You are on page 1of 16

DAELIM - PETROFAC JV (DPJV) OMAN REFINERIES AND PETROCHEMICALS COMPANY

JOB NO. : 120476 / JI-2022 SOHAR REFINERY IMPROVEMENT PROJECT (SRIP)

DOC. NO. : S-990-5132-301 REV.B WORK BREAKDOWN SYSTEM PROCEDURE

TABLE OF CONTENTS

1. PURPOSE ............................................................................................................ 3
2. SCOPE ................................................................................................................. 3
3. WBS AND WORK DEFINITION ........................................................................... 3
3.1 Introduction.................................................................................................................... 3
3.2 FWBS ............................................................................................................................ 3
3.3 PCWBS ......................................................................................................................... 3
3.4 Work Package ............................................................................................................... 3
4. OBJECTIVE OF WBS .......................................................................................... 4
5. EXTENDED APPLICATION OF WBS .................................................................. 4

Attachments
Attachment 1 : WBS Diagram
Attachment 2 : PC-WBS Map
Attachment 3 : WBS Dictionary

2 of 4
DAELIM - PETROFAC JV (DPJV) OMAN REFINERIES AND PETROCHEMICALS COMPANY

JOB NO. : 120476 / JI-2022 SOHAR REFINERY IMPROVEMENT PROJECT (SRIP)

DOC. NO. : S-990-5132-301 REV.B WORK BREAKDOWN SYSTEM PROCEDURE

1. PURPOSE
The purpose of this document is to describe the basis and method of Work Breakdown
Structure (WBS) for Sohar Refinery Improvement Project, Oman.

2. SCOPE
This procedure describes the WBS method for planning and controlling of the DPJV’s
scope of work including;
 Management
 Engineering
 Procurement
 Construction & Pre-commissioning
 Commissioning including Start-up & Performance Test.

WBS is also used to structure milestones of the Project for consolidated presentation of key
milestones of the project and payment milestones.

3. WBS AND WORK DEFINITION


3.1 Introduction
DPJV will use a matrix structure to break down the work, which is integrating Functional
WBS (FWBS) and Project Control WBS (PCWBS), enabling effective data communication
and control during the project execution period. Refer to the WBS Diagram in Attachment
1.
3.2 FWBS
FWBS breaks down the work based on the functional aspects of the activities i.e. defined
as phases at Level-1.
 Engineering
 Procurement
 Construction & Pre-commissioning
 Commissioning including Start-up & Performance Test

3.3 PCWBS
PCWBS breaks down the work based on the geographical area and then to units/facilities.
The work formation will take into account making data easily derived from the smallest
elements and, further, these data can be summarized according to the WBS.
3.4 Work Package
The FWBS and PCWBS will form a matrix, and work will be defined in a unique work
package at each intersection of the matrix under disciplines. Activities will reside under the
work packages.

3 of 4
DAELIM - PETROFAC JV (DPJV) OMAN REFINERIES AND PETROCHEMICALS COMPANY

JOB NO. : 120476 / JI-2022 SOHAR REFINERY IMPROVEMENT PROJECT (SRIP)

DOC. NO. : S-990-5132-301 REV.B WORK BREAKDOWN SYSTEM PROCEDURE

4. OBJECTIVE OF WBS
The WBS shall encompass the complete scope of the PROJECT divided into discrete,
identifiable Work Package to provide the necessary level of detail for effective planning,
progress measurement, accountability and control.

5. EXTENDED APPLICATION OF WBS


The FWBS and PCWBS will be applied to all the activities in EPC as a common basis and
identification system for communication of data and information. WBS codes and Activity
codes will be built in the schedule.

4 of 4
DAELIM - PETROFAC JV (DPJV) OMAN REFINERIES AND PETROCHEMICALS COMPANY

JOB NO. : 120476 / JI-2022 SOHAR REFINERY IMPROVEMENT PROJECT (SRIP)

DOC. NO. : S-990-5132-301 REV.B WORK BREAKDOWN SYSTEM PROCEDURE

Attachment # 1
WBS Diagram
Work Breakdown Structure

(Project)
LEVEL 0

SRIP . S

Sohar Refinery Improvement Project


LEVEL1

SRIP.M SRIP.G SRIP.E SRIP.P SRIP.C SRIP.O


(Phase)

Key Milestone Project Management Engineering Procurement Construction & Precommissioning Commissioing, Performance Test & IAC

GENERAL MILESTONE CONTRACT COMMON / GENERAL EQUIPMENT COMMON / GENERAL COMMON / GENERAL

PAYMENT MILESTONE PLAN AND PROCEDURE PROCESS BULKS PROCESS PROCESS


LEVEL 2
(Area)

UTILITIES UTILITIES UTILITIES

OFFSITES OFFSITES OFFSITES

EXISTING REFINERY EXISTING REFINERY EXISTING REFINERY

BUILDINGS 2 BUILDINGS 2 BUILDINGS 2

PROCUREMENT ENGINEERING

Process Units Utilities Off-sites Existing Refinery Buildings 2

Engineering Milestone Crude Distillation Unit 2 (CDU2) Utility Facilities Common 2 Sea Water Intake Station 2 (SWI2) Crude Distillation Unit (CDU) Main Control Building

Power Plant, Electricity and CDU LPG Merox Process Unit


Construction Milestone Vacuum Distillation Unit (VDU) Feedstock and Slop Tankage 2 Main Substation (88MSS02)
Distribution System 2 (ELC2) (LMU)

Kerosene Merox Process Unit 2 Product and Component Tankage CDU Kerosene Merox Process Main Receiving Substation
Common Water System 2 (WS2)
(KMU2) 2 Unit (KMU) (88MRS00)

Secondary Cooling Water System Resid FCC Reactor Regenerator


Bitumen Blowing Unit (BBU) Truck Loading Facilities 2 Substations (88SS14/15/16/17/18)
2 (SCWS2) Section (RFCC RXRG)

Sea Water Desalination System 2 Satelite Instrument Building


Hydrocracking Unit (HCU) Marine Loading Facilities 2 Feedstock and Slop Tankage
(SWD2) (88SIH11/12/13/16)

Potable and Service Water System Waste Water Treatment Facilities Substation & Satelite Instrument
Delayed Coker Unit (DCU) Product and Component Tankage
2 (PWS2) 2 (WWT2) Building (88SS41/SIH14)
(Unit / Facilities)

DCU LPG Merox Process Unit 3 Steam and Condensate System 2 Substation & Satelite Instrument
Flare System 2(FLR2) Interconnecting PR/Roads
(LMU3) (STM2) Building (88SS42/SIH15)
LEVEL 3

Fuel Gas and Natural Gas System Mucat Crude P/L Tie-in / Gasoline
Isomerization Unit (ISOM) Operator Shelters
2 (FG2) Blending

Sour Water Stripping Unit 2 Instrument and Plant Air System 2 132KV Cable / AOL Site / Nitrogen
Maintenance Workshop
(SWS2) (IA2) Intake

Sour Water Stripping Unit 3 MAF Main line pump, Booster Pums &
Fire Station
(SWS3) Injection pkg

Amine Regeneration Unit 2


Truck Loading Buliding
(ARU2)

Tail Gas Treating Unit 2 (TGU2) Truck Loading Satelite Office

Sulfur Recovery Unit 2 Train 1


Change & Shower Building
(SRU2-1)

Sulfur Recovery Unit 2 Train 2


Guard House
(SRU2-2)

Hydrogen Generation Unit 2


(HGU2)

Sulfur Granulation and Packing


Unit 2 (SGU2)

Quality General Civil Static Instrument Precommissioning


(Discipline)
LEVEL 4

Project Controls Process Architecture Rotating Telecom Commissioning

Metallurgy Temporary Work/Facilities HVAC Piping Painting Tie-ins / Interfaces

HSE Design Subcontracting Steel Structure Electrical Insulation Safety & F/Fighting(HSSE)
DAELIM - PETROFAC JV (DPJV) OMAN REFINERIES AND PETROCHEMICALS COMPANY

JOB NO. : 120476 / JI-2022 SOHAR REFINERY IMPROVEMENT PROJECT (SRIP)

