Revision 0
Applicability Sharjah
Document Type Plans & Manuals
Page 1 of 7
This document is an uncontrolled copy when printed or saved. Viewed by:
Ahmad Warsi 13-Mar-2012
Document Number Document Title Revision
Planning, Scheduling, Progress Measurement and
SHJ-PC-PLM-X-08361 0
Schedule Assurance Procedure
CONTENTS
8.0 APPENDICES..................................................................................... 7
Page 2 of 7
This document is an uncontrolled copy when printed or saved. Viewed by:
Ahmad Warsi 13-Mar-2012
Document Number Document Title Revision
Planning, Scheduling, Progress Measurement and
SHJ-PC-PLM-X-08361 0
Schedule Assurance Procedure
1.0 PURPOSE
The purpose of this Procedure is to provide direction for project control managers and
planning engineers for the set up and execution of the planning and scheduling functions
for all Petrofac Engineering and Construction Group projects.
The Procedure is the highest level of the Project Controls hierarchy of controls documents
and summarises the components that make up the entire suite of project controls for any
given project.
2.0 SCOPE
This procedure covers the proposal planning and engineering, procurement, construction
and completion planning scope for all Petrofac Engineering and Construction Group
proposals and projects.
Progress measurement activities for engineering, procurement, construction and
completion are also covered within this document for all Petrofac Engineering and
Construction Group proposals and projects.
3.0 DEFINITIONS
CDR Construction Documents Register
CPM Critical Path Method
IDC Inter Disciplinary Check
IFA/IFR Issued for Approval/Review
IFC Issued for Construction
IFD Issued for Design
IM Inch Meters
MC Mechanical Completion
P&ID Piping and Instrumentation Diagram
PCM Project Control Manager
PCS Project Control System
PEP Project Execution Plan
PM Project Manager
PTR Procurement Tracking Report
RFC Ready for Commissioning
RFSU Ready for Start-up
SBM Schedule Basis Memorandum
TDR Technical Documents Register
WBS Work Breakdown Structure
WDI Weld Diameter Inches
Page 3 of 7
This document is an uncontrolled copy when printed or saved. Viewed by:
Ahmad Warsi 13-Mar-2012
Document Number Document Title Revision
4.0 REFERENCES
6.0 DESCRIPTION
Project Controls documents prepared during the proposals phase generally include:
Level 2/3 schedule – CPM activity network suitable for Risk Analysis.
Risk Analysis
Manpower Histograms
Benchmarking Data
There will be a number of reviews during the development of the proposal schedule
such that the entire proposal team is aware of and contributes to the schedule. The
schedule will be reviewed and endorsed by the Project Controls Director or his
assignee and approved by the Proposals Manager.
6.9 EPC Planning
Once Petrofac has received notification of a Project award, the project controls
team is assigned and begins work on the preparation of the Project Control
deliverables required for the execution phase. It is usual for the planning package
to be prepared during the first 90 days. In order to allow the Project Team to focus
on required early critical activities, a 90 day look-ahead work list is prepared and
used to keep track of the early project activities until such time as the complete
control system is in place. In some instances it will be necessary to measure
progress against the initial 90-day lookahead which will be superseded with the
overall project progress report, when available.
The EPC Work Instruction goes into some depth about the following components of
the EPC planning phase:
Work Breakdown Structure
Project Calendars
Path of Construction
Page 5 of 7
This document is an uncontrolled copy when printed or saved. Viewed by:
Ahmad Warsi 13-Mar-2012
Document Number Document Title Revision
Planning, Scheduling, Progress Measurement and
SHJ-PC-PLM-X-08361 0
Schedule Assurance Procedure
o Fragnets
o Benchmarking data
o Critical path analysis and narrative
o Progress Measurement and control procedures
o Engineering Planning
TDR
o Procurement Planning
PTR
o Construction Planning
CDR (Construction Documents Register)
Sub-Contract Tracking
Completion planning
Any project specific procedure which are required under the specific
contract, to be prioritised for the document which need client review and
approval
6.10 Engineering Progress Measurement
The Project Control System is used to configure deliverable weightings and link
the deliverables listed in the Technical Document Register (TDR) to level 3
activities. Each deliverable is tracked through the development cycle and
actual progress is reported against achieved stage of development.
The Project Controls system generates various status reports and provides
business intelligence dashboards that allow drill down through the WBS levels of
progress.
6.11 Procurement Progress Measurement
The Project Control System is used to configure deliverable weightings and link
the deliverables listed in the Procurement Tracking Register (PTR) to level 3
activities. Each deliverable is tracked through the procurement cycle and
actual progress is reported against achieved stage of development.
The Project Controls system generates various status reports and provides
business intelligence dashboards that allow drill down through the WBS levels of
progress.
6.12 Construction Progress Measurement
The Project Control System holds corporate standard rules of credit for
construction prefabrication and installation activity. Each level 3 activity is
described and supported by level 4 sub-activities and associated fragnets.
Page 6 of 7
This document is an uncontrolled copy when printed or saved. Viewed by:
Ahmad Warsi 13-Mar-2012
Document Number Document Title Revision
Planning, Scheduling, Progress Measurement and
SHJ-PC-PLM-X-08361 0
Schedule Assurance Procedure
Progress weightings are based on earned effort and physical progress updates
are entered in the system on a weekly basis.
The Project Controls system generates various status reports and provides
business intelligence dashboards that allow drill down through the WBS levels of
progress.
6.13 Completions Progress Measurement
The Project Controls System links to the Completions System to assess check
sheets completed versus the number of estimated checksheets. Checksheets
are tracked for Construction Completion, Pre-commissioning Completion and
Commissioning Completion.
The Project Controls system generates various status reports and provides
business intelligence dashboards that allow drill down through the sub systems
and systems.
6.14 Schedule Assurance
The schedule Assurance work instruction highlights the requirement for
independent reviews of schedule status, progress documentation and forecasts
at key points throughout the project life cycle.
The assurance process provides impartial assessment of schedule forecasts with
findings presented to all concerned stakeholders in a report.
7.0 RECORDS
N/A
8.0 APPENDICES
8.15 Some Rules of Thumb
8.16 Typical Level 1 Schedule
8.17 Standard WBS Structure
8.18 Standard Construction logic and fragnets
8.19 Engineering logic diagrams
8.20 List of standard activities
8.21 Standard EPC level 3 schedule
8.22 90 day look-a-head schedule
8.23 Example TDR format
8.24 Example PTR format – Equipment
8.25 Example PTR format – Bulks
8.26 Example CDR Format
8.27 Subcontracting Progress
Page 7 of 7
This document is an uncontrolled copy when printed or saved. Viewed by:
Ahmad Warsi 13-Mar-2012
PETROFAC PROJECT CONTROL DEPARTMENT NOVEMBER 2010
PLANNING, SCHEDULING, PROGRESS MEASUREMENT AND SCHEDULE ASSURANCE QUALITY DOCUMENTS ORGANISATION
Planning, Scheduling, Progress
Measurement and Schedule Assurance
Procedure
Engineering Construction
Schedule
Proposal Progress Progress Planning, Scheduling,
Assurance
Planning Work Measurement Measurement Progress Measurement
Work
Instruction Work Work and Schedule Assurance
Instruction
Instruction Instruction Manual
Procurement Completion
EPC Planning Progress Progress
Work Measurement Measurement
Instruction Work Work
Instruction Instruction
Project Control System (PCS)
ThisAPW 22/11/2010
document is an uncontrolled copy when Z:\Project Controls\Project Controls & Planning\Planning\Procedure\Dept Manual\For BMS Upload 11_08\01a.Manual Flow Chart
printed or saved. Viewed by:
Ahmad Warsi 13-Mar-2012
Sl Major activities DURATION IN ORDINAL MONTHS
No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55
2010 2011 2012 2013 2014 2015
O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A
CONTRACT MILESTONES
Effective Date ( 01.10.2010)
Base De Vie (At Insalah CPF) ‐ Handover (01‐Oct‐2012)
WELLS (Well Pad Ready for Drilling / Well Ready for Hook up)
1 2 3
GBF (Garet el Befinat)
1 2 3
1 2 WI
HMN (Hassi Moumene) 2
1 WI
1 2 1 3 4 4 5 6
GMD (Gour Mahmoud)
2 3 5
1 2 3 4 5
IS (In Salah)
1 2 3
PIPELINE (Conditional Acceptance Certificate)
24" Dry Gas Pipeline ( ICP to Reg CPF),32" Dry Gas Pipeline (Reg CPF to IS
CPF), 16 " Wet Gas Pipeline (GBF Wells to IS CPF), 16" Wet Gas Pipeline
(HMN Wells to IS CPF)‐28.04.2013
16" Wet Gas Pipeline (IS Wells to IS CPF), 16" Wet Gas Pipeline (GMD Wells
to IS CPF ) ‐05.05.2014
CPF ‐Ready for Startup (Conditional Acceptance Certificate)
In Salah CPF / Reg CPF (28.04.2013)
2nd STAGE COMPRESSION (Conditional Acceptance Certificate)
Reg (28.04.2013) / Teg & Krechba (01.09.2014)
All Works Completed (31.12.2014)
ENGINEERING
Residual Feed Verification (Post Award)
P&ID-IDC P&ID-IFA P&ID-IFH P&ID-IFD P&ID-IFC
Process
HAZOP WITH
HAZOP WO
VENDOR PKG
VENDOR
HSE
D/S-Rot D/S-Stat
Mechanical
MTO X-Steel Drg- 1st Lot
Civil / Structural
Arch Drgs Fdn Drg
Buildings
30 % Review 60 % Review 90 % Review
3D Modeling
Plot Plan Plot Plan -IFC ISO-1st Lot
Piping
Pipeline MR s ALIGNMENT SHEETS release start
Pipeline
Cable-Layouts-Start
Load List Elect-MRs
Electrical
Instr. Index CR-Layouts
Instrumentation
Telecom
Engineering Substantially Complete
As‐Built
FREE ISSUE MATERIAL
13% Cr Line Pipes (FIM) ‐8",12" & 16" Total 164 KM 18 20 20 19 19 18 19 32
PROCUREMENT
Line Pipes Procurement (8" ,24" ,32")‐ 151 KM Approx. 26 25 25 25 25 25
E P D1 D
LP /HP Flare Package E P S D
Air Cooled Heat Exchangers E P S D1 D
Tanks E P S D
D1
Vessels / Separators E P S D
E S D
Glycol Regeneration Package P
Fuel Gas Heater E P S D
Diesel Coalsers & Filters E P S D
Scrapper Launchers / Receivers E P S D1 D
E S D
Incineration Package P
Gas Turbine Generator Package E P S D
Air Compressor & Dryer Package E P S D
Chemical Injection Package E P S D
Pumps , Other Packages & Equipments E P S D1 D
ICS Package E P S D
Package Sub‐Stations E P S D
Transformers / Electric Diesel Generators E P S D
Piping /Pipeline Bulks E P S D1 D
Piping Pre‐Fabrication ( By Sub‐contractor)
E / I / Telecom Cables E P S D1 D
E / I / Telecom Bulks E P S D1 D
CP System E P S D1 D
Structural Steel (Procurement & Fabrication) E P S D1 D
Pre‐Engineered Buildings ( Shelters ) E P S D1 D
CONSTRUCTION & COMMISSIONING
Temporary Facilities ( All Sites )
Well Heads & Pipelines
Well GBF & HMN well Pad Compln Well GMD & IS well Pad Subst. Compln
Location Confirmation & Land
Well pad construction(Incl. Access Road) Handover Start
GBF & HMN hookup Compln GMD& IS hookup Compln
Well Head hook up
GBF & HMN PL Compln
13 % Cr Steel Pipeline Laying (8" *& 12 ") ‐ Well Head‐36 KM ‐05.05.2014 (only
Welding Compln
HMN & GBF ‐28.04.2013‐ 11 Km) GBF & HMN PL Compln
13 % Cr Steel Pipeline Laying (16 " Wet Gas ‐GBF Wells to IS CPF‐ 32 KM & 16"
Wet Gas ‐HMN Wells to IS CPF‐ 13 KM, 8" CS water Inj ‐ IS CPF to HMN wells‐
16 KM) ‐28.04.2013 Welding Compln Interfield Line IS & GMD
Compln
13% Cr Steel Pipeline Laying (16" Wet Gas ‐IS Wells to IS CPF & 16" Wet Gas ‐
GMD Wells to IS CPF ) ‐ Total 79 KM ‐05‐05‐2014 Welding Compln
Reg & CPF PL Compln
CS Pipeline Laying ( 24" Dry Gas ‐ Reg CPF to ICP‐62 KM & 32" Dry Gas‐ Reg CPF
to IS CPF‐73 KM)‐28.04.2013
In Salah CPF
Building Works
UG Piping Works
Civil Works
Structural Work
Equipment Erection
Hydrotest Start
Piping Installation,Testing & Reinstatement
Control System Power on
S/Stn Energisation
Electrical / Instrumentation / Telecom / HSE works
Interface works ( Piping , Elect , Instru )
Pre‐Commissioning (incl. Utilities)
Process Commissioning
Reg CPF
Building Works
UG Piping Works
Civil Works
Structural Work
Equipment Erection
Hydrotest Start
Piping Installation,Testing & Reinstatement
Control System Power on
S/Stn Energisation
Electrical / Instrumentation / Telecom / HSE works
Interface works ( Piping , Elect , Instru )
Pre‐Commissioning (incl. Utilities)
Process Commissioning
Teg CPF
Building Works
UG Piping Works
Civil Works
Structural Work
Equipment Erection
Hydrotest Start
Piping Installation,Testing & Reinstatement
Control System Power on
S/Stn Energisation
Electrical / Instrumentation / Telecom / HSE works
Interface works ( Piping , Elect , Instru )
Pre‐Commissioning (incl. Utilities)
Process Commissioning
Krechba CPF
Site Preparation
CR & S/stn - Ready for E& I works
Building Works
Civil Works
Structural Works
Equipment Erection
Hydrotest Start
Piping Installation,Testing & Reinstatement
Electrical / Instrumentation / Telecom / HSE works
Interface works ( Piping , Elect , Instru )
Pre‐Commissioning
Commissioning
Base de Vie / Military Camp Works
Slab Concrete /
Excavation Ring Beam Concrete Compacted Fill
Bituminous Layer
Area Clearance
Foundations /
Excavation Pedestals / Columns Brick Wall / Plastering
Footings
Door / Windows
Roof Finishing Works
Fixing
Flooring / Painting /
False Ceiling
MEP Works
Alignment and Bolt
Install on Foundation Install Internals Grouting
Up
Alignment and Bolt
Install on Foundation Install Internals Grouting
Up
Painting / Finishing
Fabrication Erection Hydrotesting
Works
Installation on
Welding / Bolt‐up NDT
Foundation
Coating and
Fabrication Erection Leak Testing
Wrapping
Support Structure / Inspection and
Erection Internals and Wiring
Preparatory Work Acceptance
Support Structure / Inspection and
Handling and Setting Levelling and Fixing
Preparatory Work Acceptance
Megger / Continuity
Lay Cables Install Clips / Cleats
Test
Instruments
Supports Installation Inspection
Installation
Shot Blasting and Final Coat (Including
Intermediate Coat
Prime Coat Inspection)
Gauging, Testing and
Right of Way Stringing
Dewatering
FF ‐ 14 Days (Typical)
SS ‐ 14 Days (Typical) Welding
Trenching
Cross Work
Laying
FF
Backfilling
U/G Services (Pipe,
Install Equipment
Site Preparation Piling Piperack Foundations MH's, CB's, Drainage Backfill and Paving Piping Erection
(Static & Rotating)
Trenches)
Earthing Grid under
Underground Cable Paving Erect Steelwork ‐
Temporary Facilities Buildings Cable Supports
Routes Technical Structures
Erect Steelwork ‐
Piperacks
Electrical
Equipment Pre‐
Equipment Pre‐ Equipment
Equipment
Steel Fabrication Tank Foundations Pull Cables Terminations at Field
dressing Foundations
Equipment
Equipment
Heavy Lift Install Switchgear & Electrical
Fireproofing Structure and Pipe
Pipe Fabrication Tank Erection Electrical Panels & Terminations in
Support Foundations
JB's Buildings
Steel Concrete
Install Control & Instrument
Pipe Supports Fireproofing Cable Supports in Steel Platforms &
Instruments Panels & Terminations in
Fabrication Buildings Ladders
JB's Buildings
Basis off G
Geotechh Geotechh Nozzle
Start Platform & Clip info to
design survey report orientations/
ladder drwgs vendors
piping inputs
Buildings space
req. from Preliminary Final Building Architecture Procurement
Elect & inst electrical / building design Layouts MTO/REQ/Bid cycle
eqpt layouts telecom
Notes:
Vendor data
Inspection Shipping /
Purchase order Vendor Design review & Manufacturing
& release delivery
approval
Expediting
Notes:
1) Logic to be used for each requisition.
2) Receipt at site milestone to identify each tag number.
Installation
specifications Instrument Cable Cable /
locations routings drum
Finish
Process
instrument
Instrument index Instrument index Loop
data
set up development diagrams
Instrument
Design basis / Design In line instruments Bulk instrument Procurement
Start process hook up
review Specifications REQ/Bid/Award MTO cycle
drwgs
Panel/distribution
I/O count boards
P&IDs IFD Control room Final building
REQ/Bid/Award
equipment layouts layouts
Notes:
P&IDs IFD
Material Finish
specifications
P&IDs IFA
Intermediate
Bulk MTO valves Stress Final MTO
MTO valves &
& piping sketches valves & piping
piping
Notes:
U/G
U/G bulk MTO intermediate
MTO
U/G final MTO
Drainage Installation
Drainage layouts details
calculations
Preliminary
Manhole
building Sewerage layouts
schedule
design
Notes:
Material
Process
Start l i
selection Equipment list
l IFA Equipment list Equipment list
simulations Finish
diagrams IFD IFC
To
Process flow Cause & effect
Line list IFA Line list IFD intermediate
diagrams diagrams
piping MTO
To Final
piping MTO
Operations &
Hydraulic Preliminary
P&IDs IFA P&IDs IFD P&IDs IFC maintenance
calculations HAZOP
manual
Notes:
Del(M)
CONTRACT MILESTONES
Effective Date
Mechanical Completion of Water Intake & Water 27
Mechanical Completion of Train‐I of Gathering System 28
Mechanical Completion of Train‐II of Gathering System 33
Start‐up of Water Intake & Water Pipeline 28
Completion of Accomodation Camp 25
Start‐up of Train‐I of Gathering System and Central
29
Processing Facilities (150K BPD)
Start‐up of Train‐II of Gathering System and Central
34
Processing Facilities (250K BPD)
Completion of Work 36
ENGINEERING
Feed 4
P&ID-IDC P&ID-IFA P&ID-IFD P&ID-IFC
P&ID-IFH
Process 12
HAZOP WO VENDOR PKG HAZOP WITH VENDOR PKG
HSE 10
D/ata Sheets
Mechanical 11
Topo/Soil MTO X-Steel Drg- 1st Lot
Civil / Structural 12
Arch Drgs Fdn Drg
Buildings 9
PO Place Piling Drg
Design Pre‐Cast
Design Pre‐Cast 6
30 % Review 60 % Review 90 % Review
3D Modeling 13
Plot Plan -IDC Plot Plan -IFA Plot Plan -IFD ISO-1st Lot
Piping 13
Pipeline MR s ALIGNMENT SHEETS release start
Pipeline 10
Load List Elect-MRs Cable-Layouts-Start
Electrical 13
ICSS D/S Instr. Index
CR-Layouts
Instrumentation 13
Telecom 9
As‐Built Updation 11
PROCUREMENT
Line Pipes (PIL) 5 E P EW D1 D
LP /HP Flare Package (PIL) 9 E P EW D
Air Cooled Heat Exchangers(PIL) 11 E P EW D1 D
EW
Shell & Tube Heat Exchangers Skids ‐ Stage‐I 14 D1 D
Shell & Tube Heat Exchangers Skids ‐ Stage ‐II 18 EW D D1
Plate Heat Exchangers Skids ‐ Stage‐I 14 EW D1 D
Plate Heat Exchangers Skids ‐ Stage ‐II 18 EW D D1
EW
Desalter Package Skids ‐ Stage‐ I 14 D1 D
Desalter Package Skids ‐ Stage‐ II 18 EW D D1
Fired Heaters (PIL) [Hot Oil Heaters] ‐ 8 No 12 E P EW D1 D D1 = 3 No D = 5 No
10 ‐
10
Storage Tanks(PIL) E P EW D1 D
13
EW
HP LP Vessels Skids ‐ Stage‐I 14 D1 D
HP / LP Skids ‐ Stage‐II 18 EW D D1
P EW D1 D
Liquid N2 Storage and Vapourization Skids (PIL) 5 E
EW
Electric Heater Skids ‐ Stage‐I 14 D1 D
Electric Heater Skids ‐ Stage‐II 18 EW D D1
Filter & Filter Skids (PIL) 9 E P EW D
Hydrocyclone Skids (PIL) 9 E P EW D
Scrapper Launchers / Receivers (PIL) 10 E P EW D1 D
EW
Manifolds Skids ‐ Stage‐I 14 D1 D
Manifolds Skids ‐ Stage‐II 18 EW D D1
E P EW D1
Shutdown vales on flowlines 10‐12 D
Air Compressor & Dryer Skids (PIL) 12 E P EW D1 D
Chemical Injection Skids (PIL) 8 E P EW D1 D
Export Pumps 10 E P EW D1 D
API Pumps 8 E P EW D1 D
General Purpose Pumps 4 E P EW D1 D
Well Head Control Panel (PIL) 9 E P EW D1 D
ICSS Package (PIL) 11 E P EW D1 D
33 KV GIS Package Sub‐Station (PIL) 1 No, Main CPF 13 E P EW D
6 kv Package Sub‐Stations (PIL) Stage 1 ‐ 6 No 12 E P EW D1 D2 D3
D1 = Utilities, Trains 1 & 2 D2 = Trains 3 & 4, Water Intake, Well Pad M5 D3 = Well Pad M6
D4 = Trains 5 & 6, Trains 7 & 8 D5 = Train 9, Well Pad M8 D = Well Pad M7,
6 kv Package Sub‐Stations (PIL) Stage 2 ‐ 6 No 12 EW D4 D5 D Well Pad M10
132 kv GIS Switchgear 5 No 12 E P EW D1 D
D1 = Well Pads M5 & M6 D = Well Pads M7, M8 & M10
Transformers / Electric Diesel Generators(PIL) 8 E P EW D1 D
Dely. at Fab Shop
Piping Bulks 7 E P EW D1 D
Rcvd at Site
Piping Fabrication 3 E P EW D1 D2 D
E / I / Telecom Cables 5 E P EW D1 D
E D
E / I / Telecom Bulks 5 P EW D1
D
HT Cable 5 E P EW D1
CP System 6 E P EW D1 D
Dely. at Fab Shop
Structural Steel (procurement) 4 E P EW
Structural Steel ( Fabrication) 3 E P EW D1 D2 D
Shelters 6 E P EW D1 D2 D D1 = Life Support, Guard Post, FW Pumps, IA Compressor, Air Dryers
E P EW D1 D2 D
Pre‐engineered Substation Buildings for 132 KV 6
Pre‐Engineered Industrial Building 6 E P EW D1 D D1 = Lab, Office part 1, Canteen, F&G Station, Export S/V's room, Telecom Building, Stage 1 HVAC rooms
Accommodation Camp
E P EW
Accommodation Camp Building (Pre Engg, HVAC, Piping) 5‐8 D1 D2 D
Accommodation Camp Building (Containerized, HVAC, E P EW D1 D2 D3 D
5
Piping)
E P D1 D
Accommodation Camp Building (Equipment) 7 EW
Accommodation Camp (Containerised Substation ‐33 kV E P EW D
13
GIS) ‐ 1 No
Accommodation Camp (Containerised Substation ‐
13‐15 E P EW D
0.4kV) ‐ 3 No
E P D1 D
Accommodation Camp (E&I and Tel) 6 EW
Del(M)
Accommodation Bulk Pipe EW D
CONSTRUCTION & COMMISSIONING
Pioneer Camp 2
Temporary Facilities 6 A
Topographical & Geotechnical survey 3 A
Stage ‐I Gathering System & Central Processing Facilities
Including Utilities
Site Preparation & Access Road (flooding protection)
7 A
[Utility Area]
Site Preparation & Access Road (flooding protection)
7
[Storage Tanks & CPF Area]
Security protection (fencing, trenching,) 12
Piling 6 A
Pilling (cast in‐situ) ‐ [Tank storage] 5
Industrial Building (pre‐engineered) 10
Tank Foundations 6
Start Skid fdn [Utility Area]
Start Slug Catcher Install Sleepers
Civil Works ‐ Utility Area 18 Pre-cast Sleepers
Start Skid fdn [CPFArea]
Civil Works ‐ CPF Area 14 Pre-cast Sleepers
Install Sleepers
Tank Erection 6
Structural Work 7
Piping Work
UG Piping Works
i i k 7 Manhole Work
Last Delivery
Module Installation/ Equipment Erection 4
Fired Heaters Installation 4
Tank Hydrotest Start
Hydrotest Start
Piping Installation,Testing & Reinstatement 10
33 S/Stn Energisation
33 kv GIS Package Sub‐Station Installation 4
6 S/Stn Energisation
6 kv Package Sub‐Stations Installation 4 D D
Electrical /CP 7
Control System Power on
ICSS
Instrumentation / Telecom / HSE works 8 D
Pipeline (Trunk Line) from Well Pads M5 & M6 11
Interface works ( Piping , Elect , Inst. ) 3
Pre‐Commissioning 4
Mechanical Completion & Commissioning 4 Start of Performance Test
Assistance for Start‐up and Start Performance Test 3
HV Overhead Lines
Engineering and Procurement 6 E A
WP5 WP6 WP8
Install Switchyard 1.5
Energising 132kV
Pre‐engineered Substation (132kV substation) 6 D
Civil Works and foundation 6
Equipment erection 3
Hydrotest Start
Piping Installation,Testing & Reinstatement 5
6 S/Stn Energisation
6 kv Package Sub‐Station Instatallation 3 D
Electrical /CP 4
Control System Power on
Instrumentation / Telecom / HSE works 5
Pre‐Commissioning 3
Mechanical Completion & Commissioning 3
Well Pad Stage I (M6)
Site Preparation (leveling ‐ grading only) and Access A
2
Road
Security protection (fencing, trenching,) 6
Piling 1 A
Pre‐engineered Substation (132kV substation) 6 D
Civil Works and foundation 6
Well Pad M8 (Stage 2) fed from Well Pad M6 (Stage 1)
Equipment erection
Equipment erection 3
H d t t St
Hydrotest Startt
Piping Installation,Testing & Reinstatement 5
S/Stn Energisation
6 kv Package Sub‐Station Instatallation 3 D
Electrical /CP 4
Control System Power on
Instrumentation / Telecom / HSE works 5
Pre‐Commissioning 3
Mechanical Completion & Commissioning 3
Well Pad Stage II (M8)
Site Preparation (leveling ‐ grading only) and Access A
2
Road
Security protection (fencing, trenching,) 6
Piling 1 A
Install Switchyard 1.5
Pre‐engineered Substation (132kV substation) 6 D Energising 132KV
Civil Works and foundation 6
Equipment erection 3
Hydrotest Start
Piping Installation,Testing & Reinstatement 5
S/Stn Energisation
6 kv Package Sub‐Station Instatallation 3 D
Electrical /CP 4
Control System Power on
Instrumentation / Telecom / HSE works 5
Pre‐Commissioning 3
Mechanical Completion & Commissioning 3
Well Pad Stage II (M7)
Site Preparation (leveling ‐ grading only) and Access A
2
Road
Security protection (fencing, trenching,) 6
Piling 1 A
Pre‐engineered Substation (132kV substation) 6 D
Del(M)
Equipment erection 3
Hydrotest Start
Piping Installation,Testing & Reinstatement 5
S/Stn Energisation
6 kv Package Sub‐Station Instatallation 3 D
Electrical /CP 4
Control System Power on
Instrumentation / Telecom / HSE works 5
Pre‐Commissioning 3
Mechanical Completion & Commissioning 3
Well Pad Stage II (M10)
Site Preparation (leveling ‐ grading only) and Access A
2
Road
Security protection (fencing, trenching,) 6
Piling 1 A
Pre‐engineered Substation (132kV substation) 5 D
Civil Works and foundation 6
Equipment erection 3
Hydrotest Start
Piping Installation,Testing & Reinstatement 5
S/Stn Energisation
6 kv Package Sub‐Station Instatallation 3 D
El
Electrical /CP
i l /CP 4
Control System Power on
Instrumentation / Telecom / HSE works 5
Pre‐Commissioning 3
Mechanical Completion & Commissioning 3
Water Intake
Site Preparation (leveling ‐ grading only) and Access A
2
Road
Security protection (fencing, trenching,) 6
Piling 0.5 A
Install Switchyard 1.5
Civil Works and foundation 5
Equipment erection 3
Hydrotest Start
Piping Installation,Testing & Reinstatement 5
S/Stn Energisation
6 kv Package Sub‐Station Installation 3 D
Electrical /CP 4
Control System Power on
Instrumentation / Telecom / HSE works 5
Hydrotest Start
Water Pipeline (14 KM) 6
Pre‐Commissioning 3
Mechanical Completion & Commissioning 3
Stage ‐II Gathering System & Central Processing Facilities
Site preparation & improvement for Stage II 7 A
Piling 4
Pilling (cast in‐situ) 5
Tank Foundation 8
Start Skid fdn
Civil Works 14
Structural Work 8
Manhole Work
UG Piping 9
Module Installation /Equipment Erection 5
Fired Heaters Installation 4
Tank Erection 9
Tank hydrotest Hydrotest Start
Piping Installation, Testing & Re‐instatement 10
S/Stn Energisation
6 kv Package Sub‐Stations Installation 4 D D
First Last
Electrical / HSE works 9
ICSS Control System Power on
Instrumentation / Telecom / 10 D
Pipeline (Trunk Line) from Well Pads M7, M8 & M10 11
Interface / Tie‐ins works ( Piping , Elect , Inst. ) 4
Pre‐Commissioning 4
Comm. Complete
Mechanical Completion & Commissioning 4 Start of Performance
Test
Assistance for Start‐up and Start Performance Test 3
Accommodation Camp
Site Preparation & Access Road 7
Piling (steel) 5
Security protection (fencing/trenching) 9
Civil Work (incl Helipad) 12
Building Works ( Pre‐Engg)/HVAC/Piping}
Building Works ( Pre‐Engg)/HVAC/Piping} 10
Building Works ( Containerized/ HVAC/Piping) 9
Equipment erection 5
Piping (incl underground) 9
Install Switchyard 1.5
33 S/Stn Energisation
33 kv GIS Package Sub‐Station Instatallation 4 D
6 S/Stn Energisation
6 kv Package Sub‐Station Instatallation 3 D
Electrical 9
Instrument/Telecom (incl CCTV) 8
Pre‐Commissioning 4
Mechanical Completion & Commissioning 2.5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
LEGEND: FEED PERIOD E ‐ Inquiry D ‐ Delivery to Site(Complete)
P ‐ Order ‐ Ex‐Work
EW D1 Part Delivery to Site
13 05.01.2011
14a 26.03.2011 Updated for Bid APW JOB NO.: PI‐10031 CONTRACT NO.: DOCUMENT NO. REV. SHEET
2 28.10.2010 Issue for Proposal JK 3 of 3
JK
OVERALL PROJECT SCHEDULE ‐ LEVEL 1
1 26.10.2010 Issue for Comments
0 13.10.2010 Preliminary Sch ‐For Comments JK PROJECT : EPC of Oil Gathering System, CPF & Water Supply Project FORMAT NO.
REV DATE STATUS PREPD. CHECKED APPROVED CLIENT : LUKOIL MID‐EAST LIMITED PEC‐PCD‐F‐003 REV‐0
U/G Services (Pipe,
Install Equipment
Site Preparation Piling Piperack Foundations MH's, CB's, Drainage Backfill and Paving Piping Erection
(Static & Rotating)
Trenches)
Earthing Grid under
Underground Cable Paving Erect Steelwork ‐
Temporary Facilities Buildings Cable Supports
Routes Technical Structures
Erect Steelwork ‐
Piperacks
Electrical
Equipment Pre‐
Equipment Pre‐ Equipment
Equipment
Steel Fabrication Tank Foundations Pull Cables Terminations at Field
dressing Foundations
Equipment
Equipment
Heavy Lift Install Switchgear & Electrical
Fireproofing Structure and Pipe
Pipe Fabrication Tank Erection Electrical Panels & Terminations in
Support Foundations
JB's Buildings
Steel Concrete
Install Control & Instrument
Pipe Supports Fireproofing Cable Supports in Steel Platforms &
Instruments Panels & Terminations in
Fabrication Buildings Ladders
JB's Buildings
Basis off G
Geotechh Geotechh Nozzle
Start Platform & Clip info to
design survey report orientations/
ladder drwgs vendors
piping inputs
Buildings space
req. from Preliminary Final Building Architecture Procurement
Elect & inst electrical / building design Layouts MTO/REQ/Bid cycle
eqpt layouts telecom
Notes:
Process
datasheets Procurement Procurement
Mechanical
data sheets bid / receipt recovered /
Vendor data
Inspection Shipping /
Purchase order Vendor Design review & Manufacturing
& release delivery
approval
Expediting
Notes:
1) Logic to be used for each requisition.
2) Receipt at site milestone to identify each tag number.
Installation
specifications Instrument Cable Cable /
locations routings drum
Finish
Process
instrument
Instrument index Instrument index Loop
data
set up development diagrams
Instrument
Design basis / Design In line instruments Bulk instrument Procurement
Start process hook up
review Specifications REQ/Bid/Award MTO cycle
drwgs
Panel/distribution
I/O count boards
P&IDs IFD Control room Final building
REQ/Bid/Award
equipment layouts layouts
Notes:
Complete
Eqpt modeling
equipment
(phase 1)
modeling
P&IDs IFD
Material Finish
specifications
P&IDs IFA
Intermediate
Bulk MTO valves Stress Final MTO
MTO valves &
& piping sketches valves & piping
piping
Notes:
U/G
U/G bulk MTO intermediate
MTO
U/G final MTO
Drainage Installation
Drainage layouts details
calculations
Preliminary
Manhole
building Sewerage layouts
schedule
design
Notes:
To To
To dcs
mechanical instrument
vendor
revisions
Material
Process
Start l i
selection Equipment list
l IFA Equipment list Equipment list
simulations Finish
diagrams IFD IFC
To
Process flow Cause & effect
Line list IFA Line list IFD intermediate
diagrams diagrams
piping MTO
To Final
piping MTO
Operations &
Hydraulic Preliminary
P&IDs IFA P&IDs IFD P&IDs IFC maintenance
calculations HAZOP
manual
Notes:
Topo Main
Main piperack
piperack Equipment
Equipment Secondary
Secondary
Secondary Fabrication
Fabrication
Fabrication
survey steel
steel framing
framing steel
steel steel
steel structure
steel structure
structure steel
steeldrwgs
steel drwgs
drwgs
Procurement
Procurement
Procurement
cycle
cycle
cycle
Design Site
Site prep
prep 1st
1st civil
civil Final
Finalcivil
Final civil
civil
Specs layouts
layouts MTO/REQ/Bid
MTO/REQ/Bid MTO/REQ/Bid
MTO/REQ/Bid
MTO/REQ/Bid
Eqpt
Eqpt data
data &
&
loads
loads from
from
vendors
vendors Secondary
Secondary
Secondary Finish
Finish
Finish
Foundation
Foundation Primary
Primary FDN
FDN
FDN
FDN drwgs
FDN drwgs
drwgs
design
design drwgs
drwgs
IFC
IFC
IFC
Road
Road &
&
paving
paving
Plot Plan Piling layouts Architectural
Architectural
details
details &drwgs
&drwgs
Buildings space
req. from Preliminary Final
Final Building
Building Architecture
Architecture Procurement
Procurement
Elect & inst
electrical / building design Layouts
Layouts MTO/REQ/Bid
MTO/REQ/Bid cycle
cycle
eqpt layouts telecom
Notes:
Process
datasheets Procurement Procurement
Procurement
Mechanical
data sheets bid / receipt recovered
recovered //
Vendor data
Inspection
Inspection Shipping
Shipping //
Purchase order Vendor Design review & Manufacturing
Manufacturing
&
& release
release delivery
delivery
approval
Expediting
Notes:
1) Logic to be used for each requisition.
2) Receipt at site milestone to identify each tag number.
Instrument
Instrument Platform
Platform &
&
installation
installation details
details ladder
ladder drwgs
drwgs
Installation
Installation
specifications
specifications Instrument
Instrument Cable
Cable Cable
Cable ///
Cable
locations
locations routings
routings drum
drum
drum
Finish
Finish
Finish
Process
instrument
Instrument
Instrument index
index Instrument
Instrument index
index Loop
Loop
Loop
data
set
set up
up development
development diagrams
diagrams
diagrams
Panel/distribution
I/O count boards
P&IDs IFD Control room Final building
REQ/Bid/Award
equipment layouts layouts
Notes:
Complete
Complete
Eqpt modeling
modeling
equipment
equipment
(phase 1)
1)
modeling
modeling
Key
Key vendor
vendor Commence
Commence Complete
Complete
data
data isometric
isometric isometric
isometric
Design basis Design Plot plan, eqpt extraction
extraction extraction
extraction
Start
/ review Specifications layout IFA
P&IDs
P&IDs IFD
IFD
Material Finish
Finish
specifications
Piping modeling
modeling Piping
Piping Piping
Piping
(stage
(stage 1)
1) modeling
modeling modeling
modeling
P&IDs IFA
Intermediate
Intermediate
Bulk MTO
MTO valves
valves Stress
Stress Final
Final MTO
MTO
MTO
MTO valves
valves &
&
& piping
piping sketches
sketches valves
valves && piping
piping
piping
piping
Notes:
Procurement
Procurement Procurement
Procurement Procurement
Procurement
cycle
cycle cycle
cycle cycle
cycle
U/G
U/G
U/G bulk MTO intermediate
intermediate
MTO
MTO
U/G
U/G final
final MTO
MTO
Drainage Installation
Drainage layouts details
calculations
Preliminary
Manhole
building Sewerage layouts
schedule
design
Notes:
To
To To
To To
To dcs
dcs
mechanical
mechanical instrument
instrument vendor
vendor
revisions
revisions
Material
Process
Start selection Equipment
Equipment list
list IFA
IFA Equipment
Equipment list
list Equipment
Equipment list
Equipment list
list
simulations Finish
Finish
diagrams IFD
IFD IFC
IFC
To
To
To
Process flow Cause
Cause &
& effect
effect
Line list IFA Line
Line list
list IFD
IFD intermediate
intermediate
intermediate
diagrams diagrams
diagrams To
piping
piping MTO
piping MTO
MTO To Final
To Final
Final
piping
piping
piping
MTO
MTO
MTO
Operations
Operations &
Operations &
&
Hydraulic Preliminary
Preliminary
P&IDs IFA
IFA P&IDs
P&IDs IFD
IFD P&IDs
P&IDs IFC
IFC maintenance
maintenance
calculations HAZOP
HAZOP
manual
manual
Line
Line list
list IFC
IFC
Notes:
EPC CPF (Phase-I) at Badra Oil Field, Iraq - E&P 90583 01-Dec-11
DAYS 05-Jul-13
LA SCHEDULE
KEY MILESTONES 583 01-Dec-11 05-Jul-13
Page 1 of 9
Page 2 of 9
Page 3 of 9
Activity ID Activity Name Orig Start Finish 2009 2010 2011 2012 2013
Dur Oct N D Jan F Mar Apr M Jun Jul A S Oct N D Jan F Mar Apr M J Jul A S O N D Jan F Mar Apr M J Jul A S Oct N D J F Mar Apr M Jun Jul A S Oct N D Jan F Mar Apr M J Jul A
-38 -37 -36 -35 -34 -33 -32 -31 -30 -29 -28 -27 -26 -25 -24 -23 -22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
EIN10000 I/O lists 100 19-Feb-12 28-May-12
EIN10010 Cause & Effect diagrams 90 20-Jan-12 18-Apr-12
EIN10020 Instrument Index 80 09-Feb-12 28-Apr-12
EIN10030 Instrumentation Cable tray routing & Layout drawings 80 09-Feb-12 28-Apr-12
EIN10040 Instrumentation Bulk MTO 15 14-Apr-12 28-Apr-12
EIN10050 Piping & Electrical interface diagrams 80 09-Feb-12 28-Apr-12
EIN10060 Cable, Drum, JB & Label schedules 100 24-Feb-12 02-Jun-12
EIN10070 Instrument location plans / drawings 100 24-Feb-12 02-Jun-12
EIN10080 Instrument installation & Hook-up drawings 60 29-Apr-12 27-Jun-12
EIN10090 Instrument Loop drawings 60 24-May-12 22-Jul-12
EIN10100 Instrumentation Termination diagrams 85 29-Apr-12 22-Jul-12
EIN10110 MR/TBE/PR - Instrumentation Valves 45 15-Jan-12 28-Feb-12
EIN10120 Instrumentation Valves - Review vendor drgs 120 20-Mar-12 17-Jul-12
EIN10130 MR/TBE/PR - Field Instruments 45 04-Feb-12 19-Mar-12
EIN10140 Field Instruments - Review vendor drgs 90 09-Apr-12 07-Jul-12
EIN10150 MR/TBE/PR - Control Systems 45 16-Dec-11 29-Jan-12
EIN10160 Control Systems - Review vendor drgs 135 19-Feb-12 02-Jul-12
EIN10170 MR/TBE/PR - Instrument Cables/Cable Tray/JBs/Tubings/Bulk
70 31-Dec-11
items 09-Mar-12
EIN10180 Instrument Cables/Cable Tray/JBs/Tubings/Bulk items 110
- Review
30-Mar-12
vendor drgs
17-Jul-12
TELECOM 200 31-Dec-11 17-Jul-12
ETE10000 Design basis 15 31-Dec-11 14-Jan-12
ETE10010 Block diagrams/ Specifications 75 15-Jan-12 29-Mar-12
ETE10020 Telecom eqpt. Layouts - Plant area & Buildings 80 04-Feb-12 23-Apr-12
ETE10030 Cable layouts 80 24-Feb-12 13-May-12
ETE10040 Material take off -Telecom 55 04-Apr-12 28-May-12
ETE10050 Interconnection diagrams 80 25-Mar-12 12-Jun-12
ETE10060 Cable schedule 80 25-Mar-12 12-Jun-12
ETE10070 Installation details 70 24-Apr-12 02-Jul-12
ETE10080 Termination diagrams 70 09-May-12 17-Jul-12
ETE10090 MR/TBE/PR - Telecom system 30 01-Apr-12 30-Apr-12
ETE10100 Telecom system- Review vendor drgs 45 31-May-12 14-Jul-12
Page 4 of 9
Page 5 of 9
Page 6 of 9
Page 7 of 9
Page 8 of 9
Activity ID Activity Name Orig Start Finish 2009 2010 2011 2012 2013
Dur Oct N D Jan F Mar Apr M Jun Jul A S Oct N D Jan F Mar Apr M J Jul A S O N D Jan F Mar Apr M J Jul A S Oct N D J F Mar Apr M Jun Jul A S Oct N D Jan F Mar Apr M J Jul A
-38 -37 -36 -35 -34 -33 -32 -31 -30 -29 -28 -27 -26 -25 -24 -23 -22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
CTE10010 Telecom Cable Laying, Glanding & Terminations 92 03-Nov-12 02-Feb-13
CTE10020 Install PA/GA System 77 18-Nov-12 02-Feb-13
CTE10030 Install CCTV / Accesss Control / Security System 77 28-Nov-12 12-Feb-13
HSE 92 01-Nov-12 31-Jan-13
CHS10000 Installation of Safety & Fire Fighting Equipment 92 01-Nov-12 31-Jan-13
FIREPROOFING / PAINTING / INSULATION 136 15-Nov-12 30-Mar-13
CFP10000 Painting, Insulation & Fireproofing works 136 15-Nov-12 30-Mar-13
TIE-IN 31 28-Feb-13 30-Mar-13
TIE10000 Readiness of Tie-ins for Inlet line (By Company) 0 28-Feb-13*
TIE10005 Readiness of Tie-ins for Export line (By Company) 0 28-Feb-13
TIE10010 Tie-in for interface 31 28-Feb-13 30-Mar-13
PRE-COMMISSIONING, COMMISSIONING & START-UP 135 01-Jan-13 15-May-13
PRE-COMMISSIONING 106 01-Jan-13 16-Apr-13
CPCM10000 Pre-commissioning - E&I Systems 90 01-Jan-13 31-Mar-13
CPCM10100 Pre-commissioning - Utilities & Safety Systems 60 08-Feb-13 08-Apr-13
CPCM10200 Pre-commissioning - Process Systems 75 01-Feb-13 16-Apr-13
COMMISSIONING & START-UP 45 01-Apr-13 15-May-13
CCST10000 Commissioning - E&I Systems 29 01-Apr-13 29-Apr-13
CCST10100 Commissioning - Utilities & Safety Systems 29 09-Apr-13 07-May-13
CCST10200 Commissioning - Process Systems 29 17-Apr-13 15-May-13
PROVISIONAL AND FINAL ACCEPTANCE 30 05-Jun-13 05-Jul-13
PROVISIONAL ACCEPTANCE 0 05-Jun-13 05-Jun-13
CPAC10000 Provisional Acceptance 0 05-Jun-13
FINAL ACCEPTANCE 0 05-Jul-13 05-Jul-13
CCPT10000 Final Acceptance 0 05-Jul-13
Page 9 of 9
TITLE :
90 DAYS FRONT END SCHEDULE
(UPTO 11-JUN-09)
ORIG. DOC SIZE: This is a Word document and must not be altered Rev.
