4.3.

3 Coating Application
Sheet No.:
Hull No. Inspection date

2
Block/Tank no. Area (m )

Construction stage Block Middle Erection Hull

Environment

First coat Second coat Remarks

Date

Time of day

Relative humidity, %

o
Dew point, C

o
Air temperature, C

o
Steel temperature, C

Surface condition

First coat Second coat Remarks

Water soluble salts,


2
mg/m of NaCl
Cleanliness Dust
of the steel
surface Oil, grease

Coating system

First coat Second coat Remarks

Manufacturer

Product name(s)

Identification mark/number

Batch number

Date of application

Stripe coat

Jotun suggested procedure for coating inspection and repair according to PSPC, Version 2 January 2010 Page 24
Coating inspector'
s name:

Signature:

4.3.4 Dry Film Thickness (DFT) Measurement


Sheet No.:
Hull No. Inspection date

2
Block/Tank no. Area (m )

Construction stage Block Middle Erection Hull

Coating

Manufacturer

Product name

Identification mark/number

Batch number

Date of application

Measurement after second coat

Number of points Ratio

<288

288-320

>320

Total 100%

DFT, µm Maximum

Minimum

Average

Remarks

Jotun suggested procedure for coating inspection and repair according to PSPC, Version 2 January 2010 Page 25