DOC. NO. : S-990-5132-301 REV.B WORK BREAKDOWN SYSTEM PROCEDURE

Attachment # 2
PC-WBS Map
PC-WBS Map for SRIP
WBS Dictionary for SRIP 1 2 3 4 5 6 7 8
WBS Code Description
S SOHAR REFINERY IMPROVEMENT PROJECT S 1 SOHAR REFINERY IMPROVEMENT PROJECT
S.M KEY MILESTONES S .M 2 KEY MILESTONES
S.M.1 GENERAL MILESTONE S .M .1 3 GENERAL MILESTONE
S.M.2 PAYMENT MILESTONE S .M .2 3 PAYMENT MILESTONE
S.M.2.01 Engineering Milestone S .M .2 .01 4 Engineering Milestone
S.M.2.02 Construction Milestone S .M .2 .02 4 Construction Milestone
S.G PROJECT MANAGEMENT S .G 2 PROJECT MANAGEMENT
S.G.1 CONTRACT S .G .1 3 CONTRACT
S.G.2 PLAN AND PROCEDURE S .G .2 3 PLAN AND PROCEDURE
S.G.2.01 Project Management S .G .2 .01 4 Project Management
S.G.2.02 Project Controls S .G .2 .02 4 Project Controls
S.G.2.03 Document Management S .G .2 .03 4 Document Management
S.G.2.04 Project Engineering S .G .2 .04 4 Project Engineering
S.G.2.05 Procurement S .G .2 .05 4 Procurement
S.G.2.06 Material Management S .G .2 .06 4 Material Management
S.G.2.07 Construction S .G .2 .07 4 Construction
S.G.2.08 Quality Assurance S .G .2 .08 4 Quality Assurance
S.G.2.09 HSSE S .G .2 .09 4 HSSE
S.G.2.10 Commissioning and Start-up S .G .2 .10 4 Commissioning and Start-up
S.E ENGINEERING S .E 2 ENGINEERING
S.E.0 COMMON / GENERAL S .E .0 3 COMMON / GENERAL
S.E.0.999 Interface S .E .0 .999 4 Interface
S.E.0.999.01 Interface Management Plan & Procedure S .E .0 .999 .01 5 Interface Management Plan & Procedure
S.E.0.999.02 Interface Management & Coordination S .E .0 .999 .02 5 Interface Management & Coordination
S.E.0.000 Common Deliverables S .E .0 .000 4 Common Deliverables
S.E.0.000.GE General S .E .0 .000 .GE 5 General
S.E.0.000.PR Process S .E .0 .000 .PR 5 Process
S.E.0.000.MS Mechanical Static + Package units S .E .0 .000 .MS 5 Mechanical Static + Package units
S.E.0.000.MR Rotating S .E .0 .000 .MR 5 Rotating
S.E.0.000.CV Civil S .E .0 .000 .CV 5 Civil
S.E.0.000.SS Structural S .E .0 .000 .SS 5 Structural
S.E.0.000.PI Piping S .E .0 .000 .PI 5 Piping
S.E.0.000.AR Architecture S .E .0 .000 .AR 5 Architecture
S.E.0.000.HV HVAC S .E .0 .000 .HV 5 HVAC
S.E.0.000.EL Electrical S .E .0 .000 .EL 5 Electrical
S.E.0.000.IN Instrumentation S .E .0 .000 .IN 5 Instrumentation
S.E.0.000.FF Safety & F/Fighting S .E .0 .000 .FF 5 Safety & F/Fighting
S.E.1 PROCESS S .E .1 3 PROCESS
S.E.1.140 Crude Distillation & Vacuum Distillation & Kerosene Merox Process Unit (CDU2/VDU/KMU2S .E .1 .140 4 Crude Distillation & Vacuum Distillation & Kerosene Merox Process Unit (CDU2/VD
S.E.1.140.PR Process S .E .1 .140 .PR 5 Process
S.E.1.140.MS Mechanical Static + Package units S .E .1 .140 .MS 5 Mechanical Static + Package units
S.E.1.140.MR Rotating S .E .1 .140 .MR 5 Rotating
S.E.1.140.CV Civil S .E .1 .140 .CV 5 Civil
S.E.1.140.SS Structural S .E .1 .140 .SS 5 Structural
S.E.1.140.PI Piping S .E .1 .140 .PI 5 Piping
S.E.1.140.EL Electrical S .E .1 .140 .EL 5 Electrical
S.E.1.140.IN Instrumentation S .E .1 .140 .IN 5 Instrumentation
S.E.1.140.FF Safety & F/Fighting S .E .1 .140 .FF 5 Safety & F/Fighting
S.E.1.170 Hydrocracking Unit (HCU) S .E .1 .170 4 Hydrocracking Unit (HCU)
S.E.1.170.PR Process S .E .1 .170 .PR 5 Process
S.E.1.170.MS Mechanical Static + Package units S .E .1 .170 .MS 5 Mechanical Static + Package units
S.E.1.170.MR Rotating S .E .1 .170 .MR 5 Rotating
S.E.1.170.CV Civil S .E .1 .170 .CV 5 Civil
S.E.1.170.SS Structural S .E .1 .170 .SS 5 Structural
S.E.1.170.PI Piping S .E .1 .170 .PI 5 Piping
S.E.1.170.EL Electrical S .E .1 .170 .EL 5 Electrical
S.E.1.170.IN Instrumentation S .E .1 .170 .IN 5 Instrumentation
S.E.1.170.FF Safety & F/Fighting S .E .1 .170 .FF 5 Safety & F/Fighting
S.E.1.180 Bitumen Blowing Unit (BBU) S .E .1 .180 4 Bitumen Blowing Unit (BBU)
S.E.1.180.PR Process S .E .1 .180 .PR 5 Process
S.E.1.180.MS Mechanical Static + Package units S .E .1 .180 .MS 5 Mechanical Static + Package units
S.E.1.180.MR Rotating S .E .1 .180 .MR 5 Rotating
S.E.1.180.CV Civil S .E .1 .180 .CV 5 Civil
S.E.1.180.SS Structural S .E .1 .180 .SS 5 Structural
S.E.1.180.PI Piping S .E .1 .180 .PI 5 Piping
S.E.1.180.EL Electrical S .E .1 .180 .EL 5 Electrical
S.E.1.180.IN Instrumentation S .E .1 .180 .IN 5 Instrumentation
S.E.1.180.FF Safety & F/Fighting S .E .1 .180 .FF 5 Safety & F/Fighting
S.E.1.240 Delayed Coker & LPG Merox Process Unit (DCU/LMU3) S .E .1 .240 4 Delayed Coker & LPG Merox Process Unit (DCU/LMU3)
S.E.1.240.PR Process S .E .1 .240 .PR 5 Process
S.E.1.240.MS Mechanical Static + Package units S .E .1 .240 .MS 5 Mechanical Static + Package units
S.E.1.240.MR Rotating S .E .1 .240 .MR 5 Rotating
S.E.1.240.CV Civil S .E .1 .240 .CV 5 Civil
S.E.1.240.SS Structural S .E .1 .240 .SS 5 Structural
S.E.1.240.PI Piping S .E .1 .240 .PI 5 Piping
S.E.1.240.EL Electrical S .E .1 .240 .EL 5 Electrical
S.E.1.240.IN Instrumentation S .E .1 .240 .IN 5 Instrumentation
S.E.1.240.FF Safety & F/Fighting S .E .1 .240 .FF 5 Safety & F/Fighting
S.E.1.300 Sour Water Stripping Unit 2 (SWS2) S .E .1 .300 4 Sour Water Stripping Unit 2 (SWS2)
S.E.1.300.PR Process S .E .1 .300 .PR 5 Process
S.E.1.300.MS Mechanical Static + Package units S .E .1 .300 .MS 5 Mechanical Static + Package units
S.E.1.300.MR Rotating S .E .1 .300 .MR 5 Rotating
S.E.1.300.CV Civil S .E .1 .300 .CV 5 Civil
S.E.1.300.SS Structural S .E .1 .300 .SS 5 Structural
S.E.1.300.PI Piping S .E .1 .300 .PI 5 Piping
S.E.1.300.EL Electrical S .E .1 .300 .EL 5 Electrical
S.E.1.300.IN Instrumentation S .E .1 .300 .IN 5 Instrumentation
S.E.1.300.FF Safety & F/Fighting S .E .1 .300 .FF 5 Safety & F/Fighting
S.E.1.305 Sour Water Stripping Unit 3 (SWS3) S .E .1 .305 4 Sour Water Stripping Unit 3 (SWS3)
S.E.1.305.PR Process S .E .1 .305 .PR 5 Process
S.E.1.305.MS Mechanical Static + Package units S .E .1 .305 .MS 5 Mechanical Static + Package units
S.E.1.305.MR Rotating S .E .1 .305 .MR 5 Rotating
S.E.1.305.CV Civil S .E .1 .305 .CV 5 Civil
S.E.1.305.SS Structural S .E .1 .305 .SS 5 Structural
S.E.1.305.PI Piping S .E .1 .305 .PI 5 Piping
S.E.1.305.EL Electrical S .E .1 .305 .EL 5 Electrical
S.E.1.305.IN Instrumentation S .E .1 .305 .IN 5 Instrumentation
S.E.1.305.FF Safety & F/Fighting S .E .1 .305 .FF 5 Safety & F/Fighting
S.E.1.310 Amine Regeneration Unit 2 (ARU2) S .E .1 .310 4 Amine Regeneration Unit 2 (ARU2)
S.E.1.310.PR Process S .E .1 .310 .PR 5 Process
S.E.1.310.MS Mechanical Static + Package units S .E .1 .310 .MS 5 Mechanical Static + Package units
S.E.1.310.MR Rotating S .E .1 .310 .MR 5 Rotating
S.E.1.310.CV Civil S .E .1 .310 .CV 5 Civil
S.E.1.310.SS Structural S .E .1 .310 .SS 5 Structural
S.E.1.310.PI Piping S .E .1 .310 .PI 5 Piping
S.E.1.310.EL Electrical S .E .1 .310 .EL 5 Electrical
S.E.1.310.IN Instrumentation S .E .1 .310 .IN 5 Instrumentation
S.E.1.310.FF Safety & F/Fighting S .E .1 .310 .FF 5 Safety & F/Fighting
S.E.1.390 Hydrogen Generation Unit 2 (HGU2) S .E .1 .390 4 Hydrogen Generation Unit 2 (HGU2)
S.E.1.390.PR Process S .E .1 .390 .PR 5 Process
S.E.1.390.MS Mechanical Static + Package units S .E .1 .390 .MS 5 Mechanical Static + Package units
S.E.1.390.MR Rotating S .E .1 .390 .MR 5 Rotating
S.E.1.390.CV Civil S .E .1 .390 .CV 5 Civil
S.E.1.390.SS Structural S .E .1 .390 .SS 5 Structural
S.E.1.390.PI Piping S .E .1 .390 .PI 5 Piping