Issued for
A4 manually
R1 Review 06/04/2009 CSS DG RV /CM GS
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
PROJECT MANAGEMENT
1 ELM-PUL-QA-PLN-0001 PROJECT QUALITY PLAN 1 11-Mar-09 15-Apr-09
2 ELM-PUL-SE-PLN-0001 PROJECT HSSE PLAN 1 11-Mar-09 14-Apr-09
3 ELM-PUL-PM-PLN-0001 PROJECT COMMUNICATION PLAN 1 11-Mar-09 26-Mar-09 11-Mar-09 26-Mar-09 80
4 ELM-PUL-PM-PEP-0002 PROJECT EXECUTION PLAN 1 11-Mar-09 16-Apr-09
5 ELM-PUL-PM-PLN-0003 CONTRACTS ADMINISTARTION PLAN 1 11-Mar-09 15-Apr-09
6 ELM-PUL-PM-PLN-0004 RISK MANAGEMENT AND CONTINGENCY PLAN 1 11-Mar-09 18-Apr-09
7 ELM-PUL-PE-PLN-0001 ENGINEERING EXECUTION PLAN 1 11-Mar-09 31-Mar-09 11-Mar-09 31-Mar-09 80
8 ELM-PUL-PU-PLN-0001 PROCUREMENT EXECUTION PLAN 1 11-Mar-09 20-Apr-09
9 ELM-PUL-CM-PLN-0001 CONSTRUCTION EXECUTION PLAN 1 11-Mar-09 20-Apr-09
10 ELM-PUL-CO-PLN-0001 COMMISSIONING PLAN 1 11-Mar-09 10-Apr-09
11 ELM-PUL-IM-PLN-0001 INTERFACE MANAGEMENT PLAN 1 11-Mar-09 2-Apr-09 11-Mar-09 2-Apr-09 80
12 ELM-PUL-PC-PLN-0001 PROJECT CONTROL PLAN 1 1-Apr-09 14-Apr-09
13 ELM-PUL-PC-PRC-0003 DOCUMENT CONTROL PLAN 1 20-Mar-09 5-Apr-09 20-Mar-09 5-Apr-09 80
14 ELM-PUL-PC-PRC-0005 PROJECT INVOICING AND PAYMENT PROCEDURE 1 7-Apr-09 30-Apr-09
15 ELM-PUL-PC-SCH-0001 CONTRACTS MASTER SCHEDULE (L3) 1 11-Mar-09 30-Apr-09
16 ELM-PUL-PC-SCH-0002 90 DAYS FRONT END SCHEDULE 1 11-Mar-09 6-Apr-09
17 ELM-PUL-PC-SCH-0003 TECHNICAL DOCUMENT REGISTER 1 11-Mar-09 30-Apr-09
18 ELM-PUL-PC-SCH-0004 PROCUREMENT TRACKING REGISTER 1 11-Mar-09 15-Apr-09
ENGINEERING
PROCESS
19 ELM-PUL-PR-BOD-0001 PROCESS DESIGN BASIS 1 9.60 11-Mar-09 15-Apr-09
20 ELM-PUL-PR-PHL-0001 WATER INJECTION & DILUTION PHILOSPHY 1 2.40 4-Apr-09 25-Apr-09
21 ELM-PUL-PR-PHL-0002 OFFSITES & CENTRAL PROCESSING FACILITY PROCESS 1 2.40 4-Apr-09 25-Apr-09
CONTROL PHILOSPHY
22 ELM-PUL-PR-PHL-0003 CHEMCIAL INJECTION PHILOSPHY 1 2.40 9-Apr-09 30-Apr-09
24 ELM-PUL-PR-PHL-0005 DESIGN PHILOSOPHY - OPEN AND CLOSED DRAINS 1 2.40 9-Apr-09 30-Apr-09
30 ELM-PUL-PR-RPT-0003 OFFSITES AND CENTRAL PROCESSING FACILITY PROCESS 1 4.80 24-Apr-09 15-May-09
DESCRIPTION
31 ELM-PUL-PR-RPT-0004 UTILITIES REPORT 1 4.80 9-Apr-09 30-Apr-09
45 ELM-PUL-PR-PFD-2102 PFD - OIL STORAGE, EXPORT AND RE-RUN 1 2.64 11-Mar-09 15-Apr-09
46 ELM-PUL-PR-PFD-2401 PFD - LPG STORAGE, EXPORT AND RE-RUN 1 2.64 11-Mar-09 15-Apr-09
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
48 ELM-PUL-PR-HMB-0001 HEAT & MASS BALANCE- CENTRAL PROCESSING 1 9.60 25-Mar-09 7-Apr-09
FACILITY
49 ELM-PUL-PR-UFD-4101 UFD - HOT OIL SYSTEM - OIL STABILIZATION AREA 1 2.64 26-Mar-09 20-Apr-09
50 ELM-PUL-PR-UFD-4102 UFD - HOT OIL SYSTEM - NGL RECOVERY AREA 1 2.64 26-Mar-09 20-Apr-09
51 ELM-PUL-PR-UFD-4301 UFD - PRODUCTION CHEMICAL & METHANOL INJECTION 1 2.64 26-Mar-09 20-Apr-09
52 ELM-PUL-PR-UFD-4301 UFD - PRODUCTION CHEMICAL & METHANOL INJECTION 1 2.64 26-Mar-09 20-Apr-09
54 ELM-PUL-PR-UFD-4401 UFD - HP, HP/LT ATMOSPHERIC AND LP FLARE SYSTEMS 1 2.64 26-Mar-09 20-Apr-09
55 ELM-PUL-PR-UFD-4401 UFD - OIL TRAIN 1,OIL TRAIN 2 AND NGL FLARES 1 2.64 26-Mar-09 20-Apr-09
56 ELM-PUL-PR-UFD-4801 UFD - WARM AND COLD CLOSED DRAINS SYSTEMS 1 2.64 26-Mar-09 20-Apr-09
65 ELM-PUL-PR-UFD-6103 UFD - UTILITY AND FRESH WATER SYSTEMS 1 2.64 26-Mar-09 20-Apr-09
66 ELM-PUL-PR-UFD-6401 UFD - DIESEL FUEL RECEIVING, STORAGE AND 1 2.64 26-Mar-09 20-Apr-09
DISTRIBUTING
67 ELM-PUL-PR-UFD-6701 UFD - COMPRESSED AIR 1 2.64 26-Mar-09 20-Apr-09
72 ELM-PUL-PR-PID-0001 PID -CENTRAL PROCESSING FACILITY - DRAWING INDEX 1 4.51 9-May-09 30-May-09
SHEET 1
73 ELM-PUL-PR-PID-0001 PID -CENTRAL PROCESSING FACILITY - DRAWING INDEX 1 4.51 9-May-09 30-May-09
SHEET 2
74 ELM-PUL-PR-PID-0010 PID -GENERAL NOTES 1 4.51 9-May-09 30-May-09
84 ELM-PUL-PR-PID-1001 PID -BLOCK 208 OIL SLUG CATCHER HEADER 1 4.51 9-May-09 30-May-09
85 ELM-PUL-PR-PID-1001 PID -BLOCK 208 OIL SLUG CATCHER 1 4.51 9-May-09 30-May-09
86 ELM-PUL-PR-PID-1002 PID -EMK UNITIZED OIL SLUG CATCHER HEADER 1 4.51 9-May-09 30-May-09
87 ELM-PUL-PR-PID-1002 PID -EMK UNITIZED OIL SLUG CATCHER 1 4.51 9-May-09 30-May-09
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
88 ELM-PUL-PR-PID-1003 PID -BLOCK 208 GAS CONDENSATE SLUG CATCHER 1 4.51 9-May-09 30-May-09
HEADER
89 ELM-PUL-PR-PID-1003 PID -BLOCK 208 GAS CONDENSATE SLUG CATCHER 1 4.51 9-May-09 30-May-09
90 ELM-PUL-PR-PID-1005 PID -BLOCK 208 & EMK UNITIZED OIL INLET GAS AND 1 4.51 9-May-09 30-May-09
LIQUID PIPING
91 ELM-PUL-PR-PID-1006 PID -BLOCK 208 CONDENSATE INLET GAS AND LIQUID 1 4.51 9-May-09 30-May-09
PIPING
92 ELM-PUL-PR-PID-1007 PID -BLOCK 208 & EMK UNITIZED OIL INLET WATER 1 4.51 9-May-09 30-May-09
PIPING
93 ELM-PUL-PR-PID-1008 PID -BLOCK 208 CONDENSATE INLET WATER PIPING 1 4.51 9-May-09 30-May-09
94 ELM-PUL-PR-PID-1015 PID -BLOCK 208 GAS CONDENSATE INLET SEPARATOR 1 4.51 9-May-09 30-May-09
101 ELM-PUL-PR-PID-2013 PID -TRAIN 1 - OIL TRANSFER PUMPS 1 4.51 9-May-09 30-May-09
102 ELM-PUL-PR-PID-2013 PID -TRAIN 2 - OIL TRANSFER PUMPS 1 4.51 9-May-09 30-May-09
103 ELM-PUL-PR-PID-2014 PID -TRAIN 1 - 1ST STAGE DESALTER 1 4.51 9-May-09 30-May-09
104 ELM-PUL-PR-PID-2014 PID -TRAIN 2 - 1ST STAGE DESALTER 1 4.51 9-May-09 30-May-09
105 ELM-PUL-PR-PID-2015 PID -TRAIN 1 - 2ND STAGE DESALTER 1 4.51 9-May-09 30-May-09
106 ELM-PUL-PR-PID-2015 PID -TRAIN 2 - 2ND STAGE DESALTER 1 4.51 9-May-09 30-May-09
107 ELM-PUL-PR-PID-2016 PID -TRAIN 1 - OIL STABILIZER FEED HEATER 1 4.51 9-May-09 30-May-09
108 ELM-PUL-PR-PID-2016 PID -TRAIN 2 - OIL STABILIZER FEED HEATER 1 4.51 9-May-09 30-May-09
111 ELM-PUL-PR-PID-2018 PID -TRAIN 1 - OIL STABILIZER REBOILER 1 4.51 9-May-09 30-May-09
112 ELM-PUL-PR-PID-2018 PID -TRAIN 2 - OIL STABILIZER REBOILER 1 4.51 9-May-09 30-May-09
113 ELM-PUL-PR-PID-2019 PID -TRAIN 1 - OIL STABILIZER SIDE DRAW DRUM 1 4.51 9-May-09 30-May-09
114 ELM-PUL-PR-PID-2019 PID -TRAIN 2 - OIL STABILIZER SIDE DRAW DRUM 1 4.51 9-May-09 30-May-09
115 ELM-PUL-PR-PID-2020 PID -TRAIN 1 - CONDENSATE FLASH HEATER 1 4.51 9-May-09 30-May-09
116 ELM-PUL-PR-PID-2020 PID -TRAIN 1 - STABILIZED OIL TRANSFER PUMP SURGE 1 4.51 9-May-09 30-May-09
DRUM
117 ELM-PUL-PR-PID-2020 PID -TRAIN 1 - STABILIZED OIL TRANSFER PUMPS 1 4.51 9-May-09 30-May-09
118 ELM-PUL-PR-PID-2020 PID -TRAIN 2 - CONDENSATE FLASH HEATER 1 4.51 9-May-09 30-May-09
119 ELM-PUL-PR-PID-2020 PID -TRAIN 2 - STABILIZED OIL TRANSFER PUMP SURGE 1 4.51 9-May-09 30-May-09
DRUM
120 ELM-PUL-PR-PID-2020 PID -TRAIN 2 - STABILIZED OIL TRANSFER PUMPS 1 4.51 9-May-09 30-May-09
121 ELM-PUL-PR-PID-2021 PID -TRAIN 1 - STABILIZER CONDENSATE CONDENSER 1 4.51 9-May-09 30-May-09
122 ELM-PUL-PR-PID-2021 PID -TRAIN 2 - STABILIZER CONDENSATE CONDENSER 1 4.51 9-May-09 30-May-09
123 ELM-PUL-PR-PID-2022 PID -TRAIN 1 - STABILIZED CONDENSATE DRUM AND 1 4.51 9-May-09 30-May-09
PUMPS
124 ELM-PUL-PR-PID-2022 PID -TRAIN 2 - STABILIZED CONDENSATE DRUM AND 1 4.51 9-May-09 30-May-09
PUMPS
125 ELM-PUL-PR-PID-2023 PID -TRAIN 1 - OIL RUNDOWN COOLERS 1 4.51 9-May-09 30-May-09
126 ELM-PUL-PR-PID-2023 PID -TRAIN 2 - OIL RUNDOWN COOLERS 1 4.51 9-May-09 30-May-09
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
128 ELM-PUL-PR-PID-2025 PID -TRAIN 1 - DESALTER WASH WATER HEATER 1 4.51 9-May-09 30-May-09
129 ELM-PUL-PR-PID-2025 PID -TRAIN 2 - DESALTER WASH WATER HEATER 1 4.51 9-May-09 30-May-09
135 ELM-PUL-PR-PID-2108 PID -OIL EXPORT PUMP RECYCLE COOLER 1 4.51 9-May-09 30-May-09
137 ELM-PUL-PR-PID-2120 PID -OIL/CONDENSATE RE-RUN FLASH DRUM 1 4.51 9-May-09 30-May-09
145 ELM-PUL-PR-PID-2307 PID -CONDENSATE EXPORT PUMP RECYCLE COOLER 1 4.51 9-May-09 30-May-09
151 ELM-PUL-PR-PID-2406 PID -LPG EXPORT PUMP RECYCLE COOLER 1 4.51 9-May-09 30-May-09
152 ELM-PUL-PR-PID-2408 PID -LPG LAUNCHER / FISCAL METER 1 4.51 9-May-09 30-May-09
155 ELM-PUL-PR-PID-2501 PID -1ST STAGE ASSOCIATED GAS SUCTION HEADER 1 4.51 9-May-09 30-May-09
156 ELM-PUL-PR-PID-2510 PID -TRAIN 1 - ASSOCIATED GAS INLET COOLER 1 4.51 9-May-09 30-May-09
157 ELM-PUL-PR-PID-2510 PID -TRAIN 2 - ASSOCIATED GAS INLET COOLER 1 4.51 9-May-09 30-May-09
158 ELM-PUL-PR-PID-2510 PID -TRAIN 3 - ASSOCIATED GAS INLET COOLER 1 4.51 9-May-09 30-May-09
159 ELM-PUL-PR-PID-2511 PID -TRAIN 1 - 1ST STAGE ASSOCIATED GAS SUCTION 1 4.51 9-May-09 30-May-09
DRUM
160 ELM-PUL-PR-PID-2511 PID -TRAIN 2 - 1ST STAGE ASSOCIATED GAS SUCTION 1 4.51 9-May-09 30-May-09
DRUM
161 ELM-PUL-PR-PID-2511 PID -TRAIN 3 - 1ST STAGE ASSOCIATED GAS SUCTION 1 4.51 9-May-09 30-May-09
DRUM
162 ELM-PUL-PR-PID-2511 PID -TRAIN 1 - 1ST STAGE ASSOCIATED GAS SUCTION 1 4.51 9-May-09 30-May-09
DRUM PUMP
163 ELM-PUL-PR-PID-2511 PID -TRAIN 2 - 1ST STAGE ASSOCIATED GAS SUCTION 1 4.51 9-May-09 30-May-09
DRUM PUMP
164 ELM-PUL-PR-PID-2511 PID -TRAIN 3 - 1ST STAGE ASSOCIATED GAS SUCTION 1 4.51 9-May-09 30-May-09
DRUM PUMP
165 ELM-PUL-PR-PID-2512 PID -TRAIN 1 - 1ST STAGE ASSOCIATED GAS 1 4.51 9-May-09 30-May-09
COMPRESSOR
166 ELM-PUL-PR-PID-2512 PID -TRAIN 2 - 1ST STAGE ASSOCIATED GAS 1 4.51 9-May-09 30-May-09
COMPRESSOR
167 ELM-PUL-PR-PID-2512 PID -TRAIN 3 - 1ST STAGE ASSOCIATED GAS 1 4.51 9-May-09 30-May-09
COMPRESSOR
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
168 ELM-PUL-PR-PID-2513 PID -2ND STAGE ASSOCIATED GAS SUCTION AND 1 4.51 9-May-09 30-May-09
CONDENSATE HEADERS
169 ELM-PUL-PR-PID-2514 PID -TRAIN 1 - 2ND STAGE ASSOCIATED GAS SUCTION 1 4.51 9-May-09 30-May-09
COOLER
170 ELM-PUL-PR-PID-2514 PID -TRAIN 2 - 2ND STAGE ASSOCIATED GAS SUCTION 1 4.51 9-May-09 30-May-09
COOLER
171 ELM-PUL-PR-PID-2514 PID -TRAIN 3 - 2ND STAGE ASSOCIATED GAS SUCTION 1 4.51 9-May-09 30-May-09
COOLER
172 ELM-PUL-PR-PID-2515 PID -TRAIN 1 - 2ND STAGE ASSOCIATED GAS SUCTION 1 4.51 9-May-09 30-May-09
DRUM
173 ELM-PUL-PR-PID-2515 PID -TRAIN 2 - 2ND STAGE ASSOCIATED GAS SUCTION 1 4.51 9-May-09 30-May-09
DRUM
174 ELM-PUL-PR-PID-2515 PID -TRAIN 3 - 2ND STAGE ASSOCIATED GAS SUCTION 1 4.51 9-May-09 30-May-09
DRUM
175 ELM-PUL-PR-PID-2516 PID -TRAIN 1 - 2ND STAGE ASSOCIATED GAS 1 4.51 9-May-09 30-May-09
COMPRESSOR
176 ELM-PUL-PR-PID-2516 PID -TRAIN 2 - 2ND STAGE ASSOCIATED GAS 1 4.51 9-May-09 30-May-09
COMPRESSOR
177 ELM-PUL-PR-PID-2516 PID -TRAIN 3 - 2ND STAGE ASSOCIATED GAS 1 4.51 9-May-09 30-May-09
COMPRESSOR
178 ELM-PUL-PR-PID-2517 PID -TRAIN 1 - 2ND STAGE ASSOCIATED GAS 1 4.51 9-May-09 30-May-09
AFTERCOOLER
179 ELM-PUL-PR-PID-2517 PID -TRAIN 2 - 2ND STAGE ASSOCIATED GAS 1 4.51 9-May-09 30-May-09
AFTERCOOLER
180 ELM-PUL-PR-PID-2517 PID -TRAIN 3 - 2ND STAGE ASSOCIATED GAS 1 4.51 9-May-09 30-May-09
AFTERCOOLER
181 ELM-PUL-PR-PID-2520 PID -GAS BOOSTER COMPRESSORS SUCTION HEADERS 1 4.51 9-May-09 30-May-09
182 ELM-PUL-PR-PID-2521 PID -TRAIN 1 - BOOSTER COMPRESSOR SUCTION DRUM 1 4.51 9-May-09 30-May-09
183 ELM-PUL-PR-PID-2521 PID -TRAIN 2 - BOOSTER COMPRESSOR SUCTION DRUM 1 4.51 9-May-09 30-May-09
184 ELM-PUL-PR-PID-2521 PID -TRAIN 3 - BOOSTER COMPRESSOR SUCTION DRUM 1 4.51 9-May-09 30-May-09
188 ELM-PUL-PR-PID-2523 PID -TRAIN 1 - BOOSTER COMPRESSOR AFTERCOOLER 1 4.51 9-May-09 30-May-09
189 ELM-PUL-PR-PID-2523 PID -TRAIN 2 - BOOSTER COMPRESSOR AFTERCOOLER 1 4.51 9-May-09 30-May-09
190 ELM-PUL-PR-PID-2523 PID -TRAIN 3 - BOOSTER COMPRESSOR AFTERCOOLER 1 4.51 9-May-09 30-May-09
191 ELM-PUL-PR-PID-2601 PID -GAS DEHYDRATION INLET GAS COOLER 1 4.51 9-May-09 30-May-09
192 ELM-PUL-PR-PID-2602 PID -GAS DEHYDRATION INLET FEED K.O. DRUM 1 4.51 9-May-09 30-May-09
193 ELM-PUL-PR-PID-2603 PID -GAS DEHYDRATION COMMON HEADER 1 4.51 9-May-09 30-May-09
194 ELM-PUL-PR-PID-2610 PID -GAS DEHYDRATION INLET COALESCER 1 4.51 9-May-09 30-May-09
195 ELM-PUL-PR-PID-2612 PID -GAS MOL SIEVE BEDS 1 4.51 9-May-09 30-May-09
196 ELM-PUL-PR-PID-2613 PID -GAS MOL SIEVE BEDS 1 4.51 9-May-09 30-May-09
197 ELM-PUL-PR-PID-2614 PID -GAS MOL SIEVE BED FILTERS 1 4.51 9-May-09 30-May-09
198 ELM-PUL-PR-PID-2615 PID -GAS DEHYDRATION REGENERATION GAS 1 4.51 9-May-09 30-May-09
COMPRESSION
199 ELM-PUL-PR-PID-2616 PID -GAS DEHYDRATION REGENERATION GAS FIRED 1 4.51 9-May-09 30-May-09
HEATER
200 ELM-PUL-PR-PID-2617 PID -GAS DEHYDRATION REGENERATION GAS COOLER 1 4.51 9-May-09 30-May-09
AND SEPARATOR
201 ELM-PUL-PR-PID-2704 PID -ABSORBER 1 4.51 9-May-09 30-May-09
205 ELM-PUL-PR-PID-2710 PID -NGL FEED GAS-GAS EXCHANGER 1 4.51 9-May-09 30-May-09
206 ELM-PUL-PR-PID-2711 PID -NGL FEED GAS-LIQUID EXCHANGER 1 4.51 9-May-09 30-May-09
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
207 ELM-PUL-PR-PID-2712 PID -NGL EXPANDER SUCTION DRUM 1 4.51 9-May-09 30-May-09
210 ELM-PUL-PR-PID-2714 PID -NGL EXPANDER / COMPRESSOR AFTERCOOLER 1 4.51 9-May-09 30-May-09
217 ELM-PUL-PR-PID-2720 PID -DEBUTANIZER REFLUX DRUM AND PUMPS 1 4.51 9-May-09 30-May-09
220 ELM-PUL-PR-PID-2723 PID -RESIDUE GAS COMPRESSOR COMMON HEADER 1 4.51 9-May-09 30-May-09
221 ELM-PUL-PR-PID-2724 PID -TRAIN 1 - 1ST STAGE RESIDUE GAS SUCTION DRUM 1 4.51 9-May-09 30-May-09
222 ELM-PUL-PR-PID-2724 PID -TRAIN 2 - 1ST STAGE RESIDUE GAS SUCTION DRUM 1 4.51 9-May-09 30-May-09
223 ELM-PUL-PR-PID-2725 PID -TRAIN 1 - RESIDUE GAS COMPRESSOR - STAGE 1 1 4.51 9-May-09 30-May-09
224 ELM-PUL-PR-PID-2725 PID -TRAIN 2 - RESIDUE GAS COMPRESSOR - STAGE 1 1 4.51 9-May-09 30-May-09
225 ELM-PUL-PR-PID-2726 PID -TRAIN 1 - 1ST STAGE RESIDUE GAS AFTERCOOLER 1 4.51 9-May-09 30-May-09
226 ELM-PUL-PR-PID-2726 PID -TRAIN 2 - 1ST STAGE RESIDUE GAS AFTERCOOLER 1 4.51 9-May-09 30-May-09
227 ELM-PUL-PR-PID-2728 PID -TRAIN 1 - 2ND STAGE RESIDUE GAS SUCTION DRUM 1 4.51 9-May-09 30-May-09
228 ELM-PUL-PR-PID-2728 PID -TRAIN 2 - 2ND STAGE RESIDUE GAS SUCTION DRUM 1 4.51 9-May-09 30-May-09
229 ELM-PUL-PR-PID-2729 PID -TRAIN 1 - RESIDUE GAS COMPRESSOR - STAGE 2 1 4.51 9-May-09 30-May-09
230 ELM-PUL-PR-PID-2729 PID -TRAIN 2 - RESIDUE GAS COMPRESSOR - STAGE 2 1 4.51 9-May-09 30-May-09
231 ELM-PUL-PR-PID-2730 PID -TRAIN 1 - 2ND STAGE RESIDUE GAS AFTERCOOLER 1 4.51 9-May-09 30-May-09
232 ELM-PUL-PR-PID-2730 PID -TRAIN 2 - 2ND STAGE RESIDUE GAS AFTERCOOLER 1 4.51 9-May-09 30-May-09
233 ELM-PUL-PR-PID-2901 PID -GAS COMPRESSOR COMMON HEADER 1 4.51 9-May-09 30-May-09
234 ELM-PUL-PR-PID-2910 PID -TRAIN 1 - 1ST STAGE INJECTION SUCTION DRUM 1 4.51 9-May-09 30-May-09
235 ELM-PUL-PR-PID-2910 PID -TRAIN 2 - 1ST STAGE INJECTION SUCTION DRUM 1 4.51 9-May-09 30-May-09
236 ELM-PUL-PR-PID-2910 PID -TRAIN 3 - 1ST STAGE INJECTION SUCTION DRUM 1 4.51 9-May-09 30-May-09
237 ELM-PUL-PR-PID-2911 PID -TRAIN 1 - 1ST STAGE INJECTION GAS COMPRESSOR 1 4.51 9-May-09 30-May-09
238 ELM-PUL-PR-PID-2911 PID -TRAIN 2 - 1ST STAGE INJECTION GAS COMPRESSOR 1 4.51 9-May-09 30-May-09
239 ELM-PUL-PR-PID-2911 PID -TRAIN 3 - 1ST STAGE INJECTION GAS COMPRESSOR 1 4.51 9-May-09 30-May-09
240 ELM-PUL-PR-PID-2912 PID -TRAIN 1 - 1ST STAGE INJECTION GAS COMPRESSOR 1 4.51 9-May-09 30-May-09
AFTERCOOLER
241 ELM-PUL-PR-PID-2912 PID -TRAIN 2 - 1ST STAGE INJECTION GAS COMPRESSOR 1 4.51 9-May-09 30-May-09
AFTERCOOLER
242 ELM-PUL-PR-PID-2912 PID -TRAIN 3 - 1ST STAGE INJECTION GAS COMPRESSOR 1 4.51 9-May-09 30-May-09
AFTERCOOLER
243 ELM-PUL-PR-PID-2914 PID -TRAIN 1 - 2ND STAGE INJECTION GAS SUCTION 1 4.51 9-May-09 30-May-09
DRUM
244 ELM-PUL-PR-PID-2914 PID -TRAIN 2 - 2ND STAGE INJECTION GAS SUCTION 1 4.51 9-May-09 30-May-09
DRUM
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
245 ELM-PUL-PR-PID-2914 PID -TRAIN 3 - 2ND STAGE INJECTION GAS SUCTION 1 4.51 9-May-09 30-May-09
DRUM
246 ELM-PUL-PR-PID-2915 PID -TRAIN 1 - 2ND STAGE INJECTION GAS COMPRESSOR 1 4.51 9-May-09 30-May-09
247 ELM-PUL-PR-PID-2915 PID -TRAIN 2 - 2ND STAGE INJECTION GAS COMPRESSOR 1 4.51 9-May-09 30-May-09
248 ELM-PUL-PR-PID-2915 PID -TRAIN 3 - 2ND STAGE INJECTION GAS COMPRESSOR 1 4.51 9-May-09 30-May-09
249 ELM-PUL-PR-PID-2916 PID -TRAIN 1 - 2ND STAGE INJECTION GAS 1 4.51 9-May-09 30-May-09
AFTERCOOLER
250 ELM-PUL-PR-PID-2916 PID -TRAIN 2 - 2ND STAGE INJECTION GAS 1 4.51 9-May-09 30-May-09
AFTERCOOLER
251 ELM-PUL-PR-PID-2916 PID -TRAIN 3 - 2ND STAGE INJECTION GAS 1 4.51 9-May-09 30-May-09
AFTERCOOLER
252 ELM-PUL-PR-PID-2980 PID -INJECTION GAS 1 4.51 9-May-09 30-May-09
255 ELM-PUL-PR-PID-4102 PID -TRAIN 1 - HOT OIL EXPANSION DRUM OIL AREA 1 4.51 9-May-09 30-May-09
256 ELM-PUL-PR-PID-4102 PID -TRAIN 1 - HOT OIL CIRCULATION PUMP OIL AREA 1 4.51 9-May-09 30-May-09
257 ELM-PUL-PR-PID-4102 PID -TRAIN 2 - HOT OIL EXPANSION DRUM OIL AREA 1 4.51 9-May-09 30-May-09
258 ELM-PUL-PR-PID-4102 PID -TRAIN 2 - HOT OIL CIRCULATION PUMP OIL AREA 1 4.51 9-May-09 30-May-09
259 ELM-PUL-PR-PID-4103 PID -TRAIN 1 - HOT OIL FILTERS OIL AREA 1 4.51 9-May-09 30-May-09
260 ELM-PUL-PR-PID-4103 PID -TRAIN 2 - HOT OIL FILTERS OIL AREA 1 4.51 9-May-09 30-May-09
261 ELM-PUL-PR-PID-4104 PID -TRAIN 1 - HOT OIL FIRED HEATER OIL AREA 1 4.51 9-May-09 30-May-09
262 ELM-PUL-PR-PID-4104 PID -TRAIN 2 - HOT OIL FIRED HEATER OIL AREA 1 4.51 9-May-09 30-May-09
263 ELM-PUL-PR-PID-4107 PID -TRAIN 1 - HOT OIL DISTRIBUTION SYSTEM OIL AREA 1 4.51 9-May-09 30-May-09
264 ELM-PUL-PR-PID-4107 PID -TRAIN 2 - HOT OIL DISTRIBUTION SYSTEM OIL AREA 1 4.51 9-May-09 30-May-09
265 ELM-PUL-PR-PID-4109 PID -HOT OIL DRAIN COLLECTION 1 4.51 9-May-09 30-May-09
266 ELM-PUL-PR-PID-4112 PID -HOT OIL EXPANSION DRUM NGL AREA 1 4.51 9-May-09 30-May-09
267 ELM-PUL-PR-PID-4112 PID -HOT OIL RECIRCULATION PUMP NGL AREA 1 4.51 9-May-09 30-May-09
268 ELM-PUL-PR-PID-4113 PID -HOT OIL FILTERS NGL AREA 1 4.51 9-May-09 30-May-09
269 ELM-PUL-PR-PID-4114 PID -HOT OIL FIRED HEATER NGL AREA 1 4.51 9-May-09 30-May-09
270 ELM-PUL-PR-PID-4117 PID -HOT OIL DISTRIBUTION SYSTEM NGL AREA 1 4.51 9-May-09 30-May-09
271 ELM-PUL-PR-PID-4118 PID -HOT OIL STORAGE FILTER 1 4.51 9-May-09 30-May-09
272 ELM-PUL-PR-PID-4119 PID -HOT OIL DRAIN FILTER 1 4.51 9-May-09 30-May-09
273 ELM-PUL-PR-PID-4120 PID -HOT OIL DRAIN COLLECTION 1 4.51 9-May-09 30-May-09
274 ELM-PUL-PR-PID-4121 PID -HOT OIL DRAINS NGL AREA 1 4.51 9-May-09 30-May-09
275 ELM-PUL-PR-PID-4302 PID -OXYGEN SCAVENGER INJECTION SYSTEM 1 4.51 9-May-09 30-May-09
277 ELM-PUL-PR-PID-4304 PID -DEMULSIFIER INJECTION SYSTEM (INLET AREA) 1 4.51 9-May-09 30-May-09
278 ELM-PUL-PR-PID-4304 PID -DEMULSIFIER INJECTION SYSTEM (OIL AREA) 1 4.51 9-May-09 30-May-09
279 ELM-PUL-PR-PID-4305 PID -SCALE INHIBITOR INJECTION SYSTEM (INLET AREA) 1 4.51 9-May-09 30-May-09
280 ELM-PUL-PR-PID-4305 PID -SCALE INHIBITOR INJECTION SYSTEM (OIL AREA) 1 4.51 9-May-09 30-May-09
281 ELM-PUL-PR-PID-4306 PID -METHANOL INJECTION SYSTEM (NGL AREA) 1 4.51 9-May-09 30-May-09
283 ELM-PUL-PR-PID-4308 PID -CORROSION INHIBITOR INJECTION SYSTEM (INLET 1 4.51 9-May-09 30-May-09
AREA)
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
284 ELM-PUL-PR-PID-4308 PID -CORROSION INHIBITOR INJECTION SYSTEM 1 4.51 9-May-09 30-May-09
(DEHYDRATION AREA)
285 ELM-PUL-PR-PID-4308 PID -CORROSION INHIBITOR SYSTEM 1 4.51 9-May-09 30-May-09
286 ELM-PUL-PR-PID-4401 PID -HIGH PRESSURE FLARE COLLECTION HEADER 1 4.51 9-May-09 30-May-09
287 ELM-PUL-PR-PID-4401 PID -HIGH PRESSURE FLARE KO DRUM AND PUMPS 1 4.51 9-May-09 30-May-09
288 ELM-PUL-PR-PID-4401 PID -HIGH PRESSURE FLARE PACKAGE 1 4.51 9-May-09 30-May-09
289 ELM-PUL-PR-PID-4501 PID -LOW PRESSURE FLARE COLLECTION HEADER 1 4.51 9-May-09 30-May-09
290 ELM-PUL-PR-PID-4501 PID -LOW PRESSSURE FLARE KO DRUM 1 4.51 9-May-09 30-May-09
291 ELM-PUL-PR-PID-4501 PID -LOW PRESSURE FLARE PACKAGE 1 4.51 9-May-09 30-May-09
296 ELM-PUL-PR-PID-4701 PID -ATMOSPHERIC PRESSURE FLARE COLLECTION 1 4.51 9-May-09 30-May-09
HEADER
297 ELM-PUL-PR-PID-4701 PID -ATMOSPHERIC PRESSURE FLARE KO DRUM AND 1 4.51 9-May-09 30-May-09
PUMPS
298 ELM-PUL-PR-PID-4701 PID -ATMOSPHERIC PRESSURE FLARE PACKAGE 1 4.51 9-May-09 30-May-09
301 ELM-PUL-PR-PID-4811 PID -COMMON CLOSED DRAIN COLLECTION HEADER 1 4.51 9-May-09 30-May-09
302 ELM-PUL-PR-PID-4811 PID -COMMON CLOSED COLLECTION DRUM 1 4.51 9-May-09 30-May-09
303 ELM-PUL-PR-PID-4814 PID -WET CLOSED DRAIN DRUM 1 4.51 9-May-09 30-May-09
304 ELM-PUL-PR-PID-4815 PID -LT CLOSED DRAIN COLLECTION HEADER 1 4.51 9-May-09 30-May-09
305 ELM-PUL-PR-PID-4815 PID -LT CLOSED DRAIN DRUM 1 4.51 9-May-09 30-May-09
306 ELM-PUL-PR-PID-4816 PID -OIL/CONDENSATE LAUNCHER DRAIN COLLECTION 1 4.51 9-May-09 30-May-09
307 ELM-PUL-PR-PID-4816 PID -OIL/CONDENSATE LAUNCHER CLOSED DRAIN DRUM 1 4.51 9-May-09 30-May-09
308 ELM-PUL-PR-PID-4901 PID -OIL TRAIN-1 FLARE HEADER 1 4.51 9-May-09 30-May-09
309 ELM-PUL-PR-PID-4901 PID -OIL TRAIN-2 FLARE HEADER 1 4.51 9-May-09 30-May-09
310 ELM-PUL-PR-PID-4901 PID -OIL TRAIN-1 FLARE KO DRUM 1 4.51 9-May-09 30-May-09
311 ELM-PUL-PR-PID-4901 PID -OIL TRAIN-2 FLARE KO DRUM 1 4.51 9-May-09 30-May-09
312 ELM-PUL-PR-PID-4901 PID -OIL TRAIN-1 FLARE PACKAGE 1 4.51 9-May-09 30-May-09
313 ELM-PUL-PR-PID-4901 PID -OIL TRAIN-2 FLARE PACKAGE 1 4.51 9-May-09 30-May-09
314 ELM-PUL-PR-PID-5101 PID -PRODUCED WATER COLLECTION HEADERS 1 4.51 9-May-09 30-May-09
315 ELM-PUL-PR-PID-5110 PID -TRAIN 1 - PRODUCED WATER DEGASSER 1 4.51 9-May-09 30-May-09
316 ELM-PUL-PR-PID-5110 PID -TRAIN 2 - PRODUCED WATER DEGASSER 1 4.51 9-May-09 30-May-09
317 ELM-PUL-PR-PID-5111 PID -TRAIN 1 - PRODUCED WATER DEGASSER 1 4.51 9-May-09 30-May-09
(PRODUCTED WATER TREATMENT 2)
318 ELM-PUL-PR-PID-5122 PID -TRAIN 1 - INDUCED GAS FLOTATION UNIT 1 4.51 9-May-09 30-May-09
319 ELM-PUL-PR-PID-5122 PID -TRAIN 2 - INDUCED GAS FLOTATION UNIT 1 4.51 9-May-09 30-May-09
320 ELM-PUL-PR-PID-5123 PID -TRAIN 1 - INDUCED GAS FLOTATION 1 4.51 9-May-09 30-May-09
UNIT(PRODUCTED WATER TREATMENT 2)
321 ELM-PUL-PR-PID-5126 PID -TRAIN 1 - TREATED PRODUCED WATER PUMPS 1 4.51 9-May-09 30-May-09
322 ELM-PUL-PR-PID-5126 PID -TRAIN 2 - TREATED PRODUCED WATER PUMPS 1 4.51 9-May-09 30-May-09
323 ELM-PUL-PR-PID-5127 PID -TRAIN 1 - TREATED PRODUCED WATER PUMPS 1 4.51 9-May-09 30-May-09
(PRODUCTED WATER TREATMENT 2)
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
324 ELM-PUL-PR-PID-5202 PID -INJECTION WATER SURGE TANK 1 4.51 9-May-09 30-May-09
325 ELM-PUL-PR-PID-5203 PID -INJECTION WATER SURGE TANK (PRODUCTED 1 4.51 9-May-09 30-May-09
WATER TREATMENT 2)
326 ELM-PUL-PR-PID-5204 PID -WATER INJECTION BOOSTER PUMPS 1 4.51 9-May-09 30-May-09
327 ELM-PUL-PR-PID-5205 PID -WATER INJECTION BOOSTER PUMPS (PRODUCTED 1 4.51 9-May-09 30-May-09
WATER TREATMENT 2)
328 ELM-PUL-PR-PID-5209 PID -WATER INJECTION AND DILUTION DISTRIBUTION 1 4.51 9-May-09 30-May-09
MANIFOLD
329 ELM-PUL-PR-PID-5301 PID -HP FUEL GAS SURGE DRUM 1 4.51 9-May-09 30-May-09
332 ELM-PUL-PR-PID-5303 PID -START-UP FUEL GAS HEATER 1 4.51 9-May-09 30-May-09
333 ELM-PUL-PR-PID-5304 PID -LP FUEL GAS SURGE DRUM 1 4.51 9-May-09 30-May-09
334 ELM-PUL-PR-PID-5305 PID -LP FUEL GAS DISTRIBUTION HEADER 1 4.51 9-May-09 30-May-09
335 ELM-PUL-PR-PID-5306 PID -HP FUEL GAS DISTRIBUTION HEADER 1 4.51 9-May-09 30-May-09
336 ELM-PUL-PR-PID-5410 PID -OILY SLUDGE EVAPORATION POND 1 4.51 9-May-09 30-May-09
337 ELM-PUL-PR-PID-5420 PID -CLEAN SLUDGE EVAPORATION POND 1 4.51 9-May-09 30-May-09
341 ELM-PUL-PR-PID-6102 PID -MIO-PLIOCENE SOURCE WATER WELL COLLECTOR 1 4.51 9-May-09 30-May-09
HEADER
342 ELM-PUL-PR-PID-6110 PID -SOURCE WATER STORAGE TANK AND PUMPS 1 0.00 9-May-09 30-May-09
351 ELM-PUL-PR-PID-7001 PID -SLUG CATCHER AREA OILY WATER SUMP AND 1 4.51 9-May-09 30-May-09
PUMPS
352 ELM-PUL-PR-PID-7004 PID -OIL TRAIN 1 & 2 AREA OILY WATER SUMP AND 1 4.51 9-May-09 30-May-09
PUMPS
353 ELM-PUL-PR-PID-7006 PID -DEHYDRATION TRAIN 1 & 2 AREA OILY WATER 1 4.51 9-May-09 30-May-09
SUMP AND PUMPS
354 ELM-PUL-PR-PID-7008 PID -NGL TRAIN 1 & 2 AREA OILY WATER SUMP AND 1 4.51 9-May-09 30-May-09
PUMPS
355 ELM-PUL-PR-PID-7010 PID -RE-INJECTION COMPRESSOR AREA OILY WATER 1 4.51 9-May-09 30-May-09
SUMP AND PUMPS
356 ELM-PUL-PR-PID-7012 PID -HOT OIL AREA OILY WATER SUMP AND PUMPS 1 4.51 9-May-09 30-May-09
357 ELM-PUL-PR-PID-7014 PID -FLARE KO DRUM AREA OILY WATER SUMP AND 1 4.51 9-May-09 30-May-09
PUMPS
358 ELM-PUL-PR-PID-7030 PID -OILY WATER COLECTOR 1 4.51 9-May-09 30-May-09
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
364 ELM-PUL-PR-PID-7301 PID -SANITARY LIFT STATION & SEWAGE TREATMENT 1 4.51 9-May-09 30-May-09
PACKAGE
365 ELM-PUL-PR-PID-7501 PID -DIESEL DISTRIBUTION 1 4.51 9-May-09 30-May-09
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
558 ELM-PUL-MJ-DAT-0008 MECHANICAL DATA SHEET FOR OIL TRANSFER PUMP 2 0.24 6-Apr-09 16-Apr-09
(P02-2001-A/B)
559 ELM-PUL-MJ-DAT-0011 2 0.24 6-Apr-09 16-Apr-09
MECHANICAL DATA SHEET FOR HOT OIL
RECIRCULATION PUMPS OIL AREA (P02-4101-A/B/C)
560 ELM-PUL-MJ-DAT-0012 MECHANICAL DATA SHEET FOR OIL BOOSTER PUMPS 2 0.24 6-Apr-09 16-Apr-09
(P08-2101-A/B/C)
561 ELM-PUL-MJ-DAT-0013 MECHANICAL DATA SHEET FOR OIL EXPORT PUMPS ( 1 0.24 6-Apr-09 16-Apr-09
P08-2102-A/B/C)
562 ELM-PUL-MJ-DAT-0014 MECHANICAL DATA SHEET FOR OIL / CONDENSATE RE- 2 0.24 11-May-09 21-May-09
RUN PUMPS ( P08-2104-A/B)
563 ELM-PUL-MJ-DAT-0015 MECHANICAL DATA SHEET FOR CONDENSATE BOOSTER 2 0.24 11-May-09 21-May-09
PUMPS (P08-2301-A/B/C)
564 ELM-PUL-MJ-DAT-0016 MECHANICAL DATA SHEET FOR CONDENSATE EXPORT 1 0.24 6-Apr-09 16-Apr-09
PUMPS (P08-2302-A/B/C)
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
565 ELM-PUL-MJ-DAT-0017 MECHANICAL DATA SHEET FOR LPG RE-RUN PUMPS (P08- 2 0.24 11-May-09 21-May-09
2401-A/B)
566 ELM-PUL-MJ-DAT-0018 MECHANICAL DATA SHEET FOR LPG BOOSTER PUMPS 2 0.24 11-May-09 21-May-09
(P08-2402-A/B/C)
567 ELM-PUL-MJ-DAT-0019 MECHANICAL DATA SHEET FOR LPG EXPORT PUMPS 1 0.24 6-Apr-09 16-Apr-09
(P08-2403-A/B/C)
568 ELM-PUL-MJ-DAT-0020 MECHANICAL DATA SHEET FOR HOT OIL DRAIN DRUM 2 0.24 17-May-09 27-May-09
PUMPS (P08-4101 A/B)
569 ELM-PUL-MJ-DAT-0022 MECHANICAL DATA SHEET FOR HP FLARE KO DRUM 2 0.24 11-May-09 21-May-09
PUMPS (P08-4401-A/B)
570 ELM-PUL-MJ-DAT-0023 MECHANICAL DATA SHEET FOR LOW PRESSURE FLARE 2 0.24 11-May-09 21-May-09
KO DRUM PUMPS (P08-4501-A/B)
571 ELM-PUL-MJ-DAT-0024 MECHANICAL DATA SHEET FOR AP FLARE KO DRUM 2 0.24 11-May-09 21-May-09
PUMPS (P08-4701-A/B)
572 ELM-PUL-MJ-DAT-0025 MECHANICAL DATA SHEET FOR CLOSED DRAINS DRUM 2 0.24 17-May-09 27-May-09
PUMPS (P08-4801-A/B)
573 ELM-PUL-MJ-DAT-0026 MECHANICAL DATA SHEET FOR OFF SPEC AREA CLOSED 2 0.24 17-May-09 27-May-09
DRAINS DRUM PUMPS (P08-4802-A/B)
574 ELM-PUL-MJ-DAT-0027 MECHANICAL DATA SHEET FOR LT CLOSED DRAINS 2 0.24 17-May-09 27-May-09
DRUM PUMPS (P08-4803-A/B)
575 ELM-PUL-MJ-DAT-0028 MECHANICAL DATA SHEET FOR SLUG CATCHER AREA 2 0.24 17-May-09 27-May-09
OILY WATER PUMPS (P08-4901-A/B)
576 ELM-PUL-MJ-DAT-0029 MECHANICAL DATA SHEET FOR OIL TRAIN 1&2 AREA 2 0.24 17-May-09 27-May-09
OILY WATER PUMPS (P08-4902-A/B)
577 ELM-PUL-MJ-DAT-0030 2 0.24 17-May-09 27-May-09
MECHANICAL DATA SHEET FOR BOOSTER COMPRESSOR
AREA OILY WATER PUMPS (P08-4903-A/B)
578 ELM-PUL-MJ-DAT-0031 MECHANICAL DATA SHEET FOR NGL AREA TRAIN 1 OILY 2 0.24 17-May-09 27-May-09
WATER PUMPS (P08-4904-A/B)
579 ELM-PUL-MJ-DAT-0032 2 0.24 17-May-09 27-May-09
MECHANICAL DATA SHEET FOR REINJECTION
COMPRESSOR AREA OILY WATER PUMPS (P08-4905-A/B)
580 ELM-PUL-MJ-DAT-0033 MECHANICAL DATA SHEET FOR HOT OIL STORAGE AREA 2 0.24 17-May-09 27-May-09
OILY WATER PUMPS (P08-4906-A/B)
581 ELM-PUL-MJ-DAT-0034 MECHANICAL DATA SHEET FOR FLARE KO AREA OILY 2 0.24 17-May-09 27-May-09
WATER PUMPS (P08-4907-A/B)
582 ELM-PUL-MJ-DAT-0035 MECHANICAL DATA SHEET FOR WATER INJECTION 2 0.24 6-Apr-09 16-Apr-09
BOOSTER PUMPS ( P08-5201-A/B/C/D)
583 ELM-PUL-MJ-DAT-0036 MECHANICAL DATA SHEET FOR SOURCE WATER PUMPS ( 2 0.24 6-Apr-09 16-Apr-09
P08-6101-A/B)
584 ELM-PUL-MJ-DAT-0037 MECHANICAL DATA SHEET FOR CPI SEPARATOR OIL 2 0.24 17-May-09 27-May-09
PUMPS (P08-7001-A/B)
585 ELM-PUL-MJ-DAT-0038 MECHANICAL DATA SHEET FOR CPI SEPARATOR 2 0.24 17-May-09 27-May-09
EFFLUENT PUMPS (P08-7002-A/B)
586 ELM-PUL-MJ-DAT-0039 MECHANICAL DATA SHEET FOR OIL TRAIN 1 FLARE KO 2 0.24 11-May-09 21-May-09
DRUM PUMPS (P01-4908 A/B)
587 ELM-PUL-MJ-DAT-0040 MECHANICAL DATA SHEET FOR OIL TRAIN 2 FLARE KO 2 0.24 11-May-09 21-May-09
DRUM PUMPS (P02-5001 A/B)
588 ELM-PUL-MJ-DAT-0042 MECHANICAL DATA SHEET FOR TREATED PRODUCED 2 0.00 17-May-09 27-May-09
WATER PUMPS (P01-5101-A/B)
589 ELM-PUL-MJ-DAT-0043 MECHANICAL DATA SHEET FOR TREATED PRODUCED 2 0.00 17-May-09 27-May-09
WATER PUMPS (P02-5101-A/B)
590 ELM-PUL-MJ-DAT-0044 MECHANICAL DATA SHEET FOR TREATED PRODUCED 2 0.00 17-May-09 27-May-09
WATER PUMPS (P08-5101-A/B)
591 ELM-PUL-MJ-DAT-0045 MECHANICAL DATA SHEET FOR WATER INJECTION 2 0.24 6-Apr-09 16-Apr-09
BOOSTER PUMPS ( P08-5202-A/B)
592 ELM-PUL-MJ-DAT-0046 2 0.24 17-May-09 27-May-09
MECHANICAL DATA SHEET FOR EXPORT LAUNCHER
AREA LT CLOSED DRAIN DRUM PUMPS (P08-4804 A/B)
593 ELM-PUL-MJ-DAT-0047 MECHANICAL DATA SHEET FOR HOT OIL DRAIN PUMPS 2 0.00 17-May-09 27-May-09
NGL AND HBNS AREA (P08-4104 A/B)
594 ELM-PUL-MZ-DAT-0048 MECHANICAL DATA SHEET FOR ELECTRIC MOTOR 2 0.24 17-May-09 27-May-09
DRIVEN FIRE WATER PUMP (P08-6302-A/B)
595 ELM-PUL-MZ-DAT-0049 MECHANICAL DATA SHEET FOR DIESEL ENGINE DRIVEN 2 0.24 17-May-09 27-May-09
FIRE WATER PUMP (P08-6303-A/B)
596 ELM-PUL-MZ-DAT-0050 MECHANICAL DATA SHEET FOR FIRE WATER JOCKEY 2 0.24 17-May-09 27-May-09
PUMPS (P08-6304-A/B)
597 ELM-PUL-MJ-DAT-0051 MECHANICAL DATA SHEET FOR ASSOCIATED GAS 1 0.48 27-Mar-09 6-Apr-09
COMPRESSOR PACKAGE (X01, X02, X03-2502)
598 ELM-PUL-MJ-DAT-0052 MECHANICAL DATA SHEET FOR BOOSTER COMPRESSOR 1 0.48 27-Mar-09 6-Apr-09
PACKAGE (X01, X02, X03-2503)
599 ELM-PUL-MJ-DAT-0053 MECHANICAL DATA SHEET FOR GAS DEHYDRATION 1 0.48 27-Mar-09 6-Apr-09
REGEN COMPRESSOR (X01-2601)
600 ELM-PUL-MJ-DAT-0054 MECHANICAL DATA SHEET FOR HP NITROGEN 2 0.24 17-May-09 27-May-09
COMPRESSOR (X08-7102A/B)
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
601 ELM-PUL-MJ-DAT-0055 MECHANICAL DATA SHEET FOR NGL EXPANDER 1 0.48 26-Apr-09 6-May-09
COMPRESSOR PACKAGE (X01-2701/X02-2701)
602 ELM-PUL-MJ-DAT-0056 MECHANICAL DATA SHEET FOR RESIDUE GAS 1 0.72 26-Apr-09 6-May-09
COMPRESSOR (X01-2702, X02-2702)
603 ELM-PUL-MJ-DAT-0057 MECHANICAL DATA SHEET FOR INJECTION GAS 1 0.72 26-Apr-09 6-May-09
COMPERSSOR (X01-2901, X02-2901 & X03-2901)
604 ELM-PUL-MJ-DAT-0070 2 0.48 18-Mar-09 28-Mar-09
MECHANICAL DATA SHEET FOR INSTRUMENT AIR
COMPRESSOR & DRYER PACKAGES (X08-6701 A/B/C/D)
605 ELM-PUL-MJ-REQ-0051 REQUISITION - ELECTRIC MOTOR DRIVEN COMPRESSOR 1 1.44 5-Apr-09 15-Apr-09
PACKAGES
606 ELM-PUL-MJ-REQ-0052 1 1.44 15-Apr-09 25-Apr-09
REQUISITION - HEAVY DUTY HORIZONTAL PUMPS
607 ELM-PUL-MJ-REQ-0053 1 1.44 5-Apr-09 15-Apr-09
REQUISITION - GT DRIVEN COMPRESSOR PACKAGES
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
638 ELM-PUL-MD-DAT-0006 MECHANICAL DATA SHEET FOR GAS DEHYDRATION 2 2.40 17-Mar-09 6-Apr-09
INLET COALESCER (V01-2601)
639 ELM-PUL-MD-DAT-0007 MECHANICAL DATA SHEET FOR GAS MOLECULAR SIEVE 2 2.40 27-Mar-09 6-Apr-09
BED (V01-2602/2603/2604/2605)
640 ELM-PUL-MD-DAT-0008 MECHANICAL DATA SHEET FOR GAS DEHYDRATION FEED 2 2.40 27-Mar-09 6-Apr-09
K.O. DRUM (V01-2607)
641 ELM-PUL-MD-DAT-0009 MECHANICAL DATA SHEET FOR NGL EXPANDER SUCTION 2 2.40 17-Mar-09 6-Apr-09
DRUM (V01-2701)
642 ELM-PUL-MD-DAT-0010 MECHANICAL DATA SHEET FOR 1ST STAGE INJECTION 2 2.40 27-Mar-09 6-Apr-09
GAS SUCTION DRUM (V01/V02/V03-2901)
643 ELM-PUL-MD-DAT-0011 MECHANICAL DATA SHEET FOR 2ND STAGE INJECTION 1 2.40 27-Mar-09 6-Apr-09
GAS SUCTION DRUM (V01/V02/V03-2902)
644 ELM-PUL-MD-DAT-0012 MECHANICAL DATA SHEET FOR HP SEPARATOR 2 2.40 3-Apr-09 13-Apr-09
(V01/V02-2001)
645 ELM-PUL-MD-DAT-0013 MECHANICAL DATA SHEET FOR 1ST STAGE DESALTER 2 2.16 3-Apr-09 13-Apr-09
(V01/V02-2002)
646 ELM-PUL-MD-DAT-0014 MECHANICAL DATA SHEET FOR 2ND STAGE DESALTER 2 2.16 3-Apr-09 13-Apr-09
(V01/V02-2003)
647 ELM-PUL-MD-DAT-0015 MECHANICAL DATA SHEET FOR STABILIZED 2 0.96 3-Apr-09 13-Apr-09
CONDENSATE DRUM (V01/V02-2004)
648 ELM-PUL-MD-DAT-0016 MECHANICAL DATA SHEET FOR OIL STABILIZER SIDE 2 0.96 3-Apr-09 13-Apr-09
DRAW DRUM (V01/V02-2005)
649 ELM-PUL-MD-DAT-0017 MECHANICAL DATA SHEET FOR OIL TRANSFER PUMP 2 0.96 3-Apr-09 13-Apr-09
SURGE DRUM (V01/V02-2006)
650 ELM-PUL-MD-DAT-0018 MECHANICAL DATA SHEET FOR 1ST STAGE ASSOCIATED 2 0.96 3-Apr-09 13-Apr-09
GAS SUCTION DRUM (V01/V02-2501)
651 ELM-PUL-MD-DAT-0019 MECHANICAL DATA SHEET FOR 2ND STAGE ASSOCIATED 2 0.96 3-Apr-09 13-Apr-09
GAS SUCTION DRUM (V01/V02-2502)
652 ELM-PUL-MD-DAT-0020 MECHANICAL DATA SHEET FOR BOOSTER COMPRESSOR 2 0.96 3-Apr-09 13-Apr-09
SUCTION DRUM (V01/V02/V03-2505)
653 ELM-PUL-MD-DAT-0021 MECHANICAL DATA SHEET FOR GAS DEHYDRATION 2 1.44 3-Apr-09 13-Apr-09
REGENERATION GAS SEPARATOR (V01-2606)
654 ELM-PUL-MD-DAT-0022 MECHANICAL DATA SHEET FOR DE-BUTANIZER REFLUX 2 0.96 3-Apr-09 13-Apr-09
DRUM (V01-2702)
655 ELM-PUL-MD-DAT-0023 MECHANICAL DATA SHEET FOR 1ST STAGE RESIDUE GAS 2 0.96 3-Apr-09 13-Apr-09
SUCTION DRUM (V01/V02-2703)
656 ELM-PUL-MD-DAT-0024 MECHANICAL DATA SHEET FOR 2ND STAGE RESIDUE GAS 2 0.96 3-Apr-09 13-Apr-09
SUCTION DRUM (V01/V02-2704)
657 ELM-PUL-MD-DAT-0025 MECHANICAL DATA SHEET FOR HOT OIL EXPANSION 2 0.96 3-Apr-09 13-Apr-09
DRUM - OIL AREA (V01/V02-4101)
658 ELM-PUL-MD-DAT-0026 MECHANICAL DATA SHEET FOR HOT OIL EXPANSION 2 0.96 3-Apr-09 13-Apr-09
DRUM - NGL AREA (V01-4102)
659 ELM-PUL-MD-DAT-0027 MECHANICAL DATA SHEET FOR OIL TRAIN 1 FLARE KO 2 0.96 3-Apr-09 13-Apr-09
DRUM (V01-4901)
660 ELM-PUL-MD-DAT-0028 MECHANICAL DATA SHEET FOR OIL TRAIN 2 FLARE KO 2 0.96 3-Apr-09 13-Apr-09
DRUM (V02-5001)
661 ELM-PUL-MD-DAT-0029 MECHANICAL DATA SHEET FOR BLOCK 208 CONDENSATE 2 0.96 3-Apr-09 13-Apr-09
INLET SEPARATOR (V08-1005)
662 ELM-PUL-MD-DAT-0030 MECHANICAL DATA SHEET FOR OIL/CONDENSATE 2 0.96 3-Apr-09 13-Apr-09
RERUN FLASH DRUM (V08-2102)
663 ELM-PUL-MD-DAT-0031 MECHANICAL DATA SHEET FOR OIL/CONDENSATE 2 0.96 3-Apr-09 13-Apr-09
DEGASSING BOOT (V08-2103)
664 ELM-PUL-MD-DAT-0032 MECHANICAL DATA SHEET FOR HOT OIL DRAIN DRUM - 2 0.96 3-Apr-09 13-Apr-09
OIL AREA (V08-4101)
665 ELM-PUL-MD-DAT-0033 MECHANICAL DATA SHEET FOR HOT OIL DRAIN DRUM - 2 0.96 3-Apr-09 13-Apr-09
NGL AND HBNS AREA (V08-4102)
666 ELM-PUL-MD-DAT-0034 MECHANICAL DATA SHEET FOR HP FLARE KO DRUM (V08- 2 0.96 3-Apr-09 13-Apr-09
4401)
667 ELM-PUL-MD-DAT-0035 MECHANICAL DATA SHEET FOR LP FLARE KO DRUM (V08- 2 0.96 3-Apr-09 13-Apr-09
4501)
668 ELM-PUL-MD-DAT-0036 MECHANICAL DATA SHEET FOR HP-LT FLARE KO DRUM 2 0.96 3-Apr-09 13-Apr-09
(V08-4601)
669 ELM-PUL-MD-DAT-0037 MECHANICAL DATA SHEET FOR AP FLARE KO DRUM (V08- 2 0.96 3-Apr-09 13-Apr-09
4701)
670 ELM-PUL-MD-DAT-0038 MECHANICAL DATA SHEET FOR WET CLOSED DRAIN 2 0.96 3-Apr-09 13-Apr-09
DRUM (V08-4801)
671 ELM-PUL-MD-DAT-0039 MECHANICAL DATA SHEET FOR COMMON CLOSED DRAIN 2 0.96 3-Apr-09 13-Apr-09
DRUM (V08-4802)
672 ELM-PUL-MD-DAT-0040 MECHANICAL DATA SHEET FOR LT CLOSED DRAIN DRUM 2 0.96 3-Apr-09 13-Apr-09
(V08-4803)
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
673 ELM-PUL-MD-DAT-0041 MECHANICAL DATA SHEET FOR EXPORT LAUNCHER 2 0.96 3-Apr-09 13-Apr-09
AREA LT CLOSED DRAIN DRUM (V08-4804)
674 ELM-PUL-MD-DAT-0042 MECHANICAL DATA SHEET FOR HP FUEL GAS SURGE 2 0.96 3-Apr-09 13-Apr-09
DRUM (V08-5301)
675 ELM-PUL-MD-DAT-0043 MECHANICAL DATA SHEET FOR LP FUEL GAS SURGE 2 0.96 3-Apr-09 13-Apr-09
DRUM (V08-5302)
676 ELM-PUL-MD-DAT-0044 MECHANICAL DATA SHEET FOR NGL TRAIN 1 FLARE KO 2 0.96 3-Apr-09 13-Apr-09
DRUM (V08-5501)
677 ELM-PUL-MD-DAT-0045 MECHANICAL DATA SHEET FOR INSTRUMENT AIR 2 0.96 3-Apr-09 13-Apr-09
RECEIVER (V08-6701A/B)
678 ELM-PUL-MD-DAT-0046 MECHANICAL DATA SHEET FOR PLANT AIR RECEIVER 2 0.96 3-Apr-09 13-Apr-09
(V08-6702)
679 ELM-PUL-MD-DAT-0047 MECHANICAL DATA SHEET FOR NITROGEN SURGE DRUM 2 0.96 3-Apr-09 13-Apr-09
(V08-7101)
680 ELM-PUL-MD-DAT-0048 MECHANICAL DATA SHEET FOR HP NITROGEN STORAGE 2 0.96 3-Apr-09 13-Apr-09
VESSEL (V08-7102)
681 ELM-PUL-MD-DAT-0100 MECHANICAL DATA SHEET FOR OIL STORAGE TANK (T08- 2 1.44 10-Apr-09 20-Apr-09
2101 A/B)
682 ELM-PUL-MD-DAT-0101 MECHANICAL DATA SHEET FOR OIL / CONDENSATE 2 1.44 10-Apr-09 20-Apr-09
RERUN TANK (T08-2102)
683 ELM-PUL-MD-DAT-0102 MECHANICAL DATA SHEET FOR CONDENSATE STORAGE 2 1.44 10-Apr-09 20-Apr-09
TANK (T08-2303 A/B)
684 ELM-PUL-MD-DAT-0103 MECHANICAL DATA SHEET FOR HOT OIL STORAGE TANK 2 1.44 10-Apr-09 20-Apr-09
(T08-4101)
685 ELM-PUL-MD-DAT-0104 MECHANICAL DATA SHEET FOR INJECTION WATER 2 1.44 10-Apr-09 20-Apr-09
SURGE TANK (T08-5201)
686 ELM-PUL-MD-DAT-0105 MECHANICAL DATA SHEET FOR INJECTION WATER 2 1.44 10-Apr-09 20-Apr-09
SURGE TANK (T08-5202)
687 ELM-PUL-MD-DAT-0106 MECHANICAL DATA SHEET FOR SOURCE WATER 2 1.44 10-Apr-09 20-Apr-09
STORAGE TANK (T08-6101)
688 ELM-PUL-MD-DAT-0107 MECHANICAL DATA SHEET FOR FIRE WATER STORAGE 2 1.44 10-Apr-09 20-Apr-09
TANK (T08-6301 A/B)
689 ELM-PUL-MD-DAT-0108 MECHANICAL DATA SHEET FOR LPG STORAGE SPHERE 2 1.44 10-Apr-09 20-Apr-09
(V08-2402 A/B)
690 ELM-PUL-MD-DAT-0109 MECHANICAL DATA SHEET FOR LPG RE-RUN SPHERE 2 1.44 10-Apr-09 20-Apr-09
(V08-2401)
691 ELM-PUL-MC-DAT-0001 MECHANICAL DATA SHEET FOR HP SEPARATOR FEED 2 0.96 18-Mar-09 28-Mar-09
PRE-HEATER (E01/E02-2001-1/2)
692 ELM-PUL-MC-DAT-0002 MECHANICAL DATA SHEET FOR OIL STABILIZER FEED 2 1.01 18-Mar-09 28-Mar-09
HEATER (E01/E02-2003-1/2)
693 ELM-PUL-MC-DAT-0003 MECHANICAL DATA SHEET FOR DESALTER WASH WATER 2 1.01 18-Mar-09 28-Mar-09
HEATER (E01/E02-2006)
694 ELM-PUL-MC-DAT-0004 MECHANICAL DATA SHEET FOR NGL FEED GAS GAS 2 1.01 18-Mar-09 28-Mar-09
EXCHANGER (E01-2701-1/2/3/4)
695 ELM-PUL-MC-DAT-0005 MECHANICAL DATA SHEET FOR NGL FEED GAS LIQUID 2 1.01 18-Mar-09 28-Mar-09
EXCHANGER (E01-2702-1/2)
696 ELM-PUL-MC-DAT-0006 MECHANICAL DATA SHEET FOR DE ETHANIZER REBOILER 2 1.01 18-Mar-09 28-Mar-09
(E01-2703)
697 ELM-PUL-MC-DAT-0007 MECHANICAL DATA SHEET FOR DE ETHANIZER OVER 2 1.01 18-Mar-09 28-Mar-09
HEAD CONDENSER (E01-2707-1/2)
698 ELM-PUL-MC-DAT-0008 MECHANICAL DATA SHEET FOR CONDENSATE FLASH 2 1.01 18-Mar-09 28-Mar-09
HEATER (E01/E02-2004-1/2)
699 ELM-PUL-MC-DAT-0009 MECHANICAL DATA SHEET FOR OIL STABILIZER 2 1.01 18-Mar-09 28-Mar-09
REBOILER (E01/E02-2005-1/2)
700 ELM-PUL-MC-DAT-0010 MECHANICAL DATA SHEET FOR DE BUTANIZER FEED 2 1.01 18-Mar-09 28-Mar-09
HEATER (E01-2704)
701 ELM-PUL-MC-DAT-0011 MECHANICAL DATA SHEET FOR DE BUTANIZER REBOILER 2 1.01 18-Mar-09 28-Mar-09
(E01-2705-1/2)
702 ELM-PUL-MC-DAT-0012 MECHANICAL DATA SHEET FOR NGL FEED PRE-COOLER 2 1.01 18-Mar-09 28-Mar-09
(E01-2706)
703 ELM-PUL-MC-DAT-0050 MECHANICAL DATA SHEET FOR OIL RUN DOWN COOLER 2 0.96 15-Apr-09 25-Apr-09
(A01/A02/-2001)
704 ELM-PUL-MC-DAT-0051 MECHANICAL DATA SHEET FOR STABILIZED 2 0.96 15-Apr-09 25-Apr-09
CONDENSATE CONDENSER (A01/A02-2002)
705 ELM-PUL-MC-DAT-0052 MECHANICAL DATA SHEET FOR HOT OIL TRIM COOLER 2 0.96 15-Apr-09 25-Apr-09
(A01/A02-4101)
706 ELM-PUL-MC-DAT-0053 MECHANICAL DATA SHEET FOR 1ST STAGE ASSOCIATED 2 0.96 15-Apr-09 25-Apr-09
GAS SUCTION COOLER (A01/A02-2501)
707 ELM-PUL-MC-DAT-0054 MECHANICAL DATA SHEET FOR 2ND STAGE ASSOCIATED 2 0.96 15-Apr-09 25-Apr-09
GAS SUCTION COOLER (A01/A02-2502)
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
708 ELM-PUL-MC-DAT-0055 MECHANICAL DATA SHEET FOR GAS DEHYDRATION 1 0.96 15-Apr-09 25-Apr-09
REGENERATION GAS COOLER (A01-2602)
709 ELM-PUL-MC-DAT-0056 MECHANICAL DATA SHEET FOR 2ND STAGE ASSOCIATED 2 0.96 15-Apr-09 25-Apr-09
GAS AFTERCOOLER (A01/A02-2503)
710 ELM-PUL-MC-DAT-0057 MECHANICAL DATA SHEET FOR BOOSTER COMPRESSOR 2 0.96 15-Apr-09 25-Apr-09
AFTERCOOLER (A01/A02/A03-2504)
711 ELM-PUL-MC-DAT-0058 MECHANICAL DATA SHEET FOR 1ST STAGE RESIDUE GAS 2 0.96 15-Apr-09 25-Apr-09
AFTERCOOLER (A01/A02-2705)
712 ELM-PUL-MC-DAT-0059 MECHANICAL DATA SHEET FOR 2ND STAGE RESIDUE GAS 2 0.96 15-Apr-09 25-Apr-09
AFTERCOOLER (A01/A02-2706)
713 ELM-PUL-MC-DAT-0060 MECHANICAL DATA SHEET FOR 1ST STAGE INJECTION 1 0.96 15-Apr-09 25-Apr-09
GAS AFTERCOOLER (A01/A02/A03-2901)
714 ELM-PUL-MC-DAT-0061 MECHANICAL DATA SHEET FOR 2ND STAGE INJECTION 1 0.96 15-Apr-09 25-Apr-09
GAS AFTERCOOLER (A01/A02/A03-2902)
715 ELM-PUL-MC-DAT-0062 MECHANICAL DATA SHEET FOR GAS DEHYDRATION 2 0.96 15-Apr-09 25-Apr-09
INLET GAS COOLER (A01-2601)
716 ELM-PUL-MC-DAT-0063 MECHANICAL DATA SHEET FOR OIL EXPORT PUMP 2 0.96 10-Apr-09 20-Apr-09
RECYCLE COOLER (A08-2101)
717 ELM-PUL-MC-DAT-0064 MECHANICAL DATA SHEET FOR CONDENSATE EXPORT 2 0.96 10-Apr-09 20-Apr-09
PUMP RECYCLE COOLER (A08-2303)
718 ELM-PUL-MC-DAT-0065 MECHANICAL DATA SHEET FOR LPG EXPORT PUMP 2 0.96 10-Apr-09 20-Apr-09
RECYCLE COOLER (A08-2401)
719 ELM-PUL-MC-DAT-0066 MECHANICAL DATA SHEET FOR NGL EXPANDER 2 0.96 15-Apr-09 25-Apr-09
COMPRESSOR AFTERCOOLER (A01-2701)
720 ELM-PUL-MC-DAT-0067 MECHANICAL DATA SHEET FOR DEBUTANIZER 2 0.96 15-Apr-09 25-Apr-09
CONDENSER (A01-2702)
721 ELM-PUL-MC-DAT-0068 MECHANICAL DATA SHEET FOR NGL CONDENSATE 2 0.96 15-Apr-09 25-Apr-09
RUNDOWN COOLER (A01-2703)
722 ELM-PUL-MC-DAT-0069 MECHANICAL DATA SHEET FOR LPG RUNDOWN COOLER 2 0.96 15-Apr-09 25-Apr-09
(A01-2704)
723 ELM-PUL-MC-DAT-0070 MECHANICAL DATA SHEET FOR HOT OIL TRIM COOLER 2 0.96 15-Apr-09 25-Apr-09
(A01-4102)
724 ELM-PUL-ML-DAT-0001 MECHANICAL DATA SHEET FOR GAS MOL SIEVE BED 2 1.06 26-May-09 5-Jun-09
FILTERS (S01-2602 A/B)
725 ELM-PUL-ML-DAT-0002 MECHANICAL DATA SHEET FOR OIL TRAIN 1 HOT OIL 2 1.06 26-May-09 5-Jun-09
FILTERS (S01-4101 A/B)
726 ELM-PUL-ML-DAT-0003 MECHANICAL DATA SHEET FOR NGL TRAIN 1 HOT OIL 2 1.06 26-May-09 5-Jun-09
FILTERS (S01-4102 A/B)
727 ELM-PUL-ML-DAT-0004 MECHANICAL DATA SHEET FOR OIL TRAIN 2 HOT OIL 2 1.06 26-May-09 5-Jun-09
FILTERS (S02-4101 A/B)
728 ELM-PUL-ML-DAT-0005 MECHANICAL DATA SHEET FOR HOT OIL DRAIN FILTER 2 1.06 26-May-09 5-Jun-09
(S08-4101)
729 ELM-PUL-ML-DAT-0006 MECHANICAL DATA SHEET FOR HOT OIL STORAGE 2 1.06 26-May-09 5-Jun-09
FILTER (S08-4102)
730 ELM-PUL-ML-DAT-0007 MECHANICAL DATA SHEET FOR WATER INJECTION 2 1.06 26-May-09 5-Jun-09
COARSE FILTERS (S08-5201 A/B/C)
731 ELM-PUL-ML-DAT-0008 MECHANICAL DATA SHEET FOR WATER INJECTION 2 1.06 26-May-09 5-Jun-09
COARSE FILTERS (S08-5202 A/B)
732 ELM-PUL-ML-DAT-0009 MECHANICAL DATA SHEET FOR FUEL GAS FILTERS (S08- 2 1.06 26-May-09 5-Jun-09
5301 A/B)
733 ELM-PUL-MU-DAT-0001 PACKAGE DATA SHEET FOR PWT PACKAGE (X01- 2 1.92 31-May-09 10-Jun-09
5101/X02-5101/X08-5102)
734 ELM-PUL-MB-DAT-0001 MECHANICAL DATA SHEET FOR GAS DEHYDRATION 2 1.68 25-Mar-09 4-Apr-09
REGENERATION GAS FIRED HEATER (H01-2601)
735 ELM-PUL-MB-DAT-0002 MECHANICAL DATA SHEET FOR HOT OIL FIRED HEATER - 2 1.68 25-Mar-09 4-Apr-09
OIL AREA (H01-4101/H02-4101)
736 ELM-PUL-MB-DAT-0003 MECHANICAL DATA SHEET FOR HOT OIL FIRED HEATER - 2 1.68 25-Mar-09 4-Apr-09
NGL AREA (H01-4102)
737 ELM-PUL-MB-DAT-0004 MECHANICAL DATA SHEET FOR HP FLARE PACKAGE 2 1.68 24-May-09 3-Jun-09
(M08-4401)
738 ELM-PUL-MB-DAT-0005 MECHANICAL DATA SHEET FOR LP FLARE PACKAGE (M08- 2 1.68 24-May-09 3-Jun-09
4501)
739 ELM-PUL-MB-DAT-0006 MECHANICAL DATA SHEET FOR HP-LT FLARE PACKAGE 2 1.68 24-May-09 3-Jun-09
(M08-4601)
740 ELM-PUL-MB-DAT-0007 MECHANICAL DATA SHEET FOR AP FLARE PACKAGE (M08- 2 1.68 24-May-09 3-Jun-09
4701)
741 ELM-PUL-MB-DAT-0008 MECHANICAL DATA SHEET FOR OIL TRAIN-1 FLARE (M01- 2 1.68 24-May-09 3-Jun-09
4901)
742 ELM-PUL-MB-DAT-0009 MECHANICAL DATA SHEET FOR OIL TRAIN-2 FLARE (M02- 2 1.68 24-May-09 3-Jun-09
5001)
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
743 ELM-PUL-MB-DAT-0010 MECHANICAL DATA SHEET FOR NGL TRAIN-1 FLARE 2 1.68 24-May-09 3-Jun-09
(M08-5501)
744 ELM-PUL-MD-TRQ-0001 TECHNICAL REQUISITION FOR COLUMNS 2 1.68 16-Apr-09 6-May-09
746 ELM-PUL-MD-TRQ-0008 TECHNICAL REQUISITION FOR STORAGE TANK 2 3.36 31-Mar-09 20-Apr-09
(KNOCKED DOWN)
747 ELM-PUL-MD-DSN-0001 USERS DESIGN SPECIFICATION FOR GAS DEHYDRATION 2 1.92 27-Mar-09 6-Apr-09
INLET COALESCER (V01-2601)
748 ELM-PUL-MD-DSN-0002 USERS DESIGN SPECIFICATION FOR GAS DEHYDRATION 2 1.92 27-Mar-09 6-Apr-09
FEED K.O. DRUM (V01-2607)
749 ELM-PUL-MD-DSN-0003 USERS DESIGN SPECIFICATION FOR GAS MOL SIEVE BED 2 1.92 27-Mar-09 6-Apr-09
(V01-2602,V01-2603,V01-2604,V01-2605)
750 ELM-PUL-MD-DSN-0004 USERS DESIGN SPECIFICATION FOR 1ST STAGE 1 1.44 27-Mar-09 6-Apr-09
INJECTION GAS SUCTION DRUM (V01/V02/V03-2901)
751 ELM-PUL-MD-DSN-0005 USERS DESIGN SPECIFICATION FOR 2ND STAGE 1 1.44 27-Mar-09 6-Apr-09
INJECTION GAS SUCTION DRUM (V01/V02/V03-2902)
755 ELM-PUL-MD-REQ-0006 REQUISITION - MOLECULAR SIEVE BED INTERNALS 2 0.96 17-May-09 27-May-09
756 ELM-PUL-MD-REQ-0008 REQUISITION - STORAGE TANK (KNOCKED DOWN) 1 2.88 10-Apr-09 20-Apr-09
758 ELM-PUL-MC-REQ-0010 REQUISITION - AIR COOLED HEAT EXCHANGER 1 2.88 15-Apr-09 25-Apr-09
759 ELM-PUL-MC-REQ-0011 REQUISITION - SHELL & TUBE HEAT EXCHANGER 2 4.32 18-Mar-09 28-Mar-09
768 ELM-PUL-MD-TBE-0008 TBE - STORAGE TANK (KNOCKED DOWN) 1 11.52 11-May-09 25-May-09
770 ELM-PUL-MC-TBE-0001 TBE - AIR COOLED HEAT EXCHANGER 1 25.20 16-May-09 2-Jun-09
771 ELM-PUL-MC-TBE-0002 TBE - SHELL & TUBE HEAT EXCHANGER 2 16.32 18-Apr-09 3-May-09
776 ELM-PUL-MD-REQ-0027 REQUISITION - SS CLAD PLATE - CLADDED VESSELS 4 7.20 17-Apr-09 27-Apr-09
778 ELM-PUL-MD-REQ-0031 REQUISITION - LTCS & SS -FORGINGS - HP VESSELS 4 12.00 17-Apr-09 27-Apr-09
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
781 ELM-PUL-MD-TBE-0020 TBE - CS PLATES FOR HP VESSELS / COLUMNS 4 9.60 18-Apr-09 3-May-09
783 ELM-PUL-MD-TBE-0022 TBE - SS CLAD PLATE FOR CLADDED VESSELS 4 4.80 18-May-09 2-Jun-09
785 ELM-PUL-MD-TBE-0026 TBE - SRF NOZZLES ( CS & SS) 4 12.00 18-May-09 2-Jun-09
786 ELM-PUL-MD-TBE-0031 TBE - CS PLATES FOR STORAGE TANKS 4 9.60 18-Apr-09 3-May-09
PIPING
787 ELM-PUL-PI-BOD-0003 NOZZLE LOADING DESIGN BASIS 2 0.72 15-Mar-09 2-Apr-09
789 ELM-PUL-PI-GEN-0002 PURCHASE SPEC (PIPE, FITTINGS, FLANGES) 2 2.40 20-Mar-09 2-Apr-09
791 ELM-PUL-PI-GEN-0006 SPECIFICATION FOR MARKING, COLOR CODING 2 2.40 22-Mar-09 2-Apr-09
794 ELM-PUL-PI-DAT-0001 HIGH PRESS & LOW TEMP. VALVE DATASHEETS 1 14.40 19-Mar-09 16-Apr-09
799 ELM-PUL-PI-REQ-0100 REQUISITION - CS & LTCS PIPES (SEAMLESS) 4 6.05 13-Mar-09 28-Mar-09
800 ELM-PUL-PI-REQ-0101 REQUISITION - CS & LTCS PIPES (WELDED) 4 6.05 13-Mar-09 28-Mar-09
804 ELM-PUL-PI-REQ-0106 REQUISITION - CS & LTCS FITTINGS (WROUGHT) 4 6.05 23-Mar-09 7-Apr-09
808 ELM-PUL-PI-REQ-0110 REQUISITION - CS & LTCS FLANGES & SPECTACLE 4 6.05 23-Mar-09 7-Apr-09
BLINDS
809 ELM-PUL-PI-REQ-0111 REQUISITION - SS & DSS FLANGES & SPECTACLE BLINDS 4 6.05 28-Mar-09 12-Apr-09
810 ELM-PUL-PI-TBE-0001 TBE - CS & LTCS PIPES (SEAMLESS) 4 2.35 18-Apr-09 3-May-09
811 ELM-PUL-PI-TBE-0002 TBE - CS & LTCS PIPES (WELDED) 4 2.35 18-Apr-09 3-May-09
815 ELM-PUL-PI-TBE-0007 TBE - CS & LTCS FITTINGS (WROUGHT) 4 2.35 28-Apr-09 13-May-09
819 ELM-PUL-PI-TBE-0011 TBE - CS & LTCS FLANGES & SPECTACLE BLINDS 4 2.35 28-Apr-09 13-May-09
820 ELM-PUL-PI-TBE-0012 TBE - SS & DSS FLANGES & SPECTACLE BLINDS 4 2.35 3-May-09 18-May-09
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
876 ELM-PUL-EL-SLD-0801 SINGLE LINE DIAGRAM FOR MSB, 30KV SWITCHGEAR 1 4.80 21-Mar-09 20-Apr-09
(SG08-7601)
877 ELM-PUL-EL-SLD-0802 SINGLE LINE DIAGRAM FOR MSB, 5.5KV SWITCHGEAR 1 4.80 26-Mar-09 25-Apr-09
(SG08-7604)
878 ELM-PUL-EL-SLD-0803 SINGLE LINE DIAGRAM FOR MSB 5.5KV SWITCHGEAR 1 4.80 26-Mar-09 25-Apr-09
(SG08-7607)
879 ELM-PUL-EL-SLD-0804 SINGLE LINE DIAGRAM FOR MSB 5.5KV SWITCHGEAR 1 4.80 26-Mar-09 25-Apr-09
(SG08-7608)
880 ELM-PUL-EL-SLD-0805 SINGLE LINE DIAGRAM FOR MSB, 400V SWITCHBOARD 1 7.20 30-Apr-09 30-May-09
(SG08-7801)
881 ELM-PUL-EL-SLD-0806 SINGLE LINE DIAGRAM FOR MSB, 400V SWITCHBOARD 1 7.20 30-Apr-09 30-May-09
(SG08-7802)
882 ELM-PUL-EL-SLD-0807 SINGLE LINE DIAGRAM FOR MSB, 400V SWITCHBOARD 1 7.20 30-Apr-09 30-May-09
(SG08-7701)
883 ELM-PUL-EL-SLD-0901 SINGLE LINE DIAGRAM FOR USB, 30KV SWITCHGEAR 1 4.80 21-Mar-09 20-Apr-09
(SG08-7602)
884 ELM-PUL-EL-SLD-0902 SINGLE LINE DIAGRAM FOR USB, 5.5KV SWITCHGEAR 1 3.84 26-Mar-09 25-Apr-09
(SG08-7605)
885 ELM-PUL-EL-SLD-0903 SINGLE LINE DIAGRAM FOR USB, 400V SWITCHBOARD 1 5.76 26-Mar-09 25-Apr-09
(SG08-7702)
886 ELM-PUL-EL-SLD-0904 SINGLE LINE DIAGRAM FOR USB, 50KVA AC UPS FOR USB 1 1.92 26-Mar-09 25-Apr-09
887 ELM-PUL-EL-ELO-0901 ELECTRICAL EQUIPMENT LAYOUT - PLAN FOR UTILITY 2 5.76 21-Mar-09 20-Apr-09
SUBSTATION BUILDING
888 ELM-PUL-EL-ELO-0902 ELECTRICAL EQUIPMENT LAYOUT - PLAN FOR UTILITY 2 5.76 21-Mar-09 20-Apr-09
SUBSTATION BUILDING
889 ELM-PUL-EL-CCR-0002 OVERALL CABLE ROUTING LAYOUT 2 3.60 27-Mar-09 26-Apr-09
INSTRUMENTATION
890 ELM-PUL-IC-REQ-0501 REQUISITION - INTEGRATED CONTROL & SAFETY 1 19.20 20-Mar-09 7-Apr-09
SYSTEM
891 ELM-PUL-IC-REQ-0506 REQUISITION - TANK GAUGING SYSTEM 2 9.60 24-Apr-09 15-May-09
892 ELM-PUL-IC-REQ-0508 REQUISITION - FLOW METERING / PROVING SYSTEM 1 19.20 25-Mar-09 15-Apr-09
893 ELM-PUL-IC-REQ-0511 REQUISITION - CONTROL & SELF REGULATING VALVES 1 14.40 4-May-09 25-May-09
897 ELM-PUL-IC-DAT-0506 DATA SHEETS FOR TANK GAUGING SYSTEM 2 9.60 24-Apr-09 15-May-09
898 ELM-PUL-IC-DAT-0508 DATA SHEETS FOR FLOW METERING / PROVING SYSTEM 1 28.80 25-Mar-09 15-Apr-09
899 ELM-PUL-IC-DAT-0511 DATA SHEETS FOR CONTROL & SELF REGULATING 1 38.40 4-May-09 25-May-09
VALVES
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
900 ELM-PUL-IC-DAT-0512 DATA SHEETS FOR SHUTDOWN VALVES 2 36.00 25-Mar-09 15-Apr-09
901 ELM-PUL-IC-DAT-0514 DATA SHEETS FOR PRESSURE RELIEF VALVES 1 31.20 9-May-09 30-May-09
902 ELM-PUL-IC-DAT-0571 DATA SHEETS FOR INSTRUMENT CABLES 2 14.40 17-Mar-09 7-Apr-09
905 ELM-PUL-IC-BKD-0002 OVERALL INTEGRATED CONTROL & SAFETY SYSTEM 1 4.08 20-Mar-09 10-Apr-09
ARCHITECTURE DRAWING
906 ELM-PUL-IC-BKD-0003 OVERALL INTEGRATED CONTROL & SAFETY SYSTEM 1 4.08 9-May-09 30-May-09
ARCHITECTURE DRAWING (WITH TELECOMMUNICATION
INTERFACES)
907 ELM-PUL-IC-BKD-0004 CONTROL & MONITORING SYSTEM ARCHITECTURE 1 4.08 20-Mar-09 10-Apr-09
DRAWING
908 ELM-PUL-IC-BKD-0005 SAFE GUARDING SYSTEM ARCHITECTURE DRAWING 1 4.08 20-Mar-09 10-Apr-09
909 ELM-PUL-IC-BKD-0006 FIRE & GAS SYSTEM ARCHITECTURE DRAWING 1 4.08 20-Mar-09 10-Apr-09
910 ELM-PUL-IC-BKD-0007 SUPERVISORY CONTROL & DATA ACQUISITION SYSTEM 1 4.08 9-May-09 30-May-09
ARCHITECTURE DRAWING
911 ELM-PUL-IC-BKD-0011 OIL FISCAL METERING BLOCK DIAGRAM 1 4.08 17-Mar-09 7-Apr-09
912 ELM-PUL-IC-BKD-0012 CONDENSATE FISCAL METERING BLOCK DIAGRAM 1 4.08 17-Mar-09 7-Apr-09
913 ELM-PUL-IC-BKD-0013 LPG FISCAL METERING BLOCK DIAGRAM 1 4.08 17-Mar-09 7-Apr-09
914 ELM-PUL-IC-BKD-0014 FISCAL METERING SYSTEM ARCHITECTURE DRAWING 1 4.08 16-Mar-09 15-Apr-09
916 ELM-PUL-IC-SKE-0001 CONTROL BLOCK DIAGRAM (TURBO EXPANDER 2 3.60 20-Mar-09 10-Apr-09
COMPRESSOR PACKAGE)
917 ELM-PUL-IC-CED-1001 CAUSE & EFFECT DIAGRAM SGS - P1OIL 1 4.80 24-Apr-09 15-May-09
918 ELM-PUL-IC-CED-2001 CAUSE & EFFECT DIAGRAM SGS - P2OIL 1 3.12 24-Apr-09 15-May-09
919 ELM-PUL-IC-CED-6001 CAUSE & EFFECT DIAGRAM SGS - U1 1 6.00 24-Apr-09 15-May-09
920 ELM-PUL-IC-CED-7001 CAUSE & EFFECT DIAGRAM SGS - U2 1 3.12 24-Apr-09 15-May-09
921 ELM-PUL-IC-CED-9001 CAUSE & EFFECT DIAGRAM SGS - UTILITIES 1 4.80 24-Apr-09 15-May-09
923 ELM-PUL-IC-FGP-0001 FIRE & GAS DETECTOR LEGEND AND NOTES SHEET 1 1.68 9-Apr-09 30-Apr-09
924 ELM-PUL-IC-FGP-1001 FIRE & GAS DETECTOR LAYOUTS - DRAWING AND FIRE 1 1.58 4-May-09 25-May-09
ZONE KEY PLAN - OIL TRAIN 1
925 ELM-PUL-IC-FGP-1002 INSTRUMENT LOCATION LAYOUTS - FIRED HEATER AREA 1 1.58 4-May-09 25-May-09
- OIL TRAIN 1
926 ELM-PUL-IC-FGP-1003 INSTRUMENT LOCATION LAYOUTS - CONDENSATE 1 1.58 4-May-09 25-May-09
RECOVERY AREA -OIL TRAIN 1
927 ELM-PUL-IC-FGP-1004 INSTRUMENT LOCATION LAYOUTS - OIL TREATMENT 1 1.58 4-May-09 25-May-09
AREA - OIL TRAIN 1
928 ELM-PUL-IC-FGP-1005 INSTRUMENT LOCATION LAYOUTS - CHEMICAL 1 1.58 4-May-09 25-May-09
INJECTION AREA - OIL TRAIN 1
929 ELM-PUL-IC-FGP-1006 INSTRUMENT LOCATION LAYOUTS - CONDENSATE 1 1.58 4-May-09 25-May-09
RECOVERY AREA -OIL TRAIN 1
930 ELM-PUL-IC-FGP-1007 INSTRUMENT LOCATION LAYOUTS - OIL TREATMENT 1 1.58 4-May-09 25-May-09
AREA - OIL TRAIN 1
931 ELM-PUL-IC-FGP-1008 INSTRUMENT LOCATION LAYOUTS - OIL TREATMENT 1 1.58 4-May-09 25-May-09
AREA - OIL TRAIN 1
932 ELM-PUL-IC-FGP-1009 INSTRUMENT LOCATION LAYOUTS - OIL TREATMENT 1 1.58 4-May-09 25-May-09
AREA - OIL TRAIN 1
933 ELM-PUL-IC-FGP-2001 FIRE & GAS DETECTOR LAYOUTS - DRAWING AND FIRE 1 1.58 17-May-09 7-Jun-09
ZONE KEY PLAN - OIL TRAIN 2
934 ELM-PUL-IC-FGP-2002 FIRE & GAS DETECTOR LAYOUTS - FIRED HEATER AREA - 1 1.58 17-May-09 7-Jun-09
OIL TRAIN 2
935 ELM-PUL-IC-FGP-2003 FIRE & GAS DETECTOR LAYOUTS - CONDENSATE 1 1.58 17-May-09 7-Jun-09
RECOVERY AREA -OIL TRAIN 2
936 ELM-PUL-IC-FGP-2004 FIRE & GAS DETECTOR LAYOUTS - OIL TREATMENT 1 1.58 17-May-09 7-Jun-09
AREA - OIL TRAIN 2
937 ELM-PUL-IC-FGP-2005 FIRE & GAS DETECTOR LAYOUTS - HOT OIL SURGE 1 1.58 17-May-09 7-Jun-09
DRUM AREA
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
938 ELM-PUL-IC-FGP-2006 FIRE & GAS DETECTOR LAYOUTS - CONDENSATE 1 1.58 17-May-09 7-Jun-09
RECOVERY AREA -OIL TRAIN 2
939 ELM-PUL-IC-FGP-2007 FIRE & GAS DETECTOR LAYOUTS - OIL TREATMENT 1 1.58 17-May-09 7-Jun-09
AREA - OIL TRAIN 2
940 ELM-PUL-IC-FGP-2008 FIRE & GAS DETECTOR LAYOUTS - OIL TREATMENT 1 1.58 17-May-09 7-Jun-09
AREA - OIL TRAIN 2
941 ELM-PUL-IC-FGP-3001 FIRE & GAS DETECTOR LAYOUTS - DRAWING AND FIRE 1 1.58 9-May-09 30-May-09
ZONE KEY PLAN - AG/BG COMPRESSOR AREA
942 ELM-PUL-IC-FGP-3002 FIRE & GAS DETECTOR LAYOUTS - ASSOCIATED GAS 1 1.58 9-May-09 30-May-09
COMPRESSOR TRAIN-1 KOD AREA
943 ELM-PUL-IC-FGP-3003 FIRE & GAS DETECTOR LAYOUTS - ASSOCIATED GAS 1 1.58 9-May-09 30-May-09
COMPRESSOR TRAIN-2 KOD AREA
944 ELM-PUL-IC-FGP-3004 FIRE & GAS DETECTOR LAYOUTS - ASSOCIATED GAS 1 1.58 9-May-09 30-May-09
COMPRESSOR TRAIN-3 KOD AREA
945 ELM-PUL-IC-FGP-3005 FIRE & GAS DETECTOR LAYOUTS - ASSOCIATED GAS 1 1.58 9-May-09 30-May-09
COMPRESSOR BUILDING TRAIN 1
946 ELM-PUL-IC-FGP-3006 FIRE & GAS DETECTOR LAYOUTS - ASSOCIATED GAS 1 1.58 9-May-09 30-May-09
COMPRESSOR BUILDING TRAIN 1
947 ELM-PUL-IC-FGP-3007 FIRE & GAS DETECTOR LAYOUTS - ASSOCIATED GAS 1 1.58 9-May-09 30-May-09
COMPRESSOR BUILDING TRAIN 2
948 ELM-PUL-IC-FGP-3008 FIRE & GAS DETECTOR LAYOUTS - ASSOCIATED GAS 1 1.58 9-May-09 30-May-09
COMPRESSOR BUILDING TRAIN 2
949 ELM-PUL-IC-FGP-3009 FIRE & GAS DETECTOR LAYOUTS - ASSOCIATED GAS 1 1.58 9-May-09 30-May-09
COMPRESSOR BUILDING TRAIN 3
950 ELM-PUL-IC-FGP-3010 FIRE & GAS DETECTOR LAYOUTS - ASSOCIATED GAS 1 1.58 9-May-09 30-May-09
COMPRESSOR BUILDING TRAIN 3
951 ELM-PUL-IC-FGP-3011 FIRE & GAS DETECTOR LAYOUTS - ASSOCIATED GAS 1 1.58 9-May-09 30-May-09
COMPRESSOR N-S PIPERACK
952 ELM-PUL-IC-FGP-3014 FIRE & GAS DETECTOR LAYOUTS - BOOSTER 1 1.58 9-May-09 30-May-09
COMPRESSOR TRAIN 1 KOD AREA
953 ELM-PUL-IC-FGP-3015 FIRE & GAS DETECTOR LAYOUTS - BOOSTER 1 1.58 9-May-09 30-May-09
COMPRESSOR TRAIN 1 KOD AREA
954 ELM-PUL-IC-FGP-3016 FIRE & GAS DETECTOR LAYOUTS - BOOSTER 1 1.58 9-May-09 30-May-09
COMPRESSOR TRAIN 1 KOD AREA
955 ELM-PUL-IC-FGP-3017 FIRE & GAS DETECTOR LAYOUTS - BOOSTER 1 1.58 9-May-09 30-May-09
COMPRESSOR BUILDING TRAIN 1
956 ELM-PUL-IC-FGP-3018 FIRE & GAS DETECTOR LAYOUTS - BOOSTER 1 1.58 9-May-09 30-May-09
COMPRESSOR BUILDING TRAIN 1
957 ELM-PUL-IC-FGP-3019 FIRE & GAS DETECTOR LAYOUTS - BOOSTER 1 1.58 9-May-09 30-May-09
COMPRESSOR BUILDING TRAIN 2
958 ELM-PUL-IC-FGP-3020 FIRE & GAS DETECTOR LAYOUTS - BOOSTER 1 1.58 9-May-09 30-May-09
COMPRESSOR BUILDING TRAIN 2
959 ELM-PUL-IC-FGP-3021 FIRE & GAS DETECTOR LAYOUTS - BOOSTER 1 1.58 9-May-09 30-May-09
COMPRESSOR BUILDING TRAIN 3
960 ELM-PUL-IC-FGP-3022 FIRE & GAS DETECTOR LAYOUTS - BOOSTER 1 1.58 9-May-09 30-May-09
COMPRESSOR BUILDING TRAIN 3
961 ELM-PUL-IC-FGP-3023 FIRE & GAS DETECTOR LAYOUTS - BOOSTER 1 1.58 9-May-09 30-May-09
COMPRESSOR N-S PIPERACK
962 ELM-PUL-IC-FGP-4001 FIRE & GAS DETECTOR LAYOUTS - DRAWING AND FIRE 1 1.58 20-May-09 10-Jun-09
ZONE KEY PLAN - RG COMPRESSOR AREA
963 ELM-PUL-IC-FGP-4002 FIRE & GAS DETECTOR LAYOUTS - FUEL GAS AREA 1 1.58 20-May-09 10-Jun-09
964 ELM-PUL-IC-FGP-4003 FIRE & GAS DETECTOR LAYOUTS - CPI SEPARATOR AREA 1 1.58 20-May-09 10-Jun-09
965 ELM-PUL-IC-FGP-9001 FIRE & GAS DETECTOR LAYOUTS - DRAWING & FIRE 3 1.58 20-May-09 10-Jun-09
ZONE KEY PLAN - UTILITIES
966 ELM-PUL-IC-FGP-9002 FIRE & GAS DETECTOR LAYOUTS - PLANT AND 3 1.58 20-May-09 10-Jun-09
INSTRUMENT AIR COMPRESSOR AREA
967 ELM-PUL-IC-FGP-9003 FIRE & GAS DETECTOR LAYOUTS - NITROGEN 3 1.58 20-May-09 10-Jun-09
GENERATION AREA
968 ELM-PUL-IC-FGP-9015 FIRE & GAS DETECTOR LAYOUTS - DIESEL STORAGE 3 1.58 20-May-09 10-Jun-09
AREA
969 ELM-PUL-IC-FGP-9016 FIRE & GAS DETECTOR LAYOUTS - HOT OIL STORAGE 3 1.58 20-May-09 10-Jun-09
TANK AREA
970 ELM-PUL-IC-FGP-9021 FIRE & GAS DETECTOR LAYOUTS - DRAWING KEY PLAN - 3 2.45 20-May-09 10-Jun-09
FIRE WATER AREA
971 ELM-PUL-IC-FGP-9022 FIRE & GAS DETECTOR LAYOUTS - FIRE WATER 3 2.45 20-May-09 10-Jun-09
STORAGE TANK AREA
972 ELM-PUL-IC-FGP-9023 FIRE & GAS DETECTOR LAYOUTS - FIRE WATER PUMPS 3 2.45 20-May-09 10-Jun-09
AREA
CIVIL
973 ELM-PUL-CV-BOD-0001 CONCEPT NOTE FOR THE DESIGN OF OILY WATER - 9.60
STORM WATER - SANITARY SEWAGE AND CHEMICAL 1 31-Mar-09 30-Apr-09
DRAINAGE SYSTEMS
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
1047 ELM-PUL-TE-BKD-0003 TELECOMS CLOSE CIRCUIT TELEVISION (CCTV) SYSTEM 1 1.44 18-Mar-09 23-Apr-09
BLOCK DIAGRAM
1048 ELM-PUL-TE-BKD-0004 TELECOMS TELEPHONE SYSTEM BLOCK DIAGRAM 1 1.44 22-Mar-09 23-Apr-09
1049 ELM-PUL-TE-BKD-0005 TELECOMS PUBLIC ADDRESS GENERAL ALARM (PA/GA) 1 1.44 24-Mar-09 23-Apr-09
SYSTEM BLOCK DIAGRAM
1050 ELM-PUL-TE-BKD-0006 TELECOMS RADIO SYSTEMS BLOCK DIAGRAM 1 1.44 26-Mar-09 23-Apr-09
1051 ELM-PUL-TE-BKD-0007 TELECOMS INFORMATION TECHNOLOGY (IT) SYSTEM 1 1.44 30-Mar-09 23-Apr-09
BLOCK DIAGRAM
1052 ELM-PUL-TE-BKD-0008 TELECOMS SECURITY SYSTEM BLOCK DIAGRAM 1 1.44 1-Apr-09 23-Apr-09
1053 ELM-PUL-TE-BKD-0009 TELECOMS WEATHER MONITORING SYSTEM BLOCK 1 1.44 5-Apr-09 23-Apr-09
DIAGRAM
1054 ELM-PUL-TE-BKD-0010 TELECOMS ENTERTAINMENT SYSTEM BLOCK DIAGRAM 1 1.44 7-Apr-09 23-Apr-09
1055 ELM-PUL-TE-BKD-0011 TELECOMS STRUCTURED CABLING SYSTEM BLOCK 1 1.44 9-Apr-09 23-Apr-09
DIAGRAM
1056 ELM-PUL-TE-BKD-0012 TELECOMS FIBER OPTIC CABLE ARCHITECTURE BLOCK 1 1.44 12-Apr-09 23-Apr-09
DIAGRAM - CPF AREAS
1057 ELM-PUL-TE-BKD-0013 TELECOMS FIBER OPTIC CABLE ARCHITECTURE BLOCK 1 3.84 15-Apr-09 23-Apr-09
DIAGRAM - OFFSITES
1058 ELM-PUL-TE-LGN-0001 TELECOMS SYMBOLS AND LEGENDS DRAWING 1 1.44 28-Mar-09 23-Apr-09
1060 ELM-PUL-TE-DSN-0011 TELECOMS FIBER OPTIC CABLE SPECIFICATION 1 0.96 30-Mar-09 23-Apr-09
1061 ELM-PUL-TE-DSN-0012 TELECOMS FIBER OPTIC CABLE INSTALLATION 1 1.44 31-Mar-09 23-Apr-09
SPECIFICATION
1062 ELM-PUL-TE-DSN-0013 TELECOMS COPPER CABLE SPECIFICATIONS 1 1.44 1-Apr-09 23-Apr-09
1063 ELM-PUL-TE-BKD-0014 TELECOMS SYSTEMS GROUNDING BLOCK DIAGRAM 2 2.88 2-Apr-09 23-Apr-09
1065 ELM-PUL-TE-ELO-0001 TELECOMS CONCEPTUAL EQUIPMENT LAYOUT - CCTV 2 1.44 15-Apr-09 5-May-09
CAMERAS
1066 ELM-PUL-TE-ELO-0002 TELECOMS CONCEPTUAL EQUIPMENT LAYOUT - PA/GA 2 2.64 15-Apr-09 5-May-09
LOUDSPEAKERS
1067 ELM-PUL-TE-BKD-0015 UPDATED TELECOMS AND IT OVERALL SYSTEM BLOCK 1 5.76 19-Apr-09 10-May-09
DIAGRAM
1068 ELM-PUL-TE-BKD-0016 INTERFIELD PORTION OFFSITES LOCAL AREA NETWORK 1 3.84 21-Apr-09 10-May-09
(OLAN) BLOCK DIAGRAM
1069 ELM-PUL-TE-DSN-0014 UPDATED GENERAL SPECIFICATIONS FOR PUBLIC 1 1.44 23-Apr-09 10-May-09
ADDRESS GENERAL ALARM (PA/GA) SYSTEM
1070 ELM-PUL-TE-DSN-0015 UPDATED TELECOMS GENERAL SPECIFICATIONS FOR 1 1.44 27-Apr-09 10-May-09
STRUCTURED AND CATV CABLING SYSTEM
1071 ELM-PUL-TE-DSN-0016 UPDATED TELECOMS ENTERTAINMENT SYSTEM 1 1.44 29-Apr-09 10-May-09
SPECIFICATIONS
1072 ELM-PUL-TE-DSN-0017 UPDATED TELECOMS SECURITY SYSTEM SPECIFICATIONS 1 1.44 4-May-09 20-May-09
1073 ELM-PUL-TE-DSN-0018 UPDATED GENERAL SPECIFICATIONS FOR WEATHER 1 1.44 6-May-09 20-May-09
MONITORING SYSTEM
1074 ELM-PUL-TE-DSN-0019 UPDATED GENERAL SEPECIFICATIONS FOR PBX, LAN, 1 1.44 10-May-09 20-May-09
WAN, IT AND NETWORK MANAGEMENT SYSTEMS
1076 ELM-PUL-TE-DSN-0021 UPDATED CLOSE CIRCUIT TELEVISION (CCTV) SYSTEM 1 1.44 14-May-09 20-May-09
SPECIFICATIONS
1077 ELM-PUL-TE-DSN-0022 UPDATED RADIO TOWER SPECIFICATIONS 1 1.44 17-May-09 20-May-09
PROCUREMENT
CIVIL
1076 ISSUE INQUIRY - FABRICATION & PAINTING OF
20-Apr-09 27-Apr-09
STRUCTURAL STEEL NA 244.54
1077 ISSUE INQUIRY - STRUCTURAL STEEL PROFILES
11-Mar-09 13-Mar-09
INCLUDING PLATES NA 163.02
1078
ISSUE INQUIRY - ANCHOR BOLTS 21-Mar-09 28-Mar-09
NA 1.77
1079
ISSUE INQUIRY - TOPOSURVEY 11-Mar-09 14-Mar-09
NA 0.89
1080
ISSUE INQUIRY - GEOTECHNICAL INVESTIGATION 11-Mar-09 14-Mar-09
NA 0.89
1081
ISSUE INQUIRY - X-STEEL 12-Apr-09 27-Apr-09
NA 0.89
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
1122
TBE COMPLETE - CS PLATES FOR STORAGE TANKS 18-Apr-09 3-May-09
NA 0.00
1123
PLACE ORDER - SPHERE FABRICATION 19-Apr-09 10-May-09
NA 31.01
1124
PLACE ORDER - S&T HEAT EXCHANGERS 3-May-09 10-May-09
NA 349.97
1125
PLACE ORDER - TANK FABRICATION 25-Apr-09 10-May-09
NA 193.15
1126
PLACE ORDER - HP VESSELS 25-Apr-09 10-May-09
NA 225.93
1127
PLACE ORDER - LP VESSELS 25-Apr-09 10-May-09
NA 210.87
MECHANICAL ROTATING
1028 ISSUE INQUIRY - ASSOCIATED & BOOSTER GAS
11-Mar-09 11-Mar-09
COMPRESSOR PACKAGE (MOTOR DRIVEN) NA 460.72
1029 ISSUE INQUIRY - GAS DEHYDRATION REGENERATION
30-Mar-09 6-Apr-09
GAS COMPRESSOR NA 138.22
1030 ISSUE INQUIRY - INJECTION GAS COMPRESSOR PACKAGE
29-Apr-09 6-May-09
(GT DRIVEN) NA 895.75
1031
ISSUE INQUIRY - TURBO EXPANDER PACKAGE 29-Apr-09 6-May-09
NA 76.20
1032
ISSUE INQUIRY - HEAVY DUTY HORIZONTAL PUMPS 9-Apr-09 16-Apr-09
NA 149.73
1033 ISSUE INQUIRY - INSTRUMENT AIR COMPRESSOR AND
21-Mar-09 28-Mar-09
DRYER PACKAGE NA 65.56
1034 RECEIVE BIDS - ASSOCIATED & BOOSTER GAS
1-Apr-09 4-Apr-09
COMPRESSOR PACKAGE (MOTOR DRIVEN) NA 230.36
1035 RECEIVE BIDS - GAS DEHYDRATION REGENERATION
27-Apr-09 4-May-09
GAS COMPRESSOR NA 69.11
1036 RECEIVE BIDS - INJECTION GAS COMPRESSOR PACKAGE
27-May-09 3-Jun-09
(GT DRIVEN) NA 447.87
1037
RECEIVE BIDS - TURBO EXPANDER PACKAGE 27-May-09 3-Jun-09
NA 38.10
1038
RECEIVE BIDS - HEAVY DUTY HORIZONTAL PUMPS 7-May-09 14-May-09
NA 74.87
1039 RECEIVE BIDS - INSTRUMENT AIR COMPRESSOR AND
12-Apr-09 18-Apr-09
DRYER PACKAGE NA 32.78
1040 TBE COMPLETE - ASSOCIATED & BOOSTER GAS
4-Apr-09 19-Apr-09
COMPRESSOR PACKAGE (MOTOR DRIVEN) NA 1151.80
1041 TBE COMPLETE - INJECTION GAS COMPRESSOR
3-Jun-09 24-Apr-09
PACKAGE (GT DRIVEN) NA 2239.37
1042 TBE COMPLETE - INSTRUMENT AIR COMPRESSOR AND
18-Apr-09 3-May-09
DRYER PACKAGE NA 163.91
1043 PLACE ORDER - ASSOCIATED & BOOSTER GAS
19-Apr-09 10-May-09
COMPRESSOR PACKAGE (MOTOR DRIVEN) NA 460.72
1044 PLACE ORDER - INJECTION GAS COMPRESSORS (GT
24-Apr-09 15-May-09
DRIVEN) NA 895.75
1045 PLACE ORDER - INSTRUMENT AIR COMPRESSOR AND
3-May-09 10-May-09
DRYER PACKAGE NA 65.56
PIPING
1046
ISSUE INQUIRY - CS & LTCS PIPES ( SEAMLESS ) 21-Mar-09 28-Mar-09
NA 115.18
1047
ISSUE INQUIRY - CS & LTCS PIPES ( WELDED ) 21-Mar-09 28-Mar-09
NA 127.58
1048
ISSUE INQUIRY - SS PIPES ( SEAMLESS ) 28-Mar-09 4-Apr-09
NA 16.83
1049
ISSUE INQUIRY - SS PIPES ( WELDED ) 28-Mar-09 4-Apr-09
NA 23.04
1050
ISSUE INQUIRY - DSS PIPES 5-Apr-09 12-Apr-09
NA 53.16
1051
ISSUE INQUIRY - CS & LTCS WROUGHT FITTINGS 31-Mar-09 7-Apr-09
NA 90.37
1052
ISSUE INQUIRY - SS WROUGHT FITTINGS 31-Mar-09 7-Apr-09
NA 16.83
1053
ISSUE INQUIRY - DSS WROUGHT FITTINGS 5-Apr-09 12-Apr-09
NA 19.49
1054
ISSUE INQUIRY - FORGED FITTINGS 31-Mar-09 7-Apr-09
NA 3.54
1055 ISSUE INQUIRY - CS & LTCS FLANGES AND SPECTACLE
7-Apr-09 7-Apr-09
BLINDS NA 23.92
1056 ISSUE INQUIRY - SS & DSS FLANGES AND SPECTACLE
12-Apr-09 12-Apr-09
BLINDS NA 17.72
1057
ISSUE INQUIRY - CATHODIC PROTECTION SYSTEM 20-Apr-09 27-Apr-09
NA 1.77
1058
RECEIVE BIDS - CS & LTCS PIPES ( SEAMLESS ) 12-Apr-09 18-Apr-09
NA 57.59
1059
RECEIVE BIDS - CS & LTCS PIPES ( WELDED ) 12-Apr-09 18-Apr-09
NA 63.79
SR. NO. Document No. Document Description Approval CWF Plan Start Plan Finish Actual Actual Progress EV
category Start Finish %
1060
RECEIVE BIDS - SS PIPES ( SEAMLESS ) 22-Apr-09 25-Apr-09
NA 8.42
1061
RECEIVE BIDS - SS PIPES ( WELDED ) 25-Apr-09 25-Apr-09
NA 11.52
1062
RECEIVE BIDS - DSS PIPES 27-Apr-09 3-May-09
NA 26.58
1063
RECEIVE BIDS - CS & LTCS WROUGHT FITTINGS 22-Apr-09 28-Apr-09
NA 45.19
1064
RECEIVE BIDS - SS WROUGHT FITTINGS 22-Apr-09 28-Apr-09
NA 8.42
1065
RECEIVE BIDS - DSS WROUGHT FITTINGS 27-Apr-09 3-May-09
NA 9.75
1066
RECEIVE BIDS - FORGED FITTINGS 22-Apr-09 28-Apr-09
NA 1.77
1067 RECEIVE BIDS - CS & LTCS FLANGES AND SPECTACLE
22-Apr-09 28-Apr-09
BLINDS NA 11.96
1068 RECEIVE BIDS - SS & DSS FLANGES AND SPECTACLE
27-Apr-09 3-May-09
BLINDS NA 8.86
1069
RECEIVE BIDS - CATHODIC PROTECTION SYSTEM 12-May-09 18-May-09
NA 0.89
1070
TBE COMPLETE - CS & LTCS PIPES ( SEAMLESS ) 18-Apr-09 3-May-09
NA 287.95
1071
TBE COMPLETE - CS & LTCS PIPES ( WELDED ) 18-Apr-09 3-May-09
NA 318.96
1072
TBE COMPLETE - SS PIPES ( SEAMLESS ) 25-Apr-09 10-May-09
NA 42.09
1073
TBE COMPLETE - SS PIPES ( WELDED ) 25-Apr-09 10-May-09
NA 57.59
1074
PLACE ORDER - CS & LTCS PIPES ( SEAMLESS ) 3-May-09 10-May-09
NA 115.18
1075
PLACE ORDER - CS & LTCS PIPES ( WELDED ) 3-May-09 10-May-09
NA 127.58
ELECTRICAL
1076
ISSUE INQUIRY - DIESEL ENGINE GENERATORS 22-Mar-09 12-Apr-09
NA 67.34
1077
30-Mar-09 20-Apr-09
ISSUE INQUIRY - POWER & DISTRIBUTION TRANSFORMER NA 62.91
1078
RECEIVE BIDS - DIESEL ENGINE GENERATORS 27-Apr-09 3-May-09
NA 33.67
1079 RECEIVE BIDS - POWER & DISTRIBUTION
5-May-09 11-May-09
TRANSFORMER NA 31.45
INSTRUMENTATION
1080 ISSUE INQUIRY - INTEGRATED CONTROL & SAFETY
22-Mar-09 12-Apr-09
SYSTEMS AND SCADA NA 279.98
1081 RECEIVE BIDS - INTEGRATED CONTROL & SAFETY
27-Apr-09 4-May-09
SYSTEMS AND SCADA NA 139.99
CONSTRUCTION
CIVIL
1082
GEOTECHNICAL SURVEY WORK AT SITE 15-Apr-09 14-Jun-09
NA 447.00
1083
TOPOGRAPHY SURVEY WORK AT SITE 15-Apr-09 10-May-09
NA 447.00
1084
1-May-09
START MOBILIZATION - CPF CIVIL WORKS CONTRACTOR NA 0.00
DOC. ISSUING DISP./ SYS SEQ. BILING. REV. START ISSUE FOR COMPLETE ISSUE FOR RECD. COMMENTS ISSUE FOR RECD. COMMENTS ISSUED FOR MAN HRS. EARNED
PROGRESS ACTIVITY
ASST./W SOURCE DOC. NO. NO. DOC. DESCRIPTION CATEG-O IDC IDC REVIEW/APPROVAL INFORMATION DESIGN/CONST. MAN HRS
BR TYPE TRANS RY
IDENT. DATE
DATE DATE DATE TRANS DATE TRANS CODE DATE TRANS DATE TRANS CODE DATE TRANS
PROCESS
Engineering
P 01-Mar-2011 15/Mar/2011 29/Mar/2011 15/Aug/2011
P HEAT & MATERIAL BALANCE IN SALAH CPF 95.00
HB00 PPCE 00 0500 A 1 F 0134 0219 2 15/Aug/2011 180 E1D03PR 171.00
A 08-Mar-2011 10/Mar/2011 05/Apr/2011
P 21-Apr-2011 30-Nov-2011
HYDRAULICS CALCULATION REPORT FOR IS-CPF
HB00 P PPCE 00 0501 0 3 F 21-Apr-2011 30-Nov-2011 SF-1 95.00 882 E1D03PR 837.90
A 21-Apr-2011 12-Oct-2011
P 15-Apr-2011 15-May-2011
SEPARATOR & SCRUBBER SIZING FOR IS-CPF
HB00 P PPCE 00 0507 0 3 F SF-1 L-11 1 100.00 179 E1D03PR 179.00
A 21-Apr-2011 20-Jul-2011 07-Sep-2011
P 01-Mar-2011 31-Mar-2011
RELIEF VALVE CALCULATION FOR IS-CPF
HB00 P PPCE 00 1000 A 3 F SF-0 100.00 200 E1D03PR 200.00
A 15-Feb-2011 05-Jun-2011
P 15-Mar-2011 29-Apr-2011
P VOLUME CALCULATION FOR BLOWDOWN STUDY IS-CPF 100.00
HB00 PPCE 00 1001 0 3 F SF-1 100 E1D03PR 100.00
A 10-Mar-2011 09-Oct-2011
P 01-Mar-2011 08-Mar-2011
EQUIVALENT LENGTH CALCULATION FOR PSV INLET
HB00 P PPCE 00 1002 A 3 F SF-0 100.00 200 E1D03PR 200.00
LINE - IS-CPF
