The Engineer The Employer The Contractor

Project Name: Taiba Sheraton Hotel (Main Works)

JDE: Asset Name: Taiba Sheraton Hotel (Main Works)

Calculation Ref. No.: 5199638-TES-TSH-STRU-CA-606


-0

Originator of Submittal: Muneer PK Date: 21/11/2023

Discipline: Structural Required By Date: 26/11/2023


Is it a revision?: No Programme Start Date: 15/10/2022

Previous Reference: Programme Finish Date: 13/06/2025

Contractor's reference: TS-STH-ACC-MC-CAL-ST-0653-R00

Subject of Submittal: Calculation for Gantry Truss Platform for Link Bridge (Shop Drawing Submittal
Ref: SDS-STH-ACC-MC-SD-ST-273-R01)

Enclosure
Introduction Design/Project Criteria Standards and Spec. reference

Key Plan Design Data & Calculation Conclusion

Others

Contractor's Authorisation: Ahmed Abdelbaky Date: 21/11/2023 05:44:00 PM

ATKINS Engineer's comments:

Primary Review:

Reference Remarks
Comments:

Recommended Approval Code: D - Information,


Record
Reviewed By: Muhammad Khan Date: 27/11/2023 08:29:00 AM
Final Approver Comments:

SHODs/Lead Engineer Comments

Reviewed By: Date:

Client Comments

Reviewed By: Date:

ATKINS Resident Engineer's Comments Status

Site Operations Page 1 of 2


D - Information, Record
Authorised by: Rafeek Muhammedkutty Date : 05/12/2023 03:48:00 PM

Contractor Final Submission

Contractor Signature: Date :

Engineer Final Verification Status

ATKINS Resident Engineer's Final Comments

Authorised By: Date :

Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the contract requirement and
specifications. This check is only for review of general conformance with the design concept of the project and general compliance with the information
given in the contract documents.

Attachments

Site Operations Page 2 of 2


Supervision Consultant: The Employer: Main Works Contractor:

Project: 5199638 - Taiba Sheraton

Ref.No. TS-STH-ACC-MC-CAL-ST-0653-R00
Technical Submittal Rev.No. 00
Date: 21-11-2023
Reqd. By: ATKINS

Calculation for Gantry Truss Platform for Link Bridge (Shop Drawing Submittal
Subject of Submittal:
Ref:SDS-STH-ACC-MC-SD-ST-273-R01)
Enclosure: Pre-Qualification of Subcontractor Method Statement Guarantee Certificate Test Results

Operation & Maintenance Manual Project Quality Plan HSE Plan Calculation Survey Others

Contractor's Sign: Ahmed Abdelbaky Date: 21-11-2023


ATKINS Received Sign: Date:

Ref No 5199638/R11-

ATKINS Engineer's Comments:

Reviewed By: Date:


ATKINS Resident Engineer's Comments:
Code A - Approved

Code B - Approved As Noted

Code BR - Approved As Noted, Resubmit

Code C - Not Approved, Resubmit

Code D - Information, Record

Code E - Incomplete, Resubmit

ATKINS RE Sign: Date:

Ref.No 5199638/R10-

Contractor Received Sign: Date:


Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the contract requirement and
specifications. This check is only for review of general conformance with the design concept of the project and general compliance with the information given in
the contract documents.

SITE OPERATIONS Form No.SQP10/FM/006, Rev 00

ACC Form No. STH-FM-DC-13-R00


Page No: (1 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

CALCULATION SHEET

ACROW GANTRY TRUSS - PLATFORM

Document No.:STH-SACC-LB-CAL-ST-018-00

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (2 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

DESIGN BRIEF

• Heavy Duty Trusses system made out of ACROW soldier UBN 10 have been provided to support the

formwork of deck slab. These beams are supported at ends by 2 beams. Of HEA550 which in turn

supported by series of UC 152x152x30 placed on SHOREBRACE towers.

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (3 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

REGULATIONS AND STANDARDS

1.1.MA 100-C-V1/1
MOMRA Bridges, Tunnels, Culverts and Pedestrian Bridges
Specifications in Urban Areas Construction Specifications

1.2.AASHTO GSBTW-1995
the Guide Design Specifications for Bridge Temporary Works, First Edition (1995)

1.3.AASHTO CHBTW-1995
Construction Handbook for Bridge Temporary Works

Calculated by Eng: .I.H Checked by Eng: M.F.


