211 Fgdgaster
211 Fgdgaster
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
PROJECTS DEPARTMENT
LEADS
LEADS
LEADS
ALL
ALL
ALL
BI-10-02399
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS
DATE:
12/11/16
PROJECT
ENGINEER
A M ALMATROOK
DATE: 12/11/16
PROJECT PROPOSAL NARRATIVE
CERTIFIED
AMR EL SHARKAWY
12/11/16
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
RE-ISSUED FOR 100% PROJECT
DATE: 12/11/16
OPERATIONS
PROPOSAL
ALI H GHAMDI
DATE:
12/11/16
ADDENDUM 1
CONTROL NUMBER
VERIFICATION
EDSD
PREPARED BY:
DATE:
BY:
REVISIONCERTIFICATION
MUSTANG-HDP,
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
TABLE OF CONTENTS
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
D
C
B
DATE: 12/11/16 4.8 YANBU TO JIDDAH PIPELINE 1 & 2 SUPPORT INFRASTRUCTURE ..................................... 71
PROJECT
ENGINEER
4.9 PUMPS AND MOTORS FOR THE YANBU TO JIDDAH PIPELINE........................................... 73
A M ALMATROOK
DATE: 12/11/16 4.10 PUMP OPERATIONS FOR THE YANBU TO JIDDAH PIPELINE ............................................. 80
CERTIFIED
AMR EL SHARKAWY 4.11 PIPELINE CONNECTION FROM GRASSROOTS-YANBU ARAMCO REFINERY ....................... 80
12/11/16
DATE: 4.12 PIPELINE CONNECTION FROM SAMREF REFINERY....................................................... 81
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
4.13 PIPELINE CONNECTION FROM YASREF REFINERY ....................................................... 87
DATE: 12/11/16 4.14 PIPELINE CONNECTION FROM YANBU REFINERY TERMINAL ........................................... 91
OPERATIONS
ALI H GHAMDI
4.15 ELECTRICAL............................................................................................................ 96
12/11/16 4.16 COMMUNICATION ...................................................................................................... 121
DATE:
CONTROL NUMBER
VERIFICATION
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.23 PROCESS AUTOMATION & CONTROLS ........................................................................ 198
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
10-02399-
10-02399-
0001
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER
5.14. CHEMICAL SHELTER ............................................................................................ 280
ALL LEADS
5.15. REMOTE I/O BUILDINGS (2 UNITS) ...................................................................... 284
DATE: 12/11/16
PROJECT
ENGINEER 5.16. IDAS SHELTER (2 UNITS)...................................................................................... 287
A M ALMATROOK
5.17. OPERATION BUILDING ......................................................................................... 289
DATE: 12/11/16
CERTIFIED SECTION 6.0 – MATERIALS REQUIREMENT ...................................................................... 295
AMR EL SHARKAWY
DATE:
12/11/16 SECTION 7.0 – HIGH COMMISSION FOR INDUSTRIAL SECURITY ................................... 295
CONSTRUCTION
AGENCY SECTION 8.0 – VALUE PRACTICES / WORKSHOPS .......................................................... 295
SHAHZAD YAZDANI
SECTION 9.0 – OTHER ENGINEERING STUDIES / ASSESSMENTS / ANALYSIS ............. 295
DATE: 12/11/16
OPERATIONS SECTION 10.0 – APPENDICES ............................................................................................. 296
ALI H GHAMDI
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
1.1 PREFACE
LEADS
LEADS
LEADS
ALL
ALL
ALL
The purpose of the proposed facilities is to efficiently meet the Kingdom’s refined
product demand in Makkah Province through the construction of the Yanbu Distribution
Hub (YDH). This project will aggregate refined product from the three local refineries
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
(SAMREF, YASREF, and Yanbu Terminal) to facilitate shipment via two connecting
pipelines: the (a) Yanbu to Jiddah pipeline and the (b) Yanbu to Central Region pipeline,
which are two additional Budget Items under development.
DESCRIPTION
The Yanbu-Jiddah Pipeline, BI-10-02155, initially included the Yanbu to Jiddah pipeline
scope, NJBP scope, YDH scope, and the SSSP-5 supply pipeline scope. As the scope
for BI-10-2155 increased, it was decided to split and segregate the pipelines scope from
the in-plant scope.
BI-10-02399, Additional Capacity – North Jiddah Bulk Plant, has been introduced to the
2016-2018 Business Plan to handle the below major scope elements from BI-10-2155:
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
09/08/16
D
C
B
DISCIPLINE
ENGINEER The three refineries in the Yanbu area currently deliver product to the Western Region of
ALL LEADS Saudi Arabia via truck loading, marine vessel loading, and pipeline deliveries to
DATE: 12/11/16 Madinah. Projected product demand growth in the central and western regions will
PROJECT
ENGINEER require that additional infrastructure be built to meet these higher demands. With
A M ALMATROOK currently over 900 MBD of refining capacity, Yanbu has been identified as the refined
DATE: 12/11/16 product origin hub to supply Jiddah and the Central Region.
CERTIFIED
AMR EL SHARKAWY
12/11/16
The 2040 demand forecasts identify the following demand gaps to be supplied by YDH:
DATE:
CONSTRUCTION
AGENCY • 576 MBD on the Yanbu to North Jiddah (YNJ-1/2) pipelines (to be constructed as part
SHAHZAD YAZDANI
of this budget item, BI-10-02155); and,
DATE: 12/11/16
OPERATIONS • 400 MBD on the Yanbu to Central Region pipeline (future construction, BI-10-02167).
ALI H GHAMDI
This document, the “Project Proposal Narrative” (PPN), is intended to describe the
EDSD
overall scope for YDH project. CONTRACTOR shall read this document and its
attachments carefully and determine all the Materials, Equipment and other
DATE:
requirements of the entire project for supply, installation and successful commissioning
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The PPN shall be treated as construction scope of work. It provides overall requirements
(DCC) NO. _____________________
of the systems in a comprehensive way and is not intended to cover the work in detail.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
This document (PPN) describes the overall and major equipment, material and the work
SAY
SAY
SAY
ASH
ASH
ASH
commissioning support, and hand over the project to SAUDI ARAMCO, on time, in a full
operating condition in compliance with the relevant SAUDI ARAMCO standards,
LEADS
LEADS
LEADS
ALL
ALL
ALL
The term “Provide” used in the document in different sections by various engineering
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
facilities/ project safely and make it operational and deliver the expected results.
Any equipment/system/materials and efforts that are missing, not fully covered in this
document, but are required to complete the systems shall be identified by
CONTRACTOR during the bidding process and shall be provided.
CONTRACTOR shall conduct field surveys & testing and other engineering studies
workshops and best practices required for the project.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
• CONTRACTOR shall address all project proposal comments which were closed and
0001
0001
reflected in drawings during the detail design and construction phases as applicable.
12/11/16
08/04/16
09/08/16
DATE
• CONTRACTOR shall address and consider in the detail design package all the
recommendations outlined in various studies and submitted proposals to relevant
authorities for setting up YDH.
NO.
REV
D
C
B
DISCIPLINE
ENGINEER
• CONTRACTOR shall be responsible to produce a detail design package based on
ALL LEADS Project Proposal Package using a SAUDI ARAMCO approved engineering design
DATE: 12/11/16 office; CONTRACTOR shall be responsible for the correctness of all the engineering
PROJECT
ENGINEER
drawings, documents produced by the design office also for the drawings & documents
A M ALMATROOK
provided by vendors. Approval of above drawings and documents by SAUDI ARAMCO
DATE: 12/11/16
does not relieve CONTRACTOR of the responsibility of correct design, right
CERTIFIED equipment, proper installation, testing & commissioning.
AMR EL SHARKAWY
12/11/16
• CONTRACTOR shall have full responsibility for the detail design and engineering of all
DATE:
CONSTRUCTION
required items, elements and systems necessary for the complete, functional and safe
AGENCY operation of the entire scope of equipment and systems. The design criteria and
SHAHZAD YAZDANI
contract documents included are not all-inclusive and represent minimum
DATE: 12/11/16 requirements. Any additional elements or items required to achieve the correct and
OPERATIONS
safe operation of the system shall be engineered, designed, and shall be in place,
ALI H GHAMDI
complete and functional.
12/11/16
• CONTRACTOR shall review and approve Vendor and SUBCONTRACTOR drawings,
DATE:
CONTROL NUMBER
VERIFICATION
design, specifications and other documents for conformity to this Contract and institute
EDSD
effective internal control for prompt receipt, review, approval, and return of such
documents. CONTRACTOR shall incorporate all such applicable Vendor and
DATE:
ARAMCO.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Royal Commission (YRC) for setting up YDH facility and its operation.
SAY
SAY
SAY
• CONTRACTOR shall systematically check his design and drawings to ensure they
ENGG CERT
ASH
ASH
comply with the Scope of Work, relevant SAUDI ARAMCO, YRC standards and
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall consider the SAUDI ARAMCO Design and Engineering Standards
as per the cut-off date of September 2016. CONTRACTOR shall meet all the
requirements of the Mandatory SAUDI ARAMCO Engineering Requirements (MSAERs),
YRC, SAMREF, YASREF and Marafiq standards.
DESCRIPTION
Contractor shall use the latest edition, revision, addenda, errata of the applicable local
and international codes and standards, unless otherwise explicitly specified.
In case of conflict between requirements mentioned in different documents, the most
stringent interpretation shall be followed.
The following are the latest applicable Design and Engineering Standards and
international Codes and Standards, available for the project design.
10-02399-
JO/EWO
10-02399-
10-02399-
Any changes during execution of the project will be informed by SAUDI ARAMCO.
0001
0001
0001
09/08/16
DATE
D
C
B
Buildings
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Equipment
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAES-B-058 Emergency Shutdown, Isolation and Depressurizing
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
SAES-B-070 Fire and Safety Requirements for Bulk Plants, Air Fueling
Terminals and sulfur Handling Facilities
SAES-D-109 Design of Small Metallic Storage Tank
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
Piping
0001
0001
0001
09/08/16
DATE
Coatings
SAES-J-002 List of Inspectable Instruments
NO.
REV
D
C
B
DISCIPLINE
SAES-J-003 Instrumentation – Basic Design Criteria
ENGINEER
ALL LEADS
SAES-J-200 Pressure
DATE: 12/11/16
SAES-J-300 Level
PROJECT
ENGINEER
SAES-J-400 Temperature
A M ALMATROOK SAES-J-505 Combustible Gas and Hydrogen Sulfide in Air Detection
DATE: 12/11/16 Systems
CERTIFIED
AMR EL SHARKAWY
SAES-J-600 Pressure Relief Devices
DATE:
12/11/16 SAES-J-601 Emergency Shutdown and Isolation Systems
CONSTRUCTION SAES-J-604 Protective and Condition Monitoring Equipment for
AGENCY
SHAHZAD YAZDANI Rotating Machinery
DATE: 12/11/16 SAES-J-700 Control Valves
OPERATIONS
SAES-J-801 Control Buildings
ALI H GHAMDI
SAES-J-605 Surge Relief Protection System
12/11/16
DATE:
SAES-J-902 Electrical Systems for Instrumentation
CONTROL NUMBER
VERIFICATION
Facilities
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Centers
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAES-K-100 SAUDI ARAMCO Mechanical (HVAC) Code
SAY
SAY
SAY
ASH
ASH
Systems
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
SAES-O-203 Security Gate
ENGINEER
ALL LEADS
SAES-O-204 Security Lighting
DATE: 12/11/16
SAES-O-205 Integrated Security System
PROJECT
ENGINEER
SAES-O-206 Security Devices
A M ALMATROOK SAES-O-207 Power Supply for Security System
DATE: 12/11/16 SAES-O-208 Communication for security system
CERTIFIED
AMR EL SHARKAWY
SAES-O-209 Security Door
DATE:
12/11/16 SAES-O-210 Security Lock
CONSTRUCTION SAES-O-211 Identification Card
AGENCY
SHAHZAD YAZDANI SAES-O-212 Security Information Protection
DATE: 12/11/16 SAES-P-100 Basic Power System Design Criteria
OPERATIONS
SAES-P-101 Regulated Vendors List for Electrical Equipment
ALI H GHAMDI
SAES-P-103 UPS and DC system
12/11/16
DATE:
SAES-P-104 Wiring Methods and Materials
CONTROL NUMBER
VERIFICATION
SAES-P-111 Grounding
SAES-P-113 Motors and Generators
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAES-P-123 Lighting
SAY
SAY
SAY
ASH
ASH
concrete structures
LEADS
LEADS
LEADS
ALL
ALL
ALL
Machinery
SAES-Q-009 Concrete Retaining Walls
SAES-Q-010 Cement Based, Non-Shrink Grout for Structural and
DESCRIPTION
Equipment Grouting
SAES-Q-011 Epoxy Grout for Machinery Support
SAES-Q-012 Criteria for Design and Construction of Precast and
Pre stressed Concrete Structures
SAES-R-004 Building Design & Finishing Guidelines
SAES-S-010 Sanitary Sewers
SAES-S-020 Oily Water Drainage Systems
SAES-S-030 Storm Water Drainage Systems
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
SAES-T-151 D.C. Power Systems
ENGINEER
ALL LEADS
SAES-T-492 VHF/UHF Land-Mobile and Fixed Radio Communication
DATE: 12/11/16
SAES-T-493 Digital Trunked Radio System
PROJECT
ENGINEER
SAES-T-494 Very Small Aperture Terminal (VSAT) Network Design
A M ALMATROOK SAES-T-556 Circuit Quality and Performance
DATE: 12/11/16 SAES-T-566 Plant Demilitarized Zone (DMZ) Architecture
CERTIFIED
AMR EL SHARKAWY
SAES-T-603 Safeguards and Warning Devices
DATE:
12/11/16 SAES-T-624 Telecommunications – OSP Fiber Optics
CONSTRUCTION SAES-T-625 Inter and Intra-Building Fiber Optic Communications
AGENCY
SHAHZAD YAZDANI Cables
DATE: 12/11/16 SAES-T-628 Underground Cable
OPERATIONS
SAES-T-629 Telecommunications – Buried Cable and Wire
ALI H GHAMDI
SAES-T-631 Communications Cable Terminals
12/11/16
DATE:
SAES-T-632 Communications Cable Splicing
CONTROL NUMBER
VERIFICATION
Towers
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAES-T-911 Telecommunications Conduit System Design
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
09/08/16
DATE
Royalty/Custody Transfers
SAES-Z-001 Process Control System
NO.
REV
D
C
B
DISCIPLINE
SAES-Z-002 Technically Acceptable Process Automation Systems
ENGINEER
ALL LEADS
SAES-Z-008 Terminal Management System
DATE: 12/11/16
SAES-Z-010 Process Automation Networks Connectivity
PROJECT
ENGINEER
SAES-Z-020 Design and Installation of Fiber Optic Cables Systems for
A M ALMATROOK Process Control Networks
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
1.4.2 SAUDI ARAMCO Inspection Requirements
12/11/16
DATE:
175-000003 Instructions & Explanations of Inspection Requirements
CONSTRUCTION
AGENCY 175-321900 Pressure Vessels
SHAHZAD YAZDANI
175-343100 Panels and Cabinets for Outdoor Area
DATE: 12/11/16
OPERATIONS 175-013100 Fabricated Carbon Steel Piping
ALI H GHAMDI 175-019800 Auxiliary Piping for Mechanical Equipment
DATE:
12/11/16 175-022500 Flanges, Spectacle Plates, Spacers & Blinds
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Motors to 500 HP
C
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
175-171300 Galvanic Anodes: Aluminum, Magnesium, or Zinc for
SAY
SAY
SAY
Cathodic Protection
ENGG CERT
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
Systems
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE
175-343100 Control Panels
ENGINEER
ALL LEADS
175-345100 Monitoring Systems Vibration, Axial position and
DATE: 12/11/16
bearing Temperatures
PROJECT
ENGINEER
175-347600 Cable: Instrumentation
A M ALMATROOK
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
04-SAMSS-048 Valve Inspection and Testing Requirements
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
System (APCS-6)
09-SAMSS-060 Packaging Requirements for Coatings
09-SAMSS-067 Qualification Requirements for Internal Coating Systems
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
16-SAMSS-502 Metal-Enclosed Metal-Clad Low Voltage Switchgear
ENGINEER
ALL LEADS
Assemblies
DATE: 12/11/16
16-SAMSS-503 Indoor Control gear-Low Voltage
PROJECT
ENGINEER
16-SAMSS-504 Indoor Metal-Clad Switchgear: 1 to 38 KV
A M ALMATROOK 16-SAMSS-512 Outdoor Switchrack – Low Voltage
DATE: 12/11/16 16-SAMSS-513 Power System Automation Components
CERTIFIED
AMR EL SHARKAWY
16-SAMSS-518 Low Voltage Panel boards
DATE:
12/11/16 16-SAMSS-519 Indoor Switchboards-Low Voltage
CONSTRUCTION 16-SAMSS-520 Cable Bus
AGENCY
SHAHZAD YAZDANI 17-SAMSS-004 Conventional (Tap Adjustable) Rectifiers for Cathodic
DATE: 12/11/16 protection
OPERATIONS
17-SAMSS-005 Cathodic Protection phase controlled Rectifiers
ALI H GHAMDI
17-SAMSS-006 Galvanic Anodes for Cathodic Protection
12/11/16
DATE:
17-SAMSS-007 Impressed Current Anodes for Cathodic Protection
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Motors to 500 HP
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
17-SAMSS-511 Stationary Storage Batteries
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Hydrocarbon Fires
23-SAMSS-010 Distributed Control Systems
23-SAMSS-050 Terminal Management System
23-SAMSS-701 Industrial Ethernet Switch Specifications
26-SAMSS-084 Turbo Compressor oil 46
27 SAMSS-011 Fire, Smoke, and Combination Fire-Smoke Dampers
31-SAMSS-003 Reciprocating Compressors for Air or Gas Service
31-SAMSS-004 Centrifugal Pumps
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
Offshore Service
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE
32-SAMSS-004 Manufacture of Pressure Vessels
ENGINEER
ALL LEADS
32-SAMSS-005 Manufacture of Atmospheric Tanks
DATE: 12/11/16
32-SAMSS-013 Lubrication, Shaft Sealing and Control Oil Systems
PROJECT
ENGINEER
32-SAMSS-030 Manufacture of Small Metallic Atmospheric Storage
A M ALMATROOK Tanks
DATE: 12/11/16 32-SAMSS-038 manufacture of Skid Mounted units
CERTIFIED
AMR EL SHARKAWY
34-SAMSS-117 Turbine Flow Meters in Liquid Service
DATE:
12/11/16 34-SAMSS-118 Positive Displacement Meters
CONSTRUCTION 34-SAMSS-119 Bi-Directional Meter Prover
AGENCY
SHAHZAD YAZDANI 34-SAMSS-120 Uni-Directional Meter Prover
DATE: 12/11/16 34-SAMSS-121 Small Volume Prover
OPERATIONS
34-SAMSS-167 Truck Loading Metering Systems
ALI H GHAMDI
34-SAMSS-319 Radar Tank Gauging Equipment
12/11/16
DATE:
34-SAMSS-514 Combustible Gas and Hydrogen Sulfide Monitors
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Instruments
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Types
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
34-SAMSS-623 Programmable Controller Based ESD Systems
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
DATE: 12/11/16
OPERATIONS
SAEP-1152 Approval procedure for Ready-Mixed concrete mix
ALI H GHAMDI design
DATE:
12/11/16 SAEP-1624 Preparation of System Design Document
SAEP-1630 Preparation of Integration Test Procedure
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AA-036024-001 Roof framing plan sunshade type-I, community
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
AB-036521 Bridge Weld and Typical Brace Seal Welded and Socket
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE
AC-036950 Instrument Symbols
ENGINEER
ALL LEADS
AE-036137 Truck Loading Bottom Specification
DATE: 12/11/16
AE-036175 Details of Heavy Welding Boss for Threaded
PROJECT
ENGINEER
Connections to Vessels and Lines
A M ALMATROOK AE-036451 Pre-Heat Levels for Welding Carbon Steel
DATE: 12/11/16 AE-036141 Truck loading or unloading – general arrangement
CERTIFIED
AMR EL SHARKAWY
SA-2693 Safety Instruction Sheet – Tanks
DATE:
12/11/16 AB-036402 Details Cast Iron Catch Basin with Side inlet s
CONSTRUCTION AE-036470 RIP-RAP Slope Protection Detail
AGENCY
SHAHZAD YAZDANI AC-036078 Details Cast Iron Catch Basin without Side inlets
DATE: 12/11/16 AC-036489 Traffic Control Devices
OPERATIONS
AC-036680 SAUDI ARAMCO Security and General Purpose
ALI H GHAMDI
Fencing-Footing Details
12/11/16
DATE:
AB-036677 SAUDI ARAMCO Security and General Purpose Fencing
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.4.6 SAUDI ARAMCO Library Drawings (SALD)
SAY
SAY
SAY
ENGG CERT
Lines Details
LEADS
LEADS
LEADS
ALL
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
D
C
B
DATE: 12/11/16
1.4.8 SAUDI ARAMCO Construction Safety Manual and Safety Handbook
PROJECT
ENGINEER
A M ALMATROOK All work is to be carried out in accordance with the SAUDI ARAMCO
DATE: 12/11/16
CERTIFIED
Construction Safety Manual and the minimum behavioral safety standards
AMR EL SHARKAWY detailed in the SAUDI ARAMCO Safety Handbook. Furthermore, the project
12/11/16 shall provide Safety and Hazard Identification Plans (HIP) for Loss Prevention
DATE:
CONSTRUCTION
AGENCY
approval.
SHAHZAD YAZDANI
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
G.I.298.010 Administration Procedure of Contractor Camps/Parks
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
This project is within YRC jurisdictions and CONTRACTOR shall adhere to all
DESCRIPTION
YRC applicable standards. For full list of applicable standards See Appendix 9.
10-02399-
10-02399-
0001
0001
0001
Appendix 10.
12/11/16
08/04/16
09/08/16
DATE
DISCIPLINE
ENGINEER
Junction Box and Cable Installation Std
ALL LEADS Marked up P&ID - Tie-ins
DATE: 12/11/16 MOV’s Purchase Specs - Sample
PROJECT
ENGINEER P&ID Legend & Details
A M ALMATROOK
SAMREF Approved Manufacturer List (AML)
DATE: 12/11/16
CERTIFIED SAMREF Piping Class
AMR EL SHARKAWY
Eqp. & Inst. Tag number Req. Form
12/11/16
DATE:
CONSTRUCTION
AGENCY 1.4.12 INTERNATIONAL CODES AND STANDARDS
SHAHZAD YAZDANI
12/11/16
AISC Steel Construction Manual-13th Edition
DATE:
ACI American Concrete Institute
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
API 546 Brushless synchronous machines-500KVA and larger
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
ASME B73.1 Specification for End suction horizontal Centrifugal
ENGINEER
ALL LEADS
Pumps for chemical Process
DATE: 12/11/16
API – MPMS API Manual of Petroleum Measurement Standards
PROJECT
ENGINEER
(MPMS)
A M ALMATROOK API, RP 2000 Safety Relief Valve Sizing
DATE: 12/11/16 API-RP 686 Recommended Practices for machinery Installation and
CERTIFIED
AMR EL SHARKAWY
Installation Design
DATE:
12/11/16 B30.10 Hooks
CONSTRUCTION B30.17 Overhead and Gantry Cranes (Top Running Bridge
AGENCY
SHAHZAD YAZDANI Single Girder, Under Hung Hoist)
DATE: 12/11/16 HST-4M Performance Standard for Overhead Electric Wire Rope
OPERATIONS
Hoists
ALI H GHAMDI
12/11/16
DATE:
American National Standards Institute (ANSI)/National Electrical Manufacturers
CONTROL NUMBER
VERIFICATION
Association (NEMA)
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Association (NFPA)
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ANSI / NFPA 70 National Electric Codes
SAY
SAY
SAY
ASH
ASH
Spray Systems
LEADS
LEADS
LEADS
ALL
ALL
ALL
Appurtenances
NFPA 30 Flammable and Combustible Liquids Code
DESCRIPTION
10-02399-
10-02399-
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
ASHRAE Handbook Fundamentals
ENGINEER
ALL LEADS
INSTRUMENT, SYSTEMS AND AUTOMATION SOCIETY (ISA)
DATE: 12/11/16
PROJECT
ENGINEER
A M ALMATROOK
ISA S5.1 Instrumentation Symbols and Identification
DATE: 12/11/16
CERTIFIED International Organization for Standardization
AMR EL SHARKAWY
12/11/16
DATE: ISO 9000 Quality Systems – Model for Quality Assurance in
CONSTRUCTION
AGENCY Design/Development, Production, Installation and Servicing.
SHAHZAD YAZDANI
DATE: 12/11/16
OPERATIONS
International Electro -Technical Commissions (IEC)
ALI H GHAMDI
12/11/16
IEC 61000-6-2 Generic Standards – Immunity for Industrial
DATE:
Environments
CONTROL NUMBER
VERIFICATION
DATE:
SMACNA
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Flexible, 3rd Edition
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
LEADS
ALL
Association (AWWA)
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
D
C
B
A M ALMATROOK
API Manual of Petroleum Measurement Standards (MPMS)
DATE: 12/11/16 API Recommended Practice 2003-1998, Protection Against Ignitions Arising
CERTIFIED
AMR EL SHARKAWY
Out of Static, Lighting and Stray Currents
DATE:
12/11/16 API Recommended Practice 2610-1194, Design, Construction, Operation,
CONSTRUCTION
AGENCY
Maintenance and Inspection of Terminal, Tank Facilities
SHAHZAD YAZDANI
American Society of Civil Engineers (ASCE) Publication 7- 05 Standards -
DATE: 12/11/16
OPERATIONS
Minimum Design Loads for Buildings and Other Structures
ALI H GHAMDI API Recommended Practice 1004, Bottom Loading and Vapor Recovery
12/11/16
DATE: MC 306 Tank Motor Vehicles (to be used in conjunction with U.S. Department
CONTROL NUMBER
VERIFICATION
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.5 LIST OF ABBREVIATIONS AND ACRONYMS
SAY
SAY
SAY
Process
ENGG CERT
ASH
ASH
ASH
BBL Barrels
BPD Barrels per day
LEADS
LEADS
LEADS
ALL
ALL
ALL
DO Diesel oil
DPK Dual purpose kerosene
MB 1000 barrel
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
TELECOM
ARS Automatic Route Selection
AUTH Authorization Code
10-02399-
JO/EWO
10-02399-
10-02399-
0001
BI Budget Item
0001
0001
BS Base Station
CAT Category
12/11/16
08/04/16
09/08/16
DATE
D
C
B
DB Decibel
DISCIPLINE
ENGINEER
DDF Digital Distribution Frame
ALL LEADS DHCP Dynamic Host Configuration Protocol
DATE: 12/11/16 DWS Dispatcher Work Station
PROJECT
ENGINEER
EADS European Aeronautic Defense and Space Company
A M ALMATROOK
EARP Ethernet Address Resolution Protocol
DATE: 12/11/16
EIA Electronic Industries Alliance
CERTIFIED EMS Electronic Marker System
AMR EL SHARKAWY
ETSI European Telecommunications Standards Institute
12/11/16
DATE: FAT Factory Acceptance Test
CONSTRUCTION
AGENCY
FDP Fiber Distribution Panel
SHAHZAD YAZDANI FMR Field Material Request
DATE: 12/11/16 FOC Fiber Optic Cable
OPERATIONS FSD Functional Specification Document
ALI H GHAMDI FSF Facility Security Forces
DATE:
12/11/16 GI General Instructions
GPS Global Positioning System
CONTROL NUMBER
VERIFICATION
IF Interfaces
C
IL Insertion Loss
(DCC) NO. _____________________
IP Internet Protocol
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ISDN Integrated Services Digital Network
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
09/08/16
DATE
D
C
B
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAPMT SAUDI ARAMCO Project Management Team
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
09/08/16
DATE
D
C
B
SI System International
SIB Satellite Instrument Building
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________ 10-02399- ALL
B 08/04/16 0001 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS, 10-02399- ALL
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL LEADS ASH SAY AHG
AGENCY
BY: 0001
ALL LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE
DATE: 12/11/16
ENGINEER
DATE: 12/11/16
ENGINEER
12/11/16
DATE: 12/11/16
ALI H GHAMDI
DISCIPLINE
12/11/16
CERTIFIED
10-02399- ALL
AMR EL SHARKAWY
OPERATIONS
CONSTRUCTION
ASH AHG
A M ALMATROOK
12/11/16 ISSUED FOR 100% PROJECT PROPOSAL
SHAHZAD YAZDANI
(DCC) NO. _____________________ D 0001 LEADS SAY
DATE:
YANBU
PROJECT
Saudi Aramco 2616-ENG (03/99)
TIS
UPS
TMS
WAN
SAUDI ARABIA
Wide Area Network
X40
JO / EWO:
Truck Identification System
A
Terminal Management System
10-02399-0001
DRAWING NO.
GEN-E0102
24
Of
296
SHT.NO.
D
EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
This project is located near the city of Yanbu and the Yanbu area refineries. This plot of
land is approximately 2 km2 in size and is located east of the SAUDI ARAMCO Yanbu
Refinery (YR), adjacent to the east side of King Abdulaziz Road, and within the Yanbu
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
This project requires Land Use Permits (LUP) for both the work areas in and around
NJBP and YDH, including: YDH plant, MARAFIQ to YDH corridor for Electrical & FO
cables, Yanbu refinery/YDH Interconnecting pipelines corridor, SAMREF/YDH
Interconnecting pipeline corridor, Access road for YDH and Temporary Construction
Facility
10-02399-
10-02399-
0001
3.1 The Project Proposal Narrative with all its attachments and drawings shall be the basis
0001
0001
and serve the purpose of defining the overall scope of this project.
12/11/16
08/04/16
09/08/16
DATE
3.2 In addition, the SAUDI ARAMCO engineering procedures, practices, and general
instructions are also considered as part of the design basis for the development of
NO.
REV
D
C
B
DATE: 12/11/16
3.3 Any conflict between various design basis documents shall be highlighted to SAUDI
PROJECT
ENGINEER
ARAMCO for their review and resolution.
A M ALMATROOK
DATE: 12/11/16 3.4 This document shall be read in conjunction with relevant contract documents.
CERTIFIED
AMR EL SHARKAWY
12/11/16
3.5 CONTRACTOR shall prepare detail design package as per latest Saudi Aramco
DATE:
CONSTRUCTION
Engineering Standards, procedures and material specifications. Yanbu Royal
AGENCY
Commission standards & guidelines shall be considered for the detail design package.
SHAHZAD YAZDANI
DATE: 12/11/16
OPERATIONS 3.6 CONTRACTOR shall prepare the earthquake resistant design and detailing per
ALI H GHAMDI requirements of AISC-341, Seismic Design Manual of AISC, ACI-318 and ASCE-05.
DATE:
12/11/16 Geotech report of the project shall be utilized for the determination of Seismic Design
CONTROL NUMBER
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
Section 4 is included in this PPN to provide design basis and an overall picture of the total
project associated with BI-10-02399. This is specifically intended to provide CONTRACTOR
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall commit dedicated manpower, equipment and all necessary resources to
DESCRIPTION
CONTRACTOR shall assign a dedicated full-time team to work on the Yanbu Distribution Hub
for the entire project duration which includes but not limited to the engineering design office
and construction site office. The team shall be located in the same floor as the SAUDI
ARAMCO PMT assigned offices.
10-02399-
10-02399-
0001
The proposed facilities shall interface with the related budget items (BI’s) and other
0001
0001
components of this BI. Work for this project shall be coordinated with the respective
projects as noted below. Each respective BI below shall address interconnections
12/11/16
08/04/16
09/08/16
DATE
between the other related BI’s and existing facilities. To the extent possible, any
physical tie-ins shall be made without affecting operations. Any changes in the
NO.
REV
D
C
B
approved Testing and Inspection (T&I) schedules shall be coordinated with Oil Supply
DISCIPLINE
ENGINEER
Planning and Scheduling department (OSPAS).
ALL LEADS
A M ALMATROOK
Related Budget Items
DATE: 12/11/16
CERTIFIED 4.2.1 BI-10-02155, Yanbu – Jiddah Refined Product Pipeline
AMR EL SHARKAWY
This project shall construct refined product pipelines to deliver products from
12/11/16
DATE: Yanbu to the North Jiddah Bulk Plant. The current scope transports 576 MBD
CONSTRUCTION
AGENCY of refined petroleum products. These pipeline systems will deliver Diesel,
SHAHZAD YAZDANI Kerosene, Premium 91, and Premium 95 Gasoline designated for the Makkah
DATE: 12/11/16 province.
OPERATIONS
ALI H GHAMDI
12/11/16
The project must consider the origin pipeline pump station and origin storage
DATE:
tank requirements into the facility design.
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Yanbu into the central region of Saudi Arabia. The current scope transports
(DCC) NO. _____________________
400 MBD of refined petroleum product to a bulk plant destination in the central
region.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
The project must consider the origin pipeline pump station and origin storage
ENGG CERT
tank requirements into the facility design. Additional storage tanks at YDH shall
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The refined product production resulting from this project will be a significant
amount of product supply for YDH.
10-02399-
10-02399-
0001
0001
(ULSD, PG91, and PG95) from the YASREF Refinery to the Yanbu Refinery.
0001
The proposed pipeline route shall follow the Royal Commission Corridor
12/11/16
08/04/16
09/08/16
The custody metering shall be located inside YDH battery limit along with
NO.
REV
D
C
B
DISCIPLINE
supervisory monitoring and control Process Automation.
ENGINEER
ALL LEADS
The YASREF supply connection into YDH will connect into each of the
pipelines.
DATE: 12/11/16
PROJECT
ENGINEER
A M ALMATROOK
ERA: 2/16, ERC: 5/19
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
4.3 PROJECT PHYSICAL INTERFACES
12/11/16
DATE:
CONSTRUCTION
AGENCY The project scope for the YNJ-1/2 pipelines, BI-10-02155 & YDH and North Jiddah
SHAHZAD YAZDANI
Bulk Plant (NJBP) Expansion & Upgrade, BI-10-02399 will contain elements that shall
DATE: 12/11/16 be interfaced to achieve project purpose and intend.
OPERATIONS
ALI H GHAMDI
This project has very complicated interfaces as listed below; it is highly recommended
12/11/16
DATE: that the CONTRACTOR assign a dedicated Interfaces Manager to handle those
CONTROL NUMBER
DATE:
CONTRACTOR shall consider the interfaces when studying the Project Risk
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR shall consider all the relevant Reservation forms and interface
(DCC) NO. _____________________
packages used in the Project Proposal package for the detail design.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
BI-10-02155 is comprised of:
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
LEADS
ALL
ALL
ALL
This BI also provides for The YNJ-1/2 Pipeline System to transport 576 MBD of refined
product from YDH to the NJBP. This pipeline system will deliver Diesel, Kerosene,
Premium 91, and Premium 95 Gasoline designated for the Makkah province.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
The existing bulk plant at North Jiddah shall be upgraded and expanded to
10-02399-
JO/EWO
10-02399-
10-02399-
0001
09/08/16
NO. DATE
REV
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS
DATE: 12/11/16
PROJECT
ENGINEER
A M ALMATROOK
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY Figure 1. Project boundaries for BI-10-02155 and BI-10-02399
12/11/16
DATE:
CONSTRUCTION 4.3.1 Refinery Connections:
AGENCY
SHAHZAD YAZDANI
Refer to Appendix 2 Project Proposal Interface Packages.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
Appendix 2 contains all reservation forms, 90% comment logs, documents and
12/11/16
drawings related to the interfaces with MARAFIQ, Yanbu Royal Commissioning,
DATE:
Yanbu NGL, Yanbu refinery, SAMREF, and YASREF. The drawings included in
CONTROL NUMBER
VERIFICATION
YDH shall construct multiple pipelines to tie into the tank farm of each respective
DATE:
refinery. The tie-in location shall be downstream of any tankage and booster
BY:
pumps within the respective refinery tank farm and YRT discharge lines from
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
YASREF
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YDH shall receive PG 91/95 and DO products from the YASREF via two
SAY
SAY
SAY
pipelines. Part of the pipeline supply from YASREF to YDH will be provided by
BI-10-00043, for the supply of clean transportation fuel to Yanbu refinery. Two (2)
ENGG CERT
ASH
ASH
ASH
pipelines (one for DO and one for PG 91/95) between YASREF & Yanbu refinery
shall be provided under BI-10-00043. This project will tie-in to the isolation valve
LEADS
LEADS
LEADS
ALL
ALL
ALL
downstream provided on the pipeline and shall be the connecting points for the
pipelines leading to YDH. BI-10-00043 will provide a manual valve on both
pipelines for tie-ins to YDH.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
A. Instrumentation:
DESCRIPTION
10-02399-
10-02399-
•
0001
0001
A00001.004
12/11/16
08/04/16
09/08/16
DATE
B. Telecom
• Provide 12 core Fiber optic cable from Yanbu Distribution Hub to YASREF
NO.
REV
D
C
B
DATE: 12/11/16
PROJECT
Notes: Engineering / construction contractor for BI-10-00043 need to
ENGINEER accomplish the requirement of new surge relief systems for both
A M ALMATROOK
pipelines (YASREF – YR) and a surge relief tank & its pumps inside
DATE: 12/11/16 YASREF. Surge tank pumps to be protected with foam system.
CERTIFIED
AMR EL SHARKAWY
12/11/16 SAMREF
DATE:
CONSTRUCTION
AGENCY YDH shall receive PG 91/95, DO, and DPK from the SAMREF refinery via three
SHAHZAD YAZDANI
pipelines extending from the SAMREF tank farm to YDH product receiving
DATE: 12/11/16
manifolds. The SAMREF supply connection to YDH shall be downstream of
OPERATIONS
existing export pumps. And the required new metering skids shall be installed
ALI H GHAMDI
at SAMREF. These tie-ins will be taken from the SAMREF export lines going to
12/11/16
DATE: their terminal near to the fence at King Fahad Road (RC Corridor). All new
CONTROL NUMBER
A. Piping:
REVISIONCERTIFICATION
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Installation of 01 surge tank & 02 pumps
SAY
SAY
SAY
ASH
ASH
ASH
B. Instrumentation:
LEADS
• Provide and install Three (3) custody metering skids PG91/95, DO and DPK
LEADS
LEADS
ALL
ALL
ALL
with a prover PG91/95 and DO, and a separate prover for DPK, the skid shall
be as per SAES-Y-103. The metering skids field instrumentation shall be
integrated to metering and control cabinets such as flow computer cabinet,
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
PLC cabinet and MSC cabinet. A vendor supplied metering shelter shall be
provided to house these cabinets.
• Skid Vendor/LSTK shall supply prefab air-conditioned Metering Shelter
DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
• The contractor shall provide redundant fiber optic cables between metering
shelter and nearest OMS control building in the tank farm area of SAMREF.
12/11/16
08/04/16
09/08/16
DATE
The new DCS shall be tied to the existing plant control network at OMS
control room. The HMI station at OMS control room will be updated with the
new instrumentation added by BI-10-02399.
NO.
REV
D
C
B
DISCIPLINE • The new ESD valves added by BI-10-02399 at the battery limit of SAMREF
ENGINEER
ALL LEADS facility shall be integrated to existing ESD system. The contractor shall
DATE: 12/11/16 provide new junction boxes and cables. The ESD marshalling cabinet
PROJECT
ENGINEER
OMMRS01 shall be used to terminate ESD cables at OMS Rack-room.
A M ALMATROOK • The contractor shall provide junction boxes and field homerun cables as
DATE: 12/11/16 indicated in block diagram# IN-A00001.007
CERTIFIED
AMR EL SHARKAWY • The YDH control system shall be interfaced to SAMREF control system to
DATE:
12/11/16 have READ ONLY access to the data points such as the CMS, EIV status
CONSTRUCTION and Pump status and tank status. The data is to be exchanged via plant DMZ
AGENCY
SHAHZAD YAZDANI
through PI system at both the facilities. New fiber optic cable is to be laid from
SAMREF to YDH for the data exchange.
DATE: 12/11/16
OPERATIONS • Contractor shall install MOV-1111/2/3/4, MOV-1211/12, and MOV-
ALI H GHAMDI 1311/12/13/14/15/16/17/18 as shown in P &ID and Piping Plan #PI-
DATE:
12/11/16 A00435/36/37/38. Provide and install Junction boxes and lay homerun cable
IC-0116/117/124/125 up to new DCS Marshalling Cabinet in located in
CONTROL NUMBER
VERIFICATION
metering shelter.
EDSD
• Contractor shall provide and install ZV-1112/1212/1312 and install cable IC-
DATE:
0133 from ESD junction box to existing ESD marshalling cabinet OMRS01.
BY:
Contractor shall utilize existing cable tray to run home cable from junction to
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
Drawing Description
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
10-02399-
10-02399-
0001
0001
• Provide 12 core Fiber optic cable from SAMREF new Metering Shelter to
12/11/16
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE D. Electrical:
• Provide and Install two 480V, 3phase, 3wire MOVs Panels feeding from
ENGINEER
ALL LEADS
DATE: 12/11/16
SAMREF existing Substation No. 12.
PROJECT
ENGINEER • Provide and Install new rack mounted 10kVA UPS with 60 mins back up time
A M ALMATROOK in Substation No. 12 to feed Metering Skids.
DATE: 12/11/16
CERTIFIED
• Empty spaces of existing MCCs in Substation No. 12 shall be utilized to feed
AMR EL SHARKAWY MOVs Panels and UPS.
DATE:
12/11/16
• Run and terminate power cables for Panels and metering skids etc.
•
CONSTRUCTION
AGENCY Provide Grounding to new equipment from existing SAMREF Grounding
SHAHZAD YAZDANI
network.
DATE: 12/11/16
OPERATIONS • Provide task lighting for new equipment from existing lighting Panels.
ALI H GHAMDI
12/11/16
E. Structural:
• LSTK contractor shall perform required geotechnical investigation inside
DATE:
CONTROL NUMBER
VERIFICATION
• All necessary structures and foundations for MOV’s and metering skids.
DATE:
BY:
Yanbu Refinery
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
YDH shall receive PG 91/95, DO, and DPK from the Yanbu Refinery Terminal
C
through three pipelines extending from YRT through Yanbu refinery tank farm
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
existing marine loading pumps. These pumps will take suction from ship pump.
SAY
SAY
SAY
ASH
ASH
ASH
Provisions shall be provided in the receiving manifold for the future connection
LEADS
LEADS
LEADS
ALL
ALL
A. Piping:
• Construct 4 tie-ins with YR pipelines, including MOVs, and ZVs.
DESCRIPTION
B. Instrumentation:
• Contractor shall provide and install Motor Operated and Electrohydraulic ESD
valves at the battery limit of Yanbu Refinery, MOVs shall also be provide at
the tie-in locations.
• Contractor shall provide and install new homerun cables from valves up to
the existing SIH-1590 (Satellite Instrument House) in tank farm area. SIH-
1590 is expanded under BI-10-00043, the project shall coordinate with BI-10-
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
00043 to reserve the space in the cabinets required by this BI. All new EIVs
will be connected to new ESD Marshalling Cabinet provided by BI-10-00043.
12/11/16
08/04/16
09/08/16
D
C
B
shall be used in order to make the data exchange highly secured. Contractor
EDSD
shall provide fiber cables between YREF and YDH. The possible option of
interfacing both the facilities shall be further evaluated during detailed design.
DATE:
BY:
• Contractor shall provide and install new junction boxes, branch cables,
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
• The field installation shall be as per P & IDs VA-247876/877 and VA-
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
236952.002, VA-236956.001, VA-236956.002 and VA-236960.002
SAY
SAY
SAY
ASH
ASH
utilizing existing cable trays. Refer drawing VA-549870.001 for cable routing.
ASH
•
LEADS
LEADS
LEADS
ALL
Reference Drawings:
ALL
ALL
Drawing Description
IN-A00001.008 Block Diagram-Yanbu Refinery
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
C. Telecom
• Provide two(2) 48 core Fiber optic cable from Yanbu Distribution Hub to
12/11/16
08/04/16
09/08/16
DATE
Yanbu Refinery Admin Bldg 1401. One fiber is for IT and the other for
Process connectivity.
NO.
REV
D
C
B
A M ALMATROOK • Provide Access Points (APs) in Yanbu Distribution Hub to connect in the
DATE: 12/11/16
existing WLAN Controller at Yanbu NGL.
AMR EL SHARKAWY
CERTIFIED
• Provide connectivity and associated equipment in Yanbu Distribution Hub to
12/11/16 the third party SAMREF, YASREF and YRT.
DATE:
CONSTRUCTION • Provide the TETRA Radio system in Yanbu Distribution Hub to connect in the
AGENCY
SHAHZAD YAZDANI
existing SCN in Yanbu NGL.
DATE: 12/11/16 • Provide Transmission connectivity for SDH equipment in Riyadh Refinery.
OPERATIONS
ALI H GHAMDI
12/11/16
DATE: D. Electrical:
• Provide and Install three 480V, 3phase, 3wire MOVs Panels feeding from
CONTROL NUMBER
VERIFICATION
•
REVISIONCERTIFICATION
•
C
Grounding network.
