Sub: Geotechnical investigations etc. for Design, Drawings consultancy of five tunnels in
connection with Yavatmal-Nanded new line [B.G) project (206 Km.J in Nagpur Division
of Central Railway.
In connection with above, the Compel:;;;r.,ty i.e. CPM has accepted your offer dated
19.O9.201,9at20.6oo/abelowthe scheduled rate. Total Cost of work amounting to Rs 75,03,869.68
(Rupees Seventy-Five Lakh Three Thousand Eight Hundred Sixty-Nine and Paisa Sixty-Eight
only). The Details of Schedule of items and quantity are enclosed as Annexure "l', Instructions for
Consultant enclosed as Annexure "ll" and Terms and Condition are enclosed as Annexure"lll".
The LOA is being issued to you in duplicate. Please sign and stamp the duplicate copy on each
page after endorsing Accepted and return to this office as a token of acceptance.
Please note that:
1. Contact to ST.DGM fCivil)-E/Nagpur to start the work within 3 days from the date of issue of
Acceptance letter and complete the same in 45 days from the date of Acceptance letter.
2. No increase in the accepted rates shall be admissible during the validity of the contract-
3. The consultant should suhmit his PAN, Service contract registration number,
4. The quantity given in the schedule is approximate and may vary LOolo on either side. The payment
will be made on the actual measurements taken by the representatives of the consultant & RVNL
officials after satisfactory execution of work.
(ffi .yL.-.-.,*'
6
\:
SN Item Unit QtY. Rate Amount
ard Natural Dry Density.
ii) Grain size analysis
iii) Atterberg's limit
iv) Direct shear test
v) Triaxial shear test
vi) Consolidation test
viil Specifrc Gravity
viii) Silt factor
5b Rock samples Per 42 13,224.48 5,55,428.L6
il DensitSr sample
ii) Specific Gravity
iii) Water absorption
iv) Uniaxial compressive
strensth
5c Deformability of rock materials Per n-
a-L 3,857.28 1,62,045-76
(Young's Modulus, Modulus of sample
Deformability, Stress - Strain
Curve, failure Enerry) as per IS
9221 &,9143 for Rock.
5d Petrographic Description of rock Per 42 3,857.28 I,62,0A5.76
(gain size, Mineral Content, Sample
Texture etc.) for rack.
5e Tensile strength for rock material Per 42 2,755.20 'l.,,75,7L8.40
(indirect Tensile strength, sample
Brazrliarr Test) as per IS 1O082 for
rock.
5f Hardness and Abrasiveness of Per 42 2,755.24 1,15,718.40
rock (together with CAI-Index sample
Abrasiv-e Test)
Total 94.50.7L7.48
ff
Annexure'II'
INSTRUCTIOI{S TO CONSULTANT
ffi
Annexure'III'
TERMS & COITDITIOIYS
Name of fiIork: Geotechnica] investigations etc. for Design, Drawings consultancy
of five tunnels in connection wittr Yavatmal-Nanded new line
{B.G) project (206 Km.) in Nagpur Division of Central Railway.
*****r**
1. The work should be started within 3 days from the date of issue of
Acceptance letter and completed in 45 days {including submission of all
test reports) from the date of issue of the Acceptance letter.
2. Work shall be executed as per direction of Engineer in charge at site.
3. The quantities given in the Bili of Quantities {BOQ} are estimated and
provisional, and are given to provide a common basis for bidding. However,
the payment will be made as per the actual quantities of work ordered and
carried out, as measured by the Consultant and verified by the Employer
and valued at the rates accepted by the competent authority
4. The quantity given in the schedule is approximate and rnay vary LA a/a on
either side.
5. Amount payable by Employer to the consultant under the contract willbe
subject to 1ocal taxation. Income Tax will be deducted as Tax Deducted at
Source {TDS}.
6. A11 ancillary items for executing the services e.g. approach road to site,
launching arrangements, procuring right of way, arrangement of water
and electricity etc. is to be arranged by the Consultant, at his own cost
and included in the accepted rates.
7. There should be a minimum of 3 drilling rigs at the site during any
point of time for drilling of bore-holes.
8. The method of measurement of completed services for payment shall be in
accordance with urrits mentioned in Bill of Quantities (BOQ) against each
itern.
9. The geotechnical investigation test will be got done from NABL accredited
Laboratory.
10. Payments of bills:
The payment will be made as per progress of the work
and actual measurements taken by the representatives of the consultant
& RVNL oflicials for the work completed satisfactorily and submission of
, the necessa{r test report wherever required. Bill has to be submitted by
the consultant in required GST format.
4
ffi
5.r- -o*
1 1. Mode of Pa5rment shall be as under: