPC contract requirement,design standards and
engineering practices, provides the basis for the electrical engineering design of power plant.
The design criteria defined in this document shall be adhered to during the execution of the
electrical design and shall govern the production and contents of all project deliverables
produced by the electrical discipline.
CAS1969-2G00-31-110-01 shall always takes precedence than this one unless more strigent
requirement is in this criteria or requirement is not defined in CAS1969-2G00-31-110-01 and
not conflict with main contract.
3. REFERENCE
3.1 Standards and Code
This design references but is not limited to the following standards. The latest issues,
amendments, and supplements to these documents shall apply unless otherwise indicated.
IEC 60502(series) Power Cables with Extruded Insulation and their Accessories for
rated Voltages from 1 kV up to 30 kV
IEC 61537 Cable Tray Systems and Cable Ladder Systems for Cable
Management
Abbreviation Definition
LV Low voltage equal or lower than 1,000V but higher than 50V.
PC Power Central
PT Voltage Transformer
CT Current Transformer
LA Lightning Arrester
DG Diesel generator
PROJECT CODE :
4. ENVIRONMENTAL CONDITION
4.1 Indoors
According to CAS1969-2G00-31-110-001_0 section 4.1
4.2 Outdoor
According to CAS1969-2G00-31-110-001_0 section 4.2
5. DESIGN PRINCIPLES
5.1 Power supply
According to CAS1969-2G00-31-110-001_0 section 5.1
For thermal power plant, the control voltage for LV air circuit breaker ( ACB) is DC 220V, and
for other LV breaker control voltage is 220V single phase.
When one of main 10kV bus of the bus failure and out of operation, the load and power circuit
are switched to the standby bus. At this point, in order to ensure the stability of the system,
the coupler breaker between the normal bus and the standby bus is closed, so that all power
supplies run in parallel.
Other 10kV power distribution systems provides power for the 10 / 0.4kV auxiliary
transformer and 10kV motors;
PROJECT CODE :
Each auxiliary system has 2 x 100% transformers or several transformers with one 100%
spare transformer to supply to 0.38kV system; transformer capacity is 120 % calculation
load for dry type transformer.
The MCC power distribution system of power load for continuous production of process
adopts single bus mode, with two power incoming lines;
The UPS system serves as the standby power supply for the communication system, DCS
and PLC cabinet (Include HMI communication interface with UPS).
The protection and control power of high-voltage equipment are supplied by the DC system.
Battery discharge time of control load is calculated according to 8 hours, and power load
such as DC lubricating oil pump motor is calculated according to the unit accident stop time.
6. EQUIPMENT REQUIREMENT
6.1 Dry type transformer
The 10/0.4kV transformer in main building and Electrostatic precipitator system will be dry-
type, AN, indoor type and copper winding, NLTC, and the tap-changer is ± 2×2.5%.
The transformer is insulated with flame retardant resin and poured in vacuum. Case
protection up to IP32.
The Vector group is Dyn11, insulation class is grade F, temperature rise is grade B insulation
assessment. When the transformer is operated with the maximum rated capacity, its
maximum temperature rise shall not exceed 80K.
Impedance
Capacity (design
No Tap-changer (design Use range KKS code
value)
value)
LV Emergency
1 10±2X2.5%/0.4kV 630kVA 4% S0BMT01
system
Unit system and
Electrostatic
2 10±2X2.5%/0.4kV 1000kVA 6% 1/2/30BFT02
precipitator
system
3 10±2X2.5%/0.4kV 1600kVA 8% Station system S0BHT01
The insulation of oil-immersed transformer is insulating oil.The transformer adopts NLTC, and
the tap is ± 2×2.5%
Winding insulation class and temperature rise information of Oil Type Transformer is A class
and 55K(average)
Rated
Impedance
Capacity
No Tap-changer (design Use range KKS code
(design
value)
value)
Water
1 10±2×2.5%/0.4kV 800kVA 6% treatment S0BHT21/22
system
Coal handing
2 10±2×2.5%/0.4kV 1600kVA 8% S0BHT31/32
system
frequency 50 Hz
A complete generator excitation and voltage regulating system will be provided with the
generator. The excitation system shall be static and the excitation system shall meet the
performance requirements of generator.
