Yibal Khuff Project (YKP)

(PDO Contract No. C311520)

PROGRESS MEASUREMENT SCHEDULE

PDO Approval Code


(Final) - Document accepted. Do not re-submit except
Code A modified.
(Revise and Reissue) - Incorporate comments and re-
Code B issue for review. Work may proceed.
(Review not Required) - Incorporate comments and
Code C proceed. Do not re-issue for review.
(Rejected) - Incorporate comments and re-issue for review.
Code D Work may NOT proceed.

02 31/07/2016 RJ RS PM PM Issued for Review

01 11/5/2016 RJ RS PM PM Issued for Review


Approval TA Ref.
REV DATE PRPD CHKD APPD APPD SIGN
DESCRIPTION Code Ind.
BY BY BY BY PDO APPROVAL

WBS #: C.OM.JYK.00.00.332 GALFAR Engineering & Contracting S.A.O.G


GALFAR Document Submission Status
Drawings and Documents are
A required to be Approved by COMPANY.
Drawings and Documents are required
C to be Commented by COMPANY.
Drawings and Documents are to be
I submitted COMPANY Information. Page 2 of 81
DOC SIZE: A4 PCAP Ctrl ID #:
UNIT /
AREA ORIG. DISC. DOC. SEQ. SHEET
PLANT
DOC CODE CODE CODE TYPE NUMBER NO
CODE
No
KHF 00 101983 FA 5804 00001 0000
GALFAR JOB NO : 132-1012-000
Yibal Khuff Project (YKP)
PROGRESS MEASUREMENT SCHEDULE

Accountable / Approval (ATA / IFA) Distribution List:


Name Function Signature / Date

Responsible / Reviewer / Checker (RTA / IFR) Distribution List:


Name Function Signature / Date

Informed (IFI) Distribution List:


Name Function Signature / Date

KHF-00-101983-FA-5804-00001-0000 / Rev 02 Page 2 of 72


Yibal Khuff Project (YKP)
PROGRESS MEASUREMENT SCHEDULE

A. Revision History

SHEET DESCRIPTION OF REVISION REVISION

All Issued for Review 01

All Issued for Review 02

B. HOLDS LIST

SHEET DESCRIPTION OF HOLD

KHF-00-101983-FA-5804-00001-0000 / Rev 02 Page 3 of 72


Yibal Khuff Project (YKP)
PROGRESS MEASUREMENT SCHEDULE

1 Summary

2 Schedule B

3 Schedule C1

4 Schedule C2

5 Schedule C4

6 Schedule P1

7 Schedule M1

8 Schedule M2

9 Schedule M3

10 Schedule M4

11 Schedule H1

12 Schedule E1

13 Schedule E2

14 Schedule T1

15 Schedule I1

Note :

KHF-00-101983-FA-5804-00001-0000 / Rev 02 Page 4 of 72


PROGRESS MEASUREMENT SCHEDULE

Contract C311520 - Construction Services for Yibal Khuff Project On Plot

Summary of Schedule Prices (Indirect & Direct Costs)

Item No. Bill Code Bill Description Amount (OMR) Percentage

1 B Indirect Work 28,684,685 24.9990%


2 C1 General Civil Works 31,452,693 27.4114%
3 C2 Building Works 4,857,146 4.2331%
4 C4 Structural Steel Works 12,237,658 10.6653%
5 P1 Piping Works 21,896,584 19.0831%
6 M1 Static Equipment Works 3,632,987 3.1662%
7 M2 Tankage Works 3,415,810 2.9769%
8 M3 Rotating Equipment Works 522,828 0.4557%
9 M4 Insulation & Refractory Works 793,845 0.6918%
10 H1 HSE Installation Works 47,178 0.0411%
11 E1 Electrical Works 3,421,342 2.9817%
12 E2 Cathodic Protection (CP) Works 163,602 0.1426%
13 T1 Telecom Works 348,096 0.3034%
14 I1 Instrumentation Works 3,268,695 2.8487%
Total Amount (OMR) 114,743,151 100.000%

KHF-00-101983-FA-5804-0001-0000-02 Page 5 of 72
PROGRESS MEASUREMENT SCHEDULE

S. N. Contract Reference CBS Code Iitem Description Quanitity Unit Unit Rate (OMR) Amount (OMR) Percentage

Note:
1) The Contractors shall provide a detailed breakdown for each of the following costs, providing full visibility of the all resources and services included in the priced item.

2) The following items are in addition to the costs and/or obligations described elsewhere in the Contract for Bills of Approximate Quantities Schedule of Rate (BOAQSOR) items. Contractor shall include in this Schedule B the costs of all relevant
works, services, facilities, utilities etc. pertaining to its obligations required for completing the Works whether specified in this Schedule B as line item or not.

Section C5 Schedule A Financial Securities Cost


1
Article 2.1
1.1 C.OM.JYK.DF.00.332. ABB Performance Bond 1 LS 363,600.000 363,600.00 0.3169%
1.2 C.OM.JYK.DF.00.332. AC Insurances 1 LS 20,000.000 20,000.00 0.0174%
1.3 Parent Company Guarantee (if Applicable) 1 LS - -
1.4 Other warranties / guarantees as applicable 1 LS - -
Subtotal (A) 383,600.00 0.3343%
Section C5 Schedule A Site Establishment Costs
2
Article 2.2
Mobilisation of phase 1B activities as per Section C4.3 Article 4.3.2 excluding the costs of
2.1 C.OM.JYK.DF.00.332.CAA 1 LS 495,500.000 495,500.00 0.4318%
personnel and /or equipment mobilization and demobilization
Establishment of Company Site Offices as per Section C 4.4 and its handover to Company at the
2.2 C.OM.JYK.DF.00.332.CBE 1 LS 501,876.705 501,876.70 0.4374%
Completion of Works - 50% progress
Establishment of Company Site Offices as per Section C 4.4 and its handover to Company at the
C.OM.JYK.DF.00.332.CBE 1 LS 501,876.705 501,876.70 0.4374%
Completion of Works -100% progress
Establishment of Company warehouse/laydown area as per Section C 4.4 and its handover to
2.2a C.OM.JYK.DF.00.332.CBA 1 LS 792,771.785 792,771.78 0.6909%
Company at the Completion of Works
2.3 C.OM.JYK.DF.00.332.CBE Establishment of Contractor Site Offices as per Section C 4.4 1 LS 798,345.000 798,345.00 0.6958%
2.4 C.OM.JYK.DF.00.332.CBE Establishment of Company residential camp facility as per Section C 4.4 - 50% progress 1 LS 848,572.784 848,572.78 0.7395%
C.OM.JYK.DF.00.332.CBE Establishment of Company residential camp facility as per Section C 4.4 - 100% progress 1 LS 848,572.784 848,572.78 0.7395%
2.5 C.OM.JYK.DF.00.332.CBE Establishment of Contractor residential camp facility as per Section C 4.4 - 30% Progress 1 LS 991,100.360 991,100.36 0.8638%
C.OM.JYK.DF.00.332.CBE Establishment of Contractor residential camp facility as per Section C 4.4 - 60% Progress 1 LS 991,100.360 991,100.36 0.8638%
C.OM.JYK.DF.00.332.CBE Establishment of Contractor residential camp facility as per Section C 4.4 - 100% Progress 1 LS 1,321,467.147 1,321,467.15 1.1517%

Establishment of Common Faclities and Site services such as telecommunication, electric supply,
2.6 C.OM.JYK.DF.00.332.CBE 1 LS 400,000.000 400,000.00 0.3486%
lighting etc. as per Section C4.4
Establishment of RO plant for portable water supply as per Section C4.4 - Supply of Majour
2.7 C.OM.JYK.DF.00.332.CBE 1 LS 635,531.550 635,531.55 0.5539%
equipments
C.OM.JYK.DF.00.332.CBE Establishment of RO plant for portable water supply as per Section C4.4 - 100% completion 1 LS 635,531.550 635,531.55 0.5539%
2.8 C.OM.JYK.DF.00.332.CBE Establishment of sewage treatment plant as per Section C4.4 1 LS 584,599.000 584,599.00 0.5095%
Establishment of industrial facilities such as workshops, storage yards, fabrication yards, fuel
2.9 C.OM.JYK.DF.00.332.CBA station, concrete batching facilities, pre-cast yards, civil laboratory, calibration facilities etc. in 1 LS 1,060,371.250 1,060,371.25
accordance with Section C4.4 0.9241%
2.10 C.OM.JYK.DF.00.332.CAA Mobilisation of phase 4 as per Section C4.3 Article 4.3.5 1 LS 250,000.000 250,000.00 0.2179%
2.11 C.OM.JYK.DF.00.332.CBE Establishment of Secondary Project Resedential Camp as per Section C 4.4 1 LS 544,405.565 544,405.57 0.4745%
Subtotal (B) 12,201,622.54 10.6339%
Section C5 Schedule A
3 Article 7.3.1 Lump Sum Amount (A+B) to be paid as one off upon Company certified Approval and/or Completion. 12,585,222.54 10.9682%

Section C5 Schedule A Other Cost Elements and Site Facilities and Utilities
4
Articles 2.3, 2.4
4.1 Article 2.3.1 C.OM.JYK.DF.00.332.CAA Management and Supervisory Staff 51 Mth 157,753.000 8,045,403.00 7.0117%
Article 2.3.2 C.OM.JYK.DF.00.332.YZZ Mobilisation and Demobilisation of Construction Equipment, plants, machinery, workshops,
4.2 51 Mth 4,901.961 250,000.00 0.2179%
vehicles etc.
4.3 Article 2.3.3 C.OM.JYK.DF.00.332.CAA Mobilisation and Demobilisation of Direct and Indirect Personnel 51 Mth 27,075.490 1,380,850.00 1.2034%
Article 2.4.1 Facilities and Services for the Contractor Camp, Office, RO Plant, STP etc. for Contract's Final
4.4 Period as per Section C4.4 (for water and sewage treatment charges for Other Contractors please 51 Mth 41,018.74 2,091,955.56
refer to Section C5 Article 9.0) 1.8232%

KHF-00-101983-FA-5804-0001-0000-02 Page 6 of 72
PROGRESS MEASUREMENT SCHEDULE

S. N. Contract Reference CBS Code Iitem Description Quanitity Unit Unit Rate (OMR) Amount (OMR) Percentage

Article 2.4.2 Facilities and Services for the Company Camp and Offices for Contract's Final Period as per
4.5 51 Mth 84,926.54 4,331,253.69 3.7747%
Section C4.4
Subtotal (C) 16,099,462.25 14.0309%

Section C5 Schedule A Cost breakdown of Facilities and Services for the Contractor (Item 4.4 above)
6 2,091,955.57 1.8232%
Article 2.4.1
6.1 C.OM.JYK.DF.00.332.CBA Temporary Facilities and Utilities (C4.4.5) 51 Mth 4,901.961 250,000.00 0.2179%
6.2 C.OM.JYK.DF.00.332.CBE Secondary Project Residentail Camp Facility (Section C4.4.4.9) 51 Mth 14,596.188 744,405.57 0.6488%
6.3 C.OM.JYK.DF.00.332.CBE Project Temporary Offices - Contractor and Company (Section C4.4.4.5 and C4.4.4.7) 51 Mth 15,653.824 798,345.00 0.6958%
6.4 C.OM.JYK.DF.00.332.CBE Communications at Site (Section C4.4.5.4) 51 Mth 2,725.490 139,000.00 0.1211%
6.5 C.OM.JYK.DF.00.332.AFB Site Security and Access Control (Section C4.4.5.5 and 4.4.5.6) 51 Mth 517.647 26,400.00 0.0230%
6.6 C.OM.JYK.DF.00.332.CDB Commercial Shops (Section C4.4.5.8) 51 Mth 490.196 25,000.00 0.0218%
6.7 C.OM.JYK.DF.00.332.AFA Medical Facilities (Section C4.4.5.9) 51 Mth 1,069.706 54,555.00 0.0475%
6.8 C.OM.JYK.DF.00.332.CDB Masjid (Prayer Room Section C4.4.5.10) 51 Mth 573.529 29,250.00 0.0255%
6.9 C.OM.JYK.DF.00.332.CDB Welfare (Section C4.4.5.11) 51 Mth 490.196 25,000.00 0.0218%
Section C5 Schedule A Cost breakdown of Facilities and Services for the Company (Item 4.5 above)
7 3,569,241.70 3.1106%
Article 2.4.2
7.1 C.OM.JYK.DF.00.332.CC Civil works including road maintenance (Section C 4.4.6.1) 51 Mth 3,932.517 200,558.36 0.1748%
7.2 C.OM.JYK.DF.00.332.CBE Containerised Camp facility (Section C 4.4.6.2) 51 Mth 1,524.024 77,725.22 0.0677%
7.3 C.OM.JYK.DF.00.332.CBE Facilities Furniture (Section C 4.4.6.3) 51 Mth 6,065.196 309,325.00 0.2696%
7.4 C.OM.JYK.DF.00.332.CDB Camp services & supplies (Section C 4.4.6.4) 51 Mth 35,119.608 1,791,100.00 1.5610%
7.5 C.OM.JYK.DF.00.332.CBE HVAC (Section C 4.4.6.5) 51 Mth 6,862.745 350,000.00 0.3050%
7.6 C.OM.JYK.DF.00.332.CBE Mechanical services (Section C 4.4.6.6); 51 Mth 2,941.176 150,000.00 0.1307%
7.7 C.OM.JYK.DF.00.332.CBE Electrical services (Section C 4.4.6.7); 51 Mth 4,584.428 233,805.81 0.2038%
7.8 C.OM.JYK.DF.00.332.CBE Telecoms (Section C 4.4.6.8); 51 Mth 4,180.392 213,200.00 0.1858%
7.9 C.OM.JYK.DF.00.332.CBE Fire Alarm & Gas detection system (Section C 4.4.6.9) 51 Mth 2,422.104 123,527.31 0.1077%
7.10 C.OM.JYK.DF.00.332.CBE Material for company facilities (Section C 4.4.6.10) 51 Mth 2,352.941 120,000.00 0.1046%
Section C5 Schedule A Indirect lump sum amount applicable for Final Period of the Contract.
8 Article 1.2 (b) 28,684,684.79 24.9990%

Section C5 Schedule A Optional Works / Services


Article 2.5 The works/services requested in this section shall be used on as and when required basis during the Contract Duration and shall not be part of
9
Indirect lump sum unless any of its item shifted to Indirect lump sum at the time of Contract award

Design and construction of internal roads from CPF access road to Company and Contractor accommodation camps, offices, industrial areas etc.
as per layout / route Drawings provided in Section C6 Appendix 3 with necessary surface drainage, crossing arrangements and car parking areas
9.1
including walkways inside the camp between various services / facilities / utilities as per following:

Acces road: Asphalted


Parking area : Asphalted
9.1.1 1 LS 2,086,861.591 2,086,861.59
Internal roads: Graded
Foot paths : 50 mm reinforced concrete
Access road: layer of 150 mm thick type C soil and 100 mm thick of HDPE Geo cell filled with
crushed stone.
Parking area and internal roads: layer of 150 mm thick type C soil and 70 mm thick of HDPE Geo
9.1.2 1 LS 3,112,305.973 3,112,305.97
cell filled with crushed stone.
Foot paths: 50 mm thick of HDPE Geo cell filled with crushed stone.

KHF-00-101983-FA-5804-0001-0000-02 Page 7 of 72
PROGRESS MEASUREMENT SCHEDULE

S. N. Contract Reference CBS Code Iitem Description Quanitity Unit Unit Rate (OMR) Amount (OMR) Percentage

Access road, Parking area, and internal roads : Graded with 2 compacted layers including
maintenance and dust control by spraying water regularly during the term of the Contract.
9.1.3 1 LS 1,943,572.984 1,943,572.98
Foot paths :- 50 mm reinforced concrete.

Provision of high speed wi-fi internet facility (with the provision of after working hours limitation
9.2 of 5 GB of data per person per month) for Company, Contractor and Other Contractors personnel 1 LS 701,222.400 701,222.40
at residential camps and offices for Contract Duration.
Contractor's Key Personnel mobilisation to EP Contractor's offices in Muscat, Sharjah/UAE, India Per Person
9.3 as applicable for constructibilty review including all relevant costs pertaining to travel, visa, 3 per Month 6,978.000 20,934.00
residency, fooding, lodging etc. Pro-rata

Construction of asphalt road from existing Yibal tarmac road to CPF as per Company provided
9.4 AFC drawings as per Unit Rate Preamble P-C1-037A provided in Section C5 Schedule C Appendix 21,000 M 790.252 16,595,289.85
1.

Handing over one of the Contractor's industrial workshop to Company after completion of the
Works for its use as operations maintenance workshop after completion of the Project. The
workshop shall have an approximate area of 1,840 m2 with the provision of, wide access doors, 2
9.5 nos. EOT crane (each having about 600 m2 usage area) of 10 MT SWL each, washing bays, 1 LS 189,036.000 189,036.00
offices with air conditioners, washrooms/toilets, outside storage area etc. all in accordance with
Article 4.4.4.1 of Section C4.4.

KHF-00-101983-FA-5804-0001-0000-02 Page 8 of 72
PROGRESS MEASUREMENT SCHEDULE

Contract C311520 - Construction Services for Yibal Khuff Project On Plot

Section C5,
General Civil Works
Schedule C Bill C1

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

C1 General Civil Works

SLIT TRENCH/ UNDER GROUND SURVEY: Carrying out manual excavation of exploratory/slit
trenches generally of "A" width and average "B" depth, including deeper trenches may be
required at some locations including shoring, dewatering as required and subsequent backfilling
with watering and required compaction etc., determining existing underground services and cable
routes at proposed locations of works and plotting these to correct scale with all relevant detail
C1.01.03 C.OM.JYK.DF.00.332.SBA coordinates and submission of drawings as relevant. M 400 17.730 7,092.00 P-C1-003 0.0062%
Note: Length of each slit trench to be decided at site as per requirement unless otherwise
specified.
Data :
A=1.0M
B=1.5M

C1.01.04 C.OM.JYK.DF.00.332.SBA Ground improvement works by mass concrete M3 500 62.760 31,380.00 P-C1-021 0.0273%

C1.02 GRADING & LEVELLING


SITE PREPARATION : Site stripping including clearing vegetation, timber, trash, unsuitable
material etc. grubbing, stripping and removing top soil up to a depth of "A" mm (on average) in
all types of soil, including hard stratum and contaminated soil up to required plant level, levelling,
C1.02.01 grading and disposing of unsuitable material at a location designated by the Company
Representative, etc. complete in all respect as per project specification & drawings.
Data:
A=300MM

CUTTING in all types of soil up to required plant level, grading, levelling, identification of soil
C1.02.001 C.OM.JYK.DF.00.332.SAA suitable for backfilling, handling, transportation and storage (for reusing the same for filling) in M3 312,176 2.440 761,709.44 P-C1-005 0.6638%
layers, slopes, shapes as per project specification and drawings.

Filling with Type B material up to required plant level placed in loose material not exceeding
C1.02.004 C.OM.JYK.DF.00.332.SAA 300mm thick compacted to a minimum of 90% of its proctor maximum dry density except for the M3 875,739 5.500 4,816,564.50 P-C1-010 4.1977%
top 300 mm which should be compacted to a minimum of 95%.

C-C1-001 C.OM.JYK.DF.00.332.SAA Cutting and Filling of Normal Soil (Excavated Soil) M3 1 4.580 4.58 P-C1-005 0.0000%
C-C1-002 C.OM.JYK.DF.00.332.SAA Site Preparation M2 1 0.740 0.74 P-C1-004 0.0000%
C1.02.04 Slope Protection
Supplying, laying and compacting Riprap stone pitching as slope protection complete in all respect
C1.02.04.002 C.OM.JYK.DF.00.332.SAA M3 15,000 75.570 1,133,550.00 P-C1-012 0.9879%
as per per specifications and Drawings
C1.03 EXCAVATION
Excavation in all type of Soil/Sand for all types of foundations, sleepers, underground pits, sump,
cable/pipeline trenches etc. including carrying out shoring, strutting, dewatering, identification of
soil for backfill, stock piling of suitable soil etc. all complete as per project specification, drawings
& approved geotechnical investigation report.
C1.03.01 Note:
1)Depth of excavation will be measured from the existing ground level at the time of excavation,
excluding height of any material dumped from adjacent excavations
2)Quantity of hard stratum, contaminated-non hazardous/unsuitable material & contaminated-
hazardous soil, if any.
C1.03.01.01 MANUAL EXCAVATION
C1.03.01.01.001 C.OM.JYK.DF.00.332.SABA Up to 1.5 m depth M3 6,378 9.140 58,298.14 P-C1-013 0.0508%
C1.03.01.01.002 C.OM.JYK.DF.00.332.SABA Above 1.5 m to 3.0 m depth M3 3,632 10.070 36,577.70 P-C1-013 0.0319%
C1.03.02.01.002 C.OM.JYK.DF.00.332.SABA Above ground cutting up to 3.0 m height M3 3,511 11.100 38,968.10 P-C1-013 0.0340%

KHF-00-101983-FA-5804-0001-0000-02 Page 9 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

C1.03.01.02 MACHINE EXCAVATION 0.0000%


C1.03.01.02.001 C.OM.JYK.DF.00.332.SABA 0 to 1.5 m depth M3 57,405 2.160 123,995.17 P-C1-013 0.1081%
C1.03.01.02.002 C.OM.JYK.DF.00.332.SABA Above 1.5 to 3.0 m depth M3 32,691 2.370 77,477.90 P-C1-013 0.0675%
C1.03.01.02.003 C.OM.JYK.DF.00.332.SABA Above 3.0 to 4.5 m depth M3 839 2.580 2,165.81 P-C1-013 0.0019%
C1.03.01.02.004 C.OM.JYK.DF.00.332.SABA Above 4.5 to 6.0 m depth M3 782 2.800 2,190.52 P-C1-013 0.0019%
C1.03.02.02.001 C.OM.JYK.DF.00.332.SABA Cutting up to 3.0 m height above ground M3 31,596 2.160 68,246.80 P-C1-013 0.0595%
C1.03.02.02.002 C.OM.JYK.DF.00.332.SABA Cutting above 3 m up to 4.5 m height above ground M3 839 2.160 1,813.23 P-C1-013 0.0016%
C1.03.02.02.003 C.OM.JYK.DF.00.332.SABA Cutting above 4.5 m up to 6.0 m height above ground M3 782 2.800 2,190.52 P-C1-013 0.0019%
C1.03.04 EXCAVATION IN HARD STRATUM
Excavation in Hard Stratum/Rock (as defined in project specification including mandatory
performance of seismic tests on each and every occurrence for determination of classification as
"ROCK") & Disposal for all works like site grading, levelling, all types of foundation, sleepers,
underground pits, sump, cable/pipeline trenches etc. including carrying out chiseling/drilling,
shoring, strutting, dewatering, identification, sampling, verification and crushed for maximum re-
use (filling) at site where possible or disposal including handling, transportation to the designated
C1.03.04
area af company approved location in line with project & environmental procedure etc., all in
accordance with project specifications and local authority regulations.
Note:
1)Depth of excavation will be measured from the existing rock/hard strum level at the time of
excavation, excluding height of any material dumped from adjacent excavations
2)Payment for this item & quantity shall be upon approval by Company/ .
C1.03.04 MACHINE EXCAVATION
C1.03.04.001 C.OM.JYK.DF.00.332.SABA up to 1.5 m depth M3 31,218 17.350 541,625.36 P-C1-015 0.4720%
C1.03.04.002 C.OM.JYK.DF.00.332.SABA above 1.5 and up to 3.0 m depth M3 250 19.090 4,772.50 P-C1-015 0.0042%
C1.03.04.003 C.OM.JYK.DF.00.332.SABA above 3 and up to 4.5 m depth M3 500 20.830 10,415.00 P-C1-015 0.0091%
C1.03.04.004 C.OM.JYK.DF.00.332.SABA above 4.5 and up to 6 m depth M3 500 24.310 12,155.00 P-C1-015 0.0106%
C-C1-003 C.OM.JYK.DF.00.332.SABA Excavation in Rock M3 1 34.720 34.72 P-C1-016 0.0000%

Backfill of material in layers not exceeding "A"mm in loose thickness, compacted to achieve "B%"
of maximum Modified Proctor density, for all kinds of foundations, including handling,
transportation, placing, watering and compacting, testing etc - complete in all respect as per
project specifications & drawings. All fill material selected from either on site excavation or off site
sources recommended by approved Geotechnical Report which shall be free from organic matter
C1.04 or other unsatisfactory material. Fill material have a maximum size not exceeding "C" mm
conforming to grading requirements of project specification & approved Geotechnical
Investigation Report.
A=300mm;
B=Minimum 95%
C=150mm

WITH APPROVED EXCAVATED MATERIAL for all kinds of foundations, sleepers, including watering
C1.04.01
and compacting as per specifications.

C1.04.01.001 C.OM.JYK.DF.00.332.SABA Backfilling with approved excavated soil at site available from foundation pits, trenches M3 67,691 2.680 181,411.44 P-C1-017 0.1581%

Backfilling with approved Imported structural fill material below foundation (as per specification)
from designated borrow pit at location to be directed by Engineer/Company, including supply,
C1.04.01.002 C.OM.JYK.DF.00.332.SABA M3 14,630 5.500 80,464.82 P-C1-017 0.0701%
transportation to site, all complete as per project specification and drawings.
Note: Distance of designated borrow pit from site = As per Company instructions

Disposal of all surplus material (suitable/unsuitable/hardstratum) arising from site


cutting/excavation shall be removed from site to fill areas or to an company designated
C1.05 area/approved dump yard within "A" km from proposed project site including handling, loading, 0.0000%
unloading, transportation all complete as per project specification & drawings
A= As per company instructions

KHF-00-101983-FA-5804-0001-0000-02 Page 10 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

C1.05.001 C.OM.JYK.DF.00.332.SABA Disposal of excess earth (suitable/unsuitable) from excavation of foundation/pits/trenches etc. M3 38,426 1.150 44,189.43 P-C1-018 0.0385%

HANDLING AND DISPOSAL OF GYPSIFEROUS SOIL


Handling & Disposal of excavated GYPSIFEROUS soil (refer Technical Specification).
Contaminated non-hazardous unsuitable material - Removal, identification, sampling, testing,
C1.06 verification, site storage, transportation and disposal (at allocated dump) of contaminated non- 0.0000%
hazardous unsuitable material where specified or as required for Site Works to allow completion
of the facilities.
NOTE-Excavation shall be paid separately

C1.06.001 C.OM.JYK.DF.00.332.SABA 0 to 1.5m depth M3 31,218 1.150 35,900.25 P-C1-019 0.0313%

Handling & Disposal of hazardous contaminated soil (refer Technical Specification). Hazardous
contaminated material -Removal, identification, sampling, testing, verification, site storage,
transportation and disposal (at allocated dump) of contaminated hazardous unsuitable material
C1.06.002 C.OM.JYK.DF.00.332.SABA M3 175,000 4.610 806,750.00 P-C1-020 0.7031%
where specified or as required for Site Works to allow completion of the facilities including
processing/ treatment of hazardous material before disposal.
NOTE-Excavation shall be paid separately

BLINDING CEMENT CONCRETE / MASS STROKE


Providing, laying, compacting and curing blinding/mass concrete at all levels, having 28days
minimum cylindrical cube compressive strength of "A" N/mm2 when tested in accordance with
specification, using cement as per project specification,including supply & placing of "T" thick
polyethylene sheet Below Blinding concrete and concrete protection over Blinding concrete ,
formwork if required, etc, complete in all respects as per project specifications and drawings.
Note:- Blinding shall be "B" mm thick and shall extend a minimum of "C" mm beyond the edge of
the foundation.
C1.07 Reference document:
1) Concrete Works, Foundations and Paving Specification
2) Concrete Testing in accordance with ASTM-C39
3) Cement Testing in accordance with ASTM-C150
Data:
1)A=10N/mm2, B=50mm & C=100mm; T=1000 gauge
2)Cement used Type-II, ordinary portland cement complying with ASTM C150
3) Minimum cement content of 370 kg/m3
4) Water/Cement ratio shall not exceed 0.45

C1.07.02.V001 C.OM.JYK.DF.00.332.SABB Cement Type: OPC ; Concrete Strength: 10 N/MM2 M3 2,370 86.970 206,129.10 P-C1-022 0.1796%

STEEL REINFORCEMENT: Supply of all Material, preparation of bar bending schedule including
approval from , cutting, bending, binding with annealed steel wire and placing at all levels
Reinforcement Steel and Welded wire fabric, all complete as per project specification and
drawings. All reinforcement shall be firmly supported on approved plastic chairs & bar shall be
tied at alternate intersections.
Notes:
C1.08 1) Welding of reinforcement shall not be permitted without the written approval of the Engineer-in- 0.0000%
charge.
Data:
1) Reinforcement used - Reinforcement used - Main & secondary reinforcement deformed bar as
per BS 4449 with a minimum specified characteristics strength of 460 N/mm2.
2 )Welded wire fabric used - cold drawn wire with minimum characteristic strength of 460 N/mm2
conform to BS 4483.

C1.08.001 C.OM.JYK.DF.00.332.SABB Non-Coated Rebar MT 2,688 503.920 1,354,436.81 P-C1-024 1.1804%


C1.09 EMBEDDED ITEMS
C1.09.01 Embedded Steel

KHF-00-101983-FA-5804-0001-0000-02 Page 11 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

Supplying, fabricating, welding lugs, hot dipped galvanizing & installing in position at all levels
C1.09.01.001 C.OM.JYK.DF.00.332.SABB MT 5 1,661.000 8,305.00 P-C1-025 0.0072%
M.S. inserts to correct alignment.
C1.09.02 ANCHOR BOLTS & EMEBEDDED ITEMS
Supply of all material, fabricating and Installing Galvanized Anchor bolts to correct level and
alignment including supply & fixing necessary MS templates, Nuts, Lock nuts & Washer etc. all
complete as required as per Project specifications and drawings. Anchor bolts shall be Chromate
treated (if applicable) in addition to hot dip galvanized, the projection of the bolts shall be painted
after installation. All anchor bolts shall be rigidly fixed in position using a template before casting
concrete, with the projection as indicated on the vendor/standard drawings and minimum edge
C1.09.02.001 C.OM.JYK.DF.00.332.SABB MT 31 1,588.780 49,310.65 P-C1-025 0.0430%
distance as specified in drawings/project specifications.
Note: For Payment purpose, quantity shall be measured & paid based on actual executed weight
of Bolt, Nut, Lock nut & washer.
Reference document:
1)Design & installation of shall be as per project specification
Installing galvanized anchor bolts to correct level and Alignment including supply & fixing
necessary MS templates etc. All anchor bolts shall be rigidly fixed in position using a template
C1.09.02.002 C.OM.JYK.DF.00.332.SABB before casting concrete, with the projection as indicated on the vendor/standard drawings and MT 27 361.080 9,915.26 P-C1-025 0.0086%
minimum edge distance as specified in drawings/project specifications.(Bolt/Nuts/Lock
nut/Washer shall be Supplied by)
C1.09.03 PVC / HDPE Pipe Sleeves (min. 100 mm dia)
Supply & Installation Pipe Sleeve in various areas at all level, complete in all respect as per Project
C1.09.03.01 C.OM.JYK.DF.00.332.SABB M 100 4.290 429.00 P-C1-079 0.0004%
Specification & Drawings.
Providing, laying, compacting and curing Design Mix concrete at all levels, concrete having 28days
minimum cylindrical cube compressive strength of "A" N/mm2 when tested in accordance with
specification using cement as per project specification, including formwork, Concrete protection,
25mmx25mm chamfer in edge of the exposed concrete members, adequate compaction/vibration
of concrete, curing etc. complete in all respect as per project specification & drawings.
Note:-
For concrete protection refer note -1 to 5 below.
Reference document:
1)Civil and Structural Design Philosophy -KHF-00-PDFEED-AA-5529-00001-0000
2)All concrete testing shall be in accordance with ASTM-C39
3)Formwork shall be in accordance with ACI 347R,and construction safety manual shall be
C1.10 responsibility of the contractor
4)Finishing of concrete shall be in accordance with ACI 301, chapter 11.7 and ACI 302.1R unless
otherwise specified in the construction drawings
5)Concrete protection shall be as detailed in scope of work article 4.8.21.3.6
6)MCI corrosion inhibitor shall be added to all types of reinforced in-situ or Precast concrete
Data:
1) A=35N/mm2
2) Cement used - Type II OR Ordinary Portland Cement complying with ASTM C150 for all above
Grade structure, foundations, plinths, ground beams, grade slabs all conforming as per design
specifcation
3)Minimum cement content of 370 kg/m3
4)Water /cement ratio is not exceed 0.45

C1.10.01.V002 Cement Type: OPC ; Concrete Strength: 35 N/MM2


C1.10.01.V002.001 C.OM.JYK.DF.00.332.SABB Each individual item volume < 2 M3 M3 4,986 156.640 781,059.62 P-C1-026 0.6807%
C1.10.01.V002.002 C.OM.JYK.DF.00.332.SABB Each individual item volume > 2 M3 & < 10 M3 M3 18,366 142.790 2,622,525.02 P-C1-026 2.2856%
C1.10.01.V002.003 C.OM.JYK.DF.00.332.SABB Each individual item volume > 10 M3 & < 50 M3 M3 4,056 135.870 551,071.84 P-C1-026 0.4803%
C1.10.01.V002.004 C.OM.JYK.DF.00.332.SABB Each individual item volume > 50 M3 M3 5,188 128.940 668,924.26 P-C1-026 0.5830%
C-C1-004 C.OM.JYK.DF.00.332.SABB Reinforced Cement Concrete-Precast M3 1 238.510 238.51 P-C1-027 0.0002%

GROUTING -
Supply of all material, mixing & placing in position of following Grout including levelling, curing
C1.12
etc. all complete as per project specifications/drawings and manufacturer's recommendations.
Minimum thickness of grout shall be 25mm and measured from TOC to underside of base plate.

KHF-00-101983-FA-5804-0001-0000-02 Page 12 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage
Non Shrink grout: (Type G2)
"T" mm thick Non shrink Cementitious grout having Fosroc "Conbextra HF", or approved
equivalent shall be having minimum 28 days compressive strength of "A" N/mm2 used for
pedestals/foundations of steel structures, towers, pipe-racks, vessels, small pumps and all non
vibrating machinery etc. as per project specification & drawings.
C1.12.002 C.OM.JYK.DF.00.332.SABB M3 113 514.460 58,026.25 P-C1-028 0.0506%
Reference Specification:
1)Civil and Civil and Structural Design Criteria
Data:
1)A= 40 N/mm2
2)T= 25 mm
Epoxy Non Shrink grout: (Type G3)
"T" mm thick Non shrink Epoxy grout having Master Builders “Master Flow 410”, or Fosroc
“Conbextra EP 75”( grout thickness up to 75mm), or approved equivalent minimum 7 days
C1.12.003 C.OM.JYK.DF.00.332.SABB M3 34 2,835.920 95,476.34 P-C1-028 0.0832%
compressive strength of "A" N/mm2 used for equipment subject to vibrations and column bearing
plates of heavy structures etc. as per project specification & drawings.

DIRECT BURIED CABLE TRENCH :


Excavation in all types of soil, preparation of bedding as per specification, supplying and placing
of approved clean sand backfilling around & over the cable and backfill remaining portion by
excavated material in line with project specification/requirement including watering and
compaction in layers, supplying and laying of cable tiles, danger strip/yellow warning tape, route
markers, disposing of surplus excavated material including handling and transportation to the
C1.13 designated area from the site, additional excavation around existing underground services,
reconstruction of existing paving damaged during construction, providing crossing to existing
pipes, cables and ancillaries etc. complete in all respect as per project specifications & drawings
for following cable trench sizes (width considered at bottom of trench and depth measured from
top of paving/finished grade level).
Note:-
1) Backfilling to be done after laying of cables.
C1.13.01.001 C.OM.JYK.DF.00.332.SAD For Electrical Cable M3 35,416 12.360 437,744.85 P-C1-029 0.3815%
C1.13.01.002 C.OM.JYK.DF.00.332.SAD For Instrumentation Cable M3 14,120 14.260 201,351.20 P-C1-029 0.1755%
C1.13.01.002 C.OM.JYK.DF.00.332.SAD For Telecom Cable M3 15,019 14.260 214,167.53 P-C1-029 0.1866%
C1.14 UNDERGROUND PIPE TRENCH - FOR NON CIVIL DESIGN SCOPES
Supply of all material required and construction of trenches for the buried pipes (excluding supply
and installation of pipes), including excavation in all types of soil, levelling, compacting sub-soil,
sand padding, filling around & over pipes upto "A" mm above pipe by approved well graded clean
Sand after laying of pipes (by others), backfilling remaining portion by excavated material in line
with project specification/requirement including watering & compaction, disposal of surplus
excavated material including handling and transportation at a location designated by the company
representative, supply & placing pipe route markers etc. complete in all respect as per project
specifications and drawings for following lines. Trenches shall be suitable for laying Pipes &
fittings below grade at depth to give average 1.0m clear soil cover on top.
Note:
C1.14.001 C.OM.JYK.DF.00.332.SAD M3 400 17.920 7,168.00 P-C1-030 0.0062%
1) Supply of all pipe material/fittings & laying are excluded from contractor's scope. Supply of
material by & laying by Piping Sub-contractor
2) Backfilling to be done after laying of pipes
3) Quantity of hard stratum, contaminated-non hazardous/unsuitable material & contaminated-
hazardous soil, if any,
4) Supply of approved clean sand (if any) to be measured & paid under this item
5) For trenches not covered by following sizes, excavation, backfilling, disposal etc. will be
measured & paid
Thickness of Sand Bed =100 mm;
A=Thickness of Sand cover over the pipe= 100 mm

KHF-00-101983-FA-5804-0001-0000-02 Page 13 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

Underground Pipe Works - for Pipe line under civil design scope.
Supply of all material required and installation of pipe lines including excavation in all types of soil,
levell.ing, compacting sub-soil, sand or type 2 fill material padding, pipes & fittings laid below
grade at depth to give average 1.0m clear soil cover on top of pipes, filling around & over pipes
upto "A" mm above pipe by approved clean Sand type 2 fill material, back filling remaining
portion by type 2 fill materail (1m from EGL by excavated material and bottom part by borrowed
material) , in line with project specification/requirement including watering & compaction, disposal
of surplus excavated material including handling and transportation at a location designated by
C1.15 the company representative, supply & placing pipe route markers etc. complete in all respect as
per project specifications and drawings for following lines.
Note:
1) Supply of all pipe material & fittings are in Contractor's scope.
2) Excavation in hard stratum, disposal of contaminated soil (hazardous/ non-
hazardous/unsuitable material), if any, to be measured in this item.
3) Supply of approved clean sand (if any) to be measured & paid under this item.
4) For trenches not covered by following sizes, excavation, backfilling, disposal etc. will be
measured & paid.