• Provide task/area lighting for new equipment from existing nearby lighting
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Panels.
SAY
SAY
SAY
E. Structural:
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
• THE CONTRACTOR shall coordinate with Saudi Aramco and MARAFIQ for
the portion of works under MARAFIQ scope and insure correct interface of all
discipline’s i.e. Civil, Electrical, Protection, Communication, etc.
• THE CONTRACTOR shall furnish electrical detailed drawings, documents
and any calculation requested by MARAFIQ / Roya Commission (RC) to fulfill
the connection agreement requirements.
• THE CONTRACTOR shall utilize existing spare breaker EA06 & EB04 of GIS
to feed power to Yanbu Distribution Hub (YDH). (Refer sketch # SK-A10011,
SK-A10013 & SK-A10014)
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
accommodate line differential relays & directional relays for YDH feeders-1 &
D
C
B
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
by all relevant parties including POD, PID, MARAFIQ, etc. and be included
SAY
SAY
SAY
within the Project Test Results binders maintained and developed by THE
CONTRACTOR as per SAEP-122.
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
required based on ABB relays. Reserved available floor spaces for these
two panels. New panels to be tagged as: =EB04+R1 and =EA06+R1
NO.
REV
DISCIPLINE - Protection Scope- Back Up Protection: Two (2) new relay Panels are
ENGINEER
ALL LEADS required based on Siemens relays. Available floor spaces for these 2
DATE: 12/11/16 panels. New Panels to be tagged as: =EB04+R2 and =EA06+R2 115KV
PROJECT
ENGINEER Service Line Aramco- YDH/ Back Up protection Panel.
A M ALMATROOK
- MARAFIQ confirmed that existing Relay Panels =E+BB1 and =E+BB4 for
DATE: 12/11/16
CERTIFIED Bus Bar/BF Protection of GIS Bay EA06 & EA04 are already pre-wired.
AMR EL SHARKAWY
- DC System scope: Existing 125V DC Distribution Panel has not enough
12/11/16
DATE: spare breakers for new DC scope. MARAFIQ requested to provide new
CONSTRUCTION
AGENCY DC panel same manufacturer than existing panels “Riyadh Factory For
SHAHZAD YAZDANI
Panelboard” Available floor space for this new DC panel. New Panel to be
DATE: 12/11/16
OPERATIONS
tagged as: 125V DCDB 125V Main DCDB No. 3.
ALI H GHAMDI
- AC System scope: Existing 220V AC Distribution Panel has required spare
DATE:
12/11/16 breakers for new AC scope. THE CONTRACTOR to utilize existing spare
breakers from 220V AC Distribution Panel No. 1, 2 & 3. Note: There is No
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
the wall.
OF THIS DRAWING IS COVERED, FOR ALL
- Cable structural support shall be Unistrut type similar design that existing
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ones.
SAY
SAY
SAY
• General:
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
B. Telecom:
• THE CONTRACTOR shall design, supply, install, test and assist with
commissioning of two (2) x 2 run 12C Single Mode Fiber Optic Cables run
along with each power feeder cable from MARAFIQ Substation #9I to YDH.
(Refer sketch # SK-A10010 & ELA10130-001-003). Each of the two (2) fiber
run will have one 12 core fiber for Control and one 12 core fiber for
Communication connectivity.
• The fiber patch panel in Substation #91 shall be wall type and in YDH the
fiber patch panel shall be rack mounted type.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
C. Instrumentation:
12/11/16
THE CONTRACTOR shall provide and install the following for Water
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE
• UTILITY WATER
ENGINEER
ALL LEADS - Provide metering skid for utility water system as indicated in the drawing
DATE: 12/11/16 INA00001-011, the skid shall be provided with field instruments such as
PROJECT
ENGINEER Electromagnetic flowmeter, Pressure transmitters, Temperature
A M ALMATROOK transmitters and pH analyzer.
DATE: 12/11/16 - Supplied field instruments shall be as per MARAFIQ standard and from
CERTIFIED
AMR EL SHARKAWY approved vendors list.
DATE:
12/11/16 - Provide and install Junction boxes and branch cabling.
CONSTRUCTION
AGENCY
- Provide and install RTU with GPRS Communication Gateway. Integrate
SHAHZAD YAZDANI the RTU with existing MARAFIQ SCADA.
DATE: 12/11/16
OPERATIONS
• SANITARY WATER
ALI H GHAMDI
12/11/16 - Provide metering skid for Sanitary water system as indicated in the
DATE:
drawing INA00001-011, the skid shall be provided with field instruments
CONTROL NUMBER
VERIFICATION
Temperature transmitters.
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. Civil:
SAY
SAY
SAY
• THE CONTRACTOR shall provide and install the following for Water systems
with MARAFIQ.
ENGG CERT
ASH
ASH
ASH
• UTILITY WATER
LEADS
LEADS
LEADS
ALL
ALL
ALL
- Provide connection of Utility Water at the approved tie-in point for Potable
water system as indicated in the drawing CIA00110-002 and CIA00116-
001, using the standard typical connections of RC.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
- Contractor shall coordinate with MARAFIQ for the time to make the
connection to facilitate the connection without interfering with the line
operation. Requesting the close down of the pipe section if applicable and
DESCRIPTION
10-02399-
10-02399-
0001
09/08/16
DATE
- Contractor shall coordinate with MARAFIQ for the time to make the
connection to facilitate the connection without interfering with the line
operation.
NO.
REV
D
C
B
DISCIPLINE - Provided with pipes, fittings and flanges for a proper connection and leave
ENGINEER
ALL LEADS the connection uncovered until a water test verifies there are not spills at
DATE: 12/11/16 the joint of tie in point.
PROJECT
ENGINEER - Provide excavation and backfilling following Aramco standard SAES-A-
A M ALMATROOK 114.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY Yanbu NGL & Yanbu Royal Commissioning
12/11/16
DATE:
CONSTRUCTION • Refer to Appendix 2 for reservation forms and drawings.
AGENCY
SHAHZAD YAZDANI
Storage Tanks and Piping
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI The interface point shall be at the flange face at each respective product
12/11/16 header line downstream of any tankage, booster pumps, process piping, and
DATE:
measurement equipment downstream of YDH Receipt Header Line as outlined
CONTROL NUMBER
VERIFICATION
below.
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
respective service including the T&I tank with dual product service with
0001
0001
0001
09/08/16
DATE
D
C
B
DATE: 12/11/16
PROJECT
• Manifold/piping velocities shall comply with SAUDI ARAMCO standards
ENGINEER
and Loss Prevention Study Recommendations (CFPE-011-2014) on
A M ALMATROOK
reduced loading rates for low sulfur diesel and aromatic products.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY Gasoline Dye Injection
12/11/16
DATE:
CONSTRUCTION Two separate red and green color dye injection systems shall be installed in
AGENCY
YDH facility. The dye injection must inject dye at the inlet header of storage
SHAHZAD YAZDANI
tanks (at the downstream of receiving manifold) so that a single skid of green
DATE: 12/11/16
OPERATIONS
dye and single skid for red dye can provide adequate coloration for PG-91 and
ALI H GHAMDI
PG-95 from all the source. The color dye injection system shall be a complete
12/11/16
vendor skid with tank and injection pumps.
DATE:
CONTROL NUMBER
VERIFICATION
The scope for the color dye injection Skid is outlined in PFD VA247835-001
and P&IDs VA247891-001. CONTRACTOR shall develop a detailed P&ID after
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
pumps, pre filters and after filters. Normally, the filtration skid shall be designed
and shall have flexibilities to circulate into the same product tanks or to an
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
empty DPK tank as per the operation requirement. DPK filtration skids shall be
SAY
SAY
SAY
ASH
ASH
ASH
The scope for Filtration Skid is outlined in PFD VA-247843.001 and P&IDs VA-
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
reduce the static charge accumulation in DO. The SDA injection skid is
ENGINEER proposed to be a complete vendor skid. The injection shall be done on the inlet
ALL LEADS
line to DO storage tanks from distribution manifold. The static dissipative
DATE: 12/11/16
PROJECT
additive injection system shall be a complete vendor skid with tank and
ENGINEER
injection pumps.
A M ALMATROOK
DATE: 12/11/16 The scope for the static dissipative additive injection Skid is outlined in PFD
CERTIFIED
AMR EL SHARKAWY
VA247835-001 and P&IDs VA247893-001. CONTRACTOR shall develop a
12/11/16
detailed P&ID after receiving vendor information during detail design.
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Process Automation and Communications
DATE: 12/11/16
OPERATIONS
TMS with Distributed Control System (DCS) shall be provided for the control
ALI H GHAMDI
and logic functions required to operate YDH. The TMS-DCS shall also be
12/11/16
DATE: interfaced with subsystems such as the Emergency Shutdown System (ESD),
CONTROL NUMBER
Vibration Monitoring System (VMS), Radar Tank Gauging System (RTG), Fire
VERIFICATION
& Gas Detection System (FDS), and Custody Monitoring System (CMS) and
EDSD
other Third party controls within YDH. All the relevant communication, process
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The YNJ-1/2 pipeline system shall tie-in with YDH at downstream of shipper
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
pump after the PCVs. The battery limit will be the tie-in flange provided by YDH
SAY
SAY
SAY
in the scraper launcher lateral line for YNJ-1 / YNJ-2 and the flanges provided
in the delivery manifold for the central region pipeline. As YDH is a greenfield
ENGG CERT
ASH
ASH
ASH
development, the planning of both the YNJ-1/2 pipeline system and YDH shall
consider each other in the design as well as future plans for the facilities within
LEADS
LEADS
LEADS
ALL
ALL
ALL
YDH.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
4.3.2.1 Mechanical
DESCRIPTION
4.3.2.2 Electrical
YDH 480V systems shall provide power to the panel board located at the
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
Scraper Launcher area within YDH battery limit. The 480V panel board shall
be provided by BI-10-02155.
12/11/16
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE The YNJ-1/2 pipeline project, BI-10-02155, shall provide information required
ENGINEER
ALL LEADS for the sizing, not design, of the non-electrical facilities included in YDH project
DATE: 12/11/16
scope, BI-10-02399. The non-electrical utility systems include, but are not
PROJECT
ENGINEER
limited to:
A M ALMATROOK
12/11/16
Industrial drainage (oily water) system
DATE: • Storm water drainage
CONSTRUCTION
AGENCY • Sewerage system
SHAHZAD YAZDANI
DATE: 12/11/16
OPERATIONS
4.3.2.4 Buildings
ALI H GHAMDI
12/11/16 There are no anticipated interfaces for the building scope at YDH.
DATE:
CONTROL NUMBER
VERIFICATION
Process Automation systems for YDH and YNJ-1/2 pipelines should synergize
DATE:
BY:
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.3.3 Yanbu to Central Region Pipeline
SAY
SAY
SAY
The pipeline system shall tie-in with YDH at each respective product header
ENGG CERT
ASH
ASH
ASH
line downstream of any tankage and upstream of the pipeline booster pumps.
The detailed planning of the pipeline connection shall occur at a future date
LEADS
LEADS
LEADS
ALL
ALL
ALL
when the project plan is initiated and further developed. At this time, YDH shall
consider general provisions for the pipeline connection.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
4.3.4 Communications / IT
DESCRIPTION
10-02399-
10-02399-
0001
to Yanbu NGL will terminate first to Yanbu Refinery Admin Bldg. 1401.
0001
0001
• The YDH Package shall reserve rack space location at Engineering and
12/11/16
08/04/16
09/08/16
Maintenance Building for Pipeline FOC patch panel provided under BI-
DATE
10-2155
• The YDH Package shall reserve duct bank at Engineering and
NO.
REV
D
C
B
DATE: 12/11/16
OPERATIONS
Control Center (YRSCC).
ALI H GHAMDI
12/11/16
4.3.5 MARAFIQ
DATE:
CONTROL NUMBER
VERIFICATION
Electrical
EDSD
MARAFIQ’s Substation #9I, which is located about 3.85 km away from the
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
A10130.001-004.
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Non-Electrical Utilities
SAY
SAY
SAY
This BI will also interface with MARAFIQ utilities. The scope development
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
• Sanitary sewer
• Storm water drainage (MARAFIQ channels)
DESCRIPTION
All pipelines, power cables and fiber optic cables connecting YDH to the
previously mentioned interfaces (SAMREF, YASREF, YR, MARAFIQ and
YNGL) are within Yanbu Royal Commission jurisdictions.
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
This project shall coordinate construction activities with the respective refineries,
pipeline construction, OSPAS and Domestic Sales & Logistics (DS&LD) departments.
NO.
REV
D
C
B
Scheduling for refinery shutdowns and other critical operations shall be developed
DISCIPLINE
ENGINEER during the detail design and shall be included in the Project Execution Plan. Pre-
ALL LEADS commissioning, shutdown, commissioning and startup procedures shall be
DATE: 12/11/16 implemented in such a manner that disruptions to continuing refinery operations are
PROJECT
ENGINEER minimized. All shutdowns shall be coordinated with related companies and
A M ALMATROOK departments for review and scheduling of work. Any changes in approved T&I
DATE: 12/11/16 schedules shall be coordinated with OSPAS.
CERTIFIED
AMR EL SHARKAWY
12/11/16
4.5 DEMOLITION ACTIVITIES
DATE:
CONSTRUCTION
AGENCY A. GENERAL
SHAHZAD YAZDANI
DATE: 12/11/16 The demolition activities in this project will be limited to the demolition required
OPERATIONS
for tie-in to the existing piping in:
ALI H GHAMDI
12/11/16 • Yanbu refinery for the terminal unloading line and existing pump
DATE:
headers.
CONTROL NUMBER
VERIFICATION
• MARAFIQ tie-in points for utilities (water supply, sanitary and oily water)
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR shall identify the required demolitions for tie-in during detail
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. PIPING
SAY
SAY
SAY
ASH
ASH
ASH
components:
LEADS
LEADS
LEADS
ALL
ALL
ALL
YANBU REFINERY
• Demolition of existing Gasoline, DO & DPK pipeline (approx. 1m to 1.5m
length) for new tie-in connection for Product pipelines from YR Terminal per
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
• To install new feed line for Kerosene (DPK) to YDH, Tie-in at the 20”
common header of Kerosene loading and Transfer pumps(V25-P22 A/B/C)
to be taken at Yanbu Refinery near Pump Station-B.
• To install new feed line for Diesel (DO) to YDH ,Tie-in at the 20”MDO
common header of Diesel loading and Transfer Pumps(V25-P24-A/B/C) to
be taken at Yanbu Refinery near Pump Station-B.
• Refer below mentioned demolition piping plan drawings.
• VA236952D-001, VA236952D-002, VA236956D-001, VA236956D-002 and
VA236960D-002.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
SAMREF REFINERY
12/11/16
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE
Refinery per SAUDI ARAMCO standards.
ENGINEER
•
ALL LEADS
These tie-ins are required to transfer products from SAMREF to YDH from
DATE: 12/11/16
PROJECT
existing product export pumps (DO, PG 91, 95 & DPK) at the SAMREF
ENGINEER
refinery.
A M ALMATROOK
DATE: 12/11/16
CERTIFIED
• Refer demolition piping plan drawings. PIA00438D-001
AMR EL SHARKAWY
DATE:
12/11/16 YASREF REFINERY
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
• No Demolition is required at the YASREF. Tie-in will be provided by other
DATE: 12/11/16
BI-10-00043 inside the Yanbu refinery
OPERATIONS
ALI H GHAMDI • These tie-ins are required to transfer products from YASREF to YDH from
12/11/16
DATE: existing product export pumps (DO & PG 91,95) at the YASREF refinery.
CONTROL NUMBER
VERIFICATION
EDSD
•
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
General Requirement:
SAY
SAY
SAY
Tie-in connections:
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall assist SAUDI ARAMCO to isolate product lines & re-
commission each system to be tied into.
DESCRIPTION
10-02399-
10-02399-
0001
interfaces are covered and performed. Refer to interfaces are covered and
0001
0001
performed.
12/11/16
08/04/16
09/08/16
DATE
D
C
B
A M ALMATROOK • CONTRACTOR shall provide demolition drawing for the demolition of existing
DATE: 12/11/16 asphalt road and paving and or concrete paving in location where pipelines
CERTIFIED
AMR EL SHARKAWY
redundant in open cut road crossings are to be installed.
12/11/16
DATE:
CONSTRUCTION
AGENCY
• CONTRACTOR shall provide civil and structural drawings for all the required
SHAHZAD YAZDANI road crossings and fence penetration for laying the product pipelines, electrical
DATE: 12/11/16 & instrument cables.
OPERATIONS
ALI H GHAMDI
12/11/16
• CONTRACTOR shall determine other demolition activities during detail design
DATE:
stage, which have not been included in this demolition scope.
CONTROL NUMBER
VERIFICATION
• Roads that are demolished for the above reasons will be backfilling following
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.6 Receipt Pipeline and Connections
SAY
SAY
SAY
A. GENERAL
ENGG CERT
ASH
ASH
ASH
CONTRACTOR shall design and install the product receiving station in YDH
LEADS
LEADS
LEADS
ALL
ALL
ALL
• Four product receiving and distribution manifolds, one each for PG 95,
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
0001
0001
• Three custody metering skids with two provers (1 for PF/DO & 1 for
DPK) and densitometer at YDH (for YRT products)
12/11/16
08/04/16
09/08/16
DATE
• Surge relief protection for all eight inbound pipelines from all 3 sources
(SAMREF, YASREF & YR)
•
NO.
REV
DISCIPLINE
ENGINEER
ALL LEADS The receipt manifolds shall be sized for the maximum flow rate of a single
DATE: 12/11/16 refinery supply and the manifold is not expected to receive the same
PROJECT
ENGINEER
product from two sources simultaneously. The manifolds shall be
A M ALMATROOK
connected to all the three product sources at the upstream and to
DATE: 12/11/16
respective storage tanks at the downstream. CONTRACTOR shall provide
CERTIFIED Process interlocks to the manifold valves to receive the product from one
AMR EL SHARKAWY
source at a time. Provision for connecting the future GR refinery shall be
12/11/16
DATE: provided in all receipt manifolds.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI The product and slop manifolds shall be of 30” size and for each manifold
DATE: 12/11/16 CONTRACTOR shall provide the provision for extension in future. Each of
OPERATIONS the manifold inlet and outlet lines shall be equipped with motor operated
ALI H GHAMDI
valves and the segregation of the batches between PG 95 and PG 91 shall
12/11/16 be through a batch management system. Manifold inlet lines shall also be
DATE:
CONTROL NUMBER
the main line from DPK receiving manifold to DPK storage tanks and also to
REVISIONCERTIFICATION
DPK main line from DPK storage tanks to booster pumps. Details of
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Static Dissipative Additive (SDA) injection skid shall be installed to inject the
SAY
SAY
SAY
chemical to reduce the static charge of DO. The additives shall be injected
ENGG CERT
ASH
ASH
to the main line from the DO receiving manifold to the DO storage tanks.
ASH
LEADS
LEADS
LEADS
ALL
ALL
ALL
Red and green dye injection skids shall be installed at YDH for the coloring
of PG 95 and PG 91 products from all sources. The red and green dye shall
be injected to the main line from the PG-95/91 receiving manifold to the
PG-95/91 storage tanks respectively.
All eight inbound pipelines from all 3 sources (SAMREF, YASREF & YR)
shall be protected for surge relief and will relief into surge relief tank at
YDH. Each inlet line shall have two SRVs with its isolation valves and a
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
12/11/16
The scope for the product receiving station is outlined in PFD VA-
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER
The details of the batch management system are outlined in Section B
ALL LEADS instrumentation.
DATE: 12/11/16
PROJECT
ENGINEER B. INSTRUMENTATION
A M ALMATROOK
DATE: 12/11/16
CERTIFIED • THE CONTRACTOR shall provide and install cables IC-0952/0610
AMR EL SHARKAWY
& IC-0953/0611 from red and green dye injection controller to DCS,
12/11/16
DATE: the connection to Skid controller shall be over Modbus Serial.
CONSTRUCTION
AGENCY Cables IC-0959 & IC-0960 shall be provided to ESD system as
SHAHZAD YAZDANI hardwire connection. For details refer block diagram IN-A00001.010
DATE: 12/11/16
OPERATIONS
• THE CONTRACTOR shall provide and install cable IC-0956 from
ALI H GHAMDI
Conductivity Enhancer Injection Skid controller to DCS, the
12/11/16
DATE: connection to Skid controller shall be over Modbus Serial. For
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
diagram IN-A00001.010
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
•
(DCC) NO. _____________________
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
247894.001 and Block Diagram IN-A00002.017
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
•
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
• THE CONTRACTOR shall provide and install field instruments for
ENGINEER slop manifold as indicated in P & ID# VA-247897.001 and Block
ALL LEADS
Diagram IN-A00002.019.
DATE: 12/11/16
PROJECT
ENGINEER • THE CONTRACTOR shall provide and install branch cables from
A M ALMATROOK
field instruments to junction boxes X40-DJB-1039/DJB-1040 as per
DATE: 12/11/16 Block Diagram IN-A00002.018.
CERTIFIED
AMR EL SHARKAWY
12/11/16 • THE CONTRACTOR shall provide and install homerun cables IC-
DATE:
CONSTRUCTION 0856/0857/0862/0863 from junction boxes X40-DJB-1039/DJB-1040
AGENCY
SHAHZAD YAZDANI
to DCS Remote I/O Marshalling Cabinets located in RIB-1 as per
Block Diagram IN-A00002.019.
DATE: 12/11/16
OPERATIONS • THE CONTRACTOR shall provide and install custody metering
ALI H GHAMDI
skids X40-U-0014A/B/C for Gasoline-P91/95, DO & DPK and
12/11/16 provers X40-U-0014D/E inside YDH facility at the location indicated
DATE:
in facility plot plan. The skids shall be vendor supplied, cable
CONTROL NUMBER
VERIFICATION
• Refer block diagram IN-A00001.003 for YDH CMS overview and IN-
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
design is indicated in P &IDs VA-247886-001 to VA247890-001.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
vendor to LSTK.
• CMS shall be interfaced to DCS over Modbus TCP/IP, fiber optic
cables shall be provided to connect to DCS system located in rack
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
D
C
B
12/11/16
DATE:
CONSTRUCTION
AGENCY
C. COMMUNICATION
SHAHZAD YAZDANI
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Drawing # Description
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CO-A10003 Instrument Connection/Interconnection Diagram - YREF,
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
LEADS
ALL
ALL
ALL
D. CIVIL
•
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
E. PIPING
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
DISCIPLINE
ENGINEER
No.PI-A00001-001)
ALL LEADS • This manifold connected to all the three product sources on the
DATE: 12/11/16 upstream side of the facility to respective storage tanks on the
PROJECT
ENGINEER downstream side of the facility.
•
A M ALMATROOK
Pipelines at Receipt manifold provided with structural
DATE: 12/11/16
CERTIFIED supports/Operating platforms to operate control valves/ZVs/PZVs &
AMR EL SHARKAWY
Isolation valves.
12/11/16
DATE: • The Product and slop manifold shall be provided with future
CONSTRUCTION
AGENCY connections with Isolation valves.
SHAHZAD YAZDANI
• The pipeline for three custody metering skids each is dedicated for
DATE: 12/11/16
OPERATIONS PG95/PG91, DO and DPK, also two provers shall be provided near
ALI H GHAMDI Receipt manifold.
DATE:
12/11/16 • Pipeline for Red and Green dye injection skids shall be installed at
CONTROL NUMBER
YDH for product identification for products received from all source
VERIFICATION
refineries
EDSD
metering skid.
•
REVISIONCERTIFICATION
The piping layout for Receipt manifold, Custody metering skids are
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Piping layout for Dye injection, SDA & Conductivity enhancer skid
are mainly small bore lines, which to be carried during detail design.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
CONTRACTOR shall design and install the product receiving manifold in YDH
ENGG CERT
ASH
ASH
following facilities:
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
pipeline system.
12/11/16
08/04/16
09/08/16
•
DATE
Surge relief system for the pipelines along with associated pumps
and connections shall be covered under contractor’s scope of work.
• Pipe supports/platforms/elevated structures as per piping plans and
NO.
REV
D
C
B
following facilities:
EDSD
GENERAL
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
•
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Slop System
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Hydrocarbon Drain System
SAY
SAY
SAY
• Metering System
ENGG CERT
ASH
ASH
ASH
NON-ELECTRICAL UTILITIES
LEADS
LEADS
LEADS
ALL
ALL
ALL
• Sanitary sewer
• Storm water drainage
• Evaporation Pond
DESCRIPTION
A. GENERAL
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
The product split, the type and the capacities for the tanks to be constructed in
NO.
REV
D
C
B
DISCIPLINE
Yanbu’ distribution hub are summarized in the table below.
ENGINEER
ALL LEADS
Tank Size-
DATE: 12/11/16
Total Capacity
Working Number Design Design MDMT
PROJECT Tank Type Working
ENGINEER Volume m³ of Tanks Pressure Temp. (⁰C) (⁰C)
A M ALMATROOK Volume m³ (MB)
(MB)
DATE: 12/11/16
CERTIFIED External
PG 91 27,658 (174) 3 82,974 (522) Atm 75 0
AMR EL SHARKAWY Floating roof
12/11/16
DATE:
CONSTRUCTION
AGENCY External
PG 95 27,658 (174) 3 82,974 (522) Atm 75 0
SHAHZAD YAZDANI Floating roof
DATE: 12/11/16 Fixed Dome
OPERATIONS DO 40,842 (256.9) 3 122,526 (770.7) Atm 75 0
roof
ALI H GHAMDI
Internal
12/11/16 DPK 40,228 (253) 1 Atm 75 0
DATE:
Floating roof
CONTROL NUMBER
121,552 (764.5)
VERIFICATION
Internal
DPK 27,108 (170.5) 3 Atm 75 0
EDSD
Floating roof
Internal
DATE:
Floating Roof
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Note: The tank capacities are provided to meet the 85% of nominal volume
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
Slop System
ENGG CERT
ASH
ASH
ASH
Slop system shall be consisting of two slop tanks (by others) and two slop pumps
LEADS
LEADS
LEADS
ALL
ALL
ALL
(one operating, one spare) with necessary instrumentation and piping. Two slop
tanks each of 13,514 m³ (85 MB) working capacity shall be provided to handle the
intermix products from the pipeline, slops from the oily water treatment and surge
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
relief tank. The design parameters for the slop tank shall be as follows:
DESCRIPTION
Total Capacity,
Tank Size- Working Number of Working Design Design MDMT
Tank Type
Volume m3 (MB) Tanks Volume, m3 Pressure Temp. (⁰C) (⁰C)
(MB)
Internal
Slop 13514 (85) 2 27028 (170) Atm 75 0
Floating roof
10-02399-
10-02399-
0001
along with product storage tanks and is not included in this scope of The
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER
CONTRACTOR shall provide pumps to empty the slop tanks to product tanks and
ALL LEADS the slop product shall be blended with the finished product in in storage tanks
DATE: 12/11/16 without affecting the quality of the product. CONTRACTOR shall connect the slop
PROJECT
ENGINEER
tank pump discharge to individual tank inlet to avoid any product contamination
A M ALMATROOK
during transfer. Slop tank shall also be provided with a provision to connect to the
DATE: 12/11/16
DO /DPK booster pump suction, which enables YDH to pump the slop product to
CERTIFIED NJBP along with the intermix products.
AMR EL SHARKAWY
12/11/16
DATE: The scope for the slop system is outlined in PFD VA-247842.001 and P&IDs VA-
CONSTRUCTION
AGENCY
247912.001 to VA-247914.001.
SHAHZAD YAZDANI
DATE: 12/11/16
Surge Relief System
OPERATIONS
ALI H GHAMDI The following is a general scope narrative for the surge relief system:
12/11/16
DATE:
CONTRACTOR shall design and install surge relief systems for the YNJ-1 & YNJ-2
CONTROL NUMBER
VERIFICATION
pipelines per surge requirement from BI-10-02155 and for all the inbound pipelines
EDSD
from each source. A surge relief system consisting of a surge relief tank (by others)
and pumps shall be installed. The surge tank pump will transfer the surge volume
DATE:
to the slop tank. The central pipeline flowrate (400 MBD) is used as the basis for
BY:
the surge relief tank volume & line sizing. Accordingly, 30 minutes holdup of 400
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
MBD has been taken for surge tank sizing and 400 MBD for its inlet line sizing. The
OF THIS DRAWING IS COVERED, FOR ALL
surge relief system shall include the surge relief valves, the piping to the surge
(DCC) NO. _____________________
relief tank and the instrumentations. The surge relief tank shall be of 1,351 m³ (8.5
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
MB) capacity as specified below to cater the requirement of both YNJ-1 & YNJ-2
SAY
SAY
SAY
ASH
ASH
ASH
Total Capacity,
LEADS
ALL
ALL
Tank Type
Volume m3 (MB) Tanks Volume, m3 Pressure Temp. (⁰C) (⁰C)
(MB)
Surge Internal
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall provide two transfer pumps (one operating, one spare) to
transfer the surge volumes to the slop tanks as necessary. The details of the pump
and piping requirements are specified in piping and mechanical rotating sections of
this document. The scope for the surge relief system is outlined in PFD VA-
247849.001 and P&IDs VA-247929.001 to VA-247930.001.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
Similarly, like surge relief system at YDH, same systems shall also be provided at
12/11/16
09/08/16
DATE
At SAMREF, CONTRACTOR shall design and install surge relief systems for the
NO.
REV
D
C
B
SAMREF pipeline protection. A surge relief system consisting of a surge relief tank
DISCIPLINE
ENGINEER
and pumps shall be installed. The surge tank pump will transfer the surge volume
ALL LEADS to YDH via respective inbound pipeline from SAMREF to YDH. The SAMREF PG
DATE: 12/11/16 pipeline flowrate (554 MBD) is used as the basis for the surge relief tank volume &
PROJECT
ENGINEER line sizing. Accordingly, 30 minutes holdup of 554 MBD has been taken for surge
A M ALMATROOK tank sizing and 554 MBD for its inlet line sizing. The surge relief system shall
DATE: 12/11/16 include the surge relief valves, the piping to the surge relief tank and the
CERTIFIED instrumentations. The surge relief tank shall be of 1849 m³ (11.6 MB) capacity as
AMR EL SHARKAWY
specified below.
12/11/16
DATE:
CONSTRUCTION Total Capacity,
AGENCY Tank Size-
SHAHZAD YAZDANI Number of Working Design Design MDMT
Tank Type Working Volume
DATE: 12/11/16 Tanks Volume, m3 Pressure Temp. (⁰C) (⁰C)
OPERATIONS m3 (MB)
(MB)
ALI H GHAMDI
Surge Internal
12/11/16
DATE: Relief (at Floating 1849 (11.6) 1 1849 (11.6) Atm 75 0
CONTROL NUMBER
VERIFICATION
SAMREF) roof
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR shall provide two transfer pumps (one operating, one spare) to
(DCC) NO. _____________________
transfer the surge volumes to YDH via respective inbound pipeline from SAMREF
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
to YDH. The details of the pump and piping requirements are specified in piping
SAY
SAY
SAY
and mechanical rotating sections of this document. The scope for the surge relief
system is outlined in PFD VA-247849.001 and P&IDs VA-247934.001 to VA-
ENGG CERT
ASH
ASH
ASH
247934.002.
LEADS
LEADS
LEADS
ALL
ALL
ALL
At YR, CONTRACTOR shall design and install surge relief systems for the
YASREF and YR pipeline protection. A surge relief system consisting of a surge
relief tank and pumps shall be installed. The surge tank pump will transfer the
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
surge volume to YDH via respective inbound pipeline from YR to YDH. The
YASREF DO pipeline flowrate (650 MBD) is used as the basis for the surge relief
tank volume & line sizing. Accordingly, 30 minutes holdup of 650 MBD has been
taken for surge tank sizing and 650 MBD for its inlet line sizing. The surge relief
DESCRIPTION
system shall include the surge relief valves, the piping to the surge relief tank and
the instrumentations. The surge relief tank shall be of 2,180 m³ (13.7 MB) capacity
as specified below.
CONTRACTOR shall provide two transfer pumps (one operating, one spare) to
10-02399-
JO/EWO
10-02399-
10-02399-
0001
transfer the surge volumes to YDH via respective inbound pipeline from YR to
0001
0001
YDH. The details of the pump and piping requirements are specified in piping and
12/11/16
mechanical rotating sections of this document. The scope for the surge relief
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER
DPK Filtration Skid
ALL LEADS
DATE: 12/11/16 The CONTRACTOR shall provide a DPK filtration system to filter the off spec DPK
PROJECT
ENGINEER from the tanks. The DPK filtration is proposed to be a complete vendor skid with
A M ALMATROOK circulation pumps, pre filters and after filters. Normally, the filtration skid circulates
DATE: 12/11/16 into the same product tanks or to an empty DPK tank as per the operation
CERTIFIED requirement. . The DPK filtration skids shall be sized to handle a capacity of 45 to
AMR EL SHARKAWY
200 MBD and will be a completely vendor designed skid.
12/11/16
DATE:
CONSTRUCTION
AGENCY The preliminary scope for Filtration Skid is outlined in PFD VA-247843.001 and
SHAHZAD YAZDANI P&IDs VA-247915.001. CONTRACTOR shall develop detailed P&ID after vendor
DATE: 12/11/16 information during detail design and CONTRACTOR shall make sure the design
OPERATIONS shall meet the requirement of SAES-A-302 Aviation fuel quality assurance design
ALI H GHAMDI requirement.
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION
B. NON-ELECTRICAL UTILITIES
EDSD
The MARAFIQ battery limit will be the tie-in point at the RC corridor for potable
DATE:
BY:
water and sanitary waste water. MARAFIQ will be supplying the required quantity
of potable water and YDH will be discharging the industrial waste and sanitary
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
waste water to MARAFIQ network. CONTRACTOR shall make sure that the
C
receipt and discharge from / to MARAFIQ network is provided with the metering
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
The non-electrical utility systems include, but are not limited to:
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide utility water tank for the storage and supply of utility
water. The utility water tank and pressure equipment pumps shall be separated
DESCRIPTION
Utility water shall be provided from the MARAFIQ sweet water main. Adequate
metering system per the requirement of MARAFIQ will be provided for the metering
of utility water inflow.
Utility water will be supplied to the buildings, eyewash / safety showers, and YNJ-1
& YNJ-2 pipeline scraper launchers through utility water pumps (one operating,
one spare).
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
CONTRACTOR shall provide Metering system required for the receipt of utility
12/11/16
08/04/16
09/08/16
water per the requirement of MARAFIQ. The scope for the utility water system is
DATE
D
C
B
DISCIPLINE
ENGINEER
Oily Water Collection and Treatment system
ALL LEADS
DATE: 12/11/16 CONTRACTOR shall install two (2) oily water lift stations in Yanbu’ distribution hub
PROJECT
ENGINEER to facilitate the gravity drain of oily water from all sources.
A M ALMATROOK
DATE: 12/11/16 Oily water discharge from all identified sources shall be routed to the oily water lift
CERTIFIED stations.
AMR EL SHARKAWY
12/11/16
DATE: The rainfall water within the tank farm dikes is considered contaminated water and
CONSTRUCTION
AGENCY it will be collected by an oily water pipe system towards the oily water lift stations.
SHAHZAD YAZDANI
DATE: 12/11/16 In addition to the oily water drains from catch basins in the process area and storm
OPERATIONS
water inside of the tank dike, Oily water & DO storage tanks, sump shall also
ALI H GHAMDI
receive flammable tank dewatering, pure hydrocarbon drains from process areas,
12/11/16
DATE: and pumps. The details of hydrocarbon drain network are specified below under
CONTROL NUMBER
utilities section.
VERIFICATION
EDSD
Before water entering into the lift stations, the water shall pass through a sand
separator /trap which properly designed will retain sand particles from the sump
DATE:
BY:
pumps
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Each oily water lift station shall be provided with two pumps for normal flow (one
(DCC) NO. _____________________
operating, one spare) and two pumps for maximum flow (one operating, one
spare). The normal flow pumps will discharge to an oily water treatment system
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
whereas the maximum flow pump shall discharge to the Evaporation pond.
SAY
SAY
SAY
The details of the oily water lift station, instrumentation and details of pumps are
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide an Oily water treatment system for the treatment of
oily water. The oily water treatment system shall be of a complete vendor skid
design and the treatment system shall receive the effluent from the oily water sump
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall route the effluent from normal flow pumps to an equalization
tank which will discharge into the CPI Oily water treatment.
DESCRIPTION
The oily water treatment system shall receive the effluent from the normal flow
pump and the dewatered effluent from the product storage tanks. Before oily water
entering into the oily water treatment unit, it shall pass through an equalization
tank.
The oily water treatment system shall be of a complete vendor skid design. The
oily water treatment system shall consist of but is not limited to an oily water
equalization tank, CPI separator, water break tank, two effluent water pumps (one
10-02399-
JO/EWO
10-02399-
10-02399-
0001
operating, one spare), two skimmed oil pumps (one operating, one spare) and
0001
0001
09/08/16
DATE
D
C
B
The detail for the skid is outlined in mechanical section below. CONTRACTOR
DISCIPLINE
ENGINEER
shall provide the pump to transfer the recovered oil to the slop tank while effluent
ALL LEADS water to be transferred to the evaporation pond.
DATE: 12/11/16
PROJECT
ENGINEER The scope for the oily water system is outlined in PFD VA-247846.001 & VA-
A M ALMATROOK 247848.001 and P&IDs VA-247921.001 to VA-247923.001 CONTRACTOR shall
DATE: 12/11/16 develop detailed P&ID after vendor information during detail design.
CERTIFIED
AMR EL SHARKAWY
12/11/16
DATE: Hydrocarbon Drain System
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall make sure that a separate drain network Drains from the
DATE: 12/11/16 product tanks, manifolds, scraper launchers and pump stations will be routed to
OPERATIONS
the oily water lift stations in a separated network from the other oily water
ALI H GHAMDI
resources.
12/11/16
DATE:
CONTROL NUMBER
Utility water shall be provided from the MARAFIQ sweet water main. Adequate
metering system per the requirement of MARAFIQ will be provided for the
DATE:
BY:
metering of utility water inflow. CONTRACTOR shall provide utility water tank
REVISIONCERTIFICATION
for the storage and supply of utility water. Utility water will be supplied to
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
eyewash / safety showers, YNJ-1 & YNJ-2 pipeline scraper launchers and to
(DCC) NO. _____________________
the buildings through utility water pumps (one operating, one spare).
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall provide Metering system required for the receipt of utility
SAY
SAY
SAY
water per the requirement of MARAFIQ. The scope for the utility water system
is outlined in PFD VA-247847.001 and P&IDs VA-247924.001, 002.
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Instrumentation for the collection and discharge of sewage from the buildings to
the MARAFIQ network.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Sanitary sewage pipes from Operator shelters in the tank farm area will be
discharge in two separate lift stations. The further lift station will discharge in
the other which will pump the waste water to the main lift station located close
to the main buildings area.
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
D
C
B
DATE: 12/11/16 The contaminated storm water is collected by an oily water system to be
CERTIFIED discharge in the evaporation pond
AMR EL SHARKAWY
12/11/16
DATE:
CONSTRUCTION
AGENCY Evaporation pond
SHAHZAD YAZDANI
DATE: 12/11/16 CONTRACTOR shall validate the design of evaporation pond considering the
OPERATIONS total influent of fire water, contaminated storm water, hydro test water from
ALI H GHAMDI pumps house and tank farm area. In addition to these requirements, Project
12/11/16 shall consider the Royal Commission Environmental Regulation in sizing the
DATE:
CONTROL NUMBER
Pond.
VERIFICATION
EDSD
Provide Two (2) evaporation ponds for waste oily water sewage and one (1)
evaporation pond for hydro test and contaminated storm water. The
DATE:
BY:
accommodate about 2.0 meter deep oily water waste. Provide 0.6m minimum
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
free board.
C
Provide 300mm thick marl capping bed inside evaporation pond includes 60mil
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
rough surface HDPE (UV Resistant) liner above the marl capping.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
YDH Tank Farm and Support structure will have following sets of pumps.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Slop tanks will be emptied through Slop Tank Pumps (X40-G-0022 A/B) to
product tanks. These pumps shall be of Vertical Can Type due to low NPSH
DESCRIPTION
Apart from above following sets of pumps shall also be provided as part of YDH
Tank Farm and Support structure. Reference shall be made to Index-G for
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
Utility Water Pumps (X40-G-0030 A/B) for eyewash, safety showers and
12/11/16
08/04/16
09/08/16
DATE
DISCIPLINE
ENGINEER
No. RE-E00112
ALL LEADS
DATE: 12/11/16 Surge Relief Pumps to transfer the surge volumes to respective product
PROJECT
ENGINEER tanks (X40-G-0023 A/B) – Datasheet No. RE-E00106
A M ALMATROOK
DATE: 12/11/16
CPI Separator Skim Oil Pumps (X40-G-0025 A/B) – Datasheet No. RE-
CERTIFIED E00108 and effluent water pumps (X40-G-0026 A/B) – Datasheet No.
AMR EL SHARKAWY
12/11/16 RE-E00109. These will be part of CPI Separator package and shall be
DATE:
CONSTRUCTION
finalized by CPI Package vendor.
AGENCY
SHAHZAD YAZDANI
In addition to above following sets of pumps are required at Yanbu Refinery
DATE: 12/11/16
OPERATIONS and SAMREF.
ALI H GHAMDI
12/11/16
Surge Relief Pumps (V25-G-X004 A/B) at Yanbu Refinery – Datasheet
DATE:
No. RE-E00147.
CONTROL NUMBER
VERIFICATION
EDSD
MISCELLANEOUS REQUIREMENTS
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
Material take-offs have been prepared for reference only and will not be
0001
0001
0001
09/08/16
DATE
Technical quotations obtained from vendors will list all exceptions and
NO.
REV
D
C
B
DISCIPLINE
/or, additions to applicable project Drawings and SAUDI ARAMCO
ENGINEER
ALL LEADS
Specifications. If there is no exception to specifications, CONTRACTOR
DATE: 12/11/16
will make a statement to that effect.
PROJECT
ENGINEER
DATE:
12/11/16 CONTRACTOR shall be responsible for review and approval of NMRs
CONSTRUCTION 601, 602 and 603.
AGENCY
SHAHZAD YAZDANI
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Supply of Commissioning and Start-up spares and first fill of all the
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall obtain approval of Aramco Operations before
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
This section describes the Contractor’s scope of work for the design,
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE SR NO
ENGINEER EQUIPMENT TAG NO. QTY SERVICE
ALL LEADS
DATE: 12/11/16
1 X40-D-0028A/B 2 FIRE WATER TANK
PROJECT
ENGINEER
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SR NO
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
GASOLINE 95 RED DYE
SAY
2 1
X40-U-0002
INJECTION SKID
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
INJECTION SKID
ALL
ALL
5 1 CONDUCTIVITY ENHANCER
X40-U-0005
INJECTION SKID
DESCRIPTION
Below are the reference documents for all Mechanical Static equipment
and Packages.
REFERENCE DOCUMENTS:
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
TECHNICAL SPECIFICATION:
12/11/16
08/04/16
09/08/16
DATE
D
C
B
EQE00009018 (X40-U-0004)
DISCIPLINE
ENGINEER EQE00011029 TECHNICAL SPECIFICATION FOR DPK FILTRATION SKID
ALL LEADS
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DATA SHEETS:
SAY
SAY
SAY
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
EQE00033001 DATA SHEET FOR P95 RED DYE INJECTION SKIDS (X40-U-0002)
EQE00034001 DATA SHEET FOR P91 GREEN DYE INJECTION SKIDS (X40-U-0003)
DATASHEET FOR CONDUCTIVITY ENHANCER INJECTION SKID (X40-U-
DESCRIPTION
EQE00041001 0005)
DATASHEET FOR STATIC DISSIPATIVE ADDITIVE INJECTION SKID (X40-
EQE00042001 U-0011)
EQE00046003 DATASHEET FOR DIESEL DAY TANK X40-D-0037
DATASHEET FOR OVERHEAD CRANE FOR FIRE WATER PUMP SHELTER
EQE00051002 (X40-U-0021)
EQE00052002 DATASHEET FOR OVERHEAD CRANE FOR GIS ROOM (X40-U-0024)
DATASHEET FOR OVERHEAD CRANE FOR ENGG. & MAINTENANCE
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
09/08/16
DATE
D
C
B
sheet or P&IDs) and fireproofing (where specified on the data sheet or P&IDs).
DATE:
BY:
All skid packages design shall be vendor proven design. Skid packages shall
be suitable for the specific application by meeting all the process design
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
E. INSTRUMENTATION
SAY
SAY
SAY
ASH
ASH
ASH
mentioned below:
LEADS
LEADS
LEADS
ALL
ALL
ALL
• Provide and install cable between RTG instruments, the cables shall run
through conduits.
• Provide RTG junction boxes at the tanks as indicated in block diagram IN-
A00001.005.
• Provide and install fieldbus cables from RTG level transmitters to RTG
junction boxes through conduit.
