Saudi Aramco 2616-ENG (03/99)

OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT

MP

MP

MP
ENGG

RSD

KC

KC

MARJAN DEVELOPMENT PROGRAM


BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)


BI-10-09003 ISSUED FOR REVIEW (B1)

BI-10-09003
DESCRIPTION

TANAJIB GAS PLANT (TGP)


JO/EWO

FACILITIES SPECIFICATION
05/18/18

09/07/18

09/18/18
DATE

BASIC ENGINEERING DESIGN DATA (BEDD)


REV. NO.

G
E

DISCIPLINE
ENGINEER
junxue.lee
________________

DATE ___________

PROJECT
ENGINEER

________________
maria.peskosta
DATE ___________

CERTIFIED

________________

DATE ___________

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________________

DATE ___________
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Issued for Construction


FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 1


COMMON AREA T80 A PP-962000
OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_Rev G DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT

MP

MP

MP

TABLE OF CONTENTS
1. PURPOSE 4
ENGG

RSD

KC

KC

2. ABBREVIATIONS 4
3. REFERENCE DOCUMENTS 5
4. PROJECT DESCRIPTION 6
Project Overview 7
Plant Numbers 8
5. DATUM POINT AND ELEVATION 8
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)


BI-10-09003 ISSUED FOR REVIEW (B1)

6. MINIMUM DESIGN LIFE 8


7. APPLICABLE CODES, STANDARDS, GOVERNMENT ACTS, AND LOCAL
DESCRIPTION

AUTHORITY REGULATIONS 9
8. CLIMATIC DATA 9
Wind 9
JO/EWO

Ambient Air & Soil Temperature 10


05/18/18

09/07/18

09/18/18

Relative Humidity 11
DATE

Rainfall 11
REV. NO.

G
E

DISCIPLINE
Barometric Pressure 12
ENGINEER

________________ Solar Heat 12


DATE ___________
Seismic Data 13
PROJECT
ENGINEER

________________
Miscellaneous 13
DATE ___________
9. ECONOMIC PARAMETERS 14
CERTIFIED

________________
10. UTILITIES 14
DATE ___________
Steam 14
CONSTRUCTION
AGENCY Water 15
________________

DATE ___________
Plant and Instrument Air 19
OPERATIONS Inert Gas (Nitrogen) 20
________________

DATE ___________ Fuel Systems 20


Flare 22
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

11. CIVILS, STRUCTURAL AND BUILDINGS 23


EDSD

Topography 23
Soil Conditions 23
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

Soil Data 24
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Ground water level 24

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 2


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Buildings 24
CERT

MP

MP

MP

HVAC requirements 24
ENGG

RSD

KC

KC

Security 24
Roads and Paving 24
Drainage and Underground services 25
12. CONTROL AND INSTRUMENTATION 25
Special Approval Agency Requirements 26
13. ELECTRICAL 26
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

14. PIPING AND PIPELINES 28


BI-10-09003 ISSUED FOR REVIEW (B1)

15. EQUIPMENT 30
DESCRIPTION

Lifting Impact Factor 30


16. ENVIRONMENT CLASSIFICATION 30
17. EQUIPMENT AND PIPING INSULATION 31
JO/EWO

18. ENVIRONMENTAL REQUIREMENTS 31


19. UNITS OF MEASUREMENT 31
05/18/18

09/07/18

09/18/18
DATE

20. TRANSPORTATION LIMITS 33


REV. NO.

ATTACHMENT 1: AMBIENT AIR & SOIL TEMPERATURES 34


G
E

DISCIPLINE
ENGINEER
ATTACHMENT 2 AIR COOLER DESIGN AIR INLET TEMPERATURE 35
________________
ATTACHMENT 3 DRINKING WATER CONTAMINANT LEVELS 36
DATE ___________

PROJECT
ENGINEER

________________

DATE ___________

CERTIFIED

________________

DATE ___________

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________________

DATE ___________
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 3


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

1. PURPOSE
CERT

MP

MP

MP

This standard presents the Basic Engineering Design Data (BEDD) for the
ENGG

facilities associated with the Saudi Aramco Marjan Development Program -


RSD

KC

KC

Tanajib Gas Plant (TGP) project. It provides the general base data for other
technical documents expected to be produced during the Project.
The Saudi Aramco Budget Item number for this project is BI-10-09003.

2. ABBREVIATIONS

Abbreviations and acronyms used in this document can be found in the


Glossary of Terms T80-A-PP-092000 and in the table below:
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)


BI-10-09003 ISSUED FOR REVIEW (B1)

AOC Aramco Overseas Company B.V

ASCE American Society of Civil Engineers


DESCRIPTION

BFW Boiler Feed Water

BI Budget Item
JO/EWO

CW Cooling Water
05/18/18

09/07/18

09/18/18
DATE

DBSP Design Basis Scoping Paper


REV. NO.

FEL Front End Loading


G
E

DISCIPLINE
ENGINEER
GOSP Gas Oil Separation Plant
________________

DATE ___________
HPP High Point of Paving
PROJECT
ENGINEER

________________ MSAER Mandatory Saudi Aramco Engineering Requirements


DATE ___________

CERTIFIED PAN Project Advice Note


________________

DATE ___________ PSD Project Scope Definition


CONSTRUCTION
AGENCY PSHA Probabilistic Seismic Hazard Assessment
________________

DATE ___________
PTHA Probabilistic Tsunami Hazard Assessment
OPERATIONS

________________ RVP Raid Vapour Pressure


DATE ___________

SAES Saudi Aramco Engineering Standards


CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

SAMMS Saudi Aramco Material Systems Specifications


EDSD

SRU Sulfur Recovery Unit

TGP Tanajib Gas Plant


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

WGP Wasit Gas Plant

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 4


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

WWT Waste Water Treatment


CERT

MP

MP

MP
ENGG

RSD

KC

KC

3. REFERENCE DOCUMENTS

ANSI/ISA 5.1 Instrumentation Symbols and Identification


(R2009)

RT-17-11-2047 Preliminary Geotechnical Investigation Marjan


Field Development Site Preparation Tanajib Gas
(Saudi Aramco
Plant including Cogeneration Facilities at TGP
Geotechnical file No:
(BI-10-09003) & (BI-10-12264) Tanajib,
2017/109)
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

Kingdom of Saudi Arabia.


BI-10-09003 ISSUED FOR REVIEW (B1)

Saudi Aramco Section referenced: SAEHC-S-01 (Water)


Environmental
DESCRIPTION

Health Code

SAES-A-100 Survey Coordinates, Datums and Data Formats


JO/EWO

SAES-A-112 Meteorological and Seismic Data (25th


November 2015)
05/18/18

09/07/18

09/18/18
DATE

SAES-A-113 Onshore Geotechnical Engineering


Requirements
REV. NO.

G
E

DISCIPLINE
ENGINEER
SAES-B-068 Electrical Area Classification
________________

DATE ___________ SAES-E-004 Design Criteria of Shell and Tube Heat


PROJECT
Exchangers
ENGINEER

________________
SAES-E-007 Design Criteria of Air-Cooled Heat Exchangers
DATE ___________

CERTIFIED
SAES-F-007 System Design Criteria of Flares
________________

DATE ___________
SAES-H-001 Coating Selection and Application Requirements
CONSTRUCTION for Industrial Plants and Equipment
AGENCY

________________
SAES-H-002 Internal and External Coatings for Steel
DATE ___________
Pipelines and Piping
OPERATIONS

________________
SAES-H-003 Protective Coatings for Industrial Concrete
DATE ___________
Structures
CONTROL NUMBER

DATE _____________

SAES-H-101V Approved Saudi Aramco Data Sheets - Paints


BY: ______________
VERIFICATION

and Coatings
EDSD

SAES-H-102 Safety Requirements for Coating Applications


THIS INDICATES THAT REV. NO. ____________

SAES-H-200 Storage, Handling, and Installation of Externally


APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Coated Pipe

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 5


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

SAES-H-201 General Specifications for External and Internal


CERT

MP

MP

MP

FBE Coatings of Pipeline Field Girth Welds


ENGG

RSD

KC

KC

SAES-J-903 Intrinsically Safe Systems

SAES-K-001 Design and Installation of Heating, Ventilating


and Air Conditioning Systems

SAES-L-133 Corrosion Protection Requirements for


Pipelines, Piping and Process Equipment

SAES-L-150 Pressure Testing of Plant Piping and Pipelines


BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)


BI-10-09003 ISSUED FOR REVIEW (B1)

SAES-P-100 Basic Power System Design Criteria

SAES-P-111 Grounding
DESCRIPTION

SAES-P-113 Motors and Generators

SAEP-341 Equipment Life Cycle Cost Procedure


JO/EWO

T80-A-PP-092000 Glossary of Terms


05/18/18

09/07/18

09/18/18
DATE

T80-A-PP-312707 Safety Philosophy Gas Facility


REV. NO.

T80-A-PP-312702 Environmental Basis of Design


G
E

DISCIPLINE
ENGINEER

________________ T80-A-PP-842000 Building List OOK Scope


DATE ___________

PROJECT
T80-A-PP-050200 TGP Basis of Design
ENGINEER

________________
T80-A-PP-060200 TGP Process Engineering Design Criteria
DATE ___________

CERTIFIED
T80-J-PP-595001 Control and Instrumentation Basis of Design
________________

DATE ___________
T80-N-PP-969551 Thermal and Acoustic Insulation Specification
CONSTRUCTION
AGENCY
T80-P-PP-094000 Electrical Design Basis
________________

DATE ___________
T80-A-PP-966002 Civil and Structural Basis of Design
OPERATIONS

________________

DATE ___________ 4. PROJECT DESCRIPTION


CONTROL NUMBER

Client Name: Aramco Overseas Company B.V.