A 03-Mar-2011 24-May-2011
P 01-Mar-2011 16-Mar-2011
EQUIVALENT LENGTH CALCULATION FOR PSV OUTLET
HB00 P PPCE 00 1003 0 3 F SF-2 100.00 150 E1D03PR 150.00
& BDVS LINE - IS-CPF
A 05-Apr-2011 25-Oct-2011
P 01-Mar-2011 22-Mar-2011
EQUIVALENT LENGTH CALCULATION FOR FLARE
HB00 P PPCE 00 1004 0 3 F SF-2 100.00 150 E1D03PR 150.00
SYSTEM - IS-CPF
A 03-Mar-2011 25-Oct-2011
P 25-Mar-2011 28/Mar/2011 11/Apr/2011 22/Nov/2011
P IS CPF HP FLARE KO DRUM SIZING CALCULATION SF-1 100.00
HB00 PPCE 04 1000 0 1 F 0690 0737 2 68 E1D03C 68.00
A 06-Mar-2011 23/May/2011 14/Jun/2011 14/Jul/2011
P 25-Mar-2011 28/Mar/2011 11/Apr/2011 22/Nov/2011
IS CPF LP FLARE KO DRUM SIZING CALCULATION SF-1
HB00 P PPCE 04 1001 0 1 F 0690 0747 2 100.00 68 E1D03C 68.00
A 13-Mar-2011 23/May/2011 14/Jun/2011 14/Jul/2011
P
HYDRAULIC CALCULATIONS FOR IN SALAH CPF
HB09 P PPCE 03 1001 - 3 F 0.00 1 E1D03PR 0.00
PRODUCED WATER PUMPS H-PA-038001A/B
A
P
HYDRAULIC CALCULATIONS FOR IN SALAH CPF WATER
HB09 P PPCE 03 1002 - 3 F 0.00 1 E1D03PR 0.00
INJECTION PUMPS H-PB-038002A/B/C
A
P 01-Aug-2011 31-Aug-2011
P SIZING FOR IS CPF PRODUCED WATER EVAPORATION 95.00
HB09 PPCE 03 1004 0 3 F SF-1 1 E1D03PR 0.95
POND (H-TP-038001)
A 01-Aug-2011 24-Aug-2011
P 01-Jul-2011 31-Aug-2011
EQUIPMENT SIZING - IN SALAH CPF PLANT WATER
HB09 P PPCE 05 1000 0 3 F SF-1 95.00 1 E1D03PR 0.95
STORAGE TANK H-TA-052001
A 04-Aug-2011 22-Aug-2011
P
HYDRAULIC CALCULATIONS FOR IN SALAH CPF PLANT
HB09 P PPCE 05 1001 - 3 F 0.00 1 E1D03PR 0.00
WATER TRANSFER PUMPS H-PA-052001A/B
A
P
HYDRAULIC CALCULATIONS FOR IN SALAH CPF PLANT
HB09 P PPCE 05 1002 - 3 F 0.00 1 E1D03PR 0.00
WATER LIFT PUMPS H-PS-052002A/B/C
A
P 01-Jul-2011 31-Aug-2011
P EQUIPMENT SIZING - IN SALAH CPF FRESH WATER 95.00
HB09 PPCE 05 1001 0 3 F SF-1 1 E1D03PR 0.95
STORAGE TANK H-TA-053001
A 04-Aug-2011 22-Aug-2011
P
HYDRAULIC CALCULATIONS FOR IN SALAH CPF FRESH
HB09 P PPCE 05 1002 - 3 F 0.00 1 E1D03PR 0.00
WATER PRESSURISATION PUMPS H-PA-053001A/B
A
P
HYDRAULIC CALCULATIONS FOR IN SALAH CPF GLYCOL
HB09 P PPCE 05 1000 - 3 F 0.00 1 E1D03PR 0.00
DRAINS PUMP H-PH-054002
A
Issue Inquiry Requisition Receive Bid TBE Complete Place LOI / LOA Place PO Receive / Approve Key Vendor Drawings / Documents Place Sub-orders Receive Raw Materials Fabrication / Mfg. Inspection Release Note Ex-works Delivery Item on Board Shipping/Air Freight/Land Transport (ATA Port) Custom Clearance and Transport to site/store Visual Inspection on Receipt at Site/Store ROS
Inquiry No. Description Discipline INQD_TAG_NO PO_NO Vendor Name PO Delivery Terms PO_CDD
P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog
Supply, Fab & Galv. of Chainlink Fence,
UU00-P-ZATS-107-1000 Palisade Fence & Gates CIVIL & STRUCTURAL LOT : 001 SF0031 LINK MIDDLE EAST LTD FOB DUBAI SEAPORT, UAE 27-Mar-11 27-Mar-11 100 08-Apr-11 08-Apr-11 100 24-May-11 24-May-11 100 05-Jun-11 05-Jun-11 100 20-Jul-11 05-Jun-11 100 20-Aug-11 10-Aug-11 100.00 27-Aug-11 10-Aug-11 100.00 03-Sep-11 10-Aug-11 100.00 10-Sep-11 05-Sep-11 100.00 18-Oct-11 04-Oct-11 100.00 17-Nov-11 17-Oct-11 100.00 02-Dec-11 22-Oct-11 100.00 11-Nov-11
Supply, Fab & Galv. of Chainlink Fence,
UU00-P-ZATS-107-1000 Palisade Fence & Gates CIVIL & STRUCTURAL LOT : 002 SF0031 LINK MIDDLE EAST LTD FOB DUBAI SEAPORT, UAE 30-Oct-11 27-Mar-11 27-Mar-11 100 08-Apr-11 08-Apr-11 100 24-May-11 24-May-11 100 05-Jun-11 05-Jun-11 100 20-Jul-11 05-Jun-11 100 20-Aug-11 18-Sep-11 100.00 27-Aug-11 18-Sep-11 100.00 03-Sep-11 18-Sep-11 100.00 10-Sep-11 26-Sep-11 18-Oct-11 30-Oct-11 17-Nov-11 30-Oct-11 02-Dec-11 30-Oct-11 11-Nov-11
Supply, Fab & Galv. of Chainlink Fence,
UU00-P-ZATS-107-1000 Palisade Fence & Gates CIVIL & STRUCTURAL LOT : 003 SF0031 LINK MIDDLE EAST LTD FOB DUBAI SEAPORT, UAE 30-Oct-11 27-Mar-11 27-Mar-11 100 08-Apr-11 08-Apr-11 100 24-May-11 24-May-11 100 05-Jun-11 05-Jun-11 100 20-Jul-11 05-Jun-11 100 20-Aug-11 02-Oct-11 100.00 27-Aug-11 02-Oct-11 100.00 03-Sep-11 05-Oct-11 100.00 10-Sep-11 17-Oct-11 18-Oct-11 17-Nov-11 17-Nov-11 17-Nov-11 02-Dec-11 17-Nov-11 11-Nov-11
Supply, Fab & Galv. of Chainlink Fence,
UU00-P-ZATS-107-1000 Palisade Fence & Gates CIVIL & STRUCTURAL LOT : 004 SF0031 LINK MIDDLE EAST LTD FOB DUBAI SEAPORT, UAE 30-Oct-11 27-Mar-11 27-Mar-11 100 08-Apr-11 08-Apr-11 100 24-May-11 24-May-11 100 05-Jun-11 05-Jun-11 100 20-Jul-11 05-Jun-11 100 20-Aug-11 18-Sep-11 43.97 27-Aug-11 18-Sep-11 37.21 03-Sep-11 30-Jun-12 10-Sep-11 30-Jun-12 18-Oct-11 30-Jun-12 17-Nov-11 30-Jun-12 02-Dec-11 30-Jun-12 11-Nov-11
TECHNICAL METAL
UU00-P-ZHTS-090-1000 Anchor Bolts CIVIL & STRUCTURAL LOT : 001 SF0007 ESTABLISHMENT FCA SELLERS WORKS, UAE 09-Jun-11 01-Mar-11 02-Mar-11 100 20-Mar-11 13-Mar-11 100 10-Apr-11 07-Apr-11 100 15-Apr-11 14-Apr-11 100 30-May-11 14-Apr-11 100 25-Jun-11 26-Jul-11 100.00 02-Jul-11 26-Jul-11 100.00 09-Jul-11 26-Jul-11 100.00 16-Jul-11 15-Aug-11 23-Aug-11 12-Sep-11 22-Sep-11 12-Sep-11 07-Oct-11 27-Sep-11 07-Oct-11
TECHNICAL METAL
UU00-P-ZHTS-090-1000 Anchor Bolts CIVIL & STRUCTURAL LOT : 002 SF0007 ESTABLISHMENT FCA SELLERS WORKS, UAE 09-Jun-11 01-Mar-11 02-Mar-11 100 20-Mar-11 13-Mar-11 100 10-Apr-11 07-Apr-11 100 15-Apr-11 14-Apr-11 100 30-May-11 14-Apr-11 100 25-Jun-11 01-Jun-11 100.00 02-Jul-11 01-Jun-11 100.00 09-Jul-11 01-Jun-11 100.00 16-Jul-11 27-Jun-11 100.00 23-Aug-11 22-Jul-11 100.00 22-Sep-11 25-Aug-11 100.00 07-Oct-11 01-Sep-11 100.00 07-Oct-11
TECHNICAL METAL
UU00-P-ZHTS-090-1000 Anchor Bolts - 3rd LOT CIVIL & STRUCTURAL LOT : 003 SF0007 ESTABLISHMENT FCA SELLERS WORKS, UAE 05-Sep-11 01-Mar-11 02-Mar-11 100 20-Mar-11 13-Mar-11 100 10-Apr-11 07-Apr-11 100 15-Apr-11 14-Apr-11 100 30-May-11 14-Apr-11 100 25-Jun-11 18-Sep-11 100.00 02-Jul-11 18-Sep-11 100.00 09-Jul-11 19-Sep-11 100.00 16-Jul-11 03-Oct-11 23-Aug-11 03-Nov-11 22-Sep-11 03-Nov-11 07-Oct-11 18-Nov-11 07-Oct-11
TECHNICAL METAL
UU00-P-ZHTS-090-1000 Anchor Bolts - 4th LOT CIVIL & STRUCTURAL LOT : 004 SF0007 ESTABLISHMENT FCA SELLERS WORKS, UAE 01-Mar-11 02-Mar-11 100 20-Mar-11 13-Mar-11 100 10-Apr-11 07-Apr-11 100 15-Apr-11 14-Apr-11 100 30-May-11 14-Apr-11 100 25-Jun-11 05-Nov-11 02-Jul-11 05-Nov-11 09-Jul-11 15-Dec-11 16-Jul-11 15-Dec-11 23-Aug-11 15-Dec-11 22-Sep-11 15-Dec-11 07-Oct-11 15-Dec-11 07-Oct-11
TECHNICAL METAL
UU00-P-ZHTS-090-1000 Anchor Bolts - 4th LOT CIVIL & STRUCTURAL LOT : 005 SF0007 ESTABLISHMENT FCA SELLERS WORKS, UAE 09-Jun-11 01-Mar-11 02-Mar-11 100 20-Mar-11 13-Mar-11 100 10-Apr-11 07-Apr-11 100 15-Apr-11 14-Apr-11 100 30-May-11 14-Apr-11 100 25-Jun-11 31-May-11 02-Jul-11 31-May-11 09-Jul-11 09-Jun-11 16-Jul-11 09-Jun-11 23-Aug-11 09-Jun-11 22-Sep-11 09-Jun-11 07-Oct-11 09-Jun-11 07-Oct-11
Supply of Structural Steel Profiles &
UU00-P-ZHTS-090-1001 Plates CIVIL & STRUCTURAL UU00-P-ZHTS-090-1001-102 23-Feb-11 07-Feb-11 100 23-Mar-11 07-Mar-11 100 05-May-11 19-Apr-11 100 27-May-11 11-May-11 100 11-Jul-11 11-May-11 100 05-Aug-11 13-Jul-11 12-Aug-11 19-Jul-11 19-Aug-11 26-Jul-11 26-Aug-11 02-Aug-11 03-Oct-11 09-Sep-11 02-Nov-11 09-Oct-11 17-Nov-11 24-Oct-11 28-Sep-11
FCA SELLER'S WORKS, MUSSAFAH, ABU
UU00-P-ZHTS-090-1002 Structural Steel Fabrication CIVIL & STRUCTURAL LOT : 003 SF0015 TIGER STEEL ENGINEERING DHABI EMIRATE, UAE 30-Jun-12 22-Feb-11 06-Mar-11 100 15-Mar-11 23-Mar-11 100 05-Apr-11 19-Apr-11 100 12-Apr-11 11-May-11 100 27-May-11 11-May-11 100 23-Aug-11 21-May-12 26.59 30-Aug-11 20-Sep-11 8.60 06-Sep-11 30-Jun-12 13-Sep-11 07-Jul-12 21-Oct-11 14-Aug-12 20-Nov-11 13-Sep-12 05-Dec-11 28-Sep-12 05-Dec-11
FCA SELLER'S WORKS, MUSSAFAH, ABU
UU00-P-ZHTS-090-1002 Structural Steel Fabrication CIVIL & STRUCTURAL LOT : 001 SF0015 TIGER STEEL ENGINEERING DHABI EMIRATE, UAE 30-Jun-12 22-Feb-11 06-Mar-11 100 15-Mar-11 23-Mar-11 100 05-Apr-11 19-Apr-11 100 12-Apr-11 11-May-11 100 27-May-11 11-May-11 100 23-Aug-11 07-Sep-11 100.00 30-Aug-11 19-Sep-11 100.00 06-Sep-11 20-Sep-11 100.00 13-Sep-11 26-Sep-11 21-Oct-11 30-Oct-11 20-Nov-11 30-Oct-11 05-Dec-11 30-Oct-11 05-Dec-11
FCA SELLER'S WORKS, MUSSAFAH, ABU
UU00-P-ZHTS-090-1002 Structural Steel Fabrication CIVIL & STRUCTURAL LOT : 002 SF0015 TIGER STEEL ENGINEERING DHABI EMIRATE, UAE 30-Jun-12 22-Feb-11 06-Mar-11 100 15-Mar-11 23-Mar-11 100 05-Apr-11 19-Apr-11 100 12-Apr-11 11-May-11 100 27-May-11 11-May-11 100 23-Aug-11 01-Oct-11 100.00 30-Aug-11 04-Oct-11 100.00 06-Sep-11 16-Oct-11 100.00 13-Sep-11 10-Oct-11 21-Oct-11 10-Nov-11 20-Nov-11 10-Nov-11 05-Dec-11 10-Nov-11 05-Dec-11
UU00-P-ZHTS-090-1004 Grating, Chq. Plate, Handrail & Ladder CIVIL & STRUCTURAL UU00-P-ZHTS-090-1004-104 16-May-11 23-Aug-11 100 15-Jun-11 03-Oct-11 100 23-Jul-11 23-Nov-11 30-Jul-11 30-Nov-11 13-Sep-11 14-Jan-12 07-Nov-11 09-Mar-12 14-Nov-11 16-Mar-12 21-Nov-11 23-Mar-12 28-Nov-11 30-Mar-12 05-Jan-12 07-May-12 04-Feb-12 06-Jun-12 19-Feb-12 21-Jun-12 19-Feb-12
FOB HOUSTON PORT, USA & JEBEL ALI
UB00-P-MLTS-000-1009 HP Flare Package MECHANICAL STATIC H-FX-043001 SF0071 CALLIDUS TECHNOLOGIES LLC PORT, UAE 17-May-12 16-Apr-11 16-May-11 100 27-Jun-11 09-Jun-11 100 04-Aug-11 07-Sep-11 100 11-Aug-11 08-Sep-11 100 25-Sep-11 08-Sep-11 100 09-Nov-11 04-Dec-11 12 19-Nov-11 14-Dec-11 18-Jan-12 10-Feb-12 16-Jun-12 04-Jul-12 23-Jun-12 11-Jul-12 30-Jun-12 17-Jul-12 07-Jul-12 24-Jul-12 14-Aug-12 31-Aug-12 13-Sep-12 30-Sep-12 28-Sep-12 15-Oct-12 28-Sep-12
FOB HOUSTON PORT, USA & JEBEL ALI
UB00-P-MLTS-000-1009 LP Flare Package MECHANICAL STATIC H-FX-044001 SF0071 CALLIDUS TECHNOLOGIES LLC PORT, UAE 17-May-12 16-Apr-11 16-May-11 100 27-Jun-11 09-Jun-11 100 04-Aug-11 07-Sep-11 100 11-Aug-11 08-Sep-11 100 25-Sep-11 08-Sep-11 100 09-Nov-11 04-Dec-11 12 19-Nov-11 14-Dec-11 18-Jan-12 10-Feb-12 16-Jun-12 04-Jul-12 23-Jun-12 11-Jul-12 30-Jun-12 17-Jul-12 07-Jul-12 24-Jul-12 14-Aug-12 31-Aug-12 13-Sep-12 30-Sep-12 28-Sep-12 15-Oct-12 28-Sep-12
UB09-P-MLTS-000-1010 Fuel Gas Heater MECHANICAL STATIC H-FE-045001 SF0056 CHROMALOX (UK) LTD FOB ANTWERP, BELGIUM 01-Mar-12 25-Mar-11 28-Apr-11 100 24-Apr-11 23-May-11 100 03-Jun-11 28-Jul-11 100 10-Jun-11 04-Aug-11 100 25-Jul-11 04-Aug-11 100 08-Sep-11 29-Oct-11 35 22-Dec-11 06-Feb-12 21-Jan-12 06-Mar-12 06-Mar-12 18-Apr-12 13-Mar-12 25-Apr-12 20-Mar-12 01-May-12 27-Mar-12 08-May-12 04-May-12 15-Jun-12 03-Jun-12 15-Jul-12 18-Jun-12 30-Jul-12 18-Jun-12
UF00-P-MDTS-000-2001 Raw Diesel Storage Tank MECHANICAL STATIC H-TA-062002 15-Mar-11 28-Oct-11 08-Apr-11 21-Nov-11 09-Jun-11 08-Jan-12 16-Jun-11 15-Jan-12 31-Jul-11 29-Feb-12 14-Sep-11 14-Apr-12 25-Oct-11 25-May-12 24-Dec-11 24-Jul-12 23-Jan-12 23-Aug-12 30-Jan-12 30-Aug-12 18-Feb-12 18-Sep-12 25-Feb-12 25-Sep-12 03-Apr-12 02-Nov-12 03-May-12 02-Dec-12 18-May-12 17-Dec-12 18-May-12
UF00-P-MDTS-000-2001 Raw Water Storage Tank MECHANICAL STATIC H-TA-109001 15-Mar-11 28-Oct-11 08-Apr-11 21-Nov-11 09-Jun-11 08-Jan-12 16-Jun-11 15-Jan-12 31-Jul-11 29-Feb-12 14-Sep-11 14-Apr-12 25-Oct-11 25-May-12 24-Dec-11 24-Jul-12 23-Jan-12 23-Aug-12 30-Jan-12 30-Aug-12 18-Feb-12 18-Sep-12 25-Feb-12 25-Sep-12 03-Apr-12 02-Nov-12 03-May-12 02-Dec-12 18-May-12 17-Dec-12 18-May-12
UF00-P-MDTS-000-2001 Fire / Fresh Water Storage Tanks MECHANICAL STATIC H-TA-109002A 15-Mar-11 28-Oct-11 08-Apr-11 21-Nov-11 09-Jun-11 08-Jan-12 16-Jun-11 15-Jan-12 31-Jul-11 29-Feb-12 14-Sep-11 14-Apr-12 25-Oct-11 25-May-12 24-Dec-11 24-Jul-12 23-Jan-12 23-Aug-12 30-Jan-12 30-Aug-12 18-Feb-12 18-Sep-12 25-Feb-12 25-Sep-12 03-Apr-12 02-Nov-12 03-May-12 02-Dec-12 18-May-12 17-Dec-12 18-May-12
UF00-P-MDTS-000-2001 Fire / Fresh Water Storage Tanks MECHANICAL STATIC H-TA-109002B 15-Mar-11 28-Oct-11 08-Apr-11 21-Nov-11 09-Jun-11 08-Jan-12 16-Jun-11 15-Jan-12 31-Jul-11 29-Feb-12 14-Sep-11 14-Apr-12 25-Oct-11 25-May-12 24-Dec-11 24-Jul-12 23-Jan-12 23-Aug-12 30-Jan-12 30-Aug-12 18-Feb-12 18-Sep-12 25-Feb-12 25-Sep-12 03-Apr-12 02-Nov-12 03-May-12 02-Dec-12 18-May-12 17-Dec-12 18-May-12
UF00-P-MDTS-062-2001 Diesel Coalescer MECHANICAL STATIC H-GC-062004 25-Mar-11 02-Nov-11 24-Apr-11 02-Dec-11 28-Jun-11 08-Jan-12 05-Jul-11 15-Jan-12 19-Aug-11 29-Feb-12 03-Oct-11 14-Apr-12 12-Nov-11 24-May-12 11-Jan-12 23-Jul-12 10-Apr-12 21-Oct-12 17-Apr-12 28-Oct-12 24-Apr-12 04-Nov-12 01-May-12 11-Nov-12 08-Jun-12 19-Dec-12 08-Jul-12 18-Jan-13 23-Jul-12 02-Feb-13 23-Jul-12
UF00-P-MDTS-062-2001 Diesel Coalescer Pre-Filter MECHANICAL STATIC H-GC-062003 25-Mar-11 02-Nov-11 24-Apr-11 02-Dec-11 28-Jun-11 08-Jan-12 05-Jul-11 15-Jan-12 19-Aug-11 29-Feb-12 03-Oct-11 14-Apr-12 12-Nov-11 24-May-12 11-Jan-12 23-Jul-12 10-Apr-12 21-Oct-12 17-Apr-12 28-Oct-12 24-Apr-12 04-Nov-12 01-May-12 11-Nov-12 08-Jun-12 19-Dec-12 08-Jul-12 18-Jan-13 23-Jul-12 02-Feb-13 23-Jul-12
INDUSTRIA MECCANICA BASSI FOB MARGHERA PORT (NORTH ITALIAN
UU00-P-EETS-000-1001 Slug Catcher MECHANICAL STATIC H-LD-020001 SF0011 LUIGI & C. SPA PORT), ITALY 03-Apr-12 15-Feb-11 28-Feb-11 100 02-Mar-11 31-Mar-11 100 25-Mar-11 18-Apr-11 100 01-Apr-11 26-Apr-11 100 16-May-11 26-Apr-11 100 04-Aug-11 09-Aug-11 85 11-Apr-12 07-Mar-12 95 26-May-12 14-Apr-12 38 10-Jul-12 22-May-12 18.00 17-Jul-12 28-May-12 24-Jul-12 03-Jun-12 31-Jul-12 10-Jun-12 07-Sep-12 18-Jul-12 07-Oct-12 17-Aug-12 22-Oct-12 01-Sep-12 22-Oct-12
FOB ANTWERP INTERNATIONAL
UU00-P-MCTS-000-1004 Product Gas Cooler - Train 100 MECHANICAL STATIC H-HC-020101 SF0012 HAMON D'HONDT S.A. SEAPORT, BELGIUM 15-Mar-12 20-Feb-11 20-Feb-11 100 22-Mar-11 18-Mar-11 100 08-May-11 21-Apr-11 100 15-May-11 28-Apr-11 100 29-Jun-11 28-Apr-11 100 13-Aug-11 07-Aug-11 65 06-Jan-12 18-Jan-12 10 06-Mar-12 26-Mar-12 05-Apr-12 29-Apr-12 12-Apr-12 07-May-12 19-Apr-12 15-May-12 26-Apr-12 22-May-12 03-Jun-12 29-Jun-12 03-Jul-12 29-Jul-12 18-Jul-12 13-Aug-12 18-Jul-12
FOB ANTWERP INTERNATIONAL
UU00-P-MCTS-000-1004 Product Gas Cooler - Train 200 MECHANICAL STATIC H-HC-020201 SF0012 HAMON D'HONDT S.A. SEAPORT, BELGIUM 15-Mar-12 20-Feb-11 20-Feb-11 100 22-Mar-11 18-Mar-11 100 08-May-11 21-Apr-11 100 15-May-11 28-Apr-11 100 29-Jun-11 28-Apr-11 100 13-Aug-11 07-Aug-11 65 06-Jan-12 18-Jan-12 10 06-Mar-12 26-Mar-12 05-Apr-12 29-Apr-12 12-Apr-12 07-May-12 19-Apr-12 15-May-12 26-Apr-12 22-May-12 03-Jun-12 29-Jun-12 03-Jul-12 29-Jul-12 18-Jul-12 13-Aug-12 18-Jul-12
FOB ANTWERP INTERNATIONAL
UU00-P-MCTS-000-1004 Produced Water Air Cooler MECHANICAL STATIC H-HC-038001 SF0012 HAMON D'HONDT S.A. SEAPORT, BELGIUM 15-Mar-12 20-Feb-11 20-Feb-11 100 22-Mar-11 18-Mar-11 100 08-May-11 21-Apr-11 100 15-May-11 28-Apr-11 100 29-Jun-11 28-Apr-11 100 13-Aug-11 07-Aug-11 65 06-Jan-12 18-Jan-12 10 06-Mar-12 26-Mar-12 05-Apr-12 29-Apr-12 12-Apr-12 07-May-12 19-Apr-12 15-May-12 26-Apr-12 22-May-12 03-Jun-12 29-Jun-12 03-Jul-12 29-Jul-12 18-Jul-12 13-Aug-12 18-Jul-12
Lean Glycol Pumps (H-PB-024 101 A/B) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication works - Surge Drum skid MECHANICAL STATIC 100-C-GP-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Piping pre-fabrication works - Surge INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Drum skid MECHANICAL STATIC 100-C-SD-PIPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 30 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Str. Fabrication works - Surge Drum skid MECHANICAL STATIC 100-C-SD-STRFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Installation of equipment on skid INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 (assembly) - Surge Drum skid MECHANICAL STATIC 100-C-AS-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Piping/E&I installation works - Surge INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Drum skid MECHANICAL STATIC 100-C-OT-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 50 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Final testing & ex-works - Surge Drum INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 skid MECHANICAL STATIC 100-C-FT-EXWORK SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 25 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Still Column Overhead Pumps (H-PA-024
103 A/B) fabrication works - Overhead INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 receiver and pumps skid MECHANICAL STATIC 100-D-CP-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Still Column Overhead Receiver(H-VA-
024 105) fabrication - Overhead receiver INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 and pumps skid MECHANICAL STATIC 100-D-CR-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Str. Fabrication works - Overhead INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 receiver and pumps skid MECHANICAL STATIC 100-D-OR-STRFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Piping pre-fabrication works - Overhead INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 receiver and pumps skid MECHANICAL STATIC 100-D-OR-PIPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 30 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Installation of equipment on skid
(assembly) - Overhead receiver and INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 pumps skid MECHANICAL STATIC 100-D-AS-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Piping/E&I installation works - Overhead INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 receiver and pumps skid MECHANICAL STATIC 100-D-OT-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 50 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Final testing & ex-works - Overhead INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 receiver and pumps skid MECHANICAL STATIC 100-D-FT-EXWORK SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 25 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Str. Fabrication works - Skid E MECHANICAL STATIC 100-E-SE-STRFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Stripping Column (H-VE-024 108) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication works - Skid E MECHANICAL STATIC 100-E-SC-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Particle filters (H-GC-024 101 A/B) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication works - Skid E MECHANICAL STATIC 100-E-PF-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Charcoal filters (H-GC-024 102) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication works - Skid E MECHANICAL STATIC 100-E-CF-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Guard Filter (H-GC-024 103) Fabrication INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 works - Skid E MECHANICAL STATIC 100-E-GF-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Piping pre-fabrication works - Skid E MECHANICAL STATIC 100-E-SE-PIPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 30 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Installation of equipment on skid INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 (assembly) - Skid E MECHANICAL STATIC 100-E-AS-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Piping/E&I installation works - Skid E MECHANICAL STATIC 100-E-OT-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 50 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Final testing & ex-works -Skid E MECHANICAL STATIC 100-E-FT-EXWORK SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 25 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Glycol contactor (H-VB-024 101) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Manufacturing MECHANICAL STATIC 100-L-GC-MNF SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 75 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Issue Inquiry Requisition Receive Bid TBE Complete Place LOI / LOA Place PO Receive / Approve Key Vendor Drawings / Documents Place Sub-orders Receive Raw Materials Fabrication / Mfg. Inspection Release Note Ex-works Delivery Item on Board Shipping/Air Freight/Land Transport (ATA Port) Custom Clearance and Transport to site/store Visual Inspection on Receipt at Site/Store ROS
Inquiry No. Description Discipline INQD_TAG_NO PO_NO Vendor Name PO Delivery Terms PO_CDD
P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog
Still column Reflex Condenser (H-HA-024 INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 102) Manufacturing MECHANICAL STATIC 100-L-SC-MNF SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Blower (H-KE-024 101 A/B) Manufacturing MECHANICAL STATIC 100-L-BL-MNF SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Lean Glycol Air Cooler (H-HC-024 104) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication MECHANICAL STATIC 100-L-AC-MNF SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Still Column Overhead Condenser (H-KEM- INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 024103A/B) - fabrication MECHANICAL STATIC 100-L-OC-MNF SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Str. Fabrication works - Flash Drum MECHANICAL STATIC 200-A-FD-STRFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Piping pre-fabrication works - Flash Drum MECHANICAL STATIC 200-A-FD-PIPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 30 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Flash drum (H-VB-024 201) fabrication - INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Flash Drum MECHANICAL STATIC 200-A-FD-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Antifoam Control Agent Tank (H-TX-024 INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 201) fabrication works - Flash Drum MECHANICAL STATIC 200-A-TK-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Antifoam Control agent Dozing Pump (H- INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 PD-024 103) fabrication - Flash Drum MECHANICAL STATIC 200-A-DP-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Piping/E&I installation works - Flash INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Drum MECHANICAL STATIC 200-A-OT-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 50 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Glycol Heat exchanger (H-HA-024 201) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication - Flash Drum MECHANICAL STATIC 200-A-HE-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Installation of equipment on skid INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 (assembly) - Flash Drum MECHANICAL STATIC 200-A-AS-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Final testing & ex-works - Flash Drum MECHANICAL STATIC 200-A-FT-EXWORK SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 15-Sep-11 25 15-Sep-11 15-Sep-11 15-Sep-11 15-Sep-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Re-boiler (H-HI-024 203) fabrication INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 works - Reboiler skid MECHANICAL STATIC 200-B-RB-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Str. Fabrication works - Reboiler skid MECHANICAL STATIC 200-B-RB-STRFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Piping pre-fabrication works - Reboiler INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 skid MECHANICAL STATIC 200-B-RB-PIPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 30 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Piping/E&I installation works - Reboiler INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 skid MECHANICAL STATIC 200-B-OT-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 50 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Installation of equipment on skid INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 (assembly) - Reboiler skid MECHANICAL STATIC 200-B-AS-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Final testing & ex-works - Reboiler skid MECHANICAL STATIC 200-B-FT-EXWORK SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 25 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Str. Fabrication works - Surge Drum skid MECHANICAL STATIC 200-C-SD-STRFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Glycol KO Gas KO Pot (H-VD-024 107) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication - Surge Drum skid MECHANICAL STATIC 200-C-GK-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 50 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Surge drum (H-VL-024 104) fabrication INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 works - Surge Drum skid MECHANICAL STATIC 200-C-SD-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Piping pre-fabrication works - Surge INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Drum skid MECHANICAL STATIC 200-C-SD-PIPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 30 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Lean Glycol Pumps (H-PB-024 101 A/B) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication works - Surge Drum skid MECHANICAL STATIC 200-C-GP-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Installation of equipment on skid INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 (assembly) - Surge Drum skid MECHANICAL STATIC 200-C-AS-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Piping/E&I installation works - Surge INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Drum skid MECHANICAL STATIC 200-C-OT-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 50 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Final testing & ex-works - Surge Drum INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 skid MECHANICAL STATIC 200-C-FT-EXWORK SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 25 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Str. Fabrication works - Skid E MECHANICAL STATIC 200-E-SE-STRFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Stripping Column (H-VE-024 206) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication works - Skid E MECHANICAL STATIC 200-E-SC-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Particle filters (H-GC-024 201 A/B) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication works - Skid E MECHANICAL STATIC 200-E-PF-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Charcoal filters (H-GC-024 202) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication works - Skid E MECHANICAL STATIC 200-E-CF-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Piping pre-fabrication works - Skid E MECHANICAL STATIC 200-E-SE-PIPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 30 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Guard Filter (H-GC-024 203) Fabrication INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 works - Skid E MECHANICAL STATIC 200-E-GF-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Installation of equipment on skid INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 (assembly) - Skid E MECHANICAL STATIC 200-E-AS-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Piping/E&I installation works - Skid E MECHANICAL STATIC 200-E-OT-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 50 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Final testing & ex-works -Skid E MECHANICAL STATIC 200-E-FT-EXWORK SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 25 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Glycol contactor (H-VB-024 101) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Manufacturing MECHANICAL STATIC 200-L-GC-MNF SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 75 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Blower (H-KE-024 101 A/B) Manufacturing MECHANICAL STATIC 200-L-BL-MNF SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Lean Glycol Air Cooler (H-HC-024 104) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication MECHANICAL STATIC 200-L-AC-MNF SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Str. Fabrication works - Flash Drum MECHANICAL STATIC 300-A-FD-STRFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Piping pre-fabrication works - Flash Drum MECHANICAL STATIC 300-A-FD-PIPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 30 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
PH Control agent Dozing Pump (K-PD-024 INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 302) fabrication - Flash Drum MECHANICAL STATIC 300-A-DP-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
PH Control Agent tamk (K-TX-024 301) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication works - Flash Drum MECHANICAL STATIC 300-A-TK-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Antifoam Control Agent Dozing Pump (K- INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 PD-024 303) fabrication - Flash Drum MECHANICAL STATIC 300-A-AFP-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Antifoam Control Agent tamk (K-TX-024 INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 302) fabrication works - Flash Drum MECHANICAL STATIC 300-A-AFT-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Glycol Heat exchanger (K-HA-024 301) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication - Flash Drum MECHANICAL STATIC 300-A-HE-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Flash drum (K-VB-024 302) fabrication - INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Flash Drum MECHANICAL STATIC 300-A-FD-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Installation of equipment on skid INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 (assembly) - Flash Drum MECHANICAL STATIC 300-A-AS-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Piping/E&I installation works - Flash INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Drum MECHANICAL STATIC 300-A-OT-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 50 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Final testing & ex-works - Flash Drum MECHANICAL STATIC 300-A-FT-EXWORK SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 25 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Str. Fabrication works - Reboiler skid MECHANICAL STATIC 300-B-RB-STRFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Piping pre-fabrication works - Reboiler INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 skid MECHANICAL STATIC 300-B-RB-PIPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 30 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Re-boiler K-HI-024 303) fabrication works INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 - Reboiler skid MECHANICAL STATIC 300-B-RB-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Piping/E&I installation works - Reboiler INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 skid MECHANICAL STATIC 300-B-OT-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 50 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Installation of equipment on skid INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 (assembly) - Reboiler skid MECHANICAL STATIC 300-B-AS-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Final testing & ex-works - Reboiler skid MECHANICAL STATIC 300-B-FT-EXWORK SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 25 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Str. Fabrication works - Surge Drum skid MECHANICAL STATIC 300-C-SD-STRFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Piping pre-fabrication works - Surge INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Drum skid MECHANICAL STATIC 300-C-SD-PIPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 30 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Surge drum (K-VL-024 304) fabrication INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 works - Surge Drum skid MECHANICAL STATIC 300-C-SD-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Glycol KO Gas KO Pot (K-VD-024 307) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication - Surge Drum skid MECHANICAL STATIC 300-C-GK-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 50 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Lean Glycol Pumps (K-PB-024 301 A/B) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication works - Surge Drum skid MECHANICAL STATIC 300-C-GP-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Installation of equipment on skid INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 (assembly) - Surge Drum skid MECHANICAL STATIC 300-C-AS-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Piping/E&I installation works - Surge INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Drum skid MECHANICAL STATIC 300-C-OT-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 50 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Final testing & ex-works - Surge Drum INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 skid MECHANICAL STATIC 300-C-FT-EXWORK SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 25 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Still Column Overhead Receiver(K-VA-024
305) fabrication - Overhead receiver and INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 pumps skid MECHANICAL STATIC 300-D-CR-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Still Column Overhead Pumps (K-PA-024
303 A/B) fabrication works - Overhead INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 receiver and pumps skid MECHANICAL STATIC 300-D-CP-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Str. Fabrication works - Overhead INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 receiver and pumps skid MECHANICAL STATIC 300-D-OR-STRFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Piping pre-fabrication works - Overhead INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 receiver and pumps skid MECHANICAL STATIC 300-D-OR-PIPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 30 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Installation of equipment on skid
