EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.

FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
EPCC -01 PACKAGE FOR CDU/VDU UNIT_HRRL BARMER, RAJASTHAN 992

Project Milestone 992

Schedule Milestone 992

MS1000 Project Start (Award of Work) 0 Project Start (Award of Work)

MS1025 Start Soil Investigation work 0 Start Soil Investigation work

MS1050 Kick off Meeting 0 Kick off Meeting

MS1100 P&ID -Preliminary 0 P&ID -Preliminary

MS1125 U/G Piping 1st MTO 0 U/G Piping 1st MTO

MS1120 P&ID - AFP 0 P&ID - AFP

MS1010 Award of Heater Package 0 Award of Heater Package

MS1035 Site Mobilization and Setting of Site office with posting of 0 Site Mobilization and Setting of Site office with posting of RCM
RCM
MS1135 UG Pipe 1st MTO Ordering Complete 0 UG Pipe 1st MTO Ordering Complete

MS1710 Plot Plan - AFP 0 Plot Plan - AFP

MS1150 Start of Piling Works 0 Start of Piling Works

MS1400 Start U/G Piping Work 0 Start U/G Piping Work

MS1110 Ordering of Column and Desalter 0 Ordering of Column and Desalter

MS1175 30% Model Review Complete 0 30% Model Review Complete

MS1325 Place Order- Switchgears & Transformers 0 Place Order- Switchgears & Transformers

MS1720 AG Piping 1st MTO Ordering Complete 0 AG Piping 1st MTO Ordering Complete

MS1500 Start Heater Foundation Work 0 Start Heater Foundation Work

MS1200 P&ID - Issue for Hazop 0 P&ID - Issue for Hazop

Actual Work Critical Remaining Work Page 1 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
MS1905 Start Steel Str. Fabricati on Work 0 Start Steel Str. Fabricati on Work

MS1250 HAZOP Review complete 0 HAZOP Review complete

MS1300 60% Model Review Complete 0 60% Model Review Complete

MS1700 Start Heater Field Erection Work 0 Start Heater Field Erection Work

MS1475 Start Issue A/G Piping Isometrics- AFC 0 Start Issue A/G Piping Isometrics- AFC

MS1225 Plot PLan - AF D 0 Plot PLan - AF D

MS1525 Start A/G Piping Prefabrication 0 Start A/G Piping Prefabrication

MS1375 P&ID - AFC ( For 90 % MR) 0 P&ID - AFC ( For 90 % MR)

MS1350 Plot Plan - AFC 0 Plot Plan - AFC

MS1450 90% Model Review Complete 0 90% Model Review Complete

MS1915 Start Steel Str. Erection Work 0 Start Steel Str. Erection Work

MS1425 Completion of Foundation for CDU/VDU Column 0 Completion of Foundation for CDU/VDU Column

MS1550 Start A/G Piping Erection 0 Start A/G Piping Erection

MS1885 Substn. Building Ready for Panel Erection 0 Substn. Building Ready for Panel Erection

MS1635 Start DCS Installation in SRR Bldg. ( By Others ) 0 Start DCS Installation in SRR Bldg. ( By Others )

MS1575 Completion Erection of CDU / VDU Column 0 Completion Erection of CDU / VDU Column

MS1020 Start Precommissioning flushing and blowing work 0 Start Precommissioning flushing and blowing work

MS1895 Equipment Erection Completion 0 Equipment Erection Completion

MS1625 Energization of Substation 0 Energization of Substation

MS1835 DCS Power On 0 DCS Power On

MS1775 Start Instrument Loop & Functoin Test 0 Start Instrument Loop & Functoin Test

Actual Work Critical Remaining Work Page 2 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
MS1675 Heater Package Erection & Refractory Work Completion 0 Heater Package Erection & Refractory Work Completion

MS1650 Completion of Motor Solo Run test 0 Completion of Motor Solo Run test

MS1725 Complete A/G Piping Er ection 0 Complete A/G Piping Er ection

MS1750 Completion of Piping Hydro-testing 0 Completion of Piping Hydro-testing

MS1800 Completion of Piping Flushing, Blowing and ReinStatement 0 Completion of Piping Flushing, Blowing and Rein

MS1825 Mechanical Completion 0 Mechanical Completion

MS1810 Heater Dry Out Start 0 Heater Dry Out Start

MS1875 Commissioning Completion 0 Commissioning Completion

MS1925 Completion of 6 Months Post Commissioning Assistance and 0


PGTR
Interface: From Owner 782 Interface: From Owner

Engineering 0 Engineering

OOE1000 CDU/VDU Column Loading Information for Civil Design 0 CDU/VDU Column Loading Information for Civil Design

OOE1010 Availability of Native Files ( P&ID, MFD, PFD, Equipment 0 Availability of Native Files ( P&ID, MFD, PFD, Equipment Data Sheet Etc.)
Data Sheet Etc.)
Free Issue Material 61 Free Issue Material

FIM1000 Crude Distillation Column (CDU) from EIL/Owner (In Two 0 Crude Distillation Column (CDU) from EIL/Owner (In Two Parts field welding at Site in vertical position by o
Parts field welding at Site in vertical position by others)
FIM1255 Vacuum Distillation Column (VDU) from EIL/Owner ( In 0 Vacuum Distillation Column (VDU) from EIL/Owner ( In Three Parts , field welding in vertical position at site
Three Parts , field welding in vertical position at site by
FIM1100 FIM ( Substn ) : Detector, Hooters , Sirens etc. 0 FIM ( Substn ) : Detector, Hooters , Sirens etc.

FIM1275 FIM ( Field) : CCTV Etc. 0 FIM ( Field) : CCTV Etc.

FIM1265 FIM ( SRR) : Detector, Hooters, Sirects Etc. 0 FIM ( SRR) : Detector, Hooters, Sirects Etc.

Construction 465 Construction

OOCO1000 Handing Over of Site for Construction Work 0 Handing Over of Site for Construction Work

Actual Work Critical Remaining Work Page 3 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
OOCO1025 Handing Over of land at site for setting up Project Office, 0 Handing Over of land at site for setting up Project Office, Fabrication and Stoage Yard
Fabrication and Stoage Yard
OOCO1035 CDU & VDU COLUMN release for Piping Work 0 CDU & VDU COLUMN release for Piping Work

Precommissioning & Commissioning 294 Precommissioning & Commissioning

A6670 Availabiity of Raw Water , Plant water , Plant Air 0 Availabiity of Raw Water , Plant water , Plant Air

A6680 Availability of Cooling Water 0 Availability of Cooling Water

A6710 Availabiity of Instrument Air 0 Availabiity of Instrument Air

FIM1285 Availability of Incoming Power Supply for Substn 0 Availability of Incoming Power Supply for Substn Energization (66 Kv)
Energization (66 Kv)
A6330 Availability of DCS, ESD, F&G PLC : FIM (Ready for loop 0 Availability of DCS, ESD, F&G PLC : FIM (Ready for loop check)
check)
A6690 Avaiabiity of Nitrogen 0 Avaiabiity of Nitrogen

A6320 Availability of HP, MP , LP Steam 0 Availability of HP, MP , LP Steam

A6720 Availability of DM Water 0 Availability of DM Water

A6740 Avaiability of Boiler Feed Water 0 Avaiability of Boiler Feed Water

A6730 Availability of Fuel Gas / Fuel Oil / Flushing Oil 0 Availability of Fuel Gas / Fuel Oil / Flushing Oil

A6340 Availability of Feed for Commissioning 0 Availability of Feed for Commissioning

Engineering 490 Engineering

Process 263 Process

P&ID 263 P&ID

PID1 P&ID - Preliminary 14

PID13 P&ID - AFP 30

PID23 P&ID - AFP - For 60% Model Review ( incorporating S/R/P 21


vendor data)
PID4 P&ID - Issue for Hazop 24

Actual Work Critical Remaining Work Page 4 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
PID5 P&ID AF D ( With 60% Model Review Tag Resolution + 14
Hazop Resolution )
PID2 P&ID - AFC ( For 90% Model Review) 20

Equipment Process Data Sheet 66 Equipment Process Data Sheet

PDS - LLI/ Critical Items 34 PDS - LLI/ Critical Items

A5280 Equipment PDS - Heater 7

A5260 Equipment PDS - Air Cooler 7

A5270 Equipment PDS - Desalter 7

A5290 Equipment PDS - Ejector 10

PDS - Vessel, Heat Exchangers, Pu mps 10 PDS - Vessel, Heat Exchangers, Pumps

A6420 Equipment PDS 10

Balance Equipment PDS 30 Balance Equipment PDS

A5300 Equipment PDS - Column, Vessesl, Heat Exch., Rotating 30


Equip, Pkg. Etc. (AFR Isssue)
Instrument Process Data Sheet 84 Instrument Process Data Sheet

EA145 Data Sheet for PSVs 20

EA190 Data Sheet for Analyzer System 65

EA200 Data Sheet for Balance Instruments 70

EA175 Data Sheet for Mass Flowmeters 70

EA185 Data Sheet for Control Valves 60

EA195 Data Sheet for In-line Instruments 70

A5320 Instrument Process Data Sheet (Balance) 70

Process Engineering 251 Process Engineering

Actual Work Critical Remaining Work Page 5 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
EP1260 Process List and Documents (Balance) 251

EP1270 Equipment List 11

EP1175 HAZOP 12

Civil 407 Civil

Soil Investigation 74 Soil Investigation

A5360 Soil Investigation Plan 2

A5340 Soil Investigation Work 45

A5480 Soil Investigation report - Preliminary 14

A5350 Soil Investigation report - Final 20

Loading Data 132 Loading Data

A5410 Loading Data from Owner for CDU Column 2

A5420 Loading Data from Owner for VDU Column + Toyo - Piping 26
Team
A5470 Loading Data ( Others) 130

A5450 Loading Data for Substation Building 4

A5460 Loading Data for SRR Building 4

A5490 Loading Data for Tech Str. # 2 5

A5500 Loading Data for Tech Str. # 5 5

A5440 Loading Data from Heater Vendor 5

A5430 Loading Data from Air Cooler Vendor (Main Pipe Rack ) 14

Pile and Foundation Location Plan - AFC Category 205 Pile and Foundation Location Plan - AFC Category

Critical - Pile and Foundation Location Plan 149 Critical - Pile and Foundation Location Plan

Actual Work Critical Remaining Work Page 6 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
ENGPILE1000 CDU Column - Pile & Fdn. Location Plan 56

ENGPILE1010 Substation Bldg. - Pile & Fdn. Location Plan 50

ENGPILE1030 SRR Bldg. - Pile & Fdn. Location Plan 50

ENGPILE1060 VDU Collumn - Pile & Fdn. Location Plan 78

ENGPILE1040 Technological Structures 2 - Pile & Fdn. Location Plan 77

ENGPILE1050 Technological Structures 5 - Pile & Fdn. Location Plan 77

ENGPILE1020 Pipe Rack - Pile & Fdn. Location Plan 65

ENGPILE1070 Heaters - Pile & Fdn. Location Plan 72

ENGPILE1080 Technological Structures (1,3,4,6,7) - Pile & Fdn. Location 77


Plan
Balance - Pile and Foundation Location Plan 190 Balance - Pile and Foundation Location Plan

A5540 Balance - Pile & Fdn. Location Plan 190

Foundation Drawings 365 Foundation Drawings

A5370 Fdn Drgs for CDU Column (AFC) 40

A5570 Fdn Drgs for Main Pipe Rack (AFC) 58

A5580 Fdn Drgs for Heaters (AFC) 75

A5600 Fdn. Drawing for Substation Bldg. 45

A5610 Fdn. Drawing for SRR Bldg. 45

A5550 Fdn Drgs for VDU Column (AFC) 55

A5590 Fdn Drgs. for Tech. Structures 2 , 5 60

A5620 Fdn Drgs. for Remaining / Others / Misc. - Equipments 200

UG Composite 85 UG Composite

Actual Work Critical Remaining Work Page 7 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
A5380 Conceptual UG Composite Plan-IFR 40

A5390 U/G Composite Plans- IFC 45

Civil (Others) 300 Civil (Others)

A5400 Other including Paving Works 300

Architecture / Steel Structure 74 Architecture / Steel Structure

A5650 Sub-station Arch Drgs - 1st Issue 19

A5820 SRR Arch Drgs - 1st Issue 15

A5640 Sub-station Arch Drgs & details - AFC 55

A5660 SRR Arch Drgs & Details - AFC 45

A5630 Steel Str. 1st MTO 10

Piping 490 Piping

EPIPE1299 Piping Engineering 490

EPIPE1230 Fire Fighting Drawing - 1st Issue 20

Plot Plan 275 Plot Plan

EPIPE1010 Plot Plan-Preliminary 20

EPIPE1000 Plot Plan - AFP 30

EPIPE1050 Plot Plan - AFD 21

EPIPE1150 Plot Plan - AFC 10

3 D Modelling 160 3 D Modelling

EPIPE1075 30 % Model Review 7

EPIPE1125 60 % Model Review 7

Actual Work Critical Remaining Work Page 8 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
EPIPE1175 90 % Model Review 7

Piping MTO 290 Piping MTO

EPIPE1025 UG Pipe - MTO 1 7

EPIPE1035 AG Pipe - MTO (Preliminary) 10

EPIPE1100 AG Pipe - MTO 1 10

EPIPE1240 AG Pipe - MTO 2 6

EPIPE1250 AG Pipe - MTO 3 (Final) 6

Piping Isometric 222 Piping Isometric

EPIPE1200 AG Pipe Isometrics ( Pipe Rack, Priority T Section of Main 55


Pipe Rack + Heater Rack)
EPIPE1270 Isometric for VDU and CDU Column Piping 40

EPIPE1210 AG Pipe Isometrics - Tech Str. # 2 40

EPIPE1260 AG Pipe Isometrics - Tech Str. # 5 90

EPIPE1220 AG Pipe Isometrics ( Balance) - AFC 168

Electrical 297 Electrical

A5850 Substation Eqp. Layout (Preliminary) 5

A5780 Single Line Diagram (AFP) 26

A5830 Electrical Load List (AFR) 45

A5810 Hazardous Area Classifi cation - AFR 40

A5790 Sub-station Eqpt Layout- AFP 60

A5860 Main Cable Route & Layout Plan: Overall & Key Plan - AFR 15

A5890 Main Cable Route & Layout Plan: Overall & Key Plan - AFC 20

Actual Work Critical Remaining Work Page 9 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
A5840 Equip Sizing: Load Analysis/ Eqpt Sizing Calculations- AFR 21

A5870 Bulk Material Take Off - 1st 20

A5880 Bulk Material Take Off - final 15

Instrumentation 283 Instrumentation

EINST1000 Instrument Index- 1st Issue 50

EINST1010 SRR Bldg. Equipment Layout : Preliminary 5

EINST1050 I/O Point Summary/ Point Database 30

EINST1075 Input to Owner: DCS Hardware Finalization for DCS ( 0 Input to Owner: DCS Hardware Finalization for DCS ( Indicative Only))
Indicative Only))
EINST1110 Instrument Layout - AFC 40

EINST1100 Bulk Material Take Off 21

Procurement Engineering 387 Procurement Engineering

Static 147 Static

Towers (CS, CS+Clad, Site Joint) 130 Towers (CS, CS+Clad, Site Joint)

A2700 Prepare & Issue MR 10

A2710 Receipt of Quotation 12

A2720 Technical Querry / TBE 15

A2730 Key Vendor Data Reci ept 40

A2740 Key Vendor Data Approval 60

Tower Internals_AXDB001 89 Tower Internals_AXDB001

A2750 Prepare & Issue MR 10

A2760 Receipt of Quotation 14

Actual Work Critical Remaining Work Page 10 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
A2770 Technical Querry / TBE 14

A2780 Key Vendor Data Reci ept 30

A2790 Key Vendor Data Approval 30

Heat Exchangers 137 Heat Exchangers

CS & LAS Heat Exchanger_AXEA001 132 CS & LAS Heat Exchanger_AXEA001

A6480 Prepare & Issue MR 10

A6490 Receipt of Quotation 20

A6500 Technical Querry / TBE 20

A6510 Key Vendor Data Reci ept 20

A6520 Key Vendor Data Approval 55

SS Clad, Solid SS & Brass Exchanger_AXEA002 135 SS Clad, Solid SS & Brass Exchanger_AXEA002

A2850 Prepare & Issue MR 10

A2860 Receipt of Quotation 20

A2870 Technical Querry / TBE 20

A2880 Key Vendor Data Reci ept 20

A2890 Key Vendor Data Approval 55

Helix heat exchanger_AXEA003 137 Helix heat exchanger_AXEA003

A6580 Prepare & Issue MR 10

A6590 Receipt of Quotation 21

A6600 Technical Querry / TBE 26

A6610 Key Vendor Data Reci ept 20

Actual Work Critical Remaining Work Page 11 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
A6620 Key Vendor Data Approval 55

Air Cooler 125 Air Cooler

A5680 Prepare & Issue MR 10

A5690 Receipt of Quotation 21

A5700 Technical Querry / TBE 21

A5710 Key Vendor Data Reci ept 45

A5720 Key Vendor Data Approval 45

Vessels 142 Vessels

Big Vessels (More than 2m Dia) 142 Big Vessels (More than 2m Dia)

A2800 Prepare & Issue MR 10

A2810 Receipt of Quotation 21

A2820 Technical Querry / TBE 26

A2830 Key Vendor Data Reci ept 30

A2840 Key Vendor Data Approval 60

Small Vessels ( Less than 2m Dia) 142 Small Vessels (Less than 2m Dia)

A6530 Prepare & Issue MR 10

A6540 Receipt of Quotation 21

A6550 Technical Querry / TBE 26

A6560 Key Vendor Data Reci ept 30

A6570 Key Vendor Data Approval 60

HTAT _Fired Heaters ( Crud e Heater101- F-101A/B an d Vacuum Heater 101-F-102) 169 HTAT _Fired Heaters ( Crude Heater101-F-101A/B and Vacuum Heater 101-F-102)

Actual Work Critical Remaining Work Page 12 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
A5140 Prepare & Issue MR 5

A5150 Receipt of Quotation 10

A5160 Technical Querry / TBE 15

A5170 Key Vendor Data Reci ept 60

A5180 Key Vendor Data Approval 120

Rotating & Package 236 Rotating & Package

Pumps ( Crude Charge, Crude Booster, HVGO PDT, Demulsifier Injection Pump, VR 189
PDT + Quench Pump, RCO Pumps ( Crude Charge, Crude Booster, HVGO PDT, Demulsifier Injection Pump, VR PDT + Quench Pump, RCO

A3550 Prepare & Issue MR 10

A3560 Receipt of Quotation 21

A3570 Technical Querry / TBE 26

A3580 Key Vendor Data Reci ept 30

A3590 Key Vendor Data Approval 100

Centrifugal Pumps Remaining All (API) 177 Centrifugal Pumps Remaining All (API)

A7290 Prepare & Issue MR 10

A7300 Receipt of Quotation 21

A7310 Technical Querry / TBE 24

A7320 Key Vendor Data Reci ept 20

A7330 Key Vendor Data Approval 100

High speed Centrifugal Pumps (SUNDYNE) 178 High speed Centrifugal Pumps (SUNDYNE)

A7340 Prepare & Issue MR 10

A7350 Receipt of Quotation 21

Actual Work Critical Remaining Work Page 13 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
A7360 Technical Querry / TBE 25

A7370 Key Vendor Data Reci ept 21

A7380 Key Vendor Data Approval 100

Positive dispacement Pumps (Diaphragm) 177 Positive dispacement Pumps (Diaphragm)

A7590 Prepare & Issue MR 10

A7600 Receipt of Quotation 21

A7610 Technical Querry / TBE 24

A7620 Key Vendor Data Reci ept 18

A7630 Key Vendor Data Approval 100

Positive dispacement Pumps (Rotary) 182 Positive dispacement Pumps (Rotary)

A7540 Prepare & Issue MR 10

A7550 Receipt of Quotation 21

A7560 Technical Querry / TBE 24

A7570 Key Vendor Data Reci ept 18

A7580 Key Vendor Data Approval 100

Centrifugal Pumps (NON-API) 173 Centrifugal Pumps (NON-API)

A7490 Prepare & Issue MR 10

A7500 Receipt of Quotation 20

A7510 Technical Querry / TBE 20

A7520 Key Vendor Data Reci ept 20

A7530 Key Vendor Data Approval 100

Actual Work Critical Remaining Work Page 14 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
Reciprocating Air Compressor 173 Reciprocating Air Compressor

A7440 Prepare & Issue MR 10

A7450 Receipt of Quotation 20

A7460 Technical Querry / TBE 20

A7470 Key Vendor Data Reci ept 30

A7480 Key Vendor Data Approval 100

Purge Oil Mist System 169 Purge Oil Mist System

A7390 Prepare & Issue MR 7

A7400 Receipt of Quotation 20

A7410 Technical Querry / TBE 20

A7420 Key Vendor Data Reci ept 30

A7430 Key Vendor Data Approval 100

Package 177 Package

Desalter Package 99 Desalter Package

A5080 Prepare & Issue MR 5

A5090 Receipt of Quotation 10

A5100 Technical Querry / TBE 12

A5110 Key Vendor Data Reci ept 50

A5120 Key Vendor Data Approval 50

Ejector 122 Ejector

A3100 Prepare & Issue MR 10

Actual Work Critical Remaining Work Page 15 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
A3110 Receipt of Quotation 15

A3120 Technical Querry / TBE 20

A3130 Key Vendor Data Reci ept 55

A3140 Key Vendor Data Approval 55

Others 130 Others

A7650 Prepare & Issue MR 10

A7660 Receipt of Quotation 10

A7670 Technical Querry / TBE 25

A7680 Key Vendor Data Reci ept 55

A7640 Key Vendor Data Approval 55

Fire Fighting Equipment / Clean Agent/ Others 156 Fire Fighting Equipment / Clean Agent/ Others

A3900 Prepare & Issue MR 15

A3910 Receipt of Quotation 21

A3920 Technical Querry / TBE 20

A3930 Key Vendor Data Reci ept 30

A3940 Key Vendor Data Approval 60

HVAC Package 191 HVAC Package

A3800 Prepare & Issue MR 10

A3810 Receipt of Quotation 16

A3820 Technical Querry / TBE 25

A3830 Key Vendor Data Reci ept 40

Actual Work Critical Remaining Work Page 16 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
A3840 Key Vendor Data Approval 90

Piping 63 Piping

U/G Piping Material 1st 20 U/G Piping Material 1st

A3600 Prepare & Issue MR 5

A3610 Receipt of Quotation 10

A3620 TBE/CBE 5

A/G Piping Material 1st 25 A/G Piping Material 1st

A3650 Prepare & Issue MR 5

A3660 Receipt of Quotation 12

A3670 TBE/CBE 8

Electrical 382 Electrical

EHV & HV Switchgear (ICOG) 132 EHV & HV Switchgear (ICOG)

A3950 Prepare & Issue MR 10

A3960 Receipt of Quotation 15

A3970 Technical Querry / TBE 14

A3980 Key Vendor Data Reci ept 25

A3990 Key Vendor Data Approval 50

Transformers (Power, Lighting, Distribuition) 188 Transformers (Power, Lighting, Distribuition)

A4050 Prepare & Issue MR 10

A4060 Receipt of Quotation 15

A4070 Technical Querry / TBE 30

Actual Work Critical Remaining Work Page 17 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
A4080 Key Vendor Data Reci ept 25

A4090 Key Vendor Data Approval 90

66 KV GIS (Gas Insulated S/gear) Eqpt 183 66 KV GIS (Gas Insulated S/gear) Eqpt

A4150 Prepare & Issue MR 10

A4160 Receipt of Quotation 20

A4170 Technical Querry / TBE 20

A4180 Key Vendor Data Reci ept 25

A4190 Key Vendor Data Approval 90

415V MV Switchgear 178 415V MV Switchgear

A4100 Prepare & Issue MR 15

A4110 Receipt of Quotation 14

A4120 Technical Querry / TBE 14

A4130 Key Vendor Data Reci ept 25

A4140 Key Vendor Data Approval 90

EHV, HV & MV Cables 222 EHV, HV & MV Cables

A5730 Prepare & Issue MR 25

A5740 Receipt of Quotation 21

A5750 Technical Querry / TBE 30

A5760 Key Vendor Data Reci ept 30

A5770 Key Vendor Data Approval 90

AC UPS 222 AC UPS

Actual Work Critical Remaining Work Page 18 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
A7040 Prepare & Issue MR 30

A7050 Receipt of Quotation 30

A7060 Technical Querry / TBE 30

A7070 Key Vendor Data Reci ept 30

A7080 Key Vendor Data Approval 90

AC & DC UPS and Battery Charger 282 AC & DC UPS and Battery Charger

A7140 Prepare & Issue MR 90

A7150 Receipt of Quotation 90

A7160 Technical Querry / TBE 90

A7170 Key Vendor Data Reci ept 60

A7180 Key Vendor Data Approval 90

Cathodic Protection System 252 Cathodic Protection System

A7190 Prepare & Issue MR 30

A7200 Receipt of Quotation 30

A7210 Technical Querry / TBE 30

A7220 Key Vendor Data Reci ept 145

A7230 Key Vendor Data Approval 150

Instrumentation 328 Instrumentation

Control Valves 173 Control Valves

A4450 Prepare & Issue MR 25

A4460 Receipt of Quotation 14

Actual Work Critical Remaining Work Page 19 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
A4470 Technical Querry / TBE 14

A4480 Key Vendor Data Reci ept 25

A4490 Key Vendor Data Approval 75

On-Off/ Self Regulating Valves 173 On-Off/ Self Regulating Valves

A4500 Prepare & Issue MR 25

A4510 Receipt of Quotation 14

A4520 Technical Querry / TBE 14

A4530 Key Vendor Data Reci ept 25

A4540 Key Vendor Data Approval 75

Pressure Safety Valves 173 Pressure Safety Valves

A4550 Prepare & Issue MR 25

A4560 Receipt of Quotation 14

A4570 Technical Querry / TBE 14

A4580 Key Vendor Data Reci ept 25

A4590 Key Vendor Data Approval 75

Analyzer System 188 Analyzer System

A4600 Prepare & Issue MR 25

A4610 Receipt of Quotation 14

A4620 Technical Querry / TBE 14

A4630 Key Vendor Data Reci ept 25

A4640 Key Vendor Data Approval 90

Actual Work Critical Remaining Work Page 20 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
In-line Instruments 168 In-line Instruments

A4750 Prepare & Issue MR 25

A4760 Receipt of Quotation 14

A4770 Technical Querry / TBE 14

A4780 Key Vendor Data Reci ept 25

A4790 Key Vendor Data Approval 75

Field Instruments 168 Field Instruments

A4800 Prepare & Issue MR 25

A4810 Receipt of Quotation 14

A4820 Technical Querry / TBE 14

A4830 Key Vendor Data Reci ept 25

A4840 Key Vendor Data Approval 75

Instrument Cable Duct/Trays/ Fittings / Others 148 Instrument Cable Duct/Trays/ Fittings / Others

A4850 Prepare & Issue MR 25

A4860 Receipt of Quotation 14

A4870 Technical Querry / TBE 14

A4880 Key Vendor Data Reci ept 25

A4890 Key Vendor Data Approval 50

Procurement 591 Procurement

HTAT 425 HTAT

Fired Heaters ( Crude Heater101-F-101A/B and Vacuum Heater 101-F -102) 425 Fired Heaters ( Crude Heater101-F-101A/B and Vacuum Heater 101-F-102)

Actual Work Critical Remaining Work Page 21 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
PM2801 Ordering / LOI ISsue 5

PM2803 Heaters Manufacturing & Delivery to Site 420

Static 424 Static

Towers (CS, CS+Clad, Site Joint) 316 Towers (CS, CS+Clad, Site Joint)

PM2662 Ordering / LOI Issue 26

PM2672 Manufacturing & Delivery to Site 290

Tower Internals 264 Tower Internals

PM3022 Ordering / LOI Issue 14

PM3032 Manufacturing & Delivery to Site 250

Heat Exchanger 408 Heat Exchanger

CS & LAS Heat Exchanger 408 CS & LAS Heat Exchanger

PM2782 Ordering / LOI ISsue 20

PM2822 Part 1 : Manufacturing & Delivery to Site (TS2, TS 5 ) 240

PM2792 Part 2 :Manufacturing & Delivery to Site (Remain Heat 305


Exch.)
SS Clad, Solid SS & Brass Exchanger 390 SS Clad, Solid SS & Brass Exchanger

PM3212 Ordering / LOI ISsue 20

PM3232 Part 1 : Manufacturing & Delivery to Site (TS2, TS 5 ) 240

PM3222 Part 2 :Manufacturing & Delivery to Site (Remain Heat 290


Exch.)
Helix heat exchanger 320 Helix heat exchanger

PM3172 Ordering / LOI ISsue 15

PM3182 Manufacturing & Delivery to Site (Remain Heat Exch.) 290

Actual Work Critical Remaining Work Page 22 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
Air Cooler 395 Air Cooler

PM2922 Ordering / LOI ISsue 14

PM2942 Part 1. Manufacturing & Delivery to Site ( AIR COOLER 290


101-A-101 A~D , 101-A-102 A ~D)
PM2932 Part 2. Manufacturing & Delivery to Site (Remaining) 300

Big Vessels (More than 2m Dia) 384 Big Vessels (More than 2m Dia)

PM2802 Ordering / LOI Issue 15

PM2832 Part 1 : Manufacturing & Delivery to Site (TS2, TS 5 ) 250

PM2812 Part 2 :Manufacturing & Delivery to Site (Remain Vessel) 290

Small Vessels ( Less than 2m Dia) 384 Small Vessels (Less than 2m Dia)

PM3132 Ordering / LOI Issue 15

PM3152 Part 1 : Manufacturing & Delivery to Site (TS2, TS 5 ) 250

PM3142 Part 2 :Manufacturing & Delivery to Site (Remain Vessel) 290

Rotating Equipments 329 Rotating Equipments

Pumps ( Crude Charge, Crude Booster, HVGO PDT, Demulsifier Injection Pump, VR PDT
329+ Quench Pump, RCO Pumps ( Crude Charge, Crude Booster, HVGO PDT, Demulsifier Injection Pump, VR PDT +

PM3272 Ordering / LOI ISsue 25

PM3282 Manufacturing & Delivery to Site 304

Centrifugal Pumps Remaining All (API) 273 Centrifugal Pumps Remaining All (API)

PM3002 Ordering / LOI ISsue 15

PM3012 Manufacturing & Delivery to Site 258

High speed Centrifugal Pumps (SUNDYNE) 273 High speed Centrifugal Pumps (SUNDYNE)

PM3292 Ordering / LOI ISsue 15

Actual Work Critical Remaining Work Page 23 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
PM3302 Manufacturing & Delivery to Site 258

Positive dispacement Pumps (Diaphragm) 265 Positive dispacement Pumps (Diaphragm)

PM3252 Ordering / LOI ISsue 15

PM3262 Manufacturing & Delivery to Site 250

Positive dispacement Pumps (Rotary) 265 Positive dispacement Pumps (Rotary)

PM3312 Ordering / LOI ISsue 20

PM3322 Manufacturing & Delivery to Site 245

Centrifugal Pumps (NON-API) 273 Centrifugal Pumps (NON-API)

PM3332 Ordering / LOI ISsue 15

PM3342 Manufacturing & Delivery to Site 258

Reciprocating Air Compressor 270 Reciprocating Air Compressor

PM3352 Ordering / LOI ISsue 15

PM3362 Manufacturing & Delivery to Site 255

Purge Oil Mist System 269 Purge Oil Mist System

PM3522 Ordering / LOI ISsue 14

PM3532 Manufacturing & Delivery to Site 255

Package 355 Package

Desalter Package 313 Desalter Package

PM3062 Ordering / LOI ISsue 8

PM3072 Manufacturing & Delivery to Site 305

Ejector 317 Ejector

Actual Work Critical Remaining Work Page 24 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
PM2702 Ordering / LOI ISsue 12

PM2712 Manufacturing & Delivery to Site 305

Others 275 Others

PM3542 Ordering / LOI ISsue 20

PM3552 Manufacturing & Delivery to Site 255

Fire Fighting Equipment / Clean Agent/ Others 195 Fire Fighting Equipment / Clean Agent/ Others

PM1622 Ordering / LOI ISsue 10

PM1632 Manufacturing & Delivery to Site 185

HVAC Package 205 HVAC Package

PM1662 Ordering / LOI ISsue 10

PM1672 Manufacturing Ex. Work 195

Piping 213 Piping

U/G Piping Material 1st 129 U/G Piping Material 1st

PM1702 Ordering / LOI ISsue 6

PM1712 Manufacturing & Delivery to Site (Part Delivery) 60

PM1722 Manufacturing & Delivery to Site (Balance) 50

A/G Piping Material 1st 162 A/G Piping Material 1st

PP135 Pipe/ Fittings/ Flanges / Valves A/G 1st- LOI 7

PP140 Pipe/ Fittings/ Flanges / Valves A/G 1st-Manufacturing & 75


Delivery to Site (Part Delivery)
PP150 Pipe/ Fittings/ Flanges / Valves A/G 1st-Manufacturing & 90
Delivery to Site (Complete Delivery)
Electrical 381 Electrical

Actual Work Critical Remaining Work Page 25 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
EHV & HV Switchgear (ICOG) 218 EHV & HV Switchgear (ICOG)

PM1922 Ordering / LOI ISsue 18

PM1932 Manufacturing & Delivery to Site 200

Transformers (Power, Lighting, Distribuition) 198 Transformers (Power, Lighting, Distribuition)

PM1882 Ordering / LOI ISsue 18

PM1892 Manufacturing & Delivery to Site 180

66 KV GIS (Gas Insulated S/gear) Eqpt 218 66 KV GIS (Gas Insulated S/gear) Eqpt

PM1842 Ordering / LOI ISsue 18

PM1852 Manufacturing & Delivery to Site 200

415V MV Switchgear 207 415V MV Switchgear

PM1822 Ordering / LOI ISsue 20

PM1832 Manufacturing & Delivery to Site 200

EHV, HV & MV Cables 187 EHV, HV & MV Cables

PM3372 Ordering / LOI ISsue 60

PM3382 Manufacturing & Delivery to Site (Progressivley Delivered) 180

AC UPS 207 AC UPS

PM3412 Ordering / LOI ISsue 60

PM3422 Manufacturing & Delivery to Site 200

AC & DC UPS and Battery Charger 207 AC & DC UPS and Battery Charger

PM3392 Ordering / LOI ISsue 60

PM3402 Manufacturing & Delivery to Site 200

Actual Work Critical Remaining Work Page 26 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
Cathodic Protection System 237 Cathodic Protection System