DATE _____________
BY: ______________
VERIFICATION
EDSD

Project Name: Marjan Development Program - Tanajib Gas


Plant (TGP)

Plant Location (Country): Tanajib, Kingdom of Saudi Arabia


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Geotechnical Report: 2017/109 and 2017/109 OOK

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 6


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Project Overview
CERT

MP

MP

MP

Marjan offshore oil field is located in the Arabian Gulf, about 85 kilometers
ENGG

northeast of Tanajib. Currently, 500 MBCD of crude oil is produced from the
RSD

KC

KC

field in three (3) offshore Gas - Oil Separation Plants (GOSPs) through five (5)
remote tie-in platforms and subsea flow lines. The GOSP separates gas from
wet crude oil. The wet crude oil is then pumped to shore at Tanajib Oil Plant
for further processing. Furthermore, the resulting associated gases are
compressed and sent to Berri and Khursaniyah Gas Plants for processing.
The Marjan Increment Development Program will provide new onshore &
offshore facilities to increase the crude processing capacity by 300 MBCD (to
a total of 800 MBCD) with water cut up to 60%. In addition, it will provide a
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

new grassroot Gas & NGL processing facilities at Tanajib to process and
BI-10-09003 ISSUED FOR REVIEW (B1)

recover valuable Natural Gas Liquids (NGL) products from approximately


2,100 MMSCFD of incremental associated, non-associated and cap gas. The
additional crude will be transported to Juaymah Terminal by a new pipeline
DESCRIPTION

while the sales gas will be exported to the Master Gas System (MGS). The
program will also include a new desalination, cogeneration, and community
expansion facilities which will support the program and will be executed by 3rd
Party contractor(s).
JO/EWO

TGP Facility Description:


Tanajib Gas Plant (TGP) under BI-10-09003 is part of the Marjan Increment
05/18/18

09/07/18

09/18/18
DATE

Development Program of Saudi Aramco. TGP will be located 20 km west of


the existing Tanajib Oil Facilities. Tanajib Gas Plant will be a fully integrated
REV. NO.

gas processing plant combining Gas Processing Facilities, NGL Recovery,


G
E

DISCIPLINE
ENGINEER
NGL Fractionation, along with Sales & Gas Injection all integrated within one
________________
facility.
DATE ___________
The primary purpose of TGP facilities is to process and extract the valuable
PROJECT
ENGINEER
NGL components from the additional gas and condensate volumes associated
________________
with the Marjan and Zuluf AH Increment Development Programs. The facility
DATE ___________
will process approximately 2,500 MMSCFD of gas and 85 MBCD of
CERTIFIED
condensate associated with Marjan and Zuluf AH increments. Furthermore,
________________
the facility will be provided with required provisions for future expansion
DATE ___________ (Phase II) to accommodate the Dorra gas development expected in 2026
along with future gas lift requirements.
CONSTRUCTION
AGENCY
The Phase I scope of TGP facilities includes inlet gas handling, three (3) gas
________________
processing trains consisting of acid gas removal, dehydration, mercury
DATE ___________
removal and natural gas liquids (NGL) recovery units, two (2) NGL
OPERATIONS
fractionation units, three (3) sulfur recovery and tail gas treatment units, and
________________
three (3) Mono Ethylene Glycol (MEG) regeneration and reclamation units.
DATE ___________
The facility also includes inlet liquid handling along with two (2) trains of
condensate stripping, dehydration and mercury removal. The utilities,
electrical, process automation, communication, and off-sites industrial support
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

facilities required to support the above processing units are provided. Power
EDSD

generation and steam will be provided from a standalone new grass root
Cogen facility that will be executed by 3rd Party contractor.
Sales gas product from TGP is exported to the MGS and a portion of the gas
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

is further compressed for offshore gas injection. Ethane, propane and butane
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

are exported to Jubail, while Natural gasoline (NG) is routed to Ras Tanura
Terminal for export. Produced pentanes will be injected into the Manifa

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 7


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

stabilized crude, while molten sulfur is transported via trucks for further
processing.
CERT

MP

MP

MP
ENGG

RSD

KC

KC

Plant Numbers

Plant No. Description


T70 INLET FACILITIES
T71 GAS PROCESSING
T72 NGL RECOVERY UNITS
T73 SALES GAS AND INJECTION COMPRESSORS
T74 NGL STORAGE AND SHIPPING
T75 SULFUR RECOVERY UNIT
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

T76 UTILITIES
BI-10-09003 ISSUED FOR REVIEW (B1)

T78 SULFUR LOADING & HANDLING FACILITY


T79 FLARES AND BURN PITS
T80 COMMON AREA
DESCRIPTION

T81 ON/OFF-PLOT ISF


T82 SITE PREPARATION/ACCESS ROADS
T83 NGL FRACTIONATION
JO/EWO

T84 FUTURE

5. DATUM POINT AND ELEVATION


05/18/18

09/07/18

09/18/18
DATE

Datum Coordinates:
REV. NO.

N: 10000.000 m
G
E

DISCIPLINE
ENGINEER
E: 10000.000 m
________________

DATE ___________ UTM Coordinates:


PROJECT
ENGINEER
N: 3077346.084
________________
E: 267448.465
DATE ___________

CERTIFIED
UTM Coordinates based on Ain Al Abd 1970 Datum, Zone-39N.
________________

DATE ___________ Elevation:

CONSTRUCTION
Main Gas Plant datum elevation is the high point of paving (HPP) which equals
AGENCY
to +100.000m and it corresponds to +22.050 m based on Saudi Aramco
________________
Vertical Datum of 1978 (SAVD 78), 1994 adjustment.
DATE ___________

OPERATIONS
6. MINIMUM DESIGN LIFE
________________

DATE ___________
Minimum Design life for the overall facility shall be 25 years, and the following
values for the below listed items:
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

Minimum Reference
EDSD

Item
Design Life

Air Cooled Exchanger SAES-E-007 Para. 7


20 years
Headers
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Pump Cases 20 years API STD 610 Para. 6.1.1

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 8


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Minimum Reference
CERT

Item
MP

MP

MP

Design Life
ENGG

RSD

KC

KC

Heat Exchanger Shells 20 years SAES-E-004 Para.7

Heat Exchanger SAES-E-004 Para.7


20 years
Channels

Heat Exchanger Tube SAES-E-004 Para.7


20 years
sheets

Heat Exchanger Tubes SAES-E-004 Para.7


20 years
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

(Alloy Steel)
BI-10-09003 ISSUED FOR REVIEW (B1)

Piping (Note 1) 20 years SAES-L-133 Para. 5.3.1.1


DESCRIPTION

Valves 20 years SAES-L-133 Para. 5.3.1.1

Expansion Joints 20 years SAES-L-133 Para. 5.3.1.1


JO/EWO

WWT Mechanical SAES-L-133 Para. 5.3.1.1


20 years
Equipment
05/18/18

09/07/18

09/18/18
DATE

Note 1:
REV. NO.

Fuel Gas start-up line for Cogen Facilities required to have a design life of 1.5
G
E

DISCIPLINE
years. EPC Contractor to confirm this with Cogen BOOT Contractor.
ENGINEER

________________

DATE ___________
7. APPLICABLE CODES, STANDARDS, GOVERNMENT ACTS, AND LOCAL
PROJECT
ENGINEER
AUTHORITY REGULATIONS
________________

DATE ___________
The project standards are to be based on Mandatory Saudi Aramco
Engineering Requirements (MSAER) and international standards,
CERTIFIED

________________
incorporating requirements of any mandatory local regulations and codes.
DATE ___________ The order of precedence of project standards will be as stated in the relevant
contract documents.
CONSTRUCTION
AGENCY

________________
COMPANY Standards used for the Preliminary Design are the latest revision
DATE ___________
in effect on 29th March 2018 (DBSP approval date).
OPERATIONS

________________
8. CLIMATIC DATA
DATE ___________
Climatic Data shown here is derived from SAES-A-112 using Tanajib specified
data, except it is noted otherwise. For definitions refer to SAES-A-112.
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD

Wind

Wind Design Load Reference Code ASCE 7


Basic wind speed (3-sec gust, 50 yr) 145 km/hr (90 mph)
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Exposure Category C

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 9


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Wind Direction
CERT

MP

MP

MP

Direction of prevailing wind is from N.


ENGG

RSD

KC

KC

Wind Rose
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)


BI-10-09003 ISSUED FOR REVIEW (B1)
DESCRIPTION
JO/EWO

05/18/18

09/07/18

09/18/18
DATE
REV. NO.

G
E

Source of Data: Tanajib GP Site Prevailing Wind Rose-AOC transmittal,


DISCIPLINE
ENGINEER dated 19 June 2017 (DSN 427).
________________

DATE ___________ Ambient Air & Soil Temperature


PROJECT
ENGINEER
Refer to Attachment 1 for Ambient Air and Soil Temperatures.
________________

DATE ___________ Highest Recorded Temperature 120°F (49°C)


CERTIFIED Lowest Recorded Temperature 32°F (0°C)
________________ Lowest One-Day Mean Temperature 34°F (1°C)
DATE ___________
Average annual Temperature 77°F (25°C)
CONSTRUCTION
Maximum Metal Temperature (*) 180ºF (82°C)
AGENCY

________________ (*) the maximum metal temperature resulting from


DATE ___________ solar radiation with no flow in the line (Black Body
OPERATIONS temperature)
________________
Base temperature for air cooler design Note 1, 2, 3
DATE ___________
Monthly Normal Max. Soil Temp. (1m below grade) 86°F (30°C)
Note 1: See Attachment 1 for ambient air temperatures.
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

Note 2: See Attachment 2 for additional factors and requirements for setting
EDSD

air cooler design air inlet temperature.


Note 3: For data related to air cooler design refer to the Process Engineering
Design Criteria, T80-A-PP-060200.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 10


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Relative Humidity
CERT

MP

MP

MP

Unless otherwise stated in the relevant equipment SAES and SAMSS


ENGG

equipment shall be designed for the site relative humidity from 0 to 100%
RSD

KC

KC

condensing.

Rainfall

Precipitation

Rainfall, Average Annual 104 mm (4.1 in)


Rainfall Maximum in 24 hours 59 mm (2.3 in)
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)


BI-10-09003 ISSUED FOR REVIEW (B1)

Design rainfall intensity

The average maximum precipitation rates, for storm durations up to 2 hours,


DESCRIPTION

shall be calculated from the Steel Formula:


K
I=
t +b
JO/EWO

Where:

I = Rainfall intensity in mm/hr (in/h)


05/18/18

09/07/18

09/18/18
DATE

t = time of concentration in minutes (10 mins minimum)


REV. NO.