(assembly) - Overhead receiver and INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 pumps skid MECHANICAL STATIC 300-D-AS-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Piping/E&I installation works - Overhead INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 receiver and pumps skid MECHANICAL STATIC 300-D-OT-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 50 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Final testing & ex-works - Overhead INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 receiver and pumps skid MECHANICAL STATIC 300-D-FT-EXWORK SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 25 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Str. Fabrication works - Skid E MECHANICAL STATIC 300-E-SE-STRFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Stripping Column (K-VE-024 308) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication works - Skid E MECHANICAL STATIC 300-E-SC-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Guard Filter (K-GC-024 303) Fabrication INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 works - Skid E MECHANICAL STATIC 300-E-GF-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Piping pre-fabrication works - Skid E MECHANICAL STATIC 300-E-SE-PIPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 30 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Particle filters (K-GC-024 301 A/B) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication works - Skid E MECHANICAL STATIC 300-E-PF-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Charcoal filters (K-GC-024 302) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication works - Skid E MECHANICAL STATIC 300-E-CF-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Installation of equipment on skid INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 (assembly) - Skid E MECHANICAL STATIC 300-E-AS-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Piping/E&I installation works - Skid E MECHANICAL STATIC 300-E-OT-INSTALL SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 50 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Final testing & ex-works -Skid E MECHANICAL STATIC 300-E-FT-EXWORK SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 25 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Glycol contactor (K-VB-024 301) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Manufacturing MECHANICAL STATIC 300-L-GC-MNF SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 75 28-Apr-11 75 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Still column Reflex Condenser (K-HA-024 INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 302) Manufacturing MECHANICAL STATIC 300-L-SC-MNF SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Blower (K-KE-024 301 A/B) Manufacturing MECHANICAL STATIC 300-L-BL-MNF SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Lean Glycol Air Cooler (K-HC-024 304) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 fabrication MECHANICAL STATIC 300-L-AC-MNF SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Still Column Overhead Condenser (K-HC- INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 024105)fabrication MECHANICAL STATIC 300-L-OC-MNF SF0006 SCARDELLATO SPA ITALY 04-Apr-12 29-Jan-11 100 15-Feb-11 100 28-Apr-11 100 28-Apr-11 100 04-May-11 100 28-Apr-11 28-Apr-11 99 28-Apr-11 28-Apr-11 28-Apr-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Forced Draft Burner manufactruing - INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Reboiler skid MECHANICAL STATIC 100-B-FD-EQFAB SF0006 SCARDELLATO SPA ITALY 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 04-May-11 04-May-11 04-May-11 04-May-11 04-May-11 04-May-11 04-May-11 04-May-11 04-May-11
Glycol Still Column (H-VE-024 103) INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Manufacturing MECHANICAL STATIC 100-L-SN-MNF SF0006 SCARDELLATO SPA ITALY 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 04-May-11 04-May-11 04-May-11 04-May-11 04-May-11 04-May-11 04-May-11 04-May-11 04-May-11
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Forced Draft Burner fabrication works MECHANICAL STATIC 200-B-FB-EQPFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 04-May-11 04-May-11 04-May-11 04-May-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
Still column Reflex Condenser (H-HA-024 INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 202) Manufacturing MECHANICAL STATIC 200-L-SC-MNF SF0006 SCARDELLATO SPA ITALY 04-Apr-12 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 04-May-11 04-May-11 04-May-11 04-May-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Still Column Manufacturing MECHANICAL STATIC 200-L-SN-MNF SF0006 SCARDELLATO SPA ITALY 04-Apr-12 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 04-May-11 04-May-11 04-May-11 04-May-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Forced Draft Burner fabrication works MECHANICAL STATIC 300-B-FB-EQFAB SF0006 SCARDELLATO SPA ITALY 04-Apr-12 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 04-May-11 04-May-11 04-May-11 04-May-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
INDUSTRIE MECCANICHE FOB VENICE INTERNATIONAL SEAPORT,
UU00-P-MLTS-024-1002 Still column Manufacturing MECHANICAL STATIC 300-L-SN-MNF SF0006 SCARDELLATO SPA ITALY 04-Apr-12 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 100 04-May-11 04-May-11 04-May-11 04-May-11 04-May-11 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12 30-Jul-12
FCA INTERNATIONAL SEAPORT -
UU00-P-MLTS-101-1000 Incinerator Package MECHANICAL STATIC H-XX-101008 SF0016 INCINCO LIMITED MARSEILLE, FRANCE 05-Oct-11 20-Feb-11 22-Feb-11 100 22-Mar-11 18-Mar-11 100 23-Apr-11 05-May-11 100 30-Apr-11 12-May-11 100 14-Jun-11 12-May-11 100 29-Jul-11 15-Sep-11 96.67 08-Sep-11 15-Sep-11 100 23-Oct-11 12-Oct-11 98.33 07-Dec-11 25-Oct-11 86.67 14-Dec-11 15-Sep-11 33.33 21-Dec-11 15-Sep-11 33.33 28-Dec-11 01-Oct-11 04-Feb-12 03-Oct-11 05-Mar-12 03-Oct-11 20-Mar-12 18-Oct-11 20-Mar-12
HB09-P-MJTS-038-1000 Produced Water Pumps MECHANICAL ROTATING H-PA-038001A SF0039 WORTHINGTON SRL FOB INTERNATIONAL SEAPORT ITALY 03-May-12 15-Feb-11 28-Feb-11 100 17-Mar-11 05-Apr-11 100 09-May-11 23-Jun-11 100 16-May-11 23-Jun-11 100 30-Jun-11 23-Jun-11 100 14-Aug-11 11-Sep-11 35 23-Nov-11 10-Dec-11 40 22-Jan-12 01-Feb-12 21-Apr-12 21-Apr-12 28-Apr-12 27-Apr-12 05-May-12 03-May-12 12-May-12 10-May-12 19-Jun-12 17-Jun-12 19-Jul-12 17-Jul-12 03-Aug-12 01-Aug-12 03-Aug-12
HB09-P-MJTS-038-1000 Produced Water Pumps MECHANICAL ROTATING H-PA-038001B SF0039 WORTHINGTON SRL FOB INTERNATIONAL SEAPORT ITALY 03-May-12 15-Feb-11 28-Feb-11 100 17-Mar-11 05-Apr-11 100 09-May-11 23-Jun-11 100 16-May-11 23-Jun-11 100 30-Jun-11 23-Jun-11 100 14-Aug-11 11-Sep-11 35 23-Nov-11 10-Dec-11 40 22-Jan-12 01-Feb-12 21-Apr-12 21-Apr-12 28-Apr-12 27-Apr-12 05-May-12 03-May-12 12-May-12 10-May-12 19-Jun-12 17-Jun-12 19-Jul-12 17-Jul-12 03-Aug-12 01-Aug-12 03-Aug-12
FOB HAMBURG INTERNATIONAL
HB09-P-MJTS-038-1001 Water Injection Pumps MECHANICAL ROTATING H-PB-038002A SF0038 FLOWSERVE HAMBURG GMBH SEAPORT, GERMANY 21-Jun-12 17-Mar-11 02-Mar-11 100 16-Apr-11 13-Apr-11 100 24-May-11 23-Jun-11 100 31-May-11 23-Jun-11 100 15-Jul-11 23-Jun-11 100 29-Aug-11 25-Nov-11 25 23-Oct-11 28-Feb-12 10 22-Dec-11 11-Jun-12 05-Feb-12 28-Aug-12 12-Feb-12 09-Sep-12 19-Feb-12 21-Sep-12 26-Feb-12 28-Sep-12 04-Apr-12 05-Nov-12 04-May-12 05-Dec-12 19-May-12 20-Dec-12 19-May-12
FOB HAMBURG INTERNATIONAL
HB09-P-MJTS-038-1001 Water Injection Pumps MECHANICAL ROTATING H-PB-038002B SF0038 FLOWSERVE HAMBURG GMBH SEAPORT, GERMANY 21-Jun-12 17-Mar-11 02-Mar-11 100 16-Apr-11 13-Apr-11 100 24-May-11 23-Jun-11 100 31-May-11 23-Jun-11 100 15-Jul-11 23-Jun-11 100 29-Aug-11 25-Nov-11 25 23-Oct-11 28-Feb-12 10 22-Dec-11 11-Jun-12 05-Feb-12 28-Aug-12 12-Feb-12 09-Sep-12 19-Feb-12 21-Sep-12 26-Feb-12 28-Sep-12 04-Apr-12 05-Nov-12 04-May-12 19-Dec-12 19-May-12 03-Jan-13 19-May-12
FOB HAMBURG INTERNATIONAL
HB09-P-MJTS-038-1001 Water Injection Pumps MECHANICAL ROTATING H-PB-038002C SF0038 FLOWSERVE HAMBURG GMBH SEAPORT, GERMANY 21-Jun-12 17-Mar-11 02-Mar-11 100 16-Apr-11 13-Apr-11 100 24-May-11 23-Jun-11 100 31-May-11 23-Jun-11 100 15-Jul-11 23-Jun-11 100 29-Aug-11 25-Nov-11 25 23-Oct-11 28-Feb-12 10 22-Dec-11 11-Jun-12 05-Feb-12 28-Aug-12 12-Feb-12 09-Sep-12 19-Feb-12 21-Sep-12 26-Feb-12 28-Sep-12 04-Apr-12 05-Nov-12 04-May-12 19-Dec-12 19-May-12 03-Jan-13 19-May-12
Instrument Air Compressor & Dryer ATLAS COPSO SERVICES MIDDLE FOB INTERNATIONAL SEAPORT -
HB09-P-MLTS-063-1000 Package MECHANICAL ROTATING H-XV-063001 SF0003 EAST FZE ANTWERP, BELGIUM 15-Mar-12 10-Feb-11 10-Feb-11 100 12-Mar-11 28-Feb-11 100 23-Apr-11 07-Mar-11 100 30-Apr-11 14-Mar-11 100 14-Jun-11 20-Mar-11 100 29-Jul-11 27-Jul-11 73 08-Sep-11 27-Sep-11 80 07-Nov-11 26-Dec-11 40 05-Feb-12 09-May-12 10.00 12-Feb-12 20-May-12 19-Feb-12 30-May-12 26-Feb-12 06-Jun-12 04-Apr-12 14-Jul-12 04-May-12 13-Aug-12 19-May-12 28-Aug-12 19-May-12
FOB INTERNATIONAL SEAPORT -
HB09-P-MLTS-064-1000 Nitrogen Generation Package MECHANICAL ROTATING H-XC-064001 SF0025 AIRPACK NEDERLAND BV ANTWERP, BELGIUM 15-Nov-11 15-Feb-11 10-Feb-11 100 17-Mar-11 01-Mar-11 100 18-May-11 17-May-11 100 25-May-11 17-May-11 100 09-Jul-11 21-May-11 100 23-Aug-11 09-Oct-11 80 18-Sep-11 20-Nov-11 80 17-Nov-11 25-Feb-12 65 01-Jan-12 08-May-12 20.00 08-Jan-12 19-May-12 15-Jan-12 30-May-12 22-Jan-12 06-Jun-12 29-Feb-12 14-Jul-12 30-Mar-12 13-Aug-12 14-Apr-12 28-Aug-12 14-Apr-12
Mobile Truck Mounted Nitrogen FOB INTERNATIONAL SEAPORT -
HB09-P-MLTS-064-1000 Generation Package MECHANICAL ROTATING U-XC-064001 SF0025 AIRPACK NEDERLAND BV ANTWERP, BELGIUM 14-Feb-12 15-Feb-11 10-Feb-11 100 17-Mar-11 01-Mar-11 100 18-May-11 17-May-11 100 25-May-11 17-May-11 100 09-Jul-11 21-May-11 100 23-Aug-11 09-Oct-11 80 18-Sep-11 20-Nov-11 80 17-Nov-11 25-Feb-12 60 01-Jan-12 08-May-12 10.00 08-Jan-12 19-May-12 15-Jan-12 30-May-12 22-Jan-12 06-Jun-12 29-Feb-12 14-Jul-12 30-Mar-12 13-Aug-12 14-Apr-12 28-Aug-12 14-Apr-12
HB09-P-MLTS-101-1000 Waste Water Treatment Package MECHANICAL ROTATING H-XF-101001 SF0040 OVIVO UK LIMITED FOB INTERNATIONAL SEAPORT UK 06-Dec-11 15-Apr-11 04-Apr-11 100 15-May-11 22-Apr-11 100 30-Jun-11 27-Jun-11 100 07-Jul-11 29-Jun-11 100 21-Aug-11 05-Jul-11 100 05-Oct-11 10-Oct-11 10 14-Nov-11 25-Nov-11 13-Jan-12 02-Feb-12 12-Apr-12 15-May-12 19-Apr-12 23-May-12 21-Apr-12 25-May-12 28-Apr-12 01-Jun-12 05-Jun-12 09-Jul-12 05-Jul-12 08-Aug-12 20-Jul-12 23-Aug-12 20-Jul-12
Issue Inquiry Requisition Receive Bid TBE Complete Place LOI / LOA Place PO Receive / Approve Key Vendor Drawings / Documents Place Sub-orders Receive Raw Materials Fabrication / Mfg. Inspection Release Note Ex-works Delivery Item on Board Shipping/Air Freight/Land Transport (ATA Port) Custom Clearance and Transport to site/store Visual Inspection on Receipt at Site/Store ROS
Inquiry No. Description Discipline INQD_TAG_NO PO_NO Vendor Name PO Delivery Terms PO_CDD
P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog
SOLAR TURBINES
HB09-P-MUTS-081-1000 Gas Turbine Generator - Train 2 MECHANICAL ROTATING H-XM-081201 SF0013 INTERNATIONAL COMPANY FCA SELLER'S WORK, USA 04-Jun-12 10-Feb-11 23-Jan-11 100 03-Mar-11 01-Feb-11 100 19-May-11 26-May-11 100 26-May-11 05-Jun-11 100 12-Jun-11 05-Jun-11 100 03-Aug-11 13-Aug-11 50 18-Mar-12 29-Mar-12 65 24-May-12 04-Jun-12 11 20-Jul-12 31-Jul-12 27-Jul-12 07-Aug-12 03-Aug-12 15-Aug-12 10-Aug-12 22-Aug-12 17-Sep-12 29-Sep-12 17-Oct-12 29-Oct-12 01-Nov-12 13-Nov-12 01-Nov-12
SOLAR TURBINES
HB09-P-MUTS-081-1000 Gas Turbine Generator - Train 1 MECHANICAL ROTATING H-XM-081101 SF0013 INTERNATIONAL COMPANY FCA SELLER'S WORK, USA 04-Jun-12 10-Feb-11 23-Jan-11 100 03-Mar-11 01-Feb-11 100 19-May-11 26-May-11 100 26-May-11 05-Jun-11 100 12-Jun-11 05-Jun-11 100 03-Aug-11 13-Aug-11 50 18-Mar-12 29-Mar-12 65 24-May-12 04-Jun-12 11 20-Jul-12 31-Jul-12 27-Jul-12 07-Aug-12 03-Aug-12 15-Aug-12 10-Aug-12 22-Aug-12 17-Sep-12 29-Sep-12 17-Oct-12 29-Oct-12 01-Nov-12 13-Nov-12 01-Nov-12
SOLAR TURBINES
HB09-P-MUTS-081-1000 Gas Turbine Generator - Train 1 (LER MECHANICAL ROTATING H-XM-081101-LER SF0014 INTERNATIONAL COMPANY FCA SELLER'S WORK, USA 04-Jun-12 10-Feb-11 23-Jan-11 100 03-Mar-11 01-Feb-11 100 19-May-11 26-May-11 100 26-May-11 05-Jun-11 100 12-Jun-11 05-Jun-11 100 03-Aug-11 13-Aug-11 50 18-Mar-12 29-Mar-12 65 24-May-12 04-Jun-12 11 20-Jul-12 31-Jul-12 27-Jul-12 07-Aug-12 03-Aug-12 15-Aug-12 10-Aug-12 22-Aug-12 17-Sep-12 29-Sep-12 17-Oct-12 29-Oct-12 01-Nov-12 13-Nov-12 01-Nov-12
SOLAR TURBINES
HB09-P-MUTS-081-1000 Gas Turbine Generator - Train 2 (LER) MECHANICAL ROTATING H-XM-081201-LER SF0014 INTERNATIONAL COMPANY FCA SELLER'S WORK, USA 04-Jun-12 10-Feb-11 23-Jan-11 100 03-Mar-11 01-Feb-11 100 19-May-11 26-May-11 100 26-May-11 05-Jun-11 100 12-Jun-11 05-Jun-11 100 03-Aug-11 13-Aug-11 50 18-Mar-12 29-Mar-12 65 24-May-12 04-Jun-12 11 20-Jul-12 31-Jul-12 27-Jul-12 07-Aug-12 03-Aug-12 15-Aug-12 10-Aug-12 22-Aug-12 17-Sep-12 29-Sep-12 17-Oct-12 29-Oct-12 01-Nov-12 13-Nov-12 01-Nov-12
SOLAR TURBINES
HB09-P-MUTS-081-1000 NER - Train 1 MECHANICAL ROTATING H-XM-081101-5 SF0013 INTERNATIONAL COMPANY FCA SELLER'S WORK, USA 04-Jun-12 10-Feb-11 23-Jan-11 100 03-Mar-11 01-Feb-11 100 19-May-11 26-May-11 100 26-May-11 05-Jun-11 100 12-Jun-11 05-Jun-11 100 03-Aug-11 13-Aug-11 50 18-Mar-12 13-Aug-11 65 24-May-12 13-Aug-11 11 20-Jul-12 13-Aug-11 27-Jul-12 13-Aug-11 03-Aug-12 15-Aug-12 10-Aug-12 22-Aug-12 17-Sep-12 29-Sep-12 17-Oct-12 29-Oct-12 01-Nov-12 13-Nov-12 01-Nov-12
SOLAR TURBINES
HB09-P-MUTS-081-1000 CO2 Bottles - Train 1 MECHANICAL ROTATING H-XM-081101-6 SF0013 INTERNATIONAL COMPANY FCA SELLER'S WORK, USA 04-Jun-12 10-Feb-11 23-Jan-11 100 03-Mar-11 01-Feb-11 100 19-May-11 26-May-11 100 26-May-11 05-Jun-11 100 12-Jun-11 05-Jun-11 100 03-Aug-11 13-Aug-11 50 18-Mar-12 13-Aug-11 65 24-May-12 13-Aug-11 11 20-Jul-12 13-Aug-11 27-Jul-12 13-Aug-11 03-Aug-12 15-Aug-12 10-Aug-12 22-Aug-12 17-Sep-12 29-Sep-12 17-Oct-12 29-Oct-12 01-Nov-12 13-Nov-12 01-Nov-12
SOLAR TURBINES
HB09-P-MUTS-081-1000 Lube Oil Cooler - Train 1 MECHANICAL ROTATING H-XM-081101-7 SF0013 INTERNATIONAL COMPANY FCA SELLER'S WORK, USA 04-Jun-12 10-Feb-11 23-Jan-11 100 03-Mar-11 01-Feb-11 100 19-May-11 26-May-11 100 26-May-11 05-Jun-11 100 12-Jun-11 05-Jun-11 100 03-Aug-11 13-Aug-11 50 18-Mar-12 13-Aug-11 65 24-May-12 13-Aug-11 11 20-Jul-12 13-Aug-11 27-Jul-12 13-Aug-11 03-Aug-12 15-Aug-12 10-Aug-12 22-Aug-12 17-Sep-12 29-Sep-12 17-Oct-12 29-Oct-12 01-Nov-12 13-Nov-12 01-Nov-12
SOLAR TURBINES
HB09-P-MUTS-081-1000 Fuel Gas Treatment - Train 1 MECHANICAL ROTATING H-XM-081101-8 SF0013 INTERNATIONAL COMPANY FCA SELLER'S WORK, USA 04-Jun-12 10-Feb-11 23-Jan-11 100 03-Mar-11 01-Feb-11 100 19-May-11 26-May-11 100 26-May-11 05-Jun-11 100 12-Jun-11 05-Jun-11 100 03-Aug-11 13-Aug-11 50 18-Mar-12 13-Aug-11 65 24-May-12 13-Aug-11 11 20-Jul-12 13-Aug-11 27-Jul-12 13-Aug-11 03-Aug-12 15-Aug-12 10-Aug-12 22-Aug-12 17-Sep-12 29-Sep-12 17-Oct-12 29-Oct-12 01-Nov-12 13-Nov-12 01-Nov-12
SOLAR TURBINES
HB09-P-MUTS-081-1000 Fuel Gas Treatment - Train 2 MECHANICAL ROTATING H-XM-081201-9 SF0013 INTERNATIONAL COMPANY FCA SELLER'S WORK, USA 04-Jun-12 10-Feb-11 23-Jan-11 100 03-Mar-11 01-Feb-11 100 19-May-11 26-May-11 100 26-May-11 05-Jun-11 100 12-Jun-11 05-Jun-11 100 03-Aug-11 13-Aug-11 50 18-Mar-12 13-Aug-11 65 24-May-12 13-Aug-11 11 20-Jul-12 13-Aug-11 27-Jul-12 13-Aug-11 03-Aug-12 15-Aug-12 10-Aug-12 22-Aug-12 17-Sep-12 29-Sep-12 17-Oct-12 29-Oct-12 01-Nov-12 13-Nov-12 01-Nov-12
SOLAR TURBINES
HB09-P-MUTS-081-1000 NER - Train 2 MECHANICAL ROTATING H-XM-081201-10 SF0013 INTERNATIONAL COMPANY FCA SELLER'S WORK, USA 04-Jun-12 10-Feb-11 23-Jan-11 100 03-Mar-11 01-Feb-11 100 19-May-11 26-May-11 100 26-May-11 05-Jun-11 100 12-Jun-11 05-Jun-11 100 03-Aug-11 13-Aug-11 50 18-Mar-12 13-Aug-11 65 24-May-12 13-Aug-11 11 20-Jul-12 13-Aug-11 27-Jul-12 13-Aug-11 03-Aug-12 15-Aug-12 10-Aug-12 22-Aug-12 17-Sep-12 29-Sep-12 17-Oct-12 29-Oct-12 01-Nov-12 13-Nov-12 01-Nov-12
SOLAR TURBINES
HB09-P-MUTS-081-1000 CO2 Bottles - Train 2 MECHANICAL ROTATING H-XM-081201-11 SF0013 INTERNATIONAL COMPANY FCA SELLER'S WORK, USA 04-Jun-12 10-Feb-11 23-Jan-11 100 03-Mar-11 01-Feb-11 100 19-May-11 26-May-11 100 26-May-11 05-Jun-11 100 12-Jun-11 05-Jun-11 100 03-Aug-11 13-Aug-11 50 18-Mar-12 13-Aug-11 65 24-May-12 13-Aug-11 11 20-Jul-12 13-Aug-11 27-Jul-12 13-Aug-11 03-Aug-12 15-Aug-12 10-Aug-12 22-Aug-12 17-Sep-12 29-Sep-12 17-Oct-12 29-Oct-12 01-Nov-12 13-Nov-12 01-Nov-12
SOLAR TURBINES
HB09-P-MUTS-081-1000 Lube Oil Cooler - Train 2 MECHANICAL ROTATING H-XM-081201-12 SF0013 INTERNATIONAL COMPANY FCA SELLER'S WORK, USA 04-Jun-12 10-Feb-11 23-Jan-11 100 03-Mar-11 01-Feb-11 100 19-May-11 26-May-11 100 26-May-11 05-Jun-11 100 12-Jun-11 05-Jun-11 100 03-Aug-11 13-Aug-11 50 18-Mar-12 13-Aug-11 65 24-May-12 13-Aug-11 11 20-Jul-12 13-Aug-11 27-Jul-12 13-Aug-11 03-Aug-12 15-Aug-12 10-Aug-12 22-Aug-12 17-Sep-12 29-Sep-12 17-Oct-12 29-Oct-12 01-Nov-12 13-Nov-12 01-Nov-12
HU00-P-MJTS-000-1000 Mobile Pump MECHANICAL ROTATING H-PF-054004 16-May-11 28-Oct-11 15-Jun-11 23-Nov-11 23-Jul-11 21-Dec-11 30-Jul-11 28-Dec-11 13-Sep-11 11-Feb-12 28-Oct-11 27-Mar-12 22-Nov-11 21-Apr-12 21-Jan-12 20-Jun-12 06-Mar-12 04-Aug-12 13-Mar-12 11-Aug-12 20-Mar-12 18-Aug-12 27-Mar-12 25-Aug-12 04-May-12 02-Oct-12 03-Jun-12 01-Nov-12 18-Jun-12 16-Nov-12 18-Jun-12
HU00-P-MJTS-000-1000 Pneumatic Pump MECHANICAL ROTATING H-PF-054003 16-May-11 28-Oct-11 15-Jun-11 23-Nov-11 23-Jul-11 21-Dec-11 30-Jul-11 28-Dec-11 13-Sep-11 11-Feb-12 28-Oct-11 27-Mar-12 22-Nov-11 21-Apr-12 21-Jan-12 20-Jun-12 06-Mar-12 04-Aug-12 13-Mar-12 11-Aug-12 20-Mar-12 18-Aug-12 27-Mar-12 25-Aug-12 04-May-12 02-Oct-12 03-Jun-12 01-Nov-12 18-Jun-12 16-Nov-12 18-Jun-12
HU00-P-MJTS-000-1000 Pneumatic Pump MECHANICAL ROTATING K-PF-054302 16-May-11 28-Oct-11 15-Jun-11 23-Nov-11 23-Jul-11 21-Dec-11 30-Jul-11 28-Dec-11 13-Sep-11 11-Feb-12 28-Oct-11 27-Mar-12 22-Nov-11 21-Apr-12 21-Jan-12 20-Jun-12 06-Mar-12 04-Aug-12 13-Mar-12 11-Aug-12 20-Mar-12 18-Aug-12 27-Mar-12 25-Aug-12 04-May-12 02-Oct-12 03-Jun-12 01-Nov-12 18-Jun-12 16-Nov-12 18-Jun-12
JB00-P-MUTS-023-1000 Compressor Revamp (KRECHBA) MECHANICAL ROTATING J-XT-023150 25-Mar-11 04-Apr-11 100 27-Jun-11 09-Jun-11 100 27-Jul-11 24-May-12 03-Aug-11 31-May-12 17-Sep-11 15-Jul-12 01-Nov-11 12-Nov-12 05-Dec-12 08-Sep-13 03-Feb-13 07-Nov-13 04-Apr-13 20-Feb-14 11-Apr-13 27-Feb-14 18-Apr-13 06-Mar-14 25-Apr-13 13-Mar-14 02-Jun-13 20-Apr-14 02-Jul-13 20-May-14 17-Jul-13 04-Jun-14 17-Jul-13
UB00-P-MLTS-101-1000 Pump Station Package MECHANICAL ROTATING H-XF-101002 15-Apr-11 02-May-11 100 24-Jun-11 24-Jul-11 100 24-Jul-11 23-Nov-11 31-Jul-11 30-Nov-11 14-Sep-11 14-Jan-12 29-Oct-11 13-Feb-12 24-Nov-11 05-Mar-12 23-Jan-12 26-Mar-12 08-Mar-12 02-May-12 15-Mar-12 09-May-12 19-Mar-12 16-May-12 26-Mar-12 23-May-12 03-May-12 30-Jun-12 02-Jun-12 30-Jul-12 17-Jun-12 14-Aug-12 17-Jun-12
UB00-P-MLTS-101-1000 Pump Station Package MECHANICAL ROTATING K-XF-101XXX 15-Apr-11 02-May-11 100 24-Jun-11 24-Jul-11 100 24-Jul-11 23-Nov-11 31-Jul-11 30-Nov-11 14-Sep-11 14-Jan-12 29-Oct-11 13-Feb-12 24-Nov-11 05-Mar-12 23-Jan-12 26-Mar-12 08-Mar-12 02-May-12 15-Mar-12 09-May-12 19-Mar-12 16-May-12 26-Mar-12 23-May-12 03-May-12 30-Jun-12 02-Jun-12 30-Jul-12 17-Jun-12 14-Aug-12 17-Jun-12
UB00-P-MUTS-023-1000 Compressor Revamp-TEG Train-1 MECHANICAL ROTATING L-XT-023150 SF0001 NUOVO PIGNONE SPA FOB ITALIAN PORT BASIS 30-Apr-13 17-Feb-11 01-Feb-11 100 03-Mar-11 01-Feb-11 100 24-Mar-11 17-May-11 100 17-Jun-11 14-Jul-11 100 01-Aug-11 14-Jul-11 100 15-Sep-11 07-Nov-11 5 20-Oct-12 09-Apr-13 4 19-Dec-12 26-Jun-13 17-Feb-13 12-Sep-13 24-Feb-13 21-Sep-13 03-Mar-13 30-Sep-13 10-Mar-13 07-Oct-13 17-Apr-13 14-Nov-13 17-May-13 14-Dec-13 01-Jun-13 29-Dec-13 01-Jun-13
UB00-P-MUTS-023-1000 Compressor Revamp-REG Train-1 MECHANICAL ROTATING K-XT-023150 SF0001 NUOVO PIGNONE SPA FOB ITALIAN PORT BASIS 30-Apr-13 17-Feb-11 01-Feb-11 100 03-Mar-11 01-Feb-11 100 24-Mar-11 17-May-11 100 17-Jun-11 14-Jul-11 100 01-Aug-11 14-Jul-11 100 15-Sep-11 07-Nov-11 5 20-Oct-12 09-Apr-13 4 19-Dec-12 26-Jun-13 17-Feb-13 12-Sep-13 24-Feb-13 21-Sep-13 03-Mar-13 30-Sep-13 10-Mar-13 07-Oct-13 17-Apr-13 14-Nov-13 17-May-13 14-Dec-13 01-Jun-13 29-Dec-13 01-Jun-13
UB00-P-MUTS-023-1000 Compressor Revamp-REG Train-2 MECHANICAL ROTATING K-XT-023250 SF0001 NUOVO PIGNONE SPA FOB ITALIAN PORT BASIS 30-Apr-13 17-Feb-11 01-Feb-11 100 03-Mar-11 01-Feb-11 100 24-Mar-11 17-May-11 100 17-Jun-11 14-Jul-11 100 01-Aug-11 14-Jul-11 100 15-Sep-11 07-Nov-11 5 20-Oct-12 09-Apr-13 4 19-Dec-12 26-Jun-13 17-Feb-13 12-Sep-13 24-Feb-13 21-Sep-13 03-Mar-13 30-Sep-13 10-Mar-13 07-Oct-13 17-Apr-13 14-Nov-13 17-May-13 14-Dec-13 01-Jun-13 29-Dec-13 01-Jun-13
UB00-P-MUTS-023-1000 Compressor Revamp-TEG Train-2 MECHANICAL ROTATING L-XT-023250 SF0001 NUOVO PIGNONE SPA FOB ITALIAN PORT BASIS 30-Apr-13 17-Feb-11 01-Feb-11 100 03-Mar-11 01-Feb-11 100 24-Mar-11 17-May-11 100 17-Jun-11 14-Jul-11 100 01-Aug-11 14-Jul-11 100 15-Sep-11 07-Nov-11 5 20-Oct-12 09-Apr-13 4 19-Dec-12 26-Jun-13 17-Feb-13 12-Sep-13 24-Feb-13 21-Sep-13 03-Mar-13 30-Sep-13 10-Mar-13 07-Oct-13 17-Apr-13 14-Nov-13 17-May-13 14-Dec-13 01-Jun-13 29-Dec-13 01-Jun-13
UF00-P-MJTS-091-2001 Overhead Travelling Cranes & Monorails MECHANICAL ROTATING H-XX-XXXXX 30-Jun-11 28-Oct-11 30-Jul-11 27-Nov-11 06-Sep-11 08-Jan-12 13-Sep-11 15-Jan-12 28-Oct-11 29-Feb-12 12-Dec-11 14-Apr-12 06-Jan-12 09-May-12 06-Mar-12 08-Jul-12 20-Apr-12 22-Aug-12 27-Apr-12 29-Aug-12 05-May-12 06-Sep-12 12-May-12 13-Sep-12 19-Jun-12 21-Oct-12 19-Jul-12 20-Nov-12 03-Aug-12 05-Dec-12 03-Aug-12
Military Camp Waste Water Treatment
UF00-P-MJTS-101-2001 Package MECHANICAL ROTATING H-XF-101005 15-Apr-11 28-Oct-11 15-May-11 27-Nov-11 30-Jun-11 08-Jan-12 07-Jul-11 15-Jan-12 21-Aug-11 29-Feb-12 05-Oct-11 14-Apr-12 14-Nov-11 24-May-12 13-Jan-12 23-Jul-12 12-Apr-12 21-Oct-12 19-Apr-12 28-Oct-12 21-Apr-12 30-Oct-12 28-Apr-12 06-Nov-12 05-Jun-12 14-Dec-12 05-Jul-12 13-Jan-13 20-Jul-12 28-Jan-13 20-Jul-12
UF00-P-MJTS-101-2001 BdV Waste Water Treatment Package MECHANICAL ROTATING H-XF-101004 15-Apr-11 28-Oct-11 15-May-11 27-Nov-11 30-Jun-11 08-Jan-12 07-Jul-11 15-Jan-12 21-Aug-11 29-Feb-12 05-Oct-11 14-Apr-12 14-Nov-11 24-May-12 13-Jan-12 23-Jul-12 12-Apr-12 21-Oct-12 19-Apr-12 28-Oct-12 21-Apr-12 30-Oct-12 28-Apr-12 06-Nov-12 05-Jun-12 14-Dec-12 05-Jul-12 13-Jan-13 20-Jul-12 28-Jan-13 20-Jul-12
UF00-P-MJTS-101-2002 Waste Water Pump Package MECHANICAL ROTATING H-XF-101007 15-Apr-11 20-Nov-11 24-Jun-11 11-Dec-11 24-Jul-11 08-Jan-12 31-Jul-11 15-Jan-12 14-Sep-11 29-Feb-12 29-Oct-11 14-Apr-12 24-Nov-11 10-May-12 23-Jan-12 09-Jul-12 08-Mar-12 23-Aug-12 15-Mar-12 30-Aug-12 19-Mar-12 03-Sep-12 26-Mar-12 10-Sep-12 03-May-12 18-Oct-12 02-Jun-12 17-Nov-12 17-Jun-12 02-Dec-12 17-Jun-12
UF00-P-MJTS-101-2002 Waste Water Pump Package MECHANICAL ROTATING H-XF-101006 15-Apr-11 20-Nov-11 24-Jun-11 11-Dec-11 24-Jul-11 08-Jan-12 31-Jul-11 15-Jan-12 14-Sep-11 29-Feb-12 29-Oct-11 14-Apr-12 24-Nov-11 10-May-12 23-Jan-12 09-Jul-12 08-Mar-12 23-Aug-12 15-Mar-12 30-Aug-12 19-Mar-12 03-Sep-12 26-Mar-12 10-Sep-12 03-May-12 18-Oct-12 02-Jun-12 17-Nov-12 17-Jun-12 02-Dec-12 17-Jun-12
UF00-P-MJTS-101-2002 Waste Water Pump Package MECHANICAL ROTATING H-XF-101008 15-Apr-11 20-Nov-11 24-Jun-11 11-Dec-11 24-Jul-11 08-Jan-12 31-Jul-11 15-Jan-12 14-Sep-11 29-Feb-12 29-Oct-11 14-Apr-12 24-Nov-11 10-May-12 23-Jan-12 09-Jul-12 08-Mar-12 23-Aug-12 15-Mar-12 30-Aug-12 19-Mar-12 03-Sep-12 26-Mar-12 10-Sep-12 03-May-12 18-Oct-12 02-Jun-12 17-Nov-12 17-Jun-12 02-Dec-12 17-Jun-12
UF00-P-MJTS-101-2002 Waste Water Pump Package MECHANICAL ROTATING H-XF-101009 15-Apr-11 20-Nov-11 24-Jun-11 11-Dec-11 24-Jul-11 08-Jan-12 31-Jul-11 15-Jan-12 14-Sep-11 29-Feb-12 29-Oct-11 14-Apr-12 24-Nov-11 10-May-12 23-Jan-12 09-Jul-12 08-Mar-12 23-Aug-12 15-Mar-12 30-Aug-12 19-Mar-12 03-Sep-12 26-Mar-12 10-Sep-12 03-May-12 18-Oct-12 02-Jun-12 17-Nov-12 17-Jun-12 02-Dec-12 17-Jun-12
UF00-P-MJTS-109-2001 Fresh Water Package MECHANICAL ROTATING H-XX-109001 07-Mar-11 28-Oct-11 06-Apr-11 27-Nov-11 21-Jun-11 08-Jan-12 28-Jun-11 15-Jan-12 12-Aug-11 29-Feb-12 26-Sep-11 14-Apr-12 04-Nov-11 23-May-12 03-Jan-12 22-Jul-12 02-Apr-12 20-Oct-12 09-Apr-12 27-Oct-12 10-Apr-12 28-Oct-12 17-Apr-12 04-Nov-12 25-May-12 12-Dec-12 24-Jun-12 11-Jan-13 09-Jul-12 26-Jan-13 09-Jul-12
UF00-P-MJTS-109-2001 Fresh Water Package MECHANICAL ROTATING H-XX-109002 07-Mar-11 28-Oct-11 06-Apr-11 27-Nov-11 21-Jun-11 08-Jan-12 28-Jun-11 15-Jan-12 12-Aug-11 29-Feb-12 26-Sep-11 14-Apr-12 04-Nov-11 23-May-12 03-Jan-12 22-Jul-12 02-Apr-12 20-Oct-12 09-Apr-12 27-Oct-12 10-Apr-12 28-Oct-12 17-Apr-12 04-Nov-12 25-May-12 12-Dec-12 24-Jun-12 11-Jan-13 09-Jul-12 26-Jan-13 09-Jul-12
UU00-P-SSTS-097-1004 Chilled Water Line Ancillary Equipment HVAC UU00-P-SSTS-097-1004-110 20-Mar-11 28-Oct-11 19-Apr-11 27-Nov-11 22-May-11 08-Jan-12 29-May-11 15-Jan-12 13-Jul-11 29-Feb-12 03-Dec-11 21-Jul-12 10-Dec-11 28-Jul-12 17-Dec-11 04-Aug-12 24-Dec-11 11-Aug-12 31-Jan-12 18-Sep-12 01-Mar-12 18-Oct-12 16-Mar-12 02-Nov-12 16-Mar-12
UU00-P-SSTS-097-1005 Consumables HVAC UU00-P-SSTS-097-1005-111 16-May-11 28-Oct-11 15-Jun-11 27-Nov-11 23-Jul-11 08-Jan-12 30-Jul-11 15-Jan-12 13-Oct-11 30-Mar-12 08-Nov-11 25-Apr-12 15-Nov-11 02-May-12 22-Nov-11 09-May-12 29-Nov-11 16-May-12 06-Jan-12 23-Jun-12 05-Feb-12 23-Jul-12 20-Feb-12 07-Aug-12 20-Feb-12
UU00-P-LMTS-000-1000 CS & LTCS Pipes (Seamless) PIPING LOT : 001 SF0020 GERAB NATIONAL ENTERPRISES FCA SELLER'S WORKS, JEBEL ALI 30-Jun-11 31-Jan-11 09-Feb-11 100 02-Mar-11 10-Mar-11 100 25-Mar-11 05-May-11 100 01-Apr-11 12-May-11 100 16-May-11 12-May-11 100 08-Sep-11 28-Jul-11 100.00 15-Sep-11 28-Jul-11 100.00 22-Sep-11 08-Aug-11 100.00 29-Sep-11 22-Aug-11 100.00 06-Nov-11 17-Sep-11 100.00 06-Dec-11 04-Oct-11 100.00 21-Dec-11 08-Oct-11 100.00 21-Dec-11
UU00-P-LMTS-000-1000 CS & LTCS Pipes (Seamless) PIPING LOT : 002 SF0020 GERAB NATIONAL ENTERPRISES FCA SELLER'S WORKS, JEBEL ALI 17-Oct-11 31-Jan-11 09-Feb-11 100 02-Mar-11 10-Mar-11 100 25-Mar-11 05-May-11 100 01-Apr-11 12-May-11 100 16-May-11 12-May-11 100 08-Sep-11 14-Nov-11 25.36 15-Sep-11 22-Nov-11 22-Sep-11 30-Nov-11 29-Sep-11 07-Dec-11 06-Nov-11 14-Jan-12 06-Dec-11 13-Feb-12 21-Dec-11 28-Feb-12 21-Dec-11
UU00-P-LMTS-000-1000 CS & LTCS Pipes (Seamless) PIPING LOT : 003 SF0020 GERAB NATIONAL ENTERPRISES FCA SELLER'S WORKS, JEBEL ALI 31-Aug-11 31-Jan-11 09-Feb-11 100 02-Mar-11 10-Mar-11 100 25-Mar-11 05-May-11 100 01-Apr-11 12-May-11 100 16-May-11 12-May-11 100 08-Sep-11 28-Sep-11 100.00 15-Sep-11 28-Sep-11 100.00 22-Sep-11 10-Oct-11 100.00 29-Sep-11 24-Oct-11 06-Nov-11 24-Nov-11 06-Dec-11 25-Nov-11 21-Dec-11 25-Nov-11 21-Dec-11
UU00-P-LMTS-000-1000 CS & LTCS Pipes (Seamless) PIPING LOT : 004 SF0020 GERAB NATIONAL ENTERPRISES FCA SELLER'S WORKS, JEBEL ALI 31-Aug-11 31-Jan-11 09-Feb-11 100 02-Mar-11 10-Mar-11 100 25-Mar-11 05-May-11 100 01-Apr-11 12-May-11 100 16-May-11 12-May-11 100 08-Sep-11 20-Oct-11 100.00 15-Sep-11 20-Oct-11 100.00 22-Sep-11 27-Oct-11 100.00 29-Sep-11 27-Oct-11 06-Nov-11 27-Oct-11 06-Dec-11 27-Oct-11 21-Dec-11 27-Oct-11 21-Dec-11
UU00-P-LMTS-000-1000 CS & LTCS Pipes (Seamless) - TOP UP-2 PIPING UU00-P-LMTS-000-1000-142-14 FCA SELLER'S WORKS, JEBEL ALI 03-Oct-11 13-Apr-12 20-Apr-12 27-Apr-12 04-May-12 11-Jun-12 11-Jul-12 26-Jul-12 26-Jul-12
UU00-P-LMTS-000-1000 CS & LTCS Pipes (Seamless) PIPING LOT : 005 SF0020 GERAB NATIONAL ENTERPRISES FCA SELLER'S WORKS, JEBEL ALI 31-Jan-12 31-Jan-11 09-Feb-11 100 02-Mar-11 10-Mar-11 100 25-Mar-11 05-May-11 100 01-Apr-11 12-May-11 100 16-May-11 12-May-11 100 08-Sep-11 14-Nov-11 0.07 15-Sep-11 14-Nov-11 22-Sep-11 30-Nov-11 29-Sep-11 30-Nov-11 06-Nov-11 30-Nov-11 06-Dec-11 30-Nov-11 21-Dec-11 30-Nov-11 21-Dec-11
UU00-P-LMTS-000-1000 CS & LTCS Pipes (Seamless) PIPING LOT : 006 SF0020 GERAB NATIONAL ENTERPRISES FCA SELLER'S WORKS, JEBEL ALI 30-Nov-11 31-Jan-11 09-Feb-11 100 02-Mar-11 10-Mar-11 100 25-Mar-11 05-May-11 100 01-Apr-11 12-May-11 100 16-May-11 12-May-11 100 08-Sep-11 28-Sep-11 100.00 15-Sep-11 28-Sep-11 100.00 22-Sep-11 10-Oct-11 100.00 29-Sep-11 24-Oct-11 06-Nov-11 24-Nov-11 06-Dec-11 25-Nov-11 21-Dec-11 25-Nov-11 21-Dec-11
UU00-P-LMTS-000-1000 CS & LTCS Pipes (Seamless) - TOP UP-1 PIPING LOT : 007 SF0076 GERAB NATIONAL ENTERPRISES FCA SELLER'S WORKS, JEBEL ALI 31-Jan-12 14-Sep-11 100 14-Sep-11 100 14-Sep-11 100 14-Sep-11 100 03-Oct-11 14-Sep-11 100 13-Apr-12 14-Sep-11 5.00 20-Apr-12 14-Sep-11 27-Apr-12 31-Jan-12 04-May-12 31-Jan-12 11-Jun-12 31-Jan-12 11-Jul-12 31-Jan-12 26-Jul-12 31-Jan-12 26-Jul-12
UU00-P-LMTS-000-1000 CS & LTCS Pipes (Seamless) - TOP UP-1 PIPING LOT : 008 SF0076 GERAB NATIONAL ENTERPRISES FCA SELLER'S WORKS, JEBEL ALI 28-Sep-11 14-Sep-11 100 14-Sep-11 100 14-Sep-11 100 14-Sep-11 100 03-Oct-11 14-Sep-11 100 13-Apr-12 28-Sep-11 100.00 20-Apr-12 28-Sep-11 100.00 27-Apr-12 11-Oct-11 100.00 04-May-12 24-Oct-11 11-Jun-12 24-Nov-11 11-Jul-12 25-Nov-11 26-Jul-12 25-Nov-11 26-Jul-12
UU00-P-LMTS-000-1000 CS & LTCS Pipes (Seamless) - TOP UP-1 PIPING LOT : 009 SF0076 GERAB NATIONAL ENTERPRISES FCA SELLER'S WORKS, JEBEL ALI 28-Sep-11 14-Sep-11 100 14-Sep-11 100 14-Sep-11 100 14-Sep-11 100 03-Oct-11 14-Sep-11 100 13-Apr-12 14-Sep-11 5.00 20-Apr-12 14-Sep-11 27-Apr-12 28-Sep-11 04-May-12 28-Sep-11 11-Jun-12 28-Sep-11 11-Jul-12 28-Sep-11 26-Jul-12 28-Sep-11 26-Jul-12
UU00-P-LMTS-000-1000 CS & LTCS Pipes (Seamless) - TOP UP-1 PIPING LOT : 010 SF0076 GERAB NATIONAL ENTERPRISES FCA SELLER'S WORKS, JEBEL ALI 31-Dec-11 14-Sep-11 100 14-Sep-11 100 14-Sep-11 100 14-Sep-11 100 03-Oct-11 14-Sep-11 100 13-Apr-12 14-Sep-11 5.00 20-Apr-12 14-Sep-11 27-Apr-12 31-Dec-11 04-May-12 31-Dec-11 11-Jun-12 31-Dec-11 11-Jul-12 31-Dec-11 26-Jul-12 31-Dec-11 26-Jul-12
FOB PUSAN / MASAN / KWANGYANG,
UU00-P-LMTS-000-1001 CS & LTCS Pipes (Welded) - TOP UP PIPING UU00-P-LMTS-000-1001-143 KOREA 03-Oct-11 03-Oct-11 13-Apr-12 13-Apr-12 20-Apr-12 20-Apr-12 27-Apr-12 27-Apr-12 04-May-12 04-May-12 11-Jun-12 11-Jun-12 11-Jul-12 11-Jul-12 26-Jul-12 26-Jul-12 26-Jul-12
ERNDTEBRÜCKER EISENWERK FOB PUSAN / MASAN / KWANGYANG,
UU00-P-LMTS-000-1001 CS & LTCS Pipes (Welded) - Lot-1 PIPING LOT : 001 SF0036 GMBH & CO. KG KOREA 26-Oct-11 14-Feb-11 09-Feb-11 100 16-Mar-11 10-Mar-11 100 08-Apr-11 19-May-11 100 15-Apr-11 22-Jun-11 100 30-May-11 22-Jun-11 100 23-Sep-11 15-Dec-11 35.00 30-Sep-11 23-Dec-11 07-Oct-11 30-Dec-11 14-Oct-11 06-Jan-12 21-Nov-11 13-Feb-12 21-Dec-11 14-Mar-12 05-Jan-12 29-Mar-12 05-Jan-12
ERNDTEBRÜCKER EISENWERK FOB PUSAN / MASAN / KWANGYANG,
UU00-P-LMTS-000-1001 CS & LTCS Pipes (Welded) - Lot-2 PIPING LOT : 002 SF0036 GMBH & CO. KG KOREA 16-Feb-12 14-Feb-11 09-Feb-11 100 16-Mar-11 10-Mar-11 100 08-Apr-11 19-May-11 100 15-Apr-11 22-Jun-11 100 30-May-11 22-Jun-11 100 23-Sep-11 28-Jan-12 15.00 30-Sep-11 28-Jan-12 07-Oct-11 16-Feb-12 14-Oct-11 16-Feb-12 21-Nov-11 16-Feb-12 21-Dec-11 16-Feb-12 05-Jan-12 16-Feb-12 05-Jan-12
ERNDTEBRÜCKER EISENWERK FOB PUSAN / MASAN / KWANGYANG,
UU00-P-LMTS-000-1001 CS & LTCS Pipes (Welded) - Lot-2 PIPING LOT : 003 SF0036 GMBH & CO. KG KOREA 16-Feb-12 14-Feb-11 09-Feb-11 100 16-Mar-11 10-Mar-11 100 08-Apr-11 19-May-11 100 15-Apr-11 22-Jun-11 100 30-May-11 22-Jun-11 100 23-Sep-11 28-Jan-12 25.00 30-Sep-11 28-Jan-12 07-Oct-11 16-Feb-12 14-Oct-11 16-Feb-12 21-Nov-11 16-Feb-12 21-Dec-11 16-Feb-12 05-Jan-12 16-Feb-12 05-Jan-12
UU00-P-LMTS-000-1003 SS Pipes (Seamless) - TOP UP PIPING UU00-P-LMTS-000-1003-145 FOB ANTWERP PORT 03-Oct-11 03-Oct-11 13-Apr-12 13-Apr-12 20-Apr-12 20-Apr-12 27-Apr-12 27-Apr-12 04-May-12 04-May-12 11-Jun-12 11-Jun-12 11-Jul-12 11-Jul-12 26-Jul-12 26-Jul-12 26-Jul-12
SALZGITTER MANNESMANN
UU00-P-LMTS-000-1003 SS Pipes (Seamless) PIPING LOT : 001 SF0019 STAINLESS TUBES FRANCE SAS FOB ANTWERP PORT 30-Sep-11 14-Feb-11 01-Mar-11 100 07-Mar-11 20-Mar-11 100 08-Apr-11 12-May-11 100 25-May-11 12-May-11 100 09-Jul-11 12-May-11 100 23-Oct-11 10-Dec-11 70.00 30-Oct-11 20-Dec-11 06-Nov-11 30-Dec-11 13-Nov-11 06-Jan-12 21-Dec-11 13-Feb-12 20-Jan-12 14-Mar-12 04-Feb-12 29-Mar-12 04-Feb-12
SALZGITTER MANNESMANN
UU00-P-LMTS-000-1003 SS Pipes (Seamless) PIPING LOT : 002 SF0067 STAINLESS TUBES FRANCE SAS FOB ANTWERP PORT 11-Dec-11 14-Feb-11 01-Mar-11 100 07-Mar-11 20-Mar-11 100 08-Apr-11 12-May-11 100 25-May-11 12-May-11 100 09-Jul-11 12-May-11 100 23-Oct-11 10-Dec-11 25.00 30-Oct-11 20-Dec-11 06-Nov-11 30-Dec-11 13-Nov-11 06-Jan-12 21-Dec-11 13-Feb-12 20-Jan-12 14-Mar-12 04-Feb-12 29-Mar-12 04-Feb-12
SALZGITTER MANNESMANN
UU00-P-LMTS-000-1003 SS Pipes (Seamless) PIPING LOT : 004 SF0019 STAINLESS TUBES FRANCE SAS FOB ANTWERP PORT 30-Sep-11 14-Feb-11 01-Mar-11 100 07-Mar-11 20-Mar-11 100 08-Apr-11 12-May-11 100 25-May-11 12-May-11 100 09-Jul-11 12-May-11 100 23-Oct-11 04-Oct-11 100.00 30-Oct-11 26-Sep-11 100.00 06-Nov-11 17-Oct-11 100.00 13-Nov-11 17-Oct-11 21-Dec-11 17-Oct-11 20-Jan-12 17-Oct-11 04-Feb-12 17-Oct-11 04-Feb-12
SALZGITTER MANNESMANN
