You are on page 1of 4

PIV(7OPR01) Project Submittals

Dubai, Dubai

CIVIL_NCR-OB Report-SCL-QP002-QF1
Nov 22, 2023, ID #3788

REPORT DETAILS
Description SO-SCL-PIV-038 l Shotcrete works executed with substandard workmanship and lacked proper planning.

Created by QC CIVIL SCL PG

Status Draft

Last update Dec 5, 2023 1:36 PM

Last updated by QC CIVIL SCL PG

Prepared by QC CIVIL SCL PG 1 Created with PlanGrid


Sobha Constructions LLC 7/14/2020
Version 1.0
SCL/QP002/QF1
SOBHA CONSTRUCTIONS LLC
Quality Management System (QMS) REV. 00

Non-conformance / Observation Report DATE : 07/01/2020

Type of Finding Non-Conformance ✔ Observation

NCR/OB Report Ref. No. SO-SCL-PIV-038 l Shotcrete works for Sunken Date 05/12/2023

Project Name & No. / Dept. Investment Villa | M/s Water In Motion l Mr. Ebin

Reference Criteria Specification and Method Statement.

Objective Evidence Photos Attached

Nonconformance / Observation Description: NCR: Major Minor / ✔ Observation

Description

During our site surveillance in Investment villa Project, it has been noticed.

Shotcrete works for Sunken Seating executed with substandard workmanship and lacked proper planning.

1)Day Joints were not maintained.

2)Improper cleaning prior to shotcrete works.

Which is not acceptable.

Mohammad Yusuf Anwer QA/QC Engineer

Auditor / Originator
Designation Signature
(Name)

Root Cause Analysis, Corrective Action(s) & Preventive Action(s)

Root Cause

Corrective Action

Preventive Action

Auditee / Process Owner Reviewed by (Name)


(Name) (PM/CM/DH)

Designation Designation

Signature Signature

Effectiveness of Corrective Action(s) & Preventive Action(s)

Verified by
Signature
(QA/QC Engineer)

Approved by
Signature
(QA/QC Head)

QA/QC Department/SCL 1/1


PIV(7OPR01) Project Submittals
Dubai, Dubai

PHOTOS (5)

WhatsApp Image 2023-12-05 at 12.17.32 PM


QC CIVIL SCL PG
Dec 5, 2023 1:32 PM

WhatsApp Image 2023-12-05 at 12.20.30 PM (1)


QC CIVIL SCL PG
Dec 5, 2023 1:32 PM

WhatsApp Image 2023-12-05 at 12.17.33 PM (1) WhatsApp Image 2023-12-05 at 12.12.16 PM


QC CIVIL SCL PG QC CIVIL SCL PG
Dec 5, 2023 1:32 PM Dec 5, 2023 1:32 PM

Prepared by QC CIVIL SCL PG 3 Created with PlanGrid


PIV(7OPR01) Project Submittals
Dubai, Dubai

WhatsApp Image 2023-12-05 at 12.17.31 PM


QC CIVIL SCL PG
Dec 5, 2023 1:32 PM

Prepared by QC CIVIL SCL PG 4 Created with PlanGrid

You might also like