• Provide and install RTG fieldbus homerun cables between RTG junction
boxes and Field Communication Units located in Rack room of Operation
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
building.
• Refer block diagram IN-A00001.005 for fieldbus cabling and FCU
12/11/16
08/04/16
09/08/16
DATE
D
C
B
• All RTG components inside the rack room shall be supplied within a
DISCIPLINE
ENGINEER cabinet. The RTG shall be interfaced to DCS over industry standard open
ALL LEADS
protocols.
DATE: 12/11/16
PROJECT Product Storage & Slop Tanks Field Instrumentation
ENGINEER
A M ALMATROOK
DATE: 12/11/16
• Provide and install field instruments in the tank farm area as per P & IDs
CERTIFIED VA-247898.001 to VA-247911.001 and for slop tanks P & ID VA-247912/
AMR EL SHARKAWY
VA-247913 and block diagrams IN-A00002.001/002/003/004.
12/11/16
DATE:
CONSTRUCTION
• Provide and install branch cables from field instruments to junction boxes.
AGENCY
SHAHZAD YAZDANI • Provide and install junction boxes as per block diagrams IN-
DATE: 12/11/16 A00002.001/002/003/004.
OPERATIONS
ALI H GHAMDI
• Provide and install homerun cables from field junction boxes to DCS/ESD
12/11/16
marshalling cabinets located in Rack room of Operations Building and
DATE:
Remote Instrument Buildings as per overall cable routing drawing IN-
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR shall
(DCC) NO. _____________________
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and VA-247930-001 and as per block diagram IN-A00002.016
SAY
SAY
SAY
• Provide and install field junction box X40-AJB-2032 & X40-EAJB-X032 lay
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
• DPK Filtration Skid vendor shall provide and install field instruments as
DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
A00002.022.
• Field instruments for all the skids to be included
12/11/16
08/04/16
09/08/16
DATE
D
C
B
Utilities
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
•
OF THIS DRAWING IS COVERED, FOR ALL
• Contractor shall supply metering skid for Utility water, Waste water
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and sanitary water.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
A00001.001
• Totalizer / quantity measurement reading for products at YDH
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
• Reference drawings
DESCRIPTION
Drawing # Description
IN-A00001 System Block Diagrams
IN-A00002 Instrument Block Diagrams
IN-A00027 Instrument Points & Lines
IN-D00201 Instrument Installation Schedule-Flow
IN-D00202 Instrument Installation Schedule-Pressure
IN-D00203 Instrument Installation Schedule-Level
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
09/08/16
DATE
DISCIPLINE
ENGINEER
IN-A00003 Cable Routing Plan
ALL LEADS IN-D00005 Cable and Conduit Schedule
DATE: 12/11/16
PROJECT
ENGINEER
A M ALMATROOK
F. PIPING
DATE: 12/11/16
CERTIFIED • Piping plans have been developed showing the conceptual routing of all
AMR EL SHARKAWY
major pipes with proper configuration in order to meet process objectives.
12/11/16
DATE: Pipe supports, platform and elevated structures shown in this submittal are
CONSTRUCTION
AGENCY
preliminary. All major instruments such as MOVs, ZVs, PZVs and control
SHAHZAD YAZDANI valves are located.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
• These piping plans are intended to define scope of work for
12/11/16
CONTRACTOR and calculate “Bill of Quantity” for estimation.
DATE:
CONTROL NUMBER
VERIFICATION
• The preliminary stress analysis has been done for only the critical
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• All the Facility shall be design & constructed with adequate space to
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
A00001.001)
• All New piping (Only 2” & above) from Source refinery to receipt
manifold, Inside YDH routing to product/ slop, surge storage tanks,
Booster/Shipper Pumps, OWS lift station, DPK Filtration skid, Dye-in
skid, Drain vessel, Scraper Launchers, Utility station, Raw/Drinking
water system, Firewater piping near tank/pumps, drain lines should
be as per the requirements of the Project P&IDs and Piping plan As
per DCL list located in Appendix 13.2.2.)
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
• Line sizes 1.5” & below are not considered in during the Project
Proposal, MTO will be factored for small bore lines for estimation
12/11/16
08/04/16
09/08/16
DATE
purpose.
• Only Preliminary stress analysis done for lines connected to tanks
NO.
REV
D
C
B
DATE:
12/11/16 General Requirement for Piping
CONTROL NUMBER
VERIFICATION
CONTRACTOR shall implement and comply with all the requirements below, in
EDSD
full.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
other applicable International Codes and Standards.
SAY
SAY
SAY
ASH
ASH
ASH
required to complete the facility and shall comply with all applicable codes
and standards.
LEADS
LEADS
LEADS
ALL
ALL
ALL
stoppers, spring supports in order to limit the stresses within the acceptable
code limits.
• CONTRACTOR shall design and construct the Facility with adequate space
to facilitate operation and maintenance and with minimum spacing
requirement as per SAUDI ARAMCO standards.
• CONTRACTOR shall perform Piping Design, Procurement, Fabrication,
Transportation, Erection, Installation, Testing, Inspection, Pre
commissioning and pre-commissioning support of the following piping
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
system in the New Tank Farm Area in accordance with project drawings
listed in the document control list.
12/11/16
08/04/16
09/08/16
DATE
A M ALMATROOK
• CONTRACTOR shall be responsible for verifying all dimensions, angles,
DATE: 12/11/16
and elevations prior to fabrication and installation.
•
CERTIFIED
AMR EL SHARKAWY
CONTRACTOR shall provide all necessary vehicles for transportation of
12/11/16 personnel, utilities equipment and materials to and from the job site.
DATE:
CONSTRUCTION
AGENCY
• CONTRACTOR shall be responsible for the security and protection of all
SHAHZAD YAZDANI equipment, tools and materials at the job site until installation is complete
DATE: 12/11/16 and accepted by SAUDI ARAMCO.
OPERATIONS
ALI H GHAMDI
• Materials that are removed from the job site shall be hauled back to the
12/11/16
materials storage yard. Any of the materials left at the end of the job shall
DATE:
be transported to designated yard or stored as directed by SAUDI
CONTROL NUMBER
VERIFICATION
ARAMCO.
EDSD
• CONTRACTOR shall provide all labor and support equipment including, but
not limited to, scaffolding to perform piping work.
DATE:
BY:
• CONTRACTOR shall field verify all the dimensions and elevations shown
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SAEP-351.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• CONTRACTOR shall follow all safety precautions required by SAUDI
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
109.
• Bolts and studs shall extend completely through their nuts. As a minimum,
three (3) bolt threads shall extend through the nuts.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
09/08/16
D
C
B
•
ENGINEER
ALL LEADS CONTRACTOR shall design and construct the Facility with adequate space
DATE: 12/11/16
to facilitate operation and maintenance and with minimum spacing
PROJECT
ENGINEER
requirement as per SAUDI ARAMCO standard. Layout shall allow crane
A M ALMATROOK
access for equipment from relevant sides.
DATE: 12/11/16 • Detailed design package shall be prepared with use of 3D modeling
CERTIFIED
AMR EL SHARKAWY
software (PDS).
DATE:
12/11/16
• CONTRACTOR shall design and construct all piperacks, pipe bridges, pipe
CONSTRUCTION
AGENCY
supports and concrete pipe sleepers. CONTRACTOR shall consider all
SHAHZAD YAZDANI relevant loads in his design. Structural steel shall be galvanized. Material
DATE: 12/11/16 shall be as per 12-SAMSS-007.
OPERATIONS
ALI H GHAMDI
• CONTRACTOR shall follow SAES-Q-001 for concrete design.
12/11/16
CONTRACTOR shall consider necessary clearance under roads while
DATE:
designing piperacks.
CONTROL NUMBER
VERIFICATION
EDSD
•
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Expansion.
OF THIS DRAWING IS COVERED, FOR ALL
• CONTRACTOR shall ensure that all piping materials shall conform to the
SAUDI ARAMCO piping specification SAES-L-105 together with project
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
piping material specification and other related applicable SAUDI ARAMCO
SAY
SAY
SAY
ASH
ASH
•
ASH
LEADS
LEADS
ALL
ALL
ALL
WELDING WORK
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
shall counter bore the larger wall thickness prior to welding in accordance
10-02399-
10-02399-
0001
0001
0001
09/08/16
Before welding pipe joints, CONTRACTOR shall inspect each joint or spool
DATE
to ensure that it is free of sand, debris or other foreign materials. Each pipe
string or section shall be internally cleaned before welding, coupling or
NO.
REV
D
C
B
DATE: 12/11/16
PROJECT
RADIOGRAPHY AND NDT
ENGINEER
A M ALMATROOK • CONTRACTOR shall perform radiography of all piping joints as per clauses
DATE: 12/11/16 17.2 and 17.5 of SAES-W-011.
CERTIFIED
AMR EL SHARKAWY
• Magnetic Particle Testing and Liquid Penetrant Testing requirements for
12/11/16
DATE: pressure containing welds other than butt welds (including sockolets,
CONSTRUCTION
AGENCY
weldolets and welded bosses) shall be per clause 17.5.3 of SAES-W-011.
•
SHAHZAD YAZDANI
Upon approval of waiver, spool pieces which cannot be hydro tested are to
DATE: 12/11/16
OPERATIONS
be 100% radio graphed.
ALI H GHAMDI • Radiography of welds shall be in accordance with SAEP-1143.
12/11/16
DATE:
• CONTRACTOR shall provide adequate testing facilities at site including all
CONTROL NUMBER
VERIFICATION
complete the Piping work, including radiography and other NDT methods
and testing. CONTRACTOR shall develop and propose the required
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
•
0001
0001
0001
09/08/16
D
C
B
DATE: 12/11/16
CERTIFIED • CONTRACTOR shall submit Loss Prevention Program and Hazard
AMR EL SHARKAWY
Identification Plan for SAUDI ARAMCO approval no later than thirty (30)
12/11/16
DATE: days after the effective date of the contract.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
DATE: 12/11/16
• Prior to start of construction activities, CONTRACTOR shall identify the
OPERATIONS existing pipeway/pipe culverts to be extend in SAMREF/YASREF & submit
ALI H GHAMDI safe execution plan to SAUDI ARAMCO representative to work nearer to
12/11/16 active product/utility lines
DATE:
•
CONTROL NUMBER
and manual.
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
designated by the SAUDI ARAMCO Representative.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
•
ASH
LEADS
LEADS
ALL
ALL
ALL
A. GENERAL
CONTRACTOR shall design and install the YNJ-1 & YNJ-2 support infrastructure
including, but not limited to the following facilities:
10-02399-
•
10-02399-
0001
0001
The battery limit will be the tie-in flange provided by YDH in the scraper launcher
12/11/16
08/04/16
09/08/16
DATE
lateral line for YNJ-1 / YNJ-2. Utility Water supply from YDH shall also be provided
for YNJ-1 & YNJ-2 pipeline scrapers and accordingly drain from YNJ-1 & YNJ-2
NO.
REV
pipeline scrapers shall also be received into oily water lift station.
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS The following are the interfaces with BI-10-02155 and CONTRACTOR shall re-
DATE: 12/11/16
confirm the tie-in conditions with BI-10-02155 during detail design.
PROJECT
ENGINEER
A M ALMATROOK
a) Pipelines (YNJ-1 & YNJ-2):
DATE: 12/11/16 2 Nos. pipelines, one of 20” ND (YNJ-1) and the other of 24” ND (YNJ-2) of
CERTIFIED
AMR EL SHARKAWY
following specs:
12/11/16
DATE:
CONSTRUCTION
Pipeline Material = API 5L Gr.X65
AGENCY
SHAHZAD YAZDANI Flange Rating = 900#
DATE: 12/11/16
MAOP = 15513.2 kPag (2250 PSIG)
OPERATIONS
ALI H GHAMDI Design Temperature = 60 °C
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION
b) Utilities:
EDSD
- Utility water supply from YDH to YNJ-1/2 pipeline scraper launchers via two
DATE:
BY:
4” connections.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
The scope for the YNJ-1 & YNJ-2 support infrastructure is outlined in PFDs VA-
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
247924.001 and VA-247921.002.
SAY
SAY
SAY
B. PIPING
ENGG CERT
ASH
ASH
ASH
• The scope of work includes design and construction of two pipelines ,YNJ-1
LEADS
LEADS
LEADS
ALL
ALL
ALL
& 2 inside battery limit of YDH, but not limited to, the following activities:
• YNJ-1 20” Gasoline Pipeline & YNJ-2 24” DO/DPK Pipeline:
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
• The design and installation of YNJ-1 20” Gasoline Pipeline & YNJ-2 24”
DO/DPK Pipeline from Gasoline & DO/DPK Shipper pump to Scraper
Launcher Facility constructed under BI-10-02155. Design and Installation of
the Scraper launcher shall be the part of BI-10-02155 YDH Scope will start
DESCRIPTION
10-02399-
10-02399-
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER • CONTRACTOR scope of work includes design and construction of two
ALL LEADS
pipelines ,YNJ-1 & 2 inside battery limit of YDH ,but not limited to the
DATE: 12/11/16 following activities:
PROJECT
ENGINEER
A M ALMATROOK
DATE: 12/11/16
• YNJ-1 20” Gasoline Pipeline & YNJ-2 24” DO/DPK Pipeline:
CERTIFIED
AMR EL SHARKAWY
12/11/16 • CONTRACTOR shall design and install YNJ-1 20” Gasoline Pipeline &
DATE:
CONSTRUCTION
YNJ-2 24” DO/DPK Pipeline from Gasoline & DO/DPK Shipper pump to
AGENCY Scraper Launcher Facility constructed under BI-10-02155. Design and
SHAHZAD YAZDANI
Installation of Scraper launcher shall be the part of BI-10-02155; YDH
DATE: 12/11/16
OPERATIONS
Scope will start at a flange upstream of Scraper launcher.
ALI H GHAMDI
DATE:
12/11/16 • Interface requirements shall be accordingly coordinated with pipeline
project BI-10-02155. Following are the interface connections.
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Transportation, Erection, Installation, Testing, Inspection, and
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
A. GENERAL
0001
0001
12/11/16
08/04/16
09/08/16
CONTRACTOR shall design and install the booster and shipper pumps for YNJ-1
DATE
and YNJ-2 pipelines including, but not limited to the following facilities:
NO.
REV
•
D
C
B
DATE: 12/11/16 CONTRACTOR shall design and install three (3) booster pumps for YNJ-1 and
CERTIFIED
AMR EL SHARKAWY
YNJ-2.Pumps shall be electric motor and fixed speed with spillback to tank being
12/11/16 emptied. The motors shall be sized to accommodate the pump loads for the full
DATE:
CONSTRUCTION
spectrum of the pump curve. The pumps shall be fitted with all necessary
AGENCY instrumentation to protect the pump (including seal leak detection) and prevent
SHAHZAD YAZDANI
overpressure.
DATE: 12/11/16
OPERATIONS
CONTRACTOR shall design and install three (3) shipper pumps for YNJ-1 and
ALI H GHAMDI
YNJ-2. Pumps shall be electric motor driven and fixed speed. The motors shall be
12/11/16
DATE: sized to accommodate the pump loads for the full spectrum of the pump curve. The
CONTROL NUMBER
VERIFICATION
pumps shall be fitted with all necessary instrumentation to protect the pump
(including seal leak detection) and to prevent overpressure.
EDSD
DATE:
The following design parameters are established for the pipeline booster pumps.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
LEADS
ALL
The following design parameters are established for the pipeline shipper pumps.
Rated flow Diff. Pressure Design Temp
Service Product No. of pumps
DESCRIPTION
The scope for the YNJ-1 & YNJ-2 pumps is outlined in PFDs VA-247844.001 &
VA-247845.001 and P&IDs VA-247917.001 to VA-247920.002.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS
Gasoline booster pumps shall be in accordance with 31-SAMSS-004 and shall be
of Vertical Can type centrifugal pumps (API VS6 or VS7) due to low NPSH
DATE: 12/11/16
PROJECT availability. These pumps are provided to meet the high NPSHR of shipper pumps.
ENGINEER
Pumps will be limited to maximum of 1800 RPM. Pump materials, mechanical
A M ALMATROOK
seals shall be in accordance with SAES-G-005. Reference shall be made to
DATE: 12/11/16
CERTIFIED
datasheet no. RE-E00103 included in Index-G.
AMR EL SHARKAWY
DATE:
12/11/16 DIESEL/DPK BOOSTER PUMPS (X40-G-0018 A/B/C)
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Diesel/DPK booster pumps shall be in accordance with 31-SAMSS-004 and shall
DATE: 12/11/16
be of between bearings, horizontal split casing type Centrifugal pumps (API BB1).
OPERATIONS These pumps are provided to meet the high NPSHR of shipper pumps. Pump
ALI H GHAMDI materials, mechanical seals shall be in accordance with SAES-G-005. Reference
12/11/16 shall be made to datasheet no. RE-E00101 included in Index-G.
DATE:
CONTROL NUMBER
VERIFICATION
MISCELLANEOUS REQUIREMENTS
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Material take-offs have been prepared for reference only and will not be
considered as contractual documents and cannot be used as a basis for
any change order.
10-02399-
JO/EWO
10-02399-
10-02399-
Technical quotations obtained from vendors will list all exceptions and
0001
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
CONTRACTOR shall be responsible for Technical Bid Evaluation,
ENGINEER
ALL LEADS
placing the Purchase Order to technically approved Vendors.
DATE: 12/11/16
PROJECT
ENGINEER
CONTRACTOR shall be responsible for review and approval of NMRs
A M ALMATROOK 601, 602 and 603.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
Inspection and Testing of CONTRACTOR supplied materials will be
DATE:
12/11/16 performed as per applicable SAUDI ARAMCO Inspection Requirement
CONSTRUCTION form A-175. CONTRACTOR will arrange with his sub suppliers to
AGENCY
SHAHZAD YAZDANI comply with these requirements by stating on all sub suppliers’
DATE: 12/11/16 purchase order SAUDI ARAMCO’s intention to inspect material.
OPERATIONS
ALI H GHAMDI
Equipment installation and Commissioning & Pre-commissioning shall
12/11/16
DATE:
be in accordance with approved Vendor’s installation and
CONTROL NUMBER
VERIFICATION
commissioning procedures.
EDSD
and first fill of all the lubricants and chemicals is in the scope of
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR will provide all Non Material Requirement (NMR-
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Shipper pumps shall be provided with forced type lubrication system i-e lube oil
skids will be provided in accordance with applicable SAUDI ARAMCO Standards.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
Each shipper pump will also have a Vibration Monitoring System in accordance
with applicable SAUDI ARAMCO Standards.
12/11/16
08/04/16
09/08/16
DATE
Gasoline Shipper Pumps have gone through Novation Procurement by the design
contractor. These pumps shall be novated to the LSTK Contractor upon award of
NO.
REV
D
C
B
the contract and all relevant details of the purchase order and Novation terms will
DISCIPLINE
ENGINEER be handed over to the successful LSTK contractor. The purchase requisition is
ALL LEADS attached for reference in Appendix 11.
DATE: 12/11/16
PROJECT
ENGINEER DIESEL/DPK SHIPPER PUMPS (X40-G-0019 A/B/C)
A M ALMATROOK
DATE: 12/11/16 Diesel/DPK Shipper pumps shall be in accordance with 31-SAMSS-004 and shall
CERTIFIED
AMR EL SHARKAWY
be of between bearing, vertical split casing design centrifugal pumps (API BB5).
12/11/16
Pump materials, mechanical seals shall also be in accordance with SAES-G-005.
DATE:
Reference shall be made to datasheet no. RE-E00102 included in Index-G.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Shipper pumps will be provided with forced type lubrication system i-e lube oil
DATE: 12/11/16 skids will be provided in accordance with applicable SAUDI ARAMCO Standards.
OPERATIONS
Each shipper pump will also have Vibration Monitoring System in accordance with
ALI H GHAMDI
applicable SAUDI ARAMCO Standards
12/11/16
DATE:
CONTROL NUMBER
Diesel Shipper Pumps have gone through Novation Procurement by the design
VERIFICATION
contractor. These pumps shall be novated to the LSTK Contractor upon award of
EDSD
the contract and all relevant details of the purchase order and Novation terms will
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
MISCELLANEOUS REQUIREMENTS
(DCC) NO. _____________________
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
in Index-A for further details of these pumps.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
of the project.
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
commissioning procedures.
NO.
REV
D
C
B
DISCIPLINE
Supply of Commissioning & Pre-commissioning and Start-up spares
ENGINEER
ALL LEADS
and first fill of all the lubricants and chemicals is in the scope of
DATE: 12/11/16
CONTRACTOR. CONTRACTOR shall obtain approval of Aramco
PROJECT
ENGINEER
Operations before filling of lubricants and chemicals.
A M ALMATROOK
DATE: 12/11/16 CONTRACTOR will provide all Non Material Requirement (NMR-
CERTIFIED
AMR EL SHARKAWY
602/603), Operation and Instruction Manuals of CONTRACTOR
DATE:
12/11/16 supplied material in electronic format (Latest Acrobat Reader).
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR will provide critical spare parts for CONTRACTOR
DATE: 12/11/16 supplied items in accordance with SAEP-3101. Contractor will develop
OPERATIONS
list of critical plant equipment spares and identification.
ALI H GHAMDI
12/11/16
DATE:
CONTROL NUMBER
C. INSTRUMENTATION
VERIFICATION
EDSD
CONTRACTOR shall perform the following activities at the pump shipper and
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
•
(DCC) NO. _____________________
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
09/08/16
D
C
B
DISCIPLINE
ENGINEER • Reference drawings:
ALL LEADS
DATE: 12/11/16
PROJECT
ENGINEER Drawing # Description
A M ALMATROOK
IN-A00001 System Block Diagrams
DATE: 12/11/16
CERTIFIED IN-A00002 Instrument Block Diagrams
AMR EL SHARKAWY
IN-A00027 Instrument Points & Lines
12/11/16
DATE:
IN-D00201 Instrument Installation Schedule-Flow
CONSTRUCTION
AGENCY
IN-D00202 Instrument Installation Schedule-Pressure
SHAHZAD YAZDANI
DATE: 12/11/16
IN-D00203 Instrument Installation Schedule-Level
OPERATIONS IN-D00204 Instrument Installation Schedule-Temperature
ALI H GHAMDI
IN-D00205 Instrument Installation Schedule-Misc
12/11/16
DATE: IN-D00206 Instrument Installation Schedule-MOV/GOV/HOV/AOV
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. ELECTRICAL
SAY
SAY
SAY
• CONTRACTOR shall utilize the one line diagrams attached to this package
ENGG CERT
ASH
ASH
ASH
to develop the detail design package for utilization within purchase orders
and for construction and commissioning & Pre-commissioning.
LEADS
LEADS
LEADS
ALL
ALL
ALL
• CONTRACTOR shall use induction motors for all shipper pumps. Design of
induction motors shall be such that to achieve power factor equal or greater
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
than 0.95.
ISSUED FOR 90% PROJECT PROPOSAL
• Shipper pump motors power supply shall be from 13.8kV switchgear (Refer
to drawing # EL-A10008). Auxiliary loads for these main pumps shall be
from 480V control gears (refer to drawing # EL-A10014 to EL-A10017).
DESCRIPTION
• Booster pump motors power supply shall be from 4.16kV switchgear (Refer
to drawing # EL-A10011). Auxiliary loads for these main pumps shall be
from 480V control gears (refer to drawing # EL-A00014 to EL-A00017).
• CONTRACTOR shall design, supply, install, test, pre-commission and
provide assistance in commissioning and integrated testing to insure fully
operational systems. All Electrical Control Panels and Stop-Start Stations
shall have Push-to-Test Multi-Cluster LED’s for indication.
10-02399-
•
JO/EWO
10-02399-
10-02399-
CONTRACTOR shall design, supply and install and test Local Control Push
0001
0001
0001
09/08/16
DATE
D
C
B
Control panels for all motors 75 kW (100 HP) and larger, and all other
DISCIPLINE
ENGINEER motors where the engineering documents indicate motor space heaters are
ALL LEADS
installed, a contact shall be wired to a terminal block in the low voltage
DATE: 12/11/16 compartment of the Switchgear Feeder or Control gear bucket, as
PROJECT
ENGINEER applicable, for connection to a 24VAC control circuit (panel shall be
A M ALMATROOK designed and provided by THE CONTRACTOR) of a remotely mounted
DATE: 12/11/16 motor space heater contactor. Contact shall be closed when the main motor
CERTIFIED
AMR EL SHARKAWY
circuit contactor is de-energized. This is in accordance with SAES-P-116
12/11/16 and shall be provided, installed, tested, pre commissioned, and with
DATE:
CONSTRUCTION
commissioning assistance, by THE CONTRACTOR.
AGENCY
SHAHZAD YAZDANI • CONTRACTOR shall be responsible for design, supply, installation and
DATE: 12/11/16 testing of the interconnection wiring between Vendor supplied Electrical
OPERATIONS Equipment and Skids and the parent equipment, field instruments, etc. and
ALI H GHAMDI CONTRACTOR shall develop Wiring Interconnection Drawings, based on
DATE:
12/11/16 Actual Vendor Certified NMR 602 Drawings and NMR 603 Manuals, to
SAUDI ARAMCO standards and submit to SAUDI ARAMCO for acceptance
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
design.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
A. GENERAL
CONTRACTOR shall ensure the pump operation of the YNJ-1 and YNJ-2 pipelines
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
Three (3) Booster and Three (3) shipper pumps shall be designed for YNJ-1 and
YNJ-2. (Fourth pump shall be installed in phase-2) Pumps shall be electric motor
DESCRIPTION
The scope for the YNJ-1 & YNJ-2 pumps’ operation is outlined in PFDs VA-
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
09/08/16
DATE
A. GENERAL
NO.
REV
D
C
B
DISCIPLINE CONTRACTOR shall provide provision in the receiving manifolds for the future
ENGINEER
ALL LEADS
connections of PG 91/95, DO & DPK from Yanbu grass root refinery. A valve with a
DATE: 12/11/16
same size as of manifold (30”) shall be kept as provision in each of the product
PROJECT manifold.
ENGINEER
A M ALMATROOK
The scope for the pipeline connections from Yanbu Grass root refinery is outlined
DATE: 12/11/16
CERTIFIED in PFD VA-247835.001 and P&IDs VA-247894.001 to VA-247897.001.
AMR EL SHARKAWY
DATE:
12/11/16 B. PIPING
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
All pumps are located centrally with respective storage tanks, so that the pressure
DATE: 12/11/16
reduction due to pipe length from tank outlet to pump inlet is minimized to meet
OPERATIONS process requirement.
ALI H GHAMDI
DATE:
12/11/16 Pumps are grouped to permit economical pipe routing with free space for future
pumps & possible extension of main pipe header for future expansion.
CONTROL NUMBER
VERIFICATION
EDSD
Space for laydown areas has been considered for all pump bays which will be
required for pump maintenance purpose.
DATE:
BY:
The layout of pump suction-discharge lines, associated header lines & the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
provision for future connection in PG95/PG91, DO, DPK shall be provided as per
OF THIS DRAWING IS COVERED, FOR ALL
branch connections with isolation valves with blinds as per piping plan (Ref. DCL
(DCC) NO. _____________________
No GEN-D0001 )
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
CONTRACTOR shall provide branch connection with isolation valves with blind per
piping plan (Ref. Piping Plan listed in DCL No GEN-D0001) for future connection in
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Based on surge study, it is proposed to add new Surge tank & associated facilities
inside SAMREF refinery, this has been shown as preliminary information in overall
plot plan. Exact location and feasibility study to be conducted after confirmation
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
during detail design phase. No piping plan and MTO considered in 90% submittal.
A. GENERAL
YDH is designed to receive gasoline, diesel, and kerosene products from the
SAMREF refinery via three pipelines extending from the SAMREF tank farm to
YDH product manifolds. SAMREF existing export Pumps shall be utilized to supply
products (PG95/91, DO and DPK) to YDH.
The three pipelines will extend from the SAMREF manifold to YDH manifold of the
10-02399-
JO/EWO
10-02399-
10-02399-
0001
relevant product type. SAMREF export pumps shall supply the pressure to move
0001
0001
09/08/16
DATE
CONTRACTOR shall design and install the three product pipelines from SAMREF
and their connections into YDH receiving manifolds including, but not limited to the
NO.
REV
D
C
B
following facilities:
DISCIPLINE
ENGINEER
ALL LEADS • Tie-ins in existing piping at SAMREF
DATE: 12/11/16 • Three product pipelines each for PG95/91, DO and DPK from SAMREF to
PROJECT
ENGINEER YDH.
A M ALMATROOK • Three metering skids with two provers (1 for PG/DO and 1 for DPK) at
DATE: 12/11/16 SAMREF
AMR EL SHARKAWY
CERTIFIED
• Connections in YDH receiving manifolds for three product pipelines from
12/11/16
SAMREF.
DATE:
• Surge relief system at SAMREF including SRVs, surge tank & pump.
CONSTRUCTION
AGENCY • Fire water system connection
SHAHZAD YAZDANI
• Connection to oily water system.
DATE: 12/11/16
OPERATIONS
YDH shall receive PG 91/95, DO, and DPK from the SAMREF refinery via three
ALI H GHAMDI
pipelines extending from the SAMREF tank farm to YDH receiving manifolds. The
12/11/16
DATE: SAMREF supply connection to YDH shall be taken from downstream of existing
CONTROL NUMBER
VERIFICATION
export pumps at SAMREF. The required new metering skids shall be installed at
SAMREF. The tie-ins will be taken from the SAMREF export lines going to their
EDSD
terminal near to the fence at King Fahad Road (RC Corridor). All new equipment
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
CONTRACTOR shall design and install three product pipelines each of 30” size for
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SAMREF export pumps. Accordingly, tie-ins will be taken from 24” existing pipes to
SAMREF terminal. CONTRACTOR shall design and install three custody metering
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
skids each dedicated for PG95/PG91, DO and DPK at SAMREF. Each metering
SAY
SAY
SAY
skid shall consists of 3 meter runs (2 operating and 1 standby), two prover
assembly (1 for PG/DO and 1 for DPK) and a densitometer. These metering skids
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall install surge relief system for the new pipeline at SAMREF.
The surge relief system shall consist of surge relief valves discharging to a
common tank from all pipelines. The product collected in the tank to be emptied to
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
the pipeline with the pump provided along with surge relief tank. Details of surge
relief system at SAMREF are mentioned in section 4.7.
Connections of oily water drain from metering skids and surge relief tank & pump
DESCRIPTION
shall be finalized during detailed design. CONTRACTOR shall verify the tie-ins to
the drain / oily water system and shall connect the drains accordingly.
The scope for the SAMREF pipelines and their connections into YDH receiving
manifolds is outlined in PFD VA-247834.001 and P&IDs VA-247878.001 to VA-
247885.001.
B. PIPING
10-02399-
JO/EWO
10-02399-
10-02399-
0001
YDH shall receive PG 91/95, DO, and DPK from the SAMREF refinery via three
0001
0001
pipelines extending from the SAMREF tank farm to YDH product receiving
12/11/16
manifolds.
08/04/16
09/08/16
DATE
D
C
B
installed at SAMREF.
DISCIPLINE
ENGINEER
ALL LEADS • The main interface connection between this BI-10-02399 and others is at the
DATE: 12/11/16 existing headers itself, i.e., from the SAMREF export lines going to their
PROJECT
ENGINEER terminal near to the fence at King Fahad Road (RC Corridor. Inside plant,
A M ALMATROOK piping team will bring the connection to battery limit where inside plant piping
DATE: 12/11/16 and these 3 YR - YDH pipelines interfaces.
CERTIFIED
•
AMR EL SHARKAWY
The tie-in details and routing of three pipelines are shown in piping plans, Tie-
12/11/16
DATE: in Index as per DCL No GEN-D0001. The drawings mentioned here are only
CONSTRUCTION
AGENCY for reference; however these drawing to be verify during detail design.
SHAHZAD YAZDANI
DATE: 12/11/16 • New metering skid to be installed inside SAMREF refinery. (Ref. Plot plan
OPERATIONS
Drawing PIA00430-001). The final location will be finalized during detail
ALI H GHAMDI
design.
12/11/16
DATE:
•
CONTROL NUMBER
Based on surge study, new Surge tank & associated facilities inside SAMREF
VERIFICATION
refinery were added, exact location and feasibility study to be conducted after
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
C. PIPELINE
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
C.01 PURPOSE
The following design basis has been established for YDH to be constructed by this
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
project.
SAY
SAY
SAY
ASH
ASH
ASH
Three product pipelines shall be constructed from SAMREF refinery to YDH receipt
LEADS
LEADS
LEADS
ALL
ALL
ALL
manifolds. These pipelines shall handle diesel, DPK/kerosene and gasoline. The
gasoline pipeline shall transfer both PG91 and PG95 products in a batching
operation.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
The main interface connection between this BI-10-02399 and SAMREF is at the
DESCRIPTION
existing lines (SAMREF to Marine Terminal). Inside plant piping team will bring the
connection to battery limit where inside plant piping and these 3 SAMREF - YDH
pipelines interfaces
The pipeline to be constructed for this project shall be routed through existing RC
pipeline corridors. Pipeline route from SAMREF is through pipeline corridor at BB
Avenue, going to the 4th street corridor and to the pipeline corridor in between
10-02399-
JO/EWO
10-02399-
10-02399-
0001
King Abdul-Aziz road and Haul road of the refineries. Each product pipeline is
0001
0001
approximately 11.0 km long from SAMREF to YDH. Each pipeline shall be design
12/11/16
09/08/16
DATE
CONTRACTOR shall verify the Pipeline route according to the Overall Pipeline
route DWG PP-A00005.001 and Piping Plans. The CONTRACTOR will maintain
NO.
REV
D
C
B
1m (OD to OD) spacing between the new pipelines. The CONTRACTOR shall
DISCIPLINE
ENGINEER
ensure that the pipelines are within YRC corridor boundaries during the detail
ALL LEADS design. The below listed roads shall be thrust boring and the spacing requirements
DATE: 12/11/16 will be coordinated, discussed with the thrust boring specialist reviewed, concurred
PROJECT
ENGINEER and approved by SARAMCO and YRC during the detail design.The
A M ALMATROOK CONTRACTOR will consider the water table and borehole analysis for the road
DATE: 12/11/16 crossings during the detail design.
CERTIFIED
AMR EL SHARKAWY
C.05 PIPELINE PARAMETERS
12/11/16
DATE:
CONSTRUCTION
AGENCY Design Pressure (P) = MAOP of 1792.6 kPag (260 PSIG)
SHAHZAD YAZDANI
Design Temperature = 75°C
DATE: 12/11/16
OPERATIONS Corrosion Allowance = 1.6mm
ALI H GHAMDI
*Other Flow conditions are shown in the Line Designation Table see PID00442
REVISIONCERTIFICATION
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The three (3) 30” pipelines will cross eleven (11) roads as follow:
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
A00131.001
3 #3-Causeway Road and piping Thrust Boring 45 PP-
Corridor A00131.002
DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
A00139.001
ENGINEER
ALL LEADS
Thrust boring procedure shall be done by the approved SAUDI ARAMCO Thrust boring
DATE: 12/11/16
PROJECT contractor and pipe shall be coated as per SAES-H-002 Para. 5.1.2. and 5.4.4.
ENGINEER
A M ALMATROOK
CONTRACTOR shall conduct site survey to finalize the pipeline routing proposed
DATE: 12/11/16
CERTIFIED
during detailed design.
AMR EL SHARKAWY
DATE:
12/11/16 CONTRACTOR shall provide all adequate civil /structural arrangements for road
CONSTRUCTION crossings as proposed in pipeline drawings this shall include but not limited to soil
AGENCY
SHAHZAD YAZDANI
excavation, backfilling, concrete lining, dewatering if required and detour for open cut
road crossings.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
CONTRACTOR shall conduct detailed geotechnical investigation at road crossing
12/11/16 location to assess soil condition to determine methodology to be used for thrust boring
DATE:
option.
CONTROL NUMBER
VERIFICATION
EDSD
CONTRACTOR shall verify and provide insulation gasket and set of flanges installation
for above & underground transitions at road crossings and interface points (between
DATE:
Piping and Pipeline) inside the refineries in accordance with SAUDI ARAMCO Standard
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR shall review the proposed road crossing techniques and prepare a
(DCC) NO. _____________________
complete construction packages and seek approval from SAUDI ARAMCO, YRC and
relevant local authorities at early stage of project design.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
CONTRACTOR may consider thrust boring utilizing Micro-Tunneling Method (MTM) for
pipeline road crossings, wherever it entails time and safety advantages to the project..
ENGG CERT
ASH
ASH
ASH
SAMREF pipeline drawings submitted to YRC for road crossings are attached under
LEADS
LEADS
LEADS
ALL
ALL
ALL
Appendix 2.
D. INSTRUMENTATION
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Provide and install Three (3) custody metering skids for PG91/95, DO and DPK
DESCRIPTION
with a prover PG91/95 and DO, and a separate prover for DPK, the skid shall be
as per SAES-Y-103. The metering skids field instrumentation shall be integrated to
metering and control cabinets such as flow computer cabinet, PLC cabinet and
MSC cabinet. A vendor supplied metering shelter shall be provided to house these
cabinets.
The CONTRACTOR shall supply the Gas detection sensors field mounted beacon
and horns in the metering shelter.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
09/08/16
/SAMREF Standards.
DATE
The CONTRACTOR shall provide a new DCS Controller with input-output modules
NO.
REV
D
C
B
DATE: 12/11/16 The CONTRACTOR shall provide redundant fiber optic cables between metering
CERTIFIED shelter and nearest OMS control building in the tank farm area of SAMREF. The
AMR EL SHARKAWY
12/11/16
new DCS shall be tied to the existing plant control network at OMS control room.
DATE: The HMI station at OMS control room will be updated with the new instrumentation
CONSTRUCTION
AGENCY added by BI-10-02399.
SHAHZAD YAZDANI
DATE: 12/11/16 The new ESD valves added by BI-10-02399 at the battery limit of SAMREF facility
OPERATIONS
shall be integrated to existing ESD system. The contractor shall provide new
ALI H GHAMDI
junction boxes and cables. The ESD marshalling cabinet OMMRS01 shall be used
12/11/16
DATE: to terminate ESD cables at OMS Rack-room.
CONTROL NUMBER
VERIFICATION
The CONTRACTOR shall provide junction boxes and field homerun cables as
EDSD
The YDH control system shall be interfaced to SAMREF control system to have
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
READ ONLY access to the data points such as the CMS, EIV status and Pump
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
status and tank status. The data is to be exchanged via plant DMZ through PI
(DCC) NO. _____________________
system at both the facilities. New fiber optic cable is to be laid from SAMREF to
YDH for the data exchange.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide and install ZV-1112/1212/1312 and install cable IC-
0133 from ESD junction box to existing ESD marshalling cabinet OMRS01.
Contractor shall utilize existing cable tray to run home cable from junction to OMS
control room.
THE CONTRACTOR shall provide and install field instruments such as surge relief
System as indicated in P &IDs VA-247878-001 and VA-247879-001and VA-
247880-001 and as per block diagram IN-A00001.012
10-02399-
JO/EWO
10-02399-
10-02399-
THE CONTRACTOR shall Provide and install field junction box X40-AJB-001 &
0001
0001
0001
09/08/16
DATE
THE CONTRACTOR shall provide and install cables between IRP panels located
NO.
REV
D
C
B
A M ALMATROOK
J8DF5007-001 OMS CONTROL ROOM LAYOUT
DATE: 12/11/16 232J081-001 BLOCK DIAGRAM, OM & S CONTROL HOUSE
CERTIFIED
AMR EL SHARKAWY
IN-A00001.009 SAMREF CUSTODY METERING SKIDS
12/11/16 IN-A00001.007 SAMREF INTERFACE
DATE:
CONSTRUCTION IN-A00001.012 SAMREF INTERFACE
AGENCY
SHAHZAD YAZDANI IN-E00031 DCS INPUT-OUTPUT LIST
DATE: 12/11/16 IN-E00032 ESD INPUT-OUTPUT LIST
OPERATIONS
IN-D00030.001 CABLE AND CONDUIT SCHEDULE
ALI H GHAMDI
E. ELECTRICAL
DATE:
BY:
REVISIONCERTIFICATION
SAMREF shall supply all electrical power and connections required for MOVs and
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR scope shall include but not be limited to Design Two (2nos.) 480V,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
100A, 3Ph, 3W, 60Hz Outdoor Power Panel (NEMA 4X) with all cables, conduits,
SAY
SAY
SAY
supports structures and other required accessories to feed power to MOVs and
other miscellaneous loads (refer to drawing # EL-A10052 located in Appendix
ENGG CERT
ASH
ASH
ASH
13.2.4).
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR scope shall include but not be limited to Design for one (1), 10KVA
UPS including cables, conduit and other required accessories in Substation # 12 at
SAMREF.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
F. CIVIL
A 6.0m wide asphalt access road shall be provided. Road structure shall be as per
section 4.20 (In-Plant roads).
Oily water drainage system shall be provided and tie-in the new oily water line to
the nearest available OWS system.
E. Telecom
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
09/08/16
DATE
A. GENERAL
NO.
REV
D
C
B
DISCIPLINE YDH is designed to receive gasoline and diesel products from the YASREF
ENGINEER
ALL LEADS refinery via two pipelines. The pipeline connection will be downstream of the
DATE: 12/11/16
YASREF pumps to utilize the pump as the pressure source to move the product
PROJECT into a full tank at YDH. YDH pipeline connection shall not interfere with the transfer
ENGINEER
A M ALMATROOK
operation of product flowing from YASREF to Yanbu as per the project BI-10-
00043, Yanbu Refinery Clean Fuels – YASREF Interface.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY CONTRACTOR shall design and install the two product pipelines from YASREF
DATE:
12/11/16 and their connections into YDH receiving manifolds including, but not limited to the
CONSTRUCTION
AGENCY
following facilities:
SHAHZAD YAZDANI
Two pipelines (one for DO and one for PG 95/91) along with metering skids at
YASREF shall be provided under BI-10-00043. This project will tie-in to the
DATE:
BY:
downstream of the metering skid and isolation valve (outside YASREF battery limit,
REVISIONCERTIFICATION
inside the Yanbu refinery ) to utilize the existing export pumps and new metering
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
skids provided by BI-10-00043, for the supply to YDH. The tie-in locations to the
C
pipeline will be inside the Yanbu refinery and BI-10-00043 will provide a manual
(DCC) NO. _____________________
valve on both pipelines for tie-ins to YDH. CONTRACTOR shall co-ordinate with
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
BI-10-00043 for the tie-in location before detail design.
SAY
SAY
SAY
CONTRACTOR shall design and install two product pipelines each of 30” size for
ENGG CERT
ASH
ASH
ASH
PG95/PG91 and DO. Tie-ins will be taken accordingly in the 30” pipeline to YR
under BI-10-00043 scope. Two custody metering skids to be installed under BI-10-
LEADS
LEADS
LEADS
ALL
ALL
ALL
The scope for the YASREF pipelines and their connections into YDH receiving
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
B. PIPING
DESCRIPTION
YDH shall receive PG 91/95 and DO products from the YASREF via two pipelines.
The pipeline supply to YDH will connect to the pipeline provided by BI-10-00043.
The location of Tie in connection of PG91/95 (Tie-in No. V25-023) & DO (Tie-in No.
V25-025) from YASREF will be taken near the entrance of YR or inside the YR.
The exact location will be decided during detail design stage & co-ordination with
BI-10-00043.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
The tie-in details and routing of two pipelines are shown in PIB00451.001 & piping
0001
0001
09/08/16
DATE
The dye injection skid & associated facilities for YASREF product pipeline for
NO.
REV
D
C
B
DATE: 12/11/16
CERTIFIED C. PIPELINE
AMR EL SHARKAWY
12/11/16
DATE: C.01 PURPOSE
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI The following design basis has been established for YDH to be constructed by this
DATE: 12/11/16 project.
OPERATIONS
ALI H GHAMDI C.02 PIPELINE DESIGN BASIS
12/11/16
DATE:
The two new 30-inch product pipelines shall tie-in to the existing YASREF refinery
CONTROL NUMBER
VERIFICATION
lines going to the YDH receipt manifolds The pipeline shall handle diesel and
EDSD
gasoline. The gasoline pipeline shall transfer both PG91 and PG 95 products in a
batching operation. A 30-inch Pipeline for the surge will be routed and constructed
DATE:
BY:
from YANBU refinery parallel with these 2 new pipelines till the interface in YDH.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
These products, diesel and gasoline, shall be transferred from YASREF to YANBU
SAY
SAY
SAY
refinery as part of BI-10-00043. The tie-in to these two pipelines will be to manual
Tie-in Globe Valves (provided by BI-10-00043) located inside the perimeter fence
ENGG CERT
ASH
ASH
ASH
of YANBU refinery, the physical interface shall be at the flange provided by plant
piping team. The reference drawings for 30-inch surge pipeline at Yanbu Refinery
LEADS
LEADS
LEADS
ALL
ALL
ALL
The pipeline to be constructed for this project shall be routed through new pipeline
corridors. Pipeline route from YANBU refinery is through a thrust boring starting
from inside YANBU refinery and going to cross SSD fence, Haul Road, King
DESCRIPTION
10-02399-
10-02399-
0001
borehole analysis for the road crossings during the detail design.
