DOCUMENT NO: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502

TITLE: CABLE SCHEDULE (PHASE III)

PROJECT REFERENCE:

Project No: 44PS8901


Project Location: COIMBATORE

Project Title: COIMBATORE-MCN-AUGMENTATION

Client: RELIANCE JIO INFOCOMM LIMITED

(WHERE APPLICABLE)

Project Manager Authorization: Date:


Client Authorization: Date:

APPROVALS
Rev. Issue
No. Date Pages Revision Description By Check Approve

04 26-Oct-2021 35 Issued for Design PP HN HN


03 26-Jul-2021 35 Issued for Design AMP SNT HN
02 07-May-2021 37 Issued for Design PM TC HN
01 01-Jan.-2021 38 Issued for Design SNT TC HN
00 02-July-2020 24 Issued for Design SNT TC HN
0A 19-May-2020 24 Issued for Approval SNT TC HN
 Entire Document DOCUMENT ISSUED FOR:
Issued this Revision  In-house Review  Purchase
 Revised Pages Only  Client Review  Engineering
Issued this Revision  Enquiry  Cost Estimate

1 OF 35
PROJECT: COIMBATORE-MCN-AUGMENTATION DOC NO: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
TITLE: CABLE SCHEDULE (PHASE III) REV NO: 04
LOCATION: COIMBATORE ISSUE DATE: 26-Oct-2021

1 OBJECTIVE
To prepare Cable Schedule and Summary for Coimbatore

2 BASIS
Equipment Tag Numbering

SMPS-1 For First Floor Server Hall Tag No. 10070-AG2-CMBR-ED-001 PHASE-1
SMPS-2 For First Floor Server Hall Tag No. 10070-AG2-CMBR-ED-002
SMPS-3 For First Floor Server Hall Tag No. 10070-AG2-CMBR-ED-003
SMPS-1 For Second Floor Server Hall Tag No. 10070-AG2-CMBR-ED-201
SMPS-2 For Second Floor Server Hall Tag No. 10070-AG2-CMBR-ED-202
PHASE-3
SMPS-3 For Second Floor Server Hall Tag No. 10070-AG2-CMBR-ED-203

2. Tagging for Battery rack is as follows:


Battery Rack 1 - 1

Section- 1/ 2/ 3
Associated SMPS number
3 REFERENCE DOCUMENTS:

1Load Summary for SAG2-Coimbatore-MCN-Augmentation - 10070-E32-IN-TN-CMBR-GVRD-NB-0001-501


2.Electrical Design Basis, Doc No:10070-E91-IN-XX-XXXX-XXXX-NB-0001-501, Rev-0A
3.Master Key SLD (Phase-III), Doc No:10070-E51-IN-TN-CMBR-GVRD-NB-0001-507, Rev-00
4.Electrical Equipement Layout for Ground Floor (Phase-III), Dwg no:10070-E65-IN-TN-CMBR-GVRD-NB-0001-503, Rev-00
5.Electrical Equipement Layout for First Floor (Phase-III), Dwg no:10070-E65-IN-TN-CMBR-GVRD-NB-0001-504, Rev-00
6.Electrical Equipement Layout for Second Floor (Phase-III), Dwg no:10070-E65-IN-TN-CMBR-GVRD-NB-0001-505, Rev-00
7.Single Line Diagram of New Main LT panel (Phase-III), Doc No : 10070-E51-IN-TN-CMBR-GVRD-NB-0001-508, Rev-00
8.Single Line Diagram of Existing MPDB, Doc No : 10070-E51-IN-TN-CMBR-GVRD-NB-0001-502, Rev-00
9.Single Line Diagram of New MPDB Panel (Phase III), Doc No : 10070-E51-IN-TN-CMBR-GVRD-NB-0001-509, Rev-0A
10. Cable Tray Layout for Ground Floor (Phase III) - 10070-E63-IN-TN-CMBR-GVRD-NB-0001-504
11. Cable Tray Layout for First Floor (Phase III) - 10070-E63-IN-TN-CMBR-GVRD-NB-0001-505
12. Cable Tray Layout for Second Floor (Phase III) - 10070-E63-IN-TN-CMBR-GVRD-NB-0001-506
13. Cable Tray Layout for Open Space (Phase III) - 10070-E63-IN-TN-CMBR-GVRD-NB-0001-507
25/7/2021
NOTES:

1. For Lighting cables and receptacles, refer Lighting and Power Layout Drg. No:
10070-E68-IN-TN-CMBR-GVRD-NB-0001-503, 10070-E68-IN-TN-CMBR-GVRD-NB-0001-504, 10070-E68-IN-TN-CMBR-GVRD-NB-0001-505,
10070-E68-IN-TN-CMBR-GVRD-NB-0001-506.
2. For Earthing cables, refer Earthing Layout Drg. No:
10070-E61-IN-TN-CMBR-GVRD-NB-0001-503, 10070-E61-IN-TN-CMBR-GVRD-NB-0001-504, 10070-E61-IN-TN-CMBR-GVRD-NB-0001-505
10070-E61-IN-TN-CMBR-GVRD-NB-0001-506
3. Design margin of 20% on cable length has been considered for termination, wastage, etc
and overall of 10% extra length has been considered for each type of cable for procurement.
4. Nyvin cable between UPS to battery, Battery to Battery Isolator shall be in UPS vendor's scope
5. For 29 mtr,19.5 mtr,17 mtr actual cable length (cable length at site) of SMPS outgoing for (4kW),(6kW),(7kW) server load,
1Rx1Cx95mm², cable shall be considered. If it is exceeding the above cable lengths specified with respect to rack kW
rating, parallel runs of actual cable lengths from SMPS to server, cable of 1Cx95 Sq.mm shall be considered accordingly.
6. It is assumed that presently the site shall continue to run on 1W+1S DGs till the actual site load increases to a level when
third DG needs to be introduced. In initial stage (1W+1S) D.G.Set shall run in AMF Mode & in future after addition of third
D.G. Sets, the D.G.Set shall run in synchronisation mode.
7 .In future after addititon of third D.G.Set, cable schedule needs to be updated for change from AMF to Synchronisation
mode .As DG-3 is Future DG so all DG3 related cables need not to be considered & are striked out.
8. This document is revised due to FCR 732 & updated D.G.Set cables in line with vendor drawings.
9. This cable schedule is revised as Rev 2 for RTU Schedule.

10. This cable schedule is revised with updation of proposed 1x1250kVA Transformer, 11kV HT ICOG Panel & Second Floor New Server Rack Hall.
Also please note that future DG Set-3, 1x625kVA DG Cables are summerised but cable quantities are not considered as it is future DG.

11. This document is revised as rev 04 for FCR 884 04

Hold List:
1. D.G.Set Cables are under hold, D.G.Set Vendor Drawings are awaited .
2. New Main LT Panel Termination details, Vendor Scheme Drawings awaited
CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
PROJECT NO. 44PS8901 Title:
REV NO. : 04

CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION DATE : 26-Oct-2021

LOCATION COIMBATORE
AC CABLE SCHEDULE -PHASE-III CABLE DETAILS

No. of Length in GLANDS


Size in Sq.mm. Type Tot. Leng. (m)
Sr. No. Designation From To Load Runs Mtrs. Industrial REMARKS

EXISTING TRANSFORMER
1 11kV, 2P Structure 500kVA 500kVA EXISTING CABLE
10070-AG2-CMBR-ET-001

11kV ICOG PANEL


1 10070-AG2-CMBR-ESS-002-P1 11kV, 2P Structure 1250 kVA 3Cx300 11 kV (E), Al XLPE 1 22 21.6 2
Tag No. 10070-AG2-CMBR-ESS-002
Transformer
11kV ICOG PANEL
2 10070-AG2-CMBR-ET-001-P1 (HV Cable Box) 1250 kVA 3Cx300 11 kV (E), Al XLPE 1 18 18 0
Tag No. 10070-AG2-CMBR-ESS-002
Tag No.10070-AG2-CMBR-ET-001
UACDB-1 11kV ICOG PANEL
3 10070-AG2-CMBR-ESS-002-C1
Tag No.10070-AG2-CMBR-EKE-001 Tag No. 10070-AG2-CMBR-ESS-002
3Cx2.5 1.1 kV, YWY 1 82 82 2
TB-XX XAM-1,2
1ph UPS Auxiliary Supply to 11kV ICOG panel
UACDB-2 11kV ICOG PANEL
4 10070-AG2-CMBR-ESS-002-C2
Tag No.10070-AG2-CMBR-EKE-002 Tag No. 10070-AG2-CMBR-ESS-002
3Cx2.5 1.1 kV, YWY 1 82 82 2
TB-XX XAM-3,2

UACDB-2 11kV ICOG PANEL


5 10070-AG2-CMBR-ESS-002-C3
Tag No.10070-AG2-CMBR-EKE-002 Tag No. 10070-AG2-CMBR-ESS-002 1ph UPS AC Supply for to 11kV ICOG panel for panrl
3Cx2.5 1.1 kV, YWY 1 82 82 2
space heater & indication lamps
TB-XX XAM-5,6

Transformer
UPSDB-2
10070-AG2-CMBR-ET-001-C1 (Marshalling Box) 3Cx2.5 1.1 kV, YWY 1 73 73 2 230V, AC, 1ph Auxiliary Power Supply
6 Tag No. 10070-AG2-CMBR-ED-217
Tag No.10070-AG2-CMBR-ET-001

TB-XX TB-5,6
Transformer
11kV ICOG PANEL
(Marshalling Box) Trip Signal
Tag No. 10070-AG2-CMBR-ESS-002
Tag No.10070-AG2-CMBR-ET-001
Teminal No. TB-31 to 35 Terminal No. X-49 to X-50 2C- WTI Trip
7 10070-AG2-CMBR-ESS-002-C4 Teminal No. TB-32 to 35 Terminal No. X-55 to X-56 12Cx1.5 1.1 kV, YWY 1 18 30 2 2C- OTI Trip
Teminal No. TB-33 to 35 Terminal No. X-45 to X-46 2C- Buchholz / Relay Trip
Teminal No. TB-34 to 35 Terminal No. X-57 to X-58 2C- PRV Trip

4C-Spare
Transformer
11kV ICOG PANEL
(Marshalling Box) Alarm Signal
Tag No. 10070-AG2-CMBR-ESS-002
Tag No.10070-AG2-CMBR-ET-001
Teminal No. TB-21 to 25 Terminal No. X-47 to X-48 2C- WTI Alarm
8 10070-AG2-CMBR-ESS-002-C5 Teminal No. TB-22 to 25 Terminal No. X-51 to X-52 12Cx1.5 1.1 kV, YWY 1 18 30 2 2C- OTI Alarm
Teminal No. TB-23 to 25 Terminal No. X-53 to X-54 2C- MOG Alarm
Teminal No. TB-24 to 25 Terminal No. X-43 to X-44 2C- Buchholz / Relay Alarm
4C-Spare
Transformer MLTP I/C 1 (Transformer)
(Marshalling Box) Tag No.10070-AG2-CMBR-ES-001
9 10070-AG2-CMBR-ESS-002-C3 Tag No.10070-AG2-CMBR-ET-001 Feeder No. 4FB 4Cx2.5 1.1 kV, YWY 1 28 27.6 2
Teminal No. TB-14 to 16 Terminal No. XC1-34 to XC1-26 2C- 51N Relay
2C- Spare
Transformer MLTP I/C 1 (Transformer)
LV Busduct 1600Amps, 3 phase +100% Outdoor Type with Canopy = 11 M
10 10070-AG2-CMBR-ES-001- P1 (LV Cable Box) Tag No.10070-AG2-CMBR-ES-001 1250 kVA 11
(Outdoor / Indoor Type) neutral Indoor Type = 1.43 M
Tag No.10070-AG2-CMBR-ET-001 Feeder No. 4FB
MLTP
UACDB-1
10070-AG2-CMBR-ES-001-C1 Tag No.10070-AG2-CMBR-ES-001 3Cx2.5 1.1 kV, YWY 1 54 54 2
Tag No.10070-AG2-CMBR-EKE-001
Feeder No. 7FA 1ph AC Control Supply from UPS-1 to MLTP Panel
11
(Ground Floor)
TB-XX XA-1,2

3 OF 35
CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
PROJECT NO. 44PS8901 Title:
REV NO. : 04

CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION DATE : 26-Oct-2021

LOCATION COIMBATORE
AC CABLE SCHEDULE -PHASE-III CABLE DETAILS

No. of Length in GLANDS


Size in Sq.mm. Type Tot. Leng. (m)
Sr. No. Designation From To Load Runs Mtrs. Industrial REMARKS

MLTP
UACDB-2
10070-AG2-CMBR-ES-001-C2 Tag No.10070-AG2-CMBR-ES-001 3Cx2.5 1.1 kV, YWY 1 54 54 2
Tag No.10070-AG2-CMBR-EKE-002 1ph AC Control Supply from UPS-2 to MLTP Panel
12 Feeder No. 7FA
(Ground Floor)
TB-XX XA-5,6

MLTP
11kV ICOG PANEL Annunciator Panel
Tag No. 10070-AG2-CMBR-ESS-002 Tag No.10070-AG2-CMBR-ES-001

13 10070-AG2-CMBR-ES-001-C3 7Cx2.5 1.1 kV, YWY 1 32 32.4 2


Terminal No. X-5, 6 Terminal No. XI-13, 14 2C - HT CB Tripped
Terminal No. X-65, 66 Terminal No. XI-15, 16 2C- HT Power Healthy
3C - Spare

EXISTING TRANSFORMER NEW MAIN LT PANEL (I/C-1)


2 10070-AG2-CMBR-ES-001-P1-P3 500kVA FEEDER - 4F-B 500kVA 4Cx300 1.1 kV, A2XFY 3 13 POWER CABLE
10070-AG2-CMBR-ET-001 TAG NO : 10070-AG2-CMBR-ES-001

EXISTING TRANSFORMER NEW MAIN LT PANEL (I/C-1)


3 10070-AG2-CMBR-ES-001-C1 MARSHALING BOX FEEDER - 4F-B - 12Cx1.5 1.1 kV, YWY 1 MARSHALLING PANEL - TRIP
10070-AG2-CMBR-ET-001 TAG NO : 10070-AG2-CMBR-ES-001
2C- Buchholz Relay Trip
TERMINAL NO : HOLD TERMINAL NO : X1 - 27, 28 -
2C- OTI Trip
TERMINAL NO : HOLD TERMINAL NO : HOLD -
2C- WTI Trip
TERMINAL NO : HOLD TERMINAL NO : HOLD -
2C- Pressure Relief Valve Trip
TERMINAL NO : HOLD TERMINAL NO : HOLD -
4C- Spare
-
EXISTING TRANSFORMER NEW MAIN LT PANEL (I/C-1)
4 10070-AG2-CMBR-ES-001-C2 MARSHALING BOX FEEDER - 4F-B - 12Cx1.5 1.1 kV, YWY 1 MARSHALLING PANEL - ALARM
10070-AG2-CMBR-ET-001 TAG NO : 10070-AG2-CMBR-ES-001
2C- Buchholz Relay Alarm
25/7/2021 TERMINAL NO : HOLD -
2C- OTI Alarm
TERMINAL NO : HOLD TERMINAL NO : HOLD -
2C- WTI Alarm
TERMINAL NO : HOLD TERMINAL NO : HOLD -
2C- MOG Alarm
TERMINAL NO : HOLD TERMINAL NO : HOLD -
4C- Spare
-

EXISTING TRANSFORMER NEW MAIN LT PANEL (I/C-1)


5 10070-AG2-CMBR-ES-001-C3 MARSHALING BOX FEEDER - 4F-B - 4Cx2.5 1.1 kV, YWY 1 MARSHALLING PANEL
10070-AG2-CMBR-ET-001 TAG NO : 10070-AG2-CMBR-ES-001

TERMINAL NO : HOLD TERMINAL NO : HOLD - 2C - 51NS(Stand by Earth fault)

UACDB-1 NEW MAIN LT PANEL, FEEDER - 7F-A


14 10070-AG2-CMBR-ES-001-C4
Tag No.10070-AG2-CMBR-EKE-001 TAG NO : 10070-AG2-CMBR-ES-001
4Cx2.5 1.1 kV, YWY 1 60 60 2
1ph UPS Control Supply to MLTP Panel
UACDB-2 NEW MAIN LT PANEL, FEEDER - 7F-A (Ground Floor)
15 10070-AG2-CMBR-ES-001-C5
Tag No.10070-AG2-CMBR-EKE-002 TAG NO : 10070-AG2-CMBR-ES-001
4Cx2.5 1.1 kV, YWY 1 65 65 2

4 OF 35
CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
PROJECT NO. 44PS8901 Title:
REV NO. : 04

CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION DATE : 26-Oct-2021

LOCATION COIMBATORE
AC CABLE SCHEDULE -PHASE-III CABLE DETAILS

No. of Length in GLANDS


Size in Sq.mm. Type Tot. Leng. (m)
Sr. No. Designation From To Load Runs Mtrs. Industrial REMARKS

EXISTING TRANSFORMER
UPS DB -1 240V SINGLE PHASE SUPPLY TO
8 10070-AG2-CMBR-ET-001-P1
10070-AG2-CMBR-EKL-001
MARSHALING BOX 3Cx2.5 1.1 kV, YWY
10070-AG2-CMBR-ET-001
TRANSFORMER MARSHALLING BOX
NEW MAIN LT PANEL (I/C-2)
1.1 kV, Cu. Flex Cable
16 10070-AG2-CMBR-ES-001-P4-P15 New DG Isolator panel near DG-1 FEEDER - 2F-B 625KVA 1Cx300 12 54 648 24 POWER CABLE
TAG NO : 10070-AG2-CMBR-ES-001 (BLACK)
220Volts, 1Ph Supply for DG AMF Panel ( for
NEW MAIN LT PANEL, (16A MCB mounted inside Illumination, Battery Charger, Space heater )
17 DG 1/ C1 DG 1 (AMF Panel) 4Cx2.5 1.1 kV, YWY 1 54 54 2
feeder) D.G.Set -1, Aux feeder 2F-A (63Amps) * Arrangement for 1ph supply for canopy light to be
made at site
2C- 220Volts, 1Ph Supply for DG AMF
Terminal No: - R, N Terminal No: 3T - 5, 6
2C- Spare
NEW MAIN LT PANEL (I/C-1)
18 DG 1/ C2 FEEDER - 4F-B DG 1 (AMF Panel) 4Cx1.5 1.1 kV, YWY 1 54 54 2 MLTP - Transformer incomer
TAG NO : 10070-AG2-CMBR-ES-001
Terminal No: XV1 - 1, 2, 3, 4 Terminal No: 3T - 1, 2, 3, 4 110V AC PT Supply for MAINS Sensing
NEW MAIN LT PANEL (I/C-1)
19 DG 1/ C3 FEEDER - 4F-B DG 1(AMF Panel) 4Cx1.5 1.1 kV, YWY 1 54 54 2 MLTP - Transformer incomer
TAG NO : 10070-AG2-CMBR-ES-001
Terminal No: X1 - 29, 30 Terminal No: 1 X - 5, 6 2C- Transformer incomer ON and in Service
2C- Spare
NEW MAIN LT PANEL (I/C-1)
20 DG 1/ C4 FEEDER - 4F-B DG 1 (AMF Panel) 7Cx1.5 1.1 kV, YWY 1 54 54 2 MLTP - Trafo. Incomer (I/C-1) close & Trip from AMF
TAG NO : 10070-AG2-CMBR-ES-001
Terminal No: X1 - 3, 4 Terminal No: 1T - 7, 8 2C- Close from AMF
Terminal No: X1 - 17, 18 Terminal No: 1T - 5, 6 2C- Trip from AMF
3C- Spare
NEW MAIN LT PANEL (I/C-2)
14 DG 1/ C5 FEEDER - 2F-B DG 1 (AMF Panel) 7Cx1.5 1.1 kV, YWY 1 54 54 2 MLTP - D.G.-1 Incomer (I/C-2)
TAG NO : 10070-AG2-CMBR-ES-001

Terminal No: X2 - 3, 4 Terminal No: 1X - 9, 10 2C- Close from AMF

Terminal No: X2 - 9, 10 Terminal No: 1X - 11, 12 2C- Trip from AMF


3C- Spare
NEW MAIN LT PANEL (I/C-2)
15 DG 1/ C6 FEEDER - 2F-B DG 1(AMF Panel) 4Cx1.5 1.1 kV, YWY 1 54 54 2 MLTP - D.G.-1 Incomer (I/C-2)
TAG NO : 10070-AG2-CMBR-ES-001
Terminal No: X2- 17, 18 Terminal No: 1 X - 3, 4 2C- ON and in Service

2C- Spare

NEW MAIN LT PANEL (I/C-1)


Master Trip Contact from MLTP Trafo incomer for
16 DG 1/ C7 FEEDER - 4F-B DG 1(AMF Panel) 4Cx1.5 1.1 kV, YWY 1 54 54 2
AMF Panel.
TAG NO : 10070-AG2-CMBR-ES-001
Terminal No: X1 - 31, 32 Terminal No: 1Z - 11, 12 2C- Master Trip Contact from MLTP Trafo incomer.