K, b = non-dimensional coefficients
G
E

DISCIPLINE
ENGINEER The below table gives the rainfall intensity coefficients for the site:
________________

DATE ___________
Freq. K b
PROJECT
(year) SI English
ENGINEER

________________
5 2443 96.2 27.5
DATE ___________
10 2941 115.8 24.9
CERTIFIED

________________
25 3420 134.6 23.7
DATE ___________
50 3810 150.0 21.0
CONSTRUCTION
AGENCY 100 4300 169.3 20.0
________________

DATE ___________ Rainfall Distribution and Evaporation Rates


OPERATIONS

________________
Monthly Average
DATE ___________ Monthly
(mm) Class A pan
precipitation (mm)
evaporation data
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

Month Tanajib (1987-2013) Al-Hasa (Onshore)-


EDSD

Note1, 2.

January 26.5 138.29


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

February 11.9 159.16

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 11


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Monthly Average
CERT

Monthly
MP

MP

MP

(mm) Class A pan


precipitation (mm)
evaporation data
ENGG

RSD

KC

KC

March 13.8 251.13

April 6.5 310.61

May 0.8 414.82

June 0.0 475.09


BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

July 0.0 460.73


BI-10-09003 ISSUED FOR REVIEW (B1)

August 0.0 423.35


DESCRIPTION

September 0.2 317.73

October 4.0 260.18


JO/EWO

November 16.4 170.33

December 19.4 138.41


05/18/18

09/07/18

09/18/18
DATE

Totals 99.4 3519.83


REV. NO.

G
E

DISCIPLINE
ENGINEER
Note 1: Data to be used for Tanajib Gas Plant
________________
Note 2: A correction coefficient between 0.65 and 0.75 shall be applied to the pan
DATE ___________
evaporation rates to estimate pond evaporation rate.
PROJECT
ENGINEER

________________

DATE ___________
Thunderstorms
CERTIFIED

________________ Thunderstorms Present Yes


DATE ___________
Isokeraunic Levels (days lightning/year) 20
CONSTRUCTION
AGENCY
Flooding
________________

DATE ___________ The Site is not subject to possible flood condition.


OPERATIONS

________________

DATE ___________
Barometric Pressure
CONTROL NUMBER

DATE _____________

Minimum Design Barometric Pressure 14.36 psia (0.990 bara)


BY: ______________
VERIFICATION
EDSD

Maximum Design Barometric Pressure 14.95 psia (1.031 bara)


Average Design Barometric Pressure 14.63 psia (1.009 bara)
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

Solar Heat
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

For the HVAC design the solar heat values will be calculated by the design
software.
FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 12


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Standard figures (daily mean) for horizontal surfaces at latitude 25 oN are


available in the standard document “CIBSE Guide, Volume A, Design Data”.
CERT

MP

MP

MP

This gives the following data, BTU/hr.ft2 (Watts/m2)


ENGG

RSD

KC

KC

Month Daily Mean Values Peak Value


January 47.6 (150) 188.78 (595)
February 61.87 (195) 223.68 (705)
March 74.56 (235) 260.17 (820)
April 87.25 (275) 285.55 (900)
May 93.6 (295) 290.31 (915)
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)


BI-10-09003 ISSUED FOR REVIEW (B1)

June 93.6 (295) 288.72 (910)


July 93.6 (295) 290.31 (915)
DESCRIPTION

August 87.25 (275) 285.55 (900)


September 74.56 (235) 260.17 (820)
October 61.87 (195) 223.68 (705)
JO/EWO

November 47.60 (150) 188.78 (595)


December 42.83 (135) 172.91 (545)
05/18/18

09/07/18

09/18/18
DATE

Solar radiation effects shall not be used in flare system radiation calculation
REV. NO.

G
E

(as detailed in SAES-F-007).


DISCIPLINE
ENGINEER

________________ Seismic Data


DATE ___________

PROJECT
ENGINEER
Seismic Design Load Reference Code ASCE 7
________________
Short Period Acceleration (Ss) in %g 8.1
DATE ___________

CERTIFIED
1-sec Period Acceleration (S1) in %g 3.0
________________
Peak ground acceleration (bedrock) in %g 6.0
DATE ___________

Site Class (Note1) D


CONSTRUCTION
AGENCY

________________
Note 1: Based on the Geotechnical Investigation Report for TGP (RT-17-11-
DATE ___________
2047).
OPERATIONS PSHA required: No, adequate mapped seismic data as per SAES-A-112.
________________

DATE ___________
PTHA required: No, not considered to be tsunami hazard region.

Miscellaneous
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

Tropical Environment
EDSD

Extreme moisture Yes


Equipment to be tropicalised Yes
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Tropical Cyclones
REVISION CERTIFICATE

Tropical Cyclones present No

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 13


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Temperature Inversion
CERT

MP

MP

MP

Temperature inversion present Yes


ENGG

Design maximum in one month 3


RSD

KC

KC

Sand / Dust Storms

Sand / dust storms to be considered Yes


Average number per year See table below
Design maximum in one month 3

Average frequency Winter Spring Summer Autumn Annual


BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

(days per year)


BI-10-09003 ISSUED FOR REVIEW (B1)

Dust Haze 10.1 23.3 25.6 8.7 67.8


Local Dust Events 14.2 26.9 25.1 8.6 74.8
DESCRIPTION

Dust Storms 1.5 4.4 1.9 0.4 8.3


Source of data: -PhD Thesis ‘’Dust Storms over Saudi Arabia: Temporal and
Spatial Characteristics, Climatology and Synoptic Case Studies’’, RMIT
University September 2016.
JO/EWO

05/18/18

09/07/18

09/18/18
DATE

9. ECONOMIC PARAMETERS

The following values shall be used for any economic evaluations;


REV. NO.

G
E

DISCIPLINE Power $0.092/ kWh


ENGINEER
Fuel Gas $3.50/ MMBTU
________________
Pentane Fuel $1.78/ MMBTU
DATE ___________
Potable Water $1.6/ m3
PROJECT
ENGINEER Cooling Water $0.15/ m3
________________ BFW $2.3/ m3
DATE ___________ LP Steam $6.30/ 1,000 lb
CERTIFIED MP Steam $6.70/ 1,000 lb
________________ HP Steam $8.60/ 1,000 lb
DATE ___________ Nitrogen $4.76/ thousand SCF
CONSTRUCTION
AGENCY

________________

DATE ___________ 10. UTILITIES


OPERATIONS
All values are preliminary and subject to confirmation based on the design
________________

DATE ___________
development.
All battery limit pressures are given with respect to site grade elevation.
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD

Steam

Steam Consumers:
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Consumer battery limit system conditions are given below. An allowance shall
REVISION CERTIFICATE

be made for pressure drop within unit battery limits.

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 14


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Pressure psig Temperature °F


CERT

MP

MP

MP
ENGG

Norm. Max. Min. Design Norm Max. Min Design


RSD

KC

KC

LP steam,
conditions at 90 120 80 140 380 390 370 450
process BL
HP steam 625 670 575 730 675 700 650 750
system
HP steam to 625 640 615 730 675 700 650 750
Cogen
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

Steam Producers
BI-10-09003 ISSUED FOR REVIEW (B1)

Steam is produced at the producer battery limits at the following conditions:


DESCRIPTION

Pressure (psig) Temperature (°F)

Norm. Max. Min. Design Norm Max. Min Design


JO/EWO

SRU HP 750
635 730 680
Steam
05/18/18

09/07/18

09/18/18
DATE

Cogen HP 700 670 750


635 670 625 730 675
Steam (Note 1)
REV. NO.

Cogen LP
G
E

100 125 90 140 385 400 375 450


DISCIPLINE
ENGINEER
Steam (Note 1)
________________ Note 1: Cogen BOOT Contractor to confirm steam conditions at Cogen battery limit.
DATE ___________

PROJECT
ENGINEER
Water
________________

DATE ___________
Potable Water
CERTIFIED
Tanajib Gas Plant potable water is supplied from the Cogen facilities. Potable
________________
water feeds both the drinking and utility water systems. Potable water quality
DATE ___________
is detailed in the following table. Values are preliminary shall be confirmed by
CONSTRUCTION Cogen BOOT Contractor.
AGENCY

________________

DATE ___________
Recommended
Parameter Unit Comment
OPERATIONS Specification
________________

DATE ___________
Temperature °C Ambient
pH 8 is the maximum allowable by SAEHC.
Minimum pH of 7.5 required to maintain within
CONTROL NUMBER

DATE _____________
BY: ______________

pH 7.5 to 8 area A or B of the Bayliss curve (calcium


VERIFICATION

carbonate in equilibrium or excess - i.e. non


EDSD

corrosive)
To be confirmed by Cogen BOOT Contractor,
Total dissolved solids ppm 450 approx.
based on their remineralization process
THIS INDICATES THAT REV. NO. ____________

Total Suspended solids ppm Nil


APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

To maintain the water in area A or B on the


Total alkalinity ppm at least 125
Bayliss curve at minimum pH of 7.5
Ca hardness ppm by Cogen BOOT Dependent upon remineralization process
FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 15


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Recommended
Parameter Unit Comment
CERT

MP

MP

MP

Specification
ENGG

Temperature °C Ambient
RSD

KC

KC

Contractor
by Cogen BOOT
Total hardness ppm Dependent upon remineralization process
Contractor
by Cogen BOOT
Conductivity S/cm
Contractor
Dependent upon remineralization process
by Cogen BOOT
@ temperature °C
Contractor
0.5 ppm is the minimum required residual
chlorine to ensure disinfection is effective, 1.0
Residual chlorine ppm 0.5 to 1
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

ppm is the maximum allowable for stainless steel


BI-10-09003 ISSUED FOR REVIEW (B1)

components in system.
DESCRIPTION

Langelier Saturation 0 is neutral, 0.5 is slightly scaling (less than 0 is


0 to 0.5
index corrosive and to be avoided).
4 - 7 is the zone of little scaling or corrosion (<4 is
Ryznar Index 4–7
scaling, > 7 is corrosive, both to be avoided).
JO/EWO

by Cogen BOOT
Ca ppm Dependent upon remineralization process
Contractor
05/18/18

09/07/18

09/18/18
DATE

by Cogen BOOT
Mg ppm Dependent upon remineralization process
Contractor
REV. NO.