0001
0001
12/11/16
09/08/16
DATE
D
C
B
DISCIPLINE
Design Temperature = 75°C
ENGINEER
ALL LEADS Corrosion Allowance = 1.6mm
DATE: 12/11/16
PROJECT
Pipeline Diameter (D) = 30 inch
ENGINEER
12/11/16
DATE:
CONSTRUCTION *Other Flow conditions are shown in the Line Designation Table see PID0450
AGENCY
SHAHZAD YAZDANI
sheet 001 to 002.
DATE: 12/11/16
OPERATIONS C.06 PIPELINE ROAD CROSSING
ALI H GHAMDI
12/11/16 The two (2) pipelines and 30inch surge pipeline will cross Three (3) roads as
DATE:
follows:
CONTROL NUMBER
VERIFICATION
EDSD
TYPE
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Road
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3 #12-Haul Road (Yanbu Thrust Boring 69 PP-A00150.001
SAY
SAY
SAY
Refinery
ENGG CERT
ASH
ASH
ASH
CONTRACTOR shall conduct site survey to finalize the pipeline routing proposed
during detailed design.
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide all adequate civil /structural arrangements for road
crossings as proposed in pipeline drawings this shall include but not limited to soil
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
option.
CONTRACTOR shall verify and provide insulation gasket and set of flanges
installation for above and underground transitions at road crossings and interface
points (between Piping and Pipeline) inside the refineries in accordance with SAUDI
ARAMCO Standard requirements for cathodic protection.
CONTRACTOR shall review the proposed road crossing techniques and prepare a
complete construction packages and seek approval from SAUDI ARAMCO, YRC and
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
09/08/16
CONTRACTOR may consider thrust boring utilizing Micro-Tunneling Method (MTM) for
DATE
pipeline road crossings, wherever it entails time and safety advantages to the project..
NO.
REV
D
C
B
A M ALMATROOK YDH control system shall be interfaced to YASREF control system to have
DATE: 12/11/16 READ ONLY access to the data points such as the CMS, EIV status and Pump
CERTIFIED status. The data is to be exchanged via plant DMZ through PI system at both
AMR EL SHARKAWY
12/11/16
the facilities.
DATE:
CONSTRUCTION
AGENCY As alternate method, LSTK CONTRACTOR shall evaluate the implementation
SHAHZAD YAZDANI of the MODBUS TOFINO Firewall method within P&CSD concurrence once
DATE: 12/11/16 PCS vendor is selected.
OPERATIONS
ALI H GHAMDI
Contractor shall provide new fiber optic cable from YASREF to YDH for the
12/11/16
DATE: data exchange. The interface is shown in preliminary block # IN-A00001.004
CONTROL NUMBER
VERIFICATION
Contractor shall coordinate with Refinery Control System Vendor for the
EDSD
interface requirements.
DATE:
BY:
F. Telecom
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.14 Pipeline Connection from Yanbu Refinery Terminal
SAY
SAY
SAY
A. GENERAL
ENGG CERT
ASH
ASH
ASH
YDH is designed to receive PG 91, PG 95, Diesel, and Kerosene from the Yanbu
LEADS
LEADS
LEADS
ALL
ALL
ALL
Refinery Terminal. Three pipelines will connect into the Yanbu Refinery Terminal
offload pipelines at a location just upstream of the Existing Aramco refinery tank
farm to utilize the vessel offload pump as the primary pressure source and the
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
existing marine loading & transfer pumps as booster pumps to move the product
into a full tank at YDH. The new connections shall be designed not to interfere with
the current vessel offload operations
DESCRIPTION
CONTRACTOR shall design and install the three product pipelines each of 24” size
from Yanbu Refinery Terminal (YRT) through Yanbu Refinery (YR) and their
connections into YDH receiving manifolds including, but not limited to the following
facilities:
10-02399-
10-02399-
0001
•
0001
0001
09/08/16
DATE
YDH shall receive PG 91/95, DO, and DPK from the Yanbu Refinery Terminal
through three pipelines extending from Yanbu refinery tank farm to YDH. The
NO.
REV
D
C
B
interface to the terminal unloading lines will be at Yanbu refinery tank farm. The
DISCIPLINE
ENGINEER primary source for the supply of products to YDH shall be the pumps on the ship
ALL LEADS
and the existing marine loading & transfer pumps shall be used as booster pumps
DATE: 12/11/16 to move the product into a full tank at YDH.
PROJECT
ENGINEER
A M ALMATROOK CONTRACTOR shall design and install three product pipelines each of 24” size for
DATE: 12/11/16 PG95/PG91, DPK and DO. These pipelines will be connected at the discharge of
CERTIFIED
AMR EL SHARKAWY
existing marine loading & transfer pumps. Pump suction side shall be connected to
12/11/16 new lines that are tied into existing lines coming from YRT. Accordingly, tie-ins will
DATE:
CONSTRUCTION
be taken from the existing pipes at existing pump suction & discharge side and
AGENCY existing pipes coming from YRT.
SHAHZAD YAZDANI
DATE: 12/11/16
CONTRACTOR shall install surge relief system for the new pipelines of YASREF
OPERATIONS
and YR at Yanbu refinery. The surge relief system shall consist of surge relief
ALI H GHAMDI
valves discharging to a common tank from all pipelines. The product collected in
12/11/16
DATE: the tank to be emptied to the pipeline with the pump provided along with surge
CONTROL NUMBER
relief tank. Details of surge relief system at SAMREF are mentioned in section 4.7.
VERIFICATION
<This requirement is on hold until approval of surge analysis report from P&CSD>
EDSD
DATE:
Connection of oily water drain from surge relief tank & pump shall be finalized
BY:
during detailed design. CONTRACTOR shall verify the tie-ins to the oily water
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
The scope for the YRT pipelines and their connections into YDH receiving
manifolds is outlined in PFDs VA-239708.002, VA-250323.001, VA-250324.002 &
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
VA-250325.002 and P&IDs VA-239739.001, VA-234308.015, VA-234308.020, VA-
SAY
SAY
SAY
ASH
ASH
ASH
B. PIPING
LEADS
LEADS
LEADS
ALL
ALL
ALL
YDH shall receive PG 91/95, DO, and DPK from the Yanbu Refinery Terminal
through three pipelines extending from Yanbu refinery tank farm to YDH. The
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
interface to the terminal unloading lines will be at Yanbu refinery tank farm.
The primary source for the supply of products to YDH shall be by utilizing the
existing pumps installed at Yanbu Refinery Tank farm near to available space
DESCRIPTION
• To install new feed line for Gasoline (PG91/PG95) to YDH, tie-in at the 18”
common header of Gasoline loading and Transfer pumps (V25-P-P17 A-E)
to be taken at Yanbu Refinery near Pump Station-C.
• To install new feed line for Kerosene (DPK) to YDH, Tie-in at the 20”
common header of Kerosene loading and Transfer pumps (V25-P22 A/B/C)
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
• To install new feed line for Diesel(DO) to YDH ,Tie-in at the 20”MDO
12/11/16
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE The Layout of feed lines from existing header lines to Interface connection
ENGINEER
ALL LEADS with pipeline near YR battery limit, refer to section C.03 for detailed
DATE: 12/11/16 description.
PROJECT
ENGINEER
A M ALMATROOK • OWS UG/AG connection shall be verified during detail design Phase.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
DATE:
12/11/16 C. PIPELINE
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
C.01 PURPOSE
DATE: 12/11/16
OPERATIONS The following design basis has been established for YDH to be constructed by this
ALI H GHAMDI project.
12/11/16
DATE:
C.02 PIPELINE DESIGN BASIS
CONTROL NUMBER
VERIFICATION
EDSD
Three product pipelines shall be constructed from YANBU refinery terminal to YDH
receipt manifolds. The pipeline shall handle diesel, both grades of gasoline, and
DATE:
DPK/kerosene. The gasoline pipeline shall transfer both PG91 and PG 95 products
BY:
in a batching operation.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The main interface connection between this BI-10-02399 and others is at the
SAY
SAY
SAY
existing headers itself and not elsewhere. Inside plant piping team will bring the
connection to battery limit where inside plant piping and these 3 YR - YDH
ENGG CERT
ASH
ASH
ASH
pipelines interfaces
LEADS
LEADS
LEADS
ALL
ALL
ALL
The pipeline to be constructed for this project shall be routed through new pipeline
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
corridors. Pipeline route from YANBU refinery is through Thrust Boring starting
from inside YANBU refinery and going to cross existing SSD fence, Haul Road,
King Abdulaziz Road and Shareh Al-Awel to YDH. Each product pipeline is
approximately 500 meter long from YANBU to the new Yanbu Distribution Hub.
DESCRIPTION
Each pipeline shall be design to have elevated horizontal Vertical U-Loops for
flexibility. CONTRACTOR shall verify the Pipeline route according to the Overall
Pipeline route DWG PP-A00005.001 and Piping Plans. The CONTRACTOR will
maintain 1m (OD to OD) spacing between the new pipelines. The CONTRACTOR
shall ensure that the pipelines are within YRC corridor boundaries during the detail
design. The below listed roads shall be thrust boring and the spacing requirements
will be coordinated, discussed with the thrust boring specialist reviewed, concurred
and approved by SARAMCO and YRC during the detail design.The
CONTRACTOR will consider the water table and borehole analysis for the road
10-02399-
JO/EWO
10-02399-
10-02399-
0001
12/11/16
09/08/16
DATE
D
C
B
DISCIPLINE
Design Temperature = 75°C
ENGINEER
ALL LEADS Corrosion Allowance = 1.6mm
DATE: 12/11/16
PROJECT
Pipeline Diameter (D) = 24 inch
ENGINEER
12/11/16
DATE:
CONSTRUCTION
AGENCY *Other Flow conditions are shown in the Line Designation Table see PID00402
SHAHZAD YAZDANI sheet 001 to 004.
DATE: 12/11/16
OPERATIONS C.06 PIPELINE ROAD CROSSING
ALI H GHAMDI
12/11/16 The three (3) pipelines will cross three (3) roads as follow:
DATE:
CONTROL NUMBER
VERIFICATION
No. Approx.
1 #10-King Abdul Aziz Thrust Boring 55 PP-A00138.001
DATE:
BY:
Road
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
(Yanbu Refinery
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall conduct site survey to finalize the pipeline routing proposed
SAY
SAY
SAY
ASH
ASH
ASH
CONTRACTOR shall provide all adequate civil /structural arrangements for road
crossings as proposed in pipeline drawings this shall include but not limited to soil
LEADS
LEADS
LEADS
ALL
ALL
ALL
location to assess soil condition to determine methodology to be used for thrust boring
option.
CONTRACTOR shall verify and provide insulation gasket and set of flanges
DESCRIPTION
installation for above & underground transitions at road crossings and interface points
(between Piping and Pipeline) inside the refineries in accordance with SAUDI
ARAMCO STANDARD requirements for cathodic protection.
CONTRACTOR can consider thrust boring thru the Micro-Tunneling Method (MTM) for
pipeline road crossings, wherever it entails cost, time and safety advantages to the
project with previous SAUDI ARAMCO approval.
10-02399-
10-02399-
0001
0001
0001
D. INSTRUMENTATION
12/11/16
08/04/16
09/08/16
DATE
CONTRACTOR shall provide and install field instruments, Motor Operated and
Electrohydraulic ESD valves at the battery limit of Yanbu Refinery, MOVs shall also be
NO.
REV
D
C
B
12/11/16
DATE: All non-ESD instruments will be connected to new DCS Marshalling Cabinet provided
CONSTRUCTION
AGENCY by BI-10-00043. BI-10-02399 will provide required input-output modules to integrate to
SHAHZAD YAZDANI DCS system provided under BI-10-00043.
DATE: 12/11/16
OPERATIONS SIH-1590 will be expanded under BI-10-00043 to accommodate the expansions under
ALI H GHAMDI this BI. The DCS/ESD provided under BI-10-00043 will be integrated to YR plant
12/11/16 network.
DATE:
CONTROL NUMBER
VERIFICATION
New instrumentation provided under BI-10-02399 will be controlled from YR tank farm
EDSD
control room and the HMIs at tank farm control room will be updated accordingly.
DATE:
BY:
In addition to this, BI-10-02399 shall interface Yanbu Refinery TCFR control system to
REVISIONCERTIFICATION
YDH provides View only signals related to product transfer. The data points shall be
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
the status of product pumps and EIVs such as running, stopped, tripped etc. The
C
requirements of data from Yanbu Refinery shall be further evaluated during Detail
design phase in coordination with YDH and YREF operations.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
The interface shall be through PI system installed at both the facility, DMZ shall be
used in order to make the data exchange highly secured. Contractor shall provide fiber
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide and install new junction boxes, branch cables, homerun
cables for instruments added by this BI.
DESCRIPTION
CONTRACTOR shall provide and install field instruments such as surge relief System
as indicated in P &IDs PR-A00001.Sht001 & 002 and VA-234308-015 and VA-234308-
Sht 020 and Sht027 as per block diagram IN-A00001.013
10-02399-
JO/EWO
10-02399-
10-02399-
0001
CONTRACTOR shall Provide and install field junction box X40-AJB-001 & X40-EAJB-
0001
0001
Building.
08/04/16
09/08/16
DATE
CONTRACTOR shall provide and install cables between IRP panels located in
NO.
REV
D
C
B
DATE:
BY:
G. ELECTRICAL
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Yanbu’ Refinery shall supply all electrical power and connections required for
(DCC) NO. _____________________
MOVs and other miscellaneous loads. Total electrical loads anticipated are about
78.5kVA Two (2) 480V, 150A, 3Ph, 3W, 60Hz Outdoor Power Panel (NEMA 4X)
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
shall be provided to feed power to MOVs and other miscellaneous loads. (Refer to
SAY
SAY
SAY
drawing # EL-A10111).
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
feed new MOV power panels (Refer drawing # VA-240892-001, VA-240893.002 &
VA-240894.002).
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall coordinate with YANBU refinery to utilize the existing feeders
of YANBU substation to feed the power to newly added 150A, 480V, Switchrack at
Tank Farm area.
DESCRIPTION
CONTRACTOR shall supply and install One (1) No. 150A, 480V Switchrack near
tank farm area to feed the power to newly added Surge relief pump (X40-
X004A/B).
H. Telecom
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
4.15 ELECTRICAL
NO.
REV
D
C
B
A. GENERAL
DISCIPLINE
ENGINEER
ALL LEADS Electrical General Requirements
DATE: 12/11/16
PROJECT
ENGINEER
CONTRACTOR shall implement and comply with all the requirements as stated but
A M ALMATROOK
not limited to following:
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
CONTRACTOR scope shall include but not be limited to Detail Design,
12/11/16
DATE: procurement, supply, deliver / store, install, test, pre-commission, commissioning
CONSTRUCTION
AGENCY assistance and Final Integrated Testing, with New and Existing Systems, for all the
SHAHZAD YAZDANI
equipment provided by CONTRACTOR and all the equipment provided by SAUDI
DATE: 12/11/16
OPERATIONS ARAMCO under this BI / Project, as required for a Fully Functional and Operational
ALI H GHAMDI Facility.
12/11/16
DATE:
CONTRACTOR shall include MARAFIQ on the Engineering Review Cycle for any
CONTROL NUMBER
VERIFICATION
DATE:
CONTRACTOR shall comply with Yanbu Royal Commission (YRC) Standards and
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR shall comply with SAMREF and YASREF refineries Standards and
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
(ECRA) requirement.
ASH
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
ARAMCO Projects Inspection Acceptance.
ENGINEER
ALL LEADS
DATE: 12/11/16
CONTRACTOR shall be responsible for the proper function and safe operation of
PROJECT
ENGINEER
all the equipment and systems. The design criteria and contract documents
A M ALMATROOK included are not all-inclusive and represent minimum requirements. Any additional
DATE: 12/11/16 elements or items required to achieve the correct and safe operation of the system
CERTIFIED
AMR EL SHARKAWY
shall be engineered, designed, supplied and installed in place to render a complete
DATE:
12/11/16 functional system.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall utilize the Metric System measurement in all documents and
DATE: 12/11/16 drawings unless specifically directed otherwise by SAUDI ARAMCO.
OPERATIONS
ALI H GHAMDI
CONTRACTOR shall review and approve Vendor and Subcontractor drawings,
12/11/16
DATE:
design, specifications and other documents for conformity to this Contract and
CONTROL NUMBER
VERIFICATION
institute effective internal control for prompt receipt, review, approval and return of
EDSD
such documents. CONTRACTOR shall incorporate all such applicable Vendor and
Subcontractor information in THE CONTRACTOR’S submittals to SAUDI
DATE:
BY:
ARAMCO.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
equipment Certified NMR 602 & NMR 603 data) shall include all necessary plans,
SAY
SAY
SAY
ASH
ASH
ASH
The Project SOW as conveyed herein and the documents and drawings provided
LEADS
LEADS
LEADS
ALL
ALL
ALL
with this Scope of Work document are Coherent and NOT to be utilized separately.
Any item mentioned in this document and not indicated on drawings or indicated on
drawings or not mentioned in other documents provided with this PPN, shall be of
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall check and verify all Sub-Contractor and Vendor design and
DESCRIPTION
drawings provided comply with the Scope of Work, and documents provided with
this Scope, relevant SAUDI ARAMCO and International Standards and are in
keeping with “Good Engineering Practices”.
CONTRACTOR shall comply with SAUDI ARAMCO Standards and seek SAUDI
ARAMCO advice for any potential Waivers. CONTRACTOR shall prepare such
Waivers as per SAEP-302, as required by SAUDI ARAMCO.
10-02399-
JO/EWO
10-02399-
10-02399-
CONTRACTOR shall note that “CLOUDS” on the drawings indicate a HOLD point
0001
0001
0001
Equipment and Systems into New Equipment and Systems. This Tie-in is part of
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS
CONTRACTOR shall verify the power source of all equipment supplied under this
DATE: 12/11/16
project by installing a Label on or near each equipment or device receiving power.
PROJECT
ENGINEER
Switchgear, Controlgear, Power Panels, Motors, Receptacles, Light Switches,
A M ALMATROOK each Light, HVAC Panel, Communication Cabinet, Security Cabinet, Fire Alarm
DATE: 12/11/16 Panel, etc. shall have a Phenolic Label with Black text on a White background
CERTIFIED
AMR EL SHARKAWY
attached with stainless steel screws identifying the upstream power source. For
DATE:
12/11/16 example, for each Receptacle, Light Switch and Light, the label shall indicate the
CONSTRUCTION Upstream Panelboard Number and Circuit Breaker Number and indicate if a GFCI
AGENCY
SHAHZAD YAZDANI circuit.
DATE: 12/11/16
OPERATIONS
SAUDI ARAMCO requires new power sub-distribution systems to be
ALI H GHAMDI
400VAC/230VAC for four wire systems as listed in SAES-P-100.
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION
permitted to install a GFCI molded case circuit breaker within the panelboard
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
powering the receptacle with a 5mA trip or an Equipment Protection Device with
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
nominal 30mA trip and shall label the receptacle with the panelboard number,
(DCC) NO. _____________________
circuit breaker number and indicate on the label “Fed from GFCI MCCB”. The label
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
shall be phenolic with Black text on a White background attached with stainless
SAY
SAY
SAY
steel screws. Receptacles with integral ground fault protection are NOT
ENGG CERT
ASH
ASH
acceptable.
ASH
LEADS
LEADS
LEADS
ALL
ALL
ALL
Stand Alone UPS, Panelboard, etc. A copy of the applicable Certified NMR-602
shall be provided in the applicable electrical equipment room and with a metal book
case within each room in which an NMR is provided. These shall be provided
DESCRIPTION
CONTRACTOR shall use Premium efficiency motors for all the motor less than
500HP.
CONTRACTOR shall carry out all Electrical work in close liaison with the SAPMT
to meet the project requirements.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
assistance and Final Integrated Testing, with New and Existing Systems, including
08/04/16
09/08/16
DATE
required ETAP studies, Plant Distribution system, Plant & buildings internal &
external Lighting System, Plant & Buildings Grounding & Lightning System,
NO.
REV
D
C
B
DISCIPLINE
Security & Fence Lighting System, Plant & Buildings Fire Alarm System,
ENGINEER
ALL LEADS
Emergency Power supply System by installing Generators, UPS power supply
DATE: 12/11/16
System for Plant operations, Security operations and Communication operations,
PROJECT
ENGINEER
DC system for Substation switchgear protection, Complete Substation with
A M ALMATROOK Substation Automation system, Cathodic Protection System, LED Lighting within
DATE: 12/11/16 the Buildings and for all External Lights (except substation exterior & fence lighting)
CERTIFIED
AMR EL SHARKAWY
attached to the buildings,115kV cable routing, Interfacing with 115kV GIS at
DATE:
12/11/16 MARAFIQ Substation # 9I, Electrical Interfacing with the SAMREF, YASREF,
CONSTRUCTION Yanbu Refinery and Yanbu-Jiddah Pipeline to provide power & Cathodic
AGENCY
SHAHZAD YAZDANI Protection(CP).
DATE: 12/11/16
OPERATIONS
Electrical Studies
ALI H GHAMDI
12/11/16
DATE:
CONTRACTOR shall perform and validate all the Electrical studies as per SAES-
CONTROL NUMBER
VERIFICATION
P-100 and obtain SAUDI ARAMCO approval in order to finalize and freeze the long
EDSD
lead electrical items to facilitate timely procurement. The purpose of the electrical
studies is to verify the ability of the plant electrical power distribution components
DATE:
BY:
are adequately sized and perform as designed during normal steady state
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
operation, with stand allowable transients and isolate faulty sections during faults.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Following Electrical studies shall be perform as a minimum but not limited to:
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• ETAP Short Circuit Analysis
SAY
SAY
SAY
ASH
ASH
•
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
requirement.
12/11/16
08/04/16
09/08/16
DATE
For each of the above studies, the final study shall be completed to confirm that all
electrical equipment including all transformers, switchgear, all controlgear and all
NO.
REV
D
C
B
large motors, are adequately rated and properly specified. The study and report
DISCIPLINE
ENGINEER
shall be issued for review and approval to SAUDI ARAMCO.
ALL LEADS
DATE: 12/11/16
PROJECT
ENGINEER
All electrical loads and equipment ratings indicated on the project proposal
A M ALMATROOK
drawings and documents are preliminary and shall be verified and updated as part
DATE: 12/11/16
CERTIFIED of the detailed design engineering phase. These load values are intended only for
AMR EL SHARKAWY
ER estimate and shall not be used for construction.
12/11/16
DATE:
CONSTRUCTION
AGENCY CONTRACTOR shall define jointly with Saudi Aramco the electrical substation ID
SHAHZAD YAZDANI
number.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
DATE:
12/11/16 Electrical Overall Power Distribution System – Design Basis
CONTROL NUMBER
VERIFICATION
Total power demand for the proposed YDH facility is estimated to be 46 MVA, with
EDSD
a first phase of approximately 23.0 MVA by 2019. Adequate spare space at all
DATE:
proposed shipper pumps for Yanbu to Central Region pipeline planned from this
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
facility. The power system shall be suitable to start larger shipper pumps without
OF THIS DRAWING IS COVERED, FOR ALL
any voltage drop impact when started direct on line. For detailed electrical load list
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
Electrical Load Summary – Estimation electrical load include the demand load till
2040.
ENGG CERT
ASH
ASH
ASH
LEADS
ALL
ALL
Phase (MVA)
1. Phase-1 23.0 MVA
2. Phase-2 9.5 MVA
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
The normal power supply to the proposed facility shall be from ‘MARAFIQ’s
Substation # 9I’ which is located about 3.85km from YDH facility fence. Two (2)
115 kV feeder from the GIS at MARAFIQ’s Substation #9I, shall be used to supply
power to YDH facility.
10-02399-
10-02399-
0001
0001
12/11/16
08/04/16
09/08/16
MARAFIQ substation is connected to a reliable and strong grid point, the SSBB
DATE
115 kV substation of Yanbu-II power plant (by 2018 this new power plant will be
available to generate 800 MW electricity, a strong reliable power source of this
NO.
REV
D
C
B
DISCIPLINE region).
ENGINEER
ALL LEADS
DATE: 12/11/16 Two (2) new substations (Receiving & Utility Substation) shall be built at YDH to
PROJECT
ENGINEER receive & distribute the power within YDH.
A M ALMATROOK
DATE: 12/11/16 Receiving Substation shall house 115kV Gas Insulated Circuit Breaker bay, 13.8kV
CERTIFIED
AMR EL SHARKAWY & 480V Metal Clad Switchgear and 480V Controlgear as main electrical equipment
DATE:
12/11/16 to receive power from MARAFIQ substation # 9I and further distribute power to
CONSTRUCTION
AGENCY
Utility Substation and Shipper Pumps.
SHAHZAD YAZDANI
DATE: 12/11/16 CONTRACTOR shall perform the ETAP study and give recommendations to
OPERATIONS
improve overall power factor as per SAES-P-100. Based on preliminary ETAP
ALI H GHAMDI
12/11/16
study, Two (2), 4.2MVar, 13.8kV, 3Ph, 60Hz MV Automatic Capacitor Bank is
DATE:
required to achieve power factor above 0.95 at PCC. It shall be further evaluated
CONTROL NUMBER
VERIFICATION
with different scenarios and options to maintain pf 0.95 at PCC as per SAES-P-100
EDSD
requirement.
DATE:
BY:
Utility Substation shall house 4.16kV & 480V Metal Clad Switchgear and 480V
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Refer to Document Control Log (GEN-D0001) for the Overall Electrical System
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Design and proposed Power Distribution to YDH facilities.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
Power is stepped down from 115kV to 13.8kV and from 13.8kV to 4.16kV, 480V
ASH
and 400V by installing appropriate Power and Pad Mounted Transformers, refers
LEADS
LEADS
LEADS
ALL
ALL
ALL
motors, booster pump motors, fire pumps motors, power transformers & loop feed
pad mounted transformers.
DESCRIPTION
LV MCC, Switchracks and local panels for power supply to auxiliary pump motors,
MOVs, auxiliary power and lighting power requirements, etc.
10-02399-
10-02399-
0001
0001
0001
Dry type transformers, sub distribution power panels, lighting control panel, control
12/11/16
wiring, power receptacles, indoor/outdoor lighting, and grounding, for all buildings.
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE
refineries (Yanbu Terminal, SAMREF & YASREF) will be utilized for any new loads
ENGINEER
ALL LEADS
to be added in the respective facilities. Refer to Appendix 2 Interface packages.
DATE: 12/11/16
PROJECT
ENGINEER
Electrical System Optimization
A M ALMATROOK
DATE: 12/11/16 CONTRACTOR is full responsible to Optimize the complete electrical system
CERTIFIED
AMR EL SHARKAWY
during the Detail Engineering based on latest vendor data, current site conditions,
DATE:
12/11/16 good industrial practices, International Codes and Standards, Safety Standards,
CONSTRUCTION and SAUDI ARAMCO Standards, to make the electrical system as effective or
AGENCY
SHAHZAD YAZDANI functional as possible.
DATE: 12/11/16
OPERATIONS
CONTRACTOR shall apply optimization techniques in the following areas, but not
ALI H GHAMDI
limited to:
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
•
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Electrical load duties for equipment sizing purpose.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
design.
policy remaining the electrical system optimized around the desired criteria (cost,
reliability, environmental, safety, etc.).
10-02399-
10-02399-
0001
0001
0001
09/08/16
assistance and Final Integrated Testing, for the following items but is not limited to:
NO.
REV
D
C
B
DISCIPLINE One (1) Lot 115kV, 1250A, 3Ph, 3W, 60Hz, Gas Insulated Switchgear in receiving
ENGINEER
ALL LEADS substation as well as the Gas Insulated Bus (GIB) in GIS Room (Refer to drawing #
DATE: 12/11/16 EL-A10007 & EL-A10005).
PROJECT
ENGINEER
A M ALMATROOK One (1) 13.8kV, 3000A, 3Ph, 3W, 60Hz, metal clad switchgear in receiving
DATE: 12/11/16 substation (Refer to drawing # EL-A10008).
CERTIFIED
AMR EL SHARKAWY
DATE:
12/11/16 Two (2), 4.2MVar, 13.8kV, 3Ph, 60Hz, Outdoor type, detuned switched capacitor
CONSTRUCTION
AGENCY
bank, at receiving substation transformer yard. (Refer to drawing # EL-A10008 &
SHAHZAD YAZDANI EL-A10001.002).
DATE: 12/11/16
OPERATIONS
One (1) 4.16kV, 1200A, 3Ph, 3W, 60Hz, metal clad switchgear in utility substation
ALI H GHAMDI
12/11/16
(Refer to drawing # EL-A10009).
DATE:
CONTROL NUMBER
VERIFICATION
One (1) 480V, 1600A, 3Ph, 3W, 60Hz, metal clad switchgear in receiving
EDSD
One (1) 480V, 1600A, 3Ph, 3W, 60Hz, metal clad switchgear in utility substation
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
One (1) 4.16kV, 1200A, 3Ph, 3W, 60Hz, controlgear in utility substation (Refer to
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
drawing # EL-A10010).
SAY
SAY
SAY
ENGG CERT
ASH
ASH
One (1) 4.16kV, 1200A, 3Ph, 3W, 60Hz, controlgear in utility substation (Refer to
ASH
drawing # EL-A10011).
LEADS
LEADS
LEADS
ALL
ALL
ALL
Two (2) 480V, 800A, 3Ph, 3W, 60Hz, controlgear in receiving substation (Refer to
drawing # EL-A10014 to EL-A10015).
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Two (2) 480V, 800A, 3Ph, 3W, 60Hz, controlgear in utility substation (Refer to
drawing # EL-A10016 to EL-A10017).
DESCRIPTION
One (1) 400V, 1250A, 3Ph, 4W, 60Hz, switchboard in E & M building (Refer to
drawing # EL-A10018).
One (1) 480V, 600A, 3Ph, 3W, 60Hz, emergency controlgear in Security Support
building (Refer to drawing # EL-A10020).
Three (3) 480V, 100A, 3Ph, 3W, 60Hz, switchracks, strategically located inside
10-02399-
JO/EWO
10-02399-
10-02399-
YDH to feed power to tank farms auxiliary motors, area lighting power panels,
0001
0001
0001
MOVs power panels, Cathodic Protection power panels and other facilities loads
12/11/16
09/08/16
DATE
D
C
B
DISCIPLINE
receiving substation feeding 13.8kV switchgear (Refer to drawing # EL-A10006).
ENGINEER
ALL LEADS
DATE: 12/11/16
Two (2) 3.75/4.68 MVA OA/FA, 13.8kV/4.16kV, power transformer located at utility
PROJECT
ENGINEER
substation feeding 4.16kV switchgear (Refer to drawing #EL-A10006).
A M ALMATROOK
DATE: 12/11/16 Two (2) 1.5 MVA, 13.8kV/0.48kV, power transformer located at receiving
CERTIFIED
AMR EL SHARKAWY
substation feeding 480V switchgear (Refer to drawing #EL-A10006).
12/11/16
DATE:
CONSTRUCTION Two (2) 1.5 MVA, 13.8kV/0.48kV, power transformer located at utility substation
AGENCY
SHAHZAD YAZDANI feeding 480V switchgear (Refer to drawing #EL-A10006).
DATE: 12/11/16
OPERATIONS
One (1) 500KVA, 13.8kV/0.48kV, pad mounted transformer strategically located
ALI H GHAMDI
inside YDH to feed power to emergency controlgear in control room (Refer to
12/11/16
DATE:
drawing #EL-A10006)
CONTROL NUMBER
VERIFICATION
EDSD
One (1) 1000 KVA, 13.8kV/0.4kV, pad mounted transformer strategically located
inside YDH to feed power to switchboard in E & M building (Refer to drawing #EL-
DATE:
BY:
A10006).
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
One (1) Skid mounted Diesel Generator Set, self-contained, sound attenuated
(DCC) NO. _____________________
container with motorized louvers, complete with lighting, Fire Alarm and grounding
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
for the container. The Emergency Diesel Generator 160kW, 400V, 3Ph, 4W, 60Hz,
SAY
SAY
SAY
200kVA, 0.8 PF, complete with day oil tank, Fuel system, Cooling system, exhaust
ENGG CERT
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
One (1) Skid mounted Diesel Generator Set, self-contained, sound attenuated
container with motorized louvers, complete with lighting, Fire Alarm and grounding
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
for the container. The Emergency Diesel Generator 400kW, 480V, 3Ph, 3W, 60Hz,
500kVA, 0.8 PF, complete with day oil tank, Fuel system, Cooling system, exhaust
system along with Generator controls/protection and generator circuit breaker at
DESCRIPTION
One (1), 400V, 400A, 3Ph, 4W, 60Hz Automatic Transfer Switch (Refer to
drawing# EL-A10019).
One (1), 480V, 600A, 3Ph, 3W, 60Hz Automatic Transfer Switch (Refer to
drawing# EL-A10020).).
10-02399-
JO/EWO
10-02399-
10-02399-
CONTRACTOR shall design Local Control Push Button Stations appropriate for
0001
0001
0001
the areas of installation, Install control cables and conduits between control
12/11/16
09/08/16
DATE
D
C
B
DISCIPLINE
where mobile welding sets or power water wash equipment use is required. In
ENGINEER
ALL LEADS
addition, 230 VAC convenience outlets shall be placed throughout the plant at all
DATE: 12/11/16
location where hand tools would be required for maintenance and inside the
PROJECT
ENGINEER
buildings.
A M ALMATROOK
DATE:
12/11/16 CONTRACTOR scope shall include but not be limited to Detail Design,
CONSTRUCTION procurement, supply, deliver / store, install, test, pre-commission, commissioning
AGENCY
SHAHZAD YAZDANI assistance and Final Integrated Testing for UPS & DC system of the entire YDH
DATE: 12/11/16 facility as described below:
OPERATIONS
ALI H GHAMDI
UPS power supply system shall be provided for the E & M Building loads,
12/11/16
DATE:
Operation building loads, RIO building loads, main Security Support building loads,
CONTROL NUMBER
VERIFICATION
Tank Farm and other field Instrument Loads. Integrated AC UPS & DC Systems
EDSD
c/w respective distribution panels to power critical loads such as Control, ESD,
FGS and telecommunications system. Batteries for 8 hour back up installed in a
DATE:
BY:
separate room within the E & M Building for Telecommunication Loads. Batteries
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
for 4 hour back up installed in a separate room within the Security Support Building
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
UPS system shall be redundant as per Figure-2 of SAES-P-103 for
SAY
SAY
SAY
ASH
ASH
“Simplex UPS systems shall be used. The UPS system shall be complete with
ASH
LEADS
LEADS
ALL
ALL
ALL
transformers and distribution panels, mimic panels, and smoke detection in the
UPS cabinet (Refer to drawing #EL-A10024 to EL-A10028). Ratings are as follows:
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
One (1) 5kVA, Input voltage 400V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W
60Hz (X40- UPS-001).
DESCRIPTION
One (1) 10kVA, Input voltage 400V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W
60Hz (X40-UPS-010).
One (1) 20kVA, Input voltage 480V 3Ph 3W 60Hz, Output voltage 400V 3Ph 4W
60Hz (X40-UPS-002).
Three (3) 10kVA, Input voltage 480V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W
60Hz (X40-UPS-007, X40-UPS-008 & X40-UPS-009).
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
One (1) 45kVA, Input voltage 400V 3Ph 3W 60Hz, Output voltage 400V 3Ph 4W
12/11/16
60Hz (X40-UPS-003).
08/04/16
09/08/16
DATE
Two (2) 25kVA, Input voltage 480V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W,
NO.
REV
D
C
B
DISCIPLINE
60Hz (X40-UPS-004 & X40-UPS-005).
ENGINEER
ALL LEADS
DATE: 12/11/16
CONTRACTOR shall provide complete battery set, battery chargers, DC
PROJECT
ENGINEER
distribution panels required for 125VDC system as per one line diagram #EL-
A M ALMATROOK A10029, EL-A10030 & EL-A10033) for receiving & utility substation. Each DC
DATE: 12/11/16 Power System shall include two (2) rectifier battery chargers and two set of
CERTIFIED
AMR EL SHARKAWY
batteries, battery racks and battery monitoring system. Ratings are as follows:
12/11/16
DATE:
CONSTRUCTION One (1) 125 VDC, 350A Output, 480V, 3Ph, 60 Hz Input (X40-BC-001 & X40-BC-
AGENCY
SHAHZAD YAZDANI 002).
DATE: 12/11/16 One (1) 125 VDC, 250A Output, 480V, 3Ph, 60 Hz Input (X40-BC-003 & X40-BC-
OPERATIONS
004).
ALI H GHAMDI
One (1) -48 VDC, 200A Output, 480V, 3Ph, 60 Hz Input (X40-BC-005 & X40-BC-
12/11/16
DATE:
006).
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
procurement, supply, deliver / store, install and test for Cables (power & control),
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
About 3.85kM 115kV cabling from MARAFIQ Substation #9I to receiving substation
SAY
SAY
SAY
ASH
ASH
Direction Drilling (HDD) cables installation method shall be used to cross main
ASH
highway as per Royal Commission (RC) & MARAFIQ Guidelines. (Refer sketch
LEADS
LEADS
LEADS
ALL
ALL
ALL
SK-A10010.001)
13.8kV cabling from new 13.8kV Switchgear located inside the Receiving
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
4.16kV cabling from new 4.16kV Switchgear located inside the Utility Substation to
Controlgear & Booster Pumps. (Refer drawing # EL-A10103 sheet 001 to 004.
Buried Power and control cabling to all MV and LV loads. (Refer drawing # EL-
A10103 sheet 001 to 004.
Cable Bus from Power Transformers to respective Switchgears at the receiving &
utility substation. (Refer drawing # EL-A10001 & EL-A10002)
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
Cable trays shall be provided inside receiving, utility substation and E & M building.
12/11/16
09/08/16
DATE
Lighting System
NO.
REV
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS
CONTRACTOR scope shall include but not be limited to Detail Design,
DATE: 12/11/16
procurement, supply, deliver / store, install & test for lighting system.
PROJECT
ENGINEER
A M ALMATROOK The Lighting designs for this project shall be in accordance with IESNA RP-7
DATE: 12/11/16 (practice for Industrial Lighting) and as supplemented by SAES-P-123. The lighting
CERTIFIED
AMR EL SHARKAWY
system shall be designed for energy efficient operation.
12/11/16
DATE:
CONSTRUCTION CONTRACTOR shall design following types of lighting but not limited to; Buildings
AGENCY
SHAHZAD YAZDANI interior & exterior lighting, Area Lighting, Security Fence Lighting, Street Lighting,
DATE: 12/11/16 Task Lighting, Emergency Lighting, Tank Lighting .
OPERATIONS
ALI H GHAMDI
CONTRACTOR shall provide interior & exterior lighting for the below listed
12/11/16
DATE:
buildings & Shelters. (Refer drawing # EL-A10034, EL-A10035, EL-A10047, EL-
CONTROL NUMBER
VERIFICATION
•
APPROVAL/CERTIFICATION REQUIREMENTS,
Receiving Substation
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
• Utility Substation
(DCC) NO. _____________________
• E & M Building
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Security Support Buildings
SAY
SAY
SAY
• Operation Building
ENGG CERT
ASH
ASH
•
ASH
Operator Shelter
• Remote I/O Buildings
LEADS
LEADS
LEADS
ALL
ALL
ALL
• Chemical Shelter
• X-Ray Building
• IDAS Shelter
DESCRIPTION
• Guard House
• Security Main Gate
• Shipper, Booster and other Pump Shelters
CONTRACTOR shall provide outdoor plant and fence lighting. (Refer drawing #
EL-A10101)
CONTRACTOR shall provide tank lighting including cables, conduits, junction box,
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
cable trays etc. CONTRACTOR shall coordinate with Tank Package Contractor for
the location of Tank lighting and develop detail design drawings as required.
12/11/16
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER CONTRACTOR scope shall include but not be limited to Detail Design,
ALL LEADS
procurement, supply, deliver / store, install & test for grounding system as required
DATE: 12/11/16
PROJECT for the new Facilities in accordance with IEEE 142 and shall meet the requirements
ENGINEER
of ANSI/NFPA 70 (NEC) and ANSI C2, as supplemented or amended by SAES-P-
A M ALMATROOK
DATE: 12/11/16
111 and SAES-J-902. Intrinsically Safe Systems shall be grounded in accordance
CERTIFIED with certification requirements and SAES-J-903. Calculations of allowable and
AMR EL SHARKAWY
12/11/16
actual step & touch potentials for Substations shall be done in accordance with
DATE:
CONSTRUCTION
IEEE 80.
AGENCY
SHAHZAD YAZDANI
CONTRACTOR shall extend existing Plant Ground grid at YASREF, SAMREF and
DATE: 12/11/16
OPERATIONS Yanbu Refineries to bond the new electrical equipment, tanks, fence post,
ALI H GHAMDI structural steel, etc. Grounding system shall utilize buried copper wire loops and
12/11/16 grounding rods for perimeter grids around the transformers, substation building and
DATE:
CONTROL NUMBER
yards, E&M Building, operation room, control building, security support buildings,
BY:
shelters, other supporting buildings and overall plant grounding. (Refer drawing #
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
& EL-A10102 )
SAY
SAY
SAY
ENGG CERT
ASH
ASH
CONTRACTOR shall provide and install additional ground rods and ground grid as
ASH
required to ensure that the ground resistance does not exceed safe values as
LEADS
LEADS
LEADS
ALL
ALL
ALL
procurement, supply, deliver / store, install & test for Lightning protection system of
the buildings at YDH. The design and installation shall be based on: NFPA 780, UL
96A, and IEEE 998 or IEC 62305-1, 2, 3, 4.
DESCRIPTION
10-02399-
10-02399-
CONTRACTOR scope of work. The CPS CONTRACTOR scope shall include one
0001
0001
0001
complete package for the entire YDH underground pipeline & tanks Cathodic
12/11/16
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS
The CPS CONTRACTOR scope of work shall include but not limited to prepare a
DATE: 12/11/16
detailed design package comprising of CP drawings, layouts, installations details,
PROJECT
ENGINEER
detail material take offs, specifications, testing, pre-commissioning &
A M ALMATROOK commissioning procedure, calculations for required voltage, amperage and life
DATE: 12/11/16 expectancy of anode, No of anodes, material type of anodes, weight of anodes,
CERTIFIED
AMR EL SHARKAWY
spacing between the anodes, minimum current density and consumption rate of
DATE:
12/11/16 anode and required rating & number of rectifiers.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI Fire Detection & Alarm System
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
CONTRACTOR scope shall include but not be limited to Detail Design duly
12/11/16 endorsed by Certified Fire Protection Engineer, procurement, supply, deliver /
DATE:
store, install & test for complete, microprocessor-based addressable fire detection
CONTROL NUMBER
VERIFICATION
and alarm system, featuring intelligent spot, linear beam detectors using multi-
EDSD
capability, with reliable peer-to-peer communication. The Fire Alarm System for
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The Fire Alarm system shall include but not limited to the following: Fire Alarm
(DCC) NO. _____________________
control panel, multi spectrum flame detectors, beam detectors, automatic and
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
manually activated alarm initiating device, indicating devices, isolating devices,
SAY
SAY
SAY
ASH
ASH
holders, fire and smoke dampers and their controls, remote indicators,
ASH
annunciators, network cards, along with RGS conduits, wires and accessories
LEADS
LEADS
LEADS
ALL
ALL
ALL
required to furnish a complete operational system. All fire alarm system devices
and components shall be from one Manufacturer to avoid last minute compatibility
issues. All components employed in the Fire Alarm system and the Fire Protection
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall provide Fire Detection & Alarm System for Receiving
DESCRIPTION
Substation, Utility Substation, all other buildings and shelters (Refer drawing # EL-
A10121, to EL-A10145, EL-A10147 & EL-A10148)
10-02399-
10-02399-
Package Contractor for the Linear Heat Detection System for the external floating
0001
0001
0001
roof tanks. Linear Heat Detection System shall be interface with the nearest Fire
12/11/16
09/08/16
DATE
EL-E10068).
NO.
REV
D
C
B
DISCIPLINE
Power System Automation (PSA)
ENGINEER
ALL LEADS
DATE: 12/11/16
CONTRACTOR scope shall include but not be limited to Detail Design,
PROJECT
ENGINEER
procurement, supply, deliver / store, install, test, pre-commission, commissioning
A M ALMATROOK assistance and Final Integrated Testing for Power System Automation (PSA) at
DATE: 12/11/16 YDH Receiving Substation. Information of Receiving Substation shall be linked to
CERTIFIED
AMR EL SHARKAWY
Power System Automation (PSA). (Refer document # EL-A10031 & EL-E10039)
12/11/16
DATE:
CONSTRUCTION CONTRACTOR scope shall include but not be limited to Detail Design,
AGENCY
SHAHZAD YAZDANI procurement, supply, deliver / store, install, test, pre-commission, commissioning
DATE: 12/11/16 assistance and Final Integrated Testing for Power System Automation (PSA) at
OPERATIONS
YDH Utility Power Substation. Information of Utility Substation shall be linked to
ALI H GHAMDI
Power System Automation (PSA). (Refer document # EL-A10032 & EL-E10039)
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION
following:
• Interposing relay cabinet shall be provided in substation to control booster,
DATE:
BY:
shipper and other utility pumps. Homerun cables between substation and
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
respective RIB shall be laid. The pump status and control signals shall be
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• PSA Server shall be interfaced to DCS via OPC or other open industry
SAY
SAY
SAY
standard protocol.