UU00-P-LMTS-000-1003 SS Pipes (Seamless) PIPING LOT : 003 SF0019 STAINLESS TUBES FRANCE SAS FOB ANTWERP PORT 30-Sep-11 14-Feb-11 01-Mar-11 100 07-Mar-11 20-Mar-11 100 08-Apr-11 12-May-11 100 25-May-11 12-May-11 100 09-Jul-11 12-May-11 100 23-Oct-11 09-Oct-11 100.00 30-Oct-11 11-Oct-11 100.00 06-Nov-11 23-Oct-11 100.00 13-Nov-11 23-Oct-11 21-Dec-11 23-Oct-11 20-Jan-12 23-Oct-11 04-Feb-12 23-Oct-11 04-Feb-12
UU00-P-LMTS-000-1004 SS Pipes (Welded) PIPING LOT : 001 SF0049 BSL PIPES & FITTINGS FOB VENICE SEAPORT, ITALY 20-Dec-11 14-Feb-11 01-Mar-11 100 07-Mar-11 16-Mar-11 100 08-Apr-11 01-May-11 100 15-Apr-11 12-Jul-11 100 30-May-11 12-Jul-11 100 23-Sep-11 05-Jan-12 42.00 30-Sep-11 13-Jan-12 07-Oct-11 20-Jan-12 14-Oct-11 27-Jan-12 21-Nov-11 05-Mar-12 21-Dec-11 04-Apr-12 05-Jan-12 19-Apr-12 05-Jan-12
UU00-P-LMTS-000-1004 SS Pipes (Welded) - TOP UP-3 PIPING UU00-P-LMTS-000-1004-146-4-5 FOB VENICE SEAPORT, ITALY 03-Oct-11 13-Apr-12 20-Apr-12 27-Apr-12 04-May-12 11-Jun-12 11-Jul-12 26-Jul-12 26-Jul-12
UU00-P-LMTS-000-1004 SS Pipes (Welded) - TOP UP-1 PIPING LOT : 002 SF0062 BSL PIPES & FITTINGS FOB VENICE SEAPORT, ITALY 25-Dec-11 14-Aug-11 100 14-Aug-11 100 14-Aug-11 100 14-Aug-11 100 03-Oct-11 14-Aug-11 100 13-Apr-12 14-Aug-11 7.00 20-Apr-12 14-Aug-11 27-Apr-12 25-Dec-11 04-May-12 25-Dec-11 11-Jun-12 25-Dec-11 11-Jul-12 25-Dec-11 26-Jul-12 25-Dec-11 26-Jul-12
UU00-P-LMTS-000-1004 SS Pipes (Welded) - TOP UP-1 PIPING LOT : 003 SF0062 BSL PIPES & FITTINGS FOB VENICE SEAPORT, ITALY 02-Jan-12 14-Aug-11 100 14-Aug-11 100 14-Aug-11 100 14-Aug-11 100 03-Oct-11 14-Aug-11 100 13-Apr-12 14-Aug-11 7.00 20-Apr-12 14-Aug-11 27-Apr-12 02-Jan-12 04-May-12 02-Jan-12 11-Jun-12 02-Jan-12 11-Jul-12 02-Jan-12 26-Jul-12 02-Jan-12 26-Jul-12
UU00-P-LMTS-000-1004 SS Pipes (Welded) - TOP UP-2 PIPING LOT : 004 SF0075 SOSTA BV FOB VENICE SEAPORT, ITALY 10-Jan-12 13-Sep-11 100 13-Sep-11 100 13-Sep-11 100 13-Sep-11 100 03-Oct-11 13-Sep-11 100 13-Apr-12 13-Sep-11 3.00 20-Apr-12 13-Sep-11 27-Apr-12 10-Jan-12 04-May-12 10-Jan-12 11-Jun-12 10-Jan-12 11-Jul-12 10-Jan-12 26-Jul-12 10-Jan-12 26-Jul-12
UU00-P-LMTS-000-1005 DSS Pipes - (Seamless) TOP UP-2 PIPING UU00-P-LMTS-000-1005-147 FOB HAMBURG, GERMANY. 03-Oct-11 03-Oct-11 13-Apr-12 13-Apr-12 20-Apr-12 20-Apr-12 27-Apr-12 27-Apr-12 04-May-12 04-May-12 11-Jun-12 11-Jun-12 11-Jul-12 11-Jul-12 26-Jul-12 26-Jul-12 26-Jul-12
SALZGITTER MANNESMANN
UU00-P-LMTS-000-1005 DSS Pipes (Seamless) PIPING LOT : 001 SF0017 STAINLESS TUBES FRANCE SAS FOB HAMBURG, GERMANY. 23-Oct-11 14-Feb-11 21-Feb-11 100 07-Mar-11 16-Mar-11 100 08-Apr-11 05-May-11 100 15-Apr-11 12-May-11 100 30-May-11 12-May-11 100 23-Sep-11 11-Dec-11 75.00 30-Sep-11 20-Dec-11 07-Oct-11 30-Dec-11 14-Oct-11 06-Jan-12 21-Nov-11 13-Feb-12 21-Dec-11 14-Mar-12 05-Jan-12 29-Mar-12 05-Jan-12
UU00-P-LMTS-000-1005 DSS Pipes (Welded) PIPING LOT : 002 SF0023 H. BUTTING GMBH & CO. KG FOB HAMBURG, GERMANY. 27-Oct-11 14-Feb-11 21-Feb-11 100 07-Mar-11 16-Mar-11 100 08-Apr-11 05-May-11 100 15-Apr-11 12-May-11 100 30-May-11 12-May-11 100 23-Sep-11 11-Dec-11 82.00 30-Sep-11 20-Dec-11 07-Oct-11 30-Dec-11 14-Oct-11 06-Jan-12 21-Nov-11 13-Feb-12 21-Dec-11 14-Mar-12 05-Jan-12 29-Mar-12 05-Jan-12
SALZGITTER MANNESMANN
UU00-P-LMTS-000-1005 DSS Pipes (Seamless) PIPING LOT : 003 SF0017 STAINLESS TUBES FRANCE SAS FOB HAMBURG, GERMANY. 23-Oct-11 14-Feb-11 21-Feb-11 100 07-Mar-11 16-Mar-11 100 08-Apr-11 05-May-11 100 15-Apr-11 12-May-11 100 30-May-11 12-May-11 100 23-Sep-11 29-Sep-11 100.00 30-Sep-11 29-Sep-11 100.00 07-Oct-11 11-Oct-11 100.00 14-Oct-11 11-Oct-11 21-Nov-11 11-Oct-11 21-Dec-11 11-Oct-11 05-Jan-12 11-Oct-11 05-Jan-12
SALZGITTER MANNESMANN
UU00-P-LMTS-000-1005 DSS Pipes (Seamless) PIPING LOT : 004 SF0017 STAINLESS TUBES FRANCE SAS FOB HAMBURG, GERMANY. 25-Sep-11 14-Feb-11 21-Feb-11 100 07-Mar-11 16-Mar-11 100 08-Apr-11 05-May-11 100 15-Apr-11 12-May-11 100 30-May-11 12-May-11 100 23-Sep-11 19-Oct-11 100.00 30-Sep-11 19-Oct-11 100.00 07-Oct-11 26-Oct-11 100.00 14-Oct-11 26-Oct-11 21-Nov-11 26-Oct-11 21-Dec-11 26-Oct-11 05-Jan-12 26-Oct-11 05-Jan-12
UU00-P-LMTS-000-1005 DSS Pipes - (Welded) TOP UP PIPING UU00-P-LMTS-000-1005-147-10 FOB HAMBURG, GERMANY. 03-Oct-11 13-Apr-12 20-Apr-12 27-Apr-12 04-May-12 11-Jun-12 11-Jul-12 26-Jul-12 26-Jul-12
UU00-P-LMTS-000-1005 DSS Pipes (Welded) PIPING LOT : 005 SF0023 H. BUTTING GMBH & CO. KG FOB HAMBURG, GERMANY. 22-Feb-12 14-Feb-11 21-Feb-11 100 07-Mar-11 16-Mar-11 100 08-Apr-11 05-May-11 100 15-Apr-11 12-May-11 100 30-May-11 12-May-11 100 23-Sep-11 11-Dec-11 82.00 30-Sep-11 11-Dec-11 07-Oct-11 30-Dec-11 14-Oct-11 30-Dec-11 21-Nov-11 30-Dec-11 21-Dec-11 30-Dec-11 05-Jan-12 30-Dec-11 05-Jan-12
SALZGITTER MANNESMANN
UU00-P-LMTS-000-1005 DSS Pipes - (Seamless) TOP UP-1 PIPING LOT : 006 SF0063 STAINLESS TUBES FRANCE SAS FOB HAMBURG, GERMANY. 27-Nov-11 17-Aug-11 100 17-Aug-11 100 17-Aug-11 100 17-Aug-11 100 03-Oct-11 17-Aug-11 100 13-Apr-12 17-Aug-11 20.00 20-Apr-12 17-Aug-11 27-Apr-12 27-Nov-11 04-May-12 27-Nov-11 11-Jun-12 27-Nov-11 11-Jul-12 27-Nov-11 26-Jul-12 27-Nov-11 26-Jul-12
UU00-P-LMTS-000-1006 HDPE Pipes, Fittings & Flanges - TOP UP PIPING UU00-P-LMTS-000-1006-223 FOB INTERNATIONAL SEA PORT, UK 03-Oct-11 03-Oct-11 19-Jan-12 19-Jan-12 26-Jan-12 26-Jan-12 02-Feb-12 02-Feb-12 09-Feb-12 09-Feb-12 18-Mar-12 18-Mar-12 17-Apr-12 17-Apr-12 02-May-12 02-May-12 02-May-12
RADIUSENAAT PIPING AND
UU00-P-LMTS-000-1006 HDPE Pipes, Fittings & Flanges PIPING LOT : 001 SF0050 FITTINGS LLC FOB INTERNATIONAL SEA PORT, UK 12-Sep-11 02-Mar-11 25-Apr-11 100 23-Mar-11 16-May-11 100 18-May-11 11-Jul-11 100 25-May-11 18-Jul-11 100 09-Jul-11 18-Jul-11 100 02-Oct-11 09-Jan-12 10.00 09-Oct-11 18-Jan-12 18-Oct-11 30-Jan-12 25-Oct-11 06-Feb-12 02-Dec-11 15-Mar-12 01-Jan-12 14-Apr-12 16-Jan-12 29-Apr-12 16-Jan-12
RADIUSENAAT PIPING AND
UU00-P-LMTS-000-1006 HDPE Pipes, Fittings & Flanges PIPING LOT : 002 SF0050 FITTINGS LLC FOB INTERNATIONAL SEA PORT, UK 10-Oct-11 02-Mar-11 25-Apr-11 100 23-Mar-11 16-May-11 100 18-May-11 11-Jul-11 100 25-May-11 18-Jul-11 100 09-Jul-11 18-Jul-11 100 02-Oct-11 09-Jan-12 10.00 09-Oct-11 09-Jan-12 18-Oct-11 30-Jan-12 25-Oct-11 30-Jan-12 02-Dec-11 30-Jan-12 01-Jan-12 30-Jan-12 16-Jan-12 30-Jan-12 16-Jan-12
Issue Inquiry Requisition Receive Bid TBE Complete Place LOI / LOA Place PO Receive / Approve Key Vendor Drawings / Documents Place Sub-orders Receive Raw Materials Fabrication / Mfg. Inspection Release Note Ex-works Delivery Item on Board Shipping/Air Freight/Land Transport (ATA Port) Custom Clearance and Transport to site/store Visual Inspection on Receipt at Site/Store ROS
Inquiry No. Description Discipline INQD_TAG_NO PO_NO Vendor Name PO Delivery Terms PO_CDD
P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog
UU00-P-LMTS-000-1007 CS & LTCS Fittings (Wrought) - TOP UP PIPING UU00-P-LMTS-000-1007-148 FOB NORTH ITALIAN SEAPORT, ITALY 03-Oct-11 03-Oct-11 13-Apr-12 13-Apr-12 20-Apr-12 20-Apr-12 27-Apr-12 27-Apr-12 04-May-12 04-May-12 11-Jun-12 11-Jun-12 11-Jul-12 11-Jul-12 26-Jul-12 26-Jul-12 26-Jul-12
UU00-P-LMTS-000-1007 CS & LTCS Fittings (Wrought) - 1st Lot PIPING LOT : 001 SF0021 TECTUBI RACCORDI SPA FOB NORTH ITALIAN SEAPORT, ITALY 11-Oct-11 14-Feb-11 09-Feb-11 100 16-Mar-11 09-Mar-11 100 08-Apr-11 01-May-11 100 25-May-11 12-May-11 100 09-Jul-11 12-May-11 100 28-Oct-11 18-Dec-11 76.55 30-Oct-11 21-Dec-11 06-Nov-11 31-Dec-11 13-Nov-11 07-Jan-12 21-Dec-11 14-Feb-12 20-Jan-12 15-Mar-12 04-Feb-12 30-Mar-12 04-Feb-11
UU00-P-LMTS-000-1007 CS & LTCS Fittings (Wrought) - 2nd Lot PIPING LOT : 002 SF0093 TECTUBI RACCORDI SPA FOB NORTH ITALIAN SEAPORT, ITALY 19-Feb-12 14-Feb-11 09-Feb-11 100 16-Mar-11 09-Mar-11 100 08-Apr-11 01-May-11 100 15-Apr-11 16-Oct-11 100 30-May-11 16-Oct-11 100 23-Sep-11 07-Mar-12 30-Sep-11 07-Mar-12 07-Oct-11 19-Mar-12 14-Oct-11 19-Mar-12 21-Nov-11 19-Mar-12 21-Dec-11 19-Mar-12 05-Jan-12 19-Mar-12 05-Jan-12
UU00-P-LMTS-000-1008 DSS Fittings (Wrought) - TOP UP PIPING UU00-P-LMTS-000-1008-149 FOB NORTH ITALIAN SEAPORT, ITALY 03-Oct-11 03-Oct-11 23-Feb-12 23-Feb-12 01-Mar-12 01-Mar-12 08-Mar-12 08-Mar-12 15-Mar-12 15-Mar-12 22-Apr-12 22-Apr-12 22-May-12 22-May-12 06-Jun-12 06-Jun-12 06-Jun-12
UU00-P-LMTS-000-1008 DSS Fittings (Wrought) - 1st Lot PIPING LOT : 001 SF0022 TECTUBI RACCORDI SPA FOB NORTH ITALIAN SEAPORT, ITALY 03-Oct-11 14-Feb-11 22-Feb-11 100 07-Mar-11 16-Mar-11 100 08-Apr-11 05-May-11 100 15-Apr-11 12-May-11 100 30-May-11 12-May-11 100 23-Sep-11 11-Dec-11 65.14 30-Sep-11 11-Dec-11 07-Oct-11 30-Dec-11 14-Oct-11 30-Dec-11 21-Nov-11 30-Dec-11 21-Dec-11 30-Dec-11 05-Jan-12 30-Dec-11 05-Jan-12
UU00-P-LMTS-000-1008 DSS Fittings (Wrought) - 2nd lot PIPING LOT : 002 SF0094 TECTUBI RACCORDI SPA FOB NORTH ITALIAN SEAPORT, ITALY 19-Feb-12 14-Feb-11 22-Feb-11 100 07-Mar-11 16-Mar-11 100 08-Apr-11 05-May-11 100 15-Apr-11 16-Oct-11 100 30-May-11 16-Oct-11 100 23-Sep-11 07-Mar-12 30-Sep-11 07-Mar-12 07-Oct-11 19-Mar-12 14-Oct-11 19-Mar-12 21-Nov-11 19-Mar-12 21-Dec-11 19-Mar-12 05-Jan-12 19-Mar-12 05-Jan-12
UU00-P-LMTS-000-1008 DSS Fittings (Wrought) - 1st Lot PIPING LOT : 003 SF0022 TECTUBI RACCORDI SPA FOB NORTH ITALIAN SEAPORT, ITALY 19-Feb-12 14-Feb-11 22-Feb-11 100 07-Mar-11 16-Mar-11 100 08-Apr-11 05-May-11 100 15-Apr-11 12-May-11 100 30-May-11 12-May-11 100 23-Sep-11 27-Jan-12 30-Sep-11 27-Jan-12 07-Oct-11 19-Feb-12 14-Oct-11 19-Feb-12 21-Nov-11 19-Feb-12 21-Dec-11 19-Feb-12 05-Jan-12 19-Feb-12 05-Jan-12
UU00-P-LMTS-000-1009 All Forged Fittings - TOP UP PIPING UU00-P-LMTS-000-1009-150 FOB GENOA, ITALY 03-Oct-11 03-Oct-11 23-May-12 23-May-12 30-May-12 30-May-12 06-Jun-12 06-Jun-12 13-Jun-12 13-Jun-12 21-Jul-12 21-Jul-12 20-Aug-12 20-Aug-12 04-Sep-12 04-Sep-12 04-Sep-12
UU00-P-LMTS-000-1009 All Forged Fittings - 2nd Lot PIPING UU00-P-LMTS-000-1009-120-3 FOB GENOA, ITALY 14-Feb-11 27-Feb-11 100 07-Mar-11 22-Mar-11 100 08-Apr-11 16-May-11 100 15-Apr-11 05-Nov-11 30-May-11 20-Dec-11 22-Nov-11 05-Jun-12 29-Nov-11 12-Jun-12 06-Dec-11 19-Jun-12 13-Dec-11 26-Jun-12 20-Jan-12 03-Aug-12 19-Feb-12 02-Sep-12 05-Mar-12 17-Sep-12 05-Mar-12
UU00-P-LMTS-000-1009 All Forged Fittings - 1st Lot PIPING LOT : 001 SF0029 M.E.G.A. SPA FOB GENOA, ITALY 31-Aug-11 14-Feb-11 27-Feb-11 100 07-Mar-11 22-Mar-11 100 08-Apr-11 16-May-11 100 25-May-11 25-May-11 100 09-Jul-11 25-May-11 100 11-Jan-12 09-Dec-11 75.49 28-Jan-12 24-Dec-11 04-Feb-12 30-Dec-11 11-Feb-12 06-Jan-12 20-Mar-12 13-Feb-12 19-Apr-12 14-Mar-12 04-May-12 29-Mar-12 04-May-12
UU00-P-LMTS-000-1009 All Forged Fittings - 1st Lot PIPING LOT : 002 SF0029 M.E.G.A. SPA FOB GENOA, ITALY 31-Aug-11 14-Feb-11 27-Feb-11 100 07-Mar-11 22-Mar-11 100 08-Apr-11 16-May-11 100 25-May-11 25-May-11 100 09-Jul-11 25-May-11 100 11-Jan-12 11-Oct-11 100.00 28-Jan-12 11-Oct-11 100.00 04-Feb-12 16-Oct-11 100.00 11-Feb-12 16-Oct-11 20-Mar-12 16-Oct-11 19-Apr-12 16-Oct-11 04-May-12 16-Oct-11 04-May-12
OFFICINE NICOLA GALPERTI &
UU00-P-LMTS-000-1010 CS & LTCS Flanges & Spectacle Blinds PIPING LOT : 001 SF0026 FIGLIO SPA FOB NORTH ITALIAN SEAPORT, ITALY 19-Oct-11 14-Feb-11 09-Feb-11 100 16-Mar-11 08-Mar-11 100 08-Apr-11 19-May-11 100 25-May-11 19-May-11 100 09-Jul-11 19-May-11 100 28-Oct-11 19-Sep-11 100.00 30-Oct-11 19-Sep-11 100.00 06-Nov-11 04-Oct-11 100.00 13-Nov-11 11-Oct-11 21-Dec-11 18-Nov-11 20-Jan-12 18-Dec-11 04-Feb-12 02-Jan-12 04-Feb-12
OFFICINE NICOLA GALPERTI &
UU00-P-LMTS-000-1010 CS & LTCS Flanges & Spectacle Blinds PIPING LOT : 002 SF0026 FIGLIO SPA FOB NORTH ITALIAN SEAPORT, ITALY 19-Oct-11 14-Feb-11 09-Feb-11 100 16-Mar-11 08-Mar-11 100 08-Apr-11 19-May-11 100 25-May-11 19-May-11 100 09-Jul-11 19-May-11 100 28-Oct-11 27-Sep-11 100.00 30-Oct-11 27-Sep-11 100.00 06-Nov-11 05-Oct-11 100.00 13-Nov-11 12-Oct-11 21-Dec-11 19-Nov-11 20-Jan-12 19-Dec-11 04-Feb-12 03-Jan-12 04-Feb-12
OFFICINE NICOLA GALPERTI &
UU00-P-LMTS-000-1010 CS & LTCS Flanges & Spectacle Blinds PIPING LOT : 005 SF0026 FIGLIO SPA FOB NORTH ITALIAN SEAPORT, ITALY 19-Oct-11 14-Feb-11 09-Feb-11 100 16-Mar-11 08-Mar-11 100 08-Apr-11 19-May-11 100 25-May-11 19-May-11 100 09-Jul-11 19-May-11 100 28-Oct-11 12-Feb-12 60.00 30-Oct-11 12-Feb-12 06-Nov-11 28-Feb-12 13-Nov-11 28-Feb-12 21-Dec-11 28-Feb-12 20-Jan-12 28-Feb-12 04-Feb-12 28-Feb-12 04-Feb-12
CS & LTCS Flanges & Spectacle Blinds -
UU00-P-LMTS-000-1010 TOP UP-3 PIPING UU00-P-LMTS-000-1010-151-11 FOB NORTH ITALIAN SEAPORT, ITALY 03-Oct-11 23-Feb-12 01-Mar-12 08-Mar-12 15-Mar-12 22-Apr-12 22-May-12 06-Jun-12 06-Jun-12
CS & LTCS Flanges & Spectacle Blinds - OFFICINE AMBROGIO MELESI &
UU00-P-LMTS-000-1010 TOP UP-1 PIPING LOT : 003 SF0098 C. SRL FOB NORTH ITALIAN SEAPORT, ITALY 08-Mar-12 20-Oct-11 100 20-Oct-11 100 20-Oct-11 100 20-Oct-11 100 03-Oct-11 20-Oct-11 100 23-Feb-12 20-Oct-11 01-Mar-12 20-Oct-11 08-Mar-12 08-Mar-12 15-Mar-12 08-Mar-12 22-Apr-12 08-Mar-12 22-May-12 08-Mar-12 06-Jun-12 08-Mar-12 06-Jun-12
CS & LTCS Flanges & Spectacle Blinds - FAD FLANGE ACCIAIO E DERIVATI
UU00-P-LMTS-000-1010 TOP UP-2 PIPING LOT : 004 SF0100 SPA FOB NORTH ITALIAN SEAPORT, ITALY 01-Dec-11 20-Oct-11 100 20-Oct-11 100 20-Oct-11 100 20-Oct-11 100 03-Oct-11 20-Oct-11 100 23-Feb-12 20-Oct-11 01-Mar-12 20-Oct-11 08-Mar-12 01-Dec-11 15-Mar-12 01-Dec-11 22-Apr-12 01-Dec-11 22-May-12 01-Dec-11 06-Jun-12 01-Dec-11 06-Jun-12
OFFICINE NICOLA GALPERTI &
UU00-P-LMTS-000-1010 CS & LTCS Flanges & Spectacle Blinds PIPING LOT : 006 SF0026 FIGLIO SPA FOB NORTH ITALIAN SEAPORT, ITALY 19-Oct-11 14-Feb-11 09-Feb-11 100 16-Mar-11 08-Mar-11 100 08-Apr-11 19-May-11 100 25-May-11 19-May-11 100 09-Jul-11 19-May-11 100 28-Oct-11 11-Oct-11 30-Oct-11 11-Oct-11 06-Nov-11 19-Oct-11 13-Nov-11 19-Oct-11 21-Dec-11 19-Oct-11 20-Jan-12 19-Oct-11 04-Feb-12 19-Oct-11 04-Feb-12
OFFICINE NICOLA GALPERTI &
UU00-P-LMTS-000-1010 CS & LTCS Flanges & Spectacle Blinds PIPING LOT : 007 SF0026 FIGLIO SPA FOB NORTH ITALIAN SEAPORT, ITALY 14-Feb-11 09-Feb-11 100 16-Mar-11 08-Mar-11 100 08-Apr-11 19-May-11 100 25-May-11 19-May-11 100 09-Jul-11 19-May-11 100 28-Oct-11 12-Feb-12 60.00 30-Oct-11 12-Feb-12 06-Nov-11 28-Feb-12 13-Nov-11 28-Feb-12 21-Dec-11 28-Feb-12 20-Jan-12 28-Feb-12 04-Feb-12 28-Feb-12 04-Feb-12
CS & LTCS Flanges & Spectacle Blinds - FAD FLANGE ACCIAIO E DERIVATI
UU00-P-LMTS-000-1010 TOP UP-2 PIPING LOT : 008 SF0100 SPA FOB NORTH ITALIAN SEAPORT, ITALY 23-Nov-11 20-Oct-11 100 20-Oct-11 100 20-Oct-11 100 20-Oct-11 100 03-Oct-11 20-Oct-11 100 23-Feb-12 20-Oct-11 01-Mar-12 20-Oct-11 08-Mar-12 23-Nov-11 15-Mar-12 23-Nov-11 22-Apr-12 23-Nov-11 22-May-12 23-Nov-11 06-Jun-12 23-Nov-11 06-Jun-12
OFFICINE NICOLA GALPERTI &
UU00-P-LMTS-000-1011 SS & DSS Flanges & Spectacle Blinds PIPING LOT : 002 SF0027 FIGLIO SPA FOB NORTH ITALIAN SEAPORT, ITALY 19-Oct-11 02-Mar-11 22-Feb-11 100 01-Apr-11 14-Mar-11 100 24-Apr-11 19-May-11 100 18-May-11 19-May-11 100 02-Jul-11 19-May-11 100 23-Oct-11 20-Sep-11 100.00 28-Oct-11 20-Sep-11 100.00 04-Nov-11 04-Oct-11 100.00 11-Nov-11 11-Oct-11 19-Dec-11 18-Nov-11 18-Jan-12 18-Dec-11 02-Feb-12 02-Jan-12 02-Feb-12
OFFICINE NICOLA GALPERTI &
UU00-P-LMTS-000-1011 SS & DSS Flanges & Spectacle Blinds PIPING LOT : 001 SF0027 FIGLIO SPA FOB NORTH ITALIAN SEAPORT, ITALY 19-Oct-11 02-Mar-11 22-Feb-11 100 01-Apr-11 14-Mar-11 100 24-Apr-11 19-May-11 100 18-May-11 19-May-11 100 02-Jul-11 19-May-11 100 23-Oct-11 27-Sep-11 100.00 28-Oct-11 27-Sep-11 100.00 04-Nov-11 06-Oct-11 100.00 11-Nov-11 13-Oct-11 19-Dec-11 20-Nov-11 18-Jan-12 20-Dec-11 02-Feb-12 04-Jan-12 02-Feb-12
OFFICINE NICOLA GALPERTI &
UU00-P-LMTS-000-1011 SS & DSS Flanges & Spectacle Blinds PIPING LOT : 005 SF0027 FIGLIO SPA FOB NORTH ITALIAN SEAPORT, ITALY 19-Oct-11 02-Mar-11 22-Feb-11 100 01-Apr-11 14-Mar-11 100 24-Apr-11 19-May-11 100 18-May-11 19-May-11 100 02-Jul-11 19-May-11 100 23-Oct-11 08-Feb-12 60.00 28-Oct-11 08-Feb-12 04-Nov-11 28-Feb-12 11-Nov-11 28-Feb-12 19-Dec-11 28-Feb-12 18-Jan-12 28-Feb-12 02-Feb-12 28-Feb-12 02-Feb-12
OFFICINE NICOLA GALPERTI &
UU00-P-LMTS-000-1011 SS & DSS Flanges & Spectacle Blinds PIPING LOT : 006 SF0027 FIGLIO SPA FOB NORTH ITALIAN SEAPORT, ITALY 19-Oct-11 02-Mar-11 22-Feb-11 100 01-Apr-11 14-Mar-11 100 24-Apr-11 19-May-11 100 18-May-11 19-May-11 100 02-Jul-11 19-May-11 100 23-Oct-11 17-Oct-11 100.00 28-Oct-11 17-Oct-11 100.00 04-Nov-11 23-Oct-11 100.00 11-Nov-11 23-Oct-11 19-Dec-11 23-Oct-11 18-Jan-12 23-Oct-11 02-Feb-12 23-Oct-11 02-Feb-12
SS & DSS Flanges & Spectacle Blinds -
UU00-P-LMTS-000-1011 TOP UP-3 PIPING UU00-P-LMTS-000-1011-77-17 FOB NORTH ITALIAN SEAPORT, ITALY 03-Oct-11 24-Mar-12 31-Mar-12 07-Apr-12 14-Apr-12 22-May-12 21-Jun-12 06-Jul-12 06-Jul-12
SS & DSS Flanges & Spectacle Blinds - OFFICINE AMBROGIO MELESI &
UU00-P-LMTS-000-1011 TOP UP-1 PIPING LOT : 003 SF0099 C. SRL FOB NORTH ITALIAN SEAPORT, ITALY 08-Mar-12 20-Oct-11 100 20-Oct-11 100 20-Oct-11 100 20-Oct-11 100 03-Oct-11 20-Oct-11 100 24-Mar-12 20-Oct-11 31-Mar-12 20-Oct-11 07-Apr-12 08-Mar-12 14-Apr-12 08-Mar-12 22-May-12 08-Mar-12 21-Jun-12 08-Mar-12 06-Jul-12 08-Mar-12 06-Jul-12
SS & DSS Flanges & Spectacle Blinds - OFFICINE AMBROGIO MELESI &
UU00-P-LMTS-000-1011 TOP UP-2 PIPING LOT : 004 SF0102 C. SRL FOB NORTH ITALIAN SEAPORT, ITALY 11-Mar-12 23-Oct-11 100 23-Oct-11 100 23-Oct-11 100 23-Oct-11 100 03-Oct-11 23-Oct-11 100 24-Mar-12 23-Oct-11 31-Mar-12 23-Oct-11 07-Apr-12 11-Mar-12 14-Apr-12 11-Mar-12 22-May-12 11-Mar-12 21-Jun-12 11-Mar-12 06-Jul-12 11-Mar-12 06-Jul-12
UU00-P-LMTS-000-1012 Ball Valves (Floating)-Lot-2 PIPING UU00-P-LMTS-000-1012-122-2 FOB INTERNATIONAL SEAPORT, ITALY 01-Apr-11 09-Mar-11 100 01-May-11 23-Mar-11 100 24-May-11 07-Jul-11 100 31-May-11 05-Nov-11 15-Jul-11 20-Dec-11 05-Feb-12 04-Jul-12 12-Feb-12 11-Jul-12 19-Feb-12 18-Jul-12 26-Feb-12 25-Jul-12 04-Apr-12 01-Sep-12 04-May-12 01-Oct-12 19-May-12 16-Oct-12 19-May-12
UU00-P-LMTS-000-1012 Ball Valves (Floating)-Lot-1 PIPING LOT : 001 SF0048 OMB VALVES SPA FOB INTERNATIONAL SEAPORT, ITALY 02-Feb-12 01-Apr-11 09-Mar-11 100 01-May-11 23-Mar-11 100 24-May-11 07-Jul-11 100 31-May-11 07-Jul-11 100 15-Jul-11 07-Jul-11 100 05-Feb-12 19-Mar-12 8.00 12-Feb-12 19-Mar-12 19-Feb-12 02-Apr-12 26-Feb-12 02-Apr-12 04-Apr-12 02-Apr-12 04-May-12 02-Apr-12 19-May-12 02-Apr-12 19-May-12
UU00-P-LMTS-000-1012 Ball Valves (Floating)-Lot-1 PIPING LOT : 002 SF0048 OMB VALVES SPA FOB INTERNATIONAL SEAPORT, ITALY 20-May-12 01-Apr-11 09-Mar-11 100 01-May-11 23-Mar-11 100 24-May-11 07-Jul-11 100 31-May-11 07-Jul-11 100 15-Jul-11 07-Jul-11 100 05-Feb-12 03-May-12 8.00 12-Feb-12 03-May-12 19-Feb-12 20-May-12 26-Feb-12 20-May-12 04-Apr-12 20-May-12 04-May-12 20-May-12 19-May-12 20-May-12 19-May-12
UU00-P-LMTS-000-1012 Ball Valves (Floating)-Lot-1 PIPING LOT : 003 SF0048 OMB VALVES SPA FOB INTERNATIONAL SEAPORT, ITALY 29-Feb-12 01-Apr-11 09-Mar-11 100 01-May-11 23-Mar-11 100 24-May-11 07-Jul-11 100 31-May-11 07-Jul-11 100 15-Jul-11 07-Jul-11 100 05-Feb-12 19-Mar-12 8.00 12-Feb-12 19-Mar-12 19-Feb-12 02-Apr-12 26-Feb-12 02-Apr-12 04-Apr-12 02-Apr-12 04-May-12 02-Apr-12 19-May-12 02-Apr-12 19-May-12
UU00-P-LMTS-000-1013 Ball Valves (Trunion Mounted) Lot - 2 PIPING UU00-P-LMTS-000-1013-123-2 FOB NORTH ITALIAN SEAPORT, ITALY 01-Apr-11 14-Mar-11 100 01-May-11 09-Apr-11 100 24-May-11 21-Jul-11 100 31-May-11 20-Nov-11 15-Jul-11 04-Jan-12 06-Mar-12 26-Aug-12 13-Mar-12 02-Sep-12 20-Mar-12 09-Sep-12 27-Mar-12 16-Sep-12 04-May-12 24-Oct-12 03-Jun-12 23-Nov-12 18-Jun-12 08-Dec-12 18-Jun-12
UU00-P-LMTS-000-1013 Ball Valves (Trunion Mounted) - Lot-1 PIPING LOT : 001 SF0044 OMS SALERI SPA FOB NORTH ITALIAN SEAPORT, ITALY 30-Sep-12 01-Apr-11 14-Mar-11 100 01-May-11 09-Apr-11 100 24-May-11 21-Jul-11 100 31-May-11 21-Jul-11 100 15-Jul-11 21-Jul-11 100 06-Mar-12 09-Sep-12 7.00 13-Mar-12 19-Sep-12 20-Mar-12 30-Sep-12 27-Mar-12 07-Oct-12 04-May-12 14-Nov-12 03-Jun-12 14-Dec-12 18-Jun-12 29-Dec-12 18-Jun-12
UU00-P-LMTS-000-1013 Ball Valves (Trunion Mounted) - Lot-1 PIPING LOT : 002 SF0044 OMS SALERI SPA FOB NORTH ITALIAN SEAPORT, ITALY 31-Jul-12 01-Apr-11 14-Mar-11 100 01-May-11 09-Apr-11 100 24-May-11 21-Jul-11 100 31-May-11 21-Jul-11 100 15-Jul-11 21-Jul-11 100 06-Mar-12 12-Aug-12 7.00 13-Mar-12 22-Aug-12 20-Mar-12 31-Aug-12 27-Mar-12 07-Sep-12 04-May-12 15-Oct-12 03-Jun-12 14-Nov-12 18-Jun-12 29-Nov-12 18-Jun-12
UU00-P-LMTS-000-1013 Ball Valves (Trunion Mounted) - Lot-1 PIPING LOT : 003 SF0044 OMS SALERI SPA FOB NORTH ITALIAN SEAPORT, ITALY 04-Nov-12 01-Apr-11 14-Mar-11 100 01-May-11 09-Apr-11 100 24-May-11 21-Jul-11 100 31-May-11 21-Jul-11 100 15-Jul-11 21-Jul-11 100 06-Mar-12 13-Oct-12 7.00 13-Mar-12 13-Oct-12 20-Mar-12 04-Nov-12 27-Mar-12 04-Nov-12 04-May-12 04-Nov-12 03-Jun-12 04-Nov-12 18-Jun-12 04-Nov-12 18-Jun-12
UU00-P-LMTS-000-1013 Ball Valves (Trunion Mounted) - Lot-1 PIPING LOT : 004 SF0044 OMS SALERI SPA FOB NORTH ITALIAN SEAPORT, ITALY 31-Jul-12 01-Apr-11 14-Mar-11 100 01-May-11 09-Apr-11 100 24-May-11 21-Jul-11 100 31-May-11 21-Jul-11 100 15-Jul-11 21-Jul-11 100 06-Mar-12 12-Aug-12 7.00 13-Mar-12 12-Aug-12 20-Mar-12 31-Aug-12 27-Mar-12 31-Aug-12 04-May-12 31-Aug-12 03-Jun-12 31-Aug-12 18-Jun-12 31-Aug-12 18-Jun-12
UU00-P-LMTS-000-1013 Ball Valves (Trunion Mounted) - Lot-1 PIPING LOT : 005 SF0044 OMS SALERI SPA FOB NORTH ITALIAN SEAPORT, ITALY 30-Sep-12 01-Apr-11 14-Mar-11 100 01-May-11 09-Apr-11 100 24-May-11 21-Jul-11 100 31-May-11 21-Jul-11 100 15-Jul-11 21-Jul-11 100 06-Mar-12 09-Sep-12 7.00 13-Mar-12 09-Sep-12 20-Mar-12 30-Sep-12 27-Mar-12 30-Sep-12 04-May-12 30-Sep-12 03-Jun-12 30-Sep-12 18-Jun-12 30-Sep-12 18-Jun-12
GALPERTI ENGINEERING AND
UU00-P-LMTS-000-1014 Block & Bleed Valves PIPING LOT : 001 SF0060 FLOW CONTROL SPA FOB GENOA, ITALY 20-Apr-12 01-Apr-11 21-Mar-11 100 01-May-11 09-Apr-11 100 24-May-11 25-Aug-11 100 31-May-11 04-Sep-11 100 15-Jul-11 04-Sep-11 100 05-Feb-12 03-Jul-12 3.00 12-Feb-12 11-Jul-12 19-Feb-12 20-Jul-12 26-Feb-12 27-Jul-12 04-Apr-12 03-Sep-12 04-May-12 03-Oct-12 19-May-12 18-Oct-12 19-May-12
Dual Plate Check Valves & Wafer Check FOB NEAREST INTERNATIONAL
UU00-P-LMTS-000-1015 Valves-Lot-2 PIPING UU00-P-LMTS-000-1015-72-2 SEAPORT, UK 01-Apr-11 23-Mar-11 100 01-May-11 13-Apr-11 100 24-May-11 23-Jun-11 100 31-May-11 04-Jul-11 100 15-Jul-11 18-Aug-11 05-Feb-12 05-Feb-12 12-Feb-12 11-Feb-12 19-Feb-12 18-Feb-12 26-Feb-12 25-Feb-12 04-Apr-12 03-Apr-12 04-May-12 03-May-12 19-May-12 18-May-12 19-May-12
Dual Plate Check Valves & Wafer Check FOB NEAREST INTERNATIONAL
UU00-P-LMTS-000-1015 Valves-Lot-1 PIPING LOT : 001 SF0045 GOODWIN INTERNATIONAL LTD SEAPORT, UK 01-Apr-11 23-Mar-11 100 01-May-11 13-Apr-11 100 24-May-11 23-Jun-11 100 31-May-11 04-Jul-11 100 15-Jul-11 04-Jul-11 100 05-Feb-12 21-Dec-11 25.11 12-Feb-12 21-Dec-11 19-Feb-12 21-Dec-11 26-Feb-12 21-Dec-11 04-Apr-12 21-Dec-11 04-May-12 21-Dec-11 19-May-12 21-Dec-11 19-May-12
Dual Plate Check Valves & Wafer Check FOB NEAREST INTERNATIONAL
UU00-P-LMTS-000-1015 Valves-Lot-1 PIPING LOT : 002 SF0045 GOODWIN INTERNATIONAL LTD SEAPORT, UK 01-Apr-11 23-Mar-11 100 01-May-11 13-Apr-11 100 24-May-11 23-Jun-11 100 31-May-11 04-Jul-11 100 15-Jul-11 04-Jul-11 100 05-Feb-12 21-Dec-11 25.00 12-Feb-12 21-Dec-11 19-Feb-12 21-Dec-11 26-Feb-12 21-Dec-11 04-Apr-12 21-Dec-11 04-May-12 21-Dec-11 19-May-12 21-Dec-11 19-May-12
Dual Plate Check Valves & Wafer Check FOB NEAREST INTERNATIONAL
UU00-P-LMTS-000-1015 Valves-Lot-1 PIPING LOT : 003 SF0045 GOODWIN INTERNATIONAL LTD SEAPORT, UK 07-Jan-12 01-Apr-11 23-Mar-11 100 01-May-11 13-Apr-11 100 24-May-11 23-Jun-11 100 31-May-11 04-Jul-11 100 15-Jul-11 04-Jul-11 100 05-Feb-12 28-Dec-11 25.00 12-Feb-12 28-Dec-11 19-Feb-12 07-Jan-12 26-Feb-12 07-Jan-12 04-Apr-12 07-Jan-12 04-May-12 07-Jan-12 19-May-12 07-Jan-12 19-May-12
Dual Plate Check Valves & Wafer Check FOB NEAREST INTERNATIONAL
UU00-P-LMTS-000-1015 Valves-Lot-1 PIPING LOT : 004 SF0045 GOODWIN INTERNATIONAL LTD SEAPORT, UK 01-Apr-11 23-Mar-11 100 01-May-11 13-Apr-11 100 24-May-11 23-Jun-11 100 31-May-11 04-Jul-11 100 15-Jul-11 04-Jul-11 100 05-Feb-12 21-Dec-11 26.26 12-Feb-12 21-Dec-11 19-Feb-12 21-Dec-11 26-Feb-12 21-Dec-11 04-Apr-12 21-Dec-11 04-May-12 21-Dec-11 19-May-12 21-Dec-11 19-May-12
Dual Plate Check Valves & Wafer Check FOB NEAREST INTERNATIONAL
UU00-P-LMTS-000-1015 Valves-Lot-1 PIPING LOT : 005 SF0045 GOODWIN INTERNATIONAL LTD SEAPORT, UK 07-Jan-12 01-Apr-11 23-Mar-11 100 01-May-11 13-Apr-11 100 24-May-11 23-Jun-11 100 31-May-11 04-Jul-11 100 15-Jul-11 04-Jul-11 100 05-Feb-12 28-Dec-11 25.00 12-Feb-12 28-Dec-11 19-Feb-12 07-Jan-12 26-Feb-12 07-Jan-12 04-Apr-12 07-Jan-12 04-May-12 07-Jan-12 19-May-12 07-Jan-12 19-May-12
UU00-P-LMTS-000-1016 GCC Valves - 1st Lot PIPING LOT : 001 SF0052 MALBRANQUE FOB ANTWERPEN, BELGIUM PORT 26-Feb-12 01-Apr-11 14-Mar-11 100 01-May-11 08-Apr-11 100 24-May-11 06-Jul-11 100 31-May-11 26-Jul-11 100 15-Jul-11 26-Jul-11 100 05-Feb-12 10-May-12 9.00 12-Feb-12 18-May-12 19-Feb-12 26-May-12 26-Feb-12 02-Jun-12 04-Apr-12 10-Jul-12 04-May-12 09-Aug-12 19-May-12 24-Aug-12 19-May-12
UU00-P-LMTS-000-1016 GCC Valves - 3rd Lot PIPING UU00-P-LMTS-000-1016-125-2-4 FOB ANTWERPEN, BELGIUM PORT 01-Apr-11 14-Mar-11 100 01-May-11 08-Apr-11 100 24-May-11 06-Jul-11 100 31-May-11 15-Jul-11 05-Feb-12 12-Feb-12 19-Feb-12 26-Feb-12 04-Apr-12 04-May-12 19-May-12 19-May-12
UU00-P-LMTS-000-1016 GCC Valves - 2nd Lot PIPING LOT : 002 SF0052 MALBRANQUE FOB ANTWERPEN, BELGIUM PORT 11-Apr-12 01-Apr-11 14-Mar-11 100 01-May-11 08-Apr-11 100 24-May-11 06-Jul-11 100 31-May-11 26-Jul-11 100 15-Jul-11 26-Jul-11 100 05-Feb-12 10-May-12 9.00 12-Feb-12 10-May-12 19-Feb-12 26-May-12 26-Feb-12 26-May-12 04-Apr-12 26-May-12 04-May-12 26-May-12 19-May-12 26-May-12 19-May-12
UU00-P-LMTS-000-1016 GCC Valves - 2nd Lot PIPING LOT : 003 SF0052 MALBRANQUE FOB ANTWERPEN, BELGIUM PORT 17-Mar-12 01-Apr-11 14-Mar-11 100 01-May-11 08-Apr-11 100 24-May-11 06-Jul-11 100 31-May-11 26-Jul-11 100 15-Jul-11 26-Jul-11 100 05-Feb-12 10-May-12 9.00 12-Feb-12 10-May-12 19-Feb-12 26-May-12 26-Feb-12 26-May-12 04-Apr-12 26-May-12 04-May-12 26-May-12 19-May-12 26-May-12 19-May-12
TYCO VALVES & CONTROLS FOB NEAREST INTERNATIONAL
UU00-P-LMTS-000-1017 Butterfly Valves PIPING LOT : 001 SF0042 MIDDLE EAST SEAPORT, UK 10-Nov-11 01-Apr-11 21-Mar-11 100 01-May-11 08-Apr-11 100 24-May-11 23-Jun-11 100 31-May-11 23-Jun-11 100 15-Jul-11 23-Jun-11 100 06-Jan-12 04-Dec-11 70.00 13-Jan-12 09-Dec-11 30.00 20-Jan-12 14-Dec-11 27-Jan-12 21-Dec-11 05-Mar-12 28-Jan-12 04-Apr-12 27-Feb-12 19-Apr-12 13-Mar-12 19-Apr-12
FOB NEAREST INTERNATIONAL
UU00-P-LMTS-000-1018 Bronze Valves PIPING LOT : 001 SF0053 SHIPHAM VALVES LTD SEAPORT, UK 13-Dec-11 01-Apr-11 05-May-11 100 01-May-11 09-Jun-11 100 24-May-11 31-Jul-11 100 31-May-11 02-Aug-11 100 15-Jul-11 02-Aug-11 100 06-Jan-12 29-Feb-12 3.00 13-Jan-12 07-Mar-12 20-Jan-12 13-Mar-12 27-Jan-12 20-Mar-12 05-Mar-12 27-Apr-12 04-Apr-12 27-May-12 19-Apr-12 11-Jun-12 19-Apr-12
BARTON FIRTOP ENGINEERING
UU00-P-LMTS-000-1019 Strainers PIPING LOT : 001 SF0105 CO. LTD FOB UK PORT 24-May-12 25-May-11 01-Jun-11 100 24-Jun-11 27-Jun-11 100 17-Jul-11 27-Oct-11 100 24-Jul-11 27-Oct-11 100 07-Sep-11 27-Oct-11 100 28-Mar-12 24-Apr-12 02-May-12 24-Apr-12 09-May-12 24-May-12 16-May-12 24-May-12 23-Jun-12 24-May-12 23-Jul-12 24-May-12 07-Aug-12 24-May-12 07-Aug-12
UU00-P-LMTS-000-1020 Air Trap PIPING UU00-P-LMTS-000-1020-128 SF0097 SPIRAX-SARCO LTD 25-May-11 09-Jun-11 100 24-Jun-11 10-Jul-11 100 17-Jul-11 17-Oct-11 100 24-Jul-11 24-Oct-11 100 07-Sep-11 08-Dec-11 31-Dec-11 16-Jan-12 07-Jan-12 23-Jan-12 14-Jan-12 30-Jan-12 21-Jan-12 06-Feb-12 28-Feb-12 15-Mar-12 29-Mar-12 14-Apr-12 13-Apr-12 29-Apr-12 13-Apr-12
UU00-P-LMTS-000-1021 Bird Screen PIPING UU00-P-LMTS-000-1021-129 25-May-11 30-Oct-11 24-Jun-11 29-Nov-11 17-Jul-11 22-Dec-11 24-Jul-11 29-Dec-11 07-Sep-11 12-Feb-12 31-Dec-11 06-Jun-12 07-Jan-12 13-Jun-12 14-Jan-12 20-Jun-12 21-Jan-12 27-Jun-12 28-Feb-12 04-Aug-12 29-Mar-12 03-Sep-12 13-Apr-12 18-Sep-12 13-Apr-12
UU00-P-LMTS-000-1022 Flame Arrestor PIPING LOT : 001 SF0104 HYDROPNEUMATICS PVT. LTD. FOB MUMBAI PORT, INDIA 17-Jan-12 25-May-11 19-Jul-11 100 24-Jun-11 06-Aug-11 100 17-Jul-11 25-Oct-11 100 24-Jul-11 25-Oct-11 100 07-Sep-11 25-Oct-11 100 01-Dec-11 09-Jan-12 08-Dec-11 09-Jan-12 15-Dec-11 17-Jan-12 22-Dec-11 17-Jan-12 29-Jan-12 17-Jan-12 28-Feb-12 17-Jan-12 14-Mar-12 17-Jan-12 14-Mar-12
UU00-P-LMTS-000-1023 Sample Cooler PIPING UU00-P-LMTS-000-1023-74 25-May-11 07-Aug-11 100 30-Jun-11 31-Oct-11 23-Jul-11 23-Nov-11 30-Jul-11 30-Nov-11 13-Sep-11 14-Jan-12 06-Jan-12 27-Jun-12 13-Jan-12 04-Jul-12 20-Jan-12 11-Jul-12 27-Jan-12 18-Jul-12 05-Mar-12 25-Aug-12 04-Apr-12 24-Sep-12 19-Apr-12 09-Oct-12 19-Apr-12
UU00-P-LMTS-000-1024 Access Fittings with Corrosion Probe PIPING UU00-P-LMTS-000-1024-131 31-May-11 26-Sep-11 100 30-Jun-11 10-Oct-11 100 23-Jul-11 23-Nov-11 30-Jul-11 30-Nov-11 13-Sep-11 14-Jan-12 06-Mar-12 13-Feb-12 13-Mar-12 20-Feb-12 20-Mar-12 27-Feb-12 27-Mar-12 05-Mar-12 04-May-12 12-Apr-12 03-Jun-12 12-May-12 18-Jun-12 27-May-12 18-Jun-12
UU00-P-LMTS-000-1025 Hose & Hose Coupling PIPING UU00-P-LMTS-000-1025-132 31-May-11 21-Sep-11 100 30-Jun-11 06-Oct-11 100 23-Jul-11 06-Nov-11 30-Jul-11 13-Nov-11 13-Sep-11 28-Dec-11 06-Mar-12 04-Mar-12 13-Mar-12 11-Mar-12 20-Mar-12 18-Mar-12 27-Mar-12 25-Mar-12 04-May-12 02-May-12 03-Jun-12 01-Jun-12 18-Jun-12 16-Jun-12 18-Jun-12
UU00-P-LMTS-000-1026 Gasket PIPING LOT : 001 SF0101 KLINGER LTD FCA SELLER'S WORKS, UK 29-Jan-12 30-Jun-11 09-Jun-11 100 30-Jul-11 09-Jul-11 100 22-Aug-11 16-Oct-11 100 29-Aug-11 23-Oct-11 100 13-Oct-11 23-Oct-11 100 07-Nov-11 13-Jan-12 14-Nov-11 13-Jan-12 21-Nov-11 29-Jan-12 28-Nov-11 29-Jan-12 05-Jan-12 29-Jan-12 04-Feb-12 29-Jan-12 19-Feb-12 29-Jan-12 19-Feb-12
INDUSTRIAL MATERIAL SUPPLY
UU00-P-LMTS-000-1027 Galvanised Pipe Fittings & Flanges PIPING LOT : 002 SF0046 FZCO FCA SELLER'S WORKS, JEBEL ALI, UAE 18-Jul-11 31-May-11 26-Apr-11 100 30-Jun-11 12-Jun-11 100 23-Jul-11 23-Jun-11 100 30-Jul-11 04-Jul-11 100 13-Sep-11 04-Jul-11 100 07-Dec-11 13-Dec-11 60.00 14-Dec-11 22-Dec-11 21-Dec-11 30-Dec-11 28-Dec-11 06-Jan-12 04-Feb-12 13-Feb-12 05-Mar-12 14-Mar-12 20-Mar-12 29-Mar-12 20-Mar-12
UU00-P-LMTS-000-1027 Galvanised Pipe Fittings & Flanges PIPING LOT : 001 SF0064 GERAB NATIONAL ENTERPRISES FCA SELLER'S WORKS, JEBEL ALI, UAE 12-Sep-11 31-May-11 26-Apr-11 100 30-Jun-11 12-Jun-11 100 23-Jul-11 23-Jun-11 100 30-Jul-11 04-Jul-11 100 13-Sep-11 22-Aug-11 100 07-Dec-11 13-Dec-11 21.60 14-Dec-11 22-Dec-11 21-Dec-11 30-Dec-11 28-Dec-11 06-Jan-12 04-Feb-12 13-Feb-12 05-Mar-12 14-Mar-12 20-Mar-12 29-Mar-12 20-Mar-12
UU00-P-LMTS-000-1027 Galvanised Pipe Fittings & Flanges PIPING LOT : 003 SF0064 GERAB NATIONAL ENTERPRISES FCA SELLER'S WORKS, JEBEL ALI, UAE 12-Sep-11 31-May-11 26-Apr-11 100 30-Jun-11 12-Jun-11 100 23-Jul-11 23-Jun-11 100 30-Jul-11 04-Jul-11 100 13-Sep-11 22-Aug-11 100 07-Dec-11 20-Oct-11 100.00 14-Dec-11 20-Oct-11 100.00 21-Dec-11 27-Oct-11 100.00 28-Dec-11 27-Oct-11 04-Feb-12 27-Oct-11 05-Mar-12 27-Oct-11 20-Mar-12 27-Oct-11 20-Mar-12
UU00-P-LMTS-000-1028 Insulating Gasket PIPING UU00-P-LMTS-000-1028-134 31-May-11 13-Jul-11 100 30-Jun-11 01-Aug-11 100 23-Jul-11 23-Nov-11 30-Jul-11 30-Nov-11 13-Sep-11 14-Jan-12 06-Jan-12 13-Feb-12 13-Jan-12 20-Feb-12 20-Jan-12 27-Feb-12 27-Jan-12 05-Mar-12 05-Mar-12 12-Apr-12 04-Apr-12 12-May-12 19-Apr-12 27-May-12 19-Apr-12
UU00-P-LMTS-000-1029 Fastners PIPING LOT : 001 SF0080 OME METALLURGICA ERBESE FOB GENOVA PORT, ITALY 23-Nov-11 30-Jun-11 12-Jun-11 100 30-Jul-11 27-Jun-11 100 22-Aug-11 25-Sep-11 100 29-Aug-11 28-Sep-11 100 13-Oct-11 28-Sep-11 100 07-Nov-11 15-Dec-11 14-Nov-11 15-Dec-11 21-Nov-11 30-Dec-11 28-Nov-11 30-Dec-11 05-Jan-12 30-Dec-11 04-Feb-12 30-Dec-11 19-Feb-12 30-Dec-11 19-Feb-12
UU00-P-LMTS-000-1030 Spring Hangers, Strut & ROD Hangers PIPING UU00-P-LMTS-000-1030-136 30-Jun-11 30-Oct-11 30-Jul-11 29-Nov-11 22-Aug-11 22-Dec-11 29-Aug-11 29-Dec-11 13-Oct-11 12-Feb-12 05-Apr-12 05-Aug-12 12-Apr-12 12-Aug-12 19-Apr-12 19-Aug-12 26-Apr-12 26-Aug-12 03-Jun-12 03-Oct-12 03-Jul-12 02-Nov-12 18-Jul-12 17-Nov-12 18-Jul-12
UU00-P-LMTS-000-1031 Pipe Support Bought-out Items PIPING UU00-P-LMTS-000-1031-76 01-May-11 10-Nov-11 31-May-11 10-Dec-11 23-Jun-11 02-Jan-12 30-Jun-11 09-Jan-12 14-Aug-11 23-Feb-12 07-Dec-11 17-Jun-12 14-Dec-11 24-Jun-12 21-Dec-11 01-Jul-12 28-Dec-11 08-Jul-12 04-Feb-12 15-Aug-12 05-Mar-12 14-Sep-12 20-Mar-12 29-Sep-12 20-Mar-12
UU00-P-LMTS-000-1032 Choke Valves PIPING UU00-P-LMTS-000-1032-137 01-May-11 04-Dec-11 31-May-11 03-Jan-12 23-Jun-11 26-Jan-12 30-Jun-11 02-Feb-12 14-Aug-11 18-Mar-12 07-Dec-11 11-Jul-12 14-Dec-11 18-Jul-12 21-Dec-11 25-Jul-12 28-Dec-11 01-Aug-12 04-Feb-12 08-Sep-12 05-Mar-12 08-Oct-12 20-Mar-12 23-Oct-12 20-Mar-12
UU00-P-LMTS-000-1033 Thermal Insulation PIPING UU00-P-LMTS-000-1033-138 30-Jun-11 11-Dec-11 30-Jul-11 10-Jan-12 22-Aug-11 02-Feb-12 29-Aug-11 09-Feb-12 13-Oct-11 25-Mar-12 07-Dec-11 19-May-12 14-Dec-11 26-May-12 21-Dec-11 02-Jun-12 28-Dec-11 09-Jun-12 04-Feb-12 17-Jul-12 05-Mar-12 16-Aug-12 20-Mar-12 31-Aug-12 20-Mar-12
Supply & Fabrication of Standard Pipe
UU00-P-LMTS-000-1034 Supports PIPING UU00-P-LMTS-000-1034-139 01-May-11 27-Nov-11 31-May-11 27-Dec-11 23-Jun-11 19-Jan-12 30-Jun-11 26-Jan-12 14-Aug-11 11-Mar-12 05-Feb-12 02-Sep-12 12-Feb-12 09-Sep-12 19-Feb-12 16-Sep-12 26-Feb-12 23-Sep-12 04-Apr-12 31-Oct-12 04-May-12 30-Nov-12 19-May-12 15-Dec-12 19-May-12
