Subject of Submittal: Calculation for Gantry Truss Platform for Link Bridge (Shop Drawing Submittal
Ref: SDS-STH-ACC-MC-SD-ST-273-R01)
Enclosure
Introduction Design/Project Criteria Standards and Spec. reference
Others
Primary Review:
Reference Remarks
Comments:
Client Comments
Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the contract requirement and
specifications. This check is only for review of general conformance with the design concept of the project and general compliance with the information
given in the contract documents.
Attachments
Ref.No. TS-STH-ACC-MC-CAL-ST-0653-R00
Technical Submittal Rev.No. 00
Date: 21-11-2023
Reqd. By: ATKINS
Calculation for Gantry Truss Platform for Link Bridge (Shop Drawing Submittal
Subject of Submittal:
Ref:SDS-STH-ACC-MC-SD-ST-273-R01)
Enclosure: Pre-Qualification of Subcontractor Method Statement Guarantee Certificate Test Results
Operation & Maintenance Manual Project Quality Plan HSE Plan Calculation Survey Others
Ref No 5199638/R11-
Ref.No 5199638/R10-
CALCULATION SHEET
Document No.:STH-SACC-LB-CAL-ST-018-00
DESIGN BRIEF
• Heavy Duty Trusses system made out of ACROW soldier UBN 10 have been provided to support the
formwork of deck slab. These beams are supported at ends by 2 beams. Of HEA550 which in turn
1.1.MA 100-C-V1/1
MOMRA Bridges, Tunnels, Culverts and Pedestrian Bridges
Specifications in Urban Areas Construction Specifications
1.2.AASHTO GSBTW-1995
the Guide Design Specifications for Bridge Temporary Works, First Edition (1995)
1.3.AASHTO CHBTW-1995
Construction Handbook for Bridge Temporary Works
E
A
H
D
C
8'
7'
G
41200
5000 2200 5900 3050 3405 4106 4300 4300 8940
TB7.1(400x700) TB7.2(400x900)
1100
600
1 2
600
1550
451
S2
800
+39.815 m
UP
BEAM AT
(300x600)
2200
TB6(400x600)
3400
LANDING LVL.
2200
TB9(400x600)
600
800
3
800
FIRST FLOOR LEVEL +8.165
800
2200 150 2160 400
TB2(400x700)
8
2200
4500
TB4.1(400x600)
TB11(400x600) TB12(400x800)
800
P os t He ad J ac k So li d- 34 mm (L) 1.5"
TB10(400x600)
4
1200
SPB8(400x915)
J1
2250
2250
TBTOB 40
UP
x6
800
T=200
19( 1.35
T=240
400 m
00)
4500
RC SLAB
PT SLAB
P os t He ad J ac k So li d- 34 mm (L) 1.5"
50
SSL +39.765 m
TB5(400x600)
45
T=200
00
TB4.2(300x400)
TB3.1(300x400)
00
2200
RC SLAB
T=230
45
P os t He ad J ac k So li d- 34 mm (L) 1.5"
4000
4000
2200
PT SLAB
TB1(300x600)
00
1500
SSL +39.765 m
5
TB13(400x600) TB14(400x400)
800
TOB 40.135m
14
50
T=200
1500 350 1500
TB15(400x400)
25
RC SLAB
0
4500
27500
P os t He ad J ac k So li d- 34 mm (L) 1.5"
80 600
0
TB18(250x400)
TB3.2(250x400)
1500
H1
451
S1
1048
1549
6
TB16(300x450)
22
00
2200
800 3000
6000
6000
800
800
4500
Channel Spl i c e , L= 100 cm (Single)
50
2630
Technical Sector
00
2200
2200
2200
7
Design Management
G1
P os t He ad J ac k So li d- 34 mm (L) 1.5" U -H ea d Ja ck S ol id -3 4m m, W=1 8 Cm , 2" ,6mm