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
per following:
• Two (2) new Fiber optic patch panel (wall mounted) at MARAFIQ (SS-9I)
shall be interfaced to existing OSAS via existing RTU to provide the 115kV
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall design, supply and install and test Local Control Push Button
Stations appropriate for the areas of installation, Install control cables and conduits
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
CONTRACTOR shall design, supply and install and test Interposing Relay Panels
12/11/16
08/04/16
09/08/16
DATE
within the NEW Substations. The Interposing Relay Panels shall have separate
relays for start and stop commands and other signals as per instrument ILD’s.
NO.
REV
D
C
B
DISCIPLINE
Refer to Instrumentation Section for interface details. If additional relay panels are
ENGINEER
ALL LEADS
required, CONTRACTOR shall design provide and install and place into service.
DATE: 12/11/16
PROJECT
ENGINEER
CONTRACTOR shall design, provide, install, and test control/signal cables
A M ALMATROOK between Interposing relay panels and Controlgear and Instrument marshaling
DATE: 12/11/16 cabinets.
CERTIFIED
AMR EL SHARKAWY
12/11/16 Control Panels & Power Associated with Skids and Vendor Packages
DATE:
CONSTRUCTION
AGENCY
CONTRACTOR shall design, supply, install, test, pre-commission and provide
SHAHZAD YAZDANI
DATE: 12/11/16
assistance in commissioning the control panels associated with vendor supplied
OPERATIONS skids such as Dye Injection skids, DPK Filtration skids, Conductivity Enhancer
ALI H GHAMDI Injection skids, Custody Metering skids, Static, Dissipative Agent Injection skids,
12/11/16
DATE: Oily Water Treatment Package, Foam Skids, pump controllers, power
CONTROL NUMBER
DATE:
BY:
CONTRACTOR shall supply any and all cabling required for Equipment, Skids and
Vendor Package integration and install and test and pre-commission and support
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall be responsible for the supply, installation, and testing, pre-
SAY
SAY
SAY
commission and provide commissioning assistance for any other control panels
ENGG CERT
ASH
ASH
and systems not mentioned herein and are part of the mechanical, instrument or
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall be responsible for the interconnection between the skids and
the parent equipment, and field instruments, Substations and Control Rooms and
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
The enclosures shall be of dead front construction and shall have two doors and
12/11/16
08/04/16
09/08/16
DATE
two compartments that are separated by a barrier. One compartment shall house
the motor starter package and the other shall house the controls for liquid level and
NO.
REV
D
C
B
alarms. The doors shall overlap to prevent them from being opened with the pump
DISCIPLINE
ENGINEER motor disconnect devices in the “ON” position. The starters shall be complete with
ALL LEADS
Start / Stop Push Buttons, Start / Stop Indications, local remote control and
DATE: 12/11/16
PROJECT indications; HOA switches etc. The starters shall be provided with dry run
ENGINEER
A M ALMATROOK
protection relay to prevent the motors from dry run.
DATE: 12/11/16
CERTIFIED CONTRACTOR shall be responsible for the design, supply, installation, and test,
AMR EL SHARKAWY
12/11/16
pre-commission and provide assistance in commissioning of any other control
DATE:
CONSTRUCTION
panels and systems not mentioned herein and are part of the mechanical,
AGENCY
SHAHZAD YAZDANI
instrument or piping equipment.
DATE: 12/11/16
OPERATIONS Electrical and electronic equipment and associated wiring in Oily Water Lift Station
ALI H GHAMDI systems shall be suitable for the electrical area classification in accordance with
12/11/16
DATE: SAES-B-068, SAES-P-100 and NFPA 70 (NEC) and the Detail Design developed
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
assistance in commissioning the sanitary lift station control panels. The Sanitary
OF THIS DRAWING IS COVERED, FOR ALL
Lift Station Control Panel shall have two independent power supply sources with
(DCC) NO. _____________________
auto transfer facility built into the panel, to provide a continuous source of power to
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
the lift station. The Control Panel shall be in full compliance with SAES-S-010.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
The enclosure shall be of dead front construction and shall have two doors and two
ASH
compartments that are separated by a barrier. One compartment shall house the
LEADS
LEADS
LEADS
ALL
ALL
ALL
motor starter package and the other shall house the controls for liquid level and
alarms. The doors shall overlap to prevent them from being opened with the pump
motor disconnect devices in the “ON” position. The starters shall be complete with
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Start / Stop Push Buttons, Start / Stop Indications, local remote control &
indications; HOA switches etc. The starters shall be provided with dry run
protection relay to prevent the motors from dry run.
DESCRIPTION
Electrical and electronic equipment and associated wiring in Oily Water Lift Station
systems shall be suitable for the electrical area classification in accordance with
SAES-B-068, SAES-P-100 and NFPA 70 (NEC) and the Detail Design developed
Electrical Area Classification Drawings.
10-02399-
10-02399-
0001
0001
panels for all motors 75 kW (100 HP) and larger, and all other motors where the
engineering documents indicate motor space heaters are installed, a contact shall
12/11/16
08/04/16
09/08/16
DATE
D
C
B
A M ALMATROOK
commissioning assistance, by THE CONTRACTOR.
DATE: 12/11/16
CERTIFIED Interconnection Wiring
AMR EL SHARKAWY
12/11/16
DATE:
CONSTRUCTION
CONTRACTOR shall be responsible for design, supply, installation and testing of
AGENCY
SHAHZAD YAZDANI
the interconnection wiring between Vendor supplied Electrical Equipment and
DATE: 12/11/16
Skids and the parent equipment, field instruments, etc. and CONTRACTOR shall
OPERATIONS develop Wiring Interconnection Drawings, based on Actual Vendor Certified NMR
ALI H GHAMDI 602 Drawings and NMR 603 Manuals, to SAUDI ARAMCO standards and submit
12/11/16
DATE: to SAUDI ARAMCO for acceptance prior to termination of cabling.
CONTROL NUMBER
VERIFICATION
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
in Bulk Plant area will be rated according to area classification layout drawings
C
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
CONTRACTOR shall design all the Electrical rooms, battery rooms, UPS rooms,
LEADS
LEADS
LEADS
ALL
ALL
ALL
based on the actual Vendor information as per the SAUDI ARAMCO Direct Charge
NMR as available from SAPMT; under no circumstances the sizes shall fall short of
required spaces and clearances, to avoid future delays and expensive rework due
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Buildings where Battery rooms are provided shall comply with all requirements of
DESCRIPTION
SAES-P-103, Battery rooms shall be provided with an eye wash facility with
potable water connection & drain, and the drain shall be through acid neutralization
pit. The ventilation system shall be 100% redundant. Only direct driven exhaust
fans shall be used. An interlock with the ventilation system shall be provided to
stop the high-rate battery charging if the exhaust fan stops.
10-02399-
10-02399-
cable/conduit/cable trays pass through fire rated walls, Floor or Ceiling. The Fire
0001
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
lighting panels, power panels, lighting circuits, power circuits and grounding for the
ENGINEER
ALL LEADS
following buildings but not limited to:
DATE: 12/11/16
PROJECT
ENGINEER
Receiving Substation, Utility Power Substation, Engineering & Maintenance (E &
A M ALMATROOK M) Building, Operation Building, Operation Shelter, Chemical Shelter, Pump
DATE: 12/11/16 Shelters, Musalla, Security Gate House, Security Support Building, Security Guard
CERTIFIED
AMR EL SHARKAWY
Houses, RIO Building, IDAS Shelter, X-Ray Building, FSF Building & Foam Skid
DATE:
12/11/16 Building.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall design, supply, install test, pre-commission and provide
DATE: 12/11/16 commissioning assistance for ALL Buildings under this scope of work to include but
OPERATIONS
not be limited to following electrical equipment:
ALI H GHAMDI
12/11/16
DATE: Power Panels
CONTROL NUMBER
Power Circuits
VERIFICATION
Lighting Panels
EDSD
Lighting Circuits
DATE:
Disconnect Switches
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Sockets / Receptacles
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Control Panels
Grounding
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
All in accordance with the detailed design Lighting Layouts, Power Layouts, Panel
ENGG CERT
Schedules, Fire Alarm Layouts and Grounding Layouts. Refer to project proposal
ASH
ASH
ASH
drawings as per DCL # GEN-D0001 for Lighting, Power, Grounding, Fire Alarm
LEADS
LEADS
LEADS
ALL
buildings.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Reference Documents attached to this PPN include but are NOT limited to the
DESCRIPTION
10-02399-
10-02399-
Grounding Layouts
0001
0001
0001
09/08/16
DATE
•
SHAHZAD YAZDANI
Electrical Area Classification
DATE: 12/11/16
OPERATIONS • General Electrical Notes and Symbols
ALI H GHAMDI • Power & Grounding Layouts
DATE:
12/11/16
• Lightning Protection Layouts
CONTROL NUMBER
• Installation Details – Duct Bank, Cable Trench, Cable Bldg Entrance, Power,
VERIFICATION
Lighting, Grounding
EDSD
•
BY:
Panelboard Schedules
•
REVISIONCERTIFICATION
•
C
• Fire Alarm Detection Layouts, Riser Diagrams, Cause & Effect Logic
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Substation Automation Input / Output List for PSA & SCADA
SAY
SAY
SAY
ASH
ASH
•
ASH
LEADS
LEADS
ALL
ALL
ALL
• ETAP Studies including Load Flow, Short Circuit, Relay Coordination, Arc
Flash
• ETAP GPR & Ground Grid Calculations
• Switching Transient Analysis, Transient Recovery Voltage (TRV) evaluation
and Insulation Coordination studies
• Lightning Protection Studies
• Calculations including Lighting LUX, Cable sizing, Transformer sizing, Battery
Charger sizing, UPS sizing, Switchgear, Controlgear and Generator Sizing
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
Detailed Design drawings shall include all necessary plans, elevations, arrangements,
NO.
REV
D
C
B
A M ALMATROOK
DATE: 12/11/16 CONTRACTOR shall incorporate ALL Vendor NMR’s into the IFC package as vendor
CERTIFIED
AMR EL SHARKAWY
data becomes available and shall insure drawings utilized for construction have NMR
12/11/16 602 and NMR 603 data incorporated within, prior to site construction execution. Note
DATE:
CONSTRUCTION that this is critical path prior to pouring Concrete for Substation Floors, Precast Walls,
AGENCY
SHAHZAD YAZDANI
Transformer and Generator, Motor, Skids, Pole Foundations, etc.
DATE: 12/11/16
OPERATIONS Electrical Scope at Physical Interface Points with Pipelines & Refineries
ALI H GHAMDI
12/11/16
DATE: Yanbu to Jiddah Pipeline:
CONTROL NUMBER
VERIFICATION
EDSD
CONTRACTOR shall provide, install, test and terminate a 480V power cable to the
Scraper Launcher Area Power Panelboard. The Panelboard will be provided and
DATE:
BY:
installed within the Scraper Launcher Area by BI-10-02155. (Refer drawing # EL-A10014
REVISIONCERTIFICATION
sht. 001)
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Electrical interfaces include power connection of 480V used to power the pipeline scraper
launcher facilities loads inside YDH perimeter fence. One (1) 480V, 150A, 3Ph, 3W, 60Hz
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Outdoor Power Panel shall be provided by BI 10-02155 (Yanbu - North Jiddah Products
SAY
SAY
SAY
Pipelines).
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
construct the electrical power requirements for all the projects NEW and Existing
Electrical Equipment, in order to purchase the material and install, test and commission
all equipment requiring electrical power and electrical equipment interfaces, for YDH.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
There is no physical interface within the facility; will be utilize the pipeline provided by BI-
00043. Therefore no electrical load has been anticipated.
SAMREF shall supply all electrical power and connections required for MOVs and other
miscellaneous loads.
10-02399-
JO/EWO
10-02399-
10-02399-
CONTRACTOR scope shall include but not be limited to Detail Design, procurement,
0001
0001
0001
supply, deliver / store, install & test for Two (2nos.) 480V, 100A, 3Ph, 3W, 60Hz Outdoor
12/11/16
08/04/16
09/08/16
Power Panel (NEMA 4X) with all cables, conduits, supports structures and other required
DATE
accessories to feed power to MOVs and other miscellaneous loads (refer to drawing #
EL-A10052).
NO.
REV
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS
CONTRACTOR shall coordinate with SAMREF refinery to utilize the existing feeders of
DATE: 12/11/16
SAMREF substation to feed the power to newly added Surge relief pump (X40-X002A/B).
PROJECT
ENGINEER
A M ALMATROOK CONTRACTOR shall utilize existing space in MCC-11-10-3 & MCC-11-20-3 and supply;
DATE: 12/11/16 install three (3nos.) 100AF new circuit breakers to feed new MOV power panels & new
CERTIFIED
AMR EL SHARKAWY UPS, including feeder cables, conduits and other required accessories. (Refer sketch SK-
DATE:
12/11/16 A10051 & SK-A10052)
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR scope shall include but not be limited to Detail Design, procurement,
DATE: 12/11/16 supply, deliver / store, install & test for 10kVA, Input voltage 480V 3ph 60Hz, Output
OPERATIONS
voltage 230 1ph 60Hz. The UPS system shall be complete with charger rectifiers,
ALI H GHAMDI
inverters static switches, batteries, bypass switch, transformers and distribution panels,
12/11/16
DATE:
mimic panels, and smoke detection in the UPS cabinet in Substation # 12 at SAMREF.
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Grounding network.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
CONTRACTOR shall provide task lighting for new equipment from existing lighting
ENGG CERT
ASH
ASH
Panels.
ASH
LEADS
LEADS
LEADS
ALL
ALL
ALL
Yanbu Refinery shall supply all electrical power and connections required MOVs and
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
other miscellaneous loads. Total electrical loads anticipated are about 25kVA.
CONTRACTOR scope shall include but not be limited to Detail Design, procurement,
DESCRIPTION
supply, deliver / store, install & test for Four (4 nos.) 480V, 100A, 3Ph, 3W, 60Hz Outdoor
Power Panel (NEMA 4X) with all cables, conduits, supports structures and other required
accessories to feed power to MOVs and other miscellaneous loads (refer to drawing #
EL-A10111).
10-02399-
10-02399-
0001
0001
12/11/16
08/04/16
09/08/16
D
C
B
DISCIPLINE
CONTRACTOR shall provide task lighting for new equipment from existing lighting
ENGINEER
ALL LEADS
Panels
DATE: 12/11/16
PROJECT
ENGINEER Electrical Scope at MARAFIQ Substation # 9I Interface
A M ALMATROOK
DATE: 12/11/16 CONTRACTOR shall coordinate with SAUDI ARAMCO and MARAFIQ for the portion of
CERTIFIED
AMR EL SHARKAWY works under MARAFIQ scope and insure correct interface of all discipline’s i.e. Civil,
DATE:
12/11/16 Electrical, Protection, Communication, etc.
CONSTRUCTION CONTRACTOR shall furnish electrical detailed drawings, documents and any calculation
AGENCY
SHAHZAD YAZDANI requested by MARAFIQ / Yanbu Royal Commission (YRC) to fulfill the connection
DATE: 12/11/16 agreement requirements.
OPERATIONS
ALI H GHAMDI
CONTRACTOR shall utilize existing spare breaker EA06 & EB04 of GIS to feed power to
12/11/16
DATE:
YDH. (Refer sketch # SK-A10011, SK-A10013 & SK-A10014)
CONTROL NUMBER
VERIFICATION
EDSD
CONTRACTOR shall provide one (1) metering panel to accommodate two (2) revenue
meters & two check meters for YDH feeders-1 & 2. (Refer sketch # SK-A10013 & SK-
DATE:
BY:
A10014). The supplied meters shall be smart type meters and shall comply the MARAFIQ
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
standard. Refer Doc-ELE10069-002 for Technical specification and details for these
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
meters.
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall provide Four (4) protection relay panel to accommodate line
SAY
SAY
SAY
differential relays & directional relays for YDH feeders-1 & 2. (Refer sketch # SK-A10013
ENGG CERT
ASH
ASH
& SK-A10014)
ASH
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide one (1) 125VDC Power Panel to supply power to new relay
panels. (Refer sketch # SK-A10012)
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall provide two (2) fiber optic patch panel to be install in Substation 9I.
(Refer sketch # SK-A10014)
DESCRIPTION
CONTRACTOR shall design, supply, install, test and assist with commissioning of two
run, 3x1/C- 630 mm2, 115kV cables of 3.85km in length, from MARAFIQ Substation #9I to
YDH. (Refer sketch # SK-A10010 & SK-A10015)
CONTRACTOR shall design, supply, install, test and assist with commissioning of two (2)
run 12C Single Mode Fiber Optic Cables run along with each power feeder cable from
MARAFIQ Substation #9I to YDH. (Refer sketch # SK-A10010 & SK-A10015)
10-02399-
JO/EWO
10-02399-
10-02399-
CONTRACTOR shall provide termination kits, including connectors, at the MARAFIQ end
0001
0001
0001
and at the SAUDI ARAMCO 115kV GIS end. CONTRACTOR shall coordinate with
MARAFIQ and SAUDI ARAMCO for termination at the MARAFIQ end.
12/11/16
08/04/16
09/08/16
DATE
CONTRACTOR shall confirm MARAFIQ protection and metering requirements and reflect
NO.
REV
D
C
B
accordingly within the Detail Design Drawings. Development of protection, control, fire
DISCIPLINE
ENGINEER alarm, communication, etc., interface drawings shall be CONTRACTOR responsibility
ALL LEADS
including purchase, installation, termination and testing of the required cabling.
DATE: 12/11/16
PROJECT
ENGINEER
A M ALMATROOK
CONTRACTOR shall assist MARAFIQ as required with Manpower, and test equipment,
DATE: 12/11/16 as necessary to complete MARAFIQ 115kV and SAUDI ARAMCO 115kV Interface
CERTIFIED
AMR EL SHARKAWY
Testing including Protection, Metering, Controls, etc. including wiring interface drawing
12/11/16 development. Test Results shall be signed by all relevant parties including POD, PID,
DATE:
CONSTRUCTION MARAFIQ, etc. and be included within the Project Test Results binders maintained and
AGENCY
SHAHZAD YAZDANI
developed by CONTRACTOR as per SAEP-122.
DATE: 12/11/16
OPERATIONS CONTRACTOR to consider Integration Philosophy between the MARAFIQ 115KV
ALI H GHAMDI
Substation # 9I and the New SAUDI ARAMCO 115kV Receiving Substation. Interface
12/11/16
DATE: philosophy will be finalized as per Connection Agreement between MARAFIQ & SAUDI
CONTROL NUMBER
VERIFICATION
ARAMCO. Initial communication has been established to finalize the scope segregation
EDSD
• MARAFIQ confirmed to reserve the existing Two (2) spare GIS Bays: =EB04
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• MARAFIQ confirmed these 2 Spare GIS are already pre-wired to the local
SAY
SAY
SAY
ASH
ASH
ASH
• A new metering panel is required, same model and configuration than existing
LEADS
LEADS
LEADS
ALL
ALL
ALL
metering panels. This new metering panel shall be the combine metering
panels for 2 feeders of YDH. Each YDH feeders shall have a separate
revenue meters and will be accommodated in this panel. Reserved available
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
floor space for this panel. New Panel to be tagged as: =E+MP05 115KV
Service Cable/Revenue Metering panel.
DESCRIPTION
• Protection Scope- Primary Protection: Two (2) new Relay Panels are required
based on ABB relays. Reserved available floor spaces for these two panels.
New panels to be tagged as: =EB04+R1 and =EA06+R1 115kV Service Line
Aramco- YDH/ Primary Protection.
• Protection Scope- Back Up Protection: Two (2) new relay Panels are required
based on Siemens relays. Available floor spaces for these 2 panels. New
Panels to be tagged as: =EB04+R2 and =EA06+R2 115KV Service Line
10-02399-
JO/EWO
10-02399-
10-02399-
0001
12/11/16
08/04/16
09/08/16
• MARAFIQ confirmed that existing Relay Panels =E+BB1 and =E+BB4 for Bus
DATE
Bar/BF Protection of GIS Bay EA06 & EA04 are already pre-wired.
NO.
REV
D
C
B
DISCIPLINE • DC System scope: Existing 125V DC Distribution Panel has not enough spare
ENGINEER
ALL LEADS breakers for new DC scope. MARAFIQ requested to provide new DC panel
DATE: 12/11/16 same manufacturer than existing panels “Riyadh Factory For Panelboard”
PROJECT
ENGINEER Available floor space for this new DC panel. New Panel to be tagged as: 125V
A M ALMATROOK DCDB 125V Main DCDB No. 3.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY • AC System scope: Existing 220V AC Distribution Panel has required spare
12/11/16
DATE: breakers for new AC scope. CONTRACTOR to utilize existing spare breakers
CONSTRUCTION
AGENCY from 220V AC Distribution Panel No. 1, 2 & 3. Note: There is No 480V AC
SHAHZAD YAZDANI
panel available in MARAFIQ Substation.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI • Power Cable Routing in Basement: CONTRACTOR to develop detailed cable
DATE:
12/11/16 routing drawings following existing cable routing at MARAFIQ Substation
basement as much as possible:
CONTROL NUMBER
VERIFICATION
EDSD
the wall.
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Cable structural support shall be Unistrut type similar design that existing
OF THIS DRAWING IS COVERED, FOR ALL
ones.
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• General requirements:
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
4.16 Communication
DESCRIPTION
A. DATA NETWORK
Scope of Work
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
The Security LAN may utilize the Enterprise LAN to transport the traffic
provided with adequate level of logical separation.
NO.
REV
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS
The Yanbu Distribution Hub Enterprise LAN shall manage and control
DATE: 12/11/16
all business related types of traffic that shall traverse through its own
PROJECT
ENGINEER
physically dedicated network which can be Internet, E-mail, VoIP
A M ALMATROOK telephony, and any other data services. It may also carry traffic of
DATE: 12/11/16 Security CCTV that shall be assigned with a dedicated virtual LAN.
CERTIFIED
AMR EL SHARKAWY
12/11/16
The Yanbu Distribution Hub Enterprise LAN shall consist of a PE Router
DATE:
CONSTRUCTION
in Maintenance & Engineering Building, which shall connect to the
AGENCY
existing Juniper MX-960 in the Admin Building 1401 at Yanbu Refinery
SHAHZAD YAZDANI
DATE: 12/11/16
and Communication Building 2 at Yanbu NGL.
OPERATIONS
ALI H GHAMDI
Access switches shall be located in Operation Building, Maintenance &
DATE:
12/11/16 Engineering Building, Utility Power Substation Building, Receiving
Substation Building, Operator Shelter, Security Support Building (Main
CONTROL NUMBER
VERIFICATION
Gate & Tank Farm) and will be uplinked to the Distribution switch using
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
switch with required Power over Ethernet (PoE) ports. The access
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The Wireless LAN System under this project will be provided at
SAY
SAY
SAY
ASH
ASH
Shelter and Security Support Building (Main Gate & Tank Farm) to
ASH
LEADS
LEADS
ALL
ALL
ALL
• Patch cords
CONTRACTOR shall provide and install the wireless LAN and ensure
the appropriate placement of wireless access points to provide excellent
radio coverage and mobility to all wireless IP devices.
WLAN access point outlets shall not be installed more than 3.75 meters
above finished floor level.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
The access point shall be connected to the PoE+ port of Access switch
12/11/16
08/04/16
09/08/16
using UTP CAT-6 cable and shall be powered through its power-over-
DATE
Ethernet port.
NO.
REV
D
C
B
A M ALMATROOK
• CONTRACTOR shall install, test and commission the Data Network
DATE: 12/11/16
CERTIFIED System as per the following drawings:
AMR EL SHARKAWY
12/11/16
DATE:
CONSTRUCTION
AGENCY
• Schematic Diagram,
SHAHZAD YAZDANI
Overall Data System CO-A10033.001
DATE: 12/11/16
OPERATIONS • Overall System Diagram
ALI H GHAMDI
•
CONTROL NUMBER
Schematic Diagram,
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
CONTRACTOR shall procure, install, test and commission the one (1)
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Distribution switch equipped of 20-Port 1Gigabit Ethernet /2-Port
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
DPC module with 10Gigabit Ethernet XFP transceivers for the utilization
of the existing Juniper MX-960 PPE Routers. CONTRACTOR shall
DESCRIPTION
utilize and reserve the slot 4 of the existing Juniper MX-960 on both
Communication Building 12 at Yanbu NGL and Admin Building 1401 at
Yanbu Refinery
The CONTRACTOR shall procure, install, test and commission one (1)
Provider Edge (PE) router with redundant power supplies.
CONTRACTOR shall procure, install, test and commission the one (1)
Access Switch and one (1) Modular Access switch equipped with
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
09/08/16
D
C
B
redundant power supply, one (1) Modular Access switch equipped with
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Modular Access switch, Redundant Power Supply, fiber optic/UTP
SAY
SAY
SAY
ASH
ASH
ASH
The Modular Access switch shall be powered from utility power source
LEADS
ALL
ALL
Telecommunication Room.
CONTRACTOR shall procure, install, test and commission the one (1)
Redundant Power Supply and one (1) Access switches equipped with
DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
The access switch shall be powered from utility power source and
dedicated Rack Mounted UPS systems installed in Telecommunication
12/11/16
08/04/16
09/08/16
DATE
Room.
D
C
B
DISCIPLINE
ENGINEER CONTRACTOR shall procure, install, test and commission the one (1)
ALL LEADS
Redundant Power Supply and one (1) Access switch equipped with
DATE: 12/11/16
PROJECT SFP pluggable 1000Base-X Mini-GBIC Transceivers that support single
ENGINEER
A M ALMATROOK
mode fiber over 1310nm wavelength with LC connector. The
DATE: 12/11/16
1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
CERTIFIED fiber up to a maximum distance of 10km.
AMR EL SHARKAWY
12/11/16
DATE: CONTRACTOR shall install Universal 19” Standard Rack to mount the
CONSTRUCTION
AGENCY access switch, Redundant Power Supply, fiber optic/UTP copper patch
SHAHZAD YAZDANI
panel and ancillaries.
DATE: 12/11/16
OPERATIONS
The access switch shall be powered from utility power source and
ALI H GHAMDI
12/11/16
dedicated Rack Mounted UPS systems installed in Telecommunication
DATE:
Room.
CONTROL NUMBER
VERIFICATION
DATE:
CONTRACTOR shall procure, install, test and commission the one (1)
BY:
Redundant Power Supply and one (1) Access switch equipped with
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
fiber up to a maximum distance of 10km.
SAY
SAY
SAY
ASH
ASH
ASH
ALL
ALL
The access switch shall be powered from utility power source and
dedicated Rack Mounted UPS systems installed in Telecommunication
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Cabinet (TC).
DESCRIPTION
CONTRACTOR shall procure, install, test and commission the one (1)
Redundant Power Supply and one (1) Access switches equipped with
SFP pluggable 1000Base-X Mini-GBIC Transceivers that support single
mode fiber over 1310nm wavelength with LC connector. The
1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
fiber up to a maximum distance of 10km.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
09/08/16
D
C
B
The access switch shall be powered from utility power source and
DISCIPLINE
ENGINEER dedicated Rack Mounted UPS systems installed in Telecommunication
ALL LEADS
Room.
DATE: 12/11/16
PROJECT
ENGINEER
A M ALMATROOK
12/11/16 CONTRACTOR shall procure, install, test and commission the one (1)
DATE:
CONSTRUCTION Redundant Power Supply and one (1) Access switch equipped with
AGENCY
SHAHZAD YAZDANI
SFP pluggable 1000Base-X Mini-GBIC Transceivers that support single
DATE: 12/11/16 mode fiber over 1310nm wavelength with LC connector. The
OPERATIONS 1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
ALI H GHAMDI
fiber up to a maximum distance of 10km.
12/11/16
DATE:
CONTROL NUMBER
The access switch shall be powered from utility power source and
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Room.
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
General
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
•
ISSUED FOR 90% PROJECT PROPOSAL
UPS Equipment
• Grounding Kits
• Fiber optic transceivers
• Fiber Patch cords
• UTP Patch cords
10-02399-
10-02399-
0001
0001
0001
09/08/16
•
DATE
D
C
B
DISCIPLINE
• Conduct factory, site and system acceptance tests.
ENGINEER
ALL LEADS
• Provide installation drawings, wiring and cabling schedules, and
equipment location plans.
DATE: 12/11/16
PROJECT • Conduct link test to ensure maximum 1G or higher bandwidth
ENGINEER
optimization.
•
A M ALMATROOK
Installation of additional UTP cabling from the access points to the
DATE: 12/11/16
CERTIFIED appropriate data switches.
AMR EL SHARKAWY • Provide commissioning test plans, test schedules and test reports.
DATE:
12/11/16
• Provide accommodation, transportation and all necessary permits,
CONSTRUCTION
AGENCY
clearances and protective safety equipment for their In-Kingdom
SHAHZAD YAZDANI personnel.
DATE: 12/11/16 • The logistics associated with the In-Kingdom Installation.
OPERATIONS • The provision of all materials, tools, test equipment, and other items of
ALI H GHAMDI equipment to effect the installation and commissioning.
DATE:
12/11/16 • Project Management.
•
CONTROL NUMBER
prior to implementation.
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
and configuration sheets are readily available in the facility where the
C
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall deliver all documentation in both hardbound paper
SAY
SAY
SAY
ASH
ASH
ASH
Materials
LEADS
LEADS
LEADS
ALL
ALL
ALL
Software
ISSUED FOR 90% PROJECT PROPOSAL
0001
0001
• For each software package the migration path (when upgrades will be
expected, how the upgrades will be delivered, loaded, patching, etc.).
12/11/16
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER
ARAMCO property.
ALL LEADS
DATE: 12/11/16
PROJECT
ENGINEER
REFERENCE DRAWINGS
A M ALMATROOK
Listed below are proposal engineering documents and drawings which shall
DATE: 12/11/16
CERTIFIED be finalized by CONTRACTOR during detail design.
AMR EL SHARKAWY
12/11/16
DATE:
CONSTRUCTION SHEET
AGENCY DRAWING NO. DRAWING TITLE
SHAHZAD YAZDANI
NO.
DATE: 12/11/16 CO-A10033 001 Schematic Diagram, Overall Data System
OPERATIONS
Overall System Diagram, Data Network
ALI H GHAMDI CO-A10036 001
12/11/16
System
DATE:
CO-A10039 001 Schematic Diagram, Overall WLAN System
CONTROL NUMBER
VERIFICATION
EDSD
B. TELEPHONE NETWORK
DATE:
BY:
Scope of Work
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
IP Telephony
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• CONTRACTOR shall provide, procure, install, configure and test an
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
•
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
per below listed breakdown of numbers and IP phone types per
ENGINEER
ALL LEADS
building.
DATE: 12/11/16
PROJECT
Table 1 – IP Telephone Count and Types
ENGINEER
A M ALMATROOK
Basic IP Office IP Conference
DATE: 12/11/16 Location Subtotal
CERTIFIED Phone Phone IP Phone
AMR EL SHARKAWY
Operation Building 5 7 -- 12
EDSD
DATE:
Receiving Substation 3 -- -- 3
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
1 -- -- 1
Main Gate
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
Basic IP Office IP Conference
SAY
Location Subtotal
Phone Phone IP Phone
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Security Guardhouse
1 -- -- 1
(Tank Farm)
TOTAL 22 36 1 59
•
10-02399-
JO/EWO
10-02399-
10-02399-
CONTRACTOR shall provide the required Port licenses for all new
0001
0001
0001
09/08/16
DATE
D
C
B
•
12/11/16
DATE: CONTRACTOR shall provide the required Analog and Hotline
CONTROL NUMBER
VERIFICATION
Analog Hotline
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Location Subtotal
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Phone Phone
OF THIS DRAWING IS COVERED, FOR ALL
4 -- 4
Building
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
Analog Hotline
SAY
Location Subtotal
Phone Phone
ENGG CERT
ASH
ASH
ASH
Operations Shelter-1 1 -- 2
LEADS
LEADS
LEADS
ALL
ALL
ALL
Operations Shelter-2 1 -- 2
Operation Building 2 4 6
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
X-Ray Building 1 -- 1
Security Support Building
1 -- 1
(Tank Farm)
Security Guardhouse
1 1 2
(Tank Farm)
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
Chemical Shelter 1 -- 1
12/11/16
08/04/16
09/08/16
DATE
Metering Shelter 1 -- 1
NO.
REV
D
C
B
YASREF -- 1 1
DISCIPLINE
ENGINEER
ALL LEADS SAMREF -- 1 1
DATE: 12/11/16
PROJECT
ENGINEER
Yanbu Refinery Terminal -- 1 1
A M ALMATROOK
TOTAL 17 10 27
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
12/11/16
DATE:
• CONTRACTOR shall provide an approve telephones for all analog
CONSTRUCTION
AGENCY users and approve dial-less red phone for all hotline/emergency
SHAHZAD YAZDANI
telephone users.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
• This project shall allocate the four (4) hotline circuits in Operation
12/11/16 Building to Yanbu Regional Security Command Centre (YRSCC).
DATE:
CONTROL NUMBER
VERIFICATION
•
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
security protection against threats such as DDoS attacks, malicious
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
two (2) new Ethernet switches. The Ethernet Switch shall be utilized
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
D
C
B
12/11/16
Maintenance Building.
DATE:
CONTROL NUMBER
•
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Para. 4.2.2.3.4.
C
• This project shall lease a telephone Trunk Lines from a local service
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
provider for its Backup/outside call access. Refer to CO-A10028
SAY
SAY
SAY
Sheet 001 for the trunk lines detail. This project shall also provide
ENGG CERT
ASH
ASH
Centre (YRSCC).
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE The document also specified the CONTRACTOR’S obligations and will be
ENGINEER
ALL LEADS finalized during detailed design.
DATE: 12/11/16
PROJECT CONTRACTOR shall propose to the COMPANY the recommended training
ENGINEER
A M ALMATROOK
courses for the System. CONTRACTOR shall price the courses according
DATE: 12/11/16
to the software and equipment installed that make-up the entirety of the
CERTIFIED System.
AMR EL SHARKAWY
DATE: 12/11/16
CONTRACTOR shall supply its latest hardware and software required to
OPERATIONS support the above capacities with consideration for the expansion.
ALI H GHAMDI
DATE:
12/11/16 CONTRACTOR shall supply the required port licenses for IP phones to
expand the IP telephony platforms located in Dhahran and Abqaiq provided
CONTROL NUMBER
VERIFICATION
under BI-10-00246.
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
equipment.
OF THIS DRAWING IS COVERED, FOR ALL
System Configuration
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
requirements.
Power Systems
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
EQUIPMENT SPECIFICATIONS
IP TELEPHONE SETS
NO.
REV
D
C
B
DISCIPLINE
ENGINEER Scope
ALL LEADS
DATE: 12/11/16
PROJECT
CONTRACTOR shall engineer, procure, test and install with this
ENGINEER Specification, and the scope shall be as follows:
A M ALMATROOK
• Connectivity of IP phone at each communication service point
DATE: 12/11/16
CERTIFIED to 10/100/1000 Mbps switched Fast Ethernet ports shall be
AMR EL SHARKAWY over Unshielded Twisted Pair (UTP) Category 6 cable.
12/11/16
DATE:
CONSTRUCTION
• IP Phones shall have 2-port built-in switch in which
AGENCY first port connects to the Access Layer in the TER/TR
SHAHZAD YAZDANI
and the second port connects towards the PC/mobile
DATE: 12/11/16
OPERATIONS
terminals in the work areas.
ALI H GHAMDI • IP Phones shall support existing and latest IEEE (Power-
DATE:
12/11/16 over- Ethernet) standards.
CONTROL NUMBER
VERIFICATION
Facility.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
stations with Hotline IP-Phone terminals.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
IP Phone Types
The project shall provide three (3) types of IP telephones which are to be
installed within the Yanbu Distribution Hub:
10-02399-
10-02399-
0001
•
0001
0001
Conference IP Phone
12/11/16
08/04/16
09/08/16
DATE
Analogue Telephone
NO.
REV
D
C
B
This project shall supply and install a Line Access Gateway (LAG) with
DISCIPLINE
ENGINEER
Analogue Telephone sets in the Engineering & Maintenance Building to
ALL LEADS serve the Yanbu Distribution Hub. A Line Access Gateway (LAG) shall
DATE: 12/11/16 be provided to serve locations where IP telephone handsets cannot be
PROJECT
ENGINEER provided.
A M ALMATROOK
DATE: 12/11/16 This project shall supply and install Hotline Telephone between Main Gate,
CERTIFIED Operation Building and FSF Support Building.
AMR EL SHARKAWY
12/11/16
DATE: This project shall supply and install analogue telephone handsets in the
CONSTRUCTION
AGENCY various location of Yanbu Distribution Hub as listed in Table 2 of this
SHAHZAD YAZDANI document.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI BANDWIDTH REQUIREMENTS
12/11/16
DATE:
CONTROL NUMBER
Introduction
VERIFICATION
EDSD
The purpose of this section is to provide all the critical VoIP solution sizing
statistics and results that shall be used by CONTRACTOR to design their
DATE:
BY:
Yanbu Dist r ibut ion Hub shall have the capability to support a minimum
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
of 59 users.
C
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
building is listed in Table below.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
ASH
IP ANALOG
BUILDING NAME
TELEPHONE TELEPHONE
LEADS
LEADS
LEADS
ALL
ALL
ALL
Operation Building 12 6
X-Ray Building -- 1
Security Guardhouse 1 2
10-02399-
10-02399-
Receiving Substation 3 --
0001
0001
0001
09/08/16
DATE
--
Chemical Shelter 1
NO.
REV
--
D
C
B
Metering Shelter 1
DISCIPLINE
ENGINEER Remote Interface Unit Building 1 -- 1
ALL LEADS
DATE: 12/11/16
--
SAMREF 1
CERTIFIED
AMR EL SHARKAWY --
Yanbu Refinery Terminal 1
12/11/16
DATE:
CONSTRUCTION TOTAL 59 27
AGENCY
SHAHZAD YAZDANI
DATE: 12/11/16 Standard Erlang and Erlang-B models shall be used to estimate the
OPERATIONS required PSTN link capacity.
ALI H GHAMDI
DATE:
12/11/16 C. WIRELESS LAN NETWORK
CONTROL NUMBER
VERIFICATION
Scope of Work
EDSD
General
DATE:
BY:
This shall primarily provide wireless LAN connectivity for the users where the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The project shall provide and commission the following wireless LAN
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
subsystems:
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The wireless LAN network shall have a flexible configuration that enables it to
be deployed at any location within the new Yanbu Distribution Hub and
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
The WLAN system shall consider providing coverage and connectivity for
802.11ac in addition to 802.11a/b/g and 802.11n users. This shall be
DESCRIPTION
The WLAN shall share the data network infrastructure in terms of access
switches to facilitate wireless connectivity.
10-02399-
10-02399-
0001
0001
0001
CONTRACTOR shall design and implement the System by using the latest
12/11/16
09/08/16
DATE
D
C
B
DATE: 12/11/16 • Maintenance and Engineering Building – Ground Floor & 1st Floor
CERTIFIED • Operation Building
•
AMR EL SHARKAWY
12/11/16
Operation Shelter
DATE: • Security Guardhouse
CONSTRUCTION
AGENCY • Security Main Gate
SHAHZAD YAZDANI
DATE: 12/11/16 CONTRACTOR shall be responsible for the complete system design to
OPERATIONS
ensure full coverage within Yanbu Distribution Hub facilities.
ALI H GHAMDI
12/11/16
DATE: All components and accessories required for the completion and successful
CONTROL NUMBER
operation of the proposed WLAN system, either specified in detail or not, shall
VERIFICATION
all required quantities and provide the System “Fit for Purpose’, irrespective of
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Equipment Provision
C
This project shall provide, install, test and commission a permanent, scalable
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and a complete WLAN system in accordance with the minimum requirement
SAY
SAY
SAY
as specified.
ENGG CERT
ASH
ASH
ASH
Installation
LEADS
LEADS
LEADS
ALL
ALL
ALL
Wireless Controller
Access Points
• Wireless LAN access points shall employ two radios at 2.4 and
5GHz Frequency band
• Wireless LAN access points inside the building shall utilize UTP
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
09/08/16
DATE
D
C
B
A M ALMATROOK
REFERENCE DRAWINGS
DATE: 12/11/16
CERTIFIED SHEET
DRAWING NO. DRAWING TITLE
AMR EL SHARKAWY NO.
12/11/16
DATE: CO-A10033 001 Schematic Diagram, Overall Data System
CONSTRUCTION
AGENCY CO-A10039 001 Schematic Diagram, Overall WLAN System
SHAHZAD YAZDANI
DATE: 12/11/16
OPERATIONS D. STRUCTURED CABLING SYSTEM
ALI H GHAMDI
General
EDSD
This describes the design requirement for the Building Structured Cabling
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
proven and reliable design which will comply with the applicable standards
or codes and embody the latest proven technology.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
STANDARDS
General
DESCRIPTION
The materials and equipment provided for this System shall conform to the
requirements of the latest issues and most recent revisions and
amendments of the standards listed below and the local laws and
regulations applicable to the site.
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
General
NO.
REV
D
C
B
All the materials and equipment provided for this System shall meet the
DISCIPLINE
ENGINEER
best commercial practices, reliability, maintainability and performance of
ALL LEADS the systems defined in this specification.
DATE: 12/11/16
PROJECT
ENGINEER Structured Cabling System shall comply with BICSI standards as well as
A M ALMATROOK EIA/TIA 568, EIA/TIA-569, EIA/TIA-606, EIA/TIA-607 and all associated
DATE: 12/11/16 Technical Bulletins. The cables shall conform to the fire and safety codes
CERTIFIED NEC Article 800- 51(b) or equivalent.
AMR EL SHARKAWY
12/11/16
DATE: BICSI certified RCDD shall be prerequisites for the designers of the
CONSTRUCTION
AGENCY building cabling system.
SHAHZAD YAZDANI
DATE: 12/11/16 Building Structured Cabling System shall be designed for at least a
OPERATIONS minimum operating lifetime of 20 years.
ALI H GHAMDI
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Cableway System (horizontal and backbone) which includes but
SAY
SAY
SAY
not limited to cable tray system, Rigid Steel Conduit (RSC) and
Electro Malleable Tubing (EMT) conduits, sleeves, pull boxes,
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The Work shall include but not limited to installation, termination and
testing of CAT6 modules and test all horizontal and backbone cabling.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
TECHNICAL REQUIREMENTS
10-02399-
10-02399-
0001
0001
09/08/16
each floor.
DATE
D
C
B
DATE: 12/11/16 If the total horizontal cabling length to any IO exceeds 90m from the patch
PROJECT
ENGINEER panels, additional TR and IDF’s shall be provided.
A M ALMATROOK
• The Fire Detector shall have a remote light extended from its circuit
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
• All walls and doors in the TER/TR shall have a one-hour fire rating.
(DCC) NO. _____________________
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• The main entrance door shall have a combination door lock and
SAY
SAY
SAY
ASH
ASH
ASH
ALL
ALL
be provided.
• Each Line circuit shall originate from the dedicated power panel
located in each TER/TR. For buildings with UPS power, the
DESCRIPTION
hangers, ground straps, fixtures etc. The size and layout of the
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
D
C
B
service entrance to the building, including the entrance point through the
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
extended from the TER to a point 1.5 meters from the building foundation.
OF THIS DRAWING IS COVERED, FOR ALL
Conduits.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Equipment Racks
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Cable management system shall be provided using the rack system that
supports heavy equipment and high capacity cable for cross-connect or
interconnect applications in a telecommunication room.
DESCRIPTION
Equipment Racks shall be used for the installation of both passive and
active equipment required for their complete installation in all
communication rooms. In locations that require special security or where
environmental requirements for the active equipment cannot be met, an
enclosure may be required.
The racks system shall be modular and support copper and fiber cables.
The rack shall be constructed of steel material to accommodate 19”
components.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
The rack shall be UL listed for 800 pound load rating to accommodate
12/11/16
09/08/16
DATE
The rack shall supply space identification of quick and easy location of
NO.
REV
D
C
B
DATE: 12/11/16 The rack shall accept removable, hinged doors and fingers cable
PROJECT
ENGINEER management system. The rack system shall meet all EIA requirements as
A M ALMATROOK defined in EIA-310-D.The standard racks shall be high strength aluminum
DATE: 12/11/16 with heavy-duty base and top angle hardware.
CERTIFIED
AMR EL SHARKAWY
Standard Rack dimensions shall be 7 feet height x 19 inches width.
12/11/16
DATE: Minimum of two (2) 19” X 7” equipment racks and associated vertical &
CONSTRUCTION
AGENCY horizontal cable management system is required per TR.