Na ppm 70
G
E

Equivalent to current spec and as used in Cooling


DISCIPLINE
Cl- ppm 113
ENGINEER
Water system design.
________________

DATE ___________
Utility Water
PROJECT
ENGINEER
Utility water is fed to the cooling tower as make-up and is distributed
________________

DATE ___________
throughout TGP to all process units for general usage at utility stations.
CERTIFIED

________________

DATE ___________ Drinking Water

CONSTRUCTION
AGENCY
Drinking water is distributed throughout TGP to safety showers and industrial
________________
buildings. Drinking water shall be fit for human consumption and shall not be
DATE ___________
excessively corrosive to the water supply system. The physical and chemical
OPERATIONS
quality shall comply with requirements given in chapter 13 of section SAEHC-
________________
S-01 (Water) of the Saudi Aramco Environmental and Health Code. The
DATE ___________
detailed drinking water specification is included in Attachment 3.
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

Demineralised Water
EDSD

Tanajib Gas Plant demineralised water is supplied from the Cogen facilities.
Demineralised water is supplied on an intermittent basis to the TGP storage
tank for chemical dilution/ make-up applications in the process unit areas.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

Values are preliminary shall be confirmed by Cogen BOOT Contractor.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 16


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Demineralised Water Quality


CERT

MP

MP

MP

Parameter Value
ENGG

RSD

KC

KC

Conductivity < 1 µS/ cm

TDS (Total Dissolved Solids) < 0.1 ppm

Silica (as SiO2) < 20 ppb


Saturated at atmospheric pressure
Dissolved Oxygen and Nitrogen
and supply temperature

Water Supply Conditions


BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

Process Unit (consumers) battery limit system conditions (at grade) are given in
BI-10-09003 ISSUED FOR REVIEW (B1)

the table below. An allowance shall be made for pressure drop within unit limits.
DESCRIPTION

Pressure (psig) Temperature (°F)

Norm Max Min Design Norm Max Min Design


JO/EWO

Utility water 90 110 60 160 90 - 180*

Demineralised - 180*
60 150 90
05/18/18

09/07/18

09/18/18

Water
DATE

Drinking Water - 180*


60 90 45 150 90
REV. NO.

(local)
G
E

DISCIPLINE
ENGINEER
*Solar Gain Design Temperature
________________

DATE ___________

PROJECT HP Boiler Feedwater


ENGINEER

________________
HP boiler feedwater is demineralised water, de-aerated and chemically dosed
DATE ___________
with pH control chemical and oxygen scavenger to make it non-corrosive for
CERTIFIED carbon steel.
________________

DATE ___________ Boiler feed water shall be supplied to the following specification (BFW
specification standard to be confirmed by Cogen BOOT Contractor):
CONSTRUCTION
AGENCY
Parameter Value
________________

DATE ___________ Conductivity < 1µS/cm


OPERATIONS
TDS (Total Dissolved Solids) < 0.1ppm
________________

DATE ___________ Total Hardness (as ppm CaCO3) < 0.2ppm


pH 9.0 - 9.6
CONTROL NUMBER

DATE _____________
BY: ______________

Silica (as SiO2) < 20ppb


VERIFICATION
EDSD

Dissolved Oxygen N/D Not Detectable


Iron <25ppb
Copper <20ppb
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 17


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Pressure (psig) Temperature (°F)


CERT

MP

MP

MP
ENGG

Norm. Max. Min. Design Norm Max. Min Design


RSD

KC

KC

HP BFW at 300 212 350


1000 1025 975 1350 227
Cogen BL
HP BFW at 300 212 350
Note 1 975 900 1350 227
Consumer
Note 1: The Nominal pressure is not mentioned as it varies along the BFW header.

Steam Condensate
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

LP steam condensate from both HP and LP steam users is recovered in local


BI-10-09003 ISSUED FOR REVIEW (B1)

unit collection header systems prior to being flashed to atmospheric pressure.


LP steam condensate is not available for distribution around the TGP site;
DESCRIPTION

instead Cooled Steam Condensate is available to be used within the process


units. LP condensate conditions are indicative. As per the condensate
collection scheme, the LP condensate will be collected directly into the ATM
flash drums through headers in the respective areas. The flash drums are
JO/EWO

expected to operate nominally at about 5psig and the pressure in the LP


condensate header depends entirely on the hydraulics for the condensate
collection systems in each area.
05/18/18

09/07/18

09/18/18
DATE

Pressure (psig) Temperature (°F)


REV. NO.

Norm Max Min Design Norm Max Min Design


G
E

DISCIPLINE HP Steam 90 130 90 730 493 750


ENGINEER
Condensate
________________

DATE ___________
LP Steam 5 55 5 140 227 380
Condensate
PROJECT
ENGINEER Pumped LP Note 80 53 210 227 250 212 380
________________ Steam 1 Note Note Note 2
DATE ___________ Condensate 2 2
CERTIFIED return
________________ Pumped LP 50 75 45 140 227 250 212 380
DATE ___________ Steam
Condensate
CONSTRUCTION
AGENCY
return at
________________
Cogen BL
DATE ___________
Cooled 100 140 70 220 140 160 120 250
Steam
OPERATIONS
Condensate
________________

DATE ___________ Note 1: The Nominal pressure is not mentioned as it varies along the condensate
header.
Note 2: The conditions to be confirmed by EPC Contractor on finalisation of
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

condensate network routing and pump hydraulics.


EDSD

Note 3: Cooled Steam Condensate is deaerated to 50 ppb.


Steam condensate will be air and chemical free.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 18


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Cooling Water
CERT

MP

MP

MP

Cooling water is provided at the consumer battery limits.


ENGG

RSD

KC

KC

Pressure, psig Temperature, °F


Cooling Water
Min Norm Max Min Norm Max
CW Supply Operating 80 102
CW Supply Design 240 180*
CW Return Operating 50 130 130
CW Return Design 240 180*
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

*Solar Gain Design Temperature


BI-10-09003 ISSUED FOR REVIEW (B1)

Cooling water is (low chloride) demineralised water chemically dosed to make


it non-corrosive for carbon steel and/or stainless steel.
DESCRIPTION

Cooling water utilises a secondary closed cooling water loop. The ASU
utilises open loop cooling water for some coolers, open loop CW conditions
have been supplied to ASU vendors separately.
JO/EWO

For Fouling factors for Shell and Tube Exchangers, see Process Engineering
Design Criteria project specification (T80-A-PP-060200).
05/18/18

09/07/18

09/18/18

Chilled Water
DATE

Chilled water is provided at the consumer battery limits.


REV. NO.

G
E

DISCIPLINE
ENGINEER Pressure, psig Temperature, °F
________________ Chilled Cooling Water
DATE ___________
Min Norm Max Min Norm Max
Chilled Water
PROJECT
Operating 80 76
ENGINEER
Supply
________________

DATE ___________ Chilled Water


Design 240 180*
CERTIFIED
Supply
________________
Chilled Water
Operating 50 130 130
DATE ___________
Return
CONSTRUCTION Chilled Water
AGENCY Design 240 180*
Return
________________

DATE ___________ *Solar Gain Design Temperature


OPERATIONS
Chilled water is (low chloride) demineralised water chemically dosed to make it
________________
non-corrosive for carbon steel and/or stainless steel. Chilled water is
DATE ___________
produced from a take-off from the closed cooling water loop which is routed
through additional propane cooling. The return water is routed to the cooling
CONTROL NUMBER

DATE _____________

water basin together with cooling water return.


BY: ______________
VERIFICATION
EDSD

Plant and Instrument Air

The air system shall be in accordance with specification SAES-J-901 and shall
THIS INDICATES THAT REV. NO. ____________

be oil free.
APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Process Unit (Consumer) battery limit system conditions are given in the table
below. An allowance shall be made for pressure drop within unit limits.

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 19


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Service
CERT

MP

MP

MP

Plant/Utility Air Instrument Air


ENGG

RSD

KC

KC

Normal operating temperature, °F 115 115


Max operating temperature, °F 115 120
Max operating pressure, psig 125 125
Normal operating pressure, psig 120 100
Minimum operating pressure, psig 100 80
Design temperature, °F 185 185
Design pressure, psig 145 145
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)


BI-10-09003 ISSUED FOR REVIEW (B1)

Dew point @ system pressure, °F N/A -40


Minimum Guaranteed IA Pressure N/A 60 (Note 1)
DESCRIPTION

Note 1: Value to be used to size valve Actuators. Instrument Air System has 15
minutes reserve at normal usage rates from 80 psig – 60 psig (consumer battery limit
pressure).
JO/EWO

Note 2: Plant air supply will be shut-off when pressure in the instrument air header
(downstream of the air dryer) drops below 80 psig.
05/18/18

09/07/18

09/18/18

Inert Gas (Nitrogen)


DATE

LP nitrogen shall be generated from an ASU (Air Separation Unit) or liquid


REV. NO.

nitrogen to achieve a nitrogen concentration of ≥ 99,9% and less than


G
E

DISCIPLINE
ENGINEER
100ppmv oxygen.
________________

DATE ___________
Process Unit User Battery Limit System Conditions
PROJECT
ENGINEER Process Unit (Consumer) battery limit system conditions are given in the table
________________ below. An allowance shall be made for pressure drop within unit limits.
DATE ___________
Minimum operating pressure, psig 80
CERTIFIED

________________ Normal operating pressure, psig 100


DATE ___________
Max operating pressure, psig 125
CONSTRUCTION
AGENCY Normal operating temperature, °F Ambient
________________
Design pressure, psig 145.
DATE ___________

OPERATIONS Minimum Design temperature, °F 32


________________
Design temperature, °F 180
DATE ___________

Dew point Temperature @ System pressure °F -40


CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

Fuel Systems
EDSD

Fuel Systems Composition

Sales gas will be used as primary fuel in Tanajib Gas Plant. Master Gas will
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

be used as back up fuel and as the start-up fuel for the Cogen facilties.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 20


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Sales Gas Composition (mol%)


CERT

MP

MP

MP

Component Normal Min Max


ENGG

RSD

KC

KC

Nitrogen mol% 0.7266 0.6887 0.8682


CO2 mol% 0.0038 0.0038 0.0044
H2S mol% 0.0000 0.0000 0.0004
Methane mol% 99.2612 89.1631 99.3007
Ethane mol% 0.0085 0.0048 10.0591
C3+ mol% 0.0000 0.0000 0.0229
Total mol% 100.0000
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

HHV (BTU/scf) (Note 2) 995 994 1071


BI-10-09003 ISSUED FOR REVIEW (B1)

LHV (BTU/scf) 903 902 974


Total Sulfur (grains/100scf) 0.002 0.001 0.260
DESCRIPTION

Note 1: Sales gas normal composition is based on Year 2026 Winter Case
Note 2: Sales gas composition will vary within minimum and maximum ranges stated.
Minimum HHV of sales gas is 930 BTU/ scf.
JO/EWO

The Preliminary Master gas composition is as follows:


Master Gas
05/18/18

09/07/18

09/18/18
DATE

COMPONENT mol %
Methane 88.00
REV. NO.

