Professional Documents
Culture Documents
Signatures:
Comments, if any:
Note: This submittal was reviewed and commented by the Engineer based from the available references as per Contractor’s
submittal and contract documents. As per General Conditions of the contract, any approval, check, certificate, consent,
examination, inspection, instruction notice, proposal, request, test, similar act by the Engineer (including absence of approval)
shall not relieve the Contractor from any responsibility he has under the contract, including responsibility for errors, omissions,
discrepancies and non-compliances.
Page 1|1