SHAHZAD YAZDANI
DATE: 12/11/16 Each rack shall be bonded together with approved bonding jumpers to the
OPERATIONS communications room ground bus bar.
ALI H GHAMDI
DATE:
12/11/16 Equipment Enclosures
CONTROL NUMBER
VERIFICATION
communications room but still require voice and data connections to the
C
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Fan units equipped with a fit for purpose filtration system shall be used,
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Patch panels shall be sized with a minimum 25 percent spare capacity for
future growth and MAC (Moves, Adds & Changes) work. The patch panels
design shall remove any tools involving MAC work.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
All horizontal cables serving the information outlets (IO’s) at the IWAs shall
be terminated onto a patch panels in TER/TR/TC or data enclosures.
NO.
REV
D
C
B
DISCIPLINE
ENGINEER
Patch Panels shall be, modular, CAT-6 UTP, with integral high density
ALL LEADS punch down style connecting base. The connecting base shall employ
DATE: 12/11/16 deep channels to provide additional space for cable management. The
PROJECT
ENGINEER connecting block shall have a compatible footprint with installed 110
A M ALMATROOK systems. The connecting block shall have rounded edge.
DATE: 12/11/16
CERTIFIED Four pair Category 6 UTP cabling shall be terminated onto four pair punch
AMR EL SHARKAWY
down style connecting hardware mounted to the rear (integral to the patch
12/11/16
DATE: panel) to the category 6 modules on the front face of the patch panel
CONSTRUCTION
AGENCY wiring configuration shall conform to EIA/TIA 568B standard.
SHAHZAD YAZDANI
DATE: 12/11/16 The wire strip and connecting block, shall be marked with a highly visible
OPERATIONS color code and allow for termination of one full pair or four full pairs at a
ALI H GHAMDI time.
12/11/16
DATE:
CONTROL NUMBER
Port and panels shall be easy to identify with write on areas and optional
VERIFICATION
racks/enclosures.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
cross-connect or between the patch panel and the networking hardware
SAY
SAY
SAY
ASH
ASH
ASH
The Patch cords shall be factory terminated with modular plugs featuring a
one piece , tangle free latch design and black strain relief boots to support
LEADS
LEADS
LEADS
ALL
ALL
ALL
standards.
Category 6 UTP patch cords shall be used between punch down style
connecting blocks when configured as a cross connect or between the
connecting block and networking hardware when the connecting block is
used as a interconnect.
Patch cords shall use 24 AWG stranded Category 6 cable. The cable shall
be terminated onto eight position punch down style plugs (R-J45 modular
plugs featuring a one piece, tangle free latch design and strain relief boots)
and tested to exceed the Category 6 performances when used with the
10-02399-
JO/EWO
10-02399-
10-02399-
0001
12/11/16
The patch cords shall use grey cords with grey connectors, shall be field
08/04/16
09/08/16
DATE
D
C
B
The fiber Patch cords come in lengths of one, two and three meters.
EDSD
Cable Management
DATE:
BY:
REVISIONCERTIFICATION
Cable management shall be used to provide a neat and efficient means for
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
routing and protecting fiber and copper cables and patch cords on the
C
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
cable managers, and cable management accessories used throughout the
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
fingers. The duct fingers shall include retaining tabs to retain the cables in
place during cover removal. The covers shall be easily removed or hinged
to allow for quick moves, addition and changes.
10-02399-
10-02399-
0001
bend radius and providing cable strain relief. Panels shall be universal
0001
0001
design mounting to EIA 19” racks and constructed of steel base with
12/11/16
plastic fingers. The duct fingers shall include retaining tabs to retain the
08/04/16
09/08/16
DATE
cables in place during cover removal. The covers shall be easily removed
or hinged to allow for quick moves, addition and changes.
NO.
REV
D
C
B
DISCIPLINE
ENGINEER
The cable mangers shall be provided with wire retainers to retain the
ALL LEADS cables during cover removal and # 12-24 English and M6 metric mounting
DATE: 12/11/16 screws. The two rack unit space, horizontal cable management panel shall
PROJECT
ENGINEER be provided between two modular patch panels.
A M ALMATROOK
Backbone Cabling
VERIFICATION
EDSD
facilities.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The Backbone fiber optic cable shall be glass cable, single mode fiber
optic cable conforming to G.652D standard.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
The optic core optical fibers armored distribution cable shall be used within
buildings. Applications include intra-building backbones, routing between
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The optical fiber cable shall be suitable for riser and plenum applications.
The optical fiber cables shall have riser and Plenum designs UL listed as
CMR/OFNR (CSA-FT4) and CMP/OFNP (CSA-FT6) or an equivalent
The Fiber Optic cables shall be designed with Reverse Oscillated Lay
10-02399-
JO/EWO
10-02399-
10-02399-
0001
Stranding Method to facilitate mid-span access of fibers. All the Fiber Optic
0001
0001
09/08/16
DATE
Patch cords of same specification shall be used for the indoor distribution
system from network switches to end devices throughout the building, as
NO.
REV
D
C
B
A M ALMATROOK Copper Cable: In cases where copper cables shall be utilized to provide
DATE: 12/11/16 analogue telephone service or any other voice communication service,
CERTIFIED following shall be the minimum standard required for the cable to be used:
AMR EL SHARKAWY
12/11/16
DATE: • All cables shall meet or exceed Category 6 or Cat 3 UTP
•
CONSTRUCTION
AGENCY These requirements are for multi-pair 25 pair or more UTP 24 AWG
SHAHZAD YAZDANI copper cables.
DATE: 12/11/16 • All cables shall conform to the requirements for communication
OPERATIONS
circuits defined by local electrical code equivalent to NEC.
•
ALI H GHAMDI
The cable manufacturer shall be ISO 9001 registered.
12/11/16
DATE:
CONTROL NUMBER
Punch down 110 base and system, Cat-6 ( Cat3) UTP cable shall be
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Protection Units
(DCC) NO. _____________________
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
protector unit at the demarcation point of every building. All protector units
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Category 6 UTP patch cord shall be used between 110 style connecting
bases when configured as a cross-connect or between connecting block
and networking hardware when the connecting block is used as an
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
The patch cords shall be factory terminated with modular plugs featuring a
one piece, tangle free latch design and black strain relief boots. No field
terminated patch cords or cross-connects shall be used for the permanent
installation.
10-02399-
10-02399-
0001
09/08/16
DATE
General
NO.
REV
D
C
B
DISCIPLINE
ENGINEER
All horizontal cabling shall be CAT6 UTP, plenum rated, 24 AWG 100
ALL LEADS Ohm, 4-pair cables to create a truly structured cable environment where
DATE: 12/11/16 each horizontal link can be used for either voice or data as required.
PROJECT
ENGINEER
12/11/16
DATE: Plenum cable shall be utilized for the horizontal cable distribution network
CONSTRUCTION
AGENCY where cables are subjected to airflow and are not totally enclosed in steel
SHAHZAD YAZDANI conduit. Other areas shall use non-plenum grade in NEC & UL.
DATE: 12/11/16
OPERATIONS Bridged taps and splices are not permitted as part of the copper horizontal
ALI H GHAMDI cabling.
12/11/16
DATE:
CONTROL NUMBER
All horizontal cables shall be terminated onto punch down style UTP, CAT-
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
width as per the calculated sizing depending upon the usable area served
by them.
The maximum fill ratio shall not exceed 40% of the cable installed. A full
complement of fittings must be available including, but not limited to 45
degree and 90 degree flat, vertical inside and outside elbows, tee and
cross fittings, reducers, end caps and all other components necessary to
make the system workable. Snap-on or split covers shall be available for
10-02399-
JO/EWO
10-02399-
10-02399-
0001
12/11/16
09/08/16
DATE
radius. The communications cable tray shall not be shared with building
electrical cable. Communications wires and cables shall be separated by
NO.
REV
D
C
B
Cables installed in ducts, plenums and other spaces for environmental air
VERIFICATION
Type (CMR). Floor penetrations requiring Type CMR shall contain only
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
Only Type CMP and CMR cables shall be installed in these raceways.
Communications cables Types CMP, CMR, Communications General
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The work area shall consist of the connectivity equipment used to connect
the horizontal cabling subsystem and the equipment in the work area. The
connectivity equipment might include the following options:
DESCRIPTION
Each building shall be pre-wired for voice/data and Wireless Local Area
Network (WLAN) access point connection in accordance with TIA/EIA-
568B wiring standard. Dual Port RJ-45 Information Outlets shall be
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
provided for each room. Two (2) CAT6 4-pair horizontal cables shall be
routed, terminated and certified from the Information Outlet to the patch
12/11/16
08/04/16
09/08/16
The maximum CAT6 cable length between the IO and patch panels shall
NO.
REV
D
C
B
be 90 meters.
DISCIPLINE
ENGINEER
ALL LEADS All insert modules shall be 8P8C, non-keyed, modular RJ45 jack with
DATE: 12/11/16 pin/pair assignments wired per T568B standard termination.
PROJECT
ENGINEER
A M ALMATROOK All outlets shall be manufactured from high impact thermoplastic material
DATE: 12/11/16 UL flammability rating of 94 HB or better. All outlets and surface mount
CERTIFIED
AMR EL SHARKAWY
boxes shall be available in four colors including off-white (IW), Electrical
12/11/16
Ivory (EI), White (WH) and international Grey (IG).
DATE:
CONSTRUCTION
AGENCY Each gang box shall be connected to 1” diameter conduit. In cases of false
SHAHZAD YAZDANI
ceiling installation, the conduit shall begin from the cable tray (installed in
DATE: 12/11/16 the space between the Ceiling and the false ceiling) and terminate at the
OPERATIONS
outlet gang box.
ALI H GHAMDI
12/11/16
DATE: The conduits installed underground flushed with floor shall be 1” diameter
CONTROL NUMBER
PVC.
VERIFICATION
EDSD
directly from the Data Cabinet feed to the outlet directly whole run being
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
In cases where the conduits originate from the data cabinet but partial run
is flushed floor before serving the outlet, the amount of run above ground
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
shall be 1” diameter EMT and that under the ground shall be 1” diameter
SAY
SAY
SAY
PVC coated RSC. At each end of the conduits, bushings shall be provided
for protection of the cables.
ENGG CERT
ASH
ASH
ASH
Surface mount boxes shall be provided in 4 ports low profile boxes. Boxes
LEADS
LEADS
LEADS
ALL
ALL
ALL
shall accept all fiber, copper and miscellaneous audio/video modules. The
Boxes shall mount with screws, adhesives or optional magnets. The box
covers include breakouts for use with surface raceway. Cable tie slots
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Face plates shall be two ports as required, single gang with painted
combination head screw. The face plates shall mount to standard US
NEMA boxes and adapters .Dedicated sloped versions shall be provided
for improved bend radius control and decreased requirements in wall
depths. Each faceplate shall accept outlet modules that can be individually
inserted and removed as required.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
Power poles can be used as pathways for the horizontal cable from the
12/11/16
ceiling to the work areas. Power poles that are used for voice, data and
08/04/16
09/08/16
DATE
power cable shall be listed for the applications with a divider for
separation. The poles shall be installed as per the manufacture installation
NO.
REV
D
C
B
12/11/16
DATE: CONTRACTOR shall provide communications grounding and bonding
CONSTRUCTION
AGENCY system in all locations that utilize communications equipment, both passive
SHAHZAD YAZDANI and active. Telecommunications Main Grounding Busbar (TMGB), the
DATE: 12/11/16 Telecommunications Grounding Busbar (TGB), the Telecommunications
OPERATIONS Bonding Backbone (TBB), the Telecommunications Bonding Backbone
ALI H GHAMDI Interconnecting Bonding Conductor (TBBIBC) and the conductors used to
12/11/16 bond the components together are the components for the communication
DATE:
CONTROL NUMBER
conduct lightning and AC fault currents from the primary protectors. The
REVISIONCERTIFICATION
conductor for the TMGB shall be a minimum of 300 mm (1 ft.) from any
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
power cables, even when isolated by metallic conduits. The location of the
C
bus bar shall be designed for attaching entrance facility equipment and
other grounding bars.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
The TGB is the bar used to ground the passive and active components
inside the communications room. The TGB shall be a predrilled electro tin
ENGG CERT
ASH
ASH
ASH
plated copper bus bar provided with standard NEMA bolt hole sizing and
spacing. Minimum dimensions for the TGB are 6 mm (1/4 in) thickness x
LEADS
LEADS
LEADS
ALL
ALL
ALL
EXPANSION CAPABILITIES
SCS horizontal cabling shall have two (2) or three (3) UTP cables wired to
the information outlets of each quadplex plate.
The backbone cable system shall be sized with a minimum of 50% spare
10-02399-
JO/EWO
10-02399-
10-02399-
0001
12/11/16
09/08/16
DATE
D
C
B
12/11/16
DATE: CONTRACTOR shall install all equipment required by this specification to
CONSTRUCTION
AGENCY produce a fully functional system ready for handling over to SAUDI
SHAHZAD YAZDANI ARAMCO.
DATE: 12/11/16
OPERATIONS Quality
ALI H GHAMDI
fully trained personnel, with installation techniques who are familiar with
VERIFICATION
CONTRACTOR shall label each wire and cable in each end indicating the
wire designation. The labeling shall be identical in nomenclature and all
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
labels shall be typed and covered with transparent heat-shrinkable tubing.
SAY
SAY
SAY
CONTRACTOR shall neatly arrange all cables on the cable ladder rack,
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Plant Tagging
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Manufacturer’s Data
10-02399-
10-02399-
0001
0001
09/08/16
DATE
D
C
B
4.0 MHz, 25 MHz and 250 MHz as a minimum. Insertion loss and
DISCIPLINE
ENGINEER cross talk must be measured with a cable length of at least 305
ALL LEADS meters (1000 ft). If the cable lengths are greater than 305 m, the
DATE: 12/11/16 results must be normalized to 305 m for comparison with the
PROJECT
ENGINEER manufacturer’s data.
A M ALMATROOK
DATE: 12/11/16 • Figures 18-D and 18-E show the test set up for insertion loss and
CERTIFIED
AMR EL SHARKAWY
NEXT respectively. The frequency oscillator must be set to the
12/11/16
correct frequency, level (0 dBm), and source impedance (100 ohm).
DATE:
The level of meter must cover the required range of frequencies and
CONSTRUCTION
AGENCY a wide range of sensitivity down to 100 dBm. Test cords must be
SHAHZAD YAZDANI
• short and calibrated according to ANSI/EIA/TIA-5
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
DATE:
12/11/16 Cable Crosstalk between pairs
Insertion
CONTROL NUMBER
Freq.
VERIFICATION
1
BY:
4
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
16
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
25
(DCC) NO. _____________________
100
200
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
250
SAY
SAY
SAY
Use this table to record the measure value as a result of testing on the cable.
ENGG CERT
ASH
ASH
ASH
On the basis that an estimated 360 cable reels of 305 meters each will be used, it is
LEADS
LEADS
LEADS
ALL
ALL
ALL
proposed to select 50 random samples for measurement. If the measured values exceed
(in the case of insertion loss) or are less than (in the case of NEXT) the manufacturer’s
specifications by more than 5% at any frequency, the results must be reported to the
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
SAUDI ARAMCO Representative and another lot of samples will be chosen for testing. If
the second lot of samples fails again, the batch must be rejected.
After installation, all copper cable pairs shall be tested for circuit continuity (end to end),
DESCRIPTION
split pairs, pair-to-pair short, attenuation and noise as specified in SAES-T-634. The
recommended test set is fluke Omni scanner.
All horizontal cabling must be tested in accordance with TIA/EIA TSB 67 known as
“Transmission Performance Specification for Field Testing of Unshielded Twisted Pair
Cabling”.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/11/16
08/04/16
09/08/16
NO. DATE
REV
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS
DATE: 12/11/16
PROJECT
ENGINEER
A M ALMATROOK
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
12/11/16
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The SCS installation and testing shall be performed by Category 6 cable
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Test results shall be submitted at least two copies (both hard & soft copy)
DESCRIPTION
10-02399-
10-02399-
0001
0001
3. NEXT
0001
4. Attenuation
12/11/16
08/04/16
09/08/16
5. ELFEXT
DATE
D
C
B
12/11/16
DATE: The Field Test Report will consist of the following information in order:
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
•
THIS INDICATES THAT REV. NO.__________
resolved.
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Quality Control
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Design Drawings
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Two sets of design drawings are available during each site installation.
On-site modifications will be legibly marked on two drawing sets. After
installation, one set will be returned for as-built drawing preparation.
DESCRIPTION
Safety Equipment
First aid kits, fire extinguisher, hard hats, safety shoes, and other safety
devices will be prepared for safety personnel before testing.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
Proof of Performance
0001
0001
12/11/16
09/08/16
DATE
with the installed cabling to show the system installed means the
designed criteria.
NO.
REV
D
C
B
DISCIPLINE
ENGINEER
Field Test Procedure
ALL LEADS
A M ALMATROOK This test plan describes the requirements for testing copper cables for
DATE: 12/11/16 voice and data circuits.
CERTIFIED
AMR EL SHARKAWY
Test Equipment Requirement
12/11/16
DATE:
CONSTRUCTION
AGENCY • Volt Ohmmeter
SHAHZAD YAZDANI • Megger (Insulation tester)
DATE: 12/11/16 • PCM - 23 (VF tester)
OPERATIONS
ALI H GHAMDI
12/11/16
DATE: Reference Documents
CONTROL NUMBER
VERIFICATION
• As-Built Drawings
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
DESIGN DRAWINGS
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
General
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
For each drawing created via a CADD system, the relevant CADD
computer files shall be provided to SAUDI ARAMCO in the form of
portable removable mass storage media (CD-ROM, tape cartridge,
diskette, etc.).
10-02399-
JO/EWO
10-02399-
10-02399-
0001
12/11/16
09/08/16
DATE
D
C
B
Purchase order shall be placed immediately for long lead items. All
DISCIPLINE
ENGINEER
Non-Material Requirements (NMR) shall be reviewed during the PDR.
ALL LEADS The detailed drawings shall have sufficient detail for fabrication of the
DATE: 12/11/16 system.
PROJECT
ENGINEER
System Manuals
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
maintenance techniques.
LEADS
LEADS
LEADS
ALL
ALL
ALL
Certificates of Acceptance
SCOPE DESCRIPTION
GENERAL
This project shall provide 24-core single mode fiber optic cables 8/125
microns 1310 nanometer in Star Topology from the E & M Bldg to the
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
09/08/16
DATE
In addition, this project shall provide 2-24 core single mode fiber optic
D
C
B
A M ALMATROOK
In addition, this project shall provide FO cable infrastructure to be
DATE: 12/11/16
installed for process automation systems (ESD) for two (2) RIO
CERTIFIED buildings. All terminations will be done on proposed 24-core FOC and
AMR EL SHARKAWY
fiber patch panels.
12/11/16
DATE:
CONSTRUCTION
AGENCY
In addition, this project shall provide 4-12 core single mode fiber optic
SHAHZAD YAZDANI cable infrastructures to be installed for control and communication
DATE: 12/11/16 systems from Receiving Substation to MARAFIQ-91 Substation. All
OPERATIONS terminations will be done on proposed 24-ports fiber patch panels.
ALI H GHAMDI
DATE:
12/11/16 In addition, this project shall provide FO cable infrastructure to be
installed for Metering System connectivity to YASREF Control System,
CONTROL NUMBER
VERIFICATION
SAMREF Control System, and YRT Control System All terminations will
EDSD
The design of the fiber optic cable shall be such that the performance
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
objectives of the System are achieved when the cable has been
C
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
works shall be taken into account under this obligation.
SAY
SAY
SAY
The System shall provide permanent cabling for Local Area Network
ENGG CERT
ASH
ASH
ASH
(LAN Enterprise) and Process Control System (PCS). These cables shall
consist of single-mode nonmetallic fiber optics. Cable installation will
LEADS
LEADS
LEADS
ALL
ALL
ALL
This project shall provide 200-pair copper cables from the Operation
DESCRIPTION
1. E & M Building
2. Operation Building
3. Operator Shelter
4. Remote Interface Building - RIB-XXX1
5. Remote Interface Building – RIB-XXX2
6. Metering Shelter
10-02399-
JO/EWO
10-02399-
10-02399-
0001
8. Chemical Shelter
12/11/16
08/04/16
09/08/16
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS CONTRACTOR shall provide 25-pairs x 22 gauge copper cables to the
DATE: 12/11/16
aforementioned buildings. Likewise, CONTRACTOR shall provide
PROJECT
ENGINEER
protected terminal block 489ACC 1-25 to each building for cable
A M ALMATROOK
termination.
DATE: 12/11/16
CERTIFIED The proposed copper cable shall be used for analog telephones for
AMR EL SHARKAWY
emergency purposes.
12/11/16
DATE:
CONSTRUCTION
AGENCY The X-RAY Bldg. and Security Gatehouse of Main Gate & Tank Farm,
SHAHZAD YAZDANI Voice & data requirements can be served through the proposed POE
DATE: 12/11/16 Ethernet switch and analog line via proposed 1571 OSP cable from the
OPERATIONS main protector in the Security Support building to the remote protector in
ALI H GHAMDI the Security Gatehouse. Such cable will be installed through PVC 2-4’’Ø
DATE:
12/11/16 PVC duct to be encased in concrete.
CONTROL NUMBER
VERIFICATION
The design of the copper cable network shall be such that the
EDSD
The System shall provide permanent cabling for local distribution (Analog
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Hub Plant areas. The copper cable shall be designed for direct buried or
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
pair copper conductors in 22 AWG. Individual conductors are twisted into
SAY
SAY
SAY
pairs with varying lay lengths to minimize crosstalk and specific color
combinations to provide pair identification. Cables larger than 25 pairs are
ENGG CERT
ASH
ASH
ASH
assembled into units, which are then used to assemble the core. Units are
individually identifiable by color coded unit binders. The core assembly is
LEADS
LEADS
LEADS
ALL
ALL
ALL
to provide protection for the core. North American color coded insulation. A
corrugated, copolymer coated, 8-mil aluminum inner shielding. A black,
linear low-density polyethylene jacket is applied overall with surface
marked information such as manufacturer’s identification, pair count,
DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
09/08/16
The trench will end on the proposed pedestals and building entrance
walls.
NO.
REV
D
C
B
DISCIPLINE
ENGINEER All conduits shall be designed to accommodate fiber optic and copper
ALL LEADS paired type of cables.
DATE: 12/11/16
PROJECT
ENGINEER A pedestal is an enclosure providing an accessible cable splice point or
A M ALMATROOK terminal above ground. Refer to standard drawing AA-036748. A
DATE: 12/11/16 pedestal guard shall be installed and secured by concrete footings
CERTIFIED
AMR EL SHARKAWY
around pedestals as per design drawing standards.
12/11/16
DATE:
The underground duct-bank system shall be designed, procured,
CONSTRUCTION
AGENCY constructed and Commissioned by the CONTRACTOR. The exact
SHAHZAD YAZDANI
underground conduit routings shall be field verified by the
DATE: 12/11/16 CONTRACTOR. If required, alternative routings shall be recommended
OPERATIONS
by the CONTRACTOR. In addition, the exact duct-bank section lengths
ALI H GHAMDI
shall be determined by CONTRACTOR during detailed design.
12/11/16
DATE:
CONTROL NUMBER
Additional Requirements
VERIFICATION
EDSD
DOCUMENTATION
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Factory Acceptance Test Procedures
SAY
SAY
SAY
ASH
Equipment manuals
ASH
ASH
LEADS
LEADS
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
SAUDI ARAMCO.
12/11/16
08/04/16
09/08/16
DATE
D
C
B
specialist tools that are required to operate and maintain the test
DISCIPLINE
ENGINEER equipment.
ALL LEADS
12/11/16
DATE: The system shall provide permanent cabling for local distribution (Analog
CONTROL NUMBER
and special services) to the designated locations. The copper cable shall
VERIFICATION
AWG. Individual conductors are twisted into pairs with varying lay
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
pair identification. Cables larger than 25 pairs are assembled into units,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
which are then used to assemble the core. Units are individually
(DCC) NO. _____________________
identifiable by color coded unit binders. The core assembly is filled with
80ºC (198ºF) ETPR (External Thermal Plastic Rubber) compound,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
completely filling the interstices between the pairs and under the core
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Copper cable will be installed from the Operation Building branch spliced
to different buildings. Buildings to be served are the following.
10-02399-
10-02399-
0001
0001
0001
Operation Building 25
12/11/16
08/04/16
09/08/16
DATE
Operator Shelter 25
NO.
REV
D
C
B
DATE: 12/11/16
Security Support Building, Tank Farm 25
CERTIFIED
AMR EL SHARKAWY
Chemical Shelter 25
12/11/16
DATE:
CONSTRUCTION
AGENCY
Security Support Building, Main Gate 25
SHAHZAD YAZDANI
12/11/16
DATE:
For further details on the fiber optic cable routing, refer to the following
CONTROL NUMBER
VERIFICATION
drawings:
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The design of the fiber optic cable shall be such that the performance
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
objectives of the System are achieved when the cable has been
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
distribution panels.
The above fiber optic system shall be used to link those buildings that
require data type service in the proposed Yanbu Distribution Hub.
DESCRIPTION
For further details on the fiber optic cable routing, refer to the following
drawings:
10-02399-
10-02399-
0001
0001
09/08/16
D
C
B
A M ALMATROOK The exact cable routings shall be verified by CONTRACTOR during detailed
DATE: 12/11/16 design, and, if required, alternative routings shall be recommended by
CERTIFIED CONTRACTOR.
AMR EL SHARKAWY
12/11/16
DATE: Exact cable lengths shall be determined by CONTRACTOR during detailed
CONSTRUCTION
AGENCY design.
SHAHZAD YAZDANI
DATE: 12/11/16 Four (4) 1-inch, multi-color, corrugated sub-ducts and pull rope shall be
OPERATIONS installed in one duct of each of the underground duct banks (per SAES-T-624
ALI H GHAMDI Section 4.3.1).
12/11/16
DATE:
CONTROL NUMBER
All dielectric, Loose Buffered, Filled for underground and direct buried
environment.
DATE:
BY:
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Concentricity error <1 micron
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Cable Design
DESCRIPTION
General
The structure of the cable core shall permit high cable flexibility with minimum
stress to the individual fibers.
10-02399-
10-02399-
0001
CONTRACTOR shall use a loose, fiber bundle (tube) or a slotted core type
0001
0001
09/08/16
DATE
The core shall be filled with a compound to inhibit water migration and wrapped
with a barrier tape.
NO.
REV
D
C
B
DISCIPLINE
ENGINEER
The filling compound shall be homogenous and uniformly mixed. The
ALL LEADS compound will at least be sufficiently translucent for fiber identification.
DATE: 12/11/16
PROJECT
ENGINEER The filling compound shall not affect the color of the individual fibers.
A M ALMATROOK
DATE: 12/11/16 The filling compound shall be non-toxic and present no dermal hazards.
CERTIFIED
AMR EL SHARKAWY
The drop point of the filling compound shall not be less than 80 deg. C.
12/11/16
DATE:
CONSTRUCTION
AGENCY The filling compound shall remain stable and unaffected by long term exposure
SHAHZAD YAZDANI to weather.
DATE: 12/11/16
OPERATIONS The filling compound shall have chemical and mechanical compatibility with
ALI H GHAMDI other cable components and splicing hardware.
12/11/16
DATE:
CONTROL NUMBER
Cable Jacket
VERIFICATION
EDSD
The outer jacket shall provide the cable with a tough, flexible, protective
covering which can withstand exposure to sunlight, to atmospheric
DATE:
BY:
cable.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The cable jacket shall be of a high molecular weight, black polyethylene with a
thickness that is suitable for the proposed environment, but not less than 3.0
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
mm.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The cable jacket shall have permanent surface printed sequentially numbered
length markers at one meter intervals.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
The cable jacket shall have permanent surface printed marks at regular
intervals consisting of Manufacturer, (number of fibers) Fiber Optic Cable and
the Actual Year of Manufacture.
DESCRIPTION
10-02399-
10-02399-
0001
09/08/16
DATE
D
C
B
DISCIPLINE
3. Security Support Building, Tank Farm
ENGINEER
ALL LEADS 4. Utility Substation
DATE: 12/11/16 5. Operator Shelter
PROJECT
ENGINEER
A M ALMATROOK
6. Receiving Substation
DATE: 12/11/16 7. Security Support Building, Main Gate
CERTIFIED
AMR EL SHARKAWY
12/11/16
DATE:
Process Control System (PCS)
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Single mode fiber optic cables 24 strands will be installed from the
DATE: 12/11/16
instrument rack room at the new Operation building to RIO Building 1 (RIB-
OPERATIONS 1) under this BI for the ESD System. The route of the fiber should be
ALI H GHAMDI redundant and diverse. Process control System will assign dedicated fiber
12/11/16 strands assignment for the ESD system.
DATE:
CONTROL NUMBER
VERIFICATION
Single mode fiber optic cables 24 strands will be installed from the
EDSD
instrument rack room at the new Operation building to RIO Building 1 (RIB-
1) under this BI for the DCS System. The route of the fiber should be
DATE:
redundant and diverse. Process control System will assign dedicated fiber
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Single mode fiber optic cables 24 strands will be installed from the
(DCC) NO. _____________________
instrument rack room at the new Operation building to RIO Building 2 (RIB-
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2) under this BI for the ESD System. The route of the fiber should be
SAY
SAY
SAY
redundant and diverse. Process control System will assign dedicated fiber
strands assignment for the ESD system.
ENGG CERT
ASH
ASH
ASH
Single mode fiber optic cables 24 strands will be installed from the
LEADS
LEADS
LEADS
ALL
ALL
ALL
instrument rack room at the new Operation building to RIO Building 2 (RIB-
2) under this BI for the DCS System. The route of the fiber should be
redundant and diverse. Process control System will assign dedicated fiber
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Single mode fiber optic cables 12 strands will be installed from the new
Operation building to YASREF Control System under this BI. Process
DESCRIPTION
control System will assign dedicated fiber strands assignment for various
control system.
Single mode fiber optic cables 12 strands will be installed from the new
Operation building to SAMREF Control System under this BI. Process
control System will assign dedicated fiber strands assignment for various
control system.
Single mode fiber optic cables 48 strands will be installed from the new
10-02399-
JO/EWO
10-02399-
10-02399-
0001
Process control System will assign dedicated fiber strands assignment for
12/11/16
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER
PCS and communications ducts shall have separate building entries, IT
ALL LEADS and NON-IT, respectively.
DATE: 12/11/16
PROJECT
ENGINEER PCS fiber optic patch panels will be provided by this BI.
A M ALMATROOK
DATE:
12/11/16 The conduit system shall be designed and engineered to retain usable for
75 to 100 years and fulfill design requirements and specifications
CONTROL NUMBER
VERIFICATION
EDSD
Other Materials
DATE:
BY:
All other materials that might be required during the course of the work will
REVISIONCERTIFICATION
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CABLE PLACEMENT
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
General
The fiber optic cable minimum bending radius and maximum pulling
tensions shall be in accordance with SAES-T-624 (Sections 4.1.10 and
DESCRIPTION
4.1.11) and the fiber optic cable manufacturer’s specifications. The optical
fiber cable shall not be cut for convenience during placement. Splices shall
be located in accordance with the design drawing provided by
CONTRACTOR and approved by SAUDI ARAMCO.
This Specification covers the expected types of cable and civil construction
work normally required to prepare the fiber optic cable facilities up to and
including cable splicing and work as required.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
09/08/16
DATE
D
C
B
12/11/16 The design drawings are intended to show the estimated design and
DATE:
CONTROL NUMBER
material requirement for the construction of the facilities. The drawings are
VERIFICATION
quantities by CONTRACTOR.
C
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ARAMCO inspection and evaluation for quality. All reasonable precautions
SAY
SAY
SAY
ASH
ASH
ASH
promptly notified, with written follow-up, of any damage that occurs during
construction.
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
09/08/16
DATE
Installation work shall not commence before the relevant permits have
been obtained by CONTRACTOR construction crew.
NO.
REV
D
C
B
DISCIPLINE
ENGINEER
Excavation and Site Preparation
ALL LEADS
DATE: 12/11/16 Excavation may be required in sand, marl (natural and/or compacted),
PROJECT
ENGINEER loose rock and solid rock. Backfill of the excavated material or bringing-in
A M ALMATROOK of new fill may be required. The hauling away of excavated material and
DATE: 12/11/16 removal of above-grade debris/soil to an approved SAUDI ARAMCO site
CERTIFIED may be required. . The filling materials shall comply with SAES A 114.
AMR EL SHARKAWY
12/11/16
DATE: Excavation may be performed by machine or by hand, depending on the
CONSTRUCTION
AGENCY field condition and/or requirements of this Specification, as determined by
SHAHZAD YAZDANI the SAUDI ARAMCO representative(s) and detail design. As a general
DATE: 12/11/16 rule, at all Plant facilities, pipeline crossing, and utility crossings, hand
OPERATIONS excavation is the only method permitted.
ALI H GHAMDI
12/11/16 Prior to the start of any excavation Work, all underground facilities (i.e. oil,
DATE:
CONTROL NUMBER
have been placed. The exact location of the identified underground facility
shall be properly marked for easy identification by CONTRACTOR
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
construction crew.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
For the safety of personnel and for purposes of maintaining stability of the
excavation, the excavation work shall include all necessary timbering,
sheet pilling and shoring.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Excavations shall not be kept open any longer than reasonably necessary
to perform the intended Work.
The detail design drawing shall specify the scope, location and deep of
10-02399-
JO/EWO
10-02399-
10-02399-
0001
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER
Site leveling, filling and compaction shall be performed as specified in
ALL LEADS conformance with all applicable standards.
DATE: 12/11/16
PROJECT
ENGINEER Trenching
A M ALMATROOK
DATE: 12/11/16 Trench excavation is required, to lay direct buried cable or place conduits
CERTIFIED in the core area, plant area and open desert area. All kinds of soil
AMR EL SHARKAWY
conditions may be encountered. These Specifications are intended to
12/11/16
DATE: cover the various approved methods of trenching and laying cables or
CONSTRUCTION
AGENCY conduits under the expected range of soil and field conditions.
SHAHZAD YAZDANI
DATE: 12/11/16 The detail design drawings shall describe the required location, alignment,
OPERATIONS length and depth of cable or conduits to be placed by the trenching
ALI H GHAMDI method.
12/11/16
DATE:
CONTROL NUMBER
construction.
EDSD
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Warning tape (terra tape) shall always be installed above the cable or
10-02399-
JO/EWO
10-02399-
10-02399-
0001
12/11/16
A trench shall not be left open any longer than necessary. Cables or
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER
F. TETRA RADIO SYSTEM (RFDT)
ALL LEADS
A M ALMATROOK General
DATE: 12/11/16
CERTIFIED This defines the scope of CONTRACTOR to procure, design, install,
AMR EL SHARKAWY
integrate, test and commission a TETRA base station at the new Operation
12/11/16
DATE: and Maintenance Engineering building and associated radio terminals and
CONSTRUCTION
AGENCY accessories.
SHAHZAD YAZDANI
DATE: 12/11/16 CONTRACTOR shall provide indoor and outdoor coverage in Yanbu
OPERATIONS
Distribution Hub operational area. This new TETRA base station and
ALI H GHAMDI
TETRA Dispatch Workstations shall be integrated to the existing Saudi
12/11/16 Aramco TETRA network in Yanbu NGL SCN network. All interfaces, cards
DATE:
CONTROL NUMBER
and services required for integration with existing TETRA Network shall be
VERIFICATION
provided by CONTRACTOR.
EDSD
and transmission line system for the TETRA base station. The antenna
REVISIONCERTIFICATION
and transmission line system shall be installed on the proposed 25M Self-
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
building.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Contractor shall perform all necessary radio coverage analysis and
SAY
SAY
SAY
ASH
ASH
ASH
Distribution Hub.
LEADS
LEADS
LEADS
ALL
ALL
ALL
building.
1 12 DAS-SHELTER-1
2 13 DAS-SHELTER-2
3 18 METERING ROOM-MARAFIQ
4 SS-XXX1 RECEIVING STATION TRANSFORMER YARD
5 SS-XXX2 REMOTE I/O BUILDING
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
radio antenna and ancillaries. Antenna mast height is dependent on the
ENGINEER result of RF coverage required for suitable radio and indoor amplifier study.
ALL LEADS
In addition, antenna mast support, lightning arrestor and grounding system
DATE: 12/11/16
PROJECT
should be included.
ENGINEER
A M ALMATROOK CONTRACTOR shall install antenna grounding and feeder system, and all
DATE: 12/11/16 its ancillaries as per SAES-T-795 and SAES-T-887.
CERTIFIED
AMR EL SHARKAWY
12/11/16
DATE: CONTRACTOR shall perform all necessary Indoor signal coverage
CONTROL NUMBER
VERIFICATION
area.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
CONTRACTOR shall install the Dispatch Work Stations inside the Room
204 of Yanbu Distribution Hub Maintenance & Engineering building.
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
End-User Terminal
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
a. Programming Tools
NO.
REV
D
C
B
DISCIPLINE
ENGINEER RFUT PC programming kits shall be provided for the configuration, fleet
ALL LEADS
mapping, profiling and maintenance of the end-user terminals. Each
DATE: 12/11/16
PROJECT
programming kit shall include suitable software, programming cable, and
ENGINEER interface data port to configure the radio terminals.
A M ALMATROOK
DATE: 12/11/16 Tools for remote and centralized multi-programming of end-user radios
CERTIFIED
AMR EL SHARKAWY shall be provided to enable off-site programming. The remote
12/11/16 programming kit shall be interconnected to the master terminal through the
DATE:
CONSTRUCTION
SAUDI ARAMCO corporate data network.
AGENCY
SHAHZAD YAZDANI
Dispatcher Work Station (DWS)
DATE: 12/11/16
OPERATIONS CONTRACTOR shall install the Dispatch Work Stations inside Room 204
ALI H GHAMDI of Yanbu Distribution Hub Maintenance & Engineering. Specifications are
DATE:
12/11/16 provided in terms of the workstation features, network interfacing,
equipment hardware and accessories.
CONTROL NUMBER
VERIFICATION
EDSD
The table below identifies the key buildings to be equipped with DWS:-
DATE:
BY:
a. Network Interfacing
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
b. Power
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
a. Locating Feature
NO.
REV
D
C
B
DISCIPLINE
ENGINEER For location-type of applications, HPRs shall have built-in GPS
ALL LEADS
receivers and antennas and support Location Information Protocol.
DATE: 12/11/16
PROJECT
ENGINEER
b. Hazardous Classified Area Requirements
A M ALMATROOK
DATE: 12/11/16
CERTIFIED
The minimum Equipment Protection Level for handheld radios and its
AMR EL SHARKAWY portables accessories shall be:
12/11/16
DATE:
CONSTRUCTION Class 1, Zone 1, Gas Groups IIC (Acetylene, Hydrogen, Ethylene &
AGENCY
Propane).
SHAHZAD YAZDANI
DATE: 12/11/16
OPERATIONS
All handheld and portable Digital Trunked radio devices shall be
ALI H GHAMDI
intrinsically safe “ib” or “ia”.
12/11/16
DATE:
All handheld devices shall adhere to the requirement of GI-0006.008 in
CONTROL NUMBER
VERIFICATION
The Hand held radios (HPRs) shall be certified intrinsically Safe and
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
c. Environmental Specifications
(DCC) NO. _____________________
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
+50 degrees Celsius and have protection against humidity, water and
SAY
SAY
SAY
dust. The HPR shall have loud voice which can operate in noisy areas.
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The weight of an HPR shall be less than 450 grams its dimensions
within the 165x65x45mm limits.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
09/08/16
D
C
B
DISCIPLINE
ENGINEER Certificates for intrinsically safe rating and interoperability shall be
ALL LEADS provided.
DATE: 12/11/16
PROJECT
ENGINEER - Each HPR's shall be supplied with carrying aids/accessories including
A M ALMATROOK carrying cases, belt clips and belt clips attachment. Some HPR's
DATE: 12/11/16 shall be equipped with Remote Speaker Microphone.
CERTIFIED
AMR EL SHARKAWY
12/11/16
Vehicle Mounted Radios (VMR)
DATE:
CONSTRUCTION
AGENCY Six(6) VMRs will be provided under BI-02399. The exact quantity of VMRs
SHAHZAD YAZDANI
will be finalized during the radio coverage analysis and traffic study.
DATE: 12/11/16
OPERATIONS
VMR Transmitter/Receiver Specifications:
ALI H GHAMDI
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
For details, refer to VMR Block Diagram Drawing No. CO-A00006 sheet
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
001.
SAY
SAY
SAY
ASH
ASH
ASH
General Specification
LEADS
LEADS
LEADS
ALL
ALL
ALL
•
10-02399-
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
A M ALMATROOK
• Loudspeakers and speaker/microphone with PTT type of audio
DATE: 12/11/16 accessories shall be provided for all RFDTs.
CERTIFIED
•
AMR EL SHARKAWY
12/11/16
Security gates shall be provided and installed with outdoor
DATE: speakers to support personnel operations.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI RFDT Installation
DATE: 12/11/16
OPERATIONS RFDTs shall be provided with all the required hardware including
ALI H GHAMDI mounting brackets, RF feeder cables, data cables and connectors,
DATE:
12/11/16 Equipment rack and rack mounting kits shall be provided to mount
CONTROL NUMBER
RFDTs shall be provided with outdoor antenna, the antenna shall be 5 dBi
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
RFDT antennas shall be provided with built-in ground plate for grounding.
SAY
SAY
SAY
The antenna size and BUC power shall be based on the link budget
ENGG CERT
ASH
ASH
ASH
analysis specified for the TETRA scope to ensure the minimum BER
threshold required by the TETRA to not lose the MCCH.
LEADS
LEADS
LEADS
ALL
ALL
ALL
All materials required for the complete installation of RFDT's, including the
radio, transmission line, connectors, antenna, conduits (as required),
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
REFERENCE DRAWINGS
Listed below are proposal engineering documents and drawings which shall
be finalized by CONTRACTOR during detail design.
10-02399-
10-02399-
0001
0001
0001
09/08/16
D
C
B
DISCIPLINE
G. TRANSMISSION SYSTEM
ENGINEER
ALL LEADS
SCOPE DESCRIPTION
DATE: 12/11/16
PROJECT
ENGINEER SDH Equipment
A M ALMATROOK
DATE: 12/11/16 BI-02399 shall provide new Alcatel 1646 SDH node at Yanbu Distribution
CERTIFIED
AMR EL SHARKAWY Hub. The proposed SDH node shall be STM-4 and shall be connected to
12/11/16 Yanbu Refinery (60YREF0A
DATE:
CONSTRUCTION
AGENCY New STM-4 interface card shall be provided by this BI in Yanbu Refinery to
SHAHZAD YAZDANI
connect the new 1646 SDH at Yanbu Distribution Hub as a spur of
DATE: 12/11/16
OPERATIONS
60YREF0A in Yanbu Refinery.
ALI H GHAMDI
12/11/16
DATE:
CONTRACTOR shall provide one (1) New ES1-8FE Integrated Services
CONTROL NUMBER
VERIFICATION
Adapter (ISA) card with 8 Fast Ethernet interface port shall be provided.
Necessary port and interface cards shall also be provided for E1 interface
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
•
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Communications Supervisory Alarm System (CSAS)
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Operations Center.
10-02399-
10-02399-
0001
0001
0001
SCOPE DESCRIPTION
12/11/16
08/04/16
09/08/16
DATE
D
C
B
DATE: 12/11/16 • CONTRACTOR shall coordinate and obtain approval from Saudi
CERTIFIED
AMR EL SHARKAWY
Aramco for IT services (data and voice) provided through service
12/11/16
provider. CONTRACTOR should ensure this service provides
DATE:
Layer-2 supporting SSL-VPN connectivity. CONTRACTOR shall
CONSTRUCTION
AGENCY send the service provider quotation to Aramco IT group for review.
SHAHZAD YAZDANI
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
DRAWING NO. SHEET NO. DRAWING TITLE
DATE:
12/11/16 COA00060 001 BLOCK & LEVEL DIAGRAM - TELEPHONY
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
System (ESS). The ESS shall facilitate alarm broadcasting and notification
service for the entire Yanbu Distribution Hub and shall follow SAES-B-071
standard.
DESCRIPTION
CONTRACTOR shall provide and install ESS Control Station (CS) which
shall be composed but not to be limited to:
10-02399-
JO/EWO
10-02399-
10-02399-
•
0001
0001
0001
09/08/16
DATE
• Computer Workstation
• MassAlert Software (Customized for this project)
NO.
REV
•
D
C
B
A M ALMATROOK
• Advance Communication Board
DATE: 12/11/16 • Radio – Conventional UHF radio to be used for system
CERTIFIED
AMR EL SHARKAWY
communication
12/11/16 • Remote Status View
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
CONTRACTOR shall provide and install the above Control Station at
DATE: 12/11/16
Yanbu Distribution Hub in Operation Building. Activation of the sounders
OPERATIONS from the Control Station shall be realized through wireless
ALI H GHAMDI communication/connectivity which shall utilize commercial operating
12/11/16
DATE: frequency between 330-360 Mhz Radio.
