You are on page 1of 6

Document name Project Document List and Status - Rooftop_EPC Effective Date Approved by Position

Engineering and
Document code FM-EP-015 26-Feb-24 Paradee Sangkhapet Procurement
Manager, Asia-BU
Project : Betagro PPSEZ 1,025.64 kWp
Project Number: BETAGRO
Project Location : Phnom Penh
Project Owner : GREENYELLOW SOLAR POWER (CAMBODIA) CO., LTD
Project Customer : Betagro Cambodia Green Yellow
Rev.00 Rev. 01 Rev. 02
Document Code Document Name
Submitted Date Received Date Status Submitted Date Received Date Status Comments Submitted Date Received Date Status Comment

Project Delivery Document


GE-AB General Drawing
-001 BETAGRO -GY-GE-AB-001 List of Drawing 7-Feb-24
-002 BETAGRO -GY-GE-AB-002 Project Location 7-Feb-24 2
-003 BETAGRO -GY-GE-AB-003 Symbol and Abbrevation
CE-AB Civil Drawing
-001 BETAGRO -GY-CE-AB-001 PV Module Layout 1-Feb-24
-002 BETAGRO -GY-CE-AB-002 Mounting Layout 13-Feb-24 `

-003 BETAGRO -GY-CE-AB-003 Installation of Mounting Structure 12-Feb-24 `


-004 BETAGRO -GY-CE-AB-004 Installation of PV Module 9-Feb-24
-005 BETAGRO -GY-CE-AB-005 Inverter Housing and Racking (1/3) 12-Jan-23
-006 BETAGRO -GY-CE-AB-006 Walkway Layout 6-Feb-24
-007 BETAGRO -GY-CE-AB-007 Typical Installation of Walkway 1-Feb-24
-008 BETAGRO -GY-CE-AB-008 Guard Rail Layout 5-Feb-24
-009 BETAGRO -GY-CE-AB-009 Typical Installation of Guard Rail 6-Feb-24
-010 BETAGRO -GY-CE-AB-010 Safety Lifeline Layout 6-Feb-24
-011 BETAGRO -GY-CE-AB-011 Typical Installation of Safety Lifeline Layout 6-Feb-24
-012 BETAGRO -GY-CE-AB-012 Access Ladder Layout 9-Feb-24
-013 BETAGRO -GY-CE-AB-013 Typical Installation of Access Ladder 12-Feb-24
-014 BETAGRO -GY-CE-AB-014 Skylight protection layout 7-Feb-24
-015 BETAGRO -GY-CE-AB-015 Typical Installation of skylight protection 7-Feb-24

EE-AB Electrical Drawing


-001 BETAGRO -GY-EE-AB-001 Solar System Single Line Diagram 16-Jan-24
-002 BETAGRO -GY-EE-AB-002 PV String Layout 13-Feb-24
-003 BETAGRO -GY-EE-AB-003 Wiring Diagram of PV String 7-Feb-24
-004 BETAGRO -GY-EE-AB-004 DC Cable and Cable Tray Route 7-Feb-24
-005 BETAGRO -GY-EE-AB-005 Installation of DC Cable Tray on Rooftop 13-Feb-24
-006 BETAGRO -GY-EE-AB-006 Typical Installation Flexible Conduit for DC String Cable 13-Feb-24
-007 BETAGRO -GY-EE-AB-007 Section Detail of DC Cable Tray from Rooftop to Inverter Housing 8-Feb-24
-008 BETAGRO -GY-EE-AB-008 Installation of Inverter, 19-Feb-24
-009 BETAGRO -GY-EE-AB-009 Typical Installation Flexible Conduit of AC and DC Cable for Inverter Housing 16-Jan-23
-010 BETAGRO -GY-EE-AB-010 Installation of Lighting and Receptacle for Inverter Housing 7-Feb-24
-011 BETAGRO -GY-EE-AB-011 Installation of Receptacle for Water Pump and Circuit Water Pump Control 8-Feb-24
-012 BETAGRO -GY-EE-AB-012 AC Cable Route and Raceway 7-Feb-24
-013 BETAGRO -GY-EE-AB-013 Section Detail of AC Cable Raceway from Inverter Housing to MDB Room 5-Feb-24
-014 BETAGRO -GY-EE-AB-014 Main Distribution Board (SMDB) Room Layout and Detail 13-Feb-24 15-Feb-24
-015 BETAGRO -GY-EE-AB-015 Typical Installation of Solar Main Distribution Board (SMDB) 7-Feb-24 26-Feb-24
-016 BETAGRO -GY-EE-AB-016 Grounding System Layout 8-Feb-24
-017 BETAGRO -GY-EE-AB-017 Grounding System Diagram for DC and AC 5-Feb-24
-018 BETAGRO -GY-EE-AB-018 Typical Installation of Grounding System 7-Feb-24
-019 BETAGRO -GY-EE-AB-019 Weather Station and Instrument Layout 13-Feb-24
-020 BETAGRO -GY-EE-AB-020 Typical Installation of Weather Station and Instrument 6-Feb-24
-021 BETAGRO -GY-EE-AB-021 Communication System Configuration 5-Feb-24
-022 BETAGRO -GY-EE-AB-022 Communication Cable Route and Raceway on Rooftop 15-Fb-24
-023 BETAGRO -GY-EE-AB-023 Installation of Communication Conduit and Raceway 7-Feb-24
-024 BETAGRO -GY-EE-AB-024 PM, Communication Panel Layout (ENVISION box) 15-Feb-24
-025 BETAGRO -GY-EE-AB-025 Typical Installation of PM Panel 15-Feb-24
-026 BETAGRO -GY-EE-AB-026 Typical Installation of Communication Panel 13-Feb-24
-027 BETAGRO -GY-EE-AB-027 Typical PM Wiring Diagram (grid meter for zero export) 13-Feb-24
-028 BETAGRO -GY-EE-AB-028 Typical Installation CT and VT for MV 15-Feb-24
-029 BETAGRO -GY-EE-AB-029 Typical Installation of Modifying existing bus bar 15-Feb-24