Rated capacity:315kVA
Phase number:3
Rated Impedance:4%
The generator bus duct system will consist of the following major components:
-Potential Transformer(PT)
-Current Transformer(CT)
6.7 Motor
According to CAS1969-2G00-31-110-001_0 section 6.7
DC power system for protection and control of HV switchgear breakers and DC consumers
and emergency lighting. Batteries will be designed for 8 hours operation after a failure with a
maximum voltage drop of 10% for control load..
DC power system shall include insulation monitoring, voltage regulator (dropped diode), short
circuit, overcurrent protection, and undervoltage alarm functions.
DC power system adopts RS485 communication interface, which can upload the signal to
Electrical Control and Management System (ECMS).
• System rated current does not exceed 630A in principle, Withstand current
50kA/1S(The short circuit level is subject to the final calculation result.);
• The circuit breaker of Distribution cabinet is equipped with manual operation handle;
• Protection grade: IP54(indoor)/IP55(outdoor);
• Cabinet colour: RL7035;
• Floor mounted, cable in and out of cabinet bottom;
6.20 Hazardous area division and corresponding equipment selection
The hazardous area division in coal handing system of power plant is refer to document
F08941C-M02-01 section 8.
The selection of electrical and control device explosion-proof equipment should match
the grade of the explosion-proof area. The selection of explosion-proof grade for
electrical equipment is as follows:
Substance
Area Classification
Classification
Release Source Method of
Ventilation
Description Dust type or Protection
Vert. Hor. Rad
Zone Temperature Zone
(M) (M) .(M)
Class
Ex iD,
IIIC(lignite
lignite powder ),Da,
Coal dust 20 Well Ventilated 20 0 0 0
powder T1
Ex iD,
IIIC(lignite
lignite powder ),Db,
Coal dust 21 Well Ventilated 21 1 1 1
powder T1
Ex iD,
IIIC(lignite
lignite powder ),Dc,
Coal dust 22 Well Ventilated 22 3 3 3
powder T1
PROJECT CODE :
Ex d IIAT3
Leaked fuel oil 2 T3 Well Ventilated 2 1 - 1 Gb
For valve-controlled lead-acid battery room, during normal operation, the battery does
not produce hydrogen.Under abnormal conditions, only a tiny amount of hydrogen is
produced.The fans and lighting fixtures in the battery room are explosion-proof, and the
hydrogen leakage detector is set, which is interlocked with the fans.Once hydrogen
leakage is detected, detector will turn on the fan to drain hydrogen immediately.
8. OPERATIONAL MODES
8.1 General
The power supply of the project shall be supported from the thermal power plant, there is no
external power supply. In order to ensure the production safety, the diesel generator is also
set as the emergency and black start power supply.
During normal operation, all electrical equipment shall be supplied by the steam turbine
generator. When the normal power supply is not available, the emergency power will supply
all the emergency load.
For the electrical power system, the following modes are defined:
2) The main 10kV working bus shall be operated. The standby bus shall not be operated.
The busbar section breaker is open, and the coupler breaker is closed;
3) The two power sources of the 10kV distribution substation in Alumina plant are operated,
and the bus coupler breaker is opened;
4) The two power sources of the 10 / 0.4kV substation are operated, and the bus coupler
breaker is opened;
6) Batteries are in float charging state, and the DC loads are powered by the chargers
connected to system power.