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
• Antenna Cable
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Antenna Polyphasor – Lightning Strike Protector
SAY
SAY
SAY
ASH
ASH
ASH
communication
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall ensure that the sounders for plants alerting shall be
placed at a minimum of 15 meters above local grade. The loudspeakers
DESCRIPTION
CONTRACTOR shall provide, install and ensure that the sounders not be
closer than 15 meters to the windows of normally occupied buildings.
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
CONTRACTOR shall ensure that all installation shall follow all applicable
NO.
REV
DISCIPLINE procedures and details as stipulated in the user’s manual that is provided
ENGINEER
ALL LEADS along with the equipment/devices.
DATE: 12/11/16
PROJECT
ENGINEER DRAWING NO. SHEET NO. DRAWING TITLE
A M ALMATROOK
CO-A100054 001 SYSTEM DIAGRAM, EMERGENCY SIREN SYS.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
12/11/16
DATE: J. PAGING SYSTEM
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall design, procure, construct, test and commission a
DATE: 12/11/16 permanent, fully flexible, operational, and maintainable In-Plant Paging
OPERATIONS System (IPPS).
ALI H GHAMDI
12/11/16 This IPPS shall facilitate voice and alarm broadcasting services for the
DATE:
CONTROL NUMBER
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
System.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
For the System, all equipment shall be located within the battery limits of
the process area of the plant with desktop access units and switching
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
equipment to be installed in the Operation Building.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
• Audio Messenger
The In-Plant Paging System (IPPS) shall also consist of the following:
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
• Equipment cabinets
12/11/16
08/04/16
09/08/16
DATE
D
C
B
DATE: 12/11/16
• Mounting Assemblies and accessories
PROJECT
ENGINEER
A M ALMATROOK
• Power Supplies
DATE: 12/11/16
CERTIFIED • Uninterruptible Power Supply
AMR EL SHARKAWY
DATE:
12/11/16
• Miscellaneous items where necessary to complete the System
CONSTRUCTION
AGENCY
design e.g. acoustic booths, enclosures etc.
SHAHZAD YAZDANI
DATE: 12/11/16
OPERATIONS Final locations of field devices shall be determined during detailed design;
ALI H GHAMDI however they shall typically cover the main process buildings/plant areas,
DATE:
12/11/16 together with the Operation buildings and Control Rooms.
CONTROL NUMBER
VERIFICATION
All field equipment shall be suitable for use in its designated area
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
The System shall operate in high noise areas up to 80dBA with the support
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and augmentation of Signaling Devices such as beacons or flashing lights.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
enclosures and plugs shall be suitably certified for the hazardous
ENGINEER area.
ALL LEADS
DATE: 12/11/16
PROJECT
The power for the In-Plant Communications equipment shall be supplied
ENGINEER
from the UPS located in either of the Bulk Plant Control Room or Jetty
A M ALMATROOK
Control Room and shall operate from a 230 VAC.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
DRAWING NO. SHEET NO. DRAWING TITLE
12/11/16
DATE:
CONSTRUCTION
CO-A10047 001 BLOCK & LEVEL DIAGRAM, IN-PLANT PAGING
AGENCY
SHAHZAD YAZDANI
DATE: 12/11/16
OPERATIONS 4.14.1 IT NETWORK ENGINEER APPLICATION REQUIREMENT
ALI H GHAMDI
CONTRACTOR shall include as part of his estimate the cost for Network
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
Power
Space (floor space, rack space, wall space) in any IT Building or
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
system
Use of existing Outside Plant (OSP) ducts or sub-ducts
Use of existing Outside Plant (OSP) cable pairs/strands
Placement of Antennas on existing Towers
DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
D
C
B
It shall be noted that the IT Network Engineer Access Policy only allows
DISCIPLINE
ENGINEER
user accounts for regular SAUDI ARAMCO employees or contractor
ALL LEADS employees working under the direct supervision of IT/Engineering Tools
DATE: 12/11/16 and Documentation Group. Also, the application can only be accessed via
PROJECT
ENGINEER the SAUDI ARAMCO corporate Network.
A M ALMATROOK
DATE: 12/11/16 This requirement does NOT change or supersede any existing e- review or
CERTIFIED IPlant drawings project submittal requirements.
AMR EL SHARKAWY
12/11/16
DATE: 4.17 Fire Protection
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI A. GENERAL
DATE: 12/11/16
OPERATIONS This Project shall provide Fire water System to provide the required fire protection
ALI H GHAMDI for the proposed facilities. The Fire water system shall consist of new fire water
DATE:
12/11/16 storage, New Fire Pumps and New dedicated Fire Water Network (Underground)
for the proposed facilities. Water supply from MARAFIQ shall be used as the feed
CONTROL NUMBER
VERIFICATION
Companies selected for Design and Installation of Fire Water Systems shall have
DATE:
BY:
Install and Test Fire Water Systems and execute all other work requirements
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Fire Water Systems shall be Designed and Installed under the Supervision of a
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Registered Professional Engineer in the specialty of Fire Protection Engineering
SAY
SAY
SAY
with at least five (5) years of experience in the design of Fire Water Systems.
Design Drawings and Hydraulic Calculations shall be submitted according to
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Hydraulic Calculations shall be performed using only software that complies with
requirements of SAUDI ARAMCO and calculations of NFPA 13. Software to be
utilized shall be the latest version.
DESCRIPTION
Design, Drawings and Calculations for Fire Water and Foam System(s) shall be
supervised by a Registered Professional Engineer in the specialty of Fire
Protection in accordance with SAES-B-070. All Drawings shall bear the seal of
that Registered Engineer. The Systems Detailed Design shall be Reviewed and
Approved by Chief Fire Prevention Engineers Representative.
10-02399-
10-02399-
•
0001
0001
1000 gpm and maximum of 4000 gpm based on the design basis requirement
12/11/16
08/04/16
09/08/16
• Firewater demand shall be based on the single largest fire hazard within the
NO.
REV
D
C
B
facility.
DISCIPLINE
ENGINEER
ALL LEADS • Fire Water Storage: Two (2) Fire Water Storage Tanks equal in Size and
DATE: 12/11/16 dedicated only for firewater service shall be provided with total storage capacity
PROJECT
ENGINEER of 12 hours in accordance with SAUDI ARAMCO requirement for Hydrocarbon
A M ALMATROOK storage Facilities.
DATE: 12/11/16
AMR EL SHARKAWY
CERTIFIED
• Fire Water Supply: Fire Water supply shall be provided by MARAFIQ – ROYAL
12/11/16 COMMISSION as the primary source. Truck Filling Connection will also be
DATE:
CONSTRUCTION
provided as a backup.
AGENCY
SHAHZAD YAZDANI
• Firewater Pumping System: Dedicated Two (2) no. of Electric Driven Fire
DATE: 12/11/16
Pumps as primary Fire pumps, One (1) no. of Diesel Driven Fire Pumps as
OPERATIONS
100% backup Fire Pumps and Two (2) no. of Jockey Pumps (1-Duty & 1-
ALI H GHAMDI
Standby) to maintain the required pressure in the Fire Water Network. The
12/11/16
DATE: design of firewater pumps shall be in accordance with NFPA 20 and SAES-B-
CONTROL NUMBER
017.
VERIFICATION
EDSD
• Fire Water Distribution: A fire water distribution main shall be looped around
DATE:
the plant areas. Firewater main ring shall be located underground to protect it
BY:
from mechanical damage. Where the main cannot be buried, it shall be suitably
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
protected from vehicle impacts and the effects of fires and explosions. All
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
1FE0U and Above Ground Piping are considered to be FBE Lined Carbon
Steel, as per SAES-L-105, Line Class: 1LE0U. The Fire Water Ring main shall
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
be hydraulically sized for the maximum Demand Flow Rates on the basis of
SAY
SAY
SAY
Dual Feed.
ENGG CERT
ASH
ASH
ASH
• Fire Water Hydrants: Fire Hydrants shall be located throughout the facility.
Hydrants shall be located not less than 15m from the protected risk and shall
LEADS
LEADS
LEADS
ALL
ALL
ALL
be spaced not more than 75m apart. Fire Hydrants shall be Wet Barrel type
Hydrants that meet ANSI/AWWA C503 requirements. The Wet Barrel Hydrant
shall be a Listed Commercial Unit that complies with AWWA and has a working
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Pressure of 1380 kPag (200 PSIG). The Inlet shall be 6 inches in diameter with
approved Flat Face ANSI Flange.
• Fixed Foam System: Fixed Deluge Foam Water System shall be provided to
DESCRIPTION
protect Product Transfer Pumps and Shipper pumps with Two (2) no. of Foam
Skid package for Product Transfer pumps areas. Foam System shall be
provided in accordance with SAES-B-018 & NFPA 16 requirements. Transfer
pumps shall cover the pump casing and the floor or area at least 0.6 m (2 ft)
from the periphery of the casing. The suction and discharge flanges, casing
drain valves, gauge connections, balance lines, and pump seals shall be
included in the spray area.
• Semi Fixed Foam System: Semi Fixed Foam System to be provided for Open-
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
Top Floating Roof Tanks. This is a vendor Item and will be part of the Tank
Vendor package that will be responsible for the entire semi-fixed foam system
12/11/16
08/04/16
09/08/16
• Portable Fire Fighting Equipment: Hand Held and Mobile Fire Extinguishers
NO.
REV
D
C
B
shall be provided for the Facilities. The Extinguishers shall be Selected and
DISCIPLINE
ENGINEER Positioned in areas of Risk relevant to their application as per SAES-B-019
ALL LEADS
requirements. Where extinguishers are protecting individual equipment, they
DATE: 12/11/16 shall be located at least 7.5m from the equipment’s.
PROJECT
ENGINEER
12/11/16
DATE: o Set not less than 900 mm deep in a Concrete Footing of not less than a
CONTROL NUMBER
400 mm diameter.
VERIFICATION
EDSD
o Set with the Top of the ports not less than 914 mm Above Ground.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
o Located not less than 900 mm from any part of the Hydrant or Fire
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
o Guard Post shall not be installed in-line (directly in front of) with any of
SAY
SAY
SAY
the Hydrant or Fire Protection Equipment outlets where the Fire Hose is
attached and where the Posts could contact the Hose when it gets
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
o For Above Ground Piping or for Under Ground Piping prior to Burial, newly
installed Fire Protection Systems in Water Service, regardless of materials,
shall be Hydrostatically Tested to 1,380 kPag (200 PSIG) or 345 kPag (50
PSIG) in excess of maximum operating pressure, whichever is greater, and
held without pressure loss for 4 hours. All Piping is required to be Hydro-
Tested, including that of open ended piping for Deluge Systems.
10-02399-
10-02399-
0001
0001
welds and joints cannot be left exposed during Testing. All Hydrostatic
0001
09/08/16
D
C
B
Acceptance.
DISCIPLINE
ENGINEER
ALL LEADS o Safety Procedures in accordance with GI-0002.102 shall be followed during
DATE: 12/11/16 Pressure Testing.
PROJECT
ENGINEER
A M ALMATROOK o Dry Pipe Fire Protection System shall be Hydro-Tested in accordance with
DATE: 12/11/16 NFPA 13 and SAES-B-017.
CERTIFIED
AMR EL SHARKAWY
C. FIRE PROTECTION CONCEPT
12/11/16
DATE:
•
CONSTRUCTION
AGENCY CONTRACTOR scope of work shall include but not limited to the, detailed
SHAHZAD YAZDANI engineering design, procurement, quality control and quality assurance
DATE: 12/11/16 documentation, construction, as-built documentation, inspection, testing, pre-
OPERATIONS
commissioning, assistance to commissioning and start-up for all Fire Protection
ALI H GHAMDI
Work associated with this project.
12/11/16
DATE:
•
CONTROL NUMBER
CONTRACTOR shall Design and Construct the New Fire Piping System
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
•
C
(Underground) with Piping, Fittings, Fire Hydrant, Fire Monitor, Live Hose reel
and Post Indicator Valves as show on Fire Protection drawing FI-A00011-001
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and FIA00016-001 .
SAY
SAY
SAY
• CONTRACTOR shall provide and install Two (2) new Electric Driven Fire
ENGG CERT
ASH
ASH
ASH
Pumps, One (1) new Diesel Driven Fire Pump along with One (1) Diesel Tank
and Two (2) new Jockey Pumps as shown on drawings # FIA00011-003.
LEADS
LEADS
LEADS
ALL
ALL
ALL
• CONSTRUCTION CONTRACTON shall provide Two (2) New Foam Skids for
Product Pumps as show on the Fire Protection drawings FIA0012-001 and
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
FIA00013-001.
CONTRACTOR shall provide Deluge Foam Water Spray system with all Piping,
Fittings, Air Aspirated Foam Nozzles, Deluge Valves, Gate Vales, Y-Strainers
DESCRIPTION
for the Product pumps as per SAES-B-017 and SAES-B-070, as shown on Fire
Protection drawings FIA00012-002, FI-A00013-002, FIA00018.001, FIA00019-
001, FIA00019-002, FIA00019-003, FIA00019-007.
10-02399-
10-02399-
0001
0001
0001
09/08/16
•
DATE
D
C
B
DISCIPLINE
• CONTRACTOR shall perform Hydro-Testing of complete Fire Protection
ENGINEER System as per SAES-B-017 & SAES-A-004 requirements.
ALL LEADS
DATE: 12/11/16
PROJECT
• CONTRACTOR shall install two-wheel, cart type dry chemical, 68 kg size BC
ENGINEER extinguisher units as specified in Table -1, SAES-B-019, They shall be covered
A M ALMATROOK
with the manufacture’s cover or housed inside a roofed, noncombustible shed,
DATE: 12/11/16 with access door facing in the opposite direction of hydrocarbon handling
CERTIFIED
AMR EL SHARKAWY equipment.
12/11/16
DATE:
CONSTRUCTION • CONTRACTOR shall install 12.5 Kg BC type dry chemical hand fire
AGENCY
extinguisher shall be provided at least 7.5m for the protect pumps being
SHAHZAD YAZDANI
protected.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
• All Fire Protection Equipment and Appurtenances shall be purchased as
12/11/16 specified in the SAUDI ARAMCO Materials System and SAES-U-101.
DATE:
CONTROL NUMBER
VERIFICATION
• All Below Grade Valves in Fire Protection Systems shall be listed for use in Fire
EDSD
Service.
DATE:
• All Below Grade Block Valves in Main or Branch Service shall be Listed Post
BY:
Indicator Type Valve with Position Indicators above Grade to meet the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
• All Manual Block Valves in Fire Protection Service shall be Car-Sealed in their
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Normal Operating Position or shall be otherwise supervised per NFPA 24.
SAY
SAY
SAY
• Block Valves located on Above Grade Piping shall be Accessible as per SAES-
ENGG CERT
ASH
ASH
ASH
B-054.
LEADS
LEADS
LEADS
ALL
ALL
ALL
• Commissioning and Testing Procedures for Foam Spray System shall meet the
requirements of NFPA 16. All Tests shall be witnessed by Designated SAUDI
ARAMCO Representatives of the Loss Prevention and Fire Protection
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Departments.
D. INSTRUMENTATION
DESCRIPTION
10-02399-
10-02399-
0001
•
0001
0001
As a minimum two (2) junction shall be provided, one each for analog and
digital signals as per SAES-J-902.
12/11/16
08/04/16
09/08/16
DATE
• CONTRACTOR shall provide and install homerun cables from fire water
tanks X40-D-0701/702 to DCS cabinet located in rack room of O & M
NO.
REV
Building.
D
C
B
DISCIPLINE
ENGINEER Foam Generating Skid 1 & 2:
ALL LEADS
DATE: 12/11/16
Foam skid vendor shall provide skid instrumentation and control,
PROJECT CONTRACTOR shall provide and install data communication cables from
ENGINEER
Foam Skid Control Panel to DCS as per block diagram IN-A00001.010.
A M ALMATROOK
DATE: 12/11/16
CERTIFIED • Reference drawings
AMR EL SHARKAWY
DATE:
12/11/16 Drawing # Description
CONSTRUCTION IN-A00001 System Block Diagrams
AGENCY
SHAHZAD YAZDANI IN-A00002 Instrument Block Diagrams
DATE: 12/11/16 IN-A00027 Instrument Points & Lines
OPERATIONS
ALI H GHAMDI
IN-D00201 Instrument Installation Schedule-Flow
12/11/16 IN-D00202 Instrument Installation Schedule-Pressure
DATE:
IN-D00203 Instrument Installation Schedule-Level
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
Driven) shall be in accordance with NFPA 20 and are of axial split, between
0001
0001
0001
bearing design due to their high flow requirement. This design is also
12/11/16
maintenance friendly at site as top half of the pumps can easily be open to
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE
MISCELLANEOUS REQUIREMENTS
ENGINEER
•
ALL LEADS
Reference shall be made to technical specifications for pumps included in
DATE: 12/11/16
PROJECT Index-A for further details of these pumps.
ENGINEER
A M ALMATROOK
DATE: 12/11/16
• Pump Datasheets provided in this package are preliminary only. These will be
CERTIFIED further verified by CONTRACTOR during detailed design phase of the project
AMR EL SHARKAWY
12/11/16
before issuing for procurement activities.
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
• CONTRACTOR shall be responsible for producing equipment datasheet, SIS
DATE: 12/11/16
sheets, Noise Datasheets in accordance with SAUDI ARAMCO standard forms
OPERATIONS and datasheets.
ALI H GHAMDI
•
12/11/16
DATE: All pumps will be procured by CONTRACTOR from SAUDI ARAMCO approved
CONTROL NUMBER
VERIFICATION
•
REVISIONCERTIFICATION
CONTRACTOR shall prepare Material Requisition Package for all the pumps
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
and shall obtain approvals from relevant SAUDI ARAMCO Departments before
(DCC) NO. _____________________
issuing to Vendors.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
• Material take-offs have been prepared for reference only and will not be
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
•
ALL
ALL
Technical quotations obtained from vendors will list all exceptions and /or,
additions to applicable project Drawings and SAUDI ARAMCO Specifications. If
there is no exception to specifications, CONTRACTOR will make a statement
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
to that effect.
• CONTRACTOR shall be responsible for review and approval of NMRs 601, 602
and 603.
10-02399-
10-02399-
0001
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS • Supply of Commissioning and Start-up spares and first fill of all the lubricants
DATE: 12/11/16 and chemicals is in the scope of CONTRACTOR. CONTRACTOR shall obtain
PROJECT
ENGINEER approval of Aramco Operations before filling of lubricants and chemicals.
A M ALMATROOK
DATE: 12/11/16
CERTIFIED • CONTRACTOR will provide all Non Material Requirement (NMR-602/603),
AMR EL SHARKAWY
Operation and Instruction Manuals of CONTRACTOR supplied material in
12/11/16
DATE: electronic format (Latest Acrobat Reader).
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
• CONTRACTOR will provide critical spare parts for CONTRACTOR supplied
DATE: 12/11/16
OPERATIONS items in accordance with SAEP-3101. Contractor will develop list of critical
ALI H GHAMDI plant equipment spares and identification
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION
DATE:
A. GENERAL
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
CONTRACTOR shall connect the industrial drain generated within the facility to the
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
YDH evaporation pond. All industrial drainages shall be treated in the oily water
(DCC) NO. _____________________
treatment system. The industrial oily water treatment system shall consist of but not
limited to an oily water equalization tank, CPI separator, water break tank, two effluent
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
water pumps (one operating, one spare), two skimmed oil pumps (one operating, one
SAY
SAY
SAY
ASH
ASH
ASH
The oily water treatment system shall be of a complete vendor skid design and the
treatment system shall receive the effluent from the oily water sump via normal flow
LEADS
LEADS
LEADS
ALL
ALL
ALL
pump, main source of oily water will be dewatered effluent from the product storage
tanks. CONTRACTOR shall route the dewatered effluent from the tanks to the oily
water lift stations and then effluent will transfer from normal flow pumps to the
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
equalization tank.
The CPI vendor shall provide the pump to transfer the recovered oil from the CPI to
the slop tank while effluent water to be transferred to the YDH evaporation pond.
DESCRIPTION
CONTRACTOR and CPI system vendor shall ensure that the treated water meets the
effluent water quality requirement for YRC.
10-02399-
10-02399-
0001
12/11/16
B. CIVIL
08/04/16
09/08/16
DATE
• Storm water inside the tank farm dikes, plinth areas of pumps and other
process areas, are considered contaminated water. Contaminated water
NO.
REV
D
C
B
shall be collected by standard oily catch basin and will pass through RTR
DISCIPLINE
ENGINEER
pipe connected to the oily water sewer network and conveyed to OWLS.
ALL LEADS
DATE: 12/11/16 • Contaminated water from the tank farm dikes will be controlled by a 10”
PROJECT
ENGINEER diameter gate valve connected to the oily water sewer network. Further, in
A M ALMATROOK case of Major flood/raptor an additional 4” gate valve and 4” pipe branch line
DATE: 12/11/16 with vacuum truck connection shall be provided outside the dike oily water
CERTIFIED
AMR EL SHARKAWY
pipe.
12/11/16
DATE:
• Dewatering from Diesel tanks shall be connected to the Oily water system
CONSTRUCTION
AGENCY from the diked areas. Dewatering from the Kerosene and Gasoline tanks
SHAHZAD YAZDANI
shall be connected to a separate oily water system and conveyed to OWLS.
DATE: 12/11/16
• CONTRACTOR shall provide two (2) Oily water Lift Station wherein the
OPERATIONS
ALI H GHAMDI
OWS inlet pipe will be connected. CONTRACTOR shall assess and re-
12/11/16
DATE: validate the design of the OWS drainage system. The internal wall of the lift
CONTROL NUMBER
stations shall be coated with APCS-3 or better and while the exterior wall
VERIFICATION
shall be coated with APCS-10 on below ground and exterior coating above
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
retain sand particles from reaching the sump pumps. The oily water
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
network will discharge to the sand separator tank before the OWLS. The
(DCC) NO. _____________________
inlet pipe to the sand separator will include a gate valve indicator O&Y for
the purposes of controlling water entering to the sand separator while
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
maintenance is performing.
SAY
SAY
SAY
• Each oily water lift station shall be provided with two pumps for normal flow
ENGG CERT
ASH
ASH
ASH
(one operating, one spare) and two pumps for maximum flow (one
operating, one spare). The normal flow pumps will discharge to an oily
LEADS
LEADS
LEADS
ALL
ALL
ALL
water treatment system whereas the maximum flow pump shall discharge
to the Evaporation pond.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
• CONTRACTOR shall provide an 8”, 10”, 12” and 16” diameter RTR pipe,
IFE0U, 01-SAMSS-034 for underground oily water gravity sewer.
CONTRACTOR shall re-validate the propose size during detail design
stage. CONTRACTOR shall provide required fittings to complete the
system.
• To prevent fire transferring from an area to another area, the Oily water
network will be connected using sealed inlet oily water manholes following
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
09/08/16
•
DATE
D
C
B
DISCIPLINE
ENGINEER • Provide underground oily water sewer pressure line from oily separation to
ALL LEADS
evaporation pond.
DATE: 12/11/16
PROJECT
ENGINEER • Provide oily water sewer connection from transformer retention channel to
A M ALMATROOK
oily water sewer network.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY • Provide neutralization pit for all battery acid wash water which shall be
12/11/16 connected to oily water sewer network. Neutralization pit shall be coated
DATE:
CONSTRUCTION with, acid resistant material. The pit shall be sized for the expected waste
AGENCY
acid flow and dilution or wash-down water. The pit shall be in a readily
SHAHZAD YAZDANI
accessible location, and shall be vented to the outside. The minimum vent
DATE: 12/11/16
OPERATIONS size shall be 63 mm (2 in) OD as per SAES-S-060 para. 811.9C.
ALI H GHAMDI
12/11/16 • Provide oily water connection from foam skid, fire water pump house,
DATE:
metering skid, CPI separator and all pumps containment area.
CONTROL NUMBER
VERIFICATION
•
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Waste.
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Refer to drawing: CI-A00119 sheet 001-015
SAY
SAY
SAY
• The lift station construction shall be in accordance with ACI 350 as a water
ENGG CERT
ASH
ASH
ASH
PSI) minimum.
LEADS
LEADS
ALL
ALL
ALL
• LSTK CONTRACTOR shall consider the no. of drain points of tanks as per
P&ID VA-247904-001.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Oily water sumps at YDH will be provided with following sets of pumps:
Each Oily Water Sump will be provided with 02 sets of normal flow pumps and 01
maximum flow pumps. Vertical discharge through column type pumps in
accordance with 31-SAMSS-004 shall be selected for this service. This is due to
the reason that latest update of SAES-G-005 prohibits the use of self-priming
pumps for Oily Water Sump services if flammable liquids are going to be drained to
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
these sumps.
12/11/16
08/04/16
09/08/16
D
C
B
DATE:
12/11/16 OWS LIFT STATION NO.2 -
CONSTRUCTION
AGENCY
X40-G-0017 RE-E00117 MAXIMUM FLOW
SHAHZAD YAZDANI .
DATE: 12/11/16
OPERATIONS MISCELLANEOUS REQUIREMENTS
ALI H GHAMDI
DATE:
12/11/16 • Reference shall be made to technical specifications for pumps included in
Index-A of FEL-3 package for further details of these pumps.
CONTROL NUMBER
VERIFICATION
EDSD
• Pump Datasheets provided in FEL-3 package are preliminary only. These will
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and datasheets.
SAY
SAY
SAY
•
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
• CONTRACTOR shall prepare Material Requisition Package for all the pumps
and shall obtain approvals from relevant SAUDI ARAMCO Departments before
issuing to Vendors.
DESCRIPTION
• Material take-offs have been prepared for reference only and will not be
considered as contractual documents and cannot be used as a basis for any
change order.
• Technical quotations obtained from vendors will list all exceptions and /or,
additions to applicable project Drawings and SAUDI ARAMCO Specifications. If
there is no exception to specifications, CONTRACTOR will make a statement
10-02399-
JO/EWO
10-02399-
10-02399-
0001
to that effect.
0001
0001
12/11/16
08/04/16
09/08/16
•
DATE
D
C
B
DISCIPLINE • CONTRACTOR shall be responsible for review and approval of NMRs 601, 602
ENGINEER
ALL LEADS and 603.
DATE: 12/11/16
PROJECT
ENGINEER • Inspection and Testing of CONTRACTOR supplied materials will be performed
A M ALMATROOK
as per applicable SAUDI ARAMCO Inspection Requirement form A-175.
DATE: 12/11/16
CERTIFIED CONTRACTOR will arrange with his sub suppliers to comply with these
AMR EL SHARKAWY
requirements by stating on all sub suppliers’ purchase order SAUDI ARAMCO’s
12/11/16
DATE: intention to inspect material.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
• Equipment installation and Commissioning shall be in accordance with
DATE: 12/11/16
OPERATIONS
approved Vendor’s installation and commissioning procedures.
ALI H GHAMDI
DATE:
12/11/16 • Supply of Commissioning and Start-up spares and first fill of all the lubricants
and chemicals is in the scope of CONTRACTOR. CONTRACTOR shall obtain
CONTROL NUMBER
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
items in accordance with SAEP-3101. Contractor will develop list of critical
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall develop and submit for SAUDI ARAMCO acceptance rigging
plans and transportation calculations for all major equipment.
CONTRACTOR shall supply spreader bars, shackles, and slings for the lifting of
equipment.
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
All skid packages design shall be vendor proven design. Skid packages shall be
suitable for the specific application by meeting all the process design requirements
NO.
REV
D
C
B
12/11/16
DATE: CONTRACTOR shall provide oily water treatment package as per above
CONSTRUCTION
AGENCY reference documents.
SHAHZAD YAZDANI
DATE: 12/11/16
OPERATIONS
E. INSTRUMENTATION
ALI H GHAMDI
12/11/16
DATE: CONTRACTOR shall provide and install oil-in-water analyzer at the inlet and outlet
CONTROL NUMBER
of CPI Separator skid as indicated in P & ID and IPL. The skid instrumentation
VERIFICATION
CONTRACTOR shall provide and install field junction boxes to connect CPI skid
DATE:
Provide and install homerun cables from CPI skid X40-X-1101 to remote I/O
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
cabinet located in RIB-2. The cable shall be routed on the cable trays.
(DCC) NO. _____________________
Hydro carbon detectors to be provided at the sump for the oily water sumps.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Reference drawings
SAY
SAY
SAY
Drawing # Description
ENGG CERT
ASH
ASH
ASH
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
09/08/16
A. CIVIL
DATE
D
C
B
design in all the proposed tank farm, all access road areas with fill
DISCIPLINE
ENGINEER as per the requirements specified under SAES-A-114.
ALL LEADS
DATE: 12/11/16 B. CONTRACTOR shall prepare finish grade level in reference to the
PROJECT
ENGINEER latest rough grading drawing.
A M ALMATROOK
12/11/16
system. CONTRACTOR shall evaluate the cost with possible
DATE: provision of concrete channel and box culvert, if necessary in
CONSTRUCTION
AGENCY accordance with SAUDI ARAMCO Engineering Standard, SAES-S-
SHAHZAD YAZDANI 030.
DATE: 12/11/16
OPERATIONS
D. CONTRACTOR shall consider data of rain fall intensity to be used
ALI H GHAMDI
as reference for the propose storm water drainage design based on
12/11/16
DATE: the requirements as per SAES- A-112.
CONTROL NUMBER
VERIFICATION
the tank farm and other unpaved non-process area. The water shall
BY:
flow thru gravity open drain direct the new drain channel outside the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
drain and box culvert as per the project requirements that will
provide more economical concept.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
network
A. CONTRACTOR shall install the utility water pipe network from the
equipment pumps to each building, eye washers, and other
locations where utility water is required. The utility water pipe
10-02399-
JO/EWO
10-02399-
10-02399-
0001
09/08/16
DATE
D
C
B
A M ALMATROOK
D. Installation of utility water shall follow SAES S 40, SAES S 70 and
DATE: 12/11/16
pipe line classification.
CERTIFIED
AMR EL SHARKAWY
E. The water pipe network shall be tested using the methodology and
12/11/16
DATE: guidelines of SAES S 70.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI 4.21 SANITARY WASTE WATER
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI A. CONTRACTOR shall install the sanitary waste water network from each
DATE:
12/11/16 building to the lift stations and from the lift stations to the tie-in point
connection to MARAFIQ.
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
C. The forced sanitary waste water pipes from the lift stations will be
C
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
essential on layout design of civil works for bulk plant area, access roads,
traffic scheme, main gate layout and temporary construction facility that
includes but not limited to the following:
DESCRIPTION
• CONTRACTOR shall revalidate and re-establish all the finish grade elevations
in reference to the latest existing topographic survey drawing and to the latest
rough grading drawing.
• CONTRACTOR shall provide concrete sidewalks inside the parking area, Gate
House, E&M Building and other Support Building Facilities as provided and
shown on architectural drawings and site development plan as shown in
drawing no. CI-A00106. The sidewalk shall be 100mm thick concrete provided
with 150x150xMW9xMW9 welded wire fabric (WWF) and shall be in
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
accordance with SAUDI ARAMCO Standard drawing no. AB-036260 sheet 001
rev. 05.
12/11/16
08/04/16
09/08/16
DATE
• CONTRACTOR provide 300 mm thick marl capping inside dike area and 150
mm thick marl capping outside the dike peripheral at all non-paved areas
NO.
REV
D
C
B
including the sleeper areas and future tank foundations/apron/yard areas. Dike
DISCIPLINE
ENGINEER fill material shall comply with SAES-Q-006, sub-base material Class, placement
ALL LEADS and compaction shall be in accordance with SAES-Q-006.
DATE: 12/11/16
•
PROJECT
ENGINEER CONTRACTOR shall provide and develop a total of forty five (45) shaded
A M ALMATROOK parking slots at E&M building and six (6) parking slots at operation building as
DATE: 12/11/16 shown on the drawing CI-A00106. Likewise, a total of thirty (30) shaded
CERTIFIED
AMR EL SHARKAWY
parking slots shall be provided for visitors outside the security fence. Structural
12/11/16
design detailed calculation of the sunshades shall be submitted by the vendor.
DATE:
CONSTRUCTION
Refer to DA-950182-001
AGENCY
SHAHZAD YAZDANI
• CONTRACTOR shall provide HCIS Category I around the tank farm as shown
DATE: 12/11/16
in drawing CI-A00105. Fence shall be in accordance to the requirements as per
OPERATIONS
SAES-O-202 and SEC-02.
ALI H GHAMDI
12/11/16
DATE: • CONTRACTOR shall provide HCIS Category IV around the Support Facility as
CONTROL NUMBER
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
•
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Provide two (2) 9.0 meters wide double leaf decorative metal gates provided
OF THIS DRAWING IS COVERED, FOR ALL
with four (4) units of 4.3 meters long hydraulic crash barrier and 8 inches
(DCC) NO. _____________________
diameter bollards at main security gate house and Tank Farm Gate. Each gate
is designed to have a two (2) lanes security access road. Also, provide two (2)
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.20 meters single leaf decorative metal gates to be utilized as walkway gate
SAY
SAY
SAY
where each located at main entrance and exit gates. Four (4) Drop arms shall
be provided also in each gate. Two (2) shall be installed at the entry lane and
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
• CONTRACTOR shall provide turnstile for pedestrian entry and exit access.
• Provide type IV perimeter fence with 4.0 meters wide double leaf drive gate for
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
each heel recovery drum location. The perimeter fences shall be in accordance
with all the requirements specified in SAES-M-006 and referenced as per
SAUDI ARAMCO Standard drawing no. AB-036677 sheet 001 rev. no. 002.
DESCRIPTION
• Provide 5.0m wide lay bay for heel recovery drum/product recovery drum for
truck access.
• Provide non-mountable curb and curb & gutter. curb & gutter shall be in
reference to standard drawing AB-036260-001 rev. 005
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
before the SAUDI ARAMCO main gate. FSF facility shall comply all the
Security requirements, not limited to the following:
NO.
REV
D
C
B
DISCIPLINE
1. FSF Support Building
ENGINEER 2. FSF Sunshade
ALL LEADS
3. FSF shaded parking for FSF guards
DATE: 12/11/16
PROJECT
4. Armor Vehicle shed
ENGINEER 5. Non-Electrical Utility (Water & Sanitary)
A M ALMATROOK
DATE: 12/11/16
a. CONTRACTOR shall develop detail design of storm water flow in all the
OPERATIONS
asphalt paved area including applicable storm drain system and surface
ALI H GHAMDI
drain with proper slope.
12/11/16
DATE:
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
prohibited signs, yield signs, speed limit signs) and informative signs
SAY
SAY
SAY
showing the direction of bulk plant and access road. Use thermoplastic
paint for road markings.
ENGG CERT
ASH
ASH
ASH
1. Yellow paint line with 200mm wide on walkway edge paint line
LEADS
LEADS
LEADS
ALL
ALL
ALL
2. White paint line with 120mm wide for car parking interval
(separation)
3. White paint line with 500mm wide for stop line
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Parking stall layout and wheel stop detail and pavement arrows and
cross walk markings shall be in reference as per standard drawing nos.
DD-950107 sheet 001 rev. 00 and AD-036512 sheet 001 rev. 00
respectively. Likewise, miscellaneous parking related work like
installation of parking bumpers etc. shall refer to standard drawing no.
AE-036254-001
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
The Plant Access Road traffic scheme shall include but not limited to the
following:
NO.
REV
D
C
B
DISCIPLINE
ENGINEER
• CONTRACTOR shall provide access to the bulk plant that includes necessary
ALL LEADS traffic signs, road markings and sign board as per standard. Plant access roads
DATE: 12/11/16 shall refer to all applicable requirements as per SAES-Q-006, SAES-A-114 and
PROJECT
ENGINEER AASHTO requirements as required.
A M ALMATROOK
DATE: 12/11/16 • CONTRACTOR shall provide drop gates (drop arms) for vehicles control for
CERTIFIED both entrance and exit road lines
AMR EL SHARKAWY
12/11/16
DATE: • The road asphalt structure for 7.0 meter internal road is comprises of the
CONSTRUCTION
AGENCY following materials as per SAES-Q-006;
SHAHZAD YAZDANI
• CONTRACTOR shall Utilize CBR test values given in geotechnical report 2015/104
EDSD
• Filling materials for road subgrade shall comply with SAES Q 006 chapter 5.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
•
C
• Adequate soil stabilization methods and drainage shall be provided for all
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
access roadways in order to prevent the erosion or flooding of project road
SAY
SAY
SAY
ways.
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
the direction of bulk plant and access road. Use thermoplastic Paint for road
markings.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
•
08/04/16
09/08/16
Provide 6.0m wide access ramps crossing the dike wall to all tanks.
DATE
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS
EXTERNAL PATROL Road
DATE: 12/11/16
PROJECT
ENGINEER CONTRACTOR shall re-evaluate/validate the design requirement and include
A M ALMATROOK any other possible improvement/ requirements on layout design of access
DATE: 12/11/16 road, in plant road traffic scheme that includes but not limited to the following:
CERTIFIED
AMR EL SHARKAWY
12/11/16 • Provide 4.6 meters wide external asphalt concrete patrol road shall comprise of
DATE:
CONSTRUCTION
the following structure.
AGENCY
SHAHZAD YAZDANI
1. 50mm thick asphalt concrete wearing/surface course, Class B,
DATE: 12/11/16
OPERATIONS
2. 70mm thick asphalt concrete binder course, Class B, and provided with
ALI H GHAMDI
Tack Coat, RC-250, on top surface of the binder course
12/11/16
150mm thick aggregate base course with provision of prime coat, MC-
DATE:
70, on top surface of the aggregate base course.
CONTROL NUMBER
VERIFICATION
DATE:
Process Automation shall ensure safe and reliable operation of YDH operations. The
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
layout IN-A00004.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
TMS System
ENGG CERT
ASH
ASH
ASH
• The project shall provide the YDH with a TMS system installed in the
Operation Building, complete with operator workstations, engineering
LEADS
LEADS
LEADS
ALL
ALL
ALL
systems.
• The TMS shall include Human-Machine Interface (HMI) and software
capable of providing functions such as; graphic displays with real-time
process data, alarm summaries, trends and displays of historical data.
• The TMS system comprising of DCS & ESD shall be as per the
Function Specification IN-E00017.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
09/08/16
DATE
facility.
• The DCS system cabinet, I/O and marshalling cabinets shall be
installed in the rack room of O &M building, and in addition the project
NO.
REV
D
C
B
DISCIPLINE shall provide remote I/O cabinets in remote instrument buildings (RIB).
ENGINEER
ALL LEADS • The DCS shall provide regulatory control and supervisory monitoring
DATE: 12/11/16 YDH operations including product pipeline batch receipts, sequencing of
PROJECT
ENGINEER manifold valve line-ups, pump permissive/interlocks, tankage operations
A M ALMATROOK
and batch management operations.
DATE: 12/11/16
CERTIFIED • The DCS shall provide interface to PLC and Third Party Packages, in
AMR EL SHARKAWY
accordance with SAES-Z-001.
12/11/16
DATE: • PCS components that require time synchronization shall be time
CONSTRUCTION
AGENCY synchronized with a master Network Time Protocol (NTP) server such
SHAHZAD YAZDANI
as GPS server.
DATE: 12/11/16
OPERATIONS • Refer system block diagram IN-A00001.001 details.
ALI H GHAMDI
12/11/16
DATE: TMS-Emergency Shutdown System (ESD)
CONTROL NUMBER
VERIFICATION
• The ESD system, I/O, and marshaling cabinets shall be installed in the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
rack room of O& M building and in addition the project shall provide
CERTIFICATE
• The ESD shall provide for the safe and orderly shutdown and isolation
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
of processes in the event of pre-determined conditions. YDH storage
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
•
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
• The proper selection of TMS-DCS for the control and logic functions is
required to operate YDH in order to interface with the PCS system at
NO.
REV
D
C
B
DATE: 12/11/16
This will require a dedicated effort by the LSTK vendor to bring on board
CERTIFIED Yokogawa and Honeywell and discuss with them if their systems is
AMR EL SHARKAWY
12/11/16
capable of integrating with the existing systems currently in operation in
DATE:
CONSTRUCTION
other refineries.
AGENCY
• The data connection with respective refinery is shown in block diagrams
SHAHZAD YAZDANI
DATE: 12/11/16
IN-A00001.004/007/008. LSTK in conjunction with respective PCS
OPERATIONS vendor shall further evaluate the data interface during detail design
ALI H GHAMDI phase
12/11/16
DATE:
CONTROL NUMBER
Fire Alarm Panels (LFAP) in each building. Zone alarms and trouble
alarms shall be wired from each LFAP to a Master Fire Alarm Control
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Panel (MFACP) located in YDH control room. Common fire, ground fault
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
MODBUS or TCP/IP. Interiors of floor-mounted Input/Output, DCS,
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Engineer.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
monitoring VMS signals from shipper and booster pump stations. VMS
workstation shall be installed in Operation building engineering room
12/11/16
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER Radar Tank Gauging System (RTG)
ALL LEADS
DATE: 12/11/16
PROJECT • Radar Tank Gauging shall be provided for tank level measurements,
ENGINEER
A M ALMATROOK
temperature data, and total tank inventory calculations. The RTG shall
DATE: 12/11/16
include Human Machine Interfaces (HMI) located in the O & M building,
CERTIFIED and shall include a redundant interface with the DCS.
AMR EL SHARKAWY
•
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
detail design.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• This project shall incorporate best automation practice for the product
SAY
SAY
SAY
transfer to/from YDH. The process automation systems will provide for
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
(MSC).
• Yanbu’ Distribution Hub : This project shall provide complete CMS flow
12/11/16
08/04/16
09/08/16
DATE
D
C
B
A M ALMATROOK
future flow meters, flow computers, logic controller input/output
DATE: 12/11/16 cards, etc. The system shall be composed, to the maximum
CERTIFIED
AMR EL SHARKAWY
extent possible, of standard hardware, systems software, and
12/11/16 firmware that can be configured to meet the stated objectives.
DATE:
CONSTRUCTION The system shall allow for upgrade of system operating software
AGENCY
SHAHZAD YAZDANI
on all redundant modules of the system without impact on
DATE: 12/11/16 process operations.
OPERATIONS
ALI H GHAMDI
The custody metering system shall comprise of the following:
DATE:
12/11/16 a) FC’s
CONTROL NUMBER
b) PLC
VERIFICATION
c) MSC
EDSD
standards.
(DCC) NO. _____________________
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and duty.
SAY
SAY
SAY
ASH
ASH
o
DO and a separate prover for DPK at the Sources.
LEADS
LEADS
LEADS
ALL
ALL
ALL
o This project shall install new flow computers with the latest
technology flow meters suitable for process fluid and required
delivery flow rates.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
0001
functions:
12/11/16
08/04/16
09/08/16
process data and valve status from the flow computer, PLC,
and sampling system via MODBUS or TCP/IP protocol link.
NO.
REV
D
C
B
a data buffer/storage device and is interfaced to the DCS HMI for data
retrieval. The PI Server shall be located in the rack room and connected
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Enterprise Systems
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DCS. The OSI PI system shall obtain data from the DCS for
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
• The project shall provide all security systems required to protect the
process automation networks and systems against cyber threats. The
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
D
C
B
Operations Room
EDSD
The Operations Room shall be designed within the Operations building. The
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
HMI console shall be provided to control the facility. The Operations Room
OF THIS DRAWING IS COVERED, FOR ALL
workstation etc.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The Operations Room shall be designed so that only activities associated with
SAY
SAY
SAY
plant control are performed there. The operation room shall be engineered to
accommodate future planned expansion.
ENGG CERT
ASH
ASH
ASH
The building shall be located to minimize the risk of external damage from fires,
LEADS
LEADS
LEADS
ALL
ALL
The project shall provide minimum two (2) remote instrument buildings at the
location indicated in the Plot Plan. The RIB shall house the following as
minimum:
• Remote I/O with FTA & marshalling cabinets for DCS.
• Remote I/O with FTA & marshalling cabinets for ESD.
• Vibration Monitoring System (VMS) racks in cabinets.
• F & G instrumentation & UPS
10-02399-
JO/EWO
0001
0001
09/08/16
DATE
D
C
B
DATE: 12/11/16
CERTIFIED The purpose of this budget item is to provide an integrated Security System at
AMR EL SHARKAWY the new Yanbu Distribution Hub. The Security System is composed of the
DATE:
12/11/16 following sub-systems:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
a) Security Access Control System (SACS)
DATE: 12/11/16
OPERATIONS
b) Plate Recognition System (PRS)
ALI H GHAMDI
c) Intrusion Detection and Assessment System (IDAS) / Long Range
12/11/16
DATE: Detection and Assessment System (LRDAS)
CONTROL NUMBER
VERIFICATION
EDSD
The PRS System equipment shall be installed at the YDH Main Gatehouse;
The SACS systems shall be installed at the YDH Tank Farm Gatehouse. The
DATE:
BY:
IDAS cameras and field sensors shall be installed in the Yanbu Distribution
REVISIONCERTIFICATION
Hub perimeter to provide full perimeter fence coverage intrusion detection and
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Present Situation
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Related Documents
DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
12/11/16
08/04/16
09/08/16
DATE
PROJECT OBJECTIVES
NO.