PM3472 Ordering / LOI ISsue 30

PM3482 Manufacturing & Delivery to Site 200

Instrumentation 498 Instrumentation

Control Valves 230 Control Valves

PM2162 Ordering / LOI ISsue 20

PM2172 Manufacturing & Delivery to Site 210

On-Off/ Self Regulating Valves 230 On-Off/ Self Regulating Valves

PM2142 Ordering / LOI ISsue 20

PM2152 Manufacturing & Delivery to Site 210

Pressure Safety Valves 230 Pressure Safety Valves

PM2122 Ordering / LOI ISsue 20

PM2132 Manufacturing & Delivery to Site 210

Analyzer System 370 Analyzer System

PM2102 Ordering / LOI ISsue 20

PM2112 Manufacturing & Delivery to Site 350

In-line Instruments 265 In-line Instruments

PM2042 Ordering / LOI ISsue 15

PM2052 Manufacturing & Delivery to Site 250

Field Instruments 265 Field Instruments

PM2022 Ordering / LOI ISsue 15

Actual Work Critical Remaining Work Page 27 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
PM2032 Manufacturing & Delivery to Site 250

Instrument Cable Duct/Trays/ Fittings / Other remain 200 Instrument Cable Duct/Trays/ Fittings / Other remain

PM2062 Ordering / LOI ISsue (Final) 10

PM2072 Manufacturing and Delivery to Site (Final) 120

PM2002 Ordering / LOI ISsue 20

PM2012 Manufacturing and Delivery to Site 120

Construction 782 Construction

Temporary Facility 140 Temporary Facility

A5920 Temporary Construction Facility ( Overall) 140

Subcontracting & Mobilization 380 Subcontracting & Mobilization

Piling Work 52 Piling Work

PILE1000 Piling Work Subcontract (LOI within 1week from EDC) 14

PILE1010 Piling Contractor Mobilization 45

Civil Works 78 Civil Works

A6010 Civil / Bldg. Work Subcontract(RFQ,TBE,CBE,Ordering) 26

A6020 Civil/Bldg. Contractor Mobilization 52

Mechanical and PIping Work Subcontractor 60 Mechanical and PIping Work Subcontractor

CONPIP1000 Piping / Mech Work Subcontract (RFQ,TBE,CBE,Ordering) 30

CONPIP1025 Piping /Mech Work Subcontract Mobilization 30

E&I 105 E&I

A6230 Electrical Work Subcontract (RFQ,TBE,CBE,Ordering) 60

Actual Work Critical Remaining Work Page 28 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
A6240 Electrical Work Subcontract Mobilization 45

Insulation 120 Insulation

A6290 Insulation, Painting & Fireproofing Work Subcontract 60


(RFQ,TBE,CBE,Ordering)
A6300 Insulation, Painting & Fireproofing Work Subcontract 60
Mobilization
Steel Structure Fabrication Work 426 Steel Structure Fabrication Work

A5220 RFQ/TBE/CBE / PO Issue 26

A5200 Shop Drawing 250

A5250 Shop Drawing Approv al 250

A5210 Shop Fabrication and Delivery to Site 330

AG Piping Fabrication Work 330 AG Piping Fabrication Work

CONPIP1110 AG Piping : Shop Fabrication 330

Major Area 670 Major Ar ea

Area 1. CDU Column 555 Area 1. CDU Column

PILE1030 CDU Column Fdn. Piling 30

A6040 CDU Column-Equip. Fdn. 140

A6050 Erection of CDU Column (in-situ circumferential seam 37


included)
A6060 AG Piping Erection 210

Area 2. Building 597 Area 2. Building

66 Kv SubStation Building (Building Size 110 M x 31 M ) 590 66 Kv SubStation Building (Building Size 110 M x 31 M )

PILE1040 Substation Building Fdn. Piling 35

CC500 1st Part Sub-station ( Excavation for Fdn , Pile treatment 170
upto 1st Floor Slab Casting )

Actual Work Critical Remaining Work Page 29 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
CC510 2nd Part Sub-station ( Excavation for Fdn , Pile treatment 190
upto 1st Floor Slab Casting plus stair case upto top level )
CC840 Finishing Item 208

CC740 Sub-station Bldg Ready for Panel Installation 0 Sub-station Bldg Ready for Panel Installation

CC820 Substation Equipment Installation 186

CC760 Substation bldg HVAC installation work , Commissioning and 205


Performance Test
CC830 Substation Energization 26

Sattelite Rack Room Building (Building Size 35 M x 36 M ) 597 Sattelite Rack Room Building (Building Size 35 M x 36 M )

PILE1060 SRR Building Fdn. Piling 45

CC570 SRR building Excavation for Fdn 35

CC580 SRR building Fdn 104

CC590 SRR building Columns/ Blast-proof Outer Walls 45

CC595 SRR building Roof Slab concreting complete 35

CC610 SRR building Masonry Work/ Plastering 60

CC615 SRR building Flooring/ Tiling complete 75

CC605 SRR bldg Door/ Window Fabrication 100

CC620 SRR bldg Door/ Window/ Carpentry work 50

CC635 SRR bldg False Flooring/ Ceiling 50

CC675 SRR bldg Final Paint/ Finish work/ Stone Clad ( if Sated in 80
ITB)
CC645 SRR bldg Ready for Instrument Eqpt /Panel Installation 0 SRR bldg Ready for Instrument Eqpt /Panel Installation

CC695 SRR Building Equipments / Panels Installation ( Including 150


DCS by Others)
CC655 SRR bldg HVAC installation work , Commissioning and 180
Performance Test