1 of 7
WBS Code Description
S.E.1.390.EL Electrical S .E .1 .390 .EL 5 Electrical
S.E.1.390.IN Instrumentation S .E .1 .390 .IN 5 Instrumentation
S.E.1.390.FF Safety & F/Fighting S .E .1 .390 .FF 5 Safety & F/Fighting
S.E.1.430 Isomerization Unit (ISOM) S .E .1 .430 4 Isomerization Unit (ISOM)
S.E.1.430.PR Process S .E .1 .430 .PR 5 Process
S.E.1.430.MS Mechanical Static + Package units S .E .1 .430 .MS 5 Mechanical Static + Package units
S.E.1.430.MR Rotating S .E .1 .430 .MR 5 Rotating
S.E.1.430.CV Civil S .E .1 .430 .CV 5 Civil
S.E.1.430.SS Structural S .E .1 .430 .SS 5 Structural
S.E.1.430.PI Piping S .E .1 .430 .PI 5 Piping
S.E.1.430.EL Electrical S .E .1 .430 .EL 5 Electrical
S.E.1.430.IN Instrumentation S .E .1 .430 .IN 5 Instrumentation
S.E.1.430.FF Safety & F/Fighting S .E .1 .430 .FF 5 Safety & F/Fighting
S.E.1.440 Sulfur Recovery Unit 2 Train 1 (SRU2-1) S .E .1 .440 4 Sulfur Recovery Unit 2 Train 1 (SRU2-1)
S.E.1.440.PR Process S .E .1 .440 .PR 5 Process
S.E.1.440.MS Mechanical Static + Package units S .E .1 .440 .MS 5 Mechanical Static + Package units
S.E.1.440.MR Rotating S .E .1 .440 .MR 5 Rotating
S.E.1.440.CV Civil S .E .1 .440 .CV 5 Civil
S.E.1.440.SS Structural S .E .1 .440 .SS 5 Structural
S.E.1.440.PI Piping S .E .1 .440 .PI 5 Piping
S.E.1.440.EL Electrical S .E .1 .440 .EL 5 Electrical
S.E.1.440.IN Instrumentation S .E .1 .440 .IN 5 Instrumentation
S.E.1.440.FF Safety & F/Fighting S .E .1 .440 .FF 5 Safety & F/Fighting
S.E.1.450 Sulfur Recovery Unit 2 Train 2 (SRU2-2) S .E .1 .450 4 Sulfur Recovery Unit 2 Train 2 (SRU2-2)
S.E.1.450.PR Process S .E .1 .450 .PR 5 Process
S.E.1.450.MS Mechanical Static + Package units S .E .1 .450 .MS 5 Mechanical Static + Package units
S.E.1.450.MR Rotating S .E .1 .450 .MR 5 Rotating
S.E.1.450.CV Civil S .E .1 .450 .CV 5 Civil
S.E.1.450.SS Structural S .E .1 .450 .SS 5 Structural
S.E.1.450.PI Piping S .E .1 .450 .PI 5 Piping
S.E.1.450.EL Electrical S .E .1 .450 .EL 5 Electrical
S.E.1.450.IN Instrumentation S .E .1 .450 .IN 5 Instrumentation
S.E.1.450.FF Safety & F/Fighting S .E .1 .450 .FF 5 Safety & F/Fighting
S.E.1.460 Tail Gas Treating Unit 2 (TGU2) S .E .1 .460 4 Tail Gas Treating Unit 2 (TGU2)
S.E.1.460.PR Process S .E .1 .460 .PR 5 Process
S.E.1.460.MS Mechanical Static + Package units S .E .1 .460 .MS 5 Mechanical Static + Package units
S.E.1.460.MR Rotating S .E .1 .460 .MR 5 Rotating
S.E.1.460.CV Civil S .E .1 .460 .CV 5 Civil
S.E.1.460.SS Structural S .E .1 .460 .SS 5 Structural
S.E.1.460.PI Piping S .E .1 .460 .PI 5 Piping
S.E.1.460.EL Electrical S .E .1 .460 .EL 5 Electrical
S.E.1.460.IN Instrumentation S .E .1 .460 .IN 5 Instrumentation
S.E.1.460.FF Safety & F/Fighting S .E .1 .460 .FF 5 Safety & F/Fighting
S.E.1.470 Sulfur Granulation and Packing Unit 2 (SGU2) S .E .1 .470 4 Sulfur Granulation and Packing Unit 2 (SGU2)
S.E.1.470.PR Process S .E .1 .470 .PR 5 Process
S.E.1.470.MS Mechanical Static + Package units S .E .1 .470 .MS 5 Mechanical Static + Package units
S.E.1.470.MR Rotating S .E .1 .470 .MR 5 Rotating
S.E.1.470.CV Civil S .E .1 .470 .CV 5 Civil
S.E.1.470.SS Structural S .E .1 .470 .SS 5 Structural
S.E.1.470.PI Piping S .E .1 .470 .PI 5 Piping
S.E.1.470.EL Electrical S .E .1 .470 .EL 5 Electrical
S.E.1.470.IN Instrumentation S .E .1 .470 .IN 5 Instrumentation
S.E.1.470.FF Safety & F/Fighting S .E .1 .470 .FF 5 Safety & F/Fighting
S.E.2 UTILITIES S .E .2 3 UTILITIES
S.E.2.700 Utility Facilities Common 2 S .E .2 .700 4 Utility Facilities Common 2
S.E.2.700.PR Process S .E .2 .700 .PR 5 Process
S.E.2.700.MS Mechanical Static + Package units S .E .2 .700 .MS 5 Mechanical Static + Package units
S.E.2.700.MR Rotating S .E .2 .700 .MR 5 Rotating
S.E.2.700.CV Civil S .E .2 .700 .CV 5 Civil
S.E.2.700.SS Structural S .E .2 .700 .SS 5 Structural
S.E.2.700.PI Piping S .E .2 .700 .PI 5 Piping
S.E.2.700.EL Electrical S .E .2 .700 .EL 5 Electrical
S.E.2.700.IN Instrumentation S .E .2 .700 .IN 5 Instrumentation
S.E.2.700.FF Safety & F/Fighting S .E .2 .700 .FF 5 Safety & F/Fighting
S.E.2.710 Power Plant, Electricity and Distribution System 2 (ELC2) S .E .2 .710 4 Power Plant, Electricity and Distribution System 2 (ELC2)
S.E.2.710.PR Process S .E .2 .710 .PR 5 Process
S.E.2.710.MS Mechanical Static + Package units S .E .2 .710 .MS 5 Mechanical Static + Package units
S.E.2.710.MR Rotating S .E .2 .710 .MR 5 Rotating
S.E.2.710.CV Civil S .E .2 .710 .CV 5 Civil
S.E.2.710.SS Structural S .E .2 .710 .SS 5 Structural
S.E.2.710.PI Piping S .E .2 .710 .PI 5 Piping
S.E.2.710.EL Electrical S .E .2 .710 .EL 5 Electrical
S.E.2.710.IN Instrumentation S .E .2 .710 .IN 5 Instrumentation
S.E.2.710.FF Safety & F/Fighting S .E .2 .710 .FF 5 Safety & F/Fighting
S.E.2.730 Water System 2 (WS2) S .E .2 .730 4 Water System 2 (WS2)
S.E.2.730.PR Process S .E .2 .730 .PR 5 Process
S.E.2.730.MS Mechanical Static + Package units S .E .2 .730 .MS 5 Mechanical Static + Package units
S.E.2.730.MR Rotating S .E .2 .730 .MR 5 Rotating
S.E.2.730.CV Civil S .E .2 .730 .CV 5 Civil
S.E.2.730.SS Structural S .E .2 .730 .SS 5 Structural
S.E.2.730.PI Piping S .E .2 .730 .PI 5 Piping
S.E.2.730.EL Electrical S .E .2 .730 .EL 5 Electrical
S.E.2.730.IN Instrumentation S .E .2 .730 .IN 5 Instrumentation
S.E.2.730.FF Safety & F/Fighting S .E .2 .730 .FF 5 Safety & F/Fighting
S.E.2.731 Secondary Cooling Water System 2 (SCWS2) S .E .2 .731 4 Secondary Cooling Water System 2 (SCWS2)
S.E.2.731.PR Process S .E .2 .731 .PR 5 Process
S.E.2.731.MS Mechanical Static + Package units S .E .2 .731 .MS 5 Mechanical Static + Package units
S.E.2.731.MR Rotating S .E .2 .731 .MR 5 Rotating
S.E.2.731.CV Civil S .E .2 .731 .CV 5 Civil
S.E.2.731.SS Structural S .E .2 .731 .SS 5 Structural
S.E.2.731.PI Piping S .E .2 .731 .PI 5 Piping
S.E.2.731.EL Electrical S .E .2 .731 .EL 5 Electrical
S.E.2.731.IN Instrumentation S .E .2 .731 .IN 5 Instrumentation
S.E.2.731.FF Safety & F/Fighting S .E .2 .731 .FF 5 Safety & F/Fighting
S.E.2.732 Sea Water Desalination System 2 (SWD2) S .E .2 .732 4 Sea Water Desalination System 2 (SWD2)
S.E.2.732.PR Process S .E .2 .732 .PR 5 Process
S.E.2.732.MS Mechanical Static + Package units S .E .2 .732 .MS 5 Mechanical Static + Package units
S.E.2.732.MR Rotating S .E .2 .732 .MR 5 Rotating
S.E.2.732.CV Civil S .E .2 .732 .CV 5 Civil
S.E.2.732.SS Structural S .E .2 .732 .SS 5 Structural
S.E.2.732.PI Piping S .E .2 .732 .PI 5 Piping
S.E.2.732.EL Electrical S .E .2 .732 .EL 5 Electrical
S.E.2.732.IN Instrumentation S .E .2 .732 .IN 5 Instrumentation
S.E.2.732.FF Safety & F/Fighting S .E .2 .732 .FF 5 Safety & F/Fighting
S.E.2.734 Potable and Service Water System 2 (PWS2) S .E .2 .734 4 Potable and Service Water System 2 (PWS2)
S.E.2.734.PR Process S .E .2 .734 .PR 5 Process
S.E.2.734.MS Mechanical Static + Package units S .E .2 .734 .MS 5 Mechanical Static + Package units
S.E.2.734.MR Rotating S .E .2 .734 .MR 5 Rotating
S.E.2.734.CV Civil S .E .2 .734 .CV 5 Civil
S.E.2.734.SS Structural S .E .2 .734 .SS 5 Structural
S.E.2.734.PI Piping S .E .2 .734 .PI 5 Piping
S.E.2.734.EL Electrical S .E .2 .734 .EL 5 Electrical
S.E.2.734.IN Instrumentation S .E .2 .734 .IN 5 Instrumentation
S.E.2.734.FF Safety & F/Fighting S .E .2 .734 .FF 5 Safety & F/Fighting
S.E.2.740 Steam and Condensate System 2 (STM2) S .E .2 .740 4 Steam and Condensate System 2 (STM2)
S.E.2.740.PR Process S .E .2 .740 .PR 5 Process
S.E.2.740.MS Mechanical Static + Package units S .E .2 .740 .MS 5 Mechanical Static + Package units