REV
General
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS This project shall provide a Security Access Control System (SACS) for access
DATE: 12/11/16 control functions, sensor management and monitoring functions. The system
PROJECT
ENGINEER shall interface to the SAUDI ARAMCO Identification System, SAUDI ARAMCO
A M ALMATROOK Active Directory and IDAS.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY The SACS system automatically controls access to the processing facilities.
12/11/16 The SACS is located at the Tank Farm Gatehouse entrance. The system is
DATE:
CONSTRUCTION
AGENCY comprised of card readers on the turnstiles and drop gate for vehicles, SACS
SHAHZAD YAZDANI servers and storage equipment, display and logging devices, single entry
DATE: 12/11/16 device interfaces/controllers. Intercoms and communications interfaces,
OPERATIONS
ALI H GHAMDI
relational databases and data extraction and reporting capabilities.
12/11/16
DATE:
The SACS system shall be connected to the central SAUDI ARAMCO SACS
CONTROL NUMBER
VERIFICATION
DATE:
This project shall provide a Plate Recognition System (PRS) and CCTV camera
BY:
will also be provided. The PRS also monitors public vehicles accessing the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
detector sensors, and computer software for intelligent vehicle license plate
(DCC) NO. _____________________
recognition capabilities.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The IDAS system provided shall monitor the approximately 5.5 kilometer
DESCRIPTION
perimeter fence and critical gates. The IDAS/LRDAS shall be integrated with
the existing C2I system of the existing Yanbu Regional Security Center.
The MIDS sensor shall detect intrusion and transmit data to Yanbu Regional
Security Control Center (YNBRSCC). Failure of one of the field devices
connected to the communications network shall not affect the ability of the
system. Communication network shall be supplied in one-to-one redundant
configuration with automatic changeover.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
The project shall design Shelters and Field Equipment Cabinets to house the
12/11/16
09/08/16
DATE
D
C
B
DISCIPLINE
for IDAS/LRDAS, SACS and PRS.
ENGINEER
ALL LEADS
DATE: 12/11/16
DESIGN OBJECTIVES
PROJECT
ENGINEER
12/11/16 The IDAS system has different types of distinct field sensor technologies for
DATE:
CONSTRUCTION intrusion detection:
AGENCY
SHAHZAD YAZDANI
DATE: 12/11/16 • CCTV which consists of Fixed and PTZ cameras installed along the
OPERATIONS perimeter fence to ensure full coverage of the plant so as to secure it from
ALI H GHAMDI
possible intruders.
12/11/16
DATE:
CONTROL NUMBER
“sterile” area between the Category 1/Outer fence and the SAUDI
ARAMCO Type III/Inner fence. Sterile area measures 8 meters from the
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The distance between the poles will be reduced for areas in the site where
(DCC) NO. _____________________
there are curves and/or corners to ensure no “dead” zones within the area. The
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
final number of MIDS pairs shall be determined during the detail design.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
For the assessment part, fixed color day/night cameras with at least 5 meter
ASH
high poles with vari-focal lens located in parallel to the perimeter fence and
LEADS
LEADS
LEADS
ALL
ALL
ALL
spaced at a maximum distance 75 meters apart for straight line fence. The
distance between the poles will be reduced for areas in the site where there are
curves and/or corners to ensure no “dead” zones of the “sterile” area. Based on
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
this, it is estimated that the project will utilize approximately 82 fixed cameras.
The final number of fixed cameras will be determined during the detail design
phase.
DESCRIPTION
Pan Tilt Zoom (PTZ) day/night cameras with at least 7 meter high poles facing
perpendicularly to the perimeter fence, set at approximately 300m apart, no
“dead” zones between the camera coverage. Based on this, it is estimated that
the project will utilize approximately 18 PTZ cameras. The final number of
cameras will be determined during the detail design.
For the traceability part of the IDAS/LRDAS, the project shall provide the
10-02399-
JO/EWO
10-02399-
10-02399-
following:
0001
0001
0001
09/08/16
record in real time all video signals from fixed and PTZ cameras.
DATE
D
C
B
DATE: 12/11/16
For integrating all these technologies, the project shall provide the following:
PROJECT
ENGINEER
DATE:
12/11/16 • Approximately 94 Field Equipment foundations and 94 cabinets
CONSTRUCTION
AGENCY
IP 66/NEMA 4X type with ancillary hardware for mounting.
SHAHZAD YAZDANI
DATE: 12/11/16 • Industrial grade Ethernet switches with dual fiber optic uplink for
OPERATIONS
communications redundancy.
ALI H GHAMDI
12/11/16
DATE:
• Digital Input/output units for signal aggregation and onward
CONTROL NUMBER
VERIFICATION
processing.
EDSD
•
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
servers and applications located in the Security Support Building. The AMS
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
functionality.
10-02399-
10-02399-
0001
log.
0001
0001
12/11/16
08/04/16
09/08/16
•
DATE
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS • Given proper communication hardware, the AMS application and
DATE: 12/11/16 its servers shall be redundant and able to switch-over from the
PROJECT
ENGINEER primary to the secondary server at a maximum 1 second. The
A M ALMATROOK
redundancy doesn’t apply to the Operating system since a fault
DATE: 12/11/16
CERTIFIED
in one will render the secondary server also non-functional.
AMR EL SHARKAWY
12/11/16
DATE: The perimeter fence shall be divided into physical zones. The zone size
CONSTRUCTION
AGENCY shall be adjusted within a range of 30-150 meters to accommodate
SHAHZAD YAZDANI
optimum detection by field sensor systems while remaining within minimum
DATE: 12/11/16
assessment requirements. The architecture and zone size shall be
OPERATIONS
ALI H GHAMDI
determined during the preliminary design stage. The larger the zone size
12/11/16 the lesser the Probability of Detection (PD) and the higher the expected
DATE:
Nuisance Alarm Rate (NAR).
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
All IDAS day/night Fixed and PTZ Cameras shall run at 25fps PAL or 30fps
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
camera shall have a minimum of 525 TVL and run in MJPEG, MPEG-4, and
SAY
SAY
SAY
H.264 format.
ENGG CERT
ASH
ASH
ASH
The radar shall be fully solid state and have a modular construction
LEADS
LEADS
LEADS
ALL
enclosure ready for installation in the field. The antenna with drive motor
can be part of the assembly but can also be detachable for the ease of
transportation and installation.
DESCRIPTION
The System shall interface with the Long Range Surveillance System. It
shall trigger alarms and activate the long range cameras on receipt of a
possible intrusion.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
of IDAS functionality from the field sensor subsystem shall occur during or
after automatic switch over.
NO.
REV
D
C
B
DISCIPLINE
ENGINEER Primary IDAS/LRDAS AMS Servers shall have an availability of 99.99%.
ALL LEADS
Standby or redundant IDAS Servers shall have an availability of 99.99%.
DATE: 12/11/16
PROJECT
The combined availability of the Primary and Standby IDAS/LRDAS shall
ENGINEER
be at least 99.999%.
A M ALMATROOK
DATE: 12/11/16
CERTIFIED The IDAS/LRDAS AMS and sensor subsystems shall be provided based on
AMR EL SHARKAWY
an “open architecture” concept that allows for future inter-operability of
12/11/16
DATE:
other security systems that use standardized systems interfaces and
CONSTRUCTION
AGENCY Commercial off the shelf products (COTS). The system shall have the
SHAHZAD YAZDANI
capability to remotely monitor and manage with these parameters.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
12/11/16 This project shall provide shelters, typically 32 m2 in size consisting of one
DATE:
security room and one electrical room, approximately positioned one every
CONTROL NUMBER
VERIFICATION
•
DATE:
It shall house the IDAS and its field sensors systems for this
BY:
particular area of the fence including the video signals from all
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
The Security Access Control System (SACS) which shall be installed at the
NO.
REV
D
C
B
DATE: 12/11/16
PROJECT
• Proximity card readers shall be provided at each drop arm gate
ENGINEER
and turnstile. Proximity Readers shall be capable of reading from
A M ALMATROOK
DATE: 12/11/16
up to 4 centimeters.
CERTIFIED • Access controlled drop gates and turnstiles will be provided with
AMR EL SHARKAWY
12/11/16
electronically controlled locks or opening mechanism. The drop
DATE:
CONSTRUCTION
gate and turnstile shall be provided with a secure mechanical
AGENCY
override to allow operation of the turnstile/drop gate in the event of
SHAHZAD YAZDANI
DATE: 12/11/16
system or power failure
OPERATIONS • The System shall offer consistent read range unaffected by body
ALI H GHAMDI shielding or variable environment conditions.
DATE:
12/11/16
• The System shall be capable of preventing repeated entries
CONTROL NUMBER
VERIFICATION
Provide Access Control Proximity Card with contact smart chip modules
DATE:
BY:
used for gate card readers. Must have at least 1 second approve or cancel
REVISIONCERTIFICATION
The system Administrative Client Work Server, Local Client Server and
(DCC) NO. _____________________
Main Server should be located so that both remote support and local
operation is made available. Except for the client workstation with an
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
independent card reader and all ancillary equipment necessary to stay in
SAY
SAY
SAY
the gatehouse for the efficient operation of the RFID system, all other
ENGG CERT
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The PRS shall have a minimum 95% Arabic and 95% Latin character
DESCRIPTION
recognition accuracy.
10-02399-
10-02399-
0001
0001
0001
The PRS System shall capture all vehicles entering and leaving at a rate of
12/11/16
100%. These images shall be of the front license plates, together with the
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE
The characters recognized by the system will be stored in ASCII (American
ENGINEER
ALL LEADS
Standard Code for Information Interchange), Unicode or USC (Universal
DATE: 12/11/16
Character Set) format. Only one character format will be used throughout
PROJECT
ENGINEER
the system.
A M ALMATROOK
DATE: 12/11/16 The PRS shall read all types of rectangular Saudi number plates (Short and
CERTIFIED
AMR EL SHARKAWY
long). The PRS shall also be capable of Saudi license plate (Red, Blue,
DATE:
12/11/16 White, Yellow, Black and Green) and shall be capable of distinguishing
CONSTRUCTION similar alphanumeric license plates with different background colors.
AGENCY
SHAHZAD YAZDANI
DATE: 12/11/16 The PRS shall read the newly released types of rectangular Saudi number
OPERATIONS
plates, four (4) numbers and three (3) alphabet and added features. The
ALI H GHAMDI
PRS shall also be capable of recognizing all six (6) different colors
12/11/16
DATE:
representing different classes of Saudi License plate (Blue, White, Yellow,
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The system shall have the capability of capturing images of all retro-
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
capability of this installation.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
The PRS shall provide full time image capturing capability by use of color
ASH
LEADS
LEADS
ALL
ALL
ALL
The PRS shall be able to read any plate tilted or mounted away from a
normal vertical position at an angle of 15º or less.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
The PRS may use additional external system triggers to detect vehicles.
DESCRIPTION
White light illuminators shall be provided for the automatic number plate
recognition (ANPR) cameras.
10-02399-
10-02399-
0001
0001
12/11/16
09/08/16
DATE
provided as necessary.
NO.
REV
D
C
B
DISCIPLINE
The PRS shall recognize number plates of vehicles traveling at speeds up
ENGINEER
ALL LEADS
to 80Km/h at the capture point.
DATE: 12/11/16
PROJECT
ENGINEER
The width of the camera footprint for the color cameras is to be no greater
A M ALMATROOK than 1.6 meters at the optimum capture point.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
The PRS shall display all characters of a number plate.
12/11/16
DATE:
CONSTRUCTION The PRS should be based on optical character recognition (OCR)
AGENCY
SHAHZAD YAZDANI processing with the capacity to “learn” variation in characters through
DATE: 12/11/16 system input.
OPERATIONS
ALI H GHAMDI
The PRS shall provide both monochrome and color images of the number
12/11/16
DATE:
plate for OCR identification and license color verification purposes.
CONTROL NUMBER
VERIFICATION
EDSD
The system shall process color images to allow the color background of
vehicle licensing class to be determines automatically and a corresponding
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
The PRS shall have the capability to alert staff of the approach of a suspect
LEADS
LEADS
LEADS
ALL
ALL
ALL
Camera.
The alarm signal shall be both visual and audible, and shall indicate in
which lane the vehicle is traveling.
10-02399-
10-02399-
gatehouse.
0001
0001
0001
12/11/16
The PRS shall be able to simultaneously monitor; process and store the
08/04/16
09/08/16
DATE
information from all lanes approaching the Gates. The system shall be
designed so as to maximize the read performance in each lane.
NO.
REV
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS
The local PRS Processing/ Storage Equipment shall fully monitor, store,
DATE: 12/11/16
and send PRS Alarms and Transaction Events to a centralized database.
PROJECT
ENGINEER
The processing unit shall integrate (OCR) information and license plate
A M ALMATROOK color information from each vehicle plate.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
CONTRACTORS shall refer to the provided drawings to identify the position
DATE:
12/11/16 and space requirements for the local PRS Processing Equipment. The form
CONSTRUCTION factor of the equipment at Gatehouse should reflect the limited space at
AGENCY
SHAHZAD YAZDANI these locations. All ancillary equipment necessary for the proper operation
DATE: 12/11/16 of the PRS system shall remain in the gatehouse including the PRS
OPERATIONS
workstation for the local monitoring & control of PRS system. The PRS
ALI H GHAMDI
system shall be able to work independently when a breakdown occurs in
12/11/16
DATE:
the corporate network connectivity.
CONTROL NUMBER
VERIFICATION
EDSD
The Fault Tolerant PRS Main Server shall be provided and installed by
CONTRACTOR as approved and procured thru the specifications of SAUDI
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
The Fault Tolerant Main Server shall have redundancy in terms of storage
ENGG CERT
ASH
ASH
failures.
ASH
LEADS
LEADS
LEADS
ALL
ALL
ALL
The PRS Main Server shall be interconnected with all the Local PRS
Processing Equipment located at the gatehouse, Security Equipment
Building and with PRS monitoring workstation located0 at Yanbu RSCC via
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
The PRS main Server shall distribute the updated hot list inputs concerning
DESCRIPTION
flagged vehicles within (60) seconds to the new local PRS Processing
Equipment automatically.
The PRS Main Server shall have sufficient storage capacity to store
information for the following periods of time:
10-02399-
10-02399-
0001
0001
0001
The PRS Main Server shall have an option to automatically archive records,
12/11/16
09/08/16
DATE
medium.
NO.
REV
D
C
B
DISCIPLINE
The PRS Main Server shall maintain an accurate clock set to local time
ENGINEER
ALL LEADS
using Coordinated Universal Time (UTC) information derived from the
DATE: 12/11/16
SAUDI ARAMCO Master Clock. The local time will be synchronized to all
PROJECT
ENGINEER
Local Processor from the Main Server, by the use of a Network Time
A M ALMATROOK Protocol (NTP). All system transactions will be appended with a tamper-
DATE: 12/11/16 proof time-stamp.
CERTIFIED
AMR EL SHARKAWY
DATE:
12/11/16 The Local PRS Processing Equipment shall distribute its database
CONSTRUCTION transactions events to the PRS Main Server automatically within not more
AGENCY
SHAHZAD YAZDANI than thirty (30) minutes and upon request from local machine at gatehouse.
DATE: 12/11/16 The local PRS Processing Equipment shall automatically distribute its
OPERATIONS
database Alarm within no more than one (1) second to the PRS Main
ALI H GHAMDI
Server.
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION
capacity to store information for the following periods of time (based upon
throughput of 2000 vehicles per lane per day).
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
– PRS monochrome and color images linked to above database
SAY
SAY
SAY
entries – 30 days.
ENGG CERT
ASH
ASH
ASH
System Users shall be able to query the PRS System which shall be
LEADS
LEADS
LEADS
ALL
ALL
ALL
capable of generating, saving and printing Local and Site Global reports
listing:
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
The PRS system shall ensure that there is a clear view of each vehicle’s
license plate and shall propose measures to ensure vehicle license plates
10-02399-
JO/EWO
10-02399-
10-02399-
are captured and processed in all traffic conditions, which may require
0001
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS
Outside Plant System (OSP)
DATE: 12/11/16
PROJECT
ENGINEER The Outside Plant Cable and Conduit System shall support the Security Cabling
A M ALMATROOK
connectivity from Security Support Building to various locations of Field
DATE: 12/11/16
CERTIFIED Equipment Cabinets (FECs) through Shelter #1 and Shelter #2 along the
AMR EL SHARKAWY
perimeter fence.
12/11/16
DATE:
CONSTRUCTION
AGENCY
The works includes excavation, installation of buried and underground (in
SHAHZAD YAZDANI conduit) fiber optic cables, construction of conduit facilities, installation of
DATE: 12/11/16 pedestal with guard post, cable splicing, installation of fiber optic patch panels,
OPERATIONS
cutting and replacing of paved and asphalt areas to original condition,
ALI H GHAMDI
12/11/16
installation of marker post, installation of electronic marker, termination of fiber
DATE:
cables, cable testing and tagging.
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Systems, data bases and device drivers.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
to the C2I platform to integrate with the different Security systems installed
LEADS
LEADS
LEADS
ALL
ALL
ALL
under BI-10-00555.
10-02399-
10-02399-
The C2I application software installed in the Dhahran RSCC under BI-10-
0001
0001
0001
00555 shall have the capability to view each site and when required, a
12/11/16
password protection scheme to take over the application of this site. The
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS
SAUDI ARAMCO Corporate Network
DATE: 12/11/16
PROJECT
ENGINEER
The security system platform shall be capable of utilizing a high-
A M ALMATROOK performance standard IP-based network to establish internal
DATE: 12/11/16 communications between the systems components and to interface with
CERTIFIED
AMR EL SHARKAWY
SAUDI ARAMCO Corporate Data Network.
12/11/16
DATE:
CONSTRUCTION The proposed system shall be connected to the IP-Data network. The
AGENCY
SHAHZAD YAZDANI connection shall utilize Gigabit Ethernet Local Area Network.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION
ENVIRONMENTAL IMPACT
EDSD
DATE:
All work under the Scope of this project shall conform to all SAUDI
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
4.25 STRUCTURAL
ENGG CERT
ASH
ASH
ASH
GENERAL
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
CONTRACTOR shall ensure achieving high safety and security standards and
0001
0001
0001
09/08/16
DATE
D
C
B
DATE: 12/11/16 The mapped Maximum Considered Earthquake (MCE) spectral response
OPERATIONS accelerations for the Yanbu area are documented in SAES-A-112 as follows:
ALI H GHAMDI
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
Criteria Parameter
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Site Class as per geotechnical D
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
design, for any change in location of equipment, building or facility away from
the given test location contractor shall utilize the nearest test location and
prepare standalone report for utilization of nearest test location and submit it to
DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
CONTRACTOR shall check and verify all Sub-Contractor and Vendor design
and drawings provided comply with the Scope of Work, and documents
12/11/16
08/04/16
09/08/16
D
C
B
12/11/16
CONTRACTOR shall note that all structural drawings of project proposal are
DATE:
CONSTRUCTION
indicative; CONTRACTOR shall perform detailed structural calculations during
AGENCY detailed design as per vendor data and in accordance with SAUDI ARAMCO
SHAHZAD YAZDANI
standards.
DATE: 12/11/16
OPERATIONS
CONTRACTOR shall finalize all building design incorporating
ALI H GHAMDI
recommendations given in BRA report for all buildings. Blast resistant design
12/11/16
DATE: shall be performed where deemed necessary by using the project Building Risk
CONTROL NUMBER
DATE:
Equipment Foundations
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
CONTRACTOR shall provide concrete foundations for dye injection skid, SDA
injection skid, conductivity enhancer skid, custody metering skid, meter prover
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide slab on grade and toe wall as per vendor
requirement for equipment’s.
CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
IFC drawing for all equipment foundations.
10-02399-
10-02399-
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE CONTRACTOR shall provide concrete foundations for spur rack, platforms,
ENGINEER
ALL LEADS pipe supports at manifold location as per piping plans. CONTRACTOR shall
DATE: 12/11/16 design foundations as per stress analysis load data in accordance with SAUDI
PROJECT
ENGINEER
ARAMCO standards. CONTRACTOR shall provide all foundation design
A M ALMATROOK
calculations for SAUDI ARAMCO approval.
DATE: 12/11/16
CERTIFIED Tank farm and support infrastructure
AMR EL SHARKAWY
DATE:
12/11/16 Equipment Foundations
CONSTRUCTION
AGENCY
CONTRACTOR shall provide concrete foundations for diesel day tank, 2 No’s
SHAHZAD YAZDANI
of emergency generator set, DPK filtration skid, surge skid (DO/DPK), surge
DATE: 12/11/16
OPERATIONS
skid (GASOLINE), utility water tank, fire water tank, 2 No’s of foam skid, pumps
ALI H GHAMDI
and OWS treatment package.
12/11/16
DATE:
CONTRACTOR shall design foundations as per vendor requirement of size
CONTROL NUMBER
VERIFICATION
CONTRACTOR shall provide slab on grade and toe wall as per vendor
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
SAY
SAY
SAY
ASH
ASH
ASH
Shelters
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
CONTRACTOR shall design shelter foundations as per PEB- vendor load data
12/11/16
08/04/16
09/08/16
DATE
CONTRACTOR shall provide slab on grade for foam skid shelter with isolation
D
C
B
DISCIPLINE joint between major foundations and miscellaneous pipe supports shall be
ENGINEER
ALL LEADS provided based on load data and piping plans.
DATE: 12/11/16
PROJECT Oily water lift stations (2 No’s)
ENGINEER
A M ALMATROOK
CONTRACTOR shall design and detail reinforced cement concrete oily water
DATE: 12/11/16
CERTIFIED lift station as per sizing requirement with appropriate coating on inside and
AMR EL SHARKAWY outside face as per SAUDI ARAMCO standards.
12/11/16
DATE:
CONSTRUCTION CONTRACTOR shall provide dewatering system based on the depth of lift
AGENCY
SHAHZAD YAZDANI
station and water table level and shall dispose the water to an approved
DATE: 12/11/16
location by SAUDI ARAMCO.
OPERATIONS
ALI H GHAMDI CONTRACTOR shall take appropriate measures as per SAUDI ARAMCO
12/11/16 standards for deep soil excavations.
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
CONTRACTOR shall design and detail reinforced cement concrete sanitary lift
BY:
station as per sizing requirement with appropriate coating on inside and outside
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
location by SAUDI ARAMCO.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Dike wall
CONTRACTOR shall provide vertical expansion joint in dike wall as per figure 2
of SAES-B-005.
CONTRACTOR shall provide 1.5 mm thick HDPE liner below dike area with
appropriate HDPE insert on concrete dike wall inside face.
CONTRACTOR shall weld 1.5 mm thick HDPE liner for dike area with HDPE
liner provided by other CONTRACTOR around the tank foundations.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
above grade.
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS CONTRACTOR shall provide minimum 500 mm MARL cover for HDPE liner
DATE: 12/11/16
provided inside dike area.
PROJECT
ENGINEER
A M ALMATROOK
Steel pipe support, pipe sleepers, structural platforms and crossovers
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY CONTRACTOR shall provide structural pipe support, structural platforms and
DATE:
12/11/16 crossovers as per piping plans and design in accordance with SAUDI
CONSTRUCTION ARAMCO standards. CONTRACTOR shall provide all structural calculations for
AGENCY
SHAHZAD YAZDANI
SAUDI ARAMCO approval.
DATE: 12/11/16
OPERATIONS CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO
ALI H GHAMDI approval.
12/11/16
DATE:
CONTRACTOR shall provide concrete foundations for pipe supports, platforms,
CONTROL NUMBER
VERIFICATION
crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Culvert
OF THIS DRAWING IS COVERED, FOR ALL
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall design RCC culvert for all possible load cases and load
combinations as per SAUDI ARAMCO and AASHTO standards requirement.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Buildings
DESCRIPTION
10-02399-
10-02399-
0001
0001
09/08/16
DATE
DISCIPLINE
ENGINEER
ALL LEADS
Musallah
DATE: 12/11/16
PROJECT CONTRACTOR shall provide reinforced cement concrete frame and roof slab
ENGINEER
as per architectural plans, sections and elevations.
A M ALMATROOK
DATE: 12/11/16
CERTIFIED
CONTACTOR shall perform structural design of Musallah building in
AMR EL SHARKAWY accordance with SAUDI ARAMCO standards and submit design calculations to
DATE:
12/11/16 SAUDI ARAMCO for review and approval.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
CONTRACTOR shall refer to BRA report recommendation during detailed
design of building and shall prepare blast resistant design.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
Security Guard house (2 No’s)
12/11/16
DATE:
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
design of building.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Operator shelter (2 No’s)
SAY
SAY
SAY
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Smoking shelter
10-02399-
10-02399-
CONTRACTOR shall provide foundation for smoking shelter as per load data
0001
0001
0001
for structural steel shelter and providing anchor bolts as per SAUDI ARAMCO
standards.
12/11/16
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE CONTRACTOR shall provide reinforced cement concrete frame and roof slab
ENGINEER
ALL LEADS
as per architectural plans, sections and elevations.
DATE: 12/11/16
PROJECT CONTACTOR shall perform structural design of FSF support building in
ENGINEER
accordance with SAUDI ARAMCO standards and submit design calculations to
A M ALMATROOK
SAUDI ARAMCO for review and approval.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY CONTRACTOR shall refer to BRA report recommendation during detailed
DATE:
12/11/16 design of building.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
CONTRACTOR shall pre-engineered space frame structural sunshade for FSF
sunshade.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI CONTRACTOR shall provide PEB vendor space frame structural design
12/11/16 calculation for SAUDI ARAMCO review and approval. Space frame design
DATE:
shall be in accordance with SAUDI ARAMCO standards.
CONTROL NUMBER
VERIFICATION
EDSD
bolts shall be specified by vendor and selection of anchor bolt shall be as per
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Receiving substation
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR during detail design shall validate the use of SAUDI ARAMCO
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
standards and provide design calculations to SAUDI ARAMCO for review and
approval.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall provide slab on grade and toe/curb wall around the slab
on grade with required slopes towards oily water catch basins.
10-02399-
10-02399-
0001
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE Necessary loading on roof shall be considered for the design of double tee.
ENGINEER
ALL LEADS
CONTRACTOR shall provide transformer foundation as per Vendor data.
DATE: 12/11/16
PROJECT
ENGINEER
CONTRACTOR shall provide reinforced cement concrete fire walls for
A M ALMATROOK
transformers as per vendor data.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY CONTRACTOR shall provide slab on grade and toe/curb wall around the slab
DATE:
12/11/16 on grade with required slopes towards oily water catch basins.
CONSTRUCTION
AGENCY
Engineering & Maintenance (E & M) building
SHAHZAD YAZDANI
DATE: 12/11/16
OPERATIONS
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
ALI H GHAMDI
as per architectural plans, sections and elevations.
12/11/16
DATE:
CONTACTOR shall perform structural design of E & M building in accordance
CONTROL NUMBER
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
as per architectural plans, sections and elevations.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide structural pipe support and platforms for TCF
facility as required in accordance with SAUDI ARAMCO standards.
X-Ray Building
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.
12/11/16
08/04/16
09/08/16
DATE
D
C
B
DISCIPLINE
ARAMCO for review and approval.
ENGINEER
ALL LEADS
CONTRACTOR shall refer to BRA report recommendation during detailed
DATE: 12/11/16
PROJECT
design of building.
ENGINEER
12/11/16
DATE:
CONTROL NUMBER
Chemical shelter
VERIFICATION
EDSD
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.
DATE:
BY:
REVISIONCERTIFICATION
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall refer to BRA report recommendation during detailed
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.
10-02399-
10-02399-
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER Operation building
ALL LEADS
DATE: 12/11/16
PROJECT
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
ENGINEER as per architectural plans, sections and elevations.
A M ALMATROOK
12/11/16
DATE: CONTRACTOR shall provide continuous concrete anchor constructed
CONTROL NUMBER
Purpose Fencing.
EDSD
DATE:
CONTRACTOR shall provide foundations for fixed camera, PTZ camera, field
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
lighting pole and design of foundation shall be done as per vendor load data
SAY
SAY
SAY
and shall be in compliance with SAUDI ARAMCO standards. Anchor bolts shall
be specified by vendor in accordance with SAUDI ARAMCO standards.
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
vendor load data and shall be in compliance with SAUDI ARAMCO standards.
Anchor bolts shall be specified by vendor in accordance with SAUDI ARAMCO
standards.
DESCRIPTION
CONTRACTOR shall construct concrete duct banks for cable routing as shown
in electrical drawings.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
CONTRACTOR shall construct crash rated barriers, crash rated beams and
valve boxes.
12/11/16
08/04/16
09/08/16
DATE
catch basins.
D
C
B
DISCIPLINE
ENGINEER
ALL LEADS CONTRACTOR shall construct all required oily water manholes.
DATE: 12/11/16
PROJECT Contractor shall provide all HVAC equipment foundation including foundation
ENGINEER
A M ALMATROOK
for air stack as per HVAC drawings.
DATE: 12/11/16
CERTIFIED Contractor shall provide 18 No’s ground water monitoring well in accordance
AMR EL SHARKAWY with Royal Commission Environmental Regulation 2015 Volume II and satisfy
DATE:
12/11/16 minimum construction requirement as stated in Royal commission standard
CONSTRUCTION
AGENCY
drawing RC-EN-1. For proposed location of ground water monitoring wells refer
SHAHZAD YAZDANI SKETCH-ST-001. Contractor shall take prior approval from royal commission
DATE: 12/11/16
on final locations of ground water monitoring well during detailed design.
OPERATIONS
ALI H GHAMDI
General
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Equipment Foundations
SAY
SAY
SAY
ASH
ASH
ASH
custody metering skid, meter prover and custody metering shelter (vendor
package).
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide slab on grade and toe wall as per vendor
requirement for equipment’s.
DESCRIPTION
CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
IFC drawing for all equipment foundations.
10-02399-
10-02399-
location to access tank settlement (immediate and long term) and soil bearing
0001
0001
0001
09/08/16
DATE
load data. IFC load data shall cover all loadings for tank including tank shell,
D
C
B
DISCIPLINE tank roof and bottom plates, Empty weight, operating weight, hydro test weight,
ENGINEER
ALL LEADS corroded weight, wind load and seismic loading etc. and all loading shall be
DATE: 12/11/16
reported as per API-650 standard.
PROJECT
ENGINEER
A M ALMATROOK
CONTRACTOR is fully responsible for the design of tank foundations. E.g. type
of foundation, materials, quantities etc. the drawings those are being provided
DATE: 12/11/16
CERTIFIED to CONTRACTOR are for their reference and for cost estimate purpose. It is
AMR EL SHARKAWY CONTRACTOR’s responsibility to ensure that adequate tank foundations are
DATE:
12/11/16 designed and built, including any soil improvement/replacement resulting from
CONSTRUCTION
AGENCY
soil investigation/geotechnical report.
SHAHZAD YAZDANI
DATE: 12/11/16
In case anchor bolts are required for tank anchorage to the foundations, then
OPERATIONS anchor bolts shall as per SASD AA-036322-001 Rev 08. Coating requirement
ALI H GHAMDI of anchor bolts shall be as per 32-SAMSS-005 and bolts shall be coated with
DATE:
12/11/16 fluoropolymer/ceramic; galvanized bolts shall not be used.
Fluoropolymer/ceramic coating shall be in accordance with 09-SAMSS-107.
CONTROL NUMBER
VERIFICATION
EDSD
construction.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
as per tank vendor specifications for SAUDI ARAMCO review and approval. In
(DCC) NO. _____________________
case actual settlements are more than recommended and not acceptable to
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco, CONTRACTOR shall improve the soil to ensure that edge and
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
Standard.
0001
0001
0001
CONTRACTOR shall provide vertical expansion joint in dike wall as per figure 2
12/11/16
08/04/16
09/08/16
DATE
of SAES-B-005.
NO.
REV
CONTRACTOR shall provide 1.5 mm thick HDPE liner below dike area with
D
C
B
DISCIPLINE appropriate HDPE insert on concrete dike wall inside face and outer face of
ENGINEER
ALL LEADS tank ring beam.
DATE: 12/11/16
PROJECT CONTRACTOR shall provide protective coating APCS-10 on concrete surfaces
ENGINEER
A M ALMATROOK
below grade.
DATE: 12/11/16
CERTIFIED CONTRACTOR shall provide protective coating APCS-1B on concrete surfaces
AMR EL SHARKAWY above grade.
12/11/16
DATE:
CONSTRUCTION
AGENCY
CONTRACTOR shall provide minimum 500 mm MARL cover for HDPE liner
SHAHZAD YAZDANI provided inside dike area.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI Steel pipe support, pipe sleepers, structural platforms and crossovers
12/11/16
DATE:
CONTRACTOR shall provide structural pipe support, structural platforms and
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
approval.
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
General
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall conduct site visits to finalize the piping road crossing
inside Yanbu refinery plant as per piping plans. CONTRACTOR shall check
available space inside existing culverts to cross pipes for proposed lines and if
space is not adequate to cross the proposed lines CONTRACTOR shall
propose modifications of Existing culvert or new culverts with prior approval
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
Equipment Foundations
12/11/16
08/04/16
09/08/16
DATE
D
C
B
DATE: 12/11/16
CERTIFIED
CONTRACTOR shall provide anchor bolts as per vendor requirement in
AMR EL SHARKAWY accordance with SAUDI ARAMCO standards.
12/11/16
DATE:
CONSTRUCTION CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
AGENCY
SHAHZAD YAZDANI
IFC drawing for all equipment foundations.
DATE: 12/11/16
OPERATIONS
Surge relief tank
ALI H GHAMDI
12/11/16
CONTRACTOR shall conduct detailed geotechnical investigation at tank
DATE:
location to access tank settlement (immediate and long term) and soil bearing
CONTROL NUMBER
VERIFICATION
CONTRACTOR shall design tank foundations for all loadings as per final IFC
BY:
load data. IFC load data shall cover all loadings for tank including tank shell,
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
tank roof and bottom plates, Empty weight, operating weight, hydro test weight,
OF THIS DRAWING IS COVERED, FOR ALL
corroded weight, wind load and seismic loading etc. and all loading shall be
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR is fully responsible for the design of tank foundations. E.g. type
SAY
SAY
SAY
of foundation, materials, quantities etc. the drawings those are being provided
to CONTRACTOR are for their reference and for cost estimate purpose. It is
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
In case anchor bolts are required for tank anchorage to the foundations, then
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
anchor bolts shall as per SASD AA-036322-001 Rev 08. Coating requirement
of anchor bolts shall be as per 32-SAMSS-005 and bolts shall be coated with
fluoropolymer/ceramic; galvanized bolts shall not be used.
Fluoropolymer/ceramic coating shall be in accordance with 09-SAMSS-107. All
DESCRIPTION
10-02399-
10-02399-
0001
Saudi Aramco, CONTRACTOR shall improve the soil to ensure that edge and
0001
0001
09/08/16
DATE
D
C
B
DISCIPLINE
ENGINEER
CONTRACTOR shall fulfill all requirements specified in Appendix B of 32-
ALL LEADS SAMSS-005 for foundation design and construction.
DATE: 12/11/16
PROJECT
ENGINEER
CONTRACTOR shall provide complete system for leak detection. Tanks in
A M ALMATROOK
services other than water shall be provided with an under tank leak detection
DATE: 12/11/16
and sub-grade protection according to API STD 650, Appendix I.
CERTIFIED
AMR EL SHARKAWY
CONTRACTOR shall develop procedure and monitor tank settlement as per
12/11/16
DATE: API 650 standard and shall submit method statement to Saudi Aramco for
CONSTRUCTION
AGENCY
approval.
SHAHZAD YAZDANI
12/11/16 CONTRACTOR shall design dike wall in accordance with Saudi Aramco
DATE:
Standard.
CONTROL NUMBER
VERIFICATION
EDSD
CONTRACTOR shall provide vertical expansion joint in dike wall as per figure 2
of SAES-B-005.
DATE:
BY:
CONTRACTOR shall provide 1.5 mm thick HDPE liner below dike area with
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
appropriate HDPE insert on concrete dike wall inside face and outer face of
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall provide protective coating APCS-10 on concrete surfaces
SAY
SAY
SAY
below grade.
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide minimum 500 mm MARL cover for HDPE liner
provided inside dike area.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
0001
crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
0001
0001
09/08/16
DATE
D
C
B
DATE: 12/11/16
General
PROJECT
ENGINEER
A M ALMATROOK
CONTRACTOR shall conduct site survey to finalize the pipeline routing
DATE: 12/11/16
CERTIFIED proposed during detailed design.
AMR EL SHARKAWY
DATE:
12/11/16 CONTRACTOR shall provide all adequate civil /structural arrangements for
CONSTRUCTION road crossings as proposed in pipeline drawings and this shall include but not
AGENCY
SHAHZAD YAZDANI
limited to soil excavation, backfilling, concrete lining, dewatering if required and
DATE: 12/11/16
detour for open cut road crossings.
OPERATIONS
ALI H GHAMDI CONTRACTOR shall conduct detailed geotechnical investigation at road
12/11/16 crossing location to assess soil condition to determine methodology to be used
DATE:
for thrust boring option.
CONTROL NUMBER
VERIFICATION
EDSD
approval from SAUDI ARAMCO and prepare standalone report indicating use
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
assessing soil conditions for Yanbu –Jiddah Highway crossing and Yanbu
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
refinery exit crossing.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
GENERAL DESCRIPTION
0001
0001
0001
09/08/16
DATE
D
C
B
DATE: 12/11/16 • All exterior walls will be CMU and insulated and cladded with drywalls from
PROJECT
ENGINEER
inside the buildings (Except Substation Building which will have precast panels
A M ALMATROOK walls as per SA standards) as per the BRA recommendations.
DATE: 12/11/16
CERTIFIED • All interior walls will be CMU and drywalls as per the standards and codes
AMR EL SHARKAWY
requirements.
12/11/16
DATE:
CONSTRUCTION
AGENCY • All exterior walls (Except Substation Building) will have plaster with paint
SHAHZAD YAZDANI finish.
DATE: 12/11/16 • All interior wall surfaces and exposed structures shall be painted and finished
OPERATIONS
in accordance with SAES-H-101V.
ALI H GHAMDI
DATE:
12/11/16
• Buildings will have acoustical ceiling tiles where allowed by standards and
CONTROL NUMBER
codes.
VERIFICATION
EDSD
•
APPROVAL/CERTIFICATION REQUIREMENTS,
All buildings will have finishing materials as per Building Design and Finishing
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
• Smoking Shelter is open (No walls) covered by steel structure shelter and
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
including 4 wooden bench.
SAY
SAY
SAY
ASH
ASH
ASH
M-009.
LEADS
LEADS
LEADS
ALL
ALL
ALL
• Fire barriers shall be provided to separate different use area. Fire walls shall
be provided to the Control room, equipment Room, Rack/Server room,
Telecom, HVAC, Electrical /UPS and Battery rooms. All fire barriers shall be
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
• Interior framing, members, finishes, partition, cabinets, doors, and trim, shall
DESCRIPTION
be non-combustible.
• Provide gypsum board (fire rated and moisture resistant) drywall partitions
with insulation on metal studs with painted finish and ceramic tiles at wet
areas where required.
• All ceramic wall tiles finished shall be full height extended to under face of
ceiling. Ceramic wall base shall be cove and rounded edges at exposed
corner angles.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
• All separating wall shall be constructed to achieve a giving fire rating where
necessary exposed internal concrete surfaces shall be paint finished.
12/11/16
08/04/16
09/08/16
DATE
• Provide 19 mm thick plywood and finished with 2 coats of fire retardant paint
to Telecommunication Room. Plywood shall be installed on a fire resistive wall
NO.
REV
D
C
B
DISCIPLINE
assembly such as type ‘X’ fire rated gypsum board or concrete wall.
ENGINEER
•
ALL LEADS
Raised Access Floor shall be heavy grade access floor system with coated
DATE: 12/11/16
PROJECT
steel and durable anti-static pressure laminate floor. Where required this shall
ENGINEER
be chemical resistant and anti-static floor compound.
A M ALMATROOK
DATE: 12/11/16
CERTIFIED
• Provide anti-static vinyl tiles to Telecommunication Room and Electrical
AMR EL SHARKAWY Room.
12/11/16
DATE:
CONSTRUCTION • Provide non-slip acid resistant quarry tiles to Battery Room.
AGENCY
SHAHZAD YAZDANI
DATE: 12/11/16
• The ceiling at the Telecommunication Room, Mechanical and
OPERATIONS Electrical/Instrument Workshop shall be exposed smooth surface structure
ALI H GHAMDI and paint finished.
12/11/16
DATE:
• Battery Room shall be exposed smooth surface concrete structure with acid
CONTROL NUMBER
VERIFICATION
testing agency. The labels shall comply with NFPA-80 and shall be
permanently affixed to the door frame. The label shall be applied at the factory
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Name of manufacturer.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Trademark of the third-party inspection agency.
SAY
SAY
SAY
Fire-protection rating.
Maximum transmitted temperature end point for fire door exit enclosure and
ENGG CERT
ASH
ASH
ASH
exit passageway.
Smoke and draft control door shall show the letter “S” on the label.
LEADS
LEADS
LEADS
ALL
ALL
ALL
• All fire rated doors shall be provided with required fire rating including smoke
and draft seals in accordance with IBC Chapter 7, and UL listed, with
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
• Provide all exit doors with panic devices as per IBC 2009, Section 1008.1.10
and SAES-B-014, Section 5.13 and SAES-P-103 , Section 6.2.4
• All fire rated doors shall be provided with door closers and with smoke/in
tumescent seals to heads and both sides. Closer shall be specified to operate
for individual door size/weight and for particular internal and external.
• Provide all internal door sets paint finished galvanized steel and providing fire
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
and sound resistance where necessary. Doors with vision glass panel shall be
wired-glass. All ironmongery shall be stainless steel.
12/11/16
08/04/16
09/08/16
DATE
• Provide all external door paint finished, thermally insulated and fire-resistant
galvanized steel door with gas, dust and weather seals. Entrance door to air
NO.
REV
D
C
B
DATE: 12/11/16
PROJECT
• Provide handrail and guard or combination of handrail and guard in
ENGINEER accordance with all requirements set forth in IBC-2009, Section 1012 and
A M ALMATROOK 1013 respectively.
DATE: 12/11/16
CERTIFIED
• Provide Emergency eyewash and shower to each Battery Room according to
AMR EL SHARKAWY SAES-B-069. (Typical for all the buildings which include Battery Room)
12/11/16
DATE:
CONSTRUCTION • All buildings windows must have, LOW-E (on 2nd. Face) double glazed (6mm,
AGENCY
16mm, 6mm), reflective heat strengthen exterior & clear tempered interior
SHAHZAD YAZDANI
glazing set in powder-coated (PVDF)-Thermally Broken aluminum window
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
5.1. MAIN GATEHOUSE
12/11/16
DATE:
CIVIL
CONTROL NUMBER
VERIFICATION
•
EDSD
STRUCTURAL
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
•
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
FIRE PROTECTION
SAY
SAY
SAY
ASH
ASH
ASH
906, SAES-M-100.
LEADS
LEADS
LEADS
ALL
ALL
ALL
6.
• CONTRACTOR shall install all fire Extinguisher units less than 18 kg shall
be mounted so that the extinguisher top is not more than 1.5 m above the
floor level. Extinguisher units weighing over 18 Kg shall be mounted so that
extinguisher top is not more than 1.0 m above the floor level.
TELECOMMUNICATION
10-02399-
10-02399-
0001
0001
0001
09/08/16
•
DATE
CONTRACTOR shall provide this building 4 outlets for voice and data
communication. UTP Cat 6 4-pr x 23 ga. Cable will be used going to each
RJ45 modules in each faceplate outlets.
NO.
REV
D
C
B
DISCIPLINE
ENGINEER • CONTRACTOR shall procure, install, test and commission one (1) Radio
ALL LEADS
Frequency Dispatch Terminal (RFDT) at the Guardhouse. The transceiver
DATE: 12/11/16
PROJECT
shall be located at the Security Support Building and the control head at the
ENGINEER Guardhouse.
A M ALMATROOK
DATE: 12/11/16
CERTIFIED
• Outdoor type Cat 6 4-pr x 23ga cable will be extended from the Support
AMR EL SHARKAWY Facility building for the connectivity required in the gatehouse. Cat 6
12/11/16 protector modules shall be provided by the Contactor.
DATE:
CONSTRUCTION
AGENCY
ELECTRICAL
SHAHZAD YAZDANI
DATE: 12/11/16
OPERATIONS • For Building electrical scope refer to section 4.15.
ALI H GHAMDI
DATE:
12/11/16 5.2. MUSALLAH
CONTROL NUMBER
VERIFICATION
CIVIL
EDSD
• Provide 8” diameter RTR pipe, 80FEOD, for sanitary waste water from
DATE:
BY:
sanitary sewer network then heading to the sanitary lift station area.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
These will include the provision of sanitary manholes, cleanouts and other
C
fixtures.
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Provide 2” diameter RTR pipe, 12FEOU, from water supply network loop
SAY
SAY
SAY
ASH
ASH
ASH
ALL
ALL
ARCHITECTURAL
•
DESCRIPTION