ME-AB Mechanical Drawing


-001 BETAGRO -GY-ME-AB-001 Water Cleaning System Layout 8-Feb-24
-002 BETAGRO -GY-ME-AB-002 Section of Water Pump and Tank Foundation 19-Feb-24
-003 BETAGRO -GY-ME-AB-003 Typical Installation of Cleaning System (Water Pump, Tank, etc.) 8-Feb-24

ES-AB Design Calculation


-001 BETAGRO -GY-ES-AB-001 DC Voltage Drop and Cable Sizing Calculation 21-Feb-24
-002 BETAGRO -GY-ES-AB-002 AC Voltage Drop and Cable Sizing Calculation 21-Feb-24
-003 BETAGRO -GY-ES-AB-003 Mounting Structure Calculation 21-Feb-24
-004 BETAGRO -GY-ES-AB-004 Booster Pump and Water Tank Calculation 21-Feb-24
-005 BETAGRO -GY-ES-AB-005 CT and VT at MV line and drop out fuse sizing Calculation

Document Code Reference:


GE: General Document
CE: Civil Engineering
EE: Electrical Engineering
ME: Mechanical Engineering
ES: Design Calculation
ES: Design Calculation

Return Codes:
A: Approved without Exception
AC: Approved with Comments (Conditional Approval)
TBC: To be confirmed
R: Rejected
Document name Project Document List and Status - Rooftop_EPC Rev Effective Date Approved by Position

00 Engineering and Procurement


Document code FM-EP-015 4-Mar-21 Paradee Sangkhapet
Manager, Asia-BU
Project : Betagro PPSEZ 1,025.64 kWp
Project Number: BETAGRO
Project Location : Phnom Penh
Project Owner : GREENYELLOW SOLAR POWER (CAMBODIA) CO., LTD
Project Customer : Betagro Cambodia Green Yellow

Rev.01 Rev. xx Rev. xx Rev. xx Rev. xx


Document Code Document Name
Propose Submission Date Drawing Issued Checking Date Status Comment EPC Feedback Drawing Issued Checking Date Status Comment EPC Feedback Drawing Issued Checking Date Status Comment EPC Feedback Drawing Issued Checking Date Status Comment EPC Feedback Drawing Issued Checking Date Status Comment EPC Feedback Drawing Issued Checking Date Status

Project Delivery Document


GE General Drawing
-001 BETAGRO -GY-GE-001 List of Drawing 20-Aug-23
-002 BETAGRO -GY-GE-002 Project Location 21-Aug-23
-003 BETAGRO -GY-GE-003 Symbol and Abbrevation 22-Aug-23

CE Civil Drawing
- Please show equiptments such as walkway, guardrail, cable tray, lifeline and access ladder on PV module layot and indicate remark for each equipment. -Can you show the color for the equipment to see clearly especially walkway and skylight cover.
- Please indicate clearly which one is skylight to avoid confusion.
- Recheck whether client allow to install PV panel overlapping skylight.
-001 BETAGRO -GY-CE-001 PV Module Layout 04-Jul-23 05-Jul-23 07-Jul-23 AC 02-Aug-23 03-Aug-23 AC 08-Aug-23 09-Aug-23 A

- Please recheck clamp position with mounting cal and make sure it follow Longi installation manual. -No issue approve per Longi approval at + 2400 Pa. -No issue approve per Longi approval at + 2400 Pa.

