PROJECT No.

- 22047 Construc on of 33 Access Bridges to FOIZ Oil Terminal


Date: 12-07-2023

Scope of the Work: To study the Poten al Effect of neighboring Sheet Pile on Cathodic Protec on of
Exis ng Oil Pipes

Introduc on:

The E99 highway is provided with drainage channels on the west and east side in front of the security
wall. In order to complete the drainage works and to assure uninterrupted access to the FOIZ
terminals even during laying and maintenance of oil and service pipes, CMW in associa on with FOIZ
authori es plan to construct access bridges for each of the terminals.

The project location is shown in Figure-1 below:

Figure-1: PROJECT location

The typical Access Bridge structure is resting on free standing sheet piles NSP IIIw (or equivalent)
having total depth of 9.0m from sheet pile top. These sheet piles are embedded to a depth of 200 mm in
the concrete abutment beam.

Please refer to Figure-2 below for the Typical cross sec on of the Access Bridge.

Below the bridge, oil pipes are running for different Terminals. These pipes are provided with
Cathodic Protec on system to protect the pipes from corrosion.

Now to construct the Access Bridge, steel sheet pile to be driven in soil neighboring the Oil pipes.

Sheet piles are not designed with any cathodic protec on.

Since the oil pipes are catholically protected and have not taken into account the effect of sheet pile
on pipe cathodic protec on, Oil Terminals want to know the impact of this proposed 9m length steel
sheet pile on the pipe cathodic protec on.

Page-1
To iden fy and know the effect of sheet piles, Length of Sheet pile, Depth of Ground water Table,
Distance from Sheet pile to Oil pipes and other informa on are required.

This informa on is furnished below for further analysis of the poten al impact of sheet pile on the
Oil pipes.

Figure-2: Typical Cross Sec on of Access Bridge

All documents are furnished through Annex with this document.

List of Annex:

Annex-01: Summary of Required informa on for Analysis.

Annex-02: Cathodic Protec on Layout of the FOT Pipes

Annex-03: Typical Cross Sec on of Access Bridge.

Annex-04: Bridge loca on and Plan View.

Annex-05: Available Distance from Sheet Pile to FOT Pipes for different Bridges.

Page-2
Annex 01
Summary of Required information for Analysis
FOT Pipe Length, Sheet Pile Length and Distance of Sheet Pile from FOT Pipes

Sheet Pile Length (Running meter) NSP III w

B9 – 8.4 m (proposal one side only) Mass 136 kg/㎡

B13 – 14.4m (one side) 81.6 kg/m (single 600mm)

B14
21.0m (one side)
B15

B16 – 19.2m (one side)

B17
21.0m (one side)
B18

B19 – 13.8m (one side)

1. Total length of sheet pile (Western side) = 97.8m

Total length of sheet pile (Eastern side) = 89.4m

2. Total Length of FOT Pipes = 1420m (between FOT terminal to Culvert 4)

3. Distance from Face of sheet pile to FOT Pipes

Bridge Horizontal Distance from bridge foundation to FOT Pipe

B9 1422 mm (Western side)


B14 2070 mm (Wester side)
B15 2070 mm (Western side)
B16 580 mm (Eastern side)
B17 670 mm (Eastern side)
B18 570 mm (Eastern side)
B19 410 mm (Eastern side)

Page-4
Annex 02
Cathodic Protection Layout of the FOT Pipes
Project FOT - VLCC CONNECTIVITY

Client FUJAIRAH OIL TERMINAL FZC

PMC TEBODIN MIDDLE EAST LTD

EPC Main ALBANNA ENGINEERING &


Contractor CONSTRUCTION LLC
A
CP Contractor BSS TECHNOLOGIES
C

BE Job No. J725


TEBODIN MIDDLE EAST LTD.
ABE Document Title LINE DIAGRAM FOR CP SYSTEM
Project No. 12108

ABE Doc No. ABE-725-CP-DWG-04 Review Code Rev B


Code 1 Rejected (Revise and resubmit)
Total Pages 1 of 2
Comments as noted (Work may
Code 2 proceed subject to compliance with
and incorporation of comments)

X Code 3 No comments (Work may proceed)