F
B

E
A

H
D
C

8'
7'
G
41200
5000 2200 5900 3050 3405 4106 4300 4300 8940

TB8.1(400x600) TB8.2(400x600) TB8.3(400x600)

TB7.1(400x700) TB7.2(400x900)

1100

600
1 2
600

1550

451
S2
800

+39.815 m
UP
BEAM AT

(300x600)
2200

TB6(400x600)
3400

LANDING LVL.
2200
TB9(400x600)

600
800
3

800
FIRST FLOOR LEVEL +8.165

800
2200 150 2160 400

TB2(400x700)
8
2200

4500

TB4.1(400x600)
TB11(400x600) TB12(400x800)

800
P os t He ad J ac k So li d- 34 mm (L) 1.5"

TB10(400x600)

4
1200

SPB8(400x915)

J1
2250
2250

TBTOB 40
UP

x6

800
T=200

19( 1.35
T=240

400 m
00)
4500

RC SLAB
PT SLAB
P os t He ad J ac k So li d- 34 mm (L) 1.5"

50

SSL +39.765 m

TB5(400x600)
45

T=200
00

TB4.2(300x400)
TB3.1(300x400)
00
2200

RC SLAB

T=230
45
P os t He ad J ac k So li d- 34 mm (L) 1.5"

4000

4000
2200

PT SLAB
TB1(300x600)
00
1500

SSL +39.765 m
5
TB13(400x600) TB14(400x400)

800
TOB 40.135m
14
50

T=200
1500 350 1500
TB15(400x400)

25
RC SLAB

0
4500
27500
P os t He ad J ac k So li d- 34 mm (L) 1.5"
80 600
0

TB18(250x400)

TB3.2(250x400)
1500

H1
451
S1

1048
1549
6
TB16(300x450)

22
00
2200
800 3000

6000
6000
800
800

Calculated by Eng: .I.H


1500

4500
Channel Spl i c e , L= 100 cm (Single)

50

2630
Technical Sector

00

2200
2200
2200
7
Design Management

G1
P os t He ad J ac k So li d- 34 mm (L) 1.5" U -H ea d Ja ck S ol id -3 4m m, W=1 8 Cm , 2" ,6mm

640
1500

2
T=230
901

TB20(250x965
BRB1

PT SLAB
.1

Cross_Brace_1.20_m-E
Telescopic Frame
(800

Shore Brace Frame (H)


Shore Brace Frame (H)

SSL +39.765 m
x910

5000
16557

CHANGE IN SLAB THICKNESS


BRB1.(2800x9 PT BEAM(1000x450) U -H ea d Ja ck S ol id -3 4m m, W=1 8 Cm , 2" ,6mm
10) P os t He ad J ac k So li d- 34 mm (L) 1.5"
BRB1.3(800x910) BRB1.4(800x910)

C.B 0.9

C.B 0.9
1200405

C.B 0.9
C.B 0.9
C.B 0.9
C.B 0.9
2730 3480 3480 3480 3480

8
3480 3480 3480 3480 2730

1500
Channel Spl i c e , L= 100 cm (Single)

F1
3480 3480 3480 3480
2730
3480 3480 3480 3480
2730

2730 3480 3480 3480 3480


3480 3480 3480 3480 2730

5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
2730 3480 3480 3480 3480 2730
3480 3480 3480 3480

1500
2730

E1
3480 3480 3480 3480 2730
3480 3480 3480 3480
PROJECT: TAIBAH MADINAH SHERATON

3500
3480 3230 3230 3230 3230 2730
3480

Soldier
,L=1.5
2980 0m
2980 2980 2980

C.B 1.20 C.B 1.20 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60

C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20
3480 3230 3230 3230 3230 2730
3480
1500
C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 2980 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20
2980 C.B 1.20 C.B 1.20 C.B 1.20 1.20
C.B2980 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 2980 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20

D1
C.B 1.20 C.B 1.20 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60

3480 3230 3230 3230 2730


3480

2980 2980 2980


1714
Soldier
,L=1.5
0m

857 1704 100


3480 3230 3230 3230
6400
Channel Spl i c e , L= 100 cm (Single)
3230
3480 2730

2980 2980 2980 2980


1114
Soldier
,L=1.5
0m
1500

3480 3230 3230 3230 3230


3480 2730

2980 2980 2980 2980


Channel Spl i c e , L= 100 cm (Single)

2243 1714 1714 1714 1714 1714 1714 1714 1714 1714 1714 1714 1714 1714 1714
Soldier
3480 3230 3230 ,L=1.5
0m
3230 3230

RE
3480 2730

2980 2980 2980 2980

3500
3480 3230 3230 3230 3230 Soldier
,L=1.5
0m
3480 2730
1500

2980

FER TO
2980 2980 2980
B B
3480

32702

32184
3230 3230 3230 3230
3480 2730
Soldier
,L=1.5
0m

BRID
2980 2980 2980 2980

3480
3230 3230 3230 3230
3480 2730

Soldier
,L=1.5
0m

2980 2980 2980 2980

GE DR
1500
32000

14750
16800

3480 3230 3230 3230 3230


3480 2730
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY)

2980 2980
Sol di er , L=6.00 m

2980 2980

AWIN
Soldier

FORMWORK PLAN
,L=1.5
0m

G
3480 3230 3230
962 3230 3230
3480 2730

1
2980

900
2980 2980 2980
Soldier
,L=1.5
0m

3480 3230 3230 3230 3230


3480 2730
1500

2980
3500

1200 1200 1200 1200 1200 1200 1200 1200 2980


1200 1200 1200 1200 1200 2980 1200 1200 1200 1200 2980 1200 1200 1200 1200
1200 1200 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600
C.B 1.20 C.B 1.20 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60