UU00-P-LMTS-000-1035 Monolithic Insulating Joint PIPING UU00-P-LMTS-000-1035-140 01-May-11 28-Oct-11 31-May-11 27-Nov-11 23-Jun-11 20-Dec-11 30-Jun-11 27-Dec-11 14-Aug-11 10-Feb-12 07-Dec-11 04-Jun-12 14-Dec-11 11-Jun-12 21-Dec-11 18-Jun-12 28-Dec-11 25-Jun-12 04-Feb-12 02-Aug-12 05-Mar-12 01-Sep-12 20-Mar-12 16-Sep-12 20-Mar-12
UU00-P-LMTS-000-1036 Sweepolet (2nd Lot) PIPING UU00-P-LMTS-000-1036-141-3 FOB GENOVA PORT, ITALY 01-May-11 29-Mar-11 100 31-May-11 12-Apr-11 100 23-Jun-11 08-Aug-11 100 30-Jun-11 05-Nov-11 14-Aug-11 20-Dec-11 05-Feb-12 04-Jun-12 12-Feb-12 11-Jun-12 19-Feb-12 18-Jun-12 26-Feb-12 25-Jun-12 04-Apr-12 02-Aug-12 04-May-12 01-Sep-12 19-May-12 16-Sep-12 19-May-12
UU00-P-LMTS-000-1036 Extruded Tee(1st Lot) PIPING LOT : 001 SF0058 VALVITALIA SPA FOB GENOVA PORT, ITALY 09-Jan-12 01-May-11 29-Mar-11 100 31-May-11 12-Apr-11 100 23-Jun-11 08-Aug-11 100 30-Jun-11 08-Aug-11 100 14-Aug-11 08-Aug-11 100 05-Feb-12 31-Dec-11 3.00 12-Feb-12 05-Jan-12 19-Feb-12 09-Jan-12 26-Feb-12 16-Jan-12 04-Apr-12 23-Feb-12 04-May-12 24-Mar-12 19-May-12 08-Apr-12 19-May-12
UU00-P-LMTS-000-1036 Extruded Tee(1st Lot) PIPING LOT : 002 SF0058 VALVITALIA SPA FOB GENOVA PORT, ITALY 28-Nov-11 01-May-11 29-Mar-11 100 31-May-11 12-Apr-11 100 23-Jun-11 08-Aug-11 100 30-Jun-11 08-Aug-11 100 14-Aug-11 08-Aug-11 100 05-Feb-12 21-Dec-11 3.00 12-Feb-12 25-Dec-11 19-Feb-12 30-Dec-11 26-Feb-12 06-Jan-12 04-Apr-12 13-Feb-12 04-May-12 14-Mar-12 19-May-12 29-Mar-12 19-May-12
UU00-P-LMTS-000-1036 Sweepolet (1st Lot) PIPING LOT : 003 SF0059 M.E.G.A. SPA FOB GENOVA PORT, ITALY 28-Nov-11 01-May-11 29-Mar-11 100 31-May-11 12-Apr-11 100 23-Jun-11 08-Aug-11 100 30-Jun-11 08-Aug-11 100 14-Aug-11 08-Aug-11 100 05-Feb-12 23-Nov-11 25.00 12-Feb-12 26-Nov-11 19-Feb-12 30-Nov-11 26-Feb-12 07-Dec-11 04-Apr-12 14-Jan-12 04-May-12 13-Feb-12 19-May-12 28-Feb-12 19-May-12
UU00-P-LMTS-000-1036 Extruded Tee (3rd Lot) PIPING UU00-P-LMTS-000-1036-141-4-9 FOB GENOVA PORT, ITALY 01-May-11 31-May-11 23-Jun-11 30-Jun-11 14-Aug-11 05-Feb-12 12-Feb-12 19-Feb-12 26-Feb-12 04-Apr-12 04-May-12 19-May-12 19-May-12
UU00-P-LMTS-000-1036 Extruded Tee (2nd Lot) PIPING LOT : 004 SF0058 VALVITALIA SPA FOB GENOVA PORT, ITALY 09-Jan-12 01-May-11 29-Mar-11 100 31-May-11 12-Apr-11 100 23-Jun-11 08-Aug-11 100 30-Jun-11 08-Aug-11 100 14-Aug-11 08-Aug-11 100 05-Feb-12 31-Dec-11 12-Feb-12 31-Dec-11 19-Feb-12 09-Jan-12 26-Feb-12 09-Jan-12 04-Apr-12 09-Jan-12 04-May-12 09-Jan-12 19-May-12 09-Jan-12 19-May-12
UU00-P-LMTS-000-1036 Sweepolet (1st Lot) PIPING LOT : 005 SF0059 M.E.G.A. SPA FOB GENOVA PORT, ITALY 22-Dec-11 01-May-11 29-Mar-11 100 31-May-11 12-Apr-11 100 23-Jun-11 08-Aug-11 100 30-Jun-11 08-Aug-11 100 14-Aug-11 08-Aug-11 100 05-Feb-12 14-Dec-11 25.00 12-Feb-12 14-Dec-11 19-Feb-12 22-Dec-11 26-Feb-12 22-Dec-11 04-Apr-12 22-Dec-11 04-May-12 22-Dec-11 19-May-12 22-Dec-11 19-May-12
SERCK AUDCO VALVES
UU00-P-LMTS-000-1037 Plug Valves PIPING LOT : 001 SF0066 (FLOWSERVE) FOB INTERNATIONAL SEAPORT UK 18-Apr-12 05-May-11 05-May-11 100 26-May-11 18-Jun-11 100 25-Jun-11 24-Aug-11 100 01-Jul-11 24-Aug-11 100 15-Aug-11 24-Aug-11 100 18-Nov-11 24-May-12 10.00 25-Nov-11 07-Jun-12 01-Dec-11 18-Jun-12 08-Dec-11 25-Jun-12 15-Jan-12 02-Aug-12 14-Feb-12 01-Sep-12 29-Feb-12 16-Sep-12 29-Feb-12
UU00-P-LMTS-000-1038 Special Globe Valves PIPING UU00-P-LMTS-000-1038-1 09-Jun-11 09-Jun-11 100 09-Jul-11 05-Jul-11 100 30-Jul-11 23-Nov-11 06-Aug-11 30-Nov-11 20-Sep-11 14-Jan-12 04-Mar-12 30-May-12 11-Mar-12 06-Jun-12 18-Mar-12 13-Jun-12 25-Mar-12 20-Jun-12 02-May-12 28-Jul-12 01-Jun-12 27-Aug-12 16-Jun-12 11-Sep-12 16-Jun-12
UU00-P-LMTS-000-1039 Valve Interlocking System PIPING UU00-P-LMTS-000-1039-1 05-Oct-11 100 04-Nov-11 24-Dec-11 31-Dec-11 14-Feb-12 30-Mar-12 06-Apr-12 13-Apr-12 20-Apr-12 28-May-12 27-Jun-12 12-Jul-12 06-Oct-11
UU00-P-LMTS-000-1041 Sight Glass PIPING UU00-P-LMTS-000-1041-1 18-Oct-11 100 17-Nov-11 17-Dec-11 24-Dec-11 07-Feb-12 07-Apr-12 14-Apr-12 21-Apr-12 28-Apr-12 05-Jun-12 05-Jul-12 20-Jul-12 23-Oct-11
PL-13CR-LOGISTICS 6" Pipe Logistics PIPELINE PL-13CR-LOGISTICS-1
PL-13CR-LOGISTICS 16" Pipe Logistics - 1st Lot PIPELINE PL-13CR-LOGISTICS-2
PL-13CR-LOGISTICS 16" Pipe Logistics - 2nd Lot PIPELINE PL-13CR-LOGISTICS-3
PL-13CR-LOGISTICS 16" Pipe Logistics - 3rd Lot PIPELINE PL-13CR-LOGISTICS-4
PL-13CR-LOGISTICS 16" Pipe Logistics - 4th Lot PIPELINE PL-13CR-LOGISTICS-5
PL-13CR-LOGISTICS 16" Pipe Logistics - 5thLot PIPELINE PL-13CR-LOGISTICS-6
PL-13CR-LOGISTICS 16" Pipe Logistics - 6th. Lot PIPELINE PL-13CR-LOGISTICS-7
PL-13CR-LOGISTICS 16" Pipe Logistics - 7th. Lot PIPELINE PL-13CR-LOGISTICS-8
PL-13CR-LOGISTICS 16" Pipe Logistics - 8th. Lot PIPELINE PL-13CR-LOGISTICS-9
PL-13CR-LOGISTICS 12" Pipe Logistics - 1st Lot PIPELINE PL-13CR-LOGISTICS-10
PL-13CR-LOGISTICS 12" Pipe Logistics - 2nd Lot PIPELINE PL-13CR-LOGISTICS-11
PL-13CR-LOGISTICS 12" Pipe Logistics - 3rd Lot PIPELINE PL-13CR-LOGISTICS-12
PL-13CR-LOGISTICS 12" Pipe Logistics - 4th Lot PIPELINE PL-13CR-LOGISTICS-13
PL-13CR-LOGISTICS 8" Pipe Logistics - 1st Lot PIPELINE PL-13CR-LOGISTICS-14
PL-13CR-LOGISTICS 8" Pipe Logistics - 2nd Lot PIPELINE PL-13CR-LOGISTICS-15
PL-13CR-LOGISTICS 8" Pipe Logistics - 3rd Lot PIPELINE PL-13CR-LOGISTICS-16
PL-13CR-LOGISTICS 8" Pipe Logistics - 4th Lot PIPELINE PL-13CR-LOGISTICS-17
UT00-P-EETS-000-1040 Globe Valves PIPELINE UT00-P-EETS-000-1040-1 26-Jul-11 26-Jul-11 100 25-Aug-11 30-Oct-11 24-Sep-11 24-Dec-11 01-Oct-11 31-Dec-11 15-Nov-11 14-Feb-12 15-Mar-12 01-Sep-12 22-Mar-12 08-Sep-12 29-Mar-12 15-Sep-12 05-Apr-12 22-Sep-12 13-May-12 30-Oct-12 12-Jun-12 29-Nov-12 27-Jun-12 14-Dec-12 27-Jun-12
Manufac. (Upto Ex-works)-Coated & Bare
24" API-5L Gr.X70 CS Line Pipe (1st Lot- SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 14Km) PIPELINE LOT : 001 SF0034 INTERNATIONAL GMBH SECTION-1) 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 15-Jan-12 30.00 15-Oct-11 15-Jan-12 22-Oct-11 30-Jan-12 29-Oct-11 30-Jan-12 06-Dec-11 30-Jan-12 05-Jan-12 30-Jan-12 20-Jan-12 30-Jan-12
Coating of 24" API-5L Gr.X70 CS Line Pipe SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 (2nd Lot-18Km) PIPELINE LOT : 002 SF0034 INTERNATIONAL GMBH SECTION-1) 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 15-Jan-12 15-Oct-11 15-Jan-12 22-Oct-11 30-Jan-12 29-Oct-11 30-Jan-12 06-Dec-11 30-Jan-12 05-Jan-12 30-Jan-12 20-Jan-12 30-Jan-12
Manufac. Bare 32" API-5L Gr.X70 CS Line SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 Pipe (4th Lot-1.636Km) PIPELINE LOT : 003 SF0034 INTERNATIONAL GMBH SECTION-1) 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 17-Dec-11 30.00 15-Oct-11 17-Dec-11 22-Oct-11 30-Dec-11 29-Oct-11 30-Dec-11 06-Dec-11 30-Dec-11 05-Jan-12 30-Dec-11 20-Jan-12 30-Dec-11
Manufac. Bare 32" API-5L Gr.X70 CS Line SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 Pipe (2nd Lot-13.8Km) - WT-11.9 mm PIPELINE LOT : 004 SF0034 INTERNATIONAL GMBH SECTION-1) 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 17-Dec-11 99.00 15-Oct-11 17-Dec-11 22-Oct-11 30-Dec-11 29-Oct-11 30-Dec-11 06-Dec-11 30-Dec-11 05-Jan-12 30-Dec-11 20-Jan-12 30-Dec-11
Manufac. (Upto Ex-works)-Coated & Bare
24" API-5L Gr.X70 CS Line Pipe (2nd Lot- SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 18Km) PIPELINE LOT : 005 SF0034 INTERNATIONAL GMBH SECTION-1) 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 15-Jan-12 30.00 15-Oct-11 15-Jan-12 22-Oct-11 30-Jan-12 29-Oct-11 30-Jan-12 06-Dec-11 30-Jan-12 05-Jan-12 30-Jan-12 20-Jan-12 30-Jan-12
Manufac. (Upto Ex-works)-Coated & Bare
24" API-5L Gr.X70 CS Line Pipe (3rd Lot- SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 21.6Km) PIPELINE LOT : 006 SF0034 INTERNATIONAL GMBH SECTION-1) 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 15-Jan-12 30.00 15-Oct-11 15-Jan-12 22-Oct-11 30-Jan-12 29-Oct-11 30-Jan-12 06-Dec-11 30-Jan-12 05-Jan-12 30-Jan-12 20-Jan-12 30-Jan-12
Coating (Upto Ex-works)- 32" API-5L
Gr.X70 CS Line Pipe (2nd Lot-13.8Km) SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 WT-11.9 mm PIPELINE LOT : 007 SF0034 INTERNATIONAL GMBH SECTION-1) 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 17-Dec-11 98.93 15-Oct-11 17-Dec-11 22-Oct-11 30-Dec-11 29-Oct-11 30-Dec-11 06-Dec-11 30-Dec-11 05-Jan-12 30-Dec-11 20-Jan-12 30-Dec-11
Manufac. Bare 32" API-5L Gr.X70 CS Line SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 Pipe (3rd Lot-33.467Km) PIPELINE LOT : 008 SF0034 INTERNATIONAL GMBH SECTION-1) 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 17-Dec-11 54.00 15-Oct-11 17-Dec-11 22-Oct-11 30-Dec-11 29-Oct-11 30-Dec-11 06-Dec-11 30-Dec-11 05-Jan-12 30-Dec-11 20-Jan-12 30-Dec-11
Coating (Upto Ex-works)- 32"API-5L SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 Gr.X70 CS Line Pipe (4th Lot-1.636Km) PIPELINE LOT : 009 SF0034 INTERNATIONAL GMBH SECTION-1) 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 17-Dec-11 15-Oct-11 17-Dec-11 22-Oct-11 30-Dec-11 29-Oct-11 30-Dec-11 06-Dec-11 30-Dec-11 05-Jan-12 30-Dec-11 20-Jan-12 30-Dec-11
Coating of 24" API-5L Gr.X70 CS Line Pipe SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 (4th Lot-9.866Km) PIPELINE LOT : 010 SF0034 INTERNATIONAL GMBH SECTION-1) 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 15-Jan-12 15-Oct-11 15-Jan-12 22-Oct-11 30-Jan-12 29-Oct-11 30-Jan-12 06-Dec-11 30-Jan-12 05-Jan-12 30-Jan-12 20-Jan-12 30-Jan-12
Manufac. Bare 32" API-5L Gr.X70 CS Line SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 Pipe (1st Lot-21.6Km) - WT-11.9 mm PIPELINE LOT : 011 SF0034 INTERNATIONAL GMBH SECTION-1) 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 17-Dec-11 99.00 15-Oct-11 17-Dec-11 99.00 22-Oct-11 30-Dec-11 29-Oct-11 30-Dec-11 06-Dec-11 30-Dec-11 05-Jan-12 30-Dec-11 20-Jan-12 30-Dec-11
Manufac. (Upto Ex-works)-Coated & Bare
24" API-5L Gr.X70 CS Line Pipe (4th Lot- SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 9.866Km) PIPELINE LOT : 012 SF0034 INTERNATIONAL GMBH SECTION-1) 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 17-Dec-11 30.00 15-Oct-11 17-Dec-11 22-Oct-11 30-Dec-11 29-Oct-11 30-Dec-11 06-Dec-11 30-Dec-11 05-Jan-12 30-Dec-11 20-Jan-12 30-Dec-11
Coating of 24" API-5L Gr.X70 CS Line Pipe SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 (3rd Lot-21.6Km) PIPELINE LOT : 013 SF0034 INTERNATIONAL GMBH SECTION-1) 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 15-Jan-12 15-Oct-11 15-Jan-12 22-Oct-11 30-Jan-12 29-Oct-11 30-Jan-12 06-Dec-11 30-Jan-12 05-Jan-12 30-Jan-12 20-Jan-12 30-Jan-12
Coating of 24" API-5L Gr.X70 CS Line Pipe SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 (1st Lot-14Km) PIPELINE LOT : 014 SF0034 INTERNATIONAL GMBH SECTION-1) 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 15-Jan-12 15-Oct-11 15-Jan-12 22-Oct-11 30-Jan-12 29-Oct-11 30-Jan-12 06-Dec-11 30-Jan-12 05-Jan-12 30-Jan-12 20-Jan-12 30-Jan-12
Coating (Upto Ex-works)- 32" API-5L
Gr.X70 CS Line Pipe (1st Lot-21.6Km) - SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 WT -11.9 mm PIPELINE LOT : 015 SF0034 INTERNATIONAL GMBH SECTION-1) 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 17-Dec-11 98.93 15-Oct-11 17-Dec-11 22-Oct-11 30-Dec-11 29-Oct-11 30-Dec-11 06-Dec-11 30-Dec-11 05-Jan-12 30-Dec-11 20-Jan-12 30-Dec-11
Coating (Upto Ex-works)- 32" API-5L SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 Gr.X70 CS Line Pipe (3rd Lot-33.467Km) PIPELINE LOT : 016 SF0034 INTERNATIONAL GMBH SECTION-1) 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 17-Dec-11 19.99 15-Oct-11 17-Dec-11 22-Oct-11 30-Dec-11 29-Oct-11 30-Dec-11 06-Dec-11 30-Dec-11 05-Jan-12 30-Dec-11 20-Jan-12 30-Dec-11
SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 CS Welded Pipelines Bare & Coated PIPELINE LOT : 017 SF0034 INTERNATIONAL GMBH SECTION-1) 30-Dec-11 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 15-Jan-12 38.35 15-Oct-11 15-Jan-12 22-Oct-11 30-Jan-12 29-Oct-11 30-Jan-12 06-Dec-11 30-Jan-12 05-Jan-12 30-Jan-12 20-Jan-12 30-Jan-12 20-Jan-12
Manufac. Bare 32" API-5L Gr.X70 CS Line SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 Pipe (1st Lot-21.6Km) - WT-11.9 mm PIPELINE LOT : 018 SF0034 INTERNATIONAL GMBH SECTION-1) 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 10-Oct-11 100.00 15-Oct-11 04-Oct-11 100.00 22-Oct-11 18-Oct-11 100.00 29-Oct-11 17-Oct-11 06-Dec-11 19-Oct-11 05-Jan-12 19-Oct-11 20-Jan-12 19-Oct-11
Manufac. Bare 32" API-5L Gr.X70 CS Line SALZGITTER MANNESMANN CFR ALGERIAN PORT (REFER A6 IN
UU00-P-EETS-000-1000 Pipe (3rd Lot-33.467Km) PIPELINE LOT : 019 SF0034 INTERNATIONAL GMBH SECTION-1) 15-Feb-11 03-Mar-11 100 02-Mar-11 19-Mar-11 100 25-Mar-11 22-Jun-11 100 01-Apr-11 22-Jun-11 100 16-May-11 22-Jun-11 100 08-Oct-11 18-Oct-11 100.00 15-Oct-11 18-Oct-11 100.00 22-Oct-11 27-Oct-11 100.00 29-Oct-11 22-Oct-11 06-Dec-11 28-Oct-11 05-Jan-12 29-Oct-11 20-Jan-12 29-Oct-11
UU00-P-EETS-000-1002 Tie In Ball Valves PIPELINE LOT : 001 SF0037 VALVITALIA SPA FOB NORTH ITALIAN PORT, ITALY 23-Feb-12 01-Apr-11 23-Mar-11 100 01-May-11 08-Apr-11 100 24-May-11 09-Jun-11 100 31-May-11 16-Jun-11 100 15-Jul-11 16-Jun-11 100 07-Nov-11 29-Mar-12 8.00 14-Nov-11 29-Mar-12 21-Nov-11 23-Apr-12 28-Nov-11 23-Apr-12 05-Jan-12 23-Apr-12 04-Feb-12 23-Apr-12 19-Feb-12 23-Apr-12 19-Feb-12
UU00-P-EETS-000-1003 CS Seamless Linepipes Bare & Coated PIPELINE LOT : 001 SF0051 TENARIS GLOBAL SERVICES SA CFR SKIKDA PORT, ALGERIA 26-Jan-12 01-Apr-11 23-Mar-11 100 01-May-11 07-Apr-11 100 24-May-11 20-Jul-11 100 31-May-11 20-Jul-11 100 15-Jul-11 20-Jul-11 100 07-Nov-11 08-Feb-12 3.00 14-Nov-11 17-Feb-12 21-Nov-11 26-Feb-12 28-Nov-11 04-Mar-12 05-Jan-12 11-Apr-12 04-Feb-12 11-May-12 19-Feb-12 26-May-12 19-Feb-12
UU00-P-EETS-000-1004 Monolithic Insulating Joints PIPELINE UU00-P-EETS-000-1004-80 SF0089 ZUNT ITALIANA SRL 15-Apr-11 28-Apr-11 100 15-May-11 18-May-11 100 07-Jun-11 04-Oct-11 100 14-Jun-11 05-Oct-11 100 29-Jul-11 19-Nov-11 21-Jan-12 13-May-12 28-Jan-12 20-May-12 04-Feb-12 27-May-12 11-Feb-12 03-Jun-12 20-Mar-12 11-Jul-12 19-Apr-12 10-Aug-12 04-May-12 25-Aug-12 04-May-12
UU00-P-EETS-000-1005 Ball Valves PIPELINE UU00-P-EETS-000-1005-158 01-Apr-11 28-Jun-11 100 01-May-11 27-Jul-11 100 24-May-11 30-Oct-11 31-May-11 06-Nov-11 15-Jul-11 21-Dec-11 06-Mar-12 16-Dec-12 13-Mar-12 23-Dec-12 20-Mar-12 30-Dec-12 27-Mar-12 06-Jan-13 04-May-12 13-Feb-13 03-Jun-12 15-Mar-13 18-Jun-12 30-Mar-13 18-Jun-12
SERCK AUDCO VALVES
UU00-P-EETS-000-1006 Plug Valves PIPELINE UU00-P-EETS-000-1006-159 SF0096 (FLOWSERVE) 05-Apr-11 09-Jun-11 100 05-May-11 09-Jul-11 100 28-May-11 12-Oct-11 100 04-Jun-11 19-Oct-11 100 19-Jul-11 03-Dec-11 06-Jan-12 22-May-12 13-Jan-12 29-May-12 20-Jan-12 05-Jun-12 27-Jan-12 12-Jun-12 05-Mar-12 20-Jul-12 04-Apr-12 19-Aug-12 19-Apr-12 03-Sep-12 19-Apr-12
UU00-P-EETS-000-1008 Barred Tee PIPELINE LOT : 001 SF0069 VALVITALIA SPA FOB GENOA PORT, ITALY 09-Feb-12 25-Apr-11 10-May-11 100 25-May-11 14-Jul-11 100 17-Jun-11 25-Aug-11 100 24-Jun-11 08-Sep-11 100 08-Aug-11 08-Sep-11 100 30-Jan-12 20-Apr-12 5.00 06-Feb-12 20-Apr-12 13-Feb-12 04-May-12 20-Feb-12 04-May-12 29-Mar-12 04-May-12 28-Apr-12 04-May-12 13-May-12 04-May-12 13-May-12
UU00-P-EETS-000-1009 DSS Flanges & Fittings (Wrought) PIPELINE UU00-P-EETS-000-1009-157 25-May-11 01-Nov-11 24-Jun-11 15-Nov-11 17-Jul-11 23-Nov-11 24-Jul-11 30-Nov-11 07-Sep-11 14-Jan-12 31-Dec-11 16-May-12 07-Jan-12 23-May-12 14-Jan-12 30-May-12 21-Jan-12 06-Jun-12 28-Feb-12 14-Jul-12 29-Mar-12 13-Aug-12 13-Apr-12 28-Aug-12 13-Apr-12
UU00-P-EETS-000-1010 CS & LTCS Flanges, Blanks & Fittings PIPELINE UU00-P-EETS-000-1010-156 25-May-11 06-Jul-11 100 24-Jun-11 28-Jul-11 100 17-Jul-11 23-Nov-11 24-Jul-11 30-Nov-11 07-Sep-11 14-Jan-12 31-Dec-11 16-May-12 07-Jan-12 23-May-12 14-Jan-12 30-May-12 21-Jan-12 06-Jun-12 28-Feb-12 14-Jul-12 29-Mar-12 13-Aug-12 13-Apr-12 28-Aug-12 13-Apr-12
UU00-P-EETS-000-1011 Hot Induction Bends PIPELINE UU00-P-EETS-000-1011-161 16-May-11 11-Apr-11 100 15-Jun-11 19-May-11 100 08-Jul-11 23-Nov-11 15-Jul-11 30-Nov-11 29-Aug-11 14-Jan-12 01-Jan-12 30-May-12 08-Jan-12 06-Jun-12 15-Jan-12 13-Jun-12 22-Jan-12 20-Jun-12 29-Feb-12 28-Jul-12 30-Mar-12 27-Aug-12 14-Apr-12 11-Sep-12 14-Apr-12
Issue Inquiry Requisition Receive Bid TBE Complete Place LOI / LOA Place PO Receive / Approve Key Vendor Drawings / Documents Place Sub-orders Receive Raw Materials Fabrication / Mfg. Inspection Release Note Ex-works Delivery Item on Board Shipping/Air Freight/Land Transport (ATA Port) Custom Clearance and Transport to site/store Visual Inspection on Receipt at Site/Store ROS
Inquiry No. Description Discipline INQD_TAG_NO PO_NO Vendor Name PO Delivery Terms PO_CDD
P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog
UU00-P-EETS-000-1012 PE Liner for Water injection pipeline PIPELINE UU00-P-EETS-000-1012-162 15-May-11 11-Jul-11 100 14-Jun-11 29-Jul-11 100 07-Jul-11 24-Dec-11 14-Jul-11 31-Dec-11 28-Aug-11 14-Feb-12 22-Nov-11 10-May-12 29-Nov-11 17-May-12 06-Dec-11 24-May-12 13-Dec-11 31-May-12 20-Jan-12 08-Jul-12 19-Feb-12 07-Aug-12 05-Mar-12 22-Aug-12 05-Mar-12
FOB PUSAN / MASAN / KWANGYANG,
UU00-P-EETS-000-1014 LTCS Pipes for Terminals PIPELINE UU00-P-EETS-000-1014-153-3 KOREA 25-May-11 27-Jun-11 100 24-Jun-11 13-Jul-11 100 17-Jul-11 24-Oct-11 100 24-Jul-11 07-Sep-11 25-Dec-11 01-Jan-12 08-Jan-12 15-Jan-12 22-Feb-12 23-Mar-12 07-Apr-12 07-Apr-12
ERNDTEBRÜCKER EISENWERK FOB PUSAN / MASAN / KWANGYANG,
UU00-P-EETS-000-1014 LTCS Pipes for Terminals - Lot-1 PIPELINE LOT : 001 SF0082 GMBH & CO. KG KOREA 09-Apr-12 25-May-11 27-Jun-11 100 24-Jun-11 13-Jul-11 100 17-Jul-11 24-Oct-11 100 24-Jul-11 24-Oct-11 100 07-Sep-11 24-Oct-11 100 25-Dec-11 26-Mar-12 01-Jan-12 26-Mar-12 08-Jan-12 09-Apr-12 15-Jan-12 09-Apr-12 22-Feb-12 09-Apr-12 23-Mar-12 09-Apr-12 07-Apr-12 09-Apr-12 07-Apr-12
FOB PUSAN / MASAN / KWANGYANG,
UU00-P-EETS-000-1014 LTCS Pipes for Terminals - Lot-2 PIPELINE LOT : 002 SF0103 GERAB NATIONAL ENTERPRISES KOREA 07-Nov-11 25-May-11 24-Oct-11 100 24-Jun-11 24-Oct-11 100 17-Jul-11 24-Oct-11 100 24-Jul-11 24-Oct-11 100 07-Sep-11 24-Oct-11 100 25-Dec-11 06-Nov-11 01-Jan-12 06-Nov-11 08-Jan-12 07-Nov-11 15-Jan-12 07-Nov-11 22-Feb-12 07-Nov-11 23-Mar-12 07-Nov-11 07-Apr-12 07-Nov-11 07-Apr-12
UU00-P-EETS-000-1015 DSS pipes for Terminals - Lot-3 PIPELINE UU00-P-EETS-000-1022-154-3 FOB EUROPEAN PORT 25-May-11 27-Jun-11 100 24-Jun-11 17-Jul-11 100 17-Jul-11 24-Jul-11 07-Sep-11 25-Dec-11 01-Jan-12 08-Jan-12 15-Jan-12 22-Feb-12 23-Mar-12 07-Apr-12 07-Apr-12
UU00-P-EETS-000-1015 DSS pipes for Terminals - Lot-1 PIPELINE LOT : 001 SF0106 H. BUTTING GMBH & CO. KG FOB EUROPEAN PORT 28-Mar-12 25-May-11 27-Jun-11 100 24-Jun-11 17-Jul-11 100 17-Jul-11 26-Oct-11 100 24-Jul-11 26-Oct-11 100 07-Sep-11 26-Oct-11 100 25-Dec-11 15-Mar-12 01-Jan-12 15-Mar-12 08-Jan-12 28-Mar-12 15-Jan-12 04-Apr-12 22-Feb-12 12-May-12 23-Mar-12 11-Jun-12 07-Apr-12 26-Jun-12 07-Apr-12
UU00-P-EETS-000-1015 DSS pipes for Terminals - Lot-2 PIPELINE LOT : 002 SF0108 SCHULZ EXPORT GMBH FOB EUROPEAN PORT 10-Nov-11 25-May-11 26-Oct-11 100 24-Jun-11 26-Oct-11 100 17-Jul-11 26-Oct-11 100 24-Jul-11 26-Oct-11 100 07-Sep-11 26-Oct-11 100 25-Dec-11 09-Nov-11 01-Jan-12 09-Nov-11 08-Jan-12 10-Nov-11 15-Jan-12 17-Nov-11 22-Feb-12 25-Dec-11 23-Mar-12 24-Jan-12 07-Apr-12 08-Feb-12 07-Apr-12
UU00-P-EETS-000-1016 Access Fittings with Corrosion Probe PIPELINE UU00-P-EETS-000-1015-160 07-May-11 20-Jun-11 100 06-Jun-11 22-Sep-11 100 29-Jun-11 23-Nov-11 06-Jul-11 30-Nov-11 20-Aug-11 14-Jan-12 07-Dec-11 13-Feb-12 14-Dec-11 20-Feb-12 21-Dec-11 27-Feb-12 28-Dec-11 05-Mar-12 04-Feb-12 12-Apr-12 05-Mar-12 12-May-12 20-Mar-12 27-May-12 20-Mar-12
UU00-P-EETS-000-1017 Pig Signaler (Local / Remote) PIPELINE UU00-P-EETS-000-1017-82 13-Jul-11 14-Nov-11 12-Aug-11 14-Dec-11 19-Sep-11 21-Jan-12 26-Sep-11 28-Jan-12 10-Nov-11 13-Mar-12 04-Jun-12 05-Sep-12 11-Jun-12 12-Sep-12 18-Jun-12 19-Sep-12 25-Jun-12 26-Sep-12 02-Aug-12 03-Nov-12 01-Sep-12 03-Dec-12 16-Sep-12 18-Dec-12 16-Sep-12
UU00-P-EETS-000-1018 Key Interlocking System PIPELINE UU00-P-EETS-000-1018-164 30-Jun-11 20-Jun-11 100 01-Aug-11 07-Jul-11 100 24-Aug-11 24-Dec-11 31-Aug-11 31-Dec-11 15-Oct-11 14-Feb-12 14-Feb-12 30-Mar-12 21-Feb-12 06-Apr-12 28-Feb-12 13-Apr-12 06-Mar-12 20-Apr-12 13-Apr-12 28-May-12 13-May-12 27-Jun-12 28-May-12 12-Jul-12 28-May-12
UU00-P-EETS-000-1019 Sphere Tee PIPELINE LOT : 001 SF0070 VALVITALIA SPA FOB GENOA PORT, ITALY 23-Feb-12 25-Apr-11 15-May-11 100 25-May-11 17-Jun-11 100 17-Jun-11 08-Sep-11 100 24-Jun-11 08-Sep-11 100 08-Aug-11 08-Sep-11 100 30-Jan-12 20-Apr-12 5.00 06-Feb-12 20-Apr-12 13-Feb-12 04-May-12 20-Feb-12 04-May-12 29-Mar-12 04-May-12 28-Apr-12 04-May-12 13-May-12 04-May-12 13-May-12
UU00-P-EETS-000-1021 Scrapper Traps (Permanent) PIPELINE UU00-P-EETS-000-1021-163 SF0079 VALVITALIA SPA 30-Jun-11 15-May-11 100 01-Aug-11 07-Jun-11 100 24-Aug-11 26-Sep-11 100 31-Aug-11 26-Sep-11 100 15-Oct-11 10-Nov-11 14-Feb-12 11-Mar-12 21-Feb-12 18-Mar-12 28-Feb-12 25-Mar-12 06-Mar-12 01-Apr-12 13-Apr-12 09-May-12 13-May-12 08-Jun-12 28-May-12 23-Jun-12 28-May-12
UU00-P-EETS-000-1023 Gaskets PIPELINE UU00-P-EETS-000-1023-1 31-May-11 27-Jun-11 100 30-Jun-11 13-Jul-11 100 23-Jul-11 24-Dec-11 30-Jul-11 31-Dec-11 13-Sep-11 14-Feb-12 08-Oct-11 21-Apr-12 15-Oct-11 28-Apr-12 22-Oct-11 05-May-12 29-Oct-11 12-May-12 06-Dec-11 19-Jun-12 05-Jan-12 19-Jul-12 20-Jan-12 03-Aug-12 20-Jan-12
UU00-P-EETS-000-1024 Fasteners PIPELINE UU00-P-EETS-000-1024-1 31-May-11 06-Jul-11 100 30-Jun-11 01-Aug-11 100 23-Jul-11 24-Dec-11 30-Jul-11 31-Dec-11 13-Sep-11 14-Feb-12 08-Oct-11 10-Mar-12 15-Oct-11 17-Mar-12 22-Oct-11 24-Mar-12 29-Oct-11 31-Mar-12 06-Dec-11 08-May-12 05-Jan-12 07-Jun-12 20-Jan-12 22-Jun-12 20-Jan-12
UU00-P-EETS-000-1025 Pipeline Construction Services PIPELINE UU00-P-EETS-000-1025-1
UU00-P-EETS-000-1026 Choke Valves PIPELINE UU00-P-EETS-000-1026-1 25-May-11 25-Dec-11 24-Jun-11 24-Jan-12 17-Jul-11 16-Feb-12 24-Jul-11 23-Feb-12 07-Sep-11 08-Apr-12 25-Feb-12 26-Sep-12 03-Mar-12 03-Oct-12 10-Mar-12 10-Oct-12 17-Mar-12 17-Oct-12 24-Apr-12 24-Nov-12 24-May-12 24-Dec-12 08-Jun-12 08-Jan-13 08-Jun-12
UU00-P-EETS-000-1027 Check Valves PIPELINE UU00-P-EETS-000-1027-1 SF0091 AMPO 25-May-11 20-Jun-11 100 24-Jun-11 08-Aug-11 100 17-Jul-11 04-Oct-11 100 24-Jul-11 11-Oct-11 100 07-Sep-11 25-Nov-11 25-Feb-12 14-May-12 03-Mar-12 21-May-12 10-Mar-12 28-May-12 17-Mar-12 04-Jun-12 24-Apr-12 12-Jul-12 24-May-12 11-Aug-12 08-Jun-12 26-Aug-12 08-Jun-12
UU00-P-EETS-000-1028 Block & Bleed Valves PIPELINE UU00-P-EETS-000-1028-1 25-May-11 20-Jun-11 100 24-Jun-11 09-Jul-11 100 17-Jul-11 23-Nov-11 24-Jul-11 30-Nov-11 07-Sep-11 14-Jan-12 25-Feb-12 27-Jun-12 03-Mar-12 04-Jul-12 10-Mar-12 11-Jul-12 17-Mar-12 18-Jul-12 24-Apr-12 25-Aug-12 24-May-12 24-Sep-12 08-Jun-12 09-Oct-12 08-Jun-12
OFFICINE AMBROGIO MELESI &
UU00-P-EETS-000-1030 Anchor Flange PIPELINE LOT : 001 SF0072 C. SRL FOB NORTH ITALIAN PORT, ITALY 09-Feb-12 05-Jun-11 07-Jun-11 100 07-Jul-11 20-Jun-11 100 30-Jul-11 08-Sep-11 100 06-Aug-11 08-Sep-11 100 20-Sep-11 08-Sep-11 100 13-Jan-12 15-Apr-12 3.00 20-Jan-12 15-Apr-12 27-Jan-12 04-May-12 03-Feb-12 04-May-12 12-Mar-12 04-May-12 11-Apr-12 04-May-12 26-Apr-12 04-May-12 13-Apr-12
UU00-P-EETS-000-1101 Cathodic Protection System METALLURGY LOT : 001 SF0035 HOCKWAY MIDDLE EAST FZC FOB UK SEAPORT 31-Jan-12 17-Mar-11 24-Mar-11 100 16-Apr-11 06-Apr-11 100 24-May-11 09-Jun-11 100 31-May-11 15-Jun-11 100 15-Jul-11 15-Jun-11 100 07-Nov-11 30-Apr-12 22.00 14-Nov-11 30-Apr-12 21-Nov-11 28-May-12 28-Nov-11 28-May-12 05-Jan-12 28-May-12 04-Feb-12 28-May-12 19-Feb-12 28-May-12 19-Feb-12
SCHNEIDER ELECTRIC ENERGY FOB INTERNATIONAL SEAPORT, UK /
UB00-P-NNTS-000-1001 Substation Package SS-2 ELECTRICAL H-ZE-091010 SF0004 UK LTD TURKEY 23-Mar-12 16-Jan-11 01-Feb-11 100 17-Feb-11 14-Mar-11 100 24-Mar-11 16-Mar-11 100 31-Mar-11 16-Mar-11 100 15-May-11 23-Mar-11 100 29-Jun-11 28-Jun-11 49 07-Nov-11 26-Sep-11 100 06-Jan-12 05-Dec-11 38 05-Apr-12 18-Mar-12 25.00 12-Apr-12 26-Mar-12 19-Apr-12 05-Jun-12 26-Apr-12 12-Jun-12 03-Jun-12 20-Jul-12 03-Jul-12 19-Aug-12 18-Jul-12 03-Sep-12 18-Jul-12
SCHNEIDER ELECTRIC ENERGY FOB INTERNATIONAL SEAPORT, UK /
UB00-P-NNTS-000-1001 Substation Package SS-3 ELECTRICAL H-ZE-091011 SF0004 UK LTD TURKEY 23-Mar-12 16-Jan-11 01-Feb-11 100 17-Feb-11 14-Mar-11 100 24-Mar-11 16-Mar-11 100 31-Mar-11 16-Mar-11 100 15-May-11 23-Mar-11 100 29-Jun-11 04-Jul-11 49 07-Dec-11 26-Sep-11 100 05-Feb-12 08-Dec-11 38 05-May-12 27-Mar-12 25.00 12-May-12 05-Apr-12 19-May-12 05-Aug-12 26-May-12 12-Aug-12 03-Jul-12 19-Sep-12 02-Aug-12 19-Oct-12 17-Aug-12 03-Nov-12 17-Aug-12
SCHNEIDER ELECTRIC ENERGY FOB INTERNATIONAL SEAPORT, UK /
UB00-P-NNTS-000-1001 Substation Package SS-5 ELECTRICAL K-ZE-091901 SF0004 UK LTD TURKEY 23-Mar-12 16-Jan-11 01-Feb-11 100 17-Feb-11 14-Mar-11 100 24-Mar-11 16-Mar-11 100 31-Mar-11 16-Mar-11 100 15-May-11 23-Mar-11 100 29-Jun-11 13-Jul-11 49 07-Nov-11 26-Sep-11 100 06-Jan-12 14-Dec-11 38 05-Apr-12 11-Apr-12 25.00 12-Apr-12 20-Apr-12 19-Apr-12 05-Aug-12 26-Apr-12 12-Aug-12 03-Jun-12 19-Sep-12 03-Jul-12 19-Oct-12 18-Jul-12 03-Nov-12 18-Jul-12
SCHNEIDER ELECTRIC ENERGY FOB INTERNATIONAL SEAPORT, UK /
UB00-P-NNTS-000-1001 Substation Package SS-6 ELECTRICAL K-ZE-091902 SF0004 UK LTD TURKEY 23-Jun-12 16-Jan-11 01-Feb-11 100 17-Feb-11 14-Mar-11 100 24-Mar-11 16-Mar-11 100 31-Mar-11 16-Mar-11 100 15-May-11 23-Mar-11 100 29-Jun-11 13-Jul-11 49 07-Dec-11 26-Sep-11 100 05-Feb-12 14-Dec-11 38 05-May-12 11-Apr-12 25.00 12-May-12 20-Apr-12 19-May-12 15-Sep-12 26-May-12 22-Sep-12 03-Jul-12 30-Oct-12 02-Aug-12 29-Nov-12 17-Aug-12 14-Dec-12 17-Aug-12
SCHNEIDER ELECTRIC ENERGY FOB INTERNATIONAL SEAPORT, UK /
UB00-P-NNTS-000-1001 Substation Package SS-7 ELECTRICAL K-ZE-091903 SF0004 UK LTD TURKEY 23-Jun-12 16-Jan-11 01-Feb-11 100 17-Feb-11 14-Mar-11 100 24-Mar-11 16-Mar-11 100 31-Mar-11 16-Mar-11 100 15-May-11 23-Mar-11 100 29-Jun-11 13-Jul-11 49 07-Dec-11 26-Sep-11 100 05-Feb-12 14-Dec-11 38 05-May-12 11-Apr-12 25.00 12-May-12 20-Apr-12 19-May-12 15-Sep-12 26-May-12 22-Sep-12 03-Jul-12 30-Oct-12 02-Aug-12 29-Nov-12 17-Aug-12 14-Dec-12 17-Aug-12
SCHNEIDER ELECTRIC ENERGY FOB INTERNATIONAL SEAPORT, UK /
UB00-P-NNTS-000-1001 Substation Package SS-1 ELECTRICAL H-ZE-091005 SF0004 UK LTD TURKEY 23-Mar-12 16-Jan-11 01-Feb-11 100 17-Feb-11 14-Mar-11 100 24-Mar-11 16-Mar-11 100 31-Mar-11 16-Mar-11 100 15-May-11 23-Mar-11 100 29-Jun-11 28-Jun-11 49 07-Nov-11 26-Sep-11 100 06-Jan-12 05-Dec-11 38 05-Apr-12 18-Mar-12 25.00 12-Apr-12 26-Mar-12 19-Apr-12 05-Jun-12 26-Apr-12 12-Jun-12 03-Jun-12 20-Jul-12 03-Jul-12 19-Aug-12 18-Jul-12 03-Sep-12 18-Jul-12
SCHNEIDER ELECTRIC ENERGY FOB INTERNATIONAL SEAPORT, UK /
UB00-P-NNTS-000-1001 Substation Package SS-4 ELECTRICAL H-ZE-091012 SF0004 UK LTD TURKEY 23-Mar-12 16-Jan-11 01-Feb-11 100 17-Feb-11 14-Mar-11 100 24-Mar-11 16-Mar-11 100 31-Mar-11 16-Mar-11 100 15-May-11 23-Mar-11 100 29-Jun-11 13-Jul-11 49 07-Nov-11 26-Sep-11 100 06-Jan-12 14-Dec-11 38 05-Apr-12 11-Apr-12 25.00 12-Apr-12 20-Apr-12 19-Apr-12 05-Aug-12 26-Apr-12 12-Aug-12 03-Jun-12 19-Sep-12 03-Jul-12 19-Oct-12 18-Jul-12 03-Nov-12 18-Jul-12
SCHNEIDER ELECTRIC ENERGY FOB INTERNATIONAL SEAPORT, UK /
UB00-P-NNTS-000-1001 Substation Package SS-8 ELECTRICAL L-ZE-091901 SF0004 UK LTD TURKEY 23-Jun-12 16-Jan-11 01-Feb-11 100 17-Feb-11 14-Mar-11 100 24-Mar-11 16-Mar-11 100 31-Mar-11 16-Mar-11 100 15-May-11 23-Mar-11 100 29-Jun-11 13-Jul-11 49 07-Dec-11 26-Sep-11 100 05-Feb-12 14-Dec-11 38 05-May-12 11-Apr-12 25.00 12-May-12 20-Apr-12 19-May-12 15-Sep-12 26-May-12 22-Sep-12 03-Jul-12 30-Oct-12 02-Aug-12 29-Nov-12 17-Aug-12 14-Dec-12 17-Aug-12
SCHNEIDER ELECTRIC ENERGY
UB00-P-NNTS-000-1002 Power & Distribution Transformers ELECTRICAL H-ET-081001A SF0004 UK LTD 24-Jan-12 17-Mar-11 01-Feb-11 100 26-Apr-11 14-Mar-11 100 24-May-11 16-Mar-11 100 31-May-11 16-Mar-11 100 15-Jul-11 23-Mar-11 100 29-Aug-11 28-Jul-11 49 08-Sep-11 26-Sep-11 100 08-Oct-11 10-Nov-11 38 06-Jan-12 23-Mar-12 25.00 13-Jan-12 02-Apr-12 20-Jan-12 28-Feb-12 27-Jan-12 06-Mar-12 05-Mar-12 13-Apr-12 04-Apr-12 13-May-12 19-Apr-12 28-May-12 19-Apr-12
SCHNEIDER ELECTRIC ENERGY
UB00-P-NNTS-000-1002 Power & Distribution Transformers ELECTRICAL H-ET-081001B SF0004 UK LTD 24-Jan-12 17-Mar-11 01-Feb-11 100 26-Apr-11 14-Mar-11 100 24-May-11 16-Mar-11 100 31-May-11 16-Mar-11 100 15-Jul-11 23-Mar-11 100 29-Aug-11 28-Jul-11 49 08-Sep-11 26-Sep-11 100 08-Oct-11 10-Nov-11 38 06-Jan-12 23-Mar-12 25.00 13-Jan-12 02-Apr-12 20-Jan-12 28-Feb-12 27-Jan-12 06-Mar-12 05-Mar-12 13-Apr-12 04-Apr-12 13-May-12 19-Apr-12 28-May-12 19-Apr-12
SCHNEIDER ELECTRIC ENERGY
UB00-P-NNTS-000-1002 Power & Distribution Transformers ELECTRICAL H-ET-081002 SF0004 UK LTD 24-Jan-12 17-Mar-11 01-Feb-11 100 26-Apr-11 14-Mar-11 100 24-May-11 16-Mar-11 100 31-May-11 16-Mar-11 100 15-Jul-11 23-Mar-11 100 29-Aug-11 28-Jul-11 49 08-Sep-11 26-Sep-11 100 08-Oct-11 10-Nov-11 38 06-Jan-12 23-Mar-12 25.00 13-Jan-12 02-Apr-12 20-Jan-12 28-Feb-12 27-Jan-12 06-Mar-12 05-Mar-12 13-Apr-12 04-Apr-12 13-May-12 19-Apr-12 28-May-12 19-Apr-12
SCHNEIDER ELECTRIC ENERGY
UB00-P-NNTS-000-1002 Power & Distribution Transformers ELECTRICAL H-ET-081007 SF0004 UK LTD 24-Jan-12 17-Mar-11 01-Feb-11 100 26-Apr-11 14-Mar-11 100 24-May-11 16-Mar-11 100 31-May-11 16-Mar-11 100 15-Jul-11 23-Mar-11 100 29-Aug-11 28-Jul-11 49 08-Sep-11 26-Sep-11 100 08-Oct-11 10-Nov-11 38 06-Jan-12 23-Mar-12 25.00 13-Jan-12 02-Apr-12 20-Jan-12 28-Feb-12 27-Jan-12 06-Mar-12 05-Mar-12 13-Apr-12 04-Apr-12 13-May-12 19-Apr-12 28-May-12 19-Apr-12
SCHNEIDER ELECTRIC ENERGY
UB00-P-NNTS-000-1002 Power & Distribution Transformers ELECTRICAL H-ET-081003 SF0004 UK LTD 24-Jan-12 17-Mar-11 01-Feb-11 100 26-Apr-11 14-Mar-11 100 24-May-11 16-Mar-11 100 31-May-11 16-Mar-11 100 15-Jul-11 23-Mar-11 100 29-Aug-11 28-Jul-11 49 08-Sep-11 26-Sep-11 100 08-Oct-11 10-Nov-11 38 06-Jan-12 23-Mar-12 25.00 13-Jan-12 02-Apr-12 20-Jan-12 28-Feb-12 27-Jan-12 06-Mar-12 05-Mar-12 13-Apr-12 04-Apr-12 13-May-12 19-Apr-12 28-May-12 19-Apr-12
SCHNEIDER ELECTRIC ENERGY
UB00-P-NNTS-000-1002 Power & Distribution Transformers ELECTRICAL H-ET-081008 SF0004 UK LTD 24-Jan-12 17-Mar-11 01-Feb-11 100 26-Apr-11 14-Mar-11 100 24-May-11 16-Mar-11 100 31-May-11 16-Mar-11 100 15-Jul-11 23-Mar-11 100 29-Aug-11 28-Jul-11 49 08-Sep-11 26-Sep-11 100 08-Oct-11 10-Nov-11 38 06-Jan-12 23-Mar-12 25.00 13-Jan-12 02-Apr-12 20-Jan-12 28-Feb-12 27-Jan-12 06-Mar-12 05-Mar-12 13-Apr-12 04-Apr-12 13-May-12 19-Apr-12 28-May-12 19-Apr-12
SCHNEIDER ELECTRIC ENERGY
UB00-P-NNTS-000-1002 Power & Distribution Transformers ELECTRICAL L-ET-081905 SF0004 UK LTD 24-Jan-12 17-Mar-11 01-Feb-11 100 26-Apr-11 14-Mar-11 100 24-May-11 16-Mar-11 100 31-May-11 16-Mar-11 100 15-Jul-11 23-Mar-11 100 29-Aug-11 28-Jul-11 49 08-Sep-11 26-Sep-11 100 08-Oct-11 10-Nov-11 38 06-Jan-12 23-Mar-12 25.00 13-Jan-12 02-Apr-12 20-Jan-12 28-Feb-12 27-Jan-12 06-Mar-12 05-Mar-12 13-Apr-12 04-Apr-12 13-May-12 19-Apr-12 28-May-12 19-Apr-12
SCHNEIDER ELECTRIC ENERGY
UB00-P-NNTS-000-1002 Power & Distribution Transformers ELECTRICAL L-ET-081904 SF0004 UK LTD 24-Jan-12 17-Mar-11 01-Feb-11 100 26-Apr-11 14-Mar-11 100 24-May-11 16-Mar-11 100 31-May-11 16-Mar-11 100 15-Jul-11 23-Mar-11 100 29-Aug-11 28-Jul-11 49 08-Sep-11 26-Sep-11 100 08-Oct-11 10-Nov-11 38 06-Jan-12 23-Mar-12 25.00 13-Jan-12 02-Apr-12 20-Jan-12 28-Feb-12 27-Jan-12 06-Mar-12 05-Mar-12 13-Apr-12 04-Apr-12 13-May-12 19-Apr-12 28-May-12 19-Apr-12
SCHNEIDER ELECTRIC ENERGY
UB00-P-NNTS-000-1002 Power & Distribution Transformers ELECTRICAL K-ET-081901A SF0004 UK LTD 24-Jan-12 17-Mar-11 01-Feb-11 100 26-Apr-11 14-Mar-11 100 24-May-11 16-Mar-11 100 31-May-11 16-Mar-11 100 15-Jul-11 23-Mar-11 100 29-Aug-11 28-Jul-11 49 08-Sep-11 26-Sep-11 100 08-Oct-11 10-Nov-11 38 06-Jan-12 23-Mar-12 25.00 13-Jan-12 02-Apr-12 20-Jan-12 28-Feb-12 27-Jan-12 06-Mar-12 05-Mar-12 13-Apr-12 04-Apr-12 13-May-12 19-Apr-12 28-May-12 19-Apr-12
SCHNEIDER ELECTRIC ENERGY
UB00-P-NNTS-000-1002 Power & Distribution Transformers ELECTRICAL K-ET-081901B SF0004 UK LTD 24-Jan-12 17-Mar-11 01-Feb-11 100 26-Apr-11 14-Mar-11 100 24-May-11 16-Mar-11 100 31-May-11 16-Mar-11 100 15-Jul-11 23-Mar-11 100 29-Aug-11 28-Jul-11 49 08-Sep-11 26-Sep-11 100 08-Oct-11 10-Nov-11 38 06-Jan-12 23-Mar-12 25.00 13-Jan-12 02-Apr-12 20-Jan-12 28-Feb-12 27-Jan-12 06-Mar-12 05-Mar-12 13-Apr-12 04-Apr-12 13-May-12 19-Apr-12 28-May-12 19-Apr-12
SCHNEIDER ELECTRIC ENERGY
UB00-P-NNTS-000-1002 Power & Distribution Transformers ELECTRICAL K-ET-081904 SF0004 UK LTD 24-Jan-12 17-Mar-11 01-Feb-11 100 26-Apr-11 14-Mar-11 100 24-May-11 16-Mar-11 100 31-May-11 16-Mar-11 100 15-Jul-11 23-Mar-11 100 29-Aug-11 28-Jul-11 49 08-Sep-11 26-Sep-11 100 08-Oct-11 10-Nov-11 38 06-Jan-12 23-Mar-12 25.00 13-Jan-12 02-Apr-12 20-Jan-12 28-Feb-12 27-Jan-12 06-Mar-12 05-Mar-12 13-Apr-12 04-Apr-12 13-May-12 19-Apr-12 28-May-12 19-Apr-12
SCHNEIDER ELECTRIC ENERGY
UB00-P-NNTS-000-1002 Power & Distribution Transformers ELECTRICAL K-ET-081903 SF0004 UK LTD 24-Jan-12 17-Mar-11 01-Feb-11 100 26-Apr-11 14-Mar-11 100 24-May-11 16-Mar-11 100 31-May-11 16-Mar-11 100 15-Jul-11 23-Mar-11 100 29-Aug-11 28-Jul-11 49 08-Sep-11 26-Sep-11 100 08-Oct-11 10-Nov-11 38 06-Jan-12 23-Mar-12 25.00 13-Jan-12 02-Apr-12 20-Jan-12 28-Feb-12 27-Jan-12 06-Mar-12 05-Mar-12 13-Apr-12 04-Apr-12 13-May-12 19-Apr-12 28-May-12 19-Apr-12