C1.15.01 C.OM.JYK.DF.00.332.SAD 300 mm dia pipe HDPE M 13,500 52.080 703,080.00 P-C1-031 0.6127%
C1.15.02 C.OM.JYK.DF.00.332.SAD 350 mm dia pipe HDPE M 425 77.680 33,010.82 P-C1-031 0.0288%
C1.15.03 C.OM.JYK.DF.00.332.SAD 600 mm dia pipe HDPE M 163 222.820 36,209.14 P-C1-031 0.0316%
C1.15.04 C.OM.JYK.DF.00.332.SAD 750 mm dia pipe HDPE M 247 257.460 63,636.08 P-C1-031 0.0555%
C1.15.05 C.OM.JYK.DF.00.332.SAD 500 mm dia pipe HDPE M 163 153.490 25,058.78 P-C1-031 0.0218%
C1.15.06 C.OM.JYK.DF.00.332.SAD 900 mm dia pipe HDPE M 991 340.500 337,305.10 P-C1-031 0.2940%
C1.15.01.01 uPVC PIPE
C1.15.01.001 C.OM.JYK.DF.00.332.SADA above 50 mm up to 200 mm Diameter M 119 32.630 3,882.97 P-C1-031 0.0034%
C1.15.01.02 SANITARY LINE UPVC
C1.15.01.02.001 C.OM.JYK.DF.00.332.SADA 100 MM DIA M 119 24.550 2,921.45 P-C1-031 0.0025%
C1.15.01.03 SANITARY LINE HUME PIPE
C1.15.01.03.001 C.OM.JYK.DF.00.332.SADA 100 MM DIA M 50 27.910 1,395.50 P-C1-031 0.0012%
CONCRETE CABLE TRENCH WITH PRE-CAST CONCRETE COVER
Supply of all materials and construction of cast in situ RC Concrete Trench and Precast concrete
cover using design mix concrete cast over a layer of Blinding concrete using cement as per project
specification including excavation in all type of soil, levelling, compacting subsoil, backfilling,
disposal of surplus material together with handling and transportation to the designated area from
work site, formwork, adequate compaction/vibration, curing, concrete protection, supplying,
cutting, bending & binding of Reinforcement Steel (with ratio of reinforcement steel to concrete is
50kg/cum), supply & installation of Precast concrete cover with lifting hook, supply & placing
approved clean sand filling around cables as required etc. complete all as per Project
C1.16 specification and drawings for the following size of cable trench (dimension measured as internal
clear dimension).
Data:
1) Bottom Slab & wall min. 100mm thk and cover slab min. 100mm thk.
2) 50mm thk Blinding concrete
3) Intermediate concrete walls shall be provided for concrete trenches at 2m c/c for upporting
cover slab.
4) 50mm Dia pvc drain pipe filled with gravel at every 10m c/c.
5) 25mm x 10mm Deep hydrocarbon resistant joint sealentin area where oil spillage.
6) L50 X 50X 6 THK. Hot dip Galvanized to BS 729
C1.16.01 Electrical concrete cable trench
C1.16.01.V001 C.OM.JYK.DF.00.332.SADB 1500 mm Width X1000 mm Depth (Base slab & wall 150 mm Thk, Cover Slab100 mm Thk) M 1,000 287.470 287,470.00 P-C1-032 0.2505%
Width: 1000 MM ; Depth: 800 MM ; Base Slab Thickness: 150 MM ; Wall Slab Thickness: 150 MM
C1.16.01.V003 C.OM.JYK.DF.00.332.SADB M 1,500 257.800 386,700.00 P-C1-032 0.3370%
; Cover Slab Thickness: 150 MM
C1.16.02 Instrument concrete cable trench
C1.16.02.01 C.OM.JYK.DF.00.332.SADB 2000 mm Width X1000 mm Depth (Base slab & wall 150 mm Thk, Cover Slab100 mm Thk) M 1,205 375.760 452,790.80 P-C1-032 0.3946%
C1.16.03 Telecom concrete cable trench

KHF-00-101983-FA-5804-0001-0000-02 Page 14 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

C1.16.03.01 C.OM.JYK.DF.00.332.SADB 300 mm Width X850 mm Depth (Base slab & wall 100 mm Thk, Cover Slab100 mm Thk) M 2,000 222.460 444,920.00 P-C1-032 0.3878%
CABLE DUCT BANKS
Supply of all materials and construction of Cable Duct bank with cast in-situ Design mix concrete
having 28days minimum cylindrical Compressive strength of "A" N/mm2 cast over a layer of
Blinding concrete having strength "B" N/mm2 when tested in accordance with specification using
cement as per project specification including excavation in all type of soil, levelling, compacting
subsoil, backfilling, disposal of surplus material together with handling and transportation to the
designated area from work site, formwork, concrete protection, adequate compaction/vibration
of concrete, curing, supplying, cutting, bending & binding of Reinforcement Steel (with ratio of
reinforcement steel to concrete is 50kg/cum), supply, cutting & placing of UPVC sleeves/ducts/sub
ducts, nylon rope of suitable strength in each duct/sub-duct as required, coloring of duct bank
C1.17 surface as per requirements etc. complete all as per Project specification and drawings.
Note:-
1) For duct bank not covered by following sizes, excavation, backfilling, disposal, blinding
concrete, design mix concrete, concrete protection & reinforcement will be measured and paid
2) Reinforcement Quantity in excess of above specified quantity shall be measured
3) Minimum earth cover over the top of Duct bank is 610mm for Electrical/Instrument and 760mm
for Telecom
Data:
1)A=35N/mm2, B=10N/mm2
2)Cement used - Type II or Ordinary Portland Cement complying with ASTM C150 or equivalent
as per design specifcation
C1.17.01 WITH TEMPORARY DIVERSION
C1.17.01.01 ELECTRICAL - Cast-in-situ
C1.17.01.01.001 C.OM.JYK.DF.00.332.SADB 2100mm Width X 300mm Depth X 7000mm Length with 1X10 - 100 - Dia. UPVC Pipe Nos. 13 1,171.590 15,230.67 P-C1-033 0.0133%
C1.17.01.01.002 C.OM.JYK.DF.00.332.SADB 2100mm Width X 300mm Depth X 10000mm Length with 1X10 - 100 - Dia. UPVC Pipe Nos. 10 2,041.860 20,418.60 P-C1-033 0.0178%
C1.17.01.02 INSTRUMENTATION - cast-in-situ
C1.17.01.02.001 C.OM.JYK.DF.00.332.SADB 4100mm Width X 1100mm Depth X 6000mm Length with 1X4 - 900 - Dia. UPVC Pipe Nos. 1 12,822.910 12,822.91 P-C1-033 0.0112%
C1.17.01.02.002 C.OM.JYK.DF.00.332.SADB 4100mm Width X 1100mm Depth X 6000mm Length with 1X4 - 900 - Dia. UPVC Pipe Nos. 1 12,822.910 12,822.91 P-C1-033 0.0112%
C1.17.01.02.003 C.OM.JYK.DF.00.332.SADB 1300mm Width X 300mm Depth X 5000mm Length with 1X6 - 100 - Dia. UPVC Pipe Nos. 1 727.820 727.82 P-C1-033 0.0006%
C1.17.01.02.004 C.OM.JYK.DF.00.332.SADB 2500mm Width X 700mm Depth X 6000mm Length with 1X4 - 500 - Dia. UPVC Pipe Nos. 1 2,777.770 2,777.77 P-C1-033 0.0024%
C1.17.01.02.005 C.OM.JYK.DF.00.332.SADB 2500mm Width X 700mm Depth X 6000mm Length with 1X4 - 500 - Dia. UPVC Pipe Nos. 1 2,776.930 2,776.93 P-C1-033 0.0024%
C1.17.01.02.006 C.OM.JYK.DF.00.332.SADB 2500mm Width X 700mm Depth X 5600mm Length with 1X4 - 500 - Dia. UPVC Pipe Nos. 1 2,631.330 2,631.33 P-C1-033 0.0023%
C1.17.01.02.007 C.OM.JYK.DF.00.332.SADB 2500mm Width X 700mm Depth X 7400mm Length with 1X4 - 500 - Dia. UPVC Pipe Nos. 1 3,364.660 3,364.66 P-C1-033 0.0029%
C1.17.01.02.008 C.OM.JYK.DF.00.332.SADB 2500mm Width X 700mm Depth X 22100mm Length with 1X4 - 500 - Dia. UPVC Pipe Nos. 1 9,665.150 9,665.15 P-C1-033 0.0084%
C1.17.01.02.009 C.OM.JYK.DF.00.332.SADB 2500mm Width X 700mm Depth X 7400mm Length with 1X4 - 500 - Dia. UPVC Pipe Nos. 1 3,364.310 3,364.31 P-C1-033 0.0029%
C1.17.01.02.010 C.OM.JYK.DF.00.332.SADB 2500mm Width X 700mm Depth X 6700mm Length with 1X4 - 500 - Dia. UPVC Pipe Nos. 1 3,049.950 3,049.95 P-C1-033 0.0027%
C1.17.01.02.011 C.OM.JYK.DF.00.332.SADB 2500mm Width X 700mm Depth X 6000mm Length with 1X4 - 500 - Dia. UPVC Pipe Nos. 1 2,864.760 2,864.76 P-C1-033 0.0025%
C1.17.01.02.012 C.OM.JYK.DF.00.332.SADB 2500mm Width X 700mm Depth X 5000mm Length with 1X4 - 500 - Dia. UPVC Pipe Nos. 1 2,368.210 2,368.21 P-C1-033 0.0021%
C1.17.01.02.013 C.OM.JYK.DF.00.332.SADB 2500mm Width X 700mm Depth X 5000mm Length with 1X4 - 500 - Dia. UPVC Pipe Nos. 1 2,368.210 2,368.21 P-C1-033 0.0021%
C1.17.01.02.014 C.OM.JYK.DF.00.332.SADB 2500mm Width X 700mm Depth X 6000mm Length with 1X4 - 500 - Dia. UPVC Pipe Nos. 1 3,164.760 3,164.76 P-C1-033 0.0028%
C1.17.01.02.015 C.OM.JYK.DF.00.332.SADB 2500mm Width X 700mm Depth X 8500mm Length with 1X4 - 500 - Dia. UPVC Pipe Nos. 1 3,815.010 3,815.01 P-C1-033 0.0033%
C1.17.01.02.016 C.OM.JYK.DF.00.332.SADB 2500mm Width X 700mm Depth X 17100mm Length with 1X4 - 500 - Dia. UPVC Pipe Nos. 1 7,552.160 7,552.16 P-C1-033 0.0066%
C1.17.01.02.017 C.OM.JYK.DF.00.332.SADB 2100mm Width X 600mm Depth X 6000mm Length with 1X4 - 400 - Dia. UPVC Pipe Nos. 1 2,106.960 2,106.96 P-C1-033 0.0018%
C1.17.01.02.018 C.OM.JYK.DF.00.332.SADB 2100mm Width X 600mm Depth X 6000mm Length with 1X4 - 400 - Dia. UPVC Pipe Nos. 1 2,106.500 2,106.50 P-C1-033 0.0018%
C1.17.01.03 TELECOM
C1.17.01.03.01 C.OM.JYK.DF.00.332.SADB 520mm Width X 520mm Depth X 8000mm Length with 2X2 - 110 - Dia. UPVC Pipe Nos. 50 1,676.770 83,838.50 P-C1-033 0.0731%
C1.18 DRAINAGE & SANITARY SYSTEM

KHF-00-101983-FA-5804-0001-0000-02 Page 15 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

Supply of all materials and construction of RC Manhole with cast in-situ Design mix concrete
having 28days minimum cylindrical Compressive strength of "A" N/mm2 cast over a layer of
Blinding concrete having strength "B" N/mm2 when tested in accordance with specification using
cement as per project specification including excavation in all type of soil, levelling, compacting
subsoil, backfilling, disposal of surplus material together with handling and transportation to the
designated area from work site, formwork, concrete protection, float finish as required,
adequate compaction/vibration of concrete, curing, supplying, cutting, bending & binding of
C1.18.01 Reinforcement Steel (with ratio of reinforcement steel to concrete is 50kg/cum), supply &
installation of heavy duty manhole cover with frame as per specification & drawings, supply &
placing of galvanized iron rung/ iron step (as applicable) as per specification & drawing, supply &
placing of pipe sleeves/paddle flange using approved joint sealant as per drawing & specification,
PVC water stop etc. complete all as per Project specification and drawings.
Data:
1) A=35N/mm2, B=10N/mm2

C1.18.01.01 Accidentally Oil Contaminated water (AOC)


C1.18.01.01.001 C.OM.JYK.DF.00.332.SADA 1200 mm X 1200 mm X 1200 mm Depth (Base slab & wall 250 mm Thk, Cover Slab 200 mm Thk) Nos. 50 1,594.920 79,746.00 P-C1-034 0.0695%
Catch Pit (or Catch Basin) :
Supply of all materials and construction of RC Catch pit (or Catch basin) etc. with cast in-situ
Design mix concrete having 28days minimum cylindrical Compressive strength of "A" N/mm2 cast
over a layer of Blinding concrete having strength "B" N/mm2 when tested in accordance with
specification using cement as per project specification including excavation in all type of soil,
levelling, compacting subsoil, backfilling, disposal of surplus material together with handling and
transportation to the designated area from work site, formwork, concrete protection, float finish
C1.18.02
as required, adequate compaction/vibration of concrete, curing, supplying, cutting, bending &
binding of Reinforcement Steel (with ratio of reinforcement steel to concrete is 50kg/cum), supply
& installation of heavy duty steel grating with frame as per specification & drawings, supply &
placing of galvanized iron rung/ iron step (as applicable) as per specification & drawing, supply &
placing of pipe sleeves/paddle flange using approved joint sealant as required as per drawing &
specification, PVC water stop etc. complete all as per Project specification and drawings.

C1.18.02.V0001 C.OM.JYK.DF.00.332.SADA 1000 mm X 1000 mm X 900 mm Depth (Base slab 250 mm Thk, Wall 250 mm Thk) Nos. 100 1,309.070 130,907.00 P-C1-034 0.1141%
CAST IN SITU SUMP PIT :Supplying of all materials and construct, laying Cast In Situ concrete pits
including excavation, backfill, compaction, disposal of surplus earth, blinding concrete, curing of
structural concrete , reinforcement steel , water stopper, rungs, formwork, moisture protection,
including supply & application of underground/above ground surface protection, internal
C1.18.03 protection/coating etc., cement/sand screed, testing (including water for tests) etc. complete in all
respect as per project specifications and drawings. (Chequered plate, ladder, str.steel are not
under scope of Civil sub contractor)
Note: Extra over for Excavation of Hard stratum/rock/Contaminated Non- Hazardous/Hazardous
shall be paid separately

Valve Pit (or Valve Box) :


Supply of all materials and construction of RC Valve Pit with cast in-situ Design mix concrete
having 28days minimum cylindrical cube compressive strength of "A" N/mm2 cast over a layer of
Blinding concrete having strength "B" N/mm2 when tested in accordance with specification using
cement as per project specification including excavation in all type of soil, levelling, compacting
subsoil, backfilling, disposal of surplus material together with handling and transportation to the
designated area from work site, formwork, concrete protection, float finish as required,
C1.18.04
adequate compaction/vibration of concrete, curing, supplying, cutting, bending & binding of
Reinforcement Steel (with ratio of reinforcement steel to concrete is 80kg/cum), supply &
installation of chequered plate cover with supporting frame structure as per specification &
drawings, supply & placing of galvanized iron rung/ iron step (as applicable) as per specification &
drawing, supply & placing of pipe sleeves/paddle flange using approved joint sealant as required
as per drawing & specification, PVC water stop, steel painted traffic barrier to prevent vehicle to
encroach pit area etc. complete all as per Project specification and drawings.

C1.18.04.00 for Fire Water (FW) line


C1.18.04.01 C.OM.JYK.DF.00.332.SADA 3000 mm X 3000 mm X 1600 mm Depth (Base slab 250 mm Thk, Wall 250 mm Thk) Nos. 100 4,961.000 496,100.00 P-C1-034 0.4324%

KHF-00-101983-FA-5804-0001-0000-02 Page 16 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

C1.18.04.01 for OWS/AOC line


C1.18.04.01.001 C.OM.JYK.DF.00.332.SADA 1000 mm X 1000 mm X 1000 mm Depth (Base slab 250 mm Thk, Wall 250 mm Thk) Nos. 120 1,251.270 150,152.40 P-C1-034 0.1309%
C1.18.05 Hand Hole
Supply of all materials and construction/installation of Hand hole Pit made with Design mix cast in
situ concrete/Pre-cast concrete (as applicable) having item description same as Valve pit (item no.
18.04 above) except the following:
1) iron Steps/Rung, PVC water stop, traffic barrier are not required for Hand hole pit
2) ratio of reinforcement steel to concrete is 50kg/cum
Data:
C1.18.05.01
1)Pit shall be made up through cast-in-situ concrete
2)Concrete used - Design mix concrete of minimum 28 day cylindrical cube compressive strength
35Mpa for structural concrete and 10Mpa for Blinding concrete as per ASTM C150
3)Top cover shall be 100mm thick Pre-cast concrete cover with suitable lifting hook & edge
protection
4) uPVC sleeve on walls - 100mm dia
C1.18.05.01.V004.0 900mm X 1200mm (Internal) X 800mm Deep (Wall & wall foundation 150mm thk) with 1x2
C.OM.JYK.DF.00.332.SADA Nos. 10 1,228.620 12,286.20 P-C1-034 0.0107%
1 sleeves on each wall.
C1.18.05.01.V004.0 1200mm X 1200mm (Internal) X 1000mm Deep (Wall & wall foundation 150mm thk) with 2x2
C.OM.JYK.DF.00.332.SADA Nos. 10 1,488.700 14,887.00 P-C1-034 0.0130%
2 sleeves on each wall.
C1.18.05.01.V004.0 2000mm X 2000mm (Internal) X 1000mm Deep (Wall & wall foundation 150mm thk) with 2x3
C.OM.JYK.DF.00.332.SADA Nos. 30 2,660.670 79,820.10 P-C1-034 0.0696%
3 sleeves on each wall.
C-C1-005 C.OM.JYK.DF.00.332.SADA Construction of Septic Tank M3 1 12,689.110 12,689.11 P-C1-074 0.0111%
Sand Trap - Excavation in all types of soil, backfilling, compaction, disposal of surplus earth from
excavation including handling and transportation to the designated area at suitable distance from
the site, providing all materials, supplying & laying lean concrete , polyethylene sheet and
C1.18.06 construction of RC Concrete Sand Trap with formwork, curing, concrete protection on concrete
surface in contact with soil, including supplying, cutting, bending & placing of
reinforcement/welded wire fabric, complete in all respect as per project drawings and
specification.
2000 mm X 1000 mm X 1000 mm Depth; Base slab, wall and Cover Slab having maximum
C1.18.06.V002 C.OM.JYK.DF.00.332.SADA Nos. 50 1,707.610 85,380.50 P-C1-035 0.0744%
thickness of 200 mm.
Earth Pit for Electrical:
Supply of all materials and installation of Pre-cast concrete Earth Pit having item description same
as Valve pit (item no. 18.04 above) except the following:
1) Supply of Earthing electrode by Contractor. Drilling & installation (including sand filling) is by
Contractor.
C1.18.10
2) Recess to be provided at base for installation of Earthing electrode.
3) Iron Steps/Rung, Pipe sleeve/Paddle flange, PVC water stop, traffic barrier are not required for
Earth pit
4) Ratio of reinforcement steel to concrete is 50kg/cum
5)Thickness of Chequered plate cover = 8mm
C1.18.10.V002 C.OM.JYK.DF.00.332.SADA 450 mm Internal X 450 mm Internal X 400 mm Depth (Wall & wall foundation 0 mm Thk) Nos. 145 416.410 60,379.45 P-C1-036 0.0526%
C1.18.10.V003 C.OM.JYK.DF.00.332.SADA 450 mm Internal X 450 mm Internal X 400 mm Depth (Wall & wall foundation 0 mm Thk) Nos. 80 416.410 33,312.80 P-C1-036 0.0290%
C1.19 ROAD WORKS & PARKING
C1.19.01 ASPHALT ROAD

KHF-00-101983-FA-5804-0001-0000-02 Page 17 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

compacted selected fill, graded aggregate sub-base, asphalt concrete base course, wearing
course with or without hard shoulder (compacted gravel) & service corridor on sides, extra
widening at curve, slope protection as necessary, construction joint, camber and longitudinal
slope as required, providing road furnitures like traffic signs, road kerbs (pre-cast or cast-in-situ
concrete), road marking using thermoplastic paint, rumble strip etc. including associated civil
works like earth filling and/or excavation/box cutting in all types of soil, levelling, compacting
subsoil, backfilling, disposal of surplus material together with handling and transportation to the
designated area from work site etc. complete in all respect as per project specification &
drawings.
C1.19.01.01
Data:
Road layers thickness shall be as below per SP-1279, Chapter R.:
i) Well compacted Sub-grade
ii) 150mm Sub-Grade with "Type-B" fill material.
iii) 150mm Thk Road base with "Type-A" fill material.
iv) Bituminous prime Coat v)
Bituminous base course 50 mm thk.
vi) Bituminous Tack coat
vii) Bituminous wearing coarse 30 mm thk.
C1.19.01.01.001 C.OM.JYK.DF.00.332.SBBA Internal Road (6m wide + 1m wide shoulder + 1.2m wide service corridor on both side ) M 2,591 178.050 461,327.55 P-C1-037 0.4021%
C1.19.01.01.002 C.OM.JYK.DF.00.332.SBBA Internal Road (6m wide + without shoulder on both side ) M 3,734 136.540 509,840.36 P-C1-037 0.4443%
C1.19.01.01.003 C.OM.JYK.DF.00.332.SBBA Inter Plant Roads (4m wide + 1m wide shoulder on both side) M 572 139.890 80,017.08 P-C1-037 0.0697%
C1.19.01.01.004 C.OM.JYK.DF.00.332.SBBA Inter Plant Roads (9m wide + 1m wide shoulder on both side) M 3,000 222.190 666,570.00 P-C1-037 0.5809%
C1.19.01.01.005 C.OM.JYK.DF.00.332.SBBA Inter Plant Roads (5m wide + 1m wide shoulder on both side) M 1,854 153.650 284,867.10 P-C1-037 0.2483%
Internal roads within power plant (6m wide + 1m wide shoulder + 1.2m wide service corridor on
C-C1-006 C.OM.JYK.DF.00.332.SBBA M 1,500 178.280 267,420.00 P-C1-037 0.2331%
both side )
C-C1-007 C.OM.JYK.DF.00.332.SBBA Kerb Stone laying and fixing M 1 12.280 12.28 P-C1-063 0.0000%
C1.20 PAVING
Supplying all materials and construction of Reinforced Cement Concrete Paving laid on prepared
coarse granular sub-base including preparation of subgrade, providing expansion/ contraction/
construction joint as per specification & drawings using approved joint sealant & filler, maintaining
slope on paving, providing edge thickening & kerb wall as required including associated civil
works like excavation in all types of soil, levelling, compacting subsoil, backfilling, disposal of
surplus material together with handling and transportation to the designated area from work site,
work associated to concreting e.g. formwork, adequate compaction/vibration, curing, concrete
protection, supplying, cutting, bending & binding of Reinforcement Steel placing over of "T" thick
polyethylene sheet etc. complete in all respect as per project specification & drawings.
Note:-
1)One layer of plasticized sheet vapor barrier, 1000 gauge minimum thick shall be laid between
the concrete paving & granular sub-base. Laps shall be a minimum of 300 mm.
C1.20.01 2)The vertical faces of all concrete slab on grade shall be coated with two coats of bitumen
emulsion as per project specification.
Reference document:
1) Concrete Works, Foundations and Paving Specification
Data:
1) T=1000 gauge
2) Paving layer comprises of:
i) well compacted Sub-grade
ii) 250 mm thk sub-base of composed natural sands, gravels or crushed rock
iii)Concrete thickness as specified below
3) Kerb wall - 150mm width & 300mm height
4) Concrete used - Design mix concrete of minimum 28 day cube compressive strength 35Mpa for
structural concrete as per ASTM C150.
5) Other parameters, specifications related to Concrete work & reinforcement
C1.20.01.005 C.OM.JYK.DF.00.332.SBBA 200mm thick Concrete Paving with double layer of 10mm steel wire fabric 200x200 mm. M2 48,069 47.860 2,300,564.39 P-C1-040 2.0050%
150mm thick Concrete Grade slab with single layer high tensile deformed steel (hot rolled) of
C1.20.01.006 C.OM.JYK.DF.00.332.SBBA M2 3,952 42.730 168,865.43 P-C1-040 0.1472%
10mm diameter at 150mm c/c bothway
C-C1-008 C.OM.JYK.DF.00.332.SBBA Gravel Filling / Spreading M3 1 13.920 13.92 P-C1-043 0.0000%

KHF-00-101983-FA-5804-0001-0000-02 Page 18 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage
ASPHALT PAVING - Supplying all materials and construction of Asphalt Paving including
preparation of subgrade, graded aggregate sub-base (if applicable), asphalt concrete base course,
wearing course, providing construction joint, maintaining slope & edge thickening on paving etc.
C1.20.06 including associated civil works like excavation in all types of soil, leveling, compacting subsoil,
backfilling, disposal of surplus material together with handling and transportation to the
designated area from work site etc. complete in all respect as per project specification &
drawings.
C1.20.06.001 C.OM.JYK.DF.00.332.SBBA Asphalt Paving Thickness: 75 MM M2 11,187 20.510 229,450.50 P-C1-044 0.2000%
C1.21 Fencing work
Supplying all material & installing security fence, with construction of all civil works i.e. providing
& constructing RC foundation,including excavation in all type of soil, levelling, compacting subsoil,
backfilling, disposal of surplus material together with handling and transportation to the
designated area from work site, formwork, adequate compaction/vibration, curing, concrete
C1.21.01
protection, supplying, cutting, bending & binding of Reinforcement Steel etc. complete all as per
Project specification and drawings.
Note:-
1) Chain link fabric and tension wire shall be galvanized and PVC coated.
C1.21.01.001 C.OM.JYK.DF.00.332.SBBB Weldmesh panel Fence (External & Internal perimeter fence) M 3,444 91.720 315,904.32 P-C1-045 0.2753%
C1.21.01.003 C.OM.JYK.DF.00.332.SBBB Chain link Fence M 311 53.940 16,775.34 P-C1-045 0.0146%
C1.22 GATES
Supplying all material & installing double/single leaf Gate using PVC coated Galvanized chain link
mesh fixed to steel frame including all accessories like gate post, frame member, bracing, hinge,
drop bolt & slam plate, locking device, barbed wire etc. with construction of all civil works i.e.
providing & constructing RC foundation, including excavation in all type of soil, levelling,
compacting subsoil, backfilling, disposal of surplus material together with handling and
transportation to the designated area from work site, formwork, adequate compaction/vibration,
C1.22.01 curing, concrete protection, supplying, cutting, bending & binding of Reinforcement Steel etc.
complete all as per Project specification and drawings.
Note:-
1) All Gate post and pipes complying with ASTM A 53 SCH 40 to be hot dipped galvanized after
manufacture with an average zinc coating of 550GR/M2
2) All fitting shall be hot dipped galvanized and PVC coated after manufacture.
3) Chain link fabric and tension wire shall be galvanized and PVC coated.
C1.22.01.01 Double leaf Vehicular access gate
C1.22.01.01.01 C.OM.JYK.DF.00.332.SBBB MAIN GATE (TYPE 1) Nos. 10 1,374.830 13,748.30 P-C1-046 0.0120%
C1.22.01.01.02 C.OM.JYK.DF.00.332.SBBB MAIN GATE - (TYPE 3) Nos. 9 1,273.730 11,463.57 P-C1-046 0.0100%
C1.22.01.01.03 C.OM.JYK.DF.00.332.SBBB MAIN GATE - (TYPE 7) Nos. 5 1,129.290 5,646.45 P-C1-046 0.0049%
C1.22.01.02 Single leaf Personnel access / Emergency escape gate
C1.22.01.02.01 C.OM.JYK.DF.00.332.SBBB ESCAPE GATE (Type 21) Nos. 60 684.220 41,053.20 P-C1-046 0.0358%
C1.22.01.02.02 C.OM.JYK.DF.00.332.SBBB ESCAPE GATE (Type 22) Nos. 36 626.440 22,551.84 P-C1-046 0.0197%
C1.22.01.02.04 C.OM.JYK.DF.00.332.SBBB PERSONNEL GATE (TYPE-19) Nos. 7 606.540 4,245.78 P-C1-046 0.0037%
C1.22.01.02.05 C.OM.JYK.DF.00.332.SBBB PERSONNEL GATE (TYPE-20) Nos. 16 592.090 9,473.44 P-C1-046 0.0083%
EVAPORATION POND:
Supply of all materials required and construction of Evaporation pond complete,construction of
pond through cutting/filling, levelling pond bottom & compacting subsoil, construction of earthen
bund wall through excavation/filling with suitable approved fill material around (the pond) with
height as specified below (measured at inside of pond) having side slope of 1V:2H and top width
"A" as per relevant drawing & specification; construction of reinforced cement concrete (RCC) sump
pit, pipe support as required, RCC block for anchoring liner sheet (if used), 150mm thick RCC slab
with mesh reinforcement at pipe inlet area of pond, RCC staircases (with handrail) over bund wall
at different location including associated civil works like excavation in all type of soil, levelling,
compacting subsoil, backfilling, disposal of surplus material together with handling and
transportation to the designated area from work site, formwork, concrete protection, adequate
compaction/vibration of concrete, curing, supplying, cutting, bending & binding of Reinforcement
Steel (with ratio of reinforcement steel to concrete is 80kg/cum), supply & placing of pipe sleeves,
blinding concrete etc. complete in all respect as per project specifications & drawing for the
C1.23
following size of Evaporation pond.

KHF-00-101983-FA-5804-0001-0000-02 Page 19 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage
following size of Evaporation pond.
Base of pond shall be prepared & covered with 200mm thick compacted Gatch, 118MIL thk HDPE
liner, 50mm thick Screed and Precast Concrete Tile (600 x 600 x 50mm with 12 diax250mm
galvanized pin anchor per tile); Bundwall inside face, outside face & top surface shall be prepared
& covered with 300mm thick compacted Gatch, 118MIL thk HDPE liner, 50mm thick Screed and
Precast Concrete Tile (600 x 600 x 50mm with 12 diax250mm galvanized pin anchor per tile); HDPE
liner shall extend upto the top of bund wall and anchored to a concrete block (300 W x 600 D) as
required; Concrete kerb (250 W x 400 D) at bottom of inside face of bundwall; Concrete kerb (250
W x 400 D) at bottom of outer slope of bundwall; 1.5m walkway around pond with 150mm thick
sub-base of granular material.
Data:
1)A=1500mm
2)Concrete used - Design mix concrete of minimum 28 day cylindrical cube compressive strength
35Mpa for structural concrete and 10Mpa for Blinding concrete as per ASTM C150.

Supplying and installing Two layers of HDPE liner (capable to resist 90 C temperature of liquid )
C1.23.05.003 C.OM.JYK.DF.00.332.SBF M2 1 37.960 37.96 P-C1-047 0.0000%
with cast-in HDPE insert etc. complete in all respect as per project specification and Drawing
C1.23.09.001 C.OM.JYK.DF.00.332.SBF Base course 150 mm thk. Granular material M2 20,282 2.480 50,299.36 P-C1-047 0.0438%
C1.23.06.001 C.OM.JYK.DF.00.332.SBF Cocncrete slope protection 300 mm thk. M2 813 69.610 56,592.93 P-C1-047 0.0493%
C1.23.07.002 C.OM.JYK.DF.00.332.SBF Peripheral walkway M2 4,632 4.950 22,928.40 P-C1-047 0.0200%
C1.23.01.001 C.OM.JYK.DF.00.332.SBF Excavation for Pond M3 813 2.160 1,756.08 P-C1-047 0.0015%
C1.23.08.005 C.OM.JYK.DF.00.332.SBF Disposal M3 16,133 1.150 18,552.95 P-C1-047 0.0162%
C1.23.02.01.007 C.OM.JYK.DF.00.332.SBF Earthen Dyke for Pond M3 14,236 6.040 85,985.44 P-C1-047 0.0749%
C1.23.002 C.OM.JYK.DF.00.332.SBF RCC Anchor/Kerb & Blinding M3 0 278.280 0.00 P-C1-047 0.0000%
C1.23.003 C.OM.JYK.DF.00.332.SBF RCC Separation Wall & Blinding M3 25 278.280 6,957.00 P-C1-047 0.0061%
C1.23.04 C.OM.JYK.DF.00.332.SBF Reinforcment Steel MT 38 503.920 19,148.96 P-C1-047 0.0167%
C1.23.07.001 C.OM.JYK.DF.00.332.SBF Concrete Kerb M 0 2.750 0.00 P-C1-047 0.0000%
C1.23.09.002 C.OM.JYK.DF.00.332.SBF 200mm Thick compacted gatch for pond bed M2 1,084 2.750 2,981.00 P-C1-047 0.0026%

Supply and Installation of minimum 78MILThk. HDPE liner with 2.5% carbon black content to be
C1.23.09.003 C.OM.JYK.DF.00.332.SBF M2 280,000 3.420 957,600.00 P-C1-047 0.8346%
sulphuric acid resistant complete in all respect as per Project Specification & Drawings.
Supplying and laying of compacted sand bedding for HDPE liner complete in all respect as per
C1.23.09.004 C.OM.JYK.DF.00.332.SBF M3 42,000 13.720 576,240.00 P-C1-047 0.5022%
project specification & drawings.
Supplying and laying of Type B material as per SP1279 complete in all respect as per project
C1.23.09.005 C.OM.JYK.DF.00.332.SBF M3 84,000 5.330 447,720.00 P-C1-047 0.3902%
specification & drawings.
Supplying and laying 250 mm Low permiability compacted layer / Geo synthetic clay liner
C1.23.09.006 C.OM.JYK.DF.00.332.SBF M2 22,500 14.830 333,675.00 P-C1-047 0.2908%
complete in all respect as per project specification & drawings.
Supplying and laying of HDPE membrane complete in all respect as per project specification &
C1.23.09.007 C.OM.JYK.DF.00.332.SBF M2 45,000 9.490 427,050.00 P-C1-047 0.3722%
drawings.
Supplying and laying of Non oven Geo textile (Needle Punch) complete in all respect as per
C1.23.09.008 C.OM.JYK.DF.00.332.SBF M2 45,000 2.100 94,500.00 P-C1-047 0.0824%
project specification & drawings.
Supply and laying of granular leachate complete in all respect as per project specification &
C1.23.09.009 C.OM.JYK.DF.00.332.SBF M3 11,250 13.720 154,350.00 P-C1-047 0.1345%
drawings.
Supply and laying of 100thk fiber reinforced concrete complete in all respect as per project
C1.23.09.011 C.OM.JYK.DF.00.332.SBF M2 4,950 9.460 46,827.00 P-C1-047 0.0408%
specification & drawings.
C1.23.09.012 C.OM.JYK.DF.00.332.SBF Supply and laying of gravel filling complete in all respect as per project specification & drawings. M3 750 15.080 11,310.00 P-C1-047 0.0099%

Supply and laying leak detection system including geotextile, sand, gravel, pipes (HDPE, uPVC
C-C1-037 C.OM.JYK.DF.00.332.SBF M 800 70.090 56,072.00 P-C1-047 0.0489%
etc. as applicable) along with inspection manholes as per Project Specification & Drawings.
C-C1-009 C.OM.JYK.DF.00.332.SBF Drilling Deep Well - Earthing Well Nos. 1 16,883.830 16,883.83 P-C1-049 0.0147%
C1.26 BUND WALL & DYKE WALL AREA

KHF-00-101983-FA-5804-0001-0000-02 Page 20 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

Earthen Bund wall


Supply all material & construction of Earthen bund wall of height "H" (measured from adjacent
finished grade level), in trapezoidal cross section with top width "T" & side slope "S", using
approved material (site available excavated material/suitable imported fill material from borough pit
- as specified below) laid in 300mm thickness and compacted to 95% maximum dry density,
preparation of sub-grade, providing surface protection on bund wall as specified below, providing
access ramp, toe guard protection & toe drain/swale as required, supply & placing of carbon steel
sleeves with end seal & supports etc. including all associated civil work like excavation in all type of
soil, levelling, compacting subsoil, backfilling, disposal of surplus material together with handling
and transportation to the designated area from work site, associated concrete work (if required)
C.OM.JYK.DF.00.332.SABA like formwork, concrete protection, adequate compaction/vibration of concrete, curing, supplying, 0.0977%
cutting, bending & binding of Reinforcement Steel (as applicable), complete all as per Project
specification and drawings.
Data:
C1.26.001 M 248 452.680 112,128.84 P-C1-051
1)H=1800mm; T=1200mm; S=1(V):2(H)
2)Surface protection:
a)300mm thick Gatch compacted to 95% MDD;
b)3mm thick HDPE liner;
c)50mm thick Screed
d) Precast Tile (600 x 600 x 50mm with 12 dia x 250 mm galvanized pin anchor per tile)
3) Concrete Kerb (250 W x 400 D) at bottom of Bundwall (inside & outside) with blinding; 1.5m
wide pathway at outside of Bundwall with 150mm thick sub-base of granular material, 50mm thick
sand bed & 60mm thick interlocking tiles; 1.0m wide pathway at outside of Bundwall with 150mm
thick sub-base of granular material, 50mm thick sand bed & 60mm thick interlocking tiles
4)Concrete used - Design mix concrete of minimum 28 day cylindrical compressive strength 30Mpa
for structural concrete and 20Mpa for Blinding concrete as per ASTM C39.
5)Top loose soil below bund wall shall be removed to a depth of 150mm
6)Earth material for Bund wall shall be approved imported fill available from borough pit.
C1.27 TANK FOUNDATION & ANCILLARIES

C1.27.01 Tank resting on RC Ring wall


Excavation (Machine) in all types of soil for tank foundation with item description same as
C1.27.01.01
mentioned in item no. 2.4.1
C1.27.01.001 C.OM.JYK.DF.00.332.SABA 0 to 1.5m depth M3 5,230 17.350 90,742.24 P-C1-052 0.0791%
C1.27.01.002 C.OM.JYK.DF.00.332.SABA 1.5 to 3.0m depth M3 581 20.830 12,091.82 P-C1-052 0.0105%
C1.27.01.002.01 C.OM.JYK.DF.00.332.SABA 3 to 4.5m depth M3 8 23.870 198.12 P-C1-052 0.0002%
Backfilling & compaction with approved excavated soil at site having item description same as
C1.27.01.003 C.OM.JYK.DF.00.332.SABA M3 5,027 2.680 13,472.36 P-C1-052 0.0117%
mentioned in item no. 2.6.1 above
Disposal of excess & unusable excavated earth including handling & transportation to the
C1.27.01.004 C.OM.JYK.DF.00.332.SABA M3 1,268 1.150 1,458.20 P-C1-052 0.0013%
designated area from site with item description same as mentioned in item no. 2.7.2
C1.27.01.005 C.OM.JYK.DF.00.332.SABB Providing, laying, compacting and curing Blinding concrete M3 41 72.870 2,965.81 P-C1-052 0.0026%
C1.27.01.02 Supplying and placing of Reinforced cement concrete (RCC)
C1.27.01.02.003 C.OM.JYK.DF.00.332.SABB Each individual foundation volume >10 and < 50 M3 M3 305 153.250 46,802.55 P-C1-052 0.0408%
C1.27.01.02.004 C.OM.JYK.DF.00.332.SABB Each individual foundation volume >50 M3 M3 963 135.530 130,528.94 P-C1-052 0.1138%
Supplying, cutting, bending, binding Reinforcement Steel (hot rolled & high tensile deformed steel
C1.27.01.02.005 C.OM.JYK.DF.00.332.SABB MT 192 503.920 96,500.68 P-C1-052 0.0841%
with grade 60) including preparation of bar bending schedule
C1.27.01.02.006 C.OM.JYK.DF.00.332.SABB Supply and Installing galvanized Anchor bolts MT 5 1,733.220 8,666.10 P-C1-025 0.0076%
Supply & laying of 300mm thick compacted clean sand cushion with necessary camber below tank
C1.27.01.02.007 C.OM.JYK.DF.00.332.SABC M3 3,564 10.420 37,132.71 P-C1-052 0.0324%
base as per project specification & drawings
Supply & laying of compacted 50mm thick Sand-Bitumen Mix laid on slope above the aforesaid
C1.27.01.02.008 C.OM.JYK.DF.00.332.SABC M2 2,971 9.340 27,749.14 P-C1-052 0.0242%
clean sand base complete in all respect as per project specification and drawing.
Supply of material & laying of 118 MIL thick Polyethylene/HDPE flexible membrane liner including
C1.27.01.02.009 C.OM.JYK.DF.00.332.SABC jointing & bonding to ringwall for leak tight connection complete in all respect as per specification M2 2,962 9.490 28,109.38 P-C1-052 0.0245%
and drawing.
Supply & laying Type A granular fill throughly compacted layers as per SP1279 chapter S
C1.27.01.02.010 C.OM.JYK.DF.00.332.SABC M3 3,056 16.510 50,447.96 P-C1-052 0.0440%
complete in all respect as per project specification and drawing.
Supply & filling of Crushed rock in layers complete in all respect as per project specification and
C1.27.01.02.011 C.OM.JYK.DF.00.332.SABA M3 2,705 13.720 37,112.60 P-C1-052 0.0323%
drawing.

KHF-00-101983-FA-5804-0001-0000-02 Page 21 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

Supply of material and installation of 25mm diameter PVC pipes including plastic mesh screen
C1.27.01.02.012 C.OM.JYK.DF.00.332.SABC M 1,038 1.500 1,557.00 P-C1-052 0.0014%
over inside open end, for leak detection, complete all as per project specification and drawing.
Supply & Installation of Geotextile membrane woven/roven, Type Nicolon No. 66339 (or)
C1.27.01.02.013 C.OM.JYK.DF.00.332.SABC M2 2,004 4.500 9,016.20 P-C1-052 0.0079%
Equivalaent.
C1.27.01.02.014 TANKAGE AREA PAVING (WITH IN BUND/DYKE WALL)

Supply & laying of 200mm thick well compacted Gravel Gatch paving underlain by 50mm sand
C1.27.01.02.015 C.OM.JYK.DF.00.332.SABC bed thick blinding over liner/membrane already laid (as per item 20.3.2), storm water drain as M2 7,904 4.000 31,614.02 P-C1-052 0.0276%
required, including handling and transport from the stock pile or designated area.

C-C1-010 C.OM.JYK.DF.00.332.SABB Tank Pads Construction M3 1 38.510 38.51 P-C1-053 0.0000%


Tankage area access Ramp - over Dyke wall (maximum 2.0m high)
Supply all material & construction of 'A' m wide access ramp using filling with engineering fill
C1.27.02 material laid in 300mm thick layer, watering and compacting to 95% MDD, preparation of sub-
grade, maintaining side slope & their protection, construction of road with surface matching with
adjoining road etc. complete all as per project specifications and drawings
C1.27.02.01 C.OM.JYK.DF.00.332.SABB A=6m M 44 253.630 11,159.72 P-C1-052 0.0097%
Concrete Drain (RCC/Pre-cast/PCC) :
Supply of all materials and construction of PCC/RCC /Pre-cast (as applicable) concrete lined drain
cast over a layer of 1.5mm thick polythene sheet/Blinding concrete (as applicable) using cement
per project specification including excavation in all type of soil, levelling, compacting subsoil to
proper line and level, backfilling, disposal of surplus material together with handling and
transportation to the designated area from work site, formwork, concrete protection, float finish
as required, adequate compaction/vibration of concrete, curing, provide control joints including
C1.29 joint sealant as required including construction of following (as applicable with respect to different
items) like laying & joining of pre-cast tiles, supplying, cutting, bending & binding of
Reinforcement Steel, supply & installation of heavy duty steel grating with frame and embedded
items, supply & installation of pipe sleeves/paddle flange using approved joint sealant as required
etc., all complete as per Project specification and drawings.
Data:
1)Concrete used - Design mix concrete of minimum 28 day cylindrical compressive strength 35
Mpa for structural concrete and 10 Mpa for Blinding concrete as per ASTM C39.