2C- Spare

From DG-1 AMF Panel Control to DG-2 AMF Panel


17 DG 1/ C8 DG AMF PANEL-1 DG AMF PANEL-2 7Cx1.5 1.1 kV, YWY 1 26 26 2
Control Panel for DG Starting.
Terminal No: 1Z - 13, 14 Terminal No: 2Z - 09, 10 For DG-2 Incomer working + Standby Contact
Terminal No: 1Z - 15, 16 Terminal No: 2Z - 15, 16 For DG-2 Panel DG-2 selection
Terminal No: 1Z - 17, 18 Terminal No: 2Z - 17, 18 For DG-2 Panel Start / Stop
1C- Spare
NEW MAIN LT PANEL (I/C-2)
18 DG 1/ C9 FEEDER - 2F-B DG AMF PANEL-1 4Cx2.5 1.1 kV, YWY 1 54 54 2 MLTP - D.G.-1 Incomer (I/C-2)
TAG NO : 10070-AG2-CMBR-ES-001
Terminal No: XV2 - 1, 2, 3, 4 Terminal No: T - 1, 2, 3, 4 4C - Line Voltage to AMF

New MLTP
19 DG1/C1 DG-1 Isolator panel 4Cx2.5 1.1 kV, YWY 1 55.0 m 55 2
Bus Coupler Feeder 5F-B
Terminal No. XV3-25,26,27,28 Terminal No. 1T-1,2,3,4 4C-415 V AC BUS-1 SUPPLY TO PCC CONTROLLER

5 OF 35
CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
PROJECT NO. 44PS8901 Title:
REV NO. : 04

CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION DATE : 26-Oct-2021

LOCATION COIMBATORE
AC CABLE SCHEDULE -PHASE-III CABLE DETAILS

No. of Length in GLANDS


Size in Sq.mm. Type Tot. Leng. (m)
Sr. No. Designation From To Load Runs Mtrs. Industrial REMARKS

New MLTP I/C 2 (DG-1)


20 DG1/C2 DG-1 Isolator panel 12Cx1.5 1.1 kV, YWY 1 55.0 m 55 2
Feeder 2F-B
Terminal No. XV2-1,2,3,4 Terminal No. 1T-9,10,11,12 4C-3PH,4W,110 PT SUPPLY FOR METERING
Terminal No. XC2-34,35,36,37 Terminal No. 1T-13,14,15,16 4C-CT SUPPLY FOR METERING
4C-SPARE
New MLTP I/C 2 (DG-1)
21 DG1/C3 DG-1 Isolator panel
Feeder 2F-B
7Cx1.5 1.1 kV, YWY 1 55 55 2
Terminal No. 1T23,24 Terminal No. X2-3,4 2C-DG-1 ACB CLOSE COMMAND
Terminal No. 1X11,12 Terminal No. X2-9,10 2C-DG-1 ACB TRIP COMMAND
1C-SPARE
New MLTP I/C 2 (DG-1)
22 DG1/C4
Feeder 2F-B
DG-1 Isolator panel 7Cx1.5 1.1 kV, YWY 1 Presently DGS are operating in 1W+1S Configuration
Terminal No. X2-41,42 Terminal No. 1X7,8 2C-NIC ON FEEDBACK
Terminal No. X2-17,18 Terminal No. 1X5,6 2C-ACB NO CONTACT
3C-SPARE
23 DG1/P1 DG-1 Isolator panel DG-1 ALT. (DG-1 PCC3.3 Controller.) 4Cx2.5 1.1 kV, YWY 0.0 m 0 0 BY DG VENDOR
Terminal No. 1T-5,6,7,8 Terminal No. TB7-L1,L2,L3,N 4C-415 V AC SUPPLY FOR PCC BUS PT.
24 DG1/P2 Sync Logic Panel DG-1 Isolator panel 4Cx2.5 1.1 kV, YWY 1 70 70 2
Terminal No. T3,4 Terminal No. T1,2 2C-230 V AC SUPPLY FOR DG-1 ISOLATOR PANEL
25 DG1/P3 DG-1 Isolator panel Sync Logic Panel 4Cx2.5 1.1 kV, YWY 1 70 70 2
24V DC SUPPLY FROM
Terminal No. 1Z5,6 Terminal No. S1,2
DG-1 BATT ISOLATOR PANEL
26 DG1/P4 DG-1 BATT DG-1 Isolator panel 4Cx2.5 1.1 kV, YWY BY DG VENDOR
Terminal No. 1Z1,2 24V DC SUPPLY FOR DC CONTROL CKT.
27 DG1/P5 DG-1 BATT DG-1 ALT. (DG-1 PCC3.3 Controller.) 4Cx2.5 1.1 kV, YWY BY DG VENDOR
Terminal No. 1Z11,12 24V DC SUPPLY TO DG PCC
28 DG1/C5 DG-1 Isolator Panel Sync. Panel 4Cx1.5 1.1 kV, YWY 1 70 70 2
Terminal No. 1T-17,18,19 Terminal No. P-45,46, 3C-KW SIGNAL TO Sync.PANEL
(Spare terminal for shield is required) 1C-SPARE
29 DG1/C6 Sync Logic Panel DG-1 Isolator panel 5Cx1.5 1.1 kV, YWY 1 70 70 2
2C - DG1 START/STOP COMMAND TO DG-1
Terminal No. L1,2 Terminal No. 1Z7,8
ISOLATOR PANEL
2C - DG1 LOAD DEMAND STOP COMMAND TO DG-1
Terminal No.L3,4 Terminal No. 1Z9,10
ISOLATOR PANEL
1C-SPARE
30 DG1/C7 DG-1 Isolator panel Sync Logic Panel 12Cx1.5 1.1 kV, YWY 1 70 70 2
Terminal No. 1X21,22 Terminal No. S37,38 2C-NIC CLOSING CIRCUIT
2C - DG-1 AUTO / MANUAL F/B FROM ISOLATOR
Terminal No. 1X23,24 Terminal No. P1,2
PANEL
Terminal No. 1X25,26 Terminal No. P3,4 2C - DG-1 RUNNING F/B FROM ISOLATOR PANEL
Terminal No. 1X27,28 Terminal No. S13,14 2C - DG-1 CSD SIGNAL FROM ISOLATOR PANEL
Terminal No. 1X29,30 Terminal No. S17,18 2C- DG-1 ISOLATOR ACB NO CONTACT
2C-SPARE
31 DG1/C8 DG-1 Isolator panel DG-1 PCC3.3 Controller. 12Cx1.5 1.1 kV, YWY 1 15 15 2
Terminal No. 1Z-13,14 Terminal No. TB1-10,11 2C-REMOTE ENGINE START SIGNAL
Terminal No. 1Z-17,18 Terminal No. TB1-15,16 2C-EMERGENCY STOP ( CANOPY)
Terminal No. 1Z-19,20 Terminal No. TB5-1,2 2C-ACB CLOSE COMMAND
Terminal No. 1Z-21,22 Terminal No. TB5-4,5 2C-ACB TRIP COMMAND
Terminal No. 1Z-23,24 Terminal No. TB8-1,5 2C-ACB FAULT RESET
2C-SPARE
32 DG1/C9 DG-1 Isolator panel DG-1 PCC3.3 Controller. 7Cx1.5 1.1 kV, YWY 1 15 15 2
Terminal No. 1Z-25,26 Terminal No. TB8-8,13 2C-CUSTOMER FAULT
Terminal No. 1Z-29,32 Terminal No. TB10-7,2 2C-ACB CLOSE FEED BACK
Terminal No. 1Z-33,34 Terminal No. TB1-4,5 2C-GENSET RUNNING SIGNAL
1C-SPARE
33 DG1/C10 DG-1 Isolator panel DG-1 PCC3.3 Controller 7Cx1.5 1.1 kV, YWY 1 15 15 2
Terminal No. 1Z-27,28 Terminal No. TB10-14,17 2C-LOAD DEMAND STOP
Terminal No. 1Z-35.36 Terminal No. TB1-8,9 2C-COMMON SHUT DOWN
Terminal No. 1Z-31.32 Terminal No. TB10-10,2 2C-CB TRIPPED STATUS
1C-SPARE
34 DG1/C11 DG-1 Isolator Panel Client Panel 4Cx1.5 1.1 kV, YWY 1 70 70 2
Terminal No. 1Z-37,38 2C-Contact for Fuel level High status
Terminal No. 1Z-39,40 2C-Contact for Fuel level Low status
35 DG1/C12 METER BOX DG-1 Isolator panel 12Cx2.5 1.1 kV, YWY 1 BY DG VENDOR
Terminal No. Terminal No. 1T25,26,27,28 4C- CT & 3PH,4W SUPPLY FOR KWH METER
Terminal No. Terminal No. 1T29,30,31,32 4C- 110 PT SUPPLY FOR KWH METER
2C-SPARE
36 DG 1/ E1 DG 1 (625KVA) neutral contactor at LT panel end Earth Pit No. - DG1- Neutral Earth Pit-1 1Cx120 1.1 kV, YY, FRLS 1 75 75 2 Earthing cable from Neutral contactor (at LT panel end)
37 DG 1/ E2 DG 1 (625KVA) neutral contactor at LT panel end Earth Pit No. - DG1- Neutral Earth Pit-2 1Cx120 1.1 kV, YY, FRLS 1 75 75 2 to Earth pit.

6 OF 35
CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
PROJECT NO. 44PS8901 Title:
REV NO. : 04

CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION DATE : 26-Oct-2021

LOCATION COIMBATORE
AC CABLE SCHEDULE -PHASE-III CABLE DETAILS

No. of Length in GLANDS


Size in Sq.mm. Type Tot. Leng. (m)
Sr. No. Designation From To Load Runs Mtrs. Industrial REMARKS

New MLTP I/C 1 (Transformer)


38 SYNC./ PLC Panel / C1
Feeder 4F-B
Sync Logic Panel 7Cx1.5 1.1 kV, YWY 1 20 20 2
Terminal No. X1-9,10 Terminal No. L13,14 2C- TRF ACB CLOSE COMMAND
Terminal No. X1-23,24 Terminal No. L15,16 2C- TRF ACB TRIP COMMAND
3C-SPARE
New MLTP I/C 1 (Transformer)
39 SYNC./ PLC Panel / C2 Feeder 4F-B Sync Logic Panel 7Cx1.5 1.1 kV, YWY 1 20 20 2

Terminal No. X1-47,48 Terminal No. S9,10 2C-ACB ON FEEDBACK


Terminal No. X1-49,50 Terminal No. P13,14 2C-TRF ACB TRIP FEEDBACK
3C-SPARE
New MLTP B/C
40 SYNC./ PLC Panel / C3 Feeder 5F-B Sync Logic Panel 4Cx1.5 1.1 kV, YWY 1 20 20 2

Terminal No. X3-3,4 Terminal No. L17,18 2C- B/C ACB CLOSE COMMAND
Terminal No. X3-15,16 Terminal No. L19,20 2C- B/C ACB TRIP COMMAND

New MLTP B/C


41 SYNC./ PLC Panel / C4 Feeder 5F-B Sync Logic Panel 4Cx1.5 1.1 kV, YWY 1 20 20 2

Terminal No. X3-43,44 S11,12 2C-BC ACB ON FEEDBACK


2C-SPARE
New MLTP I/C 2 (DG-1)
42 SYNC./ PLC Panel / C5 Sync Logic Panel 5Cx1.5 1.1 kV, YWY 1 20 20 2
Feeder 2F-B
Terminal No. X2-15,16 Terminal No. S37,38 2C-NIC ON/OFF COMMAND
Terminal No. X2-39,40 Terminal No. S19,20 2C-NIC ON FEEDBACK
1C-SPARE
New MLTP I/C 2 (DG-1)
43 SYNC./ PLC Panel / C6 PLC panel 4Cx1.5 1.1 kV, YWY 1 20 20 2
Feeder 2F-B
2C-REF 615 RELAY TRIP FROM MLTP TO DG-1
Terminal No. X2-25,26 (REF 615 X100-13,14) Terminal No. P-21,22
CONTROLLER
2C-SPARE
NEW MAIN LT PANEL - I/C-3 (DG2)
1.1 kV, Cu. Flex Cable
44 10070-AG2-CMBR-ES-001-P16-P27 New DG Isolator panel near DG-2 FEEDER - 7F-B 625KVA 1C X 300 12 56 677 24 POWER CABLE
TAG NO : 10070-AG2-CMBR-ES-001 (BLACK)
220Volts, 1Ph Supply for DG AMF Panel ( for
NEW MAIN LT PANEL, (16A MCB mounted inside Illumination, Battery Charger, Space heater )
DG 2/ C1 DG 2(AMF Panel) 4Cx2.5 1.1 kV, YWY 1 56 56 2
feeder) D.G.Set -2, Aux feeder 10R-B (63Amps) * Arrangement for 1ph supply for canopy light to be
made at site
2C- 220Volts, 1Ph Supply for DG AMF
Terminal No: - R, N Terminal No: 3T - 1, 2
2C- Spare
NEW MAIN LT PANEL (I/C-1)
DG 2/ C2 FEEDER - 4F-B DG 2(AMF Panel) 4Cx1.5 1.1 kV, YWY 1 56 56 2 MLTP - Transformer incomer (I/C-1)
TAG NO : 10070-AG2-CMBR-ES-001
Terminal No: X1 - 35, 36 Terminal No: 2X - 5, 6 2C- Transformer incomer ON and in Service
2C-Spare
NEW MAIN LT PANEL - I/C-3 (DG2)
DG 2/ C3 FEEDER - 7F-B DG 2 (AMF Panel) 7Cx1.5 1.1 kV, YWY 1 56 56 2 MLTP - D.G.-2 Incomer (I/C-3)
TAG NO : 10070-AG2-CMBR-ES-001
Terminal No: X4 - 3, 4 Terminal No: 2X - 9, 10 2C- Close from AMF
Terminal No: X4 - 9, 10 Terminal No: 2X - 11, 12 2C- Trip from AMF
3C- Spare
NEW MAIN LT PANEL - I/C-3 (DG2)
DG 2/ C4 FEEDER - 7F-B DG 2(AMF Panel) 4Cx1.5 1.1 kV, YWY 1 56 56 2 MLTP - D.G.-2 Incomer (I/C-3)
TAG NO : 10070-AG2-CMBR-ES-001
Terminal No: X4- 17, 18 Terminal No: 2X - 3, 4 2C- DG Set incomer ON and in Service
2C- Spare
NEW MAIN LT PANEL (I/C-1)
Master Trip Contact from MLTP Trafo incomer for
DG 2/ C5 FEEDER - 4F-B DG 2(AMF Panel) 4Cx1.5 1.1 kV, YWY 1 56 56 2
AMF Panel.
TAG NO : 10070-AG2-CMBR-ES-001
Terminal No: X1 - 37, 38 Terminal No: 2Z - 11, 12 2C- Master Trip Contact from MLTP Trafo incomer.
DG 2/ C6 DG AMF PANEL-2 DG AMF PANEL-1 4Cx1.5 1.1 kV, YWY 1 26 26 2
DG Working + Standby potential free contact,to DG
Terminal No: 2Z - 13, 14 Terminal No: 1Z - 9, 10
Set-1 AMF Panel
2C- Spare
NEW MAIN LT PANEL - I/C-3 (DG2)
DG 2/ C7 FEEDER - 7F-B DG AMF PANEL-2 4Cx2.5 1.1 kV, YWY 1 56 56 2 MLTP - D.G.-1 Incomer (I/C-3)
TAG NO : 10070-AG2-CMBR-ES-001
Terminal No: XV4 - 1, 2, 3, 4 Terminal No: T - 1, 2, 3, 4 4C - Line Voltage to AMF

7 OF 35
CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
PROJECT NO. 44PS8901 Title:
REV NO. : 04

CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION DATE : 26-Oct-2021

LOCATION COIMBATORE
AC CABLE SCHEDULE -PHASE-III CABLE DETAILS

No. of Length in GLANDS


Size in Sq.mm. Type Tot. Leng. (m)
Sr. No. Designation From To Load Runs Mtrs. Industrial REMARKS

New MLTP B/C


1 DG2/C1 Feeder 5F-B DG-2 Isolator panel 4Cx2.5 1.1 kV, YWY 1 60.0 m 60 2

Terminal No. XV3-31,32,33,34 Terminal No. 1T-1,2,3,4 4C-415 V AC BUS-2 SUPPLY TO PCC CONTROLLER
New MLTP I/C 3 (DG-2)
2 DG2/C2 DG-2 Isolator panel 4Cx2.5 1.1 kV, YWY 2 65.0 m 130 4
Feeder 7F-B
Terminal No. XV4-1,2,3,4 Terminal No. 1T-9,10,11,12 4C-3PH,4W,110 PT SUPPLY FOR METERING
4C-CT SUPPLY FOR METERING
Terminal No. XC4-34,35,36,37 Terminal No. 1T-13,14,15,16
4C-SPARE
New MLTP I/C 3 (DG-2)
3 DG2/C3 DG-2 Isolator panel
Feeder 7F-B
7Cx1.5 1.1 kV, YWY 1 65 65 2
Terminal No. 1T23,24 Terminal No. X4-3,4 2C-DG-2 ACB CLOSE COMMAND
Terminal No. 1X11,12 Terminal No. X4-9,10 2C-DG-2 ACB TRIP COMMAND
1C-SPARE
New MLTP I/C 3 (DG-2)
4 DG2/C4
Feeder 7F-B
DG-2 Isolator panel 7Cx1.5 1.1 kV, YWY 1 0 2 Presently DGS are operating in 1W+1S Configuration
Terminal No. X4-41,42 Terminal No. 1X7,8 2C-NIC ON FEEDBACK
Terminal No. X4-17,18 Terminal No. 1X5,6 2C-ACB NO CONTACT
3C-SPARE
5 DG2/P1 DG-2 Isolator panel DG-2 ALT. (DG-2 PCC3.3 Controller.) 4Cx2.5 1.1 kV, YWY 1 15.0 m 15 2
Terminal No. 1T-5,6,7,8 Terminal No. TB7-L1,L2,L3,N 4C-415 V AC SUPPLY FOR PCC BUS PT.
6 DG2/P2 Sync Logic Panel DG-2 Isolator panel 4Cx2.5 1.1 kV, YWY 1 60 60 2
Terminal No. T5,6 Terminal No. T1,2 2C-230 V AC SUPPLY FOR DG-2 ISOLATOR PANEL
7 DG2/P3 Sync Logic Panel DG-2 Isolator panel 4Cx2.5 1.1 kV, YWY 1 60 60 2
24V DC SUPPLY FROM
Terminal No. S3,4 Terminal No. 1Z5,6
DG-2 BATT ISOLATOR PANEL
8 DG2/P4 DG-2 BATT DG-2 Isolator panel 4Cx2.5 1.1 kV, YWY BY DG VENDOR
Terminal No. 1Z1,2 24V DC SUPPLY FOR DC CONTROL CKT.
9 DG2/P5 DG-2 BATT DG-2 ALT. (DG-2 PCC3.3 Controller.) 4Cx2.5 1.1 kV, YWY BY DG VENDOR
Terminal No. 1Z11,12 24V DC SUPPLY TO DG PCC
10 DG2/C5 Sync. Panel DG-2 Isolator Panel 4Cx1.5 1.1 kV, YWY 1 60 60 2
Terminal No. P-47,48, Terminal No. 1T-17,18,19 3C-KW SIGNAL TO Sync.PANEL
(Spare terminal for shield is required) 1C-SPARE
11 DG2/C6 Sync Logic Panel DG-2 Isolator panel 5Cx1.5 1.1 kV, YWY 1 60 60 2
2C - DG2 START/STOP COMMAND TO DG-2
Terminal No. L5,6 Terminal No. 1Z7,8
ISOLATOR PANEL
2C - DG2 LOAD DEMAND STOP COMMAND TO DG-2
Terminal No.L7,8 Terminal No. 1Z9,10
ISOLATOR PANEL
1C-SPARE
12 DG2/C7 Sync Logic Panel DG-2 Isolator panel 12Cx1.5 1.1 kV, YWY 1 60 60 2
Terminal No. S-39,40 Terminal No. 1X21,22 2C-NIC CLOSING CONTACT
2C - DG-2 AUTO / MANUAL F/B FROM ISOLATOR
Terminal No. P5,6 Terminal No. 1X23,24
PANEL
Terminal No. P7,8 Terminal No. 1X25,26 2C - DG-2 RUNNING F/B FROM ISOLATOR PANEL
Terminal No. S21,22 Terminal No. 1X27,28 2C - DG-2 CSD SIGNAL FROM ISOLATOR PANEL
Terminal No. S25,26 Terminal No. 1X29,30 2C-ACB NO CONTACT
2C-SPARE
13 DG2/C8 DG-2 Isolator panel DG-2 PCC3.3 Controller. 12Cx1.5 1.1 kV, YWY 1 15 15 2
Terminal No. 1Z-13,14 Terminal No. TB1-10,11 2C-REMOTE ENGINE START SIGNAL
Terminal No. 1Z-17,18 Terminal No. TB1-15,16 2C-EMERGENCY STOP
Terminal No. 1Z-19,20 Terminal No. TB5-1,2 2C-ACB CLOSE COMMAND
Terminal No. 1Z-21,22 Terminal No. TB5-4,5 2C-ACB TRIP COMMAND
Terminal No. 1Z-23,24 Terminal No. TB8-1,5 2C-ACB FAULT RESET
2C-SPARE
14 DG2/C9 DG-2 Isolator panel DG-2 PCC3.3 Controller. 7Cx1.5 1.1 kV, YWY 1 15 15 2
Terminal No. 1Z-25,26 Terminal No. TB8-8,13 2C-CUSTOMER FAULT
Terminal No. 1Z-29,32 Terminal No. TB10-7,2 2C-ACB CLOSE FEED BACK
Terminal No. 1Z-33,34 Terminal No. TB1-4,5 2C-GENSET RUNNING SIGNAL
1C-SPARE
15 DG2/C10 DG-2 Isolator panel DG-2 PCC3.3 Controller. 7Cx1.5 1.1 kV, YWY 1 15 15 2
Terminal No. 1Z-27,28 Terminal No. TB10-14,17 2C-LOAD DEMAND STOP
Terminal No. 1Z-35,36 Terminal No. TB1-8,9 2C-COMMON SHUT DOWN
Terminal No. 1Z-31.32 Terminal No. TB10-10,2 2C-CB TRIPPED STATUS
1C-SPARE

8 OF 35
CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
PROJECT NO. 44PS8901 Title:
REV NO. : 04

CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION DATE : 26-Oct-2021

LOCATION COIMBATORE
AC CABLE SCHEDULE -PHASE-III CABLE DETAILS

No. of Length in GLANDS


Size in Sq.mm. Type Tot. Leng. (m)
Sr. No. Designation From To Load Runs Mtrs. Industrial REMARKS

16 DG2/C11 DG-2 Isolator Panel FUEL TANK 4Cx1.5 1.1 kV, YWY BY DG VENDOR
Terminal No. 1Z-37,38 2C-Contact for Fuel level High status
Terminal No. 1Z-39,40 2C-Contact for Fuel level Low status
17 DG2/C12 METER BOX DG-2 Isolator panel 12Cx2.5 1.1 kV, YWY BY DG VENDOR
Terminal No. Terminal No. 1T25,26,27,28 4C- CT & 3PH,4W SUPPLY FOR KWH METER
Terminal No. Terminal No. 1T29,30,31,32 4C- 110 PT SUPPLY FOR KWH METER
4C-SPARE
Earthing cable from Neutral contactor (at LT panel end)
18 DG 2/ E1 DG 2 (625KVA) neutral contactor at LT panel end Earth Pit No. - DG2- Neutral Earth Pit-1 1Cx120 1.1 kV, YY, FRLS 1 80 80 2
to Earth pit.
19 DG 2/ E2 DG 2 (625KVA) neutral contactor at LT panel end Earth Pit No. - DG2- Neutral Earth Pit-2 1Cx120 1.1 kV, YY, FRLS 1 80 80 2
Actual length shall be verified at site.