-002 BETAGRO -GY-CE-002 Mounting Layout 05-Jul-23 07-Jul-23 07-Jul-23 R 21-Jul-23 28-Jul-23 A 08-Aug-23 09-Aug-23 A

To make sure cliplock is installed on the roof purlin

-003 BETAGRO -GY-CE-003 Installation of Mounting Structure 06-Jul-23 21-Jul-23 28-Jul-23 AC 11-Sep-23 15-Sep-23 A

-004 BETAGRO -GY-CE-004 Installation of PV Module 07-Jul-23 25-Sep-23 03-Oct-23 A

- Please try horizontal installation as much as possible. The height of inverter should not over 2 meter for service and maintenance. - No issue with the inverter housing and racking. To prevent bird from entering the building
- To be curious, can we move air compressor out of the inverter house as It's cilent' s property.
- Can we move access ladder at this location so we can have one door and it's more convenient to go up/down from
the roof. Then no need for door at section A-A view.

- Space between front of inverter should be at least 1 meters.


- Recheck with triangle installation.

- Recheck that the cable tray shall be with cover.


- Indicate clearly which existing MDB shall be the injection point.
-005 BETAGRO -GY-CE-005 Inverter Housing and Racking (1/3) 10-Jul-23 02-Aug-23 03-Aug-23 R - Indicate spec of inveter steel racking material. 1-Sep-23 5-Sep-23 AC 12-Sep-23 22-Sep-23 AC 10-Oct-23 12-Oct-23 TBC 12-Oct-23 A

-006 BETAGRO -GY-CE-006 Walkway Layout 11-Jul-23 21-Jul-23 24-Jul-23 A - no issue approve.
-007 BETAGRO -GY-CE-007 Typical Installation of Walkway 11-Jul-23 21-Jul-23 24-Jul-23 A - no issue approve.
- Please recheck per below comments. -Update layout as highlighted in red and wire rope is 8 mm (TBC)

-008 BETAGRO -GY-CE-008 Guard Rail Layout 04-Jul-23 05-Jul-23 07-Jul-23 R 21-Jul-23 28-Jul-23 AC 08-Aug-23 12-Aug-23 A

- To make sure it's strong and stable, please provide at least 4 attacments point for guardrail poles. - No major issue. Only minor concern during installation. Please follow attached picture. - No major issue. Only minor concern during installation for wire rope clips. Please follow attached - No issue. Approved.
picture.

-009 BETAGRO -GY-CE-009 Typical Installation of Guard Rail 04-Jul-23 05-Jul-23 07-Jul-23 R 14-Jul-23 18-Jul-23 AC 21-Jul-23 24-Jul-23 AC 10-Oct-23 12-Oct-23 A

- Please install safety lifeline along the walk way. -Update layout as highlighted and wire rope is 8 mm

-010 BETAGRO -GY-CE-010 Safety Lifeline Layout 05-Jul-23 21-Jul-23 24-Jul-23 R 7/28/2023 AC 08-Aug-23 14-Aug-23 A

- To recheck with safety lifeline layout. - Please adjust how you attach to the steel tube per example. - Please show detail clearly as attached example. - I really apologize to mention later. The lifeline should have more support at every end as attached
- Only minor concern during installation for wire rope clips. Please follow attached picture. - Please show detail clearly as attached example. example.

-011 BETAGRO -GY-CE-011 Typical Installation of Safety Lifeline Layout 05-Jul-23 25-Jul-23 25-Jul-23 AC 18-Aug-23 23-Aug-23 AC 29-Aug-23 29-Aug-23 AC 17-Oct-23 20-Oct-23 AC

- No major issue. Please revise per update PV layout. To make sure all information shall be the same.
-012 BETAGRO -GY-CE-012 Access Ladder Layout 06-Jul-23 02-Aug-23 03-Aug-23 AC 08-Aug-23 12-Aug-23 A

- To add lock ladder cover


- Position cliplocks marches with purlin

-013 BETAGRO -GY-CE-013 Typical Installation of Access Ladder 06-Jul-23 02-Aug-23 07-Aug-23 AC A To provide Key for lockable cover

- Recheck per PV layout comments. - -Update layout as highlighted in red

-014 BETAGRO -GY-CE-014 Skylight protection layout 05-Jul-23 05-Jul-23 07-Jul-23 AC 7/28/2023 AC 08-Aug-23 12-Aug-23 A

- Please use HDG material for skylight cover.


-015 BETAGRO -GY-CE-015 Typical Installation of skylight protection 05-Jul-23 07-Jul-23 07-Jul-23 AC 08-Aug-23 09-Aug-23 A All parts HDG after fabrication

EE Electrical Drawing
-Please Show withstand current of busbar and size should be greater than breaker. -Please Show withstand current of busbar and size should be greater than breaker. - As location of inverter house shall be relocated to outdoor installation. Therefore, SMDB should be - Recheck to use RS485 cable for inverter. - Please provide drop out fuse for PT at MV. Check the location of equipment per conceptual. HRC fuse
Example in attached outdoor types and use cable tray with cover. - Please provide drop out fuse for PT at MV. is drop out fuse ?
- Recheck to use RS485 cable for inverter. - For SMDB ,please follow conceprtual drawing number GU-EP-CD-002-1
- Please provide drop out fuse for PT at MV. Please provide supply to lighting. - Please provide supply to lighting for inverter house.