Rectangular open drain with Cast-in-situ reinforced concrete & Steel Grating cover at Top of
Rectangular Drain.
C1.29.01 Data:
1) Grating cover used - Galvanized rectangular grating having bearing bar 5x32mm @30mm c/c
with 8dia cross bar @100c/c spacing (weight 50Kg/sqm)

C1.29.01 C.OM.JYK.DF.00.332.SBG 500mm Width X400mm Depth (Base slab & wall 200mm Thk) M 822 253.040 208,001.06 P-C1-054 0.1813%
C1.38.01 Precast Concrete Walls
C1.38.01.01 C.OM.JYK.DF.00.332.SBG Each individual item volume > 10 M3 & < 50 M3 M3 129 296.080 38,052.91 P-C1-081 0.0332%
C1.38.01.02 C.OM.JYK.DF.00.332.SBG Each individual item volume > 50 M3 M3 1,246 255.720 318,561.14 P-C1-081 0.2776%
C-C1-011 C.OM.JYK.DF.00.332.SBBA Road Crossing Works with Pipe Sleeves Nos. 1 7,009.150 7,009.15 P-C1-056 0.0061%
C-C1-012 C.OM.JYK.DF.00.332.SBBA Concrete Slab over Carrier Pipe at Road Crossing Nos. 1 2,102.740 2,102.74 P-C1-057 0.0018%
C-C1-013 C.OM.JYK.DF.00.332.SBBA RCC Pipe at Road Crossing for Drainage Nos. 1 2,102.740 2,102.74 P-C1-058 0.0018%
C-C1-014 C.OM.JYK.DF.00.332.SBBA Reinforcement Concrete Box Culvert for Road Crossing M3 1 350.460 350.46 P-C1-082 0.0003%
C-C1-015 C.OM.JYK.DF.00.332.SBBA Concrete block trenches for pipes and cables M 1 210.270 210.27 P-C1-083 0.0002%
C-C1-016 C.OM.JYK.DF.00.332.SBBB Guard rail / Crash Barrier M 1 210.270 210.27 P-C1-061 0.0002%
C-C1-017 C.OM.JYK.DF.00.332.SAE Paving - Interlock Tile Paving with Sub base M2 1 21.030 21.03 P-C1-070 0.0000%
C-C1-018 C.OM.JYK.DF.00.332.SAE Landscaping and Irrigation Works M2 1 49.060 49.06 P-C1-064 0.0000%
C-C1-019 C.OM.JYK.DF.00.332.SAE Geotextile Membrane M2 1 7.010 7.01 P-C1-071 0.0000%
C-C1-020 C.OM.JYK.DF.00.332.SAE Steel Pipe with RCC Encasement Nos. 1 1,051.370 1,051.37 P-C1-072 0.0009%
C-C1-021 C.OM.JYK.DF.00.332.SAE Slope protection by bitumen and sand M2 1 35.050 35.05 P-C1-077 0.0000%
C-C1-022 C.OM.JYK.DF.00.332.SBBB CPF Perimeter Fence, Class-B Security Fence M 6,200 140.600 871,720.00 P-C1-078 0.7597%
C-C1-034 C.OM.JYK.DF.00.332.SBBB CPF internal fence, Type-B Fence M 2,300 49.060 112,838.00 P-C1-045 0.0983%
C-C1-035 C.OM.JYK.DF.00.332.SBBB CPF internal fence, Type-B Removable Fence M 40 175.230 7,009.20 P-C1-045 0.0061%
C-C1-036 C.OM.JYK.DF.00.332.SBBB Evaporation Ponds, Type-C Fence M 1,244 43.460 54,064.24 P-C1-045 0.0471%

KHF-00-101983-FA-5804-0001-0000-02 Page 22 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

C-C1-023 C.OM.JYK.DF.00.332.SAG Demolition Works - Concrete (Plain/RCC) M3 1 35.050 35.05 P-C1-065 0.0000%
C-C1-024 C.OM.JYK.DF.00.332.SAG Demolition Works - Fencing M 1 7.010 7.01 P-C1-065 0.0000%
C-C1-025 C.OM.JYK.DF.00.332.SAG Demolition Works - Gates Nos. 1 210.270 210.27 P-C1-065 0.0002%
C-C1-026 C.OM.JYK.DF.00.332.SAG Demolition Works - Roads M2 1 11.210 11.21 P-C1-065 0.0000%
C-C1-027 C.OM.JYK.DF.00.332.SAG Demolition Works - Paving M2 1 7.010 7.01 P-C1-065 0.0000%
C-C1-028 C.OM.JYK.DF.00.332.SAG Demolition Works - Sewer Lines M 1 11.210 11.21 P-C1-065 0.0000%
C-C1-029 C.OM.JYK.DF.00.332.SAG Demolition Works - RCC Buildings M3 1 28.040 28.04 P-C1-065 0.0000%
C-C1-030 C.OM.JYK.DF.00.332.SAG Demolition Works - U/G Cables M 1 5.610 5.61 P-C1-065 0.0000%
C-C1-031 C.OM.JYK.DF.00.332.SAG Demolition Works - U/G Pipes M 1 5.610 5.61 P-C1-065 0.0000%
C-C1-033 C.OM.JYK.DF.00.332.SABC Supply and Installing galvanized Post Drilled Anchor bolts MT 1 2,102.740 2,102.74 P-C1-025 0.0018%
Subtotal (OMR) 31,452,693.30 27.4114%

KHF-00-101983-FA-5804-0001-0000-02 Page 23 of 72
PROGRESS MEASUREMENT SCHEDULE

Contract C311520 - Construction Services for Yibal Khuff Project On Plot

Section C5,
Building Works
Schedule C Bill C2

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

C2 Building Works
RCC buildings (Cast In-Situ) - Supply of all materials except material excluded in scope of Contractor
and construction of Cast-in-situ RCC buildings, excavation, backfill, disposal, formwork as necessary,
supply & placing reinforcement in position, complete in all respect including floor, walkway (along
outside periphery of building), column, beams, slabs, block walls (if any), roofs, grade slab, lintels,
ventilators, ramps, stair, ladders, handrails, fence panel , fence , gate, equipment & building
foundations, doors & windows, all architectural items/finishes, internal & external painting, false
ceiling/flooring (as required), roof finishes, gutters, down post, insulation in walls/roofs/floor to achieve
required 'U' value, required utility systems all complete as per relevant project specifications and
drawings including following;
a) Installation & Pre-commissioning of all electrical system (Supply of materials for electrical system are
C2.01 not in the scope of Contractor)
b) Installation & Pre-commissioning of all HSE systems (Supply of materials for HSE system is not in
the scope of Contractor).
c) Installation & Pre-commissioning of all HVAC system (Supply of materials for HVAC system are not in
the scope of Contracor).
d) Installation & Pre-commissioning of all Telecom & Instrumentation system (Supply of materials are
not in the scope of Contractor).
e) Supply & Installation of all Plumbing & Sanitary works
f) Installation of Cathodic Protection by Contractor (Supply of Cathodic Protection material by
Contractor.
Note: Building areas are measured between center line of external columns both ways.
C2.01.01 C.OM.JYK.DF.00.332.SBA Control Room Building - 25% Progress M2 1585 206.588 327,441.19 P-C2-001 0.2854%

C.OM.JYK.DF.00.332.SBA Control Room Building - 50% Progress M3 1585 206.588 327,441.19 P-C2-001 0.2854%

C.OM.JYK.DF.00.332.SBA Control Room Building -75% Progress M4 1585 206.588 327,441.19 P-C2-001 0.2854%

C.OM.JYK.DF.00.332.SBA Control Room Building - 100% Progress M5 1585 206.588 327,441.19 P-C2-001 0.2854%

C2.01.02 C.OM.JYK.DF.00.332.SBA Substation Building -1 - 25% Building M2 526 200.508 105,466.95 P-C2-001 0.0919%

C.OM.JYK.DF.00.332.SBA Substation Building -1 - 50% Building M3 526 200.508 105,466.95 P-C2-001 0.0919%

C.OM.JYK.DF.00.332.SBA Substation Building -1 - 75% Building M4 526 200.508 105,466.95 P-C2-001 0.0919%

C.OM.JYK.DF.00.332.SBA Substation Building -1 - 100% Building M5 526 200.508 105,466.95 P-C2-001 0.0919%

C2.01.03 C.OM.JYK.DF.00.332.SBA Substation Building -2 - 25% progress M2 1521 148.868 226,427.47 P-C2-001 0.1973%

C.OM.JYK.DF.00.332.SBA Substation Building -2 - 50% progress M3 1521 148.868 226,427.47 P-C2-001 0.1973%

C.OM.JYK.DF.00.332.SBA Substation Building -2 - 75% progress M4 1521 148.868 226,427.47 P-C2-001 0.1973%

C.OM.JYK.DF.00.332.SBA Substation Building -2 - 100% progress M5 1521 148.868 226,427.47 P-C2-001 0.1973%

C2.01.04 C.OM.JYK.DF.00.332.SBA Substation Building -3 - 25% progress M2 1483 159.158 236,030.57 P-C2-001 0.2057%

C.OM.JYK.DF.00.332.SBA Substation Building -3 - 50% progress M3 1483 159.158 236,030.57 P-C2-001 0.2057%

C.OM.JYK.DF.00.332.SBA Substation Building -3 - 75% progress M4 1483 159.158 236,030.57 P-C2-001 0.2057%

C.OM.JYK.DF.00.332.SBA Substation Building -3 - 100% progress M5 1483 159.158 236,030.57 P-C2-001 0.2057%

C2.01.05 C.OM.JYK.DF.00.332.SBA Substation Building -4 - 25% progress M2 513 216.475 111,051.68 P-C2-001 0.0968%

C.OM.JYK.DF.00.332.SBA Substation Building -4 - 50% progress M2 513 216.475 111,051.68 P-C2-001 0.0968%

C.OM.JYK.DF.00.332.SBA Substation Building -4 - 75% progress M2 513 216.475 111,051.68 P-C2-001 0.0968%

C.OM.JYK.DF.00.332.SBA Substation Building -4 - 75% progress M2 513 216.475 111,051.68 P-C2-001 0.0968%

C2.01.06 C.OM.JYK.DF.00.332.SBA Breathing Apparatus Building - 25% progress M2 175 202.655 35,464.63 P-C2-001 0.0309%

C.OM.JYK.DF.00.332.SBA Breathing Apparatus Building - 50% progress M2 175 202.655 35,464.63 P-C2-001 0.0309%

KHF-00-101983-FA-5804-0001-0000-02 Page 24 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

C.OM.JYK.DF.00.332.SBA Breathing Apparatus Building - 75% progress M2 175 202.655 35,464.63 P-C2-001 0.0309%

C.OM.JYK.DF.00.332.SBA Breathing Apparatus Building - 100% progress M2 175 202.655 35,464.63 P-C2-001 0.0309%

C2.01.07 C.OM.JYK.DF.00.332.SBA Guard House Building - 25% progress M2 152 271.835 41,318.92 P-C2-001 0.0360%

C.OM.JYK.DF.00.332.SBA Guard House Building - 50% progress M2 152 271.835 41,318.92 P-C2-001 0.0360%

C.OM.JYK.DF.00.332.SBA Guard House Building - 75% progress M2 152 271.835 41,318.92 P-C2-001 0.0360%

C.OM.JYK.DF.00.332.SBA Guard House Building - 100% progress M2 152 271.835 41,318.92 P-C2-001 0.0360%

C2.01.08 C.OM.JYK.DF.00.332.SBA Telecom Building - 25% Progress M2 81 305.673 24,759.47 P-C2-001 0.0216%

C.OM.JYK.DF.00.332.SBA Telecom Building - 50% Progress M2 81 305.673 24,759.47 P-C2-001 0.0216%

C.OM.JYK.DF.00.332.SBA Telecom Building - 75% Progress M2 81 305.673 24,759.47 P-C2-001 0.0216%

C.OM.JYK.DF.00.332.SBA Telecom Building - 100% Progress M2 81 305.673 24,759.47 P-C2-001 0.0216%

C2.01.09 C.OM.JYK.DF.00.332.SBA Steam Turbine Generator building - 25% progress M2 505.08 210.513 106,325.65 P-C2-001 0.0927%

C.OM.JYK.DF.00.332.SBA Steam Turbine Generator building - 50% progress M2 505.08 210.513 106,325.65 P-C2-001 0.0927%

C.OM.JYK.DF.00.332.SBA Steam Turbine Generator building - 75% progress M2 505.08 210.513 106,325.65 P-C2-001 0.0927%

C.OM.JYK.DF.00.332.SBA Steam Turbine Generator building - 100% progress M2 505.08 210.513 106,325.65 P-C2-001 0.0927%

SUBTOTAL IN OMR 4,857,146.07 4.2331%

KHF-00-101983-FA-5804-0001-0000-02 Page 25 of 72
PROGRESS MEASUREMENT SCHEDULE

Contract C311520 - Construction Services for Yibal Khuff Project On Plot

Section C5,
Structural Steel Works
Schedule C Bill C4
Unit Price Preamble
Item Code CBS Code Description UOM Est. Qty Amount (OMR) Percentage
(OMR) Code
C4 Structural Steel Works
C4.01 GENERAL STRUCTURAL STEEL WORK
Erection of structural steel having fixtures like stiffener plates, gussets, saddles, plates, stubs, similar
pieces including receiving of material at construction site, transporting, storing, handling, including
connecting various pieces by bolting, welding as required, alignment including touch up painting (Primer
& Paint supply by Contractor), tightening of bolts, complete in all respects as per project specification &
drawings given below.
Specification:
1. Steel : Sructural steel shall conform to BS EN 10025 & 10029, Grade S275 JR. hollow structural steel
shall be BS EN 10210 Grade S275
C4.01.02 2. Bolt: Grade 8.8 to BS 3692 or ASTM A 325 and galvanised as per BS EN ISO 1461 (minimum bolt dia
16mm).
3. Weld: BS 7688 - Specification for weldable structural steel.
Reference:
1. KHF-00-PDFEED-AA-5529-00001-0000_ Civil & Structural Design Philosophy.
2. KHF-00-PDFEED-CX-4018-00002-0000_ General Notes & Abbreviations for steel structures.
3. KHF-00-102396-CS-4180-01001-0001_ Pump Sunshades- Typical Details
Note:
1. Supply of welding electrodes and other consumables etc. as required to be included within quoted
C4.01.02.01 STEEL PIPE RACK STRUCTURE
C4.01.02.01.001 C.OM.JYK.DF.00.332.SGMA Light Weight sections (Up to 30 Kg/m) MT 1,163.01 353.860 411,542.72 P-C4-002 0.3587%
C4.01.02.01.002 C.OM.JYK.DF.00.332.SGMA Medium Weight sections (Above 30 Kg/m and up to 60 Kg/m) MT 1,966.66 353.860 695,922.31 P-C4-002 0.6065%
C4.01.02.01.003 C.OM.JYK.DF.00.332.SGMA Heavy Weight sections (> 60 Kg/m) and plates MT 4,023.94 353.860 1,423,911.41 P-C4-002 1.2410%
C4.01.02.02 EQUIPMENT SUPPORTING/ TECHNOLOGICAL STRUCTURE
C4.01.02.02.001 C.OM.JYK.DF.00.332.SGMA Light Weight sections (Up to 30 Kg/m) MT 356.45 354.860 126,489.85 P-C4-002 0.1102%
C4.01.02.02.002 C.OM.JYK.DF.00.332.SGMA Medium Weight sections (Above 30 Kg/m and up to 60 Kg/m) MT 1,308.10 353.860 462,884.27 P-C4-002 0.4034%
C4.01.02.02.003 C.OM.JYK.DF.00.332.SGMA Heavy Weight sections (> 60 Kg/m) and plates MT 1,605.68 353.860 568,185.92 P-C4-002 0.4952%
C4.01.02.03 PIPE SUPPORTS
C4.01.02.03.001 C.OM.JYK.DF.00.332.SGMA Light Weight sections (Up to 30 Kg/m) MT 221.00 353.860 78,203.06 P-C4-002 0.0682%
C4.01.02.03.002 C.OM.JYK.DF.00.332.SGMA Medium Weight sections (Above 30 Kg/m and up to 60 Kg/m) MT 221.00 353.860 78,203.06 P-C4-002 0.0682%
C4.01.02.04 PLATFORM ON GRADE
C4.01.02.04.001 C.OM.JYK.DF.00.332.SFD Light Weight sections (Up to 30 Kg/m) MT 637.00 353.860 225,408.82 P-C4-002 0.1964%
C4.01.02.04.002 C.OM.JYK.DF.00.332.SFD Medium Weight sections (Above 30 Kg/m and up to 60 Kg/m) MT 285.00 353.860 100,850.10 P-C4-002 0.0879%
C4.01.02.04.003 C.OM.JYK.DF.00.332.SFD Heavy Weight sections (> 60 Kg/m) and plates MT 27.00 353.860 9,554.22 P-C4-002 0.0083%
C4.01.02.04 WALK WAY / CROSS OVER AND FRAMING FOR UG PITS
C4.01.02.04.01 C.OM.JYK.DF.00.332.SFD Light Weight sections (Up to 30 Kg/m) MT 267.00 353.860 94,480.62 P-C4-002 0.0823%
C4.01.02.04.02 C.OM.JYK.DF.00.332.SFD Medium Weight sections (Above 30 Kg/m and up to 60 Kg/m) MT 99.00 353.860 35,032.14 P-C4-002 0.0305%
C4.01.02.05 MISC. SUPPORTS FOR ELEC./ INST./ TELE.
C4.01.02.05.01 C.OM.JYK.DF.00.332.SFC Light Weight sections (Up to 30 Kg/m) MT 273.00 353.860 96,603.78 P-C4-002 0.0842%
C4.01.02.05.02 C.OM.JYK.DF.00.332.SFC Medium Weight sections (Above 30 Kg/m and up to 60 Kg/m) MT 169.00 353.860 59,802.34 P-C4-002 0.0521%
C4.01.02.05.03 C.OM.JYK.DF.00.332.SFC Heavy Weight sections (> 60 Kg/m) and plates MT 127.00 353.860 44,940.22 P-C4-002 0.0392%
C4.01.02.05 HANDRAILING
C4.01.02.05.001 C.OM.JYK.DF.00.332.SFD On straight run M 12,141.00 4.770 57,912.57 P-C4-002 0.0505%
C4.01.02.05.002 C.OM.JYK.DF.00.332.SFD On Staircases / Crossover M 7,676.95 5.720 43,912.15 P-C4-002 0.0383%
C4.01.02.06 LADDERS
C4.01.02.06.001 C.OM.JYK.DF.00.332.SFD Ladders with cages M 2,160.70 10.490 22,665.74 P-C4-002 0.0198%
C4.01.02.06.002 C.OM.JYK.DF.00.332.SFD Ladders without cages M 40.06 7.950 318.48 P-C4-002 0.0003%
C-C4.01.02.07 Structural Steel Field Modification Works
C-C4.01.02.07.001 C.OM.JYK.DF.00.332.SFD Carrying out structural steel field modification works including cutting, fabrication, instllation etc. MT 1.00 1,083.260 1,083.26 P-C4-005A 0.0009%
C4.02 GRATINGS/ STAIR TREADS

KHF-00-101983-FA-5804-0001-0000-02 Page 26 of 72
PROGRESS MEASUREMENT SCHEDULE

Unit Price Preamble


Item Code CBS Code Description UOM Est. Qty Amount (OMR) Percentage
(OMR) Code
GRATINGS
Erection, Installation, painted and Galvanized handrail, ladder, gratings, chequered plate etc including
receiving of material at construction site, handling, transporting, storing, touch-up painting of damaged
area during transportation and erection including connecting & fixing various pieces using bolts and
welding as required etc., complete in all respects as perproject specification & drawings given below.
Specification:
1. Steel : Sructural steel shall conform to BS EN 10025 & 10029, Grade S275 JR.
2. Bolt: Structural bolts shall be in accordance with grade 8.8 to BS 3692 or ASTM A307 and galvanised
as per Bs EN ISO 1461
3. Weld: ANSI/AWS D1.1(Section 3.3) & minimum weld electrode yield strength shall be 400 N/mm2
C4.02.01
and minimum tensile strength 480 N/mm2
Reference:
1. KHF-00-PDFEED-AA-5529-00001-0000_ Civil & Structural Design Philosophy.
2. KHF-00-PDFEED-CX-4018-00002-0000_ General Notes & Abbreviations for steel structures..
3. KHF-00-PDFEED-CX-4018-00003-0001_ Stairway Arrangement & Details.
4. KHF-00-PDFEED-CX-4018-00004-0001_ Ladder Arrangement & Details ( Side entry ladder).
5. KHF-00-PDFEED-CX-4018-00004-0002_ Ladder Arrangement & Details ( Front entry ladder).
6. KHF-00-PDFEED-CX-4018-00005-0001_ Handrail Arrangement & Details. Note:
1. Supply of welding electrodes and other consumables etc. as required to be included within quoted
price.
C4.02.01.005 C.OM.JYK.DF.00.332.SFD Rectangular grating 30 MM M2 25,062.00 15.880 397,984.56 P-C4-003 0.3468%
C4.02.02 STAIR/CROSS OVER TREAD
C4.02.02.001 C.OM.JYK.DF.00.332.SFD Tread Size : 244mm X 760mm LONG M2 1,521.00 19.060 28,990.26 P-C4-003 0.0253%
C4.02.02.002 C.OM.JYK.DF.00.332.SFD Tread Size : 244mm X 1000mm LONG M2 2,398.00 19.060 45,705.88 P-C4-003 0.0398%
C4.03 CHEQUERED PLATES
CHEQUERED PLATES
Erection, Installation, painted and Galvanized handrail, ladder, gratings, chequered plate etc including
receiving of material at construction site, handling, transporting, storing, touch-up painting of damaged
area during transportation and erection including connecting & fixing various pieces using bolts and
welding as required etc., complete in all respects as perproject specification & drawings given below.
Specification:
1. Steel : Sructural steel shall conform to BS EN 10025 & 10029, Grade S275 JR.
2. Bolt: Structural bolts shall be in accordance with grade 8.8 to BS 3692 or ASTM A307 and galvanised
as per Bs EN ISO 1461
3. Weld: ANSI/AWS D1.1(Section 3.3) & minimum weld electrode yield strength shall be 400 N/mm2
C4.03.01
and minimum tensile strength 480 N/mm2
Reference:
1. KHF-00-PDFEED-AA-5529-00001-0000_ Civil & Structural Design Philosophy.
2. KHF-00-PDFEED-CX-4018-00002-0000_ General Notes & Abbreviations for steel structures..
3. KHF-00-PDFEED-CX-4018-00003-0001_ Stairway Arrangement & Details.
4. KHF-00-PDFEED-CX-4018-00004-0001_ Ladder Arrangement & Details ( Side entry ladder).
5. KHF-00-PDFEED-CX-4018-00004-0002_ Ladder Arrangement & Details ( Front entry ladder).
6. KHF-00-PDFEED-CX-4018-00005-0001_ Handrail Arrangement & Details. Note:
1. Supply of welding electrodes and other consumables etc. as required to be included within quoted
price.
C4.03.01.001 C.OM.JYK.DF.00.332.SFD Plate thickness - 6mm M2 416.22 15.880 6,609.57 P-C4-004 0.0058%
C4.04 SHELTER WORK
Structural Steel: Receiving, unloading, storing, handling, transportation, assembly, bolting, welding (as
required), touch up painting including Paint supply, erection, alignment of prefabricated steel structures
C4.04.01
including associated loose fittings/fixtures like angle cleats, stiffeners, gussets plates etc. complete in all
respects as per specification & project drawings.
C4.04.01.001 C.OM.JYK.DF.00.332.SFB Light Weight sections (Up to 30 Kg/m) MT 1,169.39 353.860 413,800.42 P-C4-005 0.3606%
C4.04.01.002 C.OM.JYK.DF.00.332.SFB Medium Weight sections (Above 30 Kg/m and up to 60 Kg/m) MT 1,567.19 353.860 554,567.13 P-C4-005 0.4833%
C4.04.01.003 C.OM.JYK.DF.00.332.SFB Heavy Weight sections (> 60 Kg/m) and plates MT 1,173.75 353.860 415,343.25 P-C4-005 0.3620%

KHF-00-101983-FA-5804-0001-0000-02 Page 27 of 72
PROGRESS MEASUREMENT SCHEDULE

Unit Price Preamble


Item Code CBS Code Description UOM Est. Qty Amount (OMR) Percentage
(OMR) Code
ERECTION / INSTALLATION OF SIDE / ROOF CLADDING WORKS FOR SHELTERS
Erection of Metal roof cladding, wall / side cladding, perforated sheets, louvers, doors and windows
including sealants, trims, flashings, ridge pieces steel galvanized gutters, rain water down pipes as per
Project specifications and Drawings.
Reference:
C4.04.02
1. KHF-00-PDFEED-AA-5529-00001-0000_ Civil & Structural Design Philosophy.
2. KHF-00-PDFEED-CX-4018-00002-0000_ General Notes & Abbreviations for steel structures.
Note:
1. Supply of welding electrodes and other consumables etc. if required to be included within quoted
price.
C4.04.02 Roof sheets (including Translucent sheets) as per specification.
C4.04.02.001 C.OM.JYK.DF.00.332.SFB Single skin ribbed panels. M2 23,516.32 12.990 305,477.00 P-C4-006 0.2662%
C4.04.02.004 C.OM.JYK.DF.00.332.SFB Side cladding - Single Skin ribbed panels M2 26,897.07 12.990 349,392.94 P-C4-006 0.3045%
C4.04.02.005 C.OM.JYK.DF.00.332.SFB Roof gutters as per project specification M 2,816.00 14.440 40,663.04 P-C4-006 0.0354%
C4.04.02.006 C.OM.JYK.DF.00.332.SFB Rain water down pipes as per project specifications M 5,659.00 17.330 98,070.47 P-C4-006 0.0855%
C4.05 FIRE PROOFING:
Supply and Application of Fire Proofing including welding of anchor pin, all accessories ,formwork
C4.05.01 ,painting complete in all respects to comply with fire resistance rating hours as per project specification
& drawings.
C4.05.01.01 LIGHT WEIGHT CONCRETE
C4.05.01.01.01 Structural Steel
C4.05.01.01.01.V001 C.OM.JYK.DF.00.332.SFE Fire Proofing Thickness ≤ 50 MM M3 3,040.00 1,336.880 4,064,115.20 P-C4-007 3.5419%
C4.05.01.01.02 Equipment
C4.05.01.01.02.V001 C.OM.JYK.DF.00.332.SFE Fire Proofing Thickness ≤ 50 MM M3 760.00 1,156.620 879,031.20 P-C4-007 0.7661%
Subtotal (OMR) 12,237,657.95 10.6653%

KHF-00-101983-FA-5804-0001-0000-02 Page 28 of 72
PROGRESS MEASUREMENT SCHEDULE

Contract C311520 - Construction Services for Yibal Khuff Project On Plot

Section C5,
Piping Works
Schedule C Bill P1

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

P1 Piping Works
P1.01 Jointing/Welding of Pipe
P1.01.01 Service : Above Ground
P1.01.01.01 Pipe Material : CS
P1.01.01.01.001 C.OM.JYK.DF.00.332.SGO Size <2";Thk. upto 6.5mm;Joint-BW Inch Dia 1228.25 9.740 11,963.16 P-P1-001 0.0104%
P1.01.01.01.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 21268 9.740 207,150.32 P-P1-001 0.1805%
P1.01.01.01.003 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. upto 6.5mm;Joint-BW Inch Dia 9626 9.740 93,757.24 P-P1-001 0.0817%
P1.01.01.01.009 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 10341 9.740 100,721.34 P-P1-001 0.0878%
P1.01.01.01.010 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 2250 9.740 21,915.00 P-P1-001 0.0191%
P1.01.01.01.011 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 21876 9.740 213,072.24 P-P1-001 0.1857%
P1.01.01.01.012 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 5880 9.740 57,271.20 P-P1-001 0.0499%
P1.01.01.01.013 C.OM.JYK.DF.00.332.SGO Size >30" to 40";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 5796 9.740 56,453.04 P-P1-001 0.0492%
P1.01.01.01.016 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >10mm to 13mm;Joint-BW Inch Dia 864 11.400 9,849.60 P-P1-001 0.0086%
P1.01.01.01.017 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >10mm to 13mm;Joint-BW Inch Dia 408 13.050 5,324.40 P-P1-001 0.0046%
P1.01.01.01.018 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >10mm to 13mm;Joint-BW Inch Dia 3296 12.220 40,277.12 P-P1-001 0.0351%
P1.01.01.01.020 C.OM.JYK.DF.00.332.SGO Size >30" to 40";Thk. >10mm to 13mm;Joint-BW Inch Dia 1944 11.400 22,161.60 P-P1-001 0.0193%
P1.01.01.01.021 C.OM.JYK.DF.00.332.SGO Size >40";Thk. >10mm to 13mm;Joint-BW Inch Dia 3030 11.400 34,542.00 P-P1-001 0.0301%
P1.01.01.01.024 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >13mm to 20mm;Joint-BW Inch Dia 1404 17.200 24,148.80 P-P1-001 0.0210%
P1.01.01.01.025 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >13mm to 20mm;Joint-BW Inch Dia 392 16.370 6,417.04 P-P1-001 0.0056%
P1.01.01.01.026 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. >13mm to 20mm;Joint-BW Inch Dia 96 15.550 1,492.80 P-P1-001 0.0013%
P1.01.01.01.032 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >20mm to 30mm;Joint-BW Inch Dia 288 30.620 8,818.56 P-P1-001 0.0077%
P1.01.01.01.113 C.OM.JYK.DF.00.332.SGO Size <2";Thk. upto 6.5mm;Joint-SW Inch Dia 90.5 9.740 881.47 P-P1-001 0.0008%
P1.01.01.04 Pipe Material : CS (NACE)
P1.01.01.04.009 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 22841 10.000 228,410.00 P-P1-001 0.1991%
P1.01.01.04.016 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >10mm to 13mm;Joint-BW Inch Dia 4310 11.710 50,470.10 P-P1-001 0.0440%
P1.01.01.04.017 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >10mm to 13mm;Joint-BW Inch Dia 8286 13.400 111,032.40 P-P1-001 0.0968%
P1.01.01.04.003 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. upto 6.5mm;Joint-BW Inch Dia 2242 10.000 22,420.00 P-P1-001 0.0195%
P1.01.01.04.010 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 20188 10.000 201,880.00 P-P1-001 0.1759%
P1.01.01.04.018 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >10mm to 13mm;Joint-BW Inch Dia 3670 10.000 36,700.00 P-P1-001 0.0320%
P1.01.01.04.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 31917 10.000 319,170.00 P-P1-001 0.2782%
P1.01.01.04.011 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 8560 10.000 85,600.00 P-P1-001 0.0746%
P1.01.01.04.012 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 7408 10.000 74,080.00 P-P1-001 0.0646%
P1.01.01.04.019 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. >10mm to 13mm;Joint-BW Inch Dia 180 12.550 2,259.00 P-P1-001 0.0020%
P1.01.01.04.023 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >13mm to 20mm;Joint-BW Inch Dia 1260 17.680 22,276.80 P-P1-001 0.0194%
P1.01.01.04.024 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >13mm to 20mm;Joint-BW Inch Dia 2432 17.680 42,997.76 P-P1-001 0.0375%
P1.01.01.04.025 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >13mm to 20mm;Joint-BW Inch Dia 3874 16.820 65,160.68 P-P1-001 0.0568%
P1.01.01.04.026 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. >13mm to 20mm;Joint-BW Inch Dia 5376 15.970 85,854.72 P-P1-001 0.0748%
P1.01.01.04.031 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >20mm to 30mm;Joint-BW Inch Dia 1392 35.730 49,736.16 P-P1-001 0.0433%
P1.01.01.04.032 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >20mm to 30mm;Joint-BW Inch Dia 3900 31.300 122,070.00 P-P1-001 0.1064%
P1.01.01.04.028 C.OM.JYK.DF.00.332.SGO Size >40";Thk. >13mm to 20mm;Joint-BW Inch Dia 7686 15.970 122,745.42 P-P1-001 0.1070%
P1.01.01.04.021 C.OM.JYK.DF.00.332.SGO Size >40";Thk. >10mm to 13mm;Joint-BW Inch Dia 1554 11.710 18,197.34 P-P1-001 0.0159%
P1.01.01.04.027 C.OM.JYK.DF.00.332.SGO Size >30" to 40";Thk. >13mm to 20mm;Joint-BW Inch Dia 1840 16.820 30,948.80 P-P1-001 0.0270%
P1.01.01.04.013 C.OM.JYK.DF.00.332.SGO Size >30" to 40";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 720 10.000 7,200.00 P-P1-001 0.0063%

KHF-00-101983-FA-5804-0001-0000-02 Page 29 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

P1.01.01.14 Pipe Material : CS (FBE Lined)


P1.01.01.14.009 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 63 11.710 737.73 P-P1-003 0.0006%
P1.01.01.23 Pipe Material : LTCS
P1.01.01.23.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 120 12.550 1,506.00 P-P1-001 0.0013%
P1.01.01.23.009 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 20 12.550 251.00 P-P1-001 0.0002%
P1.01.01.24 Pipe Material : LTCS (NACE)
P1.01.01.24.009 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 651 10.420 6,783.42 P-P1-001 0.0059%
P1.01.01.24.016 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >10mm to 13mm;Joint-BW Inch Dia 10128 12.210 123,662.88 P-P1-001 0.1078%
P1.01.01.24.017 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >10mm to 13mm;Joint-BW Inch Dia 6350 14.000 88,900.00 P-P1-001 0.0775%
P1.01.01.24.018 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >10mm to 13mm;Joint-BW Inch Dia 12402 13.110 162,590.22 P-P1-001 0.1417%
P1.01.01.24.019 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. >10mm to 13mm;Joint-BW Inch Dia 22 12.210 268.62 P-P1-001 0.0002%
P1.01.01.24.023 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >13mm to 20mm;Joint-BW Inch Dia 24 18.480 443.52 P-P1-001 0.0004%
P1.01.01.24.027 C.OM.JYK.DF.00.332.SGO Size >30" to 40";Thk. >13mm to 20mm;Joint-BW Inch Dia 3420 17.580 60,123.60 P-P1-001 0.0524%
P1.01.01.24.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 3281 10.420 34,188.02 P-P1-001 0.0298%
P1.01.01.24.010 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 986 10.420 10,274.12 P-P1-001 0.0090%
P1.01.01.24.011 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 2268 10.420 23,632.56 P-P1-001 0.0206%
P1.01.01.24.024 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >13mm to 20mm;Joint-BW Inch Dia 232 18.480 4,287.36 P-P1-001 0.0037%
P1.01.01.24.025 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >13mm to 20mm;Joint-BW Inch Dia 958 17.580 16,841.64 P-P1-001 0.0147%
P1.01.01.24.026 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. >13mm to 20mm;Joint-BW Inch Dia 11040 16.700 184,368.00 P-P1-001 0.1607%
P1.01.01.24.035 C.OM.JYK.DF.00.332.SGO Size >40";Thk. >20mm to 30mm;Joint-BW Inch Dia 144 28.300 4,075.20 P-P1-001 0.0036%
P1.01.01.24.028 C.OM.JYK.DF.00.332.SGO Size >40";Thk. >13mm to 20mm;Joint-BW Inch Dia 5238 16.700 87,474.60 P-P1-001 0.0762%
P1.01.01.24.003 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. upto 6.5mm;Joint-BW Inch Dia 184 10.420 1,917.28 P-P1-001 0.0017%
P1.01.01.35 Pipe Material : LTCS (825 Clad) (NACE)
P1.01.01.35.003 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. upto 6.5mm;Joint-BW Inch Dia 360 18.180 6,544.80 P-P1-001 0.0057%
P1.01.01.35.009 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 48 18.180 872.64 P-P1-001 0.0008%
P1.01.01.35.033 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. >20mm to 30mm;Joint-BW Inch Dia 1536 48.280 74,158.08 P-P1-001 0.0646%
P1.01.01.35.024 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >13mm to 20mm;Joint-BW Inch Dia 672 33.240 22,337.28 P-P1-001 0.0195%
P1.01.01.35.025 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >13mm to 20mm;Joint-BW Inch Dia 1528 31.560 48,223.68 P-P1-001 0.0420%
P1.01.01.37 Pipe Material : ALLOYB2
P1.01.01.37.001 C.OM.JYK.DF.00.332.SGO Size <2";Thk. upto 6.5mm;Joint-BW Inch Dia 69 26.540 1,831.26 P-P1-001 0.0016%
P1.01.01.37.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 1608 26.540 42,676.32 P-P1-001 0.0372%
P1.01.01.44 Pipe Material : ALLOY825 (NACE)
P1.01.01.44.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 22614 17.340 392,126.76 P-P1-001 0.3417%
P1.01.01.47 Pipe Material : AS 1.25Cr 0.5Mo
P1.01.01.47.009 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 348 41.170 14,327.16 P-P1-001 0.0125%
P1.01.01.47.001 C.OM.JYK.DF.00.332.SGO Size <2";Thk. upto 6.5mm;Joint-BW Inch Dia 6.5 80.900 525.85 P-P1-001 0.0005%
P1.01.01.47.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 276 41.170 11,362.92 P-P1-001 0.0099%
P1.01.01.47.010 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 24 26.870 644.88 P-P1-001 0.0006%
P1.01.01.47.018 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >10mm to 13mm;Joint-BW Inch Dia 1360 27.410 37,277.60 P-P1-001 0.0325%
P1.01.01.48 Pipe Material : AS 2.25Cr 1Mo
P1.01.01.48.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 140 41.970 5,875.80 P-P1-001 0.0051%
P1.01.01.48.032 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >20mm to 30mm;Joint-BW Inch Dia 1024 53.450 54,732.80 P-P1-001 0.0477%
P1.01.01.48.016 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >10mm to 13mm;Joint-BW Inch Dia 162 45.310 7,340.22 P-P1-001 0.0064%
P1.01.01.48.040 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. >30mm to 40mm;Joint-BW Inch Dia 192 71.840 13,793.28 P-P1-001 0.0120%
P1.01.01.52 Pipe Material : SS316
P1.01.01.52.001 C.OM.JYK.DF.00.332.SGO Size <2";Thk. upto 6.5mm;Joint-BW Inch Dia 3091.5 16.300 50,391.45 P-P1-001 0.0439%
P1.01.01.52.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 8028 16.300 130,856.40 P-P1-001 0.1140%

KHF-00-101983-FA-5804-0001-0000-02 Page 30 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

P1.01.01.52.003 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. upto 6.5mm;Joint-BW Inch Dia 1184 16.300 19,299.20 P-P1-001 0.0168%
P1.01.01.54 Pipe Material : SS316L (NACE)
P1.01.01.54.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 18342 16.750 307,228.50 P-P1-001 0.2678%
P1.01.01.54.003 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. upto 6.5mm;Joint-BW Inch Dia 5302 16.750 88,808.50 P-P1-001 0.0774%
P1.01.01.54.004 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. upto 6.5mm;Joint-BW Inch Dia 7826 16.750 131,085.50 P-P1-001 0.1142%
P1.01.01.54.005 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. upto 6.5mm;Joint-BW Inch Dia 4336 16.750 72,628.00 P-P1-001 0.0633%
P1.01.01.54.009 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 708 16.750 11,859.00 P-P1-001 0.0103%
P1.01.01.54.010 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 3342 16.750 55,978.50 P-P1-001 0.0488%
P1.01.01.54.011 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 56 16.750 938.00 P-P1-001 0.0008%
P1.01.01.54.012 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 3390 16.750 56,782.50 P-P1-001 0.0495%
P1.01.01.54.013 C.OM.JYK.DF.00.332.SGO Size >30" to 40";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 1152 16.750 19,296.00 P-P1-001 0.0168%
P1.01.01.54.016 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >10mm to 13mm;Joint-BW Inch Dia 618 19.810 12,242.58 P-P1-001 0.0107%
P1.01.01.54.017 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >10mm to 13mm;Joint-BW Inch Dia 218 22.860 4,983.48 P-P1-001 0.0043%
P1.01.01.54.024 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >13mm to 20mm;Joint-BW Inch Dia 12 30.520 366.24 P-P1-001 0.0003%
P1.01.01.54.025 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >13mm to 20mm;Joint-BW Inch Dia 1796 28.990 52,066.04 P-P1-001 0.0454%
P1.01.01.54.018 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >10mm to 13mm;Joint-BW Inch Dia 3400 21.340 72,556.00 P-P1-001 0.0632%
P1.01.01.54.021 C.OM.JYK.DF.00.332.SGO Size >40";Thk. >10mm to 13mm;Joint-BW Inch Dia 1856 19.810 36,767.36 P-P1-001 0.0320%
P1.01.01.54.026 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. >13mm to 20mm;Joint-BW Inch Dia 1608 27.460 44,155.68 P-P1-001 0.0385%
P1.01.01.62 Pipe Material : SS321
P1.01.01.62.003 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. upto 6.5mm;Joint-BW Inch Dia 80 17.520 1,401.60 P-P1-001 0.0012%
P1.01.01.62.019 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. >10mm to 13mm;Joint-BW Inch Dia 96 20.730 1,990.08 P-P1-001 0.0017%
P1.01.01.70 Pipe Material : SS316 (NACE)
P1.01.01.70.001 C.OM.JYK.DF.00.332.SGO Size <2";Thk. upto 6.5mm;Joint-BW Inch Dia 39 16.750 653.25 P-P1-001 0.0006%
P1.01.01.70.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 22082 16.750 369,873.50 P-P1-001 0.3223%
P1.01.01.70.003 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. upto 6.5mm;Joint-BW Inch Dia 5094 16.750 85,324.50 P-P1-001 0.0744%
P1.01.01.70.004 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. upto 6.5mm;Joint-BW Inch Dia 1272 16.750 21,306.00 P-P1-001 0.0186%
P1.01.01.70.016 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >10mm to 13mm;Joint-BW Inch Dia 156 19.810 3,090.36 P-P1-001 0.0027%
P1.01.01.70.005 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. upto 6.5mm;Joint-BW Inch Dia 72 16.750 1,206.00 P-P1-001 0.0011%
P1.01.01.70.009 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 144 16.750 2,412.00 P-P1-001 0.0021%
P1.01.01.70.010 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 1270 16.750 21,272.50 P-P1-001 0.0185%
P1.01.01.70.012 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 322 16.750 5,393.50 P-P1-001 0.0047%
P1.01.01.70.013 C.OM.JYK.DF.00.332.SGO Size >30" to 40";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 360 16.750 6,030.00 P-P1-001 0.0053%
P1.01.01.70.026 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. >13mm to 20mm;Joint-BW Inch Dia 840 27.460 23,066.40 P-P1-001 0.0201%
P1.01.01.70.018 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >10mm to 13mm;Joint-BW Inch Dia 40 21.340 853.60 P-P1-001 0.0007%
P1.01.01.73 Pipe Material : Duplex SS (NACE)
P1.01.01.73.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 1395 23.190 32,350.05 P-P1-001 0.0282%
P1.01.01.73.003 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. upto 6.5mm;Joint-BW Inch Dia 192 23.190 4,452.48 P-P1-001 0.0039%
P1.01.01.75 Pipe Material : Super Duplex SS (NACE)
P1.01.01.75.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 812 27.530 22,354.36 P-P1-001 0.0195%
P1.01.01.75.003 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. upto 6.5mm;Joint-BW Inch Dia 176 27.530 4,845.28 P-P1-001 0.0042%
P1.01.01.77 Pipe Material : CS (825 Clad)
P1.01.01.77.003 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. upto 6.5mm;Joint-BW Inch Dia 7040 18.180 127,987.20 P-P1-001 0.1115%
P1.01.01.77.009 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 174 18.180 3,163.32 P-P1-001 0.0028%
P1.01.01.77.010 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 240 18.180 4,363.20 P-P1-001 0.0038%
P1.01.01.77.017 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >10mm to 13mm;Joint-BW Inch Dia 2052 24.870 51,033.24 P-P1-001 0.0445%
P1.01.01.77.011 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 3164 18.180 57,521.52 P-P1-001 0.0501%
P1.01.01.77.012 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 696 18.180 12,653.28 P-P1-001 0.0110%

KHF-00-101983-FA-5804-0001-0000-02 Page 31 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

P1.01.01.77.026 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. >13mm to 20mm;Joint-BW Inch Dia 4470 29.890 133,608.30 P-P1-001 0.1164%
P1.01.01.77.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 548 18.180 9,962.64 P-P1-001 0.0087%
P1.01.01.78 Pipe Material : CS (Refractory Lined) (NACE)
P1.01.01.78.012 C.OM.JYK.DF.00.332.SGO Size >20" to 30";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 432 11.710 5,058.72 P-P1-003 0.0044%
P1.01.01.78.021 C.OM.JYK.DF.00.332.SGO Size >40";Thk. >10mm to 13mm;Joint-BW Inch Dia 2478 13.750 34,072.50 P-P1-003 0.0297%
P1.01.01.79 Pipe Material : CS (HDPE Lined) (NACE)
P1.01.01.79.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 7195 11.710 84,253.45 P-P1-003 0.0734%
P1.01.01.79.003 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. upto 6.5mm;Joint-BW Inch Dia 5020 11.710 58,784.20 P-P1-003 0.0512%
P1.01.01.79.011 C.OM.JYK.DF.00.332.SGO Size >12" to 20";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 1156 11.710 13,536.76 P-P1-003 0.0118%
P1.01.01.79.009 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 1506 11.710 17,635.26 P-P1-003 0.0154%
P1.01.01.79.010 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 1540 11.710 18,033.40 P-P1-003 0.0157%
P1.01.01.88 Pipe Material : Titanium
P1.01.01.88.001 C.OM.JYK.DF.00.332.SGO Size <2";Thk. upto 6.5mm;Joint-BW Inch Dia 23 48.340 1,111.82 P-P1-001 0.0010%
P1.01.01.88.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 129 48.340 6,235.86 P-P1-001 0.0054%
P1.01.02 Service : Under Ground
P1.01.02.01 Pipe Material : CS
P1.01.02.01.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 36 9.340 336.24 P-P1-001 0.0003%
P1.01.02.01.001 C.OM.JYK.DF.00.332.SGO Size <2";Thk. upto 6.5mm;Joint-BW Inch Dia 2.5 9.340 23.35 P-P1-001 0.0000%
P1.01.02.04 Pipe Material : CS (NACE)
P1.01.02.04.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 260 9.560 2,485.60 P-P1-001 0.0022%
P1.01.02.04.009 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 18 9.560 172.08 P-P1-001 0.0001%
P1.01.02.04.016 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >10mm to 13mm;Joint-BW Inch Dia 88 11.190 984.72 P-P1-001 0.0009%
P1.01.02.24 Pipe Material : LTCS (NACE)
P1.01.02.24.016 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >10mm to 13mm;Joint-BW Inch Dia 70 14.510 1,015.70 P-P1-001 0.0009%
P1.01.02.44 Pipe Material : ALLOY825 (NACE)
P1.01.02.44.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 24 18.660 447.84 P-P1-001 0.0004%
P1.01.02.54 Pipe Material : SS316L (NACE)
P1.01.02.54.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 350 16.440 5,754.00 P-P1-001 0.0050%
P1.01.02.70 Pipe Material : SS316 (NACE)
P1.01.02.70.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 158 16.440 2,597.52 P-P1-001 0.0023%
P1.01.02.70.003 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. upto 6.5mm;Joint-BW Inch Dia 32 16.440 526.08 P-P1-001 0.0005%
P1.01.02.73 Pipe Material : Duplex SS (NACE)
P1.01.02.73.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 36 22.090 795.24 P-P1-001 0.0007%
P1.01.02.79 Pipe Material : CS (HDPE Lined) (NACE)
P1.01.02.79.002 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. upto 6.5mm;Joint-BW Inch Dia 150 11.190 1,678.50 P-P1-003 0.0015%
P1.01.02.79.009 C.OM.JYK.DF.00.332.SGO Size 2" to 6";Thk. >6.5mm to 10mm;Joint-BW Inch Dia 2046 11.190 22,894.74 P-P1-003 0.0200%
P1.01.02.79.003 C.OM.JYK.DF.00.332.SGO Size >6" to 12";Thk. upto 6.5mm;Joint-BW Inch Dia 344 11.190 3,849.36 P-P1-003 0.0034%
P1.02 Erection of Pipe
P1.02.01 Service : Above Ground
P1.02.01.01 Pipe Material : CS
6.760 P-P1-001 0.0107%
P1.02.01.01.001 C.OM.JYK.DF.00.332.SGMB Size <2";Thk. upto 6.5mm Inch Meter 1816.4 12,278.86