2 of 7
WBS Code Description
S.E.2.740.MR Rotating S .E .2 .740 .MR 5 Rotating
S.E.2.740.CV Civil S .E .2 .740 .CV 5 Civil
S.E.2.740.SS Structural S .E .2 .740 .SS 5 Structural
S.E.2.740.PI Piping S .E .2 .740 .PI 5 Piping
S.E.2.740.EL Electrical S .E .2 .740 .EL 5 Electrical
S.E.2.740.IN Instrumentation S .E .2 .740 .IN 5 Instrumentation
S.E.2.740.FF Safety & F/Fighting S .E .2 .740 .FF 5 Safety & F/Fighting
S.E.2.750 Fuel Gas and Natural Gas System 2 (FG2) S .E .2 .750 4 Fuel Gas and Natural Gas System 2 (FG2)
S.E.2.750.PR Process S .E .2 .750 .PR 5 Process
S.E.2.750.MS Mechanical Static + Package units S .E .2 .750 .MS 5 Mechanical Static + Package units
S.E.2.750.MR Rotating S .E .2 .750 .MR 5 Rotating
S.E.2.750.CV Civil S .E .2 .750 .CV 5 Civil
S.E.2.750.SS Structural S .E .2 .750 .SS 5 Structural
S.E.2.750.PI Piping S .E .2 .750 .PI 5 Piping
S.E.2.750.EL Electrical S .E .2 .750 .EL 5 Electrical
S.E.2.750.IN Instrumentation S .E .2 .750 .IN 5 Instrumentation
S.E.2.750.FF Safety & F/Fighting S .E .2 .750 .FF 5 Safety & F/Fighting
S.E.2.760 Instrument and Plant Air System 2 (IA2) S .E .2 .760 4 Instrument and Plant Air System 2 (IA2)
S.E.2.760.PR Process S .E .2 .760 .PR 5 Process
S.E.2.760.MS Mechanical Static + Package units S .E .2 .760 .MS 5 Mechanical Static + Package units
S.E.2.760.MR Rotating S .E .2 .760 .MR 5 Rotating
S.E.2.760.CV Civil S .E .2 .760 .CV 5 Civil
S.E.2.760.SS Structural S .E .2 .760 .SS 5 Structural
S.E.2.760.PI Piping S .E .2 .760 .PI 5 Piping
S.E.2.760.EL Electrical S .E .2 .760 .EL 5 Electrical
S.E.2.760.IN Instrumentation S .E .2 .760 .IN 5 Instrumentation
S.E.2.760.FF Safety & F/Fighting S .E .2 .760 .FF 5 Safety & F/Fighting
S.E.2.770 Nitrogen System 2 (N2-2) S .E .2 .770 4 Nitrogen System 2 (N2-2)
S.E.2.770.PR Process S .E .2 .770 .PR 5 Process
S.E.2.770.MS Mechanical Static + Package units S .E .2 .770 .MS 5 Mechanical Static + Package units
S.E.2.770.MR Rotating S .E .2 .770 .MR 5 Rotating
S.E.2.770.CV Civil S .E .2 .770 .CV 5 Civil
S.E.2.770.SS Structural S .E .2 .770 .SS 5 Structural
S.E.2.770.PI Piping S .E .2 .770 .PI 5 Piping
S.E.2.770.EL Electrical S .E .2 .770 .EL 5 Electrical
S.E.2.770.IN Instrumentation S .E .2 .770 .IN 5 Instrumentation
S.E.2.770.FF Safety & F/Fighting S .E .2 .770 .FF 5 Safety & F/Fighting
S.E.3 OFFSITES S .E .3 3 OFFSITES
S.E.3.720 Sea Water Intake Station 2 (SWI2) S .E .3 .720 4 Sea Water Intake Station 2 (SWI2)
S.E.3.720.PR Process S .E .3 .720 .PR 5 Process
S.E.3.720.MS Mechanical Static + Package units S .E .3 .720 .MS 5 Mechanical Static + Package units
S.E.3.720.MR Rotating S .E .3 .720 .MR 5 Rotating
S.E.3.720.CV Civil S .E .3 .720 .CV 5 Civil
S.E.3.720.SS Structural S .E .3 .720 .SS 5 Structural
S.E.3.720.PI Piping S .E .3 .720 .PI 5 Piping
S.E.3.720.EL Electrical S .E .3 .720 .EL 5 Electrical
S.E.3.720.IN Instrumentation S .E .3 .720 .IN 5 Instrumentation
S.E.3.720.FF Safety & F/Fighting S .E .3 .720 .FF 5 Safety & F/Fighting
S.E.3.810 Feedstock and Slop Tankage 2 S .E .3 .810 4 Feedstock and Slop Tankage 2
S.E.3.810.PR Process S .E .3 .810 .PR 5 Process
S.E.3.810.MS Mechanical Static + Package units S .E .3 .810 .MS 5 Mechanical Static + Package units
S.E.3.810.MR Rotating S .E .3 .810 .MR 5 Rotating
S.E.3.810.CV Civil S .E .3 .810 .CV 5 Civil
S.E.3.810.SS Structural S .E .3 .810 .SS 5 Structural
S.E.3.810.PI Piping S .E .3 .810 .PI 5 Piping
S.E.3.810.EL Electrical S .E .3 .810 .EL 5 Electrical
S.E.3.810.IN Instrumentation S .E .3 .810 .IN 5 Instrumentation
S.E.3.810.FF Safety & F/Fighting S .E .3 .810 .FF 5 Safety & F/Fighting
S.E.3.820 Product and Component Tankage 2 S .E .3 .820 4 Product and Component Tankage 2
S.E.3.820.PR Process S .E .3 .820 .PR 5 Process
S.E.3.820.MS Mechanical Static + Package units S .E .3 .820 .MS 5 Mechanical Static + Package units
S.E.3.820.MR Rotating S .E .3 .820 .MR 5 Rotating
S.E.3.820.CV Civil S .E .3 .820 .CV 5 Civil
S.E.3.820.SS Structural S .E .3 .820 .SS 5 Structural
S.E.3.820.PI Piping S .E .3 .820 .PI 5 Piping
S.E.3.820.EL Electrical S .E .3 .820 .EL 5 Electrical
S.E.3.820.IN Instrumentation S .E .3 .820 .IN 5 Instrumentation
S.E.3.820.FF Safety & F/Fighting S .E .3 .820 .FF 5 Safety & F/Fighting
S.E.3.830 Truck Loading Facilities 2 S .E .3 .830 4 Truck Loading Facilities 2
S.E.3.830.PR Process S .E .3 .830 .PR 5 Process
S.E.3.830.MS Mechanical Static + Package units S .E .3 .830 .MS 5 Mechanical Static + Package units
S.E.3.830.MR Rotating S .E .3 .830 .MR 5 Rotating
S.E.3.830.CV Civil S .E .3 .830 .CV 5 Civil
S.E.3.830.SS Structural S .E .3 .830 .SS 5 Structural
S.E.3.830.PI Piping S .E .3 .830 .PI 5 Piping
S.E.3.830.EL Electrical S .E .3 .830 .EL 5 Electrical
S.E.3.830.IN Instrumentation S .E .3 .830 .IN 5 Instrumentation
S.E.3.830.FF Safety & F/Fighting S .E .3 .830 .FF 5 Safety & F/Fighting
S.E.3.840 Marine Loading Facilities 2 S .E .3 .840 4 Marine Loading Facilities 2
S.E.3.840.PR Process S .E .3 .840 .PR 5 Process
S.E.3.840.MS Mechanical Static + Package units S .E .3 .840 .MS 5 Mechanical Static + Package units
S.E.3.840.MR Rotating S .E .3 .840 .MR 5 Rotating
S.E.3.840.CV Civil S .E .3 .840 .CV 5 Civil
S.E.3.840.SS Structural S .E .3 .840 .SS 5 Structural
S.E.3.840.PI Piping S .E .3 .840 .PI 5 Piping
S.E.3.840.EL Electrical S .E .3 .840 .EL 5 Electrical
S.E.3.840.IN Instrumentation S .E .3 .840 .IN 5 Instrumentation
S.E.3.840.FF Safety & F/Fighting S .E .3 .840 .FF 5 Safety & F/Fighting
S.E.3.850 Waste Water Treatment Facilities 2 (WWT2) S .E .3 .850 4 Waste Water Treatment Facilities 2 (WWT2)
S.E.3.850.PR Process S .E .3 .850 .PR 5 Process
S.E.3.850.MS Mechanical Static + Package units S .E .3 .850 .MS 5 Mechanical Static + Package units
S.E.3.850.MR Rotating S .E .3 .850 .MR 5 Rotating
S.E.3.850.CV Civil S .E .3 .850 .CV 5 Civil
S.E.3.850.SS Structural S .E .3 .850 .SS 5 Structural
S.E.3.850.PI Piping S .E .3 .850 .PI 5 Piping
S.E.3.850.EL Electrical S .E .3 .850 .EL 5 Electrical
S.E.3.850.IN Instrumentation S .E .3 .850 .IN 5 Instrumentation
S.E.3.850.FF Safety & F/Fighting S .E .3 .850 .FF 5 Safety & F/Fighting
S.E.3.890 Flare System 2(FLR2) S .E .3 .890 4 Flare System 2(FLR2)
S.E.3.890.PR Process S .E .3 .890 .PR 5 Process
S.E.3.890.MS Mechanical Static + Package units S .E .3 .890 .MS 5 Mechanical Static + Package units
S.E.3.890.MR Rotating S .E .3 .890 .MR 5 Rotating
S.E.3.890.CV Civil S .E .3 .890 .CV 5 Civil
S.E.3.890.SS Structural S .E .3 .890 .SS 5 Structural
S.E.3.890.PI Piping S .E .3 .890 .PI 5 Piping
S.E.3.890.EL Electrical S .E .3 .890 .EL 5 Electrical
S.E.3.890.IN Instrumentation S .E .3 .890 .IN 5 Instrumentation
S.E.3.890.FF Safety & F/Fighting S .E .3 .890 .FF 5 Safety & F/Fighting
S.E.4 EXISTING REFINERY S .E .4 3 EXISTING REFINERY
S.E.4.110 Crude Distillation Unit (CDU) S .E .4 .110 4 Crude Distillation Unit (CDU)
S.E.4.110.PR Process S .E .4 .110 .PR 5 Process
S.E.4.110.MS Mechanical Static + Package units S .E .4 .110 .MS 5 Mechanical Static + Package units
S.E.4.110.MR Rotating S .E .4 .110 .MR 5 Rotating
S.E.4.110.CV Civil S .E .4 .110 .CV 5 Civil
S.E.4.110.SS Structural S .E .4 .110 .SS 5 Structural
S.E.4.110.PI Piping S .E .4 .110 .PI 5 Piping
S.E.4.110.EL Electrical S .E .4 .110 .EL 5 Electrical