C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20

TYPICAL SECTION A-A


C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20
C.B 1.20 C.B 1.20 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60

3480
Channel Spl i c e , L= 100 cm (Single)

3230 3230 Soldier


3230 3230 ,L=1.5
0m
BRIDGE FOR FLOOR N0.11

3480 2730
MAX LOAD APPLIED =1.5t/m2

2980 2980 2980 2980


2730 3230 3230 3230 3230 3230
3230 3230 3230 3230
1500
Channel Spl i c e , L= 100 cm (Single)

2730 3230 3230 3230 3230 3230


3230 3230 3230 3230

19
2730 3230 3230 3230 3230 3230
3230 3230 3230 3230

3
901

5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
2730 3230 3230 3230 3230 3230
3230 3230
1500

3230 3230

2730
3230 3230 3230 3230 3230
3230 3230 3230 3230
3500

C.B 0.9
C.B 0.9
HEA 550

BRB51.2(800x910) BRB51.3(800x910) BRB51.4(800x910)


BRB5
1.1800

A
PT BEAM(1000x450)
GANTRY -TRUSS

1500

20
( x91
0)

4900
Sol di er , L=6.00 m
General Layout

UC 152 X152 X30

4700

50

50

50
P os t He ad J ac k So li d- 34 mm (L) 1.5" U -H ea d Ja ck S ol id -3 4m m, W=1 8 Cm , 2" ,6mm
10
16538
1500

2770 600

1800
2200
2200
2200
Cross_Brace_1.20_m-E
Telescopic Frame

Shore Brace Frame (H)


Shore Brace Frame (H)

450
540
CALCULATION SHEET

Checked by Eng: M.F.


4461200

4500

115 685 400 400


P os t He ad J ac k So li d- 34 mm (L) 1.5" U -H ea d Ja ck S ol id -3 4m m, W=1 8 Cm , 2" ,6mm

TB68(400x515) TB69(400x515) TB70(400x515)

300
1500

11
50
00
Channel Spl i c e , L= 100 cm (Single)

1600
3000

750

TB52(250x400)
TB51(250x400)
6000
6000

4500
2630

170 2100
400 1410 2200
1500

400
12

P os t He ad J ac k So li d- 34 mm (L) 1.5"

745 100
TB59(300x400)

452
S6
400

TB58(300x600)

T=230
PT SLAB
SPB83(400x915)

SSL +39.765 m
4500
32000
1500

T=230
PT SLAB
T=240
PT SLAB

T=200
SSL +39.765 m

RC SLAB
SPB79(400x915)

400
45

P os t He ad J ac k So li d- 34 mm (L) 1.5"

TB56(400x400)
TB65(300x400)
00
45

50

13
4000
4000

00

00

P os t He ad J ac k So li d- 34 mm (L) 1.5"

400
2200
170
T=200
1500

RC SLAB
PROJECT NO. S-6126

SSL +39.765 m
2250
2250

TB53(300x600)
4500

1410 2200
400

P os t He ad J ac k So li d- 34 mm (L) 1.5"

TB61(400x600)
14

TOB +40.135m SPB84(400x915)


1200

TOB +40.135m
TB57(400x600)
400
1500 350 1500 700
9

TB62(300x600)
4500

TOB +40.135m

2180 2020 450540

400
1050

TOB +40.135m
TB63.1(400x600) TB63.2(400x600)
15

TOB +40.135m

TOB +40.135m

50 725
2200 TB55.1(400x600) TOB +40.135m

400
170 720 500
550 100

TB54.1(300x600)452
S7
250

865535
Rev. No: ( 02 )

3500

340 1210

8065
255
1200

TB64.1(400x1000) TB64.5(400x800)
TB71(250x400)

TB72(250x400)

TB54.2(300x600)

TB55.2(400x600)
1100

TB64.3(400x600) TB64.4(400x600)
16 17

1200 830
Page No: (4 / 60 )

Date: 20/11/2023

31200
5161 4200 4300 4300 4300 8940
F'
E'
B'
A'

D'
C'

G'
FIRST FLOOR LEVEL +8.165
Page No: (5 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Materials Technical Data

1.Soldier U100:

•Material: St 44
•Wt/m’ = 22.00 kg
•Aweb = 12.00 cm2
•I = 412 .00 cm4
•Z = 82.40 cm3
•Max allowable deflection in soldier = L/360
•Allowable bending stress in steel (Fall) = 1.595 t/cm2
•Allowable bending moment (Mall) = Fall x Z=1.595x82.40 =131.4 cm.t = 13.10 kN.m
•Allowable Shear stress in steel (Fall) = 0.35Fy = 0.35x2.40 = 0.84 t/cm2
•Allowable shear in steel (Qall) = Fall x Aweb = 0.84x12 = 10.08 t = 100.80 Kn
• (E) for steel =2100 t/cm2