6.760 P-P1-001 0.2965%


P1.02.01.01.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 50323.11 340,184.22

6.760 P-P1-001 0.1093%


P1.02.01.01.003 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. upto 6.5mm Inch Meter 18559.68 125,463.44

6.760 P-P1-001 0.1396%


P1.02.01.01.009 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >6.5mm to 10mm Inch Meter 23695.57 160,182.05

KHF-00-101983-FA-5804-0001-0000-02 Page 32 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage
P1.02.01.01.009 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >6.5mm to 10mm Inch Meter 23695.57 160,182.05

6.760 P-P1-001 0.0217%


P1.02.01.01.010 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >6.5mm to 10mm Inch Meter 3683.24 24,898.70

6.760 P-P1-001 0.4020%


P1.02.01.01.011 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >6.5mm to 10mm Inch Meter 68233.54 461,258.73

6.760 P-P1-001 0.0690%


P1.02.01.01.012 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. >6.5mm to 10mm Inch Meter 11717.68 79,211.52

6.760 P-P1-001 0.1533%


P1.02.01.01.013 C.OM.JYK.DF.00.332.SGMB Size >30" to 40";Thk. >6.5mm to 10mm Inch Meter 26023.21 175,916.90

6.760 P-P1-001 0.0368%


P1.02.01.01.018 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >10mm to 13mm Inch Meter 6249.35 42,245.61

6.760 P-P1-001 0.0134%


P1.02.01.01.020 C.OM.JYK.DF.00.332.SGMB Size >30" to 40";Thk. >10mm to 13mm Inch Meter 2281.39 15,422.20

6.760 P-P1-001 0.0315%


P1.02.01.01.021 C.OM.JYK.DF.00.332.SGMB Size >40";Thk. >10mm to 13mm Inch Meter 5352.65 36,183.91

6.760 P-P1-001 0.0127%


P1.02.01.01.024 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >13mm to 20mm Inch Meter 2154.22 14,562.53

6.760 P-P1-001 0.0218%


P1.02.01.01.032 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >20mm to 30mm Inch Meter 3707.65 25,063.71

6.760 P-P1-001 0.0195%


P1.02.01.01.016 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >10mm to 13mm Inch Meter 3303.15 22,329.29

6.760 P-P1-001 0.0168%


P1.02.01.01.017 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >10mm to 13mm Inch Meter 2847.9 19,251.80

6.760 P-P1-001 0.0006%


P1.02.01.01.025 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >13mm to 20mm Inch Meter 96.13 649.84

6.760 P-P1-001 0.0014%


P1.02.01.01.026 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. >13mm to 20mm Inch Meter 240 1,622.40

6.760 P-P1-001 0.0005%


P1.02.01.01.113 C.OM.JYK.DF.00.332.SGMB Size <2";Thk. upto 6.5mm Inch Meter 80 540.80

6.760 P-P1-001 0.2087%


P1.02.01.04.009 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >6.5mm to 10mm Inch Meter 35419.3 239,434.47

6.760 P-P1-001 0.0240%


P1.02.01.04.016 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >10mm to 13mm Inch Meter 4070.74 27,518.20

6.760 P-P1-001 0.0773%


P1.02.01.04.017 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >10mm to 13mm Inch Meter 13114.05 88,650.98

6.760 P-P1-001 0.0574%


P1.02.01.04.003 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. upto 6.5mm Inch Meter 9745.38 65,878.77

6.760 P-P1-001 0.2176%


P1.02.01.04.010 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >6.5mm to 10mm Inch Meter 36936.74 249,692.36

6.760 P-P1-001 0.0516%


P1.02.01.04.018 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >10mm to 13mm Inch Meter 8750.63 59,154.26

6.760 P-P1-001 0.2199%


P1.02.01.04.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 37326.27 252,325.59

6.760 P-P1-001 0.1021%


P1.02.01.04.011 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >6.5mm to 10mm Inch Meter 17323.26 117,105.24

6.760 P-P1-001 0.0685%


P1.02.01.04.012 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. >6.5mm to 10mm Inch Meter 11625.79 78,590.34

KHF-00-101983-FA-5804-0001-0000-02 Page 33 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

6.760 P-P1-001 0.0009%


P1.02.01.04.019 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. >10mm to 13mm Inch Meter 150 1,014.00

6.760 P-P1-001 0.0049%


P1.02.01.04.023 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >13mm to 20mm Inch Meter 826.17 5,584.91

6.760 P-P1-001 0.0165%


P1.02.01.04.024 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >13mm to 20mm Inch Meter 2797.93 18,914.01

6.760 P-P1-001 0.0368%


P1.02.01.04.025 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >13mm to 20mm Inch Meter 6250.04 42,250.27

6.760 P-P1-001 0.1729%


P1.02.01.04.026 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. >13mm to 20mm Inch Meter 29354.04 198,433.31

6.760 P-P1-001 0.1636%


P1.02.01.04.028 C.OM.JYK.DF.00.332.SGMB Size >40";Thk. >13mm to 20mm Inch Meter 27764.59 187,688.63

6.760 P-P1-001 0.0556%


P1.02.01.04.032 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >20mm to 30mm Inch Meter 9445.93 63,854.49

6.760 P-P1-001 0.0115%


P1.02.01.04.031 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >20mm to 30mm Inch Meter 1947.67 13,166.25

6.760 P-P1-001 0.0243%


P1.02.01.04.021 C.OM.JYK.DF.00.332.SGMB Size >40";Thk. >10mm to 13mm Inch Meter 4124.57 27,882.09

6.760 P-P1-001 0.0100%


P1.02.01.04.027 C.OM.JYK.DF.00.332.SGMB Size >30" to 40";Thk. >13mm to 20mm Inch Meter 1702.54 11,509.17

6.760 P-P1-001 0.0348%


P1.02.01.04.013 C.OM.JYK.DF.00.332.SGMB Size >30" to 40";Thk. >6.5mm to 10mm Inch Meter 5900.36 39,886.43

P1.02.01.14 Pipe Material : CS (FBE Lined)


57.400 P-P1-003 0.0023%
P1.02.01.14.009 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >6.5mm to 10mm Inch Meter 46.8 2,686.32

P1.02.01.23 Pipe Material : LTCS


6.760 P-P1-001 0.0038%
P1.02.01.23.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 653.2 4,415.63

6.760 P-P1-001 0.0014%


P1.02.01.23.009 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >6.5mm to 10mm Inch Meter 235.6 1,592.66

P1.02.01.24 Pipe Material : LTCS (NACE)


6.760 P-P1-001 0.0062%
P1.02.01.24.009 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >6.5mm to 10mm Inch Meter 1048.99 7,091.17

6.760 P-P1-001 0.0542%


P1.02.01.24.016 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >10mm to 13mm Inch Meter 9195.48 62,161.44

6.760 P-P1-001 0.0477%


P1.02.01.24.017 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >10mm to 13mm Inch Meter 8089.03 54,681.84

6.760 P-P1-001 0.2115%


P1.02.01.24.018 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >10mm to 13mm Inch Meter 35892.32 242,632.08

6.760 P-P1-001 0.0013%


P1.02.01.24.019 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. >10mm to 13mm Inch Meter 220 1,487.20

6.760 P-P1-001 0.0004%


P1.02.01.24.023 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >13mm to 20mm Inch Meter 60 405.60

6.760 P-P1-001 0.0812%


P1.02.01.24.027 C.OM.JYK.DF.00.332.SGMB Size >30" to 40";Thk. >13mm to 20mm Inch Meter 13784.46 93,182.95

6.760 P-P1-001 0.0154%


P1.02.01.24.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 2615.72 17,682.27

KHF-00-101983-FA-5804-0001-0000-02 Page 34 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

6.760 P-P1-001 0.0098%


P1.02.01.24.010 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >6.5mm to 10mm Inch Meter 1671.79 11,301.30

6.760 P-P1-001 0.0159%


P1.02.01.24.011 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >6.5mm to 10mm Inch Meter 2706.42 18,295.40

6.760 P-P1-001 0.0106%


P1.02.01.24.025 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >13mm to 20mm Inch Meter 1804.44 12,198.01

6.760 P-P1-001 0.0007%


P1.02.01.24.024 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >13mm to 20mm Inch Meter 111.37 752.86

6.760 P-P1-001 0.2039%


P1.02.01.24.026 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. >13mm to 20mm Inch Meter 34613.37 233,986.38

6.760 P-P1-001 0.0008%


P1.02.01.24.035 C.OM.JYK.DF.00.332.SGMB Size >40";Thk. >20mm to 30mm Inch Meter 144 973.44

6.760 P-P1-001 0.1155%


P1.02.01.24.028 C.OM.JYK.DF.00.332.SGMB Size >40";Thk. >13mm to 20mm Inch Meter 19598.08 132,483.02

6.760 P-P1-001 0.0052%


P1.02.01.24.003 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. upto 6.5mm Inch Meter 876.48 5,925.00

P1.02.01.35 Pipe Material : LTCS (825 Clad) (NACE)


10.190 P-P1-001 0.0049%
P1.02.01.35.003 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. upto 6.5mm Inch Meter 554.75 5,652.90

10.190 P-P1-001 0.0001%


P1.02.01.35.009 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >6.5mm to 10mm Inch Meter 13.2 134.51

10.190 P-P1-001 0.0203%


P1.02.01.35.033 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. >20mm to 30mm Inch Meter 2291.28 23,348.14

10.190 P-P1-001 0.0207%


P1.02.01.35.024 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >13mm to 20mm Inch Meter 2329.61 23,738.73

10.190 P-P1-001 0.0379%


P1.02.01.35.025 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >13mm to 20mm Inch Meter 4262.05 43,430.29

P1.02.01.37 Pipe Material : ALLOYB2


10.190 P-P1-001 0.0024%
P1.02.01.37.001 C.OM.JYK.DF.00.332.SGMB Size <2";Thk. upto 6.5mm Inch Meter 267 2,720.73

10.190 P-P1-001 0.0344%


P1.02.01.37.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 3872.97 39,465.56

P1.02.01.44 Pipe Material : ALLOY825 (NACE)


10.190 P-P1-001 0.1887%
P1.02.01.44.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 21250.68 216,544.43

P1.02.01.47 Pipe Material : AS 1.25Cr 0.5Mo


10.190 P-P1-001 0.0018%
P1.02.01.47.009 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >6.5mm to 10mm Inch Meter 206.68 2,106.07

10.190 P-P1-001 0.0060%


P1.02.01.47.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 671 6,837.49

10.190 P-P1-001 0.0005%


P1.02.01.47.010 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >6.5mm to 10mm Inch Meter 52.05 530.39

10.190 P-P1-001 0.0318%


P1.02.01.47.018 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >10mm to 13mm Inch Meter 3578.58 36,465.73

P1.02.01.48 Pipe Material : AS 2.25Cr 1Mo


10.190 P-P1-001 0.0001%
P1.02.01.48.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 9.4 95.79

KHF-00-101983-FA-5804-0001-0000-02 Page 35 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

10.190 P-P1-001 0.0147%


P1.02.01.48.032 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >20mm to 30mm Inch Meter 1655.6 16,870.56

10.190 P-P1-001 0.0011%


P1.02.01.48.016 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >10mm to 13mm Inch Meter 126.5 1,289.04

10.190 P-P1-001 0.0003%


P1.02.01.48.040 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. >30mm to 40mm Inch Meter 31.19 317.83

P1.02.01.52 Pipe Material : SS316


9.220 P-P1-001 0.0579%
P1.02.01.52.001 C.OM.JYK.DF.00.332.SGMB Size <2";Thk. upto 6.5mm Inch Meter 7210 66,476.20

9.220 P-P1-001 0.1793%


P1.02.01.52.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 22313.34 205,728.99

9.220 P-P1-001 0.0076%


P1.02.01.52.003 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. upto 6.5mm Inch Meter 947.94 8,740.01

P1.02.01.54 Pipe Material : SS316L (NACE)


9.220 P-P1-001 0.1280%
P1.02.01.54.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 15924.63 146,825.09

9.220 P-P1-001 0.0467%


P1.02.01.54.003 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. upto 6.5mm Inch Meter 5815.37 53,617.71

9.220 P-P1-001 0.0757%


P1.02.01.54.004 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. upto 6.5mm Inch Meter 9426.73 86,914.45

9.220 P-P1-001 0.0029%


P1.02.01.54.009 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >6.5mm to 10mm Inch Meter 358.01 3,300.85

9.220 P-P1-001 0.0182%


P1.02.01.54.010 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >6.5mm to 10mm Inch Meter 2269.42 20,924.05

9.220 P-P1-001 0.0006%


P1.02.01.54.011 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >6.5mm to 10mm Inch Meter 70 645.40

9.220 P-P1-001 0.0269%


P1.02.01.54.012 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. >6.5mm to 10mm Inch Meter 3350.49 30,891.52

9.220 P-P1-001 0.0079%


P1.02.01.54.013 C.OM.JYK.DF.00.332.SGMB Size >30" to 40";Thk. >6.5mm to 10mm Inch Meter 986.55 9,095.99

9.220 P-P1-001 0.0013%


P1.02.01.54.016 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >10mm to 13mm Inch Meter 167.26 1,542.14

9.220 P-P1-001 0.0025%


P1.02.01.54.017 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >10mm to 13mm Inch Meter 310.72 2,864.84

9.220 P-P1-001 0.0005%


P1.02.01.54.024 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >13mm to 20mm Inch Meter 60 553.20

9.220 P-P1-001 0.0510%


P1.02.01.54.005 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. upto 6.5mm Inch Meter 6341.16 58,465.50

9.220 P-P1-001 0.0143%


P1.02.01.54.025 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >13mm to 20mm Inch Meter 1775.75 16,372.42

9.220 P-P1-001 0.0206%


P1.02.01.54.018 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >10mm to 13mm Inch Meter 2561.36 23,615.74

9.220 P-P1-001 0.0356%


P1.02.01.54.021 C.OM.JYK.DF.00.332.SGMB Size >40";Thk. >10mm to 13mm Inch Meter 4429.78 40,842.57

9.220 P-P1-001 0.0097%


P1.02.01.54.026 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. >13mm to 20mm Inch Meter 1208.98 11,146.80

P1.02.01.62 Pipe Material : SS321

KHF-00-101983-FA-5804-0001-0000-02 Page 36 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

9.220 P-P1-001 0.0002%


P1.02.01.62.003 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. upto 6.5mm Inch Meter 18.91 174.35

9.220 P-P1-001 0.0003%


P1.02.01.62.019 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. >10mm to 13mm Inch Meter 40.8 376.18

P1.02.01.70 Pipe Material : SS316 (NACE)


9.220 P-P1-001 0.0009%
P1.02.01.70.001 C.OM.JYK.DF.00.332.SGMB Size <2";Thk. upto 6.5mm Inch Meter 106.8 984.70

9.220 P-P1-001 0.2613%


P1.02.01.70.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 32524.52 299,876.07

9.220 P-P1-001 0.0003%


P1.02.01.70.016 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >10mm to 13mm Inch Meter 42.84 394.98

9.220 P-P1-001 0.0553%


P1.02.01.70.003 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. upto 6.5mm Inch Meter 6877.3 63,408.71

9.220 P-P1-001 0.0074%


P1.02.01.70.004 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. upto 6.5mm Inch Meter 918.32 8,466.91

9.220 P-P1-001 0.0015%


P1.02.01.70.009 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >6.5mm to 10mm Inch Meter 180.77 1,666.70

9.220 P-P1-001 0.0067%


P1.02.01.70.010 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >6.5mm to 10mm Inch Meter 837 7,717.14

9.220 P-P1-001 0.0010%


P1.02.01.70.018 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >10mm to 13mm Inch Meter 122.21 1,126.78

9.220 P-P1-001 0.0098%


P1.02.01.70.026 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. >13mm to 20mm Inch Meter 1216.34 11,214.65

9.220 P-P1-001 0.0055%


P1.02.01.70.012 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. >6.5mm to 10mm Inch Meter 689.49 6,357.10

9.220 P-P1-001 0.0056%


P1.02.01.70.013 C.OM.JYK.DF.00.332.SGMB Size >30" to 40";Thk. >6.5mm to 10mm Inch Meter 703.1 6,482.58

9.220 P-P1-001 0.0010%


P1.02.01.70.005 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. upto 6.5mm Inch Meter 120 1,106.40

P1.02.01.73 Pipe Material : Duplex SS (NACE)


14.870 P-P1-001 0.0028%
P1.02.01.73.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 217.85 3,239.43

14.870 P-P1-001 0.0003%


P1.02.01.73.003 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. upto 6.5mm Inch Meter 25.44 378.29

P1.02.01.75 Pipe Material : Super Duplex SS (NACE)


14.870 P-P1-001 0.0065%
P1.02.01.75.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 504.45 7,501.17

14.870 P-P1-001 0.0045%


P1.02.01.75.003 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. upto 6.5mm Inch Meter 347.66 5,169.70

P1.02.01.77 Pipe Material : CS (825 Clad)


10.070 P-P1-001 0.0555%
P1.02.01.77.003 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. upto 6.5mm Inch Meter 6328.72 63,730.21

10.070 P-P1-001 0.0003%


P1.02.01.77.009 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >6.5mm to 10mm Inch Meter 36.91 371.68

10.070 P-P1-001 0.0013%


P1.02.01.77.010 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >6.5mm to 10mm Inch Meter 147.32 1,483.51

10.070 P-P1-001 0.0349%


P1.02.01.77.017 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >10mm to 13mm Inch Meter 3972.83 40,006.40

KHF-00-101983-FA-5804-0001-0000-02 Page 37 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage
P1.02.01.77.017 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >10mm to 13mm Inch Meter 3972.83 40,006.40

10.070 P-P1-001 0.0405%


P1.02.01.77.011 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >6.5mm to 10mm Inch Meter 4614.06 46,463.58

10.070 P-P1-001 0.0049%


P1.02.01.77.012 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. >6.5mm to 10mm Inch Meter 556.01 5,599.02

10.070 P-P1-001 0.0968%


P1.02.01.77.026 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. >13mm to 20mm Inch Meter 11029.72 111,069.28

10.070 P-P1-001 0.0093%


P1.02.01.77.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 1059.94 10,673.60

P1.02.01.78 Pipe Material : CS (Refractory Lined) (NACE)


24.700 P-P1-003 0.0119%
P1.02.01.78.012 C.OM.JYK.DF.00.332.SGMB Size >20" to 30";Thk. >6.5mm to 10mm Inch Meter 554.53 13,696.89

24.700 P-P1-003 0.1597%


P1.02.01.78.021 C.OM.JYK.DF.00.332.SGMB Size >40";Thk. >10mm to 13mm Inch Meter 7418.47 183,236.21

P1.02.01.79 Pipe Material : CS (HDPE Lined) (NACE)


31.290 P-P1-003 0.1341%
P1.02.01.79.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 4918.78 153,908.63

27.290 P-P1-003 0.1636%


P1.02.01.79.003 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. upto 6.5mm Inch Meter 6878.24 187,707.17

39.700 P-P1-003 0.0419%


P1.02.01.79.011 C.OM.JYK.DF.00.332.SGMB Size >12" to 20";Thk. >6.5mm to 10mm Inch Meter 1209.98 48,036.21

35.910 P-P1-003 0.1243%


P1.02.01.79.009 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >6.5mm to 10mm Inch Meter 3972.01 142,634.88

31.980 P-P1-003 0.1007%


P1.02.01.79.010 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. >6.5mm to 10mm Inch Meter 3612.2 115,518.16

P1.02.01.88 Pipe Material : Titanium


16.440 P-P1-001 0.0011%
P1.02.01.88.001 C.OM.JYK.DF.00.332.SGMB Size <2";Thk. upto 6.5mm Inch Meter 80 1,315.20

16.440 P-P1-001 0.0009%


P1.02.01.88.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 65 1,068.60

P1.02.02 Service : Under Ground


P1.02.02.01 Pipe Material : CS
6.620 P-P1-001 0.0001%
P1.02.02.01.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 20 132.40

6.620 P-P1-001 0.0000%


P1.02.02.01.001 C.OM.JYK.DF.00.332.SGMB Size <2";Thk. upto 6.5mm Inch Meter 5 33.10

P1.02.02.04 Pipe Material : CS (NACE)


6.620 P-P1-001 0.0030%
P1.02.02.04.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 516.98 3,422.41

6.620 P-P1-001 0.0005%


P1.02.02.04.009 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >6.5mm to 10mm Inch Meter 93.5 618.97

6.620 P-P1-001 0.0001%


P1.02.02.04.016 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >10mm to 13mm Inch Meter 10.64 70.44

P1.02.02.24 Pipe Material : LTCS (NACE)


6.620 P-P1-001 0.0002%
P1.02.02.24.016 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >10mm to 13mm Inch Meter 39.34 260.43

P1.02.02.44 Pipe Material : ALLOY825 (NACE)

KHF-00-101983-FA-5804-0001-0000-02 Page 38 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

11.750 P-P1-001 0.0005%


P1.02.02.44.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 51.33 603.13

P1.02.02.54 Pipe Material : SS316L (NACE)


9.110 P-P1-001 0.0070%
P1.02.02.54.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 876.51 7,985.01

P1.02.02.70 Pipe Material : SS316 (NACE)


9.110 P-P1-001 0.0015%
P1.02.02.70.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 187.2 1,705.39

9.110 P-P1-001 0.0001%


P1.02.02.70.003 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. upto 6.5mm Inch Meter 10.56 96.20

P1.02.02.73 Pipe Material : Duplex SS (NACE)


8.620 P-P1-001 0.0003%
P1.02.02.73.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 43.8 377.56

P1.02.02.79 Pipe Material : CS (HDPE Lined) (NACE)


31.290 P-P1-003 0.0106%
P1.02.02.79.002 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. upto 6.5mm Inch Meter 388.42 12,153.66

33.270 P-P1-003 0.0751%


P1.02.02.79.009 C.OM.JYK.DF.00.332.SGMB Size 2" to 6";Thk. >6.5mm to 10mm Inch Meter 2589.85 86,164.31

27.290 P-P1-003 0.0330%


P1.02.02.79.003 C.OM.JYK.DF.00.332.SGMB Size >6" to 12";Thk. upto 6.5mm Inch Meter 1386.62 37,840.86

P1.03 Fabrication & Erection of Pipe


P1.03.01 Service : Above Ground
P1.03.01.96 Pipe Material : GRP
3.130 P-P1-008 0.1849%
P1.03.01.96.058 C.OM.JYK.DF.00.332.SGMC Size 2" to 6" Inch Meter 67784.02 212,163.98

3.130 P-P1-008 0.0751%


P1.03.01.96.059 C.OM.JYK.DF.00.332.SGMC Size >6" to 12" Inch Meter 27545.16 86,216.35

3.130 P-P1-008 0.0003%


P1.03.01.96.061 C.OM.JYK.DF.00.332.SGMC Size >20" to 30" Inch Meter 98.4 307.99

P1.03.02 Service : Under Ground


P1.03.02.96 Pipe Material : GRP
3.130 P-P1-008 0.0704%
P1.03.02.96.058 C.OM.JYK.DF.00.332.SGMC Size 2" to 6" Inch Meter 25805.27 80,770.50

3.130 P-P1-008 0.3082%


P1.03.02.96.059 C.OM.JYK.DF.00.332.SGMC Size >6" to 12" Inch Meter 112979.38 353,625.46

3.130 P-P1-008 0.0037%


P1.03.02.96.060 C.OM.JYK.DF.00.332.SGMC Size >12" to 20" Inch Meter 1355.16 4,241.65

P1.04 Radiography Testing (RT)


P1.04.001 C.OM.JYK.DF.00.332.SGK Size <2";Thk. upto 10mm Nos. 1153 22.400 25,827.20 P-P1-011 0.0225%
P1.04.002 C.OM.JYK.DF.00.332.SGK Size 2" to 8";Thk. upto 10mm Nos. 12279 22.400 275,049.60 P-P1-011 0.2397%
P1.04.003 C.OM.JYK.DF.00.332.SGK Size >8" to 18";Thk. upto 10mm Nos. 1142 27.200 31,062.40 P-P1-011 0.0271%

KHF-00-101983-FA-5804-0001-0000-02 Page 39 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

P1.04.004 C.OM.JYK.DF.00.332.SGK Size >18" to 30";Thk. upto 10mm Nos. 254 48.360 12,283.44 P-P1-011 0.0107%
P1.04.005 C.OM.JYK.DF.00.332.SGK Size >30" to 40";Thk. upto 10mm Nos. 44 68.620 3,019.28 P-P1-011 0.0026%
P1.04.009 C.OM.JYK.DF.00.332.SGK Size 2" to 8";Thk. >10mm to 20mm Nos. 1250 22.400 28,000.00 P-P1-011 0.0244%
P1.04.010 C.OM.JYK.DF.00.332.SGK Size >8" to 18";Thk. >10mm to 20mm Nos. 481 27.380 13,169.78 P-P1-011 0.0115%
P1.04.011 C.OM.JYK.DF.00.332.SGK Size >18" to 30";Thk. >10mm to 20mm Nos. 321 48.360 15,523.56 P-P1-011 0.0135%
P1.04.012 C.OM.JYK.DF.00.332.SGK Size >30" to 40";Thk. >10mm to 20mm Nos. 40 68.620 2,744.80 P-P1-011 0.0024%
P1.04.013 C.OM.JYK.DF.00.332.SGK Size >40" to 48";Thk. >10mm to 20mm Nos. 82 100.270 8,222.14 P-P1-011 0.0072%
P1.04.017 C.OM.JYK.DF.00.332.SGK Size >8" to 18";Thk. >20mm to 40mm Nos. 65 177.780 11,555.70 P-P1-011 0.0101%
P1.04.018 C.OM.JYK.DF.00.332.SGK Size >18" to 30";Thk. >20mm to 40mm Nos. 25 177.780 4,444.50 P-P1-011 0.0039%
P1.04.014 C.OM.JYK.DF.00.332.SGK Size >48";Thk. >10mm to 20mm Nos. 11 177.780 1,955.58 P-P1-011 0.0017%
P1.05 Post Weld Heat Treatment (PWHT)
P1.05.011 C.OM.JYK.DF.00.332.SGMD Size >12" to 20";Thk. >10mm to 20mm Nos. 194 207.480 40,251.12 P-P1-012 0.0351%
P1.05.017 C.OM.JYK.DF.00.332.SGMD Size >6" to 12";Thk. >20mm to 40mm Nos. 91 115.270 10,489.57 P-P1-012 0.0091%
P1.05.018 C.OM.JYK.DF.00.332.SGMD Size >12" to 20";Thk. >20mm to 40mm Nos. 279 207.480 57,886.92 P-P1-012 0.0504%
P1.05.002 C.OM.JYK.DF.00.332.SGMD Size 2" to 6";Thk. upto 10mm Nos. 8123 49.400 401,276.20 P-P1-012 0.3497%
P1.05.003 C.OM.JYK.DF.00.332.SGMD Size >6" to 12";Thk. upto 10mm Nos. 963 118.570 114,182.91 P-P1-012 0.0995%
P1.05.004 C.OM.JYK.DF.00.332.SGMD Size >12" to 20";Thk. upto 10mm Nos. 202 210.780 42,577.56 P-P1-012 0.0371%
P1.05.005 C.OM.JYK.DF.00.332.SGMD Size >20" to 30";Thk. upto 10mm Nos. 72 322.740 23,237.28 P-P1-012 0.0203%
P1.05.009 C.OM.JYK.DF.00.332.SGMD Size 2" to 6";Thk. >10mm to 20mm Nos. 33 49.400 1,630.20 P-P1-012 0.0014%
P1.05.010 C.OM.JYK.DF.00.332.SGMD Size >6" to 12";Thk. >10mm to 20mm Nos. 229 118.570 27,152.53 P-P1-012 0.0237%
P1.05.012 C.OM.JYK.DF.00.332.SGMD Size >20" to 30";Thk. >10mm to 20mm Nos. 84 329.330 27,663.72 P-P1-012 0.0241%
P1.05.019 C.OM.JYK.DF.00.332.SGMD Size >20" to 30";Thk. >20mm to 40mm Nos. 59 329.330 19,430.47 P-P1-012 0.0169%
P1.05.021 C.OM.JYK.DF.00.332.SGMD Size >40";Thk. >20mm to 40mm Nos. 2 513.760 1,027.52 P-P1-012 0.0009%
P1.05.014 C.OM.JYK.DF.00.332.SGMD Size >40";Thk. >10mm to 20mm Nos. 37 513.760 19,009.12 P-P1-012 0.0166%
P1.06 Pipe Supports
P1.06.001 C.OM.JYK.DF.00.332.SGMA Primary Supports (fabricated from pipe material) MT 127.33 1,164.160 148,232.49 P-P1-013 0.1292%
P1.06.002 C.OM.JYK.DF.00.332.SGMA Primary Supports (fabricated from structural steel) MT 159.34 1,140.720 181,762.32 P-P1-013 0.1584%

P1.06.003 C.OM.JYK.DF.00.332.SGMA Primary Supports (Bougnt out items(Springs Turn Buckle,U-Bolt etc.)) MT 10.308 1,125.090 11,597.43 P-P1-013 0.0101%

P1.07 Supply and Application of Painting


P1.07.01 Pipe Material : Carbon Steel (CS)
P1.07.01.01 Pipe Type : Insulated/non insulated
P1.07.01.01.001 C.OM.JYK.DF.00.332.SGB Up to 100 deg. C M2 48926.11 19.580 957,973.23 P-P1-014 0.8349%
P1.07.01.01.003 C.OM.JYK.DF.00.332.SGB > 200 to 400 deg. C M2 5723.07 20.760 118,810.93 P-P1-014 0.1035%
P1.07.01.01.002 C.OM.JYK.DF.00.332.SGB > 100 to 200 deg. C M2 20279.63 20.760 421,005.12 P-P1-014 0.3669%
P1.07.01.01.004 C.OM.JYK.DF.00.332.SGB Above 400 deg. C M2 191.66 20.420 3,913.70 P-P1-014 0.0034%
C-P1.07.01.01.005 C.OM.JYK.DF.00.332.SGB Up to 70 °C (Buried) M2 157 28.270 4,438.39 P-P1-014 0.0039%
C-P1.07.01.01.006 C.OM.JYK.DF.00.332.SGB More than 70° C (Buried) M2 697.78 40.330 28,141.47 P-P1-014 0.0245%
P1.07.02 Pipe Material : Other than Carbon Steel
P1.07.02.01 Pipe Type : Insulated
Stainless Steel > 50°C ,Duplex Stainless Steel > 80°C,Super Duplex
P1.07.02.01.001 C.OM.JYK.DF.00.332.SGA M2 39924.49 82.120 3,278,599.12 P-P1-014 2.8573%
Stainless Steel > 100°C
P1.08 Supply and Application of Insulation
P1.08.05 Insulation Type : Acoustic And Personnel Protection
P1.08.05.19 Insulation Thickness : 100 mm
P1.08.05.19.014 C.OM.JYK.DF.00.332.SGC Pipe Size 10" M 3.05 57.100 174.16 P-P1-015 0.0002%
P1.08.05.19.015 C.OM.JYK.DF.00.332.SGC Pipe Size 12" M 1.22 62.580 76.35 P-P1-015 0.0001%
P1.08.05.19.016 C.OM.JYK.DF.00.332.SGC Pipe Size 14" M 1.42 65.680 93.27 P-P1-015 0.0001%

KHF-00-101983-FA-5804-0001-0000-02 Page 40 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

P1.08.06 Insulation Type : Cold Conservation


P1.08.06.05 Insulation Thickness : 30 mm
P1.08.06.05.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 12.51 13.820 172.89 P-P1-015 0.0002%
P1.08.06.05.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 1.73 20.020 34.63 P-P1-015 0.0000%
P1.08.06.05.013 C.OM.JYK.DF.00.332.SGC Pipe Size 8" M 5.69 32.060 182.42 P-P1-015 0.0002%
P1.08.06.05.014 C.OM.JYK.DF.00.332.SGC Pipe Size 10" M 3.22 38.260 123.20 P-P1-015 0.0001%
P1.08.06.05.015 C.OM.JYK.DF.00.332.SGC Pipe Size 12" M 4.88 44.090 215.16 P-P1-015 0.0002%
P1.08.06.05.017 C.OM.JYK.DF.00.332.SGC Pipe Size 16" M 12.19 53.580 653.14 P-P1-015 0.0006%
P1.08.06.05.018 C.OM.JYK.DF.00.332.SGC Pipe Size 18" M 2.29 59.410 136.05 P-P1-015 0.0001%
P1.08.06.05.019 C.OM.JYK.DF.00.332.SGC Pipe Size 20" M 36.54 65.260 2,384.60 P-P1-015 0.0021%
P1.08.06.05.021 C.OM.JYK.DF.00.332.SGC Pipe Size 24" M 2.44 76.920 187.68 P-P1-015 0.0002%
P1.08.06.05.024 C.OM.JYK.DF.00.332.SGC Pipe Size 30" M 19.05 94.430 1,798.89 P-P1-015 0.0016%
P1.08.06.04 Insulation Thickness : 25 mm
P1.08.06.04.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 29.64 11.940 353.90 P-P1-015 0.0003%
P1.08.06.04.009 C.OM.JYK.DF.00.332.SGC Pipe Size 3" M 6.96 15.040 104.68 P-P1-015 0.0001%
P1.08.06.04.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 0.51 17.790 9.07 P-P1-015 0.0000%
P1.08.06.07 Insulation Thickness : 40 mm
P1.08.06.07.013 C.OM.JYK.DF.00.332.SGC Pipe Size 8" M 129.53 36.340 4,707.12 P-P1-015 0.0041%
P1.08.06.07.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 18.13 23.610 428.05 P-P1-015 0.0004%
P1.08.06.07.015 C.OM.JYK.DF.00.332.SGC Pipe Size 12" M 117.21 49.060 5,750.32 P-P1-015 0.0050%
P1.08.06.11 Insulation Thickness : 60 mm
P1.08.06.11.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 3.14 34.160 107.26 P-P1-015 0.0001%
P1.08.06.08 Insulation Thickness : 45 mm
P1.08.06.08.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 5.61 19.260 108.05 P-P1-015 0.0001%
P1.08.06.08.009 C.OM.JYK.DF.00.332.SGC Pipe Size 3" M 276.52 22.920 6,337.84 P-P1-015 0.0055%
P1.08.06.08.017 C.OM.JYK.DF.00.332.SGC Pipe Size 16" M 92.49 63.600 5,882.36 P-P1-015 0.0051%
P1.08.06.08.019 C.OM.JYK.DF.00.332.SGC Pipe Size 20" M 25.7 76.620 1,969.13 P-P1-015 0.0017%
P1.08.06.08.024 C.OM.JYK.DF.00.332.SGC Pipe Size 30" M 8.33 109.160 909.30 P-P1-015 0.0008%
P1.08.09 Insulation Type : Heat Conservation
P1.08.09.04 Insulation Thickness : 25 mm
P1.08.09.04.004 C.OM.JYK.DF.00.332.SGC Pipe Size 0.75" M 0.19 7.790 1.48 P-P1-015 0.0000%
P1.08.09.04.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 177.64 11.210 1,991.34 P-P1-015 0.0017%
P1.08.09.04.009 C.OM.JYK.DF.00.332.SGC Pipe Size 3" M 0.53 14.120 7.48 P-P1-015 0.0000%
P1.08.09.04.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 0.61 16.700 10.19 P-P1-015 0.0000%
P1.08.09.05 Insulation Thickness : 30 mm
P1.08.09.05.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 4.32 12.490 53.96 P-P1-015 0.0000%
P1.08.09.05.009 C.OM.JYK.DF.00.332.SGC Pipe Size 3" M 134.06 15.460 2,072.57 P-P1-015 0.0018%
P1.08.09.05.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 30.37 18.100 549.70 P-P1-015 0.0005%
P1.08.09.05.012 C.OM.JYK.DF.00.332.SGC Pipe Size 6" M 221.68 23.700 5,253.82 P-P1-015 0.0046%
P1.08.09.05.013 C.OM.JYK.DF.00.332.SGC Pipe Size 8" M 6.44 28.980 186.63 P-P1-015 0.0002%
P1.08.09.05.004 C.OM.JYK.DF.00.332.SGC Pipe Size 0.75" M 0.19 9.000 1.71 P-P1-015 0.0000%
P1.08.09.05.006 C.OM.JYK.DF.00.332.SGC Pipe Size 1.5" M 0.34 11.240 3.82 P-P1-015 0.0000%
P1.08.09.07 Insulation Thickness : 40 mm
P1.08.09.07.004 C.OM.JYK.DF.00.332.SGC Pipe Size 0.75" M 0.29 11.310 3.28 P-P1-015 0.0000%
P1.08.09.07.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 0.2 14.870 2.97 P-P1-015 0.0000%
P1.08.09.07.012 C.OM.JYK.DF.00.332.SGC Pipe Size 6" M 3.05 26.330 80.31 P-P1-015 0.0001%
P1.08.09.07.014 C.OM.JYK.DF.00.332.SGC Pipe Size 10" M 179.41 37.440 6,717.11 P-P1-015 0.0059%

KHF-00-101983-FA-5804-0001-0000-02 Page 41 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

P1.08.09.07.015 C.OM.JYK.DF.00.332.SGC Pipe Size 12" M 0.61 42.830 26.13 P-P1-015 0.0000%
P1.08.09.09 Insulation Thickness : 50 mm
P1.08.09.09.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 687.71 23.680 16,284.97 P-P1-015 0.0142%
P1.08.09.09.014 C.OM.JYK.DF.00.332.SGC Pipe Size 10" M 3.05 41.200 125.66 P-P1-015 0.0001%
P1.08.09.09.003 C.OM.JYK.DF.00.332.SGC Pipe Size 0.5" M 0.61 13.400 8.17 P-P1-015 0.0000%
P1.08.09.09.004 C.OM.JYK.DF.00.332.SGC Pipe Size 0.75" M 3.62 13.990 50.64 P-P1-015 0.0000%
P1.08.09.09.005 C.OM.JYK.DF.00.332.SGC Pipe Size 1" M 0.81 14.730 11.93 P-P1-015 0.0000%
P1.08.09.09.006 C.OM.JYK.DF.00.332.SGC Pipe Size 1.5" M 0.69 16.370 11.30 P-P1-015 0.0000%
P1.08.09.09.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 2042.88 17.710 36,179.40 P-P1-015 0.0315%
P1.08.09.09.009 C.OM.JYK.DF.00.332.SGC Pipe Size 3" M 137.36 20.860 2,865.33 P-P1-015 0.0025%
P1.08.09.09.012 C.OM.JYK.DF.00.332.SGC Pipe Size 6" M 5.64 29.630 167.11 P-P1-015 0.0001%
P1.08.09.09.013 C.OM.JYK.DF.00.332.SGC Pipe Size 8" M 13.21 35.240 465.52 P-P1-015 0.0004%
P1.08.09.09.016 C.OM.JYK.DF.00.332.SGC Pipe Size 14" M 12.8 50.330 644.22 P-P1-015 0.0006%
P1.08.09.09.017 C.OM.JYK.DF.00.332.SGC Pipe Size 16" M 305.06 55.930 17,062.01 P-P1-015 0.0149%
P1.08.09.09.018 C.OM.JYK.DF.00.332.SGC Pipe Size 18" M 78.9 61.540 4,855.51 P-P1-015 0.0042%
P1.08.09.09.019 C.OM.JYK.DF.00.332.SGC Pipe Size 20" M 7.11 67.160 477.51 P-P1-015 0.0004%
P1.08.09.09.021 C.OM.JYK.DF.00.332.SGC Pipe Size 24" M 6.71 78.380 525.93 P-P1-015 0.0005%
P1.08.09.11 Insulation Thickness : 60 mm
P1.08.09.11.012 C.OM.JYK.DF.00.332.SGC Pipe Size 6" M 1230.2 33.110 40,731.92 P-P1-015 0.0355%
P1.08.09.11.015 C.OM.JYK.DF.00.332.SGC Pipe Size 12" M 112.8 50.980 5,750.54 P-P1-015 0.0050%
P1.08.09.11.016 C.OM.JYK.DF.00.332.SGC Pipe Size 14" M 2.49 54.630 136.03 P-P1-015 0.0001%
P1.08.09.11.014 C.OM.JYK.DF.00.332.SGC Pipe Size 10" M 76.24 45.150 3,442.24 P-P1-015 0.0030%
P1.08.09.11.005 C.OM.JYK.DF.00.332.SGC Pipe Size 1" M 0.43 17.620 7.58 P-P1-015 0.0000%
P1.08.09.11.006 C.OM.JYK.DF.00.332.SGC Pipe Size 1.5" M 0.61 19.330 11.79 P-P1-015 0.0000%
P1.08.09.11.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 24.47 26.920 658.73 P-P1-015 0.0006%
P1.08.09.11.013 C.OM.JYK.DF.00.332.SGC Pipe Size 8" M 658.51 38.960 25,655.55 P-P1-015 0.0224%
P1.08.09.11.017 C.OM.JYK.DF.00.332.SGC Pipe Size 16" M 2.03 60.470 122.75 P-P1-015 0.0001%
P1.08.09.11.018 C.OM.JYK.DF.00.332.SGC Pipe Size 18" M 5.94 66.310 393.88 P-P1-015 0.0003%
P1.08.09.11.021 C.OM.JYK.DF.00.332.SGC Pipe Size 24" M 5.49 83.820 460.17 P-P1-015 0.0004%
P1.08.09.11.023 C.OM.JYK.DF.00.332.SGC Pipe Size 28" M 1.42 95.480 135.58 P-P1-015 0.0001%
P1.08.09.11.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 121.93 20.720 2,526.39 P-P1-015 0.0022%
P1.08.09.11.004 C.OM.JYK.DF.00.332.SGC Pipe Size 0.75" M 1.36 16.850 22.92 P-P1-015 0.0000%
P1.08.09.11.009 C.OM.JYK.DF.00.332.SGC Pipe Size 3" M 33.95 24.000 814.80 P-P1-015 0.0007%
P1.08.09.11.011 C.OM.JYK.DF.00.332.SGC Pipe Size 5" M 0.76 30.010 22.81 P-P1-015 0.0000%
P1.08.09.13 Insulation Thickness : 70 mm
P1.08.09.13.017 C.OM.JYK.DF.00.332.SGC Pipe Size 16" M 99.22 66.390 6,587.22 P-P1-015 0.0057%
P1.08.09.13.019 C.OM.JYK.DF.00.332.SGC Pipe Size 20" M 592.03 78.730 46,610.52 P-P1-015 0.0406%
P1.08.09.13.003 C.OM.JYK.DF.00.332.SGC Pipe Size 0.5" M 0.13 19.600 2.55 P-P1-015 0.0000%
P1.08.09.13.004 C.OM.JYK.DF.00.332.SGC Pipe Size 0.75" M 0.19 20.260 3.85 P-P1-015 0.0000%
P1.08.09.13.005 C.OM.JYK.DF.00.332.SGC Pipe Size 1" M 0.69 21.070 14.54 P-P1-015 0.0000%
P1.08.09.13.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 7.2 24.340 175.25 P-P1-015 0.0002%
P1.08.09.13.009 C.OM.JYK.DF.00.332.SGC Pipe Size 3" M 0.3 27.810 8.34 P-P1-015 0.0000%
P1.08.09.13.014 C.OM.JYK.DF.00.332.SGC Pipe Size 10" M 0.51 50.190 25.60 P-P1-015 0.0000%
P1.08.09.13.015 C.OM.JYK.DF.00.332.SGC Pipe Size 12" M 4.88 56.350 274.99 P-P1-015 0.0002%
P1.08.09.13.016 C.OM.JYK.DF.00.332.SGC Pipe Size 14" M 89.11 60.220 5,366.20 P-P1-015 0.0047%
P1.08.09.13.018 C.OM.JYK.DF.00.332.SGC Pipe Size 18" M 22.4 72.560 1,625.34 P-P1-015 0.0014%
P1.08.09.13.021 C.OM.JYK.DF.00.332.SGC Pipe Size 24" M 49.64 91.080 4,521.21 P-P1-015 0.0039%