3 of 7
WBS Code Description
S.E.4.110.IN Instrumentation S .E .4 .110 .IN 5 Instrumentation
S.E.4.110.FF Safety & F/Fighting S .E .4 .110 .FF 5 Safety & F/Fighting
S.E.4.120 CDU LPG Merox Process Unit (LMU) S .E .4 .120 4 CDU LPG Merox Process Unit (LMU)
S.E.4.120.PR Process S .E .4 .120 .PR 5 Process
S.E.4.120.MS Mechanical Static + Package units S .E .4 .120 .MS 5 Mechanical Static + Package units
S.E.4.120.MR Rotating S .E .4 .120 .MR 5 Rotating
S.E.4.120.CV Civil S .E .4 .120 .CV 5 Civil
S.E.4.120.SS Structural S .E .4 .120 .SS 5 Structural
S.E.4.120.PI Piping S .E .4 .120 .PI 5 Piping
S.E.4.120.EL Electrical S .E .4 .120 .EL 5 Electrical
S.E.4.120.IN Instrumentation S .E .4 .120 .IN 5 Instrumentation
S.E.4.120.FF Safety & F/Fighting S .E .4 .120 .FF 5 Safety & F/Fighting
S.E.4.130 CDU Kerosene Merox Process Unit (KMU) S .E .4 .130 4 CDU Kerosene Merox Process Unit (KMU)
S.E.4.130.PR Process S .E .4 .130 .PR 5 Process
S.E.4.130.MS Mechanical Static + Package units S .E .4 .130 .MS 5 Mechanical Static + Package units
S.E.4.130.MR Rotating S .E .4 .130 .MR 5 Rotating
S.E.4.130.CV Civil S .E .4 .130 .CV 5 Civil
S.E.4.130.SS Structural S .E .4 .130 .SS 5 Structural
S.E.4.130.PI Piping S .E .4 .130 .PI 5 Piping
S.E.4.130.EL Electrical S .E .4 .130 .EL 5 Electrical
S.E.4.130.IN Instrumentation S .E .4 .130 .IN 5 Instrumentation
S.E.4.130.FF Safety & F/Fighting S .E .4 .130 .FF 5 Safety & F/Fighting
S.E.4.200 Resid FCC Reactor Regenerator Section (RFCC RXRG) S .E .4 .200 4 Resid FCC Reactor Regenerator Section (RFCC RXRG)
S.E.4.200.PR Process S .E .4 .200 .PR 5 Process
S.E.4.200.MS Mechanical Static + Package units S .E .4 .200 .MS 5 Mechanical Static + Package units
S.E.4.200.MR Rotating S .E .4 .200 .MR 5 Rotating
S.E.4.200.CV Civil S .E .4 .200 .CV 5 Civil
S.E.4.200.SS Structural S .E .4 .200 .SS 5 Structural
S.E.4.200.PI Piping S .E .4 .200 .PI 5 Piping
S.E.4.200.EL Electrical S .E .4 .200 .EL 5 Electrical
S.E.4.200.IN Instrumentation S .E .4 .200 .IN 5 Instrumentation
S.E.4.200.FF Safety & F/Fighting S .E .4 .200 .FF 5 Safety & F/Fighting
S.E.4.610 Feedstock and Slop Tankage S .E .4 .610 4 Feedstock and Slop Tankage
S.E.4.610.PR Process S .E .4 .610 .PR 5 Process
S.E.4.610.MS Mechanical Static + Package units S .E .4 .610 .MS 5 Mechanical Static + Package units
S.E.4.610.MR Rotating S .E .4 .610 .MR 5 Rotating
S.E.4.610.CV Civil S .E .4 .610 .CV 5 Civil
S.E.4.610.SS Structural S .E .4 .610 .SS 5 Structural
S.E.4.610.PI Piping S .E .4 .610 .PI 5 Piping
S.E.4.610.EL Electrical S .E .4 .610 .EL 5 Electrical
S.E.4.610.IN Instrumentation S .E .4 .610 .IN 5 Instrumentation
S.E.4.610.FF Safety & F/Fighting S .E .4 .610 .FF 5 Safety & F/Fighting
S.E.4.620 Product and Component Tankage S .E .4 .620 4 Product and Component Tankage
S.E.4.620.PR Process S .E .4 .620 .PR 5 Process
S.E.4.620.MS Mechanical Static + Package units S .E .4 .620 .MS 5 Mechanical Static + Package units
S.E.4.620.MR Rotating S .E .4 .620 .MR 5 Rotating
S.E.4.620.CV Civil S .E .4 .620 .CV 5 Civil
S.E.4.620.SS Structural S .E .4 .620 .SS 5 Structural
S.E.4.620.PI Piping S .E .4 .620 .PI 5 Piping
S.E.4.620.EL Electrical S .E .4 .620 .EL 5 Electrical
S.E.4.620.IN Instrumentation S .E .4 .620 .IN 5 Instrumentation
S.E.4.620.FF Safety & F/Fighting S .E .4 .620 .FF 5 Safety & F/Fighting
S.E.4.640 Waste Water Treatment S .E .4 .640 4 Waste Water Treatment
S.E.4.640.PR Process S .E .4 .640 .PR 5 Process
S.E.4.640.MS Mechanical Static + Package units S .E .4 .640 .MS 5 Mechanical Static + Package units
S.E.4.640.MR Rotating S .E .4 .640 .MR 5 Rotating
S.E.4.640.CV Civil S .E .4 .640 .CV 5 Civil
S.E.4.640.SS Structural S .E .4 .640 .SS 5 Structural
S.E.4.640.PI Piping S .E .4 .640 .PI 5 Piping
S.E.4.640.EL Electrical S .E .4 .640 .EL 5 Electrical
S.E.4.640.IN Instrumentation S .E .4 .640 .IN 5 Instrumentation
S.E.4.640.FF Safety & F/Fighting S .E .4 .640 .FF 5 Safety & F/Fighting
S.E.4.650 Marine Loading Facility S .E .4 .650 4 Marine Loading Facility
S.E.4.650.PR Process S .E .4 .650 .PR 5 Process
S.E.4.650.MS Mechanical Static + Package units S .E .4 .650 .MS 5 Mechanical Static + Package units
S.E.4.650.MR Rotating S .E .4 .650 .MR 5 Rotating
S.E.4.650.CV Civil S .E .4 .650 .CV 5 Civil
S.E.4.650.SS Structural S .E .4 .650 .SS 5 Structural
S.E.4.650.PI Piping S .E .4 .650 .PI 5 Piping
S.E.4.650.EL Electrical S .E .4 .650 .EL 5 Electrical
S.E.4.650.IN Instrumentation S .E .4 .650 .IN 5 Instrumentation
S.E.4.650.FF Safety & F/Fighting S .E .4 .650 .FF 5 Safety & F/Fighting
S.E.5 Buildings 2 S .E .5 3 Buildings 2
S.E.5.MCB Main Control Building S .E .5 .MCB 4 Main Control Building
S.E.5.MCB.AR Architecture S .E .5 .MCB.AR 5 Architecture
S.E.5.MCB.HV HVAC S .E .5 .MCB.HV 5 HVAC
S.E.5.MCB.FF Safety & F/Fighting S .E .5 .MCB.FF 5 Safety & F/Fighting
S.E.5.MCB.EL Electrical S .E .5 .MCB.EL 5 Electrical
S.E.5.MCB.IN Instrumentation S .E .5 .MCB.IN 5 Instrumentation
S.E.5.MRS Main Receiving Substation (88MRS00) S .E .5 .MRS 4 Main Receiving Substation (88MRS00)
S.E.5.MRS.AR Architecture S .E .5 .MRS.AR 5 Architecture
S.E.5.MRS.HV HVAC S .E .5 .MRS.HV 5 HVAC
S.E.5.MRS.FF Safety & F/Fighting S .E .5 .MRS.FF 5 Safety & F/Fighting
S.E.5.MRS.EL Electrical S .E .5 .MRS.EL 5 Electrical
S.E.5.MRS.IN Instrumentation S .E .5 .MRS.IN 5 Instrumentation
S.E.5.MSS Main Substation (88MSS02) S .E .5 .MSS 4 Main Substation (88MSS02)
S.E.5.MSS.AR Architecture S .E .5 .MSS .AR 5 Architecture
S.E.5.MSS.HV HVAC S .E .5 .MSS .HV 5 HVAC
S.E.5.MSS.FF Safety & F/Fighting S .E .5 .MSS .FF 5 Safety & F/Fighting
S.E.5.MSS.EL Electrical S .E .5 .MSS .EL 5 Electrical
S.E.5.MSS.IN Instrumentation S .E .5 .MSS .IN 5 Instrumentation
S.E.5.S14 Substation (88SS14) S .E .5 .S14 4 Substation (88SS14)
S.E.5.S14.AR Architecture S .E .5 .S14 .AR 5 Architecture
S.E.5.S14.HV HVAC S .E .5 .S14 .HV 5 HVAC
S.E.5.S14.FF Safety & F/Fighting S .E .5 .S14 .FF 5 Safety & F/Fighting
S.E.5.S14.EL Electrical S .E .5 .S14 .EL 5 Electrical
S.E.5.S14.IN Instrumentation S .E .5 .S14 .IN 5 Instrumentation
S.E.5.S15 Substation (88SS15) S .E .5 .S15 4 Substation (88SS15)
S.E.5.S15.AR Architecture S .E .5 .S15 .AR 5 Architecture
S.E.5.S15.HV HVAC S .E .5 .S15 .HV 5 HVAC
S.E.5.S15.FF Safety & F/Fighting S .E .5 .S15 .FF 5 Safety & F/Fighting
S.E.5.S15.EL Electrical S .E .5 .S15 .EL 5 Electrical
S.E.5.S15.IN Instrumentation S .E .5 .S15 .IN 5 Instrumentation
S.E.5.S16 Substation (88SS16) S .E .5 .S16 4 Substation (88SS16)
S.E.5.S16.AR Architecture S .E .5 .S16 .AR 5 Architecture
S.E.5.S16.HV HVAC S .E .5 .S16 .HV 5 HVAC
S.E.5.S16.FF Safety & F/Fighting S .E .5 .S16 .FF 5 Safety & F/Fighting
S.E.5.S16.EL Electrical S .E .5 .S16 .EL 5 Electrical
S.E.5.S16.IN Instrumentation S .E .5 .S16 .IN 5 Instrumentation
S.E.5.S17 Substation (88SS17) S .E .5 .S17 4 Substation (88SS17)
S.E.5.S17.AR Architecture S .E .5 .S17 .AR 5 Architecture
S.E.5.S17.HV HVAC S .E .5 .S17 .HV 5 HVAC
S.E.5.S17.FF Safety & F/Fighting S .E .5 .S17 .FF 5 Safety & F/Fighting
S.E.5.S17.EL Electrical S .E .5 .S17 .EL 5 Electrical
S.E.5.S17.IN Instrumentation S .E .5 .S17 .IN 5 Instrumentation
S.E.5.S18 Substation (88SS18) S .E .5 .S18 4 Substation (88SS18)
S.E.5.S18.AR Architecture S .E .5 .S18 .AR 5 Architecture