2) When 1 generator is in maintenance mode, the main bus does not shut down, and the
main bus of 10kV in 3 section are still in parallel state;
PROJECT CODE :
3) 10kV distribution substation: when one 10kV incoming power supply needs maintenance,
close the bus coupler breaker and the standby power circuit switch, then disconnect the
working power circuit switch, and the 10kV distribution system is supplied by the another
incoming power;
4) 10 / 0.4kV substation: when one 10 / 0.4kV transformer needs maintenance, close the
bus coupler breaker, disconnect the low-voltage side switch of the working transformer,
and the system is powered by another transformer;
6) Batteries are in float charging state, and the DC loads are supplied by the chargers
connected to system power.
The black start diesel generator will be connected to standby 10kV switchgear which can
supply power to 10kV auxiliary switchgear of any unit in power plant. The blackout
condition occurs when there is no power to restart the unit. The black start diesel
generator will be running and supplying power to all necessary loads for restarting of any
unit.
The black start facility is manual start mode. In the process of starting, with the input of
load in batches, the output of black starting diesel generator is constantly increasing, and
the unit is also started. This process should ensure the stable start of the diesel
generator set. When the unit starts and the power supply is switched to the unit, the
black start diesel generator will be rolled out and complete the black start unit. Diesel
generator will automatically start after manual start initiation.
Diesel generators supply power to emergency load in power plant and alumina plant and
black start of power plant unit. Six diesel generators according to preliminary calculation.
The parameters of diesel generator is as follows:
• Rated power:4X2000kW(for emergency load and black starting of power plant, refer
to F08941C-D03-01 Diesel Generator Sizing Selection)
• Rated power:2X1800kW(for emergency load of alumina plant, refer to F08941C-D03-
01 Diesel Generator Sizing Selection)
• Rated voltage: 10.5kV
• Rated frequency:50Hz
PROJECT CODE :
• The continuous output capacity of the diesel generator set shall be greater than the
maximum starting calculated load.
• When the diesel generator starts the maximum motor with other load, it shall meet
the requirement of overload capacity in a short time.
• When the diesel generator starts with the maximum motor, the bus voltage shall not
be less than 80% of the rated voltage.
9.1 Location
According to CAS1969-2G00-31-110-001_0 section 9.1
Back of panel
Back of panel
Back of panel
between of panel
Type of
Front of panel
Front of panel
Front of panel
side
distribution
passage
operating
operating
maintain
maintain
maintain
F
i Unrestricted 1.5 1.0 1.2 2.0 1.0 1.2 1.5 1.5 2.0 2.0 1.5 1.0 1.0
x
e restricted 1.3 0.8 1.2 1.8 0.8 1.2 1.3 1.3 2.0 1.8 1.3 0.8 0.8
d
D
r Unrestricted 1.8 1.0 1.2 2.3 1.0 1.2 1.8 1.0 2.0 2.3 1.8 1.0 1.0
a
w
-
o restricted 1.6 0.8 1.2 2.1 0.8 1.2 1.6 0.8 2.0 2.1 1.6 0.8 0.8
u
t
Note:
1. When restricted, it means restricted by the building plane and obstacles such as columns in the
passageways.
2. Panel back operation passageway means the passageway behind the panel that is used for
operating the switching equipment .
3. LV cabinet is allowed to be arranged against the wall, leaving a space of more than 200mm.
Each integrated protection measurement and control device of ECMS system has its own
fault recording function, and the generator unit considers to set up independent fault
recording device.
For the process equipment with control interlocking and which needs to be controlled in the
control center room, DCS control system is used to control starting and stopping sequence of
motors according to the process requirements.
For main 10kV distribution system, soft interlock and hard-wired interlock will be provided.
More detailed logic and philosophy information will be provided by ECMS manufacturer.
Incoming line and bus tie breaker of the 10/0.4kV substation system shall be operated by
local manual control (switchgear location )and remote control.
Feeder breakers of 10/0.4kV substation system are operated by local manual control
(switchgear location ) and remote control.
MCC motor circuit breakers are operated by local manual control (MCC location ).
LV distribution board circuit breakers are operated by local manual control (board location ).