KHF-00-101983-FA-5804-0001-0000-02 Page 42 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

P1.08.09.13.023 C.OM.JYK.DF.00.332.SGC Pipe Size 28" M 1.42 103.430 146.87 P-P1-015 0.0001%
P1.08.09.13.024 C.OM.JYK.DF.00.332.SGC Pipe Size 30" M 14.47 109.600 1,585.91 P-P1-015 0.0014%
P1.08.09.13.027 C.OM.JYK.DF.00.332.SGC Pipe Size 36" M 5.49 128.110 703.32 P-P1-015 0.0006%
P1.08.09.13.033 C.OM.JYK.DF.00.332.SGC Pipe Size 48" M 101.81 165.150 16,813.92 P-P1-015 0.0147%
P1.08.09.15 Insulation Thickness : 80 mm
P1.08.09.15.012 C.OM.JYK.DF.00.332.SGC Pipe Size 6" M 66.03 42.050 2,776.56 P-P1-015 0.0024%
P1.08.09.15.013 C.OM.JYK.DF.00.332.SGC Pipe Size 8" M 259.78 48.570 12,617.51 P-P1-015 0.0110%
P1.08.09.15.014 C.OM.JYK.DF.00.332.SGC Pipe Size 10" M 302.3 55.480 16,771.60 P-P1-015 0.0146%
P1.08.09.15.015 C.OM.JYK.DF.00.332.SGC Pipe Size 12" M 21.64 61.990 1,341.46 P-P1-015 0.0012%
P1.08.09.15.017 C.OM.JYK.DF.00.332.SGC Pipe Size 16" M 284.36 72.570 20,636.01 P-P1-015 0.0180%
P1.08.09.15.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 70.08 28.230 1,978.36 P-P1-015 0.0017%
P1.08.09.15.004 C.OM.JYK.DF.00.332.SGC Pipe Size 0.75" M 1.94 23.920 46.40 P-P1-015 0.0000%
P1.08.09.15.009 C.OM.JYK.DF.00.332.SGC Pipe Size 3" M 0.3 31.890 9.57 P-P1-015 0.0000%
P1.08.09.15.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 2.84 35.140 99.80 P-P1-015 0.0001%
P1.08.09.15.016 C.OM.JYK.DF.00.332.SGC Pipe Size 14" M 14.93 66.070 986.43 P-P1-015 0.0009%
P1.08.09.15.018 C.OM.JYK.DF.00.332.SGC Pipe Size 18" M 3.66 79.080 289.43 P-P1-015 0.0003%
P1.08.09.15.021 C.OM.JYK.DF.00.332.SGC Pipe Size 24" M 9.75 98.600 961.35 P-P1-015 0.0008%
P1.08.09.17 Insulation Thickness : 90 mm
P1.08.09.17.005 C.OM.JYK.DF.00.332.SGC Pipe Size 1" M 2.16 29.230 63.14 P-P1-015 0.0001%
P1.08.09.17.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 14.35 32.910 472.26 P-P1-015 0.0004%
P1.08.09.17.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 0.81 40.300 32.64 P-P1-015 0.0000%
P1.08.09.17.004 C.OM.JYK.DF.00.332.SGC Pipe Size 0.75" M 1.09 28.300 30.85 P-P1-015 0.0000%
P1.08.09.17.012 C.OM.JYK.DF.00.332.SGC Pipe Size 6" M 0.6 47.700 28.62 P-P1-015 0.0000%
P1.08.09.17.013 C.OM.JYK.DF.00.332.SGC Pipe Size 8" M 34.95 54.660 1,910.37 P-P1-015 0.0017%
P1.08.09.17.014 C.OM.JYK.DF.00.332.SGC Pipe Size 10" M 0.76 62.060 47.17 P-P1-015 0.0000%
P1.08.09.17.017 C.OM.JYK.DF.00.332.SGC Pipe Size 16" M 30.08 80.310 2,415.72 P-P1-015 0.0021%
P1.08.09.17.019 C.OM.JYK.DF.00.332.SGC Pipe Size 20" M 16.26 94.230 1,532.18 P-P1-015 0.0013%
P1.08.09.17.021 C.OM.JYK.DF.00.332.SGC Pipe Size 24" M 108.6 108.150 11,745.09 P-P1-015 0.0102%
P1.08.09.17.024 C.OM.JYK.DF.00.332.SGC Pipe Size 30" M 53.34 129.020 6,881.93 P-P1-015 0.0060%
P1.08.09.17.018 C.OM.JYK.DF.00.332.SGC Pipe Size 18" M 162.06 87.280 14,144.60 P-P1-015 0.0123%
P1.08.09.17.016 C.OM.JYK.DF.00.332.SGC Pipe Size 14" M 1.07 73.360 78.50 P-P1-015 0.0001%
P1.08.09.17.027 C.OM.JYK.DF.00.332.SGC Pipe Size 36" M 178.53 149.900 26,761.65 P-P1-015 0.0233%
P1.08.09.19 Insulation Thickness : 100 mm
P1.08.09.19.005 C.OM.JYK.DF.00.332.SGC Pipe Size 1" M 2.24 34.040 76.25 P-P1-015 0.0001%
P1.08.09.19.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 0.2 45.830 9.17 P-P1-015 0.0000%
P1.08.09.19.014 C.OM.JYK.DF.00.332.SGC Pipe Size 10" M 0.51 68.970 35.17 P-P1-015 0.0000%
P1.08.09.19.015 C.OM.JYK.DF.00.332.SGC Pipe Size 12" M 5.49 76.370 419.27 P-P1-015 0.0004%
P1.08.09.19.003 C.OM.JYK.DF.00.332.SGC Pipe Size 0.5" M 0.81 32.270 26.14 P-P1-015 0.0000%
P1.08.09.19.016 C.OM.JYK.DF.00.332.SGC Pipe Size 14" M 30.58 81.010 2,477.29 P-P1-015 0.0022%
P1.08.09.19.017 C.OM.JYK.DF.00.332.SGC Pipe Size 16" M 3.25 88.410 287.33 P-P1-015 0.0003%
P1.08.09.19.021 C.OM.JYK.DF.00.332.SGC Pipe Size 24" M 27.68 118.050 3,267.62 P-P1-015 0.0028%
P1.08.09.19.019 C.OM.JYK.DF.00.332.SGC Pipe Size 20" M 162.06 103.230 16,729.45 P-P1-015 0.0146%
P1.08.09.19.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 12.98 37.960 492.72 P-P1-015 0.0004%
P1.08.09.19.018 C.OM.JYK.DF.00.332.SGC Pipe Size 18" M 5.48 95.820 525.09 P-P1-015 0.0005%
P1.08.09.19.027 C.OM.JYK.DF.00.332.SGC Pipe Size 36" M 3.66 162.490 594.71 P-P1-015 0.0005%
P1.08.09.19.024 C.OM.JYK.DF.00.332.SGC Pipe Size 30" M 354.62 140.270 49,742.55 P-P1-015 0.0434%
P1.08.09.23 Insulation Thickness : 120 mm

KHF-00-101983-FA-5804-0001-0000-02 Page 43 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

P1.08.09.23.004 C.OM.JYK.DF.00.332.SGC Pipe Size 0.75" M 0.11 41.830 4.60 P-P1-015 0.0000%
P1.08.09.23.005 C.OM.JYK.DF.00.332.SGC Pipe Size 1" M 1.43 42.880 61.32 P-P1-015 0.0001%
P1.08.09.23.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 32.04 47.100 1,509.08 P-P1-015 0.0013%
P1.08.09.23.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 1.01 55.570 56.13 P-P1-015 0.0000%
P1.08.09.23.012 C.OM.JYK.DF.00.332.SGC Pipe Size 6" M 0.3 64.040 19.21 P-P1-015 0.0000%
P1.08.09.23.013 C.OM.JYK.DF.00.332.SGC Pipe Size 8" M 18.49 72.000 1,331.28 P-P1-015 0.0012%
P1.08.09.23.014 C.OM.JYK.DF.00.332.SGC Pipe Size 10" M 8.38 80.470 674.34 P-P1-015 0.0006%
P1.08.09.23.015 C.OM.JYK.DF.00.332.SGC Pipe Size 12" M 330.54 88.440 29,232.96 P-P1-015 0.0255%
P1.08.09.23.016 C.OM.JYK.DF.00.332.SGC Pipe Size 14" M 43.03 93.420 4,019.86 P-P1-015 0.0035%
P1.08.09.23.017 C.OM.JYK.DF.00.332.SGC Pipe Size 16" M 13.01 101.380 1,318.95 P-P1-015 0.0011%
P1.08.09.23.018 C.OM.JYK.DF.00.332.SGC Pipe Size 18" M 12.8 109.360 1,399.81 P-P1-015 0.0012%
P1.08.09.23.019 C.OM.JYK.DF.00.332.SGC Pipe Size 20" M 14.73 117.320 1,728.12 P-P1-015 0.0015%
P1.08.09.23.021 C.OM.JYK.DF.00.332.SGC Pipe Size 24" M 34.14 133.260 4,549.50 P-P1-015 0.0040%
P1.08.09.23.024 C.OM.JYK.DF.00.332.SGC Pipe Size 30" M 162.3 157.160 25,507.07 P-P1-015 0.0222%
P1.08.09.23.027 C.OM.JYK.DF.00.332.SGC Pipe Size 36" M 149.05 181.060 26,986.99 P-P1-015 0.0235%
P1.08.09.23.030 C.OM.JYK.DF.00.332.SGC Pipe Size 42" M 7.47 204.960 1,531.05 P-P1-015 0.0013%
P1.08.09.23.033 C.OM.JYK.DF.00.332.SGC Pipe Size 48" M 26.82 228.880 6,138.56 P-P1-015 0.0053%
P1.08.09.27 Insulation Thickness : 140 mm
P1.08.09.27.005 C.OM.JYK.DF.00.332.SGC Pipe Size 1" M 0.25 51.240 12.81 P-P1-015 0.0000%
P1.08.09.27.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 9.49 55.640 528.02 P-P1-015 0.0005%
P1.08.09.27.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 0.2 64.460 12.89 P-P1-015 0.0000%
P1.08.09.27.012 C.OM.JYK.DF.00.332.SGC Pipe Size 6" M 0.91 73.290 66.69 P-P1-015 0.0001%
P1.08.09.27.017 C.OM.JYK.DF.00.332.SGC Pipe Size 16" M 158.57 112.200 17,791.55 P-P1-015 0.0155%
P1.08.09.31 Insulation Thickness : 160 mm
P1.08.09.31.017 C.OM.JYK.DF.00.332.SGC Pipe Size 16" M 78.26 125.170 9,795.80 P-P1-015 0.0085%
P1.08.09.31.021 C.OM.JYK.DF.00.332.SGC Pipe Size 24" M 41.39 160.190 6,630.26 P-P1-015 0.0058%
P1.08.11 Insulation Type : Personnel Protection
P1.08.11.04 Insulation Thickness : 25 mm
P1.08.11.04.004 C.OM.JYK.DF.00.332.SGC Pipe Size 0.75" M 2.59 7.790 20.18 P-P1-015 0.0000%
P1.08.11.04.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 523.62 11.210 5,869.78 P-P1-015 0.0051%
P1.08.11.04.012 C.OM.JYK.DF.00.332.SGC Pipe Size 6" M 0.61 22.180 13.53 P-P1-015 0.0000%
P1.08.11.04.013 C.OM.JYK.DF.00.332.SGC Pipe Size 8" M 0.81 27.350 22.15 P-P1-015 0.0000%
P1.08.11.05 Insulation Thickness : 30 mm
P1.08.11.05.009 C.OM.JYK.DF.00.332.SGC Pipe Size 3" M 57.38 15.460 887.09 P-P1-015 0.0008%
P1.08.11.05.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 49.39 18.100 893.96 P-P1-015 0.0008%
P1.08.11.05.012 C.OM.JYK.DF.00.332.SGC Pipe Size 6" M 47.3 23.700 1,121.01 P-P1-015 0.0010%
P1.08.11.05.013 C.OM.JYK.DF.00.332.SGC Pipe Size 8" M 1.62 28.980 46.95 P-P1-015 0.0000%
P1.08.11.05.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 7.43 12.490 92.80 P-P1-015 0.0001%
P1.08.11.07 Insulation Thickness : 40 mm
P1.08.11.07.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 0.56 14.870 8.33 P-P1-015 0.0000%
P1.08.11.07.013 C.OM.JYK.DF.00.332.SGC Pipe Size 8" M 2.44 33.130 80.84 P-P1-015 0.0001%
P1.08.11.07.014 C.OM.JYK.DF.00.332.SGC Pipe Size 10" M 88.39 37.440 3,309.32 P-P1-015 0.0029%
P1.08.11.09 Insulation Thickness : 50 mm
P1.08.11.09.009 C.OM.JYK.DF.00.332.SGC Pipe Size 3" M 12.23 20.860 255.12 P-P1-015 0.0002%
P1.08.11.09.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 297.15 23.680 7,036.51 P-P1-015 0.0061%
P1.08.11.09.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 638.27 17.710 11,303.76 P-P1-015 0.0099%
P1.08.11.09.005 C.OM.JYK.DF.00.332.SGC Pipe Size 1" M 0.15 14.730 2.21 P-P1-015 0.0000%

KHF-00-101983-FA-5804-0001-0000-02 Page 44 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

P1.08.11.09.006 C.OM.JYK.DF.00.332.SGC Pipe Size 1.5" M 0.23 16.220 3.73 P-P1-015 0.0000%
P1.08.11.09.012 C.OM.JYK.DF.00.332.SGC Pipe Size 6" M 3.66 29.630 108.45 P-P1-015 0.0001%
P1.08.11.09.016 C.OM.JYK.DF.00.332.SGC Pipe Size 14" M 14.22 50.330 715.69 P-P1-015 0.0006%
P1.08.11.15 Insulation Thickness : 80 mm
P1.08.11.15.012 C.OM.JYK.DF.00.332.SGC Pipe Size 6" M 1.98 42.050 83.26 P-P1-015 0.0001%
P1.08.11.15.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 14.23 35.140 500.04 P-P1-015 0.0004%
P1.08.11.15.013 C.OM.JYK.DF.00.332.SGC Pipe Size 8" M 73.8 48.570 3,584.47 P-P1-015 0.0031%
P1.08.11.15.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 12.28 28.230 346.66 P-P1-015 0.0003%
P1.08.11.15.009 C.OM.JYK.DF.00.332.SGC Pipe Size 3" M 0.3 31.890 9.57 P-P1-015 0.0000%
P1.08.11.15.014 C.OM.JYK.DF.00.332.SGC Pipe Size 10" M 178.91 55.480 9,925.93 P-P1-015 0.0087%
P1.08.11.15.017 C.OM.JYK.DF.00.332.SGC Pipe Size 16" M 12.18 72.570 883.90 P-P1-015 0.0008%
P1.08.11.15.019 C.OM.JYK.DF.00.332.SGC Pipe Size 20" M 1.02 85.600 87.31 P-P1-015 0.0001%
P1.08.11.15.021 C.OM.JYK.DF.00.332.SGC Pipe Size 24" M 1.22 98.600 120.29 P-P1-015 0.0001%
P1.08.11.15.033 C.OM.JYK.DF.00.332.SGC Pipe Size 48" M 2.44 176.710 431.17 P-P1-015 0.0004%
P1.08.11.17 Insulation Thickness : 90 mm
P1.08.11.17.021 C.OM.JYK.DF.00.332.SGC Pipe Size 24" M 57.31 108.150 6,198.08 P-P1-015 0.0054%
P1.08.11.17.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 0.61 32.910 20.08 P-P1-015 0.0000%
P1.08.11.17.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 0.2 40.300 8.06 P-P1-015 0.0000%
P1.08.11.17.013 C.OM.JYK.DF.00.332.SGC Pipe Size 8" M 6.91 54.660 377.70 P-P1-015 0.0003%
P1.08.11.17.017 C.OM.JYK.DF.00.332.SGC Pipe Size 16" M 7.72 80.310 619.99 P-P1-015 0.0005%
P1.08.11.17.018 C.OM.JYK.DF.00.332.SGC Pipe Size 18" M 17.37 87.280 1,516.05 P-P1-015 0.0013%
P1.08.11.17.030 C.OM.JYK.DF.00.332.SGC Pipe Size 42" M 7.74 170.770 1,321.76 P-P1-015 0.0012%
P1.08.11.19 Insulation Thickness : 100 mm
P1.08.11.19.021 C.OM.JYK.DF.00.332.SGC Pipe Size 24" M 1.22 118.050 144.02 P-P1-015 0.0001%
P1.08.11.19.020 C.OM.JYK.DF.00.332.SGC Pipe Size 22" M 1.68 110.630 185.86 P-P1-015 0.0002%
P1.08.11.19.045 C.OM.JYK.DF.00.332.SGC Pipe Size 84" M 133.52 340.240 45,428.84 P-P1-015 0.0396%
P1.08.11.11 Insulation Thickness : 60 mm
P1.08.11.11.014 C.OM.JYK.DF.00.332.SGC Pipe Size 10" M 202.04 45.150 9,122.11 P-P1-015 0.0080%
P1.08.11.11.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 78.2 17.710 1,384.92 P-P1-015 0.0012%
P1.08.11.11.015 C.OM.JYK.DF.00.332.SGC Pipe Size 12" M 115.08 50.980 5,866.78 P-P1-015 0.0051%
P1.08.11.11.012 C.OM.JYK.DF.00.332.SGC Pipe Size 6" M 443.97 33.110 14,699.85 P-P1-015 0.0128%
P1.08.11.11.006 C.OM.JYK.DF.00.332.SGC Pipe Size 1.5" M 1.22 19.330 23.58 P-P1-015 0.0000%
P1.08.11.11.009 C.OM.JYK.DF.00.332.SGC Pipe Size 3" M 0.46 24.000 11.04 P-P1-015 0.0000%
P1.08.11.11.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 21.24 26.920 571.78 P-P1-015 0.0005%
P1.08.11.11.013 C.OM.JYK.DF.00.332.SGC Pipe Size 8" M 89.08 38.960 3,470.56 P-P1-015 0.0030%
P1.08.11.11.020 C.OM.JYK.DF.00.332.SGC Pipe Size 22" M 1.68 77.970 130.99 P-P1-015 0.0001%
P1.08.11.11.021 C.OM.JYK.DF.00.332.SGC Pipe Size 24" M 2.44 83.820 204.52 P-P1-015 0.0002%
P1.08.11.13 Insulation Thickness : 70 mm
P1.08.11.13.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 12.9 24.340 313.99 P-P1-015 0.0003%
P1.08.11.13.012 C.OM.JYK.DF.00.332.SGC Pipe Size 6" M 9.75 37.460 365.24 P-P1-015 0.0003%
P1.08.11.13.009 C.OM.JYK.DF.00.332.SGC Pipe Size 3" M 0.15 27.810 4.17 P-P1-015 0.0000%
P1.08.11.13.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 2.34 30.900 72.31 P-P1-015 0.0001%
P1.08.11.13.013 C.OM.JYK.DF.00.332.SGC Pipe Size 8" M 0.41 43.620 17.88 P-P1-015 0.0000%
P1.08.11.13.014 C.OM.JYK.DF.00.332.SGC Pipe Size 10" M 0.51 50.190 25.60 P-P1-015 0.0000%
P1.08.11.13.015 C.OM.JYK.DF.00.332.SGC Pipe Size 12" M 1.83 56.350 103.12 P-P1-015 0.0001%
P1.08.11.13.016 C.OM.JYK.DF.00.332.SGC Pipe Size 14" M 31.29 60.220 1,884.28 P-P1-015 0.0016%
P1.08.11.13.017 C.OM.JYK.DF.00.332.SGC Pipe Size 16" M 98.91 66.390 6,566.63 P-P1-015 0.0057%

KHF-00-101983-FA-5804-0001-0000-02 Page 45 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

P1.08.11.13.019 C.OM.JYK.DF.00.332.SGC Pipe Size 20" M 33.02 78.730 2,599.66 P-P1-015 0.0023%
P1.08.11.13.021 C.OM.JYK.DF.00.332.SGC Pipe Size 24" M 95.72 91.080 8,718.18 P-P1-015 0.0076%
P1.08.11.13.024 C.OM.JYK.DF.00.332.SGC Pipe Size 30" M 71.74 109.600 7,862.70 P-P1-015 0.0069%
P1.08.11.13.030 C.OM.JYK.DF.00.332.SGC Pipe Size 42" M 48.67 146.630 7,136.48 P-P1-015 0.0062%
P1.08.11.23 Insulation Thickness : 120 mm
P1.08.11.23.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 5.38 47.100 253.40 P-P1-015 0.0002%
P1.08.11.23.010 C.OM.JYK.DF.00.332.SGC Pipe Size 4" M 2.74 55.570 152.26 P-P1-015 0.0001%
P1.08.11.23.012 C.OM.JYK.DF.00.332.SGC Pipe Size 6" M 10.06 64.040 644.24 P-P1-015 0.0006%
P1.08.11.23.013 C.OM.JYK.DF.00.332.SGC Pipe Size 8" M 0.82 72.000 59.04 P-P1-015 0.0001%
P1.08.11.23.014 C.OM.JYK.DF.00.332.SGC Pipe Size 10" M 12.7 80.470 1,021.97 P-P1-015 0.0009%
P1.08.11.23.015 C.OM.JYK.DF.00.332.SGC Pipe Size 12" M 160.54 88.440 14,198.16 P-P1-015 0.0124%
P1.08.11.23.016 C.OM.JYK.DF.00.332.SGC Pipe Size 14" M 25.96 93.420 2,425.18 P-P1-015 0.0021%
P1.08.11.23.017 C.OM.JYK.DF.00.332.SGC Pipe Size 16" M 0.81 101.380 82.12 P-P1-015 0.0001%
P1.08.11.23.024 C.OM.JYK.DF.00.332.SGC Pipe Size 30" M 8.38 157.160 1,317.00 P-P1-015 0.0011%
P1.08.11.23.030 C.OM.JYK.DF.00.332.SGC Pipe Size 42" M 27.74 204.960 5,685.59 P-P1-015 0.0050%
P1.08.11.23.033 C.OM.JYK.DF.00.332.SGC Pipe Size 48" M 13.41 228.880 3,069.28 P-P1-015 0.0027%
P1.08.11.23.045 C.OM.JYK.DF.00.332.SGC Pipe Size 84" M 12.8 372.300 4,765.44 P-P1-015 0.0042%
P1.08.11.27 Insulation Thickness : 140 mm
P1.08.11.27.007 C.OM.JYK.DF.00.332.SGC Pipe Size 2" M 0.66 55.640 36.72 P-P1-015 0.0000%
P1.08.11.27.021 C.OM.JYK.DF.00.332.SGC Pipe Size 24" M 14.63 145.430 2,127.64 P-P1-015 0.0019%
P1.08.11.31 Insulation Thickness : 160 mm
P1.08.11.31.021 C.OM.JYK.DF.00.332.SGC Pipe Size 24" M 11.58 160.190 1,855.00 P-P1-015 0.0016%
P1.10 Chemical Cleaning
P1.10.007 C.OM.JYK.DF.00.332.SGME Pipe Size 2" M 11.02 29.100 320.68 P-P1-017 0.0003%
P1.10.015 C.OM.JYK.DF.00.332.SGME Pipe Size 12" M 102.33 174.580 17,864.77 P-P1-017 0.0156%
P1.10.016 C.OM.JYK.DF.00.332.SGME Pipe Size 14" M 97.73 203.670 19,904.67 P-P1-017 0.0173%
P1.10.017 C.OM.JYK.DF.00.332.SGME Pipe Size 16" M 55.71 232.770 12,967.62 P-P1-017 0.0113%
P1.10.010 C.OM.JYK.DF.00.332.SGME Pipe Size 4" M 133.73 58.190 7,781.75 P-P1-017 0.0068%
P1.10.012 C.OM.JYK.DF.00.332.SGME Pipe Size 6" M 158.31 87.290 13,818.88 P-P1-017 0.0120%
C-P1.11 Valve Testing at Site
C-P1.11.01 Valve Body Pressure Testing
C-P1.11.01.01 Manual Valves (Ball /Gate /Plug/ Butterfly /Globe)
C-P1.11.01.01.01 C.OM.JYK.DF.00.332.SGK Size up to 3" Nos. 1 46.880 46.88 P-P1-018 0.0000%
C-P1.11.01.01.02 C.OM.JYK.DF.00.332.SGK Size 4" to 8" Nos. 1 46.880 46.88 P-P1-018 0.0000%
C-P1.11.01.01.03 C.OM.JYK.DF.00.332.SGK Size 10" to 16" Nos. 1 62.510 62.51 P-P1-018 0.0001%
C-P1.11.01.01.04 C.OM.JYK.DF.00.332.SGK Size 18" to 24" Nos. 1 234.400 234.40 P-P1-018 0.0002%
C-P1.11.01.01.05 C.OM.JYK.DF.00.332.SGK Size 24" to 48" Nos. 1 390.660 390.66 P-P1-018 0.0003%
C-P1.11.01.01.06 C.OM.JYK.DF.00.332.SGK Size 48" and above Nos. 1 781.320 781.32 P-P1-018 0.0007%
C-P1.11.02 Valve body pressure testing and Calibration
C-P1.11.02.01 Pressure Safety Valves
C-P1.11.02.01.01 C.OM.JYK.DF.00.332.SGK Size up to 3" Nos. 135 54.690 7,383.15 P-P1-019 0.0064%
C-P1.11.02.01.02 C.OM.JYK.DF.00.332.SGK Size 4" to 8" Nos. 100 93.750 9,375.00 P-P1-019 0.0082%
C-P1.11.02.02 Pressure Vacuum Relief Valves
C-P1.11.02.02.01 C.OM.JYK.DF.00.332.SGK Size 4" to 8" Nos. 12 62.510 750.12 P-P1-019 0.0007%
C-P1.11.02.02.02 C.OM.JYK.DF.00.332.SGK Size 10" to 16" Nos. 14 125.020 1,750.28 P-P1-019 0.0015%
C-P1.12 Engineered Steam Tracing
C-P1.12.001 C.OM.JYK.DF.00.332.SGD Pipe Size 2" M 125.5 6.250 784.38 P-P1-020 0.0007%

KHF-00-101983-FA-5804-0001-0000-02 Page 46 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

C-P1.12.002 C.OM.JYK.DF.00.332.SGD Pipe Size 3" M 98.25 9.380 921.59 P-P1-020 0.0008%
C-P1.12.003 C.OM.JYK.DF.00.332.SGD Pipe Size 4" M 112.8 12.500 1,410.00 P-P1-020 0.0012%
C-P1.12.004 C.OM.JYK.DF.00.332.SGD Pipe Size 6" M 1231.5 18.760 23,102.94 P-P1-020 0.0201%
C-P1.12.005 C.OM.JYK.DF.00.332.SGD Pipe Size 8" M 55.47 25.010 1,387.30 P-P1-020 0.0012%
C-P1.12.006 C.OM.JYK.DF.00.332.SGD Pipe Size 12" M 25.3 37.500 948.75 P-P1-020 0.0008%
C-P1.12.007 C.OM.JYK.DF.00.332.SGD Pipe Size 16" M 68.32 50.000 3,416.00 P-P1-020 0.0030%
C-P1.12.008 C.OM.JYK.DF.00.332.SGD Pipe Size 24" M 32.8 75.010 2,460.33 P-P1-020 0.0021%
C-P1.12.009 C.OM.JYK.DF.00.332.SGD Pipe Size 30" M 79.86 93.750 7,486.88 P-P1-020 0.0065%
C-P1.12.010 C.OM.JYK.DF.00.332.SGD Pipe Size 36" M 163.9 112.510 18,440.39 P-P1-020 0.0161%
C-P1.12.011 C.OM.JYK.DF.00.332.SGD Pipe Size 42" M 15.38 131.270 2,018.93 P-P1-020 0.0018%

Subtotal (OMR) 21,896,584.22 19.0831%

KHF-00-101983-FA-5804-0001-0000-02 Page 47 of 72
PROGRESS MEASUREMENT SCHEDULE

Contract C311520 - Construction Services for Yibal Khuff Project On Plot

Section C5,
Static Equipment Works
Schedule C Bill M1

Preamble
Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Percentage
Code
M1 Static Equipment Works
HORIZONTAL EQUIPMENT (All Vessel, Reactors, Heat Exchanger, Separator, Desalter Etc.)
M1.01
Note:- Refer Equipment List for details. The quantity indicated in MT is the total weight excluding
Internals of the equipment but including Auxillaries & loose materials.
M1.01.01 EQUIPMENT SUPPLIED IN ONE SECTION
M1.01.01.01 ERECTION ELEVATION UP TO 6 M
M1.01.01.01.001 C.OM.JYK.DF.00.332.SHA Weight Range - upto 5 MT MT 71.70 677.990 48,611.88 P-M1-001 0.0424%
M1.01.01.01.002 C.OM.JYK.DF.00.332.SHA Weight Range - Above 5 MT and up to 10 MT MT 98.20 390.820 38,378.52 P-M1-001 0.0334%
M1.01.01.01.003 C.OM.JYK.DF.00.332.SHA Weight Range - Above 10 MT and up to 25 MT MT 226.00 309.640 69,978.64 P-M1-001 0.0610%
M1.01.01.01.004 C.OM.JYK.DF.00.332.SHA Weight Range - Above 25 MT and up to 50 MT MT 365.30 172.550 63,032.52 P-M1-001 0.0549%
M1.01.01.01.005 C.OM.JYK.DF.00.332.SHA Weight Range - Above 50 MT and up to 100 MT MT 78.10 402.660 31,447.75 P-M1-001 0.0274%
M1.01.01.01.006 C.OM.JYK.DF.00.332.SHA Weight Range - Above 100 MT and up to 200 MT MT 456.70 299.360 136,717.71 P-M1-001 0.1192%
M1.01.01.01.007 C.OM.JYK.DF.00.332.SHA Weight Range - Above 200 MT MT 323.20 251.210 81,191.07 P-M1-001 0.0708%
M1.01.01.02 ERECTION ELEVATION ABOVE 6 M AND UPTO 25 M
M1.01.01.02.001 C.OM.JYK.DF.00.332.SHA Weight Range - upto 5 MT MT 16.60 634.750 10,536.85 P-M1-001 0.0092%
M1.01.01.02.003 C.OM.JYK.DF.00.332.SHA Weight Range - Above 10 MT and up to 25 MT MT 55.60 289.070 16,072.29 P-M1-001 0.0140%
M1.01.01.02.004 C.OM.JYK.DF.00.332.SHA Weight Range - Above 25 MT and up to 50 MT MT 349.20 164.740 57,527.21 P-M1-001 0.0501%
M1.01.03 C.OM.JYK.DF.00.332.SHA ELECTRIC HEATER MT 10.00 481.350 4,813.50 P-M1-001 0.0042%
VERTICAL EQUIPMENT (COLUMN, REACTOR, ACCUMULATOR, , HEAT EXCHANGER, ETC)
M1.02
Note:- Refer Equipment List for details. The quantity indicated in MT is the total weight excluding
Internals of the equipment but including Auxillaries & loose materials.
M1.02.01 EQUIPMENT SUPPLIED IN ONE SECTION
M1.02.01.01 ERECTION ELEVATION UPTO 6 M
M1.02.01.01.01 EQUIPMENT HEIGHT UPTO 30 METER
M1.02.01.01.01.001 C.OM.JYK.DF.00.332.SHA Weight Range - upto 5 MT MT 75.40 688.960 51,947.58 P-M1-001 0.0453%
M1.02.01.01.01.002 C.OM.JYK.DF.00.332.SHA Weight Range - Above 5 MT and up to 10 MT MT 76.70 389.580 29,880.79 P-M1-001 0.0260%
M1.02.01.01.01.003 C.OM.JYK.DF.00.332.SHA Weight Range - Above 10 MT and up to 25 MT MT 139.90 287.820 40,266.02 P-M1-001 0.0351%
M1.02.01.01.01.004 C.OM.JYK.DF.00.332.SHA Weight Range - Above 25 MT and up to 50 MT MT 111.60 167.660 18,710.86 P-M1-001 0.0163%
M1.02.01.01.01.005 C.OM.JYK.DF.00.332.SHA Weight Range - Above 50 MT and up to 100 MT MT 323.70 238.040 77,053.55 P-M1-001 0.0672%
M1.02.01.01.02 EQUIPMENT HEIGHT ABOVE 30 METER AND UP TO 50 METER
M1.02.01.01.02.005 C.OM.JYK.DF.00.332.SHA Weight Range - Above 50 MT and up to 100 MT MT 62.00 342.520 21,236.24 P-M1-001 0.0185%
M1.02.01.01.02.006 C.OM.JYK.DF.00.332.SHA Weight Range - Above 100 MT and up to 200 MT MT 124.00 409.880 50,825.12 P-M1-001 0.0443%
M1.02.01.01.02.007 C.OM.JYK.DF.00.332.SHA Weight Range - Above 200 MT MT 286.00 232.620 66,529.32 P-M1-001 0.0580%
M1.02.01.02 ERECTION ELEVATION ABOVE 6 M
M1.02.01.02.01 EQUIPMENT HEIGHT UPTO 30 METER
M1.02.01.02.01.002 C.OM.JYK.DF.00.332.SHA Weight Range - Above 5 MT and up to 10 MT MT 26.60 359.180 9,554.19 P-M1-001 0.0083%
M1.02.02 EQUIPMENT SUPPLIED IN MULTIPLE SECTION
M1.02.02.01 ERECTION ELEVATION UPTO 6 M
M1.02.02.01.02 EQUIPMENT HEIGHT ABOVE 30 METER AND UP TO 50 METER
M1.02.02.01.02.005 C.OM.JYK.DF.00.332.SHA Weight Range - Above 50 MT and up to 100 MT MT 66.00 310.760 20,510.16 P-M1-002 0.0179%
M1.03 INTERNALS
M1.03.001 C.OM.JYK.DF.00.332.SHA Trays MT 79.75 1,843.040 146,982.44 P-M1-003 0.1281%
M1.03.002 C.OM.JYK.DF.00.332.SHA All Internals (Except Trays)- MT 109.67 2,456.080 269,358.29 P-M1-003 0.2347%
M1.03.003 C.OM.JYK.DF.00.332.SHA Packing MT 45.15 1,564.300 70,628.15 P-M1-003 0.0616%
M1.03.004 C.OM.JYK.DF.00.332.SHA Molecular Sieve / Reactor Catalyst MT 237.60 530.900 126,141.84 P-M1-003 0.1099%

KHF-00-101983-FA-5804-0001-0000-02 Page 48 of 72
PROGRESS MEASUREMENT SCHEDULE

Preamble
Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Percentage
Code
ERECTION OF PACKAGES
M1.04
Note:- Refer Equipment List for details. The quantity indicated in MT is the total weight of the
equipment including Auxillaries & loose materials.
M1.04.01 AIR COOLED HEAT EXCHANGER
M1.04.01.004 C.OM.JYK.DF.00.332.SHA Stick Built Package - at Elevation MT 2,135.50 269.330 575,154.22 P-M1-004 0.5013%
M1.04.02 FIRED HEATER
M1.04.02.003.01 C.OM.JYK.DF.00.332.SHA Radiant Section MT 125.00 510.480 63,810.00 P-M1-004 0.0556%
M1.04.02.003.02 C.OM.JYK.DF.00.332.SHA Convection Section MT 50.00 404.080 20,204.00 P-M1-004 0.0176%
M1.04.02.003.03 C.OM.JYK.DF.00.332.SHA Casing/Structurals MT 75.00 853.670 64,025.25 P-M1-004 0.0558%
M1.04.04 INCINERATOR / THERMAL OXYDISER
M1.04.04.003.01 C.OM.JYK.DF.00.332.SHA Incinerator Waste Heat Boiler MT 125.00 314.950 39,368.75 P-M1-004 0.0343%
M1.04.04.003.02 C.OM.JYK.DF.00.332.SHA Incinerator Superheater MT 6.00 1,266.100 7,596.60 P-M1-004 0.0066%
M1.04.04.003.03 C.OM.JYK.DF.00.332.SHA Incinerator Mixing Chamber MT 200.00 421.250 84,250.00 P-M1-004 0.0734%
M1.04.04.003.04 C.OM.JYK.DF.00.332.SHA Incinerator WHB Steam Drum MT 24.00 449.410 10,785.84 P-M1-004 0.0094%
M1.04.04.003.05 C.OM.JYK.DF.00.332.SHA Incinerator Burner MT 3.00 3,310.030 9,930.09 P-M1-004 0.0087%
M1.04.05 DEAERATOR
M1.04.05.004.01 C.OM.JYK.DF.00.332.SHA Top Vessel MT 11.40 530.020 6,042.23 P-M1-004 0.0053%
M1.04.05.004.02 C.OM.JYK.DF.00.332.SHA Packing in top vessel MT 11.00 443.580 4,879.38 P-M1-004 0.0043%
M1.04.05.004.03 C.OM.JYK.DF.00.332.SHA Bottom Vessel MT 78.60 397.900 31,274.94 P-M1-004 0.0273%
M1.04.06 FLARES
M1.04.06.001 C.OM.JYK.DF.00.332.SHA Derick Supported MT 250.00 1,669.930 417,482.50 P-M1-004 0.3638%
M1.04.11 WASTE HEAT BOILER/COMBUSTION CHAMBER/BURNERS, comprising of:
M1.04.11.01 C.OM.JYK.DF.00.332.SHA Waste Heat Boiler MT 100.00 394.770 39,477.00 P-M1-004 0.0344%
M1.04.11.02 C.OM.JYK.DF.00.332.SHA Combustion Chamber MT 250.00 364.830 91,207.50 P-M1-004 0.0795%
M1.04.11.03 C.OM.JYK.DF.00.332.SHA Burner Mixing Chamber MT 24.00 590.040 14,160.96 P-M1-004 0.0123%
M1.04.11.04 C.OM.JYK.DF.00.332.SHA Burner MT 10.00 928.570 9,285.70 P-M1-004 0.0081%
M1.04.12 ELECTROSTATIC COALESCER PACKAGE
M1.04.12.01.01 C.OM.JYK.DF.00.332.SHA Electrostatic Coalescer MT 23.00 464.860 10,691.78 P-M1-004 0.0093%
M1.04.12.01.02 C.OM.JYK.DF.00.332.SHA Transformer MT 3.00 1,247.350 3,742.05 P-M1-004 0.0033%
M1.04.12.01.03 C.OM.JYK.DF.00.332.SHA Demudding Pump MT 2.00 1,823.960 3,647.92 P-M3-001 0.0032%
M1.04.12.01.04 C.OM.JYK.DF.00.332.SHA Static Mixer MT 2.00 1,823.960 3,647.92 P-M1-004 0.0032%
M1.04.13 CANSOLV PRE-TREATMENT PACKAGE is a stick-built package comprising of:
M1.04.13.01 C.OM.JYK.DF.00.332.SHA Cansolv Pre-treatment Jet Scrubber MT 4.00 959.050 3,836.20 P-M1-004 0.0033%
M1.04.13.02 C.OM.JYK.DF.00.332.SHA Cansolv Pre-treatment Subcooling Tower MT 8.00 526.580 4,212.64 P-M1-004 0.0037%
M1.04.13.03 C.OM.JYK.DF.00.332.SHA Cansolv Pre-treatment Venturi Scrubber MT 3.00 1,247.350 3,742.05 P-M1-004 0.0033%
M1.04.13.04 C.OM.JYK.DF.00.332.SHA Cansolv Pre-treatment Jet Scubber Separator MT 4.00 959.050 3,836.20 P-M1-004 0.0033%
M1.04.13.05 C.OM.JYK.DF.00.332.SHA Cansolv Pre-treatment Liquid Tank & Separator MT 4.00 959.050 3,836.20 P-M1-004 0.0033%
M1.04.13.06 C.OM.JYK.DF.00.332.SHA Cansolv Pre-treatment Droplet Separator MT 16.00 368.050 5,888.80 P-M1-004 0.0051%
M1.04.13.07 C.OM.JYK.DF.00.332.SHA Cansolv Pre-treatment Water Cooler MT 30.00 261.160 7,834.80 P-M1-004 0.0068%
M1.04.13.08 C.OM.JYK.DF.00.332.SHA Cansolv Pre-treatment Polished Condensate Cooler MT 10.00 478.530 4,785.30 P-M1-004 0.0042%
M1.04.13.09 C.OM.JYK.DF.00.332.SHA Cansolv Pre-treatment High Pressure Nozzle System MT 1.00 3,553.790 3,553.79 P-M1-004 0.0031%
M1.04.14 CHEMICAL INJECTION PACKAGES are modular packages comprising of:
M1.04.14.01 C.OM.JYK.DF.00.332.SHA Scale Inhibitor Injection Package MT 8.00 526.580 4,212.64 P-M1-004 0.0037%

M1.04.14.02 C.OM.JYK.DF.00.332.SHA Demulsifier Injection Package MT 12.00 414.460 4,973.52 P-M1-004 0.0043%

M1.04.14.03 C.OM.JYK.DF.00.332.SHA HCL Acid Injection Package MT 19.50 318.890 6,218.36 P-M1-004 0.0054%

M1.04.14.04 C.OM.JYK.DF.00.332.SHA Caustic Injection Package MT 39.50 220.980 8,728.71 P-M1-004 0.0076%