-And please show table that you use for refer to withstand current. - Please select type of tray that use from existing MDB to SMDB. Do you use with cover or without cover?
- Please show overall SLD of cilent and injection point of New solar system to client MDB. - Please switch overall SLD of cilent to the first page
- Where is zero export location. - Please show wiring of PV string for each inverter. To make sure that different PV/string shall go to
- Please submit DC voltage drop calculation. different MPPT.
-001 BETAGRO -GY-EE-001 Solar System Single Line Diagram 07-Jul-23 26-Jul-23 27-Jul-23 R - Recheck size of AC cable per voltage drop calculation. Size of AC cable must be higer than MCCB rate. Recheck size of groundinga cable in calculation to be the 14-Aug-23 15-Aug-23 R 17-Aug-23 18-Aug-23 R 18-Aug-23 24-Aug-23 R 17-Sep-23 17-Sep-23 R 18-Sep-23 22-Sep-23 AC
same as in SLD. - Please provide one more spare for MCCB 200A on same busbar with MCCB of inverter.
- Please provide spare breaker MCCB for inveter. - Please submit DC voltage drop calculation.
- Recheck to use RS485 cable for inverter. - Recheck to use RS485 cable for inverter.
- Please provide drop out fuse for PT at MV.

- Please recheck with SLD to show wiring of PV string for each inverter. To make sure that different PV/string shall go to different MPPT. - Please recheck with SLD to show wiring of PV string for each inverter. To make sure that different - Did you check with Huawei installation manual for PV string arrangment into the inverter ?
PV/string shall go to different MPPT. - No issue with how you group the string but when wiring to the inverter please recheck with the
installation manual.

-002 BETAGRO -GY-EE-002 PV String Layout 02-Aug-23 02-Aug-23 03-Aug-23 AC 04-Oct-23 06-Oct-23 17-Aug-23 18-Aug-23 AC 10-Oct-23 12-Oct-23 AC 28-Oct-23 31-Oct-23 A

'- Did you check with Huawei installation manual for PV string arrangment into the inverter ? - Recheck for every wiring diagram induction loop must be aovid ! Why did you change from last version.
- No issue with how you group the string but when wiring to the inverter please recheck with the installation manual.
-003 BETAGRO -GY-EE-003 Wiring Diagram of PV String 03-Aug-23 02-Aug-23 12-Aug-23 A 10-Oct-23 12-Oct-23 AC 17-Oct-23 20-Oct-23 R 28-Oct-23 31-Oct-23 A

- Please show fill ratio and make sure that it's within 20%. Indicate clearly that the cable tray is with cover and HDG type. - Please show fill ratio and make sure that it's within 20%. Indicate clearly that the cable tray is with cover and HDG type. - No issue. Approved

-004 BETAGRO -GY-EE-004 DC Cable and Cable Tray Route 04-Aug-23 17-Aug-23 18-Aug-23 AC 1-Sep-23 5-Sep-23 AC 17-Oct-23 20-Oct-23 A

-005 BETAGRO -GY-EE-005 Installation of DC Cable Tray on Rooftop 04-Aug-23 1-Sep-23 5-Sep-23 A 15-Sep-23 A
-006 BETAGRO -GY-EE-006 Typical Installation Flexible Conduit for DC String Cable 07-Aug-23 02-Aug-23 12-Aug-23 A
- To be check with DC voltage drop calculation. - For location of access ladder, please recheck per comment in inverter house.
-007 BETAGRO -GY-EE-007 Section Detail of DC Cable Tray from Rooftop to Inverter Ho 07-Aug-23 14-Aug-23 15-Aug-23 AC 1-Sep-23 5-Sep-23 TBC 15-Sep-23 A
- Recheck with inverter house installation.

- Please show the height of inverter from the floor. - Please provide non-shrink grounting concrete for racking foundation check per attached PDF.. - Pending for confirmation of additional SMDB in MDB room.
- Recheck comments for inverter house. - To follow conceprtual drawing number GU-EP-CD-002-1 for SMDB - Please provide non-shrink grounting concrete for racking foundation check per attached PDF..
- Please install SDB at the same location of inverter and install SMDB in MDB room as attached PDF. This will be - Recheck to provide step ladder / bridge for service and maintenance of O&M at front of SDB. Think
more convinent for O&M and safety. about how can we open the cabinent of SDB if you place cable tray like this.

-008 BETAGRO -GY-EE-008 Installation of Inverter, 09-Aug-23 14-Aug-23 15-Aug-23 R 22-Aug-23 24-Aug-23 R 29-Aug-23 29-Aug-23 Pending 10-Oct-23 12-Oct-23 A

- Please include all structure for the inverter house in this drawing.