4 of 7
WBS Code Description
S.E.5.S18.HV HVAC S .E .5 .S18 .HV 5 HVAC
S.E.5.S18.FF Safety & F/Fighting S .E .5 .S18 .FF 5 Safety & F/Fighting
S.E.5.S18.EL Electrical S .E .5 .S18 .EL 5 Electrical
S.E.5.S18.IN Instrumentation S .E .5 .S18 .IN 5 Instrumentation
S.E.5.S41 Substation Tankage Area (88SS41) S .E .5 .S41 4 Substation Tankage Area (88SS41)
S.E.5.S41.AR Architecture S .E .5 .S41 .AR 5 Architecture
S.E.5.S41.HV HVAC S .E .5 .S41 .HV 5 HVAC
S.E.5.S41.FF Safety & F/Fighting S .E .5 .S41 .FF 5 Safety & F/Fighting
S.E.5.S41.EL Electrical S .E .5 .S41 .EL 5 Electrical
S.E.5.S41.IN Instrumentation S .E .5 .S41 .IN 5 Instrumentation
S.E.5.S42 Substation Truck Loading Facilities 2 (88SS42) S .E .5 .S42 4 Substation Truck Loading Facilities 2 (88SS42)
S.E.5.S42.AR Architecture S .E .5 .S42 .AR 5 Architecture
S.E.5.S42.HV HVAC S .E .5 .S42 .HV 5 HVAC
S.E.5.S42.FF Safety & F/Fighting S .E .5 .S42 .FF 5 Safety & F/Fighting
S.E.5.S42.EL Electrical S .E .5 .S42 .EL 5 Electrical
S.E.5.S42.IN Instrumentation S .E .5 .S42 .IN 5 Instrumentation
S.E.5.S92 Substation Sea Water Intake 2 (88SS92) S .E .5 .S92 4 Substation Sea Water Intake 2 (88SS92)
S.E.5.S92.AR Architecture S .E .5 .S92 .AR 5 Architecture
S.E.5.S92.HV HVAC S .E .5 .S92 .HV 5 HVAC
S.E.5.S92.FF Safety & F/Fighting S .E .5 .S92 .FF 5 Safety & F/Fighting
S.E.5.S92.EL Electrical S .E .5 .S92 .EL 5 Electrical
S.E.5.S92.IN Instrumentation S .E .5 .S92 .IN 5 Instrumentation
S.E.5.H11 Satelite Instrument Building (88SIH11) S .E .5 .H11 4 Satelite Instrument Building (88SIH11)
S.E.5.H11.AR Architecture S .E .5 .H11 .AR 5 Architecture
S.E.5.H11.HV HVAC S .E .5 .H11 .HV 5 HVAC
S.E.5.H11.FF Safety & F/Fighting S .E .5 .H11 .FF 5 Safety & F/Fighting
S.E.5.H11.EL Electrical S .E .5 .H11 .EL 5 Electrical
S.E.5.H11.IN Instrumentation S .E .5 .H11 .IN 5 Instrumentation
S.E.5.H12 Satelite Instrument Building (88SIH12) S .E .5 .H12 4 Satelite Instrument Building (88SIH12)
S.E.5.H12.AR Architecture S .E .5 .H12 .AR 5 Architecture
S.E.5.H12.HV HVAC S .E .5 .H12 .HV 5 HVAC
S.E.5.H12.FF Safety & F/Fighting S .E .5 .H12 .FF 5 Safety & F/Fighting
S.E.5.H12.EL Electrical S .E .5 .H12 .EL 5 Electrical
S.E.5.H12.IN Instrumentation S .E .5 .H12 .IN 5 Instrumentation
S.E.5.H13 Satelite Instrument Building (88SIH13) S .E .5 .H13 4 Satelite Instrument Building (88SIH13)
S.E.5.H13.AR Architecture S .E .5 .H13 .AR 5 Architecture
S.E.5.H13.HV HVAC S .E .5 .H13 .HV 5 HVAC
S.E.5.H13.FF Safety & F/Fighting S .E .5 .H13 .FF 5 Safety & F/Fighting
S.E.5.H13.EL Electrical S .E .5 .H13 .EL 5 Electrical
S.E.5.H13.IN Instrumentation S .E .5 .H13 .IN 5 Instrumentation
S.E.5.H14 Satelite Instrument Building (88SIH14) S .E .5 .H14 4 Satelite Instrument Building (88SIH14)
S.E.5.H14.AR Architecture S .E .5 .H14 .AR 5 Architecture
S.E.5.H14.HV HVAC S .E .5 .H14 .HV 5 HVAC
S.E.5.H14.FF Safety & F/Fighting S .E .5 .H14 .FF 5 Safety & F/Fighting
S.E.5.H14.EL Electrical S .E .5 .H14 .EL 5 Electrical
S.E.5.H14.IN Instrumentation S .E .5 .H14 .IN 5 Instrumentation
S.E.5.H15 Satelite Instrument Building (88SIH15) S .E .5 .H15 4 Satelite Instrument Building (88SIH15)
S.E.5.H15.AR Architecture S .E .5 .H15 .AR 5 Architecture
S.E.5.H15.HV HVAC S .E .5 .H15 .HV 5 HVAC
S.E.5.H15.FF Safety & F/Fighting S .E .5 .H15 .FF 5 Safety & F/Fighting
S.E.5.H15.EL Electrical S .E .5 .H15 .EL 5 Electrical
S.E.5.H15.IN Instrumentation S .E .5 .H15 .IN 5 Instrumentation
S.E.5.H16 Satelite Instrument Building (88SIH16) S .E .5 .H16 4 Satelite Instrument Building (88SIH16)
S.E.5.H16.AR Architecture S .E .5 .H16 .AR 5 Architecture
S.E.5.H16.HV HVAC S .E .5 .H16 .HV 5 HVAC
S.E.5.H16.FF Safety & F/Fighting S .E .5 .H16 .FF 5 Safety & F/Fighting
S.E.5.H16.EL Electrical S .E .5 .H16 .EL 5 Electrical
S.E.5.H16.IN Instrumentation S .E .5 .H16 .IN 5 Instrumentation
S.E.5.OS1 Operator Shelters S .E .5 .OS1 4 Operator Shelters
S.E.5.OS1.AR Architecture S .E .5 .OS1 .AR 5 Architecture
S.E.5.OS1.HV HVAC S .E .5 .OS1 .HV 5 HVAC
S.E.5.OS1.FF Safety & F/Fighting S .E .5 .OS1 .FF 5 Safety & F/Fighting
S.E.5.OS1.EL Electrical S .E .5 .OS1 .EL 5 Electrical
S.E.5.OS1.IN Instrumentation S .E .5 .OS1 .IN 5 Instrumentation
S.E.5.MWS Maintenance Workshop S .E .5 .MWS 4 Maintenance Workshop
S.E.5.MWS.AR Architecture S .E .5 .MWS.AR 5 Architecture
S.E.5.MWS.HV HVAC S .E .5 .MWS.HV 5 HVAC
S.E.5.MWS.FF Safety & F/Fighting S .E .5 .MWS.FF 5 Safety & F/Fighting
S.E.5.MWS.EL Electrical S .E .5 .MWS.EL 5 Electrical
S.E.5.MWS.IN Instrumentation S .E .5 .MWS.IN 5 Instrumentation
S.E.5,FST Fire Station S .E .5 ,FST 4 Fire Station
S.E.5,FST.AR Architecture S .E .5 ,FST .AR 5 Architecture
S.E.5,FST.HV HVAC S .E .5 ,FST .HV 5 HVAC
S.E.5,FST.FF Safety & F/Fighting S .E .5 ,FST .FF 5 Safety & F/Fighting
S.E.5,FST.EL Electrical S .E .5 ,FST .EL 5 Electrical
S.E.5,FST.IN Instrumentation S .E .5 ,FST .IN 5 Instrumentation
S.E.5.TLB Truck Loading Buliding S .E .5 .TLB 4 Truck Loading Buliding
S.E.5.TLB.AR Architecture S .E .5 .TLB .AR 5 Architecture
S.E.5.TLB.HV HVAC S .E .5 .TLB .HV 5 HVAC
S.E.5.TLB.FF Safety & F/Fighting S .E .5 .TLB .FF 5 Safety & F/Fighting
S.E.5.TLB.EL Electrical S .E .5 .TLB .EL 5 Electrical
S.E.5.TLB.IN Instrumentation S .E .5 .TLB .IN 5 Instrumentation
S.E.5.TLO Truck Loading Satelite Office S .E .5 .TLO 4 Truck Loading Satelite Office
S.E.5.TLO.AR Architecture S .E .5 .TLO .AR 5 Architecture
S.E.5.TLO.HV HVAC S .E .5 .TLO .HV 5 HVAC
S.E.5.TLO.FF Safety & F/Fighting S .E .5 .TLO .FF 5 Safety & F/Fighting
S.E.5.TLO.EL Electrical S .E .5 .TLO .EL 5 Electrical
S.E.5.TLO.IN Instrumentation S .E .5 .TLO .IN 5 Instrumentation
S.E.5.CSB Change & Shower Building S .E .5 .CSB 4 Change & Shower Building
S.E.5.CSB.AR Architecture S .E .5 .CSB .AR 5 Architecture
S.E.5.CSB.HV HVAC S .E .5 .CSB .HV 5 HVAC
S.E.5.CSB.FF Safety & F/Fighting S .E .5 .CSB .FF 5 Safety & F/Fighting
S.E.5.CSB.EL Electrical S .E .5 .CSB .EL 5 Electrical
S.E.5.CSB.IN Instrumentation S .E .5 .CSB .IN 5 Instrumentation
S.E.5.GH1 Guard House S .E .5 .GH1 4 Guard House
S.E.5.GH1.AR Architecture S .E .5 .GH1 .AR 5 Architecture
S.E.5.GH1.HV HVAC S .E .5 .GH1 .HV 5 HVAC
S.E.5.GH1.FF Safety & F/Fighting S .E .5 .GH1 .FF 5 Safety & F/Fighting
S.E.5.GH1.EL Electrical S .E .5 .GH1 .EL 5 Electrical
S.E.5.GH1.IN Instrumentation S .E .5 .GH1 .IN 5 Instrumentation
S.E.6 PROCUREMENT ENGINEERING S .E .6 3 PROCUREMENT ENGINEERING
S.E.6.000 Common S .E .6 .000 4 Common
S.E.6.000.100 Rotating S .E .6 .000 .100 5 Rotating
S.E.6.000.200 Mechanical Static + Package units S .E .6 .000 .200 5 Mechanical Static + Package units
S.E.6.000.A00 Piping S .E .6 .000 .A00 5 Piping
S.E.6.000.300 Electrical S .E .6 .000 .300 5 Electrical
S.E.6.000.400 Instrumentation S .E .6 .000 .400 5 Instrumentation
S.E.6.000.500 Safety & F/Fighting & HVAC S .E .6 .000 .500 5 Safety & F/Fighting & HVAC
S.E.6.000.600 Civil S .E .6 .000 .600 5 Civil
S.E.6.000.700 Structural S .E .6 .000 .700 5 Structural
S.E.6.000.900 Process S .E .6 .000 .900 5 Process
S.P PROCUREMENT S .P 2 PROCUREMENT
S.P.E Equmipment S .P .E 3 Equmipment
S.P.E.000 Common S .P .E .000 4 Common
S.P.E.000.100 Rotating S .P .E .000 .100 5 Rotating
S.P.E.000.200 Mechanical Static + Package S .P .E .000 .200 5 Mechanical Static + Package
S.P.E.000.300 Electrical S .P .E .000 .300 5 Electrical