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (6 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Y
b w1 w w1

c
r1 d

BROAD FLANGE I - BEAMS

h-2c
h
X X
( H.E.A. ) s

c
t
Y

Dimensions Axis X-X Axis Y-Y Details Surface Area


Sec. Weight Area Aweb
h b s t r1 c h-2c Ix Sx rx Iy Sy ry w w1 dmax Um Ut
No.
kg/m` cm 2 cm 2 mm mm mm mm mm mm mm cm 4 cm 3 cm cm 4 cm 3 cm mm mm mm x10-2 m 2/m \ m 2/t
100 16.7 21.2 4.00 96 100 5.0 8.0 12 20 56 349 73 4.06 134 26.8 2.51 56 N.A. M12 56.10 33.60
120 19.9 25.3 4.90 114 120 5.0 8.0 12 20 74 606 106 4.89 231 38.5 3.02 66 N.A. M16 67.70 34.00
140 24.7 31.4 6.38 133 140 5.5 8.5 12 21 91 1030 155 5.73 389 55.6 3.52 76 N.A. M20 79.40 32.10
160 30.4 38.8 8.04 152 160 6.0 9.0 15 24 104 1670 220 6.57 616 76.9 3.98 86 N.A. M20 90.60 29.80
180 35.5 45.3 9.12 171 180 6.0 9.5 15 25 121 2510 294 7.45 925 103 4.52 100 N.A. M24 102.00 28.70
200 42.3 53.8 11.05 190 200 6.5 10.0 18 28 134 3690 389 8.28 1340 134 4.98 110 N.A. M24 114.00 26.90
220 50.5 64.3 13.16 210 220 7.0 11.0 18 29 152 5410 515 9.17 1950 178 5.51 120 N.A. M24 126.00 24.90
240 60.3 76.8 15.45 230 240 7.5 12.0 21 33 164 7760 675 10.10 2770 231 6.00 90 40 M24 137.00 22.70
260 68.2 86.8 16.88 250 260 7.5 12.5 24 37 176 10450 836 11.00 3670 282 6.50 95 40 M24 148.00 21.70
280 76.4 97.3 19.52 270 280 8.0 13.0 24 37 196 13670 1010 11.90 4760 340 7.00 110 40 M24 160.00 21.00
300 88.3 113 22.27 290 300 8.5 14.0 27 41 208 18260 1260 12.70 6310 421 7.49 120 50 M27 172.00 19.50
320 97.6 124 25.11 310 300 9.0 15.5 27 43 224 22930 1480 13.60 6990 466 7.49 120 50 M27 176.00 18.00
340 105 133 28.22 330 300 9.5 16.5 27 44 242 27690 1680 14.40 7440 496 7.46 120 50 M27 179.00 17.10
360 112 143 31.50 350 300 10.0 17.5 27 45 260 33090 1890 15.20 7890 526 7.43 120 50 M27 183.00 16.40
400 125 159 38.72 390 300 11.0 19.0 27 46 298 45070 2310 16.80 8560 571 7.34 120 50 M27 191.00 15.30
450 140 178 45.77 440 300 11.5 21.0 27 48 344 63720 2900 18.90 9470 631 7.29 120 50 M27 201.00 14.40
500 155 198 53.28 490 300 12.0 23.0 27 50 390 86970 3550 21.00 10370 691 7.24 120 50 M27 211.00 13.60
550 166 212 61.50 540 300 12.5 24.0 27 51 438 111900 4150 23.00 10820 721 7.15 120 50 M27 221.00 13.30
600 178 226 70.20 590 300 13.0 25.0 27 52 486 141200 4790 25.00 11270 751 7.05 120 50 M27 231.00 13.00
650 190 242 79.38 640 300 13.5 26.0 27 53 534 175200 5470 26.90 11720 782 6.97 120 50 M27 241.00 12.70
700 204 260 92.22 690 300 14.5 27.0 27 54 582 215300 6240 28.80 12180 812 6.84 120 50 M27 250.00 12.30
800 224 286 110.10 790 300 15.0 28.0 30 58 674 303400 7680 32.60 12640 843 6.65 120 50 M27 270.00 12.00
900 252 321 132.80 890 300 16.0 30.0 30 60 770 422100 9480 36.30 13550 903 6.50 120 50 M27 290.00 11.50
1000 272 347 153.12 990 300 16.5 31.0 30 61 868 553800 11190 40.00 14000 934 6.35 120 50 M27 310.00 11.40
N.A. =not available for this HEA size

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (7 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

3. UC 152X152X30
UC 152X152X30 BS 4-1:1993 (Tables attached)

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (8 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

4. Shore brace Frame: (SEE ATTACHED TEST)

- Shore Brace Frame:


According to DIN 17100
• Allowable load on frame = 108.8 kn
• Allowable load on leg = 54.88 kn
• Ultimate load on frame = 24.75 ton
• Ultimate load on leg =12.375ton
• Steel grade st37
• Yield stress (fy)=2.4 t/cm2

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (9 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (10 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Trusses Finite Element Model