Information only (Accepted for
Code 4
Information only)
Note: This Approval does not relieve contractor
from agreement obligations
Signature & Date 28-Nov-2022
Name IDM244412

B 25.11.2022 Issued for Approval AFSAL MARIMUTHU SREEKANTH


A 26.10.2022 Issued for Review AFSAL MARIMUTHU SREEKANTH
Rev. Date Description Prepared Checked Approved
Page-6
Page-7
Annex 03
Typical Cross Section of Access Bridge
3200 (WT Height from Top)
1600 (Height above WT)
WATER TABLE

7400 (Height below WT)

Typical Cross Section of Bridges


Height of Sheet Pile Above Water Table = 1600 mm
Height of Sheet Pile Below Water Table = 7400 mm

Page-9
Annex 04
Bridge location and Plan View
FOT PIPES

BH-10
BH-11
BH-9

BH-8

BH-6
BH-7

3+100
FOT PIPES
3+900
BH-5

2+90
0+800 1+000
Chainage = 0

4+260
Chainage
1+300 =

2+840

Chainage at FOT Pipes Near Bridge B9 = 4+260 = 4260 m


Chainage at FOT Pipes Near Culver#4 = 2+840 = 2840 m
Length of FOT Pipes = 4260 - 2840 = 1420 m

Page-11
B13 - PLAN VIEW

Page-12
B14 & B15 - PLAN VIEW

Page-13
B16 - PLAN VIEW

Page-14
B17 & B18 - PLAN VIEW

Page-15
B19 - PLAN VIEW

Page-16
Annex 05
Available Distance from Sheet Pile to FOT Pipes for different Bridges.
BH-5
Page-18
Page-19
Page-20
Page-21
Page-22
SHEET PILE SHOP DRAWINGS

- A - B

21000
9600 3000 8400
16 x NSPIIIw SHEET PILES 5 x NSPIIIw 14 x NSPIIIw SHEET PILES
SHEET PILES
NSP IIIw SHEET PILE SECTION

+2.720m
C LEVEL OF WORKING AREA SHEET PILE PROPERTIES
MAX
- SECTION TOTAL
TOTAL
MOMENT
UNIT MASS MOMENT STEEL
SERIES AREA MODULUS CAPACITY
WIDTH [kg/m²] OF GRADE
[cm²/m] [cm³/m] [kNm/m]
[mm] INERTIA
[cm4/m] (σ=295
N/mm²)
+2.720m
NSP IIIw 600 173.2 136 1,800 56,700 531.0 S355
LEVEL OF WORKING AREA

21000
3000

ACC-FO
9600 8400
16 x NSPIIIw SHEET PILES 5 x NSPIIIw 14 x NSPIIIw SHEET PILES
SHEET PILES

ACC-FO
ACC-FO ACC-FO
B17
ACC-FO B18
TYP. PLAN (BRIDGE B17 & B18)

( Level of working area shall be


min. 0.70 m below Top of sheet pile
and not exceeding 1.5 m )

BH-11

0.7m - 1.5m
TR F TR F TR F TR F TR F TR F TR F TR F TR F TR F
TR F

VARIES FROM -2.31m to -2.40m CD


KEY PLAN

NOTES : -
ALL DIMENSIONS SHOWN ARE IN mm, UNLESS OTHERWISE NOTED.
ALL ELEVATION ARE IN m CD.
SECTION C-C (BRIDGE B17 & B18)

A 13.06.2023 VC FIRST ISSUE

Notes : - M.U.C. Engineering


1. This drawing is for illustration purpose only.
2. Surveying including setting out of piles shall be done by the Main Contractor/ Client and must be strictly followed on site.
3. Any relocation / devation of sheet pile with respect to site obstracles
need to be rectified and should be reflected in shop drawing.
4. Shope drawing based on Tender drawing.

ACCESS BRIDGES OVER FOIZ SWDS FOR


FOIZ TERMINALS IN E99 SERVICE ROAD

BRIDGE B17 & B18


PLAN AND SECTION

TP KGA
SEC. A-A (BRIDGE B17) SEC. B-B (BRIDGE B18) SEE. DRG.
A1
ESC-18047-0543
13.06.2023 13.06.2023 (841 x 594)

Page-23