)d fufiEt fudrn ftftag Tttr Floor, New Administrative Building,

Rail Vikas lVigarn t imited Central Railway,


D.N. Road, CST, Mumbai - 4OO OOl,
lndia Enterprise) Phone No. O22 -22626343,
CIN : L74999D12003GO1118633
FaxNo. O22-22626392
No. RVN L/ Mumbai/YTL-N ED/3/ Geo.lnv./Tunnels Date: - 26-09.2A19

Mls. MNEC Consultants PvL Ltd.,


1st Floor, Pratibha Sankul,
Bhagwaghar Layout
Dharampeth, Nagpur-4400 10
Ph- 07 12-25422.6, Mob- 982247 42Bl
Email : mnnilawar@gmail.com
[LETTER OFACCEPTANCEI

Sub: Geotechnical investigations etc. for Design, Drawings consultancy of five tunnels in
connection with Yavatmal-Nanded new line [B.G) project (206 Km.J in Nagpur Division
of Central Railway.

Reft - i) This office letterNo. RVNL/ Mumbai/YTL-NED/3/Ceo.lnv./Tunnel dt. 13.A9.2AD.


ii)Your Offer Letter No. MNECC/RVNL/Yvtmal-Nded/Sur//Tender/ 19 dated 19.09.2A9.

In connection with above, the Compel:;;;r.,ty i.e. CPM has accepted your offer dated
19.O9.201,9at20.6oo/abelowthe scheduled rate. Total Cost of work amounting to Rs 75,03,869.68
(Rupees Seventy-Five Lakh Three Thousand Eight Hundred Sixty-Nine and Paisa Sixty-Eight
only). The Details of Schedule of items and quantity are enclosed as Annexure "l', Instructions for
Consultant enclosed as Annexure "ll" and Terms and Condition are enclosed as Annexure"lll".
The LOA is being issued to you in duplicate. Please sign and stamp the duplicate copy on each
page after endorsing Accepted and return to this office as a token of acceptance.
Please note that:
1. Contact to ST.DGM fCivil)-E/Nagpur to start the work within 3 days from the date of issue of
Acceptance letter and complete the same in 45 days from the date of Acceptance letter.
2. No increase in the accepted rates shall be admissible during the validity of the contract-
3. The consultant should suhmit his PAN, Service contract registration number,
4. The quantity given in the schedule is approximate and may vary LOolo on either side. The payment
will be made on the actual measurements taken by the representatives of the consultant & RVNL
officials after satisfactory execution of work.

D.A.: - As above. Grr\ 1


=-TTl-s ( tg
"ACCEPTED" AryiJ
(P. L.
Addl. General Manager (Civil)-E
For CPM/ RVNL/ Mumbai,

M/s. MNEC Consultants hrt. Ltd.,


1st Floor, Pratibha Sankul,,
BhTgwaghar Layout ..
Dharampeth, Nagpur-4400 10
Copy to:
(i) JGM/Finance/RVNl/l\4umbai,forinformationplease.
(ii) ST.DGM (Civil)-EA{agpur, for information and necessary actiori'please.
Annexure -'f'
SCHEDULE OF ITEMS t

Name of lllork: Geotechnical investigations for Design, Drawings Consultancy of five


tunnels in connection with Yavatmal - Nanded New B.G. Line Project (2O6 lfln) in Nagrur
Division of Central Railway-

SN Item Unit Otv. Rate Amount


1 Mobilization and demobili -zatian LS 1
-L 3,3O,609.O0 3,3O,609"0O
charges of drilling equipment and
manpower to the project site.
This payment shall be made only
once for the entire work 5O 7o on
mobilization in the beginning and
o/o
50 on closure of u'ork.
2a Exploratory drilling of Boreholes M 147 1,322.40 1,94,392.80
15O mrn <iiameter boreholes in all
tlpe of soil including conducting
standard penetration test at
specified depth and collection of
disturbed, and undisturbed
samples from bore holes. The rate
includes cost of manpower,
machinery etc. complete.
2b Drilling of NX size bore holes (75 M
rnm diameter) in all types of rock
(boulders, weathered and fresh
rock) and collection of rock core
samples from bore holes at tunnel
sites. The rate includes cost of
manpower, machinery etc.
complete. In case of inclined
boring, the length shali be
measured along the bore holes
lensth.
a) Up to 50 M depttr M 918 5.510.40 50.58.547.20
b) Beyond 5O m up to 1OO m M 161 8,265-L2 13,30,684.32
depth
c) Bevond lOO m depth M o 9,918.24 o
3 In-situ permeability test in bore Nos 42 5,510.40 2,3L,436.8O
holes at tunnels sites.
4 Erection of drilling equipment Nos 14 49,591.68 6,94,283.52
from one bore hole site to another
bore hole site and construction of
working platform for drilling
machine including making of
anrproaches.
5 Laboratory tests
5a Soil samples Per 42 11,902.08 4,99,887.36
i) Natural moisture content sampie

(ffi .yL.-.-.,*'

