You are on page 1of 3

PROJECT DOCUMENT Page 1

No. SP2552-2-F-LA-002 Master Document List.xlsx

Customer Supplier Project number, supplier


Fujian Mawei Shipbuilding Ltd. Cargotec Norway AS SP2552-2
No.3 Chuan Zheng Road Andøyveien 23
Mawei, Fuzhou NO-4623 Kristiansand Project name, customer
CHINA NORWAY MW610-2

P.O. number, customer


VMW610-2E-03(1)

MASTER DOCUMENT LIST


Equipment: Offshore Knucle Jib Crane - Auxiliary Crane

Type: HMC 2201 - LKO 120-20

Marking of drawing
New Revised Obsolete

Revision Description Date Author Checked by Received


0 Issued for information 21.08.2013 EH LAG
1 Issued for approval 05.09.2013 EH LAG
2 Issued for information 09.09.2013 EH LAG
3 Issued for information 12.09.2013 LRH LAG 13.09.13 YZY
4 Issued for approval 01.10.2013 EH LAG
5 Issued for approval 10.10.2013 EH LAG
6 Issued for information 26.11.2013 LRH LAG
7 Issued for information 12.12.2013 EH LAG
8 Issued for information 13.12.2013 EH LAG
9 Issued for information 05.02.2014 LRH LAG

REMARK: Please verify receival of drawings and drawing list, and return a signed copy
of this drawing list to document controller within 5 days:

Date: __________ Signature: _________________________

This document and all information and data herein or herewith is the confidential and proprietary property of Cargotec Norway AS and is not to be
used, reproduced or disclosed in whole or in part by or to anyone without the written confirmation from Cargotec Norway AS.

© Cargotec Norway AS
www.cargotec.com
PROJECT DOCUMENT Page 2
No. SP2552-2-F-LA-002 Master Document List.xlsx

Revision Description Date Author Checked by Received


10 Issued for information 09.12.2014 SMA
PROJECT DOCUMENT
No. SP2552-2-F-LA-002 Master Document List.xlsx
MASTER DOCUMENT LIST
Project No. : SP2552-2 Page 1 of 1

Planned
Cargotec Doc. No.: Document title: Rev: Rev. Date Sent Received Comments:
date

SP2552-2-R-XD-001 HMC 2201 LKO 100-20 General Arrangement 10 15.05.14 19.05.14


SP2552-2-R-XD-002 HMC 2201 LKO 100-20 Working Area Diagram 2 15.05.14 19.05.14

SP2552-2-E-XI-003 SP2552-1 +AB-XI11 Sub-Block Diagrams (7 sheet) 3 13.12.13 17.02.14

SP2552-2 +AB-XT External Wiring Diagram (21


SP2552-2-E-XT-001 0 15.10.14 25.02.14
sheet)
SP2552-2 XI Main Block Diagram Electrical
SP2552-2-E-XI-001 4 22.01.14 05.02.14
Customer Interface
SP2552-2-L-XA-001 Hydraulic Flow Diagram, Tank System 0 12.12.13 13.12.13

SP2552-2-E-XU-002 SP2552-2 +AB-XU Loop Diagram ( 61 sheet) 4 22.01.14 17.02.14


SP2552-2-16 Installation rocedure 0 19.02.14 28.02.14
HMC2201 LKO 100-20 Offshore Crane Lifting
SP2552-2-R-XX-050 3 09.04.14 09.04.14
Arrangement
HMC2201 LKO 100-20 Offshore Crane Lifting
SP2552-2-R-XX-051 1 09.04.14 09.04.14
Arrangement
SP2552-2-Z-KA-003 FAT FAT - Factory Acceptance Test Report A 23.03.14 24.03.14 Issued for information
SP2552-2-Z-KA-004 HAT Harbour Acceptance Test (HAT) A 18.11.11 24.03.14 Isseud for information
SP2552-2 UM User Manual 0 09.12.14 09.12.14 Issued for information