New MLTP I/C 3 (DG-2)


20 SYNC./ PLC / C7 Sync Logic Panel 5Cx1.5 1.1 kV, YWY 0 0 Presently DGS are operating in 1W+1S Configuration
Feeder 7F-B
Terminal No. X4-15,16 Terminal No. S-39,40 2C-NIC ON/OFF COMMAND
Terminal No. X4-39,40 Terminal No. S27,28 2C-NIC ON FEEDBACK
1C-SPARE
New MLTP I/C 3 (DG-2)
21 SYNC./ PLC / C8 PLC panel 4Cx1.5 1.1 kV, YWY 1 20 20 2
Feeder 7F-B
2C-REF 615 RELAY TRIP FROM MLTP TO DG-2
Terminal No. X4-25,26 (REF 615 X100-13,14) Terminal No. P-23,24
CONTROLLER
2C-SPARE
NEW MAIN LT PANEL - I/C-4 (DG3)
1.1 kV, Cu. Flex Cable
22 10070-AG2-CMBR-ES-001-P28-P39 New DG Isolator panel near DG-3 FEEDER - 9F-B 625KVA 1C X 300 0 0 0 0 POWER CABLE
(BLACK)
TAG NO : 10070-AG2-CMBR-ES-001
New MLTP I/C 4 (DG-3)
23 DG3/C1 DG-3 Isolator panel 4Cx2.5 1.1 kV, YWY 0 0 0
Feeder 9F-B
Terminal No. XV3-35,36,37,38 Terminal No. 1T-1,2,3,4 4C-415 V AC BUS-2 SUPPLY TO PCC CONTROLLER
New MLTP I/C 4 (DG-3)
24 DG3/C2 DG-3 Isolator panel 12Cx1.5 1.1 kV, YWY 0 0 0
Feeder 9F-B
Terminal No. XV5-1,2,3,4 Terminal No. 1T-9,10,11,12 4C-3PH,4W,110 PT SUPPLY FOR METERING
4C-CT SUPPLY FOR METERING
Terminal No. XC5-34,35,36,37 Terminal No. 1T-13,14,15,16
4C-SPARE
New MLTP I/C 4 (DG-3)
25 DG3/C3 DG-3 Isolator panel
Feeder 9F-B
7Cx1.5 1.1 kV, YWY 0 0 0
Terminal No. 1T23,24 Terminal No. X5-3,4 2C-DG-3 ACB CLOSE COMMAND
Terminal No. 1X11,12 Terminal No. X5-11,12 2C-DG-3 ACB TRIP COMMAND
New MLTP I/C 4 (DG-3)
26 DG3/C4
Feeder 9F-B
DG-3 Isolator panel 7Cx1.5 1.1 kV, YWY 0 0 0
Terminal No. X5-41,42 Terminal No. 1X7,8 2C-NIC ON FEEDBACK
Terminal No. X5-17,18 Terminal No. 1X5,6 2C-ACB NO CONTACT
3C-SPARE
27 DG3/P1 DG-3 Isolator panel DG-3 ALT. (DG-3 PCC3.3 Controller.) 4Cx2.5 1.1 kV, YWY 0 0 0
Terminal No. 1T-5,6,7,8 Terminal No. TB7-L1,L2,L3,N 4C-415 V AC SUPPLY FOR PCC BUS PT.
28 DG3/P2 Sync Logic Panel DG-3 Isolator panel 4Cx2.5 1.1 kV, YWY 0 0 0
Terminal No. T7,8 Terminal No. T1,2 2C-230 V AC SUPPLY FOR DG-3 ISOLATOR PANEL
29 DG3/P3 Sync Logic Panel DG-3 Isolator panel 4Cx2.5 1.1 kV, YWY 0 0 0
24V DC SUPPLY FROM
Terminal No. S5,6 Terminal No. 1Z5,6
DG-3 BATT ISOLATOR PANEL
30 DG3/P4 DG-3 BATT DG-3 Isolator panel 4Cx2.5 1.1 kV, YWY 0 0 0
Terminal No. 1Z1,2 24V DC SUPPLY FOR DC CONTROL CKT.
31 DG3/C5 DG-3 Isolator Panel Sync. Panel 4Cx1.5 1.1 kV, YWY 0 0 0
Terminal No. 1T-17,18,19 Terminal No. P-49,50, 3C-KW SIGNAL TO Sync.PANEL
(Spare terminal for shield is required) 1C-SPARE
32 DG3/C6 Sync Logic Panel DG-3 Isolator panel 7Cx1.5 1.1 kV, YWY 0 0 0
2C - DG3 START/STOP COMMAND TO DG-1
Terminal No. L9,10 Terminal No. 1Z7,8
ISOLATOR PANEL
2C - DG3 LOAD DEMAND STOP COMMAND TO DG-3
Terminal No.L11,12 Terminal No. 1Z9,10
ISOLATOR PANEL
33 DG3/C7 DG-3 Isolator panel Sync Logic Panel 12Cx1.5 1.1 kV, YWY 0 0 0
Terminal No. 1X21,22 Terminal No. S41,42 2C-NIC CLOSING CONTACT
Terminal No. 1X23,24 Terminal No. P9,10 2C - DG-3 AUTO F/B FROM ISOLATOR PANEL
Terminal No. 1X25,26 Terminal No. P11,12 2C - DG-3 RUNNUBG F/B FROM ISOLATOR PANEL
2C - DG-3 CSD SIGNAL
Terminal No. 1X27,28 Terminal No. S29,30
FROM ISOLATOR PANEL
Terminal No. 1X29,30 Terminal No. S17,18 2C-ACB NO CONTACT FOR FEEDBACK
2C-SPARE

9 OF 35
CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
PROJECT NO. 44PS8901 Title:
REV NO. : 04

CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION DATE : 26-Oct-2021

LOCATION COIMBATORE
AC CABLE SCHEDULE -PHASE-III CABLE DETAILS

No. of Length in GLANDS


Size in Sq.mm. Type Tot. Leng. (m)
Sr. No. Designation From To Load Runs Mtrs. Industrial REMARKS

34 DG3/C8 DG-3 Isolator panel DG-3 PCC3.3 Controller. 12Cx1.5 1.1 kV, YWY 0 0 0
Terminal No. 1Z-13,14 Terminal No. TB1-10,11 2C-REMOTE ENGINE START SIGNAL
Terminal No. 1Z-17,18 Terminal No. TB1-15,16 2C-EMERGENCY STOP
Terminal No. 1Z-19,20 Terminal No. TB5-1,2 2C-ACB CLOSE COMMAND
Terminal No. 1Z-21,22 Terminal No. TB5-4,5 2C-ACB TRIP COMMAND
Terminal No. 1Z-23,24 Terminal No. TB8-1,5 2C-ACB FAULT RESET
2C-SPARE
35 DG3/C9 DG-3 Isolator panel DG-3 PCC3.3 Controller. 7Cx1.5 1.1 kV, YWY 0 0 0
Terminal No. 1Z-25,26 Terminal No. TB8-8,13 2C-CUSTOMER FAULT
Terminal No. 1Z-29,32 Terminal No. TB10-7,2 2C-ACB CLOSE FEED BACK
Terminal No. 1Z-33,34 Terminal No. TB1-4,5 2C-GENSET RUNNING SIGNAL
1C-SPARE
36 DG3/C10 DG-3 Isolator panel DG-3 PCC3.3 Controller. 7Cx1.5 1.1 kV, YWY 0 0 0
Terminal No. 1Z-27,28 Terminal No. TB10-14,17 2C-LOAD DEMAND STOP
Terminal No. 1Z-35,36 Terminal No. TB1-8,9 2C-COMMON SHUT DOWN
Terminal No. 1Z-31.32 Terminal No. TB10-10,2 2C-CB TRIPPED STATUS
1C-SPARE
37 DG3/C11 DG-3 Isolator Panel FUEL TANK 4Cx1.5 1.1 kV, YWY 0 0 0
Terminal No. 1Z-37,38 2C-Contact for Fuel level High status
Terminal No. 1Z-39,40 2C-Contact for Fuel level Low status

38 DG3/C12 METER BOX DG-3 Isolator panel 12Cx2.5 1.1 kV, YWY 0 0 0
Terminal No. 1T25,26,27,28 4C- CT & 3PH,4W SUPPLY FOR KWH METER
Terminal No. 1T29,30,31,32 4C- 110 PT SUPPLY FOR KWH METER
4C-SPARE
New MLTP I/C 4 (DG-3)
39 SYNC./ PLC / C9 PLC panel 4Cx1.5 1.1 kV, YWY 0 0 0
Feeder 9F-B
2C-REF 615 RELAY TRIP FROM MLTP TO DG-3
Terminal No. X5-25,26 (REF 615 X100-13,14) Terminal No. P-25,26
CONTROLLER
2C-SPARE
New MLTP I/C 4 (DG-3)
40 SYNC./ PLC / C10 Sync Logic Panel 7Cx1.5 1.1 kV, YWY 0 0 0
Feeder 9F-B
Terminal No. X5-15,16 Terminal No. S41,42 2C-NIC ON/OFF COMMAND
Terminal No. X5-39,40 Terminal No. S35,36 2C-NIC ON FEEDBACK
1C-SPARE
New MLTP O/G Feeder
41 SYNC./ PLC / P1 Sync Logic Panel 4Cx35 1.1 kV, A2XFY 1 20 20 2
Feeder 1F-C
Terminal No. T1,T2 4C-230 V AC SUPPLY FOR DG AUX CKT.
New MLTP I/C 1 (Transformer)
42 SYNC./ PLC / P2 Sync Logic Panel Feeder 4F-B 4Cx2.5 1.1 kV, YWY 1 20 20 2

Terminal No. T9,10,11 Terminal No. XV1-1,2,3,4 4C- 3PH,110AC SUPPLY FOR VMRT
43 SYNC./ PLC / P3 UPS-1 Sync Logic Panel 4Cx2.5 1.1 kV, YWY 1 45 45 2
Terminal No. T12,13 2C- 230V UPS POWER SUPPLY
2C-SPARE
44 SYNC./ PLC / P4 UPS-2 Sync Logic Panel 4Cx2.5 1.1 kV, YWY 1 45 45 2
Terminal No. T14,15 2C- 230V UPS POWER SUPPLY
2C-SPARE
45 DG1 PCC 3.3 controller SYNC./ PLC panel 4Cx1.5 1.1 kV, YWY 1 60 60 2
SYNC./ PLC Panel / C18 Terminal No. TB9-7,8,9,10,11 Terminal no. 1N-1,2,3,4,shield NET WORKING FOR KW & KVAR LOAD SHARING
46 SYNC./ PLC panel DG2 PCC 3.3 controller 4Cx1.5 1.1 kV, YWY 1 65 65 2
SYNC./ PLC Panel / C19 Terminal no. 1N-5,6,7,8,shield Terminal No. TB9-7,8,9,10,11 NET WORKING FOR KW & KVAR LOAD SHARING
47 DG2 PCC 3.3 controller DG3 PCC 3.3 controller 4Cx1.5 1.1 kV, YWY 1 30 30 2
SYNC./ PLC Panel / C20 Terminal No. TB9-7,8,9,10,11 Terminal No. TB9-7,8,9,10,11 NET WORKING FOR KW & KVAR LOAD SHARING
48 DG1 PCC 3.3 controller DG2 PCC 3.3 controller 2Cx1.5 Screen cable 1 30 30 2
SYNC./ PLC Panel / C21 Terminal No. TB3-11,12 Terminal No. TB3-11,12 Master DG networking

49 DG2 PCC 3.3 controller Future DG3 PCC 3.3 controller 2Cx1.5 Screen cable 1 30 30 2
SYNC./ PLC Panel / C22 Terminal No. TB3-11,12 Terminal No. TB3-11,12 Master DG networking

New MLTP I/C 4 (DG-3) DG-3 ACB No contact from MLTP Panel
SYNC./ PLC Panel / C11 PLC Panel 4Cx1.5 1.1 kV, YWY 1 20 20 2
Feeder 9F-B
Terminal No. S-31,32 Terminal No. X5-17,18

10 OF 35
CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
PROJECT NO. 44PS8901 Title:
REV NO. : 04

CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION DATE : 26-Oct-2021

LOCATION COIMBATORE
AC CABLE SCHEDULE -PHASE-III CABLE DETAILS

No. of Length in GLANDS


Size in Sq.mm. Type Tot. Leng. (m)
Sr. No. Designation From To Load Runs Mtrs. Industrial REMARKS

SMPS-1 (First Floor) For Load shedding, when future third DG is added in
50 SYNC./ PLC Panel / C12 SYNC./ PLC Panel 4Cx1.5 1.1 kV, YWY 1 35 35 2
Tag No.10070-AG2-CMBR-ED-001 system
Terminal No. L25,L26
SMPS-2 (First Floor) For Load shedding, when future third DG is added in
51 SYNC./ PLC Panel / C13 SYNC./ PLC Panel 4Cx1.5 1.1 kV, YWY 1 40 40 2
Tag No. 10070-AG2-CMBR-ED-002 system
Terminal No. L27, L28
SMPS-3 (First Floor) For Load shedding, when future third DG is added in
52 SYNC./ PLC Panel / C14 SYNC./ PLC Panel 4Cx1.5 1.1 kV, YWY 1 45 45 2
Tag No. 10070-AG2-CMBR-ED-003 system
Terminal No. L29, L30
SMPS-1 (Second Floor) For Load shedding, when future third DG is added in
53 SYNC./ PLC Panel / C15 SYNC./ PLC Panel 4Cx1.5 1.1 kV, YWY 1 45 45 2
Tag No.10070-AG2-CMBR-ED-201 system
Terminal No. L31, L32
SMPS-2 (Second Floor) For Load shedding, when future third DG is added in
54 SYNC./ PLC Panel / C16 SYNC./ PLC Panel 4Cx1.5 1.1 kV, YWY 1 48 48 2
Tag No.10070-AG2-CMBR-ED-202 system
Terminal No. L33, L34
SMPS-3 (Second Floor) For Load shedding, when future third DG is added in
55 SYNC./ PLC Panel / C17 SYNC./ PLC Panel 4Cx1.5 1.1 kV, YWY 1 50 50 2
Tag No.10070-AG2-CMBR-ED-203 system
Terminal No. L35, L36
EXISTING RCOM MLTP
NEW MAIN LT PANEL (O/G) FEEDER-10R-E (GR. FLOOR)
56 SYPE447-P2
TAG NO : 10070-AG2-CMBR-ES-001 FEED B
4Cx120 1.1 kV, 2XY 1 26 26 2
SYPE447
EXISTING RCOM MPDB, I/C-II, FEEDER NO-6F-B
NEW MAIN LT PANEL (O/G) FEEDER - 8F-B (GR. FLOOR) SYPE689
57 SYPE689-P7-P12
TAG NO : 10070-AG2-CMBR-ES-001 FEED B
4Cx300 1.1 kV, A2XFY 6 36 216 12

NEW MPDB I/C-II, FEEDER NO-7F-B


NEW MAIN LT PANEL (O/G) FEEDER - 8F-A (2ND. FLOOR)
58 10070-AG2-CMBR-EC-201-P5-P8
TAG NO : 10070-AG2-CMBR-ES-001 FEED B
4Cx300 1.1 kV, A2XFY 4 41 163 8
TAG NO. : 10070-AG2-CMBR-EC-201
LPDB CHANGEOVER SWITCH (OFF LOAD)
NEW MAIN LT PANEL (O/G) FEEDER - 10R-D
59 10070-AG2-CMBR-EKL-003-P2 (GROUND FLOOR) FEED-B 4Cx35 1.1 kV, A2XFY 1 15 15 2
TAG NO : 10070-AG2-CMBR-ES-001
TAG NO. : 10070-AG2-CMBR-EKL-003

0.37kW
NEW MAIN LT PANEL (O/G) FEEDER - 10R-C
60 HOLD
TAG NO : 10070-AG2-CMBR-ES-001
EXHAUST FAN 3Cx2.5 1.1 kV, YWY 1 10 10 2
(GROUND FLOOR)

EXISTING MPDB, (O/G) FEEDER - 3R-B Energy Meter DB -5


61 CMBR-EM-DB-5-P1 (GR. FLOOR) ( 25TR PAC-5 First Floor FOR MSC-2 ) 4Cx35 1.1 kV, A2XFY 1 12 12 2
TAG NO. : 10070-AG2-CMBR-EC-001 CMBR-EM-DB-5-P1

Energy Meter DB -5 25TR PAC-5 FOR MSC-2


62 CMBR-MCN-MAU-1F-005-P1 ( 25TR PAC-5 First Floor FOR MSC-2 ) (37.5kW) (EXISTING) 4Cx35 1.1 kV, A2XFY 1 48 48 2
CMBR-EM-DB-5-P1 TAG NO. : CMBR-MCN-MAU-1F-005

EXISTING MPDB, (O/G) FEEDER - 3R-D 120kW SMPS-3 FOR FIRST


63 10070-AG2-CMBR-ED-003-P1 (GR. FLOOR) FLOOR (PROPOSED) 4Cx120 1.1 kV, 2XY 1 42 42 2
TAG NO. : 10070-AG2-CMBR-EC-001 TAG NO. : 10070-AG2-CMBR-ED-003
LIGHTING AND SMALL
EXISTING MPDB, (O/G) FEEDER - 4F-A
POWER DB
64 10070-AG2-CMBR-EKL-001-P1 (GR. FLOOR) 4C X 35 1.1 kV, A2XFY 1 54 54 2
FOR 1ST FLOOR
TAG NO. : 10070-AG2-CMBR-EC-001
TAG NO. : 10070-AG2-CMBR-EKL-001
EXISTING MPDB, (O/G) FEEDER - 4F-B Energy Meter DB -4
65 CMBR-EM-DB-4-P1 (GR. FLOOR) ( 25TR PAC-4 First Floor FOR MSC-2 ) 4C X 35 1.1 kV, A2XFY 1 12 12 2
TAG NO. : 10070-AG2-CMBR-EC-001 CMBR-EM-DB-4-P1

Energy Meter DB -4 25TR PAC-4 FOR MSC-2


66 CMBR-MCN-MAU-1F-004-P1 ( 25TR PAC-4 First Floor FOR MSC-2 ) (37.5kW) (EXISTING) 4C X 35 1.1 kV, A2XFY 1 46 46 2
CMBR-EM-DB-4-P1 TAG NO. : CMBR-MCN-MAU-1F-004

EXISTING MPDB, (O/G) FEEDER - 7F-C 120kW SMPS-1 FOR FIRST


67 10070-AG2-CMBR-ED-001-P1 (GR. FLOOR) FLOOR (EXISTING ) 4Cx120 1.1 kV, 2XY 1 47 47 2 Existing Cable
TAG NO. : 10070-AG2-CMBR-EC-001 TAG NO. : 10070-AG2-CMBR-ED-001

EXISTING MPDB, (O/G) FEEDER - 7F-D 120kW SMPS-2 FOR FIRST


68 10070-AG2-CMBR-ED-002-P1 (GR. FLOOR) FLOOR (EXISTING ) 4Cx120 1.1 kV, 2XY 1 43 43 2 Existing Cable
TAG NO. : 10070-AG2-CMBR-EC-001 TAG NO. : 10070-AG2-CMBR-ED-002

11 OF 35
CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
PROJECT NO. 44PS8901 Title:
REV NO. : 04

CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION DATE : 26-Oct-2021

LOCATION COIMBATORE
AC CABLE SCHEDULE -PHASE-III CABLE DETAILS

No. of Length in GLANDS


Size in Sq.mm. Type Tot. Leng. (m)
Sr. No. Designation From To Load Runs Mtrs. Industrial REMARKS

EXISTING MPDB, (O/G) FEEDER - 4R-B Energy Meter DB -2


69 CMBR-EM-DB-2-P1 (GR. FLOOR) ( 25TR PAC-2 First Floor FOR MSC-2 ) 4Cx35 1.1 kV, A2XFY 1 12 12 2
TAG NO. : 10070-AG2-CMBR-EC-001 CMBR-EM-DB-2-P1

Energy Meter DB -2 25TR PAC-2 FOR MSC-2


70 CMBR-MCN-MAU-1F-002-P1 ( 25TR PAC-2 First Floor FOR MSC-2 ) (37.5kW) (PROPOSED) 4Cx35 1.1 kV, A2XFY 1 38 38 2
CMBR-EM-DB-2-P1 TAG NO. : CMBR-MCN-MAU-1F-002

EXISTING MPDB, (O/G) FEEDER - 3F-B 3.7kW 1.5kW EXHAUST FAN


71 CMBR-MCN-MAF-002-P1 (GR. FLOOR) EXISTING ELECTRICAL ROOM 3Cx2.5 1.1 kV, YWY 1 20 20 2 Existing Cable
TAG NO. : 10070-AG2-CMBR-EC-001 TAG NO. : CMBR-MCN-MAF-1F-002

EXISTING MPDB EMERGENCY


72 10070-AG2-CMBR-EPR-003-P1 (GR. FLOOR) PUSH BUTTON 3Cx2.5 1.1 kV, YWY 1 20 20 2 Existing Cable
TAG NO. : 10070-AG2-CMBR-EC-001 TAG NO. : 10070-AG2-CMBR-EPR-003

EXISTING MPDB, (O/G) FEEDER - 7F-B Energy Meter DB -3


73 CMBR-EM-DB-3-P1 (GR. FLOOR) ( 25TR PAC-3 First Floor FOR MSC-2 ) 4Cx35 1.1 kV, A2XFY 1 15 15 2
TAG NO. : 10070-AG2-CMBR-EC-001 CMBR-EM-DB-3-P1

Energy Meter DB -3 25TR PAC-3 FOR MSC-2


74 CMBR-MCN-MAU-1F-003-P1 ( 25TR PAC-3 First Floor FOR MSC-2 ) (37.5kW) (EXISTING) 4Cx35 1.1 kV, A2XFY 1 42 42 2
CMBR-EM-DB-3-P1 TAG NO. : CMBR-MCN-1F-MAU-003

EXISTING MPDB, (O/G) FEEDER - 4F-C 120kW SMPS-1 FOR FIRST


75 10070-AG2-CMBR-ED-001-P1 (GR. FLOOR) FLOOR (PROPOSED) - FEED-A 4Cx120 1.1 kV, 2XY 1 47 47 2
TAG NO. : 10070-AG2-CMBR-EC-001 TAG NO. : 10070-AG2-CMBR-ED-001

EXISTING MPDB, (O/G) FEEDER - 4F-D 120kW SMPS-2 FOR FIRST


76 10070-AG2-CMBR-ED-002-P1 (GR. FLOOR) FLOOR (PROPOSED) - FEED-A 4Cx120 1.1 kV, 2XY 1 43 43 2
TAG NO. : 10070-AG2-CMBR-EC-001 TAG NO. : 10070-AG2-CMBR-ED-002

EXISTING MPDB, (O/G) FEEDER - 7R-B 20TR PAC-6 FOR MSC-2


77 CMBR-MCN-MAU -1F-006-P1 (GR. FLOOR) (30kW) (PROPOSED) 4Cx35 1.1 kV, A2XFY 1 52 52 2 PAC-6 Unit to be removed.
TAG NO. : 10070-AG2-CMBR-EC-001 TAG NO. : CMBR-MCN-MAU-006

EXISTING MPDB, (O/G) FEEDER - 4R-D 1.5kW EXHAUST FAN


78 CMBR-MCN-MAF-003-P1 (GR. FLOOR) EXISTING ELECTRICAL ROOM 3Cx2.5 1.1 kV, YWY 1 25 25 2 Existing Cable
TAG NO. : 10070-AG2-CMBR-EC-001 TAG NO. : CMBR-MCN-MAF-003

EXISTING MPDB, (O/G) FEEDER - 4R-D EMERGENCY


79 10070-AG2-CMBR-EPR-004-P1 (GR. FLOOR) PUSH BUTTON 3Cx2.5 1.1 kV, YWY 1 25 25 2 Existing Cable
TAG NO. : 10070-AG2-CMBR-EC-001 TAG NO. : 10070-AG2-CMBR-EPR-004

EXISTING MPDB, (O/G) FEEDER - 7R-D


FIRE FIGHTING MCC
80 10070-AG2-CMBR-EC-002-P1 (GR. FLOOR) 4Cx35 1.1 kV, A2XFY 3 25 75 6 Existing Cable
TAG NO. : 10070-AG2-CMBR-EC-002
TAG NO. : 10070-AG2-CMBR-EC-001

EXISTING MPDB, (O/G) FEEDER - 8F-C


20kVA UPS-1
81 10070-AG2-CMBR-EUP-001-P1 (GR. FLOOR)
TAG NO. : 10070-AG2-CMBR-EUP-001
4Cx10 1.1 kV, YWY 1 38 38 2
TAG NO. : 10070-AG2-CMBR-EC-001

12 OF 35
CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
PROJECT NO. 44PS8901 Title:
REV NO. : 04

CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION DATE : 26-Oct-2021

LOCATION COIMBATORE
AC CABLE SCHEDULE -PHASE-III CABLE DETAILS

No. of Length in GLANDS


Size in Sq.mm. Type Tot. Leng. (m)
Sr. No. Designation From To Load Runs Mtrs. Industrial REMARKS