640
1500
2
T=230
901
TB20(250x965
BRB1
PT SLAB
.1
Cross_Brace_1.20_m-E
Telescopic Frame
(800
SSL +39.765 m
x910
5000
16557
C.B 0.9
C.B 0.9
1200405
C.B 0.9
C.B 0.9
C.B 0.9
C.B 0.9
2730 3480 3480 3480 3480
8
3480 3480 3480 3480 2730
1500
Channel Spl i c e , L= 100 cm (Single)
F1
3480 3480 3480 3480
2730
3480 3480 3480 3480
2730
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
2730 3480 3480 3480 3480 2730
3480 3480 3480 3480
1500
2730
E1
3480 3480 3480 3480 2730
3480 3480 3480 3480
PROJECT: TAIBAH MADINAH SHERATON
3500
3480 3230 3230 3230 3230 2730
3480
Soldier
,L=1.5
2980 0m
2980 2980 2980
C.B 1.20 C.B 1.20 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60
C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20
3480 3230 3230 3230 3230 2730
3480
1500
C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 2980 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20
2980 C.B 1.20 C.B 1.20 C.B 1.20 1.20
C.B2980 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 2980 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20
D1
C.B 1.20 C.B 1.20 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60 L.S60
2243 1714 1714 1714 1714 1714 1714 1714 1714 1714 1714 1714 1714 1714 1714
Soldier
3480 3230 3230 ,L=1.5
0m
3230 3230
RE
3480 2730
3500
3480 3230 3230 3230 3230 Soldier
,L=1.5
0m
3480 2730
1500
2980
FER TO
2980 2980 2980
B B
3480
32702
32184
3230 3230 3230 3230
3480 2730
Soldier
,L=1.5
0m
BRID
2980 2980 2980 2980
3480
3230 3230 3230 3230
3480 2730
Soldier
,L=1.5
0m
GE DR
1500
32000
14750
16800
2980 2980
Sol di er , L=6.00 m
2980 2980
AWIN
Soldier
FORMWORK PLAN
,L=1.5
0m
G
3480 3230 3230
962 3230 3230
3480 2730
1
2980
900
2980 2980 2980
Soldier
,L=1.5
0m
2980
3500
C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20 C.B 1.20
3480
Channel Spl i c e , L= 100 cm (Single)
3480 2730
MAX LOAD APPLIED =1.5t/m2
19
2730 3230 3230 3230 3230 3230
3230 3230 3230 3230
3
901
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
5980
2730 3230 3230 3230 3230 3230
3230 3230
1500
3230 3230
2730
3230 3230 3230 3230 3230
3230 3230 3230 3230
3500
C.B 0.9
C.B 0.9
HEA 550
A
PT BEAM(1000x450)
GANTRY -TRUSS
1500
20
( x91
0)
4900
Sol di er , L=6.00 m
General Layout
4700
50
50
50
P os t He ad J ac k So li d- 34 mm (L) 1.5" U -H ea d Ja ck S ol id -3 4m m, W=1 8 Cm , 2" ,6mm
10
16538
1500
2770 600
1800
2200
2200
2200
Cross_Brace_1.20_m-E
Telescopic Frame
450
540
CALCULATION SHEET
4500
300
1500
11
50
00
Channel Spl i c e , L= 100 cm (Single)
1600
3000
750
TB52(250x400)
TB51(250x400)
6000
6000
4500
2630
170 2100
400 1410 2200
1500
400
12
P os t He ad J ac k So li d- 34 mm (L) 1.5"
745 100
TB59(300x400)
452
S6
400
TB58(300x600)
T=230
PT SLAB
SPB83(400x915)
SSL +39.765 m
4500
32000
1500
T=230
PT SLAB
T=240
PT SLAB
T=200
SSL +39.765 m
RC SLAB
SPB79(400x915)
400
45