M1.04.14.05 C.OM.JYK.DF.00.332.SHA Anti-foam Injection Package MT 2.00 1,823.960 3,647.92 P-M1-004 0.0032%
M1.04.14.06 C.OM.JYK.DF.00.332.SHA Phosphate Injection Package MT 1.50 2,400.580 3,600.87 P-M1-004 0.0031%

KHF-00-101983-FA-5804-0001-0000-02 Page 49 of 72
PROGRESS MEASUREMENT SCHEDULE

Preamble
Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Percentage
Code
M1.04.14.07 C.OM.JYK.DF.00.332.SHA Phosphate Dosing Package MT 2.00 1,823.960 3,647.92 P-M1-004 0.0032%
M1.04.14.08 C.OM.JYK.DF.00.332.SHA Hypochlorite Injection Package MT 4.00 959.050 3,836.20 P-M1-004 0.0033%
M1.04.14.09 C.OM.JYK.DF.00.332.SHA Coagulant Injection Package MT 1.00 3,553.790 3,553.79 P-M1-004 0.0031%

M1.04.14.10 C.OM.JYK.DF.00.332.SHA SMBS Injection Package MT 0.00 0.00 P-M1-004

M1.04.14.11 C.OM.JYK.DF.00.332.SHA Dispersant Injection Package MT 0.00 0.00 P-M1-004


M1.04.14.12 C.OM.JYK.DF.00.332.SHA Oxygen Scavanger Injection Package MT 3.00 1,247.350 3,742.05 P-M1-004 0.0033%
M1.04.14.13 C.OM.JYK.DF.00.332.SHA Anti Scalant Injection Package MT 1.00 3,553.790 3,553.79 P-M1-004 0.0031%
M1.04.14.14 C.OM.JYK.DF.00.332.SHA Sodium Bicarbonate Package MT 0.00 - 0.00 P-M1-004 0.0000%
M1.04.14.15 C.OM.JYK.DF.00.332.SHA Volatile Amine Injection Package MT 3.00 1,247.350 3,742.05 P-M1-004 0.0033%
M1.04.14.16 C.OM.JYK.DF.00.332.SHA Oxygen Scavanger Injection Package MT 3.00 1,247.350 3,742.05 P-M1-004 0.0033%
M1.04.14.17 C.OM.JYK.DF.00.332.SHA Chemical Injection Package MT 5.00 786.060 3,930.30 P-M1-004 0.0034%
M1.04.15 AUXILIARY BOILER PACKAGES #1 & #2, comprising of:
M1.04.15.01 C.OM.JYK.DF.00.332.SHA Super Heater 1 & 2 MT 30.00 411.170 12,335.10 P-M1-004 0.0108%
M1.04.15.02 C.OM.JYK.DF.00.332.SHA Economiser MT 20.00 538.290 10,765.80 P-M1-004 0.0094%
M1.04.15.03 C.OM.JYK.DF.00.332.SHA Evaporator MT 20.00 538.290 10,765.80 P-M1-004 0.0094%
M1.04.15.04 C.OM.JYK.DF.00.332.SHA Blowdown Cooler MT 18.00 400.120 7,202.16 P-M1-004 0.0063%
M1.04.15.05 C.OM.JYK.DF.00.332.SHA Burner 1 & 2 MT 2.00 4,074.150 8,148.30 P-M1-004 0.0071%
M1.04.15.06 C.OM.JYK.DF.00.332.SHA Forced Draught Fan MT 3.00 2,747.470 8,242.41 P-M1-004 0.0072%
M1.04.15.07 C.OM.JYK.DF.00.332.SHA Scanner Air Fan 1 & 2 MT 4.00 2,084.140 8,336.56 P-M1-004 0.0073%
M1.04.15.08 C.OM.JYK.DF.00.332.SHA Blowdown Transfer Pumps MT 4.00 1,240.310 4,961.24 P-M1-004 0.0043%
M1.04.15.09 C.OM.JYK.DF.00.332.SHA Phosphate Dosing Pumps MT 3.00 2,184.930 6,554.79 P-M1-004 0.0057%
M1.04.15.10 C.OM.JYK.DF.00.332.SHA Phosphate Dosing Tank with mixer MT 6.00 1,420.800 8,524.80 P-M1-004 0.0074%
M1.04.15.10 C.OM.JYK.DF.00.332.SHA Steam Drum MT 80.00 448.840 35,907.20 P-M1-004 0.0313%
M1.04.15.11 C.OM.JYK.DF.00.332.SHA Water Drum MT 60.00 313.900 18,834.00 P-M1-004 0.0164%
M1.04.15.12 C.OM.JYK.DF.00.332.SHA Blow down vessel MT 50.00 285.660 14,283.00 P-M1-004 0.0124%
M1.04.16 WATER TREATMENT PACKAGE, comprising of:
M1.04.16.01 C.OM.JYK.DF.00.332.SHA Raw Water Stripper Package MT 7.00 588.360 4,118.52 P-M1-004 0.0036%
M1.04.16.02 C.OM.JYK.DF.00.332.SHA Multimedia Filtration Package MT 9.00 521.240 4,691.16 P-M1-004 0.0041%
M1.04.16.03 C.OM.JYK.DF.00.332.SHA Ultra Filtration Package MT 15.00 456.660 6,849.90 P-M1-004 0.0060%
M1.04.16.04 C.OM.JYK.DF.00.332.SHA RO Package Train 1&2 MT 46.00 277.860 12,781.56 P-M1-004 0.0111%
M1.04.16.05 C.OM.JYK.DF.00.332.SHA Clean-In-Place Package MT 9.00 521.240 4,691.16 P-M1-004 0.0041%
M1.04.16.06 C.OM.JYK.DF.00.332.SHA Potable Water Treatment Package MT 3.00 1,247.350 3,742.05 P-M1-004 0.0033%
M1.04.16.07 C.OM.JYK.DF.00.332.SHA UV Sterilizer Unit MT 0.75 4,800.360 3,600.27 P-M1-004 0.0031%
M1.04.17 BFW PREPARATION, TREATMENT & DISTRIBUTION PACKAGE, comprising of:
M1.04.17.01 C.OM.JYK.DF.00.332.SHA Fractional Electro-Deionization Package MT 1.00 3,553.790 3,553.79 P-M1-004 0.0031%
M1.04.17.02 C.OM.JYK.DF.00.332.SHA PCC Filtration Package MT 2.50 1,477.990 3,694.98 P-M1-004 0.0032%
M1.04.17.03 C.OM.JYK.DF.00.332.SHA Mixed Bed Polisher Package MT 25.00 435.200 10,880.00 P-M1-004 0.0095%
M1.04.17.04 C.OM.JYK.DF.00.332.SHA Cansolv Stripper Package MT 4.00 959.050 3,836.20 P-M1-004 0.0033%
M1.04.17.05 C.OM.JYK.DF.00.332.SHA Cansolv Multimedia Filtration Package MT 8.00 526.580 4,212.64 P-M1-004 0.0037%
M1.04.17.06 C.OM.JYK.DF.00.332.SHA Cansolv RO Package MT 10.00 591.040 5,910.40 P-M1-004 0.0052%
M1.04.17.07 C.OM.JYK.DF.00.332.SHA Reject Neutralization Package MT 2.50 1,477.990 3,694.98 P-M1-004 0.0032%
M1.04.17.08 C.OM.JYK.DF.00.332.SHA Cansolv SMBS Package MT 1.00 3,553.790 3,553.79 P-M1-004 0.0031%
M1.04.17.09 C.OM.JYK.DF.00.332.SHA Cansolv Dispersant Package MT 1.00 3,553.790 3,553.79 P-M1-004 0.0031%
M1.04.18 SULPHUR BLOCK HANDLING PACKAGE, comprising of:
M1.04.18.01 C.OM.JYK.DF.00.332.SHA Sulphur Pouring Arm/Swivel Joint Assembly MT 57.00 242.400 13,816.80 P-M1-004 0.0120%
M1.04.19 CANSOLV ABSORPTION PURIFICATION UNIT
M1.04.19.01 C.OM.JYK.DF.00.332.SHA Cansolv Absorption Purification Unit MT 7.00 588.360 4,118.52 P-M1-004 0.0036%
M1.04.20 CRANE AND HOISTS
M1.04.20.01 C.OM.JYK.DF.00.332.SHA Weight Range - Above 5 MT and up to 10 MT MT 32.50 420.800 13,676.00 P-M1-004 0.0119%
M1.04.20.02 C.OM.JYK.DF.00.332.SHA Weight Range - Above 10 MT and up to 25 MT MT 25.00 435.200 10,880.00 P-M1-004 0.0095%

KHF-00-101983-FA-5804-0001-0000-02 Page 50 of 72
PROGRESS MEASUREMENT SCHEDULE

Preamble
Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Percentage
Code

M1.04.20.03 C.OM.JYK.DF.00.332.SHA HOT for Pumps < 500 Kgs. MT 1.50 2,400.580 3,600.87 P-M3-004 0.0031%

M1.04.20.04 C.OM.JYK.DF.00.332.SHA EOT for Pumps > 500 Kgs. MT 79.20 1,272.130 100,752.70 P-M3-004 0.0878%

M1.04.20.05 C.OM.JYK.DF.00.332.SHA EOT for Blowers MT 3.30 1,483.440 4,895.35 P-M3-004 0.0043%

Erection of Shop Fabricated Tanks


M1.05
Note:- Refer Tank List for details. The quantity indicated in MT is the total weight of the Shop
Fabricated Tank/s including Auxiliaries & loose materials.

M1.05.003 C.OM.JYK.DF.00.332.SBI Weight Range- Above 10 MT & up to 20 MT MT 163.80 438.140 71,767.33 P-M1-005 0.0625%

Subtotal (OMR) 3,632,987.16 3.1662%

KHF-00-101983-FA-5804-0001-0000-02 Page 51 of 72
PROGRESS MEASUREMENT SCHEDULE

Contract C311520 - Construction Services for Yibal Khuff Project On Plot

Section C5,
Tankage Works
Schedule C Bill M2

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

M2 Tankage Works
ERECTION OF STORAGE TANK SUPPLIED IN KNOCKED DOWN CONDITION
M2.01

M2.01.01 Tank - Fixed Roof


M2.01.01.01 Cone Roof Tank
M2.01.01.01.001 C.OM.JYK.DF.00.332.SBI Material of Construction CS , Dia Range Up to 12 Mtr MT 239.40 1,347.030 322,478.98 P-M2-001 0.2810%

M2.01.01.01.002 C.OM.JYK.DF.00.332.SBI Material of Construction CS , Dia Range Above 12 Mtr and up to 60 Mtr. MT 419.60 1,347.030 565,213.79 P-M2-001 0.4926%

M2.01.01.01.004 C.OM.JYK.DF.00.332.SBI Material of Construction CS-NACE , Dia Range Up to 12 Mtr MT 114.50 1,347.030 154,234.94 P-M2-001 0.1344%

M2.01.01.01.005 C.OM.JYK.DF.00.332.SBI Material of Construction CS-NACE , Dia Range Above 12 Mtr and up to 60 Mtr. MT 667.90 1,347.030 899,681.34 P-M2-001 0.7841%

M2.05 PAINTING WORK OF TANK


M2.05.01 SUPPLY & APPLICATION OF PAINT ON EXTERNAL SURFACE
M2.05.01.01 Surface Material - Carbon Steel (CS)
M2.05.01.01.001 C.OM.JYK.DF.00.332.SBI Non Insulated Tank, Temperature up to 100 Deg. C M2 9,815.30 21.590 211,912.33 P-M2-005 0.1847%

Non Insulated and Insulated Tank , Temperature above 100 Deg. C and up to 400
M2.05.01.01.002 C.OM.JYK.DF.00.332.SBI M2 2,214.70 22.570 49,985.78 P-M2-005 0.0436%
Deg. C
M2.05.01.01.004 C.OM.JYK.DF.00.332.SBI Insulated Tank, Temperature up to 100 Deg. C M2 1,325.50 21.030 27,875.27 P-M2-005 0.0243%

M2.05.02 SUPPLY & APPLICATION OF PAINT ON INTERNAL SURFACE


Surface Material - Carbon Steel (CS), Temperature up to 60 Deg. C and above the
M2.05.02.002 C.OM.JYK.DF.00.332.SBI M2 13,639.90 30.730 419,154.13 P-M2-005 0.3653%
water phase
M2.05.02.003 C.OM.JYK.DF.00.332.SBI Surface Material - Carbon Steel (CS), Temperatures between 60 to 93 °C M2 991.70 83.890 83,193.71 P-M2-005 0.0725%

M2.05.02.004 C.OM.JYK.DF.00.332.SBI Surface Material - Carbon Steel (CS), for Potable Water M2 250.00 25.390 6,347.50 P-M2-005 0.0055%

M2.05.03 SUPPLY & APPLICATION OF PAINT ON UNDER SIDE OF BOTTOM PLATE


M2.05.03.001 C.OM.JYK.DF.00.332.SBI Surface Material - Carbon Steel (CS), Temperature below 70 °C M2 2,136.98 28.840 61,630.60 P-M2-005 0.0537%

M2.05.03.002 C.OM.JYK.DF.00.332.SBI Surface Material - Carbon Steel (CS), Temperature Equal to and above 70 °C M2 821.92 38.890 31,964.34 P-M2-005 0.0279%

M2.07 INTERNAL LINING


M2.07.01 SUPPLY AND APPLICATION OF INTERNAL LINING

Surface Material - Carbon Steel (CS), Temperature up to 60 Deg. C and in


M2.07.01.V002 C.OM.JYK.DF.00.332.SBI M2 9,547.93 60.970 582,137.29 P-M2-006 0.5073%
continuous water phase

Subtotal (OMR) 3,415,809.98 2.9769%

KHF-00-101983-FA-5804-0001-0000-02 Page 52 of 72
PROGRESS MEASUREMENT SCHEDULE

Contract C311520 - Construction Services for Yibal Khuff Project On Plot

Section C5,
Rotating Equipment Works
Schedule C Bill M3

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

M3 Rotating Equipment Works


INSTALLATION OF CENTRIFUGAL PUMP
M3.01 Note:- Refer Equipment List for details. The quantity indicated in MT is the total weight of the
equipment including Auxillaries & loose materials.
M3.01.01 Electric Motor Driven Centrifugal Pump
M3.01.01.001 C.OM.JYK.DF.00.332.SHB Weight Range - up to 1 MT MT 64.60 2,176.540 140,604.48 P-M3-001 0.1225%
M3.01.01.002 C.OM.JYK.DF.00.332.SHB Weight Range - Above 1 MT and up to 3 MT MT 54.55 822.940 44,891.38 P-M3-001 0.0391%
M3.01.01.003 C.OM.JYK.DF.00.332.SHB Weight Range - Above 3 MT and up to 5 MT MT 34.98 466.700 16,325.17 P-M3-001 0.0142%
M3.01.01.004 C.OM.JYK.DF.00.332.SHB Weight Range - Above 5 MT and up to 10 MT MT 92.50 396.960 36,718.80 P-M3-001 0.0320%
M3.01.01.005 C.OM.JYK.DF.00.332.SHB Weight Range - Above 10 MT and up to 25 MT MT 33.00 183.010 6,039.33 P-M3-001 0.0053%
M3.01.04 Diesel Engine Driven Centrifugal Pump
M3.01.04.004 C.OM.JYK.DF.00.332.SHB Weight Range - Above 5 MT and up to 10 MT MT 9.00 453.320 4,079.88 P-M3-001 0.0036%
INSTALLATION OF FANS/ BLOWER WITH DRIVER
M3.03 Note:- Refer Equipment List for details. The quantity indicated in MT is the total weight of the
equipment including Auxillaries & loose materials.
M3.03.001 C.OM.JYK.DF.00.332.SHB Weight Range - up to 1 MT MT 2.00 2,720.850 5,441.70 P-M3-001 0.0047%
M3.03.004 C.OM.JYK.DF.00.332.SHB Weight Range - Above 5 MT and up to 10 MT MT 18.00 226.660 4,079.88 P-M3-001 0.0036%
M3.03.005 C.OM.JYK.DF.00.332.SHB Weight Range - Above 10 MT and up to 25 MT MT 50.00 241.580 12,079.00 P-M3-001 0.0105%
INSTALLATION OF COMPRESSOR PACKAGE - CENTRIFUGAL
M3.05 Note:- Refer Equipment List for details. The quantity indicated in MT is the total weight of the
equipment including Auxillaries & loose materials.
M3.05.01 Electric Motor Driven Centrifugal Compressor
M3.05.01.001 C.OM.JYK.DF.00.332.SHB Weight Range - up to 50 MT MT 35.00 226.060 7,912.10 P-M3-002 0.0069%
M3.05.01.003 C.OM.JYK.DF.00.332.SHB Weight Range - Above 100 MT MT 220.00 239.400 52,668.00 P-M3-002 0.0459%
INSTALLATION OF COMPRESSOR PACKAGE - POSITIVE DISPLACEMENT
M3.06 Note:- Refer Equipment List for details. The quantity indicated in MT is the total weight of the
equipment including Auxillaries & loose materials.
M3.06.01 Electric Motor Driven Positive Displacement Compressor
M3.06.01.001 C.OM.JYK.DF.00.332.SHB Weight Range - up to 50 MT MT 50.00 95.270 4,763.50 P-M3-002 0.0042%
INSTALLATION OF AIR COMPRESSOR AND DRYER PACKAGE
M3.07 Note:- Refer Equipment List for details. The quantity indicated in MT is the total weight of the
equipment including Auxillaries & loose materials.
M3.07.005 C.OM.JYK.DF.00.332.SHB Weight Range - Above 10 MT and up to 25 MT MT 132.00 228.760 30,196.32 P-M3-002 0.0263%
INSTALLATION OF STEAM POWER GENERATOR
M3.09 Note:- Refer Equipment List for details. The quantity indicated in MT is the total weight of the
equipment including Auxillaries & loose materials.
M3.09.003 C.OM.JYK.DF.00.332.SHB Weight Range - Above 100 MT MT 120.00 631.890 75,826.80 P-M3-001 0.0661%
INSTALLATION OF NITROGEN GENERATION PACKAGE
M3.13 Note:- Refer Equipment List for details. The quantity indicated in MT is the total weight of the
equipment including Auxillaries & loose materials.
M3.13.003 C.OM.JYK.DF.00.332.SHB Weight Range - Above 3 MT and up to 5 MT MT 30.00 773.700 23,211.00 P-M3-001 0.0202%
INSTALLATION OF VAPOUR RECOVERY PACKAGE
M3.21 Note:- Refer Equipment List for details. The quantity indicated in MT is the total weight of the
equipment including Auxillaries & loose materials.
M3.21.002 C.OM.JYK.DF.00.332.SHB Weight Range - Above 50 MT and up to 100 MT MT 55.36 86.040 4,763.17 P-M3-001 0.0042%
INSTALLATION OF REFRIGERANT PACKAGE
M3.25 Note:- Refer Equipment List for details. The quantity indicated in MT is the total weight of the
equipment including Auxillaries & loose materials.
M3.25.007 C.OM.JYK.DF.00.332.SHB Weight Range - Above 50 MT & up to 100 MT MT 70.00 201.010 14,070.70 P-M3-001 0.0123%
M3.25.008 C.OM.JYK.DF.00.332.SHB Weight Range - Above 100 MT MT 232.00 130.830 30,352.56 P-M3-001 0.0265%

KHF-00-101983-FA-5804-0001-0000-02 Page 53 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Preamble Code Percentage

INSTALLATION OF BREATHING AIR COMPRESSOR PACKAGE


M3.26 Note:- Refer Equipment List for details. The quantity indicated in MT is the total weight of the
equipment including Auxillaries & loose materials.
M3.26.005 C.OM.JYK.DF.00.332.SHB Weight Range - Above 10 MT & up to 25 MT MT 10.00 407.990 4,079.90 P-M3-001 0.0036%
INSTALLATION OF EMERGENCY START, DIESEL ENGINE DRIVEN GENERATOR PACKAGE.
M3.27 Complete with all auxiliary system like - lubrication, electrical starting system, cooling, fuel
handling, along with F&G detection, alarm system, mounted on skid.
M3.27.001 C.OM.JYK.DF.00.332.SHB Weight Range up to 50 MT MT 37.00 127.690 4,724.53 P-M3-001 0.0041%

SUBTOTAL IN OMR 522,828.20 0.4557%

KHF-00-101983-FA-5804-0001-0000-02 Page 54 of 72
PROGRESS MEASUREMENT SCHEDULE

Contract C311520 - Construction Services for Yibal Khuff Project - On Plot

Section C5,
Insulation & Refractory Works
Schedule C Bill M4

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amonut (OMR) Preamble Code Percentage

M4 Equipment Insulation & Refractory Works


M4.01 EQUIPMENT
M4.01.01 HOT INSULATION
M4.01.01.01 Supply & Installation of Heat Conservation (HC) Insulation
M4.01.01.01.V002 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 50 MM M2 19.30 55.550 1,072.12 P-M4-001 0.0009%

M4.01.01.01.V007 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 40 MM M2 107.30 54.140 5,809.22 P-M4-001 0.0051%

M4.01.01.01.V008 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 120 MM M2 3132.00 68.210 213,633.72 P-M4-001 0.1862%

M4.01.01.01.V009 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 140 MM M2 40.80 71.020 2,897.62 P-M4-001 0.0025%

M4.01.01.01.V010 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 160 MM M2 483.50 73.830 35,696.81 P-M4-001 0.0311%

M4.01.01.03 Supply & Installation of Personnel Protection(PP) Insulation


M4.01.01.03.V008 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 40 MM M2 16.40 54.140 887.90 P-M4-001 0.0008%

M4.01.01.03.V009 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 50 MM M2 1844.00 55.550 102,434.20 P-M4-001 0.0893%

M4.01.01.03.V010 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 70 MM M2 80.90 57.660 4,664.69 P-M4-001 0.0041%

M4.01.02 COLD INSULATION


M4.01.02.01 Supply & Installation of Cold Conservation (CC) Insulation
M4.01.02.01.V003 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 50 MM M2 29.00 63.990 1,855.71 P-M4-001 0.0016%

M4.02 TANK
M4.02.01 HOT INSULATION
M4.02.01.01 Supply & Installation of Heat Conservation (HC) Insulation
M4.02.01.01.01 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 120 MM M2 597.00 68.210 40,721.37 P-M4-001 0.0355%

M4.02.02 COLD INSULATION


M4.02.02.01 Supply & Installation of Cold Conservation (CC) Insulation
M4.02.02.01.V003 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 50 MM M2 1221.00 63.990 78,131.79 P-M4-001 0.0681%

M4.03.01 INSTALLATION OF REFRACTORY


M4.03.03.01 Installation of High Purity Bubble Alumina Insulating Castable
M4.03.03.01.V001 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 75 MM M3 1.30 2,061.770 2,680.30 P-M4-004 0.0023%
M4.03.03.01.V002 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 125 MM M3 5.70 2,061.770 11,752.09 P-M4-004 0.0102%

M4.03.03.02 Installation of Dense Refractory Insulating Firebrick/Castable


M4.03.03.02.V001 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 95 MM M3 2.00 2,061.770 4,123.54 P-M4-004 0.0036%

M4.03.03.02.V002 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 100 MM M3 21.00 2,061.770 43,297.17 P-M4-004 0.0377%

M4.03.03.02.V003 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 125 MM M3 36.50 2,061.770 75,254.61 P-M4-004 0.0656%

M4.03.03.03 Installation of High Alumina Dense Firebrick/Castable


M4.03.03.03.V001 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 50 MM M3 2.00 2,061.770 4,123.54 P-M4-004 0.0036%

M4.03.03.03.V002 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 95 MM M3 0.80 2,061.770 1,649.42 P-M4-004 0.0014%

M4.03.03.03.V003 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 125 MM M3 52.90 2,061.770 109,067.63 P-M4-004 0.0951%

KHF-00-101983-FA-5804-0001-0000-02 Page 55 of 72
PROGRESS MEASUREMENT SCHEDULE

Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amonut (OMR) Preamble Code Percentage

M4.03.03.03.V004 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 200 MM M3 7.80 2,061.770 16,081.81 P-M4-004 0.0140%

M4.03.03.03.V005 C.OM.JYK.DF.00.332.SHC Insulation Thickness: 225 MM M3 0.70 2,061.770 1,443.24 P-M4-004 0.0013%

M4.04.01 Engineered Steam Tracing


M4.04.01.01 C.OM.JYK.DF.00.332.SHC Installation of Engineered steam Tracing on External Surface of Equipment M2 900.00 40.630 36,567.00 P-M4-005 0.0319%

Subtotal (OMR) 793,845.48 0.6918%

KHF-00-101983-FA-5804-0001-0000-02 Page 56 of 72
PROGRESS MEASUREMENT SCHEDULE

Contract C311520 - Construction Services for Yibal Khuff Project On Plot

Section C5,
HSE Installation Works
Schedule C Bill H1

Unit Price
Item Code CBS Code Description UOM Est. Qty Amount (OMR) Preamble Code Percentage
(OMR)
H1 HSE Installation Works
H1.01 Installation of following Fire Hydrant Stand Post with Accessories (including pumper connection)
H1.01.V003 C.OM.JYK.DF.00.332.SJ Fire Hydrant Stand Post With Accessories Ways: 4 Nos. Nos. 126.00 84.110 10,597.86 P-H1-001 0.0092%
Installation of following Fire Hose Cabinet with all accessories as per project specifications &
H1.03
drawings
H1.03.01 Outdoor Type
H1.03.01.V001 C.OM.JYK.DF.00.332.SJ No. of Pistol Grip Nozzle: 2 Nos.; No. of Fire Hose: 2 Nos. Set 126.00 39.250 4,945.50 P-H1-001 0.0043%
H1.04 Monitors
Installation of Firewater Oscillating Monitor Capable of 360 deg horizontal and +90 to -45 deg
H1.04.03
vertical movement. 2.5 in fog and straight nozzle of following capacity.
H1.04.03.V001 C.OM.JYK.DF.00.332.SJ Capacity: 120 M3/Hr. Nos. 30.00 16.820 504.60 P-H1-001 0.0004%
H1.04.03.V002 C.OM.JYK.DF.00.332.SJ Capacity: 180 M3/Hr. Nos. 16.00 16.820 269.12 P-H1-001 0.0002%
Installation of following Dry/ Wet riser Landing Valve with Hose Reel with all accessories (Self
H1.05
Regulating control valve Nozzle, angle valves, wrenches and adaptors)
H1.05.01 Type : Internal
H1.05.01.V001 C.OM.JYK.DF.00.332.SJ Hose Reel Diameter: 1 Inch; Hose Reel Length: 30 M Nos. 28.00 19.630 549.64 P-H1-001 0.0005%
H1.06 Deluge/ Foam system equipment
H1.06.002 C.OM.JYK.DF.00.332.SJ Installation of Foam Storage Tank (Capacity) with all accessories Set 1.00 700.910 700.91 P-H1-001 0.0006%
H1.06.003 C.OM.JYK.DF.00.332.SJ Filling of Foam Concentrate Litre 3,000.00 0.700 2,100.00 P-H1-001 0.0018%
Installation of following Deluge skid (Water/Foam spray) Containing a Isolation valve, pressure
H1.06.01 indicator, pressure transmitter, Orifice Plate, Basic trim kit including water motor gong, basket
strainer, deluge valve. Skid sandblasted & painted.
H1.06.01.V002 C.OM.JYK.DF.00.332.SJ Size: 4 Inch Nos. 9.00 350.460 3,154.14 P-H1-001 0.0027%
H1.06.02 Installation of following Foam Pump Skid
FIREDOS / FIREMIKS Water Driven Foam Pumping / Mixing Pump Unit ( Foam Proportioner
H1.06.02.004 C.OM.JYK.DF.00.332.SJ Set 2.00 350.460 700.92 P-H1-001 0.0006%
System - Mechanical Direct Water Driven Variable Foam injection System )
H1.06.03 Installation of following Water/Foam Spray Nozzle (316 stainless steel/Brass/Naval Brass )
H1.06.03.V002 C.OM.JYK.DF.00.332.SJ Size: 0.5 Inch Nos. 94.00 28.040 2,635.76 P-H1-001 0.0023%
H1.06.07 Installation of Deluge Valve
H1.06.07.001 C.OM.JYK.DF.00.332.SJ Size: 4 Inch (At Inlet of Oscillation Monitor) Nos. 46.00 8.410 386.86 P-H1-001 0.0003%
H1.06.07.002 C.OM.JYK.DF.00.332.SJ Size: 6 Inch ( For CANSOLV Unit) Nos. 1.00 8.410 8.41 P-H1-001 0.0000%
H1.06.07.003 C.OM.JYK.DF.00.332.SJ Size: 8 Inch ( On Foam Lines to Tanks (T-3401 / T-3402) Nos. 2.00 8.410 16.82 P-H1-001 0.0000%
H1.06.08 Bursting disc on foam discharge outlet line
H1.06.08.001 C.OM.JYK.DF.00.332.SJ Size: 8 Inch Nos. 2.00 28.040 56.08 P-H1-001 0.0000%
H1.06.09 Installation of High Back Presure Foam Maker (HBPFM)
H1.06.09.001 C.OM.JYK.DF.00.332.SJ HBPFM 250 Nos. 4.00 35.050 140.20 P-H1-001 0.0001%
H1.10 Installation of Portable & Mobile Fire Extinguishing Equipment
H1.10.001 C.OM.JYK.DF.00.332.SJ DCP - Portable Extinguisher - 9 Kg Nos. 63.00 4.210 265.23 P-H1-001 0.0002%
H1.10.002 C.OM.JYK.DF.00.332.SJ CO2 - Portable Extinguisher - 5 Kg Nos. 24.00 4.210 101.04 P-H1-001 0.0001%
H1.10.003 C.OM.JYK.DF.00.332.SJ Foam - Portable Extinguisher - 9 kg Nos. 3.00 4.210 12.63 P-H1-001 0.0000%
H1.10.004 C.OM.JYK.DF.00.332.SJ Wheeled type Dry Powder Extinguisher - 50 Kg Nos. 7.00 11.210 78.47 P-H1-001 0.0001%
H1.10.005 C.OM.JYK.DF.00.332.SJ Wheeled type CO2 Fire Extinguisher - 45 Kg Nos. 5.00 11.210 56.05 P-H1-001 0.0000%
H1.10.008 C.OM.JYK.DF.00.332.SJ CO2 - Portable Extinguisher - 9 kg Nos. 27.00 4.210 113.67 P-H1-001 0.0001%
H1.10.009 C.OM.JYK.DF.00.332.SJ Wet Chemical - Portable Extinguisher - 6l Nos. 7.00 4.210 29.47 P-H1-001 0.0000%
H1.11 Safety Equipment
Installation of Safety Shower and Eye Wash Station with Insulated storage tank and In-Built
H1.11.002 C.OM.JYK.DF.00.332.SJ Set 9.00 35.050 315.45 P-H1-001 0.0003%
Chiller
H1.11.003 C.OM.JYK.DF.00.332.SJ Installation of Self Contained Eye Wash Station Nos. 7.00 21.030 147.21 P-H1-001 0.0001%
H1.11.004 C.OM.JYK.DF.00.332.SJ Installation of Wind Sock with Pole Nos. 20.00 350.460 7,009.20 P-H1-001 0.0061%

KHF-00-101983-FA-5804-0001-0000-02 Page 57 of 72
PROGRESS MEASUREMENT SCHEDULE

Unit Price
Item Code CBS Code Description UOM Est. Qty Amount (OMR) Preamble Code Percentage
(OMR)
H1.11.006 C.OM.JYK.DF.00.332.SJ Placing of Fire Blankets Nos. 7.00 2.800 19.60 P-H1-001 0.0000%
H1.11.008 C.OM.JYK.DF.00.332.SJ Installation of Safety Shower with Insulated Storage Tank Nos. 5.00 28.040 140.20 P-H1-001 0.0001%
H1.11.009 C.OM.JYK.DF.00.332.SJ Catridge Face Masks Nos. 250.00 2.800 700.00 P-H1-001 0.0006%
H1.11.010 C.OM.JYK.DF.00.332.SJ Storage Cabinet for 25 Nos. of Catridge Face Masks Nos. 9.00 2.800 25.20 P-H1-001 0.0000%
Emergency Escape Breathing Apparatus (EEBA) With Cabinet:
Escape set shall be light weight with fully adjustable twin strap shoulder harness and back
H1.11.011 C.OM.JYK.DF.00.332.SJ Nos. 20.00 21.030 420.60 P-H1-001 0.0004%
mounted 2.0 liter water capacity 300 bar working pressure composite cylinder giving nominal 15
min of air for escape purposes
Working Sets (SCBA):
H1.11.012 C.OM.JYK.DF.00.332.SJ Wall mounted with cylinder sized for 45 min of air duration and with safety warning set at 30 min Nos. 20.00 7.010 140.20 P-H1-001 0.0001%
to ensure that 15 min breathing air supply is always available
H1.11.013 C.OM.JYK.DF.00.332.SJ SCBA (30 minutes duration) for Rescue Team Nos. 25.00 7.010 175.25 P-H1-001 0.0002%
Breathing Air Mobile CascadeTrailer (4 X 50l water capacity cylinders in 300 bar pressure) with
H1.11.014 C.OM.JYK.DF.00.332.SJ Set 10.00 210.270 2,102.70 P-H1-001 0.0018%
Anti-Static Heat Resistant BA Hoses
H1.11.015 C.OM.JYK.DF.00.332.SJ Fixed Manifolds for Breathing Air Mobile Trailer Nos. 15.00 28.040 420.60 P-H1-001 0.0004%
Breathing Air Hand Movable Mobile Cascade Trolleys (with four 9.0 liter 300 bar air storage
H1.11.016 C.OM.JYK.DF.00.332.SJ Set 3.00 28.040 84.12 P-H1-001 0.0001%
cylinders) and Anti-Static Heat Resistant BA Hoses
Portable manifolds will be floor mounted with tripod type floor stand. Manifold shall be fitted with
carrying handle, 1 off high flow Rectus quick release male plug for connection to feed hose, 4 off
H1.11.017 C.OM.JYK.DF.00.332.SJ Rectus quick release female couplers for connection to personnel hoses, constant reading Nos. 3.00 700.910 2,102.73 P-H1-001 0.0018%
pressure gauge, safety pressure relief valve and bleed valve for release of pressure for ease of
disconnection
H1.11.018 C.OM.JYK.DF.00.332.SJ H2S Portable Monitors Nos. 20.00 14.020 280.40 P-H1-001 0.0002%
H1.11.019 C.OM.JYK.DF.00.332.SJ SO2 Portable Monitors Nos. 20.00 14.020 280.40 P-H1-001 0.0002%
H1.11.020 C.OM.JYK.DF.00.332.SJ Oxygen Resuscitator Nos. 3.00 14.020 42.06 P-H1-001 0.0000%
H1.11.021 C.OM.JYK.DF.00.332.SJ Oxygen Bottle Nos. 3.00 14.020 42.06 P-H1-001 0.0000%
Installation of Safety Shower and Eye Wash Station with Insulated storage tank and without
H1.11.022 C.OM.JYK.DF.00.332.SJ Set 9.00 21.030 189.27 P-H1-001 0.0002%
Chiller
H1.12 Signage's
H1.12.001 C.OM.JYK.DF.00.332.SJ Installation of Indoor Safety Signs Nos. 480.00 7.010 3,364.80 P-H1-001 0.0029%
H1.12.002 C.OM.JYK.DF.00.332.SJ Installation of Outdoor Safety Signs Nos. 250.00 7.010 1,752.50 P-H1-001 0.0015%

Subtotal (OMR) 47,177.93 0.0411%

KHF-00-101983-FA-5804-0001-0000-02 Page 58 of 72
PROGRESS MEASUREMENT SCHEDULE

Contract C311520 - Construction Services for Yibal Khuff Project On Plot

Section C5, Schedule


Electrical Works
C Bill E1
Preamble
Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Percentage
Code
E1 Electrical Works
E1.01 ELECTRICAL EQUIPMENT
E1.01.01 Transformer Installation, Testing and Pre-commissioning
E1.01.01.01 Transformer- Voltage Rating upto 1.1KV, Outdoor Type
E1.01.01.02 Transformer- Voltage Rating above 1.1 KV and upto 11KV, Outdoor Type
E1.01.01.02.001 C.OM.JYK.DF.00.332.SK Weight up to & including 5 MT MT 20.76 288.480 5,988.84 P-E1-001 0.0052%
E1.01.01.02.002 C.OM.JYK.DF.00.332.SK Weight above 5 MT and up to 10 MT MT 147.84 314.080 46,433.59 P-E1-001 0.0405%
E1.01.01.03 Transformer- Voltage Rating above 11 KV and up to 33 KV, Outdoor Type
E1.01.01.03.003 C.OM.JYK.DF.00.332.SK Weight above 10 MT and up to 25 MT MT 60.00 373.910 22,434.60 P-E1-001 0.0196%
E1.01.01.03.004 C.OM.JYK.DF.00.332.SK Weight above 25 MT and up to 50 MT MT 206.00 384.900 79,289.40 P-E1-001 0.0691%
E1.01.01.03.005 C.OM.JYK.DF.00.332.SK Weight above 50 MT and up to 100 MT MT 77.00 424.380 32,677.26 P-E1-001 0.0285%
Installation, Testing and Pre-commissioning - Switchgear, Distribution Boards,
E1.01.02 Capacitor Banks, Variable Speed Drive, Remote Control Units (RTUs), UPS Panels,
Lighting Panels, All kind of other Panels etc.
E1.01.02.01 Voltage Rating upto 1.1KV, Outdoor Type
E1.01.02.01.003 C.OM.JYK.DF.00.332.SK Above 500 kg and Up to & including 1000kg MT 3.20 538.550 1,723.36 P-E1-002 0.0015%
E1.01.02.04 Voltage Rating upto 1.1KV, Indoor Type
E1.01.02.04.001 C.OM.JYK.DF.00.332.SK Up to & including 100 kg MT 0.07 1,548.380 108.39 P-E1-002 0.0001%
E1.01.02.04.003 C.OM.JYK.DF.00.332.SK Above 500 kg and Up to & including 1000kg MT 138.40 611.200 84,590.08 P-E1-002 0.0737%
E1.01.02.04.004 C.OM.JYK.DF.00.332.SK Above 1000 kg and Up to & including 1500 kg MT 5.90 543.290 3,205.41 P-E1-002 0.0028%
E1.01.02.04.005 C.OM.JYK.DF.00.332.SK Above 1500 kg and Up to & including 3000 kg MT 6.00 488.960 2,933.76 P-E1-002 0.0026%
E1.01.02.05 Voltage Rating above 1.1 KV and upto 11KV, Indoor Type
E1.01.02.05.004 C.OM.JYK.DF.00.332.SK Above 1000 kg and Up to & including 1500 kg MT 117.60 563.410 66,257.02 P-E1-002 0.0577%
E1.01.02.06 Voltage Rating above 11 KV & up to 33 KV, Indoor Type
E1.01.02.06.005 C.OM.JYK.DF.00.332.SK Above 1500 kg and Up to & including 3000 kg MT 38.00 507.070 19,268.66 P-E1-002 0.0168%
E1.01.02.06.006 C.OM.JYK.DF.00.332.SK Above 3000 kg MT 6.50 460.960 2,996.24 P-E1-002 0.0026%
C-E1.01.02.07 Voltage Rating above 11 KV & up to 132 KV, Outdoor Type
C-E1.01.02.07.001 C.OM.JYK.DF.00.332.SK Weight above 25 MT and up to 50 MT MT 30.00 518.790 15,563.70 P-E1-002 0.0136%
C-E1.01.02.08 Transformer Neutral Earthing Resistor (NER)
C-E1.01.02.08.001 C.OM.JYK.DF.00.332.SK Above 3000 kg MT 5.00 460.960 2,304.80 P-E1-022 0.0020%
C-E1.01.02.09 Installation of solar powered road lights
C-E1.01.02.09.001 C.OM.JYK.DF.00.332.SK Installation of Light poles (12 m height) powered by solar system Nos. 50.00 97.260 4,863.00 P-E1-018 0.0042%
E1.01.03 Bus Duct Installation, Testing and Pre-commissioning
E1.01.03.01 Bus Duct of Voltage Rating upto 1.1KV
E1.01.03.01.002 C.OM.JYK.DF.00.332.SK Segregated/ Non segregated Bus Duct with Current Rating above 2000 A M 240.00 106.310 25,514.40 P-E1-003 0.0222%
E1.01.05 Battery Banks Installation, Testing and Pre-commissioning
E1.01.05.001 C.OM.JYK.DF.00.332.SK Battery Bank for AC UPS MT 34.00 317.350 10,789.90 P-E1-005 0.0094%
E1.01.05.002 C.OM.JYK.DF.00.332.SK Battery Bank for DC UPS MT 14.00 317.350 4,442.90 P-E1-005 0.0039%
E1.01.06 Diesel Generators Installation, Testing and Pre-commissioning
Diesel generator Voltage Rating 400 V Complete with acoustic hood, fire alarm &
E1.01.06.01
suppression system.
E1.01.06.01.002 C.OM.JYK.DF.00.332.SK Weight above 5 MT and up to 10 MT MT 9.50 355.420 3,376.49 P-E1-006 0.0029%
E1.02.02 Cable/ Conductor Terminations
Cable Termination
E1.02.02.01
Heat Shrinkable Raychem or equivalent make
E1.02.02.01.01 Power Cable Rating 3.3 to 11 KV , 1 Core