1-Defined Material

Steel (S235):-

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (11 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Steel (S275):-

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (12 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

2-Defined Sections

1- SOLDIER ][ 10 FOR UPPER, LOWER CHORDS, DIAGONALS


& TRANSVERCE SOLDIERS:-

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (13 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

2-Tube 1.5''x 2.5”MM:-

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (14 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

3-Bracing Angle:-

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (15 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

3-Bracing Angle:-

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (16 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

3-Defined Loads

The applied loads are from:-


Max. Load Applied = 1.50 t/m2.
Load Patterns:-

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (17 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

1-Loads from Client:-


Max. Load Applied = 1.50 t/m2.
Distance between Trusses = 1.714 m.
Loaded Width =1.714/2=0.857 m.
W`=1.50 x 0.857=1.30 t/m`.
DISTRUBUTED LIVE LOAD = working area load + formwork self-weight
= 0.15 + 0.05= 0.20 t/m2
Ws = 0.20 x 0.857 = 0.174 t/m`. 857
1714

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (18 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

4- Trusses Finite Element Model

3D View for Truss Unit

Applied Loads on Gantry

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (19 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

6- Trusses Finite Element Model Checks

Steel Interaction Ratios (BS5950-2000)

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (20 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126
1-SAP STEEL CHECK ON MOST CRITICAL MEMBER IN UPPER CHORD:-

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (21 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126
2-SAP STEEL CHECK ON MOST CRITICAL MEMBER IN LOWER CHORD: -

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (22 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126
3-SAP STEEL CHECK ON MOST CRITICAL DIAGONAL LOAD: -

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (23 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126
4-SAP STEEL CHECK ON MOST CRITICAL VERTICAL TUBE:-

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (24 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

 Check For deflection:

TABLE: Joint Displacements


Joint OutputCase CaseType U1 U2 U3
Text Text Text m m m
716 COMB1 Combination -0.000384986 -5.5214E-06 -0.00338553
717 COMB1 Combination 0.002689965 1.61741E-05 -0.003474272
718 COMB1 Combination -0.000561005 -3.63107E-06 -0.00671156
719 COMB1 Combination 0.002404883 4.00612E-05 -0.006783978
720 COMB1 Combination -0.000566937 4.27764E-06 -0.00964233
721 COMB1 Combination 0.001952019 5.75709E-05 -0.00971601
722 COMB1 Combination -0.000445179 8.12446E-06 -0.011919098
723 COMB1 Combination 0.001373233 6.88638E-05 -0.011992889
724 COMB1 Combination -0.000240484 9.90858E-06 -0.013358579
725 COMB1 Combination 0.000710413 7.34224E-05 -0.013432583
726 COMB1 Combination 9.54585E-06 9.7923E-06 -0.013849584
727 COMB1 Combination 5.41224E-06 7.11395E-05 -0.013923744
Max. Displacement (m) 0.002787384 0.000148767 0.013923744
Max. Displacement (mm) 2.787383539 0.148767108 13.92374433

− max =13.923 mm @ JOINT 727 < (46.67 mm) (16800/360=46.67 mm)


SAFE From sap calculation

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (25 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Check of Connections

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (26 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

1- Check of bolt M16x100 mm (8.8):-


A- Check of Shear strength of bolts:-
TABLE: Element Forces - Frames
Frame Station OutputCase CaseType P
Text mm Text Text N
1351 5440.036667 COMB1 Combination -211292.2616
1351 5440.036667 COMB1 Combination -211292.2616
1351 5554.307978 COMB1 Combination -211292.2616
1351 5554.307978 COMB1 Combination -205066.8579
1351 5840.011667 COMB1 Combination -205066.8579
1351 8640.011667 COMB1 Combination -270479.4565
1351 8925.539529 COMB1 Combination -270479.4565
1351 8925.539529 COMB1 Combination -278780.4908
1351 9039.986667 COMB1 Combination -278780.4908
1351 9039.986667 COMB1 Combination -278780.4908
1351 9340.023334 COMB1 Combination -278780.4908
1351 9340.023334 COMB1 Combination -287200.3472
1351 9640.036667 COMB1 Combination -287200.3472
1351 9640.036667 COMB1 Combination -287200.3473
1351 9754.307978 COMB1 Combination -287200.3473
1351 9754.307978 COMB1 Combination -278709.4187
1351 10040.01167 COMB1 Combination -278709.4187
1351 10040.01167 COMB1 Combination -278709.4376
1351 10325.53953 COMB1 Combination -278709.4376
1351 10325.53953 COMB1 Combination -287256.2138
Max. Axial Force (N) 287256.2138
Max. Axial Force (Kn) 287.2562138
Max. Axial Force (t) 28.72562138

• Max Force P = 287.25 KN

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (27 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Channel Splice , L=100 cm (Single)

1000
• Max force / Rivet = (287.25 /5)
= 57.45KN < 70 KN. SAFE

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (28 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

2- Check of upper guest plate :-


a. Check of Bearing Capacity of upper guest plate:-

100 100

32
8

140
347

418
344
? 17
.50
100
100

87

300
25

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (29 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

