You are on page 1of 5

Programme: King Abdullah Financial District (KAFD)

Observation & Comments Sheet (OCS)

PROJECT / PARCEL skywalks Project PROGRAMME No. KAFD00256


OCS NUMBER KAFD-SKW-SAB-STR-OCS-00003 Rev. R00 DATE 8-Oct-23

ORIGINATOR Saudi Arabian Baytur Construction Company TRANSMITTAL No. / DATE WF-025390

DOCUMENT No. KAFD-SKW-SAB-STR-MAR-00019 Rev. R00 DISCIPLINE STR

MAR for THREADED ROD AM 8.8 M24 HDG (Manufacturer Hilti & Supplier Hilti saudi
DOCUMENT TITLE DOCUMENT TYPE MAR
arabia)
Comment Code Legend (for individual comments): Reply Code Legend:
Comments / Replies Legends & Status Open / Closed
1 = Action Required; 2 = Note / Advisory / Recommendation i = Incorporated; ii = Not incorporated for reason stated in reply
Page / Section / Comment Reply Reply Status by
No. Initial Reviewer Comment Originator Reply
Sheet Code Code Reviewer

Compliance sheet with the project specification as per Approved Design Report KAFD-SKW-SAB-STR-RPT-
1 MM GEN 1
to be provided. 00119.

Threaded Rods shall be used for Bearing Base Plate


2 MM GEN 1 Area of application to be specified Installation as specified in Approved Design Report KAFD-
SKW-SAB-STR-RPT-00119.

3 MM GEN 1 Sample is required. Provided.

A - Approved B - Approved with Comments C - Revise and Resubmit


Review Status Code: C D - Rejected
Project Management-Construction Development and Management Company
Supervision Consultant (SC) Originator
Management (PMCM) (KAFD-DMC)
Reviewer Name(s) / COMMENTS / STATUS COMMENTS / STATUS COMMENTS / STATUS
Position REPLY APPROVED BY
Initials RECOMMENDED BY SC RECOMMENDED BY PMCM ADVISED BY KAFD-DMC

M.Maassarani Lead Structure Name: Spiridon Mitri Name: Name: Name:

Position: Project Director Position: Program Director Position: Position:

Signature: Signature: Signature: Signature:

Date: 8-Oct-2023 Date: Date: Date:

*Approval status from the Reviewer shall be deemed as permission to proceed but shall not relieve the Originator from full compliance with contractual requirements*

Form No. KAFD-MUP-SAP-QMS-FRM-00071 R01 10-May-2023 Page 1 of 5


Programme: King Abdullah Financial district (KAFD)

Observation & Comments Sheet (OCS)

PROJECT / PARCEL PROGRAMME No.


OCS NUMBER Rev. DATE DD/MMM/YYYY
ORIGINATOR TRANSMITTAL No. / DATE DD/MMM/YYYY
DOCUMENT No. Rev. DISCIPLINE
DOCUMENT TITLE DOCUMENT TYPE
Comment Code Legend (for individual comments): Reply Code Legend:
Comments / Replies Legends & Status Open / Closed
1 = Action Required; 2 = Note / Advisory / Recommendation i = Incorporated; ii = Not incorporated for reason stated in reply
Page / Section / Comment Reply Reply Status by
No. Initial Reviewer Comment Originator Reply
Sheet Code Code Reviewer

Review Status Code: E D - No Objection E - No Objection with Comments C - Objection

Project Management-Construction
Supervision Consultant (SC) Programme Management Office (PMO) Originator
Management (PMCM)
Reviewer Name(s) / COMMENTS / STATUS COMMENTS / STATUS COMMENTS / STATUS
Position REPLY APPROVED BY
Initials RECOMMENDED BY SC RECOMMENDED BY PMCM ADVISED BY PMO
Name: Name: Name: Name:
Position: Position: Position: Position:

Signature: Signature: Signature: Signature:

© JASARA Form No. KAFD-RY-RIAL-PGEN-JAS-QMS-FRM-0024 Rev. 00 Page 2 of 5


Programme: King Abdullah Financial district (KAFD)

Observation & Comments Sheet (OCS)

Date: Date: Date: Date:

PROJECT (as applicable) PROGRAMME No.


OCS NUMBER Rev. DATE
DOCUMENT NO.: Rev. DOCUMENT TITLE
Comment Reply Reply Status by
No. Initial Page / Section Reviewer Comment Originator Reply
Code Code Reviewer

© JASARA Form No. KAFD-RY-RIAL-PGEN-JAS-QMS-FRM-0024 Rev. 00 Page 3 of 5


KAFD Programme Name & Originator Logo
Logo Document Title (required)
First Reviewer Final Reviewer
(as required) Logo (required)

You might also like