Date 25.02.23 to 04.03.

23
Material /Component/ Equipment Job Start
S/L Model Plant No Job No PR No
Description Date

1 Engine assembly V-480 D13F Ex-00627 7258/22 10/23/2022 2300026074

2 Engine assembly V-480 D13F Ex-00629 7255/22 10/22/2022 Hold

3 Engine assembly V-480 D13F Ex-00533 5483/21 3/14/2022 2300023684

4 Engine Assembly D-85(Insurance)  S6D125E-2 8171/22


DZ-00852 08.02.23
5 Engine Assembly L-150 H D13 F 8203/22 12.02.23 2300028326 
LP-01027
6 Engine Assembly BD 155 BS-6D170-1 7844/22 12/31/2022 2300027465
DZ-000943
7 V3307T 7567/22 12/10/2022 2300026558
Engine Assembly of Bobcat S-650 LS-00739
8 Engine Assy of Bobcat S-590 V2607T 6817/22
LS-00617 8/10/2022
9 Engine Assy of Bobcat S-250 V3800T 6422/22
LS-00275 6/21/2022
10 BF6M1013FC LP-00815 7480/22 11/20/2022 2300026204
Engine Assy.of SDLG Loader
11 Engine Assy.of D-65 S6D125-1 DZ-00269 7806/22 2300027392
12/29/2022
Eng.Assy of Volvo Tipper FMX-440 Pc-
12 24
D13F TP-00764 8276/22 21.02.23
WEEKLY ENGINE SECTION PLAN CUM PROGR
WORK IN PROGRESS (WIP)
Expected
Age Of Manpoer Job
PR Date Job Description Readiness
Job Deployed Status
Date

14-Dec-22 141 Lathe work Completed. 3 Running

142 3 Hold

8-Sep-22 364 Lathe work Completed. 3 Running

- Accidental Case-Under Insurance. 3 Running

Crankshaft sent for Lathe work. 3 Running

72 Lathe work Completed. 3 Running

29-Dec-22 93 3 Running

215 3 Running

265 3 Running

19-Dec-22 113 Lathe work Completed. 3 Running

74 CylBlock ,Crank and Con-Rod to lathe . 3 Running

Crankshaft sent for Lathe work. 3 Running


PLAN CUM PROGRESS REPORT

Actual
Delay (No
Ready
of days)
Date

18.01.23 -

0
OGRESS REPORT

Job Remarks

All Material received except Eng.Overhaul Kit and Bearing Housing.

Parts list for Long Block .

All Material received except Eng.Overhaul Kit and Bearing Housing.

Financial received by Procurement deptt.

PO place to SRP-SRP.

All Parts reched at cwh ,Issue in 4 pair main bearing..Pending parts -Baffle,Turbocharger.

Waiting for parts.

One engine has Ordered for Purchase.

Decession Pending .

Parts reached at Durgapur Transport.

Parts supposed to reached at Durgapur Transport.

Waiting For Financial.


WORK PLANNED (WP)
Job Start
Received Date Material Description Remarks
Date