-009 BETAGRO -GY-EE-009 Typical Installation Flexible Conduit of AC and DC Cable for 09-Aug-23
-010 BETAGRO -GY-EE-010 Installation of Lighting and Receptacle for Inverter Housing
Installation of Receptacle for Water Pump and Circuit
-011 BETAGRO -GY-EE-011 15-Aug-23
Water Pump Control
- To update per new location of inverter installation. - Please provide non-shrink grounting concrete for racking foundation check per attached PDF.. - Indicate the distance between each tray/ height of inverter/ make sure it's not over 2 meter. Show
-Please show fill ratio of cable tray/ 2D spacing between each group of cable. Also show cable route clearance between inverter SMDB, height of SMDB.
- To follow conceprtual drawing number GU-EP-CD-002-1 for SMDB and size for AC cable to the existing MDB. - Confirm to use HDG material for cable tray.
- Please install SDB at the same location of inverter and install SMDB in MDB room as attached PDF. This will be - Kindly show more detail inside MDB room. To see where cabninet you inject to.
more convinent for O&M. This will be more convinent for O&M and safety.

- To recheck with the location of small acess ladder./ Check comment in inveter housing.
- Please recheck whether we can move existing air compressor then install small ladder to the roof in
-012 BETAGRO -GY-EE-012 AC Cable Route and Raceway 15-Aug-23 17-Aug-23 18-Aug-23 Pending 22-Aug-23 24-Aug-23 R - Recheck whether you can move inverter to the left to have more entrance space on the right. Or redesign cable tray 6-Sep-23 7-Sep-23 R that area instead. 18-Sep-23 22-Sep-23 AC 04-Nov-23 06-Nov-23 A - No issue approve.
to be not that high.

- Indicate the distance between each tray/ height of inverter/ make sure it's not over 2 meter. Show
clearance between inverter SMDB, height of SMDB.

- Please install cable tray in trefoil to avoid induce current. '- Please install cable tray in trefoil to avoid induce current.

-013 BETAGRO -GY-EE-013 Section Detail of AC Cable Raceway from Inverter Housing 15-Aug-23 18-Sep-23 22-Sep-23 R 17-Oct-23 20-Oct-23 AC 30-Oct-23 31-Oct-23 A

-014 BETAGRO -GY-EE-014 Main Distribution Board (MDB) Room Layout and Detail 22-Aug-23 27-Sep-23 29-Sep-23 A - no issue approve.

- Recheck all comment in SLD. - Indicate standarad for the cabinent and busbar used for SMDB.
- Please provide supply to lighting for inverter house at SMDB. - Indicate current short circuit for the cabinent.
- Indicate standarad for the cabinent and busbar used for SMDB. - Indicate detail for wiring diagram per updated SLD.
- Indicate current short circuit for the cabinent.
- Indicate detail for wiring diagram per updated SLD.

-015 BETAGRO -GY-EE-015 Typical Installation of Solar Main Distribution Board (SMDB) 22-Aug-23 22-Aug-23 23-Aug-23 R 18-Sep-23 22-Sep-23 AC 27-Sep-23 29-Sep-23 A - no issue approve.

- Please provide grounding cable more on safey lifeline and guardrail. - Please provide grounding cable more on safey lifeline and guardrail. Make sure all equipent at each zone is well
grounded

-016 BETAGRO -GY-EE-016 Grounding System Layout 02-Aug-23 02-Aug-23 03-Aug-23 AC - Recheck to provide ground test box per conceptual. 7-Sep-23 8-Sep-23 R 18-Sep-23 03-Oct-23 A 31-Oct-23 01-Nov-23 A - no issue approve. 31-Oct-23 01-Nov-23 TBC

- Please provid new grounding system per GY's conceptual.


- Make sure grounding resistance shall be less than 5 Ohm.
- As This project shall have MV protection. Please provide MV grounding system at MV pole/ PQM panel per
conceptual.

-017 BETAGRO -GY-EE-017 Grounding System Diagram for DC and AC 04-Aug-23 14-Aug-23 15-Aug-23 R 7-Sep-23 8-Sep-23 R 18-Sep-23 03-Oct-23 A
- Please bond grounding cable for each equipment directyly to main ground not bypass between each equipment.

-018 BETAGRO -GY-EE-018 Typical Installation of Grounding System 04-Aug-23 10-Nov-23 14-Nov-23 A - No issue. Approved
- Please indicate communication used for sensor and conduit used for the cable. - Please indicate communication cable used for sensor and conduit used for the cable.
-019 BETAGRO -GY-EE-019 Weather Station and Instrument Layout 08-Aug-23 17-Aug-23 18-Aug-23 AC 12-Sep-23 17-Sep-23 AC - Where do you install wind speed sensor and recheck the required model of pyranometer which need to be first class. 27-Sep-23 03-Oct-23 A - no issue approve.