• compression force on Diagonal Member Pt = -122.278KN


• Max compression. force due to one Rivet Pin PRivet = Pt / (3 Rivet)
=- 40.76KN <70 KN SAFE

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (30 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

3- Check of Lower guest plate :-


a. Check of Bearing Capacity of lower guest plate :-

300

36
167
81

100
? 17.50

100
416

344

347
140

100 100
250

• Max compresion force on Diagonal Member Pt = 122.278KN


• Max copmresion force due to one Rivet Privet = Pt / (3 rivet) = 40.76 KN
<70 KN SAFE

(Diagonal Chord due to Load Combination 1)

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (31 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

4- Check of Channel Splice: -


a. Check of Bearing Capacity of Channel Splice: -
900

? 17

82
8
8

8
50 100 100 100 100 100 100 100 100 100 50
1000
• Max Tension force on Lower Chord Member Pt = 287.25 KN
• Max Tension force due to one bolt Pbolt = Pt / (1 bolts+4 Rivet) = 57.45 KN
<70 KN SAFE

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (32 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Check of UB 533X210X109

Loads from trusses ( REACTION FROM TRUSSES)

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (33 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

APPLIED LOADS FOR BEAM HEA550:

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (34 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Steel Design Sections (BS5950-2000)

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (35 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

-CHECK FOR DEFLECTION

 Check For Deflection:


max =1.447 mm < (3.33 mm) (600/180=3.33 mm) SAFE From sap calculation

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (36 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Check of UC152 X 152 X30

UC 152X152X30 BS 4-1:1993 (Tables attached)

Steel Design Sections (BS5950-2000)

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (37 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126
SAP STEEL CHECK OF UC 152X152X30

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (38 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

 Check For Deflection:


max =1.418mm < (3.33 mm) (1200/360=3.33 mm) SAFE From sap calculation

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (39 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Check of SHOREBRACE

MAX LOAD ON SHORE BRACE LEG = 52.71 KN < 54.00 KN SAFE

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (40 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126
1800

Check of Soldier ][100


107

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1200 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600

127
HEA 500 L=12000
275

Ring_Lock_Ledger_L_0.60_m_(Galv.)-E Ring_Lock_Ledger_L_0.60_m_(Galv.)-E

900 600 600 600 600 600 600 600 600 600 600 600 600
1 1

L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60


Ring Lock Vertical , L=1.50 m (E)

Ring Lock Vertical , L=1.50 m (E)

Ring Lock Vertical , L=1.50 m (E)

Ring Lock Vertical , L=1.50 m (E)


1 1 1 1 1 1 1 1 1

1800
Cross_Brace_0.90_m-E Cross_Brace_1.20_m-E Cross_Brace_1.20_m-E Cross_Brace_1.20_m-E Cross_Brace_1.20_m-E Cross_Brace_1.20_m-E

Load on Soldier ][100 L=1.50 m


1 1 1 1 1 1 1 1 1 1

Design Ratio :

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (41 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Check of I BEAM # 550 (First Layer)

Load on I Beam # 500 L= 12.00 m

Design Ratio :

Reaction :

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (42 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Check of UC 152 X152 X30 (First Layer)

For Shorebrace Towers :


Max. Reaction = 53.93 KN

Load on UC 152 X152 X 30 for shorebrace Towers

Design Ratio :

Reaction :

Max. Reaction on Shorebrace Tower = 53.93 Kn < 54.00 KN (Safe)

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (43 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

For Ringlock Towers :


Max. Reaction = 258.46 KN

Load on I Beam 01 UC 152 X152 X 30 for Ringlock Towers :

Reaction :

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (44 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Load on I Beam 02 UC 152 X152 X 30 for Ringlock Towers :

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (45 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Reactions :

Max. Reaction = 70.38 KN < 100 KN ( Safe)

Allowable Load on Ringlock Vertical = 100 KNS

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (46 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (47 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (48 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

SHORING AROUND TRUSS


USING PD8 SYSTEM

REGULATIONS AND STANDARDS

BS 1139-1.1:1990, Metal scaffolding – Part 1: Tubes – Section 1.1: Specification for steel tube.

BS 1139-2.1:1991, Metal scaffolding – Part 2: Couplers – Section 2.1: Specification for steel
couplers, loose spigots and base-plates for use in working scaffolds and false work made of steel
tubes.

BS 1139-2.2:1991, Metal scaffolding – Part 2: Couplers – Section 2.2: Specification for steel and
aluminum couplers, fittings and accessories for use in tubular scaffolding...

BS 5268-2:1991, Structural use of timber – Part 2: Code of practice for permissible stress design,
materials and workmanship.

BS 5507-1: 1977, Methods of test for false work equipment – Part 1: Floor centers.

BS 5507-3: 1982, Methods of test for false work equipment – Part 3: Props.

BS 5973: 1993, Code of practice for access and working scaffolds and special scaffold structures
in steel.