5 of 7
WBS Code Description
S.P.E.000.400 Instrumentation S .P .E .000 .400 5 Instrumentation
S.P.E.000.FF Safety & F/Fighting & HVAC S .P .E .000 .FF 5 Safety & F/Fighting & HVAC
S.P.B Bulk Materials S .P .B 3 Bulk Materials
S.P.B.000 Common S .P .B .000 4 Common
S.P.B.000.A00 Piping S .P .B .000 .A00 5 Piping
S.P.B.000.300 Electrical S .P .B .000 .300 5 Electrical
S.P.B.000.400 Instrumentation S .P .B .000 .400 5 Instrumentation
S.P.B.000.500 Safety & F/Fighting & HVAC S .P .B .000 .500 5 Safety & F/Fighting & HVAC
S.P.B.000.600 Civil S .P .B .000 .600 5 Civil
S.P.B.000.700 Steel Structure S .P .B .000 .700 5 Steel Structure
S.P.B.000.900 Process S .P .B .000 .900 5 Process
S.C CONSTRUCTION & PRECOMMISSIONING S .C 2 CONSTRUCTION & PRECOMMISSIONING
S.C.0 COMMON/GENERAL S .C .0 3 COMMON/GENERAL
S.C.0.000 Common S .C .0 .000 4 Common
S.C.0.000.SC Subcontracting S .C .0 .000 .SC 5 Subcontracting
S.C.0.000.SP Site Preparation S .C .0 .000 .SP 5 Site Preparation
S.C.0.000.TF Temporary Work/Facilities S .C .0 .000 .TF 5 Temporary Work/Facilities
S.C.0.000.IF Tie-ins / Interfaces S .C .0 .000 .IF 5 Tie-ins / Interfaces
S.C.1 PROCESS S .C .1 3 PROCESS
S.C.1.140 Crude Distillation & Vacuum Distillation & Kerosene Merox Process Unit (CDU2/VDU/KMU2S .C .1 .140 4 Crude Distillation & Vacuum Distillation & Kerosene Merox Process Unit (CDU2/VD
S.C.1.140.CV Civil S .C .1 .140 .CV 5 Civil
S.C.1.140.SS Steel Structure S .C .1 .140 .SS 5 Steel Structure
S.C.1.140.MS Static & Package Equipment S .C .1 .140 .MS 5 Static & Package Equipment
S.C.1.140.MR Rotating Equipment S .C .1 .140 .MR 5 Rotating Equipment
S.C.1.140.PI Piping S .C .1 .140 .PI 5 Piping
S.C.1.140.EL Electrical S .C .1 .140 .EL 5 Electrical
S.C.1.140.IN Control & Instrument S .C .1 .140 .IN 5 Control & Instrument
S.C.1.140.FF Fire Fighting S .C .1 .140 .FF 5 Fire Fighting
S.C.1.140.PA Painting S .C .1 .140 .PA 5 Painting
S.C.1.140.IS Insulation S .C .1 .140 .IS 5 Insulation
S.C.1.140.PC Pre-commissioning S .C .1 .140 .PC 5 Pre-commissioning
S.C.1.170 Hydrocracking Unit (HCU) S .C .1 .170 4 Hydrocracking Unit (HCU)
S.C.1.140.CV Civil S .C .1 .140 .CV 5 Civil
S.C.1.140.SS Steel Structure S .C .1 .140 .SS 5 Steel Structure
S.C.1.140.MS Static & Package Equipment S .C .1 .140 .MS 5 Static & Package Equipment
S.C.1.140.MR Rotating Equipment S .C .1 .140 .MR 5 Rotating Equipment
S.C.1.140.PI Piping S .C .1 .140 .PI 5 Piping
S.C.1.140.EL Electrical S .C .1 .140 .EL 5 Electrical
S.C.1.140.IN Control & Instrument S .C .1 .140 .IN 5 Control & Instrument
S.C.1.140.FF Fire Fighting S .C .1 .140 .FF 5 Fire Fighting
S.C.1.140.PA Painting S .C .1 .140 .PA 5 Painting
S.C.1.140.IS Insulation S .C .1 .140 .IS 5 Insulation
S.C.1.140.PC Pre-commissioning S .C .1 .140 .PC 5 Pre-commissioning
S.C.1.180 Bitumen Blowing Unit (BBU) S .C .1 .180 4 Bitumen Blowing Unit (BBU)
S.C.1.240 Delayed Coker & LPG Merox Process Unit (DCU/LMU3) S .C .1 .240 4 Delayed Coker & LPG Merox Process Unit (DCU/LMU3)
S.C.1.140.CV Civil S .C .1 .140 .CV 5 Civil
S.C.1.140.SS Steel Structure S .C .1 .140 .SS 5 Steel Structure
S.C.1.140.MS Static & Package Equipment S .C .1 .140 .MS 5 Static & Package Equipment
S.C.1.140.MR Rotating Equipment S .C .1 .140 .MR 5 Rotating Equipment
S.C.1.140.PI Piping S .C .1 .140 .PI 5 Piping
S.C.1.140.EL Electrical S .C .1 .140 .EL 5 Electrical
S.C.1.140.IN Control & Instrument S .C .1 .140 .IN 5 Control & Instrument
S.C.1.140.FF Fire Fighting S .C .1 .140 .FF 5 Fire Fighting
S.C.1.140.PA Painting S .C .1 .140 .PA 5 Painting
S.C.1.140.IS Insulation S .C .1 .140 .IS 5 Insulation
S.C.1.140.PC Pre-commissioning S .C .1 .140 .PC 5 Pre-commissioning
S.C.1.300 Sour Water Stripping Unit 2 (SWS2) S .C .1 .300 4 Sour Water Stripping Unit 2 (SWS2)
S.C.1.305 Sour Water Stripping Unit 3 (SWS3) S .C .1 .305 4 Sour Water Stripping Unit 3 (SWS3)
S.C.1.310 Amine Regeneration Unit 2 (ARU2) S .C .1 .310 4 Amine Regeneration Unit 2 (ARU2)
S.C.1.390 Hydrogen Generation Unit 2 (HGU2) S .C .1 .390 4 Hydrogen Generation Unit 2 (HGU2)
S.C.1.140.CV Civil S .C .1 .140 .CV 5 Civil
S.C.1.140.SS Steel Structure S .C .1 .140 .SS 5 Steel Structure
S.C.1.140.MS Static & Package Equipment S .C .1 .140 .MS 5 Static & Package Equipment
S.C.1.140.MR Rotating Equipment S .C .1 .140 .MR 5 Rotating Equipment
S.C.1.140.PI Piping S .C .1 .140 .PI 5 Piping
S.C.1.140.EL Electrical S .C .1 .140 .EL 5 Electrical
S.C.1.140.IN Control & Instrument S .C .1 .140 .IN 5 Control & Instrument
S.C.1.140.FF Fire Fighting S .C .1 .140 .FF 5 Fire Fighting
S.C.1.140.PA Painting S .C .1 .140 .PA 5 Painting
S.C.1.140.IS Insulation S .C .1 .140 .IS 5 Insulation
S.C.1.140.PC Pre-commissioning S .C .1 .140 .PC 5 Pre-commissioning
S.C.1.430 Isomerization Unit (ISOM) S .C .1 .430 4 Isomerization Unit (ISOM)
S.C.1.140.CV Civil S .C .1 .140 .CV 5 Civil
S.C.1.140.SS Steel Structure S .C .1 .140 .SS 5 Steel Structure
S.C.1.140.MS Static & Package Equipment S .C .1 .140 .MS 5 Static & Package Equipment
S.C.1.140.MR Rotating Equipment S .C .1 .140 .MR 5 Rotating Equipment
S.C.1.140.PI Piping S .C .1 .140 .PI 5 Piping
S.C.1.140.EL Electrical S .C .1 .140 .EL 5 Electrical
S.C.1.140.IN Control & Instrument S .C .1 .140 .IN 5 Control & Instrument
S.C.1.140.FF Fire Fighting S .C .1 .140 .FF 5 Fire Fighting
S.C.1.140.PA Painting S .C .1 .140 .PA 5 Painting
S.C.1.140.IS Insulation S .C .1 .140 .IS 5 Insulation
S.C.1.140.PC Pre-commissioning S .C .1 .140 .PC 5 Pre-commissioning
S.C.1.440 Sulfur Recovery Unit 2 Train 1 (SRU2-1) S .C .1 .440 4 Sulfur Recovery Unit 2 Train 1 (SRU2-1)
S.C.1.450 Sulfur Recovery Unit 2 Train 2 (SRU2-2) S .C .1 .450 4 Sulfur Recovery Unit 2 Train 2 (SRU2-2)
S.C.1.460 Tail Gas Treating Unit 2 (TGU2) S .C .1 .460 4 Tail Gas Treating Unit 2 (TGU2)
S.C.1.470 Sulfur Granulation and Packing Unit 2 (SGU2) S .C .1 .470 4 Sulfur Granulation and Packing Unit 2 (SGU2)
S.C.2 UTILITIES S .C .2 3 UTILITIES
S.E.2.700 Utility Facilities Common 2 S .C .2 .700 4 Utility Facilities Common 2
S.E.2.710 Power Plant, Electricity and Distribution System 2 (ELC2) S .C .2 .710 4 Power Plant, Electricity and Distribution System 2 (ELC2)
S.E.2.730 Water System 2 (WS2) S .C .2 .730 4 Water System 2 (WS2)
S.E.2.731 Secondary Cooling Water System 2 (SCWS2) S .C .2 .731 4 Secondary Cooling Water System 2 (SCWS2)
S.E.2.732 Sea Water Desalination System 2 (SWD2) S .C .2 .732 4 Sea Water Desalination System 2 (SWD2)
S.E.2.734 Potable and Service Water System 2 (PWS2) S .C .2 .734 4 Potable and Service Water System 2 (PWS2)
S.E.2.740 Steam and Condensate System 2 (STM2) S .C .2 .740 4 Steam and Condensate System 2 (STM2)
S.E.2.750 Fuel Gas and Natural Gas System 2 (FG2) S .C .2 .750 4 Fuel Gas and Natural Gas System 2 (FG2)
S.E.2.760 Instrument and Plant Air System 2 (IA2) S .C .2 .760 4 Instrument and Plant Air System 2 (IA2)
S.E.2.770 Nitrogen System 2 (N2-2) S .C .2 .770 4 Nitrogen System 2 (N2-2)
S.C.3 OFFSITES S .C .3 3 OFFSITES
S.E.3.720 Sea Water Intake Station 2 (SWI2) S .C .3 .720 4 Sea Water Intake Station 2 (SWI2)
S.E.3.810 Feedstock and Slop Tankage 2 S .C .3 .810 4 Feedstock and Slop Tankage 2
S.E.3.820 Product and Component Tankage 2 S .C .3 .820 4 Product and Component Tankage 2
S.E.3.830 Truck Loading Facilities 2 S .C .3 .830 4 Truck Loading Facilities 2
S.E.3.840 Marine Loading Facilities 2 S .C .3 .840 4 Marine Loading Facilities 2
S.E.3.850 Waste Water Treatment Facilities 2 (WWT2) S .C .3 .850 4 Waste Water Treatment Facilities 2 (WWT2)
S.E.3.890 Flare System 2(FLR2) S .C .3 .890 4 Flare System 2(FLR2)
S.C.4 EXISTING REFINERY S .C .4 3 EXISTING REFINERY
S.E.4.110 Crude Distillation Unit (CDU) S .C .4 .110 4 Crude Distillation Unit (CDU)
S.E.4.120 CDU LPG Merox Process Unit (LMU) S .C .4 .120 4 CDU LPG Merox Process Unit (LMU)
S.E.4.130 CDU Kerosene Merox Process Unit (KMU) S .C .4 .130 4 CDU Kerosene Merox Process Unit (KMU)
S.E.4.200 Resid FCC Reactor Regenerator Section (RFCC RXRG) S .C .4 .200 4 Resid FCC Reactor Regenerator Section (RFCC RXRG)
S.E.4.610 Feedstock and Slop Tankage S .C .4 .610 4 Feedstock and Slop Tankage
S.E.4.620 Product and Component Tankage S .C .4 .620 4 Product and Component Tankage
S.E.4.640 Waste Water Treatment S .C .4 .640 4 Waste Water Treatment
S.E.4.650 Marine Loading Facility S .C .4 .650 4 Marine Loading Facility
S.C.5 Buildings 2 S .C .5 3 Buildings 2
S.C.5.MCB Main Control Building S .C .5 .MCB 4 Main Control Building