Actual Work Critical Remaining Work Page 30 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
CC685 Roof Treatment 60

CC705 DCS Power On 0 DCS Power On

Area 3. Piperack 475 Area 3. Piperack

PILE1050 Main Pipe Rack Fdn. Piling Works 85

A6080 Main Piperack Fdn. Work 130

A6070 Main Pipe Rack : RCC Precast Works 155

A6090 Main Piperack RCC Precast Erection 210

A6460 AG Piping Erection 350

A6440 Steel Str. Erection Work 260

A6450 Equipment Erection ( AIR COOLER 101-A- 101 A~D , 26


101-A-102 A ~D)
Area 4. VDU Column 571 Area 4. VDU Column

PILE1090 VDU Column Fdn. Piling 30

A6100 VDU Column-Equip. Fdn. + Superstructure (~ 5M Duration 180


Considered)
CONHTR1055 Erection of VDU Column (in-situ circumferential seam 52
included)
CONHTR1065 AG Pipe Erection 210

Area 5. Tech. Structures 611 Area 5. Tech. Structures

TS # 2 530 TS # 2

PILE1070 Tech. Structures (# 2) Fdn. Piling 45

A6120 Tech Str.-2 FDN. Work 60

A6360 Steel Str. Erection Work TS # 2 170

A6390 Equipment Erection 90

Actual Work Critical Remaining Work Page 31 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
A6400 Stair, Ladder, Platform, Grating, Handrail etc. 90

A6470 AG Pipe Erection 250

TS # 5 551 TS # 5

PILE1080 Tech. Structures (# 5) Fdn. Piling 50

A6380 Tech Str.-5 FDN Work and Concrete Works 170

A6640 Steel Str. Erection Work TS # 5 (Part 1) 80

A6660 Equipment Erection - Part 1 80

A6630 AG Pipe Erection 300

A6410 Stair, Ladder, Platform, Grating, Handrail etc. 220

A6370 Steel Str. Erection Work TS # 5 (Part 2) 148

A6430 Equipment Erection - Part 2 130

TS Others (1,3,4,6,7) 562 TS Others (1,3,4,6,7)

PILE1120 Tech. Structures (# 1,3,4,6,7) Fdn. Piling 70

A7690 Tech Str.-(# 1,3,4,6,7) FDN Work. 100

A7700 Steel Str. Erection Work TS # (# 1,3,4,6,7) 150

A7710 Equipment Erection 100

A7720 AG Pipe Erection 200

A7730 Stair, Ladder, Platform, Grating, Handrail etc. 90

Area 6. Heaters 535 Area 6. Heaters

Heater (CDU Heater : 2 Nos; VDU Heater : 1 Nos; Common Stack ~85 Meter) 535 Heater (CDU Heater : 2 Nos; VDU Heater : 1 Nos; Common S

PILE1100 Heater Fdn. Piling 80

Actual Work Critical Remaining Work Page 32 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
A6110 Heater-Equip. Fdn. 90

A6130 Heater Erection 460

A6180 Heater Piping Erection Work 245

Area 7. LPGTU Area 532 Area 7. LPGTU Area

A7750 Piling Work 60

A7760 Fdn Work 200

A7780 Steel Str. Erection Work 150

A7800 Equipment Erection 90

A7790 AG Pipe Erection Work 200

Area 8. FGTU Area 449 Area 8. FGTU Area

A7810 Piling Work 60

A7820 Fdn Work 150

A7850 Equipment Erection 90

A7830 Steel Str. Erection Work 150

A7840 AG Pipe Erection Work 200

Area 9. Desalter 258 Area 9. Desalter

A7870 Civil Works FDN 104

A7880 Equipment Erection 48

A7890 AG Piping Work 104

Common 707 Common

Piping Work (Common) 657 Piping Work (Common)

Actual Work Critical Remaining Work Page 33 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone
EPCC-01 PACKAGE FOR CDU/VDU WITH HWOG TREATMENT UNIT, SAT. LPG TREATING UNIT & SAT.
FUEL GAS TREATING UNIT FOR HPCL RAJASTHAN REFINERY LIMITED (HRRL) & RAJASTHAN
REFINERY PROJECT (RRP) AT PACHPADRA TEHSIL, BARMER DISTRICT, RAJASTHAN, INDIA.

(BIDDING DOCUMENT NO.: AKR/B224-101-PM-T-7201/2001)

PROJECT SCHEDULE
Activity ID Activity Name Original
Duration Month
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
CONPIP1050 UG Pipe : Fabrication and Laying 250

CONPIP1100 AG Pipe: Hydrotest & Reinstatement 300

Electrical Work 270 Electrical Work

A6150 Electrical Tray & Cabling Work 270

Instrument Work 338 Instrument Work

A7860 Instrument Tray & Cabling Work 270

A6220 Inline and Field Instrument Installation Work 230

Insulation , Painting & Fireproofing 402 Insulation , Painting & Fireproofing

A6310 Execution of Insulation, Painting & Fireproofing Work 402

Precommissioning Overall 268 Precommissioning Overall

PRECOM1000 Flushing/Blowing and Reinstatement of Process and Utility 250


Piping ( Initially using portable Compressor on HIRE)
PRECOM1050 Motor Solo Run 45

PRECOM1025 Loop Check & Function Check 149

PRECOM1150 Mechanical Run Test for Rotating Machines 70

PRECOM1075 Precom Works (Others; Boil out , Steam Blowing , Chemical 75


loading etc. )
PRECOM1095 Mechanical Completion 0 Mechanical Completion

Commissioning 52 Commissioning

PRECOM1085 Heater Refractory Dryout 40

A6350 Commissioning 60

Post Commissioning Service & PGTR 158

A7900 6 Months Post Commissioning assistance Service and PGTR 158

Actual Work Critical Remaining Work Page 34 of 34 Date Revision Checked Approved
01-Jun-19 ISSUE FOR PROPOSAL UCY RC
Remaining Work Milestone