G
E

Ethane 2.50
DISCIPLINE
ENGINEER Propane 0.08
________________

DATE ___________ i-Butane 0.05


PROJECT n-Butane -
ENGINEER

________________ i-Pentane -
DATE ___________
n-Pentane -
CERTIFIED
n-Hexane -
________________

DATE ___________ n-Heptane -


Nitrogen 9.37
CONSTRUCTION
AGENCY
Carbon Dioxide -
________________

DATE ___________
Helium -
OPERATIONS H2S -
________________
H2O -
DATE ___________
COS -
CS2 -
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

Mercaptans -
EDSD

Benzene -
Toluene -
p-Xylene -
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

HHV (BTU/scf) 937


LHV (BTU/scf) 845

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 21


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Master Gas
CERT

MP

MP

MP

COMPONENT mol %
ENGG

RSD

KC

KC

Wobbe Index (Note 1) 44.83

Relative Molecular Mass (RMM) 17.558

Total Sulfur Content

Note 1: Wobbe Index in accordance with ISO 6976:1995, (Wobbe Index = HHV /√SG
at 15°C and 101.325kPa(a)
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

HP Fuel Gas will be used as primary fuel in the Cogen gas turbines, Auxiliary
BI-10-09003 ISSUED FOR REVIEW (B1)

Boilers and HRSGs.


Fuel Systems Supply Conditions
DESCRIPTION

Fuel gas supply conditions to process unit (consumer) battery limits are given
in the table below. An allowance has been made for pressure drop within unit
limits.
JO/EWO

Fuel Gas is distributed around the TGP to fired equipment, vessel blanketing,
and as purge gas for flare headers.
Pressure (psig) Temperature (°F)
05/18/18

09/07/18

09/18/18
DATE

Norm Max Min Design Norm Max Min Design


HP Fuel
750 760 750 880 130 100 180
REV. NO.

Gas Supply
G
E

DISCIPLINE LP Fuel
ENGINEER 70 80 70 140 85 70 180
________________
Gas Supply
DATE ___________

PROJECT Flare
ENGINEER

________________
Each flare system downstream of the discharge flange of each relieving device
DATE ___________
shall be hydraulically designed to be within the following back pressure
CERTIFIED
limitations:
________________

DATE ___________
Relief Valve Type Maximum Back Pressure
(% gauge set pressure)
CONSTRUCTION
AGENCY

________________
Conventional 10
DATE ___________
Balanced 30
OPERATIONS

________________
Pilot-operated 50
DATE ___________

Design temperature provided in following tables are for Flare headers outside of
process unit battery limits.
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD

LP Flare Header Conditions

Pressure (psig) Temperature (°F)


Maximum 15 Note 1 400
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Normal 2 Ambient
Minimum 1 32

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 22


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Pressure (psig) Temperature (°F)


CERT

MP

MP

MP

460 (max)
Design 7.5 psia / 50
ENGG

RSD

32 (min)
KC

KC

Note 1: Short term excursion for power failure up to 40% of psv set pressure,
22 psig.

HP Flare Header Conditions

Pressure (psig) Temperature (°F)


Maximum 144
Normal 2 Ambient
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

Minimum 1 HOLD based on depressurisation


BI-10-09003 ISSUED FOR REVIEW (B1)

420 (max)
Design 7.5 psia / 160
HOLD based on depressurisation
DESCRIPTION

LT Flare Header Conditions

Pressure (psig) Temperature (°F)


Maximum 104 245
JO/EWO

Normal 2 Ambient
Minimum 1 -205
05/18/18

09/07/18

09/18/18

HOLD based on depressurisation


DATE

Design 7.5 psia / 115


300
REV. NO.

LLP Flare Header Conditions


G
E

DISCIPLINE
ENGINEER
Pressure (psig) Temperature (°F)
________________

DATE ___________
Maximum 8 120
Normal 1-2 Ambient
PROJECT
ENGINEER Minimum 1 Ambient
________________
32
DATE ___________ Design 7.5 psia / 50
180
CERTIFIED

________________

DATE ___________
11. CIVILS, STRUCTURAL AND BUILDINGS

CONSTRUCTION Topography
AGENCY

________________
The topography of the area at Tanajib Gas Plant site is undulating with few
DATE ___________
peaks and dips across the site.
OPERATIONS

________________ The ground elevation vary from about EL +8.00 m to EL. +41.00 (Saudi
DATE ___________ Aramco Vertical Datum) and have a difference of about 33.0 m across the site.
No above ground obstructions have been reported from the topographic
survey.
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD

Soil Conditions

The project site is located on very loose to loose surface sand deposits
overlying medium dense sand that are distributed randomly over the entire site
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

area as detailed in the Preliminary Geotechnical Report (RT-17-11-2047, Saudi


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Aramco Geotechnical File 2017/109).

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 23


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Soil Data
CERT

MP

MP

MP

Refer to the Preliminary Geotechnical Investigation Report for TGP (RT-17-11-


ENGG

2047) for details of Tanajib Gas Plant area Soil Characteristics.


RSD

KC

KC

Min (ohm-m) Max (ohm-m)


Earth Resistivity 157 552.6
Min (k-m/W) Max (k-m/W)
Thermal Resistivity 1.464 2.976

Ground water level


BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)


BI-10-09003 ISSUED FOR REVIEW (B1)

The preliminary geotechnical investigation included water level observations in


each of the exploratory boreholes. These observations indicate that the
groundwater level varies from 0.47 m to 17.00 m below existing ground level at
DESCRIPTION

the time of the survey. The report highlights that ground water levels will vary due
to seasonal variation in rainfall, surface evaporation rates and tidal effects.

Buildings
JO/EWO

For the list of buildings refer to Building List, T80-A-PP-842000.


05/18/18

09/07/18

09/18/18
DATE

HVAC requirements

HVAC requirements will be defined as per SAES-K-001 and SAES-A-112:


REV. NO.

G
E

DISCIPLINE Winter design ambient for heating (Note 1) 41°F (5°C)


ENGINEER
Summer design ambient for air conditioning Note 2
________________

DATE ___________ Note 1: Winter Design Dry Bulb Temperature @ 99% as per SAES-A-112
PROJECT
ENGINEER Note 2: Ambient design criteria as per SAES-K-001.
________________

DATE ___________ Security


CERTIFIED

________________ The facility classification (FC) for TGP fences is specified in the Security Risk
DATE ___________ Assessment Report (HIMA-520-SRA-001A).
During the construction phase, temporary construction security fencing will be
CONSTRUCTION
AGENCY required to protect the site and prevent any intrusion by members of the public
________________ and/or animals.
DATE ___________

OPERATIONS Roads and Paving


________________

DATE ___________
Paving
The surfaces finishes shall be as summarised below:
CONTROL NUMBER

DATE _____________
BY: ______________

All roads shall be Asphalt concrete


VERIFICATION
EDSD

Contaminated Areas: Concrete paved (ref. section 7.13, SAES-Q-001)


Non- contaminated Areas (on plot): Asphalt paved
Area between outer plant roads and top of embankment: compacted fill
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Off-plot: Compacted fill

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 24


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Flare Tip Crane Access areas (100 mx 35m): Minimum 10 cm asphalt on two
layers over 30 cm crushed stone shall be provided with a minimum bearing
CERT

MP

MP

MP

capacity of 65 ton per square meter.


ENGG

RSD

KC

KC

Slope protection requirements shall comply with SAES-A-114.

See also Civil and Structural Basis of Design T80-A-PP-966002.


Roads
Primary and secondary roads width and inner turning radius shall be as follows:

Road Type Min. Width (m) Min. Inner Turning Shoulder


radius (m) width (m)
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

Primary Roads 8.0 12.2 2.0


BI-10-09003 ISSUED FOR REVIEW (B1)

Secondary Roads 7.0 12.2 1.5


Access Ways 6.1 9.1 -
Patrol Roads with 6.1 9.1 -
DESCRIPTION

Fire Truck Access


Patrol Roads 4.6 7.0 -
without Fire Truck
JO/EWO

Access
05/18/18

09/07/18

09/18/18

Drainage and Underground services


DATE

The following segregated drainage systems shall be provided:


REV. NO.

G
E

Clean Storm Water Sewer


DISCIPLINE
ENGINEER

________________
Oil Water Sewer
DATE ___________
Sanitary Waste Water Sewer
PROJECT
ENGINEER Chemical Sewer
________________

DATE ___________
Closed Drain System
CERTIFIED For details refer to the Civil and Structural Basis of Design, T80-A-PP-966002.
________________

DATE ___________
12. CONTROL AND INSTRUMENTATION
CONSTRUCTION
AGENCY Instrumentation and Control Systems will be furnished in accordance with
________________ Piping and Instrumentation Diagrams (P&ID). Instrument standard
DATE ___________
SAES-J-003 covers the selection, design and application of process
OPERATIONS instruments and systems and SAES-Z-001 covers the Process Control
________________ Systems engineering, design, procurement and installation.
DATE ___________
Instrument Symbology shall be to ANSI/ISA-5.1 (R2009), as modified by Saudi
Aramco specification SAES-J-003.
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

Refer to spec SAES-J-003 for environmental requirements for instrument


EDSD

enclosures.
Other Instrumentation requirements shall be in accordance with Saudi Aramco
SAES-J series specifications.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

Instrument Power supplies shall be as per Control and Instrumentation Basis


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

of Design, T80-J-PP-595001.