6 of 7
WBS Code Description
S.C.5.MRS Main Receiving Substation (88MRS00) S .C .5 .MRS 4 Main Receiving Substation (88MRS00)
S.C.5.MSS Main Substation (88MSS02) S .C .5 .MSS 4 Main Substation (88MSS02)
S.C.5.S14 Substation (88SS14) S .C .5 .S14 4 Substation (88SS14)
S.C.5.S14.CV Civil S .C .5 .S14 .CV 5 Civil
S.C.5.S14.AR Architecture S .C .5 .S14 .AR 5 Architecture
S.C.5.S14.HV HVAC S .C .5 .S14 .HV 5 HVAC
S.C.5.S14.EL Electrical S .C .5 .S14 .EL 5 Electrical
S.C.5.S14.PC Pre-commissioning S .C .5 .S14 .PC 5 Pre-commissioning
S.C.5.S15 Substation (88SS15) S .C .5 .S15 4 Substation (88SS15)
S.C.5.S15.CV Civil S .C .5 .S15 .CV 5 Civil
S.C.5.S15.AR Architecture S .C .5 .S15 .AR 5 Architecture
S.C.5.S15.HV HVAC S .C .5 .S15 .HV 5 HVAC
S.C.5.S15.EL Electrical S .C .5 .S15 .EL 5 Electrical
S.C.5.S15.PC Pre-commissioning S .C .5 .S15 .PC 5 Pre-commissioning
S.C.5.S16 Substation (88SS16) S .C .5 .S16 4 Substation (88SS16)
S.C.5.S17 Substation (88SS17) S .C .5 .S17 4 Substation (88SS17)
S.C.5.S17.CV Civil S .C .5 .S17 .CV 5 Civil
S.C.5.S17.AR Architecture S .C .5 .S17 .AR 5 Architecture
S.C.5.S17.HV HVAC S .C .5 .S17 .HV 5 HVAC
S.C.5.S17.EL Electrical S .C .5 .S17 .EL 5 Electrical
S.C.5.S17.PC Pre-commissioning S .C .5 .S17 .PC 5 Pre-commissioning
S.C.5.S18 Substation (88SS18) S .C .5 .S18 4 Substation (88SS18)
S.C.5.S18.CV Civil S .C .5 .S18 .CV 5 Civil
S.C.5.S18.AR Architecture S .C .5 .S18 .AR 5 Architecture
S.C.5.S18.HV HVAC S .C .5 .S18 .HV 5 HVAC
S.C.5.S18.EL Electrical S .C .5 .S18 .EL 5 Electrical
S.C.5.S18.PC Pre-commissioning S .C .5 .S18 .PC 5 Pre-commissioning
S.C.5.S41 Substation Tankage Area (88SS41) S .C .5 .S41 4 Substation Tankage Area (88SS41)
S.C.5.S42 Substation Truck Loading Facilities 2 (88SS42) S .C .5 .S42 4 Substation Truck Loading Facilities 2 (88SS42)
S.C.5.S92 Substation Sea Water Intake 2 (88SS92) S .C .5 .S92 4 Substation Sea Water Intake 2 (88SS92)
S.C.5.E11 Satelite Instrument Building (88SIH11) S .C .5 .E11 4 Satelite Instrument Building (88SIH11)
S.C.5.E11.CV Civil S .C .5 .E11 .CV 5 Civil
S.C.5.E11.AR Architecture S .C .5 .E11 .AR 5 Architecture
S.C.5.E11.HV HVAC S .C .5 .E11 .HV 5 HVAC
S.C.5.E11.EL Electrical S .C .5 .E11 .EL 5 Electrical
S.C.5.E11.IN Instrumentation & Control S .C .5 .E11 .IN 5 Instrumentation & Control
S.C.5.E11.PC Pre-commissioning S .C .5 .E11 .PC 5 Pre-commissioning
S.C.5.E12 Satelite Instrument Building (88SIH12) S .C .5 .E12 4 Satelite Instrument Building (88SIH12)
S.C.5.E13 Satelite Instrument Building (88SIH13) S .C .5 .E13 4 Satelite Instrument Building (88SIH13)
S.C.5.E13.CV Civil S .C .5 .E13 .CV 5 Civil
S.C.5.E13.AR Architecture S .C .5 .E13 .AR 5 Architecture
S.C.5.E13.HV HVAC S .C .5 .E13 .HV 5 HVAC
S.C.5.E13.EL Electrical S .C .5 .E13 .EL 5 Electrical
S.C.5.E13.IN Instrumentation & Control S .C .5 .E13 .IN 5 Instrumentation & Control
S.C.5.E13.PC Pre-commissioning S .C .5 .E13 .PC 5 Pre-commissioning
S.C.5.E14 Satelite Instrument Building (88SIH14) S .C .5 .E14 4 Satelite Instrument Building (88SIH14)
S.C.5.E15 Satelite Instrument Building (88SIH15) S .C .5 .E15 4 Satelite Instrument Building (88SIH15)
S.C.5.E16 Satelite Instrument Building (88SIH16) S .C .5 .E16 4 Satelite Instrument Building (88SIH16)
S.C.5.OS1 Operator Shelters S .C .5 .OS1 4 Operator Shelters
S.C.5.MWS Maintenance Workshop S .C .5 .MWS 4 Maintenance Workshop
S.C.5,FST Fire Station S .C .5 ,FST 4 Fire Station
S.C.5.TLB Truck Loading Buliding S .C .5 .TLB 4 Truck Loading Buliding
S.C.5.TLO Truck Loading Satelite Office S .C .5 .TLO 4 Truck Loading Satelite Office
S.C.5.CSB Change & Shower Building S .C .5 .CSB 4 Change & Shower Building
S.C.5.GH1 Guard House S .C .5 .GH1 4 Guard House
S.O COMMISSIONING, PERFORMANCE TEST AND IAC S .O 2 COMMISSIONING, PERFORMANCE TEST AND IAC

7 of 7
DAELIM - PETROFAC JV (DPJV) OMAN REFINERIES AND PETROCHEMICALS COMPANY

JOB NO. : 120476 / JI-2022 SOHAR REFINERY IMPROVEMENT PROJECT (SRIP)

DOC. NO. : S-990-5132-301 REV.B WORK BREAKDOWN SYSTEM PROCEDURE

Attachment # 3
WBS Dictionary

You might also like