6
\:
SN Item Unit QtY. Rate Amount
ard Natural Dry Density.
ii) Grain size analysis
iii) Atterberg's limit
iv) Direct shear test
v) Triaxial shear test
vi) Consolidation test
viil Specifrc Gravity
viii) Silt factor
5b Rock samples Per 42 13,224.48 5,55,428.L6
il DensitSr sample
ii) Specific Gravity
iii) Water absorption
iv) Uniaxial compressive
strensth
5c Deformability of rock materials Per n-
a-L 3,857.28 1,62,045-76
(Young's Modulus, Modulus of sample
Deformability, Stress - Strain
Curve, failure Enerry) as per IS
9221 &,9143 for Rock.
5d Petrographic Description of rock Per 42 3,857.28 I,62,0A5.76
(gain size, Mineral Content, Sample
Texture etc.) for rack.
5e Tensile strength for rock material Per 42 2,755.20 'l.,,75,7L8.40
(indirect Tensile strength, sample
Brazrliarr Test) as per IS 1O082 for
rock.
5f Hardness and Abrasiveness of Per 42 2,755.24 1,15,718.40
rock (together with CAI-Index sample
Abrasiv-e Test)
Total 94.50.7L7.48

Accepted Rate: (-) 2O.6tr/o below


Total Cost of work: Rs. 75,()3;469.641-
(Rupees Seventy-Five Lakh Three Thousand Eight Hundred Si:rty-Nine aad Paisa Si:rty-
Eisht onlyl
4
J--"--

ff
Annexure'II'
INSTRUCTIOI{S TO CONSULTANT

Name of trIork: Geotechnical investigations etc. for Design, Drawings


consultancy of five tunnels in connection v"'ith Yavatma-l-
Nanded nerv line (B.G) project (206 Km.) in Nagpur
Division of Central Railway.

1. No increase in the accepted rates will be admissible during the validity


of ttre contract.
2. The rates in the Bill of Quantities shall, except in so far as it is otherwise
provided under the contract, include all remuneration for staff,
transportation, surveys, equipment (vehicles, office equipment,
furniture), printing of documents, office and residential
accommodation, constructional plant, labour, supervision, materials,
erection, maintenance, insurance, profit, taxes and duties including all
general risks, liabilities and obligations set out or implied in the
Contract.
3. Accepted rates are inclusive of all taxes, GST, access liabilities and the
cost of insurances of the Consultant. No tax liability or insurance
expenses will be borne by RVNL. However, any concession/ exemption
in the taxes, duties and cess as applicable, shall be passed on to RVNL.
4. The rates are inclusive of all lead (except as otherwise specilically
provided in the description of a particular item), lifts, ascend, descend,
handling, re-handling crossing of naJlah/streams/tracks any other
obstructions.
5. The Consultant should submit his GST registration No., PAN and Bank
details etc.
6. The Consultant will have to submit the bill in GST format. The payment
will be made after satisfactory completion of the work.
.4
(-a

ffi
Annexure'III'
TERMS & COITDITIOIYS
Name of fiIork: Geotechnica] investigations etc. for Design, Drawings consultancy
of five tunnels in connection wittr Yavatmal-Nanded new line
{B.G) project (206 Km.) in Nagpur Division of Central Railway.
*****r**
1. The work should be started within 3 days from the date of issue of
Acceptance letter and completed in 45 days {including submission of all
test reports) from the date of issue of the Acceptance letter.
2. Work shall be executed as per direction of Engineer in charge at site.
3. The quantities given in the Bili of Quantities {BOQ} are estimated and
provisional, and are given to provide a common basis for bidding. However,
the payment will be made as per the actual quantities of work ordered and
carried out, as measured by the Consultant and verified by the Employer
and valued at the rates accepted by the competent authority
4. The quantity given in the schedule is approximate and rnay vary LA a/a on
either side.
5. Amount payable by Employer to the consultant under the contract willbe
subject to 1ocal taxation. Income Tax will be deducted as Tax Deducted at
Source {TDS}.
6. A11 ancillary items for executing the services e.g. approach road to site,
launching arrangements, procuring right of way, arrangement of water
and electricity etc. is to be arranged by the Consultant, at his own cost
and included in the accepted rates.
7. There should be a minimum of 3 drilling rigs at the site during any
point of time for drilling of bore-holes.
8. The method of measurement of completed services for payment shall be in
accordance with urrits mentioned in Bill of Quantities (BOQ) against each
itern.
9. The geotechnical investigation test will be got done from NABL accredited
Laboratory.
10. Payments of bills:
The payment will be made as per progress of the work
and actual measurements taken by the representatives of the consultant
& RVNL oflicials for the work completed satisfactorily and submission of
, the necessa{r test report wherever required. Bill has to be submitted by
the consultant in required GST format.
4
ffi
5.r- -o*
1 1. Mode of Pa5rment shall be as under:

S. ilo. Descriptioa/ Condition of pa5rment Amount


oavable
Pa5rment for Field Bore will be released
i) after satisfactory completion of 50 o/a of the 35 o/o

total required quantity.


Payment for Field Bore will be released
ii) after satisfactory completion of IAO o/o of 25o/o
the total required quantity.
Payment will be released after all bore
iii) lOo/o
samples are sent to laboratory for testing.
Balance payment will be released after
completion and submission of laboratory
testing reports of bore log samples, in hard
irr) 30%
and soft copies and physical samples of
bore logs taken and complete work done to
the satisfaction of Eneineer in charse.

72. In case of any dlspute, the jurisdiction of court will be Mumbai.