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 25


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Special Approval Agency Requirements


CERT

MP

MP

MP

Hazardous Area Certification by one of the following agencies is required for


ENGG

instruments and/or systems:


RSD

KC

KC

CSA (Compliance, Safety and Accountability)


FM (FM Approvals LLC, formerly Factory Mutual Research Corporation)
UL (Underwriters Laboratories Inc.)
Approved IECEx Certification Bodies (EXCBs) under IECEx Certified
Equipment Scheme
Note: Selection of Instruments Certified Intrinsically Safe shall be approved by
Saudi Aramco Engineering Services Organisation. Refer to Specification
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

SAES-J-903.
BI-10-09003 ISSUED FOR REVIEW (B1)

13. ELECTRICAL
DESCRIPTION

General requirements for electrical equipment, materials and design shall be


in accordance with:
Standard SAES-P-Series and Specifications and Standards referred to
JO/EWO

therein.
Relevant SAMSS for specialist electrical equipment, etc.
05/18/18

09/07/18

09/18/18

Nominal voltage levels shall be selected according to SAES-P-100 Section


DATE

6.1.3, as follows:
REV. NO.

G
E

Type of
DISCIPLINE
Nominal Specific
ENGINEER
Phase Wire System
Voltage Note(s)
________________
Grounding
DATE ___________
400Y/230 Three Four Wire Solid S1
PROJECT
ENGINEER 400 Three Three Wire Solid
________________ 480 Three Three Wire Solid
DATE ___________
4,160 Three Three Wire Low S3, S5
CERTIFIED Resistance
________________ 13,800 Three Three Wire Low S3, S6
DATE ___________
Resistance
CONSTRUCTION
33,000 Three Three Wire Solid S2
AGENCY
34,500 Three Three Wire Solid S2
________________
69,000 Three Three Wire Solid S2
DATE ___________
115,000 Three Three Wire Solid S2, S4
OPERATIONS
132,000 Three Three Wire Solid S2
________________

DATE ___________
230,000 Three Three Wire Solid S2
380,000 Three Three Wire Solid S2
CONTROL NUMBER

DATE _____________

General Notes:
BY: ______________
VERIFICATION
EDSD

G1. Existing ungrounded systems and existing systems with different voltage levels (e.g., 2.4 kV) are
not required to be changed retroactively.
G2. Additions or extensions to existing systems with different voltage levels that increase the MVA
capacity of the system is not permitted. The exception is if the new or replacement equipment has
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

a dual voltage rating with a voltage level in Table 1. Transformers that are replacements to
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

transformers operating at a different voltage level, be dual voltage rating with a voltage level in
Table 1.

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 26


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

G3. Steady-state service and utilization voltage ranges shall be per Voltage Range A, ANSI C84.1 for
the above nominal voltages. For Saudi Aramco installations, the service voltage is defined as the
CERT

MP

MP

MP

voltage at the secondary of a supply transformer having a primary voltage of more than 600 volts.
G4. See SAES-P-111 for specific system grounding requirements and for grounding requirements for
ENGG

RSD

KC

KC

special applications such as downhole pump motors.


G5. SEC nominal distribution voltages may be used on the high voltage side of transformers fed
directly from a SEC distribution system.
G6. These nominal system voltage requirements do not apply to captive transformers in specialty
applications such as supplying submersible pump motors and high voltage adjustable frequency
drive applications. Voltages for captive transformer applications shall be reviewed by the EED
Coordinator.
G7. Power supply dedicated for specialized systems (such as medical equipment, labs, shops, and
packaged systems), industrial, control systems, instruments, and communication devices may
utilize other voltage levels.
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)


BI-10-09003 ISSUED FOR REVIEW (B1)

Specific Notes:

S1. 400/230 V is only acceptable at sub-distribution levels (for example, general power supply inside
DESCRIPTION

buildings, distribution transformer to panelboards feeding lighting, receptacles, etc.). Saudi


Aramco material specifications prohibit neutral busses for low voltage switchgear and controlgear.
S2. Not an acceptable voltage for inside-plant distribution of power. Acceptable for delivery of power
from inside-plant to outside-plant or from plant to plant; provided the distance is 3 km or greater.
JO/EWO

Exception: Radial circuits feeding power transformers.


S3. Solidly grounded system shall be specified for systems feeding overhead lines. If the system is
feeding combination of overhead lines and other local loads, the overhead line ground fault
05/18/18

09/07/18

09/18/18
DATE

protection shall be capable of detecting 10-20% of the available ground fault current at the end of
the overhead line. If such detection level is not achievable, consult the EED Coordinator.
S4. This also includes system operating at 110 kV.
REV. NO.

G
E

S5. 400 A, 10 second resistor.


DISCIPLINE
ENGINEER
S6. 400 A or 1,000 A, 10 second resistor.
________________

DATE ___________
System Frequency shall be 60 Hz.
PROJECT
ENGINEER
Motor Voltages shall be as per SAES-P-113 section 6.2 as follows:
________________

DATE ___________
Nominal Motor Number
CERTIFIED
System Nameplate of kW (hP) Type Notes
________________
Voltage Voltage Phases
DATE ___________

230 220 1 up to 0.25 (0.34) -


CONSTRUCTION
AGENCY
0.18 (0.25) to 185
________________
480 460 3 (250) Induction 1
DATE ___________

OPERATIONS 185 (250) to 3,000


________________ 4,160 4,000 3 (4,000) Induction 4
DATE ___________

400 (540) to 3,000


Synchronous
4,160 4,000 3 (4,000) 2
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD

750 (1,000) to
Induction or
13,800 13,200 3 10,500 (14,000) 2
Synchronous
above 10,500 Induction or
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

13,800 13,200 3 (14,000) Synchronous 5, 6


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 27


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Notes:
CERT

MP

MP

MP

(1) Dual voltage 230/460 V are only acceptable for motors up to 30 hp.
ENGG

(2) Below 3,750 kW (5,000 hp) synchronous motors shall only be applied at operating speeds of 1,200
RSD

KC

KC

RPM and below.


(3) Not used.
(4) Induction motors less than 500 hp with 480 V system are permitted with approval.
(5) Motors over 30,000 hp are permitted with approval.
(6) AFD driven Induction motors are allowed when the AFD is capable of providing power factor
correction.
* Exceptions to SAES-P-113, 6.2:
1. The rated voltage of motors which are part of an Adjustable-Frequency Drive system shall be at the
discretion of the drive system supplier.
2. The above table doesn’t apply for direct replacement or spare motors.
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

3. The above table doesn’t apply to motor(s) for an addition to an existing train if the facility had
BI-10-09003 ISSUED FOR REVIEW (B1)

planned for the addition when first built.


Hazardous area classification shall be in accordance with SAES-B-068.
DESCRIPTION

Design basis shall be as per Electrical Design Basis, T80-P-PP-094000.

14. PIPING AND PIPELINES


JO/EWO

Piping shall comply with ASME B31.3:2016.


Pipelines shall comply with ASME B31.4:2016 and ASME B31.8:2016.
05/18/18

09/07/18

09/18/18
DATE

Material specifications shall be designed in accordance with SAES-L-105.


REV. NO.

G
E

DISCIPLINE
ENGINEER
Category D and Category M Fluids
________________
For Fluid Categorisation, refer to Section 300.2 in ASME 31.3.
DATE ___________

PROJECT
Category D: A fluid service in which all the following apply:
ENGINEER

________________ 1) The fluid is non-flammable and non-toxic


DATE ___________
2) The design pressure does not exceed 150 psig (10.3 barg)
CERTIFIED

________________
3) The design temperature range is -20°F (-29°C) to 366°F (186°C)
DATE ___________
Category M – A fluid service in which a single exposure to a very small
CONSTRUCTION
quantity of toxic fluid, caused by leakage, can produce serious irreversible
AGENCY
harm to persons on breathing or bodily contact, even when prompt
________________
restorative measures are taken.
DATE ___________

OPERATIONS Refer to Line Designation Tables for identification of lines in Category D and M
________________ service.
DATE ___________
Pipelines Design shall comply with SAES-L-410 and SAES-B-064.
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

Severe Cyclic Services


EDSD

CONTRACTOR shall identify those lines subject to severe cyclic conditions in


accordance with ASME B31.3. These conditions exist where SE exceeds
0.8SA and the equivalent number of cycles exceeds 7000; or where other
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

conditions will produce an equivalent effect.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 28


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Arrangement of Air-Cooled heat exchangers


CERT

MP

MP

MP

The following principles shall be followed for air-cooled and heat exchangers:
ENGG

In process units where multiple air coolers exists, the air coolers shall be
RSD

KC

KC

mounted on the piperack structures to minimize the potential issues


associated with hot air recirculation.
For stand-alone air-cooled heat exchangers, such as those associated with
compressors, maximise the use of independent structure to ease their
maintenance.
Provide clear access to air-cooled heat exchangers from two sides, to ease
maintenance.
Provide platforms for motor access. Motor access platforms on adjacent
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

piperack segments should be interconnected.


BI-10-09003 ISSUED FOR REVIEW (B1)

In general, AOC preference is for forced draft fans to be used (for ease of
maintenance), but where for process reasons induced draft fans are used,
DESCRIPTION

provide access platform to top of the fan. Where possible provide staircases to
motor access platforms.
In general, comply with requirements of SAES-B-055.
JO/EWO

Allowable nozzle loads


The maximum allowable nozzle loads shall be considered for piping design:
05/18/18

09/07/18

09/18/18
DATE

Vertical in-line pumps shall be as per API 610 Table 5


REV. NO.