Fire Fighting MCC


Pressure Switch
82 10070-AG2-CMBR-EC-002-C1 Feeder No: 2FD 4Cx1.5 1.1 kV, YWY 1 10 10 2 To Start Main Motor
PS-3
Tag No.10070-AG2-CMBR-EC-002
2C - NO contact of Pressure Switch PS-3 to start Main
Terminal No. By Site Terminal No. X-35 to X-36
Pump Motor when pressure reaches to 7.5 kg/cm2
2C - SPARE
Fire Fighting MCC
83 Diesel Pump Control Panel - C1 Feeder No: 2FD Diesel Pump Control Panel 4Cx1.5 1.1 kV, YWY 1 29 28.8 2
Tag No.10070-AG2-CMBR-EC-002
2C - Main Pump Motor trip signal to Diesel Pump control
Terminal No. X-19 to X-20 Terminal No. TB3-25 to TB2-26
panel
2C - SPARE
Fire Fighting MCC
Pressure Switch
84 10070-AG2-CMBR-EC-002-C2 Feeder No: 2FA 4Cx1.5 1.1 kV, YWY 1 15 15 2 To Start Jockey pump Motor
PS-1
Tag No.10070-AG2-CMBR-EC-002
2C - NO contact of Pressure Switch PS-1 to start Jockey
Terminal No. By Site Terminal No. X-35 to X-36
Pump Motor when pressure reaches to 8.5 kg/cm2
2C - SPARE
Fire Fighting MCC
Pressure Switch
85 10070-AG2-CMBR-EC-002-C3 Feeder No: 2FA 4Cx1.5 1.1 kV, YWY 1 15 15 2 To Stop Jockey pump Motor
PS-2
Tag No.10070-AG2-CMBR-EC-002
2C - NC contact of Pressure Switch PS-2 to stop Jockey
Terminal No. By Site Terminal No. X-33 to X-34
Pump Motor when pressure reaches to 9 kg/cm2
2C - Spare
Fire Fighting MCC
86 10070-AG2-CMBR-EC-002-C4 Diesel Pump Control Panel Feeder No: 2FA 4Cx1.5 1.1 kV, YWY 1 15 15 2 To Stop Jockey pump Motor
Tag No.10070-AG2-CMBR-EC-002
2C - Diesel Pump running contact to stop Jockey Pump
Terminal No. TB3-43 to TB2-44 Terminal No. X-3 to X-4
Motor
2C - SPARE
20KVA UPS DB-1
87 Diesel Pump Control Panel - P1 Diesel Pump Control Panel 4Cx4 1.1 kV, YWY 1 115 115.2 2 1ph UPS Auxiliary Supply to Diesel Pump Control Panel
Tag No.10070-AG2-CMBR-EUP-021
Terminal No. TB1-2,3

Pressure Switch
88 Diesel Pump Control Panel - C2 Diesel Pump Control Panel 4Cx1.5 1.1 kV, YWY 1 15 15 2 To start Diesel Pump
PS-4
Terminal No. 10TB2 to 12TB2
2C - NO contact of Pressure Switch PS-4 to start Diesel
Terminal No. By Site ((Marked terminal numbers to be validated at site w.r.t
Pump when pressure reaches to 6.5 kg/cm2
panel available at site)
2C - Spare
EXISTING MPDB, (O/G) FEEDER - 8R-B Energy Meter DB -1
89 CMBR-EM-DB-3-P1 (GR. FLOOR) ( 25TR PAC-1 First Floor FOR MSC-2 ) 4Cx35 1.1 kV, A2XFY 1 18 18 2
TAG NO. : 10070-AG2-CMBR-EC-001 CMBR-EM-DB-1-P1

Energy Meter DB -1 25TR PAC-1 FOR MSC-2


90 CMBR-MCN-MAU-1F-001-P1 ( 25TR PAC-1 First Floor FOR MSC-2 ) (37.5kW) (PROPOSED) 4Cx35 1.1 kV, A2XFY 1 36 36 2
CMBR-EM-DB-1-P1 TAG NO. : CMBR-MCN-MAU-1F--001

EXISTING MPDB, (O/G) FEEDER - 8R-D 120kW SMPS-3 FOR FIRST


91 10070-AG2-CMBR-ED-003-P1 (GR. FLOOR) FLOOR (PROPOSED) 4Cx120 1.1 kV, 2XY 1 42 42 2
TAG NO. : 10070-AG2-CMBR-EC-001 TAG NO. : 10070-AG2-CMBR-ED-003

13 OF 35
CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
PROJECT NO. 44PS8901 Title:
REV NO. : 04

CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION DATE : 26-Oct-2021

LOCATION COIMBATORE
AC CABLE SCHEDULE -PHASE-III CABLE DETAILS

No. of Length in GLANDS


Size in Sq.mm. Type Tot. Leng. (m)
Sr. No. Designation From To Load Runs Mtrs. Industrial REMARKS

NEW MPDB, (O/G) FEEDER- 2R-C LPDB CHANGEOVER SWITCH (OFF LOAD)
92 10070-AG2-CMBR-EKL-202 -P1 (2ND. FLOOR) (2ND. FLOOR) FEED-A 4Cx35 1.1 kV, A2XFY
TAG NO. : 10070-AG2-CMBR-EC-201 TAG NO. : 10070-AG2-CMBR-EKL-202

LIGHTING & SMALL POWER DISTRIBUTION BOARD


LPDB CHANGEOVER SWITCH (OFF LOAD)
93 10070-AG2-CMBR-EKL-201-P1 (2ND. FLOOR) 4Cx35 1.1 kV, A2XFY
TAG NO. : 10070-AG2-CMBR-EKL-201
TAG NO. : 10070-AG2-CMBR-EKL-201

NEW MPDB, (O/G) FEEDER- 2R-D 0.37kW


94 EXHAUST FAN - (2ND. FLOOR) (2ND. FLOOR) EXHAUST FAN 3Cx2.5 1.1 kV, YWY
TAG NO. : 10070-AG2-CMBR-EC-201 (2ND. FLOOR)

NEW MPDB, (O/G) FEEDER- 2F-B 20TR PAC (CRAC 3)


95 10070-CMBR-MAU-SF-03-P1 (2ND. FLOOR) 30kW (SECOND FLOOR) 4Cx35 1.1 kV, A2XFY
TAG NO. : 10070-AG2-CMBR-EC-201 TAG NO. : 10070-CMBR-MAU-SF-03

NEW MPDB, (O/G) FEEDER- 1F-C 20TR PAC (CRAC 1)


96 0070-CMBR-MAU-SF-01-P1 (2ND. FLOOR) 30kW (SECOND FLOOR) 4Cx35 1.1 kV, A2XFY
TAG NO. : 10070-AG2-CMBR-EC-201 TAG NO. : 10070-CMBR-MAU-SF-01

NEW MPDB (O/G) FEEDER- 2F-D 120kW SMPS-03


97 10070-AG2-CMBR-ED-203-P1 (2ND. FLOOR) FEED A 4Cx120 1.1 kV, 2XY
TAG NO. : 10070-AG2-CMBR-EC-201 TAG NO. : 10070-AG2-CMBR-ED-203

NEW MPDB, (O/G) FEEDER- 1R-E 120kW SMPS-02


98 10070-AG2-CMBR-ED-202-P1 (2ND. FLOOR) FEED A 4Cx120 1.1 kV, 2XY
TAG NO. : 10070-AG2-CMBR-EC-201 TAG NO. : 10070-AG2-CMBR-ED-202

NEW MPDB, (O/G) FEEDER- 1F-D 120kW SMPS-01


99 10070-AG2-CMBR-ED-201-P1 (2ND. FLOOR) FEED A 4Cx120 1.1 kV, 2XY
TAG NO. : 10070-AG2-CMBR-EC-201 TAG NO. : 10070-AG2-CMBR-ED-201

NEW MPDB, (O/G) FEEDER- 9F-D 120kW SMPS-03


100 10070-AG2-CMBR-ED-203-P1 (2ND. FLOOR) FEED B 4Cx120 1.1 kV, 2XY
TAG NO. : 10070-AG2-CMBR-EC-201 TAG NO. : 10070-AG2-CMBR-ED-203

NEW MPDB, (O/G) FEEDER- 8R-E 120kW SMPS-02


101 10070-AG2-CMBR-ED-202-P1 (2ND. FLOOR) FEED B 4Cx120 1.1 kV, 2XY
TAG NO. : 10070-AG2-CMBR-EC-201 TAG NO. : 10070-AG2-CMBR-ED-202

NEW MPDB (O/G) FEEDER- 8F-D 120kW SMPS-01


102 10070-AG2-CMBR-ED-201-P1 (2ND. FLOOR) FEED B 4Cx120 1.1 kV, 2XY
TAG NO. : 10070-AG2-CMBR-EC-201 TAG NO. : 10070-AG2-CMBR-ED-201

NEW MPDB, (O/G) FEEDER- 9F-C 20TR PAC (CRAC 2)


103 10070-CMBR-MAU-SF-02-P1 (2ND. FLOOR) 30kW (SECOND FLOOR) 4Cx35 1.1 kV, A2XFY
TAG NO. : 10070-AG2-CMBR-EC-201 TAG NO. : TAG NO. : 10070-CMBR-MAU-SF-02

NEW MPDB, (O/G) FEEDER- 8F-B 20TR PAC (CRAC 4)


104 10070-CMBR-MAU-SF-04-P1 (2ND. FLOOR) 30kW (SECOND FLOOR) 4Cx35 1.1 kV, A2XFY
TAG NO. : 10070-AG2-CMBR-EC-201 TAG NO. : TAG NO. : 10070-CMBR-MAU-SF-04

NEW MPDB, (O/G) FEEDER- 9R-C LPDB CHANGEOVER SWITCH (OFF LOAD)
105 10070-AG2-CMBR-EKL-202 -P2 (2ND. FLOOR) (2ND. FLOOR) FEED-B 4Cx35 1.1 kV, A2XFY
TAG NO. : 10070-AG2-CMBR-EC-201 TAG NO. : 10070-AG2-CMBR-EKL-202

NEW MPDB, (O/G) FEEDER- 9R-D 0.37kW


106 EXHAUST FAN - (2ND. FLOOR) (2ND. FLOOR) EXHAUST FAN 3Cx2.5 1.1 kV, YWY
TAG NO. : 10070-AG2-CMBR-EC-201 (2ND. FLOOR)

14 OF 35
CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
PROJECT NO. 44PS8901 Title:
REV NO. : 04

CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION DATE : 26-Oct-2021

LOCATION COIMBATORE
AC CABLE SCHEDULE -PHASE-III CABLE DETAILS

No. of Length in GLANDS


Size in Sq.mm. Type Tot. Leng. (m)
Sr. No. Designation From To Load Runs Mtrs. Industrial REMARKS

MPDB (Second Floor)


UACDB-1
107 10070-AG2-CMBR-EC-201-C1 Feeder No. 6FA 3Cx2.5 1.1 kV, YWY 1 54 54 2
Tag No.10070-AG2-CMBR-EKE-001
Tag No.10070-AG2-CMBR-EC-201 1ph UPS Auxiliary Supply to MPDB Panel (Second
Floor)
MPDB (Second Floor)
UACDB-2
108 10070-AG2-CMBR-EC-201-C2 Feeder No. 6FA 3Cx2.5 1.1 kV, YWY 1 54 54 2
Tag No.10070-AG2-CMBR-EKE-002
Tag No.10070-AG2-CMBR-EC-202

MPDB (Second Floor)


SMPS-1 (Second Floor) I/C-1
109 10070-AG2-CMBR-ED-201-P1 Feeder No. 1FD 120 kW 4Cx120 1.1 kV, 2XY 1 36 36 2
Tag No. 10070-AG2-CMBR-ED-201
Tag No.10070-AG2-CMBR-EC-201
MPDB (Second Floor)
SMPS-1 (Second Floor) I/C-2
110 10070-AG2-CMBR-ED-201-P2 Feeder No. 8FD 120 kW 4Cx120 1.1 kV, 2XY 1 36 36 2
Tag No. 10070-AG2-CMBR-ED-201
Tag No.10070-AG2-CMBR-EC-201
MPDB (Second Floor)
SMPS-2 (Second Floor) I/C-1
111 10070-AG2-CMBR-ED-202-P1 Feeder No. 1RE 120 kW 4Cx120 1.1 kV, 2XY 1 31 31.2 2
Tag No. 10070-AG2-CMBR-ED-202
Tag No.10070-AG2-CMBR-EC-201
MPDB (Second Floor)
SMPS-2 (Second Floor) I/C-2
112 10070-AG2-CMBR-ED-202-P2 Feeder No. 8RE 120 kW 4Cx120 1.1 kV, 2XY 1 31 31.2 2
Tag No. 10070-AG2-CMBR-ED-202
Tag No.10070-AG2-CMBR-EC-201
MPDB (Second Floor)
SMPS-3 (Second Floor) I/C-1
113 10070-AG2-CMBR-ED-203-P1 Feeder No. 2FD 120 kW 4Cx120 1.1 kV, 2XY 1 36 36 2
Tag No. 10070-AG2-CMBR-ED-203
Tag No.10070-AG2-CMBR-EC-201
MPDB (Second Floor)
SMPS-3 (Second Floor) I/C-2
114 10070-AG2-CMBR-ED-203-P2 Feeder No. 9FD 120 kW 4Cx120 1.1 kV, 2XY 1 36 36 2
Tag No. 10070-AG2-CMBR-ED-203
Tag No.10070-AG2-CMBR-EC-201
MPDB (Second Floor)
CRAC-1 2nd Floor
115 CMBR-MCN-MAU-SF-01-P1 Feeder No. 1FC 37 kW 4Cx35 1.1 kV, A2XFY 1 62 62.4 2
Tag No. CMBR-MCN-MAU-SF-01
Tag No.10070-AG2-CMBR-EC-201
MPDB (Second Floor)
CRAC-2 2nd Floor
116 CMBR-MCN-MAU-SF-02-P1 Feeder No. 9FC 37 kW 4Cx35 1.1 kV, A2XFY 1 59 58.8 2
Tag No. CMBR-MCN-MAU-SF-02
Tag No.10070-AG2-CMBR-EC-201
MPDB (Second Floor)
CRAC-3 2nd Floor
117 CMBR-MCN-MAU-SF-03-P1 Feeder No. 2FB 37 kW 4Cx35 1.1 kV, A2XFY 1 54 54 2
Tag No. CMBR-MCN-MAU-SF-03
Tag No.10070-AG2-CMBR-EC-201
MPDB (Second Floor)
CRAC-4 2nd Floor
118 CMBR-MCN-MAU-SF-04-P1 Feeder No. 8FB 37 kW 4Cx35 1.1 kV, A2XFY 1 50 50.4 2
Tag No. CMBR-MCN-MAU-SF-04
Tag No.10070-AG2-CMBR-EC-201
MPDB (Second Floor)
CRAC-5 2nd Floor
119 CMBR-MCN-MAU-SF-05-P1 Feeder No. 1FB 37 kW 4Cx35 1.1 kV, A2XFY 1 41 40.8 2
Tag No. CMBR-MCN-MAU-SF-05
Tag No.10070-AG2-CMBR-EC-201
MPDB (Second Floor)
CRAC-6 2nd Floor Vacant Feeders 8RA-8RB feeders to be modified to
120 CMBR-MCN-MAU-SF-06-P1 Feeder No.( 8RA-8RB Modified) 37 kW 4Cx35 1.1 kV, A2XFY 1 37 37.2 2
Tag No. CMBR-MCN-MAU-SF-06 100 Amps PAC feder.
Tag No.10070-AG2-CMBR-EC-201
MPDB (Second Floor)
UPS-1 (Second Floor)
121 10070-AG2-CMBR-EUP-201- P1 Feeder No. 2FC 75 kVA 4Cx120 1.1 kV, 2XY 1 36 36 2
Tag No. 10070-AG2-CMBR-EUP-201
Tag No.10070-AG2-CMBR-EC-201
MPDB (Second Floor)
UPS-2 (Second Floor)
122 10070-AG2-CMBR-EUP-202- P1 Feeder No. 8FC 75 kVA 4Cx120 1.1 kV, 2XY 1 36 36 2
Tag No. 10070-AG2-CMBR-EUP-202
Tag No.10070-AG2-CMBR-EC-201

AG2-CMBR-ED-214-P1 (Red) UPS-1 (Second Floor) UPS Battery 1


123
AG2-CMBR-ED-214-P2 (Black) Tag No. 10070-AG2-CMBR-EUP-201 Tag No.10070-AG2-CMBR-ED-214

AG2-CMBR-ED-214-P1 (Red) UPS-2 (Second Floor) UPS Battery 2


124
AG2-CMBR-ED-214-P2 (Black) Tag No. 10070-AG2-CMBR-EUP-202 Tag No.10070-AG2-CMBR-ED-215

UPS-1 (Second Floor) UPSDB-1


125 10070-AG2-CMBR-ED-216- P1 250A 4Cx120 1.1 kV, 2XY 1 16 15.6 2
Tag No. 10070-AG2-CMBR-EUP-201 Tag No. 10070-AG2-CMBR-ED-216

UPS-2 (Second Floor) UPSDB-2


126 10070-AG2-CMBR-ED-217- P1 250A 4Cx120 1.1 kV, 2XY 1 18 18 2
Tag No. 10070-AG2-CMBR-EUP-202 Tag No. 10070-AG2-CMBR-ED-217

15 OF 35
CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
PROJECT NO. 44PS8901 Title:
REV NO. : 04

CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION DATE : 26-Oct-2021

LOCATION COIMBATORE
AC CABLE SCHEDULE -PHASE-III CABLE DETAILS

No. of Length in GLANDS


Size in Sq.mm. Type Tot. Leng. (m)
Sr. No. Designation From To Load Runs Mtrs. Industrial REMARKS

MPDB (Second Floor)


LPDB 1 Changeover Switch
127 10070-AG2-CMBR-EKL-202-P1 Feeder No. 2RC 63A 4Cx35 1.1 kV, A2XFY 1 17 16.8 2
Tag No. 10070-AG2-CMBR-EKL-202
Tag No.10070-AG2-CMBR-EC-201

MPDB (Second Floor)


LPDB 1 Changeover Switch
128 10070-AG2-CMBR-EKL-202-P2 Feeder No. 9RC 63A 4Cx35 1.1 kV, A2XFY 1 17 16.8 2
Tag No. 10070-AG2-CMBR-EKL-201
Tag No.10070-AG2-CMBR-EC-201

LPDB 1 Changeover Switch LPDB 1


129 10070-AG2-CMBR-EKL-201-P1 63A 4Cx35 1.1 kV, A2XFY 1 5 5 2
Tag No. 10070-AG2-CMBR-EKL-202 Tag No. 10070-AG2-CMBR-EKL-202

MPDB (Second Floor) 0.37 kW Exhaust Fan-2


130 NDDG-MCN-MAF-GF-02-P1 Feeder No. 1RD (Electrical Room) 0.37 kW 2 1 15 15 0
Tag No.10070-AG2-CMBR-EC-201 Tag No. NDDG-CMBR-MAF-SF-01

Access Control System for


UPSDB-1 Access Control System for Door
131 Access Controller-1-P1 Access Controller-1 2 Door 1 78 78 2
Tag No. 10070-AG2-CMBR-ED-216

UPSDB-2 Access Control System for


132 Access Controller-2-P1 Access Controller-2 2 1 98 98.4 2 Access Control System for Door
Tag No. 10070-AG2-CMBR-ED-217 Door

SMPS -1 in Bay 02 Hooter-1 located on Bay-01 48V DC Power Supply to


133 HOOTER 1-P1 48V 2 1 16 15.6 2 48V DC Power Supply to Hooter 01
(10070-AG2-CMBR-ED-201) (Second Floor) Hooter 01

SMPS -1 in Bay 02 Hooter-2 located on Bay-02 48V DC Power Supply to


134 HOOTER 2-P2 48V 2 1 12 12 2 48V DC Power Supply to Hooter 02
(10070-AG2-CMBR-ED-201) (Second Floor) Hooter 02

SMPS -2 in Bay 03 Hooter-3 located on Bay-03 48V DC Power Supply to


135 HOOTER 3-P3 48V 2 1 12 12 2 48V DC Power Supply to Hooter 03
(10070-AG2-CMBR-ED-202) (Second Floor) Hooter 03

SMPS -2 in Bay 03 Hooter-4 located on Bay-04 48V DC Power Supply to


136 HOOTER 4-P4 48V 2 1 16 15.6 2 48V DC Power Supply to Hooter 04
(10070-AG2-CMBR-ED-202) (Second Floor) Hooter 04

SMPS -3 in Bay 04 Hooter-5 located on Bay-05 48V DC Power Supply to


137 HOOTER 5-P5 48V 2 1 16 15.6 2 48V DC Power Supply to Hooter 05
(10070-AG2-CMBR-ED-203) (Second Floor) Hooter 05

SMPS -3 in Bay 04 Hooter-6 located on Bay-06 48V DC Power Supply to


138 HOOTER 6-P6 48V 2 1 16 15.6 2 48V DC Power Supply to Hooter 06
(10070-AG2-CMBR-ED-203) (Second Floor) Hooter 06

16 OF 35
PROJECT NO.: . 44PS8901 TITLE: CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION REV NO. : 04
LOCATION COIMBATORE DATE : 26-Oct-2021
ANNEXURE A: SMPS DISTRIBUTION MATRIX GROUND FLOOR FOR PHASE -1 & PHASE -III
SMPS-1 First Floor (PHASE-I) SMPS -2 FIRST FLOOR (PHASE-I)

Fuses Fuses Bay no & Row Fuses Fuses


Terminal no Name of Rack Bay no & Row no KW Terminal no Name of Rack Bay no & Row no KW Terminal no Name of Rack KW Terminal no Name of Rack Bay no & Row no KW
(-ve Bus) (-ve Bus) no (-ve Bus) (-ve Bus)
200A Fuse 200A Fuse 200A Fuse 200A Fuse
FACEBOOK-2 1 23
SECAT-1
1 Spare 1 23 CDN-2 B05,R02 5 1 Spare 1 B05,R05 5 1
(600x1200x2200)
(600x1200x2200)
FACEBOOK-1 2 Spare 24 GOOGLE-2
2 Spare 1 24 CDN-1 B05,R01 5 1 1 CDN-4 B05,R04 5 1
(600x1200x2200) (600x1200x2200)
3 Spare 25
GOOGLE-1
3 Spare 1 25 Spare 1 1 CDN-3 B05,R03 5 1
(600x1200x2200)

100 A Fuse 100 A Fuse 100 A Fuse 100 A Fuse


26
TX POI -1 TX POI-1
4 B04,R08 5 1 26 1 4 1 B04,R08 5 1
(700x1000x2200) METRO METRO (700x1000x2200)
CORE + CORE +
B03,R07 10 B03,R07 10
ACCESSES - 1 5 ACCESSES - 1 27
(700x1000x2200) (700x1000x2200)
TX POI -2 TX POI-2
5 B04,R07 5 1 27 1 1 B04,R07 5 1
(700x1000x2200) (700x1000x2200)

6 28
6 1 28 METRO METRO 1 1
ALU MGW-1 CORE + CORE + ALU MGW-1
B04,R06 6 B03,R06 10 B03,R06 10 B04,R06 6
(600x1000x2200) ACCESSES - 2 7 ACCESSES - 2 29 (600x1000x2200)
7 1 29 (700x1000x2200) (700x1000x2200) 1 1

IPSE 8 IPSE 30
8 1 30 B03,R05 5 1 B03,R05 5 1 1
ALU MGW -2 (600x1000x2200) (600x1000x2200) ALU MGW-2
B04,R05 6 B04,R05 6
(600x1000x2200) 9 31 (600x1000x2200)
9 1 31 1 1 1
IBR-2 IBR -2
B03,R03 7 B03,R03 7
(800x1000x2200) 10 (800x1000x2200) 32
DCN DCN
10 B04,R04 4 1 32 1 1 B04,R04 4 1
(800x1000x2200) (800x1000x2200)
11 33
11 1 33 1 1 1
IBR-1 SAR-2 SAR-2 IBR-1
B04,R03 7 B03,R02 7 B03,R02 7 B04,R03 7
(800x1000x2200) (800x1000x2200) 12 (800x1000x2200) 34 (800x1000x2200)
12 1 34 1 1 1

13 35
13 1 35 1 1 1
SAR-1 NEXUS- 2 NEXUS- 2 SAR-1
B04,R02 7 B03,R01 7 B03,R01 7 B04,R02 7
(800x1000x2200) (800x1200x2200) 14 (800x1200x2200) 36 (800x1000x2200)
14 1 36 1 1 1

VGW-6 37
15 1 37 B02,R07 5 1 15 Spare 1 1
NEXUS-1 (600x1200x2200) NEXUS- 1
B04,R01 7 B04,R01 7
(800x1200x2200) 38 (800x1200x2200)
VGW-5
16 1 38 B02,R06 5 1 16 Spare 1 1
(600x1200x2200)

VGW-4 39 VGW-8
17 Spare 1 39 B02,R05 5 1 17 Spare 1 B02,R09 5 1
(600x1200x2200) (600x1200x2200)
18 40
VGW-3 VGW-7 ASBC
18 Spare 1 40 B02,R04 5 1 Spare 1 B02,R08 5 1
(600x1200x2200) (600x1200x2200)
04
VGW-2 19 41 RAN-1
19 Spare 1 41 B02,R03 5 1 Spare 1 B05,R07 5 1
(600x1200x2200) (600x1200x2200)

VGW-1 20 42 RAN-2
20 Spare 1 42 B02,R02 5 1 Spare 1 B05,R08 5 1
(600x1200x2200) (600x1200x2200)

ACI 21 43 SECAT-2
21 Spare 1 43 B02,R01 5 1 Spare 1 B05,R06 5 1
(600x1200x2200) (600x1200x2200)
22 44
22 Spare 1 44 Spare 1 Spare 1 Spare 1

SUM(KW) 47 17 SUM(KW) 91 15 SUM(KW) 46 17 SUM(KW) 87 17


PROJECT NO.: . 44PS8901 TITLE: CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION REV NO. : 04
LOCATION COIMBATORE DATE : 26-Oct-2021

SMPS -3 First Floor ( PHASE-III)

Fuses Fuses
Terminal no Name of Rack Bay no & Row no KW Terminal no Name of Rack Bay no & Row no KW
(-ve Bus) (-ve Bus)
100A Fuse 100A Fuse
1 Spare 1 17 Spare 1
2 Spare 1 18 Spare 1

200 A Fuse 200 A Fuse


VGW-8 19 SECAT-1
3 B02,R09 5 1 B05,R05 5 1
(600x1200x2200) (600x1200x2200)
20 GOOGLE-2
VGW-7 ASBC
4 B02,R08 5 1 CDN-4 B05,R04 5 1
(600x1200x2200) 04 (600x1200x2200)
21 GOOGLE-1
VGW-6
5 B02,R07 5 1 CDN-3 B05,R03 5 1
(600x1200x2200)
(600x1200x2200)
22 FACEBOOK-2
VGW-5
6 B02,R06 5 1 CDN-2 B05,R02 5 1
(600x1200x2200)
(600x1200x2200)
23 FACEBOOK-1
VGW-4
7 B02,R05 5 1 CDN-1 B05,R01 5 1
(600x1200x2200)
(600x1200x2200)
VGW-3 24
8 B02,R04 5 1 Spare 1
(600x1200x2200)

VGW-2 25
9 B02,R03 5 1 Spare 1
(600x1200x2200)

VGW-1 26
10 B02,R02 5 1 Spare 1
(600x1200x2200)

ACI 27
11 B02,R01 5 1 Spare 1
(600x1200x2200)

RAN-2 28
12 B05,R08 5 1 Spare 1
(600x1200x2200)

RAN-1 29
13 B05,R07 5 1 Spare 1
(600x1200x2200)

SECAT-2 30
14 B05,R06 5 1 Spare 1
(600x1200x2200)
31
15 Spare 1 Spare 1

16 32
Spare 1 Spare 1

SUM(KW) 60 16 SUM(KW) 25 16

Note:
1. Permissible Voltage drop for DC load is 2% considering actual server rack load
PROJECT NO. 44PS8901 Title: CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION REV NO. : 04
LOCATION COIMBATORE DATE : 26-Oct-2021

ANNEXURE B: DC CABLE SCHEDULE FIRST FLOOR - PHASE-1 & PHSE-III

No. of Runs Tot. No. of


Load Straight length No. of fuses Total Length
Sr. No. Designation (Red) Designation (Black) Name of rack From To Size in Sq.mm. Type considering Runs Remarks
Day-1 in (m) (-ve fuse) in (m)
Vtg drop only (+ve & -ve)

ANNEXURE B: DC CABLE SHEDULE FIRST FLOOR (PHASE-1)

Server Rack B04, R08-P1 Server Rack B04, R08-P2 SMPS 1-T4 1Cx70 1.1 kV, YY 12 1 1 2 24 FIRST FLOOR
1 TX POI -1 5.0 kW
Server Rack B04, R08-P3 to P4 Server Rack B04, R08-P5 to P6 SMPS 2-T26 1Cx70 1.1 kV, YY 23 2 1 4 92 FIRST FLOOR

Server Rack B04, R07- P1 Server Rack B04, R07- P2 SMPS 1-T5 1Cx70 1.1 kV, YY 13 1 1 2 26 FIRST FLOOR
2 TX POI -2 5.0 kW
Server Rack B04, R07- P3 to P4 Server Rack B04, R07- P5 to P6 SMPS 2-T27 1Cx70 1.1 kV, YY 23 2 1 4 92 FIRST FLOOR

Server Rack B04, R06- P1 to P2 Server Rack B04, R06- P3 to P4 SMPS 1-T6-T7 1Cx70 1.1 kV, YY 14 1 2 4 56 FIRST FLOOR
3 ALU MGW-1 6.0 kW
Server Rack B04, R06- P5 to P6 Server Rack B04, R06- P6 to P8 SMPS 2-T28-T29 1Cx70 1.1 kV, YY 23 1 2 4 92 FIRST FLOOR

Server Rack B04, R05- P1 to P2 Server Rack B04, R05- P3 to P4 SMPS 1-T8-T9 1Cx70 1.1 kV, YY 15 1 2 4 60 FIRST FLOOR
4 ALU MGW-2 6.0 kW
Server Rack B04, R05- P5 to P6 Server Rack B04, R05- P6 to P8 SMPS 2-T30-T31 1Cx70 1.1 kV, YY 22 1 2 4 88 FIRST FLOOR

Server Rack B04, R04- P1 Server Rack B04, R04- P2 SMPS 1-T10 1Cx70 1.1 kV, YY 16 1 1 2 32 FIRST FLOOR
5 DCN 4.0 kW
Server Rack B04, R04- P3 Server Rack B04, R04- P4 SMPS 2-T32 1Cx70 1.1 kV, YY 21 1 1 2 42 FIRST FLOOR

Server Rack B04, R03-P1 to P2 Server Rack B04, R03- P3 to P4 SMPS 1-T11-T12 1Cx70 1.1 kV, YY 16 1 2 4 64 FIRST FLOOR
6 IBR-1 7.0 kW
Server Rack B04, R03-P5 to P6 Server Rack B04, R03- P6 to P8 SMPS 2-T33-T34 1Cx70 1.1 kV, YY 19 1 2 4 76 FIRST FLOOR

Server Rack B04, R02- P1 to P2 Server Rack B04, R02- P3 to P4 SMPS 1-T13-T14 1Cx70 1.1 kV, YY 17 1 2 4 68 FIRST FLOOR
7 SAR-1 7.0 kW
Server Rack B04, R02-P5 to P6 Server Rack B04, R02- P6 to P8 SMPS 2-T35-T36 1Cx70 1.1 kV, YY 19 1 2 4 76 FIRST FLOOR

Server Rack B04, R01-P1 to P2 Server Rack B04, R01- P3 to P4 SMPS 1-T15-T16 1Cx70 1.1 kV, YY 18 1 2 4 72 FIRST FLOOR
8 Nexus-1 7.0 kW
Server Rack B04, R01-P5 to P6 Server Rack B04, R01- P6 to P8 SMPS 2-T37-T38 1Cx70 1.1 kV, YY 19 1 2 4 76 FIRST FLOOR

Server Rack B03, R07 - P1 to P2 Server Rack B03, R07 - P3 to P4 SMPS 2-T4-T5 1Cx70 1.1 kV, YY 12 1 2 4 48 FIRST FLOOR
9 Metro Core+Access-1 10.0 kW
Server Rack B03, R07 - P5 to P8 Server Rack B03, R07 - P9 to P12 SMPS 1-T26-T27 1Cx70 1.1 kV, YY 25 2 2 8 200 FIRST FLOOR

Server Rack B03, R06 -P1 to P2 Server Rack B03, R06 - P3 to P4 SMPS 2-T6-T7 1Cx70 1.1 kV, YY 13 1 2 4 52 FIRST FLOOR
10 Metro Core+Access-2 10.0 kW
Server Rack B03, R06 - P5 to P8 Server Rack B03, R06 - P9 to P12 SMPS 1-T28-T29 1Cx70 1.1 kV, YY 26 2 2 8 208 FIRST FLOOR

Server Rack B03, R05 - P1 Server Rack B03, R05 - P2 SMPS 2-T8 1Cx70 1.1 kV, YY 14 1 1 2 28 FIRST FLOOR
11 IPSE 5.0 kW
Server Rack B03, R05 - P3 to P4 Server Rack B03, R05 - P5 to P6 SMPS 1-T30 1Cx70 1.1 kV, YY 25 2 1 4 100 FIRST FLOOR

Server Rack B03, R03 - P1 to P2 Server Rack B03, R03 - P3 to P4 SMPS 2-T9-T10 1Cx70 1.1 kV, YY 16 1 2 4 64 FIRST FLOOR
12 IBR-2 7.0 kW
Server Rack B03, R03 - P5 to P6 Server Rack B03, R03 - P7 to P8 SMPS 1-T31-T32 1Cx70 1.1 kV, YY 23 1 2 4 92 FIRST FLOOR

Server Rack B03, R02 - P1 to P2 Server Rack B03, R02 - P3 to P4 SMPS 2-T11-T12 1Cx70 1.1 kV, YY 17 1 2 4 68 FIRST FLOOR
13 SAR-2 7.0 kW
Server Rack B03, R02 - P5 to P6 Server Rack B03, R02 - P7 to P8 SMPS 1-T33-T34 1Cx70 1.1 kV, YY 22 1 2 4 88 FIRST FLOOR

Server Rack B03, R01 - P1 to P2 Server Rack B03, R01 - P3 to P4 SMPS 2-T13-T14 1Cx70 1.1 kV, YY 18 1 2 4 72 FIRST FLOOR
14 Nexus-2 7.0 kW
Server Rack B03, R01 - P5 to P6 Server Rack B03, R01 - P7 to P8 SMPS 1-T35-T36 1Cx70 1.1 kV, YY 22 1 2 4 88 FIRST FLOOR
PROJECT NO. 44PS8901 Title: CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION REV NO. : 04
LOCATION COIMBATORE DATE : 26-Oct-2021

ANNEXURE B: DC CABLE SCHEDULE FIRST FLOOR - PHASE-1 & PHSE-III


Battery Rack
Battery Rack 1-1 / P1-P2 Battery Rack 1-1- P3 to P4 SMPS 1 1Cx95 1.1 kV, YY 7 4 28 FIRST FLOOR
1-1
Battery Rack
Battery Rack 1-2/ P1-P2 Battery Rack 1-2- P3 to P4 SMPS 1 1Cx95 1.1 kV, YY 7 4 28 FIRST FLOOR
1-2
15
Battery Rack
Battery Rack 1-3/ P1-P2 Battery Rack 1-3- P3to P4 SMPS1 1Cx95 1.1 kV, YY 7 4 28 FIRST FLOOR
1-3
Battery Rack
Battery Rack 1-4/ P1-P2 Battery Rack 1-4- P3 to P4 SMPS 1 1Cx95 1.1 kV, YY 7 4 28 FIRST FLOOR
1-4
Battery Rack
Battery Rack 2-1 / P1-P2 Battery Rack 2-1- P3 to P4 SMPS 2 1Cx95 1.1 kV, YY 7 4 28 FIRST FLOOR
2-1
Battery Rack
Battery Rack 2-2 / P1-P2 Battery Rack 2-2-P3 to P4 SMPS 2 1Cx95 1.1 kV, YY 7 4 28 FIRST FLOOR
2-2
16
Battery Rack
Battery Rack 2-3/ P1-P2 25/7/2021 SMPS 2 1Cx95 1.1 kV, YY 7 4 28 FIRST FLOOR
2-3
Battery Rack
Battery Rack 2-4/ P1-P2 Battery Rack 2-4- P3 to P4 SMPS 2 1Cx95 1.1 kV, YY 7 4 28 FIRST FLOOR
2-4

DC CABLE SCHEDULE FIRST FLOOR - PHSE-III

Server rack B02,R09/ P1 Server rack B02,R09/ P2 SMPS 3-T3 1Cx95 1.1 kV, YY 10 1 1 2 19
17 VGW-8 Server rack B02,R09 7.0 kW
Server rack B02,R09/ P3 Server rack B02,R09/ P4 SMPS 2-T39 1Cx95 1.1 kV, YY 12 1 1 2 24

Server rack B02,R08/ P1 Server rack B02,R08/ P2 SMPS 3-T4 1Cx95 1.1 kV, YY 10 1 1 2 19
18 VGW-7 ASBC Server rack B02,R08 7.0 kW As per FCR 884
Server rack B02,R08/ P3 Server rack B02,R08/ P4 SMPS 2-T40 1Cx95 1.1 kV, YY 13 1 1 2 26
04

Server rack B02,R07/ P1 Server rack B02,R07/ P2 SMPS 3-T5 1Cx95 1.1 kV, YY 11 1 1 2 22
19 VGW-6 Server rack B02,R07 7.0 kW
Server rack B02,R07/ P3 Server rack B02,R07/ P4 SMPS 1-T37 1Cx95 1.1 kV, YY 15 1 1 2 30

Server rack B02,R06/ P1 Server rack B02,R06/ P2 SMPS 3-T6 1Cx95 1.1 kV, YY 11 1 1 2 22
20 VGW-5 Server rack B02,R06 7.0 kW
Server rack B02,R06/ P3-P4 Server rack B02,R06/ P5-P6 SMPS 1-T38 1Cx95 1.1 kV, YY 18 2 1 4 72

Server rack B02,R05/ P1 Server rack B02,R05/ P2 SMPS 3-T7 1Cx95 1.1 kV, YY 12 1 1 2 24
21 VGW-4 Server rack B02,R05 7.0 kW
Server rack B02,R05/ P3-P4 Server rack B02,R05/ P5-P6 SMPS 1-T39 1Cx95 1.1 kV, YY 19 2 1 4 77

Server rack B02,R04/ P1 Server rack B02,R04/ P2 SMPS 3-T8 1Cx95 1.1 kV, YY 13 1 1 2 26
22 VGW-3 Server rack B02,R04 7.0 kW
Server rack B02,R04/ P3-P4 Server rack B02,R04/ P5-P6 SMPS 1-T40 1Cx95 1.1 kV, YY 19 2 1 4 77

Server rack B02,R03/ P1 Server rack B02,R03/ P2 SMPS 3-T9 1Cx95 1.1 kV, YY 13 1 1 2 26
23 VGW-2 Server rack B02,R03 7.0 kW
Server rack B02,R03/ P3-P4 Server rack B02,R03/ P5-P6 SMPS 1-T41 1Cx95 1.1 kV, YY 20 2 1 4 82

Server rack B02,R02/ P1 Server rack B02,R02/ P2 SMPS 3-T10 1Cx95 1.1 kV, YY 14 1 1 2 29
24 VGW-1 Server rack B02,R02 7.0 kW
Server rack B02,R02/ P3-P4 Server rack B02,R02/ P5-P6 SMPS 1-T42 1Cx95 1.1 kV, YY 22 2 1 4 86

Server rack B02,R01/ P1 Server rack B02,R01/ P2 SMPS 3-T11 1Cx95 1.1 kV, YY 14 1 1 2 29
25 ACI Server rack B02,R01 7.0 kW
Server rack B02,R01/ P3-P4 Server rack B02,R01/ P5-P6 SMPS 1-T43 1Cx95 1.1 kV, YY 22 2 1 4 86

Server rack B05,R08/ P1-P2 Server rack B05,R08/ P3-P4 SMPS 3-T12 1Cx95 1.1 kV, YY 23 2 1 4 91
26 RAN-2 Server rack B05,R08 7.0 kW
Server rack B05,R08/ P5-P6 Server rack B05,R08/ P7-P8 SMPS 2-T42 1Cx95 1.1 kV, YY 22 2 1 4 88

Server rack B05,R07/ P1-P2 Server rack B05,R07/ P3-P4 SMPS 3-T13 1Cx95 1.1 kV, YY 22 2 1 4 86
27 RAN-1 Server rack B05,R07 7.0 kW
Server rack B05,R07/ P5-P6 Server rack B05,R07/ P7-P8 SMPS 2-T41 1Cx95 1.1 kV, YY 19 2 1 4 77

Server rack B05,R06/ P1-P2 Server rack B05,R06/ P3-P4 SMPS 3-T14 1Cx95 1.1 kV, YY 22 2 1 4 86
28 SECAT-2 Server rack B05,R06 7.0 kW
Server rack B05,R06/ P4-P5 Server rack B05,R06/ P6-P7 SMPS 2-T43 1Cx95 1.1 kV, YY 18 2 1 4 72
PROJECT NO. 44PS8901 Title: CABLE SCHEDULE (PHASE III) DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: COIMBATORE-MCN-AUGMENTATION REV NO. : 04
LOCATION COIMBATORE DATE : 26-Oct-2021

ANNEXURE B: DC CABLE SCHEDULE FIRST FLOOR - PHASE-1 & PHSE-III

Server rack B05,R05/ P1-P2 Server rack B05,R05/ P3-P4 SMPS 2-T23 1Cx95 1.1 kV, YY 18 2 1 4 72
29 SECAT-1 Server rack B05,R05 7.0 kW
Server rack B05,R05/ P5-P6 Server rack B05,R05/ P7-P8 SMPS 3-T19 1Cx95 1.1 kV, YY 20 2 1 4 82

AS PER FCR 732 THERE IS CHANGE IN


Server rack B05,R02/ P1 Server rack B05,R02/ P2 SMPS 1-T23 1Cx95 1.1 kV, YY 13 1 1 2 26
FACEBOOK-2 NOMENCLATURE OF THE RACKS.
30 Server rack B05,R02 7.0 kW
CDN-2
Server rack B05,R02/ P3-P4 Server rack B05,R02/ P5-P6 SMPS 3-T22 1Cx95 1.1 kV, YY 19 2 1 4 77

Server rack B05,R01/ P1 Server rack B05,R01/ P2 SMPS 1-T24 1Cx95 1.1 kV, YY 14 1 1 2 29
FACEBOOK-1
31 Server rack B05,R01 7.0 kW
CDN-1
Server rack B05,R01/ P3-P4 Server rack B05,R01/ P5-P6 SMPS 3-T23 1Cx95 1.1 kV, YY 20 2 1 4 82

Server rack B05,R04/ P1 Server rack B05,R04/ P2 SMPS 2-T24 1Cx95 1.1 kV, YY 17 1 1 2 34
GOOGLE-2
32 Server rack B05,R04 7.0 kW
CDN-4
Server rack B05,R04/ P3-P4 Server rack B05,R04/ P5-P6 SMPS 3-T20 1Cx95 1.1 kV, YY 20 2 1 4 82

Server rack B05,R03/ P1 Server rack B05,R03/ P2 SMPS 2-T25 1Cx95 1.1 kV, YY 16 1 1 2 31
GOOGLE-1
33 Server rack B05,R03 7.0 kW
CDN-3
Server rack B05,R03/ P3-P4 Server rack B05,R03/ P5-P6 SMPS 3-T21 1Cx95 1.1 kV, YY 19 2 1 4 77

Battery Rack
Battery Rack 3-1/ P1-P2 Battery Rack 3-1/ P3-P4 SMPS 3 1Cx95 1.1 kV, YY 7 4 28
3-1
Battery Rack
Battery Rack 3-2/ P1-P2 Battery Rack 3-2/ P3-P4 SMPS 3 1Cx95 1.1 kV, YY 7 4 28
3-2
34
Battery Rack
Battery Rack 3-3/ P1-P2 Battery Rack 3-3/ P3-P4 SMPS 3 1Cx95 1.1 kV, YY 7 4 28
3-3
Battery Rack
Battery Rack 3-4/ P1-P2 Battery Rack 3-4/ P3-P4 SMPS 3 1Cx95 1.1 kV, YY 7 4 28
3-4
Note:

1. Design margin of 20% on cable length has been considered for termination, wastage etc for each cable length and overall of 10% extra length has been considered for each type of cable for procurement.

2. Permissible Voltage drop for DC load is 2% considering actual server rack load

3.As per FCR 732 there is change in Nomenclature of racks CDN-1, CDN-2, CDN-3 & CDN-4 changed to FACEBOOK-1, FACEBOOK-2, GOOGLE-1 & GOOGLE-2
PROJECT NO. DOC NO.:
44PS8901 Title: CABLE SCHEDULE 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502

CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: SAG2-COIMBATORE-MCN-AUGMENTATION REV NO. : 04

LOCATION COIMBATORE DATE : 26-Oct-2021


ANNEXURE E: SMPS DISTRIBUTION MATRIX FOR SECOND FLOOR SERVER HALL
SMPS 1 SMPS 2
BUS A BUS B BUS A BUS B
Terminal Fuses Fuses Fuses Fuses
Name of Rack Bay no & Row no KW Terminal no Name of Rack Bay no & Row no KW Terminal no Name of Rack Bay no & Row no KW Terminal no Name of Rack Bay no & Row no KW
no (-ve Bus) (-ve Bus) (-ve Bus) (-ve Bus)
100A Fuse 100A Fuse 100A Fuse 100A Fuse
1 Spare 16 Spare 1 Spare 16
2 Spare 17 Spare 2 Spare 17

200 A Fuse 200 A Fuse 200 A Fuse 200 A Fuse

3 COLOCATED AG2 L2-B01,R01 7 1 18 METRO CORE-02 L2-B03,R10 6 1 3 METRO CORE-02 L2-B03,R10 6 1 18 COLOCATED AG2 L2-B01,R01 7 1
4 COLOCATED AG1 L2-B01,R02 5 1 19 METRO CORE-03 L2-B03,R11 6 1 4 METRO CORE-03 L2-B03,R11 6 1 19 COLOCATED AG1 L2-B01,R02 5 1

5 AG3-02 L2-B02,R01 8 1 20 NLD CORE TML-01 L2-B04,R01 8 1 5 NLD CORE TML-01 L2-B04,R01 8 1 20 AG3-02 L2-B02,R01 8 1

6 ICR-02 L2-B02,R02 8 1 21 NLD CORE TML-02 L2-B04,R02 8 1 6 NLD CORE TML-02 L2-B04,R02 8 1 21 ICR-02 L2-B02,R02 8 1

7 IPSE-02 L2-B02,R09 5 1 22 NLD CORE TML-03 L2-B04,R03 8 1 7 NLD CORE TML-03 L2-B04,R03 8 1 22 IPSE-02 L2-B02,R09 5 1

8 IPSE-01 L2-B02,R10 5 1 23 REGIONAL CORE-02 L2-B04,R11 6 1 8 NLD COLLECTOR-01 L2-B04,R04 6 1 23 1


NLD CORE OTN DXC-03 L2-B05,R04 18
9 AG3-01 L2-B03,R01 8 1 24 REGIONAL CORE-03 L2-B04,R12 6 1 9 NLD COLLECTOR-02 L2-B04,R05 6 1 24 1
10 ICR-01 L2-B03,R02 8 1 25 1 10 NLD COLLECTOR-03 L2-B04,R06 6 1 25 1
NLD CORE OTN DXC-02 L2-B05,R01 18
11 DCN L2-B03,R04 4 1 26 1 11 IP DATA L2-B04,R09 6 1 26 NLD CORE OTN DXC-01 L2-B05,R06 20 1

12 DC RACK L2-B03,R05 5 1 27 12 REGIONAL CORE-01 L2-B04,R10 6 1 27 1

13 METRO CORE-01 L2-B03,R08 6 1 28 13 28


14 29 14 29
15 30 15 30
SUM(KW) 69 11 SUM(KW) 66 9 SUM(KW) 66 10 SUM(KW) 71.0 10
SMPS 3
BUS A BUS B

Fuses Fuses
Terminal no Name of Rack Bay no & Row no KW Terminal no Name of Rack Bay no & Row no KW
(-ve Bus) (-ve Bus)
100A Fuse 100A Fuse
1 Spare 16 Spare
2 Spare 17 Spare

200 A Fuse 200 A Fuse


3 REGIONAL CORE-02 L2-B04,R11 6 1 18 IPSE-01 L2-B02,R10 5 1
4 REGIONAL CORE-03 L2-B04,R12 6 1 19 AG3-01 L2-B03,R01 8 1

5 1 20 ICR-01 L2-B03,R02 8 1
NLD CORE OTN DXC-02 L2-B05,R01 18
6 1 21 DCN L2-B03,R04 4 1

7 1 22 DC RACK L2-B03,R05 5 1
NLD CORE OTN DXC-03 L2-B05,R04 18
8 1 23 METRO CORE-01 L2-B03,R08 6 1
9 1 24 NLD COLLECTOR-01 L2-B04,R04 6 1
10 NLD CORE OTN DXC-01 L2-B05,R06 20 1 25 NLD COLLECTOR-02 L2-B04,R05 6 1
11 1 26 NLD COLLECTOR-03 L2-B04,R06 6 1

12 27 IP DATA L2-B04,R09 6 1

13 28 REGIONAL CORE-01 L2-B04,R10 6 1


14 29
15 30
SUM(KW) 68 9 SUM(KW) 66 11
PROJECT NO. 44PS8901 Title: CABLE SCHEDULE DOC NO.:
10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: SAG2-COIMBATORE-MCN-AUGMENTATION REV NO. : 04

COIMBATORE 26-Oct-2021
LOCATION DATE :

ANNEXURE F: DC CABLE SCHEDULE FOR SECOND FLOOR SERVER HALL

No. of Runs per


Load Straight length in No. of fuses Tot. No. of Runs Total Length in
Sr. No. Designation (Red) Designation (Black) Name of rack From To Size in Sq.mm. Type fuse considering Remarks
(m) (-ve fuse) (+ve & -ve) (m)
Vtg drop only

ANNEXURE B: DC CABLE SHEDULE

A SECOND FLOOR

Server Rack L2-B01,R01 / P1 Server Rack L2-B01,R01 / P2 SMPS 1-T3 1Cx95 1.1 kV, YY 16 1 1 2 32

1 COLOCATED AG2 L2-B01,R01 7.0 kW

Server Rack L2-B01,R01 / P3-P4 Server Rack L2-B01,R01 / P5-P6 SMPS 2-T18 1Cx95 1.1 kV, YY 20 2 1 4 80

Server Rack L2-B01,R02 / P1-P2 Server Rack L2-B01,R02 / P3-P4 SMPS 1-T4 1Cx95 1.1 kV, YY 15 1 1 2 30

2 COLOCATED AG1 L2-B01,R02 5.0 kW

Server Rack L2-B01,R02 / P5-P6 Server Rack L2-B01,R02 / P7-P8 SMPS 2-T19 1Cx95 1.1 kV, YY 19 1 1 2 38

Server Rack L2-B02,R01 / P1-P2 Server Rack L2-B02,R01 / P3-P4 SMPS 1-T5 1Cx95 1.1 kV, YY 15 2 1 4 60

3 AG3-02 L2-B02,R01 8.0 kW

Server Rack L2-B02,R01 / P5-P6 Server Rack L2-B02,R01 / P7-P8 SMPS 2-T20 1Cx95 1.1 kV, YY 18 2 1 4 72

Server Rack L2-B02,R02 / P1 Server Rack L2-B02,R02 / P2 SMPS 1-T6 1Cx95 1.1 kV, YY 14 1 1 2 28

4 ICR-02 L2-B02,R02 8.0 kW

Server Rack L2-B02,R02 / P3-P4 Server Rack L2-B02,R02 / P5-P6 SMPS 2-T21 1Cx95 1.1 kV, YY 16 2 1 4 64

Server Rack L2-B02,R09 / P1 Server Rack L2-B02,R09 / P2 SMPS 1-T7 1Cx95 1.1 kV, YY 19 1 1 2 38

5 IPSE-02 L2-B02,R09 5.0 kW

Server Rack L2-B02,R09 / P3-P4 Server Rack L2-B02,R09 / P5-P6 SMPS 2-T22 1Cx95 1.1 kV, YY 15 1 1 2 30

Server Rack L2-B02,R10 / P1 Server Rack L2-B02,R10 / P2 SMPS 1-T8 1Cx95 1.1 kV, YY 19 1 1 2 38

6 IPSE-01 L2-B02,R10 5.0 kW

Server Rack L2-B02,R10 / P3-P4 Server Rack L2-B02,R10 / P5-P6 SMPS 3-T18 1Cx95 1.1 kV, YY 22 1 1 2 44

Server Rack L2-B03,R01 / P1-P2 Server Rack L2-B03,R01 / P3-P4 SMPS 1-T9 1Cx95 1.1 kV, YY 15 2 1 4 60

7 AG3-01 L2-B03,R01 8.0 kW

Server Rack L2-B03,R01 / P5-P6 Server Rack L2-B03,R01 / P7-P8 SMPS 3-T19 1Cx95 1.1 kV, YY 19 2 1 4 76

Server Rack L0-B02,R11 / P1-P2 Server Rack L0-B02,R11 / P3-P4 SMPS 1-T10 1Cx95 1.1 kV, YY 15 2 3 12 180

8 ICR-01 L2-B03,R02 8.0 kW

Server Rack L0-B02,R11 / P5-P6 Server Rack L0-B02,R11 / P7-P8 SMPS 3-T20 1Cx95 1.1 kV, YY 19 2 3 12 228

Server Rack L2-B03,R04 / P1 Server Rack L2-B03,R04 / P2 SMPS 1-T11 1Cx95 1.1 kV, YY 14 1 1 2 28

9 DCN L2-B03,R04 4.0 kW

Server Rack L2-B03,R04 / P3 Server Rack L2-B03,R04 / P4 SMPS 3-T21 1Cx95 1.1 kV, YY 18 1 1 2 36

Server Rack L2-B03,R05 / P1 Server Rack L2-B03,R05 / P2 SMPS 1-T12 1Cx95 1.1 kV, YY 13 1 1 2 26

10 DC RACK L2-B03,R05 5.0 kW

Server Rack L2-B03,R05 / P3 Server Rack L2-B03,R05 / P4 SMPS 3-T22 1Cx95 1.1 kV, YY 17 1 1 2 34

Server Rack L2-B03,R08 / P1 Server Rack L2-B03,R08 / P2 SMPS 1-T13 1Cx95 1.1 kV, YY 15 1 1 2 30

11 METRO CORE-01 L2-B03,R08 6.0 kW

Server Rack L2-B03,R08 / P3-P4 Server Rack L2-B03,R08 / P5-P6 SMPS 3-T23 1Cx95 1.1 kV, YY 21 2 1 4 84
PROJECT NO. 44PS8901 Title: CABLE SCHEDULE DOC NO.:
10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: SAG2-COIMBATORE-MCN-AUGMENTATION REV NO. : 04

COIMBATORE 26-Oct-2021
LOCATION DATE :

ANNEXURE F: DC CABLE SCHEDULE FOR SECOND FLOOR SERVER HALL

No. of Runs per


Load Straight length in No. of fuses Tot. No. of Runs Total Length in
Sr. No. Designation (Red) Designation (Black) Name of rack From To Size in Sq.mm. Type fuse considering Remarks
(m) (-ve fuse) (+ve & -ve) (m)
Vtg drop only

ANNEXURE B: DC CABLE SHEDULE

A SECOND FLOOR

Server Rack L2-B03,R10 / P1 Server Rack L2-B03,R10 / P2 SMPS 2-T3 1Cx95 1.1 kV, YY 14 1 1 2 28

12 METRO CORE-02 L2-B03,R10 6.0 kW

Server Rack L2-B03,R10 / P3 Server Rack L2-B03,R10 / P4 SMPS 1-T18 1Cx95 1.1 kV, YY 15 1 1 2 30

Server Rack L2-B03,R11 / P1 Server Rack L2-B03,R11 / P2 SMPS 2-T4 1Cx95 1.1 kV, YY 14 1 1 2 28

13 METRO CORE-03 L2-B03,R11 6.0 kW

Server Rack L2-B03,R11 / P3 Server Rack L2-B03,R11 / P4 SMPS 1-T19 1Cx95 1.1 kV, YY 15 1 1 2 30

Server Rack L2-B04,R01 / P1-P2 Server Rack L2-B04,R01 / P3-P4 SMPS 2-T5 1Cx95 1.1 kV, YY 19 2 1 4 76

14 NLD CORE TML-01 L2-B04,R01 8.0 kW

Server Rack L2-B04,R01 / P5-P6 Server Rack L2-B04,R01 / P7-P8 SMPS 1-T20 1Cx95 1.1 kV, YY 17 2 1 4 68

Server Rack L0-B03,R10 / P1-P2 Server Rack L0-B03,R10 / P3-P4 SMPS 2-T6 1Cx95 1.1 kV, YY 18 2 3 12 216

15 NLD CORE TML-02 L2-B04,R02 8.0 kW

Server Rack L0-B03,R10 / P5-P6 Server Rack L0-B03,R10 / P7-P8 SMPS 1-T21 1Cx95 1.1 kV, YY 18 2 3 12 216

Server Rack L2-B04,R03 / P1-P2 Server Rack L2-B04,R03 / P3-P4 SMPS 2-T7 1Cx95 pl 17 2 1 4 68

16 NLD CORE TML-03 L2-B04,R03 8.0 kW

Server Rack L2-B04,R03 / P5-P6 Server Rack L2-B04,R03 / P7-P8 SMPS 1-T22 1Cx95 1.1 kV, YY 17 2 1 4 68

Server Rack L2-B04,R04 / P1-P2 Server Rack L2-B04,R04 / P3-P4 SMPS 2-T8 1Cx95 1.1 kV, YY 16 1 1 2 32

17 NLD COLLECTOR-01 L2-B04,R04 6.0 kW

Server Rack L2-B04,R04 / P5-P6 Server Rack L2-B04,R04 / P7-P8 SMPS 3-T24 1Cx95 1.1 kV, YY 15 1 1 2 30

Server Rack L2-B04,R05 / P1 Server Rack L2-B04,R05 / P2 SMPS 2-T9,10,11 1Cx95 1.1 kV, YY 16 1 1 2 32

18 NLD COLLECTOR-02 L2-B04,R05 6.0 kW

Server Rack L2-B04,R05 / P3-P4 25/7/2021 SMPS 3-T25 1Cx95 1.1 kV, YY 15 1 1 2 30

Server Rack L2-B04,R06 / P1 Server Rack L2-B04,R06 / P2 SMPS 2-T10 1Cx95 1.1 kV, YY 15 1 1 2 30

19 NLD COLLECTOR-03 L2-B04,R06 6.0 kW

Server Rack L2-B04,R06 / P3-P4 Server Rack L2-B04,R06 / P5-P6 SMPS 3-T26 1Cx95 1.1 kV, YY 14 1 1 2 28

Server Rack L2-B04,R09 / P1 Server Rack L2-B04,R09 / P2 SMPS 2-T11 1Cx95 1.1 kV, YY 19 1 1 2 38

20 IP DATA L2-B04,R09 6.0 kW

Server Rack L2-B04,R09 / P3-P4 Server Rack L2-B04,R09 / P5-P6 SMPS 3-T27 1Cx95 1.1 kV, YY 12 1 1 2 24

Server Rack L2-B04,R10 / P1-P2 Server Rack L2-B04,R10 / P3-P4 SMPS 2-T12 1Cx95 1.1 kV, YY 20 2 1 4 80

21 REGIONAL CORE-01 L2-B04,R10 6.0 kW

Server Rack L2-B04,R10 / P5 Server Rack L2-B04,R10 / P6 SMPS 3-T28 1Cx95 1.1 kV, YY 13 1 1 2 26

Server Rack L2-B04,R11 / P1 Server Rack L2-B04,R11 / P2 SMPS 3-T3 1Cx95 1.1 kV, YY 13 1 1 2 26

22 REGIONAL CORE-02 L2-B04,R11 6.0 kW

Server Rack L2-B04,R11 / P3-P4 Server Rack L2-B04,R11 / P5-P6 SMPS 1-T23 1Cx95 1.1 kV, YY 20 2 1 4 80
PROJECT NO. 44PS8901 Title: CABLE SCHEDULE DOC NO.:
10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: SAG2-COIMBATORE-MCN-AUGMENTATION REV NO. : 04

COIMBATORE 26-Oct-2021
LOCATION DATE :

ANNEXURE F: DC CABLE SCHEDULE FOR SECOND FLOOR SERVER HALL

No. of Runs per


Load Straight length in No. of fuses Tot. No. of Runs Total Length in
Sr. No. Designation (Red) Designation (Black) Name of rack From To Size in Sq.mm. Type fuse considering Remarks
(m) (-ve fuse) (+ve & -ve) (m)
Vtg drop only

ANNEXURE B: DC CABLE SHEDULE

A SECOND FLOOR

Server Rack L0-B04,R11 / P1 Server Rack L0-B04,R11 / P2 SMPS 3-T4 1Cx95 1.1 kV, YY 14 1 3 6 84

23 REGIONAL CORE-03 L2-B04,R12 6.0 kW

Server Rack L0-B04,R11 / P3-P4 Server Rack L0-B04,R11 / P5-P6 SMPS 1-T24,25 1Cx95 1.1 kV, YY 20 2 3 12 240

AUX DCDB-1
Server Rack L2-B05,R01 / P1-P2 Server Rack L2-B05,R01 / P3-P4 SMPS 3-T5,6 1Cx95 1.1 kV, YY 19 2 1 4 76 DC Cable to OTN DXC rack will be
L2-B05,R01
through Aux. DCDB. First cable will
(Feed for NLD CORE OTN
24 NLD CORE OTN DXC-02 18.0 kW terminate at Aux. DCDB and from
DXC-02
DCDB vendor will lay cable to OTN
Server Rack L2-B05,R01 / P5-P6 Server Rack L2-B05,R01 / P7-P8 SMPS 1-T26,27 (L2-B05,R01)(Refer 1Cx95 1.1 kV, YY 22 2 1 4 88 DXC rack.
remark)

AUX DCDB-2
Server Rack L2-B05,R04 / P1 Server Rack L2-B05,R04 / P2 SMPS 3-T7,8 1Cx95 1.1 kV, YY 18 2 1 4 72 DC Cable to OTN DXC rack will be
L2-B05,R04
through Aux. DCDB. First cable will
(Feed for NLD CORE OTN
25 NLD CORE OTN DXC-03 18.0 kW terminate at Aux. DCDB and from
DXC-03
DCDB vendor will lay cable to OTN
Server Rack L2-B05,R04 / P3-P4 Server Rack L2-B05,R04 / P5-P6 SMPS 2-T23,24 (L2-B05,R04)(Refer 1Cx95 1.1 kV, YY 19 2 1 4 76 DXC rack.
remark)

AUX DCDB-1
Server Rack L2-B06,R01 / P1 Server Rack L2-B06,R01 / P2 SMPS 3-T9,10,11 1Cx95 1.1 kV, YY 22 3 1 6 132 DC Cable to OTN DXC rack will be
L2-B06,R01
through Aux. DCDB. First cable will
(Feed for NLD CORE OTN
26 NLD CORE OTN DXC-01 20.0 kW terminate at Aux. DCDB and from
DXC-01
DCDB vendor will lay cable to OTN
Server Rack L2-B06,R01 / P3-P4 Server Rack L2-B06,R01 / P5-P6 SMPS 2-T25,26,27 (L2-B06,R01)(Refer 1Cx95 1.1 kV, YY 24 3 1 6 144 DXC rack.
remark)

Battery Rack 1-1 - P1 to P2 Battery Rack 1-1- P3 to P4 SMPS 1 Battery Rack 1-1 1Cx95 1.1 kV, YY 8 2 1 4 32

27

Battery Rack 1-2 - P1 to P2 Battery Rack 1-2- P3 to P4 SMPS 1 Battery Rack 1-2 1Cx95 1.1 kV, YY 8 2 1 4 32

Battery Rack 1-3- P1 to P2 Battery Rack 1-3- P3 to P4 SMPS 1 Battery Rack 1-3 1Cx95 1.1 kV, YY 8 2 1 4 32

28

Battery Rack 1-4 - P1 to P2 Battery Rack 1-4- P3 to P4 SMPS 1 Battery Rack 1-4 1Cx95 1.1 kV, YY 8 2 1 4 32

Battery Rack 2-1-P1 to P2 Battery Rack 2-1- P3 to P4 SMPS 2 Battery Rack 2-1 1Cx95 1.1 kV, YY 8 2 1 4 32

29

Battery Rack 2-2-P1 to P2 Battery Rack 2-2-P3 to P4 SMPS 2 Battery Rack 2-2 1Cx95 1.1 kV, YY 8 2 1 4 32

Battery Rack 2-3-P1 to P2 Battery Rack 2-3- P3 to P4 SMPS 2 Battery Rack 2-3 1Cx95 1.1 kV, YY 8 2 1 4 32

30

Battery Rack 2-4-P1 to P2 Battery Rack 2-4-P3 to P4 SMPS 2 Battery Rack 2-4 1Cx95 1.1 kV, YY 8 2 1 4 32

Battery Rack 3-1-P1 to P2 Battery Rack 3-1- P3 to P4 SMPS 3 Battery Rack 3-1 1Cx95 1.1 kV, YY 8 2 1 4 32

31

Battery Rack 3-2-P1 to P2 Battery Rack 3-2-P3 to P4 SMPS 3 Battery Rack 3-2 1Cx95 1.1 kV, YY 8 2 1 4 32

Battery Rack 3-3-P1 to P2 Battery Rack 3-3- P3 to P4 SMPS 3 Battery Rack 3-3 1Cx95 1.1 kV, YY 8 2 1 4 32

32

Battery Rack 3-4-P1 to P2 Battery Rack 3-4-P3 to P4 SMPS 3 Battery Rack 3-4 1Cx95 1.1 kV, YY 8 2 1 4 32

Note:
1. The Cable schedule has been prepared for full saturation.
2. Permissible Voltage drop for DC load is 2% considering actual server rack load
PROJECT NO. 44PS8901 DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
CLIENT RELIANCE JIO INFOCOMM LIMITED REV NO. : 04
LOCATION COIMBATORE DATE : 26-Oct-2021
ANNEXURE B: UPS DISTRIBUTION MATRIX

UPSDB 1 UPSDB 2
Phase MCB No. Rating
RACK LOAD RACK LOAD
1 vEPC POD -1 5.0 vEPC POD -7 5.0
2 vEPC POD -2 5.0 vEPC POD -8 5.0
3 vEPC POD -7 5.0 vEPC POD -1 5.0
4 vEPC POD -8 5.0 vEPC POD -2 5.0
R 32 A
5 Spare Spare
6 Spare Spare
7 Spare Spare
8 Spare Spare
PHASE LOADING 20.0 20.0
1 vEPC POD -3 5.0 vEPC POD -9 5.0
2 vEPC POD -4 5.0 vEPC POD -10 5.0
3 vEPC POD -9 5.0 vEPC POD -3 5.0
4 vEPC POD -10 5.0 vEPC POD -4 5.0
Y 32 A
5 Spare Spare
6 Spare Spare
7 Spare Spare
8 Spare Spare
PHASE LOADING 20.0 20.0
1 vEPC POD -5 5.0 vEPC POD -11 5.0
2 vEPC POD -6 5.0 vEPC POD -12 5.0
3 vEPC POD -11 5.0 vEPC POD -5 5.0
4 vEPC POD -12 5.0 vEPC POD -6 5.0
B 32 A
5 Spare Spare
6 Spare Spare
7 Spare Spare
8 Spare Spare
PHASE LOADING 20.0 20.0
LOAD ON DB 60.0 60.0
PROJECT NO. 44PS8901 Title: CABLE SCHEDULE DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502

CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT: SAG2-COIMBATORE-MCN-AUGMENTATION REV NO. : 04

26-Oct-2021
LOCATION COIMBATORE DATE :

ANNEXURE C: AC CABLE SCHEDULE


Total
Load Straight length in
Sr. No. Designation Name of rack From To Size in Sq.mm. Type No. of Runs No. of Glands Length in Remarks
(m)
(m)

Server Rack L2-B01 R03 / P1 UPSDB 1-R1 3Cx10 1.1 kV, Cu flex Cable 17 1 2 17
1 vEPC POD-1 L2-B01 R03 5.0 kW
Server Rack L2-B01 R03 / P2 UPSDB 2-R3 3Cx10 1.1 kV, Cu flex Cable 18 1 2 18

Server Rack L2-B01 R04 / P1 UPSDB 1-R2 3Cx10 1.1 kV, Cu flex Cable 17 1 2 17
2 vEPC POD-2 L2-B01 R04 5.0 kW
Server Rack L2-B01 R04 / P2 UPSDB 2-R4 3Cx10 1.1 kV, Cu flex Cable 17 1 2 17

Server Rack L2-B01 R05 / P1 UPSDB 1-Y1 3Cx10 1.1 kV, Cu flex Cable 16 1 2 16
3 vEPC POD-3 L2-B01 R05 5.0 kW
Server Rack L2-B01 R05 / P2 UPSDB 2-Y3 3Cx10 1.1 kV, Cu flex Cable 16 1 2 16

Server Rack L2-B01 R06 / P1 UPSDB 1-Y2 3Cx10 1.1 kV, Cu flex Cable 15 1 2 15
4 vEPC POD-4 L2-B01 R06 5.0 kW
Server Rack L2-B01 R06 / P2 UPSDB 2-Y4 3Cx10 1.1 kV, Cu flex Cable 16 1 2 16

Server Rack L2-B01 R07 / P1 UPSDB 1-B1 3Cx10 1.1 kV, Cu flex Cable 14 1 2 14
5 vEPC POD-5 L2-B01 R07 5.0 kW
Server Rack L2-B01 R07 / P2 UPSDB 2-B3 3Cx10 1.1 kV, Cu flex Cable 15 1 2 15

