R2 - Material Inspection Request - CIVIL - QF - Report

R2 - MATERIAL INSPECTION REQUEST - CIVIL - QF


General Information

Form Name R-MIR-C-Q-276 Location MIR - CIVIL

Project Name Orchard - Pour Date Created 27/09/2023 09:43

MIR Ref. no R-MIR-C-Q-276

Client SWD

PMC INC solutions

Inspection Yes

Contractor BGS Infratech

MIR related Discipline: Civil

Description of Supplied Materials: ACC block

Supplier Ashtech buildpro India Pvt Ltd

Date of Receipt of Material On Site: 27-9-2023

Storage Location: Ground

Unit: Cub, bags

Quantity: 20cub,50 bags

Inspection Reports:

Physical Damage? No

Details Given in Delivery Note Correct? (Type, Size, Yes


Wt., Qty. etc.)

Conform with Approved Material Submittal Yes

For MEP/ Rebar (Any other items which require test Yes
certificate) Material Test Certificate attach

QA/QC /Tower /Building In-Charge comments (one No


person only)

Engineer's Decision (PMC/ Smart World):

The above materials have been inspected on site and A- Approved -Fully satisfactory and can be used for
found, at time of inspection, to be: permanent works at site.

General Remarks Mtc review found OK

General Image

R2 - Material Inspection Request - CIVIL - QF - Report Page 1 / 4


Photo 27/09/23 09:44:05 - 27/09/2023 09:44 Photo 27/09/23 09:44:17 - 27/09/2023 09:44

R2 - Material Inspection Request - CIVIL - QF - Report Page 2 / 4


General Image

Photo 29/09/23 09:47:46 - 29/09/2023 09:47 Photo 10/10/23 14:50:47 - 10/10/2023 14:50

Photo 10/10/23 14:51:11 - 10/10/2023 14:51

Submitted

Name : Date : Signature :


BGS Infra (BGS Infra) 29/09/2023 09:54

Approved by SWD Engineer/Manager

Name : Date : Signature :


SWD Engineer - Jaykumar sharma 29/09/2023 12:34
(SWD)

Sent back to Draft -2

Tax invoice number mentioned in mtc not matched and adhesive mtc not attached.

Name : Date : Signature :

R2 - Material Inspection Request - CIVIL - QF - Report Page 3 / 4


Sent back to Draft -2
Consultant Engineer - Naresh Singh 30/09/2023 13:56
(Solutions INC)

Submitted

Name : Date : Signature :


BGS Infra (BGS Infra) 10/10/2023 14:51

Approved by SWD Engineer/Manager

Name : Date : Signature :


SWD Engineer - Jaykumar sharma 20/10/2023 17:44
(SWD)

Approved by Consultant Engineer/SWD Quality Manager

Name : Date : Signature :


Consultant Engineer - Naresh Singh 20/10/2023 17:50
(Solutions INC)