Centrifugal pumps shall be as per API 610 Table 5


G
E

DISCIPLINE
ENGINEER ANSI / ASME B73.1 Pumps and ISO 5199 / 2858 Pumps: maximum
________________ allowable loads to be agreed with equipment manufacturer
DATE ___________
General Purpose Steam Turbines shall be as per NEMA Publication SM-23
PROJECT
ENGINEER

________________
Special Purpose Steam Turbines shall be as per NEMA Publication SM-23
DATE ___________
as basis, but maximum allowable loads to be agreed with equipment
manufacturer.
CERTIFIED

________________ Centrifugal compressors shall be as per API 617


DATE ___________
Fire heaters and steam generators shall be as per API 650
CONSTRUCTION
AGENCY Pressure vessels nozzles loads to be specified on data sheets for
________________ confirmation by vendor.
DATE ___________
Shell and tube heat exchangers shall be as per API STD 660
OPERATIONS

________________ Air-cooled exchangers shall be as per API 661


DATE ___________
Plate & Frame Heat Exchangers shall be as per API STD 662
Tanks shall be as per API 650
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

Double pipe heat exchangers or electric heat exchangers: maximum


EDSD

allowable loads to be agreed with equipment manufacturer.


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

Pressure Testing of Piping and Pipelines:


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

All piping services shall be pressure tested in accordance with SAES-L-150.

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 29


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

All plant piping and pipelines shall be hydrostatic pressure tested irrespective of
size and service, except for the lube oil and seal oil piping, which shall be
CERT

MP

MP

MP

pressure tested with its own fluid.


ENGG

RSD

KC

KC

15. EQUIPMENT

Lifting Impact Factor

The impact factor for lifting devices is specified as 2.0 minimum.

16. ENVIRONMENT CLASSIFICATION


BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)


BI-10-09003 ISSUED FOR REVIEW (B1)

Tanajib Gas Plant is classified as “Highly Corrosive Environment” as per


SAES-A-134 Table 1. However, for electrical equipment Severe Corrosive
Environment” shall per considered according to SAES-P-100 Section 9.
DESCRIPTION

The following criteria shall be applied:


JO/EWO

SAES definition Applicable to TGP

“Severe corrosive environment” in The material selection shall be in


05/18/18

09/07/18

09/18/18

accordance with Section 9 of SAES-P- accordance to SAES-P-104 for conduits,


DATE

100 for electrical material and special enclosures and cable ties,
equipment selection. aluminium trays.
REV. NO.

G
E

DISCIPLINE
ENGINEER
“Highly Corrosive” (equivalent to ISO Coatings selected in accordance with
________________
12944 C5-I) in accordance with SAES- SAES-H-001 per SAES-A-134 Table 2.
DATE ___________
A-134 Table 1: “Industrial area located
less than 300 m from the following:
PROJECT
ENGINEER corrosive chemicals and emissions
________________ being handled or produced (e.g. sulfur
DATE ___________ plants).
CERTIFIED

________________
“Highly Corrosive” requirement of Coating required in accordance with SAES-
DATE ___________
SAES-A-134 Table 2 states Carbon H-001, Section 7, B.
and Low Alloy Steel coated in
CONSTRUCTION accordance with SAES-H-001 for
AGENCY
“Corrosive Industrial Atmospheric
________________
Exposure”.
DATE ___________

OPERATIONS
“Highly Corrosive Environment” Protect for aggressive external environment
________________
requirement of SAES-A-134 paragraph using ceramic fluoropolymer coating
DATE ___________
6.2.7 states that bolting material shall be required for bolting material per 09-SAMSS-
protected in accordance with SAES-H-001 107.
Section 7, G: Fasteners: Carbon Steel and
CONTROL NUMBER

DATE _____________

Low Alloy.
BY: ______________
VERIFICATION
EDSD

“Highly Corrosive” requirement of SAES-A- Coating required for galvanized steel in


134 Table 2 states Galvanized Steel accordance with SAES-H-001, Section 7, H:
coated in accordance with SAES-H-001. Galvanized Steel.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

“Highly Corrosive” requirement of SAES-A- Coating required for austenitic stainless


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

134 Table 2 states Austenitic Stainless steel and nickel-chromium alloys in


Steel and Nickel-Chromium Alloys shall be accordance with SAES-H-001, Section 7, I:
coated in accordance with SAES-H-001. Stainless Steel and SAES-H-002.

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 30


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

17. EQUIPMENT AND PIPING INSULATION


CERT

MP

MP

MP

Refer to T80-N-PP-969551 Thermal and Acoustic Insulation Specification for


ENGG

the criteria applied for the calculation of the equipment and piping and
RSD

KC

KC

insulation.

18. ENVIRONMENTAL REQUIREMENTS

For the environmental design basis refer to Environmental Basis of Design,


T80-A-PP-312702.

19. UNITS OF MEASUREMENT


BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

The System of Measurement to be used shall refer to the agreed table below:
BI-10-09003 ISSUED FOR REVIEW (B1)

DISCIPLINE ITEM UNITS REMARKS


DESCRIPTION

Length m, km Roads
Mass kg, Tonne Transport weights
All Disciplines
Area m² Plot Area
JO/EWO

Volume m³ Transport Volume


DISCIPLINE SPECIFIC UNITS
05/18/18

09/07/18

09/18/18
DATE

DISCIPLINE ITEM UNITS REMARKS


CIVIL All Units Metric
REV. NO.

G
E

DISCIPLINE
ENGINEER Diameter Inches
________________
Pressure psig
DATE ___________ PIPING
Temperature °F
PROJECT
ENGINEER
Length mm, m
________________

DATE ___________
Load list to include HP
CERTIFIED
unit as well.
________________
All drawings shall
DATE ___________
Power – Driver MW, KW show power in HP
ELECTRICAL
CONSTRUCTION
AGENCY
only.
________________ Power – KVA, MVA
DATE ___________ Transformer
OPERATIONS Wire Size mm²
________________

DATE ___________
As per SA Standard
SAES-J-003
CONTROL NUMBER

DATE _____________
BY: ______________

Temperature °F
VERIFICATION
EDSD

CONTROLS in-H2O to be used


when normal operating
Pressure psig pressure is between 0-
1 psig
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

Pressure – vacuum in-H2O


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Level ft, Inches

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 31


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

DISCIPLINE ITEM UNITS REMARKS


CERT

MP

MP

MP

Liquid Volumetric USGPM For steam condensate


ENGG

RSD

flow rate – non-


KC

KC

use both volume &


hydrocarbons mass flow rate
Liquid Volumetric BPD, MBD
flow rate –
hydrocarbons
Molar gas flow rate SCFM, SCFH
– utilities Air, N2,
etc.
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

Molar gas flow rate MMSCFD MSCFD, SCFH are


BI-10-09003 ISSUED FOR REVIEW (B1)

– hydrocarbons typically used for low


flow rates e.g. purge
station, cover gas, etc.
DESCRIPTION

Mass flow rate (all) lb/hr, Mlb/hr MTD metric ton per day
for sulphur
Velocity m/s
JO/EWO

Vibration Mil (0.001 inch)


Concentration Mole, ppm(w),
ppm(v),%w, %v, Pounds
05/18/18

09/07/18

09/18/18
DATE

Per Thousand Barrels


Viscosity – cSt
REV. NO.

kinematic
G
E

DISCIPLINE
ENGINEER Viscosity – dynamic cP
________________ Density lb/ ft³
DATE ___________
Heat Duty MMBTU/H
PROJECT
ENGINEER Specific Heat BTU/ lb °F
________________

DATE ___________
Length ft, in
CERTIFIED

________________
Area ft²
DATE ___________ Bbl for HC
Volume Gall for non-HC/Chemicals
CONSTRUCTION
AGENCY Level Inches, ft
________________
Mass lb MT for sulphur
DATE ___________
Temperature °F
OPERATIONS
Pressure psig in-H2O to be used
________________
PROCESS when normal operating
DATE ___________
pressure is between 0-
1 psig
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

Pressure – vacuum in-H2O


EDSD

Mass flow rate (all) lb/hr, Mlb/hr MTD metric ton per day
for sulphur
Liquid Volumetric For steam condensate
flow rate – non- use both volume &
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

hydrocarbons USGPM
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

mass flow rate


REVISION CERTIFICATE

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 32


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

DISCIPLINE ITEM UNITS REMARKS


CERT

MP

MP

MP

Liquid Volumetric Note 4


BPD, MBD,
ENGG

RSD

KC

KC

flow rate –
hydrocarbons
Molar gas flow rate
– utilities Air, N2, SCFM, SCFH
etc.
Molar gas flow rate MMSCFD MSCFD, SCFH are
– hydrocarbons typically used for low
flow rates e.g. purge
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

station, cover gas, etc.


BI-10-09003 ISSUED FOR REVIEW (B1)

Velocity ft/ s
Density lb/ ft³
DESCRIPTION

Viscosity – cSt
kinematic
Viscosity – dynamic cP
Latent Heat BTU/ lb
JO/EWO

PROCESS
Specific Heat BTU/ lb °F
Thermal BTU ft/ hr ft² °F
05/18/18

09/07/18

09/18/18

Conductivity
DATE

Surface Tension lb-f/ ft


REV. NO.

Heat Duty MMBTU/ hr


G
E

DISCIPLINE Fouling resistance hr ft² °F/ BTU


ENGINEER

________________ Concentration mole%, ppmv, ppmw,


DATE ___________
wt%, vol%
PROJECT Vibration Mil (0.001 inch)
ENGINEER

________________

DATE ___________
Notes:
Any other measurement unit which is not covered on the above table shall refer to SAES-
CERTIFIED
J-003 and SAEP-103.
________________

DATE ___________ Measurement units for data taken from PSD and Saudi Aramco standards will be kept as
they are in this document to manage consistency. Using these data for preparation of
CONSTRUCTION deliverables should be done by converting them to the agreed measurement units as the
AGENCY
table above.
________________

DATE ___________ The Standard Conditions used as reference for material properties will be 60°F = 15.56
OPERATIONS
°C and 14.7 psi (101.325 kPa) identified by use of ‘S’ (e.g. Sft3 hr), otherwise units shall
________________
be assumed to be at actual conditions.
DATE ___________
A volume at standard reference conditions shall be expressed in standard cubic feet or ft³
(std).
CONTROL NUMBER

DATE _____________

MBCD (Thousand Barrels per calendar Days) can be used when referring to the overall
BY: ______________
VERIFICATION

average capacity of a facility.


EDSD

20. TRANSPORTATION LIMITS

Refer to Heavy and Large Transportation Route Survey Report T82-A-PP-829615


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

for details and transport recommendations.