Server Rack L2-B01 R08 / P1 UPSDB 1-B2 3Cx10 1.1 kV, Cu flex Cable 14 1 2 14
6 vEPC POD-6 L2-B01 R08 5.0 kW
Server Rack L2-B01 R08 / P2 UPSDB 2-B4 3Cx10 1.1 kV, Cu flex Cable 14 1 2 14

Server Rack L2-B01 R09 / P1 UPSDB 1-R3 3Cx10 1.1 kV, Cu flex Cable 13 1 2 13
7 vEPC POD-7 L2-B01 R09 5.0 kW
Server Rack L2-B01 R09 / P2 UPSDB 2-R1 3Cx10 1.1 kV, Cu flex Cable 14 1 2 14

Server Rack L2-B01 R10 / P1 UPSDB 1-R4 3Cx10 1.1 kV, Cu flex Cable 13 1 2 13
8 vEPC POD-8 L2-B01 R10 5.0 kW
Server Rack L2-B01 R10 / P2 UPSDB 2-R2 3Cx10 1.1 kV, Cu flex Cable 13 1 2 13

Server Rack L2-B01 R11 / P1 UPSDB 1-Y3 3Cx10 1.1 kV, Cu flex Cable 12 1 2 12
9 vEPC POD-9 L2-B01 R11 5.0 kW
Server Rack L2-B01 R11 / P2 UPSDB 2-Y1 3Cx10 1.1 kV, Cu flex Cable 13 1 2 13

Server Rack L2-B01 R12 / P1 UPSDB 1-Y4 3Cx10 1.1 kV, Cu flex Cable 11 1 2 11
10 vEPC POD-10 L2-B01 R12 5.0 kW
Server Rack L2-B01 R12 / P2 UPSDB 2-Y2 3Cx10 1.1 kV, Cu flex Cable 12 1 2 12

Server Rack L2-B01 R13 / P1 UPSDB 1-B3 3Cx10 1.1 kV, Cu flex Cable 11 1 2 11
11 vEPC POD-11 L2-B01 R13 5.0 kW
Server Rack L2-B01 R13 / P2 UPSDB 2-B1 3Cx10 1.1 kV, Cu flex Cable 12 1 2 12

Server Rack L2-B01 R14 / P1 UPSDB 1-B4 3Cx10 1.1 kV, Cu flex Cable 10 1 2 10
12 vEPC POD-12 L2-B01 R14 5.0 kW
Server Rack L2-B01 R14 / P2 UPSDB 2-B2 3Cx10 1.1 kV, Cu flex Cable 11 1 2 11

Note:
1. Overall margin of 10% extra has been considered for AC Rack cables for procurement.
2. Permissible Voltage drop for AC load is 2% considering actual server rack load
COIMBATORE

Sr. No. Equipment List Make Remarks


Open space Ground 1st Floor 2nd Floor Total Quantity
A HVAC

1 PAC Units 5 4 9 Vertiv

B Electrical

1 Transformer (1250kVA) 1 - - - 1 Voltamp

2 MLTP Panel - 1 - - 1 L&T

3 Fire Alarm Panel - 1 - - 1 RAVEL

4 DG (625kVA) 3 - - - 3 SUDHIR Engine Details: KTAA - 19 - G13,


Alternator -STAMFORD
KVA rating: 625kVA
Controller Details: PCC3.3

5 SEB Load Manager - 1 - - 1 SATEC

6 DG Incomer Load Manager - 2 - - 2 SATEC

7 HT Relay 1 1 L&T

8 HT Panel Load Manager 1 1 L&T

9 UPS (75 kVA) 2 2 EATON

10 UPS Battery 2 2 EXICOM

11 SMPS (120kW) - - 1 3 4 DELTA New SMPS only considered

12 SMPS Battery Rack Smoke Detecter - - 1 3 4 QUANTA New SMPS battery only considered
PROJECT NO. 44PS8901 TITLE: CABLE SCHEDULE DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
COIMBATORE MCN-
CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT : REV NO. : 04
AUGMENTATION
LOCATION COIMBATORE Issue date: 26-Oct-2021
Annexure C: RTU anf FAS Cable Schedule

Cable Qty in
Sr.No. Description of System Type From To Cable Type From TB To TB Remarks
Mtrs
A. New MLTP Panel Ground Floor ( Qty - 1 No)
RTU Panel (First floor 1 pair *1 sq. mm. shielded , Armoured RTU
1 AC Power fail RTU-MLTP/ 1 Hardwired Main LT Panel (Ground Floor) X1-53,X1-54 48
DCN Rack L1- B04,R04) Twisted pair cable DI 1 ,12V
RTU Panel (First floor 1 pair *1 sq. mm. shielded , Armoured RTU
2 AC Incomer trip fault RTU-MLTP/ 1 Hardwired Main LT Panel (Ground Floor) X1-49,X1-50 48
DCN Rack L1- B04,R04) Twisted pair cable DI 3, 12V

B. Transformer Existing (Oil Type) (Qty - 1 Nos)


RTU Panel (First floor 1 pair *1 sq.mm. shielded , Armoured RTU Marshalling Box
1 Winding Temperature Alarm RTU-HTWTA Hardwired Marshalling Box(Open Space) transformer 58
DCN Rack L1- B04,R04) Twisted pair cable CH1 ,12V TB 26, 30
RTU Panel (First floor 1 pair *1 sq.mm. shielded , Armoured RTU Marshalling Box
2 Buccholz alarm RTU-BZA Hardwired Marshalling Box(Open Space) transformer 58
DCN Rack L1- B04,R04) Twisted pair cable CH 2 ,12V TB 29, 30
RTU Panel (First floor 1 pair *1 sq.mm. shielded , Armoured RTU Marshalling Box
3 MOG alarm RTU-MOGA Hardwired Marshalling Box(Open Space) transformer 58
DCN Rack L1- B04,R04) Twisted pair cable CH 3 ,12V TB 28, 30
RTU Panel (First floor 1 pair *1 sq.mm. shielded , Armoured RTU Marshalling Box
4 Oil temperature alarm RTU-OTA Hardwired Marshalling Box(Open Space) transformer 58
DCN Rack L1- B04,R04) Twisted pair cable CH 4 ,12V TB 27, 30

C CRAC (Qty - 12Nos)


RTU Panel (First floor 1 pair *1 sq. mm. shielded , RTU PAC-01
1 Modbus Integration RTU-PAC 01 Soft Integration CMBR-MCN-MAU-1F-01 (First Floor) 25
DCN Rack L1- B04,R04) Armoured Twisted pair cable COM 2 RX, TX RS485 + / -
1 pair *1 sq. mm. shielded , PAC-01 PAC-02
2 Modbus Integration RTU-PAC 02 Soft Integration CMBR-MCN-MAU-1F-01 (First Floor) CMBR-MCN-MAU-1F-02 (First Floor) 12
Armoured Twisted pair cable RS485 + / - RS485 + / -
1 pair *1 sq. mm. shielded , PAC-02 PAC-03
3 Modbus Integration RTU-PAC 03 Soft Integration CMBR-MCN-MAU-1F-02 (First Floor) CMBR-MCN-MAU-1F-03 (First Floor) 12
Armoured Twisted pair cable RS485 + / - RS485 + / -
1 pair *1 sq. mm. shielded , PAC-03 PAC-04
4 Modbus Integration RTU-PAC 04 Soft Integration CMBR-MCN-MAU-1F-03 (First Floor) CMBR-MCN-MAU-1F-04 (First Floor) 12
Armoured Twisted pair cable RS485 + / - RS485 + / -
1 pair *1 sq. mm. shielded , PAC-04 PAC-05
5 Modbus Integration RTU-PAC 05 Soft Integration CMBR-MCN-MAU-1F-04 (First Floor) CMBR-MCN-MAU-1F-05 (First Floor) 12
Armoured Twisted pair cable RS485 + / - RS485 + / -
1 pair *1 sq. mm. shielded , PAC-05 PAC-06
6 Modbus Integration RTU-PAC 06 Soft Integration CMBR-MCN-MAU-1F-05 (First Floor) CMBR-MCN-MAU-SF-04 (Second Floor) 45
Armoured Twisted pair cable RS485 + / - RS485 + / -
1 pair *1 sq. mm. shielded , PAC-06 PAC-07
7 Modbus Integration RTU-PAC 07 Soft Integration CMBR-MCN-MAU-SF-04 (Second Floor) CMBR-MCN-MAU-SF-03 (Second Floor) 16
Armoured Twisted pair cable RS485 + / - RS485 + / -
1 pair *1 sq. mm. shielded , PAC-07 PAC-08
8 Modbus Integration RTU-PAC 08 Soft Integration CMBR-MCN-MAU-SF-03 (Second Floor) CMBR-MCN-MAU-SF-02 (Second Floor) 16
Armoured Twisted pair cable RS485 + / - RS485 + / -
1 pair *1 sq. mm. shielded , PAC-08 PAC-09
9 Modbus Integration RTU-PAC 09 Soft Integration CMBR-MCN-MAU-SF-02 (Second Floor) CMBR-MCN-MAU-SF-01 (Second Floor) 16
Armoured Twisted pair cable RS485 + / - RS485 + / -
1 pair *1 sq. mm. shielded , PAC-09 PAC-10
10 Modbus Integration RTU-PAC 10 Soft Integration CMBR-MCN-MAU-SF-01 (Second Floor) CMBR-MCN-MAU-SF-07 (Second Floor) 25
Armoured Twisted pair cable RS485 + / - RS485 + / -
1 pair *1 sq. mm. shielded , PAC-10 PAC-11
11 Modbus Integration RTU-PAC 11 Soft Integration CMBR-MCN-MAU-SF-07 (Second Floor) CMBR-MCN-MAU-SF-06 (Second Floor) 16
Armoured Twisted pair cable RS485 + / - RS485 + / -
1 pair *1 sq. mm. shielded , PAC-11 PAC-12
12 Modbus Integration RTU-PAC 12 Soft Integration CMBR-MCN-MAU-SF-06 (Second Floor) CMBR-MCN-MAU-SF-05 (Second Floor) 16
Armoured Twisted pair cable RS485 + / - RS485 + / -
PROJECT NO. 44PS8901 TITLE: CABLE SCHEDULE DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
COIMBATORE MCN-
CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT : REV NO. : 04
AUGMENTATION
LOCATION COIMBATORE Issue date: 26-Oct-2021
Annexure C: RTU anf FAS Cable Schedule
D. Soft Integration with SEB LM,DG LM,DG
Modbus integration with RTU - SEB Load SEB LM For MLTP Incomer-1 (Transfo Incomer)
RTU Panel (First floor MLTP (Ground Floor) - SEB Load 1 pair *1 sq. mm. shielded , Armoured RTU COM 3
1 Manager Soft Integration +, - 48 Load Manager considered as SEB Load
DCN Rack L1- B04,R04) Manager Twisted pair cable D+ , D-
(Modbus Port) Manager
Modbus integration with RTU-DG-1 Load SEB LM DG-1 LM
MLTP (Ground Floor - DG-1 Load 1 pair *1 sq. mm. shielded , Armoured
2 Manager Soft Integration MLTP (Ground Floor) - SEB Load Manager +, - +,- 10
Manager) Twisted pair cable
(Modbus Port) (Modbus Port)
Modbus integration with RTU-DG-2 Load DG-1 LM DG-2 LM
MLTP (Ground Floor - DG-2 Load 1 pair *1 sq. mm. shielded , Armoured
3 Manager Soft Integration MLTP ( Ground Floor - DG-1 Load Manager) +,- +,- 10
Manager) Twisted pair cable
(Modbus Port) (Modbus Port)
Modbus integration with RTU-DG-3 Load DG-2 LM DG-3 LM
MLTP (Ground Floor - DG-3 Load 1 pair *1 sq. mm. shielded , Armoured
4 Manager Soft Integration MLTP (Ground Floor - DG-2 Load Manager) +,- +,- 10
Manager) Twisted pair cable
(Modbus Port) (Modbus Port)
DG-3 LM DG-1
DG-1 (10070-AG2-CMBR-EMG-001) 1 pair *1 sq. mm. shielded , Armoured
5 Modbus integration with RTU-DG-1 Soft Integration MLTP (Ground Floor - DG-3 Load Manager) +,- TB 15 -1, +3 50
Open Space Area Twisted pair cable
(Modbus Port)
DG-1 (10070-AG2-CMBR-EMG-001) Open DG-2 (10070-AG2-CMBR-EMG-002) 1 pair *1 sq. mm. shielded , Armoured DG-1 DG-2
6 Modbus integration with RTU-DG-2 Soft Integration 23
Space Area Open Space Area Twisted pair cable TB 15 -1, +3 TB 15 -1, +3
DG-2 (10070-AG2-CMBR-EMG-002) Open 1 pair *1 sq. mm. shielded , Armoured DG-2 DG-3
7 Modbus integration with RTU-DG-3 Soft Integration DG-3 Open Space Area 25
Space Area Twisted pair cable TB 15 -1, +3 TB 15 -1, +3

E. FA System & RTU Panel ( Qty - 1 Nos )


FAS - 'RS 485
Output port of
RTU Panel (First floor 1 pair *1 sq. mm. shielded , Armoured RTU COM 4
1 Soft Integration with FAS Panel RTU-FAS Soft Integration FACP Modbus Converter 60
DCN Rack L1- B04,R04) Twisted pair cable D+ & D-
(RE-AMB) : Terminal
A. B

FAS - 'RS 485


Output port of
1 pair *1 sq. mm. shielded , Armoured
2 Modbus Integration with RTU-HT panel LM Soft Integration FACP HT panel LM (Open Space ) Modbus Converter XM-3,4 70
Twisted pair cable
(RE-AMB) : Terminal
A. B

Modbus integration with HT Panel Relays (RTU- HT panel - Numerical Relays (Open 1 pair *1 sq. mm. shielded , Armoured
3 Soft Integration HT panel LM (Open Space ) XM-3,4 XM-1,2 20
HT PANEL Relay) Space) Twisted pair cable

from ±48 V DC power source from DCN rack


RTU Panel (First floor 3 C* 2.5 sq. mm. copper conductor,
F RTU Power Supply (DCN RACK) 25/7/2021 (First floor ±48v DC- supply RTU Power 8
DCN Rack L1- B04,R04) armoured FRLS PVC insulated cables
DCN Rack L1- B04,R04)
RTU Panel (First floor RTU LAN 1 DCN/AUX switch
G RTU TCP/IP Interface (DCN RACK) Hardwired LAN Switch Cat6 communication cable 8
DCN Rack L1- B04,R04) port 1 port 1

UPSDB-1 (First Floor) 3 C* 2.5 sq. mm. copper conductor,


H FACP-GF - P1 Hardwired FACP UPS DB FACP Power 48
Tag No. 10070-AG2-CMBR-EKE-001 armoured FRLS PVC insulated cables

UPSDB-1 (First Floor) 3 C* 2.5 sq. mm. copper conductor,


I PSP Hardwired PSP (Power Supply Panel) UPS DB PSP Power 48
Tag No. 10070-AG2-CMBR-EKE-001 armoured FRLS PVC insulated cables

J. Soft Integration with 75kVA UPS


RTU Panel (First floor UPS 01 Second Floor 1 pair *1 sq. mm. shielded , Armoured RTU COM 6 UPS 01
1 RTU - UPS 1 Soft Integration 60
DCN Rack L1- B04,R04) (10070-AG2-CMBR-EUP-201) Twisted pair cable D+ , D- Rx D+, Rx D-
UPS 01 Second Floor BAU for UPS-1 Second Floor 1 pair *1 sq. mm. shielded , Armoured UPS 01 +, -
2 Modbus Integration UPS 1 - BAU 01 Soft Integration 10
(10070-AG2-CMBR-EUP-201) (10070-AG2-CMBR-EUP-214) Twisted pair cable Rx D+, Rx D- (Modbus Port)
BAU for UPS-1 Second Floor UPS 02 Second Floor 1 pair *1 sq. mm. shielded , Armoured +, - UPS 02
3 RTU - UPS 2 Soft Integration 10
(10070-AG2-CMBR-EUP-214) (10070-AG2-CMBR-EUP-202) Twisted pair cable (Modbus Port) Rx D+, Rx D-
UPS 02 Second Floor BAU for UPS-1 Second Floor 1 pair *1 sq. mm. shielded , Armoured UPS 02 +, -
4 Modbus Integration UPS 1 - BAU 02 Soft Integration 10
(10070-AG2-CMBR-EUP-202) (10070-AG2-CMBR-EUP-215) Twisted pair cable Rx D+, Rx D- (Modbus Port)

NOTE: 1) DCN/Auxillary switch, Port 1 is reserved for RTU 1 & Port 2 is reserve for RTU 2 (Future)
PROJECT NO. 44PS8901 TITLE : CABLE SCHEDULE DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT : COIMBATORE-MCN-AUGMENTATION REV NO. : 04
LOCATION COIMBATORE Issue date: 26-Oct-2021
Annexure C: RTU anf FAS Cable Schedule

Cable Qty in
Sr.No. Description of System Type From To Cable Type From TB To TB Remarks
Mtrs

J SMPS
1 SMPS CAT 6 Cable SMPS 1-1-DCN Hardwired SMPS 1 (First Floor) (10070-AG2-CMBR-ED-003) DCN Switch (First Floor L1- B04,R04) Cat6 communication cable Ports Ports 22
2 SMPS CAT 6 Cable SMPS 1-1-DCN Hardwired SMPS 1 (First Floor) (10070-AG2-CMBR-ED-003) DCN Switch (First Floor L1- B04,R04) Cat6 communication cable Ports Ports 22
3 SMPS CAT 6 Cable SMPS 2-1-DCN Hardwired SMPS 1 (Second Floor)(10070-AG2-CMBR-ED-201) DCN Switch (First Floor L2- B03,R04) Cat6 communication cable Ports Ports 25
4 SMPS CAT 6 Cable SMPS 2-1-DCN Hardwired SMPS 1 (Second Floor)(10070-AG2-CMBR-ED-201) DCN Switch (First Floor L2- B03,R04) Cat6 communication cable Ports Ports 25
5 SMPS CAT 6 Cable SMPS 2-2-DCN Hardwired SMPS 2 (Second Floor)(10070-AG2-CMBR-ED-202) DCN Switch (First Floor L2- B03,R04) Cat6 communication cable Ports Ports 25
6 SMPS CAT 6 Cable SMPS 2-2-DCN Hardwired SMPS 2 (Second Floor)(10070-AG2-CMBR-ED-202) DCN Switch (First Floor L2- B03,R04) Cat6 communication cable Ports Ports 25
7 SMPS CAT 6 Cable SMPS 2-3-DCN Hardwired SMPS 3 (Second Floor)(10070-AG2-CMBR-ED-203) DCN Switch (First Floor L2- B03,R04) Cat6 communication cable Ports Ports 25
8 SMPS CAT 6 Cable SMPS 2-3-DCN Hardwired SMPS 3 (Second Floor)(10070-AG2-CMBR-ED-203) DCN Switch (First Floor L2- B03,R04) Cat6 communication cable Ports Ports 25

K SMPS Battery Rack Smoke Detection Power Supply


Power Supply (-48 VDC ) to Smoke Detector
3 C* 2.5 sq. mm. copper conductor,
1 1 -1 Hardwired SMPS 1 (First Floor) (10070-AG2-CMBR-ED-003) Smoke Detector 1 (mounted in Battery rack-1) TBD at site TBD at site 7
armoured FRLS PVC insulated cables
SMPS 1 - SD1
Power Supply (-48 VDC ) to Smoke Detector
3 C* 2.5 sq. mm. copper conductor,
2 1-2 Hardwired SMPS 1 (First Floor) (10070-AG2-CMBR-ED-003) Smoke Detector 2 (mounted in Battery rack-1) TBD at site TBD at site 8
armoured FRLS PVC insulated cables
SMPS 1 - SD2
Power Supply (-48 VDC ) to Smoke Detector
3 C* 2.5 sq. mm. copper conductor,
3 2-1 Hardwired SMPS 1 (Second Floor)(10070-AG2-CMBR-ED-201) Smoke Detector 3 (mounted in Battery rack-2) TBD at site TBD at site 7
armoured FRLS PVC insulated cables
SMPS 2 - SD3
Power Supply (-48 VDC ) to Smoke Detector
3 C* 2.5 sq. mm. copper conductor,
4 2-2 Hardwired SMPS 1 (Second Floor)(10070-AG2-CMBR-ED-201) Smoke Detector 4 (mounted in Battery rack-2) TBD at site TBD at site 8
armoured FRLS PVC insulated cables
SMPS 2 - SD4
Power Supply (-48 VDC ) to Smoke Detector
3 C* 2.5 sq. mm. copper conductor,
5 3-1 Hardwired SMPS 2 (Second Floor)(10070-AG2-CMBR-ED-202) Smoke Detector 5 (mounted in Battery rack-3) TBD at site TBD at site 7
armoured FRLS PVC insulated cables
SMPS 3- SD5
Power Supply (-48 VDC ) to Smoke Detector
3 C* 2.5 sq. mm. copper conductor,
6 3-2 Hardwired SMPS 2 (Second Floor)(10070-AG2-CMBR-ED-202) Smoke Detector 6 (mounted in Battery rack-3) TBD at site TBD at site 8
armoured FRLS PVC insulated cables
SMPS 3 - SD6
Power Supply (-48 VDC ) to Smoke Detector
3 C* 2.5 sq. mm. copper conductor,
5 3-1 Hardwired SMPS 3 (Second Floor)(10070-AG2-CMBR-ED-203) Smoke Detector 7 (mounted in Battery rack-4) TBD at site TBD at site 10
armoured FRLS PVC insulated cables
SMPS 4- SD7
Power Supply (-48 VDC ) to Smoke Detector
3 C* 2.5 sq. mm. copper conductor,
6 3-2 Hardwired SMPS 3 (Second Floor)(10070-AG2-CMBR-ED-203) Smoke Detector 8 (mounted in Battery rack-4) TBD at site TBD at site 10
armoured FRLS PVC insulated cables
SMPS 4 - SD8

L SMPS Battery Rack Smoke Detection


Battery Rack
SMPS 1 Controller (First Floor) (10070-AG2-CMBR-ED- 1 pair *1 sq. mm. shielded , Armoured
1 Smoke Detector 1-1 Hardwired Smoke Detector 1-1 TBD at site TBD at site 7 Location of Main Junction Box & Fan
003) Twisted pair cable
SD1-SMPS 1 starter Panel at First Floot assumed
Battery Rack near SMPS (First Floor) (10070-AG2-
1 pair *1 sq. mm. shielded , Armoured CMBR-ED-003)
2 Smoke Detector 1-2 Hardwired Smoke Detector 1-2 Main Junction Box-1 (First Floor) TBD at site TBD at site 10
Twisted pair cable
SD2-MJB

To FAN Starter panel ( First Floor ) - MJB- 3 C* 2.5 sq. mm. copper conductor,
3 Hardwired Main Junction Box-1 (First Floor) FAN Starter panel (First Floor)) TBD at site TBD at site 10
FSP armoured FRLS PVC insulated cables