KHF-00-101983-FA-5804-0001-0000-02 Page 59 of 72
PROGRESS MEASUREMENT SCHEDULE

Preamble
Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Percentage
Code
E1.02.02.01.01.003 C.OM.JYK.DF.00.332.SK Core Size 150 Sq. mm to 240 Sq. MM Nos. 360.00 58.970 21,229.20 P-E1-008 0.0185%
E1.02.02.01.01.004 C.OM.JYK.DF.00.332.SK Core Size 300 Sq. mm to 400 Sq. MM Nos. 30.00 64.460 1,933.80 P-E1-008 0.0017%
E1.02.02.01.01.005 C.OM.JYK.DF.00.332.SK Core Size 630 Sq. MM Nos. 168.00 75.430 12,672.24 P-E1-008 0.0110%
E1.02.02.01.02 Power Cable Rating 3.3 to 11 KV , 3 Core
E1.02.02.01.02.001 C.OM.JYK.DF.00.332.SK Core Size 25 Sq. mm to 50 Sq. MM Nos. 54.00 96.680 5,220.72 P-E1-008 0.0045%
E1.02.02.01.02.003 C.OM.JYK.DF.00.332.SK Core Size 150 Sq. mm to 240 Sq. MM Nos. 4.00 104.910 419.64 P-E1-008 0.0004%
E1.02.02.01.03 Power Cable Rating 33 KV , 1 Core
E1.02.02.01.03.003 C.OM.JYK.DF.00.332.SK Core Size 150 Sq. mm to 240 Sq. MM Nos. 24.00 58.970 1,415.28 P-E1-008 0.0012%
E1.02.02.01.03.004 C.OM.JYK.DF.00.332.SK Core Size 300 Sq. mm to 400 Sq. MM Nos. 12.00 64.460 773.52 P-E1-008 0.0007%
E1.02.02.01.03.005 C.OM.JYK.DF.00.332.SK Core Size 630 Sq. MM Nos. 84.00 75.430 6,336.12 P-E1-008 0.0055%
E1.02.02.01.07 Power Cable Rating 132 KV , 1 Core
E1.02.02.01.07.001 C.OM.JYK.DF.00.332.SK Core Size 240 Sq. mm to 400 Sq. MM Nos. 2.00 5,288.280 10,576.56 P-E1-008 0.0092%
E1.02.02.02 Power Cable Termination
E1.02.02.02.001 C.OM.JYK.DF.00.332.SK Core Size 4 Sq. mm to 6 Sq. MM Nos. 11,336.00 5.210 59,060.56 P-E1-008 0.0515%
E1.02.02.02.002 C.OM.JYK.DF.00.332.SK Core Size 10 Sq. mm to 16 Sq. MM Nos. 2,168.00 6.530 14,157.04 P-E1-008 0.0123%
E1.02.02.02.003 C.OM.JYK.DF.00.332.SK Core Size 25 Sq. mm to 50 Sq. MM Nos. 2,026.00 8.760 17,747.76 P-E1-008 0.0155%
E1.02.02.02.004 C.OM.JYK.DF.00.332.SK Core Size 70 Sq. mm to 120 Sq. MM Nos. 926.00 10.510 9,732.26 P-E1-008 0.0085%
E1.02.02.02.005 C.OM.JYK.DF.00.332.SK Core Size 150 Sq. mm to 240 Sq. MM Nos. 1,042.00 13.150 13,702.30 P-E1-008 0.0119%
E1.02.02.02.007 C.OM.JYK.DF.00.332.SK Core Size 630 Sq. MM Nos. 96.00 8.970 861.12 P-E1-008 0.0008%
E1.02.02.03 Control Cable Termination
E1.02.02.03.001 C.OM.JYK.DF.00.332.SK Core 2 to 7, Core size up to 2.5 Sq. MM Nos. 11,060.00 5.970 66,028.20 P-E1-008 0.0575%
E1.02.02.03.002 C.OM.JYK.DF.00.332.SK Core 8 to 19, Core size up to 2.5 Sq. MM Nos. 18,276.00 7.910 144,563.16 P-E1-008 0.1260%
E1.02.03 Cable Straight Through Joint
Bare / Insulated Conductors, 1 Core: (Earthing)
E1.02.03.05
Jointing for following conductors by crimping type connectors
E1.02.03.05.001 C.OM.JYK.DF.00.332.SK Core Size 4 Sq. mm to 6 Sq. MM Nos. 25,000.00 3.550 88,750.00 P-E1-008 0.0773%
E1.02.03.05.002 C.OM.JYK.DF.00.332.SK Core Size 10 Sq. mm to 16 Sq. MM Nos. 2,000.00 8.780 17,560.00 P-E1-008 0.0153%
E1.02.03.05.003 C.OM.JYK.DF.00.332.SK Core Size 25 Sq. mm to 50 Sq. MM Nos. 13,000.00 9.520 123,760.00 P-E1-008 0.1079%
E1.02.03.05.004 C.OM.JYK.DF.00.332.SK Core Size 70 Sq. mm to 120 Sq. MM Nos. 9,000.00 10.350 93,150.00 P-E1-008 0.0812%
E1.02.03.05.005 C.OM.JYK.DF.00.332.SK Core Size 300 Sq. mm to 400 Sq. MM Nos. 1,000.00 12.800 12,800.00 P-E1-008 0.0112%
E1.02.04 CABLE GLANDS FOR FOLLOWING CABLE SIZES
E1.02.04.001 C.OM.JYK.DF.00.332.SK Overall dia UP to & including 20 mm Nos. 5,976.00 11.870 70,935.12 P-E1-010 0.0618%
E1.02.04.002 C.OM.JYK.DF.00.332.SK Overall dia 20mm and Up to & including 30 mm Nos. 2,150.00 25.650 55,147.50 P-E1-010 0.0481%
E1.02.04.003 C.OM.JYK.DF.00.332.SK Overall dia 30mm and Up to & including 40 mm Nos. 200.00 33.810 6,762.00 P-E1-010 0.0059%
E1.02.04.004 C.OM.JYK.DF.00.332.SK Overall dia 40mm and Up to & including 50 mm Nos. 434.00 49.850 21,634.90 P-E1-010 0.0189%
E1.02.04.005 C.OM.JYK.DF.00.332.SK Overall dia 50mm and Up to & including 60 mm Nos. 128.00 77.660 9,940.48 P-E1-010 0.0087%

E1.03 CABLE TRAY/ LADDER AND ACCESSORIES : FABRICATION AND INSTALLATION

E1.03.V003 C.OM.JYK.DF.00.332.SK Width: 150 MM M 741.00 9.490 7,032.09 P-E1-011 0.0061%


E1.03.V004 C.OM.JYK.DF.00.332.SK Width: 300 MM M 1,260.00 13.290 16,745.40 P-E1-011 0.0146%
E1.03.V006 C.OM.JYK.DF.00.332.SK Width: 600 MM M 630.00 20.930 13,185.90 P-E1-011 0.0115%
LIGHTING FIXTURES: INSTALLATION, TESTING AND PRE-COMMISSIONING
E1.04
E1.04.01 Hazardous Area
Tubular fluorescent / LED Lighting fixture with 1 /2 /3 lamps 8W upto 80W, with all
E1.04.01.003 C.OM.JYK.DF.00.332.SK accessories and associated lighting junction box - Wall / Column Bracket mounted Nos. 41.00 22.400 918.40 P-E1-012 0.0008%
(L1-103 type)
High /Low Pressure Mercury (HPMV) / Sodium vapour (HPSV)/ Metal Halide lamp /
E1.04.01.008 C.OM.JYK.DF.00.332.SK halogen / LED Lighting fixture with 50W upto 400W lamps with all accessories and Nos. 469.00 39.200 18,384.80 P-E1-012 0.0160%
associated lighting junction box - Suspension mounted

KHF-00-101983-FA-5804-0001-0000-02 Page 60 of 72
PROGRESS MEASUREMENT SCHEDULE

Preamble
Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Percentage
Code
High /Low Pressure Mercury (HPMV) / Sodium vapour (HPSV)/ Metal Halide lamp /
halogen / LED Lighting fixture with 50W upto 400W lamps with all accessories and
E1.04.01.010 C.OM.JYK.DF.00.332.SK Nos. 1,147.00 52.260 59,942.22 P-E1-012 0.0522%
associated lighting junction box - Suitable for mounting on 4m upto 6m High Pole
(L1-131/132 types) with upto 2 fixtures
High /Low Pressure Mercury (HPMV) / Sodium vapour (HPSV)/ Metal Halide lamp /
halogen / LED Lighting fixture with 50W upto 400W lamps with all accessories and
E1.04.01.011 C.OM.JYK.DF.00.332.SK Nos. 204.00 62.700 12,790.80 P-E1-012 0.0111%
associated lighting junction box - Suitable for mounting on 8m upto 10m High Pole
(L1-142/143/144 / 145 / 146 / 147 types) with upto 4 fixtures
E1.04.01.015 C.OM.JYK.DF.00.332.SK Exit Light Nos. 110.00 22.400 2,464.00 P-E1-012 0.0021%
E1.04.02 Non Hazardous (Safe) Area
Tubular fluorescent Lighting fixture with 1 /2 /3 lamps 8W upto 80W, with all
E1.04.02.001 C.OM.JYK.DF.00.332.SK accessories and associated lighting junction box - Ceiling / False ceiling / beam Nos. 207.00 39.200 8,114.40 P-E1-012 0.0071%
mounted (L1-101A/B type)
Tubular fluorescent Lighting fixture with 1 /2 /3 lamps 8W upto 80W, with all
E1.04.02.002 C.OM.JYK.DF.00.332.SK accessories and associated lighting junction box - Suspension mounted (L1-102A/B Nos. 765.00 37.700 28,840.50 P-E1-012 0.0251%
types)
High /Low Pressure Mercury (HPMV) / Sodium vapour (HPSV)/ Metal Halide lamp /
halogen / LED Lighting fixture with 50W upto 400W lamps with all accessories and
E1.04.02.011 C.OM.JYK.DF.00.332.SK Nos. 1,603.00 37.080 59,439.24 P-E1-012 0.0518%
associated lighting junction box - Suitable for mounting on 8m upto 10m High Pole
(L1-142/143/144 / 145 / 146 / 147 types) with upto 4 fixtures
E1.04.02.015 C.OM.JYK.DF.00.332.SK Exit Light Nos. 61.00 20.900 1,274.90 P-E1-012 0.0011%
LIGHTING POLES STRAIGHT / HINGED TYPE:INSTALLATION, TESTING AND PRE-
E1.05
COMMISSIONING
E1.05.002 C.OM.JYK.DF.00.332.SK Pole height 4 M to 7 M (L1-131 type) Nos. 1,289.00 48.630 62,684.07 P-E1-013 0.0546%
E1.05.003 C.OM.JYK.DF.00.332.SK Pole height 8 M to 10 M (L1-132 / 143 / 146 / 147 types) Nos. 1,631.00 64.850 105,770.35 P-E1-013 0.0922%
SWITCHES, SOCKET OUTLET / WELDING OUTLET & LCS: INSTALLATION, TESTING
E1.06
AND PRE-COMMISSIONING
E1.06.001 C.OM.JYK.DF.00.332.SK Socket/ Outlet/ LCS up to 230V Nos. 873.00 44.030 38,438.19 P-E1-014 0.0335%
E1.06.002 C.OM.JYK.DF.00.332.SK Socket/ Outlet/ LCS 400V and above Nos. 1,051.00 52.830 55,524.33 P-E1-014 0.0484%
E1.07 JUNCTION BOX: INSTALLATION, TESTING AND PRE-COMMISSIONING
E1.07.001 C.OM.JYK.DF.00.332.SK Junction box of Size up to 300 mm wide X 300 mm long X 150 mm thick Nos. 2,886.00 44.030 127,070.58 P-E1-014 0.1107%
EARTHING AND LIGHTNING PROTECTION : INSTALLATION, TERMINATION,
E1.08
TESTING AND PRE-COMMISSIONING
E1.08.01 Earth Busbar
E1.08.01.002 C.OM.JYK.DF.00.332.SK Length above 500 mm Nos. 125.00 68.000 8,500.00 P-E1-015 0.0074%
E1.08.02 Earthing Electrode
E1.08.02.001 C.OM.JYK.DF.00.332.SK Up to 5.0 meter depth by driving method Nos. 616.00 297.330 183,155.28 P-E1-015 0.1596%
E1.08.03 Lightning Protection
E1.08.03.001 C.OM.JYK.DF.00.332.SK Air Terminal complete with base plate support Nos. 6.00 104.180 625.08 P-E1-015 0.0005%
E1.08.03.002 C.OM.JYK.DF.00.332.SK Test-link box Nos. 46.00 69.170 3,181.82 P-E1-015 0.0028%
E1.08.03.003 C.OM.JYK.DF.00.332.SK Copper Strip/ Tape 25mm x 3mm M 2,053.00 14.820 30,425.46 P-E1-015 0.0265%
E1.09 CONDUIT/ PIPE
E1.09.V001 C.OM.JYK.DF.00.332.SK Size: 0.75 Inch M 4,530.00 3.620 16,398.60 P-E1-009 0.0143%
HEAT TRACING: INSTALLATION, TERMINATION, TESTING AND PRE-
E1.10
COMMISSIONING
E1.10.01 Heat Tracing Cables and accessories
E1.10.01.001 C.OM.JYK.DF.00.332.SK Parallel self regulating type heater cable M 1,760.00 1.140 2,006.40 P-E1-016 0.0017%
E1.10.01.002 C.OM.JYK.DF.00.332.SK Thermostat Nos. 70.00 109.990 7,699.30 P-E1-016 0.0067%
E1.10.01.003 C.OM.JYK.DF.00.332.SK Junction Box Nos. 70.00 47.140 3,299.80 P-E1-016 0.0029%
E1.10.01.004 C.OM.JYK.DF.00.332.SK Heat Tracing Distribution Board MT 1.60 74.700 119.52 P-E1-016 0.0001%
C-E1.10.01.005 C.OM.JYK.DF.00.332.SK Multi Cable Transit (MCT) System: Frame and MCT block installation Nos. 1.00 87.290 87.29 P-E1-017 0.0001%
E1.11 ELECTRICAL NETWORK, MONITORING AND CONTROL SYSTEM (ENMCS)
E1.11.01.001 C.OM.JYK.DF.00.332.SK Server Nos. 3.00 394.950 1,184.85 P-E1-002 0.0010%

KHF-00-101983-FA-5804-0001-0000-02 Page 61 of 72
PROGRESS MEASUREMENT SCHEDULE

Preamble
Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Percentage
Code
E1.11.01.002 C.OM.JYK.DF.00.332.SK Engineering Work Station (EWS) Nos. 4.00 443.030 1,772.12 P-E1-002 0.0015%
E1.11.01.003 C.OM.JYK.DF.00.332.SK Operator Work Station (OWS) Nos. 1.00 355.460 355.46 P-E1-002 0.0003%
E1.11.01.004 C.OM.JYK.DF.00.332.SK ENMCS controller Nos. 6.00 61.900 371.40 P-E1-002 0.0003%
E1.11.01.005 C.OM.JYK.DF.00.332.SK Switch Nos. 10.00 102.010 1,020.10 P-E1-002 0.0009%
E1.11.01.006 C.OM.JYK.DF.00.332.SK SCADA Gate way Nos. 1.00 76.340 76.34 P-E1-002 0.0001%
E1.11.01.007 C.OM.JYK.DF.00.332.SK Electrical domine Gate way Nos. 1.00 101.800 101.80 P-E1-002 0.0001%
E1.11.01.008 C.OM.JYK.DF.00.332.SK Printer Nos. 1.00 61.900 61.90 P-E1-002 0.0001%
E1.12 CABLES
E1.12.01 19/33 (36) kV, Cu/XLPE/AWA/PVC
E1.12.01.001 C.OM.JYK.DF.00.332.SK 1C X 630 Sq.mm M 14,370.00 1.880 27,015.60 P-E1-007 0.0235%
E1.12.01.002 C.OM.JYK.DF.00.332.SK 1C X 300 Sq.mm M 690.00 1.880 1,297.20 P-E1-007 0.0011%
E1.12.01.003 C.OM.JYK.DF.00.332.SK 1C X 150 Sq.mm M 1,560.00 1.400 2,184.00 P-E1-007 0.0019%
E1.12.02 8.7/15 (17.5) kV, Cu/XLPE/AWA/PVC
E1.12.02.001 C.OM.JYK.DF.00.332.SK 1C X 300 Sq.mm M 900.00 1.880 1,692.00 P-E1-007 0.0015%
E1.12.03 6.35/11 (12) kV, Cu/XLPE/AWA/PVC
E1.12.03.001 C.OM.JYK.DF.00.332.SK 1C X 300 Sq.mm M 600.00 1.880 1,128.00 P-E1-007 0.0010%
E1.12.03.002 C.OM.JYK.DF.00.332.SK 1C X 240 Sq.mm M 4,320.00 1.490 6,436.80 P-E1-007 0.0056%
E1.12.03.003 3.8/6.6 (7.2) kV, Cu/XLPE/AWA/PVC
E1.12.03.004 C.OM.JYK.DF.00.332.SK 1C X 630 Sq.mm M 6,240.00 1.680 10,483.20 P-E1-007 0.0091%
E1.12.03.005 C.OM.JYK.DF.00.332.SK 1C X 240 Sq.mm M 27,630.00 1.490 41,168.70 P-E1-007 0.0359%
E1.12.03.006 C.OM.JYK.DF.00.332.SK 1C X 150 Sq.mm M 12,720.00 1.400 17,808.00 P-E1-007 0.0155%
E1.12.04 3.8/6.6 (7.2) kV, Cu/XLPE/SWA/PVC
E1.12.04.001 C.OM.JYK.DF.00.332.SK 3C X 50 Sq.mm M 7,560.00 1.250 9,450.00 P-E1-007 0.0082%
E1.12.04.002 C.OM.JYK.DF.00.332.SK 3C X 185 Sq.mm M 700.00 2.330 1,631.00 P-E1-007 0.0014%
E1.12.05 76/132 (145) kV, Cu/XLPE/HDP
E1.12.05.001 C.OM.JYK.DF.00.332.SK 1C X 240 Sq.mm(O.D 70mm) M 1,200.00 4.490 5,388.00 P-E1-007 0.0047%
E1.12.06 0.6/1kV, Cu/XLPE/PVC/AWA/PVC
E1.12.06.001 C.OM.JYK.DF.00.332.SK 1CX630 Sq.mm M 3,754.00 2.100 7,883.40 P-E1-007 0.0069%
E1.12.07 0.6/1kV, Cu/XLPE/PVC/SWA/PVC
E1.12.07.001 C.OM.JYK.DF.00.332.SK 2CX2.5 Sq.mm M 70,199.00 0.630 44,225.37 P-E1-007 0.0385%
E1.12.07.002 C.OM.JYK.DF.00.332.SK 2CX4 Sq.mm M 12,254.00 0.670 8,210.18 P-E1-007 0.0072%
E1.12.07.003 C.OM.JYK.DF.00.332.SK 2CX6 Sq.mm M 8,698.00 0.730 6,349.54 P-E1-007 0.0055%
E1.12.07.004 C.OM.JYK.DF.00.332.SK 2CX10 Sq.mm M 1,889.00 0.760 1,435.64 P-E1-007 0.0013%
E1.12.07.005 C.OM.JYK.DF.00.332.SK 2CX16 Sq.mm M 22,580.00 0.800 18,064.00 P-E1-007 0.0157%
E1.12.07.006 C.OM.JYK.DF.00.332.SK 2CX25 Sq.mm M 294.00 0.840 246.96 P-E1-007 0.0002%
E1.12.07.007 C.OM.JYK.DF.00.332.SK 2CX35 Sq.mm M 80.00 0.880 70.40 P-E1-007 0.0001%
E1.12.07.008 C.OM.JYK.DF.00.332.SK 2CX50 Sq.mm M 160.00 0.910 145.60 P-E1-007 0.0001%
E1.12.07.009 C.OM.JYK.DF.00.332.SK 2CX95 Sq.mm M 176.00 0.970 170.72 P-E1-007 0.0001%
E1.12.07.010 C.OM.JYK.DF.00.332.SK 3CX2.5 Sq.mm M 60,121.00 0.640 38,477.44 P-E1-007 0.0335%
E1.12.07.011 C.OM.JYK.DF.00.332.SK 3CX4 Sq.mm M 5,875.00 0.690 4,053.75 P-E1-007 0.0035%
E1.12.07.012 C.OM.JYK.DF.00.332.SK 3CX6 Sq.mm M 11,301.00 0.760 8,588.76 P-E1-007 0.0075%
E1.12.07.013 C.OM.JYK.DF.00.332.SK 3CX10 Sq.mm M 18,280.00 0.790 14,441.20 P-E1-007 0.0126%
E1.12.07.014 C.OM.JYK.DF.00.332.SK 3CX16 Sq.mm M 19,661.00 0.830 16,318.63 P-E1-007 0.0142%
E1.12.07.015 C.OM.JYK.DF.00.332.SK 3CX25 Sq.mm M 53,357.00 0.880 46,954.16 P-E1-007 0.0409%
E1.12.07.016 C.OM.JYK.DF.00.332.SK 3CX35 Sq.mm M 32,328.00 0.910 29,418.48 P-E1-007 0.0256%
E1.12.07.017 C.OM.JYK.DF.00.332.SK 3CX50 Sq.mm M 9,279.00 0.970 9,000.63 P-E1-007 0.0078%
E1.12.07.018 C.OM.JYK.DF.00.332.SK 3CX70 Sq.mm M 17,016.00 1.020 17,356.32 P-E1-007 0.0151%
E1.12.07.019 C.OM.JYK.DF.00.332.SK 3CX95 Sq.mm M 10,771.00 1.120 12,063.52 P-E1-007 0.0105%
E1.12.07.020 C.OM.JYK.DF.00.332.SK 3CX120 Sq.mm M 8,461.00 1.280 10,830.08 P-E1-007 0.0094%

KHF-00-101983-FA-5804-0001-0000-02 Page 62 of 72
PROGRESS MEASUREMENT SCHEDULE

Preamble
Item Code CBS Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Percentage
Code
E1.12.07.021 C.OM.JYK.DF.00.332.SK 3CX150 Sq.mm M 17,105.00 1.490 25,486.45 P-E1-007 0.0222%
E1.12.07.022 C.OM.JYK.DF.00.332.SK 3CX185 Sq.mm M 23,260.00 1.670 38,844.20 P-E1-007 0.0339%
E1.12.07.023 C.OM.JYK.DF.00.332.SK 4CX2.5 Sq.mm M 67,337.00 0.670 45,115.79 P-E1-007 0.0393%
E1.12.07.024 C.OM.JYK.DF.00.332.SK 4CX4 Sq.mm M 8,458.00 0.730 6,174.34 P-E1-007 0.0054%
E1.12.07.025 C.OM.JYK.DF.00.332.SK 4CX10 Sq.mm M 602.00 0.810 487.62 P-E1-007 0.0004%
E1.12.07.026 C.OM.JYK.DF.00.332.SK 4CX16 Sq.mm M 140.00 0.860 120.40 P-E1-007 0.0001%
E1.12.07.027 C.OM.JYK.DF.00.332.SK 4CX25 Sq.mm M 1,067.00 0.940 1,002.98 P-E1-007 0.0009%
E1.12.07.028 C.OM.JYK.DF.00.332.SK 4CX50 Sq.mm M 514.00 1.020 524.28 P-E1-007 0.0005%
E1.12.07.029 C.OM.JYK.DF.00.332.SK 4CX70 Sq.mm M 1,112.00 1.120 1,245.44 P-E1-007 0.0011%
E1.12.07.030 C.OM.JYK.DF.00.332.SK 4CX95 Sq.mm M 1,651.00 1.360 2,245.36 P-E1-007 0.0020%
E1.12.07.031 C.OM.JYK.DF.00.332.SK 4CX120 Sq.mm M 263.00 1.640 431.32 P-E1-007 0.0004%
E1.12.07.032 C.OM.JYK.DF.00.332.SK 4CX150 Sq.mm M 493.00 1.890 931.77 P-E1-007 0.0008%
E1.12.07.033 C.OM.JYK.DF.00.332.SK 4CX185 Sq.mm M 4,719.00 2.230 10,523.37 P-E1-007 0.0092%
E1.12.07.034 C.OM.JYK.DF.00.332.SK 7CX2.5 Sq.mm M 242,709.00 0.810 196,594.29 P-E1-007 0.1713%
E1.12.07.035 C.OM.JYK.DF.00.332.SK 12CX2.5 Sq.mm M 39,288.00 0.980 38,502.24 P-E1-007 0.0336%
E1.12.07.036 C.OM.JYK.DF.00.332.SK 19CX2.5 Sq.mm M 1,618.00 1.090 1,763.62 P-E1-007 0.0015%
E1.12.08 Lighting Cable; 0.6/1kV, Cu/XLPE/PVC/SWA/PVC
E1.12.08.001 C.OM.JYK.DF.00.332.SK 4CX10 Sq.mm M 8,400.00 0.810 6,804.00 P-E1-007 0.0059%
E1.12.08.002 C.OM.JYK.DF.00.332.SK 4CX16 Sq.mm M 11,200.00 0.860 9,632.00 P-E1-007 0.0084%
E1.12.08.003 C.OM.JYK.DF.00.332.SK 4CX25 Sq.mm M 13,200.00 0.940 12,408.00 P-E1-007 0.0108%
E1.12.08.004 C.OM.JYK.DF.00.332.SK 2CX2.5 Sq.mm M 2,700.00 0.630 1,701.00 P-E1-007 0.0015%
E1.12.09 Lighting Wires
E1.12.09.001 C.OM.JYK.DF.00.332.SK 2.5 Sq.mm M 30,400.00 0.170 5,168.00 P-E1-007 0.0045%
E1.12.09.002 C.OM.JYK.DF.00.332.SK 4 Sq.mm M 5,000.00 0.180 900.00 P-E1-007 0.0008%
C-E1.12.10 EARTHING CABLES
0.45/0.75 kV grade, Cu/PVC, stranded, plain annealed copper conductor, extruded
Yellow / Green PVC insulation of flame retardant.
C-E1.12.10.001 C.OM.JYK.DF.00.332.SK 1C X 6 Sq.mm M 10,000.00 0.520 5,200.00 P-E1-007 0.0045%
C-E1.12.10.002 C.OM.JYK.DF.00.332.SK 1C X 16 Sq.mm M 10,000.00 1.040 10,400.00 P-E1-007 0.0091%
C-E1.12.10.003 C.OM.JYK.DF.00.332.SK 1C X 25 Sq.mm M 45,000.00 1.640 73,800.00 P-E1-007 0.0643%
C-E1.12.10.004 C.OM.JYK.DF.00.332.SK 1C X 35 Sq.mm M 500.00 2.140 1,070.00 P-E1-007 0.0009%
C-E1.12.10.005 C.OM.JYK.DF.00.332.SK 1C X 70 Sq.mm M 35,000.00 4.280 149,800.00 P-E1-007 0.1306%
C-E1.12.10.006 C.OM.JYK.DF.00.332.SK 1C X 120 Sq.mm M 2,000.00 7.210 14,420.00 P-E1-007 0.0126%
C-E1.12.10.007 C.OM.JYK.DF.00.332.SK 1C X 400 Sq.mm M 6,000.00 22.600 135,600.00 P-E1-007 0.1182%
C-E1.13 Structural steel support fabrication/installation
C-E1.13.001 C.OM.JYK.DF.00.332.SK Supply, Fabrication, Painting, Erection of Structural Steel Supports MT 1.00 3,764.740 3,764.74 P-E1-019 0.0033%

Subtotal (OMR) 3,421,342.46 2.9817%

KHF-00-101983-FA-5804-0001-0000-02 Page 63 of 72
PROGRESS MEASUREMENT SCHEDULE

Contract C311520 - Construction Services for Yibal Khuff Project On Plot

Section C5,
Cathodic Protection Works
Schedule C Bill E2
Unit Price Preamble
Item Code CBS Code Description UOM Est. Qty Amount (OMR) Percentage
(OMR) Code
E2 Cathodic Protection (CP) Works
E2.01 Installation of Transformer Rectifier
E2.01.002 C.OM.JYK.DF.00.332.SL Weight above 0.5 MT and up to 1 MT MT 14.40 288.480 4,154.11 P-E2-001 0.0036%
E2.02 Installation of Test Facilities
E2.02.004 C.OM.JYK.DF.00.332.SL Three Pin Test Station Nos. 126.00 52.050 6,558.30 P-E2-002 0.0057%
Installation of Junction/ Distribution Boxes, PCR Enclosure Box, Drain Point, Potential
E2.03
Monitoring and other Test Box of following size
E2.03.V005 C.OM.JYK.DF.00.332.SL Length: 450 MM ; Width: 450 MM ; Height: 260 MM Nos. 77.00 52.050 4,007.85 P-E2-003 0.0035%
E2.04 CABLES/ CONDUCTORS
E2.04.001 C.OM.JYK.DF.00.332.SL Application of Coating Repair Material Nos. 198.00 83.000 16,434.00 P-E2-005 0.0143%
E2.04.01 Cables Laying
E2.04.01.V002 C.OM.JYK.DF.00.332.SL Core Size: 10 MM2; Nos. of Core: 1 Nos. M 3,690.00 0.760 2,804.40 P-E2-004 0.0024%
E2.04.01.V003 C.OM.JYK.DF.00.332.SL Core Size: 16 MM2; Nos. of Core: 1 Nos. M 4,398.00 0.800 3,518.40 P-E2-004 0.0031%
E2.04.01.V005 C.OM.JYK.DF.00.332.SL Core Size: 35 MM2; Nos. of Core: 1 Nos. M 1,440.00 0.880 1,267.20 P-E2-004 0.0011%
E2.04.02 Cable Termination
E2.04.02.002 C.OM.JYK.DF.00.332.SL Pin Brazing Nos. 198.00 112.260 22,227.48 P-E2-005 0.0194%
E2.05 Installation of CP Anoded Bed For Piping & Pipelines
E2.05.014 C.OM.JYK.DF.00.332.SL Soil Potential Access Pot Nos. 92.00 69.400 6,384.80 P-E2-006 0.0056%
E2.05.020 C.OM.JYK.DF.00.332.SL Pre-Packaged Zinc / Magneisum sacrificial anode Vertical installation Nos. 126.00 59.090 7,445.34 P-E2-006 0.0065%
E2.06 Installation of CP System For Tanks External
E2.06.01 ICCP Type
E2.06.01.002 C.OM.JYK.DF.00.332.SL Conductor Bar / Anode Ribbon installation M 8,145.00 2.070 16,860.15 P-E2-006 0.0147%
E2.06.01.004 C.OM.JYK.DF.00.332.SL Anode Power Feeder installation Nos. 66.00 104.110 6,871.26 P-E2-006 0.0060%
E2.06.01.006 C.OM.JYK.DF.00.332.SL Installation of Perforated uPVC monitoring length pipe on underside of tank base Nos. 24.00 34.700 832.80 P-E2-006 0.0007%
Installation of uPVC perimeter monitoring tube (Permanent Access Point) beneath tank
E2.06.01.007 C.OM.JYK.DF.00.332.SL Nos. 96.00 34.700 3,331.20 P-E2-006 0.0029%
base.
E2.07 Installation of Tanks Internal CP
E2.07.02 Sacrificial Anode CP Type
E2.07.02.001 C.OM.JYK.DF.00.332.SL Installation of anodes on the welded brackets, secure with nut & bolts. Nos. 786.00 69.400 54,548.40 P-E2-006 0.0475%
E2.07.02.002 C.OM.JYK.DF.00.332.SL Reference anode installation through tank shell Nos. 24.00 104.110 2,498.64 P-E2-006 0.0022%
E2.08 Installation of CP Monitoring Equipment
E2.08.002 C.OM.JYK.DF.00.332.SL Coupon Installation Nos. 33.00 116.910 3,858.03 P-E2-006 0.0034%

Subtotal (OMR) 163,602.36 0.1426%

KHF-00-101983-FA-5804-0001-0000-02 Page 64 of 72
PROGRESS MEASUREMENT SCHEDULE

Contract C311520 - Construction Services for Yibal Khuff Project On Plot

Section C5,
Telecom Works
Schedule C Bill T1

Unit Rate Preamble


Item Code CBS Code Description UOM Est. Qty Amount (OMR) Percentage
(OMR) Code

T1 Telecom Works
T1.01 TELECOMMUNICATION INFRASTRUCTURE INSTALLATION
T1.01.01 ERECTION OF TOWER
Four legged telecommunications tower, erected to manufacturer's specifications, complete with one work/
rest platform onto pre-cast foundations and anchor bolts, inclusive of lightening protection final, Earthing
T1.01.01.01
connection to ground earth ring, complete with safety climbing ladder and safety cage or hoist mechanism
of following height
T1.01.01.01.004 C.OM.JYK.DF.00.332.SM Tower Height - above 40 M and up to 60 M Nos. 1.00 69,951.300 69,951.30 P-T1-001 0.0610%
T1.01.01.02 Additional work/ rest platform, complete with hatch and safety rail of following area
T1.01.02 INSTALLATION OF ANTENNAS
T1.01.02.01 Installation of Tower mounted microwave dish of following diameter onto support bracket/ pole/ standoff
T1.01.02.01.003 C.OM.JYK.DF.00.332.SM Dish Diameter - above 1.2 Meter and up to 2.0 Meter Nos. 12.00 1,051.370 12,616.44 P-T1-001A 0.0110%

T1.01.02.02 Installation of Tower mounted Yaggi antenna of following dimension onto support bracket/ pole/ standoff
Installation of Tower/ Roof mounted Omni-directional antenna of following dimension onto support
T1.01.02.03
bracket/ pole/ standoff
T1.01.02.03.002 C.OM.JYK.DF.00.332.SM Omni-directional antenna dimension above 1 M Nos. 14.00 711.470 9,960.58 P-T1-001A 0.0087%
Installation of feeder/ co-axial cable/ waveguide complete with hangers connector, clamps, earthing kits,
T1.01.02.04
wall glands etc. of following size.
T1.01.02.05 Installation of ground level satellite dish following diameter onto pre-cast foundations
T1.01.03 ERECTION OF TELECOMMUNICATION POLES ETC.
T1.01.03.001 C.OM.JYK.DF.00.332.SM Installation of external Telephone outdoor hood Nos. 10.00 33.560 335.60 P-T1-001B 0.0003%
T1.01.03.003 C.OM.JYK.DF.00.332.SM Installation - Field Marshalling Box Nos. 6.00 36.450 218.70 P-T1-001B 0.0002%
T1.01.03.01 Miscellaneous pole of following height erected on pre-cast concrete foundations with anchor bolts
T1.01.03.01.001 C.OM.JYK.DF.00.332.SM Pole Height - up to 1.5 M Nos. 14.00 36.450 510.30 P-T1-001B 0.0004%
Installation of Self supporting tilt-over mounting pole/tower for Camera of following height on pre-cast
T1.01.03.02
concrete foundations
T1.01.03.02.002 C.OM.JYK.DF.00.332.SM Height - above 3.0 M and up to 9M Nos. 104.00 77.100 8,018.40 P-T1-001B 0.0070%
T1.01.03.03 Installation of Mounting poles of following for outdoor field telephones on pre-cast concrete foundations
T1.01.03.03.001 C.OM.JYK.DF.00.332.SM Height - 1.5m Nos. 10.00 28.040 280.40 P-T1-001B 0.0002%
T1.01.03.04 Installation of Mounting poles of following height for Loud Speakers on pre-cast concrete foundations
T1.01.03.04.001 C.OM.JYK.DF.00.332.SM Height - up to 3.0 M Nos. 184.00 28.040 5,159.36 P-T1-001B 0.0045%
T1.01.04 CABLE LAYING - EXTERNAL (OUT SIDE BUILDING)
T1.01.04.01 Laying of all type of cables (fibre Optic, Coaxial, bare etc.) in open cable trench with marking tape.
T1.01.04.01.001 C.OM.JYK.DF.00.332.SM Overall Diameter - UP to & including 25 mm M 60,000.00 0.700 42,000.00 P-T1-002 0.0366%
T1.01.04.01.002 C.OM.JYK.DF.00.332.SM Overall Diameter - above 25mm and Up to & including 50 mm M 5,500.00 0.810 4,455.00 P-T1-002 0.0039%
T1.01.04.02 Laying of all type of cables (fibre Optic, Coaxial, bare etc.) in conduit/ duct bank.
T1.01.04.02.001 C.OM.JYK.DF.00.332.SM Overall Diameter - up to & including 25 mm M 400.00 0.690 276.00 P-T1-002 0.0002%
Installation of glands and sealing for all types of cable of following sizes in Building, Equipment Shelter,
T1.01.04.03
Junction Box, Manhole etc.
T1.01.05 CABLE LAYING - INTERNAL (IN SIDE BUILDING)
T1.01.05.01 Laying of all type of cables (fibre Optic, Coaxial, bare etc.) with cable ties & gland
T1.01.05.01.001 C.OM.JYK.DF.00.332.SM Overall Diameter - Up to & including 25 mm M 50,000.00 0.700 35,000.00 P-T1-002 0.0305%
T1.01.06 CABLE TERMINATIONS - - EXTERNAL (OUT SIDE BUILDING)
T1.01.06.006 C.OM.JYK.DF.00.332.SM Termination of coaxial cable Nos. 68.00 1.090 74.12 P-T1-003 0.0001%
Termination of single/ multipair/ LV power cable, armoured/ unarmoured cable in external JB/ outdoor
T1.01.06.009 C.OM.JYK.DF.00.332.SM Nos. 100.00 2.370 237.00 P-T1-003 0.0002%
cabinet usings screw type connectors
T1.01.07 CABLE TERMINATIONS - INTERNAL (IN SIDE BUILDING)
Termination of CAT UTP cable in termination block/ module using insertion tool e.g. Krone Termination Nos. of
T1.01.07.008 C.OM.JYK.DF.00.332.SM 3,385.00 2.730 9,241.05 P-T1-003 0.0081%
Block Cable

KHF-00-101983-FA-5804-0001-0000-02 Page 65 of 72
PROGRESS MEASUREMENT SCHEDULE

Unit Rate Preamble


Item Code CBS Code Description UOM Est. Qty Amount (OMR) Percentage
(OMR) Code
Installation of Cat 6A, RJ-45 compatible triple outlet with cover plate shall have 3 RJ 45 sockets (one voice
T1.01.07.011 C.OM.JYK.DF.00.332.SM Nos. 414.00 7.470 3,092.58 P-T1-003 0.0027%
two data) and required accessories for both voice and data.
Installation of Cat 6A, RJ-45 single outlet with cover plate and required accessories for both voice and
T1.01.07.012 C.OM.JYK.DF.00.332.SM Nos. 60.00 7.290 437.40 P-T1-003 0.0004%
data.
T1.01.08 INSTALLATION IN TELECOMMUNICATIONS EQUIPMENT ROOM
Installation of up to 100 pair rack mountable MDF/IDF, Standard inclusive of KRONE blocks with IDC
T1.01.08.006 C.OM.JYK.DF.00.332.SM Nos. 96.00 9.110 874.56 P-T1-004 0.0008%
terminals,
C-T1.01.09 Cable Duct
C-T1.01.09.001 C.OM.JYK.DF.00.332.SM HDPE Ducts (50mm) M 5,000.00 1.890 9,450.00 P-T1-005 0.0082%
C-T1.01.09.002 C.OM.JYK.DF.00.332.SM Warning Mesh M 5,000.00 0.630 3,150.00 P-T1-005 0.0027%
C-T1.01.09.003 C.OM.JYK.DF.00.332.SM Warning Tape M 5,000.00 2.100 10,500.00 P-T1-005 0.0092%
C-T1.01.09.004 C.OM.JYK.DF.00.332.SM MultiEntry GRP Manhole Nos. 50.00 475.220 23,761.00 P-T1-006 0.0207%
T1.02 TELECOMMUNICATION SYSTEM INSTALLATION
T1.02.01 RACK MOUNTABLE SYSTEMS AND SUB-SYSTEM ASSEMBLIES
Installation of Servers and Management Systems: CCTV/ PAGA/ IPBX/ ACS/ PIDS/ Video Conferencing/
T1.02.01.001 C.OM.JYK.DF.00.332.SM Nos. 15.00 91.120 1,366.80 P-T1-004 0.0012%
VSAT/ Radar Detection System/ Weather Monitoring ETC.
T1.02.01.002 C.OM.JYK.DF.00.332.SM Installation of Layer 2/ 3/ LAN Switches, Router, Core Switches, 12, 24, 48, 72, 96 ports Nos. 39.00 54.670 2,132.13 P-T1-004 0.0019%
T1.02.01.003 C.OM.JYK.DF.00.332.SM Installation of RJ 45/ Fibre optic Patch Panels, 24, 48, 72, 96 ports Nos. 314.00 28.040 8,804.56 P-T1-004 0.0077%
T1.02.01.009 C.OM.JYK.DF.00.332.SM Installation of RJ-45 type patch cables 1M - 20M length Nos. 1,696.00 5.470 9,277.12 P-T1-004 0.0081%
T1.02.01.011 C.OM.JYK.DF.00.332.SM Installation of fibre optic cords 1M - 20M length Nos. 7,072.00 4.210 29,773.12 P-T1-004 0.0259%
T1.02.01.014 C.OM.JYK.DF.00.332.SM Installation of fibre optic converter and vice versa in an enclosure with all necessary accessories Nos. 40.00 18.220 728.80 P-T1-004 0.0006%
T1.02.02 INSTALLATION OF FULLY EQUIPPED, CONFIGURED AND TESTED SYSTEMS
T1.02.02.002 C.OM.JYK.DF.00.332.SM Installation of cabinet, size above 21U and up to 42 U high Nos. 39.00 196.260 7,654.14 P-T1-004 0.0067%
T1.03 TELECOMMUNICATION - TERMINAL EQUIPMENT
T1.03.01 TELEPHONE TERMINAL EQUIPMENT
Installation of standard Analog/ Digital/ IP indoor desk mounted telephone set and connection to wall/
T1.03.01.001 C.OM.JYK.DF.00.332.SM Nos. 90.00 7.290 656.10 P-T1-004 0.0006%
floor mounted socket/ JB using integral cable
T1.03.01.002 C.OM.JYK.DF.00.332.SM Installation of Hotline Telephone and connection to wall/ floor mounted socket/ JB using integral cable Nos. 4.00 10.930 43.72 P-T1-004 0.0000%
Installation of Outdoor Analog/ Digital/ IP telephone set in hood/ booth and connection to wall/ floor
T1.03.01.003 C.OM.JYK.DF.00.332.SM Nos. 10.00 10.930 109.30 P-T1-004 0.0001%
mounted socket/ JB using integral cable
Installation of Hotline Operator consoles and connection to wall/ floor mounted socket/ JB using integral
T1.03.01.005 C.OM.JYK.DF.00.332.SM Nos. 1.00 110.740 110.74 P-T1-004 0.0001%
cable
C-T1.03.01.007 C.OM.JYK.DF.00.332.SM Installation and termination of outdoor telephone set Nos. 10.00 9.110 91.10 P-T1-004 0.0001%
T1.03.01.006 C.OM.JYK.DF.00.332.SM Installation and termination of outdoor external sounder Nos. 10.00 9.110 91.10 P-T1-004 0.0001%
T1.03.02 CCTV TERMINAL EQUIPMENT
T1.03.02.001 C.OM.JYK.DF.00.332.SM Installation of CCTV camera - External, PTZ type, safe/ explosion proof onto pre-installed pole/ tower Nos. 104.00 22.780 2,369.12 P-T1-004 0.0021%
Installation of other CCTV camera - External, e.g. fixed, IR sensing, thermal, motion sensing onto pre-
T1.03.02.002 C.OM.JYK.DF.00.332.SM Nos. 1.00 26.420 26.42 P-T1-004 0.0000%
installed pole/ tower
Installation of other high spec Long Range Detection Camera, e.g. as used in LRDAS onto pre-installed
T1.03.02.003 C.OM.JYK.DF.00.332.SM Nos. 1.00 27.340 27.34 P-T1-004 0.0000%
pole/ tower
T1.03.02.004 C.OM.JYK.DF.00.332.SM Installation of CCTV camera - Internal, PTZ/ fixed/ indoor Dome - wall mounted Nos. 58.00 21.870 1,268.46 P-T1-004 0.0011%
T1.03.02.006 C.OM.JYK.DF.00.332.SM Installation of CCTV video monitor - Desk mounted Nos. 2.00 54.670 109.34 P-T1-004 0.0001%
T1.03.02.007 C.OM.JYK.DF.00.332.SM Installation of CCTV video monitor - Wall mounted Nos. 6.00 58.320 349.92 P-T1-004 0.0003%
T1.03.02.008 Installation of CCTV camera control and switching unit/ keyboard - Desk mounted Nos. 2.00 91.120 182.24 P-T1-004 0.0002%
T1.03.02.009 C.OM.JYK.DF.00.332.SM Installation of CCTV Network Management System/ Workstation - Desk Mounted Nos. 2.00 218.690 437.38 P-T1-004 0.0004%
T1.03.03 PAGA/ PAGE PARTY TERMINAL EQUIPMENT
T1.03.03.001 C.OM.JYK.DF.00.332.SM Installation of PAGA Access Control panel/Console with monitor Nos. 7.00 182.240 1,275.68 P-T1-004 0.0011%
T1.03.03.004 C.OM.JYK.DF.00.332.SM Installation of 6W - 25W Indoor loudspeakers - Wall mounted Nos. 39.00 14.580 568.62 P-T1-004 0.0005%
T1.03.03.005 C.OM.JYK.DF.00.332.SM Installation of 6W - 25W Indoor loudspeakers - Ceiling mounted Nos. 103.00 16.400 1,689.20 P-T1-004 0.0015%
T1.03.03.006 C.OM.JYK.DF.00.332.SM Installation of 8W - 25W Outdoor loudspeaker on pre-installed mounting pole Nos. 157.00 16.400 2,574.80 P-T1-004 0.0022%
T1.03.03.007 C.OM.JYK.DF.00.332.SM Installation of external Flashing Beacons on pre-installed pole/ wall mounted Nos. 27.00 54.670 1,476.09 P-T1-004 0.0013%
T1.03.03.010 C.OM.JYK.DF.00.332.SM Installation of Management Terminal/ Workstation - Desk mounted Nos. 6.00 36.450 218.70 P-T1-004 0.0002%
ACCESS CONTROL/ INTRUSION DETECTION/ PERIMETER INTRUSION DETECTION SYSTEM/ ALARM
T1.03.04
MONITORING TERMINAL EQUIPMENT
Installation of Access Control Workstations including monitor, DVD-RW Writer, camera, Laminator,
T1.03.04.001 C.OM.JYK.DF.00.332.SM Nos. 2.00 581.760 1,163.52 P-T1-004 0.0010%
Laminator, High Speed Colour Laser Printer.