REVISION CERTIFICATE

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 33


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

ATTACHMENT 1: AMBIENT AIR & SOIL TEMPERATURES


CERT

MP

MP

MP

The Table below shows the summary of ambient air temperatures:


ENGG

RSD

KC

KC

Average Annual Temperature 77°F (25°C)

Average Daily Max. Temp. (hottest month) 97°F (36°C)

Monthly Normal Max. Temp. (hottest month) 108°F (42°C)

Average Daily Soil Temp. (1m below grade) 84°F (29°C)

Monthly Normal Max. Soil Temp. (1m below grade) 86°F (30°C)
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)

Lowest One-Day Mean Temperature 34°F (1°C)


BI-10-09003 ISSUED FOR REVIEW (B1)

Highest One-Day Mean Temperature 104°F (40°C)


DESCRIPTION

Lowest Recorded Temperature 32°F (0°C)

Highest Recorded Temperature 120°F (49°C)

111°F (44°C)
JO/EWO

Summer Design Dry Bulb Temp. @ 1%

Mean Coincident Wet Bulb Temp. @ 1% 79°F (26°C)


05/18/18

09/07/18

09/18/18

109°F (43°C)
DATE

Summer Design Dry Bulb Temp. @ 2.5%


Mean Coincident Wet Bulb Temp. @ 2.5% 79°F (26°C)
REV. NO.

G
E

Summer Design Wet Bulb Temp. @ 1% 88°F (31°C)


DISCIPLINE
ENGINEER

________________
Mean Coincident Dry Bulb Temp. @ 1% 93°F (34°C)
DATE ___________

Summer Design Wet Bulb Temp. @ 2.5% 86°F (30°C)


PROJECT
ENGINEER

________________
Mean Coincident Dry Bulb Temp. @ 2.5% 93°F (34°C)
DATE ___________

Summer Design Dry Bulb Temp. @ 5% 108°F (42°C)


CERTIFIED

________________
Mean Daily Range 22°F (12°C)
DATE ___________

Winter Design Dry Bulb Temp. @ 99% 41°F (5°C)


CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________________

DATE ___________
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 34


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
Saudi Aramco 2616-ENG (03/99)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

ATTACHMENT 2 AIR COOLER DESIGN AIR INLET TEMPERATURE


CERT

MP

MP

MP

Design Air Inlet Temperature


ENGG

RSD

KC

KC

1. Design air inlet temperature shall be determined by the Design Engineer based
on the value of the summer design dry bulb temperature for the particular site as
specified in SAES-A-112.
2. Design air inlet temperature shall either be the design dry bulb at 1% for critical air
temperature or at 2.5% for non-critical air temperature. This temperature shall be
increased due to: the location of the exchanger with respect to processing units
and buildings, and the number of bays, in accordance with the following
requirements.
BI-10-09003 ISSUED FOR PROPOSAL (C1)

BI-10-09003 ISSUED FOR PROPOSAL (C2)


BI-10-09003 ISSUED FOR REVIEW (B1)

3. For exchangers located within industrial plants or shaded by buildings, an


additional 1.1°C (2°F) shall be added to the basic summer design dry bulb
temperature.
DESCRIPTION

4. For installations with more than five bays, the basic summer design dry bulb
temperature shall be increased by a further amount as follows depending on the
type of exchanger. The word “installations” in this context means individual
JO/EWO

exchanger service or different exchanger services placed side by side in the same
bank.
For induced draft exchangers, add 1.7°C (3°F)
05/18/18

09/07/18

09/18/18
DATE

For forced draft exchangers, add 2.8°C (5°F)


REV. NO.

For humidified air coolers, add 1.1°C (2°F)


G
E

DISCIPLINE
ENGINEER 5. Exchangers in excess of five bays shall be oriented such that their tubes are
________________ perpendicular to the prevailing summer wind direction. If due to the plant layout,
DATE ___________ this orientation cannot be obtained, an addition of 1.1°C (2°F) is required.
PROJECT
ENGINEER 6. Final air-side design temperature shall be the sum of the values specified in
________________ above paragraphs 2, 3, 4 and 5, as applicable.
DATE ___________
7. The design inlet air temperature for exchangers in lube and seal oil services shall
CERTIFIED

________________
be the summer dry bulb temperature at 1.0% plus 4.4°C (8°F).
DATE ___________

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________________

DATE ___________
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

BASIC ENGINEERING DESIGN DATA DOC 35


T80 A PP-962000
COMMON AREA OF G
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 39
T80-A-PP-962000_RevG DOC CLASS: 1 DSN: 315
T80-A-PP-962000_RevG

DATE ___________

DATE ___________

DATE ___________

DATE ___________

DATE ___________
REVISION CERTIFICATE EDSD REV. NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

________________

________________

________________

________________

________________

Saudi Aramco 2616-ENG (03/99)


CONSTRUCTION
VERIFICATION

OPERATIONS
THIS INDICATES THAT REV. NO. ____________

DISCIPLINE
CERTIFIED

ENGINEER

ENGINEER
PROJECT
AGENCY
OF THIS DRAWING IS COVERED, FOR ALL E 05/18/18 BI-10-09003 ISSUED FOR REVIEW (B1) RSD MP
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
F 09/07/18 BI-10-09003 ISSUED FOR PROPOSAL (C1) KC MP
BY DRAWING COMPLETION CERTIFICATE BY: ______________
(DCC)NO. _______________________________ G 09/18/18 BI-10-09003 ISSUED FOR PROPOSAL (C2) KC MP
DATE _____________
TANAJIB

COMMON AREA

BASIC ENGINEERING DESIGN DATA

FACILITIES SPECIFICATION

ATTACHMENT 3 DRINKING WATER CONTAMINANT LEVELS

SAUDI ARABIAN OIL COMPANY


SAUDI ARABIA

DWG.TYPE
DOC
PLANT .NO
T80
JO / EWO: BI-10-09003

INDEX
A
DOC CLASS: 1

PP-962000

DRAWING NO.
DSN:

SHT. NO.
OF
39

36
315

REV. NO.
G

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
T80-A-PP-962000_RevG

DATE ___________

DATE ___________

DATE ___________

DATE ___________

DATE ___________
REVISION CERTIFICATE EDSD REV. NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

________________

________________

________________

________________

________________

Saudi Aramco 2616-ENG (03/99)


CONSTRUCTION
VERIFICATION

OPERATIONS
THIS INDICATES THAT REV. NO. ____________

DISCIPLINE
CERTIFIED

ENGINEER

ENGINEER
PROJECT
AGENCY
OF THIS DRAWING IS COVERED, FOR ALL E 05/18/18 BI-10-09003 ISSUED FOR REVIEW (B1) RSD MP
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
F 09/07/18 BI-10-09003 ISSUED FOR PROPOSAL (C1) KC MP
BY DRAWING COMPLETION CERTIFICATE BY: ______________
(DCC)NO. _______________________________ G 09/18/18 BI-10-09003 ISSUED FOR PROPOSAL (C2) KC MP
DATE _____________
TANAJIB

COMMON AREA

BASIC ENGINEERING DESIGN DATA

FACILITIES SPECIFICATION

SAUDI ARABIAN OIL COMPANY


SAUDI ARABIA

DWG.TYPE
DOC
PLANT .NO
T80
JO / EWO: BI-10-09003

INDEX
A
DOC CLASS: 1

PP-962000

DRAWING NO.
DSN:

SHT. NO.
OF
39

37
315

REV. NO.
G

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
T80-A-PP-962000_RevG

DATE ___________

DATE ___________

DATE ___________

DATE ___________

DATE ___________
REVISION CERTIFICATE EDSD REV. NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

________________

________________

________________

________________

________________

Saudi Aramco 2616-ENG (03/99)


CONSTRUCTION
VERIFICATION

OPERATIONS
THIS INDICATES THAT REV. NO. ____________

DISCIPLINE
CERTIFIED

ENGINEER

ENGINEER
PROJECT
AGENCY
OF THIS DRAWING IS COVERED, FOR ALL E 05/18/18 BI-10-09003 ISSUED FOR REVIEW (B1) RSD MP
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
F 09/07/18 BI-10-09003 ISSUED FOR PROPOSAL (C1) KC MP
BY DRAWING COMPLETION CERTIFICATE BY: ______________
(DCC)NO. _______________________________ G 09/18/18 BI-10-09003 ISSUED FOR PROPOSAL (C2) KC MP
DATE _____________
TANAJIB

COMMON AREA

BASIC ENGINEERING DESIGN DATA

FACILITIES SPECIFICATION

SAUDI ARABIAN OIL COMPANY


SAUDI ARABIA

DWG.TYPE
DOC
PLANT .NO
T80
JO / EWO: BI-10-09003

INDEX
A
DOC CLASS: 1

PP-962000

DRAWING NO.
DSN:

SHT. NO.
OF
39

38
315

REV. NO.
G

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
T80-A-PP-962000_RevG

DATE ___________

DATE ___________

DATE ___________

DATE ___________

DATE ___________
REVISION CERTIFICATE EDSD REV. NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

________________

________________

________________

________________

________________

Saudi Aramco 2616-ENG (03/99)


CONSTRUCTION
VERIFICATION

OPERATIONS
THIS INDICATES THAT REV. NO. ____________

DISCIPLINE
CERTIFIED

ENGINEER

ENGINEER
PROJECT
AGENCY
OF THIS DRAWING IS COVERED, FOR ALL E 05/18/18 BI-10-09003 ISSUED FOR REVIEW (B1) RSD MP
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
F 09/07/18 BI-10-09003 ISSUED FOR PROPOSAL (C1) KC MP
BY DRAWING COMPLETION CERTIFICATE BY: ______________
(DCC)NO. _______________________________ G 09/18/18 BI-10-09003 ISSUED FOR PROPOSAL (C2) KC MP
DATE _____________
TANAJIB

COMMON AREA

BASIC ENGINEERING DESIGN DATA

FACILITIES SPECIFICATION

SAUDI ARABIAN OIL COMPANY


SAUDI ARABIA

DWG.TYPE
DOC
PLANT .NO
T80
JO / EWO: BI-10-09003

INDEX
A
DOC CLASS: 1

PP-962000

DRAWING NO.
DSN:

SHT. NO.
OF
39

39
315

REV. NO.
G

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.