10kV unit auxiliary distribution section incoming circuit breakers are set to fast bus transfer
device, 10/0.4 kV substation line incoming circuit breakers are set to ATS, 0.38kV MCC
distribution line incoming switch is set to auto transfer isolation switch.
l Generator protection
l 10kV busbar:
u Differential protection 87
u Instantaneous overcurrent 50
u Time overcurrent 51
l 10 / 0.4kV transformer
l 10kV PT
l 10kV motor
13. LIGHTING
PROJECT CODE :
The determination of lighting types shall comply with the following requirements:
• Normal lighting shall be provided for work and relevant auxiliary places
• Normal lighting shall reach the required lighting level in the utility area, process
area, loading area and auxiliary area according to the lighting level in table 13-2.
• When the normal lighting power fails in the following places, emergency lighting
shall be set:
• The main control room, fire control room, shall be provided with standby lighting;
• Emergency safety lighting shall be set in the following areas:
u Control room, switch room and generator room, power plant boiler room.
u Fire control panel and fire pump surrounding area.
• Exits and passageway, that need ensuring the safe evacuation of people should
be provided with Escape lighting.
Area Lighting
PROJECT CODE :
Area Lighting
Workshop Floodlights,LED
• Dusty places shall adopt lightings with protection grade not lower than IP55;
• In outdoor places, lightings with a protection rating not less than IP65 shall be used;
13.3 Illumination and Quality
Illuminance standard values are shown in the table below. The deviation between design and
standard illuminance values should not less than - 10%.
PROJECT CODE :
Electrical Switchgear
Laboratories
PROJECT CODE :
Road lighting
The illumination of escape lighting shall be no less than 1 Lux in the area below 2 meters
along the route of evacuation center.
Emergency safety lighting shall be no less than 10% of normal illumination and no less than
15 Lux.
Standby lighting is consistent with normal lighting illumination in fire pump house, central
control room.
Laboratory √
Switchgear room √ √
Corridor stairwell √
Street lamp √ √
14. CABLE
14.1 General
PROJECT CODE :
17. ECMS
The ECMS is used for electrical power system data acquisition and system condition
monitoring and control function of electrical devices.
The ECMS shall set control&monitoring cell, fiber-optic cable redundant communication
buses, two computerized operator stations, engineering station, man-machine interfaces
(MMI), printers, gateways modems, etc.
The ECMS and DCS are connected through suitable, fast, reliable and redundant
communication. ECMS monitors and controls all electrical equipment (including generator
and excitation system, high-voltage and part of low-voltage distribution swithgear, diesel
generator and emergency auxiliary power system, DC and UPS system (only for supervising),
excluding motor). DCS only monitors electrical equipment of ECMS system and does not
participate in control operation.
The ECMS shall be engineered and designed as a complete system with an open
architecture (system communications shall be Profibus DP, Modbus TCP, RS-485,
Modbus RTU, Ethernet TCP/IP, IEC 61850 or equal).
The EPC contractor will provide a power supply to the termination point of the Vendor’s
equipment.
The Vendor is responsible for completing all electrical work within his package, including:
• Electrical design.
• Supply produced drawings.
• Software programming.
• Package assembly.
• Guide installation and commissioning.
• Factory unit test and test run.
• Maintenance manual
• Installation, operation and storage manual
• Spare parts list and special tools
• Shipping in one piece wherever possible. Any loose pieces which cannot be mounted
on the equipment must be carefully marked, tagged and boxed with the same
equipment, complete with installation instructions where applicable.
• Supply of technical information including installation instructions, operations manual,
technical manuals.
18.2 Standards and Code
According to document CAS1969-2G00-31-111-001_0 section 3.1.1, 3.1.2 and 3.1.3
Reference drawing/document:
Abbreviation Definition
LV Low voltage equal or lower than 1,000V but higher than 50V.
18.5.13 Conduits
According to document CAS1969-2G00-31-111-001_0 section 6.14.