KHF-00-101983-FA-5804-0001-0000-02 Page 66 of 72
PROGRESS MEASUREMENT SCHEDULE

Unit Rate Preamble


Item Code CBS Code Description UOM Est. Qty Amount (OMR) Percentage
(OMR) Code

T1.03.04.004 C.OM.JYK.DF.00.332.SM Termination and installation of Door/ Gate Control unit Nos. 103.00 14.580 1,501.74 P-T1-007 0.0013%
T1.03.04.007 C.OM.JYK.DF.00.332.SM Termination and installation of - Internal Access Cards Readers Nos. 192.00 14.580 2,799.36 P-T1-007 0.0024%
T1.03.04.008 C.OM.JYK.DF.00.332.SM Termination and installation of - External Access Cards Readers Nos. 14.00 18.220 255.08 P-T1-007 0.0002%
T1.03.04.009 C.OM.JYK.DF.00.332.SM Termination and installation of - Door Latch/ Release and sounder Nos. 4.00 18.220 72.88 P-T1-007 0.0001%
T1.03.04.010 C.OM.JYK.DF.00.332.SM Termination and installation of - Door Magnetic Contacts c/w Sounder Nos. 123.00 18.220 2,241.06 P-T1-007 0.0020%
T1.03.04.013 C.OM.JYK.DF.00.332.SM Termination and installation of of Break Glass Units. Nos. 94.00 12.760 1,199.44 P-T1-007 0.0010%
T1.03.04.015 C.OM.JYK.DF.00.332.SM Installation of IDS/ PID/ PID Radar workstation and monitor Nos. 1.00 581.760 581.76 P-T1-007 0.0005%
T1.03.04.025 C.OM.JYK.DF.00.332.SM Installation of PIDS Zone Control Unit for Fence-mounted/ Buried Cable Nos. 4.00 595.780 2,383.12 P-T1-007 0.0021%

Installation of Start Sensor and End Sensor equipped with Fiber Outdoor Enclosures to house the start/end
T1.03.04.026 C.OM.JYK.DF.00.332.SM Nos. 16.00 54.670 874.72 P-T1-004 0.0008%
sensors and fiber optic splices, complete with all necessary mounting hardware & other accessories.
Installation of isolators equipped with Outdoor Enclosures to house the isolators and fiber optic splices,
T1.03.04.027 C.OM.JYK.DF.00.332.SM Nos. 8.00 21.870 174.96 P-T1-004 0.0002%
complete with all necessary mounting hardware & other accessories.
C-T1.03.04.028 C.OM.JYK.DF.00.332.SM Electric Strike Latches for single leaf doors Nos. 32.00 10.930 349.76 P-T1-007 0.0003%
C-T1.03.04.029 C.OM.JYK.DF.00.332.SM Magnetic Locks for docuble leaf doors Nos. 22.00 10.930 240.46 P-T1-007 0.0002%
C-T1.03.04.030 C.OM.JYK.DF.00.332.SM Boob barrier for main gate Nos. 2.00 127.570 255.14 P-T1-007 0.0002%
C-T1.03.04.031 C.OM.JYK.DF.00.332.SM Full length turnstile gate Nos. 2.00 255.130 510.26 P-T1-007 0.0004%
T1.03.05 TETRA UHF MOBILE RADIO SYSTEM & HAND HELD EQUIPMENT
Installation of TETRA remote repeater complete with Antenna TX/RX Vertical collinear antenna, including
T1.03.05.001 C.OM.JYK.DF.00.332.SM Nos. 1.00 727.200 727.20 P-T1-004 0.0006%
connectors, grounding kits, antenna brackets, surge Arrestor and lightening protector
Installation of TETRA fixed Radio complete with remote control head for desktop mount, antenna, feeder
T1.03.05.002 C.OM.JYK.DF.00.332.SM Nos. 4.00 762.240 3,048.96 P-T1-004 0.0027%
cable, connectors, earth kits, building entry, mounting kit, Surge arrestors and Lightning arrestors
T1.03.05.003 C.OM.JYK.DF.00.332.SM Installation of Dispatcher Console including Monitor Nos. 2.00 581.760 1,163.52 P-T1-004 0.0010%
Installation of Tetra vehicle mount mobile radio unit equipped with magnetic based antennas and
T1.03.05.004 C.OM.JYK.DF.00.332.SM Nos. 10.00 350.740 3,507.40 P-T1-004 0.0031%
mounting accessories
T1.03.10.002 C.OM.JYK.DF.00.332.SM Installation of Satellite/ VSAT base station Nos. 1.00 2,033.770 2,033.77 P-T1-004 0.0018%

Subtotal (OMR) 348,095.94 0.3034%

KHF-00-101983-FA-5804-0001-0000-02 Page 67 of 72
PROGRESS MEASUREMENT SCHEDULE

Contract C311520 - Construction Services for Yibal Khuff Project On Plot

Section C5,
Instrumentation Works
Schedule C Bill I1
Preamble
Item Code Item Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Percentage
Code
I1 Instrumentation Works
I1.01 Valves
I1.01.01 Control & Self actuated Valves
I1.01.01.01 Control Valves with Pneumatic Actuator - Globe/ Angle/ Plug / 3-Way/Self Acting/ De-Superheater
I1.01.01.01.001 C.OM.JYK.DF.00.332.SN Size up to 3" Nos. 256.00 126.220 32,312.32 P-I1-001 0.0282%
I1.01.01.01.002 C.OM.JYK.DF.00.332.SN Size 4" to 8" Nos. 93.00 200.320 18,629.76 P-I1-001 0.0162%
I1.01.01.01.003 C.OM.JYK.DF.00.332.SN Size 10" to 16" Nos. 39.00 311.460 12,146.94 P-I1-001 0.0106%
I1.01.01.01.004 C.OM.JYK.DF.00.332.SN Size 18" to 24" Nos. 22.00 635.630 13,983.86 P-I1-001 0.0122%
I1.01.01.01.005 C.OM.JYK.DF.00.332.SN Size above 32" Nos. 2.00 959.800 1,919.60 P-I1-001 0.0017%
I1.01.01.01.006 C.OM.JYK.DF.00.332.SN Size 26" to 32" Nos. 2.00 959.800 1,919.60 P-I1-001 0.0017%
I1.01.03 Actuated Valves - Ball /Gate /Plug/ Butterfly /Globe
I1.01.03.01 Shutdown Valves with Pneumatic Actuator
I1.01.03.01.001 C.OM.JYK.DF.00.332.SN Size up to 3" Nos. 210.00 126.220 26,506.20 P-I1-001 0.0231%
I1.01.03.01.002 C.OM.JYK.DF.00.332.SN Size 4" to 8" Nos. 111.00 200.320 22,235.52 P-I1-001 0.0194%
I1.01.03.01.003 C.OM.JYK.DF.00.332.SN Size 10" to 16" Nos. 69.00 311.460 21,490.74 P-I1-001 0.0187%
I1.01.03.01.004 C.OM.JYK.DF.00.332.SN Size 18" to 24" Nos. 24.00 635.630 15,255.12 P-I1-001 0.0133%
I1.01.03.01.006 C.OM.JYK.DF.00.332.SN Size above 32" Nos. 3.00 959.800 2,879.40 P-I1-001 0.0025%
I1.01.03.03 On-Off Valves with Pneumatic Actuator
I1.01.03.03.001 C.OM.JYK.DF.00.332.SN Size up to 3" Nos. 46.00 126.220 5,806.12 P-I1-001 0.0051%
I1.01.03.03.002 C.OM.JYK.DF.00.332.SN Size 4" to 8" Nos. 16.00 200.320 3,205.12 P-I1-001 0.0028%
I1.01.03.03.003 C.OM.JYK.DF.00.332.SN Size 10" to 16" Nos. 24.00 311.460 7,475.04 P-I1-001 0.0065%
I1.01.03.03.004 C.OM.JYK.DF.00.332.SN Size 18" to 24" Nos. 1.00 635.630 635.63 P-I1-001 0.0006%
I1.01.04 Motor Operated Valves - Ball / Butterfly / Gate / Plug
I1.01.04.004 C.OM.JYK.DF.00.332.SN Size 18" to 24" Nos. 2.00 635.630 1,271.26 P-I1-001 0.0011%
I1.01.06 Pressure Safety Valves
I1.01.06.001 C.OM.JYK.DF.00.332.SN Size up to 3" Nos. 135.00 96.700 13,054.50 P-I1-001 0.0114%
I1.01.06.002 C.OM.JYK.DF.00.332.SN Size 4" to 8" Nos. 100.00 170.800 17,080.00 P-I1-001 0.0149%
I1.01.08 Pressure Vacuum Relief Valves
I1.01.08.002 C.OM.JYK.DF.00.332.SN Size 4" to 8" Nos. 12.00 170.800 2,049.60 P-I1-001 0.0018%
I1.01.08.003 C.OM.JYK.DF.00.332.SN Size 10" to 16" Nos. 14.00 281.950 3,947.30 P-I1-001 0.0034%
I1.02 Flow Assemblies & Meters
I1.02.02 Orifice and Flange Assemblies
I1.02.02.001 C.OM.JYK.DF.00.332.SN Size up to 8" Nos. 152.00 170.800 25,961.60 P-I1-002 0.0226%
I1.02.02.002 C.OM.JYK.DF.00.332.SN Size 10" to 16" Nos. 29.00 281.950 8,176.55 P-I1-002 0.0071%
I1.02.02.003 C.OM.JYK.DF.00.332.SN Size 18" to 30" Nos. 9.00 930.300 8,372.70 P-I1-002 0.0073%
I1.02.05 Venturi Flow Meters
I1.02.05.003 C.OM.JYK.DF.00.332.SN Size 18" to 30" Nos. 1.00 841.100 841.10 P-I1-002 0.0007%
I1.02.06 Averaging Pitot Tubes
I1.02.06.003 C.OM.JYK.DF.00.332.SN Size 18" to 30" Nos. 1.00 589.330 589.33 P-I1-002 0.0005%
I1.02.06.004 C.OM.JYK.DF.00.332.SN Size 32" to 48" Nos. 2.00 867.190 1,734.38 P-I1-002 0.0015%
I1.02.09 Restriction Orifices - Single Stage
I1.02.09.001 C.OM.JYK.DF.00.332.SN Size up to 8" Nos. 270.00 50.400 13,608.00 P-I1-002 0.0119%
I1.02.09.002 C.OM.JYK.DF.00.332.SN Size 10" to 16" Nos. 6.00 87.450 524.70 P-I1-002 0.0005%
I1.02.09.003 C.OM.JYK.DF.00.332.SN Size 18" to 30" Nos. 4.00 170.800 683.20 P-I1-002 0.0006%
I1.02.09.004 C.OM.JYK.DF.00.332.SN Size 32" to 48" Nos. 1.00 281.950 281.95 P-I1-002 0.0002%
I1.02.10 Restriction Orifices - Multi-stage Assemblies
I1.02.10.001 C.OM.JYK.DF.00.332.SN Size up to 8" Nos. 1.00 105.960 105.96 P-I1-002 0.0001%
I1.02.11 Variable Area Flow meter Transmitter
I1.02.11.001 C.OM.JYK.DF.00.332.SN Size up to 4" Nos. 16.00 126.220 2,019.52 P-I1-002 0.0018%

KHF-00-101983-FA-5804-0001-0000-02 Page 68 of 72
PROGRESS MEASUREMENT SCHEDULE

Preamble
Item Code Item Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Percentage
Code
I1.02.12 Variable Area Flow meter
I1.02.12.001 C.OM.JYK.DF.00.332.SN Size up to 4" Nos. 60.00 126.220 7,573.20 P-I1-002 0.0066%
I1.02.14 Magnetic Type Flow meter
I1.02.14.001 C.OM.JYK.DF.00.332.SN Size up to 8" Nos. 33.00 200.320 6,610.56 P-I1-002 0.0058%
I1.02.14.002 C.OM.JYK.DF.00.332.SN Size 10" to 16" Nos. 3.00 311.460 934.38 P-I1-002 0.0008%
I1.02.15 Ultrasonic Flow meter
I1.02.15.001 C.OM.JYK.DF.00.332.SN Size up to 8" Nos. 12.00 200.320 2,403.84 P-I1-002 0.0021%
I1.02.15.002 C.OM.JYK.DF.00.332.SN Size 10" to 16" Nos. 8.00 311.460 2,491.68 P-I1-002 0.0022%
I1.02.15.003 C.OM.JYK.DF.00.332.SN Size 18" to 30" Nos. 6.00 635.630 3,813.78 P-I1-002 0.0033%
I1.02.15.004 C.OM.JYK.DF.00.332.SN Size 32" to 48" Nos. 2.00 867.190 1,734.38 P-I1-002 0.0015%
I1.02.15.005 C.OM.JYK.DF.00.332.SN Size 52" and above Nos. 1.00 1,261.650 1,261.65 P-I1-002 0.0011%
I1.02.16 Carioles Flow meter
I1.02.16.001 C.OM.JYK.DF.00.332.SN Size up to 8" Nos. 69.00 200.320 13,822.08 P-I1-002 0.0120%
I1.02.16.002 C.OM.JYK.DF.00.332.SN Size 10" to 16" Nos. 1.00 311.460 311.46 P-I1-002 0.0003%
I1.02.19 Votex Flow meter
I1.02.19.001 C.OM.JYK.DF.00.332.SN Size up to 8" Nos. 32.00 200.320 6,410.24 P-I1-002 0.0056%
I1.02.19.002 C.OM.JYK.DF.00.332.SN Size 10" to 16" Nos. 8.00 311.460 2,491.68 P-I1-002 0.0022%
I1.02.19.003 C.OM.JYK.DF.00.332.SN Size 18" and above Nos. 1.00 635.630 635.63 P-I1-002 0.0006%
I1.03 Field Instruments
I1.03.01 Gauges/ Local Indicators / Push Button Station
I1.03.01.001 C.OM.JYK.DF.00.332.SN Pressure Gauges Nos. 36.00 31.860 1,146.96 P-I1-003 0.0010%
I1.03.01.002 C.OM.JYK.DF.00.332.SN D.P. Gauges Nos. 33.00 61.390 2,025.87 P-I1-003 0.0018%
I1.03.01.003 C.OM.JYK.DF.00.332.SN Temperature Gauges with thermowell Nos. 1.00 41.130 41.13 P-I1-003 0.0000%
I1.03.01.004 C.OM.JYK.DF.00.332.SN Magnetic Level Gauges Nos. 24.00 50.400 1,209.60 P-I1-003 0.0011%
I1.03.01.005 C.OM.JYK.DF.00.332.SN Reflex Level Gauges Nos. 1.00 50.400 50.40 P-I1-003 0.0000%
I1.03.01.007 C.OM.JYK.DF.00.332.SN Local Push Button Station Nos. 10.00 52.120 521.20 P-I1-003 0.0005%
I1.03.01.009 C.OM.JYK.DF.00.332.SN Test Thermowell Nos. 3.00 189.330 567.99 P-I1-003 0.0005%
I1.03.01.010 C.OM.JYK.DF.00.332.SN Limit Switches Nos. 12.00 135.490 1,625.88 P-I1-003 0.0014%
I1.03.02 Transmitters/ Switches
I1.03.02.001 C.OM.JYK.DF.00.332.SN Pressure transmitters- HART Nos. 237.00 135.490 32,111.13 P-I1-003 0.0280%
I1.03.02.002 C.OM.JYK.DF.00.332.SN Pressure transmitters- FF Nos. 570.00 135.490 77,229.30 P-I1-003 0.0673%
I1.03.02.005 C.OM.JYK.DF.00.332.SN D.P. Transmitters - HART Nos. 256.00 135.490 34,685.44 P-I1-003 0.0302%
I1.03.02.006 C.OM.JYK.DF.00.332.SN D.P. Transmitters - FF Nos. 478.00 135.490 64,764.22 P-I1-003 0.0564%
I1.03.02.007 C.OM.JYK.DF.00.332.SN D.P. Transmitters -Capillary- HART Nos. 6.00 135.490 812.94 P-I1-003 0.0007%
I1.03.02.008 C.OM.JYK.DF.00.332.SN D.P. Transmitters -Capillary- FF Nos. 10.00 135.490 1,354.90 P-I1-003 0.0012%
I1.03.02.011 C.OM.JYK.DF.00.332.SN Radar Level transmitters ( Non-Contact) - HART Nos. 1.00 311.460 311.46 P-I1-003 0.0003%
I1.03.02.012 C.OM.JYK.DF.00.332.SN Radar Level transmitters ( Non-Contact) - FF Nos. 1.00 311.460 311.46 P-I1-003 0.0003%
I1.03.02.013 C.OM.JYK.DF.00.332.SN Radar Level transmitters ( GWR) - FF Nos. 37.00 311.460 11,524.02 P-I1-003 0.0100%
I1.03.02.014 C.OM.JYK.DF.00.332.SN Radar Level transmitters ( GWR) - HART Nos. 20.00 311.460 6,229.20 P-I1-003 0.0054%
I1.03.02.019 C.OM.JYK.DF.00.332.SN Temperature transmitters with thermowell- HART Nos. 93.00 135.490 12,600.57 P-I1-003 0.0110%
I1.03.02.020 C.OM.JYK.DF.00.332.SN Temperature transmitters with thermowell- FF Nos. 377.00 135.490 51,079.73 P-I1-003 0.0445%
I1.03.02.025 C.OM.JYK.DF.00.332.SN Remote Indicator - Electronic (Loop Powered Indicator) Nos. 20.00 116.950 2,339.00 P-I1-003 0.0020%
I1.03.02.027 C.OM.JYK.DF.00.332.SN Vibration Transmitter Nos. 380.00 116.950 44,441.00 P-I1-003 0.0387%
I1.03.02.035 C.OM.JYK.DF.00.332.SN Local Handswitch Nos. 116.00 61.390 7,121.24 P-I1-003 0.0062%
I1.03.02.037 C.OM.JYK.DF.00.332.SN Level Transmitter-Capacitance Type Nos. 3.00 135.490 406.47 P-I1-003 0.0004%
I1.04.01 Analyzer
I1.04.01.001 C.OM.JYK.DF.00.332.SN Analyzer - CO2 Nos. 1.00 277.860 277.86 P-I1-004 0.0002%
I1.04.01.004 C.OM.JYK.DF.00.332.SN Analyzer - Conductivity Nos. 8.00 277.860 2,222.88 P-I1-004 0.0019%
I1.04.01.005 C.OM.JYK.DF.00.332.SN Analyzer - Density Nos. 2.00 277.860 555.72 P-I1-004 0.0005%
I1.04.01.008 C.OM.JYK.DF.00.332.SN Analyzer - Oxygen Nos. 6.00 277.860 1,667.16 P-I1-004 0.0015%
I1.04.01.015 C.OM.JYK.DF.00.332.SN Analyzer - Gas Chromatograph Nos. 0.00 - 0.00 P-I1-004 0.0000%
I1.04.01.016 C.OM.JYK.DF.00.332.SN Analyzer - H2S Nos. 3.00 277.860 833.58 P-I1-004 0.0007%
I1.04.01.018 C.OM.JYK.DF.00.332.SN Analyzer -Moisture Nos. 4.00 277.860 1,111.44 P-I1-004 0.0010%

KHF-00-101983-FA-5804-0001-0000-02 Page 69 of 72
PROGRESS MEASUREMENT SCHEDULE

Preamble
Item Code Item Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Percentage
Code
I1.04.01.019 C.OM.JYK.DF.00.332.SN Analyzer -Total Organic Carbon Nos. 5.00 277.860 1,389.30 P-I1-004 0.0012%
I1.04.01.020 C.OM.JYK.DF.00.332.SN Analyzer-Chlorine Nos. 2.00 277.860 555.72 P-I1-004 0.0005%
I1.04.01.021 C.OM.JYK.DF.00.332.SN Analyzer - pH Nos. 16.00 277.860 4,445.76 P-I1-004 0.0039%
I1.04.01.022 C.OM.JYK.DF.00.332.SN Analyzers _CEMS (Continuous Emission Monitoring System) Nos. 2.00 1,389.310 2,778.62 P-I1-004 0.0024%
I1.04.01.024 C.OM.JYK.DF.00.332.SN Analyzer Water Nos. 1.00 138.920 138.92 P-I1-004 0.0001%
I1.04.01.026 C.OM.JYK.DF.00.332.SN Analyzer-BS&W Nos. 2.00 277.860 555.72 P-I1-004 0.0005%
I1.04.01.027 C.OM.JYK.DF.00.332.SN Analyzer - Other Nos. 5.00 277.860 1,389.30 P-I1-004 0.0012%
I1.04.01.028 C.OM.JYK.DF.00.332.SN Analyzer - SO2 Nos. 4.00 277.860 1,111.44 P-I1-004 0.0010%
I1.04.01.029 C.OM.JYK.DF.00.332.SN Analyzer - Sulphur Nos. 5.00 277.860 1,389.30 P-I1-004 0.0012%
I1.05 Fire & Gas (F&G) Detectors
I1.05.01 F&G Detectors - Building
I1.05.01.001 C.OM.JYK.DF.00.332.SN Heat Detector - Rate of rise Nos. 3.00 50.400 151.20 P-I1-007 0.0001%
I1.05.01.002 C.OM.JYK.DF.00.332.SN Heat Detector (Fusible Tube / plug) Nos. 54.00 50.400 2,721.60 P-I1-007 0.0024%
I1.05.01.004 C.OM.JYK.DF.00.332.SN Flammable Gas Detector (IR - type) Nos. 24.00 68.910 1,653.84 P-I1-007 0.0014%
I1.05.01.006 C.OM.JYK.DF.00.332.SN Flame Detector (Triple IR) Nos. 10.00 68.910 689.10 P-I1-007 0.0006%
I1.05.01.007 C.OM.JYK.DF.00.332.SN Smoke Detector point type Nos. 407.00 31.860 12,967.02 P-I1-007 0.0113%
I1.05.01.010 C.OM.JYK.DF.00.332.SN Hydrogen Gas Detector Nos. 38.00 105.960 4,026.48 P-I1-007 0.0035%
I1.05.01.012 C.OM.JYK.DF.00.332.SN Toxic H2S detector / Flammable Gas detector Nos. 24.00 105.960 2,543.04 P-I1-007 0.0022%
I1.05.01.013 C.OM.JYK.DF.00.332.SN Manual Call Point (MCP)- Indoor Nos. 108.00 31.860 3,440.88 P-I1-007 0.0030%
I1.05.01.016 C.OM.JYK.DF.00.332.SN Flammable Gas Beacon - Indoor/Outdoor Nos. 23.00 87.450 2,011.35 P-I1-007 0.0018%
I1.05.01.019 C.OM.JYK.DF.00.332.SN Fire alarm - Indoor/Outdoor Nos. 103.00 31.860 3,281.58 P-I1-007 0.0029%
I1.05.02 F&G Detectors - Field
I1.05.02.001 C.OM.JYK.DF.00.332.SN IR Gas Detector Nos. 70.00 87.450 6,121.50 P-I1-007 0.0053%
I1.05.02.003 C.OM.JYK.DF.00.332.SN LOS HC Flammable Gas Detector/ Open path gas detector Nos. 17.00 87.450 1,486.65 P-I1-007 0.0013%
I1.05.02.004 C.OM.JYK.DF.00.332.SN IR Flame Detector Nos. 50.00 87.450 4,372.50 P-I1-007 0.0038%
I1.05.02.005 C.OM.JYK.DF.00.332.SN Smoke Detector- Ionization type Nos. 8.00 31.860 254.88 P-I1-007 0.0002%
I1.05.02.008 C.OM.JYK.DF.00.332.SN Flammable Gas Detector Nos. 63.00 87.450 5,509.35 P-I1-007 0.0048%
I1.05.02.009 C.OM.JYK.DF.00.332.SN Hydrogen Gas Detector Nos. 2.00 87.450 174.90 P-I1-007 0.0002%
I1.05.02.010 C.OM.JYK.DF.00.332.SN Point Toxic ( H2S , CO) Gas Detector Nos. 191.00 87.450 16,702.95 P-I1-007 0.0146%
I1.05.02.012 C.OM.JYK.DF.00.332.SN Heat Detector- Fixed Temperature type Nos. 33.00 31.860 1,051.38 P-I1-007 0.0009%
I1.05.02.013 C.OM.JYK.DF.00.332.SN Heat Detector- RR type Nos. 2.00 87.450 174.90 P-I1-007 0.0002%
I1.05.02.014 C.OM.JYK.DF.00.332.SN High Sensitive Smoke Detector Nos. 10.00 87.450 874.50 P-I1-007 0.0008%
I1.05.02.015 C.OM.JYK.DF.00.332.SN Ultrasonic leak detector Nos. 86.00 87.450 7,520.70 P-I1-007 0.0066%
I1.05.02.016 C.OM.JYK.DF.00.332.SN Manual Call Point- Outdoor Nos. 121.00 31.860 3,855.06 P-I1-007 0.0034%
I1.05.02.018 C.OM.JYK.DF.00.332.SN Beacon (RED) Fire (Outdoor) Nos. 175.00 50.400 8,820.00 P-I1-007 0.0077%
I1.05.02.019 C.OM.JYK.DF.00.332.SN Sounder/Horn For Fire(Outdoor) Nos. 23.00 50.400 1,159.20 P-I1-007 0.0010%
I1.06 Instrumentation Package
I1.06.01 Custody Metering Skid
I1.06.01.002 C.OM.JYK.DF.00.332.SN Custody Metering Skid - Weight Range above 5 MT and up to 10 MT Nos. 1.00 4,753.900 4,753.90 P-I1-008 0.0041%
I1.06.01.003 C.OM.JYK.DF.00.332.SN Custody Metering Skid - Weight Range above 10 MT and up to 25 MT Nos. 2.00 13,893.130 27,786.26 P-I1-008 0.0242%
I1.06.01.005 C.OM.JYK.DF.00.332.SN Flow Computer Cabinets - Weight up to 500Kg Nos. 5.00 370.480 1,852.40 P-I1-008 0.0016%
I1.06.01.007 C.OM.JYK.DF.00.332.SN Supervisory Computer Work stations - LCD monitor Nos. 3.00 46.300 138.90 P-I1-008 0.0001%
I1.06.02 Machine Condition Monitoring System
I1.06.02.001 C.OM.JYK.DF.00.332.SN MCMS Cabinet/ Server/ Fiber Optic Patch Panel - Weight up to 500Kg Nos. 9.00 370.480 3,334.32 P-I1-009 0.0029%
I1.06.04.002 C.OM.JYK.DF.00.332.SN Local Control Panel - Weight up to 500Kg Nos. 18.00 370.480 6,668.64 P-I1-010 0.0058%
I1.07 ICSS Package
I1.07.001 C.OM.JYK.DF.00.332.SN DCS System Cabinet/ Marshaling Cabinets/ Relay Cabinets - Weight up to 500Kg Nos. 46.00 370.480 17,042.08 P-I1-010 0.0149%
I1.07.003 C.OM.JYK.DF.00.332.SN ESD & FGS System Cabinet/ Marshaling Cabinets/ Relay Cabinets - Weight up to 500Kg Nos. 54.00 463.090 25,006.86 P-I1-010 0.0218%
I1.07.005 C.OM.JYK.DF.00.332.SN Server Cabinets - Weight up to 500Kg Nos. 6.00 555.710 3,334.26 P-I1-010 0.0029%
I1.07.006 C.OM.JYK.DF.00.332.SN Work Station-14 " - 24"LCD Screen Nos. 20.00 27.780 555.60 P-I1-010 0.0005%
I1.07.007 C.OM.JYK.DF.00.332.SN Monitoring Screens - 42 "to 72 " LED/LCD Screen Nos. 7.00 37.040 259.28 P-I1-010 0.0002%
I1.07.008 C.OM.JYK.DF.00.332.SN Console Bay Nos. 5.00 64.830 324.15 P-I1-010 0.0003%
I1.07.010 C.OM.JYK.DF.00.332.SN Package PLC Cabinets – Weight up to 500kg Nos. 9.00 370.480 3,334.32 P-I1-010 0.0029%

KHF-00-101983-FA-5804-0001-0000-02 Page 70 of 72
PROGRESS MEASUREMENT SCHEDULE

Preamble
Item Code Item Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Percentage
Code
I1.07.014 C.OM.JYK.DF.00.332.SN Printers Nos. 2.00 27.780 55.56 P-I1-010 0.0000%
I1.08 Cable Laying
I1.08.01 Branch Cables
I1.08.01.002 C.OM.JYK.DF.00.332.SN Cable OD above 10 mm and up to 20 mm M 255,845.00 0.700 179,091.50 P-I1-011 0.1561%
I1.08.02 Main Cables
I1.08.02.002 C.OM.JYK.DF.00.332.SN Cable OD above 10 mm and up to 20 mm M 187,914.00 0.700 131,539.80 P-I1-011 0.1146%
I1.08.02.003 C.OM.JYK.DF.00.332.SN Cable OD above 20 mm and up to 30 mm M 66,630.00 0.840 55,969.20 P-I1-011 0.0488%
I1.08.02.004 C.OM.JYK.DF.00.332.SN Cable OD above 30 mm and up to 40 mm M 200,062.00 1.040 208,064.48 P-I1-011 0.1813%
I1.08.02.005 C.OM.JYK.DF.00.332.SN Cable OD above 40 mm and up to 50 mm M 15,587.00 1.300 20,263.10 P-I1-011 0.0177%
I1.08.03 Communication Cables
I1.08.03.002 C.OM.JYK.DF.00.332.SN Cable OD above 10 mm and up to 20 mm M 7,604.00 1.210 9,200.84 P-I1-011 0.0080%
I1.08.04 Cable Termination
I1.08.04.001 C.OM.JYK.DF.00.332.SN Terminations Nos. 99,294.00 5.850 580,869.90 P-I1-011 0.5062%
I1.09.01 Cable Glanding
I1.09.01.002 C.OM.JYK.DF.00.332.SN Cable OD above 10 mm and up to 20 mm Nos. 12,625.00 8.730 110,216.25 P-I1-012 0.0961%
I1.09.01.003 C.OM.JYK.DF.00.332.SN Cable OD above 20 mm and up to 30 mm Nos. 184.00 16.850 3,100.40 P-I1-012 0.0027%
I1.09.01.004 C.OM.JYK.DF.00.332.SN Cable OD above 30 mm and up to 40 mm Nos. 316.00 24.030 7,593.48 P-I1-012 0.0066%
I1.09.01.005 C.OM.JYK.DF.00.332.SN Cable OD above 40 mm and up to 50 mm Nos. 150.00 36.630 5,494.50 P-I1-012 0.0048%
I1.10 Cable Trays, Cable Ladders
I1.10.001 C.OM.JYK.DF.00.332.SN 50 mm wide M 29,652.00 3.530 104,671.56 P-I1-013 0.0912%
I1.10.002 C.OM.JYK.DF.00.332.SN 100 mm wide M 5,756.00 6.760 38,910.56 P-I1-013 0.0339%
I1.10.003 C.OM.JYK.DF.00.332.SN 150 mm wide M 2,959.00 8.610 25,476.99 P-I1-013 0.0222%
I1.10.004 C.OM.JYK.DF.00.332.SN 300 mm wide M 2,350.00 12.480 29,328.00 P-I1-013 0.0256%
I1.10.005 C.OM.JYK.DF.00.332.SN 450 mm wide M 2,400.00 15.640 37,536.00 P-I1-013 0.0327%
I1.10.006 C.OM.JYK.DF.00.332.SN 600 mm wide M 4,041.00 19.090 77,142.69 P-I1-013 0.0672%
I1.11 Instrument Junction Boxes
I1.11.002 C.OM.JYK.DF.00.332.SN Junction Box - 20 to 80 Terminals Nos. 500.00 63.170 31,585.00 P-I1-014 0.0275%
I1.11.003 C.OM.JYK.DF.00.332.SN Foundation Filed Bus Junction Box Nos. 380.00 53.900 20,482.00 P-I1-014 0.0179%
I1.12 Tubing & Fitting - Impulse and Air Supply
I1.12.01 Instrument Hook up (Tubing /Piping with its fittings)
I1.12.01.001 C.OM.JYK.DF.00.332.SN PG - (Tube Hook up) Nos. 40.00 0.700 28.00 P-I1-015 0.0000%
I1.12.01.007 C.OM.JYK.DF.00.332.SN PT (Tube Hook up) Nos. 780.00 1.930 1,505.40 P-I1-015 0.0013%
I1.12.01.013 C.OM.JYK.DF.00.332.SN DPG-(Liquid or Gas) - ( Pipe Hook Up ) Nos. 40.00 18.150 726.00 P-I1-015 0.0006%
I1.12.01.014 C.OM.JYK.DF.00.332.SN DPT - (Tube Hook up) Nos. 585.00 18.150 10,617.75 P-I1-015 0.0093%
I1.12.01.017 C.OM.JYK.DF.00.332.SN DP-FT- (Tube Hook up) Nos. 330.00 18.150 5,989.50 P-I1-015 0.0052%
I1.12.01.022 C.OM.JYK.DF.00.332.SN Analyzer (Tube Hook up) Nos. 136.00 389.010 52,905.36 P-I1-015 0.0461%
I1.12.02 Air Supply Tubing with its fittings
I1.12.02.001 C.OM.JYK.DF.00.332.SN Control valves /HIPPS /ESD /Blow Down Valves /ON-OFF /Deluge Valve Nos. 973.00 1.930 1,877.89 P-I1-015 0.0016%
I1.12.03 Steam Tracing/ Electrical Heat Tracing
I1.12.03.007 C.OM.JYK.DF.00.332.SN PT (Tube Hook up) Nos. 6.00 1.930 11.58 P-I1-015 0.0000%
I1.12.03.014 C.OM.JYK.DF.00.332.SN DPT - (Tube Hook up) Nos. 22.00 18.150 399.30 P-I1-015 0.0003%
I1.12.03.015 C.OM.JYK.DF.00.332.SN DPT (Liquid or Gas) - ( Pipe Hook Up ) Nos. 4.00 18.150 72.60 P-I1-015 0.0001%
I1.13 Instrument Bulks
I1.13.01 Conduits/ Ducts
I1.13.01.001 C.OM.JYK.DF.00.332.SN Size - 1 to 2 Inch M 1,261.50 4.540 5,727.21 P-I1-016 0.0050%
I1.13.02 Multi Cable Transit (MCT) Frame and MCT block installation
I1.13.02.001 C.OM.JYK.DF.00.332.SN Frame size having area up to & including 15,000 mm2 Nos. 18.00 1,563.280 28,139.04 P-I1-016 0.0245%
I1.13.04 Other Instrumentation Bulk
I1.13.04.002 C.OM.JYK.DF.00.332.SN Sun Shades Nos. 4,398.00 44.300 194,831.40 P-I1-016 0.1698%
I1.13.04.003 C.OM.JYK.DF.00.332.SN Tag plates Nos. 6,996.00 9.310 65,132.76 P-I1-016 0.0568%
I1.13.04.004 C.OM.JYK.DF.00.332.SN Stanchion Nos. 2,348.00 35.520 83,400.96 P-I1-016 0.0727%
I1.13.04.005 C.OM.JYK.DF.00.332.SN Junction Box Mounting Frames Nos. 805.00 29.350 23,626.75 P-I1-016 0.0206%
I1.13.05 Sampling System

KHF-00-101983-FA-5804-0001-0000-02 Page 71 of 72
PROGRESS MEASUREMENT SCHEDULE

Preamble
Item Code Item Code Description UOM Est. Qty Unit Price (OMR) Amount (OMR) Percentage
Code
I1.13.05.001 C.OM.JYK.DF.00.332.SN Sampling Unit Nos. 162.00 64.830 10,502.46 P-I1-016 0.0092%
I1.15 Valve Testing at Site
I1.15.01 Valve Body Pressure Testing
I1.15.01.01 Control & Self actuated Valves
I1.15.01.01.01 Control Valves with Pneumatic Actuator - Globe/ Gate/ Self Acting Valves
I1.15.01.01.01.001 C.OM.JYK.DF.00.332.SN Size up to 3" Nos. 256.00 46.300 11,852.80 P-I1-018 0.0103%
I1.15.01.01.01.002 C.OM.JYK.DF.00.332.SN Size 4" to 8" Nos. 93.00 92.620 8,613.66 P-I1-018 0.0075%
I1.15.01.01.01.003 C.OM.JYK.DF.00.332.SN Size 10" to 16" Nos. 39.00 222.290 8,669.31 P-I1-018 0.0076%
I1.15.01.01.01.004 C.OM.JYK.DF.00.332.SN Size 18" and above Nos. 26.00 370.480 9,632.48 P-I1-018 0.0084%
I1.15.01.03 Actuated Isolation Valves - Ball /Gate /Plug/ Butterfly /Globe
I1.15.01.03.01 Shutdown Valves with Pneumatic Actuator
I1.15.01.03.01.001 C.OM.JYK.DF.00.332.SN Size up to 3" Nos. 210.00 46.300 9,723.00 P-I1-018 0.0085%
I1.15.01.03.01.002 C.OM.JYK.DF.00.332.SN Size 4" to 8" Nos. 111.00 92.620 10,280.82 P-I1-018 0.0090%
I1.15.01.03.01.003 C.OM.JYK.DF.00.332.SN Size 10" to 16" Nos. 69.00 222.290 15,338.01 P-I1-018 0.0134%
I1.15.01.03.01.004 C.OM.JYK.DF.00.332.SN Size 18" and above Nos. 27.00 370.480 10,002.96 P-I1-018 0.0087%
I1.15.01.03.03 On-Off Valves with Pneumatic Actuator
I1.15.01.03.03.001 C.OM.JYK.DF.00.332.SN Size up to 3" Nos. 46.00 46.300 2,129.80 P-I1-018 0.0019%
I1.15.01.03.03.002 C.OM.JYK.DF.00.332.SN Size 4" to 8" Nos. 16.00 92.620 1,481.92 P-I1-018 0.0013%
I1.15.01.03.03.003 C.OM.JYK.DF.00.332.SN Size 10" to 16" Nos. 24.00 222.290 5,334.96 P-I1-018 0.0046%
I1.15.01.03.03.004 C.OM.JYK.DF.00.332.SN Size 18" and above Nos. 1.00 370.480 370.48 P-I1-018 0.0003%
I1.15.01.04 Motor Operated Valves - Ball / Butterfly / Gate / Plug
I1.15.01.04.004 C.OM.JYK.DF.00.332.SN Size 18" and above Nos. 2.00 370.480 740.96 P-I1-018 0.0006%
I1.15.01.06 Pressure Safety Valves
I1.15.01.06.001 C.OM.JYK.DF.00.332.SN Size up to 3" Nos. 135.00 46.300 6,250.50 P-I1-018 0.0054%
I1.15.01.06.002 C.OM.JYK.DF.00.332.SN Size 4" to 8" Nos. 100.00 92.620 9,262.00 P-I1-018 0.0081%
I1.15.01.08 Pressure Vacuum Relief Valves
I1.15.01.08.002 C.OM.JYK.DF.00.332.SN Size 4" to 8" Nos. 12.00 129.670 1,556.04 P-I1-018 0.0014%
I1.15.01.08.003 C.OM.JYK.DF.00.332.SN Size 10" to 16" Nos. 14.00 222.290 3,112.06 P-I1-018 0.0027%
I1.15.02 Valve Seat Leakage Testing
I1.15.02.01 Control & Self actuated Valves
I1.15.02.01.01 Control Valves with Pneumatic Actuator - Globe/ Gate/ Self Acting Valves
I1.15.02.01.01.001 C.OM.JYK.DF.00.332.SN Size up to 3" Nos. 256.00 46.300 11,852.80 P-I1-019 0.0103%
I1.15.02.01.01.002 C.OM.JYK.DF.00.332.SN Size 4" to 8" Nos. 93.00 92.620 8,613.66 P-I1-019 0.0075%
I1.15.02.01.01.003 C.OM.JYK.DF.00.332.SN Size 10" to 16" Nos. 39.00 222.290 8,669.31 P-I1-019 0.0076%
I1.15.02.01.01.004 C.OM.JYK.DF.00.332.SN Size 18" and above Nos. 26.00 370.480 9,632.48 P-I1-019 0.0084%
I1.15.02.03 Actuated Isolation Valves - Ball /Gate /Plug/ Butterfly /Globe
I1.15.02.03.01 Shutdown Valves with Pneumatic Actuator
I1.15.02.03.01.001 C.OM.JYK.DF.00.332.SN Size up to 3" Nos. 210.00 46.300 9,723.00 P-I1-019 0.0085%
I1.15.02.03.01.002 C.OM.JYK.DF.00.332.SN Size 4" to 8" Nos. 111.00 92.620 10,280.82 P-I1-019 0.0090%
I1.15.02.03.01.003 C.OM.JYK.DF.00.332.SN Size 10" to 16" Nos. 69.00 222.290 15,338.01 P-I1-019 0.0134%
I1.15.02.03.01.004 C.OM.JYK.DF.00.332.SN Size 18" and above Nos. 27.00 370.480 10,002.96 P-I1-019 0.0087%
I1.15.02.03.03 On-Off Valves with Pneumatic Actuator
I1.15.02.03.03.001 C.OM.JYK.DF.00.332.SN Size up to 3" Nos. 46.00 46.300 2,129.80 P-I1-019 0.0019%
I1.15.02.03.03.002 C.OM.JYK.DF.00.332.SN Size 4" to 8" Nos. 16.00 92.620 1,481.92 P-I1-019 0.0013%
I1.15.02.03.03.003 C.OM.JYK.DF.00.332.SN Size 10" to 16" Nos. 24.00 222.290 5,334.96 P-I1-019 0.0046%
I1.15.02.03.03.004 C.OM.JYK.DF.00.332.SN Size 18" and above Nos. 1.00 370.480 370.48 P-I1-019 0.0003%
I1.15.02.04 Motor Operated Valves - Ball / Butterfly / Gate / Plug
I1.15.02.04.004 C.OM.JYK.DF.00.332.SN Size 18" and above Nos. 2.00 370.480 740.96 P-I1-019 0.0006%

Subtotal (OMR) 3,268,695.23 2.8487%

KHF-00-101983-FA-5804-0001-0000-02 Page 72 of 72