-020 BETAGRO -GY-EE-020 Typical Installation of Weather Station and Instrument 08-Aug-23 10-Nov-23 14-Nov-23 A - No issue. Approved
- Please use LIYCY cable for weather sensor. - No issue. Approved
- Please recheck with conceptual communication diagram and proper type of communication cable per actual site. Recheck whether fiber optic required or not.
-021 BETAGRO -GY-EE-021 Communication System Configuration 09-Aug-23 06-Nov-23 06-Nov-23 R 10-Nov-23 14-Nov-23 A

-022 BETAGRO -GY-EE-022 Communication Cable Route and Raceway on Rooftop 09-Aug-23 10-Nov-23 14-Nov-23 A - No issue. Approved
-023 BETAGRO -GY-EE-023 Installation of Communication Conduit and Raceway 09-Aug-23
-024 BETAGRO -GY-EE-024 PM, Communication Panel Layout (ENVISION box) 12-Aug-23 24-Aug-23 25-Aug-23 A 31-Oct-23 01-Nov-23 A
- Please provide ground rod for low voltage side and snake guard net. - Please recheck conceptual for location of equipment and distance between MV and LV grounding rod per
- Please indicate detail such as size of CT/PT, drop out fuse, conceptual.
- Recheck to follow GY's standard for MV protection pole. - Per SLD, please recheck the location for drop out fuse of solar to be at PT. Can we install new electrical pole after
existing drop out fuse.

-025 BETAGRO -GY-EE-025 Typical Installation of PM Panel 12-Aug-23 24-Aug-23 25-Aug-23 R 22-Sep-23 26-Sep-23 R
- No major issue. Please show typical installion in MDB room on the racking/ wall - Please indicate and show clearly where do you install envision box not only this cabinent. - Please show envision conctrol box and UPS.

-026 BETAGRO -GY-EE-026 Typical Installation of Communication Panel 12-Aug-23 1-Sep-23 5-Sep-23 AC 12-Sep-23 17-Sep-23 AC 28-Oct-23 31-Oct-23 R 04-Nov-23 10-Nov-23 AC Add UPS

- Please provide slide-link terminal per conceptual. Recheck per GY's conceptual. Indicate VA and the power source for UPS. - Please recheck conceptual for location of equipment and distance between MV and LV grounding rod per
conceptual.
- Per SLD, please recheck the location for drop out fuse of solar to be at PT. Can we install new electrical pole after
existing drop out fuse.

-027 BETAGRO -GY-EE-027 Typical PM Wiring Diagram (grid meter for zero export) 15-Aug-23 25-Sep-23 26-Sep-23 R 22-Sep-23 26-Sep-23 R 28-Oct-23 31-Oct-23 A

- Please provide ground rod for low voltage side and snake guard net. - Please recheck conceptual for location of equipment and distance between MV and LV grounding rod per - Please recheck conceptual for location of equipment and distance between MV and LV grounding rod
- Please indicate detail such as size of CT/PT, drop out fuse, model of PQM and etc. follow below picture. conceptual. per conceptual.
- Check distance between grounding for LV and HV per local standard. - Relocate the zero export location to pole No.3 as per discussed in meeting on 14-Nov.
- Combine Existing of MV

-028 BETAGRO -GY-EE-028 Typical Installation CT and VT for MV 15-Aug-23 11-Aug-23 15-Aug-23 R 24-Oct-23 27-Oct-23 R 16-Nov-23 R

-029 BETAGRO -GY-EE-029 Typical Installation of Modifying existing bus bar 15-Aug-23 17-Oct-23 24-Oct-23 A
-030 BETAGRO -GY-EE-030 UPS and Router 26-Jul-23 27-Jul-23 AC To be approve when submit the SLD

ME Mechanical Drawing
- To approve with water flow calculation.
-001 BETAGRO -GY-ME-001 Water Cleaning System Layout 25-Aug-23 7-Sep-23 8-Sep-23 R - Please indicate radius of water range for each circle. Make sure this range is practical for O&M otherwise more faucet must be provided.

-002 BETAGRO -GY-ME-002 Section of Water Pump and Tank Foundation 25-Aug-23
-003 BETAGRO -GY-ME-003 Typical Installation of Cleaning System (Water Pump, Tank, 25-Aug-23

ES Design Calculation
-001 BETAGRO -GY-ES-001 DC Voltage Drop and Cable Sizing Calculation 02-Aug-23 02-Aug-23 03-Aug-23 AC - No major issue. Please show average for all string and make sure it's not over 1.5 % {(1.69+1.44+1.47+1.63+1.54+1+1.39+1.72)/8} = 30-Aug-23 31-Aug-23 TBC 15-Sep-23 A
-002 BETAGRO -GY-ES-002 AC Voltage Drop and Cable Sizing Calculation 06-Jul-23 21-Jul-23 24-Jul-23 AC - To be recheck and approve when submitted SLD. Please update the latest SLD. 11-Aug-23 15-Aug-23 TBC 15-Sep-23 A
-003 BETAGRO -GY-ES-003 Mounting Structure Calculation 04-Aug-23 05-Jul-23 07-Jul-23 AC - No major issue. Please submit mounting structure drawing and layout to be rechecked together. 14-Aug-23 To submit the revised calculation for the latest mouting structure layout 30-Sep-23 3-Oct-23 A
-004 BETAGRO -GY-ES-004 Water Flow Rate Calculation/Report 26-Aug-23
-005 BETAGRO -GY-ES-005 CT and VT at MV line and drop out fuse sizing Calculation 25-Aug-23 10-Oct-23 13-Oct-23 TBC 24-Oct-23 27-Oct-23 A
-006 BETAGRO -GY-ES-006 Structure of Roof Calculation UNDER BMB SCOPE UNDER BMB SCOPE UNDER BMB SCOPE UNDER BMB SCOPE UNDER BMB SCOPE