BS 5975: 1996, Formwork for concrete.

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (49 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

FORMWORK MATERIALS TECHNICAL DATA


(1) Cladding Timber 1”x4”:
A = 10 (2.5) = 25 cm2
I = 10 (2.5) 3/12 = 13.02 cm4
Z = 10 (2.5) 2/6 = 10.42 cm3
•Max allowable deflection in sheeting = (L/360)
•Allowable bending stress in plywood (Fall) = 85 kg/cm2
•(E) = 85 t/cm2

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (50 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

(2) SOLDIER U100:


•Material: St 44
•Wt/m’ = 22.00 kg
•Aweb = 12.00 cm2
•I = 412 .00 cm4
•Z = 82.40 cm3
•Max allowable deflection in soldier = L/360
•Allowable bending stress in steel (Fall) = 1.595 t/cm2
•Allowable bending moment (Mall) = Fall x Z=1.595x82.40 =131.4 cm.t = 13.10 kN.m
•Allowable Shear stress in steel (Fall) = 0.35Fy = 0.35x2.40 = 0.84 t/cm2
•Allowable shear in steel (Qall) = Fall x Aweb = 0.84x12 = 10.08 t = 100.80 Kn
• (E) for steel =2100 t/cm2

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (51 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

(3) PD 8:

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (52 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

CHECK FORMWORK ELEMENTS FOR PLATFORM


9

1500 1500 1500 1500 1500 1500 1200 FIRST FLOOR LEVEL +8.16
C ha nn el Splice , L= 10 0 cm (Sing le) C ha nn el Splice , L= 10 0 cm (Sing le)

Soldier , L =6 .0 0m

4000
Soldie

Soldie

Soldie

Soldie
50m

50m

50m

50m
r,L=1.

r,L=1.

r,L=1.

r,L=1.
r,L=1.

r,L=1.

r,L=1.

r,L=1.
50m

50m

50m

50m
Soldie

Soldie

Soldie

Soldie

540
45
Soldier , L =6 .0 0m
00

HEA 550
6000 2250
UC 152 X152 X30
U -H ead J ac k Solid-34mm, W= 18 C m ,2",6mm

U -H ead J ac k Solid-34mm, W= 18 C m ,2",6mm

Telescopic Frame

Cross_Brace_1.20_m-E

50

8065
00 00
45

6000
Shore Brace Frame (H)
2250

50
00
3000

Shore Brace Frame (H)


Pos t H ead J ac k Solid-34mm (L) 1.5"
Pos t H ead J ac k Solid-34mm (L) 1.5"

4000
Pos t H ead J ac k Solid-34mm (L) 1.5"

Pos t H ead J ac k Solid-34mm (L) 1.5"

Pos t H ead J ac k Solid-34mm (L) 1.5"

Pos t H ead J ac k Solid-34mm (L) 1.5"

4461200 2630 1500 350 1500 700

Formwork Section

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (53 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Design Loads
1) Live Load: -
Live Load = 1.50 kn/m2 BS5975 Page 26

Live Load = 2.0 kn/m2 (including impact load & o.w. of formwork)
-Concrete Density

BS 5975:2008 page.58
-Working Area loads

BS 5975:1996 page.22

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (54 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

FORMWORK AGUIDE TO AGOOD PRATICE, page94

- Soffit Formwork (SELF WEIGHT)

FORMWORK AGUIDE TO AGOOD PRATICE, page94

BS 5975:2008 page.59
DISTRUBUTED LIVE LOAD = working area load + formwork self-weight
= 0.15 + 0.05= 0.20 t/m2

- Ws = LL = 2.00 Kn/m2

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (55 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

CHECK ELEMENTS
(1) Cladding Timber 1”x4”:
* Max. Spacing between Secondary Beams = 1.50 m
* WPLYWOOD = 2.00 x 0.1 = 0.20 Kn/m2

• Check for Moment:


M = WL2/10
= 0.20 x (1.50)2 / 10 = 0.045 Kn.m
Z = M/F
= 0.045x100 / 0.85 = 5.294 m3 < 10.42 m3
• Check for Deflection:
∆ = 0.0068 WL4/EI
= (0.0068 x 0.20 x (150)4)/ (100x85x13.02)
= 6.22 mm

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (56 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

(2) SECONDARY DECKING Soldier ][100:


- Max. Loaded Withd of Sec. Soldiers = 1.50 m
• WBeam = Ws X Beam spacing = 2.00 X 1.50 = 3.00 KN/m’

Maximum loads & deflections from attached Program Results:


• Check for Moment:
Max. Moment for attached Program = 1.42 Kn.m < 13.10 Kn.m SAFE
• Check for Shear:
Max. Shear for attached Program = 3.40 Kn < 100.80 Kn SAFE
• Check for deflection:
Max. Deflection for attached Program = 0.67 mm < 5.55 mm SAFE
(L/360= 2000/360= 5.55 mm)

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (57 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

430
1

2730 5
2000
300

5
1

Program summary:

Calculated by Eng: .I.H Checked by Eng: M.F.