Battery Rack
SMPS 1 Controller (Second Floor)(10070-AG2-CMBR-ED- 1 pair *1 sq. mm. shielded , Armoured
4 Smoke Detector 2-1 Hardwired Smoke Detector 1-1 TBD at site TBD at site 7
201) Twisted pair cable
SD3-SMPS 1
Battery Rack
1 pair *1 sq. mm. shielded , Armoured
5 Smoke Detector 2-2 Hardwired Smoke Detector 1-2 Main Junction Box-1 (Second Floor Floor) TBD at site TBD at site 10
Twisted pair cable
SD4-MJB
Battery Rack
SMPS 2 Controller (Second Floor)(10070-AG2-CMBR-ED- 1 pair *1 sq. mm. shielded , Armoured
6 Smoke Detector 2-1 Hardwired Smoke Detector 2-1 TBD at site TBD at site 7
202) Twisted pair cable
SD5-SMPS 2
Battery Rack - 2
1 pair *1 sq. mm. shielded , Armoured
7 Smoke Detector 2-2 Hardwired Smoke Detector 2-2 Main Junction Box-1 (Second Floor) TBD at site TBD at site 13
Twisted pair cable
SD6-MJB
Battery Rack
SMPS 3 Controller (Second Floor)(10070-AG2-CMBR-ED- 1 pair *1 sq. mm. shielded , Armoured
8 Smoke Detector 3-1 Hardwired Smoke Detector 3-1 TBD at site TBD at site 7
203) Twisted pair cable
SD5-SMPS 3
Battery Rack - 3
Main Junction Box-1 (Second Floor near Fan Starter 1 pair *1 sq. mm. shielded , Armoured
9 Smoke Detector 3-2 Hardwired Smoke Detector 3-2 TBD at site TBD at site 19
Panel ) Twisted pair cable
SD6-MJB

To FAN Starter panel (Second Floor)- MJB- 3 C* 2.5 sq. mm. copper conductor,
10 Hardwired Main Junction Box-1 (Second Floor) FAN Starter panel TBD at site TBD at site 10
FSP armoured FRLS PVC insulated cables
PROJECT NO. 44PS8901 TITLE : CABLE SCHEDULE DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT : COIMBATORE-MCN-AUGMENTATION REV NO. : 04
LOCATION COIMBATORE Issue date: 26-Oct-2021
Annexure C: RTU anf FAS Cable Schedule

Cable Qty in
Sr.No. Description of System Type From To Cable Type From TB To TB Remarks
Mtrs
H. Battery Rack Smoke Detection
Power Supply (-48 VDC ) to Smoke 3 C* 2.5 sq. mm. copper
1 Detector 1 -1 Hardwired SMPS 1 (Second Floor) Smoke Detector 1 (mounted in Battery rack-1) conductor, armoured FRLS PVC SMPS 1-1 MCB-36 2,5 8
SMPS 1 - SD1 insulated cables
Power Supply (-48 VDC ) to Smoke 3 C* 2.5 sq. mm. copper
2 Detector 1-2 Hardwired SMPS 1 (Second Floor) Smoke Detector 2 (mounted in Battery rack-1) conductor, armoured FRLS PVC SMPS 1-2 MCB-37 2,5 8
SMPS 1 - SD2 insulated cables
Power Supply (-48 VDC ) to Smoke 3 C* 2.5 sq. mm. copper
3 Detector 2-1 25/7/2021 SMPS 2 (Second Floor) Smoke Detector 3 (mounted in Battery rack-2) conductor, armoured FRLS PVC SMPS 2-1 MCB-36 2,5 8
SMPS 2 - SD3 insulated cables
Power Supply (-48 VDC ) to Smoke 3 C* 2.5 sq. mm. copper
4 Detector 2-2 Hardwired SMPS 2 (Second Floor) Smoke Detector 4 (mounted in Battery rack-2) conductor, armoured FRLS PVC SMPS 2-2 MCB-37 2,5 8
SMPS 2 - SD4 insulated cables
Electrical SCOPE
Power Supply (-48 VDC ) to Smoke 3 C* 2.5 sq. mm. copper
5 Detector 3-1 Hardwired SMPS 3 (Second Floor) Smoke Detector 5 (mounted in Battery rack-3) conductor, armoured FRLS PVC SMPS 3-1 MCB-36 2,5 8
SMPS 3- SD5 insulated cables
Power Supply (-48 VDC ) to Smoke 3 C* 2.5 sq. mm. copper
6 Detector 3-2 Hardwired SMPS 3 (Second Floor) Smoke Detector 6 (mounted in Battery rack-3) conductor, armoured FRLS PVC SMPS 3-2 MCB-37 2,5 8
SMPS 3 - SD6 insulated cables
Power Supply (-48 VDC ) to Smoke 3 C* 2.5 sq. mm. copper
5 Detector 3-1 Hardwired SMPS 4 (Second Floor) Smoke Detector 7 (mounted in Battery rack-3) conductor, armoured FRLS PVC SMPS 4-1 MCB-36 2,5 8
SMPS 4- SD7 insulated cables
Power Supply (-48 VDC ) to Smoke 3 C* 2.5 sq. mm. copper
6 Detector 3-2 Hardwired SMPS 4 (Second Floor) Smoke Detector 8 (mounted in Battery rack-3) conductor, armoured FRLS PVC SMPS 4-2 MCB-37 2,5 8
SMPS 4 - SD8 insulated cables

M Fan Monitoring system


1 pair *1 sq. mm. shielded , Armoured
1 Main Junction Box-1 Hardwired Rack - R01, Bay 02 (First Floor) Main Junction Box-1 TBD at site TBD at site 7
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
2 Main Junction Box-1 Hardwired Rack - R02, Bay 02 (First Floor) Main Junction Box-1 TBD at site TBD at site 8
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
3 Main Junction Box-1 Hardwired Rack - R03, Bay 02 (First Floor) Main Junction Box-1 TBD at site TBD at site 10
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
4 Main Junction Box-1 Hardwired Rack - R04, Bay 02 (First Floor) Main Junction Box-1 TBD at site TBD at site 11
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
5 Main Junction Box-1 Hardwired Rack - R05, Bay 02 (First Floor) Main Junction Box-1 TBD at site TBD at site 12
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
6 Main Junction Box-1 Hardwired Rack - R06, Bay 02 (First Floor) Main Junction Box-1 TBD at site TBD at site 13
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
7 Main Junction Box-1 Hardwired Rack - R07, Bay 02 (First Floor) Main Junction Box-1 TBD at site TBD at site 14
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
8 Main Junction Box-1 Hardwired Rack - R08, Bay 02 (First Floor) Main Junction Box-1 TBD at site TBD at site 16
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
9 Main Junction Box-1 Hardwired Rack - R09, Bay 02 (First Floor) Main Junction Box-1 TBD at site TBD at site 17
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
10 Main Junction Box-2 Hardwired Rack - R01, Bay 05 (First Floor) Main Junction Box-2 TBD at site TBD at site 7
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
11 Main Junction Box-2 Hardwired Rack - R02, Bay 05 (First Floor) Main Junction Box-2 TBD at site TBD at site 8
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
12 Main Junction Box-2 Hardwired Rack - R03, Bay 05 (First Floor) Main Junction Box-2 TBD at site TBD at site 10
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
13 Main Junction Box-2 Hardwired Rack - R04, Bay 05 (First Floor) Main Junction Box-2 TBD at site TBD at site 11
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
14 Main Junction Box-2 Hardwired Rack - R05, Bay 05 (First Floor) Main Junction Box-2 TBD at site TBD at site 12
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
15 Main Junction Box-2 Hardwired Rack - R06, Bay 05 (First Floor) Main Junction Box-2 TBD at site TBD at site 13
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
16 Main Junction Box-2 Hardwired Rack - R07, Bay 05 (First Floor) Main Junction Box-2 TBD at site TBD at site 14
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
17 Main Junction Box-2 Hardwired Rack - R08, Bay 05 (First Floor) Main Junction Box-2 TBD at site TBD at site 16
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
18 Main Junction Box-1 Hardwired Rack - R01, Bay 01 (Second Floor) Main Junction Box-1 TBD at site TBD at site 7
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
19 Main Junction Box-1 Hardwired Rack - R02, Bay 01 (Second Floor) Main Junction Box-1 TBD at site TBD at site 8
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
20 Main Junction Box-1 Hardwired Rack - R03, Bay 01 (Second Floor) Main Junction Box-1 TBD at site TBD at site 10
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
21 Main Junction Box-1 Hardwired Rack - R04, Bay 01 (Second Floor) Main Junction Box-1 TBD at site TBD at site 11
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
22 Main Junction Box-1 Hardwired Rack - R05, Bay 01 (Second Floor) Main Junction Box-1 TBD at site TBD at site 12
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
23 Main Junction Box-1 Hardwired Rack - R06, Bay 01 (Second Floor) Main Junction Box-1 TBD at site TBD at site 7
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
24 Main Junction Box-1 Hardwired Rack - R07, Bay 01 (Second Floor) Main Junction Box-1 TBD at site TBD at site 8
Twisted pair cable
PROJECT NO. 44PS8901 TITLE : CABLE SCHEDULE DOC NO.: 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
CLIENT RELIANCE JIO INFOCOMM LIMITED PROJECT : COIMBATORE-MCN-AUGMENTATION REV NO. : 04
LOCATION COIMBATORE Issue date: 26-Oct-2021
Annexure C: RTU anf FAS Cable Schedule

Cable Qty in
Sr.No. Description of System Type From To Cable Type From TB To TB Remarks
Mtrs
1 pair *1 sq. mm. shielded , Armoured
25 Main Junction Box-1 Hardwired Rack - R08, Bay 01 (Second Floor) Main Junction Box-1 TBD at site TBD at site 10
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
26 Main Junction Box-1 Hardwired Rack - R09, Bay 01 (Second Floor) Main Junction Box-1 TBD at site TBD at site 11
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
27 Main Junction Box-1 Hardwired Rack - R10, Bay 01 (Second Floor) Main Junction Box-1 TBD at site TBD at site 12
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
28 Main Junction Box-1 Hardwired Rack - R11, Bay 01 (Second Floor) Main Junction Box-1 TBD at site TBD at site 13
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
29 Main Junction Box-1 Hardwired Rack - R12, Bay 01 (Second Floor) Main Junction Box-1 TBD at site TBD at site 14
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
30 Main Junction Box-1 Hardwired Rack - R13, Bay 01 (Second Floor) Main Junction Box-1 TBD at site TBD at site 16
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
31 Main Junction Box-1 Hardwired Rack - R14, Bay 01 (Second Floor) Main Junction Box-1 TBD at site TBD at site 17
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
32 Main Junction Box-2 Hardwired Rack - R01, Bay 02 (Second Floor) Main Junction Box-2 TBD at site TBD at site 7
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
33 Main Junction Box-2 Hardwired Rack - R02, Bay 02 (Second Floor) Main Junction Box-2 TBD at site TBD at site 8
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
34 Main Junction Box-2 Hardwired Rack - R09, Bay 02 (Second Floor) Main Junction Box-2 TBD at site TBD at site 10
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
35 Main Junction Box-2 Hardwired Rack - R10, Bay 02 (Second Floor) Main Junction Box-2 TBD at site TBD at site 11
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
36 Main Junction Box-2 Hardwired Rack - R05, Bay 02 (Second Floor) Main Junction Box-2 TBD at site TBD at site
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
37 Main Junction Box-3 Hardwired Rack - R01, Bay 03 (Second Floor) Main Junction Box-3 TBD at site TBD at site 7
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
38 Main Junction Box-3 Hardwired Rack - R02, Bay 03 (Second Floor) Main Junction Box-3 TBD at site TBD at site 10
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
39 Main Junction Box-3 Hardwired Rack - R03, Bay 03 (Second Floor) Main Junction Box-3 TBD at site TBD at site
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
40 Main Junction Box-3 Hardwired Rack - R04, Bay 03 (Second Floor) Main Junction Box-3 TBD at site TBD at site 12
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
41 Main Junction Box-3 Hardwired Rack - R05, Bay 03 (Second Floor) Main Junction Box-3 TBD at site TBD at site 13
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
42 Main Junction Box-3 Hardwired Rack - R08, Bay 03 (Second Floor) Main Junction Box-3 TBD at site TBD at site 14
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
43 Main Junction Box-3 Hardwired Rack - R10, Bay 03 (Second Floor) Main Junction Box-3 TBD at site TBD at site 16
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
44 Main Junction Box-3 Hardwired Rack - R11, Bay 03 (Second Floor) Main Junction Box-3 TBD at site TBD at site 16
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
45 Main Junction Box-4 Hardwired Rack - R01, Bay 04 (Second Floor) Main Junction Box-4 TBD at site TBD at site 7
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
46 Main Junction Box-4 Hardwired Rack - R02, Bay 04 (Second Floor) Main Junction Box-4 TBD at site TBD at site 8
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
47 Main Junction Box-4 Hardwired Rack - R03, Bay 04 (Second Floor) Main Junction Box-4 TBD at site TBD at site 10
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
48 Main Junction Box-4 Hardwired Rack - R04, Bay 04 (Second Floor) Main Junction Box-4 TBD at site TBD at site 11
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
49 Main Junction Box-4 Hardwired Rack - R05, Bay 04 (Second Floor) Main Junction Box-4 TBD at site TBD at site 12
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
50 Main Junction Box-4 Hardwired Rack - R06, Bay 04 (Second Floor) Main Junction Box-4 TBD at site TBD at site 13
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
51 Main Junction Box-4 Hardwired Rack - R10, Bay 04 (Second Floor) Main Junction Box-4 TBD at site TBD at site 11
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
52 Main Junction Box-4 Hardwired Rack - R11, Bay 04 (Second Floor) Main Junction Box-4 TBD at site TBD at site 12
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
53 Main Junction Box-4 Hardwired Rack - R12, Bay 04 (Second Floor) Main Junction Box-4 TBD at site TBD at site 13
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
54 Main Junction Box-5 Hardwired Rack - R01, Bay 05 (Second Floor) Main Junction Box-5 TBD at site TBD at site 10
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
55 Main Junction Box-5 Hardwired Rack - R04, Bay 05 (Second Floor) Main Junction Box-5 TBD at site TBD at site 11
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
56 Fan monitoring bay Hooter-1 to MJB-1 Hardwired Fan monitoring bay Hooter-1 (First floor) Main Junction Box-1 (First Floor near L1-B02) TBD at site TBD at site 4
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
57 Fan monitoring bay Hooter-2 to MJB-2 Hardwired Fan monitoring bay Hooter-2 (First floor) Main Junction Box-2 (First Floor near L1-B05) TBD at site TBD at site 4
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
58 Fan monitoring bay Hooter-1 to MJB-1 Hardwired Fan monitoring bay Hooter-1 (Second floor) Main Junction Box-1 (Second Floor near L2-B01) TBD at site TBD at site 4
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
59 Fan monitoring bay Hooter-2 to MJB-2 Hardwired Fan monitoring bay Hooter-2 (Secondt floor) Main Junction Box-2 (Second Floor near L2-B02) TBD at site TBD at site 4
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
60 Fan monitoring bay Hooter-3 to MJB-3 Hardwired Fan monitoring bay Hooter-3 (Second floor) Main Junction Box-3 (Second Floor near L2-B03) TBD at site TBD at site 4
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
61 Fan monitoring bay Hooter-4 to MJB-4 Hardwired Fan monitoring bay Hooter-4 (Second floor) Main Junction Box-4 (Second Floor near L2-B04) TBD at site TBD at site 4
Twisted pair cable
1 pair *1 sq. mm. shielded , Armoured
62 Fan monitoring bay Hooter-5 to MJB-5 Hardwired Fan monitoring bay Hooter-5 (Second floor) Main Junction Box-5 (Second Floor near L2-B05) TBD at site TBD at site 4
Twisted pair cable
Note: Fan monitoring system for vendor supplied racks is not provided
PROJECT NO. 44PS8901 CABLE SCHEDULE (PHASE III) DOC. NO 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
CLIENT RELIANCE JIO INFOCOMM LIMITED REV NO; 04
LOCATION COIMBATORE ISSUE DATE : 26-Oct-2021
PROJECT COIMBATORE-MCN-AUGMENTATION
I. POWER/ CONTROL CABLE SUMMARY
Calc. length Total length in
Sr. No. Size in Sqmm Type Remarks
in mtrs. mtrs.
A. HV CABLES
1 3Cx185 33 kV (E), Al XLPE 0m 0m
2 3Cx300 11 kV (E), Al XLPE 120 m 144 m
3 3Cx300 6.6 kV (E), Al XLPE 0m
B. DC CABLES
1 1Cx150 (RED) 1.1 kV, YY 0m 0
2 1Cx150 (BLACK) 1.1 kV, YY 0m 0
3 1Cx95 (RED) 1.1 kV, YY 3800 m 4560
4 1Cx95 (BLACK) 1.1 kV, YY 3800 m 4560
5 1Cx70 (RED) 1.1 kV, YY 0m 0
6 1Cx70 (BLACK) 1.1 kV, YY 0m 0
5 1Cx50 (RED) 1.1 kV, YY 0m 0
6 1Cx50 (BLACK) 1.1 kV, YY 0m 0
C. POWER AND CONTROL ELECTRICAL CABLES
1 1Cx240 1.1 kV, 2XFY 0m 0m
2 4Cx300 1.1 kV, A2XFY 379 m 455 m
3 4Cx185 1.1 kV, A2XFY 0m 0m
4 4Cx150 1.1 kV, A2XFY 0m 0m
5 4Cx95 1.1 kV, A2XFY 0m 0m
6 4Cx50 1.1 kV, A2XFY 0m 0m
7 4Cx35 1.1 kV, A2XFY 1408 m 1690
8 4Cx120 1.1 kV, 2XY 914 m 1097 m
9 4Cx10 1.1 kV, YWY 38 m 38 m
10 4Cx6 1.1 kV, YWY 0m 0m
11 4Cx4 1.1 kV, YWY 115 m 138 m
12 4Cx2.5 1.1 kV, YWY 1171 m 1405 m
13 4Cx1.5 1.1 kV, YWY 1454 m 1745 m
14 3Cx4 1.1 kV, YY 0m
15 3Cx2.5 1.1 kV, YY 0m 0m
16 3Cx2.5 1.1 kV, YWY 813 m 975 m
17 19Cx1.5 1.1 kV, YWY 0m 0m
18 12Cx1.5 1.1 kV, YWY 495 m 594 m
19 7Cx1.5 1.1 kV, YWY 486 m 584 m
22 7Cx1.5 1.1 kV, YY 0m 0m
23 3Cx10 1.1 kV, Cu flex Cable 0m 0m
24 3Cx10 1.1 kV, YWY 400 m 480 m
25 4Cx10 25/7/2021 0m 0m
26 2Cx10 1.1 kV, YY, FRLS 0m 0m
27 1Cx300 1.1 kV, Cu. Flex Cable 648 m 778 m
(BLACK)
28 1Cx120 1.1 kV, YY, FRLS 0m 0m

29 3Cx4 1.1 kV, YWY 54 m 65 m


30 3Cx2.5 1.1 kV, Cu. 0m 0m
Flex Cable
D. INSTRUMENTATION CABLES
3Cx2.5 copper conductor, 686 m 823 m
armoured FRLS PVC
insulated cables
1
4Cx1 (2 pair) shielded, 0m 0m
Armoured Twisted Cu.
2 cable
3 3Cx1.5 Armoured Cu. cable 0m 0m
1 pair x 1 shielded, Armoured 1574 m 1889 m
4 Twisted pair cable
2Cx1.5 FRLS, PVC Armoured 0m 0m
5 Cu. cable for FAS
6 Cat 5E/ Cat 6 LAN cable 536 m 643 m
7 2 pair x 0.5 shielded cable
PROJECT NO. 44PS8901 CABLE SCHEDULE (PHASE III) DOC. NO 10070-E84-IN-TN-CMBR-GVRD-NB-0001-502
CLIENT RELIANCE JIO INFOCOMM LIMITED REV NO; 04
LOCATION COIMBATORE ISSUE DATE : 26-Oct-2021
PROJECT COIMBATORE-MCN-AUGMENTATION
II CABLE GLAND/ HT TERMINATION KIT SUMMARY
Sr. No. Size in Sqmm Calc. Qty Total Qty
A. HV CABLES
1 3Cx185 33 kV (E), Al XLPE 0m 0 Nos.
2 3Cx300 11 kV (E), Al XLPE 12 14 Nos.
3 3Cx300 6.6 kV (E), Al XLPE 0m 0 Nos.
B. DC CABLES
1 1Cx150 (RED) 1.1 kV, YY 0m 0 Nos.
2 1Cx150 (BLACK) 1.1 kV, YY 0m 0 Nos.
3 1Cx95 (RED) 1.1 kV, YY 480 576 Nos.
4 1Cx95 (BLACK) 1.1 kV, YY 480 576 Nos.
3 1Cx70 (RED) 1.1 kV, YY 0m 0 Nos.
4 1Cx70 (BLACK) 1.1 kV, YY 0m 0 Nos.
5 1Cx50 (RED) 1.1 kV, YY 0m 0 Nos.
6 1Cx50 (BLACK) 1.1 kV, YY 0m 0 Nos.
C. POWER AND CONTROL ELECTRICAL CABLES
1 1Cx240 1.1 kV, 2XFY 0m 0 Nos.
2 4Cx300 1.1 kV, A2XFY 33 m 33 Nos.
3 4Cx185 1.1 kV, A2XFY 0m 0 Nos.
4 4Cx150 1.1 kV, A2XFY 0m 0 Nos.
5 4Cx95 1.1 kV, A2XFY 0m 0 Nos.
6 4Cx50 1.1 kV, A2XFY 0m 0 Nos.
7 4Cx35 1.1 kV, A2XFY 76 91 Nos.
8 4Cx120 1.1 kV, 2XY 54 65 Nos.
9 4Cx10 1.1 kV, YWY 2m 2 Nos.
10 4Cx6 1.1 kV, YWY 0m 0 Nos.
11 4Cx4 1.1 kV, YWY 6 8 Nos.
4Cx2.5 1.1 kV, YWY 44 53 Nos.
12
4Cx1.5 1.1 kV, YWY 94 113 Nos.
13
14 3Cx4 1.1 kV, YY 0m 0 Nos.
15 3Cx2.5 1.1 kV, YY 0m 0 Nos.
16 3Cx2.5 1.1 kV, YWY 60 m 72 Nos.
17 19Cx1.5 1.1 kV, YWY 0m 0 Nos.
18 12Cx1.5 1.1 kV, YWY 20 24 Nos.
19 7Cx1.5 1.1 kV, YWY 50 60 Nos.
20 7Cx1.5 1.1 kV, YY 0m 0 Nos.
21 3Cx10 1.1 kV, Cu flex Cable 0m 0 Nos.
22 3Cx10 1.1 kV, YWY 30 m 36 Nos.
23 4Cx10 1.1 kV, YY, FRLS 0m 0 Nos.
24 2Cx10 1.1 kV, YY, FRLS 0m 0 Nos.
1Cx300 1.1 kV, Cu. Flex Cable 24 m 24 Nos.
25 (BLACK)
1Cx120 1.1 kV, YY, FRLS 0m 0 Nos.
26
27 1Cx300 1.1 kV, Cu flex Cable 24 m 24 Nos.
28 3Cx4 1.1 kV, YWY 10 12 Nos.
29 3Cx2.5 1.1 kV, Cu. 0m 0 Nos.
30 3Cx2.5 1.1 kV, Cu flex Cable 0m 0 Nos.
D. INSTRUMENTATION CABLES
3Cx2.5 copper conductor, 86 103 Nos.
armoured FRLS PVC
1 insulated cables
4Cx1 (2 pair) shielded, 0m 0 Nos.
Armoured Twisted Cu.
2 cable
3 3Cx1.5 Armoured Cu. cable 0m 0 Nos.
1 pair x 1 shielded, Armoured 258 310 Nos.
4 Twisted pair cable
2Cx1.5 FRLS, PVC Armoured 0m 0 Nos.
5 Cu. cable for FAS
6 Cat 5E/ Cat 6 LAN cable 26 14 Nos.
7 2 pair x 0.5 shielded cable 0m 0 Nos.