Document Code Reference:


GE: General Document Summary for Drawing
CE: Civil Engineering Total Document 57
EE: Electrical Engineering Total Submitted 48
ME: Mechanical Engineering Approved 40
ES: Design Calculation Approved with Note 4
ES: Design Calculation To Be Confirmed
Not Approved 3
For Construction
Return Codes:
A: Approved without Exception
AC: Approved with Comments (Conditional Approval)
TBC: To be confirmed
R: Rejected
Rev. xx

Comment Drawing Issue Checking Date Status Comment Drawing Issue Checking Date Status Comment EPC Feedback Drawing Issue Checking Date Status Comment EPC Feedback

- Ok with drop out fuse. -Can we install like this ? - Make clearly on SMDB. Those are separate busbar and got power supply from where
- Please add detail as previous version. '- Also attached in SMDB the SLD

- Please check for PV string wiring. Different No. of PV/string and azimuth must be in the different
MPPT.
22-Sep-23 26-Sep-23 R 04-Oct-23 06-Oct-23 TBC 24-Oct-23 27-Oct-23 AC
Project Document List and Status
Project : Makro Trad 500kWp
Project Number: ST-060
Project Location : Trad, Thailand (Solar Rooftop)
Project Owner : Green Yellow (Thailand) Co.,LTD.
Project Customer : Siam Makro EPC - Green Yellow Green Yellow - Client

Rev.1 Rev.2 Rev.3 Rev.1 Rev.2


Document Code Document Name
Received Date Return Date Status Received Date Return Date Status Received Date Return Date Status Received Date Return Date Status Received Date Return Date Status

GE Project Delivery Document


ST-060-GY-GE-001 Organization Chart 25-Jun-20 27-Jun-20 A 25-Jun-20 27-Jun-20 A
ST-060-GY-GE-002 Project Schedule 25-Jun-20 27-Jun-20 A 25-Jun-20 27-Jun-20 A
ST-060-GY-GE-003 Work Health and Safety Management Plan 25-Jun-20 27-Jun-20 A 25-Jun-20 27-Jun-20 A
ST-060-GY-GE-004 Sub-Contractors List 25-Jun-20 27-Jun-20 A 25-Jun-20 27-Jun-20 A
ST-060-GY-GE-005 Daily Report to Owner 25-Jun-20 27-Jun-20 A 25-Jun-20 27-Jun-20 A
ST-060-GY-GE-006 Weekly Report to Owner 25-Jun-20 27-Jun-20 A 25-Jun-20 27-Jun-20 A
ST-060-GY-GE-007 Monthly Report to Owner 25-Jun-20 27-Jun-20 A 25-Jun-20 27-Jun-20 A

GE Site Investigation
ST-060-GY-GE-001 Roof Structure Analysis 25-Jun-20 27-Jun-20 R 30-Jun-20 5-Jul-20 A 5-Jul-20 6-Jul-20 A 5-Jul-20 6-Jul-20 A
ST-060-GY-GE-002 Grid Connection and Regulatory Compliance Document 25-Jun-20 27-Jun-20 A 25-Jun-20 27-Jun-20 A

GE Pre-Mobilization
ST-060-GY-GE-001 Temporary Traffic Management Plan
ST-060-GY-GE-002 Laydown Area Layout Plan

GE General Drawing
ST-060-GY-GE-001 General Drawing 25-Jun-20 27-Jun-20 R 28-Jun-20 30-Jun-20 A 5-Jul-20 8-Jul-20 A 25-Jun-20 27-Jun-20 A
ST-060-GY-GE-002 List of Drawing 25-Jun-20 27-Jun-20 A 25-Jun-20 27-Jun-20 A
ST-060-GY-GE-003 Project Location 25-Jun-20 27-Jun-20 A 25-Jun-20 27-Jun-20 A
ST-060-GY-GE-004 Symbol and Abbrevation 25-Jun-20 27-Jun-20 A 25-Jun-20 27-Jun-20 A