Page No: (58 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126
A.CM2 I.CM4 Z.CM3 Δall.CM Fall Kg\Cm2 Qall.t E .T\Cm2 Mall.T.M
Solider ][10 12 412 82.4 0.3 1390 10.08 2060 1.314

LOAD DIAGRAM UNIT IN KN


FORCE/DISPLACEMENTS DIAGRAMS DUE TO STATIC LOAD CASE: DC
3.5 3 3
3
2.5
2

LOAD
1.5
1
0.5 Rollers, 0.3 Rollers, 2.3
0
-0.5 0 0.5 1 1.5 2 2.5 3
-1
SPACING (M)
(3)
Shear Diagram (kn) 4.0

2.9 3.0 MAIN


2.0
Shear (kn) Shear, kN X, m
1.0 Max = 2.9 0.30001
0.0 Min = -3.1 2.3
0 0.5 1 1.5 2 2.5 3
-1.0

-2.0

-3.1 -3.0

-4.0
Spacing (m)

Moment Diagram (kn.m)


-0.28 -0.40
Spacing (m)
0 0.5 1 1.5 2 2.5 3 -0.20 Moment, kN*m X, m
0.00 Max = 1.29 1.3
Moment (kn.m)

0.20 Min = -0.28 2.30001


0.40
0.60
0.80
1.00
1.20
1.29
1.40

Deflection Diagram (mm)


0.60

0.38 0.40
D eflection (mm)

0.20 Deflections, mm X, m
Max = 0.38 2.73
0.00
0 0.5 1 1.5 2 2.5 3 Min = -0.61 1.3
-0.20

-0.40

-0.61 -0.60

-0.80
Spacing (m)

DECKING Soldier ][100 :


Calculated by Eng: .I.H Checked by Eng: M.F.
Page No: (59 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

- Max. Span of Main Decking = 2.00 m.


- Loaded width by one Beam = 2.443 m
• W = Ws X Alu Beam spacing = 2.00 X 2.443 = 4.886 KN/m’

1500 2443 925 925 1687


1 1 1 1 1

Channel Splice , L=100 cm (Single)

1
1 1
1 1
1 1
1

4000
m
.50
, L=1
ier
Sold

Maximum loads & deflections from attached Program Results:


• Max Bending Moment = 1.36 KN.m < 13.100
540
45
00 KN.m Safe
• Max. Shear force = 3.60 KN < 100.80 KN Safe
• Allowable deflection = L/180 =745/180 = 4.138 mm
• Max deflection = 0.61mm < 4.138 mm Safe
• Max. Load on one Leg = Max Reaction from Main Decking .
= 6.72 KN < 73.00 KN Safe
BLOCKNAME FACTOR
745

BLOCKNAME FACTOR

3
2730

2730

2730
1250

BLOCKNAME FACTOR
901
735

BLOCKNAME FACTOR

Calculated by Eng: .I.H Checked by Eng: M.F.


BLOCKNAME FACTOR
Page No: (60 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126

Program Solider ][10


A.CM2
12
I.CM4
412
Z.CM3
82.4
Δall.CM Fall Kg\Cm2
0.3 1390
Qall.t
10.08
E .T\Cm2
2060
Mall.T.M
1.314
summary

LOAD DIAGRAM UNIT IN KN


FORCE/DISPLACEMENTS DIAGRAMS DUE TO STATIC LOAD CASE: DC
6
4.886 4.886
5
4

LOAD
3
2
1
Rollers, 0.735 Rollers, 1.985
0
0 0.5 1 1.5 2 2.5 3
-1
-2
SPACING (M)

Shear Diagram (kn) 5.0


4.0
3.6
3.0
Shear, kN X, m
2.0

Shear (kn)
Max = 3.6 1.98501
1.0
Min = -3.6 0.735
0.0
0 0.5 1 1.5 2 2.5 3 -1.0

-2.0
-3.0
-3.6
-4.0
Spacing (m)

Moment Diagram (kn.m)


-1.60
Spacing (m) -1.36
-1.40 Moment, kN*m X, m
-1.20 Max = 0.00 0
Moment (kn.m)

-1.00 Min = -1.36 1.985

-0.80

-0.60

-0.40

-0.20
0 0.5 1 1.5 2 2.5 3
0.00 0.00

Deflection Diagram (mm)


0.20
0.12 0.10
0.00
Deflection (mm)

0 0.5 1 1.5 2 2.5 3 Deflections, mm X, m


-0.10
Max = 0.12 1.36
-0.20
Min = -0.61 2.73
-0.30
-0.40
-0.50

-0.61 -0.60
-0.70
Spacing (m)

Reaction Diagram (kn)


8
7
6.72
Reactions, kN X, m
6
Reaction (kn)

Max = 6.72 1.985


5
Min = 0.00 0
4
ΣR = 13.34
3
2
1

0.00 0
0 0.5 1 1.5 2 2.5 3
Spacing (m)

Calculated by Eng: .I.H Checked by Eng: M.F.