P os t He ad J ac k So li d- 34 mm (L) 1.5"
TB56(400x400)
TB65(300x400)
00
45
50
13
4000
4000
00
00
P os t He ad J ac k So li d- 34 mm (L) 1.5"
400
2200
170
T=200
1500
RC SLAB
PROJECT NO. S-6126
SSL +39.765 m
2250
2250
TB53(300x600)
4500
1410 2200
400
P os t He ad J ac k So li d- 34 mm (L) 1.5"
TB61(400x600)
14
TOB +40.135m
TB57(400x600)
400
1500 350 1500 700
9
TB62(300x600)
4500
TOB +40.135m
400
1050
TOB +40.135m
TB63.1(400x600) TB63.2(400x600)
15
TOB +40.135m
TOB +40.135m
50 725
2200 TB55.1(400x600) TOB +40.135m
400
170 720 500
550 100
TB54.1(300x600)452
S7
250
865535
Rev. No: ( 02 )
3500
340 1210
8065
255
1200
TB64.1(400x1000) TB64.5(400x800)
TB71(250x400)
TB72(250x400)
TB54.2(300x600)
TB55.2(400x600)
1100
TB64.3(400x600) TB64.4(400x600)
16 17
1200 830
Page No: (4 / 60 )
Date: 20/11/2023
31200
5161 4200 4300 4300 4300 8940
F'
E'
B'
A'
D'
C'
G'
FIRST FLOOR LEVEL +8.165
Page No: (5 / 60 )
CALCULATION SHEET Rev. No: ( 02 )
Technical Sector GANTRY -TRUSS
Date: 20/11/2023
Design Management
PROJECT: TAIBAH MADINAH SHERATON
COMPANY: ACC (ARABIAN CONSTRUCTION COMPANY) PROJECT NO. S-6126
1.Soldier U100:
•Material: St 44
•Wt/m’ = 22.00 kg
•Aweb = 12.00 cm2
•I = 412 .00 cm4
•Z = 82.40 cm3
•Max allowable deflection in soldier = L/360
•Allowable bending stress in steel (Fall) = 1.595 t/cm2
•Allowable bending moment (Mall) = Fall x Z=1.595x82.40 =131.4 cm.t = 13.10 kN.m
•Allowable Shear stress in steel (Fall) = 0.35Fy = 0.35x2.40 = 0.84 t/cm2
•Allowable shear in steel (Qall) = Fall x Aweb = 0.84x12 = 10.08 t = 100.80 Kn
• (E) for steel =2100 t/cm2
Y
b w1 w w1
c
r1 d
h-2c
h
X X
( H.E.A. ) s
c
t
Y
3. UC 152X152X30
UC 152X152X30 BS 4-1:1993 (Tables attached)
Steel (S235):-
Steel (S275):-
2-Defined Sections
3-Bracing Angle:-
3-Bracing Angle:-
3-Defined Loads
Check of Connections
1000
• Max force / Rivet = (287.25 /5)
= 57.45KN < 70 KN. SAFE
100 100
32
8
140
347
418
344
? 17
.50
100
100
87
300
25
300
36
167
81
100
? 17.50
100
416
344
347
140
100 100
250
? 17
82
8
8
8
50 100 100 100 100 100 100 100 100 100 50
1000
• Max Tension force on Lower Chord Member Pt = 287.25 KN
• Max Tension force due to one bolt Pbolt = Pt / (1 bolts+4 Rivet) = 57.45 KN
<70 KN SAFE
Check of UB 533X210X109
Check of SHOREBRACE
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1200 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600
127
HEA 500 L=12000
275
Ring_Lock_Ledger_L_0.60_m_(Galv.)-E Ring_Lock_Ledger_L_0.60_m_(Galv.)-E
900 600 600 600 600 600 600 600 600 600 600 600 600
1 1
1800
Cross_Brace_0.90_m-E Cross_Brace_1.20_m-E Cross_Brace_1.20_m-E Cross_Brace_1.20_m-E Cross_Brace_1.20_m-E Cross_Brace_1.20_m-E
Design Ratio :
Design Ratio :
Reaction :
Design Ratio :
Reaction :
Reaction :
Reactions :
BS 1139-1.1:1990, Metal scaffolding – Part 1: Tubes – Section 1.1: Specification for steel tube.