CE Civil Drawing
ST-060-GY-CE-001 PV Module Layout 25-Jun-20 27-Jun-20 A 5-Jul-20 8-Jul-20 A
ST-060-GY-CE-002 Mounting Layout 25-Jun-20 27-Jun-20 A 5-Jul-20 8-Jul-20 A
ST-060-GY-CE-003 Installation of Mounting Structure 25-Jun-20 27-Jun-20 A 5-Jul-20 8-Jul-20 A
ST-060-GY-CE-004 Installation of PV Module 25-Jun-20 27-Jun-20 R 28-Jun-20 30-Jun-20 A 5-Jul-20 8-Jul-20 A
ST-060-GY-CE-005 Inverter Housing and Racking 25-Jun-20 27-Jun-20 R 28-Jun-20 30-Jun-20 R 5-Jul-20 8-Jul-20 A 5-Jul-20 8-Jul-20 A
ST-060-GY-CE-006 Walkway Layout 25-Jun-20 27-Jun-20 AC 28-Jun-20 30-Jun-20 AC 5-Jul-20 8-Jul-20 A
ST-060-GY-CE-007 Typical Installation of Walkway 25-Jun-20 27-Jun-20 A 5-Jul-20 8-Jul-20 A
ST-060-GY-CE-008 Guard Rail Layout
ST-060-GY-CE-009 Typical Installation of Guard Rail
ST-060-GY-CE-010 Safety Lifeline Layout
ST-060-GY-CE-011 Typical Installation of Safety Lifeline Layout
ST-060-GY-CE-012 Typical Installation of Ladder

EE Electrical Drawing
ST-060-GY-EE-001 Solar System Single Line Diagram
ST-060-GY-EE-002 PV String Layout
ST-060-GY-EE-003 Wiring Diagram of PV String
ST-060-GY-EE-004 DC Cable and Cable Tray Route
ST-060-GY-EE-005 Installation of DC Cable Tray
ST-060-GY-EE-006 Installation of Inverter, DC Combiner Box and SDB
ST-060-GY-EE-007 AC Cable Route and Raceway
ST-060-GY-EE-008 Installation of AC Cable Tray
ST-060-GY-EE-009
ST-060-GY-EE-010 Typical Installation of SMDB
ST-060-GY-EE-011 Main Distribution Board (MDB) Room Layout
ST-060-GY-EE-012 Grounding System Layout and Diagram for DC and AC
ST-060-GY-EE-013 Typical Installation of Grounding System
ST-060-GY-EE-014 Weather Station and Instrument Layout
ST-060-GY-EE-015 Typical Installation of Weather Station and Instrument
ST-060-GY-EE-016 Communication System Configuration
ST-060-GY-EE-017 Communication Cable Route and Raceway
ST-060-GY-EE-018 Typical Installation of Utility Power Supply for Monitoring System
ST-060-GY-EE-019 Typical PQM and Relay Protection Diagram

ME Mechanical Drawing
ST-060-GY-ME-001 Water Cleaning System Layout
ST-060-GY-ME-002 Typical Installation of Cleaning System (Water Pump, Tank, etc.)

ES Design Calculation
ST-060-GY-ES-001 DC Voltage Drop and Cable Sizing Calculation 25-Jun-20 27-Jun-20 A
ST-060-GY-ES-002 AC Voltage Drop and Cable Sizing Calculation
ST-060-GY-ES-003 Water Flow Rate Calculation/Report
ST-060-GY-ES-004 Protection Equipment and Relay Setting Calculation

ES Technical Specifications
ST-060-GY-ES-001 Mounting Structure
ST-060-GY-ES-002 PV Panel
ST-060-GY-ES-003 Inverter
ST-060-GY-ES-004 DC Combiner Box
ST-060-GY-ES-005 AC Cable
ST-060-GY-ES-006 DC Cable
ST-060-GY-ES-007 DC Connectors (MC4)
ST-060-GY-ES-008 Grounding System
ST-060-GY-ES-009 Cable Tray
ST-060-GY-ES-010 Conduit-Flexible Conduit
ST-060-GY-ES-011 Power Meter
ST-060-GY-ES-012 Protection Relay
ST-060-GY-ES-013 Power Quality Meter (PQM)
ST-060-GY-ES-014 Current Transformer (CT)
ST-060-GY-ES-015 Voltage Transformer (VT)
ST-060-GY-ES-016 Water Cleaning System (Pump, Tank, Pipe, etc.)
ST-060-GY-ES-017 Communication Cable
ST-060-GY-ES-018 Pyranometer
ST-060-GY-ES-019 Ambient Temperature Sensor
ST-060-GY-ES-020 Module Temperature Sensor
ST-060-GY-ES-021 Walkway
ST-060-GY-ES-022 Fall Protection System
ST-060-GY-ES-023 SMDB Drawing and Specification
ST-060-GY-ES-024 SDB Drawing and Specification
ST-060-GY-ES-025 Relay and PQM Panel Drawing and Specification

Document Code Reference: Summary


GE: General Document Total Document
CE: Civil Engineering Total Submitted
EE: Electrical Engineering Approved
ME: Mechanical Engineering Approved with Note
MS: Mechanical Specifications Not Approved
QC: Quality Control For Construction

Return Codes:
A: Approved without Exception
R: Returned for Correction
X: Rejected
RC: Reviewed and Commented
AC: Approved with Comments (Conditional Approval)
I: Accepted for Information
IC: Accepted for Information with Comments