SCHNEIDER ELECTRIC ENERGY
UB00-P-NNTS-000-1002 Power & Distribution Transformers ELECTRICAL K-ET-081902A SF0004 UK LTD 24-Jan-12 17-Mar-11 01-Feb-11 100 26-Apr-11 14-Mar-11 100 24-May-11 16-Mar-11 100 31-May-11 16-Mar-11 100 15-Jul-11 23-Mar-11 100 29-Aug-11 28-Jul-11 49 08-Sep-11 26-Sep-11 100 08-Oct-11 10-Nov-11 38 06-Jan-12 23-Mar-12 25.00 13-Jan-12 02-Apr-12 20-Jan-12 28-Feb-12 27-Jan-12 06-Mar-12 05-Mar-12 13-Apr-12 04-Apr-12 13-May-12 19-Apr-12 28-May-12 19-Apr-12
SCHNEIDER ELECTRIC ENERGY
UB00-P-NNTS-000-1002 Power & Distribution Transformers ELECTRICAL K-ET-081902B SF0004 UK LTD 24-Jan-12 17-Mar-11 01-Feb-11 100 26-Apr-11 14-Mar-11 100 24-May-11 16-Mar-11 100 31-May-11 16-Mar-11 100 15-Jul-11 23-Mar-11 100 29-Aug-11 28-Jul-11 49 08-Sep-11 26-Sep-11 100 08-Oct-11 10-Nov-11 38 06-Jan-12 23-Mar-12 25.00 13-Jan-12 02-Apr-12 20-Jan-12 28-Feb-12 27-Jan-12 06-Mar-12 05-Mar-12 13-Apr-12 04-Apr-12 13-May-12 19-Apr-12 28-May-12 19-Apr-12
SCHNEIDER ELECTRIC ENERGY
UB00-P-NNTS-000-1003 Modification of MV Switchgear ELECTRICAL K-EJ-081701 SF0030 UK LTD FOB SUR MER FRANCE BASIS 04-Jan-12 16-Apr-11 02-Mar-11 100 16-May-11 06-Apr-11 100 23-Jun-11 16-May-11 100 30-Jun-11 16-May-11 100 14-Aug-11 16-May-11 100 28-Sep-11 10-Sep-11 25 03-Oct-11 20-Oct-11 100 07-Nov-11 20-Oct-11 20 05-Feb-12 14-Feb-12 12-Feb-12 23-Feb-12 19-Feb-12 15-Mar-12 26-Feb-12 22-Mar-12 04-Apr-12 29-Apr-12 04-May-12 29-May-12 19-May-12 13-Jun-12 19-May-12
UB00-P-NNTS-000-1004 Emergency Diesel Generators ELECTRICAL H-XN-084003 SF0024 CUMMINS MIDDLE EAST FZE FOB INTERNATIONAL SEAPORT, ITALY 15-May-12 16-Jan-11 09-Feb-11 100 17-Feb-11 22-Mar-11 100 18-May-11 07-Jun-11 100 25-May-11 18-Jul-11 100 09-Jul-11 25-Jul-11 100 23-Aug-11 27-Oct-11 16.5 02-Nov-11 15-Jan-12 32 31-Dec-11 21-Mar-12 25 30-Mar-12 30-Jun-12 06-Apr-12 08-Jul-12 13-Apr-12 15-Jul-12 20-Apr-12 22-Jul-12 28-May-12 29-Aug-12 27-Jun-12 28-Sep-12 12-Jul-12 23-Oct-12 12-Jul-12
UB00-P-NNTS-000-1004 Emergency Diesel Generators ELECTRICAL H-XN-084002 SF0024 CUMMINS MIDDLE EAST FZE FOB INTERNATIONAL SEAPORT, ITALY 15-May-12 16-Jan-11 09-Feb-11 100 17-Feb-11 22-Mar-11 100 18-May-11 07-Jun-11 100 25-May-11 18-Jul-11 100 09-Jul-11 25-Jul-11 100 23-Aug-11 27-Oct-11 16.5 02-Nov-11 15-Jan-12 32 31-Dec-11 21-Mar-12 25 30-Mar-12 30-Jun-12 06-Apr-12 08-Jul-12 13-Apr-12 15-Jul-12 20-Apr-12 22-Jul-12 28-May-12 29-Aug-12 27-Jun-12 28-Sep-12 12-Jul-12 23-Oct-12 12-Jul-12
UB00-P-NNTS-000-1004 Emergency Diesel Generators ELECTRICAL H-XN-084001 SF0024 CUMMINS MIDDLE EAST FZE FOB INTERNATIONAL SEAPORT, ITALY 13-Jun-12 16-Jan-11 09-Feb-11 100 17-Feb-11 22-Mar-11 100 18-May-11 07-Jun-11 100 25-May-11 18-Jul-11 100 09-Jul-11 25-Jul-11 100 23-Aug-11 27-Oct-11 16.5 02-Nov-11 15-Jan-12 32 31-Dec-11 21-Mar-12 25 30-Mar-12 30-Jun-12 06-Apr-12 08-Jul-12 13-Apr-12 15-Jul-12 20-Apr-12 22-Jul-12 28-May-12 29-Aug-12 27-Jun-12 28-Sep-12 12-Jul-12 13-Oct-12 12-Jul-12
UB00-P-NNTS-000-1005 Modification of LV Switchgear ELECTRICAL L-EL-082701 16-Apr-11 02-Mar-11 100 16-May-11 06-Apr-11 100 23-Jun-11 24-Dec-11 30-Jun-11 31-Dec-11 14-Aug-11 14-Feb-12 28-Sep-11 14-Apr-12 03-Oct-11 14-May-12 07-Nov-11 13-Jun-12 05-Feb-12 17-Aug-12 12-Feb-12 24-Aug-12 19-Feb-12 31-Aug-12 26-Feb-12 07-Sep-12 04-Apr-12 15-Oct-12 04-May-12 14-Nov-12 19-May-12 29-Nov-12 19-May-12
UB00-P-NNTS-000-1006 Solar System ELECTRICAL UB00-P-NNTS-000-1006-169 30-May-11 07-Jun-11 100 29-Jun-11 08-Jul-11 100 06-Aug-11 24-Dec-11 13-Aug-11 31-Dec-11 27-Sep-11 14-Feb-12 22-Feb-12 12-Dec-12 03-Mar-12 22-Dec-12 10-Mar-12 29-Dec-12 17-Mar-12 05-Jan-13 24-Apr-12 12-Feb-13 24-May-12 14-Mar-13 08-Jun-12 29-Mar-13 08-Jun-12
UB00-P-NNTS-000-1007 AC UPS System ELECTRICAL UB00-P-NNTS-000-1007-170 SF0085 GUTOR ELECTRONIC LLC 16-May-11 20-Jun-11 100 15-Jun-11 07-Jul-11 100 23-Jul-11 27-Sep-11 100 30-Jul-11 02-Oct-11 100 13-Sep-11 16-Nov-11 06-Jan-12 10-Mar-12 13-Jan-12 17-Mar-12 20-Jan-12 24-Mar-12 27-Jan-12 31-Mar-12 05-Mar-12 08-May-12 04-Apr-12 07-Jun-12 19-Apr-12 22-Jun-12 19-Apr-12
MV/LV Power, Control & Earthing Cables -
UB00-P-NNTS-000-1008 TOP UP ELECTRICAL UB00-P-NNTS-000-1008-8 05-Jan-12 05-Jan-12 26-Jun-12 26-Jun-12 03-Jul-12 03-Jul-12 10-Jul-12 10-Jul-12 17-Jul-12 17-Jul-12 24-Aug-12 24-Aug-12 23-Sep-12 23-Sep-12 08-Oct-12 08-Oct-12 08-Oct-12
TURK PRYSMIAN KABLO VE
UB00-P-NNTS-000-1008 MV/LV Power, Control & Earthing Cables ELECTRICAL LOT : 001 SF0032 SISTEMLERI AS FCA MUDANYA, BURSA, TURKEY 13-Nov-11 06-Mar-11 20-Mar-11 100 05-Apr-11 02-Apr-11 100 13-May-11 23-Jun-11 100 20-May-11 14-Jul-11 100 04-Jul-11 14-Jul-11 100 27-Oct-11 10-Feb-12 43.20 03-Nov-11 19-Feb-12 10-Nov-11 28-Feb-12 17-Nov-11 06-Mar-12 25-Dec-11 13-Apr-12 24-Jan-12 13-May-12 08-Feb-12 28-May-12 08-Feb-12
UB00-P-NNTS-000-1009 Lighting Fixtures (Safe Area) - TOP UP ELECTRICAL UB00-P-NNTS-000-1009-9 05-Jan-12 05-Jan-12 26-Jun-12 26-Jun-12 03-Jul-12 03-Jul-12 10-Jul-12 10-Jul-12 17-Jul-12 17-Jul-12 24-Aug-12 24-Aug-12 23-Sep-12 23-Sep-12 08-Oct-12 08-Oct-12 08-Oct-12
UB00-P-NNTS-000-1009 Lighting Fixtures (Safe Area) ELECTRICAL UB00-P-NNTS-000-1009-171 SF0092 ATX-EGS ELECTRICAL GROUP 16-May-11 21-Jun-11 100 15-Jun-11 11-Jul-11 100 23-Jul-11 09-Oct-11 100 30-Jul-11 12-Oct-11 100 13-Sep-11 26-Nov-11 07-Dec-11 19-Feb-12 14-Dec-11 26-Feb-12 21-Dec-11 04-Mar-12 28-Dec-11 11-Mar-12 04-Feb-12 18-Apr-12 05-Mar-12 18-May-12 20-Mar-12 02-Jun-12 20-Mar-12
UB00-P-NNTS-000-1010 Junction Boxes - TOP UP ELECTRICAL UB00-P-NNTS-000-1010-10 05-Jan-12 05-Jan-12 26-Jun-12 26-Jun-12 03-Jul-12 03-Jul-12 10-Jul-12 10-Jul-12 17-Jul-12 17-Jul-12 24-Aug-12 24-Aug-12 23-Sep-12 23-Sep-12 08-Oct-12 08-Oct-12 08-Oct-12
UB00-P-NNTS-000-1010 Junction Boxes ELECTRICAL UB00-P-NNTS-000-1010-172 SF0081 R. STAHL MIDDLE EAST FZE 16-May-11 18-Jul-11 100 15-Jun-11 10-Aug-11 100 23-Jul-11 14-Oct-11 100 30-Jul-11 20-Oct-11 100 13-Sep-11 04-Dec-11 07-Dec-11 27-Feb-12 14-Dec-11 05-Mar-12 21-Dec-11 12-Mar-12 28-Dec-11 19-Mar-12 04-Feb-12 26-Apr-12 05-Mar-12 26-May-12 20-Mar-12 10-Jun-12 20-Mar-12
UB00-P-NNTS-000-1011 Lighting Poles - TOP UP ELECTRICAL UB00-P-NNTS-000-1011-11 05-Jan-12 05-Jan-12 26-Jun-12 26-Jun-12 03-Jul-12 03-Jul-12 10-Jul-12 10-Jul-12 17-Jul-12 17-Jul-12 24-Aug-12 24-Aug-12 23-Sep-12 23-Sep-12 08-Oct-12 08-Oct-12 08-Oct-12
VALMONT - MITAS POLES
UB00-P-NNTS-000-1011 Lighting Poles ELECTRICAL LOT : 001 SF0090 INDUSTRIES FOB MERSIN PORT, TURKEY 16-Dec-11 16-May-11 20-Jun-11 100 15-Jun-11 07-Jul-11 100 23-Jul-11 27-Sep-11 100 30-Jul-11 05-Oct-11 100 13-Sep-11 26-Oct-11 100 07-Dec-11 09-Dec-11 14-Dec-11 09-Dec-11 21-Dec-11 16-Dec-11 28-Dec-11 16-Dec-11 04-Feb-12 16-Dec-11 05-Mar-12 16-Dec-11 20-Mar-12 16-Dec-11 20-Mar-12
Earthing & Lightning Protection Materials
UB00-P-NNTS-000-1012 - TOP UP ELECTRICAL UB00-P-NNTS-084-1012-12 FCA SELLER'S WORKS, PINXTON, UK 05-Jan-12 05-Jan-12 16-Jul-12 16-Jul-12 23-Jul-12 23-Jul-12 30-Jul-12 30-Jul-12 06-Aug-12 06-Aug-12 13-Sep-12 13-Sep-12 13-Oct-12 13-Oct-12 28-Oct-12 28-Oct-12 28-Oct-12
UB00-P-NNTS-000-1012 Earthing & Lightning Protection Materials ELECTRICAL LOT : 001 SF0084 KINGSMILL INDUSTRIES (UK) LTD FCA SELLER'S WORKS, PINXTON, UK 29-Nov-11 16-May-11 20-Jun-11 100 15-Jun-11 05-Jul-11 100 23-Jul-11 29-Sep-11 100 30-Jul-11 03-Oct-11 100 13-Sep-11 03-Oct-11 100 07-Dec-11 23-Nov-11 13.00 14-Dec-11 23-Nov-11 21-Dec-11 29-Nov-11 28-Dec-11 29-Nov-11 04-Feb-12 29-Nov-11 05-Mar-12 29-Nov-11 20-Mar-12 29-Nov-11 20-Mar-12
Welding & Convenience Sockets -
UB00-P-NNTS-000-1013 Hazardous Area ELECTRICAL LOT : 002 SF0074 ATX-EGS ELECTRICAL GROUP NOT APPLICABLE 06-Nov-11 16-May-11 05-Jun-11 100 15-Jun-11 14-Jun-11 100 23-Jul-11 29-Aug-11 100 30-Jul-11 11-Sep-11 100 13-Sep-11 11-Sep-11 100 07-Dec-11 10-Mar-12 13.00 14-Dec-11 10-Mar-12 21-Dec-11 30-Mar-12 28-Dec-11 30-Mar-12 04-Feb-12 30-Mar-12 05-Mar-12 30-Mar-12 20-Mar-12 30-Mar-12 20-Mar-12
Welding & Convenience Sockets -
UB00-P-NNTS-000-1013 Hazardous Area ELECTRICAL LOT : 001 SF1015 COOPER CROUSE-HINDS LLC NOT APPLICABLE 16-May-11 05-Jun-11 100 15-Jun-11 14-Jun-11 100 23-Jul-11 29-Aug-11 100 30-Jul-11 11-Sep-11 100 13-Sep-11 03-Oct-11 100 07-Dec-11 02-Oct-11 14-Dec-11 02-Oct-11 21-Dec-11 02-Oct-11 28-Dec-11 02-Oct-11 04-Feb-12 02-Oct-11 05-Mar-12 02-Oct-11 20-Mar-12 02-Oct-11 20-Mar-12
Welding & Convenience Sockets -
UB00-P-NNTS-000-1013 Hazardous Area ELECTRICAL LOT : 003 SF6006 HOCKWAY MIDDLE EAST FZC NOT APPLICABLE 16-May-11 05-Jun-11 100 15-Jun-11 14-Jun-11 100 23-Jul-11 29-Aug-11 100 30-Jul-11 11-Sep-11 100 13-Sep-11 11-Sep-11 100 07-Dec-11 20-Nov-11 14-Dec-11 20-Nov-11 21-Dec-11 20-Nov-11 28-Dec-11 20-Nov-11 04-Feb-12 20-Nov-11 05-Mar-12 20-Nov-11 20-Mar-12 20-Nov-11 20-Mar-12
UB00-P-NNTS-000-1015 Remote Control Units ELECTRICAL UB00-P-NNTS-084-1015-3 SF0095 R. STAHL MIDDLE EAST FZE 16-May-11 19-Jul-11 100 15-Jun-11 08-Aug-11 100 23-Jul-11 11-Oct-11 100 30-Jul-11 17-Oct-11 100 13-Sep-11 01-Dec-11 07-Dec-11 24-Feb-12 14-Dec-11 02-Mar-12 21-Dec-11 09-Mar-12 28-Dec-11 16-Mar-12 04-Feb-12 23-Apr-12 05-Mar-12 23-May-12 20-Mar-12 07-Jun-12 20-Mar-12
UB00-P-NNTS-000-1016 Termination Kits ELECTRICAL LOT : 001 SF0077 DANWAY LLC FCA JEBEL ALI SEAPORT, UAE 15-Jun-11 12-Jun-11 100 15-Jul-11 05-Jul-11 100 22-Aug-11 15-Sep-11 100 29-Aug-11 22-Sep-11 100 13-Oct-11 22-Sep-11 100 06-Jan-12 12-Mar-12 13.00 13-Jan-12 12-Mar-12 20-Jan-12 30-Mar-12 27-Jan-12 30-Mar-12 05-Mar-12 30-Mar-12 04-Apr-12 30-Mar-12 19-Apr-12 30-Mar-12 19-Apr-12
Welding & Convenience Socket (Safe
UB00-P-NNTS-000-1017 Area) ELECTRICAL UB00-P-NNTS-084-1017-5 16-May-11 06-Nov-11 15-Jun-11 06-Dec-11 23-Jul-11 13-Jan-12 30-Jul-11 20-Jan-12 13-Sep-11 05-Mar-12 07-Dec-11 06-May-12 14-Dec-11 13-May-12 21-Dec-11 20-May-12 28-Dec-11 27-May-12 04-Feb-12 04-Jul-12 05-Mar-12 03-Aug-12 20-Mar-12 18-Aug-12 20-Mar-12
Welding & Convenience Socket (Safe
UB00-P-NNTS-000-1017 Area) - TOP UP ELECTRICAL UB00-P-NNTS-084-1017-13 05-Jan-12 05-Jan-12 26-Jun-12 26-Jun-12 03-Jul-12 03-Jul-12 10-Jul-12 10-Jul-12 17-Jul-12 17-Jul-12 24-Aug-12 24-Aug-12 23-Sep-12 23-Sep-12 08-Oct-12 08-Oct-12 08-Oct-12
UB00-P-NNTS-000-1018 Cable Glands ELECTRICAL UB00-P-NNTS-084-1018-6 16-May-11 14-Sep-11 100 15-Jun-11 29-Sep-11 100 23-Jul-11 24-Dec-11 30-Jul-11 31-Dec-11 13-Sep-11 14-Feb-12 07-Dec-11 21-Apr-12 14-Dec-11 28-Apr-12 21-Dec-11 05-May-12 28-Dec-11 12-May-12 04-Feb-12 19-Jun-12 05-Mar-12 19-Jul-12 20-Mar-12 03-Aug-12 20-Mar-12
UB00-P-NNTS-000-1019 Heat Tracing System ELECTRICAL UB00-P-NNTS-084-1019-7 13-Oct-11 05-Nov-11 12-Nov-11 05-Dec-11 20-Dec-11 20-Dec-11 27-Dec-11 27-Dec-11 10-Feb-12 10-Feb-12 05-May-12 05-May-12 12-May-12 12-May-12 19-May-12 19-May-12 26-May-12 26-May-12 03-Jul-12 03-Jul-12 02-Aug-12 02-Aug-12 17-Aug-12 17-Aug-12 17-Aug-12
YOKOGAWA EUROPE SOLUTIONS FOB INTERNATIONAL SEAPORT, THE
UU00-P-KKTS-000-1001 Integrated Control System (ICS) INSTRUMENTATION ICS-2 SF0010 B.V. NETHERLANDS 28-Aug-12 15-Feb-11 28-Feb-11 100 17-Mar-11 13-Mar-11 100 23-Apr-11 24-Apr-11 100 30-Apr-11 25-Apr-11 100 14-Jun-11 06-May-11 100 29-Jul-11 17-Aug-11 54 06-Jan-12 07-Mar-12 42 06-Mar-12 22-May-12 04-Jun-12 13-Sep-12 11-Jun-12 22-Sep-12 18-Jun-12 30-Sep-12 25-Jun-12 07-Oct-12 02-Aug-12 14-Nov-12 01-Sep-12 14-Dec-12 16-Sep-12 29-Dec-12 16-Sep-12
YOKOGAWA EUROPE SOLUTIONS FOB INTERNATIONAL SEAPORT, THE
UU00-P-KKTS-000-1001 Integrated Control System (ICS) INSTRUMENTATION ICS-1 SF0010 B.V. NETHERLANDS 07-Sep-12 15-Feb-11 28-Feb-11 100 17-Mar-11 13-Mar-11 100 23-Apr-11 24-Apr-11 100 30-Apr-11 25-Apr-11 100 14-Jun-11 06-May-11 100 29-Jul-11 17-Aug-11 54 06-Jan-12 07-Mar-12 42 06-Mar-12 22-May-12 04-Jun-12 13-Sep-12 11-Jun-12 22-Sep-12 18-Jun-12 30-Sep-12 25-Jun-12 07-Oct-12 02-Aug-12 14-Nov-12 01-Sep-12 14-Dec-12 16-Sep-12 29-Dec-12 16-Sep-12
YOKOGAWA EUROPE SOLUTIONS FOB INTERNATIONAL SEAPORT, THE
UU00-P-KKTS-000-1001 RTU for WHCP - ICSS INSTRUMENTATION ICS-RTU SF0010 B.V. NETHERLANDS 28-Aug-12 06-May-11 100 06-May-11 100 06-May-11 100 06-May-11 100 06-May-11 100 06-May-11 54 06-May-11 42 06-May-11 06-May-11 06-May-11 30-Sep-12 07-Oct-12 14-Nov-12 14-Dec-12 29-Dec-12
WEATHERFORD OIL TOOLS
UU00-P-KKTS-000-1002 Wellhead Control/Solar/Hydraulic Panels INSTRUMENTATION LOT : 001 SF0057 MIDDLE EAST LTD CAC INC. FCA SELLER'S WORKS, JEBEL ALI, UAE 08-Jul-12 17-Mar-11 13-Mar-11 100 16-Apr-11 28-Mar-11 100 24-May-11 28-Jul-11 100 31-May-11 11-Aug-11 100 15-Jul-11 21-Aug-11 100 07-Dec-11 04-Aug-12 7.00 14-Dec-11 04-Aug-12 21-Dec-11 30-Aug-12 28-Dec-11 30-Aug-12 04-Feb-12 30-Aug-12 05-Mar-12 30-Aug-12 20-Mar-12 30-Aug-12 20-Mar-12
Leak Detection System (LDS) & Fibre SENSOR HIGHWAY LIMITED
Optics Pipeline Integrity Monitoring (SCHLUMBERGER),ATMOS
UU00-P-KKTS-000-1003 System (FOPIMS) INSTRUMENTATION UU00-P-KKTS-000-1003-15 INTERNATIONAL LIMITED
SF1016,SF0083,SF0086 16-Apr-11 15-May-11 100 16-May-11 14-Jun-11 100 23-Jun-11 26-Sep-11 100 30-Jun-11 02-Oct-11 100 14-Aug-11 16-Nov-11 07-Dec-11 10-Mar-12 14-Dec-11 17-Mar-12 21-Dec-11 24-Mar-12 28-Dec-11 31-Mar-12 04-Feb-12 08-May-12 05-Mar-12 07-Jun-12 20-Mar-12 22-Jun-12 20-Mar-12
Condition Performance Monitoring
UU00-P-KKTS-000-1004 System (CPMS) INSTRUMENTATION UU00-P-KKTS-000-1004-16 15-Jul-11 07-Aug-11 100 14-Aug-11 30-Oct-11 21-Sep-11 07-Dec-11 28-Sep-11 14-Dec-11 12-Nov-11 28-Jan-12 06-Mar-12 30-May-12 13-Mar-12 06-Jun-12 20-Mar-12 13-Jun-12 27-Mar-12 20-Jun-12 04-May-12 28-Jul-12 03-Jun-12 27-Aug-12 18-Jun-12 11-Sep-12 18-Jun-12
UU00-P-KKTS-000-1005 Flow Computer INSTRUMENTATION UU00-P-KKTS-000-1005-17 15-Jun-11 17-Aug-11 100 15-Jul-11 14-Sep-11 100 22-Aug-11 24-Dec-11 29-Aug-11 31-Dec-11 13-Oct-11 14-Feb-12 05-Feb-12 22-Sep-12 12-Feb-12 29-Sep-12 19-Feb-12 06-Oct-12 26-Feb-12 13-Oct-12 04-Apr-12 20-Nov-12 04-May-12 20-Dec-12 19-May-12 04-Jan-13 19-May-12
UU00-P-KKTS-000-1006 Control Valves INSTRUMENTATION UU00-P-KKTS-000-1006-84 SF0078 KOSO KENT INTROL LIMITED 16-May-11 31-May-11 100 15-Jun-11 27-Jun-11 100 23-Jul-11 25-Aug-11 100 30-Jul-11 09-Oct-11 100 13-Sep-11 23-Nov-11 04-Jun-12 14-Aug-12 11-Jun-12 21-Aug-12 18-Jun-12 28-Aug-12 25-Jun-12 04-Sep-12 02-Aug-12 12-Oct-12 01-Sep-12 11-Nov-12 16-Sep-12 26-Nov-12 16-Sep-12
UU00-P-KKTS-000-1007 Actuated Isolation Valves INSTRUMENTATION UU00-P-KKTS-000-1007-18 16-Apr-11 16-May-11 100 16-May-11 16-Jun-11 100 23-Jun-11 31-Oct-11 30-Jun-11 07-Nov-11 14-Aug-11 22-Dec-11 06-Jan-12 17-Dec-12 13-Jan-12 24-Dec-12 20-Jan-12 31-Dec-12 27-Jan-12 07-Jan-13 05-Mar-12 14-Feb-13 04-Apr-12 16-Mar-13 19-Apr-12 31-Mar-13 19-Apr-12
UU00-P-KKTS-000-1008 Choke Valve with Hydraulic Actuators INSTRUMENTATION UU00-P-KKTS-000-1008-19 01-Sep-11 23-Oct-11 100 01-Oct-11 22-Nov-11 08-Nov-11 24-Jan-12 15-Nov-11 31-Jan-12 30-Dec-11 16-Mar-12 24-Mar-12 09-Jun-12 31-Mar-12 16-Jun-12 07-Apr-12 23-Jun-12 14-Apr-12 30-Jun-12 22-May-12 07-Aug-12 21-Jun-12 06-Sep-12 06-Jul-12 21-Sep-12 06-Jul-12
UU00-P-KKTS-000-1009 Ball Control Valves INSTRUMENTATION LOT : 001 SF0068 PIBIVIESSE SRL FOB GENOA PORT, ITALY 10-Jun-12 16-May-11 29-May-11 100 15-Jun-11 14-Jun-11 100 23-Jul-11 25-Aug-11 100 30-Jul-11 04-Sep-11 100 13-Sep-11 04-Sep-11 100 05-Apr-12 24-Jun-12 7.00 12-Apr-12 02-Jul-12 19-Apr-12 10-Jul-12 26-Apr-12 17-Jul-12 03-Jun-12 24-Aug-12 03-Jul-12 23-Sep-12 18-Jul-12 08-Oct-12 18-Jul-12
UU00-P-KKTS-000-1010 Shutdown Valves INSTRUMENTATION UU00-P-KKTS-000-1010-85 14-Apr-11 05-May-11 100 14-May-11 05-Nov-11 07-Jun-11 29-Nov-11 14-Jun-11 06-Dec-11 29-Jul-11 20-Jan-12 05-Feb-12 29-Jul-12 12-Feb-12 05-Aug-12 19-Feb-12 12-Aug-12 26-Feb-12 19-Aug-12 04-Apr-12 26-Sep-12 04-May-12 26-Oct-12 19-May-12 10-Nov-12 19-May-12
SERCK AUDCO VALVES
UU00-P-KKTS-000-1011 Motor Operated Valve (Plug Type) INSTRUMENTATION LOT : 001 SF0061 (FLOWSERVE) FOB INTERNATIONAL SEAPORT UK 19-Apr-12 16-Apr-11 20-Apr-11 100 16-May-11 18-May-11 100 23-Jun-11 01-Sep-11 100 30-Jun-11 01-Sep-11 100 14-Aug-11 01-Sep-11 100 05-May-12 06-Jun-12 17.00 12-May-12 12-Jun-12 19-May-12 19-Jun-12 26-May-12 26-Jun-12 03-Jul-12 03-Aug-12 02-Aug-12 02-Sep-12 17-Aug-12 17-Sep-12 17-Aug-12
Block / Gas Over Oil Valves - (N033-BV-
UU00-P-KKTS-000-1012 065)-32" INSTRUMENTATION UU00-P-KKTS-000-1012-22 17-Mar-11 02-May-11 100 16-Apr-11 20-May-11 100 24-May-11 25-Oct-11 100 31-May-11 01-Nov-11 15-Jul-11 16-Dec-11 05-Feb-12 18-Sep-12 12-Feb-12 25-Sep-12 19-Feb-12 02-Oct-12 26-Feb-12 09-Oct-12 04-Apr-12 16-Nov-12 04-May-12 16-Dec-12 19-May-12 31-Dec-12 19-May-12
Block / Gas Over Oil Valves - (X033-BV-
UU00-P-KKTS-000-1012 171)-24" INSTRUMENTATION UU00-P-KKTS-000-1012-22-2 17-Mar-11 02-May-11 100 16-Apr-11 20-May-11 100 24-May-11 25-Oct-11 100 31-May-11 01-Nov-11 15-Jul-11 16-Dec-11 05-Feb-12 18-Sep-12 12-Feb-12 25-Sep-12 19-Feb-12 02-Oct-12 26-Feb-12 09-Oct-12 04-Apr-12 16-Nov-12 04-May-12 16-Dec-12 19-May-12 31-Dec-12 19-May-12
Block / Gas Over Oil Valves - (X033-BV-
UU00-P-KKTS-000-1012 191)-32" INSTRUMENTATION UU00-P-KKTS-000-1012-22-3 17-Mar-11 02-May-11 100 16-Apr-11 20-May-11 100 24-May-11 25-Oct-11 100 31-May-11 01-Nov-11 15-Jul-11 16-Dec-11 05-Feb-12 18-Sep-12 12-Feb-12 25-Sep-12 19-Feb-12 02-Oct-12 26-Feb-12 09-Oct-12 04-Apr-12 16-Nov-12 04-May-12 16-Dec-12 19-May-12 31-Dec-12 19-May-12
Block / Gas Over Oil Valves - (X033-BV-
UU00-P-KKTS-000-1012 192)-32" INSTRUMENTATION UU00-P-KKTS-000-1012-22-4 17-Mar-11 02-May-11 100 16-Apr-11 20-May-11 100 24-May-11 25-Oct-11 100 31-May-11 01-Nov-11 15-Jul-11 16-Dec-11 05-Feb-12 18-Sep-12 12-Feb-12 25-Sep-12 19-Feb-12 02-Oct-12 26-Feb-12 09-Oct-12 04-Apr-12 16-Nov-12 04-May-12 16-Dec-12 19-May-12 31-Dec-12 19-May-12
Block / Gas Over Oil Valves - (X033-BV-
UU00-P-KKTS-000-1012 193)-32" INSTRUMENTATION UU00-P-KKTS-000-1012-22-5 17-Mar-11 02-May-11 100 16-Apr-11 20-May-11 100 24-May-11 25-Oct-11 100 31-May-11 01-Nov-11 15-Jul-11 16-Dec-11 05-Feb-12 18-Sep-12 12-Feb-12 25-Sep-12 19-Feb-12 02-Oct-12 26-Feb-12 09-Oct-12 04-Apr-12 16-Nov-12 04-May-12 16-Dec-12 19-May-12 31-Dec-12 19-May-12
Block / Gas Over Oil Valves - (X033-BV-
UU00-P-KKTS-000-1012 141)-24" INSTRUMENTATION UU00-P-KKTS-000-1012-22-6 17-Mar-11 02-May-11 100 16-Apr-11 20-May-11 100 24-May-11 25-Oct-11 100 31-May-11 01-Nov-11 15-Jul-11 16-Dec-11 05-Feb-12 18-Sep-12 12-Feb-12 25-Sep-12 19-Feb-12 02-Oct-12 26-Feb-12 09-Oct-12 04-Apr-12 16-Nov-12 04-May-12 16-Dec-12 19-May-12 31-Dec-12 19-May-12
Block / Gas Over Oil Valves - (X033-BV-
UU00-P-KKTS-000-1012 131)-24" INSTRUMENTATION UU00-P-KKTS-000-1012-22-7 17-Mar-11 02-May-11 100 16-Apr-11 20-May-11 100 24-May-11 25-Oct-11 100 31-May-11 01-Nov-11 15-Jul-11 16-Dec-11 05-Feb-12 18-Sep-12 12-Feb-12 25-Sep-12 19-Feb-12 02-Oct-12 26-Feb-12 09-Oct-12 04-Apr-12 16-Nov-12 04-May-12 16-Dec-12 19-May-12 31-Dec-12 19-May-12
Block / Gas Over Oil Valves - (X033-BV-
UU00-P-KKTS-000-1012 045)-32" INSTRUMENTATION UU00-P-KKTS-000-1012-22-8 17-Mar-11 02-May-11 100 16-Apr-11 20-May-11 100 24-May-11 25-Oct-11 100 31-May-11 01-Nov-11 15-Jul-11 16-Dec-11 05-Feb-12 18-Sep-12 12-Feb-12 25-Sep-12 19-Feb-12 02-Oct-12 26-Feb-12 09-Oct-12 04-Apr-12 16-Nov-12 04-May-12 16-Dec-12 19-May-12 31-Dec-12 19-May-12
Block / Gas Over Oil Valves - (X033-BV-
UU00-P-KKTS-000-1012 035)-32" INSTRUMENTATION UU00-P-KKTS-000-1012-22-9 17-Mar-11 02-May-11 100 16-Apr-11 20-May-11 100 24-May-11 25-Oct-11 100 31-May-11 01-Nov-11 15-Jul-11 16-Dec-11 05-Feb-12 18-Sep-12 12-Feb-12 25-Sep-12 19-Feb-12 02-Oct-12 26-Feb-12 09-Oct-12 04-Apr-12 16-Nov-12 04-May-12 16-Dec-12 19-May-12 31-Dec-12 19-May-12
UU00-P-KKTS-000-1013 Pressure Relief Valves INSTRUMENTATION UU00-P-KKTS-000-1013-23 14-Jun-11 07-Jul-11 100 14-Jul-11 27-Jul-11 100 21-Aug-11 22-Dec-11 30-Aug-11 31-Dec-11 14-Oct-11 14-Feb-12 26-Apr-12 22-Sep-12 03-May-12 29-Sep-12 10-May-12 06-Oct-12 17-May-12 13-Oct-12 24-Jun-12 20-Nov-12 24-Jul-12 20-Dec-12 08-Aug-12 04-Jan-13 08-Aug-12
UU00-P-KKTS-000-1014 Pressure / DP Gauges INSTRUMENTATION UU00-P-KKTS-000-1014-86 13-Sep-11 15-Dec-11 13-Oct-11 14-Jan-12 20-Nov-11 21-Feb-12 27-Nov-11 28-Feb-12 11-Jan-12 13-Apr-12 05-May-12 06-Aug-12 12-May-12 13-Aug-12 19-May-12 20-Aug-12 26-May-12 27-Aug-12 03-Jul-12 04-Oct-12 02-Aug-12 03-Nov-12 17-Aug-12 18-Nov-12 17-Aug-12
UU00-P-KKTS-000-1015 Temperature Gauges & Thermowells INSTRUMENTATION UU00-P-KKTS-000-1015-222 13-Sep-11 15-Dec-11 13-Oct-11 14-Jan-12 20-Nov-11 21-Feb-12 27-Nov-11 28-Feb-12 11-Jan-12 13-Apr-12 05-May-12 06-Aug-12 12-May-12 13-Aug-12 19-May-12 20-Aug-12 26-May-12 27-Aug-12 03-Jul-12 04-Oct-12 02-Aug-12 03-Nov-12 17-Aug-12 18-Nov-12 17-Aug-12
UU00-P-KKTS-000-1016 Level Gauges INSTRUMENTATION UU00-P-KKTS-000-1016-24 SF0087 CESARE BONETTI SPA 13-Sep-11 07-Jul-11 100 13-Oct-11 04-Aug-11 100 20-Nov-11 27-Sep-11 100 27-Nov-11 03-Oct-11 100 11-Jan-12 17-Nov-11 05-May-12 11-Mar-12 12-May-12 18-Mar-12 19-May-12 25-Mar-12 26-May-12 01-Apr-12 03-Jul-12 09-May-12 02-Aug-12 08-Jun-12 17-Aug-12 23-Jun-12 17-Aug-12
UU00-P-KKTS-000-1017 Electronic Transmitters & Rotameters INSTRUMENTATION UU00-P-KKTS-000-1017-25 11-Sep-11 14-Nov-11 11-Oct-11 14-Dec-11 18-Nov-11 24-Jan-12 25-Nov-11 31-Jan-12 09-Jan-12 16-Mar-12 05-May-12 28-Jul-12 12-May-12 04-Aug-12 19-May-12 11-Aug-12 26-May-12 18-Aug-12 03-Jul-12 25-Sep-12 02-Aug-12 25-Oct-12 17-Aug-12 09-Nov-12 17-Aug-12
UU00-P-KKTS-000-1018 Level Transmitter Radar Type INSTRUMENTATION LOT : 001 SF0073 EMERSON FZE FOB JEBEL ALI SEAPORT, UAE 20-Dec-11 16-May-11 23-May-11 100 15-Jun-11 14-Jun-11 100 23-Jul-11 12-Sep-11 100 30-Jul-11 13-Sep-11 100 13-Sep-11 13-Sep-11 100 06-Jan-12 19-Jan-12 13.00 13-Jan-12 19-Jan-12 20-Jan-12 30-Jan-12 27-Jan-12 30-Jan-12 05-Mar-12 30-Jan-12 04-Apr-12 30-Jan-12 19-Apr-12 30-Jan-12 19-Apr-12
UU00-P-KKTS-000-1021 Flow Assemblies INSTRUMENTATION UU00-P-KKTS-000-1021-28 16-May-11 01-Sep-11 100 15-Jun-11 22-Sep-11 100 23-Jul-11 24-Dec-11 30-Jul-11 31-Dec-11 13-Sep-11 14-Feb-12 06-Jan-12 28-Jul-12 13-Jan-12 04-Aug-12 20-Jan-12 11-Aug-12 27-Jan-12 18-Aug-12 05-Mar-12 25-Sep-12 04-Apr-12 25-Oct-12 19-Apr-12 09-Nov-12 19-Apr-12
UU00-P-KKTS-000-1022 Ultrasonic Flow Meters INSTRUMENTATION UU00-P-KKTS-000-1022-88 15-Jul-11 25-Jul-11 100 14-Aug-11 17-Aug-11 100 21-Sep-11 24-Dec-11 28-Sep-11 31-Dec-11 12-Nov-11 14-Feb-12 05-May-12 25-Aug-12 12-May-12 01-Sep-12 19-May-12 08-Sep-12 26-May-12 15-Sep-12 03-Jul-12 23-Oct-12 02-Aug-12 22-Nov-12 17-Aug-12 07-Dec-12 17-Aug-12
UU00-P-KKTS-000-1023 Turbine Flow Meters INSTRUMENTATION UU00-P-KKTS-000-1023-29 15-Jul-11 30-Oct-11 14-Aug-11 24-Nov-11 21-Sep-11 24-Dec-11 28-Sep-11 31-Dec-11 12-Nov-11 14-Feb-12 05-May-12 07-Aug-12 12-May-12 14-Aug-12 19-May-12 21-Aug-12 26-May-12 28-Aug-12 03-Jul-12 05-Oct-12 02-Aug-12 04-Nov-12 17-Aug-12 19-Nov-12 17-Aug-12
UU00-P-KKTS-000-1024 Vortex Flow Meters INSTRUMENTATION UU00-P-KKTS-000-1024-30 15-Jul-11 30-Oct-11 14-Aug-11 24-Nov-11 21-Sep-11 24-Dec-11 28-Sep-11 31-Dec-11 12-Nov-11 14-Feb-12 04-Jun-12 06-Sep-12 11-Jun-12 13-Sep-12 18-Jun-12 20-Sep-12 25-Jun-12 27-Sep-12 02-Aug-12 04-Nov-12 01-Sep-12 04-Dec-12 16-Sep-12 19-Dec-12 16-Sep-12
UU00-P-KKTS-000-1025 V-Cone Flow Meters INSTRUMENTATION UU00-P-KKTS-000-1025-31 15-Jul-11 07-Aug-11 100 14-Aug-11 27-Aug-11 100 21-Sep-11 24-Dec-11 28-Sep-11 31-Dec-11 12-Nov-11 14-Feb-12 05-Feb-12 25-Aug-12 12-Feb-12 01-Sep-12 19-Feb-12 08-Sep-12 26-Feb-12 15-Sep-12 04-Apr-12 23-Oct-12 04-May-12 22-Nov-12 19-May-12 07-Dec-12 19-May-12
UU00-P-KKTS-000-1026 Magnetic Flow Meters INSTRUMENTATION UU00-P-KKTS-000-1026-89 15-Jul-11 26-Jul-11 100 14-Aug-11 01-Sep-11 100 21-Sep-11 24-Dec-11 28-Sep-11 31-Dec-11 12-Nov-11 14-Feb-12 06-Jan-12 05-May-12 13-Jan-12 12-May-12 20-Jan-12 19-May-12 27-Jan-12 26-May-12 05-Mar-12 03-Jul-12 04-Apr-12 02-Aug-12 19-Apr-12 17-Aug-12 19-Apr-12
YOKOGAWA EUROPE SOLUTIONS FOB INTERNATIONAL SEAPORT, THE
UU00-P-KKTS-000-1028 Fire & Gas Detectors INSTRUMENTATION UU00-P-KKTS-000-1028-33 SF0010 B.V. NETHERLANDS 28-Aug-12 16-Apr-11 28-Feb-11 100 16-May-11 13-Mar-11 100 23-Jun-11 24-Apr-11 100 30-Jun-11 25-Apr-11 100 14-Aug-11 06-May-11 100 07-Dec-11 19-Jul-12 14-Dec-11 08-Aug-12 21-Dec-11 28-Aug-12 28-Dec-11 04-Sep-12 04-Feb-12 12-Oct-12 05-Mar-12 11-Nov-12 20-Mar-12 26-Nov-12 20-Mar-12
UU00-P-KKTS-000-1030 Instrument Cables - TOP UP INSTRUMENTATION UU00-P-KKTS-000-1030-42 05-Jan-12 05-Jan-12 26-Jun-12 26-Jun-12 03-Jul-12 03-Jul-12 10-Jul-12 10-Jul-12 17-Jul-12 17-Jul-12 24-Aug-12 24-Aug-12 23-Sep-12 23-Sep-12 08-Oct-12 08-Oct-12 08-Oct-12
UU00-P-KKTS-000-1030 Instrument Cables - Lot 2 INSTRUMENTATION UU00-P-KKTS-000-1030-90-4 17-Mar-11 20-Mar-11 100 16-Apr-11 31-Mar-11 100 24-May-11 29-May-11 100 31-May-11 05-Nov-11 15-Jul-11 20-Dec-11 07-Dec-11 05-May-12 14-Dec-11 12-May-12 21-Dec-11 19-May-12 28-Dec-11 26-May-12 04-Feb-12 03-Jul-12 05-Mar-12 02-Aug-12 20-Mar-12 17-Aug-12 20-Mar-12
UU00-P-KKTS-000-1030 Instrument Cables- Lot 1 INSTRUMENTATION LOT : 001 SF0033 LEONI KERPEN GMBH FOB ANTWERP PORT, BELGIUM 30-Nov-11 17-Mar-11 20-Mar-11 100 16-Apr-11 31-Mar-11 100 24-May-11 29-May-11 100 31-May-11 09-Jun-11 100 15-Jul-11 09-Jun-11 100 07-Dec-11 14-Jan-12 50.00 14-Dec-11 22-Jan-12 21-Dec-11 30-Jan-12 28-Dec-11 06-Feb-12 04-Feb-12 15-Mar-12 05-Mar-12 14-Apr-12 20-Mar-12 29-Apr-12 20-Mar-12
UU00-P-KKTS-000-1031 Instrument Junction Boxes INSTRUMENTATION UU00-P-KKTS-000-1031-35 15-Jul-11 23-Aug-11 100 14-Aug-11 06-Sep-11 100 21-Sep-11 31-Oct-11 28-Sep-11 07-Nov-11 12-Nov-11 22-Dec-11 06-Jan-12 24-Mar-12 13-Jan-12 31-Mar-12 20-Jan-12 07-Apr-12 27-Jan-12 14-Apr-12 05-Mar-12 22-May-12 04-Apr-12 21-Jun-12 19-Apr-12 06-Jul-12 19-Apr-12
UU00-P-KKTS-000-1031 Instrument Junction Boxes - TOP UP INSTRUMENTATION UU00-P-KKTS-000-1031-43 05-Jan-12 05-Jan-12 26-Jun-12 26-Jun-12 03-Jul-12 03-Jul-12 10-Jul-12 10-Jul-12 17-Jul-12 17-Jul-12 24-Aug-12 24-Aug-12 23-Sep-12 23-Sep-12 08-Oct-12 08-Oct-12 08-Oct-12
UU00-P-KKTS-000-1032 Cable Glands INSTRUMENTATION UU00-P-KKTS-000-1032-36 02-May-11 14-Sep-11 100 23-May-11 25-Nov-11 21-Jun-11 24-Dec-11 28-Jun-11 31-Dec-11 12-Aug-11 14-Feb-12 07-Dec-11 10-Jun-12 14-Dec-11 17-Jun-12 21-Dec-11 24-Jun-12 28-Dec-11 01-Jul-12 04-Feb-12 08-Aug-12 05-Mar-12 07-Sep-12 20-Mar-12 22-Sep-12 20-Mar-12
UU00-P-KKTS-000-1032 Cable Glands - TOP UP INSTRUMENTATION UU00-P-KKTS-000-1032-44 05-Jan-12 05-Jan-12 26-Jun-12 26-Jun-12 03-Jul-12 03-Jul-12 10-Jul-12 10-Jul-12 17-Jul-12 17-Jul-12 24-Aug-12 24-Aug-12 23-Sep-12 23-Sep-12 08-Oct-12 08-Oct-12 08-Oct-12
UU00-P-KKTS-000-1033 Instrument Tubes & Fittings INSTRUMENTATION UU00-P-KKTS-000-1033-37 14-Aug-11 30-Oct-11 13-Sep-11 29-Nov-11 21-Oct-11 06-Jan-12 28-Oct-11 13-Jan-12 12-Dec-11 27-Feb-12 05-Feb-12 22-Apr-12 12-Feb-12 29-Apr-12 19-Feb-12 06-May-12 26-Feb-12 13-May-12 04-Apr-12 20-Jun-12 04-May-12 20-Jul-12 19-May-12 04-Aug-12 19-May-12
UU00-P-KKTS-000-1033 Instrument Tubes & Fittings - TOP UP INSTRUMENTATION UU00-P-KKTS-000-1033-45 05-Jan-12 05-Jan-12 26-Jun-12 26-Jun-12 03-Jul-12 03-Jul-12 10-Jul-12 10-Jul-12 17-Jul-12 17-Jul-12 24-Aug-12 24-Aug-12 23-Sep-12 23-Sep-12 08-Oct-12 08-Oct-12 08-Oct-12
UU00-P-KKTS-000-1034 Instrument Bulk Material INSTRUMENTATION UU00-P-KKTS-000-1034-38 14-Aug-11 10-Dec-11 13-Sep-11 09-Jan-12 21-Oct-11 16-Feb-12 28-Oct-11 23-Feb-12 12-Dec-11 08-Apr-12 06-Jan-12 03-May-12 13-Jan-12 10-May-12 20-Jan-12 17-May-12 27-Jan-12 24-May-12 05-Mar-12 01-Jul-12 04-Apr-12 31-Jul-12 19-Apr-12 15-Aug-12 19-Apr-12
UU00-P-KKTS-000-1034 Instrument Bulk Material - TOP UP INSTRUMENTATION UU00-P-KKTS-000-1034-46 05-Jan-12 05-Jan-12 26-Jun-12 26-Jun-12 03-Jul-12 03-Jul-12 10-Jul-12 10-Jul-12 17-Jul-12 17-Jul-12 24-Aug-12 24-Aug-12 23-Sep-12 23-Sep-12 08-Oct-12 08-Oct-12 08-Oct-12
UU00-P-KKTS-000-1035 Instrument Sunshades INSTRUMENTATION UU00-P-KKTS-000-1035-39 14-Aug-11 10-Dec-11 13-Sep-11 09-Jan-12 21-Oct-11 16-Feb-12 28-Oct-11 23-Feb-12 12-Dec-11 08-Apr-12 06-Jan-12 03-May-12 13-Jan-12 10-May-12 20-Jan-12 17-May-12 27-Jan-12 24-May-12 05-Mar-12 01-Jul-12 04-Apr-12 31-Jul-12 19-Apr-12 15-Aug-12 19-Apr-12
UU00-P-KKTS-000-1036 Instrument Tag Plates INSTRUMENTATION UU00-P-KKTS-000-1036-40 14-Aug-11 31-Jan-12 13-Sep-11 01-Mar-12 21-Oct-11 08-Apr-12 28-Oct-11 15-Apr-12 12-Dec-11 30-May-12 06-Jan-12 24-Jun-12 13-Jan-12 01-Jul-12 20-Jan-12 08-Jul-12 27-Jan-12 15-Jul-12 05-Mar-12 22-Aug-12 04-Apr-12 21-Sep-12 19-Apr-12 06-Oct-12 19-Apr-12
Cable Ladders, Trays & Accessories - TOP
UU00-P-KKTS-000-1037 UP INSTRUMENTATION UU00-P-KKTS-000-1037-47 05-Jan-12 05-Jan-12 26-Jun-12 26-Jun-12 03-Jul-12 03-Jul-12 10-Jul-12 10-Jul-12 17-Jul-12 17-Jul-12 24-Aug-12 24-Aug-12 23-Sep-12 23-Sep-12 08-Oct-12 08-Oct-12 08-Oct-12
TEKOM-PUK
ELECTROMECHANICAL INDUSTRY FOB (INTERNATIONAL) IZMIR SEAPORT,
UU00-P-KKTS-000-1037 Cable Ladders, Trays & Accessories INSTRUMENTATION LOT : 001 SF0028 AND TRADE INC. TURKEY 30-Jun-11 06-Mar-11 20-Mar-11 100 05-Apr-11 01-Apr-11 100 13-May-11 29-May-11 100 20-May-11 31-May-11 100 04-Jul-11 31-May-11 100 27-Sep-11 09-Sep-11 100.00 04-Oct-11 09-Sep-11 100.00 11-Oct-11 27-Sep-11 100.00 18-Oct-11 01-Oct-11 25-Nov-11 20-Oct-11 25-Dec-11 20-Oct-11 09-Jan-12 04-Nov-11 09-Jan-12
UU00-P-KKTS-000-1038 VESDA System INSTRUMENTATION UU00-P-KKTS-000-1038-1 01-Aug-11 100 19-Aug-11 100 24-Dec-11 31-Dec-11 14-Feb-12 25-Mar-12 01-Apr-12 08-Apr-12 15-Apr-12 23-May-12 22-Jun-12 07-Jul-12 24-Aug-12
PETROFAC FACILITIES
MANAGEMENT INTERNATIONAL
UU00-P-XXTS-000-1000 RAM Study HSE UU00-P-XXTS-000-1000-232 SF4002 LIMITED DDP PETROFAC SHARJAH OFFICE, UAE 31-Jan-11 31-Jan-11 100 02-Mar-11 28-Feb-11 100 12-Mar-11 31-Mar-11 100 14-Mar-11 31-Mar-11 100
UU00-P-XXTS-000-1001 Explosion Overpressure Study HSE UU00-P-XXTS-000-1001-233 SF4001 BMT FLUID MECHANICS LIMITED DDP PETROFAC SHARJAH OFFICE, UAE 03-Feb-11 06-Feb-11 100 05-Mar-11 17-Feb-11 100 15-Mar-11 31-Mar-11 100 17-Mar-11 31-Mar-11 100
UU00-P-XXTS-000-1002 FHA, MAR and Safety Design Case Study HSE UU00-P-XXTS-000-1002-228 SF4003 ABBOT RISK CONSULTING LTD DDP PETROFAC SHARJAH OFFICE, UAE 03-Feb-11 09-Feb-11 100 05-Mar-11 28-Feb-11 100 15-Mar-11 06-Apr-11 100 17-Mar-11 06-Apr-11 100
UU00-P-XXTS-000-1003 Environmental Impact Assessment Study HSE UU00-P-XXTS-000-1003-229 03-Aug-11 02-Sep-11 12-Sep-11 14-Sep-11
UU00-P-XXTS-000-1004 Energy Efficiency Study HSE UU00-P-XXTS-000-1004-235 SF4008 WORLEY PARSONS DDP PETROFAC SHARJAH OFFICE, UAE 14-Mar-11 20-Mar-11 100 13-Apr-11 19-Apr-11 100 23-Apr-11 17-Jun-11 100 25-Apr-11 23-Jun-11 100
HU-TECH ERGONOMICS AND
UU00-P-XXTS-000-1005 Human Factor Engineering Study HSE UU00-P-XXTS-000-1005-231 SF4009 HUMAN FACTORS DDP PETROFAC SHARJAH OFFICE, UAE 31-Mar-11 28-Mar-11 100 30-Apr-11 14-Apr-11 100 10-May-11 12-Jul-11 100 12-May-11 12-Jul-11 100
Issue Inquiry Requisition Receive Bid TBE Complete Place LOI / LOA Place PO Receive / Approve Key Vendor Drawings / Documents Place Sub-orders Receive Raw Materials Fabrication / Mfg. Inspection Release Note Ex-works Delivery Item on Board Shipping/Air Freight/Land Transport (ATA Port) Custom Clearance and Transport to site/store Visual Inspection on Receipt at Site/Store ROS
Inquiry No. Description Discipline INQD_TAG_NO PO_NO Vendor Name PO Delivery Terms PO_CDD
P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog P F A % Prog
UU00-P-XXTS-076-1006 Fire Fighting & Safety Equipment HSE UU00-P-XXTS-076-1006-48 16-Apr-11 14-Jun-11 100 24-May-11 04-Jul-11 100 23-Jul-11 24-Dec-11 30-Jul-11 31-Dec-11 13-Sep-11 14-Feb-12 06-Mar-12 07-Apr-12 13-Mar-12 14-Apr-12 20-Mar-12 21-Apr-12 27-Mar-12 28-Apr-12 04-May-12 05-Jun-12 03-Jun-12 05-Jul-12 18-Jun-12 20-Jul-12 18-Jun-12
UU00-P-XXTS-076-1008 Safety Signs HSE UU00-P-XXTS-076-1008-50 20-Jun-11 14-Jun-11 100 20-Jul-11 06-Jul-11 100 22-Aug-11 24-Dec-11 29-Aug-11 31-Dec-11 13-Oct-11 14-Feb-12 06-Jan-12 07-Apr-12 13-Jan-12 14-Apr-12 20-Jan-12 21-Apr-12 27-Jan-12 28-Apr-12 05-Mar-12 05-Jun-12 04-Apr-12 05-Jul-12 19-Apr-12 20-Jul-12 19-Apr-12
UU00-P-TTTS-086-1001 Telecom System TELECOM UU00-P-TTTS-086-1001-51 25-Apr-11 18-Apr-11 100 25-May-11 07-Jun-11 100 17-Jul-11 08-Aug-11 100 24-Jul-11 25-Aug-11 100 07-Sep-11 13-Nov-11 29-May-12 19-Jul-12 05-Jun-12 26-Jul-12 12-Jun-12 02-Aug-12 19-Jun-12 09-Aug-12 27-Jul-12 16-Sep-12 26-Aug-12 16-Oct-12 10-Sep-12 31-Oct-12 10-Sep-12
UU00-P-TTTS-086-1002 Passive Cooling Shelters TELECOM UU00-P-TTTS-086-1002-52 01-May-11 23-May-11 100 31-May-11 07-Jul-11 100 08-Jul-11 23-Nov-11 15-Jul-11 30-Nov-11 29-Aug-11 14-Jan-12 20-Feb-12 13-Jun-12 27-Feb-12 20-Jun-12 05-Mar-12 27-Jun-12 12-Mar-12 04-Jul-12 19-Apr-12 11-Aug-12 19-May-12 10-Sep-12 03-Jun-12 25-Sep-12 03-Jun-12
UU00-P-TTTS-086-1003 Telecom Cables & Bulks TELECOM LOT : 001 SF0054 DRAKA COMTEQ IBERICA SL FOB SANTANDER, SPAIN 25-Apr-11 16-May-11 100 04-Jul-11 15-Jun-11 100 11-Aug-11 28-Jul-11 100 18-Aug-11 09-Aug-11 100 02-Oct-11 09-Aug-11 100 25-Jan-12 07-Mar-12 15.00 01-Feb-12 07-Mar-12 08-Feb-12 25-Mar-12 15-Feb-12 25-Mar-12 24-Mar-12 25-Mar-12 23-Apr-12 25-Mar-12 08-May-12 25-Mar-12 29-Mar-12
UU00-P-TTTS-086-1004 Radio & Tower TELECOM UU00-P-TTTS-086-1004-54 SF0110 MITAS TELECOM SYSTEMS 16-May-11 18-May-11 100 15-Jun-11 02-Jun-11 100 23-Jul-11 23-Nov-11 30-Jul-11 30-Nov-11 13-Sep-11 14-Jan-12 06-Jan-12 18-Apr-12 13-Jan-12 25-Apr-12 20-Jan-12 02-May-12 27-Jan-12 09-May-12 05-Mar-12 16-Jun-12 04-Apr-12 16-Jul-12 19-Apr-12 31-Jul-12 19-Apr-12
UU00-P-TTTS-086-1005 Telecom Copper Cables TELECOM UU00-P-TTTS-086-1005-1 31-Jul-11 100 15-Sep-11 100 07-Nov-11 14-Nov-11 29-Dec-11 02-Apr-12 09-Apr-12 16-Apr-12 23-Apr-12 31-May-12 30-Jun-12 15-Jul-12 22-Sep-12