BS 1139-2.1:1991, Metal scaffolding – Part 2: Couplers – Section 2.1: Specification for steel
couplers, loose spigots and base-plates for use in working scaffolds and false work made of steel
tubes.
BS 1139-2.2:1991, Metal scaffolding – Part 2: Couplers – Section 2.2: Specification for steel and
aluminum couplers, fittings and accessories for use in tubular scaffolding...
BS 5268-2:1991, Structural use of timber – Part 2: Code of practice for permissible stress design,
materials and workmanship.
BS 5507-1: 1977, Methods of test for false work equipment – Part 1: Floor centers.
BS 5507-3: 1982, Methods of test for false work equipment – Part 3: Props.
BS 5973: 1993, Code of practice for access and working scaffolds and special scaffold structures
in steel.
(3) PD 8:
1500 1500 1500 1500 1500 1500 1200 FIRST FLOOR LEVEL +8.16
C ha nn el Splice , L= 10 0 cm (Sing le) C ha nn el Splice , L= 10 0 cm (Sing le)
Soldier , L =6 .0 0m
4000
Soldie
Soldie
Soldie
Soldie
50m
50m
50m
50m
r,L=1.
r,L=1.
r,L=1.
r,L=1.
r,L=1.
r,L=1.
r,L=1.
r,L=1.
50m
50m
50m
50m
Soldie
Soldie
Soldie
Soldie
540
45
Soldier , L =6 .0 0m
00
HEA 550
6000 2250
UC 152 X152 X30
U -H ead J ac k Solid-34mm, W= 18 C m ,2",6mm
Telescopic Frame
Cross_Brace_1.20_m-E
50
8065
00 00
45
6000
Shore Brace Frame (H)
2250
50
00
3000
4000
Pos t H ead J ac k Solid-34mm (L) 1.5"
Formwork Section
Design Loads
1) Live Load: -
Live Load = 1.50 kn/m2 BS5975 Page 26
Live Load = 2.0 kn/m2 (including impact load & o.w. of formwork)
-Concrete Density
BS 5975:2008 page.58
-Working Area loads
BS 5975:1996 page.22
BS 5975:2008 page.59
DISTRUBUTED LIVE LOAD = working area load + formwork self-weight
= 0.15 + 0.05= 0.20 t/m2
- Ws = LL = 2.00 Kn/m2
CHECK ELEMENTS
(1) Cladding Timber 1”x4”:
* Max. Spacing between Secondary Beams = 1.50 m
* WPLYWOOD = 2.00 x 0.1 = 0.20 Kn/m2
430
1
2730 5
2000
300
5
1
Program summary:
LOAD
1.5
1
0.5 Rollers, 0.3 Rollers, 2.3
0
-0.5 0 0.5 1 1.5 2 2.5 3
-1
SPACING (M)
(3)
Shear Diagram (kn) 4.0
-2.0
-3.1 -3.0
-4.0
Spacing (m)
0.38 0.40
D eflection (mm)
0.20 Deflections, mm X, m
Max = 0.38 2.73
0.00
0 0.5 1 1.5 2 2.5 3 Min = -0.61 1.3
-0.20
-0.40
-0.61 -0.60
-0.80
Spacing (m)
1
1 1
1 1
1 1
1
4000
m
.50
, L=1
ier
Sold
BLOCKNAME FACTOR
3
2730
2730
2730
1250
BLOCKNAME FACTOR
901
735
BLOCKNAME FACTOR
LOAD
3
2
1
Rollers, 0.735 Rollers, 1.985
0
0 0.5 1 1.5 2 2.5 3
-1
-2
SPACING (M)
Shear (kn)
Max = 3.6 1.98501
1.0
Min = -3.6 0.735
0.0
0 0.5 1 1.5 2 2.5 3 -1.0
-2.0
-3.0
-3.6
-4.0
Spacing (m)
-0.80
-0.60
-0.40
-0.20
0 0.5 1 1.5 2 2.5 3
0.00 0.00
-0.61 -0.60
-0.70
Spacing (m)
0.00 0
0 0.5 1 1.5 2 2.5 3
Spacing (m)