Al Reeman II Phase 3 - Villas and Infrastructure

BACKFILLING LAYERS DATA SHEET


1. Activities to complete prior to backfilling.
Roa
d Length Concrete Hydro/Deflection Signed
No. (m) Stank test Done
From To Nurol M&M

2. Backfilling 3. Total Number of Layers


Required…………….

S/ Remark’s
No. FROM TO
1 Cover Level (CL) Cover Level (CL)
Ground
2 Ground Level(GL)
Level(GL)
3 Invert Level(IL) Invert Level(IL)
No. Test Signed
Of
Laye Thickness Length 3rd Party
Visual Lab
Lab Nurol M&M Date
r
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

Remarks By Engineer: