This document is from Saudi Aramco and pertains to the Yanbu Distribution Hub and North Jiddah Bulk Plant Expansion project. It contains project details such as descriptions, drawings, and verification from the project engineer and construction agency. The document provides proprietary information owned by Saudi Aramco regarding the pipeline distribution and terminal projects department.

Uploaded by

bill
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
681 views296 pages

211 Fgdgaster

This document is from Saudi Aramco and pertains to the Yanbu Distribution Hub and North Jiddah Bulk Plant Expansion project. It contains project details such as descriptions, drawings, and verification from the project engineer and construction agency. The document provides proprietary information owned by Saudi Aramco regarding the pipeline distribution and terminal projects department.

Uploaded by

bill
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Saudi Aramco 2616-ENG (03/99)

PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

PIPELINES, DISTRIBUTION & TERMINAL


ENGG CERT

ASH
ASH
ASH

PROJECTS DEPARTMENT
LEADS

LEADS
LEADS
ALL

ALL
ALL

ISSUED FOR 100% PROJECT PROPOSAL


ISSUED FOR 100% PROJECT PROPOSAL

YANBU-NORTH JIDDAH DISTRIBUTION &


ISSUED FOR 90% PROJECT PROPOSAL

PIPELINE PROJECTS DIVISION


DESCRIPTION

BI-10-02399

YANBU DISTRIBUTION HUB AND NORTH


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

JIDDAH BULK PLANT EXPANSION


12/11/16
08/04/16

09/08/16
DATE

(YANBU DISTRIBUTION HUB PORTION)


NO.
REV

D
C
B

DISCIPLINE
ENGINEER
ALL LEADS

DATE:
12/11/16
PROJECT
ENGINEER

A M ALMATROOK

DATE: 12/11/16
PROJECT PROPOSAL NARRATIVE
CERTIFIED
AMR EL SHARKAWY

12/11/16
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
RE-ISSUED FOR 100% PROJECT
DATE: 12/11/16
OPERATIONS
PROPOSAL
ALI H GHAMDI

DATE:
12/11/16
ADDENDUM 1
CONTROL NUMBER
VERIFICATION
EDSD

PREPARED BY:
DATE:
BY:
REVISIONCERTIFICATION

MUSTANG-HDP,
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

AL-KHOBAR, SAUDI ARABIA.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 1


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
TABLE OF CONTENTS
SAY
SAY
SAY

SECTION 1.0 – INTRODUCTION .............................................................................................. 4


ENGG CERT

ASH
ASH
ASH

1.1 PREFACE ................................................................................................................... 4


LEADS

LEADS
LEADS
ALL

ALL
ALL

1.2 PRESENT SITUATION ............................................................................................... 4


1.3 PROJECT PROPOSAL NARRATIVE .......................................................................... 4
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

1.4 SAUDI ARAMCO DESIGN / ENGINEERING STANDARDS ........................................ 6


1.5 LIST OF ABBREVIATIONS AND ACRONYMS.......................................................... 21
SECTION 2.0 – PROJECT DESCRIPTION .............................................................................. 25
DESCRIPTION

2.1 PLANT LOCATION ................................................................................................... 25


2.2 LAND USE PERMIT (LUP) ........................................................................................ 25
SECTION 3.0 – PROJECT DESIGN CRITERIA ....................................................................... 25
SECTION 4.0 – DETAILED SCOPE OF WORK ....................................................................... 26
4.1 OVERALL SCOPE .................................................................................................... 26
4.2 INTERFACES WITH OTHER BI’S ............................................................................. 26
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

4.3 PROJECT PHYSICAL INTERFACES ....................................................................... 27


12/11/16

4.4 PROJECT OPERATING INTERFACES .................................................................... 42


08/04/16

09/08/16
DATE

4.5 DEMOLITION ACTIVITIES ....................................................................................... 42


NO.
REV

D
C
B

4.6 RECEIPT PIPELINE AND CONNECTIONS ......................................................................... 45


DISCIPLINE
ENGINEER 4.7 YANBU’ DISTRIBUTION HUB TANK FARM AND SUPPORT INFRASTRUCTURE ..................... 50
ALL LEADS

DATE: 12/11/16 4.8 YANBU TO JIDDAH PIPELINE 1 & 2 SUPPORT INFRASTRUCTURE ..................................... 71
PROJECT
ENGINEER
4.9 PUMPS AND MOTORS FOR THE YANBU TO JIDDAH PIPELINE........................................... 73
A M ALMATROOK

DATE: 12/11/16 4.10 PUMP OPERATIONS FOR THE YANBU TO JIDDAH PIPELINE ............................................. 80
CERTIFIED
AMR EL SHARKAWY 4.11 PIPELINE CONNECTION FROM GRASSROOTS-YANBU ARAMCO REFINERY ....................... 80
12/11/16
DATE: 4.12 PIPELINE CONNECTION FROM SAMREF REFINERY....................................................... 81
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
4.13 PIPELINE CONNECTION FROM YASREF REFINERY ....................................................... 87
DATE: 12/11/16 4.14 PIPELINE CONNECTION FROM YANBU REFINERY TERMINAL ........................................... 91
OPERATIONS
ALI H GHAMDI
4.15 ELECTRICAL............................................................................................................ 96
12/11/16 4.16 COMMUNICATION ...................................................................................................... 121
DATE:
CONTROL NUMBER
VERIFICATION

4.17 FIRE PROTECTION .................................................................................................... 180


EDSD

4.18 INDUSTRIAL DRAINAGE SYSTEM................................................................................. 187


DATE:

4.19 GRADING & STORM WATER DRAINAGE ............................................................. 193


BY:
REVISIONCERTIFICATION

4.20 UTILITY WATER SUPPLY ...................................................................................... 194


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

4.21 SANITARY WASTE WATER ................................................................................... 194


(DCC) NO. _____________________

4.22 OVERALL SITE DEVELOPMENT AND FACILITIES: .............................................. 195

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 2


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.23 PROCESS AUTOMATION & CONTROLS ........................................................................ 198
SAY
SAY
SAY

4.24 INTEGRATED SECURITY SYSTEM ....................................................................... 205


ENGG CERT

ASH
ASH
ASH

4.25 STRUCTURAL........................................................................................................ 218


LEADS

LEADS
LEADS
ALL

ALL

SECTION 5.0 – BUILDINGS .................................................................................................. 234


ALL

GENERAL ARCHITECTURAL BASIS OF DESIGN ........................................................... 234


5.1. MAIN GATEHOUSE................................................................................................ 236
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

5.2. MUSALLAH ............................................................................................................ 237


5.3. SECURITY GUARD HOUSE (2 NOS.) ..................................................................... 241
DESCRIPTION

5.4. OPERATOR SHELTER (2 NOS.) ............................................................................ 243


5.5. SMOKING SHELTER.............................................................................................. 247
5.6. FSF SUPPORT BUILDING ..................................................................................... 248
5.7. RECEIVING SUBSTATION..................................................................................... 252
5.8. UTILITY POWER SUBSTATION ............................................................................. 257
5.9. ENGINEERING & MAINTENANCE (E & M) BUILDING ........................................... 262
10-02399-
JO/EWO

10-02399-
10-02399-
0001

5.10. SECURITY SUPPORT BUILDING (2 NOS).............................................................. 268


0001
0001

5.11. TEMPORARY CONSTRUCTION FACILITY ........................................................... 273


12/11/16
08/04/16

09/08/16
DATE

5.12. X-RAY BUILDING ................................................................................................... 277


5.13. FIRE WATER UTILITY WATER PUMP SHELTER .................................................. 280
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
5.14. CHEMICAL SHELTER ............................................................................................ 280
ALL LEADS
5.15. REMOTE I/O BUILDINGS (2 UNITS) ...................................................................... 284
DATE: 12/11/16
PROJECT
ENGINEER 5.16. IDAS SHELTER (2 UNITS)...................................................................................... 287
A M ALMATROOK
5.17. OPERATION BUILDING ......................................................................................... 289
DATE: 12/11/16
CERTIFIED SECTION 6.0 – MATERIALS REQUIREMENT ...................................................................... 295
AMR EL SHARKAWY

DATE:
12/11/16 SECTION 7.0 – HIGH COMMISSION FOR INDUSTRIAL SECURITY ................................... 295
CONSTRUCTION
AGENCY SECTION 8.0 – VALUE PRACTICES / WORKSHOPS .......................................................... 295
SHAHZAD YAZDANI
SECTION 9.0 – OTHER ENGINEERING STUDIES / ASSESSMENTS / ANALYSIS ............. 295
DATE: 12/11/16
OPERATIONS SECTION 10.0 – APPENDICES ............................................................................................. 296
ALI H GHAMDI

12/11/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 3


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

SECTION 1.0 – INTRODUCTION


ENGG CERT

ASH
ASH
ASH

1.1 PREFACE
LEADS

LEADS
LEADS
ALL

ALL
ALL

The purpose of the proposed facilities is to efficiently meet the Kingdom’s refined
product demand in Makkah Province through the construction of the Yanbu Distribution
Hub (YDH). This project will aggregate refined product from the three local refineries
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

(SAMREF, YASREF, and Yanbu Terminal) to facilitate shipment via two connecting
pipelines: the (a) Yanbu to Jiddah pipeline and the (b) Yanbu to Central Region pipeline,
which are two additional Budget Items under development.
DESCRIPTION

This project is in alignment with the current Distribution Master Plan.

The Yanbu-Jiddah Pipeline, BI-10-02155, initially included the Yanbu to Jiddah pipeline
scope, NJBP scope, YDH scope, and the SSSP-5 supply pipeline scope. As the scope
for BI-10-2155 increased, it was decided to split and segregate the pipelines scope from
the in-plant scope.

BI-10-02399, Additional Capacity – North Jiddah Bulk Plant, has been introduced to the
2016-2018 Business Plan to handle the below major scope elements from BI-10-2155:
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

1. North Jiddah Bulk Plant Expansion (NJBP)


12/11/16
08/04/16

09/08/16

2. Yanbu Distribution Hub (YDH), this Project Proposal Narrative (PPN)


DATE

1.2 PRESENT SITUATION


NO.
REV

D
C
B

DISCIPLINE
ENGINEER The three refineries in the Yanbu area currently deliver product to the Western Region of
ALL LEADS Saudi Arabia via truck loading, marine vessel loading, and pipeline deliveries to
DATE: 12/11/16 Madinah. Projected product demand growth in the central and western regions will
PROJECT
ENGINEER require that additional infrastructure be built to meet these higher demands. With
A M ALMATROOK currently over 900 MBD of refining capacity, Yanbu has been identified as the refined
DATE: 12/11/16 product origin hub to supply Jiddah and the Central Region.
CERTIFIED
AMR EL SHARKAWY

12/11/16
The 2040 demand forecasts identify the following demand gaps to be supplied by YDH:
DATE:
CONSTRUCTION
AGENCY • 576 MBD on the Yanbu to North Jiddah (YNJ-1/2) pipelines (to be constructed as part
SHAHZAD YAZDANI
of this budget item, BI-10-02155); and,
DATE: 12/11/16
OPERATIONS • 400 MBD on the Yanbu to Central Region pipeline (future construction, BI-10-02167).
ALI H GHAMDI

12/11/16 1.3 PROJECT PROPOSAL NARRATIVE


DATE:
CONTROL NUMBER
VERIFICATION

This document, the “Project Proposal Narrative” (PPN), is intended to describe the
EDSD

overall scope for YDH project. CONTRACTOR shall read this document and its
attachments carefully and determine all the Materials, Equipment and other
DATE:

requirements of the entire project for supply, installation and successful commissioning
BY:

of YDH project, fully meeting the objective of BI-10-02399.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

The PPN shall be treated as construction scope of work. It provides overall requirements
(DCC) NO. _____________________

of the systems in a comprehensive way and is not intended to cover the work in detail.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 4


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
This document (PPN) describes the overall and major equipment, material and the work
SAY
SAY
SAY

to be provided for YDH project and it is deemed to be the responsibility of


CONTRACTOR to supply, fabricate, install, inspect, test, pre-commissioning,
ENGG CERT

ASH
ASH
ASH

commissioning support, and hand over the project to SAUDI ARAMCO, on time, in a full
operating condition in compliance with the relevant SAUDI ARAMCO standards,
LEADS

LEADS
LEADS
ALL

ALL
ALL

practices, GIs, procedures and other requirements.

The term “Provide” used in the document in different sections by various engineering
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

disciplines/trades shall mean to instruct CONTRACTOR to detail design, supply,


fabricate, install, erect, inspect, test, and commission the equipment, system for the
entire facility. This also includes, but is not limited to, all other sundry materials,
products, consumables and all other necessary items including labor to build the
DESCRIPTION

facilities/ project safely and make it operational and deliver the expected results.

Any equipment/system/materials and efforts that are missing, not fully covered in this
document, but are required to complete the systems shall be identified by
CONTRACTOR during the bidding process and shall be provided.

CONTRACTOR shall conduct field surveys & testing and other engineering studies
workshops and best practices required for the project.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

• CONTRACTOR shall address all project proposal comments which were closed and
0001
0001

reflected in drawings during the detail design and construction phases as applicable.
12/11/16
08/04/16

09/08/16
DATE

• CONTRACTOR shall address and consider in the detail design package all the
recommendations outlined in various studies and submitted proposals to relevant
authorities for setting up YDH.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
• CONTRACTOR shall be responsible to produce a detail design package based on
ALL LEADS Project Proposal Package using a SAUDI ARAMCO approved engineering design
DATE: 12/11/16 office; CONTRACTOR shall be responsible for the correctness of all the engineering
PROJECT
ENGINEER
drawings, documents produced by the design office also for the drawings & documents
A M ALMATROOK
provided by vendors. Approval of above drawings and documents by SAUDI ARAMCO
DATE: 12/11/16
does not relieve CONTRACTOR of the responsibility of correct design, right
CERTIFIED equipment, proper installation, testing & commissioning.
AMR EL SHARKAWY

12/11/16
• CONTRACTOR shall have full responsibility for the detail design and engineering of all
DATE:
CONSTRUCTION
required items, elements and systems necessary for the complete, functional and safe
AGENCY operation of the entire scope of equipment and systems. The design criteria and
SHAHZAD YAZDANI
contract documents included are not all-inclusive and represent minimum
DATE: 12/11/16 requirements. Any additional elements or items required to achieve the correct and
OPERATIONS
safe operation of the system shall be engineered, designed, and shall be in place,
ALI H GHAMDI
complete and functional.
12/11/16
• CONTRACTOR shall review and approve Vendor and SUBCONTRACTOR drawings,
DATE:
CONTROL NUMBER
VERIFICATION

design, specifications and other documents for conformity to this Contract and institute
EDSD

effective internal control for prompt receipt, review, approval, and return of such
documents. CONTRACTOR shall incorporate all such applicable Vendor and
DATE:

SUBCONTRACTOR information in THE CONTRACTOR’S submittals to SAUDI


BY:

ARAMCO.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

• THE CONTRACTOR’S drawings shall include all necessary plans, elevations,


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

arrangements, sections, profiles, views and details of all facilities


(DCC) NO. _____________________

• CONTRACTOR shall follow relevant guidelines and Standards mandated by Yanbu


`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 5


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Royal Commission (YRC) for setting up YDH facility and its operation.
SAY
SAY
SAY

• CONTRACTOR shall systematically check his design and drawings to ensure they
ENGG CERT

ASH
ASH

comply with the Scope of Work, relevant SAUDI ARAMCO, YRC standards and
ASH

International Standards and are in keeping with good engineering practices.


LEADS

LEADS
LEADS
ALL

ALL
ALL

1.4 SAUDI ARAMCO DESIGN / ENGINEERING STANDARDS


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall consider the SAUDI ARAMCO Design and Engineering Standards
as per the cut-off date of September 2016. CONTRACTOR shall meet all the
requirements of the Mandatory SAUDI ARAMCO Engineering Requirements (MSAERs),
YRC, SAMREF, YASREF and Marafiq standards.
DESCRIPTION

Contractor shall use the latest edition, revision, addenda, errata of the applicable local
and international codes and standards, unless otherwise explicitly specified.
In case of conflict between requirements mentioned in different documents, the most
stringent interpretation shall be followed.

The following are the latest applicable Design and Engineering Standards and
international Codes and Standards, available for the project design.
10-02399-
JO/EWO

10-02399-
10-02399-

Any changes during execution of the project will be informed by SAUDI ARAMCO.
0001

0001
0001

1.4.1 SAUDI ARAMCO Engineering Standards (SAES)


12/11/16
08/04/16

09/08/16
DATE

SAES-A-004 General Requirements for Pressure Testing


NO.
REV

D
C
B

SAES-A-007 Hydrostatic Testing Fluids and Lay-Up Procedures


DISCIPLINE
ENGINEER SAES-A-100 Survey Coordinates, Datum and Data Formats
ALL LEADS SAES-A-102 Ambient Air Quality and Source Emissions Standards
DATE: 12/11/16 SAES-A-104 Waste water treatment, Reuse and Disposal
PROJECT
ENGINEER SAES-A-105 Noise Control
A M ALMATROOK
SAES-A-112 Meteorological and Seismic Design Data
DATE: 12/11/16
CERTIFIED SAES-A-113 Geotechnical Engineering Requirements
AMR EL SHARKAWY
SAES-A-114 Excavation and Backfill
12/11/16
DATE: SAES-A-202 SAUDI ARAMCO Engineering Drawing Preparation
CONSTRUCTION
AGENCY SAES-A-204 Preparation of Structural Calculations
SHAHZAD YAZDANI
SAES-A-400 Industrial Drainage Systems
DATE: 12/11/16
OPERATIONS
SAES-A-401 Closed Drain Systems (CDS)
ALI H GHAMDI SAES-B-005 Spacing and Diking for Atmospheric Low Pressure Tanks
DATE:
12/11/16 SAES-B-006 Fireproofing for plants
SAES-B-014 Safety Requirements for Plant and Operations Support
CONTROL NUMBER
VERIFICATION

Buildings
EDSD

SAES-B-017 Fire Water System Design


DATE:

SAES-B-018 Foam Systems


BY:

SAES-B-019 Portable, Mobile and Special Fixed Firefighting


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Equipment
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

SAES-B-054 Access, Egress and Material Handling for Plant Facilities


(DCC) NO. _____________________

SAES-B-055 Plant Layout

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 6


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAES-B-058 Emergency Shutdown, Isolation and Depressurizing
SAY
SAY
SAY

SAES-B-067 Safety Identification and Safety Colors


ENGG CERT

ASH
ASH

SAES-B-068 Electrical area classification


ASH

SAES-B-069 Emergency Eyewashes and Showers


LEADS

LEADS
LEADS
ALL

ALL
ALL

SAES-B-070 Fire and Safety Requirements for Bulk Plants, Air Fueling
Terminals and sulfur Handling Facilities
SAES-D-109 Design of Small Metallic Storage Tank
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

SAES-D-001 Design Criteria for Pressure Vessels


SAES-D-100 Design Criteria of Atmospheric and Low Pressure Tanks
SAES-E-007 Design Criteria for Air-Cooled heat Exchanges
DESCRIPTION

SAES-G-005 Centrifugal Pumps


SAES-G-006 Positive Displacement Pumps-Controlled Volume
SAES-G-007 Submersible Pumps and Motors for Water Well and
Offshore Service
SAES-G-101 Regulated Vendors List for Pumps and Mechanical Seals
SAES-H-001 Coating Selection and Application Requirements for
Industrial Plant and Equipment
SAES-H-002 Internal and External Coatings for Steel Pipelines &
10-02399-
JO/EWO

10-02399-
10-02399-

Piping
0001

0001
0001

SAES-H-003 Protective Coating for Industrial Concrete Structures


12/11/16

SAES-H-101V Approved SAUDI ARAMCO Data Sheets- Paints and


08/04/16

09/08/16
DATE

Coatings
SAES-J-002 List of Inspectable Instruments
NO.
REV

D
C
B

DISCIPLINE
SAES-J-003 Instrumentation – Basic Design Criteria
ENGINEER
ALL LEADS
SAES-J-200 Pressure
DATE: 12/11/16
SAES-J-300 Level
PROJECT
ENGINEER
SAES-J-400 Temperature
A M ALMATROOK SAES-J-505 Combustible Gas and Hydrogen Sulfide in Air Detection
DATE: 12/11/16 Systems
CERTIFIED
AMR EL SHARKAWY
SAES-J-600 Pressure Relief Devices
DATE:
12/11/16 SAES-J-601 Emergency Shutdown and Isolation Systems
CONSTRUCTION SAES-J-604 Protective and Condition Monitoring Equipment for
AGENCY
SHAHZAD YAZDANI Rotating Machinery
DATE: 12/11/16 SAES-J-700 Control Valves
OPERATIONS
SAES-J-801 Control Buildings
ALI H GHAMDI
SAES-J-605 Surge Relief Protection System
12/11/16
DATE:
SAES-J-902 Electrical Systems for Instrumentation
CONTROL NUMBER
VERIFICATION

SAES-J-904 Foundation fieldbus (FF) Systems


EDSD

SAES-K-001 Design and Installation of Heating, Ventilating and Air


Conditioning Systems
DATE:
BY:

SAES-K-002 Air Conditioning Systems for Essential Operating


REVISIONCERTIFICATION

Facilities
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

SAES-K-003 HVAC Systems for Communications Facilities & Data


(DCC) NO. _____________________

Centers

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 7


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAES-K-100 SAUDI ARAMCO Mechanical (HVAC) Code
SAY
SAY
SAY

SAES-L-100 Applicable Codes and Standards for Pressure Piping


ENGG CERT

ASH
ASH

Systems
ASH

SAES-K-101 Regulated Vendors List for Heating, Ventilating and Air


LEADS

LEADS
LEADS
ALL

ALL
ALL

Conditioning (HVAC) Equipment.


SAES-L-102 Regulated Vendors List for Valves
SAES-L-105 Piping Material Specifications
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

SAES-L-108 Selection of Valves


SAES-L-109 Selection of Flanges, Stud Bolts & Gaskets
SAES-L-132 Material Selection for Piping Systems
DESCRIPTION

SAES-L-133 Corrosion Protection Requirements for Pipelines, Piping


and Process Equipment
SAES-L-150 Pressure Testing of Plant Piping and Pipelines
SAES-L-310 Design of Plant Piping
SAES-L-350 Construction of Plant Piping
SAES-L-610 Nonmetallic Piping in Oily Water
SAES-M-001 Structural Design Criteria for Non-Building Structures
SAES-M-006 SAUDI ARAMCO General Purpose Fencing
10-02399-
JO/EWO

10-02399-
10-02399-

SAES-M-009 Design Criteria for Blast Resistant Buildings


0001

0001
0001

SAES-M-100 SAUDI ARAMCO Building Code


12/11/16

SAES-N-004 Design and Installation of Building Thermal Insulation


08/04/16

09/08/16
DATE

SAES-O-201 Application of security directive


SAES-O-202 Security Fencing
NO.
REV

D
C
B

DISCIPLINE
SAES-O-203 Security Gate
ENGINEER
ALL LEADS
SAES-O-204 Security Lighting
DATE: 12/11/16
SAES-O-205 Integrated Security System
PROJECT
ENGINEER
SAES-O-206 Security Devices
A M ALMATROOK SAES-O-207 Power Supply for Security System
DATE: 12/11/16 SAES-O-208 Communication for security system
CERTIFIED
AMR EL SHARKAWY
SAES-O-209 Security Door
DATE:
12/11/16 SAES-O-210 Security Lock
CONSTRUCTION SAES-O-211 Identification Card
AGENCY
SHAHZAD YAZDANI SAES-O-212 Security Information Protection
DATE: 12/11/16 SAES-P-100 Basic Power System Design Criteria
OPERATIONS
SAES-P-101 Regulated Vendors List for Electrical Equipment
ALI H GHAMDI
SAES-P-103 UPS and DC system
12/11/16
DATE:
SAES-P-104 Wiring Methods and Materials
CONTROL NUMBER
VERIFICATION

SAES-P-107 Overhead Distribution System


EDSD

SAES-P-111 Grounding
SAES-P-113 Motors and Generators
DATE:
BY:

SAES-P-114 Power System and Equipment Protection


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

SAES-P-116 Switchgear and Control Equipment


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

SAES-P-119 Onshore Substations


(DCC) NO. _____________________

SAES-P-121 Transformers and Reactors

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 8


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAES-P-123 Lighting
SAY
SAY
SAY

SAES-P-126 Power System Automation


ENGG CERT

ASH
ASH

SAES-Q-001 Criteria for design and construction of


ASH

concrete structures
LEADS

LEADS
LEADS
ALL

ALL
ALL

SAES-Q-005 Concrete Foundations


SAES-Q-006 Asphalt and Sulfur Extended Asphalt Concrete Paving
SAES-Q-007 Foundations and Supporting Structures for Heavy
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Machinery
SAES-Q-009 Concrete Retaining Walls
SAES-Q-010 Cement Based, Non-Shrink Grout for Structural and
DESCRIPTION

Equipment Grouting
SAES-Q-011 Epoxy Grout for Machinery Support
SAES-Q-012 Criteria for Design and Construction of Precast and
Pre stressed Concrete Structures
SAES-R-004 Building Design & Finishing Guidelines
SAES-S-010 Sanitary Sewers
SAES-S-020 Oily Water Drainage Systems
SAES-S-030 Storm Water Drainage Systems
10-02399-
JO/EWO

10-02399-
10-02399-

SAES-S-040 SAUDI ARAMCO Water Systems


0001

0001
0001

SAES-S-060 SAUDI ARAMCO Plumbing Code


12/11/16

SAES-S-070 Installation of Utility Piping Systems


08/04/16

09/08/16
DATE

SAES-T-018 Telecommunications – Symbols, Abbreviations and


Definitions
NO.
REV

D
C
B

DISCIPLINE
SAES-T-151 D.C. Power Systems
ENGINEER
ALL LEADS
SAES-T-492 VHF/UHF Land-Mobile and Fixed Radio Communication
DATE: 12/11/16
SAES-T-493 Digital Trunked Radio System
PROJECT
ENGINEER
SAES-T-494 Very Small Aperture Terminal (VSAT) Network Design
A M ALMATROOK SAES-T-556 Circuit Quality and Performance
DATE: 12/11/16 SAES-T-566 Plant Demilitarized Zone (DMZ) Architecture
CERTIFIED
AMR EL SHARKAWY
SAES-T-603 Safeguards and Warning Devices
DATE:
12/11/16 SAES-T-624 Telecommunications – OSP Fiber Optics
CONSTRUCTION SAES-T-625 Inter and Intra-Building Fiber Optic Communications
AGENCY
SHAHZAD YAZDANI Cables
DATE: 12/11/16 SAES-T-628 Underground Cable
OPERATIONS
SAES-T-629 Telecommunications – Buried Cable and Wire
ALI H GHAMDI
SAES-T-631 Communications Cable Terminals
12/11/16
DATE:
SAES-T-632 Communications Cable Splicing
CONTROL NUMBER
VERIFICATION

SAES-T-633 Communications Splice Closures


EDSD

SAES-T-634 Telecommunications – Cable Testing and Acceptance


SAES-T-744 Design Criteria and Installation of Communication
DATE:
BY:

Towers
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

SAES-T-795 Communications Facility Grounding System


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

SAES-T-887 Protection at Power Plants and Radio Stations


(DCC) NO. _____________________

SAES-T-903 Electrical Protection – Outside Plant

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 9


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAES-T-911 Telecommunications Conduit System Design
SAY
SAY
SAY

SAES-T-912 Communications Feeder Cable


ENGG CERT

ASH
ASH

SAES-T-914 Telecommunications Distribution Cable


ASH

SAES-T-916 Telecommunications Building Cable Systems


LEADS

LEADS
LEADS
ALL

ALL
ALL

SAES-T-920 Telecommunications Cable Information


SAES-T-928 Telecommunications – OSP Buried Plant
SAES-T-938 Telecommunications – OSP System DesignSAES-U-101
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Regulated Vendors List for Fire Protection Equipment


SAES-U-101 Regulated Vendors List for Fire Protection Equipment
SAES-W-010 Welding Requirements for Pressure Vessels
DESCRIPTION

SAES-W-011 Welding Requirements for On Plot Piping


SAES-W-012 Welding Requirements for Pipelines
SAES-W-017 Welding Requirements for Tanks
SAES-X-400 Cathodic Protection Buried pipelines
SAES-X-500 Cathodic Protection of Vessel and Tank Internals
SAES-X-600 Cathodic Protection of Plant facilities
SAES-X-700 Cathodic Protection of onshore well casings
SAES-Y-103 Royalty/Custody Metering of Hydrocarbon Liquids
10-02399-
JO/EWO

10-02399-
10-02399-

SAES-Y-301 Royalty/Custody Measurement of Hydrocarbon using


0001

0001
0001

Radar Tank Gauging Systems


12/11/16

SAES-Y-501 Dynamic Sampling of Hydrocarbon Liquids for


08/04/16

09/08/16
DATE

Royalty/Custody Transfers
SAES-Z-001 Process Control System
NO.
REV

D
C
B

DISCIPLINE
SAES-Z-002 Technically Acceptable Process Automation Systems
ENGINEER
ALL LEADS
SAES-Z-008 Terminal Management System
DATE: 12/11/16
SAES-Z-010 Process Automation Networks Connectivity
PROJECT
ENGINEER
SAES-Z-020 Design and Installation of Fiber Optic Cables Systems for
A M ALMATROOK Process Control Networks
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
1.4.2 SAUDI ARAMCO Inspection Requirements
12/11/16
DATE:
175-000003 Instructions & Explanations of Inspection Requirements
CONSTRUCTION
AGENCY 175-321900 Pressure Vessels
SHAHZAD YAZDANI
175-343100 Panels and Cabinets for Outdoor Area
DATE: 12/11/16
OPERATIONS 175-013100 Fabricated Carbon Steel Piping
ALI H GHAMDI 175-019800 Auxiliary Piping for Mechanical Equipment
DATE:
12/11/16 175-022500 Flanges, Spectacle Plates, Spacers & Blinds
CONTROL NUMBER

175-022501 Flanges; Weld Neck, Forged Steel


VERIFICATION

175-091900 Inspection and Testing Requirements


EDSD

175-060100 GASKETS: Metal, Spiral-Wound or Jacketed


DATE:

175-120100 Steel Structures


BY:

175-170200 Severe Duty Totally Enclosed Squirrel Cage Induction


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Motors to 500 HP
C

(DCC) NO. _____________________

175-170300 Motors Foam-Wound, Squirrel Cage Induction 500 HP


and above or Brushless Synchronous
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 10


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
175-171300 Galvanic Anodes: Aluminum, Magnesium, or Zinc for
SAY
SAY
SAY

Cathodic Protection
ENGG CERT

ASH
ASH

175-171500 Cables for Cathodic Protection


ASH

175-120150 Spreader Beam


LEADS

LEADS
LEADS
ALL

ALL
ALL

175-310200 Mechanical Seals for Pumps


175-130900 Coupling Shaft Special Purpose
175-320300 Positive Material Identification
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

175-324900 Tanks Atmosphere, Steel within scope


175-323600 Air Cooled Heat Exchangers
175-325100 Steel Tanks Aboveground according to API-12F, API-650
DESCRIPTION

Appendix-J and UL-142


175-326100 Lubrication, Shaft Sealing and Control Oil Systems
175-310500 Pump: API, Centrifugal Horizontal, End Suction Single
Stage or Vertical Inline
175-341700 Pressure Retaining Instruments
175-310600 Pump: API, Centrifugal
175-310200 Mechanical Seals for Pumps
175-341900 Valve Safety Relief Conventional and Balanced Type
10-02399-
JO/EWO

10-02399-
10-02399-

175-310300 Pumps: Rotary per API-676


0001

0001
0001

175-173700 Skid Mounted Equipment: Auxiliary Electrical


12/11/16

Systems
08/04/16

09/08/16
DATE

175-340100 Valve: Control


175-340200 Package Unit Instrumentation
NO.
REV

D
C
B

DISCIPLINE
175-343100 Control Panels
ENGINEER
ALL LEADS
175-345100 Monitoring Systems Vibration, Axial position and
DATE: 12/11/16
bearing Temperatures
PROJECT
ENGINEER
175-347600 Cable: Instrumentation
A M ALMATROOK

DATE: 12/11/16 1.4.3 SAUDI ARAMCO Material Specification Standards


CERTIFIED
AMR EL SHARKAWY
01-SAMSS-010 Fabricated Steel Piping
12/11/16
DATE:
01-SAMSS-017 Auxiliary Piping for Mechanical Equipment
CONSTRUCTION
AGENCY 01-SAMSS-029 RTR (Fiberglass) Sewer Pipe and Fittings for Gravity
SHAHZAD YAZDANI
Flow
DATE: 12/11/16
OPERATIONS 01-SAMSS-034 RTR (Fiberglass) Pressure Pipe and Fittings
ALI H GHAMDI 01-SAMSS-035 API Line Pipe
DATE:
12/11/16 01-SAMSS-038 Small quantity purchase and Approved pipe mills
CONTROL NUMBER

01-SAMSS-091 Oil Field Chemical Injection Skid System


VERIFICATION

02-SAMSS-005 Butt Welding Pipe Fittings


EDSD

02-SAMSS-011 Forged Steel and Alloy Flanges


DATE:

04-SAMSS-001 Gate Valves


BY:

04-SAMSS-002 Globe Valves


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

04-SAMSS-005 Check Valves, Swing Type


C

(DCC) NO. _____________________

04-SAMSS-035 General Requirements for Valves


04-SAMSS-041 Expanding Plug Valves
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 11


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
04-SAMSS-048 Valve Inspection and Testing Requirements
SAY
SAY
SAY

04-SAMSS-051 Ball Valves, API SPEC 6D


ENGG CERT

ASH
ASH

04-SAMSS-052 Ball Valves, API SPEC 6A


ASH

09-SAMSS-021 Qualification Requirements for Alkyd Enamel Coating


LEADS

LEADS
LEADS
ALL

ALL
ALL

System (APCS-6)
09-SAMSS-060 Packaging Requirements for Coatings
09-SAMSS-067 Qualification Requirements for Internal Coating Systems
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Used in Immersion Service


09-SAMSS-069 Qualification Requirements for Epoxy Coatings for
Atmospheric Service
DESCRIPTION

09-SAMSS-088 Aggregates for Concrete


09-SAMSS-091 Qualification Requirement For Shop-Applied Internal
FBE Coatings
09-SAMSS-097 Ready-Mixed Concrete
09-SAMSS-107 Qualification Requirements and Application of Composite
Fluoro-polymer/Ceramic Coatings to Fasteners
12-SAMSS-005 Marking of Metal Products
12-SAMSS-007 Fabrication of Structural and Miscellaneous Steel
10-02399-
JO/EWO

10-02399-
10-02399-

12-SAMSS-008 Erection of Structural and Miscellaneous Steel


0001

0001
0001

12-SAMSS-014 Pre-Engineered Metal Buildings


12/11/16

14-SAMSS-531 Power Transformers


08/04/16

09/08/16
DATE

14-SAMSS-536 Pad mounted Three Phase Distribution Transformers


15-SAMSS-502 Medium Voltage Cable 5KV through 35 KV
NO.
REV

D
C
B

DISCIPLINE
16-SAMSS-502 Metal-Enclosed Metal-Clad Low Voltage Switchgear
ENGINEER
ALL LEADS
Assemblies
DATE: 12/11/16
16-SAMSS-503 Indoor Control gear-Low Voltage
PROJECT
ENGINEER
16-SAMSS-504 Indoor Metal-Clad Switchgear: 1 to 38 KV
A M ALMATROOK 16-SAMSS-512 Outdoor Switchrack – Low Voltage
DATE: 12/11/16 16-SAMSS-513 Power System Automation Components
CERTIFIED
AMR EL SHARKAWY
16-SAMSS-518 Low Voltage Panel boards
DATE:
12/11/16 16-SAMSS-519 Indoor Switchboards-Low Voltage
CONSTRUCTION 16-SAMSS-520 Cable Bus
AGENCY
SHAHZAD YAZDANI 17-SAMSS-004 Conventional (Tap Adjustable) Rectifiers for Cathodic
DATE: 12/11/16 protection
OPERATIONS
17-SAMSS-005 Cathodic Protection phase controlled Rectifiers
ALI H GHAMDI
17-SAMSS-006 Galvanic Anodes for Cathodic Protection
12/11/16
DATE:
17-SAMSS-007 Impressed Current Anodes for Cathodic Protection
CONTROL NUMBER
VERIFICATION

17-SAMSS-008 Junction Boxes for Cathodic Protection


EDSD

17-SAMSS-017 Impressed Current Cathodic protection Cables


17-SAMSS-018 Remote Monitoring System for Cathodic protection
DATE:
BY:

17-SAMSS-502 Form-Wound Induction Motors 500 HP and Above


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

17-SAMSS-503 Severe Duty, Totally Enclosed Squirrel Cage Induction


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Motors to 500 HP
(DCC) NO. _____________________

17-SAMSS-515 Auxiliary Electrical Systems for Skid-Mounted Equipment

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 12


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
17-SAMSS-511 Stationary Storage Batteries
SAY
SAY
SAY

17-SAMSS-514 Battery Charger/Rectifier


ENGG CERT

ASH
ASH

17-SAMSS-515 Auxiliary Electrical Systems for Skid-Mounted Equipment


ASH

17-SAMSS-516 Uninterruptible Power Supply System


LEADS

LEADS
LEADS
ALL

ALL
ALL

17-SAMSS-518 Diesel Generator Sets


26-SAMSS-059 Insulating Oil Uninterruptible Power Supply System
18-SAMSS-625 Outside Plant – Fiber optic cable specifications (single
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

mode and multiple mode).


20-SAMSS-001 Welding and Brazing Consumables
21-SAMSS-011 Fluoro Protein Foam Concentrate For MTBE
DESCRIPTION

Hydrocarbon Fires
23-SAMSS-010 Distributed Control Systems
23-SAMSS-050 Terminal Management System
23-SAMSS-701 Industrial Ethernet Switch Specifications
26-SAMSS-084 Turbo Compressor oil 46
27 SAMSS-011 Fire, Smoke, and Combination Fire-Smoke Dampers
31-SAMSS-003 Reciprocating Compressors for Air or Gas Service
31-SAMSS-004 Centrifugal Pumps
10-02399-
JO/EWO

10-02399-
10-02399-

31-SAMSS-009 Positive Displacement Pumps – Controlled Volume3


0001

0001
0001

31-SAMSS-010 Submersible Pumps and Motors for Water Well and


12/11/16

Offshore Service
08/04/16

09/08/16
DATE

31-SAMSS-012 Shaft Sealing System for Centrifugal and Rotary


Pumps
NO.
REV

D
C
B

DISCIPLINE
32-SAMSS-004 Manufacture of Pressure Vessels
ENGINEER
ALL LEADS
32-SAMSS-005 Manufacture of Atmospheric Tanks
DATE: 12/11/16
32-SAMSS-013 Lubrication, Shaft Sealing and Control Oil Systems
PROJECT
ENGINEER
32-SAMSS-030 Manufacture of Small Metallic Atmospheric Storage
A M ALMATROOK Tanks
DATE: 12/11/16 32-SAMSS-038 manufacture of Skid Mounted units
CERTIFIED
AMR EL SHARKAWY
34-SAMSS-117 Turbine Flow Meters in Liquid Service
DATE:
12/11/16 34-SAMSS-118 Positive Displacement Meters
CONSTRUCTION 34-SAMSS-119 Bi-Directional Meter Prover
AGENCY
SHAHZAD YAZDANI 34-SAMSS-120 Uni-Directional Meter Prover
DATE: 12/11/16 34-SAMSS-121 Small Volume Prover
OPERATIONS
34-SAMSS-167 Truck Loading Metering Systems
ALI H GHAMDI
34-SAMSS-319 Radar Tank Gauging Equipment
12/11/16
DATE:
34-SAMSS-514 Combustible Gas and Hydrogen Sulfide Monitors
CONTROL NUMBER
VERIFICATION

34-SAMSS-318 Automatic Tank Gauging Equipment


EDSD

34-SAMSS-321 Radar Tank Gauging Systems for Royalty/Custody


Measurement of Hydrocarbon Liquids
DATE:
BY:

34-SAMSS-010 Quality Requirement for Pressure Retaining


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Instruments
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

34-SAMSS-611 Safety Relief Valves Conventional and Balanced


(DCC) NO. _____________________

Types

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 13


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
34-SAMSS-623 Programmable Controller Based ESD Systems
SAY
SAY
SAY

34-SAMSS-625 Machinery Protection System


ENGG CERT

ASH
ASH

34-SAMSS-634 Local ZV Control Systems


ASH

34-SAMSS-711 Control Valves


LEADS

LEADS
LEADS
ALL

ALL
ALL

34-SAMSS-717 Hydraulic Valve Actuators Systems

34-SAMSS-718 Electric Motor Operated Valve Actuators


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

34 SAMSS 820 Instrument Control Panel Indoors


34-SAMSS-821 Instrument Control Cabinets – Outdoor
34-SAMSS-830 Programmable Logic Controllers
DESCRIPTION

34-SAMSS-831 Instrumentation for Packaged Units


34-SAMSS-841 Flow Computer for Custody Transfer Measurement of
Hydrocarbon Liquids
34-SAMSS-847 Preset Controller for Truck Loading and Unloading
Systems
34-SAMSS-913 Instrumentation and Thermocouple Cable

1.4.4 SAUDI ARAMCO Engineering Procedure


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

SAEP-14 Project Proposal


SAEP-22 Tank Calibration Requirements
12/11/16
08/04/16

09/08/16
DATE

SAEP-28 Radar Tank Gauging System Verification Requirements


SAEP-99 Process Automation Networks and Systems Security
NO.
REV

SAEP-302 Instructions for Obtaining a Waiver of a Mandatory


D
C
B

DISCIPLINE SAUDI ARAMCO Engineering Requirement


ENGINEER
ALL LEADS SAEP-334 Retrieval, Certification and Submittal of SAUDI ARAMCO
DATE: 12/11/16 Engineering & Vendor Drawings
PROJECT
ENGINEER SAEP-316 Performance Qualification Requirements of Coating
A M ALMATROOK Personnel
DATE: 12/11/16 SAEP-318 Pressure Relief Valve Program Authorization for
CERTIFIED
AMR EL SHARKAWY
Installation, Deletion and Changes
12/11/16 SAEP-319 Pressure Relief Devices - Testing and Inspection
DATE:
CONSTRUCTION
Requirements
AGENCY SAEP-747 Pipelines Leak Detection Systems
SHAHZAD YAZDANI

DATE: 12/11/16
OPERATIONS
SAEP-1152 Approval procedure for Ready-Mixed concrete mix
ALI H GHAMDI design
DATE:
12/11/16 SAEP-1624 Preparation of System Design Document
SAEP-1630 Preparation of Integration Test Procedure
CONTROL NUMBER
VERIFICATION

SAEP-1634 Factory Acceptance Test


EDSD

SAEP-1638 Site Acceptance Test


DATE:

SAEP-3101 Equipment & Spare Parts Data Requirement for


BY:

CONTRACTOR Produced Equipment.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

1.4.5 SAUDI ARAMCO Standards Drawings (SASD)


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 14


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AA-036024-001 Roof framing plan sunshade type-I, community
SAY
SAY
SAY

AA-036513-001 Custody Transfer


ENGG CERT

ASH
ASH

AA-036322-001 Rev.08 Anchor Bolt Details


ASH

AA-036026-001 Site L/O-Decorative Metal Gate


LEADS

LEADS
LEADS
ALL

ALL
ALL

AA-036026-002 Foundation General


AA-036026-003 Details, Decorative Metal Gate
AA-036051 Site Layout-Computer Gate House Fac. 4 lanes
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

AA-036678 SAUDI ARAMCO Security and General Purpose Fencing


AA-036755-001 Details-Drive Gate & Walk Gate
AA036755-002 Details-Gates Locking Device and Drop Bolt
DESCRIPTION

AB-036003-001 Manways and Vents for Tanks


AB-036054 Oily Water Sewer Manholes
AB-036260 Concrete Sidewalk, Curb and Gutter Details
AB-036019 Thermowell Assembly and Detail
AB-036106-001 Assembly and Details of Type "A” Stairs for Walkways
and Platforms.
AB-036106-002 Assembly and Details of Type "A" Stairs for Walkways
and Platforms-Metric
10-02399-
JO/EWO

10-02399-
10-02399-

AB-036227 Standard Symbols for Piping Orthographic Drawings


0001

0001
0001

AB-036386 Hardness Testing for Welding Procedure Qualifications


12/11/16

AB-036521 Bridge Weld and Typical Brace Seal Welded and Socket
08/04/16

09/08/16
DATE

Welded Valves On Process Lines


AC-036045 Detail Vent, Drain and Sample Connections
NO.
REV

D
C
B

DISCIPLINE
AC-036950 Instrument Symbols
ENGINEER
ALL LEADS
AE-036137 Truck Loading Bottom Specification
DATE: 12/11/16
AE-036175 Details of Heavy Welding Boss for Threaded
PROJECT
ENGINEER
Connections to Vessels and Lines
A M ALMATROOK AE-036451 Pre-Heat Levels for Welding Carbon Steel
DATE: 12/11/16 AE-036141 Truck loading or unloading – general arrangement
CERTIFIED
AMR EL SHARKAWY
SA-2693 Safety Instruction Sheet – Tanks
DATE:
12/11/16 AB-036402 Details Cast Iron Catch Basin with Side inlet s
CONSTRUCTION AE-036470 RIP-RAP Slope Protection Detail
AGENCY
SHAHZAD YAZDANI AC-036078 Details Cast Iron Catch Basin without Side inlets
DATE: 12/11/16 AC-036489 Traffic Control Devices
OPERATIONS
AC-036680 SAUDI ARAMCO Security and General Purpose
ALI H GHAMDI
Fencing-Footing Details
12/11/16
DATE:
AB-036677 SAUDI ARAMCO Security and General Purpose Fencing
CONTROL NUMBER
VERIFICATION

AB-036679 Gate Details


EDSD

AD-036009 Water Line Valve Direct Buried


AD-036512 Arrows and Cross Walk Markings
DATE:
BY:

AE-036083 Manhole Cover for Sewer


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

AE-036254 Parking Bumpers Precast Concrete Block


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

AE-036412 Guard Post and Guardrail details


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 15


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.4.6 SAUDI ARAMCO Library Drawings (SALD)
SAY
SAY
SAY
ENGG CERT

DB-950054 Thermocouple Well Assemblies-Horizontal Process


ASH
ASH
ASH

Lines Details
LEADS

LEADS
LEADS
ALL

DC-950040 Pressure Indicators and Switches - Locally Mounted


ALL
ALL

DC-950042 Pressure Instrument - Blinds and Indicating Type -


Instrument Piping Details
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

DC-950043 Electrical Connections for Field-Mounted Instruments


DD-950022-006 Details of Ground Connections, Switchboard/Control
Panels Ground Bus to Ground Grid
DESCRIPTION

DD-950025 Nameplate Details for Instrument Boards


DD-950053 Field Mounting Details for Instruments.

1.4.7 Non-Material Requirement (NMR)

NMR - 7907 Instrumentation


NMR - 7912 Electric Rotary Machinery
NMR - 7919-1 Pressure Vessels
NMR - 7925 Valves
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

NMR - 7927 Fabricated Structural Steel


NMR - 7918 Safety relief Valves
12/11/16
08/04/16

09/08/16
DATE

NMR - 7923 Control Panel


NMR - 7927 Fabricated Structural Steel
NO.
REV

D
C
B

NMR - 7918-1 Tanks


DISCIPLINE
ENGINEER
NMR - 7902 Pumps
ALL LEADS

DATE: 12/11/16
1.4.8 SAUDI ARAMCO Construction Safety Manual and Safety Handbook
PROJECT
ENGINEER

A M ALMATROOK All work is to be carried out in accordance with the SAUDI ARAMCO
DATE: 12/11/16
CERTIFIED
Construction Safety Manual and the minimum behavioral safety standards
AMR EL SHARKAWY detailed in the SAUDI ARAMCO Safety Handbook. Furthermore, the project
12/11/16 shall provide Safety and Hazard Identification Plans (HIP) for Loss Prevention
DATE:
CONSTRUCTION
AGENCY
approval.
SHAHZAD YAZDANI

DATE: 12/11/16 1.4.9 SAUDI ARAMCO General Instructions


OPERATIONS
ALI H GHAMDI
CONTRACTOR shall adhere to all pertinent general instructions, in particular,
12/11/16
DATE: the following for the execution of the work:
CONTROL NUMBER
VERIFICATION

G.I.001 General Instruction


EDSD

G.I.2.100 Work Permit System


DATE:

G.I.2.721 Electrical Arc Flash Hazard Mitigation


BY:

G.I.6.001 Notification Requirement for Incidents (Including Fires)


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

G.I.6.012 Isolation, Lockout and Use of Hold Tags


C

(DCC) NO. _____________________

G.I.6.030 Traffic and Vehicle Safety


G.I.8.001 Safety Requirements for Scaffolding
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 16


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
G.I.298.010 Administration Procedure of Contractor Camps/Parks
SAY
SAY
SAY

and Construction Camps


ENGG CERT

ASH
ASH

G.I.710.001 SAUDI ARAMCO ID Cards


ASH

G.I.710.002 Classification of Sensitive Documents


LEADS

LEADS
LEADS
ALL

ALL
ALL

GI-1781.001 Inspection, Testing and Maintenance of Fire


Protection Equipment
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

1.4.10 Yanbu Royal Commission Standards

This project is within YRC jurisdictions and CONTRACTOR shall adhere to all
DESCRIPTION

YRC applicable standards. For full list of applicable standards See Appendix 9.

RCER-2015-Volume I- FINAL-July 2, 2015 Environmental Regulations


RCER-2015-Volume II- FINAL-July 2, 2015 Environmental Regulations

1.4.11 SAMREF Standards

CONTRACTOR shall adhere to all SAMREF standards, format, procedures and


requirements standards, for the scope of work inside SAMREF facilities. See
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Appendix 10.
12/11/16
08/04/16

09/08/16
DATE

Dwg. Numbering Procedure


Drafting Procedure
NO.
REV

Juction Box -Numbering Std


D
C
B

DISCIPLINE
ENGINEER
Junction Box and Cable Installation Std
ALL LEADS Marked up P&ID - Tie-ins
DATE: 12/11/16 MOV’s Purchase Specs - Sample
PROJECT
ENGINEER P&ID Legend & Details
A M ALMATROOK
SAMREF Approved Manufacturer List (AML)
DATE: 12/11/16
CERTIFIED SAMREF Piping Class
AMR EL SHARKAWY
Eqp. & Inst. Tag number Req. Form
12/11/16
DATE:
CONSTRUCTION
AGENCY 1.4.12 INTERNATIONAL CODES AND STANDARDS
SHAHZAD YAZDANI

DATE: 12/11/16 IBC-2009 International Building Code.


OPERATIONS
NFPA-72 National Fire Alarm Code
ALI H GHAMDI

12/11/16
AISC Steel Construction Manual-13th Edition
DATE:
ACI American Concrete Institute
CONTROL NUMBER
VERIFICATION

API Standard 650 Welded Tanks for oil storage


EDSD

API 2003 Protection Against Ignitions Arising Out of Static,


Lightning and Stray Currents
DATE:
BY:

API 505 Recommended practice for classification of locations for


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

electrical installations at petroleum facilities


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

API 541 Form-wound Squirrel-Cage Induction Motors—500


(DCC) NO. _____________________

Horsepower and Larger

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 17


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
API 546 Brushless synchronous machines-500KVA and larger
SAY
SAY
SAY

API 675 Positive Displacement Pumps – Controlled Volume


ENGG CERT

ASH
ASH

API 676 Positive Displacement Pumps – Rotary


ASH

ANSI American National Standards Institute (ANSI) Standards


LEADS

LEADS
LEADS
ALL

ALL
ALL

API STD 610 Centrifugal Pumps for Petroleum, Petrochemical and


Natural Gas Industries
API STD 614 Lubrication shaft sealing and control oil system
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

for special purpose application


API STD 682 Shaft Sealing Systems for Centrifugal and Rotary
Pumps
DESCRIPTION

API STD 671 Special purpose coupling for petroleum, chemical


and gas industry services
HI 9.6.7 Viscosity Correction
API American Petroleum Institute (API) Standards
AWS American Welding Society (AWS) Standards
ASTM American Society for Testing Materials
ASME Section IX Welding & Brazing Qualifications
ASME Section V Non Destructive Testing
10-02399-
JO/EWO

10-02399-
10-02399-

ASME SEC VIII Div. 1 Rules for Construction of Pressure Vessels


0001

0001
0001

ASME B31.3 Process Piping


12/11/16

ASME B31.4 Pipeline Transportation for liquid hydrocarbons


08/04/16

09/08/16
DATE

ASME B16.5 Pipe Flanges and Flanged Fittings


ASME B16.11 Forged Steel Fittings, Socket-welded and Threaded.
NO.
REV

D
C
B

DISCIPLINE
ASME B73.1 Specification for End suction horizontal Centrifugal
ENGINEER
ALL LEADS
Pumps for chemical Process
DATE: 12/11/16
API – MPMS API Manual of Petroleum Measurement Standards
PROJECT
ENGINEER
(MPMS)
A M ALMATROOK API, RP 2000 Safety Relief Valve Sizing
DATE: 12/11/16 API-RP 686 Recommended Practices for machinery Installation and
CERTIFIED
AMR EL SHARKAWY
Installation Design
DATE:
12/11/16 B30.10 Hooks
CONSTRUCTION B30.17 Overhead and Gantry Cranes (Top Running Bridge
AGENCY
SHAHZAD YAZDANI Single Girder, Under Hung Hoist)
DATE: 12/11/16 HST-4M Performance Standard for Overhead Electric Wire Rope
OPERATIONS
Hoists
ALI H GHAMDI

12/11/16
DATE:
American National Standards Institute (ANSI)/National Electrical Manufacturers
CONTROL NUMBER
VERIFICATION

Association (NEMA)
EDSD

ANSI / NEMA ICS 2 Industrial Control Devices


DATE:
BY:

ANSI / NEMA ICS 6 Enclosures or Industrials Controls and Systems


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

American National Standards Institute (ANSI)/National Fire Protection


C

Association (NFPA)
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 18


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ANSI / NFPA 70 National Electric Codes
SAY
SAY
SAY

NFPA 13 Standard for the Installation of Sprinkler Systems


ENGG CERT

ASH
ASH

NFPA 16 Installation of Foam-Water Sprinkler and Foam-Water


ASH

Spray Systems
LEADS

LEADS
LEADS
ALL

ALL
ALL

NFPA 20 Installation of Stationary Pumps


NFPA 22 Water Tanks for Private Fire Protection
NFPA 24 Installation of Private Fire Service Mains and Their
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Appurtenances
NFPA 30 Flammable and Combustible Liquids Code
DESCRIPTION

NFPA 90A Installation of Air Conditioning and Ventilating


System
American Society of Heating, refrigerating & Air-Conditioning Engineers,
Inc. (ASHRAE)

ASHRAE STD 52 Filters, Testing Air-Cleaning Devices


ASHRAE STD 55 Thermal Environmental Conditions for Human
Comfort
10-02399-
JO/EWO

10-02399-
10-02399-

ASHRAE STD 62 Ventilation for Acceptable Indoor Quality


0001

0001
0001

ASHRAE STD 111 Practice for Measurement, Testing, Adjusting and


12/11/16

Balancing of HVAC Systems


08/04/16

09/08/16
DATE

ASHRAE Handbook HVAC Applications


ASHRAE Handbook Systems and Equipment
NO.
REV

D
C
B

DISCIPLINE
ASHRAE Handbook Fundamentals
ENGINEER
ALL LEADS
INSTRUMENT, SYSTEMS AND AUTOMATION SOCIETY (ISA)
DATE: 12/11/16
PROJECT
ENGINEER

A M ALMATROOK
ISA S5.1 Instrumentation Symbols and Identification
DATE: 12/11/16
CERTIFIED International Organization for Standardization
AMR EL SHARKAWY

12/11/16
DATE: ISO 9000 Quality Systems – Model for Quality Assurance in
CONSTRUCTION
AGENCY Design/Development, Production, Installation and Servicing.
SHAHZAD YAZDANI

DATE: 12/11/16
OPERATIONS
International Electro -Technical Commissions (IEC)
ALI H GHAMDI

12/11/16
IEC 61000-6-2 Generic Standards – Immunity for Industrial
DATE:
Environments
CONTROL NUMBER
VERIFICATION

IEC 62305-1,2, 4, 5 Standard for Lightning Protection System


EDSD

DATE:

SMACNA
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

SMACNA 2002 HVAC SYSTEM-TESTING, Adjusting and


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Balancing, 3rd Edition


(DCC) NO. _____________________

SMACNA 2005 HVAC Duct Construction Standard-Metal and

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 19


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Flexible, 3rd Edition
SAY
SAY
SAY

SMACNA 2002 Fire, Smoke and Radiation damper Installation Guide


for HVAC Systems, 5th Edition
ENGG CERT

ASH
ASH
ASH
LEADS

LEADS
LEADS
ALL

American National Standards Institute (ANSI) / American Water Works


ALL
ALL

Association (AWWA)
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

ANSI / AWWA C503 Wet Barrel Fire Hydrants

American National Standards Institute (ANSI) Standards


American Petroleum Institute (API) Standards.
DESCRIPTION

AMS/ANSI B31.3 Process Piping


CMAA SPEC # 70 Specification for Top Running & Gantry Type Multiple
Girder Electric Overhead Traveling Cranes
CMAA SPEC #74 Specification for Top Running and Under Running Single
Girder Electrical Travelling Cranes Utilizing Under
Running Trolley Hoist
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

The International Society of Automation (ISA) Standards and Recommended


Practices for Instrumentation and Control.
12/11/16
08/04/16

09/08/16
DATE

National Fire Protection Association (NFPA) Standards


National Electrical Manufacturers Association (NEMA) Standards
NO.
REV

D
C
B

DISCIPLINE ISA RP 12.1 - Electrical Instruments in Hazardous Atmospheres


ENGINEER
ALL LEADS IEEE 100 - Standard Dictionary of Electrical and Electronic Terms
DATE: 12/11/16
PROJECT
ANSI/ICS 6-1983 - Enclosures for Industrial Controls and Systems
ENGINEER

A M ALMATROOK
API Manual of Petroleum Measurement Standards (MPMS)
DATE: 12/11/16 API Recommended Practice 2003-1998, Protection Against Ignitions Arising
CERTIFIED
AMR EL SHARKAWY
Out of Static, Lighting and Stray Currents
DATE:
12/11/16 API Recommended Practice 2610-1194, Design, Construction, Operation,
CONSTRUCTION
AGENCY
Maintenance and Inspection of Terminal, Tank Facilities
SHAHZAD YAZDANI
American Society of Civil Engineers (ASCE) Publication 7- 05 Standards -
DATE: 12/11/16
OPERATIONS
Minimum Design Loads for Buildings and Other Structures
ALI H GHAMDI API Recommended Practice 1004, Bottom Loading and Vapor Recovery
12/11/16
DATE: MC 306 Tank Motor Vehicles (to be used in conjunction with U.S. Department
CONTROL NUMBER
VERIFICATION

of Transportation 406, Section 49)


EDSD

PROCESS INDUSTRIES PRACTICES (PIP)


DATE:

UL Underwriters Laboratories, Inc.


BY:
REVISIONCERTIFICATION

OSHA Occupational Safety and Health Act Standards


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

SSPC Society for Protective Coatings


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 20


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.5 LIST OF ABBREVIATIONS AND ACRONYMS
SAY
SAY
SAY

Process
ENGG CERT

ASH
ASH
ASH

BBL Barrels
BPD Barrels per day
LEADS

LEADS
LEADS
ALL

ALL
ALL

DO Diesel oil
DPK Dual purpose kerosene
MB 1000 barrel
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

MBD 1000 barrel per day


NJBP North Jiddah Bulk Plant
PG 91 Premium Gasoline-91 RON
PG 95 Premium Gasoline-95 RON
DESCRIPTION

PSP Project Scoping Paper


TBD To be decided
ULSD Ultra-low Sulphur diesel
YNJ-1 Yanbu Jiddah pipeline -1
YNJ-2 Yanbu Jiddah pipeline -2

TELECOM
ARS Automatic Route Selection
AUTH Authorization Code
10-02399-
JO/EWO

10-02399-
10-02399-
0001

BI Budget Item
0001
0001

BS Base Station
CAT Category
12/11/16
08/04/16

09/08/16
DATE

CIDR Classless Inter-Domain Routing


CNI Caller Number Identification
NO.
REV

D
C
B

DB Decibel
DISCIPLINE
ENGINEER
DDF Digital Distribution Frame
ALL LEADS DHCP Dynamic Host Configuration Protocol
DATE: 12/11/16 DWS Dispatcher Work Station
PROJECT
ENGINEER
EADS European Aeronautic Defense and Space Company
A M ALMATROOK
EARP Ethernet Address Resolution Protocol
DATE: 12/11/16
EIA Electronic Industries Alliance
CERTIFIED EMS Electronic Marker System
AMR EL SHARKAWY
ETSI European Telecommunications Standards Institute
12/11/16
DATE: FAT Factory Acceptance Test
CONSTRUCTION
AGENCY
FDP Fiber Distribution Panel
SHAHZAD YAZDANI FMR Field Material Request
DATE: 12/11/16 FOC Fiber Optic Cable
OPERATIONS FSD Functional Specification Document
ALI H GHAMDI FSF Facility Security Forces
DATE:
12/11/16 GI General Instructions
GPS Global Positioning System
CONTROL NUMBER
VERIFICATION

HCRMON Remote Monitoring for High Capacity Network


EDSD

HDPE High Density Polyethylene


HPR Hand Portable Radio
DATE:
BY:

ICMP Internet Control Message Protocol


REVISIONCERTIFICATION

IEEE Institute of Electrical and Electronics Engineers


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

IF Interfaces
C

IL Insertion Loss
(DCC) NO. _____________________

IP Internet Protocol

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 21


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ISDN Integrated Services Digital Network
SAY
SAY
SAY

ISIS Intermediate System to Intermediate System


ITU International Telecommunications Union
ENGG CERT

ASH
ASH
ASH

kb/s Kilobits Per Second


Km Kilometers
LEADS

LEADS
LEADS
ALL

ALL
ALL

LAG Line Access Gateway


LAN Local Area Network
LCD Liquid Crystal Display
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

MAC Media Access Control


Mb/s Megabits Per Second
Mbps Mega-bits per second transmission data rate
MCAN Mechanical Completion Acceptance Notice
DESCRIPTION

MCC Mechanical Completion Certificate


MDPE Medium Density Polyethylene
MGCP Media Gateway Control Protocol
MH Maintenance Hole
MHz Mega Hertz
MIB Management Information Base
MOH Music on Hold
MSTP Multiple Spanning Tree Protocol
MTBF Mean Time between Failures
10-02399-
JO/EWO

10-02399-
10-02399-
0001

MTO Material Take-off


0001
0001

MTTR Mean Time to Repair


12/11/16

NEC National Electric Code


08/04/16

09/08/16
DATE

NEMA National Electrical Manufacturer’s Association


NESC National Electric Safety Code
NO.
REV

D
C
B

NFC National Fire Code


DISCIPLINE
ENGINEER
NFPA National Fire Protection Association
ALL LEADS Nm Nanometer
DATE: 12/11/16 NMS Network Management System
PROJECT
ENGINEER O&M Operation & Maintenance
A M ALMATROOK OSP Outside Plant
DATE: 12/11/16 OSPF Open Shortest Path First
CERTIFIED OTDR Optical Time Domain Reflectometer
AMR EL SHARKAWY
P/L Pipeline
12/11/16
DATE: PAT Performance Acceptance Test
CONSTRUCTION
AGENCY PED Pedestal
SHAHZAD YAZDANI PoE Power over Ethernet
DATE: 12/11/16 PVC Polyvinyl Chloride
OPERATIONS QoS Quality of Service
ALI H GHAMDI REA Rural Electrification Administration
12/11/16 RFC Request for Comments
DATE:
CONTROL NUMBER

RFDT Radio Frequency Dispatch Terminal


VERIFICATION

RFI Request for Information


EDSD

RFUT RF User Terminal


RMON Remote Network Monitoring
DATE:
BY:

RSTP Rapid Spanning Tree Protocol


REVISIONCERTIFICATION

SACS Saudi Aramco Construction Standards


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SAEP Saudi Aramco Engineering Procedure


C

(DCC) NO. _____________________

SAES Saudi Aramco Engineering Standards


SAMSS Saudi Aramco Materials Supply System

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 22


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAPMT SAUDI ARAMCO Project Management Team
SAY
SAY
SAY

SASO Saudi Arabian Standards Organization


SAT Site Acceptance Test
ENGG CERT

ASH
ASH
ASH

SCCP Skinny Client Control Protocol


SCN Switching Control Node
LEADS

LEADS
LEADS
ALL

ALL
ALL

SIP Session Initiation Protocol


SNMP Simple Network Management Protocol
SSD Safety and Security Directives
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

STP Spanning Tree Protocol


TBC TETRA Base Station Controller
TCP Transmission Control Protocol
TDMA Time Division Multiple Access
DESCRIPTION

TER Telecommunications Equipment Room


TETRA Terrestrial Trunk Radio
TGB Telecommunications Ground Bar
TIA Telecommunications Industry Association
TMGB Telecommunications Master Ground Bar
TR Telecommunication Room
UDP UTP Distribution Panel
UHF Ultra High Frequency
UPS Uninterruptible Power Supply
10-02399-
JO/EWO

10-02399-
10-02399-
0001

UTP Unshielded Twisted Pair


0001
0001

VAC Voltage Alternating Current


12/11/16

VAD Voice Activity Detection


08/04/16

09/08/16
DATE

VDC Voltage Direct Current


VHF Very High Frequency
NO.
REV

D
C
B

VLAN Virtual Local Area Network


DISCIPLINE
ENGINEER
VMR Vehicle Mounted Radios
ALL LEADS VPN Virtual Private Network
DATE: 12/11/16 WAN Wide Area Network
PROJECT
ENGINEER WAP Wireless Access Protocol
A M ALMATROOK WLAN Wireless Local Area Network
DATE: 12/11/16
CERTIFIED INSTRUMENTATION
AMR EL SHARKAWY
BOL Bill of Lading
12/11/16
DATE: ESD Emergency Shut Down
CONSTRUCTION
AGENCY DID Driver Interface Device
SHAHZAD YAZDANI DVS Drivers verification device
DATE: 12/11/16 FCU Field Control Unit
OPERATIONS FOC Fiber Optic Cable
ALI H GHAMDI LAN Local Area Network
12/11/16 MOV Motor Operated Valve
DATE:
CONTROL NUMBER

OID Optical Interface Detector


VERIFICATION

OIS Order Identification System


EDSD

PLC Programmable Logic Controller


PP Patch Panel
DATE:
BY:

RFI Radio Frequency Interference


REVISIONCERTIFICATION

RTG Radar Tank Guag / Inventory


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SAT Site Acceptance Test


C

(DCC) NO. _____________________

SI System International
SIB Satellite Instrument Building

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 23


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
C

DATE:
DATE:
THIS INDICATES THAT REV. NO.__________ 10-02399- ALL
B 08/04/16 0001 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS, 10-02399- ALL
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL LEADS ASH SAY AHG

AGENCY
BY: 0001

ALL LEADS

PROJECT
BY DRAWING COMPLETION CERTIFICATE

DATE: 12/11/16
ENGINEER

DATE: 12/11/16
ENGINEER

12/11/16
DATE: 12/11/16

ALI H GHAMDI
DISCIPLINE

12/11/16
CERTIFIED
10-02399- ALL

AMR EL SHARKAWY

OPERATIONS
CONSTRUCTION
ASH AHG

A M ALMATROOK
12/11/16 ISSUED FOR 100% PROJECT PROPOSAL

SHAHZAD YAZDANI
(DCC) NO. _____________________ D 0001 LEADS SAY
DATE:

YANBU
PROJECT
Saudi Aramco 2616-ENG (03/99)

TIS

UPS
TMS

WAN

YDH & NJBP EXPANSION


PROPOSAL NARRATIVE

YANBU DISTRIBUTION HUB PORTION


DOC

SAUDI ARABIA
Wide Area Network

X40
JO / EWO:
Truck Identification System

Uninterruptible Power Supply

A
Terminal Management System

DWG.TYPE PLANT NO. INDEX


SAUDI ARABIAN OIL COMPANY

10-02399-0001
DRAWING NO.

GEN-E0102
24
Of
296
SHT.NO.

D
EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

SECTION 2.0 – PROJECT DESCRIPTION


ENGG CERT

ASH
ASH
ASH

2.1 PLANT LOCATION


LEADS

LEADS
LEADS
ALL

ALL
ALL

This project is located near the city of Yanbu and the Yanbu area refineries. This plot of
land is approximately 2 km2 in size and is located east of the SAUDI ARAMCO Yanbu
Refinery (YR), adjacent to the east side of King Abdulaziz Road, and within the Yanbu
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Royal Commission (YRC) Industrial City.

2.2 LAND USE PERMIT (LUP)


DESCRIPTION

This project requires Land Use Permits (LUP) for both the work areas in and around
NJBP and YDH, including: YDH plant, MARAFIQ to YDH corridor for Electrical & FO
cables, Yanbu refinery/YDH Interconnecting pipelines corridor, SAMREF/YDH
Interconnecting pipeline corridor, Access road for YDH and Temporary Construction
Facility

SECTION 3.0 – PROJECT DESIGN CRITERIA


10-02399-
JO/EWO

10-02399-
10-02399-
0001

3.1 The Project Proposal Narrative with all its attachments and drawings shall be the basis
0001
0001

and serve the purpose of defining the overall scope of this project.
12/11/16
08/04/16

09/08/16
DATE

3.2 In addition, the SAUDI ARAMCO engineering procedures, practices, and general
instructions are also considered as part of the design basis for the development of
NO.
REV

D
C
B

DISCIPLINE CONTRACTOR’s bid.


ENGINEER
ALL LEADS

DATE: 12/11/16
3.3 Any conflict between various design basis documents shall be highlighted to SAUDI
PROJECT
ENGINEER
ARAMCO for their review and resolution.
A M ALMATROOK

DATE: 12/11/16 3.4 This document shall be read in conjunction with relevant contract documents.
CERTIFIED
AMR EL SHARKAWY

12/11/16
3.5 CONTRACTOR shall prepare detail design package as per latest Saudi Aramco
DATE:
CONSTRUCTION
Engineering Standards, procedures and material specifications. Yanbu Royal
AGENCY
Commission standards & guidelines shall be considered for the detail design package.
SHAHZAD YAZDANI

DATE: 12/11/16
OPERATIONS 3.6 CONTRACTOR shall prepare the earthquake resistant design and detailing per
ALI H GHAMDI requirements of AISC-341, Seismic Design Manual of AISC, ACI-318 and ASCE-05.
DATE:
12/11/16 Geotech report of the project shall be utilized for the determination of Seismic Design
CONTROL NUMBER

Category (SDC) per guidelines of ASCE-05.


VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 25


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

SECTION 4.0 – DETAILED SCOPE OF WORK


ENGG CERT

ASH
ASH
ASH

Section 4 is included in this PPN to provide design basis and an overall picture of the total
project associated with BI-10-02399. This is specifically intended to provide CONTRACTOR
LEADS

LEADS
LEADS
ALL

ALL
ALL

as much overall project information as possible to enable CONTRACTOR to consider


execution methods/ strategies that may reduce the overall cost of the defined scope included
in this PPN. Note that portions of section 4 are applicable to YDH PPN scope of work.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

General Engineering and Design

CONTRACTOR shall commit dedicated manpower, equipment and all necessary resources to
DESCRIPTION

perform the Works activities.

CONTRACTOR shall assign a dedicated full-time team to work on the Yanbu Distribution Hub
for the entire project duration which includes but not limited to the engineering design office
and construction site office. The team shall be located in the same floor as the SAUDI
ARAMCO PMT assigned offices.

4.1 OVERALL SCOPE


10-02399-
JO/EWO

10-02399-
10-02399-
0001

The proposed facilities shall interface with the related budget items (BI’s) and other
0001
0001

components of this BI. Work for this project shall be coordinated with the respective
projects as noted below. Each respective BI below shall address interconnections
12/11/16
08/04/16

09/08/16
DATE

between the other related BI’s and existing facilities. To the extent possible, any
physical tie-ins shall be made without affecting operations. Any changes in the
NO.
REV

D
C
B

approved Testing and Inspection (T&I) schedules shall be coordinated with Oil Supply
DISCIPLINE
ENGINEER
Planning and Scheduling department (OSPAS).
ALL LEADS

DATE: 12/11/16 4.2 INTERFACES WITH OTHER BI’s


PROJECT
ENGINEER

A M ALMATROOK
Related Budget Items
DATE: 12/11/16
CERTIFIED 4.2.1 BI-10-02155, Yanbu – Jiddah Refined Product Pipeline
AMR EL SHARKAWY
This project shall construct refined product pipelines to deliver products from
12/11/16
DATE: Yanbu to the North Jiddah Bulk Plant. The current scope transports 576 MBD
CONSTRUCTION
AGENCY of refined petroleum products. These pipeline systems will deliver Diesel,
SHAHZAD YAZDANI Kerosene, Premium 91, and Premium 95 Gasoline designated for the Makkah
DATE: 12/11/16 province.
OPERATIONS
ALI H GHAMDI

12/11/16
The project must consider the origin pipeline pump station and origin storage
DATE:
tank requirements into the facility design.
CONTROL NUMBER
VERIFICATION
EDSD

ERA: 8/16, ERC: 7/20


DATE:
BY:

4.2.2 BI-10-02167, Refined Product Pipeline – Yanbu-Central Region


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

This project constructs a refined product pipeline to delivery product from


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Yanbu into the central region of Saudi Arabia. The current scope transports
(DCC) NO. _____________________

400 MBD of refined petroleum product to a bulk plant destination in the central
region.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 26


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

The project must consider the origin pipeline pump station and origin storage
ENGG CERT

tank requirements into the facility design. Additional storage tanks at YDH shall
ASH
ASH
ASH

be constructed as part of this pipeline project.


LEADS

LEADS
LEADS
ALL

ALL
ALL

ERA: 2/17, ERC: 1/21


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

4.2.3 BI-10-02159, Grassroots Refinery and Petrochemical – Yanbu


This project expands the Yanbu Refinery to increase Western Region’s refined
products supply and increase the integration between the refinery and
chemicals to maximize profitability.
DESCRIPTION

The refined product production resulting from this project will be a significant
amount of product supply for YDH.

ERA: 7/18, ERC: 12/23

4.2.4 BI-10-00043, Yanbu Refinery Clean Fuels – YASREF Interface


This project constructs two pipelines to transfer Clean Transportation Fuels
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001

(ULSD, PG91, and PG95) from the YASREF Refinery to the Yanbu Refinery.
0001

The proposed pipeline route shall follow the Royal Commission Corridor
12/11/16
08/04/16

09/08/16

between the YASREF Refinery and the Yanbu Refinery.


DATE

The custody metering shall be located inside YDH battery limit along with
NO.
REV

D
C
B

DISCIPLINE
supervisory monitoring and control Process Automation.
ENGINEER
ALL LEADS
The YASREF supply connection into YDH will connect into each of the
pipelines.
DATE: 12/11/16
PROJECT
ENGINEER

A M ALMATROOK
ERA: 2/16, ERC: 5/19
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
4.3 PROJECT PHYSICAL INTERFACES
12/11/16
DATE:
CONSTRUCTION
AGENCY The project scope for the YNJ-1/2 pipelines, BI-10-02155 & YDH and North Jiddah
SHAHZAD YAZDANI
Bulk Plant (NJBP) Expansion & Upgrade, BI-10-02399 will contain elements that shall
DATE: 12/11/16 be interfaced to achieve project purpose and intend.
OPERATIONS
ALI H GHAMDI
This project has very complicated interfaces as listed below; it is highly recommended
12/11/16
DATE: that the CONTRACTOR assign a dedicated Interfaces Manager to handle those
CONTROL NUMBER

challenging interfaces and to present an interface management plan at an early stage


VERIFICATION

of the project following the direction of SAEP-367.


EDSD

DATE:

CONTRACTOR shall consider the interfaces when studying the Project Risk
BY:

Management, and Constructability and logistic assessment.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall consider all the relevant Reservation forms and interface
(DCC) NO. _____________________

packages used in the Project Proposal package for the detail design.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 27


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
BI-10-02155 is comprised of:
SAY
SAY
SAY

Yanbu-North Jiddah Pipeline System


ENGG CERT

ASH
ASH
ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

This BI also provides for The YNJ-1/2 Pipeline System to transport 576 MBD of refined
product from YDH to the NJBP. This pipeline system will deliver Diesel, Kerosene,
Premium 91, and Premium 95 Gasoline designated for the Makkah province.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

BI-10-02399 is comprised of the following two components:

a) Yanbu Distribution Hub


DESCRIPTION

YDH is a Greenfield refined storage facility at Yanbu that collects products


(PG91, PG95, DO and DPK) from the local Yanbu area refineries and delivers
to pipelines extending to Jiddah and the Central Region.

b) North Jiddah Bulk Plant Expansion and Upgrade

The existing bulk plant at North Jiddah shall be upgraded and expanded to
10-02399-
JO/EWO

10-02399-
10-02399-
0001

accommodate the receipt of the YNJ-1/2 pipelines as well as increased truck


0001
0001

loading and offloading facilities..


12/11/16
08/04/16

09/08/16
NO. DATE
REV

D
C
B

DISCIPLINE
ENGINEER
ALL LEADS

DATE: 12/11/16
PROJECT
ENGINEER

A M ALMATROOK

DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY Figure 1. Project boundaries for BI-10-02155 and BI-10-02399
12/11/16
DATE:
CONSTRUCTION 4.3.1 Refinery Connections:
AGENCY
SHAHZAD YAZDANI
Refer to Appendix 2 Project Proposal Interface Packages.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
Appendix 2 contains all reservation forms, 90% comment logs, documents and
12/11/16
drawings related to the interfaces with MARAFIQ, Yanbu Royal Commissioning,
DATE:
Yanbu NGL, Yanbu refinery, SAMREF, and YASREF. The drawings included in
CONTROL NUMBER
VERIFICATION

this Appendix are also included in the general YDH package.


EDSD

YDH shall construct multiple pipelines to tie into the tank farm of each respective
DATE:

refinery. The tie-in location shall be downstream of any tankage and booster
BY:

pumps within the respective refinery tank farm and YRT discharge lines from
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

terminal ship pump.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

YASREF

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 28


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YDH shall receive PG 91/95 and DO products from the YASREF via two
SAY
SAY
SAY

pipelines. Part of the pipeline supply from YASREF to YDH will be provided by
BI-10-00043, for the supply of clean transportation fuel to Yanbu refinery. Two (2)
ENGG CERT

ASH
ASH
ASH

pipelines (one for DO and one for PG 91/95) between YASREF & Yanbu refinery
shall be provided under BI-10-00043. This project will tie-in to the isolation valve
LEADS

LEADS
LEADS
ALL

ALL
ALL

downstream provided on the pipeline and shall be the connecting points for the
pipelines leading to YDH. BI-10-00043 will provide a manual valve on both
pipelines for tie-ins to YDH.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

The interface scope with YASREF is described as following:

A. Instrumentation:
DESCRIPTION

• The YDH control system shall be interfaced to YASREF control system to


have READ ONLY access to the data points such as the CMS, EIV status
and Pump status. The data is to be exchanged via plant DMZ through PI
system at both the facilities.
• Contractor shall provide new fiber optic cable from YASREF to YDH for the
data exchange. The interface is shown in preliminary block # IN-A00001.004
• Contractor shall coordinate with Refinery Control System Vendor for the
interface requirements.
10-02399-
JO/EWO

10-02399-
10-02399-


0001

0001

Reference Drawing: BLOCK DIAGRAM-YASREF INTERFACE IN-


0001

A00001.004
12/11/16
08/04/16

09/08/16
DATE

B. Telecom
• Provide 12 core Fiber optic cable from Yanbu Distribution Hub to YASREF
NO.
REV

D
C
B

Central Control Building (CCB).


DISCIPLINE
ENGINEER • Provide VOIP hotline in YASREF Central Control Building (CCB)
ALL LEADS

DATE: 12/11/16
PROJECT
Notes: Engineering / construction contractor for BI-10-00043 need to
ENGINEER accomplish the requirement of new surge relief systems for both
A M ALMATROOK
pipelines (YASREF – YR) and a surge relief tank & its pumps inside
DATE: 12/11/16 YASREF. Surge tank pumps to be protected with foam system.
CERTIFIED
AMR EL SHARKAWY

12/11/16 SAMREF
DATE:
CONSTRUCTION
AGENCY YDH shall receive PG 91/95, DO, and DPK from the SAMREF refinery via three
SHAHZAD YAZDANI
pipelines extending from the SAMREF tank farm to YDH product receiving
DATE: 12/11/16
manifolds. The SAMREF supply connection to YDH shall be downstream of
OPERATIONS
existing export pumps. And the required new metering skids shall be installed
ALI H GHAMDI
at SAMREF. These tie-ins will be taken from the SAMREF export lines going to
12/11/16
DATE: their terminal near to the fence at King Fahad Road (RC Corridor). All new
CONTROL NUMBER

equipment shall also be installed at space available adjacent to the tie-ins.


VERIFICATION
EDSD

The interface scope with SAMREF is described as following:


DATE:
BY:

A. Piping:
REVISIONCERTIFICATION

• Construct 4 tie-ins with SAMREF pipelines, including MOVs, and ZVs.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

• Construct 1 tie-in with drain system


(DCC) NO. _____________________

• Install 3 metering skids & 2 Prover skids.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 29


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Installation of 01 surge tank & 02 pumps
SAY
SAY
SAY

• Using the existing pumps.


ENGG CERT

ASH
ASH
ASH

B. Instrumentation:
LEADS

• Provide and install Three (3) custody metering skids PG91/95, DO and DPK
LEADS
LEADS
ALL

ALL
ALL

with a prover PG91/95 and DO, and a separate prover for DPK, the skid shall
be as per SAES-Y-103. The metering skids field instrumentation shall be
integrated to metering and control cabinets such as flow computer cabinet,
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

PLC cabinet and MSC cabinet. A vendor supplied metering shelter shall be
provided to house these cabinets.
• Skid Vendor/LSTK shall supply prefab air-conditioned Metering Shelter
DESCRIPTION

constructed in compliance with electrical area classification requirements and


Saudi Aramco /SAMREF Standards.
• The contractor shall provide a new DCS Controller with input-output modules
and a FTA/marshalling cabinet to integrate new field instruments added by
BI-10-02399 in SAMREF facility. The DCS cabinets shall be installed in
metering shelter. The Metering Supervisory Computer (MSC) shall be
interfaced to DCS via open industry standard protocol such as Modbus
TCP/IP, OPC etc. Refer block diagram IN-A00001.009 for Custody Metering
System.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

• The contractor shall provide redundant fiber optic cables between metering
shelter and nearest OMS control building in the tank farm area of SAMREF.
12/11/16
08/04/16

09/08/16
DATE

The new DCS shall be tied to the existing plant control network at OMS
control room. The HMI station at OMS control room will be updated with the
new instrumentation added by BI-10-02399.
NO.
REV

D
C
B

DISCIPLINE • The new ESD valves added by BI-10-02399 at the battery limit of SAMREF
ENGINEER
ALL LEADS facility shall be integrated to existing ESD system. The contractor shall
DATE: 12/11/16 provide new junction boxes and cables. The ESD marshalling cabinet
PROJECT
ENGINEER
OMMRS01 shall be used to terminate ESD cables at OMS Rack-room.
A M ALMATROOK • The contractor shall provide junction boxes and field homerun cables as
DATE: 12/11/16 indicated in block diagram# IN-A00001.007
CERTIFIED
AMR EL SHARKAWY • The YDH control system shall be interfaced to SAMREF control system to
DATE:
12/11/16 have READ ONLY access to the data points such as the CMS, EIV status
CONSTRUCTION and Pump status and tank status. The data is to be exchanged via plant DMZ
AGENCY
SHAHZAD YAZDANI
through PI system at both the facilities. New fiber optic cable is to be laid from
SAMREF to YDH for the data exchange.
DATE: 12/11/16
OPERATIONS • Contractor shall install MOV-1111/2/3/4, MOV-1211/12, and MOV-
ALI H GHAMDI 1311/12/13/14/15/16/17/18 as shown in P &ID and Piping Plan #PI-
DATE:
12/11/16 A00435/36/37/38. Provide and install Junction boxes and lay homerun cable
IC-0116/117/124/125 up to new DCS Marshalling Cabinet in located in
CONTROL NUMBER
VERIFICATION

metering shelter.
EDSD

• Contractor shall provide and install ZV-1112/1212/1312 and install cable IC-
DATE:

0133 from ESD junction box to existing ESD marshalling cabinet OMRS01.
BY:

Contractor shall utilize existing cable tray to run home cable from junction to
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

OMS control room.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

• Installation shall be as per below reference drawings


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 30


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

Drawing Description
ENGG CERT

ASH
ASH
ASH

J8DF5007-001 OMS CONTROL ROOM LAYOUT


LEADS

LEADS
LEADS
ALL

232J081-001 BLOCK DIAGRAM, OM & S CONTROL HOUSE


ALL
ALL

IN-A00001.009 SAMREF CUSTODY METERING SKIDS


IN-A00001.007 SAMREF INTERFACE
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

IN-E00031 DCS INPUT-OUTPUT LIST


IN-E00032 ESD INPUT-OUTPUT LIST
IN-D00030.001 CABLE AND CONDUIT SCHEDULE
DESCRIPTION

IN-E00015 FSD- DISTRIBUTED CONTROL SYSTEM


IN-E00016 TSD-DCS MODIFICATION-SAMREF DCS
C. T
eIN-E00011 SHT 001-014 ISS FOR MOVs
l IN-E00006/7 SHT 001-003 ISS FOR PZVs
eIN-E00013 SHT 001-003 ISS FOR ZVs
c
om
• Provide 12 core Fiber optic cable from Yanbu Distribution Hub to SAMREF
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001

new Metering Shelter.


0001

• Provide 12 core Fiber optic cable from SAMREF new Metering Shelter to
12/11/16
08/04/16

09/08/16
DATE

OMS Control Room.


• Provide VOIP hotline in SAMREF OMS Control Room.
NO.
REV

D
C
B

DISCIPLINE D. Electrical:
• Provide and Install two 480V, 3phase, 3wire MOVs Panels feeding from
ENGINEER
ALL LEADS

DATE: 12/11/16
SAMREF existing Substation No. 12.
PROJECT
ENGINEER • Provide and Install new rack mounted 10kVA UPS with 60 mins back up time
A M ALMATROOK in Substation No. 12 to feed Metering Skids.
DATE: 12/11/16
CERTIFIED
• Empty spaces of existing MCCs in Substation No. 12 shall be utilized to feed
AMR EL SHARKAWY MOVs Panels and UPS.
DATE:
12/11/16
• Run and terminate power cables for Panels and metering skids etc.

CONSTRUCTION
AGENCY Provide Grounding to new equipment from existing SAMREF Grounding
SHAHZAD YAZDANI
network.
DATE: 12/11/16
OPERATIONS • Provide task lighting for new equipment from existing lighting Panels.
ALI H GHAMDI

12/11/16
E. Structural:
• LSTK contractor shall perform required geotechnical investigation inside
DATE:
CONTROL NUMBER
VERIFICATION

SAMREF refinery during detailed design.


EDSD

• All necessary structures and foundations for MOV’s and metering skids.
DATE:
BY:

Yanbu Refinery
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

YDH shall receive PG 91/95, DO, and DPK from the Yanbu Refinery Terminal
C

through three pipelines extending from YRT through Yanbu refinery tank farm
(DCC) NO. _____________________

to YDH. The Yanbu refinery supply connection to YDH shall be downstream of

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 31


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
existing marine loading pumps. These pumps will take suction from ship pump.
SAY
SAY
SAY

The required new metering skids shall be installed at YDH.


ENGG CERT

ASH
ASH
ASH

Provisions shall be provided in the receiving manifold for the future connection
LEADS

LEADS
LEADS

of PG 91/95, DO & DPK from Yanbu grass root refinery.


ALL

ALL
ALL

The interface scope with SAMREF is described as following:


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

A. Piping:
• Construct 4 tie-ins with YR pipelines, including MOVs, and ZVs.
DESCRIPTION

• Installation of surge tanks and pumps

B. Instrumentation:
• Contractor shall provide and install Motor Operated and Electrohydraulic ESD
valves at the battery limit of Yanbu Refinery, MOVs shall also be provide at
the tie-in locations.
• Contractor shall provide and install new homerun cables from valves up to
the existing SIH-1590 (Satellite Instrument House) in tank farm area. SIH-
1590 is expanded under BI-10-00043, the project shall coordinate with BI-10-
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

00043 to reserve the space in the cabinets required by this BI. All new EIVs
will be connected to new ESD Marshalling Cabinet provided by BI-10-00043.
12/11/16
08/04/16

09/08/16

BI-10-02399 will provide required input-output modules to integrate to ESD


DATE

system provided under BI-10-00043.


• All non-ESD instruments will be connected to new DCS Marshalling Cabinet
NO.
REV

D
C
B

DISCIPLINE provided by BI-10-00043. BI-10-02399 will provide required input-output


ENGINEER
ALL LEADS
modules to integrate to DCS system provided under BI-10-00043.
DATE: 12/11/16 • SIH-1590 will be expanded under BI-10-00043 to accommodate the
PROJECT
ENGINEER
expansions under this BI. The DCS/ESD provided under BI-10-00043 will be
A M ALMATROOK
integrated to YR plant network.
DATE: 12/11/16 • New instrumentation provided under BI-10-02399 will be controlled from YR
CERTIFIED
AMR EL SHARKAWY
tank farm control room and the HMIs at tank farm control room will be
12/11/16
updated accordingly Refer block diagram IN-A00001.008 for details.
DATE:
CONSTRUCTION • In addition to this, BI-10-02399 shall interface Yanbu Refinery TCFR control
AGENCY
SHAHZAD YAZDANI
system to YDH provides View only signals related to product transfer. The
data points shall be the status of product pumps and EIVs such as running,
DATE: 12/11/16
OPERATIONS stopped, tripped etc. The requirements of data from Yanbu Refinery shall be
ALI H GHAMDI further evaluated during detailed design in coordination with YDH and YREF
12/11/16 operations.
DATE:
• The interface shall be through PI system installed at both the facility, DMZ
CONTROL NUMBER
VERIFICATION

shall be used in order to make the data exchange highly secured. Contractor
EDSD

shall provide fiber cables between YREF and YDH. The possible option of
interfacing both the facilities shall be further evaluated during detailed design.
DATE:
BY:

• Contractor shall provide and install new junction boxes, branch cables,
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

homerun cables for instruments added by this BI.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

• The field installation shall be as per P & IDs VA-247876/877 and VA-
(DCC) NO. _____________________

234308.015/020/027 and Piping Plans PI-A00403.004, VA-236952.001, VA-

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 32


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
236952.002, VA-236956.001, VA-236956.002 and VA-236960.002
SAY
SAY
SAY

• Contractor shall run homerun cables from Junction boxes to SIH-1590


ENGG CERT

ASH
ASH

utilizing existing cable trays. Refer drawing VA-549870.001 for cable routing.
ASH


LEADS

LEADS
LEADS
ALL

Reference Drawings:
ALL
ALL

Drawing Description
IN-A00001.008 Block Diagram-Yanbu Refinery
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

VA-549870.001 Cable/Conduit Layout


VA-549714.002 System Architecture PCS Tank Farm
IN-D00031.001 Cable and Conduit Schedule
DESCRIPTION

Technical Specification Document -DCS


IN-E00020 Modification
IN-E00033 DCS INPUT-OUTPUT LIST
IN-E00034 ESD INPUT-OUTPUT LIST
IN-E00008/9/10/12.001 ISS FOR ANALOG INSTRUMENTS
IN-E00011-015 TO 046 ISS FOR MOVs
IN-E00013-004 TO 008 ISS FOR ZVs
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

C. Telecom
• Provide two(2) 48 core Fiber optic cable from Yanbu Distribution Hub to
12/11/16
08/04/16

09/08/16
DATE

Yanbu Refinery Admin Bldg 1401. One fiber is for IT and the other for
Process connectivity.
NO.
REV

D
C
B

• Provide hotline circuits in Operation Bldg. at Yanbu Distribution Hub to


DISCIPLINE
ENGINEER connect in the Yanbu RSCC.
ALL LEADS
• Provide PE Router in Yanbu Distribution Hub to connect in the existing PPE
DATE: 12/11/16
PROJECT Routers at Yanbu Refinery Admin Bldg 1401 and Yanbu NGL.
ENGINEER

A M ALMATROOK • Provide Access Points (APs) in Yanbu Distribution Hub to connect in the
DATE: 12/11/16
existing WLAN Controller at Yanbu NGL.
AMR EL SHARKAWY
CERTIFIED
• Provide connectivity and associated equipment in Yanbu Distribution Hub to
12/11/16 the third party SAMREF, YASREF and YRT.
DATE:
CONSTRUCTION • Provide the TETRA Radio system in Yanbu Distribution Hub to connect in the
AGENCY
SHAHZAD YAZDANI
existing SCN in Yanbu NGL.
DATE: 12/11/16 • Provide Transmission connectivity for SDH equipment in Riyadh Refinery.
OPERATIONS
ALI H GHAMDI

12/11/16
DATE: D. Electrical:
• Provide and Install three 480V, 3phase, 3wire MOVs Panels feeding from
CONTROL NUMBER
VERIFICATION

YANBU refinery existing Substation No. 7, 8 and 9.


EDSD

• Empty spaces of existing MCCs in Substation No. 7, 8 and 9 shall be utilized


DATE:

to feed MOVs Panels.


BY:


REVISIONCERTIFICATION

Run and terminate power cables for MOV.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Provide Grounding to new MOV panels from existing YANBU refinery


(DCC) NO. _____________________

Grounding network.
• Provide task/area lighting for new equipment from existing nearby lighting
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 33


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Panels.
SAY
SAY
SAY

E. Structural:
ENGG CERT

ASH
ASH
ASH

• LSTK contractor shall use geotechnical report recommendation from proposal


geotechnical report 2015/104 and existing geotechnical report 93/90 for
LEADS

LEADS
LEADS
ALL

ALL
ALL

foundation design requirement during detailed design.


• All necessary structures and foundations for MOV’s and Pipe Supports.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Other Connection: MARAFIQ

A. Electrical Scope at MARAFIQ Substation # 9I Interface:


DESCRIPTION

• THE CONTRACTOR shall coordinate with Saudi Aramco and MARAFIQ for
the portion of works under MARAFIQ scope and insure correct interface of all
discipline’s i.e. Civil, Electrical, Protection, Communication, etc.
• THE CONTRACTOR shall furnish electrical detailed drawings, documents
and any calculation requested by MARAFIQ / Roya Commission (RC) to fulfill
the connection agreement requirements.
• THE CONTRACTOR shall utilize existing spare breaker EA06 & EB04 of GIS
to feed power to Yanbu Distribution Hub (YDH). (Refer sketch # SK-A10011,
SK-A10013 & SK-A10014)
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

• THE CONTRACTOR shall provide one (1) metering panel to accommodate


two (2) revenue meters & two check meters for YDH feeders-1 & 2. (Refer
12/11/16
08/04/16

09/08/16
DATE

sketch # SK-A10013 & SK-A10014)


• THE CONTRACTOR shall provide Four (4) protection relay panel to
NO.
REV

accommodate line differential relays & directional relays for YDH feeders-1 &
D
C
B

DISCIPLINE 2. (Refer sketch # SK-A10013 & SK-A10014)


ENGINEER
ALL LEADS • THE CONTRACTOR shall provide one (1) 125VDC Power Panel to supply
DATE: 12/11/16 power to new relay panels. (Refer sketch # SK-A10012)
PROJECT
ENGINEER
• THE CONTRACTOR shall provide two (2) fiber optic patch panel to be install
A M ALMATROOK
in Substation 9I. (Refer sketch # SK-A10014)
DATE: 12/11/16
CERTIFIED • THE CONTRACTOR shall design, supply, install, test and assist with
AMR EL SHARKAWY
commissioning of two run, 3x1/C- 630 mm2, 115kV cables of 3.85km in
12/11/16
DATE: length, from MARAFIQ Substation #9I to YDH. (Refer sketch # SK-A10010 &
CONSTRUCTION
AGENCY
SK-A10015)
SHAHZAD YAZDANI
• THE CONTRACTOR shall provide termination kits, including connectors, at
DATE: 12/11/16 the MARAFIQ end and at the Saudi Aramco 115kV GIS end. THE
OPERATIONS
CONTRACTOR shall coordinate with MARAFIQ and Saudi Aramco for
ALI H GHAMDI
termination at the MARAFIQ end.
12/11/16
DATE:
• THE CONTRACTOR shall confirm MARAFIQ protection and metering
CONTROL NUMBER
VERIFICATION

requirements and reflect accordingly within the Detail Design Drawings.


Development of protection, control, fire alarm, communication, etc., interface
EDSD

drawings shall be THE CONTRACTOR responsibility including purchase,


DATE:

installation, termination and testing of the required cabling.


BY:

• THE CONTRACTOR shall assist MARAFIQ as required with Manpower, and


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

test equipment, as necessary to complete MARAFIQ 115kV and Saudi


C

Aramco 115kV Interface Testing including Protection, Metering, Controls, etc.


(DCC) NO. _____________________

including wiring interface drawing development. Test Results shall be signed

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 34


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
by all relevant parties including POD, PID, MARAFIQ, etc. and be included
SAY
SAY
SAY

within the Project Test Results binders maintained and developed by THE
CONTRACTOR as per SAEP-122.
ENGG CERT

ASH
ASH
ASH

• THE CONTRACTOR to consider Integration Philosophy between the


LEADS

LEADS
LEADS

MARAFIQ 115KV Substation # 9I and the New Saudi Aramco 115kV


ALL

ALL
ALL

Receiving Substation. Interface philosophy will be finalized as per Connection


Agreement between MARAFIQ & Saudi Aramco. Initial communication has
been established to finalize the scope segregation between Saudi Aramco &
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

MARAFIQ. Proposed interface requirements are as followed:


- MARAFIQ confirmed to reserve the existing Two (2) spare GIS Bays:
=EB04 and =EA06 for Saudi Aramco YDH project. MARAFIQ requested
DESCRIPTION

Saudi Aramco to submit the breaker reservation thru official letter.


- MARAFIQ confirmed these 2 Spare GIS are already pre-wired to the local
control panel =EB04+S and =EA06+S.
- A new metering panel is required, same model and configuration than as
in existing Crystal metering panels. This new metering panel shall be the
combine metering panels for 2 feeders of YDH. Each YDH feeders shall
have a separate revenue meters and will be accommodated in this panel.
Reserved available floor space for this panel. New Panel to be tagged as:
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

=E+MP05 115KV Service Cable/Revenue Metering panel.


- Protection Scope- Primary Protection: Two (2) new Relay Panels are
12/11/16
08/04/16

09/08/16
DATE

required based on ABB relays. Reserved available floor spaces for these
two panels. New panels to be tagged as: =EB04+R1 and =EA06+R1
NO.
REV

115kV Service Line Aramco- YDH/ Primary Protection.


D
C
B

DISCIPLINE - Protection Scope- Back Up Protection: Two (2) new relay Panels are
ENGINEER
ALL LEADS required based on Siemens relays. Available floor spaces for these 2
DATE: 12/11/16 panels. New Panels to be tagged as: =EB04+R2 and =EA06+R2 115KV
PROJECT
ENGINEER Service Line Aramco- YDH/ Back Up protection Panel.
A M ALMATROOK
- MARAFIQ confirmed that existing Relay Panels =E+BB1 and =E+BB4 for
DATE: 12/11/16
CERTIFIED Bus Bar/BF Protection of GIS Bay EA06 & EA04 are already pre-wired.
AMR EL SHARKAWY
- DC System scope: Existing 125V DC Distribution Panel has not enough
12/11/16
DATE: spare breakers for new DC scope. MARAFIQ requested to provide new
CONSTRUCTION
AGENCY DC panel same manufacturer than existing panels “Riyadh Factory For
SHAHZAD YAZDANI
Panelboard” Available floor space for this new DC panel. New Panel to be
DATE: 12/11/16
OPERATIONS
tagged as: 125V DCDB 125V Main DCDB No. 3.
ALI H GHAMDI
- AC System scope: Existing 220V AC Distribution Panel has required spare
DATE:
12/11/16 breakers for new AC scope. THE CONTRACTOR to utilize existing spare
breakers from 220V AC Distribution Panel No. 1, 2 & 3. Note: There is No
CONTROL NUMBER
VERIFICATION

480V AC panel available in MARAFIQ Substation.


EDSD

- Power Cable Routing in Basement: MARAFIQ requested as minimum to


DATE:

follow the same cable routing design in the basement:


BY:

- Cable trays have to be heavy duty 600mmx150mm for cable transition to


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

the wall.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

- Cable trays support shall be unistrut type.


(DCC) NO. _____________________

- Cable structural support shall be Unistrut type similar design that existing

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 35


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ones.
SAY
SAY
SAY

• General:
ENGG CERT

ASH
ASH
ASH

- MARAFIQ shall be included in the Review Cycle during Detail Engineering.


- MARAFIQ informed that technical queries shall be submitted on separate
LEADS

LEADS
LEADS
ALL

ALL
ALL

Memos, queries under same discipline can be grouped in one Memo.


- MARAFIQ requested Saudi Aramco to provide the SOW Narrative for
review.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

- MARAFIQ informed that all equipment related to MARAFIQ scope shall be


procured as per RC Standards.
DESCRIPTION

B. Telecom:
• THE CONTRACTOR shall design, supply, install, test and assist with
commissioning of two (2) x 2 run 12C Single Mode Fiber Optic Cables run
along with each power feeder cable from MARAFIQ Substation #9I to YDH.
(Refer sketch # SK-A10010 & ELA10130-001-003). Each of the two (2) fiber
run will have one 12 core fiber for Control and one 12 core fiber for
Communication connectivity.
• The fiber patch panel in Substation #91 shall be wall type and in YDH the
fiber patch panel shall be rack mounted type.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

C. Instrumentation:
12/11/16

THE CONTRACTOR shall provide and install the following for Water
08/04/16

09/08/16
DATE

metering system with MARAFIQ:


NO.
REV

D
C
B

DISCIPLINE
• UTILITY WATER
ENGINEER
ALL LEADS - Provide metering skid for utility water system as indicated in the drawing
DATE: 12/11/16 INA00001-011, the skid shall be provided with field instruments such as
PROJECT
ENGINEER Electromagnetic flowmeter, Pressure transmitters, Temperature
A M ALMATROOK transmitters and pH analyzer.
DATE: 12/11/16 - Supplied field instruments shall be as per MARAFIQ standard and from
CERTIFIED
AMR EL SHARKAWY approved vendors list.
DATE:
12/11/16 - Provide and install Junction boxes and branch cabling.
CONSTRUCTION
AGENCY
- Provide and install RTU with GPRS Communication Gateway. Integrate
SHAHZAD YAZDANI the RTU with existing MARAFIQ SCADA.
DATE: 12/11/16
OPERATIONS
• SANITARY WATER
ALI H GHAMDI

12/11/16 - Provide metering skid for Sanitary water system as indicated in the
DATE:
drawing INA00001-011, the skid shall be provided with field instruments
CONTROL NUMBER
VERIFICATION

such as Electromagnetic flowmeter, Pressure transmitters and


EDSD

Temperature transmitters.
DATE:

- Supplied field instruments shall be as per MARAFIQ standard and from


BY:

approved vendors list.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

- Provide and install Junction boxes and branch cabling.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

- Provide and install RTU with GPRS Communication Gateway. Integrate


(DCC) NO. _____________________

the RTU with existing MARAFIQ SCADA.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 36


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. Civil:
SAY
SAY
SAY

• THE CONTRACTOR shall provide and install the following for Water systems
with MARAFIQ.
ENGG CERT

ASH
ASH
ASH

• UTILITY WATER
LEADS

LEADS
LEADS
ALL

ALL
ALL

- Provide connection of Utility Water at the approved tie-in point for Potable
water system as indicated in the drawing CIA00110-002 and CIA00116-
001, using the standard typical connections of RC.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

- Contractor shall coordinate with MARAFIQ for the time to make the
connection to facilitate the connection without interfering with the line
operation. Requesting the close down of the pipe section if applicable and
DESCRIPTION

execute the connection in a time manner.


- Provided with pipes, fittings and flanges for a proper connection and leave
the connection uncovered until a water test verifies there are not spills at
the joint of tie in point.
- Provide excavation and backfilling following Aramco standard SAES A
114.
• SANITARY WATER
- Provide connection of Sanitary Water at the approved tie- in point for
10-02399-
JO/EWO

10-02399-
10-02399-
0001

Sanitary water system as indicated in the drawing CIA00110-002 and


0001
0001

CIA00116-001, using the standard typical connections of RC.


12/11/16
08/04/16

09/08/16
DATE

- Contractor shall coordinate with MARAFIQ for the time to make the
connection to facilitate the connection without interfering with the line
operation.
NO.
REV

D
C
B

DISCIPLINE - Provided with pipes, fittings and flanges for a proper connection and leave
ENGINEER
ALL LEADS the connection uncovered until a water test verifies there are not spills at
DATE: 12/11/16 the joint of tie in point.
PROJECT
ENGINEER - Provide excavation and backfilling following Aramco standard SAES-A-
A M ALMATROOK 114.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY Yanbu NGL & Yanbu Royal Commissioning
12/11/16
DATE:
CONSTRUCTION • Refer to Appendix 2 for reservation forms and drawings.
AGENCY
SHAHZAD YAZDANI
Storage Tanks and Piping
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI The interface point shall be at the flange face at each respective product
12/11/16 header line downstream of any tankage, booster pumps, process piping, and
DATE:
measurement equipment downstream of YDH Receipt Header Line as outlined
CONTROL NUMBER
VERIFICATION

below.
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 37


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY
ENGG CERT

ASH
ASH
ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

ISSUED FOR 100% PROJECT PROPOSAL


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

• Manifolds shall be constructed to allow for dedicated product service and


DESCRIPTION

dedicated receipt and delivery of product (2-PG91, 2-PG95, 2-DO, 2-


DPK, and slop).

• A product dedicated receipt manifold shall connect all of the refinery


supply pipelines to each tank in that respective service including the T&I
tank with dual product service.

• A product dedicated delivery manifold shall connect each tank in that


10-02399-
JO/EWO

10-02399-
10-02399-

respective service including the T&I tank with dual product service with
0001

0001
0001

each of the designated outbound pipelines.


12/11/16
08/04/16

09/08/16
DATE

• Each manifold shall be designed to provide for future expansion of


connections for additional tanks or supply/delivery pipelines. All piping
NO.
REV

D
C
B

and manifolds shall be designed to minimize product cross


DISCIPLINE
ENGINEER contamination.
ALL LEADS

DATE: 12/11/16
PROJECT
• Manifold/piping velocities shall comply with SAUDI ARAMCO standards
ENGINEER
and Loss Prevention Study Recommendations (CFPE-011-2014) on
A M ALMATROOK
reduced loading rates for low sulfur diesel and aromatic products.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY Gasoline Dye Injection
12/11/16
DATE:
CONSTRUCTION Two separate red and green color dye injection systems shall be installed in
AGENCY
YDH facility. The dye injection must inject dye at the inlet header of storage
SHAHZAD YAZDANI
tanks (at the downstream of receiving manifold) so that a single skid of green
DATE: 12/11/16
OPERATIONS
dye and single skid for red dye can provide adequate coloration for PG-91 and
ALI H GHAMDI
PG-95 from all the source. The color dye injection system shall be a complete
12/11/16
vendor skid with tank and injection pumps.
DATE:
CONTROL NUMBER
VERIFICATION

The scope for the color dye injection Skid is outlined in PFD VA247835-001
and P&IDs VA247891-001. CONTRACTOR shall develop a detailed P&ID after
EDSD

vendor information during detail design.


DATE:
BY:

DPK Filtration System


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

The DPK filtration is proposed to be a complete vendor skid with circulation


(DCC) NO. _____________________

pumps, pre filters and after filters. Normally, the filtration skid shall be designed
and shall have flexibilities to circulate into the same product tanks or to an
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 38


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
empty DPK tank as per the operation requirement. DPK filtration skids shall be
SAY
SAY
SAY

sized to handle a capacity of 45 to 200 MBD and will be a completely vendor


designed skid
ENGG CERT

ASH
ASH
ASH

The scope for Filtration Skid is outlined in PFD VA-247843.001 and P&IDs VA-
LEADS

LEADS
LEADS
ALL

ALL
ALL

247915.001. CONTRACTOR shall develop a detailed P&ID after vendor


information during detail design and CONTRACTOR shall make sure the
design shall meet the requirement of SAES-A-302 Aviation fuel quality
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

assurance design requirement

Conductivity Enhancer Injection Skid


DESCRIPTION

Conductivity enhancer injection skid shall be provided at YDH to enhance


conductivity of DPK. The conductivity enhancer injection skid is proposed to be
a complete vendor skid. The injection shall be provided on the inlet line to DPK
storage tanks from receiving manifold. Provision shall also be provided for
injection to the suction of the booster pumps in view of conductivity reduced in
the product due to filtration or aging. The conductivity enhancer injection
system shall be a complete vendor skid with tank and injection pumps.
The scope for the conductivity enhancer injection Skid is outlined in PFD
10-02399-

VA247835-001 and P&IDs VA247892-001. CONTRACTOR shall develop a


JO/EWO

10-02399-
10-02399-
0001

0001
0001

detailed P&ID after receiving vendor information during detail design.


12/11/16
08/04/16

09/08/16
DATE

Static Dissipative Additive (SDA) Injection Skid

Static Dissipative Additive (SDA) injection skid shall be provided at YDH to


NO.
REV

D
C
B

DISCIPLINE
reduce the static charge accumulation in DO. The SDA injection skid is
ENGINEER proposed to be a complete vendor skid. The injection shall be done on the inlet
ALL LEADS
line to DO storage tanks from distribution manifold. The static dissipative
DATE: 12/11/16
PROJECT
additive injection system shall be a complete vendor skid with tank and
ENGINEER
injection pumps.
A M ALMATROOK

DATE: 12/11/16 The scope for the static dissipative additive injection Skid is outlined in PFD
CERTIFIED
AMR EL SHARKAWY
VA247835-001 and P&IDs VA247893-001. CONTRACTOR shall develop a
12/11/16
detailed P&ID after receiving vendor information during detail design.
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Process Automation and Communications
DATE: 12/11/16
OPERATIONS
TMS with Distributed Control System (DCS) shall be provided for the control
ALI H GHAMDI
and logic functions required to operate YDH. The TMS-DCS shall also be
12/11/16
DATE: interfaced with subsystems such as the Emergency Shutdown System (ESD),
CONTROL NUMBER

Vibration Monitoring System (VMS), Radar Tank Gauging System (RTG), Fire
VERIFICATION

& Gas Detection System (FDS), and Custody Monitoring System (CMS) and
EDSD

other Third party controls within YDH. All the relevant communication, process
DATE:

parameters and status shall be interlinked between Yanbu, YASREF, SAMREF


BY:

refineries, MARAFIQ & YDH.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

4.3.2 Yanbu to Jiddah Pipeline


(DCC) NO. _____________________

The YNJ-1/2 pipeline system shall tie-in with YDH at downstream of shipper
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 39


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
pump after the PCVs. The battery limit will be the tie-in flange provided by YDH
SAY
SAY
SAY

in the scraper launcher lateral line for YNJ-1 / YNJ-2 and the flanges provided
in the delivery manifold for the central region pipeline. As YDH is a greenfield
ENGG CERT

ASH
ASH
ASH

development, the planning of both the YNJ-1/2 pipeline system and YDH shall
consider each other in the design as well as future plans for the facilities within
LEADS

LEADS
LEADS
ALL

ALL
ALL

YDH.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

4.3.2.1 Mechanical
DESCRIPTION

The project construction interface point shall be a flange connection at the


pipeline scraper launcher. The design interface point shall be at the tank outlet
flange because the system hydraulic modelling shall be included in the scope
of the YNJ-1/2 pipeline project, BI-10-02155 Industrial drainage system piping
shall take into account YNJ-1/2 Pipeline System drainage requirements.

4.3.2.2 Electrical

YDH 480V systems shall provide power to the panel board located at the
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Scraper Launcher area within YDH battery limit. The 480V panel board shall
be provided by BI-10-02155.
12/11/16
08/04/16

09/08/16
DATE

4.3.2.3 Non-Electrical Utilities


NO.
REV

D
C
B

DISCIPLINE The YNJ-1/2 pipeline project, BI-10-02155, shall provide information required
ENGINEER
ALL LEADS for the sizing, not design, of the non-electrical facilities included in YDH project
DATE: 12/11/16
scope, BI-10-02399. The non-electrical utility systems include, but are not
PROJECT
ENGINEER
limited to:
A M ALMATROOK

DATE: 12/11/16 • Potable water system


CERTIFIED • Fire protection system

AMR EL SHARKAWY

12/11/16
Industrial drainage (oily water) system
DATE: • Storm water drainage
CONSTRUCTION
AGENCY • Sewerage system
SHAHZAD YAZDANI

DATE: 12/11/16
OPERATIONS
4.3.2.4 Buildings
ALI H GHAMDI

12/11/16 There are no anticipated interfaces for the building scope at YDH.
DATE:
CONTROL NUMBER
VERIFICATION

4.3.2.5 Process Automation and Communications


EDSD

Process Automation systems for YDH and YNJ-1/2 pipelines should synergize
DATE:
BY:

engineering design, construction and/or start-up to ensure cost effective and


REVISIONCERTIFICATION

safe commissioning and start-up.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 40


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.3.3 Yanbu to Central Region Pipeline
SAY
SAY
SAY

The pipeline system shall tie-in with YDH at each respective product header
ENGG CERT

ASH
ASH
ASH

line downstream of any tankage and upstream of the pipeline booster pumps.
The detailed planning of the pipeline connection shall occur at a future date
LEADS

LEADS
LEADS
ALL

ALL
ALL

when the project plan is initiated and further developed. At this time, YDH shall
consider general provisions for the pipeline connection.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

4.3.4 Communications / IT
DESCRIPTION

The communications system shall interface to existing SAUDI ARAMCO (SA)


communication infrastructure for Voice, Plant Dedicated Network (PDN),
Corporate IT, data centers, mobile radio and security. The project shall provide
the necessary interface cards in the telecommunications equipment and cables
to provide the connectivity to the networks as required.

• The single mode fiber (per 18-SAMSS-625) connections to the Yanbu’


area refineries will be provided under this project. Connectivity of YDH
10-02399-
JO/EWO

10-02399-
10-02399-
0001

to Yanbu NGL will terminate first to Yanbu Refinery Admin Bldg. 1401.
0001
0001

• The YDH Package shall reserve rack space location at Engineering and
12/11/16
08/04/16

09/08/16

Maintenance Building for Pipeline FOC patch panel provided under BI-
DATE

10-2155
• The YDH Package shall reserve duct bank at Engineering and
NO.
REV

D
C
B

Maintenance Building for Pipeline FOC cable provided under BI-10-


DISCIPLINE
ENGINEER 2155
ALL LEADS • The process automation traffic shall be transmitted through dedicated
DATE: 12/11/16 fiber strands, PDN segregated from the corporate IT data network.
• The IT and security systems traffic shall be transmitted through the
PROJECT
ENGINEER

A M ALMATROOK corporate IT data network. PDN should meet SAEP-99 as a minimum


DATE: 12/11/16 requirement.
AMR EL SHARKAWY
CERTIFIED
• The telephone services shall be IP based and provided through the
12/11/16 VoIP call control systems core servers in Dhahran and Abqaiq.
DATE:
CONSTRUCTION
• Mobile radio shall be based on Terrestrial Trunked Radio (TETRA)
AGENCY technology.
• The security systems will be interfaced to Yanbu Regional Security
SHAHZAD YAZDANI

DATE: 12/11/16
OPERATIONS
Control Center (YRSCC).
ALI H GHAMDI

12/11/16
4.3.5 MARAFIQ
DATE:
CONTROL NUMBER
VERIFICATION

Electrical
EDSD

The electrical interface includes a 115 kV power connection with GIS at


DATE:

MARAFIQ’s Substation #9I, which is located about 3.85 km away from the
BY:

proposed YDH. Refer to Cable Routing drawing EL-A10150.001,EL-


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

A10130.001-004.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 41


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Non-Electrical Utilities
SAY
SAY
SAY

This BI will also interface with MARAFIQ utilities. The scope development
ENGG CERT

ASH
ASH
ASH

design activities will coordinate with MARAFIQ to finalize a formal agreement.


LEADS

LEADS
LEADS
ALL

ALL
ALL

The non-electrical utility Interfaces include:


• Potable water system
• Fire protection system
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

• Sanitary sewer
• Storm water drainage (MARAFIQ channels)
DESCRIPTION

4.3.6 Yanbu Royal Commission (YRC)

All pipelines, power cables and fiber optic cables connecting YDH to the
previously mentioned interfaces (SAMREF, YASREF, YR, MARAFIQ and
YNGL) are within Yanbu Royal Commission jurisdictions.

CONTRACTOR shall comply with Yanbu Royal Commission (YRC) Standards


and regulations for any scope related to YRC and MARAFIQ.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

4.4 PROJECT OPERATING INTERFACES


12/11/16
08/04/16

09/08/16
DATE

This project shall coordinate construction activities with the respective refineries,
pipeline construction, OSPAS and Domestic Sales & Logistics (DS&LD) departments.
NO.
REV

D
C
B

Scheduling for refinery shutdowns and other critical operations shall be developed
DISCIPLINE
ENGINEER during the detail design and shall be included in the Project Execution Plan. Pre-
ALL LEADS commissioning, shutdown, commissioning and startup procedures shall be
DATE: 12/11/16 implemented in such a manner that disruptions to continuing refinery operations are
PROJECT
ENGINEER minimized. All shutdowns shall be coordinated with related companies and
A M ALMATROOK departments for review and scheduling of work. Any changes in approved T&I
DATE: 12/11/16 schedules shall be coordinated with OSPAS.
CERTIFIED
AMR EL SHARKAWY

12/11/16
4.5 DEMOLITION ACTIVITIES
DATE:
CONSTRUCTION
AGENCY A. GENERAL
SHAHZAD YAZDANI

DATE: 12/11/16 The demolition activities in this project will be limited to the demolition required
OPERATIONS
for tie-in to the existing piping in:
ALI H GHAMDI

12/11/16 • Yanbu refinery for the terminal unloading line and existing pump
DATE:
headers.
CONTROL NUMBER
VERIFICATION

• SAMREF for the product pipeline tie-in.


EDSD

• MARAFIQ tie-in points for utilities (water supply, sanitary and oily water)
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

CONTRACTOR shall identify the required demolitions for tie-in during detail
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

design and construction.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 42


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. PIPING
SAY
SAY
SAY

CONTRACTOR shall be responsible for demolishing the following facility


ENGG CERT

ASH
ASH
ASH

components:
LEADS

LEADS
LEADS
ALL

ALL
ALL

YANBU REFINERY
• Demolition of existing Gasoline, DO & DPK pipeline (approx. 1m to 1.5m
length) for new tie-in connection for Product pipelines from YR Terminal per
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

SAUDI ARAMCO standards.


• To install new feed line for Gasoline(PG91/PG95) to YDH ,Tie-in at the 18”
common header of Gasoline loading and Transfer pumps(V25-P-P17 A-
E)to be taken at Yanbu Refinery near Pump Station-C
DESCRIPTION

• To install new feed line for Kerosene (DPK) to YDH, Tie-in at the 20”
common header of Kerosene loading and Transfer pumps(V25-P22 A/B/C)
to be taken at Yanbu Refinery near Pump Station-B.
• To install new feed line for Diesel (DO) to YDH ,Tie-in at the 20”MDO
common header of Diesel loading and Transfer Pumps(V25-P24-A/B/C) to
be taken at Yanbu Refinery near Pump Station-B.
• Refer below mentioned demolition piping plan drawings.
• VA236952D-001, VA236952D-002, VA236956D-001, VA236956D-002 and
VA236960D-002.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

SAMREF REFINERY
12/11/16
08/04/16

09/08/16
DATE

• Demolition of existing Gasoline, DO & DPK pipeline (approx. 1m to 1.5m


length) for new tie-in connection for product pipelines from SAMREF
NO.
REV

D
C
B

DISCIPLINE
Refinery per SAUDI ARAMCO standards.
ENGINEER


ALL LEADS
These tie-ins are required to transfer products from SAMREF to YDH from
DATE: 12/11/16
PROJECT
existing product export pumps (DO, PG 91, 95 & DPK) at the SAMREF
ENGINEER
refinery.
A M ALMATROOK

DATE: 12/11/16
CERTIFIED
• Refer demolition piping plan drawings. PIA00438D-001
AMR EL SHARKAWY

DATE:
12/11/16 YASREF REFINERY
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
• No Demolition is required at the YASREF. Tie-in will be provided by other
DATE: 12/11/16
BI-10-00043 inside the Yanbu refinery
OPERATIONS
ALI H GHAMDI • These tie-ins are required to transfer products from YASREF to YDH from
12/11/16
DATE: existing product export pumps (DO & PG 91,95) at the YASREF refinery.
CONTROL NUMBER
VERIFICATION
EDSD

NEW GRASS ROOT YANBU REFINERY


DATE:


BY:

It is future refinery, at present there is no interface scope.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 43


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
General Requirement:
SAY
SAY
SAY

Tie-in connections:
ENGG CERT

ASH
ASH
ASH

CONTRACTOR to provide construction tie-in package with regard to location,


LEADS

LEADS
LEADS
ALL

ALL
ALL

orientation, dimensions, etc., prior to final fabrication.

CONTRACTOR shall verify each tie-in with regard to location, orientation,


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

dimensions, etc., prior to final fabrication.

CONTRACTOR shall assist SAUDI ARAMCO to isolate product lines & re-
commission each system to be tied into.
DESCRIPTION

CONTRACTOR shall submit to SAUDI ARAMCO, for approval specific


procedures and sequences for tie-ins to existing facilities and to new facilities.
The tie-in procedures are to be submitted fourteen (14) days in advance of the
planned tie-in date.

CONSTRUCTION CONTRACTOR shall perform tie-ins to existing facilities as


stipulated in the project. For interface with other BI’s CONTRACTOR is
mandated to closely co-ordinate with other BI’s to ensure that all agreed
10-02399-
JO/EWO

10-02399-
10-02399-
0001

interfaces are covered and performed. Refer to interfaces are covered and
0001
0001

performed.
12/11/16
08/04/16

09/08/16
DATE

Refer to Tie-in index drawings for YANBU, PI-B00401.001/002/003/004.


Refer to Tie-in index drawing for YASREF, PIB00451-001.
NO.
REV

D
C
B

Refer to Tie-in index drawing for SAMREF, PIB00434-001.


DISCIPLINE
ENGINEER
ALL LEADS

DATE: 12/11/16 C. CIVIL


PROJECT
ENGINEER

A M ALMATROOK • CONTRACTOR shall provide demolition drawing for the demolition of existing
DATE: 12/11/16 asphalt road and paving and or concrete paving in location where pipelines
CERTIFIED
AMR EL SHARKAWY
redundant in open cut road crossings are to be installed.
12/11/16
DATE:
CONSTRUCTION
AGENCY
• CONTRACTOR shall provide civil and structural drawings for all the required
SHAHZAD YAZDANI road crossings and fence penetration for laying the product pipelines, electrical
DATE: 12/11/16 & instrument cables.
OPERATIONS
ALI H GHAMDI

12/11/16
• CONTRACTOR shall determine other demolition activities during detail design
DATE:
stage, which have not been included in this demolition scope.
CONTROL NUMBER
VERIFICATION

• Roads that are demolished for the above reasons will be backfilling following
EDSD

SAES-A-114 and reinstated after the under pavement work is completed.


DATE:
BY:

Work shall be in accordance with SAES-Q-006 clause 6, Pavement


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Reconstruction after trenching.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 44


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.6 Receipt Pipeline and Connections
SAY
SAY
SAY

A. GENERAL
ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall design and install the product receiving station in YDH
LEADS

LEADS
LEADS
ALL

ALL
ALL

including, but not limited to the following facilities:

• Four product receiving and distribution manifolds, one each for PG 95,
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

PG 91, DO & DPK


• One Slop manifold
• Provision for connections in the receiving manifolds for two product
DESCRIPTION

pipelines from YASREF


• Provision for connections in the receiving manifolds for three product
pipelines from SAMREF
• Provision for connections in the receiving manifolds for three product
pipelines from Yanbu Refinery Terminal (YRT) via Yanbu Refinery (YR)
• Provision in the receiving manifolds for future connection of PG 91/95,
DO & DPK from Yanbu Grass root refinery
• Two dye injection skids for PG 95 and PG 91 at YDH
• Conductivity enhancer injection skid for DPK at YDH

10-02399-
JO/EWO

10-02399-

Static Dissipative Additive (SDA) injection skid for DO at YDH


10-02399-
0001

0001
0001

• Three custody metering skids with two provers (1 for PF/DO & 1 for
DPK) and densitometer at YDH (for YRT products)
12/11/16
08/04/16

09/08/16
DATE

• Surge relief protection for all eight inbound pipelines from all 3 sources
(SAMREF, YASREF & YR)

NO.
REV

Interface management system


D
C
B

DISCIPLINE
ENGINEER
ALL LEADS The receipt manifolds shall be sized for the maximum flow rate of a single
DATE: 12/11/16 refinery supply and the manifold is not expected to receive the same
PROJECT
ENGINEER
product from two sources simultaneously. The manifolds shall be
A M ALMATROOK
connected to all the three product sources at the upstream and to
DATE: 12/11/16
respective storage tanks at the downstream. CONTRACTOR shall provide
CERTIFIED Process interlocks to the manifold valves to receive the product from one
AMR EL SHARKAWY
source at a time. Provision for connecting the future GR refinery shall be
12/11/16
DATE: provided in all receipt manifolds.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI The product and slop manifolds shall be of 30” size and for each manifold
DATE: 12/11/16 CONTRACTOR shall provide the provision for extension in future. Each of
OPERATIONS the manifold inlet and outlet lines shall be equipped with motor operated
ALI H GHAMDI
valves and the segregation of the batches between PG 95 and PG 91 shall
12/11/16 be through a batch management system. Manifold inlet lines shall also be
DATE:
CONTROL NUMBER

equipped with ZV.


VERIFICATION
EDSD

Conductivity enhancer injection skid shall be installed to inject the chemical


for enhancement of conductivity of DPK. The additives shall be injected to
DATE:
BY:

the main line from DPK receiving manifold to DPK storage tanks and also to
REVISIONCERTIFICATION

DPK main line from DPK storage tanks to booster pumps. Details of
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Conductivity enhancer injection skid shall be finalized after vendor


C

(DCC) NO. _____________________

information during detail design.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 45


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Static Dissipative Additive (SDA) injection skid shall be installed to inject the
SAY
SAY
SAY

chemical to reduce the static charge of DO. The additives shall be injected
ENGG CERT

ASH
ASH

to the main line from the DO receiving manifold to the DO storage tanks.
ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

Three custody metering skids each dedicated for PG95/PG91, DO and


DPK shall also be installed at YDH for YRT products. Each metering skid
shall consist of 4 meter runs (3 operating and 1 standby), prover assembly
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

and densitometer. Prover shall be common for PG 91 , PG 95 and diesel,


whereas one prover will be dedicated for DPK.
DESCRIPTION

Red and green dye injection skids shall be installed at YDH for the coloring
of PG 95 and PG 91 products from all sources. The red and green dye shall
be injected to the main line from the PG-95/91 receiving manifold to the
PG-95/91 storage tanks respectively.

All eight inbound pipelines from all 3 sources (SAMREF, YASREF & YR)
shall be protected for surge relief and will relief into surge relief tank at
YDH. Each inlet line shall have two SRVs with its isolation valves and a
10-02399-
JO/EWO

10-02399-
10-02399-

thermal relief valve.


0001

0001
0001

12/11/16

The scope for the product receiving station is outlined in PFD VA-
08/04/16

09/08/16
DATE

247835.001 & VA-247949.001 and P&IDs VA-247891.001 to VA-


247897.001 & VA-247929.001.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
The details of the batch management system are outlined in Section B
ALL LEADS instrumentation.
DATE: 12/11/16
PROJECT
ENGINEER B. INSTRUMENTATION
A M ALMATROOK

DATE: 12/11/16
CERTIFIED • THE CONTRACTOR shall provide and install cables IC-0952/0610
AMR EL SHARKAWY
& IC-0953/0611 from red and green dye injection controller to DCS,
12/11/16
DATE: the connection to Skid controller shall be over Modbus Serial.
CONSTRUCTION
AGENCY Cables IC-0959 & IC-0960 shall be provided to ESD system as
SHAHZAD YAZDANI hardwire connection. For details refer block diagram IN-A00001.010
DATE: 12/11/16
OPERATIONS
• THE CONTRACTOR shall provide and install cable IC-0956 from
ALI H GHAMDI
Conductivity Enhancer Injection Skid controller to DCS, the
12/11/16
DATE: connection to Skid controller shall be over Modbus Serial. For
CONTROL NUMBER

details refer block diagram IN-A00001.010


VERIFICATION
EDSD

• THE CONTRACTOR shall provide and install cable IC-0957 from


DATE:

SDA Injection Skid controller to DCS, the connection to Skid


BY:

controller shall be over Modbus Serial. For details refer block


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

diagram IN-A00001.010
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C


(DCC) NO. _____________________

THE CONTRACTOR shall provide and install field instruments for


Gasoline P95/91 at receiving manifold as indicated in P & ID# VA-
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 46


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
247894.001 and Block Diagram IN-A00002.017
SAY
SAY
SAY

• THE CONTRACTOR shall provide and install branch cables from


ENGG CERT

ASH
ASH
ASH

field instruments to junction boxes X40-AJB-2033/DJB-1037/EAJB-


4027/EDJB-3022 as per Block Diagram IN-A00002.017.
LEADS

LEADS
LEADS
ALL

ALL
ALL

• THE CONTRACTOR shall provide and install homerun cables IC-


0790/0797/0798/0805/0806 from junction boxes X40-AJB-
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

2033/DJB-1037/EAJB-4027/EDJB-3022 to DCS/ESD Remote I/O


Marshalling Cabinets located in RIB-1 as per Block Diagram IN-
A00002.017.
DESCRIPTION

• THE CONTRACTOR shall provide and install field instruments for


DO/DPK at receiving manifold as indicated in P & ID# VA-
247895.001/ VA-247896.001/ VA-247897.001 and Block Diagram
IN-A00002.018

• THE CONTRACTOR shall provide and install branch cables from


field instruments to junction boxes X40-AJB-2034/DJB-1038/EAJB-
4028/EDJB-3023 as per Block Diagram IN-A00002.018.
10-02399-
JO/EWO

10-02399-
10-02399-
0001


0001
0001

THE CONTRACTOR shall provide and install homerun cables IC-


0832/0838/0839/0849/0850/0851 from junction boxes X40-AJB-
12/11/16
08/04/16

09/08/16
DATE

2034/DJB-1038/EAJB-4028/EDJB-3023 to DCS/ESD Remote I/O


Marshalling Cabinets located in RIB-1 as per Block Diagram IN-
A00002.018.
NO.
REV

D
C
B

DISCIPLINE
• THE CONTRACTOR shall provide and install field instruments for
ENGINEER slop manifold as indicated in P & ID# VA-247897.001 and Block
ALL LEADS
Diagram IN-A00002.019.
DATE: 12/11/16
PROJECT
ENGINEER • THE CONTRACTOR shall provide and install branch cables from
A M ALMATROOK
field instruments to junction boxes X40-DJB-1039/DJB-1040 as per
DATE: 12/11/16 Block Diagram IN-A00002.018.
CERTIFIED
AMR EL SHARKAWY

12/11/16 • THE CONTRACTOR shall provide and install homerun cables IC-
DATE:
CONSTRUCTION 0856/0857/0862/0863 from junction boxes X40-DJB-1039/DJB-1040
AGENCY
SHAHZAD YAZDANI
to DCS Remote I/O Marshalling Cabinets located in RIB-1 as per
Block Diagram IN-A00002.019.
DATE: 12/11/16
OPERATIONS • THE CONTRACTOR shall provide and install custody metering
ALI H GHAMDI
skids X40-U-0014A/B/C for Gasoline-P91/95, DO & DPK and
12/11/16 provers X40-U-0014D/E inside YDH facility at the location indicated
DATE:
in facility plot plan. The skids shall be vendor supplied, cable
CONTROL NUMBER
VERIFICATION

between field instrument, junction boxes and marshaling cabinet


EDSD

shall be vendor supplied.


• THE CONTRACTOR/SKID VENDOR shall supply and install
DATE:
BY:

metering shelter to house metering and control cabinets. Contractor


REVISIONCERTIFICATION

shall integrate metering shelter F & G to DCS system.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

• Refer block diagram IN-A00001.003 for YDH CMS overview and IN-
(DCC) NO. _____________________

A 00002.020 metering MOVs. The preliminary custody metering

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 47


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
design is indicated in P &IDs VA-247886-001 to VA247890-001.
SAY
SAY
SAY

• THE CONTRACTOR/VENDOR shall provide and install cables


ENGG CERT

ASH
ASH
ASH

between metering skid junction boxes to metering shelter control


panels. The quantity and type cables shall be provided by skid
LEADS

LEADS
LEADS
ALL

ALL
ALL

vendor to LSTK.
• CMS shall be interfaced to DCS over Modbus TCP/IP, fiber optic
cables shall be provided to connect to DCS system located in rack
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

room of operations building.


• All branch cables shall be through conduit and homerun cables shall
run on the cables trays provided on pipe sleepers.
DESCRIPTION

• Communications with all third party control system shall be


redundant.
• Reference drawings:
Drawing # Description
IN-A00001 System Block Diagrams
IN-A00002 Instrument Block Diagrams
IN-A00027 Instrument Points & Lines
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

IN-D00201 Instrument Installation Schedule-Flow


IN-D00202 Instrument Installation Schedule-Pressure
12/11/16
08/04/16

09/08/16
DATE

IN-D00203 Instrument Installation Schedule-Level


IN-D00204 Instrument Installation Schedule-Temperature
NO.
REV

D
C
B

IN-D00205 Instrument Installation Schedule-Misc


DISCIPLINE
ENGINEER IN-D00206 Instrument Installation Schedule-MOV/GOV/HOV/AOV
ALL LEADS
IN-D00207 Instrument Installation Schedule-Relief Valves
DATE: 12/11/16
PROJECT
ENGINEER
IN-A00004 Equipment Layouts
A M ALMATROOK IN-A00003 Cable Routing Plan
DATE: 12/11/16 IN-D00005 Cable and Conduit Schedule
CERTIFIED
AMR EL SHARKAWY

12/11/16
DATE:
CONSTRUCTION
AGENCY
C. COMMUNICATION
SHAHZAD YAZDANI

DATE: 12/11/16 • CONTRACTOR shall provide FO cable infrastructure to be installed


OPERATIONS for Metering System connectivity to YASREF Control System,
ALI H GHAMDI SAMREF Control System, and YRT Control System All terminations
DATE:
12/11/16 will be done on proposed 12-core fiber patch panels except for
Yanbu Refinery where 48-core fiber will be used.
CONTROL NUMBER
VERIFICATION

• CONTRACTOR shall provide one (1) analog telephone each inside


EDSD

YASREF Control System, SAMREF Control System, and YRT


DATE:

Control System to be connected to existing Saudi Aramco


BY:

Telephone Network via the proposed network of YDH.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Drawing # Description
(DCC) NO. _____________________

CO-A10002 Cable Routing Plan – YDH –YREF, YASREF & SAMREF

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 48


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CO-A10003 Instrument Connection/Interconnection Diagram - YREF,
SAY
SAY
SAY

YASREF & SAMREF


CO-A10029 Schematic Diagram Analog Telephone System
ENGG CERT

ASH
ASH
ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

D. CIVIL


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall provide Oily water system to collect oily water


ISSUED FOR 90% PROJECT PROPOSAL

from this facility.


• CONTRACTOR shall provide Utility/potable water connection for
DESCRIPTION

washing, eye wash and shower.


• CONTRACTOR shall provide sealed catch basin.
• CONTRACTOR shall provide storm water system.

E. PIPING

The design and installation of product receiving manifold in YDH shall


include, but not limited to the following facilities:
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

• Piping shall provide Dedicated product receipt manifold from the


12/11/16
08/04/16

09/08/16
DATE

source refineries consist of total four (04) receipt manifold


connecting eight pipelines carrying PG95/PG91/DO & DPK near
NO.
REV

battery limit of YDH/RC corridor on west side of plot(Refer Plot plan


D
C
B

DISCIPLINE
ENGINEER
No.PI-A00001-001)
ALL LEADS • This manifold connected to all the three product sources on the
DATE: 12/11/16 upstream side of the facility to respective storage tanks on the
PROJECT
ENGINEER downstream side of the facility.

A M ALMATROOK
Pipelines at Receipt manifold provided with structural
DATE: 12/11/16
CERTIFIED supports/Operating platforms to operate control valves/ZVs/PZVs &
AMR EL SHARKAWY
Isolation valves.
12/11/16
DATE: • The Product and slop manifold shall be provided with future
CONSTRUCTION
AGENCY connections with Isolation valves.
SHAHZAD YAZDANI
• The pipeline for three custody metering skids each is dedicated for
DATE: 12/11/16
OPERATIONS PG95/PG91, DO and DPK, also two provers shall be provided near
ALI H GHAMDI Receipt manifold.
DATE:
12/11/16 • Pipeline for Red and Green dye injection skids shall be installed at
CONTROL NUMBER

YDH for product identification for products received from all source
VERIFICATION

refineries
EDSD

• SDA injection skid and Conductivity enhancer skid located near


DATE:
BY:

metering skid.

REVISIONCERTIFICATION

The piping layout for Receipt manifold, Custody metering skids are
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

shown in Piping plan as per Drawing control sheet.



(DCC) NO. _____________________

Piping layout for Dye injection, SDA & Conductivity enhancer skid
are mainly small bore lines, which to be carried during detail design.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 49


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

CONTRACTOR shall design and install the product receiving manifold in YDH
ENGG CERT

ASH
ASH

as per drawings issued DCL.no.GEN-D0001 including, but not limited to the


ASH

following facilities:
LEADS

LEADS
LEADS
ALL

ALL
ALL

• CONTRACTOR shall perform Piping Design, Procurement,


Fabrication, Transportation, Erection, Installation, Testing,
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Inspection, Pre commissioning and Commissioning support for the


following piping system in accordance with the latest edition of
SAUDI ARAMCO Engineering Standards & Specifications and other
DESCRIPTION

applicable International Codes and Standards:


• Distribution manifold of four products and slops shall be routed to
associated facilities inside YDH limit in accordance with project
drawings listed in document control list.
• All new piping from Battery limit of RC Corridor to New storage Tank
feeding to the booster pumps as per Project P&IDs and Piping Plans
listed in DCL.
• Hydraulics & surge analysis of the pipeline system shall be provided
10-02399-
JO/EWO

10-02399-
10-02399-
0001

by the contractor and approved prior to laying and installation of the


0001
0001

pipeline system.
12/11/16
08/04/16

09/08/16


DATE

Surge relief system for the pipelines along with associated pumps
and connections shall be covered under contractor’s scope of work.
• Pipe supports/platforms/elevated structures as per piping plans and
NO.
REV

D
C
B

DISCIPLINE other project documents. Requirement of additional supports not


ENGINEER
ALL LEADS covered in the proposal drawings but required to complete the
DATE: 12/11/16 project shall be include in CONTRACTOR scope
PROJECT
ENGINEER • Overall dimensions of all CONTROL VALVES,ZVs/MOVs/PZVs/SP
A M ALMATROOK
items shown in piping plan are preliminary only, contractor to verify
DATE: 12/11/16
CERTIFIED final dimensions and all piping drawings, size, elevation of operating
AMR EL SHARKAWY
platforms, lifting arrangement to be executed during detail design by
12/11/16
DATE: THE CONTRACTOR.

CONSTRUCTION
AGENCY Insulating gaskets and stud bolds at interface with pipelines shall be
SHAHZAD YAZDANI
within piping CONTRACTOR scope.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
4.7 Yanbu’ Distribution Hub Tank Farm and Support Infrastructure
12/11/16
DATE:
Yanbu’ distribution hub tank farm and support infrastructure consists of the
CONTROL NUMBER
VERIFICATION

following facilities:
EDSD

GENERAL
DATE:
BY:

• Product storage tanks


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Slop System
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

• Surge Relief System


(DCC) NO. _____________________

• DPK Filtration Skid

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 50


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Hydrocarbon Drain System
SAY
SAY
SAY

• Metering System
ENGG CERT

ASH
ASH
ASH

NON-ELECTRICAL UTILITIES
LEADS

LEADS
LEADS
ALL

ALL
ALL

• Potable water system


• Fire protection system
• Industrial drainage (oily water) system
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

• Sanitary sewer
• Storm water drainage
• Evaporation Pond
DESCRIPTION

• Oily water treatment system

A. GENERAL

Product Storage Tanks

The product tanks shall be constructed as a separate construction package in the


distribution hub (YDH) and is not included in this scope of THE CONTRACTOR;
10-02399-

however CONTRACTOR shall provide automatic tank dewatering system, the


JO/EWO

10-02399-
10-02399-
0001

0001
0001

required instrumentation and piping requirements as specified in the piping, and


instrumentation sections of this document. Refer to Appendix 6 for YDH Storage
12/11/16
08/04/16

09/08/16
DATE

Tanks Package (by Others).

The product split, the type and the capacities for the tanks to be constructed in
NO.
REV

D
C
B

DISCIPLINE
Yanbu’ distribution hub are summarized in the table below.
ENGINEER
ALL LEADS
Tank Size-
DATE: 12/11/16
Total Capacity
Working Number Design Design MDMT
PROJECT Tank Type Working
ENGINEER Volume m³ of Tanks Pressure Temp. (⁰C) (⁰C)
A M ALMATROOK Volume m³ (MB)
(MB)
DATE: 12/11/16
CERTIFIED External
PG 91 27,658 (174) 3 82,974 (522) Atm 75 0
AMR EL SHARKAWY Floating roof
12/11/16
DATE:
CONSTRUCTION
AGENCY External
PG 95 27,658 (174) 3 82,974 (522) Atm 75 0
SHAHZAD YAZDANI Floating roof
DATE: 12/11/16 Fixed Dome
OPERATIONS DO 40,842 (256.9) 3 122,526 (770.7) Atm 75 0
roof
ALI H GHAMDI
Internal
12/11/16 DPK 40,228 (253) 1 Atm 75 0
DATE:
Floating roof
CONTROL NUMBER

121,552 (764.5)
VERIFICATION

Internal
DPK 27,108 (170.5) 3 Atm 75 0
EDSD

Floating roof
Internal
DATE:

DO/DPK 53,132 (334.2) 1 53,132 (334.2) Atm 75 0


BY:

Floating Roof
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Note: The tank capacities are provided to meet the 85% of nominal volume
(DCC) NO. _____________________

specified per the project scoping paper.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 51


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

Slop System
ENGG CERT

ASH
ASH
ASH

Slop system shall be consisting of two slop tanks (by others) and two slop pumps
LEADS

LEADS
LEADS
ALL

ALL
ALL

(one operating, one spare) with necessary instrumentation and piping. Two slop
tanks each of 13,514 m³ (85 MB) working capacity shall be provided to handle the
intermix products from the pipeline, slops from the oily water treatment and surge
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

relief tank. The design parameters for the slop tank shall be as follows:
DESCRIPTION

Total Capacity,
Tank Size- Working Number of Working Design Design MDMT
Tank Type
Volume m3 (MB) Tanks Volume, m3 Pressure Temp. (⁰C) (⁰C)
(MB)
Internal
Slop 13514 (85) 2 27028 (170) Atm 75 0
Floating roof

The slop tanks shall be constructed as separate construction package in YDH


10-02399-
JO/EWO

10-02399-
10-02399-
0001

along with product storage tanks and is not included in this scope of The
0001
0001

CONTRACTOR; however CONTRACTOR shall provide tank dewatering system,


the required instrumentation and piping requirements as specified in the piping and
12/11/16
08/04/16

09/08/16
DATE

instrumentation sections of this document. Refer to Appendix 6 for YDH Storage


Tanks Package (by Others).
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
CONTRACTOR shall provide pumps to empty the slop tanks to product tanks and
ALL LEADS the slop product shall be blended with the finished product in in storage tanks
DATE: 12/11/16 without affecting the quality of the product. CONTRACTOR shall connect the slop
PROJECT
ENGINEER
tank pump discharge to individual tank inlet to avoid any product contamination
A M ALMATROOK
during transfer. Slop tank shall also be provided with a provision to connect to the
DATE: 12/11/16
DO /DPK booster pump suction, which enables YDH to pump the slop product to
CERTIFIED NJBP along with the intermix products.
AMR EL SHARKAWY

12/11/16
DATE: The scope for the slop system is outlined in PFD VA-247842.001 and P&IDs VA-
CONSTRUCTION
AGENCY
247912.001 to VA-247914.001.
SHAHZAD YAZDANI

DATE: 12/11/16
Surge Relief System
OPERATIONS
ALI H GHAMDI The following is a general scope narrative for the surge relief system:
12/11/16
DATE:
CONTRACTOR shall design and install surge relief systems for the YNJ-1 & YNJ-2
CONTROL NUMBER
VERIFICATION

pipelines per surge requirement from BI-10-02155 and for all the inbound pipelines
EDSD

from each source. A surge relief system consisting of a surge relief tank (by others)
and pumps shall be installed. The surge tank pump will transfer the surge volume
DATE:

to the slop tank. The central pipeline flowrate (400 MBD) is used as the basis for
BY:

the surge relief tank volume & line sizing. Accordingly, 30 minutes holdup of 400
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

MBD has been taken for surge tank sizing and 400 MBD for its inlet line sizing. The
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

surge relief system shall include the surge relief valves, the piping to the surge
(DCC) NO. _____________________

relief tank and the instrumentations. The surge relief tank shall be of 1,351 m³ (8.5

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 52


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
MB) capacity as specified below to cater the requirement of both YNJ-1 & YNJ-2
SAY
SAY
SAY

and future central region pipeline.


ENGG CERT

ASH
ASH
ASH

Total Capacity,
LEADS

Tank Size- Working Number of Working Design Design MDMT


LEADS
LEADS
ALL

ALL
ALL

Tank Type
Volume m3 (MB) Tanks Volume, m3 Pressure Temp. (⁰C) (⁰C)
(MB)
Surge Internal
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

1351 (8.5) 1 1351 (8.5) Atm 75 0


Relief Floating roof

CONTRACTOR shall provide tank dewatering and the required instrumentation


DESCRIPTION

piping and pumps as specified in instrumentation, piping and mechanical sections


of this document.

CONTRACTOR shall provide two transfer pumps (one operating, one spare) to
transfer the surge volumes to the slop tanks as necessary. The details of the pump
and piping requirements are specified in piping and mechanical rotating sections of
this document. The scope for the surge relief system is outlined in PFD VA-
247849.001 and P&IDs VA-247929.001 to VA-247930.001.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Similarly, like surge relief system at YDH, same systems shall also be provided at
12/11/16

SAMREF and YR.


08/04/16

09/08/16
DATE

At SAMREF, CONTRACTOR shall design and install surge relief systems for the
NO.
REV

D
C
B

SAMREF pipeline protection. A surge relief system consisting of a surge relief tank
DISCIPLINE
ENGINEER
and pumps shall be installed. The surge tank pump will transfer the surge volume
ALL LEADS to YDH via respective inbound pipeline from SAMREF to YDH. The SAMREF PG
DATE: 12/11/16 pipeline flowrate (554 MBD) is used as the basis for the surge relief tank volume &
PROJECT
ENGINEER line sizing. Accordingly, 30 minutes holdup of 554 MBD has been taken for surge
A M ALMATROOK tank sizing and 554 MBD for its inlet line sizing. The surge relief system shall
DATE: 12/11/16 include the surge relief valves, the piping to the surge relief tank and the
CERTIFIED instrumentations. The surge relief tank shall be of 1849 m³ (11.6 MB) capacity as
AMR EL SHARKAWY
specified below.
12/11/16
DATE:
CONSTRUCTION Total Capacity,
AGENCY Tank Size-
SHAHZAD YAZDANI Number of Working Design Design MDMT
Tank Type Working Volume
DATE: 12/11/16 Tanks Volume, m3 Pressure Temp. (⁰C) (⁰C)
OPERATIONS m3 (MB)
(MB)
ALI H GHAMDI
Surge Internal
12/11/16
DATE: Relief (at Floating 1849 (11.6) 1 1849 (11.6) Atm 75 0
CONTROL NUMBER
VERIFICATION

SAMREF) roof
EDSD

CONTRACTOR shall provide tank dewatering and the required instrumentation


DATE:
BY:

piping and pumps as specified in instrumentation, piping and mechanical sections


of this document.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall provide two transfer pumps (one operating, one spare) to
(DCC) NO. _____________________

transfer the surge volumes to YDH via respective inbound pipeline from SAMREF

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 53


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
to YDH. The details of the pump and piping requirements are specified in piping
SAY
SAY
SAY

and mechanical rotating sections of this document. The scope for the surge relief
system is outlined in PFD VA-247849.001 and P&IDs VA-247934.001 to VA-
ENGG CERT

ASH
ASH
ASH

247934.002.
LEADS

LEADS
LEADS
ALL

ALL
ALL

At YR, CONTRACTOR shall design and install surge relief systems for the
YASREF and YR pipeline protection. A surge relief system consisting of a surge
relief tank and pumps shall be installed. The surge tank pump will transfer the
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

surge volume to YDH via respective inbound pipeline from YR to YDH. The
YASREF DO pipeline flowrate (650 MBD) is used as the basis for the surge relief
tank volume & line sizing. Accordingly, 30 minutes holdup of 650 MBD has been
taken for surge tank sizing and 650 MBD for its inlet line sizing. The surge relief
DESCRIPTION

system shall include the surge relief valves, the piping to the surge relief tank and
the instrumentations. The surge relief tank shall be of 2,180 m³ (13.7 MB) capacity
as specified below.

CONTRACTOR shall provide tank dewatering and the required instrumentation


piping and pumps as specified in instrumentation, piping and mechanical sections
of this document.

CONTRACTOR shall provide two transfer pumps (one operating, one spare) to
10-02399-
JO/EWO

10-02399-
10-02399-
0001

transfer the surge volumes to YDH via respective inbound pipeline from YR to
0001
0001

YDH. The details of the pump and piping requirements are specified in piping and
12/11/16

mechanical rotating sections of this document. The scope for the surge relief
08/04/16

09/08/16
DATE

system is outlined in PFD PR-A00004.001 and P&IDs PR-A00001.001 to PR-


A00001.002.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
DPK Filtration Skid
ALL LEADS

DATE: 12/11/16 The CONTRACTOR shall provide a DPK filtration system to filter the off spec DPK
PROJECT
ENGINEER from the tanks. The DPK filtration is proposed to be a complete vendor skid with
A M ALMATROOK circulation pumps, pre filters and after filters. Normally, the filtration skid circulates
DATE: 12/11/16 into the same product tanks or to an empty DPK tank as per the operation
CERTIFIED requirement. . The DPK filtration skids shall be sized to handle a capacity of 45 to
AMR EL SHARKAWY
200 MBD and will be a completely vendor designed skid.
12/11/16
DATE:
CONSTRUCTION
AGENCY The preliminary scope for Filtration Skid is outlined in PFD VA-247843.001 and
SHAHZAD YAZDANI P&IDs VA-247915.001. CONTRACTOR shall develop detailed P&ID after vendor
DATE: 12/11/16 information during detail design and CONTRACTOR shall make sure the design
OPERATIONS shall meet the requirement of SAES-A-302 Aviation fuel quality assurance design
ALI H GHAMDI requirement.
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION

B. NON-ELECTRICAL UTILITIES
EDSD

The MARAFIQ battery limit will be the tie-in point at the RC corridor for potable
DATE:
BY:

water and sanitary waste water. MARAFIQ will be supplying the required quantity
of potable water and YDH will be discharging the industrial waste and sanitary
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

waste water to MARAFIQ network. CONTRACTOR shall make sure that the
C

receipt and discharge from / to MARAFIQ network is provided with the metering
(DCC) NO. _____________________

system as per the requirement of MARAFIQ.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 54


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

The non-electrical utility systems include, but are not limited to:
ENGG CERT

ASH
ASH
ASH

• Utility water system


• Sanitary sewer
LEADS

LEADS
LEADS
ALL

ALL
ALL

• Storm water drainage


• Fire protection system
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Utility water system

CONTRACTOR shall provide utility water tank for the storage and supply of utility
water. The utility water tank and pressure equipment pumps shall be separated
DESCRIPTION

from the Fire protection water tanks and equipment.

Utility water shall be provided from the MARAFIQ sweet water main. Adequate
metering system per the requirement of MARAFIQ will be provided for the metering
of utility water inflow.

Utility water will be supplied to the buildings, eyewash / safety showers, and YNJ-1
& YNJ-2 pipeline scraper launchers through utility water pumps (one operating,
one spare).
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall provide Metering system required for the receipt of utility
12/11/16
08/04/16

09/08/16

water per the requirement of MARAFIQ. The scope for the utility water system is
DATE

outlined in PFD VA-247847.001 and P&IDs VA-247924.001, 002.


NO.
REV

D
C
B

DISCIPLINE
ENGINEER
Oily Water Collection and Treatment system
ALL LEADS

DATE: 12/11/16 CONTRACTOR shall install two (2) oily water lift stations in Yanbu’ distribution hub
PROJECT
ENGINEER to facilitate the gravity drain of oily water from all sources.
A M ALMATROOK

DATE: 12/11/16 Oily water discharge from all identified sources shall be routed to the oily water lift
CERTIFIED stations.
AMR EL SHARKAWY

12/11/16
DATE: The rainfall water within the tank farm dikes is considered contaminated water and
CONSTRUCTION
AGENCY it will be collected by an oily water pipe system towards the oily water lift stations.
SHAHZAD YAZDANI

DATE: 12/11/16 In addition to the oily water drains from catch basins in the process area and storm
OPERATIONS
water inside of the tank dike, Oily water & DO storage tanks, sump shall also
ALI H GHAMDI
receive flammable tank dewatering, pure hydrocarbon drains from process areas,
12/11/16
DATE: and pumps. The details of hydrocarbon drain network are specified below under
CONTROL NUMBER

utilities section.
VERIFICATION
EDSD

Before water entering into the lift stations, the water shall pass through a sand
separator /trap which properly designed will retain sand particles from the sump
DATE:
BY:

pumps
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Each oily water lift station shall be provided with two pumps for normal flow (one
(DCC) NO. _____________________

operating, one spare) and two pumps for maximum flow (one operating, one
spare). The normal flow pumps will discharge to an oily water treatment system

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 55


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
whereas the maximum flow pump shall discharge to the Evaporation pond.
SAY
SAY
SAY

The details of the oily water lift station, instrumentation and details of pumps are
ENGG CERT

ASH
ASH
ASH

outlined in instrumentation and mechanical sections below.


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall provide an Oily water treatment system for the treatment of
oily water. The oily water treatment system shall be of a complete vendor skid
design and the treatment system shall receive the effluent from the oily water sump
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

via normal flow pump.

CONTRACTOR shall route the effluent from normal flow pumps to an equalization
tank which will discharge into the CPI Oily water treatment.
DESCRIPTION

The oily water treatment system shall receive the effluent from the normal flow
pump and the dewatered effluent from the product storage tanks. Before oily water
entering into the oily water treatment unit, it shall pass through an equalization
tank.

The oily water treatment system shall be of a complete vendor skid design. The
oily water treatment system shall consist of but is not limited to an oily water
equalization tank, CPI separator, water break tank, two effluent water pumps (one
10-02399-
JO/EWO

10-02399-
10-02399-
0001

operating, one spare), two skimmed oil pumps (one operating, one spare) and
0001
0001

necessary instrumentation and interconnecting piping. Pumps shall be provided to


transfer the recovered oil to the slop tank while effluent water to be transferred to
12/11/16
08/04/16

09/08/16
DATE

the YDH evaporation pond.


NO.
REV

D
C
B

The detail for the skid is outlined in mechanical section below. CONTRACTOR
DISCIPLINE
ENGINEER
shall provide the pump to transfer the recovered oil to the slop tank while effluent
ALL LEADS water to be transferred to the evaporation pond.
DATE: 12/11/16
PROJECT
ENGINEER The scope for the oily water system is outlined in PFD VA-247846.001 & VA-
A M ALMATROOK 247848.001 and P&IDs VA-247921.001 to VA-247923.001 CONTRACTOR shall
DATE: 12/11/16 develop detailed P&ID after vendor information during detail design.
CERTIFIED
AMR EL SHARKAWY

12/11/16
DATE: Hydrocarbon Drain System
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall make sure that a separate drain network Drains from the
DATE: 12/11/16 product tanks, manifolds, scraper launchers and pump stations will be routed to
OPERATIONS
the oily water lift stations in a separated network from the other oily water
ALI H GHAMDI
resources.
12/11/16
DATE:
CONTROL NUMBER

Utility water system


VERIFICATION
EDSD

Utility water shall be provided from the MARAFIQ sweet water main. Adequate
metering system per the requirement of MARAFIQ will be provided for the
DATE:
BY:

metering of utility water inflow. CONTRACTOR shall provide utility water tank
REVISIONCERTIFICATION

for the storage and supply of utility water. Utility water will be supplied to
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

eyewash / safety showers, YNJ-1 & YNJ-2 pipeline scraper launchers and to
(DCC) NO. _____________________

the buildings through utility water pumps (one operating, one spare).

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 56


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall provide Metering system required for the receipt of utility
SAY
SAY
SAY

water per the requirement of MARAFIQ. The scope for the utility water system
is outlined in PFD VA-247847.001 and P&IDs VA-247924.001, 002.
ENGG CERT

ASH
ASH
ASH

Sewage collection and disposal


LEADS

LEADS
LEADS
ALL

ALL
ALL

Instrumentation for the collection and discharge of sewage from the buildings to
the MARAFIQ network.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Sewage discharged from buildings will be routed to a common sump and


transported by two lift pumps (one operating, one spare) to the MARAFIQ
sewage water network.
DESCRIPTION

Sanitary sewage pipes from Operator shelters in the tank farm area will be
discharge in two separate lift stations. The further lift station will discharge in
the other which will pump the waste water to the main lift station located close
to the main buildings area.

Adequate metering system per the requirement of MARAFIQ shall be provided


for the metering of discharge effluent. The scope for the sanitary system is
outlined in PFD VA-247848.001 and P&IDs VA-247926.001.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Storm water collection system


12/11/16
08/04/16

09/08/16
DATE

CONTRACTOR shall construct the storm water collection system consisting in


but not limited to pipes, culverts, transfer boxes, manholes, channels, and
NO.
REV

D
C
B

headwalls discharge structures.


DISCIPLINE
ENGINEER
ALL LEADS The drainage system considers an adequate and consistent finish floor slope
DATE: 12/11/16 towards channels and catch basins. Channels will be sloped properly to
PROJECT
ENGINEER conduct the storm water and discharge to MARAFIQ channels network.
A M ALMATROOK

DATE: 12/11/16 The contaminated storm water is collected by an oily water system to be
CERTIFIED discharge in the evaporation pond
AMR EL SHARKAWY

12/11/16
DATE:
CONSTRUCTION
AGENCY Evaporation pond
SHAHZAD YAZDANI

DATE: 12/11/16 CONTRACTOR shall validate the design of evaporation pond considering the
OPERATIONS total influent of fire water, contaminated storm water, hydro test water from
ALI H GHAMDI pumps house and tank farm area. In addition to these requirements, Project
12/11/16 shall consider the Royal Commission Environmental Regulation in sizing the
DATE:
CONTROL NUMBER

Pond.
VERIFICATION
EDSD

Provide Two (2) evaporation ponds for waste oily water sewage and one (1)
evaporation pond for hydro test and contaminated storm water. The
DATE:
BY:

evaporation ponds shall be excavated with sufficient depth in order to


REVISIONCERTIFICATION

accommodate about 2.0 meter deep oily water waste. Provide 0.6m minimum
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

free board.
C

(DCC) NO. _____________________

Provide 300mm thick marl capping bed inside evaporation pond includes 60mil

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 57


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
rough surface HDPE (UV Resistant) liner above the marl capping.
SAY
SAY
SAY

Provide 150 mm thick reinforced concrete Splash.


ENGG CERT

ASH
ASH
ASH

C. MECHANICAL ROTATING EQUIPMENT


LEADS

LEADS
LEADS
ALL

ALL
ALL

YDH Tank Farm and Support structure will have following sets of pumps.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

SLOP TANK PUMPS (X40-G-0022 A/B)

Slop tanks will be emptied through Slop Tank Pumps (X40-G-0022 A/B) to
product tanks. These pumps shall be of Vertical Can Type due to low NPSH
DESCRIPTION

available as per hydraulic calculations. Pumps shall be in accordance with 31-


SAMSS-004. Reference shall be made to datasheet no. RE-E00105 in Index-G
for further details of these pumps.

MISCELLANEOUS DUTY PUMPS

Apart from above following sets of pumps shall also be provided as part of YDH
Tank Farm and Support structure. Reference shall be made to Index-G for
10-02399-
JO/EWO

10-02399-
10-02399-

preliminary datasheets of these pumps.


0001

0001
0001

Utility Water Pumps (X40-G-0030 A/B) for eyewash, safety showers and
12/11/16
08/04/16

09/08/16
DATE

drinking water – Datasheet No. RE-E00113


NO.
REV

Sanitary Pumps for Sewage Lift Stations (X40-G-0029 A/B) – Datasheet


D
C
B

DISCIPLINE
ENGINEER
No. RE-E00112
ALL LEADS

DATE: 12/11/16 Surge Relief Pumps to transfer the surge volumes to respective product
PROJECT
ENGINEER tanks (X40-G-0023 A/B) – Datasheet No. RE-E00106
A M ALMATROOK

DATE: 12/11/16
CPI Separator Skim Oil Pumps (X40-G-0025 A/B) – Datasheet No. RE-
CERTIFIED E00108 and effluent water pumps (X40-G-0026 A/B) – Datasheet No.
AMR EL SHARKAWY

12/11/16 RE-E00109. These will be part of CPI Separator package and shall be
DATE:
CONSTRUCTION
finalized by CPI Package vendor.
AGENCY
SHAHZAD YAZDANI
In addition to above following sets of pumps are required at Yanbu Refinery
DATE: 12/11/16
OPERATIONS and SAMREF.
ALI H GHAMDI

12/11/16
Surge Relief Pumps (V25-G-X004 A/B) at Yanbu Refinery – Datasheet
DATE:
No. RE-E00147.
CONTROL NUMBER
VERIFICATION
EDSD

Surge Relief Pumps at SAMREF (X40-G-X002 A/B) – Datasheet No.


RE-E00148.
DATE:
BY:

MISCELLANEOUS REQUIREMENTS
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Reference shall be made to technical specifications for pumps included


(DCC) NO. _____________________

in Index-A for further details of these pumps.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 58


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

Pump Datasheets provided in this package will be further verified by


ENGG CERT

ASH
ASH

CONTRACTOR during detailed design phase of the project before


ASH

issuing for procurement activities.


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall be responsible for producing equipment


datasheet, SIS sheets, Noise Datasheets in accordance with SAUDI
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

ARAMCO standard forms and datasheets.

All pumps will be procured by CONTRACTOR from SAUDI ARAMCO


DESCRIPTION

approved manufacturer for each Commodity Classification Code (CCC).


SAUDI ARAMCO will provide the list of approved manufacturers after
award of Contract.

CONTRACTOR shall prepare Material Requisition Package for all the


pumps and shall obtain approvals from relevant SAUDI ARAMCO
Departments before issuing to Vendors.
10-02399-
JO/EWO

10-02399-
10-02399-

Material take-offs have been prepared for reference only and will not be
0001

0001
0001

considered as contractual documents and cannot be used as a basis for


12/11/16

any change order.


08/04/16

09/08/16
DATE

Technical quotations obtained from vendors will list all exceptions and
NO.
REV

D
C
B

DISCIPLINE
/or, additions to applicable project Drawings and SAUDI ARAMCO
ENGINEER
ALL LEADS
Specifications. If there is no exception to specifications, CONTRACTOR
DATE: 12/11/16
will make a statement to that effect.
PROJECT
ENGINEER

A M ALMATROOK CONTRACTOR shall be responsible for Technical Bid Evaluation,


DATE: 12/11/16 placing the Purchase Order to technically approved Vendors.
CERTIFIED
AMR EL SHARKAWY

DATE:
12/11/16 CONTRACTOR shall be responsible for review and approval of NMRs
CONSTRUCTION 601, 602 and 603.
AGENCY
SHAHZAD YAZDANI

DATE: 12/11/16 Inspection and Testing of CONTRACTOR supplied materials will be


OPERATIONS
performed as per applicable SAUDI ARAMCO Inspection Requirement
ALI H GHAMDI
form A-175. CONTRACTOR will arrange with his sub suppliers to
12/11/16
DATE:
comply with these requirements by stating on all sub suppliers’
CONTROL NUMBER
VERIFICATION

purchase order SAUDI ARAMCO’s intention to inspect material.


EDSD

Equipment installation and Commissioning shall be in accordance with


DATE:
BY:

approved Vendor’s installation and commissioning procedures.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Supply of Commissioning and Start-up spares and first fill of all the
(DCC) NO. _____________________

lubricants and chemicals is in the scope of CONTRACTOR.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 59


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall obtain approval of Aramco Operations before
SAY
SAY
SAY

filling of lubricants and chemicals.


ENGG CERT

ASH
ASH
ASH

CONTRACTOR will provide all Non Material Requirement (NMR-


LEADS

LEADS
LEADS
ALL

ALL
ALL

602/603), Operation and Instruction Manuals of CONTRACTOR


supplied material in electronic format (Latest Acrobat Reader).
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR will provide critical spare parts for CONTRACTOR


supplied items in accordance with SAEP-3101. Contractor will develop
list of critical plant equipment spares and identification.
DESCRIPTION

CONTRACTOR shall be responsible to complete the Novation


procurement process for the Gasoline and Diesel shipper pumps.
CONTRACTOR will be provided with all relevant details of the purchase
order and Novation terms.

D. MECHANICAL STATIC EQUIPMENT

This section describes the Contractor’s scope of work for the design,
10-02399-
JO/EWO

10-02399-
10-02399-

manufacture /fabrication, supply, packaging & storage, supervision for


0001

0001
0001

installation, commissioning, start-up activities. Provision of Spare Parts


required for erection & commissioning, start-up and 2 years operation.
12/11/16
08/04/16

09/08/16
DATE

Following list of equipment shall be provided by CONTRACTOR:


NO.
REV

D
C
B

DISCIPLINE SR NO
ENGINEER EQUIPMENT TAG NO. QTY SERVICE
ALL LEADS

DATE: 12/11/16
1 X40-D-0028A/B 2 FIRE WATER TANK
PROJECT
ENGINEER

A M ALMATROOK 2 1 UTILITY WATER TANK


X40-D-0014
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
3 1 DIESEL DAY TANK
DATE:
12/11/16 X40-D-0037
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI 4 1 SURGE TANK
X40-D-X001
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI 5 X07-U-0XX1 1 MONORAIL
12/11/16
DATE:
6 X40-U-0021, X40-U- 3 OVERHEAD CRANES
CONTROL NUMBER
VERIFICATION

0024 & X40-U-0025


EDSD

DATE:

Following Packages shall be provided by CONTRACTOR:


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

SR NO
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

EQUIPMENT TAG NO. QTY SERVICE


C

(DCC) NO. _____________________

1 X40-U-0001 1 KEROSENE FILTRATION SKID

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 60


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
GASOLINE 95 RED DYE
SAY

2 1
X40-U-0002
INJECTION SKID
ENGG CERT

ASH
ASH
ASH

3 1 GASOLINE 91 GREEN DYE


X40-U-0003
LEADS

LEADS
LEADS
ALL

INJECTION SKID
ALL
ALL

4 1 OILY WATER TREATMENT


X40-U-0004
PACKAGE
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

5 1 CONDUCTIVITY ENHANCER
X40-U-0005
INJECTION SKID
DESCRIPTION

6 1 STATIC DISSIPATIVE ADDITIVE


X40-U-0011
INJECTION SKID

Below are the reference documents for all Mechanical Static equipment
and Packages.

REFERENCE DOCUMENTS:
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

TECHNICAL SPECIFICATION:
12/11/16
08/04/16

09/08/16
DATE

EQE00006012 TECHNICAL SPECIFICATION FOR FIRE & UTILITY WATER TANKS


TECHNICAL SPECIFICATION FOR OILY WATER TREATMENT PACKAGE
NO.
REV

D
C
B

EQE00009018 (X40-U-0004)
DISCIPLINE
ENGINEER EQE00011029 TECHNICAL SPECIFICATION FOR DPK FILTRATION SKID
ALL LEADS

DATE: 12/11/16 EQE00012030 TECHNICAL SPECIFICATION FOR DYE INJECTION SKIDS


PROJECT
ENGINEER EQE00015014 TECHNICAL SPECIFICATION FOR OVERHEAD CRANES
A M ALMATROOK
EQE00016010 TECHNICAL SPECIFICATION FOR UL-142 TANKS
DATE: 12/11/16
CERTIFIED EQE00018008 TECHNICAL SPECIFICATION FOR DROP ARM BARRIER
AMR EL SHARKAWY

12/11/16 EQE00019010 TECHNICAL SPECIFICATION FOR CRASH BARRIER


DATE:
CONSTRUCTION
AGENCY
EQE00013018 TECHNICAL SPECIFICATION FOR INJECTION SKID
SHAHZAD YAZDANI
EQE00054013 TECHNICAL SPECIFICATION FOR INTERNAL FLOATING ROOF TANK
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI

12/11/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 61


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DATA SHEETS:
SAY
SAY
SAY
ENGG CERT

ASH
ASH
ASH

EQE00027004 DATA SHEET FOR FIRE WATER TANKS (X40-D-0028 A/B)


EQE00028004 DATA SHEET FOR UTILITY WATER TANK (X40-D-0014)
LEADS

LEADS
LEADS
ALL

ALL
ALL

EQE00030001 DATA SHEET FOR OILY WATER TREATMENT PACKAGE (X40-U-0004)


EQE00032001 DATA SHEET FOR DPK FILTRATION SKID (X40-U-0001)
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

EQE00033001 DATA SHEET FOR P95 RED DYE INJECTION SKIDS (X40-U-0002)
EQE00034001 DATA SHEET FOR P91 GREEN DYE INJECTION SKIDS (X40-U-0003)
DATASHEET FOR CONDUCTIVITY ENHANCER INJECTION SKID (X40-U-
DESCRIPTION

EQE00041001 0005)
DATASHEET FOR STATIC DISSIPATIVE ADDITIVE INJECTION SKID (X40-
EQE00042001 U-0011)
EQE00046003 DATASHEET FOR DIESEL DAY TANK X40-D-0037
DATASHEET FOR OVERHEAD CRANE FOR FIRE WATER PUMP SHELTER
EQE00051002 (X40-U-0021)
EQE00052002 DATASHEET FOR OVERHEAD CRANE FOR GIS ROOM (X40-U-0024)
DATASHEET FOR OVERHEAD CRANE FOR ENGG. & MAINTENANCE
10-02399-
JO/EWO

10-02399-
10-02399-

EQE00053002 BUILDING (X40-U-0025)


0001

0001
0001

EQE00059002 DATASHEET FOR MONORAIL (SANITARY LIFT STATION)


12/11/16
08/04/16

09/08/16
DATE

EQE00057004 DATA SHEET FOR SURGE TANK (X40-D-X001)


NO.
REV

D
C
B

DISCIPLINE CONTRACTOR shall be responsible for supply, procurement, fabrication,


ENGINEER
ALL LEADS transportation handling, storage at site, erection, inspection, testing and Pre-
DATE: 12/11/16
commissioning, Commissioning support of all equipment and packages.
PROJECT
ENGINEER
CONTRACTOR shall take necessary precautions in handling the equipment to
A M ALMATROOK
prevent any damage during transportation and loading/unloading.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY CONTRACTOR shall develop and submit for SAUDI ARAMCO acceptance
DATE:
12/11/16 rigging plans and transportation calculations for all major equipment.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall supply spreader bars, shackles, and slings for the lifting
DATE: 12/11/16
of equipment.
OPERATIONS
ALI H GHAMDI All equipment shall be installed and commissioned as per SAUDI ARAMCO
DATE:
12/11/16 Standards and Manufacturer recommendations.
CONTROL NUMBER
VERIFICATION

CONTRACTOR shall be responsible for insulation (where specified on the data


EDSD

sheet or P&IDs) and fireproofing (where specified on the data sheet or P&IDs).
DATE:
BY:

All skid packages design shall be vendor proven design. Skid packages shall
be suitable for the specific application by meeting all the process design
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

requirements and environmental, safety and Industry standards.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 62


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
E. INSTRUMENTATION
SAY
SAY
SAY

CONTRACTOR shall perform the following activities at following areas as


ENGG CERT

ASH
ASH
ASH

mentioned below:
LEADS

LEADS
LEADS
ALL

ALL
ALL

RTG for Product Storage & Slop Tanks:

• Provide and install radar level transmitters, multisport temperature sensors,


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

pressure transmitters and other tank gauging devices as indicated in P &


IDs VA-247898.001 to VA-247911.001 and for slop tanks P & ID VA-
247912/ VA-247913. Refer block diagram IN-A00001.005 for details.
DESCRIPTION

• Provide and install cable between RTG instruments, the cables shall run
through conduits.
• Provide RTG junction boxes at the tanks as indicated in block diagram IN-
A00001.005.
• Provide and install fieldbus cables from RTG level transmitters to RTG
junction boxes through conduit.
• Provide and install RTG fieldbus homerun cables between RTG junction
boxes and Field Communication Units located in Rack room of Operation
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

building.
• Refer block diagram IN-A00001.005 for fieldbus cabling and FCU
12/11/16
08/04/16

09/08/16
DATE

assignments. The assignment shown is preliminary and shall be finalized


during detail design phase.
NO.
REV

D
C
B

• All RTG components inside the rack room shall be supplied within a
DISCIPLINE
ENGINEER cabinet. The RTG shall be interfaced to DCS over industry standard open
ALL LEADS
protocols.
DATE: 12/11/16
PROJECT Product Storage & Slop Tanks Field Instrumentation
ENGINEER

A M ALMATROOK

DATE: 12/11/16
• Provide and install field instruments in the tank farm area as per P & IDs
CERTIFIED VA-247898.001 to VA-247911.001 and for slop tanks P & ID VA-247912/
AMR EL SHARKAWY
VA-247913 and block diagrams IN-A00002.001/002/003/004.
12/11/16
DATE:
CONSTRUCTION
• Provide and install branch cables from field instruments to junction boxes.
AGENCY
SHAHZAD YAZDANI • Provide and install junction boxes as per block diagrams IN-
DATE: 12/11/16 A00002.001/002/003/004.
OPERATIONS
ALI H GHAMDI
• Provide and install homerun cables from field junction boxes to DCS/ESD
12/11/16
marshalling cabinets located in Rack room of Operations Building and
DATE:
Remote Instrument Buildings as per overall cable routing drawing IN-
CONTROL NUMBER
VERIFICATION

A00003.001 and block diagrams IN-A00002.001/002/003/004.


EDSD

• To include product quantity measuring system from YDH to


DATE:
BY:

Surge Relief System


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall
(DCC) NO. _____________________

• Provide and install field instruments as indicated in P &IDs VA-247929-001


`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 63


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and VA-247930-001 and as per block diagram IN-A00002.016
SAY
SAY
SAY

• Provide and install field junction box X40-AJB-2032 & X40-EAJB-X032 lay
ENGG CERT

ASH
ASH
ASH

homerun cable IC-0773,IC-0950 from JB to RIB-2.


• Provide and install cables between IRP panels located in substation XXX1
LEADS

LEADS
LEADS
ALL

ALL
ALL

to RIB-2 DCS/ESD remote I/O cabinets.


DPK Filtration Skid
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

THE CONTRACTOR/VENDOR SHALL

• DPK Filtration Skid vendor shall provide and install field instruments as
DESCRIPTION

indicated in P &IDs VA-247915 as per block diagram IN-A00002.022


• DPK Filtration Skid vendor shall provide and install junction boxes.
• Contractor shall provide and install homerun cables from skid junction
boxes to DCS marshaling cabinet located in RIB-2. The cables laying shall
be as per block diagram IN-A00002.022.
• Contractor shall integrate skid pumps to IRP panel located in substation
XXX2. Provide and install homerun cables DCS marshaling cabinet located
in RIB-2 to MCC. The cables laying shall be as per block diagram IN-
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

A00002.022.
• Field instruments for all the skids to be included
12/11/16
08/04/16

09/08/16
DATE

Oily Water Collection and Treatment system


NO.
REV

D
C
B

• Contractor shall provide and install field instruments as indicated in P &IDs


DISCIPLINE
ENGINEER VA-247921, VA-247922 & VA-247923 and as per block diagram IN-
ALL LEADS
A00002.011, IN-A00002.012 & IN-A00002.021
DATE: 12/11/16
PROJECT
ENGINEER
• Provide and install branch cables from field instruments to junction boxes.
A M ALMATROOK • Provide and install junction boxes as per block diagrams IN-A00002.011,
DATE: 12/11/16 IN-A00002.012 & IN-A00002.021
CERTIFIED
AMR EL SHARKAWY
• Provide and install homerun cables from field junction boxes to DCS/ESD
12/11/16
DATE: marshalling cabinets located in Rack room of Operations Building and
CONSTRUCTION
AGENCY
Remote Instrument Buildings as per overall cable routing drawing IN-
SHAHZAD YAZDANI A00003.001 and block diagrams IN-A00002.011/012/021.
DATE: 12/11/16
OPERATIONS
• Provide and install cables between MCC IRP to DCS/ESD cabinets located
ALI H GHAMDI
in Remote Instrument Buildings.
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION

Utilities
EDSD

DATE:

a) Utility Water/Waste Water/Sanitary water


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Contractor shall provide water metering skids as shown in P&IDs.


C

(DCC) NO. _____________________

• Contractor shall supply metering skid for Utility water, Waste water

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 64


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and sanitary water.
SAY
SAY
SAY

• Metering skids shall be provided with an RTU to connect to existing


ENGG CERT

ASH
ASH
ASH

SCADA located in MARAFIQ facility.


• Metering skid interface shall be as per block diagram IN-
LEADS

LEADS
LEADS
ALL

ALL
ALL

A00001.001
• Totalizer / quantity measurement reading for products at YDH
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL

upstream of Yanbu-Jiddah pipeline to be connected to the DCS.


ISSUED FOR 90% PROJECT PROPOSAL

• Reference drawings
DESCRIPTION

Drawing # Description
IN-A00001 System Block Diagrams
IN-A00002 Instrument Block Diagrams
IN-A00027 Instrument Points & Lines
IN-D00201 Instrument Installation Schedule-Flow
IN-D00202 Instrument Installation Schedule-Pressure
IN-D00203 Instrument Installation Schedule-Level
10-02399-
JO/EWO

10-02399-
10-02399-

IN-D00204 Instrument Installation Schedule-Temperature


0001

0001
0001

IN-D00205 Instrument Installation Schedule-Misc


12/11/16
08/04/16

09/08/16
DATE

IN-D00206 Instrument Installation Schedule-MOV/GOV/HOV/AOV


IN-D00207 Instrument Installation Schedule-Relief Valves
NO.
REV

IN-A00004 Equipment Layouts


D
C
B

DISCIPLINE
ENGINEER
IN-A00003 Cable Routing Plan
ALL LEADS IN-D00005 Cable and Conduit Schedule
DATE: 12/11/16
PROJECT
ENGINEER

A M ALMATROOK
F. PIPING
DATE: 12/11/16
CERTIFIED • Piping plans have been developed showing the conceptual routing of all
AMR EL SHARKAWY
major pipes with proper configuration in order to meet process objectives.
12/11/16
DATE: Pipe supports, platform and elevated structures shown in this submittal are
CONSTRUCTION
AGENCY
preliminary. All major instruments such as MOVs, ZVs, PZVs and control
SHAHZAD YAZDANI valves are located.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
• These piping plans are intended to define scope of work for
12/11/16
CONTRACTOR and calculate “Bill of Quantity” for estimation.
DATE:
CONTROL NUMBER
VERIFICATION

• The Detail Design contractor shall develop further details of the


EDSD

Piping Plan & Isometrics for construction and installation purposes.


DATE:

• The preliminary stress analysis has been done for only the critical
BY:

lines connected to pump systems. Any re-adjustment of the pipe


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

routing if needed and provision proper supports such as guides,


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

stoppers, spring supports in order to limit the stresses within the


(DCC) NO. _____________________

acceptable code limits will be developed during detail design phase.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 65


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• All the Facility shall be design & constructed with adequate space to
SAY
SAY
SAY

facilitate operation and maintenance and with minimum spacing


requirement as per SAUDI ARAMCO standards.
ENGG CERT

ASH
ASH
ASH

• The Piping Design, Procurement, Fabrication, Transportation,


LEADS

LEADS
LEADS
ALL

ALL
ALL

Erection, Installation, Testing, Inspection, Pre commissioning and


Commissioning support of the following piping system in the New
Tank Farm Area shall be in accordance with project drawings listed
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL

in the document control list.


ISSUED FOR 90% PROJECT PROPOSAL

• All new piping systems associated with New Product Tanks


(Ref. Process Equipment list PR-E00103 & Overall Plot plan-PI-
DESCRIPTION

A00001.001)

• All New piping (Only 2” & above) from Source refinery to receipt
manifold, Inside YDH routing to product/ slop, surge storage tanks,
Booster/Shipper Pumps, OWS lift station, DPK Filtration skid, Dye-in
skid, Drain vessel, Scraper Launchers, Utility station, Raw/Drinking
water system, Firewater piping near tank/pumps, drain lines should
be as per the requirements of the Project P&IDs and Piping plan As
per DCL list located in Appendix 13.2.2.)
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

• Line sizes 1.5” & below are not considered in during the Project
Proposal, MTO will be factored for small bore lines for estimation
12/11/16
08/04/16

09/08/16
DATE

purpose.
• Only Preliminary stress analysis done for lines connected to tanks
NO.
REV

D
C
B

and pumps as part of design verification.


DISCIPLINE
ENGINEER
ALL LEADS
• During detail desing all large bore and critical lines to be stress
DATE: 12/11/16
analyse and requried special and spring support to be provided.

PROJECT
ENGINEER Future space considered for extension of sleepers in Pipe way &
A M ALMATROOK Pipe trench.
DATE: 12/11/16
CERTIFIED • The requirement of surge tank, surge skid, surge tank pump are
AMR EL SHARKAWY
tentatively shown in SAMREF and Yanbu refinery overall plot plan
12/11/16 Yanbu refinery. The location & feasibility study to be carry after
DATE:
CONSTRUCTION
AGENCY
confirmation from client.
SHAHZAD YAZDANI
• Detail layout showing assembly areas, travel distances shall be
DATE: 12/11/16
develop during detail design by CONTRACTOR.
OPERATIONS
ALI H GHAMDI

DATE:
12/11/16 General Requirement for Piping
CONTROL NUMBER
VERIFICATION

CONTRACTOR shall implement and comply with all the requirements below, in
EDSD

full.
DATE:
BY:

• CONTRACTOR shall perform Piping Design, Procurement, Fabrication,


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Transportation, Erection, Installation, Testing, Inspection, Pre-


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

commissioning and Commissioning support in accordance with the latest


(DCC) NO. _____________________

edition of SAUDI ARAMCO Engineering Standards & Specifications and

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 66


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
other applicable International Codes and Standards.
SAY
SAY
SAY

• CONTRACTOR shall provide the detailed construction drawing package


ENGG CERT

ASH
ASH
ASH

required to complete the facility and shall comply with all applicable codes
and standards.
LEADS

LEADS
LEADS
ALL

ALL
ALL

• CONTRACTOR shall complete the design calculations in support of the


construction drawings and all other necessary calculations/documents.

ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall develop further details and isometrics for construction


ISSUED FOR 90% PROJECT PROPOSAL

and installation purpose.


• CONTRACTOR shall also perform the stress calculations and readjust the
pipe routing if needed and provide proper supports such as guides,
DESCRIPTION

stoppers, spring supports in order to limit the stresses within the acceptable
code limits.
• CONTRACTOR shall design and construct the Facility with adequate space
to facilitate operation and maintenance and with minimum spacing
requirement as per SAUDI ARAMCO standards.
• CONTRACTOR shall perform Piping Design, Procurement, Fabrication,
Transportation, Erection, Installation, Testing, Inspection, Pre
commissioning and pre-commissioning support of the following piping
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

system in the New Tank Farm Area in accordance with project drawings
listed in the document control list.
12/11/16
08/04/16

09/08/16
DATE

• CONTRACTOR shall perform all Piping works in accordance with SAUDI


ARAMCO Engineering Standard SAES-L-310, SAES-L-350 other
NO.
REV

applicable SAUDI ARAMCO Standards and Specifications and the


D
C
B

DISCIPLINE American Society of Mechanical Engineers (ASME) Code ASME B31.4.


ENGINEER
ALL LEADS
• CONTRACTOR shall carry out all piping work in close liaison with the
DATE: 12/11/16 SAUDI ARAMCO Representative to meet the project requirements.
PROJECT
ENGINEER

A M ALMATROOK
• CONTRACTOR shall be responsible for verifying all dimensions, angles,
DATE: 12/11/16
and elevations prior to fabrication and installation.

CERTIFIED
AMR EL SHARKAWY
CONTRACTOR shall provide all necessary vehicles for transportation of
12/11/16 personnel, utilities equipment and materials to and from the job site.
DATE:
CONSTRUCTION
AGENCY
• CONTRACTOR shall be responsible for the security and protection of all
SHAHZAD YAZDANI equipment, tools and materials at the job site until installation is complete
DATE: 12/11/16 and accepted by SAUDI ARAMCO.
OPERATIONS
ALI H GHAMDI
• Materials that are removed from the job site shall be hauled back to the
12/11/16
materials storage yard. Any of the materials left at the end of the job shall
DATE:
be transported to designated yard or stored as directed by SAUDI
CONTROL NUMBER
VERIFICATION

ARAMCO.
EDSD

• CONTRACTOR shall provide all labor and support equipment including, but
not limited to, scaffolding to perform piping work.
DATE:
BY:

• CONTRACTOR shall field verify all the dimensions and elevations shown
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

on drawings prior to start of any fabrication, erection and installation.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

• CONTRACTOR shall install all bolted flanged joints in accordance with


(DCC) NO. _____________________

SAEP-351.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 67


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• CONTRACTOR shall follow all safety precautions required by SAUDI
SAY
SAY
SAY

ARAMCO Standards and those suggested by the Loss Prevention Engineer


to ensure safe construction works.
ENGG CERT

ASH
ASH
ASH

• Flanged and bolted connections shall meet the requirements of SAES-L-


LEADS

LEADS
LEADS
ALL

ALL
ALL

109.
• Bolts and studs shall extend completely through their nuts. As a minimum,
three (3) bolt threads shall extend through the nuts.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

• CONTRACTOR shall design and fabricate all miscellaneous pipe supports


required for the project and ensure that pipe support attachments to piping
are included during fabrication of piping spools and prior to any hydrostatic
DESCRIPTION

testing of the system. Pipes shall be provided with necessary guides,


springs, clamps, anchors, etc. as required. Pipe shoe shall be provided for
insulated lines. Height of shoe for different lines shall be adjusted as per the
thickness of insulation. Pipe Support number shall be marked in relevant
piping drawings
• CONTRACTOR shall fabricate and install field pipe supports, dummy legs,
guides, saddles, slide bearing plates, shoes and shims.
• CONTRACTOR shall provide high point vent and low point drain at suitable
10-02399-
JO/EWO

10-02399-
10-02399-

locations shall be provided in piping system.


0001

0001
0001

• CONTRACTOR shall furnish, without limitation, all facilities, tools, labor,


12/11/16
08/04/16

09/08/16

supervision, technical and professional services, material, equipment,


DATE

supplies and consumables required to procure, construct, install, test and


commission, the NJBP expansion facility in accordance with the Project
NO.
REV

D
C
B

Documents listed in Document Control list.


DISCIPLINE


ENGINEER
ALL LEADS CONTRACTOR shall design and construct the Facility with adequate space
DATE: 12/11/16
to facilitate operation and maintenance and with minimum spacing
PROJECT
ENGINEER
requirement as per SAUDI ARAMCO standard. Layout shall allow crane
A M ALMATROOK
access for equipment from relevant sides.
DATE: 12/11/16 • Detailed design package shall be prepared with use of 3D modeling
CERTIFIED
AMR EL SHARKAWY
software (PDS).
DATE:
12/11/16
• CONTRACTOR shall design and construct all piperacks, pipe bridges, pipe
CONSTRUCTION
AGENCY
supports and concrete pipe sleepers. CONTRACTOR shall consider all
SHAHZAD YAZDANI relevant loads in his design. Structural steel shall be galvanized. Material
DATE: 12/11/16 shall be as per 12-SAMSS-007.
OPERATIONS
ALI H GHAMDI
• CONTRACTOR shall follow SAES-Q-001 for concrete design.
12/11/16
CONTRACTOR shall consider necessary clearance under roads while
DATE:
designing piperacks.
CONTROL NUMBER
VERIFICATION
EDSD

PIPING MATERIAL SUPPLY


DATE:


BY:

CONTRACTOR shall supply all materials and consumables required for


fabrication and construction of piping works for North Jiddah Bulk Plant
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Expansion.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

• CONTRACTOR shall ensure that all piping materials shall conform to the
SAUDI ARAMCO piping specification SAES-L-105 together with project
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 68


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
piping material specification and other related applicable SAUDI ARAMCO
SAY
SAY
SAY

Standards and Specifications.


ENGG CERT

ASH
ASH


ASH

CONTRACTOR shall use only new materials. Material substitutions shall


not be permitted without the approval of SAUDI ARAMCO prior to any
LEADS

LEADS
LEADS
ALL

ALL
ALL

procurement or fabrication activities.

WELDING WORK
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

• Welders and Welding Procedures shall be qualified and approved in


accordance with SAUDI ARAMCO Engineering Procedures SAEP-324,
SAEP-352 (CONTRACTOR Welders and Procedures) and Standard SAES-
DESCRIPTION

W-011 before welding start.


• Welds which are defective and beyond repair, in the sole opinion of the
SAUDI ARAMCO Representative, shall be cut out and replaced by
CONTRACTOR at no additional cost to SAUDI ARAMCO.
• CONTRACTOR shall provide all required welding equipment accessories
and consumables.
• When joining pipes and fittings of unequal wall thickness, CONTRACTOR
10-02399-
JO/EWO

shall counter bore the larger wall thickness prior to welding in accordance
10-02399-
10-02399-
0001

0001
0001

with ASME B31.3.



12/11/16
08/04/16

09/08/16

Before welding pipe joints, CONTRACTOR shall inspect each joint or spool
DATE

to ensure that it is free of sand, debris or other foreign materials. Each pipe
string or section shall be internally cleaned before welding, coupling or
NO.
REV

D
C
B

bolting to another pipe section or equipment in accordance with SAES-L-


DISCIPLINE
ENGINEER
350.
ALL LEADS

DATE: 12/11/16
PROJECT
RADIOGRAPHY AND NDT
ENGINEER

A M ALMATROOK • CONTRACTOR shall perform radiography of all piping joints as per clauses
DATE: 12/11/16 17.2 and 17.5 of SAES-W-011.
CERTIFIED
AMR EL SHARKAWY
• Magnetic Particle Testing and Liquid Penetrant Testing requirements for
12/11/16
DATE: pressure containing welds other than butt welds (including sockolets,
CONSTRUCTION
AGENCY
weldolets and welded bosses) shall be per clause 17.5.3 of SAES-W-011.

SHAHZAD YAZDANI
Upon approval of waiver, spool pieces which cannot be hydro tested are to
DATE: 12/11/16
OPERATIONS
be 100% radio graphed.
ALI H GHAMDI • Radiography of welds shall be in accordance with SAEP-1143.
12/11/16
DATE:
• CONTRACTOR shall provide adequate testing facilities at site including all
CONTROL NUMBER
VERIFICATION

necessary equipment, consumables, materials, labor etc., to enable to


EDSD

complete the Piping work, including radiography and other NDT methods
and testing. CONTRACTOR shall develop and propose the required
DATE:

inspection and NDT methods, documentation records and procedures to


BY:

meet the Aramco requirements.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 69


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

PAINTING, COATING AND INSULATION


ENGG CERT

ASH
ASH
ASH

• CONTRACTOR shall supply and apply painting and coating material in


accordance with vendor's recommended practice and as outlined in SAUDI
LEADS

LEADS
LEADS
ALL

ALL
ALL

ARAMCO Engineering Standards Index-H series.


• CONTRACTOR shall supply all mixing, cleaning, spray, and other
applicable materials and all equipment required to perform painting.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

• CONTRACTOR shall provide all instruments and tools required to verify


paint dry film thickness.
DESCRIPTION

• CONTRACTOR shall be responsible for cleanup of all paint cans and


debris associated with painting at the jobsite at the end of each working
day.
• CONTRACTOR shall ensure that no paint shall be placed within 2 inches of
areas to be welded prior to welding. Weld areas can only be painted after
the successful completion of required testing.
• CONTRACTOR shall adhere to safety identification and color coding as
specified in SAES-B-067.
10-02399-
JO/EWO

10-02399-
10-02399-


0001

0001
0001

CONTRACTOR shall supply insulation for piping system. CONTRACTOR


shall also be responsible for application of insulation material, stainless
12/11/16
08/04/16

09/08/16

steel cladding including provision of vapor barrier, supports, wire mesh,


DATE

cleat, clips, etc. on piping system as per relevant specifications.


NO.
REV

D
C
B

DISCIPLINE Special Requirements:


ENGINEER
ALL LEADS
• Prior to start of construction, CONTRACTOR shall perform field verification
DATE: 12/11/16
PROJECT of all existing hazards that may jeopardize the safety of personnel and
ENGINEER
property.
A M ALMATROOK

DATE: 12/11/16
CERTIFIED • CONTRACTOR shall submit Loss Prevention Program and Hazard
AMR EL SHARKAWY
Identification Plan for SAUDI ARAMCO approval no later than thirty (30)
12/11/16
DATE: days after the effective date of the contract.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI

DATE: 12/11/16
• Prior to start of construction activities, CONTRACTOR shall identify the
OPERATIONS existing pipeway/pipe culverts to be extend in SAMREF/YASREF & submit
ALI H GHAMDI safe execution plan to SAUDI ARAMCO representative to work nearer to
12/11/16 active product/utility lines
DATE:


CONTROL NUMBER

CONTRACTOR shall comply with all SAUDI ARAMCO safety regulations


VERIFICATION

and manual.
EDSD

DATE:

• CONTRACTOR shall prepare a detailed construction Critical Path Method


BY:

(CPM) schedule and submit it to SAUDI ARAMCO for approval. Unless


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

otherwise instructed by the SAUDI ARAMCO Representative,


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall dismantle all temporary facilities after completion of


(DCC) NO. _____________________

work and return all SAUDI ARAMCO supplied materials to a location

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 70


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
designated by the SAUDI ARAMCO Representative.
SAY
SAY
SAY
ENGG CERT

ASH
ASH


ASH

CONTRACTOR shall dispose wastes associated with this scope of work in


accordance with G.I. 430. 001 “Waste Management” and Cat-3 EIA report.
LEADS

LEADS
LEADS
ALL

ALL
ALL

• CONTRACTOR shall be responsible for handling, transporting and storing


critical materials such as scraper cups, chemicals and other materials
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

which require temperature controlled storage space

4.8 Yanbu to Jiddah Pipeline 1 & 2 Support Infrastructure


DESCRIPTION

A. GENERAL

CONTRACTOR shall design and install the YNJ-1 & YNJ-2 support infrastructure
including, but not limited to the following facilities:

• Tie-in to 20” YNJ-1 pipeline for PG95/PG91


• Tie-in to 24” YNJ-2 pipeline for DO/DPK
• Utility water supply tie-in to YNJ-1 & YNJ-2 pipeline scrapers
10-02399-
JO/EWO

10-02399-


10-02399-

Drain collection tie-in from YNJ-1 & YNJ-2 pipeline scrapers


0001

0001
0001

The battery limit will be the tie-in flange provided by YDH in the scraper launcher
12/11/16
08/04/16

09/08/16
DATE

lateral line for YNJ-1 / YNJ-2. Utility Water supply from YDH shall also be provided
for YNJ-1 & YNJ-2 pipeline scrapers and accordingly drain from YNJ-1 & YNJ-2
NO.
REV

pipeline scrapers shall also be received into oily water lift station.
D
C
B

DISCIPLINE
ENGINEER
ALL LEADS The following are the interfaces with BI-10-02155 and CONTRACTOR shall re-
DATE: 12/11/16
confirm the tie-in conditions with BI-10-02155 during detail design.
PROJECT
ENGINEER

A M ALMATROOK
a) Pipelines (YNJ-1 & YNJ-2):
DATE: 12/11/16 2 Nos. pipelines, one of 20” ND (YNJ-1) and the other of 24” ND (YNJ-2) of
CERTIFIED
AMR EL SHARKAWY
following specs:
12/11/16
DATE:
CONSTRUCTION
Pipeline Material = API 5L Gr.X65
AGENCY
SHAHZAD YAZDANI Flange Rating = 900#
DATE: 12/11/16
MAOP = 15513.2 kPag (2250 PSIG)
OPERATIONS
ALI H GHAMDI Design Temperature = 60 °C
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION

b) Utilities:
EDSD

- Utility water supply from YDH to YNJ-1/2 pipeline scraper launchers via two
DATE:
BY:

4” connections.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

- Drain from YNJ-1/2 pipeline scrapers to YDH via two 4” lines


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

The scope for the YNJ-1 & YNJ-2 support infrastructure is outlined in PFDs VA-
(DCC) NO. _____________________

247844.001 to VA-247847 and P&IDs VA-247918.002, VA-247920.002, VA-

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 71


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
247924.001 and VA-247921.002.
SAY
SAY
SAY

B. PIPING
ENGG CERT

ASH
ASH
ASH

• The scope of work includes design and construction of two pipelines ,YNJ-1
LEADS

LEADS
LEADS
ALL

ALL
ALL

& 2 inside battery limit of YDH, but not limited to, the following activities:
• YNJ-1 20” Gasoline Pipeline & YNJ-2 24” DO/DPK Pipeline:
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

• The design and installation of YNJ-1 20” Gasoline Pipeline & YNJ-2 24”
DO/DPK Pipeline from Gasoline & DO/DPK Shipper pump to Scraper
Launcher Facility constructed under BI-10-02155. Design and Installation of
the Scraper launcher shall be the part of BI-10-02155 YDH Scope will start
DESCRIPTION

at a flange upstream of the Scraper launcher.


• Interface requirements shall be accordingly coordinated with pipeline
project BI-10-02155. Following are the interface connections.

a. YNJ-1 Pipeline connection Upstream scraper Launcher


b. YNJ-2 Pipeline connection Upstream of Scraper Launcher
c. Drain connection for both Scraper Launchers.
10-02399-
JO/EWO

10-02399-
10-02399-

d. Utility water connection.


0001

0001
0001

Reference Dwg: As per DCL no.GEN-D0001.


12/11/16
08/04/16

09/08/16
DATE

General Requirement for Piping


NO.
REV

D
C
B

DISCIPLINE
ENGINEER • CONTRACTOR scope of work includes design and construction of two
ALL LEADS
pipelines ,YNJ-1 & 2 inside battery limit of YDH ,but not limited to the
DATE: 12/11/16 following activities:
PROJECT
ENGINEER

A M ALMATROOK

DATE: 12/11/16
• YNJ-1 20” Gasoline Pipeline & YNJ-2 24” DO/DPK Pipeline:
CERTIFIED
AMR EL SHARKAWY

12/11/16 • CONTRACTOR shall design and install YNJ-1 20” Gasoline Pipeline &
DATE:
CONSTRUCTION
YNJ-2 24” DO/DPK Pipeline from Gasoline & DO/DPK Shipper pump to
AGENCY Scraper Launcher Facility constructed under BI-10-02155. Design and
SHAHZAD YAZDANI
Installation of Scraper launcher shall be the part of BI-10-02155; YDH
DATE: 12/11/16
OPERATIONS
Scope will start at a flange upstream of Scraper launcher.
ALI H GHAMDI

DATE:
12/11/16 • Interface requirements shall be accordingly coordinated with pipeline
project BI-10-02155. Following are the interface connections.
CONTROL NUMBER
VERIFICATION
EDSD

e. YNJ-1 Pipeline connection Upstream scraper Launcher


DATE:
BY:

f. YNJ-2 Pipeline connection Upstream of Scraper Launcher


g. Drain connection for both Scraper Launchers.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

h. Utility water connection.


C

(DCC) NO. _____________________

• CONTRACTOR shall perform Piping Design, Procurement, Fabrication,


`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 72


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Transportation, Erection, Installation, Testing, Inspection, and
SAY
SAY
SAY

Commissioning and Pre-commissioning the following piping system in


accordance with the latest edition of SAUDI ARAMCO Engineering
ENGG CERT

ASH
ASH
ASH

Standards & Specifications and other applicable International Codes and


Standards.
LEADS

LEADS
LEADS
ALL

ALL
ALL

a. Product piping upstream of scraper launcher which shall be


connected to respective shipper pumps as per project drawings.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

b. New pipe ways and pipe supports as required by project


drawings shall be provided.
c. An elevated platform shall be provided for control valves station.
DESCRIPTION

d. Surge relief tanks and associated piping.


e. Surge product transfer pump and associated piping.
f. Interface product shipper pumps and associated piping.

Refer DCL no.GEN-D0001.for list of drawings.

4.9 Pumps and Motors for the Yanbu to Jiddah Pipeline


10-02399-
JO/EWO

10-02399-
10-02399-
0001

A. GENERAL
0001
0001

12/11/16
08/04/16

09/08/16

CONTRACTOR shall design and install the booster and shipper pumps for YNJ-1
DATE

and YNJ-2 pipelines including, but not limited to the following facilities:
NO.
REV


D
C
B

Three (3) booster pumps for YNJ-1 pipeline


DISCIPLINE
ENGINEER • Three (3) shipper pumps for YNJ-1 pipeline
ALL LEADS • Three (3) booster pumps for YNJ-2 pipeline
DATE: 12/11/16 • Three (3) shipper pumps for YNJ-2 pipeline
PROJECT
ENGINEER • Pumps associated automation, control and safety shutdown requirements.
A M ALMATROOK

DATE: 12/11/16 CONTRACTOR shall design and install three (3) booster pumps for YNJ-1 and
CERTIFIED
AMR EL SHARKAWY
YNJ-2.Pumps shall be electric motor and fixed speed with spillback to tank being
12/11/16 emptied. The motors shall be sized to accommodate the pump loads for the full
DATE:
CONSTRUCTION
spectrum of the pump curve. The pumps shall be fitted with all necessary
AGENCY instrumentation to protect the pump (including seal leak detection) and prevent
SHAHZAD YAZDANI
overpressure.
DATE: 12/11/16
OPERATIONS
CONTRACTOR shall design and install three (3) shipper pumps for YNJ-1 and
ALI H GHAMDI
YNJ-2. Pumps shall be electric motor driven and fixed speed. The motors shall be
12/11/16
DATE: sized to accommodate the pump loads for the full spectrum of the pump curve. The
CONTROL NUMBER
VERIFICATION

pumps shall be fitted with all necessary instrumentation to protect the pump
(including seal leak detection) and to prevent overpressure.
EDSD

DATE:

The following design parameters are established for the pipeline booster pumps.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 73


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

Rated flow Diff. Pressure Design Temp


Service Product No. of pumps
m³/hr (MBD) (kPa) ⁰C
ENGG CERT

ASH
ASH
ASH
LEADS

LEADS
LEADS
ALL

YNJ-1 PG 91 /95 530 (80) 3* 490.2 75


ALL
ALL

YNJ-2 DO /DPK 744 (112.33) 3* 557.8 75

*Fourth pump shall be installed during Phase-II.


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

The following design parameters are established for the pipeline shipper pumps.
Rated flow Diff. Pressure Design Temp
Service Product No. of pumps
DESCRIPTION

m³/hr (MBD) (kPa) ⁰C

YNJ-1 PG 91 /95 530 (80) 3* 13479.3 75


YNJ-2 DO /DPK 744 (112.33) 3* 13451.7 75

*Fourth pump shall be installed during Phase-II.

The scope for the YNJ-1 & YNJ-2 pumps is outlined in PFDs VA-247844.001 &
VA-247845.001 and P&IDs VA-247917.001 to VA-247920.002.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

B. MECHANICAL – ROTATING EQUIPMENT


12/11/16
08/04/16

09/08/16
DATE

B.01 BOOSTER PUMPS

GASOLINE BOOSTER PUMPS (X40-G-0020 A/B/C)


NO.
REV

D
C
B

DISCIPLINE
ENGINEER
ALL LEADS
Gasoline booster pumps shall be in accordance with 31-SAMSS-004 and shall be
of Vertical Can type centrifugal pumps (API VS6 or VS7) due to low NPSH
DATE: 12/11/16
PROJECT availability. These pumps are provided to meet the high NPSHR of shipper pumps.
ENGINEER
Pumps will be limited to maximum of 1800 RPM. Pump materials, mechanical
A M ALMATROOK
seals shall be in accordance with SAES-G-005. Reference shall be made to
DATE: 12/11/16
CERTIFIED
datasheet no. RE-E00103 included in Index-G.
AMR EL SHARKAWY

DATE:
12/11/16 DIESEL/DPK BOOSTER PUMPS (X40-G-0018 A/B/C)
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Diesel/DPK booster pumps shall be in accordance with 31-SAMSS-004 and shall
DATE: 12/11/16
be of between bearings, horizontal split casing type Centrifugal pumps (API BB1).
OPERATIONS These pumps are provided to meet the high NPSHR of shipper pumps. Pump
ALI H GHAMDI materials, mechanical seals shall be in accordance with SAES-G-005. Reference
12/11/16 shall be made to datasheet no. RE-E00101 included in Index-G.
DATE:
CONTROL NUMBER
VERIFICATION

MISCELLANEOUS REQUIREMENTS
EDSD

Reference shall be made to technical specifications for pumps included


DATE:
BY:

in Index-A for further details of these pumps.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Pump Datasheets provided in this package are preliminary only. These


(DCC) NO. _____________________

will be further verified by CONTRACTOR during detailed design phase


of the project before issuing for procurement activities.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 74


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

CONTRACTOR shall be responsible for producing equipment


ENGG CERT

ASH
ASH

datasheet, SIS sheets, Noise Datasheets in accordance with SAUDI


ASH

ARAMCO standard forms and datasheets.


LEADS

LEADS
LEADS
ALL

ALL
ALL

All pumps will be procured by CONTRACTOR from SAUDI ARAMCO


approved manufacturer for each Commodity Classification Code (CCC).
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

SAUDI ARAMCO will provide the list of approved manufacturers after


award of Contract.
DESCRIPTION

CONTRACTOR shall prepare Material Requisition Package for all the


pumps and shall obtain approvals from relevant SAUDI ARAMCO
Departments before issuing to Vendors.

Material take-offs have been prepared for reference only and will not be
considered as contractual documents and cannot be used as a basis for
any change order.
10-02399-
JO/EWO

10-02399-
10-02399-

Technical quotations obtained from vendors will list all exceptions and
0001

0001
0001

/or, additions to applicable project Drawings and SAUDI ARAMCO


12/11/16

Specifications. If there is no exception to specifications, CONTRACTOR


08/04/16

09/08/16
DATE

will make a statement to that effect.


NO.
REV

D
C
B

DISCIPLINE
CONTRACTOR shall be responsible for Technical Bid Evaluation,
ENGINEER
ALL LEADS
placing the Purchase Order to technically approved Vendors.
DATE: 12/11/16
PROJECT
ENGINEER
CONTRACTOR shall be responsible for review and approval of NMRs
A M ALMATROOK 601, 602 and 603.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
Inspection and Testing of CONTRACTOR supplied materials will be
DATE:
12/11/16 performed as per applicable SAUDI ARAMCO Inspection Requirement
CONSTRUCTION form A-175. CONTRACTOR will arrange with his sub suppliers to
AGENCY
SHAHZAD YAZDANI comply with these requirements by stating on all sub suppliers’
DATE: 12/11/16 purchase order SAUDI ARAMCO’s intention to inspect material.
OPERATIONS
ALI H GHAMDI
Equipment installation and Commissioning & Pre-commissioning shall
12/11/16
DATE:
be in accordance with approved Vendor’s installation and
CONTROL NUMBER
VERIFICATION

commissioning procedures.
EDSD

Supply of Commissioning & Pre-commissioning and Start-up spares


DATE:
BY:

and first fill of all the lubricants and chemicals is in the scope of
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

CONTRACTOR. CONTRACTOR shall obtain approval of Aramco


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Operations before filling of lubricants and chemicals.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 75


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR will provide all Non Material Requirement (NMR-
SAY
SAY
SAY

602/603), Operation and Instruction Manuals of CONTRACTOR


ENGG CERT

ASH
ASH

supplied material in electronic format (Latest Acrobat Reader).


ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR will provide critical spare parts for CONTRACTOR


supplied items in accordance with SAEP-3101. Contractor will develop
list of critical plant equipment spares and identification.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

B.02 SHIPPER PUMPS


DESCRIPTION

GASOLINE SHIPPER PUMPS (X40-G-0021 A/B/C)

Gasoline Shipper pumps shall be in accordance with 31-SAMSS-004 and shall be


of between bearing, vertical split casing type centrifugal pumps (API BB5). Pump
materials, mechanical seals are in accordance with SAES-G-005. Reference shall
be made to datasheet no. RE-E00104 included in Index-G.

Shipper pumps shall be provided with forced type lubrication system i-e lube oil
skids will be provided in accordance with applicable SAUDI ARAMCO Standards.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Each shipper pump will also have a Vibration Monitoring System in accordance
with applicable SAUDI ARAMCO Standards.
12/11/16
08/04/16

09/08/16
DATE

Gasoline Shipper Pumps have gone through Novation Procurement by the design
contractor. These pumps shall be novated to the LSTK Contractor upon award of
NO.
REV

D
C
B

the contract and all relevant details of the purchase order and Novation terms will
DISCIPLINE
ENGINEER be handed over to the successful LSTK contractor. The purchase requisition is
ALL LEADS attached for reference in Appendix 11.
DATE: 12/11/16
PROJECT
ENGINEER DIESEL/DPK SHIPPER PUMPS (X40-G-0019 A/B/C)
A M ALMATROOK

DATE: 12/11/16 Diesel/DPK Shipper pumps shall be in accordance with 31-SAMSS-004 and shall
CERTIFIED
AMR EL SHARKAWY
be of between bearing, vertical split casing design centrifugal pumps (API BB5).
12/11/16
Pump materials, mechanical seals shall also be in accordance with SAES-G-005.
DATE:
Reference shall be made to datasheet no. RE-E00102 included in Index-G.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Shipper pumps will be provided with forced type lubrication system i-e lube oil
DATE: 12/11/16 skids will be provided in accordance with applicable SAUDI ARAMCO Standards.
OPERATIONS
Each shipper pump will also have Vibration Monitoring System in accordance with
ALI H GHAMDI
applicable SAUDI ARAMCO Standards
12/11/16
DATE:
CONTROL NUMBER

Diesel Shipper Pumps have gone through Novation Procurement by the design
VERIFICATION

contractor. These pumps shall be novated to the LSTK Contractor upon award of
EDSD

the contract and all relevant details of the purchase order and Novation terms will
DATE:

be handed over to the successful LSTK contractor. The purchase requisition is


BY:

attached for reference in Appendix 11.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

MISCELLANEOUS REQUIREMENTS
(DCC) NO. _____________________

Reference shall be made to technical specifications for pumps included


`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 76


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
in Index-A for further details of these pumps.
SAY
SAY
SAY
ENGG CERT

ASH
ASH

Pump Datasheets provided in this package are preliminary only. These


ASH

will be further verified by CONTRACTOR during detailed design phase


LEADS

LEADS
LEADS
ALL

ALL
ALL

of the project.

CONTRACTOR shall be responsible for producing equipment


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

datasheet, SIS sheets, Noise Datasheets in accordance with SAUDI


ARAMCO standard forms and datasheets.
DESCRIPTION

CONTRACTOR shall be responsible for review and approval of NMRs


601, 602 and 603.

Inspection and Testing of CONTRACTOR supplied materials will be


performed as per applicable SAUDI ARAMCO Inspection Requirement
form A-175. CONTRACTOR will arrange with his sub suppliers to
comply with these requirements by stating on all sub suppliers’
purchase order SAUDI ARAMCO’s intention to inspect material.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Equipment installation and Commissioning & Pre-commissioning shall


12/11/16

be in accordance with approved Vendor’s installation and


08/04/16

09/08/16
DATE

commissioning procedures.
NO.
REV

D
C
B

DISCIPLINE
Supply of Commissioning & Pre-commissioning and Start-up spares
ENGINEER
ALL LEADS
and first fill of all the lubricants and chemicals is in the scope of
DATE: 12/11/16
CONTRACTOR. CONTRACTOR shall obtain approval of Aramco
PROJECT
ENGINEER
Operations before filling of lubricants and chemicals.
A M ALMATROOK

DATE: 12/11/16 CONTRACTOR will provide all Non Material Requirement (NMR-
CERTIFIED
AMR EL SHARKAWY
602/603), Operation and Instruction Manuals of CONTRACTOR
DATE:
12/11/16 supplied material in electronic format (Latest Acrobat Reader).
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR will provide critical spare parts for CONTRACTOR
DATE: 12/11/16 supplied items in accordance with SAEP-3101. Contractor will develop
OPERATIONS
list of critical plant equipment spares and identification.
ALI H GHAMDI

12/11/16
DATE:
CONTROL NUMBER

C. INSTRUMENTATION
VERIFICATION
EDSD

SHIPPER & BOOSTER PUMP STATIONS FOR P91/95, DO/DPK


DATE:
BY:

CONTRACTOR shall perform the following activities at the pump shipper and
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

booster pump stations.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C


(DCC) NO. _____________________

Provide and install field instrument as indicated in below P & IDs


and block diagrams IN-A00002.005/006/007/008.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 77


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

VA247917-001 P&ID-GASOLINE 95/91 BOOSTER PUMPS


ENGG CERT

ASH
ASH

VA247918-001 P&ID-GASOLINE 95/91 SHIPPER PUMPS


ASH

VA247918-002 P&ID-GASOLINE 95/91 SHIPPER PUMPS


LEADS

LEADS
LEADS
ALL

ALL
ALL

VA247919-001 P&ID-DO/DPK BOOSTER PUMPS


VA247920-001 P&ID-DO/DPK SHIPPER PUMPS
VA247920-002 P&ID-DO/DPK SHIPPER PUMPS
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

• Provide and install branch cables from field instruments to field


DESCRIPTION

junction boxes as indicated in block diagrams IN-


A00002.005/006/007/008.
• Provide and install homerun cables from field junction boxes to
remote instrument buildings as indicated in IN-
A00002.005/006/007/008.
• Provide and install cables from DCS/ESD IRP panels located in
Substations to RIBs as indicated in IN-A00002.005/006/007/008.
• Provide and install vibration and bearing temperature junction boxes
10-02399-
JO/EWO

10-02399-
10-02399-

as per block diagram IN-A00001.006


0001

0001
0001

• Provide homerun cables from junction boxes to VMS Marshaling


12/11/16
08/04/16

09/08/16

Cabinets and system racks located in respective RIBs.


DATE

• VMS system shall be connected to DCS via Modbus TCP/IP and


hardwired to ESD remote I/O’s located in RIB buildings.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER • Reference drawings:
ALL LEADS

DATE: 12/11/16
PROJECT
ENGINEER Drawing # Description
A M ALMATROOK
IN-A00001 System Block Diagrams
DATE: 12/11/16
CERTIFIED IN-A00002 Instrument Block Diagrams
AMR EL SHARKAWY
IN-A00027 Instrument Points & Lines
12/11/16
DATE:
IN-D00201 Instrument Installation Schedule-Flow
CONSTRUCTION
AGENCY
IN-D00202 Instrument Installation Schedule-Pressure
SHAHZAD YAZDANI

DATE: 12/11/16
IN-D00203 Instrument Installation Schedule-Level
OPERATIONS IN-D00204 Instrument Installation Schedule-Temperature
ALI H GHAMDI
IN-D00205 Instrument Installation Schedule-Misc
12/11/16
DATE: IN-D00206 Instrument Installation Schedule-MOV/GOV/HOV/AOV
CONTROL NUMBER
VERIFICATION

IN-D00207 Instrument Installation Schedule-Relief Valves


EDSD

IN-A00004 Equipment Layouts


IN-A00003 Cable Routing Plan
DATE:
BY:

IN-D00005 Cable and Conduit Schedule


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 78


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. ELECTRICAL
SAY
SAY
SAY

• CONTRACTOR shall utilize the one line diagrams attached to this package
ENGG CERT

ASH
ASH
ASH

to develop the detail design package for utilization within purchase orders
and for construction and commissioning & Pre-commissioning.
LEADS

LEADS
LEADS
ALL

ALL
ALL

• CONTRACTOR shall use induction motors for all shipper pumps. Design of
induction motors shall be such that to achieve power factor equal or greater
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL

than 0.95.
ISSUED FOR 90% PROJECT PROPOSAL

• Shipper pump motors power supply shall be from 13.8kV switchgear (Refer
to drawing # EL-A10008). Auxiliary loads for these main pumps shall be
from 480V control gears (refer to drawing # EL-A10014 to EL-A10017).
DESCRIPTION

• Booster pump motors power supply shall be from 4.16kV switchgear (Refer
to drawing # EL-A10011). Auxiliary loads for these main pumps shall be
from 480V control gears (refer to drawing # EL-A00014 to EL-A00017).
• CONTRACTOR shall design, supply, install, test, pre-commission and
provide assistance in commissioning and integrated testing to insure fully
operational systems. All Electrical Control Panels and Stop-Start Stations
shall have Push-to-Test Multi-Cluster LED’s for indication.
10-02399-


JO/EWO

10-02399-
10-02399-

CONTRACTOR shall design, supply and install and test Local Control Push
0001

0001
0001

Button Stations appropriate for the areas of installation, Install control


cables and conduits between control stations and the Interposing relay
12/11/16
08/04/16

09/08/16
DATE

panels or Control gear.


• Within Switchgear and Control gear switching assemblies and Starter
NO.
REV

D
C
B

Control panels for all motors 75 kW (100 HP) and larger, and all other
DISCIPLINE
ENGINEER motors where the engineering documents indicate motor space heaters are
ALL LEADS
installed, a contact shall be wired to a terminal block in the low voltage
DATE: 12/11/16 compartment of the Switchgear Feeder or Control gear bucket, as
PROJECT
ENGINEER applicable, for connection to a 24VAC control circuit (panel shall be
A M ALMATROOK designed and provided by THE CONTRACTOR) of a remotely mounted
DATE: 12/11/16 motor space heater contactor. Contact shall be closed when the main motor
CERTIFIED
AMR EL SHARKAWY
circuit contactor is de-energized. This is in accordance with SAES-P-116
12/11/16 and shall be provided, installed, tested, pre commissioned, and with
DATE:
CONSTRUCTION
commissioning assistance, by THE CONTRACTOR.
AGENCY
SHAHZAD YAZDANI • CONTRACTOR shall be responsible for design, supply, installation and
DATE: 12/11/16 testing of the interconnection wiring between Vendor supplied Electrical
OPERATIONS Equipment and Skids and the parent equipment, field instruments, etc. and
ALI H GHAMDI CONTRACTOR shall develop Wiring Interconnection Drawings, based on
DATE:
12/11/16 Actual Vendor Certified NMR 602 Drawings and NMR 603 Manuals, to
SAUDI ARAMCO standards and submit to SAUDI ARAMCO for acceptance
CONTROL NUMBER
VERIFICATION

prior to termination of cabling.


EDSD

• CONTRACTOR shall develop Area Classification drawings at the beginning


DATE:

of detailed design phase and obtain SAUDI ARAMCO Approval. Equipment


BY:

installed in YDH area will be rated according to area classification layout


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

drawings (Refer to drawing #EL-A10003). Attached drawings shall be used


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

only as guide actual drawings shall be developed by the CONTRACTOR.


(DCC) NO. _____________________

• CONTRACTOR to update the ETAP study provided during the detail

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 79


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
design.
SAY
SAY
SAY
ENGG CERT

ASH
ASH
ASH

4.10 Pump Operations for the Yanbu to Jiddah Pipeline


LEADS

LEADS
LEADS
ALL

ALL
ALL

A. GENERAL

CONTRACTOR shall ensure the pump operation of the YNJ-1 and YNJ-2 pipelines
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL

including, but not limited to the following facilities:


ISSUED FOR 90% PROJECT PROPOSAL

Three (3) Booster and Three (3) shipper pumps shall be designed for YNJ-1 and
YNJ-2. (Fourth pump shall be installed in phase-2) Pumps shall be electric motor
DESCRIPTION

and fixed speed with spillback to tank being emptied.


The pipeline booster and shipper pumps shall be controlled locally from YDH but
CONTRACTOR shall provide viewing capabilities to OSPAS. Pump start-up
philosophy shall be based on the start-up of a single shipper pump at a time and
not two or more shipper pumps simultaneously. CONTRACTOR shall co-ordinate
with BI-10-02155 for the operation philosophy required by the pipeline prior to
detail design and construction.

The scope for the YNJ-1 & YNJ-2 pumps’ operation is outlined in PFDs VA-
10-02399-
JO/EWO

10-02399-
10-02399-

247844.001 & VA-247845.001 and P&IDs VA-247917.001 to VA-247920.002.


0001

0001
0001

4.11 Pipeline Connection from Grassroots-Yanbu Aramco Refinery


12/11/16
08/04/16

09/08/16
DATE

A. GENERAL
NO.
REV

D
C
B

DISCIPLINE CONTRACTOR shall provide provision in the receiving manifolds for the future
ENGINEER
ALL LEADS
connections of PG 91/95, DO & DPK from Yanbu grass root refinery. A valve with a
DATE: 12/11/16
same size as of manifold (30”) shall be kept as provision in each of the product
PROJECT manifold.
ENGINEER

A M ALMATROOK
The scope for the pipeline connections from Yanbu Grass root refinery is outlined
DATE: 12/11/16
CERTIFIED in PFD VA-247835.001 and P&IDs VA-247894.001 to VA-247897.001.
AMR EL SHARKAWY

DATE:
12/11/16 B. PIPING
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
All pumps are located centrally with respective storage tanks, so that the pressure
DATE: 12/11/16
reduction due to pipe length from tank outlet to pump inlet is minimized to meet
OPERATIONS process requirement.
ALI H GHAMDI

DATE:
12/11/16 Pumps are grouped to permit economical pipe routing with free space for future
pumps & possible extension of main pipe header for future expansion.
CONTROL NUMBER
VERIFICATION
EDSD

Space for laydown areas has been considered for all pump bays which will be
required for pump maintenance purpose.
DATE:
BY:

The layout of pump suction-discharge lines, associated header lines & the
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

provision for future connection in PG95/PG91, DO, DPK shall be provided as per
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

branch connections with isolation valves with blinds as per piping plan (Ref. DCL
(DCC) NO. _____________________

No GEN-D0001 )

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 80


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

CONTRACTOR shall provide branch connection with isolation valves with blind per
piping plan (Ref. Piping Plan listed in DCL No GEN-D0001) for future connection in
ENGG CERT

ASH
ASH
ASH

PG95/PG91, DO, DPK and Slop manifold


LEADS

LEADS
LEADS
ALL

ALL
ALL

Based on surge study, it is proposed to add new Surge tank & associated facilities
inside SAMREF refinery, this has been shown as preliminary information in overall
plot plan. Exact location and feasibility study to be conducted after confirmation
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

during detail design phase. No piping plan and MTO considered in 90% submittal.

4.12 Pipeline Connection from SAMREF Refinery


DESCRIPTION

A. GENERAL

YDH is designed to receive gasoline, diesel, and kerosene products from the
SAMREF refinery via three pipelines extending from the SAMREF tank farm to
YDH product manifolds. SAMREF existing export Pumps shall be utilized to supply
products (PG95/91, DO and DPK) to YDH.

The three pipelines will extend from the SAMREF manifold to YDH manifold of the
10-02399-
JO/EWO

10-02399-
10-02399-
0001

relevant product type. SAMREF export pumps shall supply the pressure to move
0001
0001

the product into YDH tank at full height.


12/11/16
08/04/16

09/08/16
DATE

CONTRACTOR shall design and install the three product pipelines from SAMREF
and their connections into YDH receiving manifolds including, but not limited to the
NO.
REV

D
C
B

following facilities:
DISCIPLINE
ENGINEER
ALL LEADS • Tie-ins in existing piping at SAMREF
DATE: 12/11/16 • Three product pipelines each for PG95/91, DO and DPK from SAMREF to
PROJECT
ENGINEER YDH.
A M ALMATROOK • Three metering skids with two provers (1 for PG/DO and 1 for DPK) at
DATE: 12/11/16 SAMREF
AMR EL SHARKAWY
CERTIFIED
• Connections in YDH receiving manifolds for three product pipelines from
12/11/16
SAMREF.
DATE:
• Surge relief system at SAMREF including SRVs, surge tank & pump.
CONSTRUCTION
AGENCY • Fire water system connection
SHAHZAD YAZDANI
• Connection to oily water system.
DATE: 12/11/16
OPERATIONS
YDH shall receive PG 91/95, DO, and DPK from the SAMREF refinery via three
ALI H GHAMDI
pipelines extending from the SAMREF tank farm to YDH receiving manifolds. The
12/11/16
DATE: SAMREF supply connection to YDH shall be taken from downstream of existing
CONTROL NUMBER
VERIFICATION

export pumps at SAMREF. The required new metering skids shall be installed at
SAMREF. The tie-ins will be taken from the SAMREF export lines going to their
EDSD

terminal near to the fence at King Fahad Road (RC Corridor). All new equipment
DATE:

shall also be installed at space available near to tie-ins.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

CONTRACTOR shall design and install three product pipelines each of 30” size for
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

PG95/PG91, DO and DPK. These pipelines will be connected at the discharge of


(DCC) NO. _____________________

SAMREF export pumps. Accordingly, tie-ins will be taken from 24” existing pipes to
SAMREF terminal. CONTRACTOR shall design and install three custody metering
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 81


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
skids each dedicated for PG95/PG91, DO and DPK at SAMREF. Each metering
SAY
SAY
SAY

skid shall consists of 3 meter runs (2 operating and 1 standby), two prover
assembly (1 for PG/DO and 1 for DPK) and a densitometer. These metering skids
ENGG CERT

ASH
ASH
ASH

shall be interfaced with YDH through SAMREF.


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall install surge relief system for the new pipeline at SAMREF.
The surge relief system shall consist of surge relief valves discharging to a
common tank from all pipelines. The product collected in the tank to be emptied to
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

the pipeline with the pump provided along with surge relief tank. Details of surge
relief system at SAMREF are mentioned in section 4.7.

Connections of oily water drain from metering skids and surge relief tank & pump
DESCRIPTION

shall be finalized during detailed design. CONTRACTOR shall verify the tie-ins to
the drain / oily water system and shall connect the drains accordingly.

The scope for the SAMREF pipelines and their connections into YDH receiving
manifolds is outlined in PFD VA-247834.001 and P&IDs VA-247878.001 to VA-
247885.001.

B. PIPING
10-02399-
JO/EWO

10-02399-
10-02399-
0001

YDH shall receive PG 91/95, DO, and DPK from the SAMREF refinery via three
0001
0001

pipelines extending from the SAMREF tank farm to YDH product receiving
12/11/16

manifolds.
08/04/16

09/08/16
DATE

• The SAMREF supply connection to YDH shall be downstream of existing


export pumps. And the required new metering skids & injections skids shall be
NO.
REV

D
C
B

installed at SAMREF.
DISCIPLINE
ENGINEER
ALL LEADS • The main interface connection between this BI-10-02399 and others is at the
DATE: 12/11/16 existing headers itself, i.e., from the SAMREF export lines going to their
PROJECT
ENGINEER terminal near to the fence at King Fahad Road (RC Corridor. Inside plant,
A M ALMATROOK piping team will bring the connection to battery limit where inside plant piping
DATE: 12/11/16 and these 3 YR - YDH pipelines interfaces.
CERTIFIED


AMR EL SHARKAWY
The tie-in details and routing of three pipelines are shown in piping plans, Tie-
12/11/16
DATE: in Index as per DCL No GEN-D0001. The drawings mentioned here are only
CONSTRUCTION
AGENCY for reference; however these drawing to be verify during detail design.
SHAHZAD YAZDANI

DATE: 12/11/16 • New metering skid to be installed inside SAMREF refinery. (Ref. Plot plan
OPERATIONS
Drawing PIA00430-001). The final location will be finalized during detail
ALI H GHAMDI
design.
12/11/16
DATE:


CONTROL NUMBER

Based on surge study, new Surge tank & associated facilities inside SAMREF
VERIFICATION

refinery were added, exact location and feasibility study to be conducted after
EDSD

confirmation during detail design phase.


DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

C. PIPELINE
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

C.01 PURPOSE
The following design basis has been established for YDH to be constructed by this
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 82


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
project.
SAY
SAY
SAY

C.02 PIPELINE DESIGN BASIS


ENGG CERT

ASH
ASH
ASH

Three product pipelines shall be constructed from SAMREF refinery to YDH receipt
LEADS

LEADS
LEADS
ALL

ALL
ALL

manifolds. These pipelines shall handle diesel, DPK/kerosene and gasoline. The
gasoline pipeline shall transfer both PG91 and PG95 products in a batching
operation.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

C.03 PIPELINE PHYSICAL INTERFACES

The main interface connection between this BI-10-02399 and SAMREF is at the
DESCRIPTION

existing lines (SAMREF to Marine Terminal). Inside plant piping team will bring the
connection to battery limit where inside plant piping and these 3 SAMREF - YDH
pipelines interfaces

C.04 PRODUCT PIPELINE CORRIDOR

The pipeline to be constructed for this project shall be routed through existing RC
pipeline corridors. Pipeline route from SAMREF is through pipeline corridor at BB
Avenue, going to the 4th street corridor and to the pipeline corridor in between
10-02399-
JO/EWO

10-02399-
10-02399-
0001

King Abdul-Aziz road and Haul road of the refineries. Each product pipeline is
0001
0001

approximately 11.0 km long from SAMREF to YDH. Each pipeline shall be design
12/11/16

to have elevated horizontal Vertical U-Loops for flexibility.


08/04/16

09/08/16
DATE

CONTRACTOR shall verify the Pipeline route according to the Overall Pipeline
route DWG PP-A00005.001 and Piping Plans. The CONTRACTOR will maintain
NO.
REV

D
C
B

1m (OD to OD) spacing between the new pipelines. The CONTRACTOR shall
DISCIPLINE
ENGINEER
ensure that the pipelines are within YRC corridor boundaries during the detail
ALL LEADS design. The below listed roads shall be thrust boring and the spacing requirements
DATE: 12/11/16 will be coordinated, discussed with the thrust boring specialist reviewed, concurred
PROJECT
ENGINEER and approved by SARAMCO and YRC during the detail design.The
A M ALMATROOK CONTRACTOR will consider the water table and borehole analysis for the road
DATE: 12/11/16 crossings during the detail design.
CERTIFIED
AMR EL SHARKAWY
C.05 PIPELINE PARAMETERS
12/11/16
DATE:
CONSTRUCTION
AGENCY Design Pressure (P) = MAOP of 1792.6 kPag (260 PSIG)
SHAHZAD YAZDANI
Design Temperature = 75°C
DATE: 12/11/16
OPERATIONS Corrosion Allowance = 1.6mm
ALI H GHAMDI

12/11/16 Pipeline Diameter (D) = 30 inch


DATE:
CONTROL NUMBER

Pipe Specification = API-5L Grade X60


VERIFICATION
EDSD

Flange Rating = ASME Class 150


DATE:
BY:

*Other Flow conditions are shown in the Line Designation Table see PID00442
REVISIONCERTIFICATION

sheet 001 to 002 and PID00442 sheet 001 to 003.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

C.06 PIPELINE ROAD CROSSING

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 83


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The three (3) 30” pipelines will cross eleven (11) roads as follow:
SAY
SAY
SAY

Item Road Name PROPOSED Length (M) REF. DWG


ENGG CERT

ASH
ASH
ASH

No. CROSSING Approx.


TYPE
LEADS

LEADS
LEADS
ALL

ALL
ALL

1 #1-King Fahd Road Thrust Boring 90 PP-


A00130.001
2 #2-Main Berth Access Road Thrust Boring 21 PP-
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

A00131.001
3 #3-Causeway Road and piping Thrust Boring 45 PP-
Corridor A00131.002
DESCRIPTION

4 #4-NGL Main Facilities Open Cut 23 PP-


A00132.001
5 #5-NGL Plant Entrance Road Thrust Boring 37 PP-
A00133.001
6 #6-Access Road to Diners Open Cut 34 PP-
A00134.001
7 #7- Al Mishani Street (Haul Road) Thrust Boring 25 PP-
A00135.001
8 #8-Approach Road(From/To Thrust Boring 47 PP-
YASREF) A00136.001
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

9 #9-Approach Road(From/To YR) Thrust Boring 46 PP-


A00137.001
12/11/16
08/04/16

09/08/16
DATE

10 #10-King Abdul Aziz Road Thrust Boring 55 PP-


A00138.001
11 #11-Shareh Al Awel Thrust Boring 126 PP-
NO.
REV

D
C
B

DISCIPLINE
A00139.001
ENGINEER
ALL LEADS
Thrust boring procedure shall be done by the approved SAUDI ARAMCO Thrust boring
DATE: 12/11/16
PROJECT contractor and pipe shall be coated as per SAES-H-002 Para. 5.1.2. and 5.4.4.
ENGINEER

A M ALMATROOK
CONTRACTOR shall conduct site survey to finalize the pipeline routing proposed
DATE: 12/11/16
CERTIFIED
during detailed design.
AMR EL SHARKAWY

DATE:
12/11/16 CONTRACTOR shall provide all adequate civil /structural arrangements for road
CONSTRUCTION crossings as proposed in pipeline drawings this shall include but not limited to soil
AGENCY
SHAHZAD YAZDANI
excavation, backfilling, concrete lining, dewatering if required and detour for open cut
road crossings.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
CONTRACTOR shall conduct detailed geotechnical investigation at road crossing
12/11/16 location to assess soil condition to determine methodology to be used for thrust boring
DATE:
option.
CONTROL NUMBER
VERIFICATION
EDSD

CONTRACTOR shall verify and provide insulation gasket and set of flanges installation
for above & underground transitions at road crossings and interface points (between
DATE:

Piping and Pipeline) inside the refineries in accordance with SAUDI ARAMCO Standard
BY:

requirements for cathodic protection.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall review the proposed road crossing techniques and prepare a
(DCC) NO. _____________________

complete construction packages and seek approval from SAUDI ARAMCO, YRC and
relevant local authorities at early stage of project design.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 84


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

CONTRACTOR may consider thrust boring utilizing Micro-Tunneling Method (MTM) for
pipeline road crossings, wherever it entails time and safety advantages to the project..
ENGG CERT

ASH
ASH
ASH

SAMREF pipeline drawings submitted to YRC for road crossings are attached under
LEADS

LEADS
LEADS
ALL

ALL
ALL

Appendix 2.

D. INSTRUMENTATION
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall perform the following activities in SAMREF

Provide and install Three (3) custody metering skids for PG91/95, DO and DPK
DESCRIPTION

with a prover PG91/95 and DO, and a separate prover for DPK, the skid shall be
as per SAES-Y-103. The metering skids field instrumentation shall be integrated to
metering and control cabinets such as flow computer cabinet, PLC cabinet and
MSC cabinet. A vendor supplied metering shelter shall be provided to house these
cabinets.

The CONTRACTOR shall supply the Gas detection sensors field mounted beacon
and horns in the metering shelter.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Skid Vendor/LSTK shall supply prefab air-conditioned Metering Shelter constructed


in compliance with electrical area classification requirements and Saudi Aramco
12/11/16
08/04/16

09/08/16

/SAMREF Standards.
DATE

The CONTRACTOR shall provide a new DCS Controller with input-output modules
NO.
REV

D
C
B

and a separate FTA/marshalling cabinet to integrate new field instruments added


DISCIPLINE
ENGINEER by BI-10-02399 in SAMREF facility. The DCS cabinets shall be installed in
ALL LEADS metering shelter. The Metering Supervisory Computer (MSC) shall be interfaced to
DATE: 12/11/16 DCS via open industry standard protocol such as Modbus TCP/IP, OPC etc. Refer
PROJECT
ENGINEER block diagram IN-A00001.009 for Custody Metering System.
A M ALMATROOK

DATE: 12/11/16 The CONTRACTOR shall provide redundant fiber optic cables between metering
CERTIFIED shelter and nearest OMS control building in the tank farm area of SAMREF. The
AMR EL SHARKAWY

12/11/16
new DCS shall be tied to the existing plant control network at OMS control room.
DATE: The HMI station at OMS control room will be updated with the new instrumentation
CONSTRUCTION
AGENCY added by BI-10-02399.
SHAHZAD YAZDANI

DATE: 12/11/16 The new ESD valves added by BI-10-02399 at the battery limit of SAMREF facility
OPERATIONS
shall be integrated to existing ESD system. The contractor shall provide new
ALI H GHAMDI
junction boxes and cables. The ESD marshalling cabinet OMMRS01 shall be used
12/11/16
DATE: to terminate ESD cables at OMS Rack-room.
CONTROL NUMBER
VERIFICATION

The CONTRACTOR shall provide junction boxes and field homerun cables as
EDSD

indicated in block diagram# IN-A00001.007


DATE:
BY:

The YDH control system shall be interfaced to SAMREF control system to have
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

READ ONLY access to the data points such as the CMS, EIV status and Pump
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

status and tank status. The data is to be exchanged via plant DMZ through PI
(DCC) NO. _____________________

system at both the facilities. New fiber optic cable is to be laid from SAMREF to
YDH for the data exchange.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 85


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

As alternate method, LSTK CONTRACTOR shall evaluate the


implementation of the MODBUS TOFINO Firewall method within P&CSD
ENGG CERT

ASH
ASH
ASH

concurrence once PCS vendor is selected.


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall install MOV-1111/2/3/4, MOV-1211/12, and MOV-


1311/12/13/14/15/16/17/18 as shown in P &ID and Piping Plan #PI-
A00435/36/37/38. Provide and install Junction boxes and lay homerun cable IC-
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

0116/117/124/125 up to new DCS Marshalling Cabinet in located in metering


shelter.
DESCRIPTION

CONTRACTOR shall provide and install ZV-1112/1212/1312 and install cable IC-
0133 from ESD junction box to existing ESD marshalling cabinet OMRS01.
Contractor shall utilize existing cable tray to run home cable from junction to OMS
control room.

THE CONTRACTOR shall provide and install field instruments such as surge relief
System as indicated in P &IDs VA-247878-001 and VA-247879-001and VA-
247880-001 and as per block diagram IN-A00001.012
10-02399-
JO/EWO

10-02399-
10-02399-

THE CONTRACTOR shall Provide and install field junction box X40-AJB-001 &
0001

0001
0001

X40-EAJB-001 and DJB-003 lay homerun cable IC-3029,IC-3032,IC-3039 from JB


to OMS control room.
12/11/16
08/04/16

09/08/16
DATE

THE CONTRACTOR shall provide and install cables between IRP panels located
NO.
REV

D
C
B

in substation to OMS control room.


DISCIPLINE
ENGINEER
ALL LEADS
Installation shall be as per below reference drawings
DATE: 12/11/16
PROJECT
ENGINEER

A M ALMATROOK
J8DF5007-001 OMS CONTROL ROOM LAYOUT
DATE: 12/11/16 232J081-001 BLOCK DIAGRAM, OM & S CONTROL HOUSE
CERTIFIED
AMR EL SHARKAWY
IN-A00001.009 SAMREF CUSTODY METERING SKIDS
12/11/16 IN-A00001.007 SAMREF INTERFACE
DATE:
CONSTRUCTION IN-A00001.012 SAMREF INTERFACE
AGENCY
SHAHZAD YAZDANI IN-E00031 DCS INPUT-OUTPUT LIST
DATE: 12/11/16 IN-E00032 ESD INPUT-OUTPUT LIST
OPERATIONS
IN-D00030.001 CABLE AND CONDUIT SCHEDULE
ALI H GHAMDI

12/11/16 IN-E000000 FSD- DISTRIBUTED CONTROL SYSTEM


DATE:
IN-E000000 TSD-DCS MODIFICATION-SAMREF DCS
CONTROL NUMBER
VERIFICATION
EDSD

E. ELECTRICAL
DATE:
BY:
REVISIONCERTIFICATION

SAMREF shall supply all electrical power and connections required for MOVs and
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

other miscellaneous loads.


C

(DCC) NO. _____________________

CONTRACTOR scope shall include but not be limited to Design Two (2nos.) 480V,

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 86


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
100A, 3Ph, 3W, 60Hz Outdoor Power Panel (NEMA 4X) with all cables, conduits,
SAY
SAY
SAY

supports structures and other required accessories to feed power to MOVs and
other miscellaneous loads (refer to drawing # EL-A10052 located in Appendix
ENGG CERT

ASH
ASH
ASH

13.2.4).
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR scope shall include but not be limited to Design for one (1), 10KVA
UPS including cables, conduit and other required accessories in Substation # 12 at
SAMREF.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall Provide Lighting and Grounding system in compliance with


SAUDI ARAMCO Standards by utilizing existing system.
DESCRIPTION

F. CIVIL

A 6.0m wide asphalt access road shall be provided. Road structure shall be as per
section 4.20 (In-Plant roads).
Oily water drainage system shall be provided and tie-in the new oily water line to
the nearest available OWS system.

E. Telecom
10-02399-
JO/EWO

10-02399-
10-02399-

For FOC cable road crossing, refer to Appendix 2


0001

0001
0001

4.13 Pipeline Connection from YASREF Refinery


12/11/16
08/04/16

09/08/16
DATE

A. GENERAL
NO.
REV

D
C
B

DISCIPLINE YDH is designed to receive gasoline and diesel products from the YASREF
ENGINEER
ALL LEADS refinery via two pipelines. The pipeline connection will be downstream of the
DATE: 12/11/16
YASREF pumps to utilize the pump as the pressure source to move the product
PROJECT into a full tank at YDH. YDH pipeline connection shall not interfere with the transfer
ENGINEER

A M ALMATROOK
operation of product flowing from YASREF to Yanbu as per the project BI-10-
00043, Yanbu Refinery Clean Fuels – YASREF Interface.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY CONTRACTOR shall design and install the two product pipelines from YASREF
DATE:
12/11/16 and their connections into YDH receiving manifolds including, but not limited to the
CONSTRUCTION
AGENCY
following facilities:
SHAHZAD YAZDANI

DATE: 12/11/16 • Two tie-ins in pipes at Yanbu Refinery


OPERATIONS • Two product pipelines each for PG95/91 and DO from tie-in
ALI H GHAMDI • Interfacing of both custody metering skids from YASREF to YDH
DATE:
12/11/16 • Connections in YDH receiving manifolds for two product pipelines from
YASREF
CONTROL NUMBER
VERIFICATION
EDSD

Two pipelines (one for DO and one for PG 95/91) along with metering skids at
YASREF shall be provided under BI-10-00043. This project will tie-in to the
DATE:
BY:

downstream of the metering skid and isolation valve (outside YASREF battery limit,
REVISIONCERTIFICATION

inside the Yanbu refinery ) to utilize the existing export pumps and new metering
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

skids provided by BI-10-00043, for the supply to YDH. The tie-in locations to the
C

pipeline will be inside the Yanbu refinery and BI-10-00043 will provide a manual
(DCC) NO. _____________________

valve on both pipelines for tie-ins to YDH. CONTRACTOR shall co-ordinate with

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 87


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
BI-10-00043 for the tie-in location before detail design.
SAY
SAY
SAY

CONTRACTOR shall design and install two product pipelines each of 30” size for
ENGG CERT

ASH
ASH
ASH

PG95/PG91 and DO. Tie-ins will be taken accordingly in the 30” pipeline to YR
under BI-10-00043 scope. Two custody metering skids to be installed under BI-10-
LEADS

LEADS
LEADS
ALL

ALL
ALL

00043 shall be interfaced with YDH.

The scope for the YASREF pipelines and their connections into YDH receiving
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

manifolds is outlined in PFD VA-247833.001 and P&IDs VA-247876.001 & VA-


247877.001.

B. PIPING
DESCRIPTION

YDH shall receive PG 91/95 and DO products from the YASREF via two pipelines.
The pipeline supply to YDH will connect to the pipeline provided by BI-10-00043.

The location of Tie in connection of PG91/95 (Tie-in No. V25-023) & DO (Tie-in No.
V25-025) from YASREF will be taken near the entrance of YR or inside the YR.
The exact location will be decided during detail design stage & co-ordination with
BI-10-00043.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

The tie-in details and routing of two pipelines are shown in PIB00451.001 & piping
0001
0001

plan dwg no. PI-A00403.004 located in DCL no GEN-D0001. The drawing


mentioned here are only for reference.
12/11/16
08/04/16

09/08/16
DATE

The dye injection skid & associated facilities for YASREF product pipeline for
NO.
REV

D
C
B

PG91/95 will be provided inside boundary limit of YDH.


DISCIPLINE
ENGINEER
ALL LEADS Based on surge study, new Surge lines & associated facilities were added inside
DATE: 12/11/16 YANBU refinery, exact location and feasibility study to be conducted after
PROJECT
ENGINEER
confirmation during detail design phase.
A M ALMATROOK

DATE: 12/11/16
CERTIFIED C. PIPELINE
AMR EL SHARKAWY

12/11/16
DATE: C.01 PURPOSE
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI The following design basis has been established for YDH to be constructed by this
DATE: 12/11/16 project.
OPERATIONS
ALI H GHAMDI C.02 PIPELINE DESIGN BASIS
12/11/16
DATE:
The two new 30-inch product pipelines shall tie-in to the existing YASREF refinery
CONTROL NUMBER
VERIFICATION

lines going to the YDH receipt manifolds The pipeline shall handle diesel and
EDSD

gasoline. The gasoline pipeline shall transfer both PG91 and PG 95 products in a
batching operation. A 30-inch Pipeline for the surge will be routed and constructed
DATE:
BY:

from YANBU refinery parallel with these 2 new pipelines till the interface in YDH.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

C.03 PIPELINE PHYSICAL INTERFACES


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 88


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
These products, diesel and gasoline, shall be transferred from YASREF to YANBU
SAY
SAY
SAY

refinery as part of BI-10-00043. The tie-in to these two pipelines will be to manual
Tie-in Globe Valves (provided by BI-10-00043) located inside the perimeter fence
ENGG CERT

ASH
ASH
ASH

of YANBU refinery, the physical interface shall be at the flange provided by plant
piping team. The reference drawings for 30-inch surge pipeline at Yanbu Refinery
LEADS

LEADS
LEADS
ALL

ALL
ALL

is PI-A00403.004 and YDH is PI-A00047.001.

C.04 PRODUCT PIPELINE CORRIDOR


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

The pipeline to be constructed for this project shall be routed through new pipeline
corridors. Pipeline route from YANBU refinery is through a thrust boring starting
from inside YANBU refinery and going to cross SSD fence, Haul Road, King
DESCRIPTION

Abdulaziz Road and Shareh Al-Awel to YDH. Each product pipeline is


approximately 500 meter long from YANBU to the new Yanbu Distribution Hub.
Each pipeline shall be designed to have elevated horizontal Vertical U-Loops for
flexibility. The CONTRACTOR will maintain 1m (OD to OD) spacing between the
new pipelines. The CONTRACTOR shall ensure that the pipelines are within YRC
corridor boundaries during the detail design. The below listed roads shall be thrust
boring and the spacing requirements will be coordinated, discussed with the thrust
boring specialist reviewed, concurred and approved by SARAMCO and YRC
during the detail design.The CONTRACTOR will consider the water table and
10-02399-
JO/EWO

10-02399-
10-02399-
0001

borehole analysis for the road crossings during the detail design.
0001
0001

12/11/16

C.05 PIPELINE PARAMETERS


08/04/16

09/08/16
DATE

Design Pressure (P) = MAOP of 1792.6 kPag (260 PSIG)


NO.
REV

D
C
B

DISCIPLINE
Design Temperature = 75°C
ENGINEER
ALL LEADS Corrosion Allowance = 1.6mm
DATE: 12/11/16
PROJECT
Pipeline Diameter (D) = 30 inch
ENGINEER

A M ALMATROOK Pipe Specification = API-5L Grade X60


DATE: 12/11/16
CERTIFIED
Flange Rating = ASME Class 150
AMR EL SHARKAWY

12/11/16
DATE:
CONSTRUCTION *Other Flow conditions are shown in the Line Designation Table see PID0450
AGENCY
SHAHZAD YAZDANI
sheet 001 to 002.
DATE: 12/11/16
OPERATIONS C.06 PIPELINE ROAD CROSSING
ALI H GHAMDI

12/11/16 The two (2) pipelines and 30inch surge pipeline will cross Three (3) roads as
DATE:
follows:
CONTROL NUMBER
VERIFICATION
EDSD

Item Road Name PROPOSED Length (M) REF. DWG


No. CROSSING Approx.
DATE:

TYPE
BY:

1 #10-King Abdul Aziz Thrust Boring 55 PP-A00138.001


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Road
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

2 #11-Shareh Al-Awel Thrust Boring 126 PP-A00139.001


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 89


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3 #12-Haul Road (Yanbu Thrust Boring 69 PP-A00150.001
SAY
SAY
SAY

Refinery
ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall conduct site survey to finalize the pipeline routing proposed
during detailed design.
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall provide all adequate civil /structural arrangements for road
crossings as proposed in pipeline drawings this shall include but not limited to soil
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

excavation, backfilling, concrete lining, dewatering if required.

CONTRACTOR shall conduct detailed geotechnical investigation at road crossing


location to assess soil condition to determine methodology to be used for thrust boring
DESCRIPTION

option.

CONTRACTOR shall verify and provide insulation gasket and set of flanges
installation for above and underground transitions at road crossings and interface
points (between Piping and Pipeline) inside the refineries in accordance with SAUDI
ARAMCO Standard requirements for cathodic protection.

CONTRACTOR shall review the proposed road crossing techniques and prepare a
complete construction packages and seek approval from SAUDI ARAMCO, YRC and
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

relevant local authorities at early stage of project design.


12/11/16
08/04/16

09/08/16

CONTRACTOR may consider thrust boring utilizing Micro-Tunneling Method (MTM) for
DATE

pipeline road crossings, wherever it entails time and safety advantages to the project..
NO.
REV

D
C
B

YASREF pipeline drawings submitted to YRC for road crossings attached.


DISCIPLINE
ENGINEER
ALL LEADS

DATE: 12/11/16 D. INSTRUMENTATION


PROJECT
ENGINEER

A M ALMATROOK YDH control system shall be interfaced to YASREF control system to have
DATE: 12/11/16 READ ONLY access to the data points such as the CMS, EIV status and Pump
CERTIFIED status. The data is to be exchanged via plant DMZ through PI system at both
AMR EL SHARKAWY

12/11/16
the facilities.
DATE:
CONSTRUCTION
AGENCY As alternate method, LSTK CONTRACTOR shall evaluate the implementation
SHAHZAD YAZDANI of the MODBUS TOFINO Firewall method within P&CSD concurrence once
DATE: 12/11/16 PCS vendor is selected.
OPERATIONS
ALI H GHAMDI
Contractor shall provide new fiber optic cable from YASREF to YDH for the
12/11/16
DATE: data exchange. The interface is shown in preliminary block # IN-A00001.004
CONTROL NUMBER
VERIFICATION

Contractor shall coordinate with Refinery Control System Vendor for the
EDSD

interface requirements.
DATE:
BY:

F. Telecom
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

For FOC cable road crossing, refer to Appendix 2


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 90


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.14 Pipeline Connection from Yanbu Refinery Terminal
SAY
SAY
SAY

A. GENERAL
ENGG CERT

ASH
ASH
ASH

YDH is designed to receive PG 91, PG 95, Diesel, and Kerosene from the Yanbu
LEADS

LEADS
LEADS
ALL

ALL
ALL

Refinery Terminal. Three pipelines will connect into the Yanbu Refinery Terminal
offload pipelines at a location just upstream of the Existing Aramco refinery tank
farm to utilize the vessel offload pump as the primary pressure source and the
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

existing marine loading & transfer pumps as booster pumps to move the product
into a full tank at YDH. The new connections shall be designed not to interfere with
the current vessel offload operations
DESCRIPTION

CONTRACTOR shall design and install the three product pipelines each of 24” size
from Yanbu Refinery Terminal (YRT) through Yanbu Refinery (YR) and their
connections into YDH receiving manifolds including, but not limited to the following
facilities:

• Tie-ins in existing piping at YR


• Three product pipelines each for PG95/91, DO and DPK from YR to YDH
• Connections in YDH receiving manifolds for three product pipelines from YRT
• Surge relief system at YR including SRVs, surge tank & pump.
10-02399-
JO/EWO

10-02399-
10-02399-
0001


0001
0001

Fire water system connection


• Connection to oily water system.
12/11/16
08/04/16

09/08/16
DATE

YDH shall receive PG 91/95, DO, and DPK from the Yanbu Refinery Terminal
through three pipelines extending from Yanbu refinery tank farm to YDH. The
NO.
REV

D
C
B

interface to the terminal unloading lines will be at Yanbu refinery tank farm. The
DISCIPLINE
ENGINEER primary source for the supply of products to YDH shall be the pumps on the ship
ALL LEADS
and the existing marine loading & transfer pumps shall be used as booster pumps
DATE: 12/11/16 to move the product into a full tank at YDH.
PROJECT
ENGINEER

A M ALMATROOK CONTRACTOR shall design and install three product pipelines each of 24” size for
DATE: 12/11/16 PG95/PG91, DPK and DO. These pipelines will be connected at the discharge of
CERTIFIED
AMR EL SHARKAWY
existing marine loading & transfer pumps. Pump suction side shall be connected to
12/11/16 new lines that are tied into existing lines coming from YRT. Accordingly, tie-ins will
DATE:
CONSTRUCTION
be taken from the existing pipes at existing pump suction & discharge side and
AGENCY existing pipes coming from YRT.
SHAHZAD YAZDANI

DATE: 12/11/16
CONTRACTOR shall install surge relief system for the new pipelines of YASREF
OPERATIONS
and YR at Yanbu refinery. The surge relief system shall consist of surge relief
ALI H GHAMDI
valves discharging to a common tank from all pipelines. The product collected in
12/11/16
DATE: the tank to be emptied to the pipeline with the pump provided along with surge
CONTROL NUMBER

relief tank. Details of surge relief system at SAMREF are mentioned in section 4.7.
VERIFICATION

<This requirement is on hold until approval of surge analysis report from P&CSD>
EDSD

DATE:

Connection of oily water drain from surge relief tank & pump shall be finalized
BY:

during detailed design. CONTRACTOR shall verify the tie-ins to the oily water
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

system and shall connect the drain accordingly.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

The scope for the YRT pipelines and their connections into YDH receiving
manifolds is outlined in PFDs VA-239708.002, VA-250323.001, VA-250324.002 &
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 91


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
VA-250325.002 and P&IDs VA-239739.001, VA-234308.015, VA-234308.020, VA-
SAY
SAY
SAY

234308.026 & VA-234308.027.


ENGG CERT

ASH
ASH
ASH

B. PIPING
LEADS

LEADS
LEADS
ALL

ALL
ALL

YDH shall receive PG 91/95, DO, and DPK from the Yanbu Refinery Terminal
through three pipelines extending from Yanbu refinery tank farm to YDH. The
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

interface to the terminal unloading lines will be at Yanbu refinery tank farm.

The primary source for the supply of products to YDH shall be by utilizing the
existing pumps installed at Yanbu Refinery Tank farm near to available space
DESCRIPTION

towards YRT fence to feed to YDH.

• To install new feed line for Gasoline (PG91/PG95) to YDH, tie-in at the 18”
common header of Gasoline loading and Transfer pumps (V25-P-P17 A-E)
to be taken at Yanbu Refinery near Pump Station-C.

• To install new feed line for Kerosene (DPK) to YDH, Tie-in at the 20”
common header of Kerosene loading and Transfer pumps (V25-P22 A/B/C)
10-02399-
JO/EWO

10-02399-
10-02399-

to be taken at Yanbu Refinery near Pump Station-B.


0001

0001
0001

• To install new feed line for Diesel(DO) to YDH ,Tie-in at the 20”MDO
12/11/16
08/04/16

09/08/16
DATE

common header of Diesel loading and Transfer Pumps(V25-P24-A/B/C) to


be taken at Yanbu Refinery near Pump Station-B.
NO.
REV

D
C
B

DISCIPLINE The Layout of feed lines from existing header lines to Interface connection
ENGINEER
ALL LEADS with pipeline near YR battery limit, refer to section C.03 for detailed
DATE: 12/11/16 description.
PROJECT
ENGINEER

A M ALMATROOK • OWS UG/AG connection shall be verified during detail design Phase.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY

DATE:
12/11/16 C. PIPELINE
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
C.01 PURPOSE
DATE: 12/11/16
OPERATIONS The following design basis has been established for YDH to be constructed by this
ALI H GHAMDI project.
12/11/16
DATE:
C.02 PIPELINE DESIGN BASIS
CONTROL NUMBER
VERIFICATION
EDSD

Three product pipelines shall be constructed from YANBU refinery terminal to YDH
receipt manifolds. The pipeline shall handle diesel, both grades of gasoline, and
DATE:

DPK/kerosene. The gasoline pipeline shall transfer both PG91 and PG 95 products
BY:

in a batching operation.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

C.03 PIPELINE PHYSICAL INTERFACES


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 92


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The main interface connection between this BI-10-02399 and others is at the
SAY
SAY
SAY

existing headers itself and not elsewhere. Inside plant piping team will bring the
connection to battery limit where inside plant piping and these 3 YR - YDH
ENGG CERT

ASH
ASH
ASH

pipelines interfaces
LEADS

LEADS
LEADS
ALL

ALL
ALL

C.04 PRODUCT PIPELINE CORRIDOR

The pipeline to be constructed for this project shall be routed through new pipeline
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

corridors. Pipeline route from YANBU refinery is through Thrust Boring starting
from inside YANBU refinery and going to cross existing SSD fence, Haul Road,
King Abdulaziz Road and Shareh Al-Awel to YDH. Each product pipeline is
approximately 500 meter long from YANBU to the new Yanbu Distribution Hub.
DESCRIPTION

Each pipeline shall be design to have elevated horizontal Vertical U-Loops for
flexibility. CONTRACTOR shall verify the Pipeline route according to the Overall
Pipeline route DWG PP-A00005.001 and Piping Plans. The CONTRACTOR will
maintain 1m (OD to OD) spacing between the new pipelines. The CONTRACTOR
shall ensure that the pipelines are within YRC corridor boundaries during the detail
design. The below listed roads shall be thrust boring and the spacing requirements
will be coordinated, discussed with the thrust boring specialist reviewed, concurred
and approved by SARAMCO and YRC during the detail design.The
CONTRACTOR will consider the water table and borehole analysis for the road
10-02399-
JO/EWO

10-02399-
10-02399-
0001

crossings during the detail design.


0001
0001

12/11/16

C.05 PIPELINE PARAMETERS


08/04/16

09/08/16
DATE

Design Pressure (P) = MAOP of 1792.6 kPag (260 PSIG)


NO.
REV

D
C
B

DISCIPLINE
Design Temperature = 75°C
ENGINEER
ALL LEADS Corrosion Allowance = 1.6mm
DATE: 12/11/16
PROJECT
Pipeline Diameter (D) = 24 inch
ENGINEER

A M ALMATROOK Pipe Specification = API-5L Grade X60


DATE: 12/11/16
CERTIFIED
Flange Rating = ASME Class 150
AMR EL SHARKAWY

12/11/16
DATE:
CONSTRUCTION
AGENCY *Other Flow conditions are shown in the Line Designation Table see PID00402
SHAHZAD YAZDANI sheet 001 to 004.
DATE: 12/11/16
OPERATIONS C.06 PIPELINE ROAD CROSSING
ALI H GHAMDI

12/11/16 The three (3) pipelines will cross three (3) roads as follow:
DATE:
CONTROL NUMBER
VERIFICATION

Item Road Name CROSSING TYPE Length(M) REF. DWG


EDSD

No. Approx.
1 #10-King Abdul Aziz Thrust Boring 55 PP-A00138.001
DATE:
BY:

Road
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

2 #11-Shareh Al-Awel Thrust Boring 126 PP-A00139.001


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

3 #12-Haul Road Thrust Boring 69 PP-A00150.001


(DCC) NO. _____________________

(Yanbu Refinery

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 93


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall conduct site survey to finalize the pipeline routing proposed
SAY
SAY
SAY

during detailed design.


ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall provide all adequate civil /structural arrangements for road
crossings as proposed in pipeline drawings this shall include but not limited to soil
LEADS

LEADS
LEADS
ALL

ALL
ALL

excavation, backfilling, concrete lining, dewatering if required.

CONTRACTOR shall conduct detailed geotechnical investigation at road crossing


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

location to assess soil condition to determine methodology to be used for thrust boring
option.

CONTRACTOR shall verify and provide insulation gasket and set of flanges
DESCRIPTION

installation for above & underground transitions at road crossings and interface points
(between Piping and Pipeline) inside the refineries in accordance with SAUDI
ARAMCO STANDARD requirements for cathodic protection.

CONTRACTOR can consider thrust boring thru the Micro-Tunneling Method (MTM) for
pipeline road crossings, wherever it entails cost, time and safety advantages to the
project with previous SAUDI ARAMCO approval.

SAMREF pipeline drawings submitted to YRC for road crossings to be attached.


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

D. INSTRUMENTATION
12/11/16
08/04/16

09/08/16
DATE

CONTRACTOR shall provide and install field instruments, Motor Operated and
Electrohydraulic ESD valves at the battery limit of Yanbu Refinery, MOVs shall also be
NO.
REV

D
C
B

provide at the tie-in locations.


DISCIPLINE
ENGINEER
ALL LEADS CONTRACTOR shall provide and install new homerun cables from valves up to the
DATE: 12/11/16 existing SIH-1590 (Satellite Instrument House) in tank farm area. SIH-1590 is
PROJECT
ENGINEER expanded under BI-10-00043, the project shall coordinate with BI-10-00043 shall to
A M ALMATROOK reserve the space required by this BI. All new EIVs will be connected to new ESD
DATE: 12/11/16 Marshalling Cabinet provided by BI-10-00043. BI-10-02399 will provide required input-
CERTIFIED output modules to integrate to ESD system provided under BI-10-00043.
AMR EL SHARKAWY

12/11/16
DATE: All non-ESD instruments will be connected to new DCS Marshalling Cabinet provided
CONSTRUCTION
AGENCY by BI-10-00043. BI-10-02399 will provide required input-output modules to integrate to
SHAHZAD YAZDANI DCS system provided under BI-10-00043.
DATE: 12/11/16
OPERATIONS SIH-1590 will be expanded under BI-10-00043 to accommodate the expansions under
ALI H GHAMDI this BI. The DCS/ESD provided under BI-10-00043 will be integrated to YR plant
12/11/16 network.
DATE:
CONTROL NUMBER
VERIFICATION

New instrumentation provided under BI-10-02399 will be controlled from YR tank farm
EDSD

control room and the HMIs at tank farm control room will be updated accordingly.
DATE:
BY:

In addition to this, BI-10-02399 shall interface Yanbu Refinery TCFR control system to
REVISIONCERTIFICATION

YDH provides View only signals related to product transfer. The data points shall be
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

the status of product pumps and EIVs such as running, stopped, tripped etc. The
C

(DCC) NO. _____________________

requirements of data from Yanbu Refinery shall be further evaluated during Detail
design phase in coordination with YDH and YREF operations.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 94


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

The interface shall be through PI system installed at both the facility, DMZ shall be
used in order to make the data exchange highly secured. Contractor shall provide fiber
ENGG CERT

ASH
ASH
ASH

cables between YREF and YDH.


LEADS

LEADS
LEADS
ALL

ALL
ALL

As alternate method, LSTK CONTRACTOR shall evaluate the implementation of the


MODBUS TOFINO Firewall method within P&CSD concurrence once PCS vendor is
selected.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall provide and install new junction boxes, branch cables, homerun
cables for instruments added by this BI.
DESCRIPTION

The field installation shall be as per P & IDs VA-247876/877 and


VA-234308.015/020/027 and Piping Plans PI-A00403.004, VA-236952.001, VA-
236952.002, VA-236956.001, VA-236956.002 and VA-236960.002

CONTRACTOR shall provide and install field instruments such as surge relief System
as indicated in P &IDs PR-A00001.Sht001 & 002 and VA-234308-015 and VA-234308-
Sht 020 and Sht027 as per block diagram IN-A00001.013
10-02399-
JO/EWO

10-02399-
10-02399-
0001

CONTRACTOR shall Provide and install field junction box X40-AJB-001 & X40-EAJB-
0001
0001

004 and DJB-007 lay homerun cable IC-2071,IC-2074,IC-2064 from JB to SIH-1590


12/11/16

Building.
08/04/16

09/08/16
DATE

CONTRACTOR shall provide and install cables between IRP panels located in
NO.
REV

D
C
B

substation to SIH-1590 Building.


DISCIPLINE
ENGINEER
ALL LEADS CONTRACTOR shall run homerun cables from Junction boxes to SIH-1590 utilizing
DATE: 12/11/16 existing cable trays. Refer drawing VA-549870.001 for cable routing.
PROJECT
ENGINEER

A M ALMATROOK Reference Drawings:


DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
Drawing# Description
DATE:
12/11/16 IN-A00001.008 Block Diagram-Yanbu Refinery
CONSTRUCTION
AGENCY
IN-A00001.013 Instrument Block Diagram
SHAHZAD YAZDANI VA-549870.001 Cable/Conduit Layout
DATE: 12/11/16 VA-549714.002 System Architecture PCS Tank Farm
OPERATIONS
ALI H GHAMDI
IN-D00031.001 Cable and Conduit Schedule
DATE:
12/11/16 IN-E00000 Technical Specification Document -DCS Modification
IN-E00033 DCS INPUT-OUTPUT LIST
CONTROL NUMBER
VERIFICATION

IN-E00034 ESD INPUT-OUTPUT LIST


EDSD

DATE:
BY:

G. ELECTRICAL
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Yanbu’ Refinery shall supply all electrical power and connections required for
(DCC) NO. _____________________

MOVs and other miscellaneous loads. Total electrical loads anticipated are about
78.5kVA Two (2) 480V, 150A, 3Ph, 3W, 60Hz Outdoor Power Panel (NEMA 4X)
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 95


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
shall be provided to feed power to MOVs and other miscellaneous loads. (Refer to
SAY
SAY
SAY

drawing # EL-A10111).
ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall utilize existing space in V21-MC71A, V21-MC81A & V21-


MC91A at Substation no-7, 8 & 9 for three (3nos.) 100AF new circuit breakers to
LEADS

LEADS
LEADS
ALL

ALL
ALL

feed new MOV power panels (Refer drawing # VA-240892-001, VA-240893.002 &
VA-240894.002).
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall coordinate with YANBU refinery to utilize the existing feeders
of YANBU substation to feed the power to newly added 150A, 480V, Switchrack at
Tank Farm area.
DESCRIPTION

CONTRACTOR shall supply and install One (1) No. 150A, 480V Switchrack near
tank farm area to feed the power to newly added Surge relief pump (X40-
X004A/B).

CONTRACTOR shall Provide Lighting and Grounding system in compliance with


SAUDI ARAMCO Standards by utilizing existing system.

H. Telecom
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

For FOC cable road crossing, refer to Appendix 2


12/11/16
08/04/16

09/08/16
DATE

4.15 ELECTRICAL
NO.
REV

D
C
B

A. GENERAL
DISCIPLINE
ENGINEER
ALL LEADS Electrical General Requirements
DATE: 12/11/16
PROJECT
ENGINEER
CONTRACTOR shall implement and comply with all the requirements as stated but
A M ALMATROOK
not limited to following:
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
CONTRACTOR scope shall include but not be limited to Detail Design,
12/11/16
DATE: procurement, supply, deliver / store, install, test, pre-commission, commissioning
CONSTRUCTION
AGENCY assistance and Final Integrated Testing, with New and Existing Systems, for all the
SHAHZAD YAZDANI
equipment provided by CONTRACTOR and all the equipment provided by SAUDI
DATE: 12/11/16
OPERATIONS ARAMCO under this BI / Project, as required for a Fully Functional and Operational
ALI H GHAMDI Facility.
12/11/16
DATE:
CONTRACTOR shall include MARAFIQ on the Engineering Review Cycle for any
CONTROL NUMBER
VERIFICATION

job related to MARAFIQ.


EDSD

DATE:

CONTRACTOR shall comply with Yanbu Royal Commission (YRC) Standards and
BY:

regulations for any scope related to YRC and MARAFIQ.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall comply with SAMREF and YASREF refineries Standards and
(DCC) NO. _____________________

regulations for any scope related to these refineries.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 96


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

CONTRACTOR shall implement Electricity & Cogeneration Regulatory Authority


ENGG CERT

ASH
ASH

(ECRA) requirement.
ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall be responsible for the correctness of all Drawings and


Documents and Software provided from vendors / manufactures / suppliers / sub-
contractors, etc. Approval or Acceptance of these Drawings and Documents and
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Software by SAUDI ARAMCO does not relive CONTRACTOR of the responsibility


of correct design, right equipment, proper installation, testing and commissioning.
DESCRIPTION

CONTRACTOR shall be fully responsible for the preparation of purchase orders,


SAUDI ARAMCO Acceptance or Approvals, FAT’s (Factory Inspection test)
inspections, Delivery to Site and storage of all the required electrical items; cooling
for batteries (UPS & DC) shall be operational prior to site delivery at a temperature
concurred by the battery manufacturer. All electric equipment that requires space
heater or anti condensation shall be provided with safe space heating arrangement
to prevent moisture absorption and damage to equipment; temporary power
requirements shall be arranged by THE CONTRACTOR.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall provide an Equipment Preservation Plan to SAUDI ARAMCO


12/11/16

a Minimum of 90 days prior to site delivery of any major electrical equipment or


08/04/16

09/08/16
DATE

electronic or battery systems and temperature sensitive equipment arrival on the


project site or delivery to an off-site storage warehouse/location for SAUDI
NO.
REV

D
C
B

DISCIPLINE
ARAMCO Projects Inspection Acceptance.
ENGINEER
ALL LEADS

DATE: 12/11/16
CONTRACTOR shall be responsible for the proper function and safe operation of
PROJECT
ENGINEER
all the equipment and systems. The design criteria and contract documents
A M ALMATROOK included are not all-inclusive and represent minimum requirements. Any additional
DATE: 12/11/16 elements or items required to achieve the correct and safe operation of the system
CERTIFIED
AMR EL SHARKAWY
shall be engineered, designed, supplied and installed in place to render a complete
DATE:
12/11/16 functional system.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall utilize the Metric System measurement in all documents and
DATE: 12/11/16 drawings unless specifically directed otherwise by SAUDI ARAMCO.
OPERATIONS
ALI H GHAMDI
CONTRACTOR shall review and approve Vendor and Subcontractor drawings,
12/11/16
DATE:
design, specifications and other documents for conformity to this Contract and
CONTROL NUMBER
VERIFICATION

institute effective internal control for prompt receipt, review, approval and return of
EDSD

such documents. CONTRACTOR shall incorporate all such applicable Vendor and
Subcontractor information in THE CONTRACTOR’S submittals to SAUDI
DATE:
BY:

ARAMCO.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

THE CONTRACTOR’S detailed “SHOP Drawings” (site developed for site


(DCC) NO. _____________________

installation and interface of Vendor equipment’s based on actual purchased

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 97


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
equipment Certified NMR 602 & NMR 603 data) shall include all necessary plans,
SAY
SAY
SAY

elevations, arrangements, sections, profiles, views and details of all facilities.


ENGG CERT

ASH
ASH
ASH

The Project SOW as conveyed herein and the documents and drawings provided
LEADS

LEADS
LEADS
ALL

ALL
ALL

with this Scope of Work document are Coherent and NOT to be utilized separately.
Any item mentioned in this document and not indicated on drawings or indicated on
drawings or not mentioned in other documents provided with this PPN, shall be of
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

like effect as if indicated or mentioned in both and vice versa.

CONTRACTOR shall check and verify all Sub-Contractor and Vendor design and
DESCRIPTION

drawings provided comply with the Scope of Work, and documents provided with
this Scope, relevant SAUDI ARAMCO and International Standards and are in
keeping with “Good Engineering Practices”.

CONTRACTOR shall comply with SAUDI ARAMCO Standards and seek SAUDI
ARAMCO advice for any potential Waivers. CONTRACTOR shall prepare such
Waivers as per SAEP-302, as required by SAUDI ARAMCO.
10-02399-
JO/EWO

10-02399-
10-02399-

CONTRACTOR shall note that “CLOUDS” on the drawings indicate a HOLD point
0001

0001
0001

due to unavailability of information or indicates a REQUIRED Tie-in from Existing


12/11/16

Equipment and Systems into New Equipment and Systems. This Tie-in is part of
08/04/16

09/08/16
DATE

CONTRACTOR Scope including any Software Supply, Upgrade and / or


modifications of Existing software.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
ALL LEADS
CONTRACTOR shall verify the power source of all equipment supplied under this
DATE: 12/11/16
project by installing a Label on or near each equipment or device receiving power.
PROJECT
ENGINEER
Switchgear, Controlgear, Power Panels, Motors, Receptacles, Light Switches,
A M ALMATROOK each Light, HVAC Panel, Communication Cabinet, Security Cabinet, Fire Alarm
DATE: 12/11/16 Panel, etc. shall have a Phenolic Label with Black text on a White background
CERTIFIED
AMR EL SHARKAWY
attached with stainless steel screws identifying the upstream power source. For
DATE:
12/11/16 example, for each Receptacle, Light Switch and Light, the label shall indicate the
CONSTRUCTION Upstream Panelboard Number and Circuit Breaker Number and indicate if a GFCI
AGENCY
SHAHZAD YAZDANI circuit.
DATE: 12/11/16
OPERATIONS
SAUDI ARAMCO requires new power sub-distribution systems to be
ALI H GHAMDI
400VAC/230VAC for four wire systems as listed in SAES-P-100.
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION

SAUDI ARAMCO requires general purpose receptacles be powered with 230VAC


EDSD

as per SASCO 2203 receptacle requirements as indicated within SAES-P-119


“Substations”. On drawings which indicate a GFCI is required, CONTRACTOR is
DATE:
BY:

permitted to install a GFCI molded case circuit breaker within the panelboard
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

powering the receptacle with a 5mA trip or an Equipment Protection Device with
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

nominal 30mA trip and shall label the receptacle with the panelboard number,
(DCC) NO. _____________________

circuit breaker number and indicate on the label “Fed from GFCI MCCB”. The label

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 98


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
shall be phenolic with Black text on a White background attached with stainless
SAY
SAY
SAY

steel screws. Receptacles with integral ground fault protection are NOT
ENGG CERT

ASH
ASH

acceptable.
ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

Framed A-Size one lines (as-built) shall be provided by CONTRACTOR and


installed in applicable Substations & Electrical Rooms including ALL rooms which
contain at least one (1) or more Switchgear, Controlgear, ATS, Battery Charger,
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Stand Alone UPS, Panelboard, etc. A copy of the applicable Certified NMR-602
shall be provided in the applicable electrical equipment room and with a metal book
case within each room in which an NMR is provided. These shall be provided
DESCRIPTION

before energization of the equipment.

CONTRACTOR shall use Premium efficiency motors for all the motor less than
500HP.

CONTRACTOR shall carry out all Electrical work in close liaison with the SAPMT
to meet the project requirements.
10-02399-
JO/EWO

10-02399-
10-02399-

CONTRACTOR scope shall include but not be limited to Detail Design,


0001

0001
0001

procurement, supply, deliver / store, install, test, pre-commission, commissioning


12/11/16

assistance and Final Integrated Testing, with New and Existing Systems, including
08/04/16

09/08/16
DATE

required ETAP studies, Plant Distribution system, Plant & buildings internal &
external Lighting System, Plant & Buildings Grounding & Lightning System,
NO.
REV

D
C
B

DISCIPLINE
Security & Fence Lighting System, Plant & Buildings Fire Alarm System,
ENGINEER
ALL LEADS
Emergency Power supply System by installing Generators, UPS power supply
DATE: 12/11/16
System for Plant operations, Security operations and Communication operations,
PROJECT
ENGINEER
DC system for Substation switchgear protection, Complete Substation with
A M ALMATROOK Substation Automation system, Cathodic Protection System, LED Lighting within
DATE: 12/11/16 the Buildings and for all External Lights (except substation exterior & fence lighting)
CERTIFIED
AMR EL SHARKAWY
attached to the buildings,115kV cable routing, Interfacing with 115kV GIS at
DATE:
12/11/16 MARAFIQ Substation # 9I, Electrical Interfacing with the SAMREF, YASREF,
CONSTRUCTION Yanbu Refinery and Yanbu-Jiddah Pipeline to provide power & Cathodic
AGENCY
SHAHZAD YAZDANI Protection(CP).
DATE: 12/11/16
OPERATIONS
Electrical Studies
ALI H GHAMDI

12/11/16
DATE:
CONTRACTOR shall perform and validate all the Electrical studies as per SAES-
CONTROL NUMBER
VERIFICATION

P-100 and obtain SAUDI ARAMCO approval in order to finalize and freeze the long
EDSD

lead electrical items to facilitate timely procurement. The purpose of the electrical
studies is to verify the ability of the plant electrical power distribution components
DATE:
BY:

are adequately sized and perform as designed during normal steady state
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

operation, with stand allowable transients and isolate faulty sections during faults.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Following Electrical studies shall be perform as a minimum but not limited to:
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 99


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• ETAP Short Circuit Analysis
SAY
SAY
SAY

• ETAP Loads Flow Analysis


ENGG CERT

ASH
ASH


ASH

ETAP Motor Starting Study


• ETAP Protective Device Co-Coordination
LEADS

LEADS
LEADS
ALL

ALL
ALL

• ETAP Arc Flash Studies as per SABP-P-051 & SAES-P-100


• ETAP Grounding study
• ETAP Power Factor Correction study
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

• Switching Transient Analysis, Transient Recovery Voltage (TRV) evaluation and


Insulation Coordination studies
• Lightning Protection Studies
DESCRIPTION

• Cathodic protection study

CONTRACTOR shall perform the ETAP study and give recommendations to


improve overall power factor as per SAES-P-100. Based on preliminary ETAP
study, Two (2), 4.2MVar, 13.8kV, 3Ph, 60Hz MV Automatic Capacitor Bank is
required to achieve power factor above 0.95 at PCC. It shall be further evaluated
with different scenarios and options to maintain pf 0.95 at PCC as per SAES-P-100
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

requirement.
12/11/16
08/04/16

09/08/16
DATE

For each of the above studies, the final study shall be completed to confirm that all
electrical equipment including all transformers, switchgear, all controlgear and all
NO.
REV

D
C
B

large motors, are adequately rated and properly specified. The study and report
DISCIPLINE
ENGINEER
shall be issued for review and approval to SAUDI ARAMCO.
ALL LEADS

DATE: 12/11/16
PROJECT
ENGINEER
All electrical loads and equipment ratings indicated on the project proposal
A M ALMATROOK
drawings and documents are preliminary and shall be verified and updated as part
DATE: 12/11/16
CERTIFIED of the detailed design engineering phase. These load values are intended only for
AMR EL SHARKAWY
ER estimate and shall not be used for construction.
12/11/16
DATE:
CONSTRUCTION
AGENCY CONTRACTOR shall define jointly with Saudi Aramco the electrical substation ID
SHAHZAD YAZDANI
number.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI

DATE:
12/11/16 Electrical Overall Power Distribution System – Design Basis
CONTROL NUMBER
VERIFICATION

Total power demand for the proposed YDH facility is estimated to be 46 MVA, with
EDSD

a first phase of approximately 23.0 MVA by 2019. Adequate spare space at all
DATE:

levels of power distribution shall be considered in order to accommodate future


BY:

proposed shipper pumps for Yanbu to Central Region pipeline planned from this
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

facility. The power system shall be suitable to start larger shipper pumps without
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

any voltage drop impact when started direct on line. For detailed electrical load list
(DCC) NO. _____________________

refer to document # CAL- EL121.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 100


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

Electrical Load Summary – Estimation electrical load include the demand load till
2040.
ENGG CERT

ASH
ASH
ASH
LEADS

S.No. Load Description by Project Maximum Operating Load


LEADS
LEADS
ALL

ALL
ALL

Phase (MVA)
1. Phase-1 23.0 MVA
2. Phase-2 9.5 MVA
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

3. Future 12.8 MVA


Total Demand Load (including 46.0 MVA
10% growth)
DESCRIPTION

The normal power supply to the proposed facility shall be from ‘MARAFIQ’s
Substation # 9I’ which is located about 3.85km from YDH facility fence. Two (2)
115 kV feeder from the GIS at MARAFIQ’s Substation #9I, shall be used to supply
power to YDH facility.

CONTRACTOR shall coordinate with MARAFIQ and implement the connection


agreement requirements between MARAFIQ & SAUDI ARAMCO during detail
10-02399-
JO/EWO

10-02399-
10-02399-

design & construction phase of the project.


0001

0001
0001

12/11/16
08/04/16

09/08/16

MARAFIQ substation is connected to a reliable and strong grid point, the SSBB
DATE

115 kV substation of Yanbu-II power plant (by 2018 this new power plant will be
available to generate 800 MW electricity, a strong reliable power source of this
NO.
REV

D
C
B

DISCIPLINE region).
ENGINEER
ALL LEADS

DATE: 12/11/16 Two (2) new substations (Receiving & Utility Substation) shall be built at YDH to
PROJECT
ENGINEER receive & distribute the power within YDH.
A M ALMATROOK

DATE: 12/11/16 Receiving Substation shall house 115kV Gas Insulated Circuit Breaker bay, 13.8kV
CERTIFIED
AMR EL SHARKAWY & 480V Metal Clad Switchgear and 480V Controlgear as main electrical equipment
DATE:
12/11/16 to receive power from MARAFIQ substation # 9I and further distribute power to
CONSTRUCTION
AGENCY
Utility Substation and Shipper Pumps.
SHAHZAD YAZDANI

DATE: 12/11/16 CONTRACTOR shall perform the ETAP study and give recommendations to
OPERATIONS
improve overall power factor as per SAES-P-100. Based on preliminary ETAP
ALI H GHAMDI

12/11/16
study, Two (2), 4.2MVar, 13.8kV, 3Ph, 60Hz MV Automatic Capacitor Bank is
DATE:
required to achieve power factor above 0.95 at PCC. It shall be further evaluated
CONTROL NUMBER
VERIFICATION

with different scenarios and options to maintain pf 0.95 at PCC as per SAES-P-100
EDSD

requirement.
DATE:
BY:

Utility Substation shall house 4.16kV & 480V Metal Clad Switchgear and 480V
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Controlgear as main electrical equipment to distribute power within YDH facilities.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

Refer to Document Control Log (GEN-D0001) for the Overall Electrical System

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 101


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Design and proposed Power Distribution to YDH facilities.
SAY
SAY
SAY
ENGG CERT

ASH
ASH

Power is stepped down from 115kV to 13.8kV and from 13.8kV to 4.16kV, 480V
ASH

and 400V by installing appropriate Power and Pad Mounted Transformers, refers
LEADS

LEADS
LEADS
ALL

ALL
ALL

to Key Single Line Diagram EL-A10006.

HV Switchgear & HV Controlgear shall be used to supply power to shipper pump


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

motors, booster pump motors, fire pumps motors, power transformers & loop feed
pad mounted transformers.
DESCRIPTION

LV MCC, Switchracks and local panels for power supply to auxiliary pump motors,
MOVs, auxiliary power and lighting power requirements, etc.

Plant Emergency backup generator c/w emergency distribution panel/MCC shall be


provided to power the critical loads and all vital service loads and infrastructure in
order to enable safe shutdown of the facility in the event of loss of Utility Power.
Generator shall be provided with an acoustic enclosure suitable for outdoor
environment.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Dry type transformers, sub distribution power panels, lighting control panel, control
12/11/16

wiring, power receptacles, indoor/outdoor lighting, and grounding, for all buildings.
08/04/16

09/08/16
DATE

Additionally, existing MV and LV power networks associated with Yanbu area


NO.
REV

D
C
B

DISCIPLINE
refineries (Yanbu Terminal, SAMREF & YASREF) will be utilized for any new loads
ENGINEER
ALL LEADS
to be added in the respective facilities. Refer to Appendix 2 Interface packages.
DATE: 12/11/16
PROJECT
ENGINEER
Electrical System Optimization
A M ALMATROOK

DATE: 12/11/16 CONTRACTOR is full responsible to Optimize the complete electrical system
CERTIFIED
AMR EL SHARKAWY
during the Detail Engineering based on latest vendor data, current site conditions,
DATE:
12/11/16 good industrial practices, International Codes and Standards, Safety Standards,
CONSTRUCTION and SAUDI ARAMCO Standards, to make the electrical system as effective or
AGENCY
SHAHZAD YAZDANI functional as possible.
DATE: 12/11/16
OPERATIONS
CONTRACTOR shall apply optimization techniques in the following areas, but not
ALI H GHAMDI
limited to:
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION

• Substation equipment layout arrangement and building dimensions.


EDSD

• Transformer yard arrangement based on transformer vendor data.


• Optimize the GIS room layout and dimensions based on latest vendor data.
DATE:
BY:

• Power and distribution transformer sizing, and loading factors.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Switchgears, switchboards, motor control centers, and power panel boards’


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

location, number’s and bus ratings.


(DCC) NO. _____________________

• Power cable sizing.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 102


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Electrical load duties for equipment sizing purpose.
SAY
SAY
SAY

• Major electrical equipment location in plot plan in order to minimize voltage


ENGG CERT

ASH
ASH
ASH

drop issues, oversized cables, and unnecessary costs.


LEADS

LEADS
LEADS
ALL

ALL
ALL

The current Receiving Substation equipment layout is as indicated in the


Equipment Layout Dwg ELA10001.001-002. LSTK CONTRACTOR shall revise
and submit all affected deliverables based on this equipment layout during detail
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

design.

This Optimization shall be oriented to determine the most economical expansion


DESCRIPTION

policy remaining the electrical system optimized around the desired criteria (cost,
reliability, environmental, safety, etc.).

CONTRACTOR shall re-check all electrical drawings provided in this Project


Proposal in order to identify the possible Optimization with appropriate solutions as
well as discuss with SAUDI ARAMCO its implementation.

Electrical Detailed Description


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR scope shall include but not be limited to Detail Design,


12/11/16
08/04/16

09/08/16

procurement, supply, deliver / store, install, test, pre-commission, commissioning


DATE

assistance and Final Integrated Testing, for the following items but is not limited to:
NO.
REV

D
C
B

DISCIPLINE One (1) Lot 115kV, 1250A, 3Ph, 3W, 60Hz, Gas Insulated Switchgear in receiving
ENGINEER
ALL LEADS substation as well as the Gas Insulated Bus (GIB) in GIS Room (Refer to drawing #
DATE: 12/11/16 EL-A10007 & EL-A10005).
PROJECT
ENGINEER

A M ALMATROOK One (1) 13.8kV, 3000A, 3Ph, 3W, 60Hz, metal clad switchgear in receiving
DATE: 12/11/16 substation (Refer to drawing # EL-A10008).
CERTIFIED
AMR EL SHARKAWY

DATE:
12/11/16 Two (2), 4.2MVar, 13.8kV, 3Ph, 60Hz, Outdoor type, detuned switched capacitor
CONSTRUCTION
AGENCY
bank, at receiving substation transformer yard. (Refer to drawing # EL-A10008 &
SHAHZAD YAZDANI EL-A10001.002).
DATE: 12/11/16
OPERATIONS
One (1) 4.16kV, 1200A, 3Ph, 3W, 60Hz, metal clad switchgear in utility substation
ALI H GHAMDI

12/11/16
(Refer to drawing # EL-A10009).
DATE:
CONTROL NUMBER
VERIFICATION

One (1) 480V, 1600A, 3Ph, 3W, 60Hz, metal clad switchgear in receiving
EDSD

substation (Refer to drawing # EL-A10012).


DATE:
BY:

One (1) 480V, 1600A, 3Ph, 3W, 60Hz, metal clad switchgear in utility substation
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

(Refer to drawing # EL-A10013).


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

One (1) 4.16kV, 1200A, 3Ph, 3W, 60Hz, controlgear in utility substation (Refer to

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 103


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
drawing # EL-A10010).
SAY
SAY
SAY
ENGG CERT

ASH
ASH

One (1) 4.16kV, 1200A, 3Ph, 3W, 60Hz, controlgear in utility substation (Refer to
ASH

drawing # EL-A10011).
LEADS

LEADS
LEADS
ALL

ALL
ALL

Two (2) 480V, 800A, 3Ph, 3W, 60Hz, controlgear in receiving substation (Refer to
drawing # EL-A10014 to EL-A10015).
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Two (2) 480V, 800A, 3Ph, 3W, 60Hz, controlgear in utility substation (Refer to
drawing # EL-A10016 to EL-A10017).
DESCRIPTION

One (1) 400V, 1250A, 3Ph, 4W, 60Hz, switchboard in E & M building (Refer to
drawing # EL-A10018).

One (1) 480V, 600A, 3Ph, 3W, 60Hz, emergency controlgear in Security Support
building (Refer to drawing # EL-A10020).

Three (3) 480V, 100A, 3Ph, 3W, 60Hz, switchracks, strategically located inside
10-02399-
JO/EWO

10-02399-
10-02399-

YDH to feed power to tank farms auxiliary motors, area lighting power panels,
0001

0001
0001

MOVs power panels, Cathodic Protection power panels and other facilities loads
12/11/16

(Refer to drawing # EL-A10021 to EL-A10023).


08/04/16

09/08/16
DATE

Two (2) 50/66.6 MVA OA/FA, 115kV/13.8kV, power transformer located at


NO.
REV

D
C
B

DISCIPLINE
receiving substation feeding 13.8kV switchgear (Refer to drawing # EL-A10006).
ENGINEER
ALL LEADS

DATE: 12/11/16
Two (2) 3.75/4.68 MVA OA/FA, 13.8kV/4.16kV, power transformer located at utility
PROJECT
ENGINEER
substation feeding 4.16kV switchgear (Refer to drawing #EL-A10006).
A M ALMATROOK

DATE: 12/11/16 Two (2) 1.5 MVA, 13.8kV/0.48kV, power transformer located at receiving
CERTIFIED
AMR EL SHARKAWY
substation feeding 480V switchgear (Refer to drawing #EL-A10006).
12/11/16
DATE:
CONSTRUCTION Two (2) 1.5 MVA, 13.8kV/0.48kV, power transformer located at utility substation
AGENCY
SHAHZAD YAZDANI feeding 480V switchgear (Refer to drawing #EL-A10006).
DATE: 12/11/16
OPERATIONS
One (1) 500KVA, 13.8kV/0.48kV, pad mounted transformer strategically located
ALI H GHAMDI
inside YDH to feed power to emergency controlgear in control room (Refer to
12/11/16
DATE:
drawing #EL-A10006)
CONTROL NUMBER
VERIFICATION
EDSD

One (1) 1000 KVA, 13.8kV/0.4kV, pad mounted transformer strategically located
inside YDH to feed power to switchboard in E & M building (Refer to drawing #EL-
DATE:
BY:

A10006).
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

One (1) Skid mounted Diesel Generator Set, self-contained, sound attenuated
(DCC) NO. _____________________

container with motorized louvers, complete with lighting, Fire Alarm and grounding

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 104


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
for the container. The Emergency Diesel Generator 160kW, 400V, 3Ph, 4W, 60Hz,
SAY
SAY
SAY

200kVA, 0.8 PF, complete with day oil tank, Fuel system, Cooling system, exhaust
ENGG CERT

ASH
ASH

system along with Generator controls/protection and generator circuit breaker at


ASH

Generator (Refer to drawing# EL-A10019).


LEADS

LEADS
LEADS
ALL

ALL
ALL

One (1) Skid mounted Diesel Generator Set, self-contained, sound attenuated
container with motorized louvers, complete with lighting, Fire Alarm and grounding
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

for the container. The Emergency Diesel Generator 400kW, 480V, 3Ph, 3W, 60Hz,
500kVA, 0.8 PF, complete with day oil tank, Fuel system, Cooling system, exhaust
system along with Generator controls/protection and generator circuit breaker at
DESCRIPTION

Generator (Refer to drawing# EL-A10020).

One (1), 400V, 400A, 3Ph, 4W, 60Hz Automatic Transfer Switch (Refer to
drawing# EL-A10019).

One (1), 480V, 600A, 3Ph, 3W, 60Hz Automatic Transfer Switch (Refer to
drawing# EL-A10020).).
10-02399-
JO/EWO

10-02399-
10-02399-

CONTRACTOR shall design Local Control Push Button Stations appropriate for
0001

0001
0001

the areas of installation, Install control cables and conduits between control
12/11/16

stations and the Interposing relay panels or MCC.


08/04/16

09/08/16
DATE

Convenience Outlets: 480 VAC welding receptacles shall be installed at locations


NO.
REV

D
C
B

DISCIPLINE
where mobile welding sets or power water wash equipment use is required. In
ENGINEER
ALL LEADS
addition, 230 VAC convenience outlets shall be placed throughout the plant at all
DATE: 12/11/16
location where hand tools would be required for maintenance and inside the
PROJECT
ENGINEER
buildings.
A M ALMATROOK

DATE: 12/11/16 UPS & DC System


CERTIFIED
AMR EL SHARKAWY

DATE:
12/11/16 CONTRACTOR scope shall include but not be limited to Detail Design,
CONSTRUCTION procurement, supply, deliver / store, install, test, pre-commission, commissioning
AGENCY
SHAHZAD YAZDANI assistance and Final Integrated Testing for UPS & DC system of the entire YDH
DATE: 12/11/16 facility as described below:
OPERATIONS
ALI H GHAMDI
UPS power supply system shall be provided for the E & M Building loads,
12/11/16
DATE:
Operation building loads, RIO building loads, main Security Support building loads,
CONTROL NUMBER
VERIFICATION

Tank Farm and other field Instrument Loads. Integrated AC UPS & DC Systems
EDSD

c/w respective distribution panels to power critical loads such as Control, ESD,
FGS and telecommunications system. Batteries for 8 hour back up installed in a
DATE:
BY:

separate room within the E & M Building for Telecommunication Loads. Batteries
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

for 4 hour back up installed in a separate room within the Security Support Building
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

for Security Loads.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 105


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
UPS system shall be redundant as per Figure-2 of SAES-P-103 for
SAY
SAY
SAY

Telecommunication system. For Instrument System & Security System Loads


ENGG CERT

ASH
ASH

“Simplex UPS systems shall be used. The UPS system shall be complete with
ASH

charger rectifiers, inverters static switches, batteries, bypass switch, isolation


LEADS

LEADS
LEADS
ALL

ALL
ALL

transformers and distribution panels, mimic panels, and smoke detection in the
UPS cabinet (Refer to drawing #EL-A10024 to EL-A10028). Ratings are as follows:
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

One (1) 5kVA, Input voltage 400V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W
60Hz (X40- UPS-001).
DESCRIPTION

One (1) 10kVA, Input voltage 400V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W
60Hz (X40-UPS-010).

One (1) 20kVA, Input voltage 480V 3Ph 3W 60Hz, Output voltage 400V 3Ph 4W
60Hz (X40-UPS-002).

Three (3) 10kVA, Input voltage 480V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W
60Hz (X40-UPS-007, X40-UPS-008 & X40-UPS-009).
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

One (1) 45kVA, Input voltage 400V 3Ph 3W 60Hz, Output voltage 400V 3Ph 4W
12/11/16

60Hz (X40-UPS-003).
08/04/16

09/08/16
DATE

Two (2) 25kVA, Input voltage 480V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W,
NO.
REV

D
C
B

DISCIPLINE
60Hz (X40-UPS-004 & X40-UPS-005).
ENGINEER
ALL LEADS

DATE: 12/11/16
CONTRACTOR shall provide complete battery set, battery chargers, DC
PROJECT
ENGINEER
distribution panels required for 125VDC system as per one line diagram #EL-
A M ALMATROOK A10029, EL-A10030 & EL-A10033) for receiving & utility substation. Each DC
DATE: 12/11/16 Power System shall include two (2) rectifier battery chargers and two set of
CERTIFIED
AMR EL SHARKAWY
batteries, battery racks and battery monitoring system. Ratings are as follows:
12/11/16
DATE:
CONSTRUCTION One (1) 125 VDC, 350A Output, 480V, 3Ph, 60 Hz Input (X40-BC-001 & X40-BC-
AGENCY
SHAHZAD YAZDANI 002).
DATE: 12/11/16 One (1) 125 VDC, 250A Output, 480V, 3Ph, 60 Hz Input (X40-BC-003 & X40-BC-
OPERATIONS
004).
ALI H GHAMDI
One (1) -48 VDC, 200A Output, 480V, 3Ph, 60 Hz Input (X40-BC-005 & X40-BC-
12/11/16
DATE:
006).
CONTROL NUMBER
VERIFICATION
EDSD

Cable, Cablebus & Cable Tray System


DATE:
BY:

CONTRACTOR scope shall include but not be limited to Detail Design,


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

procurement, supply, deliver / store, install and test for Cables (power & control),
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Cable bus & Cable Tray but not limited to:


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 106


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
About 3.85kM 115kV cabling from MARAFIQ Substation #9I to receiving substation
SAY
SAY
SAY

115kV Gas Insulated Switchgear (GIS) at YDH. Thrust Boring or Horizontal


ENGG CERT

ASH
ASH

Direction Drilling (HDD) cables installation method shall be used to cross main
ASH

highway as per Royal Commission (RC) & MARAFIQ Guidelines. (Refer sketch
LEADS

LEADS
LEADS
ALL

ALL
ALL

SK-A10010.001)

13.8kV cabling from new 13.8kV Switchgear located inside the Receiving
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Substation to Utility Substation power transforms, Pad Mounted Looped


Transformers & Shipper Pumps. (Refer drawing # EL-A10103 sheet 001 to 004)
DESCRIPTION

4.16kV cabling from new 4.16kV Switchgear located inside the Utility Substation to
Controlgear & Booster Pumps. (Refer drawing # EL-A10103 sheet 001 to 004.

Buried Power and control cabling to all MV and LV loads. (Refer drawing # EL-
A10103 sheet 001 to 004.

Cable Bus from Power Transformers to respective Switchgears at the receiving &
utility substation. (Refer drawing # EL-A10001 & EL-A10002)
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Cable trays shall be provided inside receiving, utility substation and E & M building.
12/11/16

(Refer drawing # EL-A10042, EL-A10043 & EL-A10044)


08/04/16

09/08/16
DATE

Lighting System
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
ALL LEADS
CONTRACTOR scope shall include but not be limited to Detail Design,
DATE: 12/11/16
procurement, supply, deliver / store, install & test for lighting system.
PROJECT
ENGINEER

A M ALMATROOK The Lighting designs for this project shall be in accordance with IESNA RP-7
DATE: 12/11/16 (practice for Industrial Lighting) and as supplemented by SAES-P-123. The lighting
CERTIFIED
AMR EL SHARKAWY
system shall be designed for energy efficient operation.
12/11/16
DATE:
CONSTRUCTION CONTRACTOR shall design following types of lighting but not limited to; Buildings
AGENCY
SHAHZAD YAZDANI interior & exterior lighting, Area Lighting, Security Fence Lighting, Street Lighting,
DATE: 12/11/16 Task Lighting, Emergency Lighting, Tank Lighting .
OPERATIONS
ALI H GHAMDI
CONTRACTOR shall provide interior & exterior lighting for the below listed
12/11/16
DATE:
buildings & Shelters. (Refer drawing # EL-A10034, EL-A10035, EL-A10047, EL-
CONTROL NUMBER
VERIFICATION

A10050, EL-A10054, EL-A10057, EL-A10060, EL-A10063, EL-A10066, EL-


EDSD

A10069, EL-A10072, EL-A10075, EL-A10078, EL-A10081, EL-A10084, EL-


A10086, EL-A10088, EL-A10090 & EL-A10094).
DATE:
BY:
REVISIONCERTIFICATION


APPROVAL/CERTIFICATION REQUIREMENTS,

Receiving Substation
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

• Utility Substation
(DCC) NO. _____________________

• E & M Building

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 107


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Security Support Buildings
SAY
SAY
SAY

• Operation Building
ENGG CERT

ASH
ASH


ASH

Operator Shelter
• Remote I/O Buildings
LEADS

LEADS
LEADS
ALL

ALL
ALL

• FSF Support Building


• Musallah
• Foam Skid Shelter
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

• Chemical Shelter
• X-Ray Building
• IDAS Shelter
DESCRIPTION

• Guard House
• Security Main Gate
• Shipper, Booster and other Pump Shelters

CONTRACTOR shall provide outdoor plant and fence lighting. (Refer drawing #
EL-A10101)

CONTRACTOR shall provide tank lighting including cables, conduits, junction box,
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

cable trays etc. CONTRACTOR shall coordinate with Tank Package Contractor for
the location of Tank lighting and develop detail design drawings as required.
12/11/16
08/04/16

09/08/16
DATE

Grounding & Lightning Protection System


NO.
REV

D
C
B

DISCIPLINE
ENGINEER CONTRACTOR scope shall include but not be limited to Detail Design,
ALL LEADS
procurement, supply, deliver / store, install & test for grounding system as required
DATE: 12/11/16
PROJECT for the new Facilities in accordance with IEEE 142 and shall meet the requirements
ENGINEER
of ANSI/NFPA 70 (NEC) and ANSI C2, as supplemented or amended by SAES-P-
A M ALMATROOK

DATE: 12/11/16
111 and SAES-J-902. Intrinsically Safe Systems shall be grounded in accordance
CERTIFIED with certification requirements and SAES-J-903. Calculations of allowable and
AMR EL SHARKAWY

12/11/16
actual step & touch potentials for Substations shall be done in accordance with
DATE:
CONSTRUCTION
IEEE 80.
AGENCY
SHAHZAD YAZDANI
CONTRACTOR shall extend existing Plant Ground grid at YASREF, SAMREF and
DATE: 12/11/16
OPERATIONS Yanbu Refineries to bond the new electrical equipment, tanks, fence post,
ALI H GHAMDI structural steel, etc. Grounding system shall utilize buried copper wire loops and
12/11/16 grounding rods for perimeter grids around the transformers, substation building and
DATE:
CONTROL NUMBER

all other electrical equipment.


VERIFICATION
EDSD

CONTRACTOR shall provide grounding system for the substations, transformer


DATE:

yards, E&M Building, operation room, control building, security support buildings,
BY:

shelters, other supporting buildings and overall plant grounding. (Refer drawing #
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

EL-A10040, EL-A10041, EL-A10049, EL-A10051, EL-A10055, EL-A10058, EL-


C

(DCC) NO. _____________________

A10061, EL-A10064, EL-A10067, EL-A10070, EL-A10073, EL-A10076, EL-


A10079, EL-A10082, EL-A10085, EL-A10087, EL-A10089, EL-A10093, EL-A10095
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 108


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
& EL-A10102 )
SAY
SAY
SAY
ENGG CERT

ASH
ASH

CONTRACTOR shall provide and install additional ground rods and ground grid as
ASH

required to ensure that the ground resistance does not exceed safe values as
LEADS

LEADS
LEADS
ALL

ALL
ALL

defined in IEEE 80 to comply with SAES-P-111.

CONTRACTOR scope shall include but not be limited to Detail Design,


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

procurement, supply, deliver / store, install & test for Lightning protection system of
the buildings at YDH. The design and installation shall be based on: NFPA 780, UL
96A, and IEEE 998 or IEC 62305-1, 2, 3, 4.
DESCRIPTION

CONTRACTOR shall provide Lightning Protection System for Receiving


Substation, Utility Substation, transformer yards and other buildings. (Refer
drawing # EL-A10045 & EL-A10046)

Cathodic Protection System:

CONTRACTOR shall prepare Cathodic Protection Specialist (CPS)


10-02399-
JO/EWO

10-02399-
10-02399-

CONTRACTOR scope of work. The CPS CONTRACTOR scope shall include one
0001

0001
0001

complete package for the entire YDH underground pipeline & tanks Cathodic
12/11/16

Protection. The complete CP system shall be in full compliance of SAES-X-400,


08/04/16

09/08/16
DATE

SAES-X-500 & SAES-X-600. For scope description refer to document # EL-


E10067007.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
ALL LEADS
The CPS CONTRACTOR scope of work shall include but not limited to prepare a
DATE: 12/11/16
detailed design package comprising of CP drawings, layouts, installations details,
PROJECT
ENGINEER
detail material take offs, specifications, testing, pre-commissioning &
A M ALMATROOK commissioning procedure, calculations for required voltage, amperage and life
DATE: 12/11/16 expectancy of anode, No of anodes, material type of anodes, weight of anodes,
CERTIFIED
AMR EL SHARKAWY
spacing between the anodes, minimum current density and consumption rate of
DATE:
12/11/16 anode and required rating & number of rectifiers.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI Fire Detection & Alarm System
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
CONTRACTOR scope shall include but not be limited to Detail Design duly
12/11/16 endorsed by Certified Fire Protection Engineer, procurement, supply, deliver /
DATE:
store, install & test for complete, microprocessor-based addressable fire detection
CONTROL NUMBER
VERIFICATION

and alarm system, featuring intelligent spot, linear beam detectors using multi-
EDSD

sensor technology, Multi spectrum IR Flame detectors, a powerful networking


DATE:

capability, with reliable peer-to-peer communication. The Fire Alarm System for
BY:

this project comprises of plant system and the buildings systems.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

The Fire Alarm system shall include but not limited to the following: Fire Alarm
(DCC) NO. _____________________

control panel, multi spectrum flame detectors, beam detectors, automatic and

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 109


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
manually activated alarm initiating device, indicating devices, isolating devices,
SAY
SAY
SAY

power supply modules, Battery Modules, Control Modules, Electro-Magnetic door


ENGG CERT

ASH
ASH

holders, fire and smoke dampers and their controls, remote indicators,
ASH

annunciators, network cards, along with RGS conduits, wires and accessories
LEADS

LEADS
LEADS
ALL

ALL
ALL

required to furnish a complete operational system. All fire alarm system devices
and components shall be from one Manufacturer to avoid last minute compatibility
issues. All components employed in the Fire Alarm system and the Fire Protection
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

System shall be UL listed.

CONTRACTOR shall provide Fire Detection & Alarm System for Receiving
DESCRIPTION

Substation, Utility Substation, all other buildings and shelters (Refer drawing # EL-
A10121, to EL-A10145, EL-A10147 & EL-A10148)

CONTRACTOR shall provide Electronic Fire Detection (EFD) technology for


Shipper pumps areas. Fire detection shall be cross zoned such that two detector
units must detect fire in order to activate an automatic fire suppression system.

CONTRACTOR shall coordinate & finalize interface requirements with Tank


10-02399-
JO/EWO

10-02399-
10-02399-

Package Contractor for the Linear Heat Detection System for the external floating
0001

0001
0001

roof tanks. Linear Heat Detection System shall be interface with the nearest Fire
12/11/16

Alarm Control Panel provided by CONTRACTOR (Refer drawing # EL-A10149 &


08/04/16

09/08/16
DATE

EL-E10068).
NO.
REV

D
C
B

DISCIPLINE
Power System Automation (PSA)
ENGINEER
ALL LEADS

DATE: 12/11/16
CONTRACTOR scope shall include but not be limited to Detail Design,
PROJECT
ENGINEER
procurement, supply, deliver / store, install, test, pre-commission, commissioning
A M ALMATROOK assistance and Final Integrated Testing for Power System Automation (PSA) at
DATE: 12/11/16 YDH Receiving Substation. Information of Receiving Substation shall be linked to
CERTIFIED
AMR EL SHARKAWY
Power System Automation (PSA). (Refer document # EL-A10031 & EL-E10039)
12/11/16
DATE:
CONSTRUCTION CONTRACTOR scope shall include but not be limited to Detail Design,
AGENCY
SHAHZAD YAZDANI procurement, supply, deliver / store, install, test, pre-commission, commissioning
DATE: 12/11/16 assistance and Final Integrated Testing for Power System Automation (PSA) at
OPERATIONS
YDH Utility Power Substation. Information of Utility Substation shall be linked to
ALI H GHAMDI
Power System Automation (PSA). (Refer document # EL-A10032 & EL-E10039)
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION

CONTRACTOR shall consider electrical interface to YDH control system as per


EDSD

following:
• Interposing relay cabinet shall be provided in substation to control booster,
DATE:
BY:

shipper and other utility pumps. Homerun cables between substation and
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

respective RIB shall be laid. The pump status and control signals shall be
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

integrated to the remote I/O’s provided in the RIBs.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 110


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• PSA Server shall be interfaced to DCS via OPC or other open industry
SAY
SAY
SAY

standard protocol.
ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall consider electrical interface to MARAFIQ control system as


LEADS

LEADS
LEADS
ALL

ALL
ALL

per following:
• Two (2) new Fiber optic patch panel (wall mounted) at MARAFIQ (SS-9I)
shall be interfaced to existing OSAS via existing RTU to provide the 115kV
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

breaker status to existing OSAS.

Interconnections, Motor Controls & Instrument Relay Panels


DESCRIPTION

CONTRACTOR shall design, supply, install, test, pre-commission and provide


assistance in commissioning and integrated testing to insure fully operational
systems. All Electrical Control Panels and Stop-Start Stations shall have Push-to-
Test Multi-Cluster LED’s for indication.

CONTRACTOR shall design, supply and install and test Local Control Push Button
Stations appropriate for the areas of installation, Install control cables and conduits
10-02399-
JO/EWO

10-02399-
10-02399-

between control stations and the Interposing relay panels or Controlgear.


0001

0001
0001

CONTRACTOR shall design, supply and install and test Interposing Relay Panels
12/11/16
08/04/16

09/08/16
DATE

within the NEW Substations. The Interposing Relay Panels shall have separate
relays for start and stop commands and other signals as per instrument ILD’s.
NO.
REV

D
C
B

DISCIPLINE
Refer to Instrumentation Section for interface details. If additional relay panels are
ENGINEER
ALL LEADS
required, CONTRACTOR shall design provide and install and place into service.
DATE: 12/11/16
PROJECT
ENGINEER
CONTRACTOR shall design, provide, install, and test control/signal cables
A M ALMATROOK between Interposing relay panels and Controlgear and Instrument marshaling
DATE: 12/11/16 cabinets.
CERTIFIED
AMR EL SHARKAWY

12/11/16 Control Panels & Power Associated with Skids and Vendor Packages
DATE:
CONSTRUCTION
AGENCY
CONTRACTOR shall design, supply, install, test, pre-commission and provide
SHAHZAD YAZDANI

DATE: 12/11/16
assistance in commissioning the control panels associated with vendor supplied
OPERATIONS skids such as Dye Injection skids, DPK Filtration skids, Conductivity Enhancer
ALI H GHAMDI Injection skids, Custody Metering skids, Static, Dissipative Agent Injection skids,
12/11/16
DATE: Oily Water Treatment Package, Foam Skids, pump controllers, power
CONTROL NUMBER

supplies/controls, etc. which shall be further defined by CONTRACTOR during


VERIFICATION

Detail Design development.


EDSD

DATE:
BY:

CONTRACTOR shall supply any and all cabling required for Equipment, Skids and
Vendor Package integration and install and test and pre-commission and support
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

commissioning as required to insure fully functional integrated systems for YDH


C

(DCC) NO. _____________________

Project.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 111


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall be responsible for the supply, installation, and testing, pre-
SAY
SAY
SAY

commission and provide commissioning assistance for any other control panels
ENGG CERT

ASH
ASH

and systems not mentioned herein and are part of the mechanical, instrument or
ASH

piping equipment, but not limited too.


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall be responsible for the interconnection between the skids and
the parent equipment, and field instruments, Substations and Control Rooms and
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

shall develop interconnection wiring and piping drawings to SAUDI ARAMCO


SACS standards for input in to IPlant. The drawings shall be submitted to SAUDI
ARAMCO for acceptance.
DESCRIPTION

Oily Water Lift Station Control Panels

CONTRACTOR shall design, supply, install, test, pre-commission and provide


assistance in commissioning the Oily Water Lift station control panels for Normal
Flow and Maximum Flow. The Oily Water Lift Station Control panel shall have two
independent power supply sources with auto transfer facility built into the local
control panel, to provide a continuous source of power to the lift station. The
10-02399-

Control Panel shall be in full compliance with SAES-S-020.


JO/EWO

10-02399-
10-02399-
0001

0001
0001

The enclosures shall be of dead front construction and shall have two doors and
12/11/16
08/04/16

09/08/16
DATE

two compartments that are separated by a barrier. One compartment shall house
the motor starter package and the other shall house the controls for liquid level and
NO.
REV

D
C
B

alarms. The doors shall overlap to prevent them from being opened with the pump
DISCIPLINE
ENGINEER motor disconnect devices in the “ON” position. The starters shall be complete with
ALL LEADS
Start / Stop Push Buttons, Start / Stop Indications, local remote control and
DATE: 12/11/16
PROJECT indications; HOA switches etc. The starters shall be provided with dry run
ENGINEER

A M ALMATROOK
protection relay to prevent the motors from dry run.
DATE: 12/11/16
CERTIFIED CONTRACTOR shall be responsible for the design, supply, installation, and test,
AMR EL SHARKAWY

12/11/16
pre-commission and provide assistance in commissioning of any other control
DATE:
CONSTRUCTION
panels and systems not mentioned herein and are part of the mechanical,
AGENCY
SHAHZAD YAZDANI
instrument or piping equipment.
DATE: 12/11/16
OPERATIONS Electrical and electronic equipment and associated wiring in Oily Water Lift Station
ALI H GHAMDI systems shall be suitable for the electrical area classification in accordance with
12/11/16
DATE: SAES-B-068, SAES-P-100 and NFPA 70 (NEC) and the Detail Design developed
CONTROL NUMBER

Electrical Area Classification Drawings.


VERIFICATION
EDSD

Sanitary Lift Station Control Panel


DATE:
BY:

CONTRACTOR shall design, supply, install, test, pre-commission and provide


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

assistance in commissioning the sanitary lift station control panels. The Sanitary
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Lift Station Control Panel shall have two independent power supply sources with
(DCC) NO. _____________________

auto transfer facility built into the panel, to provide a continuous source of power to

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 112


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
the lift station. The Control Panel shall be in full compliance with SAES-S-010.
SAY
SAY
SAY
ENGG CERT

ASH
ASH

The enclosure shall be of dead front construction and shall have two doors and two
ASH

compartments that are separated by a barrier. One compartment shall house the
LEADS

LEADS
LEADS
ALL

ALL
ALL

motor starter package and the other shall house the controls for liquid level and
alarms. The doors shall overlap to prevent them from being opened with the pump
motor disconnect devices in the “ON” position. The starters shall be complete with
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Start / Stop Push Buttons, Start / Stop Indications, local remote control &
indications; HOA switches etc. The starters shall be provided with dry run
protection relay to prevent the motors from dry run.
DESCRIPTION

Electrical and electronic equipment and associated wiring in Oily Water Lift Station
systems shall be suitable for the electrical area classification in accordance with
SAES-B-068, SAES-P-100 and NFPA 70 (NEC) and the Detail Design developed
Electrical Area Classification Drawings.

Motor Space Heater Control Panel


10-02399-
JO/EWO

10-02399-
10-02399-

Within Switchgear and Controlgear switching assemblies and Starter Control


0001

0001
0001

panels for all motors 75 kW (100 HP) and larger, and all other motors where the
engineering documents indicate motor space heaters are installed, a contact shall
12/11/16
08/04/16

09/08/16
DATE

be wired to a terminal block in the low voltage compartment of the Switchgear


Feeder or Controlgear bucket, as applicable, for connection to a 24VAC control
NO.
REV

D
C
B

circuit (panel shall be designed and provided by THE CONTRACTOR) of a


DISCIPLINE
ENGINEER remotely mounted motor space heater contactor. Contact shall be closed when the
ALL LEADS
main motor circuit contactor is de-energized. This is in accordance with SAES-P-
DATE: 12/11/16
PROJECT 116 and shall be provided, installed, tested, pre commissioned, and with
ENGINEER

A M ALMATROOK
commissioning assistance, by THE CONTRACTOR.
DATE: 12/11/16
CERTIFIED Interconnection Wiring
AMR EL SHARKAWY

12/11/16
DATE:
CONSTRUCTION
CONTRACTOR shall be responsible for design, supply, installation and testing of
AGENCY
SHAHZAD YAZDANI
the interconnection wiring between Vendor supplied Electrical Equipment and
DATE: 12/11/16
Skids and the parent equipment, field instruments, etc. and CONTRACTOR shall
OPERATIONS develop Wiring Interconnection Drawings, based on Actual Vendor Certified NMR
ALI H GHAMDI 602 Drawings and NMR 603 Manuals, to SAUDI ARAMCO standards and submit
12/11/16
DATE: to SAUDI ARAMCO for acceptance prior to termination of cabling.
CONTROL NUMBER
VERIFICATION

Electrical Area Classification


EDSD

DATE:
BY:

CONTRACTOR shall develop Area Classification drawings at the beginning of


detailed design phase and obtain SAUDI ARAMCO Approval. Equipment installed
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

in Bulk Plant area will be rated according to area classification layout drawings
C

(DCC) NO. _____________________

(Refer to drawing #EL-A10003). Attached drawings shall be used only as guide


actual drawings shall be developed by THE CONTRACTOR.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 113


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

General Building Notes


ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall design all the Electrical rooms, battery rooms, UPS rooms,
LEADS

LEADS
LEADS
ALL

ALL
ALL

based on the actual Vendor information as per the SAUDI ARAMCO Direct Charge
NMR as available from SAPMT; under no circumstances the sizes shall fall short of
required spaces and clearances, to avoid future delays and expensive rework due
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

to SAUDI ARAMCO inspection group objections.

Buildings where Battery rooms are provided shall comply with all requirements of
DESCRIPTION

SAES-P-103, Battery rooms shall be provided with an eye wash facility with
potable water connection & drain, and the drain shall be through acid neutralization
pit. The ventilation system shall be 100% redundant. Only direct driven exhaust
fans shall be used. An interlock with the ventilation system shall be provided to
stop the high-rate battery charging if the exhaust fan stops.

CONTRACTOR scope shall include but not be limited to Detail Design,


procurement, supply, deliver / store, install & test for Fire Stops wherever
10-02399-
JO/EWO

10-02399-
10-02399-

cable/conduit/cable trays pass through fire rated walls, Floor or Ceiling. The Fire
0001

0001
0001

Stops shall be in compliance with UL and SAES-U-101.


12/11/16
08/04/16

09/08/16
DATE

CONTRACTOR scope shall include but not be limited to Detail Design,


procurement, supply, deliver / store, install & test for lighting fixtures, receptacles,
NO.
REV

D
C
B

DISCIPLINE
lighting panels, power panels, lighting circuits, power circuits and grounding for the
ENGINEER
ALL LEADS
following buildings but not limited to:
DATE: 12/11/16
PROJECT
ENGINEER
Receiving Substation, Utility Power Substation, Engineering & Maintenance (E &
A M ALMATROOK M) Building, Operation Building, Operation Shelter, Chemical Shelter, Pump
DATE: 12/11/16 Shelters, Musalla, Security Gate House, Security Support Building, Security Guard
CERTIFIED
AMR EL SHARKAWY
Houses, RIO Building, IDAS Shelter, X-Ray Building, FSF Building & Foam Skid
DATE:
12/11/16 Building.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall design, supply, install test, pre-commission and provide
DATE: 12/11/16 commissioning assistance for ALL Buildings under this scope of work to include but
OPERATIONS
not be limited to following electrical equipment:
ALI H GHAMDI

12/11/16
DATE: Power Panels
CONTROL NUMBER

Power Circuits
VERIFICATION

Lighting Panels
EDSD

Lighting Circuits
DATE:

Fire Alarm Detection


BY:

Disconnect Switches
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Sockets / Receptacles
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Dry Type Transformers


(DCC) NO. _____________________

Control Panels
Grounding
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 114


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

All in accordance with the detailed design Lighting Layouts, Power Layouts, Panel
ENGG CERT

Schedules, Fire Alarm Layouts and Grounding Layouts. Refer to project proposal
ASH
ASH
ASH

drawings as per DCL # GEN-D0001 for Lighting, Power, Grounding, Fire Alarm
LEADS

LEADS
LEADS
ALL

Layouts, Panel schedules and Electrical One Line Diagrams of respective


ALL
ALL

buildings.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Electrical Major Deliverables

Reference Documents attached to this PPN include but are NOT limited to the
DESCRIPTION

following and shall be further developed by CONTRACTOR during the Detail


Design:

Electrical One Line Diagrams


Protection & Metering Diagrams
Electrical Area Classification
Substation Equipment Layouts
Lighting Layouts
Power Layouts
10-02399-
JO/EWO

10-02399-
10-02399-

Grounding Layouts
0001

0001
0001

Lightning Protection Layouts


Fire Detection & Alarm Layouts
12/11/16
08/04/16

09/08/16
DATE

Fire Detection & Alarm Riser Diagrams


Substation Automation Block Diagram
NO.
REV

Input / Output List for PSA & SCADA


D
C
B

DISCIPLINE Panelboard Schedules


ENGINEER
ALL LEADS Cable Routing Layouts
DATE: 12/11/16
Cable Tray Layouts
PROJECT
ENGINEER
Equipment Data Sheets
A M ALMATROOK
Cable & Conduit Schedule
DATE: 12/11/16
Typical Installation Details
CERTIFIED
AMR EL SHARKAWY
CONTRACTOR shall as a minimum develop the following Detail Design
12/11/16
DATE: Deliverables for utilization during procurement, construction and commissioning:
CONSTRUCTION
AGENCY


SHAHZAD YAZDANI
Electrical Area Classification
DATE: 12/11/16
OPERATIONS • General Electrical Notes and Symbols
ALI H GHAMDI • Power & Grounding Layouts
DATE:
12/11/16
• Lightning Protection Layouts
CONTROL NUMBER

• Installation Details – Duct Bank, Cable Trench, Cable Bldg Entrance, Power,
VERIFICATION

Lighting, Grounding
EDSD

• Cable Routing Layouts


DATE:


BY:

Panelboard Schedules

REVISIONCERTIFICATION

Major Equipment Specifications with Purchase Requisitions Development


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Buildings, Area, Access Road, Tanks Lighting Layouts


(DCC) NO. _____________________

• Fire Alarm Detection Layouts, Riser Diagrams, Cause & Effect Logic

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 115


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Substation Automation Input / Output List for PSA & SCADA
SAY
SAY
SAY

• Substations Equipment Layout


ENGG CERT

ASH
ASH


ASH

Substation Equipment Section & Details


• Electrical Load List – including Process, Mechanical (HVAC, Rotating,
LEADS

LEADS
LEADS
ALL

ALL
ALL

Vessels), Telecommunications, Security, Automation, Instrumentation Loads


• One Line Diagrams – Key and Protection & Metering
• Schematic & Interconnection drawings
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

• Cable & Conduit Schedule


• Equipment Datasheets
• Material Take-Off
DESCRIPTION

• ETAP Studies including Load Flow, Short Circuit, Relay Coordination, Arc
Flash
• ETAP GPR & Ground Grid Calculations
• Switching Transient Analysis, Transient Recovery Voltage (TRV) evaluation
and Insulation Coordination studies
• Lightning Protection Studies
• Calculations including Lighting LUX, Cable sizing, Transformer sizing, Battery
Charger sizing, UPS sizing, Switchgear, Controlgear and Generator Sizing
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

• Smart Plant Electrical Outputs


• 3D Model.
12/11/16
08/04/16

09/08/16
DATE

Detailed Design drawings shall include all necessary plans, elevations, arrangements,
NO.
REV

D
C
B

sections, profiles, views and details of all facilities.


DISCIPLINE
ENGINEER
ALL LEADS
CONTRACTOR develops the Detail Design Deliverables as necessary to insure a
DATE: 12/11/16
PROJECT fully functional operational facility.
ENGINEER

A M ALMATROOK

DATE: 12/11/16 CONTRACTOR shall incorporate ALL Vendor NMR’s into the IFC package as vendor
CERTIFIED
AMR EL SHARKAWY
data becomes available and shall insure drawings utilized for construction have NMR
12/11/16 602 and NMR 603 data incorporated within, prior to site construction execution. Note
DATE:
CONSTRUCTION that this is critical path prior to pouring Concrete for Substation Floors, Precast Walls,
AGENCY
SHAHZAD YAZDANI
Transformer and Generator, Motor, Skids, Pole Foundations, etc.
DATE: 12/11/16
OPERATIONS Electrical Scope at Physical Interface Points with Pipelines & Refineries
ALI H GHAMDI

12/11/16
DATE: Yanbu to Jiddah Pipeline:
CONTROL NUMBER
VERIFICATION
EDSD

CONTRACTOR shall provide, install, test and terminate a 480V power cable to the
Scraper Launcher Area Power Panelboard. The Panelboard will be provided and
DATE:
BY:

installed within the Scraper Launcher Area by BI-10-02155. (Refer drawing # EL-A10014
REVISIONCERTIFICATION

sht. 001)
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

Electrical interfaces include power connection of 480V used to power the pipeline scraper
launcher facilities loads inside YDH perimeter fence. One (1) 480V, 150A, 3Ph, 3W, 60Hz
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 116


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Outdoor Power Panel shall be provided by BI 10-02155 (Yanbu - North Jiddah Products
SAY
SAY
SAY

Pipelines).
ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall develop all required detailed design drawings as necessary to


LEADS

LEADS
LEADS
ALL

ALL
ALL

construct the electrical power requirements for all the projects NEW and Existing
Electrical Equipment, in order to purchase the material and install, test and commission
all equipment requiring electrical power and electrical equipment interfaces, for YDH.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

YASREF Refinery Connection:


DESCRIPTION

There is no physical interface within the facility; will be utilize the pipeline provided by BI-
00043. Therefore no electrical load has been anticipated.

SAMREF Refinery Connection:

SAMREF shall supply all electrical power and connections required for MOVs and other
miscellaneous loads.
10-02399-
JO/EWO

10-02399-
10-02399-

CONTRACTOR scope shall include but not be limited to Detail Design, procurement,
0001

0001
0001

supply, deliver / store, install & test for Two (2nos.) 480V, 100A, 3Ph, 3W, 60Hz Outdoor
12/11/16
08/04/16

09/08/16

Power Panel (NEMA 4X) with all cables, conduits, supports structures and other required
DATE

accessories to feed power to MOVs and other miscellaneous loads (refer to drawing #
EL-A10052).
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
ALL LEADS
CONTRACTOR shall coordinate with SAMREF refinery to utilize the existing feeders of
DATE: 12/11/16
SAMREF substation to feed the power to newly added Surge relief pump (X40-X002A/B).
PROJECT
ENGINEER

A M ALMATROOK CONTRACTOR shall utilize existing space in MCC-11-10-3 & MCC-11-20-3 and supply;
DATE: 12/11/16 install three (3nos.) 100AF new circuit breakers to feed new MOV power panels & new
CERTIFIED
AMR EL SHARKAWY UPS, including feeder cables, conduits and other required accessories. (Refer sketch SK-
DATE:
12/11/16 A10051 & SK-A10052)
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR scope shall include but not be limited to Detail Design, procurement,
DATE: 12/11/16 supply, deliver / store, install & test for 10kVA, Input voltage 480V 3ph 60Hz, Output
OPERATIONS
voltage 230 1ph 60Hz. The UPS system shall be complete with charger rectifiers,
ALI H GHAMDI
inverters static switches, batteries, bypass switch, transformers and distribution panels,
12/11/16
DATE:
mimic panels, and smoke detection in the UPS cabinet in Substation # 12 at SAMREF.
CONTROL NUMBER
VERIFICATION
EDSD

CONTRACTOR shall develop Area Classification drawings at the beginning of detailed


design phase and obtain SAUDI ARAMCO Approval. Equipment installed in SAMREF
DATE:
BY:

area will be rated according to area classification (refer drawing # EL-A10004).


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall provide Grounding to new equipment from existing SAMREF


(DCC) NO. _____________________

Grounding network.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 117


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

CONTRACTOR shall provide task lighting for new equipment from existing lighting
ENGG CERT

ASH
ASH

Panels.
ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

Yanbu Refinery Connection:

Yanbu Refinery shall supply all electrical power and connections required MOVs and
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

other miscellaneous loads. Total electrical loads anticipated are about 25kVA.

CONTRACTOR scope shall include but not be limited to Detail Design, procurement,
DESCRIPTION

supply, deliver / store, install & test for Four (4 nos.) 480V, 100A, 3Ph, 3W, 60Hz Outdoor
Power Panel (NEMA 4X) with all cables, conduits, supports structures and other required
accessories to feed power to MOVs and other miscellaneous loads (refer to drawing #
EL-A10111).

CONTRACTOR shall utilize existing space in V21-MC71A, V21-MC81A & V21-MC91A


and supply; install Four (4nos.) 100AF new circuit breakers to feed new MOV power
panels, including feeder cables, conduits and other required accessories. (Refer Drawing
10-02399-
JO/EWO

10-02399-
10-02399-

no# VA-240892.001, VA-240893.002, VA-240894.002)


0001

0001
0001

12/11/16
08/04/16

09/08/16

CONTRACTOR shall provide Grounding to new equipment from existing YANBU


DATE

REFINERY Grounding network.


NO.
REV

D
C
B

DISCIPLINE
CONTRACTOR shall provide task lighting for new equipment from existing lighting
ENGINEER
ALL LEADS
Panels
DATE: 12/11/16
PROJECT
ENGINEER Electrical Scope at MARAFIQ Substation # 9I Interface
A M ALMATROOK

DATE: 12/11/16 CONTRACTOR shall coordinate with SAUDI ARAMCO and MARAFIQ for the portion of
CERTIFIED
AMR EL SHARKAWY works under MARAFIQ scope and insure correct interface of all discipline’s i.e. Civil,
DATE:
12/11/16 Electrical, Protection, Communication, etc.
CONSTRUCTION CONTRACTOR shall furnish electrical detailed drawings, documents and any calculation
AGENCY
SHAHZAD YAZDANI requested by MARAFIQ / Yanbu Royal Commission (YRC) to fulfill the connection
DATE: 12/11/16 agreement requirements.
OPERATIONS
ALI H GHAMDI
CONTRACTOR shall utilize existing spare breaker EA06 & EB04 of GIS to feed power to
12/11/16
DATE:
YDH. (Refer sketch # SK-A10011, SK-A10013 & SK-A10014)
CONTROL NUMBER
VERIFICATION
EDSD

CONTRACTOR shall provide one (1) metering panel to accommodate two (2) revenue
meters & two check meters for YDH feeders-1 & 2. (Refer sketch # SK-A10013 & SK-
DATE:
BY:

A10014). The supplied meters shall be smart type meters and shall comply the MARAFIQ
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

standard. Refer Doc-ELE10069-002 for Technical specification and details for these
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

meters.
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 118


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall provide Four (4) protection relay panel to accommodate line
SAY
SAY
SAY

differential relays & directional relays for YDH feeders-1 & 2. (Refer sketch # SK-A10013
ENGG CERT

ASH
ASH

& SK-A10014)
ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall provide one (1) 125VDC Power Panel to supply power to new relay
panels. (Refer sketch # SK-A10012)
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall provide two (2) fiber optic patch panel to be install in Substation 9I.
(Refer sketch # SK-A10014)
DESCRIPTION

CONTRACTOR shall design, supply, install, test and assist with commissioning of two
run, 3x1/C- 630 mm2, 115kV cables of 3.85km in length, from MARAFIQ Substation #9I to
YDH. (Refer sketch # SK-A10010 & SK-A10015)

CONTRACTOR shall design, supply, install, test and assist with commissioning of two (2)
run 12C Single Mode Fiber Optic Cables run along with each power feeder cable from
MARAFIQ Substation #9I to YDH. (Refer sketch # SK-A10010 & SK-A10015)
10-02399-
JO/EWO

10-02399-
10-02399-

CONTRACTOR shall provide termination kits, including connectors, at the MARAFIQ end
0001

0001
0001

and at the SAUDI ARAMCO 115kV GIS end. CONTRACTOR shall coordinate with
MARAFIQ and SAUDI ARAMCO for termination at the MARAFIQ end.
12/11/16
08/04/16

09/08/16
DATE

CONTRACTOR shall confirm MARAFIQ protection and metering requirements and reflect
NO.
REV

D
C
B

accordingly within the Detail Design Drawings. Development of protection, control, fire
DISCIPLINE
ENGINEER alarm, communication, etc., interface drawings shall be CONTRACTOR responsibility
ALL LEADS
including purchase, installation, termination and testing of the required cabling.
DATE: 12/11/16
PROJECT
ENGINEER

A M ALMATROOK
CONTRACTOR shall assist MARAFIQ as required with Manpower, and test equipment,
DATE: 12/11/16 as necessary to complete MARAFIQ 115kV and SAUDI ARAMCO 115kV Interface
CERTIFIED
AMR EL SHARKAWY
Testing including Protection, Metering, Controls, etc. including wiring interface drawing
12/11/16 development. Test Results shall be signed by all relevant parties including POD, PID,
DATE:
CONSTRUCTION MARAFIQ, etc. and be included within the Project Test Results binders maintained and
AGENCY
SHAHZAD YAZDANI
developed by CONTRACTOR as per SAEP-122.
DATE: 12/11/16
OPERATIONS CONTRACTOR to consider Integration Philosophy between the MARAFIQ 115KV
ALI H GHAMDI
Substation # 9I and the New SAUDI ARAMCO 115kV Receiving Substation. Interface
12/11/16
DATE: philosophy will be finalized as per Connection Agreement between MARAFIQ & SAUDI
CONTROL NUMBER
VERIFICATION

ARAMCO. Initial communication has been established to finalize the scope segregation
EDSD

between SAUDI ARAMCO & MARAFIQ. Proposed interface requirements are as


followed:
DATE:
BY:

• MARAFIQ confirmed to reserve the existing Two (2) spare GIS Bays: =EB04
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

and =EA06 for SAUDI ARAMCO YDH project.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 119


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• MARAFIQ confirmed these 2 Spare GIS are already pre-wired to the local
SAY
SAY
SAY

control panel =EB04+S and =EA06+S.


ENGG CERT

ASH
ASH
ASH

• A new metering panel is required, same model and configuration than existing
LEADS

LEADS
LEADS
ALL

ALL
ALL

metering panels. This new metering panel shall be the combine metering
panels for 2 feeders of YDH. Each YDH feeders shall have a separate
revenue meters and will be accommodated in this panel. Reserved available
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

floor space for this panel. New Panel to be tagged as: =E+MP05 115KV
Service Cable/Revenue Metering panel.
DESCRIPTION

• Protection Scope- Primary Protection: Two (2) new Relay Panels are required
based on ABB relays. Reserved available floor spaces for these two panels.
New panels to be tagged as: =EB04+R1 and =EA06+R1 115kV Service Line
Aramco- YDH/ Primary Protection.

• Protection Scope- Back Up Protection: Two (2) new relay Panels are required
based on Siemens relays. Available floor spaces for these 2 panels. New
Panels to be tagged as: =EB04+R2 and =EA06+R2 115KV Service Line
10-02399-
JO/EWO

10-02399-
10-02399-
0001

Aramco- YDH/ Back Up protection Panel.


0001
0001

12/11/16
08/04/16

09/08/16

• MARAFIQ confirmed that existing Relay Panels =E+BB1 and =E+BB4 for Bus
DATE

Bar/BF Protection of GIS Bay EA06 & EA04 are already pre-wired.
NO.
REV

D
C
B

DISCIPLINE • DC System scope: Existing 125V DC Distribution Panel has not enough spare
ENGINEER
ALL LEADS breakers for new DC scope. MARAFIQ requested to provide new DC panel
DATE: 12/11/16 same manufacturer than existing panels “Riyadh Factory For Panelboard”
PROJECT
ENGINEER Available floor space for this new DC panel. New Panel to be tagged as: 125V
A M ALMATROOK DCDB 125V Main DCDB No. 3.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY • AC System scope: Existing 220V AC Distribution Panel has required spare
12/11/16
DATE: breakers for new AC scope. CONTRACTOR to utilize existing spare breakers
CONSTRUCTION
AGENCY from 220V AC Distribution Panel No. 1, 2 & 3. Note: There is No 480V AC
SHAHZAD YAZDANI
panel available in MARAFIQ Substation.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI • Power Cable Routing in Basement: CONTRACTOR to develop detailed cable
DATE:
12/11/16 routing drawings following existing cable routing at MARAFIQ Substation
basement as much as possible:
CONTROL NUMBER
VERIFICATION
EDSD

Cable trays have to be heavy duty 600mmx150mm for cable transition to


DATE:

the wall.
BY:

Cable trays support shall be unistrut type.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Cable structural support shall be Unistrut type similar design that existing
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

ones.
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 120


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• General requirements:
SAY
SAY
SAY

• Contractor shall incorporate all the MARAFIQ comments during detail


ENGG CERT

ASH
ASH
ASH

engineering. Refer Appendix-12 for MARAFIQ comments..


Contractor/SAPMT shall include MARAFIQ in the Engineering Review
LEADS

LEADS
LEADS
ALL

ALL
ALL

Cycle during detail engineering.


Contractor shall procure all equipment related to MARAFIQ Scope as per
Royal Commissioning Standards.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

4.16 Communication
DESCRIPTION

A. DATA NETWORK

Scope of Work

The Yanbu Distribution Hub Data Network System will comprise of


several physically separated LANs that includes the Enterprise LAN for
corporate systems including OSPAS, Security CCTV LAN and Process
LAN to mainly secure and independently transport, control and manage
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

their respective traffic. CCTV design shall be in full compliance with


SAES-T-555.
12/11/16
08/04/16

09/08/16
DATE

The Security LAN may utilize the Enterprise LAN to transport the traffic
provided with adequate level of logical separation.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
ALL LEADS
The Yanbu Distribution Hub Enterprise LAN shall manage and control
DATE: 12/11/16
all business related types of traffic that shall traverse through its own
PROJECT
ENGINEER
physically dedicated network which can be Internet, E-mail, VoIP
A M ALMATROOK telephony, and any other data services. It may also carry traffic of
DATE: 12/11/16 Security CCTV that shall be assigned with a dedicated virtual LAN.
CERTIFIED
AMR EL SHARKAWY

12/11/16
The Yanbu Distribution Hub Enterprise LAN shall consist of a PE Router
DATE:
CONSTRUCTION
in Maintenance & Engineering Building, which shall connect to the
AGENCY
existing Juniper MX-960 in the Admin Building 1401 at Yanbu Refinery
SHAHZAD YAZDANI

DATE: 12/11/16
and Communication Building 2 at Yanbu NGL.
OPERATIONS
ALI H GHAMDI
Access switches shall be located in Operation Building, Maintenance &
DATE:
12/11/16 Engineering Building, Utility Power Substation Building, Receiving
Substation Building, Operator Shelter, Security Support Building (Main
CONTROL NUMBER
VERIFICATION

Gate & Tank Farm) and will be uplinked to the Distribution switch using
EDSD

inter-building Outside Plant Fiber Optic cable.


DATE:
BY:

CONTRACTOR shall install, test and commission the full functionality of


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

switch with required Power over Ethernet (PoE) ports. The access
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

switches with Redundant Power Supply shall be used for IP telephones


(DCC) NO. _____________________

and Wireless Access points within the Yanbu Distribution Hub.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 121


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The Wireless LAN System under this project will be provided at
SAY
SAY
SAY

Operation Building, Maintenance & Engineering Building, Operator


ENGG CERT

ASH
ASH

Shelter and Security Support Building (Main Gate & Tank Farm) to
ASH

support mobile computing in the Yanbu Distribution Hub facilities.


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall provide and install the following wireless LAN


subsystems:
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

• Wireless access points


• Mounting kits for access points
DESCRIPTION

• Patch cords

CONTRACTOR shall provide and install the wireless LAN and ensure
the appropriate placement of wireless access points to provide excellent
radio coverage and mobility to all wireless IP devices.

WLAN access point outlets shall not be installed more than 3.75 meters
above finished floor level.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

The access point shall be connected to the PoE+ port of Access switch
12/11/16
08/04/16

09/08/16

using UTP CAT-6 cable and shall be powered through its power-over-
DATE

Ethernet port.
NO.
REV

D
C
B

All components and accessories required for the satisfactory operation


DISCIPLINE
ENGINEER of the WLAN system shall be supplied and installed by the
ALL LEADS
CONTRACTOR.
DATE: 12/11/16
PROJECT
ENGINEER

A M ALMATROOK
• CONTRACTOR shall install, test and commission the Data Network
DATE: 12/11/16
CERTIFIED System as per the following drawings:
AMR EL SHARKAWY

12/11/16
DATE:
CONSTRUCTION
AGENCY
• Schematic Diagram,
SHAHZAD YAZDANI
Overall Data System CO-A10033.001
DATE: 12/11/16
OPERATIONS • Overall System Diagram
ALI H GHAMDI

12/11/16 Data Network System CO-A10036.001


DATE:


CONTROL NUMBER

Schematic Diagram,
VERIFICATION
EDSD

Overall WLAN System CO-A10039.001


DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Maintenance & Engineering Building


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

CONTRACTOR shall procure, install, test and commission the one (1)

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 122


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Distribution switch equipped of 20-Port 1Gigabit Ethernet /2-Port
SAY
SAY
SAY

10Gigabit Ethernet L2/L3 line card with SFP pluggable 1000Base-X


ENGG CERT

ASH
ASH

Mini-GBIC and 10GBE-XFP Transceivers that support single mode fiber


ASH

over 1310nm wavelength with LC connector. The 1000Base-X Mini-


LEADS

LEADS
LEADS
ALL

ALL
ALL

GBIC Transceiver supports 9 micron single mode fiber up to a


maximum distance of 10km.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall provide a 4-Port 10-Gigabit Ethernet Enhanced


ISSUED FOR 90% PROJECT PROPOSAL

DPC module with 10Gigabit Ethernet XFP transceivers for the utilization
of the existing Juniper MX-960 PPE Routers. CONTRACTOR shall
DESCRIPTION

utilize and reserve the slot 4 of the existing Juniper MX-960 on both
Communication Building 12 at Yanbu NGL and Admin Building 1401 at
Yanbu Refinery

The CONTRACTOR shall procure, install, test and commission one (1)
Provider Edge (PE) router with redundant power supplies.

CONTRACTOR shall procure, install, test and commission the one (1)
Access Switch and one (1) Modular Access switch equipped with
10-02399-
JO/EWO

10-02399-
10-02399-

redundant SFP pluggable 1000Base-X Mini-GBIC Transceivers that


0001

0001
0001

support single mode fiber over 1310nm wavelength with LC connector.


12/11/16
08/04/16

09/08/16

The 1000Base-X Mini-GBIC Transceiver supports 9 micron single mode


DATE

fiber up to a maximum distance of 10km.


NO.
REV

D
C
B

CONTRACTOR shall install Universal 19” Standard Rack to mount the


DISCIPLINE
ENGINEER switches, Redundant Power Supply, fiber optic/UTP copper patch panel
ALL LEADS
and ancillaries on each floor.
DATE: 12/11/16
PROJECT
ENGINEER The PE Router and Access switch and Modular Access switch installed
A M ALMATROOK
in Maintenance & Engineering Building shall be powered from utility
DATE: 12/11/16
CERTIFIED power source and Telecoms-dedicated Uninterruptible Power Supply
AMR EL SHARKAWY
(UPS) system
12/11/16
DATE:
CONSTRUCTION
AGENCY
CONTRACTOR shall be responsible for the logical set-up of the
SHAHZAD YAZDANI required VLAN/IP addressing and shall be followed based on the
DATE: 12/11/16 provided Data Configuration Sheet of Data Network and Engineering
OPERATIONS
ALI H GHAMDI
Operation Building
12/11/16
DATE:
CONTROL NUMBER

CONTRACTOR shall procure, install, test and commission the


VERIFICATION

redundant power supply, one (1) Modular Access switch equipped with
EDSD

interface modules and SFP pluggable 1000Base-X Mini-GBIC


DATE:

Transceivers that support single mode fiber over 1310nm wavelength


BY:

with LC connector. The 1000Base-X Mini-GBIC Transceiver supports 9


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

micron single mode fiber up to a maximum distance of 10km.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

CONTRACTOR shall install Universal 19” Standard Rack to mount the

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 123


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Modular Access switch, Redundant Power Supply, fiber optic/UTP
SAY
SAY
SAY

copper patch panel and ancillaries.


ENGG CERT

ASH
ASH
ASH

The Modular Access switch shall be powered from utility power source
LEADS

and dedicated Rack Mounted UPS systems installed in


LEADS
LEADS
ALL

ALL
ALL

Telecommunication Room.

Receiving Substation Building


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall procure, install, test and commission the one (1)
Redundant Power Supply and one (1) Access switches equipped with
DESCRIPTION

SFP pluggable 1000Base-X Mini-GBIC Transceivers that support single


mode fiber over 1310nm wavelength with LC connector. The
1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
fiber up to a maximum distance of 10km.

CONTRACTOR shall install Universal 19” Standard Rack to mount the


access switch, Redundant Power Supply, fiber optic/UTP copper patch
panel and ancillaries.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

The access switch shall be powered from utility power source and
dedicated Rack Mounted UPS systems installed in Telecommunication
12/11/16
08/04/16

09/08/16
DATE

Room.

Utility Power Substation


NO.
REV

D
C
B

DISCIPLINE
ENGINEER CONTRACTOR shall procure, install, test and commission the one (1)
ALL LEADS
Redundant Power Supply and one (1) Access switch equipped with
DATE: 12/11/16
PROJECT SFP pluggable 1000Base-X Mini-GBIC Transceivers that support single
ENGINEER

A M ALMATROOK
mode fiber over 1310nm wavelength with LC connector. The
DATE: 12/11/16
1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
CERTIFIED fiber up to a maximum distance of 10km.
AMR EL SHARKAWY

12/11/16
DATE: CONTRACTOR shall install Universal 19” Standard Rack to mount the
CONSTRUCTION
AGENCY access switch, Redundant Power Supply, fiber optic/UTP copper patch
SHAHZAD YAZDANI
panel and ancillaries.
DATE: 12/11/16
OPERATIONS
The access switch shall be powered from utility power source and
ALI H GHAMDI

12/11/16
dedicated Rack Mounted UPS systems installed in Telecommunication
DATE:
Room.
CONTROL NUMBER
VERIFICATION

Operator Shelter 1 & 2


EDSD

DATE:

CONTRACTOR shall procure, install, test and commission the one (1)
BY:

Redundant Power Supply and one (1) Access switch equipped with
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

SFP pluggable 1000Base-X Mini-GBIC Transceivers that support single


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

mode fiber over 1310nm wavelength with LC connector. The


(DCC) NO. _____________________

1000Base-X Mini-GBIC Transceiver supports 9 micron single mode

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 124


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
fiber up to a maximum distance of 10km.
SAY
SAY
SAY

CONTRACTOR shall install Universal 19” Standard Rack to mount the


ENGG CERT

ASH
ASH
ASH

access switch, Redundant Power Supply, fiber optic/UTP copper patch


LEADS

panel and ancillaries.


LEADS
LEADS
ALL

ALL
ALL

The access switch shall be powered from utility power source and
dedicated Rack Mounted UPS systems installed in Telecommunication
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Cabinet (TC).
DESCRIPTION

Security Support Building Main Gate

CONTRACTOR shall procure, install, test and commission the one (1)
Redundant Power Supply and one (1) Access switches equipped with
SFP pluggable 1000Base-X Mini-GBIC Transceivers that support single
mode fiber over 1310nm wavelength with LC connector. The
1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
fiber up to a maximum distance of 10km.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall install Universal 19” Standard Rack to mount the


12/11/16
08/04/16

09/08/16

access switch, Redundant Power Supply, fiber optic/UTP copper patch


DATE

panel and ancillaries.


NO.
REV

D
C
B

The access switch shall be powered from utility power source and
DISCIPLINE
ENGINEER dedicated Rack Mounted UPS systems installed in Telecommunication
ALL LEADS
Room.
DATE: 12/11/16
PROJECT
ENGINEER

A M ALMATROOK

DATE: 12/11/16 Security Support Building Tank Farm Gate


CERTIFIED
AMR EL SHARKAWY

12/11/16 CONTRACTOR shall procure, install, test and commission the one (1)
DATE:
CONSTRUCTION Redundant Power Supply and one (1) Access switch equipped with
AGENCY
SHAHZAD YAZDANI
SFP pluggable 1000Base-X Mini-GBIC Transceivers that support single
DATE: 12/11/16 mode fiber over 1310nm wavelength with LC connector. The
OPERATIONS 1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
ALI H GHAMDI
fiber up to a maximum distance of 10km.
12/11/16
DATE:
CONTROL NUMBER

CONTRACTOR shall install Universal 19” Standard Rack to mount the


VERIFICATION

access switch, Redundant Power Supply, fiber optic/UTP copper patch


EDSD

panel and ancillaries.


DATE:
BY:

The access switch shall be powered from utility power source and
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

dedicated Rack Mounted UPS systems installed in Telecommunication


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Room.
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 125


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
General
SAY
SAY
SAY

This document shall be constructed in concurrence with the data network


ENGG CERT

ASH
ASH
ASH

drawing CO-A00033 sheet 001.


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall provide and commission the following subsystems:


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL


ISSUED FOR 90% PROJECT PROPOSAL

Access and Distribution Switches


• Firewalls
• Wireless Access points

DESCRIPTION

UPS Equipment
• Grounding Kits
• Fiber optic transceivers
• Fiber Patch cords
• UTP Patch cords

In addition to the Supply, Installation and Commissioning of the equipment,


CONTRACTOR shall undertake a number of ancillary tasks to ensure
conformity of the equipment and System to the overall intent of Project
requirements. These additional tasks shall include, but not necessary limited
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

to, the following:


12/11/16
08/04/16

09/08/16


DATE

Procure Commissioning spares


• Deliver accessories, equipment, installation and other materials, and
commissioning spares to site.
NO.
REV

D
C
B

DISCIPLINE
• Conduct factory, site and system acceptance tests.
ENGINEER
ALL LEADS
• Provide installation drawings, wiring and cabling schedules, and
equipment location plans.
DATE: 12/11/16
PROJECT • Conduct link test to ensure maximum 1G or higher bandwidth
ENGINEER
optimization.

A M ALMATROOK
Installation of additional UTP cabling from the access points to the
DATE: 12/11/16
CERTIFIED appropriate data switches.
AMR EL SHARKAWY • Provide commissioning test plans, test schedules and test reports.
DATE:
12/11/16
• Provide accommodation, transportation and all necessary permits,
CONSTRUCTION
AGENCY
clearances and protective safety equipment for their In-Kingdom
SHAHZAD YAZDANI personnel.
DATE: 12/11/16 • The logistics associated with the In-Kingdom Installation.
OPERATIONS • The provision of all materials, tools, test equipment, and other items of
ALI H GHAMDI equipment to effect the installation and commissioning.
DATE:
12/11/16 • Project Management.

CONTROL NUMBER

CONTRACTOR shall obtain SAUDI ARAMCO approval for the design


VERIFICATION

prior to implementation.
EDSD

Drawings and Documents


DATE:
BY:

CONTRACTOR shall ensure that the Engineering Drawings, Data Sheets,


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

and configuration sheets are readily available in the facility where the
C

equipment indicated will be installed.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 126


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall deliver all documentation in both hardbound paper
SAY
SAY
SAY

format and also a CD-ROM based electronic file copy.


ENGG CERT

ASH
ASH
ASH

Materials
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall provide ample supply of ancillaries, patch cords as


the project requires, and to have a more viable system.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL

Software
ISSUED FOR 90% PROJECT PROPOSAL

All the software are the property of SAUDI ARAMCO, therefore


CONTRACTOR shall provide SAUDI ARAMCO with a complete list of all
DESCRIPTION

software installed, complete with revisions, versions, installed locations,


migration path, maintenance agreement and related upgrades for
maintenance and operation of the equipment as specified in this FSD.

CONTRACTOR shall provide SAUDI ARAMCO with software and related


upgrades for maintenance and operation of the equipment as follow:

• A complete list of all software installed, complete with revisions,


versions, etc.
10-02399-
JO/EWO

• The locations where this software is installed.


10-02399-
10-02399-
0001

0001
0001

• For each software package the migration path (when upgrades will be
expected, how the upgrades will be delivered, loaded, patching, etc.).
12/11/16
08/04/16

09/08/16
DATE

• Upgrade/patching management should be part of a service or


maintenance agreement for a prolonged period of time.
NO.

• Any sub-routine used to enhance the software shall be SAUDI


REV

D
C
B

DISCIPLINE
ENGINEER
ARAMCO property.
ALL LEADS

DATE: 12/11/16
PROJECT
ENGINEER
REFERENCE DRAWINGS
A M ALMATROOK
Listed below are proposal engineering documents and drawings which shall
DATE: 12/11/16
CERTIFIED be finalized by CONTRACTOR during detail design.
AMR EL SHARKAWY

12/11/16
DATE:
CONSTRUCTION SHEET
AGENCY DRAWING NO. DRAWING TITLE
SHAHZAD YAZDANI
NO.
DATE: 12/11/16 CO-A10033 001 Schematic Diagram, Overall Data System
OPERATIONS
Overall System Diagram, Data Network
ALI H GHAMDI CO-A10036 001
12/11/16
System
DATE:
CO-A10039 001 Schematic Diagram, Overall WLAN System
CONTROL NUMBER
VERIFICATION
EDSD

B. TELEPHONE NETWORK
DATE:
BY:

Scope of Work
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

IP Telephony
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 127


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• CONTRACTOR shall provide, procure, install, configure and test an
SAY
SAY
SAY

IP Telephony System to be utilized as a primary medium for


ENGG CERT

ASH
ASH
ASH

inbound and outbound voice communications at the new Yanbu


Distribution Hub. This shall include the provision and installation of
LEADS

LEADS
LEADS
ALL

ALL
ALL

fifty nine (59) totals of new IP telephone handsets which includes


one (1) Conference Telephone handset and seventeen (17) analog
& ten (10) hotline telephone handsets including all required
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

accessories and materials. The IP Telephone System shall utilize


the provided Data Network System under this project for
transmission and connection towards IP Telephone Core System
DESCRIPTION

located at SAUDI ARAMCO Dhahran B-840 and Abqaiq Comm.


Building. All new telephone equipment shall comply with the
equipment platform provided under BI-10-00246 Replace
Telephone Switches Kingdom Wide.

• CONTRACTOR shall install and commission the IP Telephone


System as per the following drawings:
10-02399-
JO/EWO

10-02399-
10-02399-
0001


0001
0001

Schematic Diagram, - CO-A10028.001


Overall IP Telephone System
12/11/16
08/04/16

09/08/16
DATE

• CONTRACTOR shall provide the required IP telephone system as


NO.
REV

D
C
B

DISCIPLINE
per below listed breakdown of numbers and IP phone types per
ENGINEER
ALL LEADS
building.
DATE: 12/11/16
PROJECT
Table 1 – IP Telephone Count and Types
ENGINEER

A M ALMATROOK
Basic IP Office IP Conference
DATE: 12/11/16 Location Subtotal
CERTIFIED Phone Phone IP Phone
AMR EL SHARKAWY

12/11/16 Engineering &


DATE: 6 25 1 32
Maintenance Building
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Operations Shelter-1 0 4 -- 4
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
Operations Shelter-2 0 4 -- 4
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION

Operation Building 5 7 -- 12
EDSD

DATE:

Receiving Substation 3 -- -- 3
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Security Support Building


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

1 -- -- 1
Main Gate
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 128


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
Basic IP Office IP Conference
SAY

Location Subtotal
Phone Phone IP Phone
ENGG CERT

ASH
ASH
ASH

Security Main Gatehouse 1 -- -- 1


LEADS

LEADS
LEADS
ALL

ALL
ALL

Security Support Building


1 -- -- 1
Tank Farm
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Security Guardhouse
1 -- -- 1
(Tank Farm)

Utility Power Substation 4 -- -- 4


DESCRIPTION

TOTAL 22 36 1 59

• CONTRACTOR shall provide approve Basic IP telephones for


Basic Users, Office IP telephones for all Office Class users and
Conference IP phone.


10-02399-
JO/EWO

10-02399-
10-02399-

CONTRACTOR shall provide the required Port licenses for all new
0001

0001
0001

IP telephones to expand the IP telephony platforms located in


Dhahran and Abqaiq provided under BI-10-00246.
12/11/16
08/04/16

09/08/16
DATE

• CONTRACTOR shall be responsible for all connection and


NO.
REV

D
C
B

integration requirements of IP Phone endpoints going to the Access


DISCIPLINE
ENGINEER Ethernet Switch located at the designated building.
ALL LEADS

DATE: 12/11/16 Analog / Hotline Telephone


PROJECT
ENGINEER

A M ALMATROOK • CONTRACTOR shall provide, procure, install, test and commission


DATE: 12/11/16 one (1) new Line Access Gateway (LAG) including all required
CERTIFIED
AMR EL SHARKAWY accessories and materials. The LAG shall be utilized to provide
DATE:
12/11/16 analog telephone lines for the Yanbu Distribution Hub and provide
CONSTRUCTION
AGENCY
back-up outside access calls when the corporate telephone network
SHAHZAD YAZDANI is unavailable. As a minimum, the LAG shall compose of the
DATE: 12/11/16 following modules; two (2) FXO/FXS Interface Modules and an
OPERATIONS
active & standby Main Control Boards.
ALI H GHAMDI


12/11/16
DATE: CONTRACTOR shall provide the required Analog and Hotline
CONTROL NUMBER
VERIFICATION

telephone system as listed in below Table.


EDSD

Table 2 – Analog and Hotline Telephone Count


DATE:
BY:

Analog Hotline
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Location Subtotal
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Phone Phone
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Engineering & Maintenance


(DCC) NO. _____________________

4 -- 4
Building

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 129


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
Analog Hotline
SAY

Location Subtotal
Phone Phone
ENGG CERT

ASH
ASH
ASH

Operations Shelter-1 1 -- 2
LEADS

LEADS
LEADS
ALL

ALL
ALL

Operations Shelter-2 1 -- 2

Operation Building 2 4 6
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Remote Interface Unit Building 1 1 -- 1

Remote Interface Unit Building 2 1 -- 1


DESCRIPTION

Security Support Building


1 -- 1
Main Gate
Security Main Gate 1 1 2

X-Ray Building 1 -- 1
Security Support Building
1 -- 1
(Tank Farm)
Security Guardhouse
1 1 2
(Tank Farm)
10-02399-
JO/EWO

10-02399-
10-02399-

FSF Support Building -- 1 1


0001

0001
0001

Chemical Shelter 1 -- 1
12/11/16
08/04/16

09/08/16
DATE

Metering Shelter 1 -- 1
NO.
REV

D
C
B

YASREF -- 1 1
DISCIPLINE
ENGINEER
ALL LEADS SAMREF -- 1 1
DATE: 12/11/16
PROJECT
ENGINEER
Yanbu Refinery Terminal -- 1 1
A M ALMATROOK
TOTAL 17 10 27
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY

12/11/16
DATE:
• CONTRACTOR shall provide an approve telephones for all analog
CONSTRUCTION
AGENCY users and approve dial-less red phone for all hotline/emergency
SHAHZAD YAZDANI
telephone users.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
• This project shall allocate the four (4) hotline circuits in Operation
12/11/16 Building to Yanbu Regional Security Command Centre (YRSCC).
DATE:
CONTROL NUMBER
VERIFICATION

• CONTRACTOR shall install and commission the Analog/Hotline


EDSD

Telephony System as per the following drawings:


DATE:


BY:

Schematic Diagram, - CO-A10029.001


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Overall Analog Telephone System


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

• CONTRACTOR shall provide, procure, install, test and commission


(DCC) NO. _____________________

two (2) new Firewalls. The Firewall shall be utilized to provide

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 130


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
security protection against threats such as DDoS attacks, malicious
SAY
SAY
SAY

intrusions, and viruses.


ENGG CERT

ASH
ASH
ASH

• CONTRACTOR shall provide, procure, install, test and commission


LEADS

LEADS
LEADS

two (2) new Ethernet switches. The Ethernet Switch shall be utilized
ALL

ALL
ALL

to support the system 10/100/1000Base-T ports and GBE ports


interface requirements.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

• CONTRACTOR shall provide, procure, install and activate two (2)


1000 Base-TX SFP Modules on GE SFP port on each of the two
Huawei Firewalls.
DESCRIPTION

• CONTRACTOR shall provide, procure, install and activate two (2)


1000 Base-TX SFP Modules on Distribution Switch located at
Engineering & Maintenance Building.

• CONTRACTOR shall provide, install and terminate two (2) Duplex


Fiber Optic Patch Cords, 10M with LC-LC connectors between
system Firewalls to Distribution Switch.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

• CONTRACTOR shall provide, install and terminate eighty six (86) 5


Meters Systimax UTP Cat-6 Patch Cords with RJ-45 connectors.
12/11/16
08/04/16

09/08/16
DATE

UTP Patch Cords shall be utilized for telephone system equipment


network cabling as shown in drawing number CO-A10028 Sheet 001
NO.
REV

D
C
B

and CO-A10029 Sheet 001.


DISCIPLINE
ENGINEER
ALL LEADS • CONTRACTOR shall provide, procure, install, test and commission
DATE: 12/11/16 one Voice Recording System including all required accessories and
PROJECT
ENGINEER materials. The Voice Recorder shall be utilized to log and record all
A M ALMATROOK
hotlines/ emergency calls for 12 months as per HCIS requirement.
DATE: 12/11/16
CERTIFIED See reference drawing CO-A10028 Sheet 001 and CO-A10029
AMR EL SHARKAWY
Sheet 001 for details.
12/11/16
DATE:
CONSTRUCTION
AGENCY
• CONTRACTOR shall provide and install one (1) 600mm (W) X
SHAHZAD YAZDANI 1000mm (D) X 1800mm (H) System Cabinet including all required
DATE: 12/11/16 accessories. The cabinet shall be utilized to house the telephone
OPERATIONS
system equipment and shall be located at Engineering &
ALI H GHAMDI

12/11/16
Maintenance Building.
DATE:
CONTROL NUMBER


VERIFICATION

Telephone system equipment shall be powered through a -


EDSD

Distribution Power Panel located at Telecommunication Room.


DATE:

• Telephone active equipment shall be grounded and bonded to the


BY:

nearest telecommunications grounding system as per SAES-T-795


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Para. 4.2.2.3.4.
C

(DCC) NO. _____________________

• This project shall lease a telephone Trunk Lines from a local service

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 131


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
provider for its Backup/outside call access. Refer to CO-A10028
SAY
SAY
SAY

Sheet 001 for the trunk lines detail. This project shall also provide
ENGG CERT

ASH
ASH

four (4) hotline circuits going to Yanbu Regional Security Command


ASH

Centre (YRSCC).
LEADS

LEADS
LEADS
ALL

ALL
ALL

A Main Distribution Frame (MDF) shall be provided to allow the orderly


and logical termination and interconnection of capable pairs to and from:
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

• Line Access Gateway


• Analog Telephones
• Public exchange trunk lines
DESCRIPTION

• Building distribution IDFs and structured cabling patch


panels

CONTRACTOR has to provide the equipment for Telephone Network


System and Unified Communications as per the System descriptions,
standards and System interfaces defined around each functional layer of the
conceptual design. The overall solution is expected to have availability and
reliability of 99.99%.
10-02399-
JO/EWO

10-02399-
10-02399-

CONTRACTOR shall integrate the System to the COMPANY’s Telephone


0001

0001
0001

Network System located in Dhahran and Abqaiq. CONTRACTOR shall


ensure that integration shall be seamless. All the System services that are
12/11/16
08/04/16

09/08/16
DATE

available in the Yanbu Distribution Hub shall be accessible by the


COMPANY in Dhahran and vice-versa.
NO.
REV

D
C
B

DISCIPLINE The document also specified the CONTRACTOR’S obligations and will be
ENGINEER
ALL LEADS finalized during detailed design.
DATE: 12/11/16
PROJECT CONTRACTOR shall propose to the COMPANY the recommended training
ENGINEER

A M ALMATROOK
courses for the System. CONTRACTOR shall price the courses according
DATE: 12/11/16
to the software and equipment installed that make-up the entirety of the
CERTIFIED System.
AMR EL SHARKAWY

12/11/16 CONTRACTOR shall design, procure, construct, test and commission a


DATE:
CONSTRUCTION
AGENCY
permanent, fully flexible, operational, and maintainable System.
SHAHZAD YAZDANI

DATE: 12/11/16
CONTRACTOR shall supply its latest hardware and software required to
OPERATIONS support the above capacities with consideration for the expansion.
ALI H GHAMDI

DATE:
12/11/16 CONTRACTOR shall supply the required port licenses for IP phones to
expand the IP telephony platforms located in Dhahran and Abqaiq provided
CONTROL NUMBER
VERIFICATION

under BI-10-00246.
EDSD

CONTRACTOR is responsible for designing, supplying, delivering, surveying


DATE:
BY:

and installing, commissioning, developing test acceptance documents,


testing, acceptance testing, performing configuration and warranting all
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

equipment.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

System Configuration
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 132


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

The Yanbu Distribution Hub Telephone Network System shall be configured


as described on Schematic Diagrams.
ENGG CERT

ASH
ASH
ASH

• Overall IP Telephone System CO-A10028.001


LEADS

LEADS
LEADS
ALL

ALL
ALL

• Overall Analog Telephone System CO-A10029.001

Commercial off the Shelf (COTS) hardware, system software, application


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL

software packages and firmware shall be configured to meet the stated


ISSUED FOR 90% PROJECT PROPOSAL

requirements.

System performance, reliability, flexibility, upward compatibility and


DESCRIPTION

expansion to meet future requirements shall be the basis of the design.

Power Systems

The System power shall be derived from a - 4 8 V o l t D C p o w e r


system.

For equipment requiring other supply voltages, suitable transformers,


inverters or AC/DC power supplies shall be provided.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Equipment plugs shall be of a US “flat pin” design with grounding contact.


12/11/16
08/04/16

09/08/16
DATE

EQUIPMENT SPECIFICATIONS

IP TELEPHONE SETS
NO.
REV

D
C
B

DISCIPLINE
ENGINEER Scope
ALL LEADS

DATE: 12/11/16
PROJECT
CONTRACTOR shall engineer, procure, test and install with this
ENGINEER Specification, and the scope shall be as follows:
A M ALMATROOK
• Connectivity of IP phone at each communication service point
DATE: 12/11/16
CERTIFIED to 10/100/1000 Mbps switched Fast Ethernet ports shall be
AMR EL SHARKAWY over Unshielded Twisted Pair (UTP) Category 6 cable.
12/11/16
DATE:
CONSTRUCTION
• IP Phones shall have 2-port built-in switch in which
AGENCY first port connects to the Access Layer in the TER/TR
SHAHZAD YAZDANI
and the second port connects towards the PC/mobile
DATE: 12/11/16
OPERATIONS
terminals in the work areas.
ALI H GHAMDI • IP Phones shall support existing and latest IEEE (Power-
DATE:
12/11/16 over- Ethernet) standards.
CONTROL NUMBER
VERIFICATION

• Procurement of Enterprise grade IP Phones to


EDSD

meet the requirements of this project and to be installed in


each of the communication service points of Hail Distribution
DATE:

Facility.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

• IP-Phone based terminals use for Hotline Communications


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

shall be equipped with add-on dialing module which has


(DCC) NO. _____________________

programmable keys that includes easy identification of the


functions and display on the LCD the name of the sites or
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 133


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
stations with Hotline IP-Phone terminals.
SAY
SAY
SAY

• Configuration of all IP Phones procured and installed under


ENGG CERT

ASH
ASH
ASH

this project and to accommodate all new required software,


hardware and device licenses as required.
LEADS

LEADS
LEADS
ALL

ALL
ALL

• Testing and Commissioning the IP Phone endpoints


and completion of the installation.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

• IP Phone shall be compatible with the existing Huawei IMS


Plat form.
DESCRIPTION

IP Phone Types

The project shall provide three (3) types of IP telephones which are to be
installed within the Yanbu Distribution Hub:

• Office Class IP Phone


• Basic Class IP Phone
10-02399-
JO/EWO

10-02399-
10-02399-
0001


0001
0001

Conference IP Phone
12/11/16
08/04/16

09/08/16
DATE

Analogue Telephone
NO.
REV

D
C
B

This project shall supply and install a Line Access Gateway (LAG) with
DISCIPLINE
ENGINEER
Analogue Telephone sets in the Engineering & Maintenance Building to
ALL LEADS serve the Yanbu Distribution Hub. A Line Access Gateway (LAG) shall
DATE: 12/11/16 be provided to serve locations where IP telephone handsets cannot be
PROJECT
ENGINEER provided.
A M ALMATROOK

DATE: 12/11/16 This project shall supply and install Hotline Telephone between Main Gate,
CERTIFIED Operation Building and FSF Support Building.
AMR EL SHARKAWY

12/11/16
DATE: This project shall supply and install analogue telephone handsets in the
CONSTRUCTION
AGENCY various location of Yanbu Distribution Hub as listed in Table 2 of this
SHAHZAD YAZDANI document.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI BANDWIDTH REQUIREMENTS
12/11/16
DATE:
CONTROL NUMBER

Introduction
VERIFICATION
EDSD

The purpose of this section is to provide all the critical VoIP solution sizing
statistics and results that shall be used by CONTRACTOR to design their
DATE:
BY:

solutions. The solution and equipment proposed by CONTRACTOR for


REVISIONCERTIFICATION

Yanbu Dist r ibut ion Hub shall have the capability to support a minimum
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

of 59 users.
C

(DCC) NO. _____________________

The breakdown of the quantity of IP and Analog telephones types per

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 134


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
building is listed in Table below.
SAY
SAY
SAY
ENGG CERT

ASH
ASH
ASH

IP ANALOG
BUILDING NAME
TELEPHONE TELEPHONE
LEADS

LEADS
LEADS
ALL

ALL
ALL

Maintenance & Engineering Building 32 4

Operator Shelter 1 & 2 8 2


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Operation Building 12 6

Security Support Building (Main Gate) 1 1


DESCRIPTION

Security Main Gate 1 2

X-Ray Building -- 1

Security Support Building (Tank Farm) 1 1

Security Guardhouse 1 2

FSF Support Building -- 1


10-02399-
JO/EWO

10-02399-
10-02399-

Receiving Substation 3 --
0001

0001
0001

Utility Power Substation 4 --


12/11/16
08/04/16

09/08/16
DATE

--
Chemical Shelter 1
NO.
REV

--
D
C
B

Metering Shelter 1
DISCIPLINE
ENGINEER Remote Interface Unit Building 1 -- 1
ALL LEADS

DATE: 12/11/16 Remote Interface Unit Building 2 -- 1


PROJECT
ENGINEER --
YASREF 1
A M ALMATROOK

DATE: 12/11/16
--
SAMREF 1
CERTIFIED
AMR EL SHARKAWY --
Yanbu Refinery Terminal 1
12/11/16
DATE:
CONSTRUCTION TOTAL 59 27
AGENCY
SHAHZAD YAZDANI

DATE: 12/11/16 Standard Erlang and Erlang-B models shall be used to estimate the
OPERATIONS required PSTN link capacity.
ALI H GHAMDI

DATE:
12/11/16 C. WIRELESS LAN NETWORK
CONTROL NUMBER
VERIFICATION

Scope of Work
EDSD

General
DATE:
BY:

This shall primarily provide wireless LAN connectivity for the users where the
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

wireless LAN installation shall be provided under BI-10-02399.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

The project shall provide and commission the following wireless LAN

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 135


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
subsystems:
SAY
SAY
SAY

• Wireless LAN indoor access points


ENGG CERT

ASH
ASH
ASH

• Mounting kits for access points


• UTP patch cords
LEADS

LEADS
LEADS
ALL

ALL
ALL

The wireless LAN network shall have a flexible configuration that enables it to
be deployed at any location within the new Yanbu Distribution Hub and
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

associated open areas with secured connectivity.

The WLAN system shall consider providing coverage and connectivity for
802.11ac in addition to 802.11a/b/g and 802.11n users. This shall be
DESCRIPTION

designed and implemented to provide the capability to work efficiently with


high performance in mix-mode without interference.

The WLAN shall share the data network infrastructure in terms of access
switches to facilitate wireless connectivity.

CONTRACTOR shall design, procure, install, test and commission a fully


flexible and secure wireless LAN network to facilitate wireless data access for
the users in Yanbu Distribution Hub facilities.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall design and implement the System by using the latest
12/11/16

proven technology of wireless equipment hardware and software available to


08/04/16

09/08/16
DATE

prevent product early obsolescence.


NO.
REV

D
C
B

CONTRACTOR shall develop a design that presents the appropriate


DISCIPLINE
ENGINEER
placement of wireless access points to provide excellent radio coverage and
ALL LEADS mobility to all wireless IP devices.
DATE: 12/11/16
PROJECT
ENGINEER The following indoor areas shall be provided with wireless LAN facilities:
A M ALMATROOK

DATE: 12/11/16 • Maintenance and Engineering Building – Ground Floor & 1st Floor
CERTIFIED • Operation Building

AMR EL SHARKAWY

12/11/16
Operation Shelter
DATE: • Security Guardhouse
CONSTRUCTION
AGENCY • Security Main Gate
SHAHZAD YAZDANI

DATE: 12/11/16 CONTRACTOR shall be responsible for the complete system design to
OPERATIONS
ensure full coverage within Yanbu Distribution Hub facilities.
ALI H GHAMDI

12/11/16
DATE: All components and accessories required for the completion and successful
CONTROL NUMBER

operation of the proposed WLAN system, either specified in detail or not, shall
VERIFICATION

be supplied and installed by the CONTRACTOR. CONTRACTOR shall verify


EDSD

all required quantities and provide the System “Fit for Purpose’, irrespective of
DATE:

estimated quantities given in this document.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Equipment Provision
C

(DCC) NO. _____________________

This project shall provide, install, test and commission a permanent, scalable

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 136


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and a complete WLAN system in accordance with the minimum requirement
SAY
SAY
SAY

as specified.
ENGG CERT

ASH
ASH
ASH

Installation
LEADS

LEADS
LEADS
ALL

ALL
ALL

The wireless LAN equipment shall be installed in areas as mentioned above.


Wireless LAN access points shall be directly connected to the Power-over-
Ethernet (PoE) ports of the access switches unless otherwise specified.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Wireless Controller

• CONTRACTOR shall utilize the existing Wireless LAN Controller in


DESCRIPTION

the Yanbu NGL.


• The Wireless LAN Controller shall manage, secure, route and
switching function for all wireless access points.

Access Points

• Wireless LAN access points shall employ two radios at 2.4 and
5GHz Frequency band
• Wireless LAN access points inside the building shall utilize UTP
10-02399-
JO/EWO

10-02399-
10-02399-

copper connection to the assigned access switch.


0001

0001
0001

• Wireless access points shall be ceiling mounted unless otherwise


specified.
12/11/16
08/04/16

09/08/16
DATE

• Wireless LAN access points shall be Power-over-Ethernet unless


used in a meshed configuration and utilizing fiber optic connection
NO.
REV

D
C
B

which is powered independently through a power injector.


DISCIPLINE
ENGINEER
• Wireless LAN access point mounting assembly should be
ALL LEADS ergonomically designed so that the aesthetic view of the area shall
DATE: 12/11/16 be preserved.
PROJECT
ENGINEER

A M ALMATROOK
REFERENCE DRAWINGS
DATE: 12/11/16
CERTIFIED SHEET
DRAWING NO. DRAWING TITLE
AMR EL SHARKAWY NO.
12/11/16
DATE: CO-A10033 001 Schematic Diagram, Overall Data System
CONSTRUCTION
AGENCY CO-A10039 001 Schematic Diagram, Overall WLAN System
SHAHZAD YAZDANI

DATE: 12/11/16
OPERATIONS D. STRUCTURED CABLING SYSTEM
ALI H GHAMDI

12/11/16 SCOPE DESCRIPTION


DATE:
CONTROL NUMBER
VERIFICATION

General
EDSD

This describes the design requirement for the Building Structured Cabling
DATE:

System (SCS) for Yanbu Distribution Hub, to provide the communication


BY:

services for the new buildings.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

This technical specification shall be used as the basis in specifying and


(DCC) NO. _____________________

defining the requirements for the design, supply, installation and


commissioning of the structured cabling system for the new building.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 137


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

Telecommunication services will be provided at the new Yanbu Distribution


Hub facilities.
ENGG CERT

ASH
ASH
ASH

All equipment and materials specified to be supplied will be of modern,


LEADS

LEADS
LEADS
ALL

ALL
ALL

proven and reliable design which will comply with the applicable standards
or codes and embody the latest proven technology.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

STANDARDS

General
DESCRIPTION

The materials and equipment provided for this System shall conform to the
requirements of the latest issues and most recent revisions and
amendments of the standards listed below and the local laws and
regulations applicable to the site.

This specification is to be read in conjunction with all relevant SAUDI


ARAMCO Engineering and Material standards, codes, practices and
regulations, Ministry of PTT requirements, and Saudi Arabian Government
Safety and Security Directives (SSD).
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

GENERAL SYSTEM REQUIREMENTS


12/11/16
08/04/16

09/08/16
DATE

General
NO.
REV

D
C
B

All the materials and equipment provided for this System shall meet the
DISCIPLINE
ENGINEER
best commercial practices, reliability, maintainability and performance of
ALL LEADS the systems defined in this specification.
DATE: 12/11/16
PROJECT
ENGINEER Structured Cabling System shall comply with BICSI standards as well as
A M ALMATROOK EIA/TIA 568, EIA/TIA-569, EIA/TIA-606, EIA/TIA-607 and all associated
DATE: 12/11/16 Technical Bulletins. The cables shall conform to the fire and safety codes
CERTIFIED NEC Article 800- 51(b) or equivalent.
AMR EL SHARKAWY

12/11/16
DATE: BICSI certified RCDD shall be prerequisites for the designers of the
CONSTRUCTION
AGENCY building cabling system.
SHAHZAD YAZDANI

DATE: 12/11/16 Building Structured Cabling System shall be designed for at least a
OPERATIONS minimum operating lifetime of 20 years.
ALI H GHAMDI

12/11/16 Structured Cabling System shall be designed, procured, installed, tested


DATE:
CONTROL NUMBER

and commissioned as a complete, fully flexible system to facilitate


VERIFICATION

communications services for voice and data of the buildings which


EDSD

includes the following:


DATE:
BY:

• Cableway infrastructure and termination inside the Telecom


REVISIONCERTIFICATION

Equipment Room /Telecom Room and enclosure which includes


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

but not limited to cable runways, equipment racks, cross-connect


(DCC) NO. _____________________

terminals, grounding, horizontal and backbone cabling.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 138


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Cableway System (horizontal and backbone) which includes but
SAY
SAY
SAY

not limited to cable tray system, Rigid Steel Conduit (RSC) and
Electro Malleable Tubing (EMT) conduits, sleeves, pull boxes,
ENGG CERT

ASH
ASH
ASH

outlet boxes, cableway supports, etc.


LEADS

LEADS
LEADS
ALL

ALL
ALL

The Work shall include but not limited to installation, termination and
testing of CAT6 modules and test all horizontal and backbone cabling.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

TECHNICAL REQUIREMENTS

Telecom Equipment Room (TER)/Telecom Rooms (TR)


DESCRIPTION

CONTRACTOR shall design and provide a Telecom Equipment Room


(TER)/Telecommunications Rooms (TR) in the required buildings for the
co-location of data and voice termination equipment on each location of
the buildings in accordance with EIA/TIA 569 & BICSI TDMM.

CONTRACTOR shall design, procure, construct, test, and commission all


associated facilities within the TR to include but not limited to, cable splice
closure, grounding system, and cable tagging and relevant backboards.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001

Telecommunications Room (TER/TR) in the required buildings shall house


0001

the telecommunication equipment to serve the occupants of the building at


12/11/16
08/04/16

09/08/16

each floor.
DATE

CONTRACTOR shall ensure that the TR arrangements, cable pathways


NO.
REV

D
C
B

details shall meet the requirements per ANSI/TIA/EIA-569B and grounding


DISCIPLINE
ENGINEER
requirement per ANSI/TIA/EIA-607.
ALL LEADS

DATE: 12/11/16 If the total horizontal cabling length to any IO exceeds 90m from the patch
PROJECT
ENGINEER panels, additional TR and IDF’s shall be provided.
A M ALMATROOK

DATE: 12/11/16 Physical Characteristics


CERTIFIED
AMR EL SHARKAWY
The environment and the physical features of the space of TER/TR
12/11/16
DATE: shall be as follows:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI • HVAC system shall ensure that the TER/TR is maintained at a
DATE: 12/11/16 temperature of 18-24 degrees centigrade indoor dry bulb
OPERATIONS
temperature.
ALI H GHAMDI
• The HVAC system shall provide humidity control to keep the indoor
12/11/16
DATE: air relative humidity level at 30-55%.
CONTROL NUMBER

• Each TER/TR shall have independent HVAC controls, i.e. a


VERIFICATION

thermostat to regulate the temperature and humidity controls


EDSD

located inside the TER/TR.



DATE:

Fire Alarm and Detection System shall be provided in each TER/TR.


BY:

• The Fire Detector shall have a remote light extended from its circuit
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

to a location outside the main entrance door.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

• All walls and doors in the TER/TR shall have a one-hour fire rating.
(DCC) NO. _____________________

• Minimum of one fire extinguisher of required type shall be installed.


• A Wall Mounted Telephone shall be placed in the TER/TR.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 139


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• The main entrance door shall have a combination door lock and
SAY
SAY
SAY

shall open outward if the building fire code allows.


• Lighting and emergency lighting shall be provided in each TER/TR.
ENGG CERT

ASH
ASH
ASH

• Electrical convenience duplex 230V AC outlet spaced at 1880mm


LEADS

intervals around the perimeter of the walls at a height of 450mm


LEADS
LEADS
ALL

ALL
ALL

above floor level,


• A twist lock duplex 230V above each equipment rack ceiling
mounted AC outlet together with the dedicated power outlets shall
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

be provided.
• Each Line circuit shall originate from the dedicated power panel
located in each TER/TR. For buildings with UPS power, the
DESCRIPTION

dedicated power panel shall be powered from the Building UPS.


• Grounding - CONTRACTOR shall supply a #4/0 AWG grounding
conductor bonded to the building ground grid, for later connection to
the TER/TR grounding system.
• Plywood boarding ¾ inch thick by eight (8) feet by four (4) feet shall
be installed on at least two walls within the rooms and painted with
two (2) coats of fire retardant white paint.
• The cable support system inside the TER/TR shall be Ladder type
trays. Cable Trays fittings and hardware include, but not limited to:
10-02399-
JO/EWO

hangers, ground straps, fixtures etc. The size and layout of the
10-02399-
10-02399-
0001

0001
0001

ladders and cable trays shall be determined and approved during


detail design.
12/11/16
08/04/16

09/08/16
DATE

• A full complement of mounting brackets shall be incorporated in the


design which shall include but not limited to threaded rod bracket
kits, ladder rack bracket kits, wall bracket kits and all other
NO.
REV

D
C
B

DISCIPLINE components necessary to make the system workable. The mounting


ENGINEER
ALL LEADS
brackets shall be manufactured from cold rolled steel with zinc
chromate, e-coating or painted black powder coat finish.
DATE: 12/11/16
PROJECT • Outside plant fiber optic feeder cable shall be fed onto the fiber optic
ENGINEER
patch panel located inside the telecommunications equipment room.

A M ALMATROOK
Fire retardant tape shall be wrapped on to the outside Fiber Optic
DATE: 12/11/16
CERTIFIED Cable Terminating on to the fiber patch panel on the run from the
AMR EL SHARKAWY Cable entry point inside the TER/TER to the Patch Panel.
DATE:
12/11/16 • However , in places where it is mandatory to place the terminating
CONSTRUCTION hardware more than 15 meters from the underground cable entry
AGENCY
SHAHZAD YAZDANI point, suitable splice closure shall be provided for transition of
DATE: 12/11/16
outdoor type cable to the indoor type cable.
OPERATIONS
ALI H GHAMDI Building Entrance/Entrance Facilities
12/11/16
DATE:
The building entrance facilities shall consist of the telecommunication
CONTROL NUMBER
VERIFICATION

service entrance to the building, including the entrance point through the
EDSD

building floor adjacent to an exterior wall and continuing to the entrance


room or space.
DATE:
BY:

Entrance conduits – 4” diameter PVC concrete encased conduits shall be


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

extended from the TER to a point 1.5 meters from the building foundation.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Please refer to OSP documentation for additional details on the entrance


(DCC) NO. _____________________

Conduits.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 140


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

The entrance room/space is typically located within 15m (50ft) of the


outside cable entrance point. The entrance facilities shall contain the inter-
ENGG CERT

ASH
ASH
ASH

building backbone cabling pathways that link a building to other buildings


on site.
LEADS

LEADS
LEADS
ALL

ALL
ALL

Equipment Racks
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Cable management system shall be provided using the rack system that
supports heavy equipment and high capacity cable for cross-connect or
interconnect applications in a telecommunication room.
DESCRIPTION

Equipment Racks shall be used for the installation of both passive and
active equipment required for their complete installation in all
communication rooms. In locations that require special security or where
environmental requirements for the active equipment cannot be met, an
enclosure may be required.

The racks system shall be modular and support copper and fiber cables.
The rack shall be constructed of steel material to accommodate 19”
components.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

The rack shall be UL listed for 800 pound load rating to accommodate
12/11/16

large networking equipment.


08/04/16

09/08/16
DATE

The rack shall supply space identification of quick and easy location of
NO.
REV

D
C
B

rack mount items, double sided#12-24 EIA universal mounting-hole


DISCIPLINE
ENGINEER
spacing.
ALL LEADS

DATE: 12/11/16 The rack shall accept removable, hinged doors and fingers cable
PROJECT
ENGINEER management system. The rack system shall meet all EIA requirements as
A M ALMATROOK defined in EIA-310-D.The standard racks shall be high strength aluminum
DATE: 12/11/16 with heavy-duty base and top angle hardware.
CERTIFIED
AMR EL SHARKAWY
Standard Rack dimensions shall be 7 feet height x 19 inches width.
12/11/16
DATE: Minimum of two (2) 19” X 7” equipment racks and associated vertical &
CONSTRUCTION
AGENCY horizontal cable management system is required per TR.
SHAHZAD YAZDANI

DATE: 12/11/16 Each rack shall be bonded together with approved bonding jumpers to the
OPERATIONS communications room ground bus bar.
ALI H GHAMDI

DATE:
12/11/16 Equipment Enclosures
CONTROL NUMBER
VERIFICATION

Communication equipment enclosures shall be designed and installed on


EDSD

a case by case basis depending on the circumstance that would require a


change from the project standard equipment rack.
DATE:
BY:
REVISIONCERTIFICATION

Enclosures may be used in buildings where size may prohibit a


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

communications room but still require voice and data connections to the
C

(DCC) NO. _____________________

LAN enclosures shall have a locking mechanism.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 141


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Fan units equipped with a fit for purpose filtration system shall be used,
SAY
SAY
SAY

where necessary, to ensure that the maximum enclosure temperature


does not exceed the manufacturer’s recommended operating temperature
ENGG CERT

ASH
ASH
ASH

for active equipment.


LEADS

LEADS
LEADS
ALL

ALL
ALL

Cable Termination Hardware

Each horizontal or backbone cabling run will be terminated to the patch


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

panels using appropriate connectors or connecting blocks depending upon


the cable type. Matching patch cords will be used to perform cross connect
into the networking / voice hardware.
DESCRIPTION

To ensure uniformity, all patch panels for their perspective application,


copper, fiber, etc. shall be from the same manufacturer and part number
throughout the job site. All copper patch panels shall support CAT6
applications and facilitate cross-connection using modular CAT6 4-pair
patch cords with RJ-45 end plug.

Patch panels shall be sized with a minimum 25 percent spare capacity for
future growth and MAC (Moves, Adds & Changes) work. The patch panels
design shall remove any tools involving MAC work.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Modular Patch Panel


12/11/16
08/04/16

09/08/16
DATE

All horizontal cables serving the information outlets (IO’s) at the IWAs shall
be terminated onto a patch panels in TER/TR/TC or data enclosures.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
Patch Panels shall be, modular, CAT-6 UTP, with integral high density
ALL LEADS punch down style connecting base. The connecting base shall employ
DATE: 12/11/16 deep channels to provide additional space for cable management. The
PROJECT
ENGINEER connecting block shall have a compatible footprint with installed 110
A M ALMATROOK systems. The connecting block shall have rounded edge.
DATE: 12/11/16
CERTIFIED Four pair Category 6 UTP cabling shall be terminated onto four pair punch
AMR EL SHARKAWY
down style connecting hardware mounted to the rear (integral to the patch
12/11/16
DATE: panel) to the category 6 modules on the front face of the patch panel
CONSTRUCTION
AGENCY wiring configuration shall conform to EIA/TIA 568B standard.
SHAHZAD YAZDANI

DATE: 12/11/16 The wire strip and connecting block, shall be marked with a highly visible
OPERATIONS color code and allow for termination of one full pair or four full pairs at a
ALI H GHAMDI time.
12/11/16
DATE:
CONTROL NUMBER

Port and panels shall be easy to identify with write on areas and optional
VERIFICATION

label holder for color coded labels.


EDSD

The patch panels shall be mountable to the standard EIA 19”


DATE:
BY:

racks/enclosures.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Modular Patch Cords


C

(DCC) NO. _____________________

Modular patch cords shall be used between patch panels configured as

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 142


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
cross-connect or between the patch panel and the networking hardware
SAY
SAY
SAY

when the patch is used as an interconnection.


ENGG CERT

ASH
ASH
ASH

The Patch cords shall be factory terminated with modular plugs featuring a
one piece , tangle free latch design and black strain relief boots to support
LEADS

LEADS
LEADS
ALL

ALL
ALL

easy moves , addition and changes .They shall be constructed with


Category 6 24 AWG stranded UTP cable. Each patch cord shall be 100%
performance tested at the factory in a channel test to the Category 6
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

standards.

Punch Down System and Patch Cord Assemblies


DESCRIPTION

Category 6 UTP patch cords shall be used between punch down style
connecting blocks when configured as a cross connect or between the
connecting block and networking hardware when the connecting block is
used as a interconnect.

Patch cords shall use 24 AWG stranded Category 6 cable. The cable shall
be terminated onto eight position punch down style plugs (R-J45 modular
plugs featuring a one piece, tangle free latch design and strain relief boots)
and tested to exceed the Category 6 performances when used with the
10-02399-
JO/EWO

10-02399-
10-02399-
0001

specified Category 6 modular jacks.


0001
0001

12/11/16

The patch cords shall use grey cords with grey connectors, shall be field
08/04/16

09/08/16
DATE

terminable and shall employ a clear cap for wiring identification.


NO.
REV

D
C
B

Fiber Patch Panels


DISCIPLINE
ENGINEER
ALL LEADS Fiber Patch Panels shall be equipped with SC connectors shall be
DATE: 12/11/16 provided to terminate the cables. Patching within the cabinets /racks shall
PROJECT
ENGINEER be via dual SC-SC connector fiber patch cables.
A M ALMATROOK

DATE: 12/11/16 Fiber Optic Patch Cords


CERTIFIED
AMR EL SHARKAWY
The fiber patch cords shall be pre-terminated patch cables with SC
12/11/16
DATE: connector.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI The fiber patch cords and pigtails shall be constructed from high
DATE: 12/11/16 performance single mode optical fiber cable with SC connectors.
OPERATIONS
ALI H GHAMDI Integral boots shall be provided to provide strain relief and help maintain
12/11/16 consistent polarity.
DATE:
CONTROL NUMBER
VERIFICATION

The fiber Patch cords come in lengths of one, two and three meters.
EDSD

Cable Management
DATE:
BY:
REVISIONCERTIFICATION

Cable management shall be used to provide a neat and efficient means for
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

routing and protecting fiber and copper cables and patch cords on the
C

(DCC) NO. _____________________

equipment racks and enclosures. The system shall be complete cable


management system comprised of vertical cable managers, horizontal

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 143


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
cable managers, and cable management accessories used throughout the
SAY
SAY
SAY

cabling system. The system shall protect network investment by


maintaining system performance, controlling cable bend radius and
ENGG CERT

ASH
ASH
ASH

providing cable strain relief.


LEADS

LEADS
LEADS
ALL

ALL
ALL

Vertical Cable Manager

Vertical cable mangers shall include components that aid in routing,


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

managing and organizing cable to and from patch panels and/or


equipment. Managers shall protect network equipment by controlling cable
bend radius and providing cable strain relief .Managers shall be universal
design mounting to EIA 19” racks and constructed of base with plastic
DESCRIPTION

fingers. The duct fingers shall include retaining tabs to retain the cables in
place during cover removal. The covers shall be easily removed or hinged
to allow for quick moves, addition and changes.

Horizontal Cable Manager

Horizontal cable managers shall include components that aid in routing,


managing and organizing cable to and from patch panels and/or
equipment. Panels shall protect network equipment by controlling cable
10-02399-
JO/EWO

10-02399-
10-02399-
0001

bend radius and providing cable strain relief. Panels shall be universal
0001
0001

design mounting to EIA 19” racks and constructed of steel base with
12/11/16

plastic fingers. The duct fingers shall include retaining tabs to retain the
08/04/16

09/08/16
DATE

cables in place during cover removal. The covers shall be easily removed
or hinged to allow for quick moves, addition and changes.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
The cable mangers shall be provided with wire retainers to retain the
ALL LEADS cables during cover removal and # 12-24 English and M6 metric mounting
DATE: 12/11/16 screws. The two rack unit space, horizontal cable management panel shall
PROJECT
ENGINEER be provided between two modular patch panels.
A M ALMATROOK

DATE: 12/11/16 In Cabinet Cable Manager


CERTIFIED
AMR EL SHARKAWY
In cabinet cable management system shall include components that aid in
12/11/16
DATE: routing, managing and organizing cable to and from patch panels and/or
CONSTRUCTION
AGENCY equipment within a cabinet. Mangers shall protect network equipment by
SHAHZAD YAZDANI controlling cable bend radius and providing cable strain relief. Panels shall
DATE: 12/11/16 be a flexible design with adjustable mounting Panels shall be constructed
OPERATIONS PVC duct with steel mounting brackets attached. Duct fingers shall have
ALI H GHAMDI score lines for easy removal.
12/11/16
DATE:
CONTROL NUMBER

Backbone Cabling
VERIFICATION
EDSD

The Backbone Cable Subsystem in a building is the part of the structured


cabling system that provides connectivity between Equipment rooms,
DATE:
BY:

telecommunication rooms and telecommunication service entrance


REVISIONCERTIFICATION

facilities.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

The Backbone fiber optic cable shall be glass cable, single mode fiber
optic cable conforming to G.652D standard.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 144


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

The optic core optical fibers armored distribution cable shall be used within
buildings. Applications include intra-building backbones, routing between
ENGG CERT

ASH
ASH
ASH

telecommunication rooms and connectorized cables in riser and plenum


environments. The optical fiber is inside a spiral wrap of interlocking
LEADS

LEADS
LEADS
ALL

ALL
ALL

aluminum armor for ruggedness and superior crush resistance (Interlock


Armored).Identification sheath marking shall provide positive identification
and length verification.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Cables shall be CSA-FT4 rated or an equivalent. The Optical Fiber cables


shall have water blocking, application specific fame / smoke rating high
density features.
DESCRIPTION

The optical fiber cable shall be suitable for riser and plenum applications.

The optical fiber cables shall have riser and Plenum designs UL listed as
CMR/OFNR (CSA-FT4) and CMP/OFNP (CSA-FT6) or an equivalent

The indoor Fiber Optic cable shall be un-armored.

The Fiber Optic cables shall be designed with Reverse Oscillated Lay
10-02399-
JO/EWO

10-02399-
10-02399-
0001

Stranding Method to facilitate mid-span access of fibers. All the Fiber Optic
0001
0001

Cables shall be terminated to a patch panel.


12/11/16
08/04/16

09/08/16
DATE

Patch cords of same specification shall be used for the indoor distribution
system from network switches to end devices throughout the building, as
NO.
REV

D
C
B

well as the interfaces between various systems and networks.


DISCIPLINE
ENGINEER
ALL LEADS The type of Backbone copper cable shall be 100 ohms unshielded twisted
DATE: 12/11/16 pair multi-pair cable.
PROJECT
ENGINEER

A M ALMATROOK Copper Cable: In cases where copper cables shall be utilized to provide
DATE: 12/11/16 analogue telephone service or any other voice communication service,
CERTIFIED following shall be the minimum standard required for the cable to be used:
AMR EL SHARKAWY

12/11/16
DATE: • All cables shall meet or exceed Category 6 or Cat 3 UTP

CONSTRUCTION
AGENCY These requirements are for multi-pair 25 pair or more UTP 24 AWG
SHAHZAD YAZDANI copper cables.
DATE: 12/11/16 • All cables shall conform to the requirements for communication
OPERATIONS
circuits defined by local electrical code equivalent to NEC.

ALI H GHAMDI
The cable manufacturer shall be ISO 9001 registered.
12/11/16
DATE:
CONTROL NUMBER

Voice Termination Hardware


VERIFICATION
EDSD

Punch down 110 base and system, Cat-6 ( Cat3) UTP cable shall be
DATE:

terminated upon a standard density 110 style cat-6 connecting block,


BY:

providing for termination of four pair cables.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Protection Units
(DCC) NO. _____________________

All copper circuits shall be protected between each building with a


`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 145


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
protector unit at the demarcation point of every building. All protector units
SAY
SAY
SAY

shall be grounded according to the manufactures recommendations.


ENGG CERT

ASH
ASH
ASH

Cross Connecting Hardware


LEADS

LEADS
LEADS
ALL

ALL
ALL

Category 6 UTP patch cord shall be used between 110 style connecting
bases when configured as a cross-connect or between connecting block
and networking hardware when the connecting block is used as an
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

interconnect. Patch cords shall be 24 AWG stranded Category 6 cable.


The cable shall be terminated onto 110 style plugs tested to exceed CAT-6
performance when used in a channel with the specified category 6
modules.
DESCRIPTION

The patch cords shall be factory terminated with modular plugs featuring a
one piece, tangle free latch design and black strain relief boots. No field
terminated patch cords or cross-connects shall be used for the permanent
installation.

Horizontal Cable System

The horizontal cabling system is the portion of the telecommunication


10-02399-
JO/EWO

10-02399-
10-02399-
0001

cabling system that extends from the work area telecommunication


0001
0001

outlet/connector to the horizontal cross-connect in the Telecommunication


12/11/16

Room/Telecommunication Equipment Room/Telecom Closet.


08/04/16

09/08/16
DATE

General
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
All horizontal cabling shall be CAT6 UTP, plenum rated, 24 AWG 100
ALL LEADS Ohm, 4-pair cables to create a truly structured cable environment where
DATE: 12/11/16 each horizontal link can be used for either voice or data as required.
PROJECT
ENGINEER

A M ALMATROOK The horizontal cabling shall utilize a physical star-wired configuration. It


DATE: 12/11/16 shall comprise of uninterrupted cable runs terminated at the user
CERTIFIED information outlets and within the Telecommunications Room.
AMR EL SHARKAWY

12/11/16
DATE: Plenum cable shall be utilized for the horizontal cable distribution network
CONSTRUCTION
AGENCY where cables are subjected to airflow and are not totally enclosed in steel
SHAHZAD YAZDANI conduit. Other areas shall use non-plenum grade in NEC & UL.
DATE: 12/11/16
OPERATIONS Bridged taps and splices are not permitted as part of the copper horizontal
ALI H GHAMDI cabling.
12/11/16
DATE:
CONTROL NUMBER

The maximum distance of the horizontal cable shall be 90 meters. The


VERIFICATION

maximum distance for cross-connect jumpers and patch cords, jumpers


EDSD

and patch cords that connect horizontal cabling with equipment or


backbone cabling shall not exceed 6 meters in length.
DATE:
BY:
REVISIONCERTIFICATION

All horizontal cables shall be terminated onto punch down style UTP, CAT-
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

6 modular patch panels or punch down style connecting blocks in


C

(DCC) NO. _____________________

TER/TR/TC / DATA enclosure at one end and at CAT- 6 outlet using


EIA/TIA 568-B at the IWA at the other end.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 146


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

Each telecommunication outlet location shall have at a minimum three (3)


Category 6 cables.
ENGG CERT

ASH
ASH
ASH

Horizontal Cable Management


LEADS

LEADS
LEADS
ALL

ALL
ALL

All major runs of the horizontal cable shall be installed in a


communications cable tray C-profile perforated, metallic, 75 mm deep and
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

width as per the calculated sizing depending upon the usable area served
by them.

Communication cables or wires shall not be strapped, taped or attached by


DESCRIPTION

any means to the exterior of any conduit or raceway as a means of


support. All trays shall be installed with the proper bend radius and support
for maximum loading.

The maximum fill ratio shall not exceed 40% of the cable installed. A full
complement of fittings must be available including, but not limited to 45
degree and 90 degree flat, vertical inside and outside elbows, tee and
cross fittings, reducers, end caps and all other components necessary to
make the system workable. Snap-on or split covers shall be available for
10-02399-
JO/EWO

10-02399-
10-02399-
0001

all directional fittings.


0001
0001

12/11/16

The fitting shall be capable of maintaining a 2” minimum cable bend


08/04/16

09/08/16
DATE

radius. The communications cable tray shall not be shared with building
electrical cable. Communications wires and cables shall be separated by
NO.
REV

D
C
B

at least 50.8mm (2 in) from conductors of any electric light or power.


DISCIPLINE
ENGINEER
ALL LEADS In each section of tray, a bonding jumper shall be installed as required.
DATE: 12/11/16 When combination utility poles are used from the ceiling for power and
PROJECT
ENGINEER communication cable, the poles shall be specifically listed for the
A M ALMATROOK application.
DATE: 12/11/16
CERTIFIED A full complement of mounting brackets shall be incorporated in the design
AMR EL SHARKAWY
which shall include but not limited to Threaded rod bracket kits, Ladder
12/11/16
DATE: rack bracket kits, wall bracket kits and all other components necessary to
CONSTRUCTION
AGENCY make the system workable. The mounting brackets shall be manufactured
SHAHZAD YAZDANI from cold rolled steel with zinc chromate, e-coating or painted black
DATE: 12/11/16 powder coat finish.
OPERATIONS
ALI H GHAMDI Horizontal Cable Types
12/11/16
DATE:
CONTROL NUMBER

Cables installed in ducts, plenums and other spaces for environmental air
VERIFICATION

shall be Communication Plenum Cable Type (CMP). Listed plenum


EDSD

communications raceways shall be installed in ducts and plenums. Cables


installed in vertical runs and penetrating more than one floor, or cables
DATE:
BY:

installed in vertical runs in a shaft, shall be Communication Riser Cable


REVISIONCERTIFICATION

Type (CMR). Floor penetrations requiring Type CMR shall contain only
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

cables suitable for riser or plenum use. Listed riser communications


C

(DCC) NO. _____________________

raceways shall be installed in vertical riser runs in a shaft from floor to


floor.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 147


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

Only Type CMP and CMR cables shall be installed in these raceways.
Communications cables Types CMP, CMR, Communications General
ENGG CERT

ASH
ASH
ASH

Purpose Cable (CMG) shall be used in distribution frames and cross-


connect arrays.
LEADS

LEADS
LEADS
ALL

ALL
ALL

Work Area Subsystems


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

The work area shall consist of the connectivity equipment used to connect
the horizontal cabling subsystem and the equipment in the work area. The
connectivity equipment might include the following options:
DESCRIPTION

• Patch(equipment cords) and modular connectors


• Outlet and surface mount boxes
• Surface raceway and outlet poles

Information Outlets (IO) and surface mount boxes

Each building shall be pre-wired for voice/data and Wireless Local Area
Network (WLAN) access point connection in accordance with TIA/EIA-
568B wiring standard. Dual Port RJ-45 Information Outlets shall be
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

provided for each room. Two (2) CAT6 4-pair horizontal cables shall be
routed, terminated and certified from the Information Outlet to the patch
12/11/16
08/04/16

09/08/16

panels within the building’s Telecommunication Room (TER/TR).


DATE

The maximum CAT6 cable length between the IO and patch panels shall
NO.
REV

D
C
B

be 90 meters.
DISCIPLINE
ENGINEER
ALL LEADS All insert modules shall be 8P8C, non-keyed, modular RJ45 jack with
DATE: 12/11/16 pin/pair assignments wired per T568B standard termination.
PROJECT
ENGINEER

A M ALMATROOK All outlets shall be manufactured from high impact thermoplastic material
DATE: 12/11/16 UL flammability rating of 94 HB or better. All outlets and surface mount
CERTIFIED
AMR EL SHARKAWY
boxes shall be available in four colors including off-white (IW), Electrical
12/11/16
Ivory (EI), White (WH) and international Grey (IG).
DATE:
CONSTRUCTION
AGENCY Each gang box shall be connected to 1” diameter conduit. In cases of false
SHAHZAD YAZDANI
ceiling installation, the conduit shall begin from the cable tray (installed in
DATE: 12/11/16 the space between the Ceiling and the false ceiling) and terminate at the
OPERATIONS
outlet gang box.
ALI H GHAMDI

12/11/16
DATE: The conduits installed underground flushed with floor shall be 1” diameter
CONTROL NUMBER

PVC.
VERIFICATION
EDSD

A 1” diameter coupling shall be provided at the transition point of 1”


DATE:

diameter EMT to 1” diameter PVC. In cases where conduits originate


BY:

directly from the Data Cabinet feed to the outlet directly whole run being
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

above ground, 1” diameter EMT conduit shall be provided.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

In cases where the conduits originate from the data cabinet but partial run
is flushed floor before serving the outlet, the amount of run above ground
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 148


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
shall be 1” diameter EMT and that under the ground shall be 1” diameter
SAY
SAY
SAY

PVC coated RSC. At each end of the conduits, bushings shall be provided
for protection of the cables.
ENGG CERT

ASH
ASH
ASH

Surface mount boxes shall be provided in 4 ports low profile boxes. Boxes
LEADS

LEADS
LEADS
ALL

ALL
ALL

shall accept all fiber, copper and miscellaneous audio/video modules. The
Boxes shall mount with screws, adhesives or optional magnets. The box
covers include breakouts for use with surface raceway. Cable tie slots
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

shall be included to prove strain relief to the cables.

The information outlet openings shall be standard NEMA-equivalent


opening .This size shall provide openings that are dimensionally equivalent
DESCRIPTION

to standard (NEMA OS 1 WD-6) openings. In addition, a minimum depth of


30.5mm (1.2 in) should be provided.

Face plates shall be two ports as required, single gang with painted
combination head screw. The face plates shall mount to standard US
NEMA boxes and adapters .Dedicated sloped versions shall be provided
for improved bend radius control and decreased requirements in wall
depths. Each faceplate shall accept outlet modules that can be individually
inserted and removed as required.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Power poles can be used as pathways for the horizontal cable from the
12/11/16

ceiling to the work areas. Power poles that are used for voice, data and
08/04/16

09/08/16
DATE

power cable shall be listed for the applications with a divider for
separation. The poles shall be installed as per the manufacture installation
NO.
REV

D
C
B

instructions and following the local applicable codes.


DISCIPLINE
ENGINEER
ALL LEADS Fire Stopping
DATE: 12/11/16
PROJECT
ENGINEER Fire stopping material and procedures shall conform to the international
A M ALMATROOK BICSI TDMM standard
DATE: 12/11/16
CERTIFIED Communications Grounding
AMR EL SHARKAWY

12/11/16
DATE: CONTRACTOR shall provide communications grounding and bonding
CONSTRUCTION
AGENCY system in all locations that utilize communications equipment, both passive
SHAHZAD YAZDANI and active. Telecommunications Main Grounding Busbar (TMGB), the
DATE: 12/11/16 Telecommunications Grounding Busbar (TGB), the Telecommunications
OPERATIONS Bonding Backbone (TBB), the Telecommunications Bonding Backbone
ALI H GHAMDI Interconnecting Bonding Conductor (TBBIBC) and the conductors used to
12/11/16 bond the components together are the components for the communication
DATE:
CONTROL NUMBER

grounding and bonding infrastructure.


VERIFICATION
EDSD

The TMGB is generally located in the entrance facility, where the


communication service enters the building. Its primary function is to
DATE:
BY:

conduct lightning and AC fault currents from the primary protectors. The
REVISIONCERTIFICATION

conductor for the TMGB shall be a minimum of 300 mm (1 ft.) from any
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

power cables, even when isolated by metallic conduits. The location of the
C

(DCC) NO. _____________________

bus bar shall be designed for attaching entrance facility equipment and
other grounding bars.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 149


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

The TGB is the bar used to ground the passive and active components
inside the communications room. The TGB shall be a predrilled electro tin
ENGG CERT

ASH
ASH
ASH

plated copper bus bar provided with standard NEMA bolt hole sizing and
spacing. Minimum dimensions for the TGB are 6 mm (1/4 in) thickness x
LEADS

LEADS
LEADS
ALL

ALL
ALL

50 mm (2 in) width. Length can vary as required in each communications


room.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

All bonding conductors shall be a minimum of No. 6 AWG insulated copper


using listed 2-hole compression connectors. Each bonding conductor shall
be labeled per ANSI/TIA/EIA 606. All bonding conductors shall be marked
by a distinctive green color and be tagged with the label.
DESCRIPTION

EXPANSION CAPABILITIES

Unless specified otherwise, the following shall apply.

SCS horizontal cabling shall have two (2) or three (3) UTP cables wired to
the information outlets of each quadplex plate.

The backbone cable system shall be sized with a minimum of 50% spare
10-02399-
JO/EWO

10-02399-
10-02399-
0001

capacity, allowing for future expansion.


0001
0001

12/11/16

COMMUNICATIONS DISTRIBUTION DESIGNER


08/04/16

09/08/16
DATE

All building telecommunications cable system design must be done under


NO.
REV

D
C
B

the design authority of a valid/current BICSI Registered Communications


DISCIPLINE
ENGINEER
Distribution Design (BICSI RCDD) to ensure that a minimum level of
ALL LEADS competency has been provided in the telecommunication office building
DATE: 12/11/16 infrastructure and cable system.
PROJECT
ENGINEER

A M ALMATROOK INSTALLATION AND COMMISSIONING


DATE: 12/11/16
CERTIFIED Installation
AMR EL SHARKAWY

12/11/16
DATE: CONTRACTOR shall install all equipment required by this specification to
CONSTRUCTION
AGENCY produce a fully functional system ready for handling over to SAUDI
SHAHZAD YAZDANI ARAMCO.
DATE: 12/11/16
OPERATIONS Quality
ALI H GHAMDI

12/11/16 CONTRACTOR shall ensure that the installation is to be carried out by


DATE:
CONTROL NUMBER

fully trained personnel, with installation techniques who are familiar with
VERIFICATION

the system and the equipment.


EDSD

CONTRACTOR shall ensure installation work shall be performed in a


DATE:
BY:

workmanlike manner using best practices, and adhering to the


REVISIONCERTIFICATION

requirements of SAUDI ARAMCO standards.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

CONTRACTOR shall label each wire and cable in each end indicating the
wire designation. The labeling shall be identical in nomenclature and all

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 150


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
labels shall be typed and covered with transparent heat-shrinkable tubing.
SAY
SAY
SAY

CONTRACTOR shall neatly arrange all cables on the cable ladder rack,
ENGG CERT

ASH
ASH
ASH

cable tray, or supports to prevent twisting and unnecessary crossover of


cables. All signal cables and wiring shall be secured.
LEADS

LEADS
LEADS
ALL

ALL
ALL

Plant Tagging
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall be responsible for tagging all equipment and the


verification of proper tagging shall be carried out as part of the mechanical
completion inspection.
DESCRIPTION

Testing and Inspection of UTP Cables

Manufacturer’s Data

• Test data shall be provided by the manufacturer for each purchase


order of copper premises distribution system cables, complying with
the TIA/EIA 568B.2-1, ISO/IEC 11801 (2002) and CENELEC
EN50173-1 (2002) specifications for UTP Cat. 6 cables.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001

Test To Be Performed By CONTRACTOR before Installation


0001

• In addition to the test data provided by the manufacturer, the


12/11/16
08/04/16

09/08/16
DATE

Category 6 cables shall be measured for attenuation (insertion loss)


and near end cross talk (NEXT) at the following frequencies: 1 MHz,
NO.
REV

D
C
B

4.0 MHz, 25 MHz and 250 MHz as a minimum. Insertion loss and
DISCIPLINE
ENGINEER cross talk must be measured with a cable length of at least 305
ALL LEADS meters (1000 ft). If the cable lengths are greater than 305 m, the
DATE: 12/11/16 results must be normalized to 305 m for comparison with the
PROJECT
ENGINEER manufacturer’s data.
A M ALMATROOK

DATE: 12/11/16 • Figures 18-D and 18-E show the test set up for insertion loss and
CERTIFIED
AMR EL SHARKAWY
NEXT respectively. The frequency oscillator must be set to the
12/11/16
correct frequency, level (0 dBm), and source impedance (100 ohm).
DATE:
The level of meter must cover the required range of frequencies and
CONSTRUCTION
AGENCY a wide range of sensitivity down to 100 dBm. Test cords must be
SHAHZAD YAZDANI
• short and calibrated according to ANSI/EIA/TIA-5
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI

DATE:
12/11/16 Cable Crosstalk between pairs
Insertion
CONTROL NUMBER

Freq.
VERIFICATION

Loss (dB) (dB)


(MHz)
EDSD

1-2 1-3 1-4 2-3 2-4 3-4


DATE:

1
BY:

4
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

16
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

25
(DCC) NO. _____________________

100
200
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 151


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
250
SAY
SAY
SAY

Use this table to record the measure value as a result of testing on the cable.
ENGG CERT

ASH
ASH
ASH

On the basis that an estimated 360 cable reels of 305 meters each will be used, it is
LEADS

LEADS
LEADS
ALL

ALL
ALL

proposed to select 50 random samples for measurement. If the measured values exceed
(in the case of insertion loss) or are less than (in the case of NEXT) the manufacturer’s
specifications by more than 5% at any frequency, the results must be reported to the
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

SAUDI ARAMCO Representative and another lot of samples will be chosen for testing. If
the second lot of samples fails again, the batch must be rejected.

After installation, all copper cable pairs shall be tested for circuit continuity (end to end),
DESCRIPTION

split pairs, pair-to-pair short, attenuation and noise as specified in SAES-T-634. The
recommended test set is fluke Omni scanner.

All horizontal cabling must be tested in accordance with TIA/EIA TSB 67 known as
“Transmission Performance Specification for Field Testing of Unshielded Twisted Pair
Cabling”.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

12/11/16
08/04/16

09/08/16
NO. DATE
REV

D
C
B

DISCIPLINE
ENGINEER
ALL LEADS

DATE: 12/11/16
PROJECT
ENGINEER

A M ALMATROOK

DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY

12/11/16
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI

DATE: 12/11/16
OPERATIONS
ALI H GHAMDI

12/11/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 152


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The SCS installation and testing shall be performed by Category 6 cable
SAY
SAY
SAY

manufacturer certified installer.


ENGG CERT

ASH
ASH
ASH

Test results shall be signed by the Category 6 cable manufacturer certified


installer in each sheet and witnessed by SAUDI ARAMCO Representative.
LEADS

LEADS
LEADS
ALL

ALL
ALL

Copy of calibration certificate shall be attached to test results document.


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Testing shall be done in the presence of SAUDI ARAMCO Representative.

Test results shall be submitted at least two copies (both hard & soft copy)
DESCRIPTION

Test to be performed by UTP cable Manufacturer for Certification

• After CONTRACTOR has carried out installation, certified UTP


cable Manufacturer Structured Cabling Engineer will carry out the
following tests on-site before the service is cut over.

1. Wire map (Continuity)


2. Length
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001

3. NEXT
0001

4. Attenuation
12/11/16
08/04/16

09/08/16

5. ELFEXT
DATE

6. Delay & Delay Skew


7. Return Loss
NO.
REV

D
C
B

8. Power Sum Cross talk (PS Next & PS Elfext)


DISCIPLINE
ENGINEER
ALL LEADS • Fluke Omni scanner is to be used for these tests. Records for every
DATE: 12/11/16 cable shall be printed out and kept for future reference.
PROJECT
ENGINEER

A M ALMATROOK Test Record Forms


DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
Acceptance Test Record Forms will be used for Exchanged Cable,
12/11/16
Digital Test Data. Refer to Section 4 or to the SAES-T-634.
DATE:
CONSTRUCTION
AGENCY Supplemental electronic data file will be made on diskette or CD
SHAHZAD YAZDANI attached to the associated Test Record Form.
DATE: 12/11/16
OPERATIONS
Test Report Format
ALI H GHAMDI

12/11/16
DATE: The Field Test Report will consist of the following information in order:
CONTROL NUMBER
VERIFICATION

• Type of test and name of systems tested.


EDSD

• Copy of the Test Procedure(s) that have been followed.



DATE:

Copies of the completed and signed test Record Forms.


BY:

• Summary discussion of the test performed and the overall results.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,


THIS INDICATES THAT REV. NO.__________

Discussion of any problems encountered and how they were


CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

resolved.
(DCC) NO. _____________________

• Test Equipment List.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 153


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Quality Control
SAY
SAY
SAY

The installation team chief on a daily basis performs QA/QC inspections


ENGG CERT

ASH
ASH
ASH

during the equipment installation. Monitoring may also be conducted by


SAUDI ARAMCO Operations personnel on their own and notify the
LEADS

LEADS
LEADS
ALL

ALL
ALL

installation team of findings.

Design Drawings
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Two sets of design drawings are available during each site installation.
On-site modifications will be legibly marked on two drawing sets. After
installation, one set will be returned for as-built drawing preparation.
DESCRIPTION

The remaining set is kept with the SAUDI ARAMCO Operations


personnel for plant-in-place records until the corrected as-built set is
developed.

Safety Equipment

First aid kits, fire extinguisher, hard hats, safety shoes, and other safety
devices will be prepared for safety personnel before testing.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

Proof of Performance
0001
0001

12/11/16

After mechanical completion, official demonstration will be performed


08/04/16

09/08/16
DATE

with the installed cabling to show the system installed means the
designed criteria.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
Field Test Procedure
ALL LEADS

DATE: 12/11/16 General


PROJECT
ENGINEER

A M ALMATROOK This test plan describes the requirements for testing copper cables for
DATE: 12/11/16 voice and data circuits.
CERTIFIED
AMR EL SHARKAWY
Test Equipment Requirement
12/11/16
DATE:
CONSTRUCTION
AGENCY • Volt Ohmmeter
SHAHZAD YAZDANI • Megger (Insulation tester)
DATE: 12/11/16 • PCM - 23 (VF tester)
OPERATIONS
ALI H GHAMDI

12/11/16
DATE: Reference Documents
CONTROL NUMBER
VERIFICATION

• As-Built Drawings
EDSD

• Approved Test Procedures


DATE:

• SAUDI ARAMCO Standards : SAES-T-634


BY:

• Test Equipment Manuals for Volt-Ohmmeter, Megger (Insulation


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________

tester), and PCM - 23 (VF tester)


CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

DESIGN DRAWINGS
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 154


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

General
ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall list all required drawings in the Non-Material


Requirement (NMR).
LEADS

LEADS
LEADS
ALL

ALL
ALL

All drawings shall be prepared and submitted in accordance with SAUDI


ARAMCO Standards.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

All drawings specifically prepared for this project shall be prepared


using CADD and submitted on removable mass storage media in
accordance with the SAUDI ARAMCO Drafting Manual.
DESCRIPTION

Use of common drawings whenever practicable shall be acceptable,


provided that there is no loss of clarity.

For each drawing created via a CADD system, the relevant CADD
computer files shall be provided to SAUDI ARAMCO in the form of
portable removable mass storage media (CD-ROM, tape cartridge,
diskette, etc.).
10-02399-
JO/EWO

10-02399-
10-02399-
0001

Review Drawings – Preliminary Design Review (PDR)


0001
0001

12/11/16

CONTRACTOR shall submit PDR package with system drawings in two


08/04/16

09/08/16
DATE

(2) weeks after contract award.


NO.
REV

D
C
B

Purchase order shall be placed immediately for long lead items. All
DISCIPLINE
ENGINEER
Non-Material Requirements (NMR) shall be reviewed during the PDR.
ALL LEADS The detailed drawings shall have sufficient detail for fabrication of the
DATE: 12/11/16 system.
PROJECT
ENGINEER

A M ALMATROOK Review Drawings – Final Design Review


DATE: 12/11/16
CERTIFIED Three (3) weeks after contract award, CONTRACTOR shall submit
AMR EL SHARKAWY
Final Design Review Package with all final “build to” drawings for
12/11/16
DATE: SAUDI ARAMCO final review and approval.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI All “NMRs” that have changed since the PDR and all new “NMRs” shall
DATE: 12/11/16 be shown during the CDR and confirmed as part of the design.
OPERATIONS
ALI H GHAMDI As-Built Drawings
12/11/16
DATE:
CONTROL NUMBER

After completion of the Site Acceptance Test (SAT), pre-commissioning


VERIFICATION

and commissioning, CONTRACTOR shall update the drawings to reflect


EDSD

any changes. These drawings shall be clearly marked “As-Built” and


dated.
DATE:
BY:
REVISIONCERTIFICATION

System Manuals
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

CONTRACTOR shall provide System Manuals for operation,


preventative maintenance and repair of the System.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 155


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

Appropriate Quality Assurance procedures for each application shall be


provided including all validation tests procedures and project
ENGG CERT

ASH
ASH
ASH

maintenance techniques.
LEADS

LEADS
LEADS
ALL

ALL
ALL

Certificates of Acceptance

CONTRACTOR shall prepare Certificates of Acceptance for each major


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

phase of factory/site testing. Any noted exceptions to the test phases


shall be attached to the document that then finalizes completion of that
particular phase. There shall be no outstanding exception items
remaining at the time of Site Acceptance Test (SAT) certification.
DESCRIPTION

E. OUTSIDE PLANT SYSTEM

SCOPE DESCRIPTION

GENERAL

This project shall provide 24-core single mode fiber optic cables 8/125
microns 1310 nanometer in Star Topology from the E & M Bldg to the
10-02399-
JO/EWO

10-02399-
10-02399-

Operation Building, Utility Substation, Operator Shelter, Receiving


0001

0001
0001

Substation, Security Support building Main Gate and Security Support


Building Tank Farm. All terminations will be done on proposed 24-core
12/11/16
08/04/16

09/08/16
DATE

fiber patch panels in every building.


NO.
REV

In addition, this project shall provide 2-24 core single mode fiber optic
D
C
B

DISCIPLINE cable infrastructures to be installed for communication systems from


ENGINEER
ALL LEADS Engineering & Maintenance Bldg. to Yanbu refinery. All terminations will
DATE: 12/11/16 be done on proposed 24-ports fiber patch panels.
PROJECT
ENGINEER

A M ALMATROOK
In addition, this project shall provide FO cable infrastructure to be
DATE: 12/11/16
installed for process automation systems (ESD) for two (2) RIO
CERTIFIED buildings. All terminations will be done on proposed 24-core FOC and
AMR EL SHARKAWY
fiber patch panels.
12/11/16
DATE:
CONSTRUCTION
AGENCY
In addition, this project shall provide 4-12 core single mode fiber optic
SHAHZAD YAZDANI cable infrastructures to be installed for control and communication
DATE: 12/11/16 systems from Receiving Substation to MARAFIQ-91 Substation. All
OPERATIONS terminations will be done on proposed 24-ports fiber patch panels.
ALI H GHAMDI

DATE:
12/11/16 In addition, this project shall provide FO cable infrastructure to be
installed for Metering System connectivity to YASREF Control System,
CONTROL NUMBER
VERIFICATION

SAMREF Control System, and YRT Control System All terminations will
EDSD

be done on proposed 12-core fiber patch panels except for Yanbu


Refinery where 48-core fiber will be used.
DATE:
BY:

The design of the fiber optic cable shall be such that the performance
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

objectives of the System are achieved when the cable has been
C

manufactured, installed, spliced and terminated. The performance of the


(DCC) NO. _____________________

terminal, transmission and ancillary equipment covered by this scope of

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 156


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
works shall be taken into account under this obligation.
SAY
SAY
SAY

The System shall provide permanent cabling for Local Area Network
ENGG CERT

ASH
ASH
ASH

(LAN Enterprise) and Process Control System (PCS). These cables shall
consist of single-mode nonmetallic fiber optics. Cable installation will
LEADS

LEADS
LEADS
ALL

ALL
ALL

include the underground conduit system. Also all associated facilities,


such as pedestals, pedestal guards, marker posts, grounding protection,
and FOC fiber patch panels shall be provided
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

OUTSIDE PLANT COPPER CABLES

This project shall provide 200-pair copper cables from the Operation
DESCRIPTION

Building and to be distributed to the following buildings:

1. E & M Building
2. Operation Building
3. Operator Shelter
4. Remote Interface Building - RIB-XXX1
5. Remote Interface Building – RIB-XXX2
6. Metering Shelter
10-02399-
JO/EWO

10-02399-
10-02399-
0001

7. Security Support Building Tank Farm


0001
0001

8. Chemical Shelter
12/11/16
08/04/16

09/08/16

9. Security Support Building Main Gate


DATE

10. Government Security Facility


NO.
REV

D
C
B

DISCIPLINE
ENGINEER
ALL LEADS CONTRACTOR shall provide 25-pairs x 22 gauge copper cables to the
DATE: 12/11/16
aforementioned buildings. Likewise, CONTRACTOR shall provide
PROJECT
ENGINEER
protected terminal block 489ACC 1-25 to each building for cable
A M ALMATROOK
termination.
DATE: 12/11/16
CERTIFIED The proposed copper cable shall be used for analog telephones for
AMR EL SHARKAWY
emergency purposes.
12/11/16
DATE:
CONSTRUCTION
AGENCY The X-RAY Bldg. and Security Gatehouse of Main Gate & Tank Farm,
SHAHZAD YAZDANI Voice & data requirements can be served through the proposed POE
DATE: 12/11/16 Ethernet switch and analog line via proposed 1571 OSP cable from the
OPERATIONS main protector in the Security Support building to the remote protector in
ALI H GHAMDI the Security Gatehouse. Such cable will be installed through PVC 2-4’’Ø
DATE:
12/11/16 PVC duct to be encased in concrete.
CONTROL NUMBER
VERIFICATION

The design of the copper cable network shall be such that the
EDSD

performance objectives of the System are achieved when the cables


have been manufactured, installed, spliced and terminated.
DATE:
BY:

The System shall provide permanent cabling for local distribution (Analog
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

and special services) to the designated locations in the Yanbu Distribution


C

Hub Plant areas. The copper cable shall be designed for direct buried or
(DCC) NO. _____________________

underground duct application. Conductors shall be solid annealed multi-

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 157


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
pair copper conductors in 22 AWG. Individual conductors are twisted into
SAY
SAY
SAY

pairs with varying lay lengths to minimize crosstalk and specific color
combinations to provide pair identification. Cables larger than 25 pairs are
ENGG CERT

ASH
ASH
ASH

assembled into units, which are then used to assemble the core. Units are
individually identifiable by color coded unit binders. The core assembly is
LEADS

LEADS
LEADS
ALL

ALL
ALL

filled with an 80 ºC (198 ºF) ETPR (External Thermal Plastic Rubber)


compound, completely filling the interstices between the pairs and under
the core wrap. A corrugated steel wrap, is applied over the core assembly
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

to provide protection for the core. North American color coded insulation. A
corrugated, copolymer coated, 8-mil aluminum inner shielding. A black,
linear low-density polyethylene jacket is applied overall with surface
marked information such as manufacturer’s identification, pair count,
DESCRIPTION

AWG, product, identification, and sequential footage. Cable shall


conform to (REA U.S.) specification PE-39.

The exact cable routings shall be field verified by CONTRACTOR during


detailed design. If required, alternative routings shall be recommended
by the CONTRACTOR. In addition, the exact cable lengths shall be
determined by CONTRACTOR during detailed design.

UNDERGROUND CONDUIT SYSTEM


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

This project shall provide 4-4ӯ PVC underground conduit encased in


12/11/16
08/04/16

09/08/16

concrete to accommodate the proposed fiber optic and copper cables.


DATE

The trench will end on the proposed pedestals and building entrance
walls.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER All conduits shall be designed to accommodate fiber optic and copper
ALL LEADS paired type of cables.
DATE: 12/11/16
PROJECT
ENGINEER A pedestal is an enclosure providing an accessible cable splice point or
A M ALMATROOK terminal above ground. Refer to standard drawing AA-036748. A
DATE: 12/11/16 pedestal guard shall be installed and secured by concrete footings
CERTIFIED
AMR EL SHARKAWY
around pedestals as per design drawing standards.
12/11/16
DATE:
The underground duct-bank system shall be designed, procured,
CONSTRUCTION
AGENCY constructed and Commissioned by the CONTRACTOR. The exact
SHAHZAD YAZDANI
underground conduit routings shall be field verified by the
DATE: 12/11/16 CONTRACTOR. If required, alternative routings shall be recommended
OPERATIONS
by the CONTRACTOR. In addition, the exact duct-bank section lengths
ALI H GHAMDI
shall be determined by CONTRACTOR during detailed design.
12/11/16
DATE:
CONTROL NUMBER

Additional Requirements
VERIFICATION
EDSD

DOCUMENTATION
DATE:
BY:

CONTRACTOR shall supply the following documentation:


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

• A System design manual


C

(DCC) NO. _____________________

• Construction drawings and documentation


• Red-lined and As-built drawing
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 158


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Factory Acceptance Test Procedures
SAY
SAY
SAY

• Commissioning and Performance Acceptance Test procedures



ENGG CERT

ASH

Equipment manuals
ASH
ASH

• Operating and Maintenance (O&M) manuals and handbooks



LEADS

LEADS
LEADS

Spare parts data package for cataloguing and standardization


ALL

ALL
ALL

CONTRACTOR shall be responsible for completing plant tagging of


capital equipment in accordance with SAUDI ARAMCO requirements.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Installation Materials, Installation and Commissioning Services


DESCRIPTION

CONTRACTOR shall install the equipment to ensure that requirements


for a complete, fully operational, integrated and maintainable turnkey
System is provided.

The installation shall comply with SAUDI ARAMCO standards, Saudi


Arabia Government standards, and/or International standards as
applicable.

CONTRACTOR shall Commission the System. Once the System is on-


stream, CONTRACTOR shall hand over the operational System to
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

SAUDI ARAMCO.
12/11/16
08/04/16

09/08/16
DATE

Tools and Test Equipment

CONTRACTOR shall make available, as part of the System, any


NO.
REV

D
C
B

specialist tools that are required to operate and maintain the test
DISCIPLINE
ENGINEER equipment.
ALL LEADS

DATE: 12/11/16 Spares


PROJECT
ENGINEER

A M ALMATROOK Start-up Spares shall be supplied in accordance with Contract.


DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
Copper Cable
12/11/16
DATE:
CONSTRUCTION
Copper Cable Specifications
AGENCY
SHAHZAD YAZDANI
The design of copper cables shall be such that the performance
DATE: 12/11/16
objectives of the system are achieved when the cables have been
OPERATIONS
manufactured, installed, spliced and terminated.
ALI H GHAMDI

12/11/16
DATE: The system shall provide permanent cabling for local distribution (Analog
CONTROL NUMBER

and special services) to the designated locations. The copper cable shall
VERIFICATION

be designed for direct buried or underground duct application. Conductor


EDSD

shall be solid annealed multi pair copper conductors are in 22 and 26


DATE:

AWG. Individual conductors are twisted into pairs with varying lay
BY:

lengths to minimized crosstalk and specific color combinations to provide


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

pair identification. Cables larger than 25 pairs are assembled into units,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

which are then used to assemble the core. Units are individually
(DCC) NO. _____________________

identifiable by color coded unit binders. The core assembly is filled with
80ºC (198ºF) ETPR (External Thermal Plastic Rubber) compound,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 159


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
completely filling the interstices between the pairs and under the core
SAY
SAY
SAY

wrap. A corrugated steel wrap, is applied over the core assembly to


provide protection for the core. North American color coded insulation. A
ENGG CERT

ASH
ASH
ASH

corrugated, copolymer coated, 8-mil aluminum inner shielding. A black,


linear low-density polyethylene jacket is applied overall with surface
LEADS

LEADS
LEADS
ALL

ALL
ALL

marked information such as manufacture’s identification, pair count,


AWG, product identification and sequential footage. Cable shall conform
to (REA U.S.) specification PE-39.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

The exact cable routings shall be field verified by CONTRACTOR during


detailed design. If required, alternative routings shall be recommended
by THE CONTRACTOR. In addition, the exact cable lengths shall be
DESCRIPTION

determined by CONTRACTOR during detail design.

Copper cable will be installed from the Operation Building branch spliced
to different buildings. Buildings to be served are the following.

BUILDING NAME NUMBER OF COPPER PAIRS

E & M Building 200


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Operation Building 25
12/11/16
08/04/16

09/08/16
DATE

Operator Shelter 25
NO.
REV

D
C
B

Remote Interface Building – RIB-1 25


DISCIPLINE
ENGINEER
ALL LEADS Remote Interface Building – RIB-2 25
DATE: 12/11/16
PROJECT
ENGINEER
Metering Shelter 25
A M ALMATROOK

DATE: 12/11/16
Security Support Building, Tank Farm 25
CERTIFIED
AMR EL SHARKAWY
Chemical Shelter 25
12/11/16
DATE:
CONSTRUCTION
AGENCY
Security Support Building, Main Gate 25
SHAHZAD YAZDANI

DATE: 12/11/16 Government Security Facility 25


OPERATIONS
ALI H GHAMDI

12/11/16
DATE:
For further details on the fiber optic cable routing, refer to the following
CONTROL NUMBER
VERIFICATION

drawings:
EDSD

DRAWING NO. SHEET NO. DRAWING TITLE


DATE:
BY:

CO-A10067 001-002 COPPER SCHEMATIC DIAGRAM -YDH


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Fiber Optic Cable


(DCC) NO. _____________________

The design of the fiber optic cable shall be such that the performance
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 160


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
objectives of the System are achieved when the cable has been
SAY
SAY
SAY

manufactured, installed, spliced and terminated. The performance of the


terminal, transmission and ancillary equipment covered by this scope of
ENGG CERT

ASH
ASH
ASH

work shall be taken into account under this obligation.


LEADS

LEADS
LEADS
ALL

ALL
ALL

The cable shall be ITU-G.652D single-mode non-metallic fiber optics and


meet all requirements of 18-SAMSS-625. Also, all associated facilities, such
as splice closures, marker posts, grounding protection and the fiber
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

distribution panels.

The above fiber optic system shall be used to link those buildings that
require data type service in the proposed Yanbu Distribution Hub.
DESCRIPTION

For further details on the fiber optic cable routing, refer to the following
drawings:

DRAWING NO. SHEET NO. DRAWING TITLE


CO-A10066 001 FOC SCHEMATIC DIAGRAM- YDH TO YREF
10-02399-
JO/EWO

10-02399-
10-02399-

CO-A10068 001-002 FOC SCHEMATIC DIAGRAM- YDH


0001

0001
0001

INSTRUMENT INTERCON DIAGRAM – YREF,


CO-A10003 001
12/11/16
08/04/16

09/08/16

YASREF & SAMREF


DATE

INST CONN/INTERCONNECTION DIAG – OB,


CO-A10005 001
RIB1, RIB2, RS & METERING SHELTER
NO.
REV

D
C
B

DISCIPLINE INST CONN/INTERCONNECTION DIAG – ESD


ENGINEER CO-A10074 001
ALL LEADS FOC-OPERATION BLDG, RIB1, RIB2
DATE: 12/11/16
PROJECT
ENGINEER

A M ALMATROOK The exact cable routings shall be verified by CONTRACTOR during detailed
DATE: 12/11/16 design, and, if required, alternative routings shall be recommended by
CERTIFIED CONTRACTOR.
AMR EL SHARKAWY

12/11/16
DATE: Exact cable lengths shall be determined by CONTRACTOR during detailed
CONSTRUCTION
AGENCY design.
SHAHZAD YAZDANI

DATE: 12/11/16 Four (4) 1-inch, multi-color, corrugated sub-ducts and pull rope shall be
OPERATIONS installed in one duct of each of the underground duct banks (per SAES-T-624
ALI H GHAMDI Section 4.3.1).
12/11/16
DATE:
CONTROL NUMBER

Fiber Optic Cable Specifications


VERIFICATION
EDSD

All dielectric, Loose Buffered, Filled for underground and direct buried
environment.
DATE:
BY:

Non Zero Dispersion shifted


REVISIONCERTIFICATION

Non-metallic, including strength member


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Tensile strength: >= 10N


C

Mode field diameter: 8.6 – 9.5 Microns


(DCC) NO. _____________________

Cladding Diameter: 125.0 microns

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 161


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Concentricity error <1 micron
SAY
SAY
SAY

Attenuation @ wavelength: 1550 nm – 0.35dB/km


Variation of attenuation between 0 deg. C & 70 deg. C: -0.01 dB
ENGG CERT

ASH
ASH
ASH

Cable cut off wavelength <1260nM


Attenuation discontinuities at 13100nm <0.1 dB
LEADS

LEADS
LEADS
ALL

ALL
ALL

Attenuation change 1300 to 1324 nm <0.09 dB/km


Proof test stress 0.69 Gpa (Minimum)
Zero dispersion wavelength 1540 nm (zero dispersion cable)
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Expected fiber life span: 20 years

Cable Design
DESCRIPTION

General

The structure of the cable core shall permit high cable flexibility with minimum
stress to the individual fibers.

One or more strength members shall be an integral part of the cable


construction. The strength members shall be sufficient to support the stress of
installation and protect the cable in service.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

CONTRACTOR shall use a loose, fiber bundle (tube) or a slotted core type
0001
0001

cable with multiple fibers per tube or slot.


12/11/16
08/04/16

09/08/16
DATE

The core shall be filled with a compound to inhibit water migration and wrapped
with a barrier tape.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
The filling compound shall be homogenous and uniformly mixed. The
ALL LEADS compound will at least be sufficiently translucent for fiber identification.
DATE: 12/11/16
PROJECT
ENGINEER The filling compound shall not affect the color of the individual fibers.
A M ALMATROOK

DATE: 12/11/16 The filling compound shall be non-toxic and present no dermal hazards.
CERTIFIED
AMR EL SHARKAWY
The drop point of the filling compound shall not be less than 80 deg. C.
12/11/16
DATE:
CONSTRUCTION
AGENCY The filling compound shall remain stable and unaffected by long term exposure
SHAHZAD YAZDANI to weather.
DATE: 12/11/16
OPERATIONS The filling compound shall have chemical and mechanical compatibility with
ALI H GHAMDI other cable components and splicing hardware.
12/11/16
DATE:
CONTROL NUMBER

Cable Jacket
VERIFICATION
EDSD

The outer jacket shall provide the cable with a tough, flexible, protective
covering which can withstand exposure to sunlight, to atmospheric
DATE:
BY:

temperatures and to stresses that can be expected in the installation of this


REVISIONCERTIFICATION

cable.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

The cable jacket shall be of a high molecular weight, black polyethylene with a
thickness that is suitable for the proposed environment, but not less than 3.0

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 162


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
mm.
SAY
SAY
SAY

The cable jacket shall be resistant to crude oil, hydrocarbons, sulfur


ENGG CERT

ASH
ASH
ASH

compounds and salt water.


LEADS

LEADS
LEADS
ALL

ALL
ALL

The cable jacket shall have permanent surface printed sequentially numbered
length markers at one meter intervals.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

The cable jacket shall have permanent surface printed marks at regular
intervals consisting of Manufacturer, (number of fibers) Fiber Optic Cable and
the Actual Year of Manufacture.
DESCRIPTION

Fiber Optic Cable for Inside Use


Upon entering a building all fiber cables shall have a transition splice to
convert the cable from outside rated cable to internal rated cable. All
internal cables will comply with (SAES-T-624 Para 4.2.2). Under no
circumstances shall outside rated cable be terminated at the equipment.
Local Area Network (LAN)
10-02399-
JO/EWO

10-02399-
10-02399-
0001

Single mode fiber optic cables using a non-dispersion-shifted fiber G.652D


0001
0001

will be installed from OME building to various building as follows:


12/11/16
08/04/16

09/08/16
DATE

1. Engineering & Maintenance Building


2. Operation Building
NO.
REV

D
C
B

DISCIPLINE
3. Security Support Building, Tank Farm
ENGINEER
ALL LEADS 4. Utility Substation
DATE: 12/11/16 5. Operator Shelter
PROJECT
ENGINEER

A M ALMATROOK
6. Receiving Substation
DATE: 12/11/16 7. Security Support Building, Main Gate
CERTIFIED
AMR EL SHARKAWY

12/11/16
DATE:
Process Control System (PCS)
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Single mode fiber optic cables 24 strands will be installed from the
DATE: 12/11/16
instrument rack room at the new Operation building to RIO Building 1 (RIB-
OPERATIONS 1) under this BI for the ESD System. The route of the fiber should be
ALI H GHAMDI redundant and diverse. Process control System will assign dedicated fiber
12/11/16 strands assignment for the ESD system.
DATE:
CONTROL NUMBER
VERIFICATION

Single mode fiber optic cables 24 strands will be installed from the
EDSD

instrument rack room at the new Operation building to RIO Building 1 (RIB-
1) under this BI for the DCS System. The route of the fiber should be
DATE:

redundant and diverse. Process control System will assign dedicated fiber
BY:

strands assignment for the DCS system.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Single mode fiber optic cables 24 strands will be installed from the
(DCC) NO. _____________________

instrument rack room at the new Operation building to RIO Building 2 (RIB-

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 163


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2) under this BI for the ESD System. The route of the fiber should be
SAY
SAY
SAY

redundant and diverse. Process control System will assign dedicated fiber
strands assignment for the ESD system.
ENGG CERT

ASH
ASH
ASH

Single mode fiber optic cables 24 strands will be installed from the
LEADS

LEADS
LEADS
ALL

ALL
ALL

instrument rack room at the new Operation building to RIO Building 2 (RIB-
2) under this BI for the DCS System. The route of the fiber should be
redundant and diverse. Process control System will assign dedicated fiber
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

strands assignment for the DCS system.

Single mode fiber optic cables 12 strands will be installed from the new
Operation building to YASREF Control System under this BI. Process
DESCRIPTION

control System will assign dedicated fiber strands assignment for various
control system.

Single mode fiber optic cables 12 strands will be installed from the new
Operation building to SAMREF Control System under this BI. Process
control System will assign dedicated fiber strands assignment for various
control system.

Single mode fiber optic cables 48 strands will be installed from the new
10-02399-
JO/EWO

10-02399-
10-02399-
0001

Operation building to Yanbu Refinery Control System under this BI.


0001
0001

Process control System will assign dedicated fiber strands assignment for
12/11/16

various control system.


08/04/16

09/08/16
DATE

The PCS fiber optic cables will be routed underground.


NO.
REV

D
C
B

DISCIPLINE
ENGINEER
PCS and communications ducts shall have separate building entries, IT
ALL LEADS and NON-IT, respectively.
DATE: 12/11/16
PROJECT
ENGINEER PCS fiber optic patch panels will be provided by this BI.
A M ALMATROOK

DATE: 12/11/16 Temporary Requirements


CERTIFIED
AMR EL SHARKAWY
Temporary communication services required during construction shall be
12/11/16
DATE: provided by this BI. This includes the installation and removal of all
CONSTRUCTION
AGENCY temporary facilities required by CONTRACTOR and SAPMT. Final location
SHAHZAD YAZDANI of the site offices shall be provided during detailed design stage.
DATE: 12/11/16
OPERATIONS System Design Life and Reliability
ALI H GHAMDI

DATE:
12/11/16 The conduit system shall be designed and engineered to retain usable for
75 to 100 years and fulfill design requirements and specifications
CONTROL NUMBER
VERIFICATION
EDSD

Other Materials
DATE:
BY:

All other materials that might be required during the course of the work will
REVISIONCERTIFICATION

be procured by SAUDI ARAMCO on a Field Material Request (FMR)


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

generated by THE CONTRACTOR.


C

(DCC) NO. _____________________

Transportation, Handling and Delivery

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 164


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

All materials are to be inspected upon delivery by the SAUDI ARAMCO


Representative for signs of damage during transport, handling and
ENGG CERT

ASH
ASH
ASH

delivery. Reports of damage are to be compiled immediately and new


materials procured.
LEADS

LEADS
LEADS
ALL

ALL
ALL

CABLE PLACEMENT
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

General

The fiber optic cable minimum bending radius and maximum pulling
tensions shall be in accordance with SAES-T-624 (Sections 4.1.10 and
DESCRIPTION

4.1.11) and the fiber optic cable manufacturer’s specifications. The optical
fiber cable shall not be cut for convenience during placement. Splices shall
be located in accordance with the design drawing provided by
CONTRACTOR and approved by SAUDI ARAMCO.

This Specification covers the expected types of cable and civil construction
work normally required to prepare the fiber optic cable facilities up to and
including cable splicing and work as required.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

All Work including design drawings, cable splicing, terminating, testing,


0001
0001

and Commissioning shall be evaluated and accepted as defined within all


12/11/16

applicable requirements and standards.


08/04/16

09/08/16
DATE

All specification rely on the referenced standards, standard drawings,


NO.
REV

D
C
B

codes of practice, industry standards, general instructions, operating


DISCIPLINE
ENGINEER
instructions, safety policy, Saudi Arabian Government standards and
ALL LEADS policies and the other requirements listed in this Specification Document.
DATE: 12/11/16
PROJECT
ENGINEER If there is a conflict between the requirements of the various reference
A M ALMATROOK documents, the matter shall be brought to the attention of the SAUDI
DATE: 12/11/16 ARAMCO representative for resolution.
CERTIFIED
AMR EL SHARKAWY
Each Work category of this Specification includes a broad description of
12/11/16
DATE: the Work, variables and options (depending on the design drawing and
CONSTRUCTION
AGENCY field condition), prime reference documents for broad scope and/or
SHAHZAD YAZDANI guidance, principal requirements and precautions and a listing of
DATE: 12/11/16 inspection items. Mandatory SAUDI ARAMCO witnessed inspection items
OPERATIONS are specifically noted.
ALI H GHAMDI

12/11/16 The design drawings are intended to show the estimated design and
DATE:
CONTROL NUMBER

material requirement for the construction of the facilities. The drawings are
VERIFICATION

to be marked up in the field to reflect as- built construction, which is in any


EDSD

way different from the original design.


DATE:
BY:

To ensure uninterrupted installation and start up all tools, equipment,


REVISIONCERTIFICATION

machinery and installation materials shall be provided in sufficient


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

quantities by CONTRACTOR.
C

(DCC) NO. _____________________

All CONTRACTOR provided materials shall be subject to SAUDI

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 165


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ARAMCO inspection and evaluation for quality. All reasonable precautions
SAY
SAY
SAY

shall be taken to ensure that damage to buildings, furnishing, structures,


utilities, pipelines and other facilities be avoided. SAUDI ARAMCO shall be
ENGG CERT

ASH
ASH
ASH

promptly notified, with written follow-up, of any damage that occurs during
construction.
LEADS

LEADS
LEADS
ALL

ALL
ALL

Some Work may be performed adjacent to, or in conjunction with existing,


operational communication systems. CONTRACTOR shall ensure that the
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

operational integrity of the existing system is maintained while performing/


commissioning this work.

CONTRACTOR shall ensure that after conduit and/or cable laying


DESCRIPTION

operations, roads, streets, sidewalks and curbing, paved areas, walls,


foundations, fencing, or any other structural, civil or landscaped facilities
are returned to their original condition. This shall be at no additional cost to
SAUDI ARAMCO and subject to the satisfaction of SAUDI ARAMCO
and/or representative(s) of the Saudi Arabian government, as applicable.

Special permit and Work methods may be specified by Saudi Arabian


Government authorities within the area of, or at the boundary of,
government property or facilities such as roads and highways, military
10-02399-
JO/EWO

10-02399-
10-02399-
0001

reservations, public utilities. The permit shall be obtained by


0001
0001

CONTRACTOR with the help of SAUDI ARAMCO as needed.


12/11/16
08/04/16

09/08/16
DATE

Installation work shall not commence before the relevant permits have
been obtained by CONTRACTOR construction crew.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
Excavation and Site Preparation
ALL LEADS

DATE: 12/11/16 Excavation may be required in sand, marl (natural and/or compacted),
PROJECT
ENGINEER loose rock and solid rock. Backfill of the excavated material or bringing-in
A M ALMATROOK of new fill may be required. The hauling away of excavated material and
DATE: 12/11/16 removal of above-grade debris/soil to an approved SAUDI ARAMCO site
CERTIFIED may be required. . The filling materials shall comply with SAES A 114.
AMR EL SHARKAWY

12/11/16
DATE: Excavation may be performed by machine or by hand, depending on the
CONSTRUCTION
AGENCY field condition and/or requirements of this Specification, as determined by
SHAHZAD YAZDANI the SAUDI ARAMCO representative(s) and detail design. As a general
DATE: 12/11/16 rule, at all Plant facilities, pipeline crossing, and utility crossings, hand
OPERATIONS excavation is the only method permitted.
ALI H GHAMDI

12/11/16 Prior to the start of any excavation Work, all underground facilities (i.e. oil,
DATE:
CONTROL NUMBER

gas and/or water pipes, telephone or power cables, etc.), shall be


VERIFICATION

positively identified by CONTRACTOR. This shall be verified by the SAUDI


EDSD

ARAMCO and by operating department of the facility. CONTRACTOR


shall use underground facility detection equipment that must be of recent
DATE:
BY:

manufacture and suitable for performing surveys to locate all types of


REVISIONCERTIFICATION

communication cables, and other utilities. The locating equipment must be


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

able to locate metallic backed warning tape where non-metallic cables


C

(DCC) NO. _____________________

have been placed. The exact location of the identified underground facility
shall be properly marked for easy identification by CONTRACTOR

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 166


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
construction crew.
SAY
SAY
SAY

CONTRACTOR shall employ the most cost efficient equipment and


ENGG CERT

ASH
ASH
ASH

machinery within his control to perform the Work.


LEADS

LEADS
LEADS
ALL

ALL
ALL

For the safety of personnel and for purposes of maintaining stability of the
excavation, the excavation work shall include all necessary timbering,
sheet pilling and shoring.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

In no case shall the width of trench excavated in a roadway or under a


pipeline be greater than what is reasonably necessary for completion of
the Work.
DESCRIPTION

Open excavation shall be guarded by highly visible barricade. Adequate


flashing lights and warning signs must be provided if excavation is
performed in or near any roadway.

Excavations shall not be kept open any longer than reasonably necessary
to perform the intended Work.

The detail design drawing shall specify the scope, location and deep of
10-02399-
JO/EWO

10-02399-
10-02399-
0001

excavation. If a survey marker and/or a monument is damaged as a


0001
0001

consequence of the Work, CONTRACTOR shall be responsible for any


12/11/16

fines, where applicable, repairing such marker and/or monument and


08/04/16

09/08/16
DATE

returning the same to its original place without any additional


compensation.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
Site leveling, filling and compaction shall be performed as specified in
ALL LEADS conformance with all applicable standards.
DATE: 12/11/16
PROJECT
ENGINEER Trenching
A M ALMATROOK

DATE: 12/11/16 Trench excavation is required, to lay direct buried cable or place conduits
CERTIFIED in the core area, plant area and open desert area. All kinds of soil
AMR EL SHARKAWY
conditions may be encountered. These Specifications are intended to
12/11/16
DATE: cover the various approved methods of trenching and laying cables or
CONSTRUCTION
AGENCY conduits under the expected range of soil and field conditions.
SHAHZAD YAZDANI

DATE: 12/11/16 The detail design drawings shall describe the required location, alignment,
OPERATIONS length and depth of cable or conduits to be placed by the trenching
ALI H GHAMDI method.
12/11/16
DATE:
CONTROL NUMBER

The reference standards and drawing shall detail the requirements of


VERIFICATION

construction.
EDSD

Trenching may be performed by machine or by hand, depending on the


DATE:
BY:

field situation and/or requirements of this Specification or as determined by


REVISIONCERTIFICATION

the SAUDI ARAMCO representative.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

Typical trenching machines are backhoe, wheel excavator, rock breaker or


rock saw.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 167


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

Machine excavation is not permitted either near or under hydrocarbon,


water or other pipelines and telephone/ power cable facilities and such
ENGG CERT

ASH
ASH
ASH

excavation shall be accordance with the standards SAES-T-911 and


SAES-B-064.
LEADS

LEADS
LEADS
ALL

ALL
ALL

When authorized to open-cut road, CONTRACTOR shall cut the pavement


and excavate the trench as narrow as possible and place 4” PVC concrete
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

encased conduits as per SAES-T-928 Para 6.1.5. The disturbed roadbed


shall be restored with the original type of fill and compacted to the
requirements of the relevant Road Authority. Hot mix asphalt shall be used
to restore the pavement to original condition.
DESCRIPTION

Shoring or sloping shall be required for safety, depending on soil


conditions and depth of trench.

Dewatering may be required to permit the intended construction and to


enable compaction of the trench bottom and/or the backfill in accordance
with the reference standards and drawings.

Warning tape (terra tape) shall always be installed above the cable or
10-02399-
JO/EWO

10-02399-
10-02399-
0001

conduits. Refer to standard Drawing AA-036748.


0001
0001

12/11/16

A trench shall not be left open any longer than necessary. Cables or
08/04/16

09/08/16
DATE

conduits shall be placed concurrently with trench work, inspected and


backfill performed promptly.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
F. TETRA RADIO SYSTEM (RFDT)
ALL LEADS

DATE: 12/11/16 SCOPE DESCRIPTION


PROJECT
ENGINEER

A M ALMATROOK General
DATE: 12/11/16
CERTIFIED This defines the scope of CONTRACTOR to procure, design, install,
AMR EL SHARKAWY
integrate, test and commission a TETRA base station at the new Operation
12/11/16
DATE: and Maintenance Engineering building and associated radio terminals and
CONSTRUCTION
AGENCY accessories.
SHAHZAD YAZDANI

DATE: 12/11/16 CONTRACTOR shall provide indoor and outdoor coverage in Yanbu
OPERATIONS
Distribution Hub operational area. This new TETRA base station and
ALI H GHAMDI
TETRA Dispatch Workstations shall be integrated to the existing Saudi
12/11/16 Aramco TETRA network in Yanbu NGL SCN network. All interfaces, cards
DATE:
CONTROL NUMBER

and services required for integration with existing TETRA Network shall be
VERIFICATION

provided by CONTRACTOR.
EDSD

CONTRACTOR shall design, install, test and commission new antenna


DATE:
BY:

and transmission line system for the TETRA base station. The antenna
REVISIONCERTIFICATION

and transmission line system shall be installed on the proposed 25M Self-
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Supported Tower beside new Operation and Maintenance Engineering


(DCC) NO. _____________________

building.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 168


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Contractor shall perform all necessary radio coverage analysis and
SAY
SAY
SAY

frequency study to determine the optimum antenna type, transmission line


system, antenna system configuration that assure radio coverage at Yanbu
ENGG CERT

ASH
ASH
ASH

Distribution Hub.
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall install complete TETRA desktop radio at a fixed


location at the Operation Center & Control Room with separate radio
transceiver and control head at Operations and Engineering Maintenance
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

building.

CONTRACTOR’s responsibilities shall include design, procure, install and


commission indoor repeater system to enhanced radio signal with the
DESCRIPTION

following key buildings.

No Building number Building Name

1 12 DAS-SHELTER-1
2 13 DAS-SHELTER-2
3 18 METERING ROOM-MARAFIQ
4 SS-XXX1 RECEIVING STATION TRANSFORMER YARD
5 SS-XXX2 REMOTE I/O BUILDING
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall be install complete TETRA desktop radio at the


12/11/16
08/04/16

09/08/16
DATE

Security gatehouse with complete outdoor antenna and its ancillaries.

CONTRACTOR shall design, install, test and commission TETRA desktop


NO.
REV

D
C
B

DISCIPLINE
radio antenna and ancillaries. Antenna mast height is dependent on the
ENGINEER result of RF coverage required for suitable radio and indoor amplifier study.
ALL LEADS
In addition, antenna mast support, lightning arrestor and grounding system
DATE: 12/11/16
PROJECT
should be included.
ENGINEER

A M ALMATROOK CONTRACTOR shall install antenna grounding and feeder system, and all
DATE: 12/11/16 its ancillaries as per SAES-T-795 and SAES-T-887.
CERTIFIED
AMR EL SHARKAWY

12/11/16 CONTRACTOR shall be install outdoor antenna with 5 db gain or better.


DATE:
CONSTRUCTION
An undistorted radiation pattern shall be ensured by optimal placement of
AGENCY the antenna. All materials required for the complete installation of RFDT,
SHAHZAD YAZDANI
including the radio, transmission line, connectors, antenna, conduits,
DATE: 12/11/16
OPERATIONS
grounding, electrostatic protection, and wall penetration port shall be
provided.
ALI H GHAMDI

12/11/16
DATE: CONTRACTOR shall perform all necessary Indoor signal coverage
CONTROL NUMBER
VERIFICATION

analysis in all buildings, frequency study to determine the optimum


antenna type, transmission line system, antenna height, and antenna
EDSD

system configuration that assure radio coverage at Yanbu operational


DATE:

area.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

The CONTRACTOR’s responsibilities shall include design, procurement,


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

installation, upgrades, integrations, testing and commissioning of the


(DCC) NO. _____________________

Mobile Radio System which includes, Antenna System, Dispatch Work


Stations, Radio Frequency Dispatch Terminals.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 169


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

CONTRACTOR shall install the Dispatch Work Stations inside the Room
204 of Yanbu Distribution Hub Maintenance & Engineering building.
ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall provide HPR encryption and authentication keys.


LEADS

LEADS
LEADS
ALL

ALL
ALL

ISSUED FOR 100% PROJECT PROPOSAL

Dispatcher Work Station (DWS)


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Voice Logging Recorder


DESCRIPTION

This project shall utilize the existing Logging Recorder in building


Communication Building 12 at YANBU NGL. CONTRACTOR shall
upgrade the logging recorder and provide licenses as required to
accommodate this project’s requirement.

The number of Talk groups shall be determined by the proponent and


check the logging recorder at YANBU NGL, if it can accommodate the
project requirements otherwise, an upgrade shall be done by the project.

End-User Terminal
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

This section presents the type of Radio Frequency Dispatch Terminals


12/11/16
08/04/16

09/08/16
DATE

(RFDTs) and the associated accessories.

a. Programming Tools
NO.
REV

D
C
B

DISCIPLINE
ENGINEER RFUT PC programming kits shall be provided for the configuration, fleet
ALL LEADS
mapping, profiling and maintenance of the end-user terminals. Each
DATE: 12/11/16
PROJECT
programming kit shall include suitable software, programming cable, and
ENGINEER interface data port to configure the radio terminals.
A M ALMATROOK

DATE: 12/11/16 Tools for remote and centralized multi-programming of end-user radios
CERTIFIED
AMR EL SHARKAWY shall be provided to enable off-site programming. The remote
12/11/16 programming kit shall be interconnected to the master terminal through the
DATE:
CONSTRUCTION
SAUDI ARAMCO corporate data network.
AGENCY
SHAHZAD YAZDANI
Dispatcher Work Station (DWS)
DATE: 12/11/16
OPERATIONS CONTRACTOR shall install the Dispatch Work Stations inside Room 204
ALI H GHAMDI of Yanbu Distribution Hub Maintenance & Engineering. Specifications are
DATE:
12/11/16 provided in terms of the workstation features, network interfacing,
equipment hardware and accessories.
CONTROL NUMBER
VERIFICATION
EDSD

The table below identifies the key buildings to be equipped with DWS:-
DATE:
BY:

DWS Location Quantity


REVISIONCERTIFICATION

Room-204, E&M Bldg 01


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

a. Network Interfacing

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 170


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

Dispatcher workstations shall be interconnected through E1 circuits to


the SCN. For details refer to Block and Level Diagram-TETRA DWS
ENGG CERT

ASH
ASH
ASH

drawing number CO-A10049.Sheet 001


LEADS

LEADS
LEADS
ALL

ALL
ALL

b. Power

The Dispatcher Work Station (DWS) shall be powered from the


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

available 230VAC Uninterruptable Power Supply (UPS).

Hand-Portable Radios (HPR)


DESCRIPTION

10 HPRs will be provided under BI-02399. However, the exact quantity of


HPRs will be finalized during the detailed design.

HPR Transmit / Receive Specification:

Frequency 410-430 MHz


Transmitter RF Power Minimum of 0.6 Watt with adaptive
power control of 3 steps of 5 dB
RF Channel Bandwidth 25 KHz
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Receiver Static Sensitivity -112 dBm or better


Receiver Dynamic Sensitivity -103 dBm or better
12/11/16
08/04/16

09/08/16
DATE

a. Locating Feature
NO.
REV

D
C
B

DISCIPLINE
ENGINEER For location-type of applications, HPRs shall have built-in GPS
ALL LEADS
receivers and antennas and support Location Information Protocol.
DATE: 12/11/16
PROJECT
ENGINEER
b. Hazardous Classified Area Requirements
A M ALMATROOK

DATE: 12/11/16
CERTIFIED
The minimum Equipment Protection Level for handheld radios and its
AMR EL SHARKAWY portables accessories shall be:
12/11/16
DATE:
CONSTRUCTION Class 1, Zone 1, Gas Groups IIC (Acetylene, Hydrogen, Ethylene &
AGENCY
Propane).
SHAHZAD YAZDANI

DATE: 12/11/16
OPERATIONS
All handheld and portable Digital Trunked radio devices shall be
ALI H GHAMDI
intrinsically safe “ib” or “ia”.
12/11/16
DATE:
All handheld devices shall adhere to the requirement of GI-0006.008 in
CONTROL NUMBER
VERIFICATION

terms of restriction, labelling and use.


EDSD

The Hand held radios (HPRs) shall be certified intrinsically Safe and
DATE:

adhere to Hazardous and Environmental classified areas requirement


BY:

under SAES-P-100, SAES-B-068 and SAES-T-493 paragraph 6.5.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

c. Environmental Specifications
(DCC) NO. _____________________

HPRs shall be capable of operating in temperatures ranging from 0 to


`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 171


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
+50 degrees Celsius and have protection against humidity, water and
SAY
SAY
SAY

dust. The HPR shall have loud voice which can operate in noisy areas.
ENGG CERT

ASH
ASH
ASH

d. Size and Ergonomics


LEADS

LEADS
LEADS
ALL

ALL
ALL

The weight of an HPR shall be less than 450 grams its dimensions
within the 165x65x45mm limits.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

e. Batteries and Chargers

• The battery shall be capable of an operational duty cycle of


5/5/90 (Transmit/Receive/Idle for eight hours of continual use. Each
DESCRIPTION

portable radio shall be provided with two batteries, one for


operational use and the other as spare battery. Batteries shall be
intrinsically safe.

• Single unit battery chargers shall be provided with each radio


unit. Multiple unit battery chargers (5-slot minimum) shall be
provided in limited quantities.

• The battery chargers shall operate from 230VAC, 60 Hz. Battery


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

chargers shall be provided with an electrical cord that has a US-


Type end plug. Adapters for a European 230VAC type plug shall be
12/11/16
08/04/16

09/08/16

provided in limited quantities.


DATE

- All accessories shall be intrinsically safe and interoperable.


NO.
REV

D
C
B

DISCIPLINE
ENGINEER Certificates for intrinsically safe rating and interoperability shall be
ALL LEADS provided.
DATE: 12/11/16
PROJECT
ENGINEER - Each HPR's shall be supplied with carrying aids/accessories including
A M ALMATROOK carrying cases, belt clips and belt clips attachment. Some HPR's
DATE: 12/11/16 shall be equipped with Remote Speaker Microphone.
CERTIFIED
AMR EL SHARKAWY

12/11/16
Vehicle Mounted Radios (VMR)
DATE:
CONSTRUCTION
AGENCY Six(6) VMRs will be provided under BI-02399. The exact quantity of VMRs
SHAHZAD YAZDANI
will be finalized during the radio coverage analysis and traffic study.
DATE: 12/11/16
OPERATIONS
VMR Transmitter/Receiver Specifications:
ALI H GHAMDI

12/11/16 Frequency 410-430 MHz


DATE:
Transmitter RF Power 3 Watt or higher
CONTROL NUMBER
VERIFICATION

RF Channel Bandwidth 25 KHz


EDSD

RF Power Control Steps 5 dB


Receiver Static Sensitivity -112 dBm or better
DATE:

Receiver Dynamic Sensitivity -103 dBm or better


BY:

Input Power 13.8 VDC +/- 10%


Temperature Range -1000C to +5500C Operating
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

-20 C to +70 C Storage


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

For details, refer to VMR Block Diagram Drawing No. CO-A00006 sheet

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 172


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
001.
SAY
SAY
SAY

Radio Frequency Dispatch Terminals (RFDT)


ENGG CERT

ASH
ASH
ASH

General Specification
LEADS

LEADS
LEADS
ALL

ALL
ALL

• Three(3) RFDT shall be provided under this project. The RFDT is


a radio terminal device at a fixed location, such as an office or
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

control room, that interfaces to and operates on the System in a


similar way as a handheld Portable Radio (HPR) or Vehicle
Mounted Radio (VMR) does, i.e. over the air.
DESCRIPTION

• The RFDT shall be powered from a 230VAC Uninterruptable


Power Supply (UPS).

• For details, refer to RFDT Block Diagram Drawing No.CO-A10050


Sheet 001.

Features and Accessories


10-02399-

RFDTs shall have separate transceiver bodies and control heads.


JO/EWO

10-02399-
10-02399-
0001

0001
0001

• Multiple desktop remote control functionality with PTT shall be


12/11/16
08/04/16

09/08/16
DATE

supported. The remote control heads shall be connected to the


RFDT via the buildings internal copper wiring or by installing
NO.
REV

separate lines. Each RFDT shall be capable to support at least six


D
C
B

DISCIPLINE remote control heads controllable from a maximum distance of 100


ENGINEER
ALL LEADS meters. The necessary hardware to support up to six remote
DATE: 12/11/16
control heads shall be provided and installed.
PROJECT
ENGINEER

A M ALMATROOK
• Loudspeakers and speaker/microphone with PTT type of audio
DATE: 12/11/16 accessories shall be provided for all RFDTs.
CERTIFIED


AMR EL SHARKAWY

12/11/16
Security gates shall be provided and installed with outdoor
DATE: speakers to support personnel operations.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI RFDT Installation
DATE: 12/11/16
OPERATIONS RFDTs shall be provided with all the required hardware including
ALI H GHAMDI mounting brackets, RF feeder cables, data cables and connectors,
DATE:
12/11/16 Equipment rack and rack mounting kits shall be provided to mount
CONTROL NUMBER

RFDTs inside Telecommunications Equipment Rooms. Surge protectors


VERIFICATION

and grounding kit shall also be provided.


EDSD

RFDT Antenna Systems


DATE:
BY:

RFDTs shall be provided with outdoor antenna, the antenna shall be 5 dBi
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

gain or better. An undistorted radiation pattern shall be ensured by optimal


C

placement of the antennas.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 173


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
RFDT antennas shall be provided with built-in ground plate for grounding.
SAY
SAY
SAY

The antenna size and BUC power shall be based on the link budget
ENGG CERT

ASH
ASH
ASH

analysis specified for the TETRA scope to ensure the minimum BER
threshold required by the TETRA to not lose the MCCH.
LEADS

LEADS
LEADS
ALL

ALL
ALL

All materials required for the complete installation of RFDT's, including the
radio, transmission line, connectors, antenna, conduits (as required),
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

grounding, electrostatic surge protection, and wall/roof penetration port shall


be provided.

Refer to the Radio Frequency Report under subcontract studies section of


DESCRIPTION

this package for details.

REFERENCE DRAWINGS

Listed below are proposal engineering documents and drawings which shall
be finalized by CONTRACTOR during detail design.

DRAWING NO. SHEET NO. DRAWING TITLE


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CO-A10049 001 BLOCK & LEVEL TETRA DWS, RM 204, E&M


12/11/16
08/04/16

09/08/16

CO-A10050 001 BLOCK & LEVEL TETRA RFDT, SECURITY GH


NO. DATE
REV

D
C
B

DISCIPLINE
G. TRANSMISSION SYSTEM
ENGINEER
ALL LEADS
SCOPE DESCRIPTION
DATE: 12/11/16
PROJECT
ENGINEER SDH Equipment
A M ALMATROOK

DATE: 12/11/16 BI-02399 shall provide new Alcatel 1646 SDH node at Yanbu Distribution
CERTIFIED
AMR EL SHARKAWY Hub. The proposed SDH node shall be STM-4 and shall be connected to
12/11/16 Yanbu Refinery (60YREF0A
DATE:
CONSTRUCTION
AGENCY New STM-4 interface card shall be provided by this BI in Yanbu Refinery to
SHAHZAD YAZDANI
connect the new 1646 SDH at Yanbu Distribution Hub as a spur of
DATE: 12/11/16
OPERATIONS
60YREF0A in Yanbu Refinery.
ALI H GHAMDI

12/11/16
DATE:
CONTRACTOR shall provide one (1) New ES1-8FE Integrated Services
CONTROL NUMBER
VERIFICATION

Adapter (ISA) card with 8 Fast Ethernet interface port shall be provided.
Necessary port and interface cards shall also be provided for E1 interface
EDSD

port. Necessary DDF shall also be provided by the CONTRACTOR.


DATE:
BY:

The following circuits require connectivity through the new SDH:


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

TETRA Basetation – 2E1


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

• Dispatcher Workstation – 2E1


(DCC) NO. _____________________

• Power System Automation (PSA) – 2E1

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 174


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Communications Supervisory Alarm System (CSAS)
SAY
SAY
SAY

• CONTRACTOR shall provide and install new CSAS remote


ENGG CERT

ASH
ASH
ASH

Terminal Unit at the Telecom Equipment Room of the Operations


and Maintenance Building.
LEADS

LEADS
LEADS
ALL

ALL
ALL

• CONTRACTOR shall wire all facility and equipment alarms to the


CSAS RTU and shall be transmitted to the Dhahran Network
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Operations Center.

• CSAS System shall be equipped with data display, 20-60VDC, 32


digital input, 16 Control Output, with necessary software for
DESCRIPTION

Aramco and with Ethernet interface.

DRAWING NO. SHEET NO. DRAWING TITLE


CO-A10051 001 SDH TRANSMISSION SYSTEM

H. TEMPORARY COMMUNICATION REQUIREMENTS


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

SCOPE DESCRIPTION
12/11/16
08/04/16

09/08/16
DATE

• CONTRACTOR shall provide and install all temporary


communications services required during construction. This shall
NO.
REV

D
C
B

include, Outside Plant Cabling System, Structured Cabling System,


DISCIPLINE
ENGINEER Data Network and Telephone System.
ALL LEADS

DATE: 12/11/16 • All temporary communications facilities shall be decommissioned


PROJECT
ENGINEER and removed after the completion of the project.
A M ALMATROOK

DATE: 12/11/16 • CONTRACTOR shall coordinate and obtain approval from Saudi
CERTIFIED
AMR EL SHARKAWY
Aramco for IT services (data and voice) provided through service
12/11/16
provider. CONTRACTOR should ensure this service provides
DATE:
Layer-2 supporting SSL-VPN connectivity. CONTRACTOR shall
CONSTRUCTION
AGENCY send the service provider quotation to Aramco IT group for review.
SHAHZAD YAZDANI

DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
DRAWING NO. SHEET NO. DRAWING TITLE
DATE:
12/11/16 COA00060 001 BLOCK & LEVEL DIAGRAM - TELEPHONY
CONTROL NUMBER

COA00061 001 OVERALL LOGICAL DIAGRAM - DATA


VERIFICATION
EDSD

COA00062 001 TRENCH AND CONDUIT LAYOUT


001
DATE:

COA00063 COPPER CABLE SCHEMATIC DIAGRAM


BY:

COA00064 001 HORIZONTAL OUTLET LAYOUT


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

COA00065 001 HORIZONTAL RISER DIAGRAM


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 175


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

• All temporary communications facilities shall be decommissioned


and removed after the completion of the project.
ENGG CERT

ASH
ASH
ASH

I. EMERGENCY SIREN SYSTEM (ESS)


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall design, procure, construct, test and commission a


permanent, fully flexible, operational and maintainable Emergency Siren
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

System (ESS). The ESS shall facilitate alarm broadcasting and notification
service for the entire Yanbu Distribution Hub and shall follow SAES-B-071
standard.
DESCRIPTION

CONTRACTOR shall provide the ESS at Yanbu Distribution Hub in


accordance with applicable SAUDI ARAMCO Standards. CONTRACTOR
shall ensure that the provided System shall meet the best commercial
practices, reliability, maintainability and performance.

CONTRACTOR shall provide and install ESS Control Station (CS) which
shall be composed but not to be limited to:
10-02399-
JO/EWO

10-02399-
10-02399-


0001

0001
0001

Communication Control Unit


• Noise Cancelling Microphone
12/11/16
08/04/16

09/08/16
DATE

• Computer Workstation
• MassAlert Software (Customized for this project)
NO.
REV


D
C
B

Battery (12VD, 7AH)



DISCIPLINE
ENGINEER Antenna (w/ bracket)
ALL LEADS
• Antenna Cable
DATE: 12/11/16
PROJECT • Antenna Polyphasor – Lightning Strike Protector
ENGINEER

A M ALMATROOK
• Advance Communication Board
DATE: 12/11/16 • Radio – Conventional UHF radio to be used for system
CERTIFIED
AMR EL SHARKAWY
communication
12/11/16 • Remote Status View
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
CONTRACTOR shall provide and install the above Control Station at
DATE: 12/11/16
Yanbu Distribution Hub in Operation Building. Activation of the sounders
OPERATIONS from the Control Station shall be realized through wireless
ALI H GHAMDI communication/connectivity which shall utilize commercial operating
12/11/16
DATE: frequency between 330-360 Mhz Radio.
CONTROL NUMBER
VERIFICATION

CONTRACTOR shall provide and install Stationary Electronic Sirens which


EDSD

shall be composed but not to be limited to:


DATE:
BY:

• 3200 Watt High Powered Speaker Station


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

• Digitized Pre-Recorded voice Message Board/ACB


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

• Antenna (w/ bracket)


(DCC) NO. _____________________

• Antenna Cable

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 176


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Antenna Polyphasor – Lightning Strike Protector
SAY
SAY
SAY

• Radio – Conventional UHF radio to be used for system


ENGG CERT

ASH
ASH
ASH

communication
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall provide and install the Stationary Electronics Sirens


based on site-specific computer-based modeling provided by Siren
Manufacturer/Vendor to ensure all areas are covered at the minimum
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

required sound level.

CONTRACTOR shall ensure that the sounders for plants alerting shall be
placed at a minimum of 15 meters above local grade. The loudspeakers
DESCRIPTION

shall emit horizontally.

CONTRACTOR shall provide, install and ensure that the sounders not be
closer than 15 meters to the windows of normally occupied buildings.

CONTRACTOR shall provide the mounting poles, foundations, including all


required mounting accessories that shall be utilized by the sounders to
meet its full functionality.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

The ESS system shall be powered from a nearest uninterruptible power


supply (UPS) system.
12/11/16
08/04/16

09/08/16
DATE

CONTRACTOR shall ensure that all installation shall follow all applicable
NO.
REV

SAUDI ARAMCO Standards and/or the recommended vendor/manufacturer


D
C
B

DISCIPLINE procedures and details as stipulated in the user’s manual that is provided
ENGINEER
ALL LEADS along with the equipment/devices.
DATE: 12/11/16
PROJECT
ENGINEER DRAWING NO. SHEET NO. DRAWING TITLE
A M ALMATROOK
CO-A100054 001 SYSTEM DIAGRAM, EMERGENCY SIREN SYS.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY

12/11/16
DATE: J. PAGING SYSTEM
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall design, procure, construct, test and commission a
DATE: 12/11/16 permanent, fully flexible, operational, and maintainable In-Plant Paging
OPERATIONS System (IPPS).
ALI H GHAMDI

12/11/16 This IPPS shall facilitate voice and alarm broadcasting services for the
DATE:
CONTROL NUMBER

Yanbu Distribution Hub in accordance with SAES-T-481 (In-Plant Voice


VERIFICATION

Paging System) and all SAUDI ARAMCO applicable standards.


EDSD

DATE:

Equipment to be provided as part of the System shall meet the best


BY:

commercial practices, reliability, maintainability and performance of the


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

System.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

For the System, all equipment shall be located within the battery limits of
the process area of the plant with desktop access units and switching
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 177


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
equipment to be installed in the Operation Building.
SAY
SAY
SAY

The In-Plant Paging System (IPPS) shall consist of the following:


ENGG CERT

ASH
ASH
ASH

• Master Call Station/Access Units


LEADS

LEADS
LEADS
ALL

ALL
ALL

• Controller or Master Control Unit


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

• Audio Messenger

• Telephone Interface Unit


DESCRIPTION

• Line Supervisory Unit

• Audio Power Amplifier

• Signaling Devices (beacons)

The In-Plant Paging System (IPPS) shall also consist of the following:
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

• Equipment cabinets
12/11/16
08/04/16

09/08/16
DATE

• Access Panels/Call Stations, Tone & speech generator, Amplifiers


and Inter cabling within junction boxes/enclosures.
NO.
REV

D
C
B

DISCIPLINE • Loudspeakers and loudspeaker drivers


ENGINEER
ALL LEADS

DATE: 12/11/16
• Mounting Assemblies and accessories
PROJECT
ENGINEER

A M ALMATROOK
• Power Supplies
DATE: 12/11/16
CERTIFIED • Uninterruptible Power Supply
AMR EL SHARKAWY

DATE:
12/11/16
• Miscellaneous items where necessary to complete the System
CONSTRUCTION
AGENCY
design e.g. acoustic booths, enclosures etc.
SHAHZAD YAZDANI

DATE: 12/11/16
OPERATIONS Final locations of field devices shall be determined during detailed design;
ALI H GHAMDI however they shall typically cover the main process buildings/plant areas,
DATE:
12/11/16 together with the Operation buildings and Control Rooms.
CONTROL NUMBER
VERIFICATION

In-Plant Communications equipment shall be able to operate under


EDSD

environmental conditions stated in the SAES-J-003.


DATE:
BY:

All field equipment shall be suitable for use in its designated area
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

classification. Where applicable, equipment used in hazardous areas shall


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

be certified as Intrinsically Safe.


(DCC) NO. _____________________

The System shall operate in high noise areas up to 80dBA with the support
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 178


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and augmentation of Signaling Devices such as beacons or flashing lights.
SAY
SAY
SAY

Each indoor, outdoor or hazardous area loudspeakers and horns shall be


ENGG CERT

ASH
ASH
ASH

supported by a remote power amplifier for driving the loudspeakers.


LEADS

LEADS
LEADS
ALL

ALL
ALL

The Cabling shall consist of the following as a minimum:

• System cable from system distribution equipment to the field devices


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

with ground conductor and spare conductors (recommended cable


by manufacturer).

• Loudspeaker/Flashing Light cable shall contain two (2) or three (3)


DESCRIPTION

conductors whichever is applicable per vendor recommendation.

• Cables shall be UL listed for indoor and outdoor applications.

• Cables installed within a building shall be listed as being resistant to


the spread of fire in accordance with the National Electrical Code
(NEC) Article 800-50 and Article 800-51.

• Outer jacket of the cables shall be made of flame retardant, moisture


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

and ultraviolet resistant material to provide protection from oil,


chemical, mechanical and other environmental abuse.
12/11/16
08/04/16

09/08/16
DATE

• Loudspeaker/Flashing Light cable shall be installed in ¾ inch Rigid


Steel Conduit from amplifier enclosures as required. All fittings,
NO.
REV

D
C
B

DISCIPLINE
enclosures and plugs shall be suitably certified for the hazardous
ENGINEER area.
ALL LEADS

DATE: 12/11/16
PROJECT
The power for the In-Plant Communications equipment shall be supplied
ENGINEER
from the UPS located in either of the Bulk Plant Control Room or Jetty
A M ALMATROOK
Control Room and shall operate from a 230 VAC.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
DRAWING NO. SHEET NO. DRAWING TITLE
12/11/16
DATE:
CONSTRUCTION
CO-A10047 001 BLOCK & LEVEL DIAGRAM, IN-PLANT PAGING
AGENCY
SHAHZAD YAZDANI

DATE: 12/11/16
OPERATIONS 4.14.1 IT NETWORK ENGINEER APPLICATION REQUIREMENT
ALI H GHAMDI

12/11/16 IT physical infrastructure shall be fully documented in the geographic


DATE:
information system (GIS) based IT Network Engineer (NE) application. The
CONTROL NUMBER
VERIFICATION

CONTRACTOR shall include as part of his estimate the cost for Network
EDSD

Engineer updates and documentation. The updates and documentation


shall include:
DATE:
BY:

a) Reservation of IT physical infrastructure: IT physical infrastructures


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

that are planned to be used as part of the project must be reserved in


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

NE application. These reservations shall be renewed by the project


(DCC) NO. _____________________

every six (6) months. IT physical infrastructures that are required to be


reserved in NE include:
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 179


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

Power
Space (floor space, rack space, wall space) in any IT Building or
ENGG CERT

ASH
ASH
ASH

IT controlled space (Telecommunication Rooms, etc.)


Connections to any existing IT equipment
LEADS

LEADS
LEADS
ALL

ALL
ALL

Connections to any existing In Side Plant (ISP) cables and/or floor


outlets
Connections to any existing IT Communications Grounding
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

system
Use of existing Outside Plant (OSP) ducts or sub-ducts
Use of existing Outside Plant (OSP) cable pairs/strands
Placement of Antennas on existing Towers
DESCRIPTION

b) Project Proposal Design Package: IT physical infrastructure (both


Inside Plant (ISP) and Outside Plant (OSP)) engineering design shall
be entered into NE upon the completion of the Project Proposal Phase.

c) Issued for Construction Design Package: IT physical infrastructure


(both Inside Plant (ISP) and Outside Plant (OSP)) engineering design
shall be entered into NE application upon the completion of Issued for
Construction (IFC) engineering design package.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

d) As-Built Drawings: Actual "redline/as-built" updates of IT physical


12/11/16

infrastructure shall be updated in NE application upon the completion


08/04/16

09/08/16
DATE

of the project as part of the As-built Design package.


NO.
REV

D
C
B

It shall be noted that the IT Network Engineer Access Policy only allows
DISCIPLINE
ENGINEER
user accounts for regular SAUDI ARAMCO employees or contractor
ALL LEADS employees working under the direct supervision of IT/Engineering Tools
DATE: 12/11/16 and Documentation Group. Also, the application can only be accessed via
PROJECT
ENGINEER the SAUDI ARAMCO corporate Network.
A M ALMATROOK

DATE: 12/11/16 This requirement does NOT change or supersede any existing e- review or
CERTIFIED IPlant drawings project submittal requirements.
AMR EL SHARKAWY

12/11/16
DATE: 4.17 Fire Protection
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI A. GENERAL
DATE: 12/11/16
OPERATIONS This Project shall provide Fire water System to provide the required fire protection
ALI H GHAMDI for the proposed facilities. The Fire water system shall consist of new fire water
DATE:
12/11/16 storage, New Fire Pumps and New dedicated Fire Water Network (Underground)
for the proposed facilities. Water supply from MARAFIQ shall be used as the feed
CONTROL NUMBER
VERIFICATION

source to the new fire water storage tanks.


EDSD

Companies selected for Design and Installation of Fire Water Systems shall have
DATE:
BY:

Certified Fire Protection Engineer, Qualified Engineers and Designers to Design,


REVISIONCERTIFICATION

Install and Test Fire Water Systems and execute all other work requirements
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

competently in accordance with SAES-B-017.


C

(DCC) NO. _____________________

Fire Water Systems shall be Designed and Installed under the Supervision of a

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 180


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Registered Professional Engineer in the specialty of Fire Protection Engineering
SAY
SAY
SAY

with at least five (5) years of experience in the design of Fire Water Systems.
Design Drawings and Hydraulic Calculations shall be submitted according to
ENGG CERT

ASH
ASH
ASH

SAUDI ARAMCO procedures for Plan and Equipment submittals.


LEADS

LEADS
LEADS
ALL

ALL
ALL

All Tests of Fire Suppression System Shall be witnessed by designated


representative of Loss Prevention and Fire Protection Department as per SAES-
B-070, Section 7.5
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Hydraulic Calculations shall be performed using only software that complies with
requirements of SAUDI ARAMCO and calculations of NFPA 13. Software to be
utilized shall be the latest version.
DESCRIPTION

Design, Drawings and Calculations for Fire Water and Foam System(s) shall be
supervised by a Registered Professional Engineer in the specialty of Fire
Protection in accordance with SAES-B-070. All Drawings shall bear the seal of
that Registered Engineer. The Systems Detailed Design shall be Reviewed and
Approved by Chief Fire Prevention Engineers Representative.

B. FIRE PROTECTION CONCEPT


10-02399-
JO/EWO

10-02399-
10-02399-


0001

0001

Fire Water Demand: Fire Water Demand shall be considered as a minimum


0001

1000 gpm and maximum of 4000 gpm based on the design basis requirement
12/11/16
08/04/16

09/08/16

specified in SAES-B-017, Clause 5.19.5 for Medium Risk Areas.


DATE

• Firewater demand shall be based on the single largest fire hazard within the
NO.
REV

D
C
B

facility.
DISCIPLINE
ENGINEER
ALL LEADS • Fire Water Storage: Two (2) Fire Water Storage Tanks equal in Size and
DATE: 12/11/16 dedicated only for firewater service shall be provided with total storage capacity
PROJECT
ENGINEER of 12 hours in accordance with SAUDI ARAMCO requirement for Hydrocarbon
A M ALMATROOK storage Facilities.
DATE: 12/11/16

AMR EL SHARKAWY
CERTIFIED
• Fire Water Supply: Fire Water supply shall be provided by MARAFIQ – ROYAL
12/11/16 COMMISSION as the primary source. Truck Filling Connection will also be
DATE:
CONSTRUCTION
provided as a backup.
AGENCY
SHAHZAD YAZDANI
• Firewater Pumping System: Dedicated Two (2) no. of Electric Driven Fire
DATE: 12/11/16
Pumps as primary Fire pumps, One (1) no. of Diesel Driven Fire Pumps as
OPERATIONS
100% backup Fire Pumps and Two (2) no. of Jockey Pumps (1-Duty & 1-
ALI H GHAMDI
Standby) to maintain the required pressure in the Fire Water Network. The
12/11/16
DATE: design of firewater pumps shall be in accordance with NFPA 20 and SAES-B-
CONTROL NUMBER

017.
VERIFICATION
EDSD

• Fire Water Distribution: A fire water distribution main shall be looped around
DATE:

the plant areas. Firewater main ring shall be located underground to protect it
BY:

from mechanical damage. Where the main cannot be buried, it shall be suitably
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

protected from vehicle impacts and the effects of fires and explosions. All
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Buried Piping are considered to be RTR, as per SAES-L-105, Line Class:


(DCC) NO. _____________________

1FE0U and Above Ground Piping are considered to be FBE Lined Carbon
Steel, as per SAES-L-105, Line Class: 1LE0U. The Fire Water Ring main shall
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 181


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
be hydraulically sized for the maximum Demand Flow Rates on the basis of
SAY
SAY
SAY

Dual Feed.
ENGG CERT

ASH
ASH
ASH

• Fire Water Hydrants: Fire Hydrants shall be located throughout the facility.
Hydrants shall be located not less than 15m from the protected risk and shall
LEADS

LEADS
LEADS
ALL

ALL
ALL

be spaced not more than 75m apart. Fire Hydrants shall be Wet Barrel type
Hydrants that meet ANSI/AWWA C503 requirements. The Wet Barrel Hydrant
shall be a Listed Commercial Unit that complies with AWWA and has a working
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Pressure of 1380 kPag (200 PSIG). The Inlet shall be 6 inches in diameter with
approved Flat Face ANSI Flange.

• Fixed Foam System: Fixed Deluge Foam Water System shall be provided to
DESCRIPTION

protect Product Transfer Pumps and Shipper pumps with Two (2) no. of Foam
Skid package for Product Transfer pumps areas. Foam System shall be
provided in accordance with SAES-B-018 & NFPA 16 requirements. Transfer
pumps shall cover the pump casing and the floor or area at least 0.6 m (2 ft)
from the periphery of the casing. The suction and discharge flanges, casing
drain valves, gauge connections, balance lines, and pump seals shall be
included in the spray area.

• Semi Fixed Foam System: Semi Fixed Foam System to be provided for Open-
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Top Floating Roof Tanks. This is a vendor Item and will be part of the Tank
Vendor package that will be responsible for the entire semi-fixed foam system
12/11/16
08/04/16

09/08/16

from top of tank to hose connection outside of the dike area.


DATE

• Portable Fire Fighting Equipment: Hand Held and Mobile Fire Extinguishers
NO.
REV

D
C
B

shall be provided for the Facilities. The Extinguishers shall be Selected and
DISCIPLINE
ENGINEER Positioned in areas of Risk relevant to their application as per SAES-B-019
ALL LEADS
requirements. Where extinguishers are protecting individual equipment, they
DATE: 12/11/16 shall be located at least 7.5m from the equipment’s.
PROJECT
ENGINEER

A M ALMATROOK • Barriers for Protection of Exposed Fire Fighting Equipment: CONTRACTOR


DATE: 12/11/16 shall provide and install Vertical Traffic Posts (Bollards) to protect all end
CERTIFIED
AMR EL SHARKAWY
devices. The Bollards shall be designed such that access to Equipment is not
12/11/16 impaired. The Bollards shall have the following requirements;
DATE:
CONSTRUCTION
AGENCY o Constructed of Steel not less than 100 mm in diameter and Concrete
SHAHZAD YAZDANI
filled.
DATE: 12/11/16
OPERATIONS
o Spaced not more than 1200 mm between posts on center.
ALI H GHAMDI

12/11/16
DATE: o Set not less than 900 mm deep in a Concrete Footing of not less than a
CONTROL NUMBER

400 mm diameter.
VERIFICATION
EDSD

o Set with the Top of the ports not less than 914 mm Above Ground.
DATE:
BY:

o Horizontal Cross-Bars between Vertical Posts are prohibited.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

o Located not less than 900 mm from any part of the Hydrant or Fire
(DCC) NO. _____________________

Protection Equipment protected.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 182


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
o Guard Post shall not be installed in-line (directly in front of) with any of
SAY
SAY
SAY

the Hydrant or Fire Protection Equipment outlets where the Fire Hose is
attached and where the Posts could contact the Hose when it gets
ENGG CERT

ASH
ASH
ASH

pressurized and gets stiff in a straightened position.


LEADS

LEADS
LEADS
ALL

ALL
ALL

• Hydro – Testing Requirements:

o Hydro-Testing of complete Fire Protection System shall be performed in


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

accordance with SAES-B-017 and SAES-A-004 requirements.

o Prior to Hydro-Testing, the System shall be flushed in accordance with


NFPA 24.
DESCRIPTION

o For Above Ground Piping or for Under Ground Piping prior to Burial, newly
installed Fire Protection Systems in Water Service, regardless of materials,
shall be Hydrostatically Tested to 1,380 kPag (200 PSIG) or 345 kPag (50
PSIG) in excess of maximum operating pressure, whichever is greater, and
held without pressure loss for 4 hours. All Piping is required to be Hydro-
Tested, including that of open ended piping for Deluge Systems.

o For Underground installations, Test Duration shall be 24 hours if piping


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001

welds and joints cannot be left exposed during Testing. All Hydrostatic
0001

Tests of Fire Water Systems shall be recorded continuously. Partially


12/11/16
08/04/16

09/08/16

Buried Systems shall be treated as Underground Installations. For Fire


DATE

Water Systems not Hydro-Tested as a single system during Construction, a


Final Full System Hydro-Test is required to be made before Final
NO.
REV

D
C
B

Acceptance.
DISCIPLINE
ENGINEER
ALL LEADS o Safety Procedures in accordance with GI-0002.102 shall be followed during
DATE: 12/11/16 Pressure Testing.
PROJECT
ENGINEER

A M ALMATROOK o Dry Pipe Fire Protection System shall be Hydro-Tested in accordance with
DATE: 12/11/16 NFPA 13 and SAES-B-017.
CERTIFIED
AMR EL SHARKAWY
C. FIRE PROTECTION CONCEPT
12/11/16
DATE:


CONSTRUCTION
AGENCY CONTRACTOR scope of work shall include but not limited to the, detailed
SHAHZAD YAZDANI engineering design, procurement, quality control and quality assurance
DATE: 12/11/16 documentation, construction, as-built documentation, inspection, testing, pre-
OPERATIONS
commissioning, assistance to commissioning and start-up for all Fire Protection
ALI H GHAMDI
Work associated with this project.
12/11/16
DATE:


CONTROL NUMBER

CONTRACTOR shall Design and Construct the New Fire Piping System
VERIFICATION

(Underground) in the new expansion Area, in accordance with applicable


EDSD

SAUDI ARAMCO Engineering Standards - SAES-B-017, SAES-B-018, SAES-


DATE:

B-019, SAES-B-070, SAUDI ARAMCO Engineering Specifications and


BY:

applicable NFPA standards.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall provide and install New Fire Water Network


(DCC) NO. _____________________

(Underground) with Piping, Fittings, Fire Hydrant, Fire Monitor, Live Hose reel
and Post Indicator Valves as show on Fire Protection drawing FI-A00011-001
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 183


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and FIA00016-001 .
SAY
SAY
SAY

• CONTRACTOR shall provide and install Two (2) new Electric Driven Fire
ENGG CERT

ASH
ASH
ASH

Pumps, One (1) new Diesel Driven Fire Pump along with One (1) Diesel Tank
and Two (2) new Jockey Pumps as shown on drawings # FIA00011-003.
LEADS

LEADS
LEADS
ALL

ALL
ALL

• CONSTRUCTION CONTRACTON shall provide Two (2) New Foam Skids for
Product Pumps as show on the Fire Protection drawings FIA0012-001 and
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

FIA00013-001.

CONTRACTOR shall provide Deluge Foam Water Spray system with all Piping,
Fittings, Air Aspirated Foam Nozzles, Deluge Valves, Gate Vales, Y-Strainers
DESCRIPTION

for the Product pumps as per SAES-B-017 and SAES-B-070, as shown on Fire
Protection drawings FIA00012-002, FI-A00013-002, FIA00018.001, FIA00019-
001, FIA00019-002, FIA00019-003, FIA00019-007.

• CONTRACTOR shall provide necessary Caution / Identification Signs for the


Fire Protection System components as per SAUDI ARAMCO and NFPA
requirements.

• CONTRACTOR shall Paint all Above-ground Fire Protection Piping and


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Components in Safety Red Color.


12/11/16
08/04/16

09/08/16


DATE

CONTRACTOR shall Provide One Monitor Coverage for Custody Metering


Skids for YDH and SAMREF Area.
NO.
REV

D
C
B

DISCIPLINE
• CONTRACTOR shall perform Hydro-Testing of complete Fire Protection
ENGINEER System as per SAES-B-017 & SAES-A-004 requirements.
ALL LEADS

DATE: 12/11/16
PROJECT
• CONTRACTOR shall install two-wheel, cart type dry chemical, 68 kg size BC
ENGINEER extinguisher units as specified in Table -1, SAES-B-019, They shall be covered
A M ALMATROOK
with the manufacture’s cover or housed inside a roofed, noncombustible shed,
DATE: 12/11/16 with access door facing in the opposite direction of hydrocarbon handling
CERTIFIED
AMR EL SHARKAWY equipment.
12/11/16
DATE:
CONSTRUCTION • CONTRACTOR shall install 12.5 Kg BC type dry chemical hand fire
AGENCY
extinguisher shall be provided at least 7.5m for the protect pumps being
SHAHZAD YAZDANI
protected.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
• All Fire Protection Equipment and Appurtenances shall be purchased as
12/11/16 specified in the SAUDI ARAMCO Materials System and SAES-U-101.
DATE:
CONTROL NUMBER
VERIFICATION

• All Below Grade Valves in Fire Protection Systems shall be listed for use in Fire
EDSD

Service.
DATE:

• All Below Grade Block Valves in Main or Branch Service shall be Listed Post
BY:

Indicator Type Valve with Position Indicators above Grade to meet the
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

requirements of NFPA 24.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

• All Manual Block Valves in Fire Protection Service shall be Car-Sealed in their

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 184


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Normal Operating Position or shall be otherwise supervised per NFPA 24.
SAY
SAY
SAY

• Block Valves located on Above Grade Piping shall be Accessible as per SAES-
ENGG CERT

ASH
ASH
ASH

B-054.
LEADS

LEADS
LEADS
ALL

ALL
ALL

• Commissioning and Testing Procedures for Foam Spray System shall meet the
requirements of NFPA 16. All Tests shall be witnessed by Designated SAUDI
ARAMCO Representatives of the Loss Prevention and Fire Protection
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Departments.

D. INSTRUMENTATION
DESCRIPTION

Fire Water System:

• CONTRACTOR shall provide and install field instruments such as pressure


indicator, level transmitters, motor operated valves (MOV) for fire water
tanks as indicated in P &ID drawing FIA00011-002.
• CONTRACTOR shall provide and install field instruments such pressure
indicators, pressure transmitters, flow meters, pressure control valves as
depicted in P & ID FIA00011-002 & FIA00011-003.
10-02399-
JO/EWO

10-02399-
10-02399-
0001


0001
0001

As a minimum two (2) junction shall be provided, one each for analog and
digital signals as per SAES-J-902.
12/11/16
08/04/16

09/08/16
DATE

• CONTRACTOR shall provide and install homerun cables from fire water
tanks X40-D-0701/702 to DCS cabinet located in rack room of O & M
NO.
REV

Building.
D
C
B

DISCIPLINE
ENGINEER Foam Generating Skid 1 & 2:
ALL LEADS

DATE: 12/11/16
Foam skid vendor shall provide skid instrumentation and control,
PROJECT CONTRACTOR shall provide and install data communication cables from
ENGINEER
Foam Skid Control Panel to DCS as per block diagram IN-A00001.010.
A M ALMATROOK

DATE: 12/11/16
CERTIFIED • Reference drawings
AMR EL SHARKAWY

DATE:
12/11/16 Drawing # Description
CONSTRUCTION IN-A00001 System Block Diagrams
AGENCY
SHAHZAD YAZDANI IN-A00002 Instrument Block Diagrams
DATE: 12/11/16 IN-A00027 Instrument Points & Lines
OPERATIONS
ALI H GHAMDI
IN-D00201 Instrument Installation Schedule-Flow
12/11/16 IN-D00202 Instrument Installation Schedule-Pressure
DATE:
IN-D00203 Instrument Installation Schedule-Level
CONTROL NUMBER
VERIFICATION

IN-D00204 Instrument Installation Schedule-Temperature


EDSD

IN-D00205 Instrument Installation Schedule-Misc


DATE:

IN-D00206 Instrument Installation Schedule-MOV/GOV/HOV/AOV


BY:

IN-D00207 Instrument Installation Schedule-Relief Valves


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

IN-A00004 Equipment Layouts


C

(DCC) NO. _____________________

IN-A00003 Cable Routing Plan


IN-D00005 Cable and Conduit Schedule
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 185


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

E. MECHANICAL - ROTATING EQUIPMENT


ENGG CERT

ASH
ASH
ASH

• Contractor shall provide following sets of Fire Water Pumps at YDH.


LEADS

LEADS
LEADS
ALL

ALL
ALL

Diesel Engine Driven Fire Water Pump – 1 No. (X40-G-0035,


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Datasheet No. RE-E00119)


Electric Motor Driven Fire Water Pump – 2 Nos. (X40-G-0034 A/B,
Datasheet No. RE-E00118)
DESCRIPTION

Fire Water Jockey Pumps – 2 Nos. (X40-G-0036 A/B, Datasheet


No. RE-E00120)

• Reference shall be made to individual pump datasheets included in index-G.

Fire Water pumps shall be selected in accordance with SAES-G-005 and


SAES-B-017. Fire Water Jockey pumps shall be in accordance with ASME
B73.1. Fire Water Main Pumps (Diesel Engine Driven and Electric Motor
10-02399-
JO/EWO

10-02399-
10-02399-

Driven) shall be in accordance with NFPA 20 and are of axial split, between
0001

0001
0001

bearing design due to their high flow requirement. This design is also
12/11/16

maintenance friendly at site as top half of the pumps can easily be open to
08/04/16

09/08/16
DATE

access the internal components without disturbing the piping connections.


NO.
REV

D
C
B

DISCIPLINE
MISCELLANEOUS REQUIREMENTS
ENGINEER


ALL LEADS
Reference shall be made to technical specifications for pumps included in
DATE: 12/11/16
PROJECT Index-A for further details of these pumps.
ENGINEER

A M ALMATROOK

DATE: 12/11/16
• Pump Datasheets provided in this package are preliminary only. These will be
CERTIFIED further verified by CONTRACTOR during detailed design phase of the project
AMR EL SHARKAWY

12/11/16
before issuing for procurement activities.
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
• CONTRACTOR shall be responsible for producing equipment datasheet, SIS
DATE: 12/11/16
sheets, Noise Datasheets in accordance with SAUDI ARAMCO standard forms
OPERATIONS and datasheets.
ALI H GHAMDI


12/11/16
DATE: All pumps will be procured by CONTRACTOR from SAUDI ARAMCO approved
CONTROL NUMBER
VERIFICATION

manufacturer for each Commodity Classification Code (CCC). SAUDI


EDSD

ARAMCO will provide the list of approved manufacturers after award of


Contract.
DATE:
BY:


REVISIONCERTIFICATION

CONTRACTOR shall prepare Material Requisition Package for all the pumps
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

and shall obtain approvals from relevant SAUDI ARAMCO Departments before
(DCC) NO. _____________________

issuing to Vendors.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 186


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

• Material take-offs have been prepared for reference only and will not be
ENGG CERT

ASH
ASH
ASH

considered as contractual documents and cannot be used as a basis for any


change order.
LEADS

LEADS
LEADS
ALL


ALL
ALL

Technical quotations obtained from vendors will list all exceptions and /or,
additions to applicable project Drawings and SAUDI ARAMCO Specifications. If
there is no exception to specifications, CONTRACTOR will make a statement
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

to that effect.

• CONTRACTOR shall be responsible for Technical Bid Evaluation, placing the


DESCRIPTION

Purchase Order to technically approved Vendors.

• CONTRACTOR shall be responsible for review and approval of NMRs 601, 602
and 603.

• Inspection and Testing of CONTRACTOR supplied materials will be performed


as per applicable SAUDI ARAMCO Inspection Requirement form A-175.
CONTRACTOR will arrange with his sub suppliers to comply with these
10-02399-
JO/EWO

10-02399-
10-02399-
0001

requirements by stating on all sub suppliers’ purchase order SAUDI ARAMCO’s


0001
0001

intention to inspect material.


12/11/16
08/04/16

09/08/16
DATE

• Equipment installation and Commissioning shall be in accordance with


approved Vendor’s installation and commissioning procedures.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
ALL LEADS • Supply of Commissioning and Start-up spares and first fill of all the lubricants
DATE: 12/11/16 and chemicals is in the scope of CONTRACTOR. CONTRACTOR shall obtain
PROJECT
ENGINEER approval of Aramco Operations before filling of lubricants and chemicals.
A M ALMATROOK

DATE: 12/11/16
CERTIFIED • CONTRACTOR will provide all Non Material Requirement (NMR-602/603),
AMR EL SHARKAWY
Operation and Instruction Manuals of CONTRACTOR supplied material in
12/11/16
DATE: electronic format (Latest Acrobat Reader).
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
• CONTRACTOR will provide critical spare parts for CONTRACTOR supplied
DATE: 12/11/16
OPERATIONS items in accordance with SAEP-3101. Contractor will develop list of critical
ALI H GHAMDI plant equipment spares and identification
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION

4.18 Industrial Drainage System


EDSD

DATE:

A. GENERAL
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

CONTRACTOR shall connect the industrial drain generated within the facility to the
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

YDH evaporation pond. All industrial drainages shall be treated in the oily water
(DCC) NO. _____________________

treatment system. The industrial oily water treatment system shall consist of but not
limited to an oily water equalization tank, CPI separator, water break tank, two effluent
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 187


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
water pumps (one operating, one spare), two skimmed oil pumps (one operating, one
SAY
SAY
SAY

spare) and necessary instrumentation and interconnecting piping.


ENGG CERT

ASH
ASH
ASH

The oily water treatment system shall be of a complete vendor skid design and the
treatment system shall receive the effluent from the oily water sump via normal flow
LEADS

LEADS
LEADS
ALL

ALL
ALL

pump, main source of oily water will be dewatered effluent from the product storage
tanks. CONTRACTOR shall route the dewatered effluent from the tanks to the oily
water lift stations and then effluent will transfer from normal flow pumps to the
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

equalization tank.

The CPI vendor shall provide the pump to transfer the recovered oil from the CPI to
the slop tank while effluent water to be transferred to the YDH evaporation pond.
DESCRIPTION

CONTRACTOR and CPI system vendor shall ensure that the treated water meets the
effluent water quality requirement for YRC.

The current design considers a permanent drain connection to MARAFIQ industrial


water network; however at a later stage this connection is no longer required. LSTK
Contractor shall delete the industrial drainage from YDH to MARAFIQ outlined in PFD
VA-247846.001 & VA-247848.001 and P&ID VA-247921.001 to VA-247923.001, and
10-02399-
JO/EWO

10-02399-
10-02399-
0001

downside the drain pump.


0001
0001

12/11/16

B. CIVIL
08/04/16

09/08/16
DATE

• Storm water inside the tank farm dikes, plinth areas of pumps and other
process areas, are considered contaminated water. Contaminated water
NO.
REV

D
C
B

shall be collected by standard oily catch basin and will pass through RTR
DISCIPLINE
ENGINEER
pipe connected to the oily water sewer network and conveyed to OWLS.
ALL LEADS

DATE: 12/11/16 • Contaminated water from the tank farm dikes will be controlled by a 10”
PROJECT
ENGINEER diameter gate valve connected to the oily water sewer network. Further, in
A M ALMATROOK case of Major flood/raptor an additional 4” gate valve and 4” pipe branch line
DATE: 12/11/16 with vacuum truck connection shall be provided outside the dike oily water
CERTIFIED
AMR EL SHARKAWY
pipe.
12/11/16
DATE:
• Dewatering from Diesel tanks shall be connected to the Oily water system
CONSTRUCTION
AGENCY from the diked areas. Dewatering from the Kerosene and Gasoline tanks
SHAHZAD YAZDANI
shall be connected to a separate oily water system and conveyed to OWLS.
DATE: 12/11/16

• CONTRACTOR shall provide two (2) Oily water Lift Station wherein the
OPERATIONS
ALI H GHAMDI
OWS inlet pipe will be connected. CONTRACTOR shall assess and re-
12/11/16
DATE: validate the design of the OWS drainage system. The internal wall of the lift
CONTROL NUMBER

stations shall be coated with APCS-3 or better and while the exterior wall
VERIFICATION

shall be coated with APCS-10 on below ground and exterior coating above
EDSD

ground shall be APCS-1B.


DATE:
BY:

• Contractor shall construct a sand separator /trap tank properly designed to


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

retain sand particles from reaching the sump pumps. The oily water
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

network will discharge to the sand separator tank before the OWLS. The
(DCC) NO. _____________________

inlet pipe to the sand separator will include a gate valve indicator O&Y for
the purposes of controlling water entering to the sand separator while
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 188


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
maintenance is performing.
SAY
SAY
SAY

• Each oily water lift station shall be provided with two pumps for normal flow
ENGG CERT

ASH
ASH
ASH

(one operating, one spare) and two pumps for maximum flow (one
operating, one spare). The normal flow pumps will discharge to an oily
LEADS

LEADS
LEADS
ALL

ALL
ALL

water treatment system whereas the maximum flow pump shall discharge
to the Evaporation pond.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

• CONTRACTOR shall provide sealed oily catch basin as per standard


drawing no. AB-036402 and /or drawing no. AC-036078 inside pump
house, scraper area and transformer area. Provide customize sealed catch
basin inside dike area.
DESCRIPTION

• CONTRACTOR shall provide an 8”, 10”, 12” and 16” diameter RTR pipe,
IFE0U, 01-SAMSS-034 for underground oily water gravity sewer.
CONTRACTOR shall re-validate the propose size during detail design
stage. CONTRACTOR shall provide required fittings to complete the
system.

• To prevent fire transferring from an area to another area, the Oily water
network will be connected using sealed inlet oily water manholes following
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

standards and drawings details supplied in civil drawings.


12/11/16
08/04/16

09/08/16


DATE

To prevent that oily water manholes will collapse by sand sedimentation,


the contractor shall construct catch basin lids/grates with means to retain
sand from reaching the pipe network.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER • Provide underground oily water sewer pressure line from oily separation to
ALL LEADS
evaporation pond.
DATE: 12/11/16
PROJECT
ENGINEER • Provide oily water sewer connection from transformer retention channel to
A M ALMATROOK
oily water sewer network.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY • Provide neutralization pit for all battery acid wash water which shall be
12/11/16 connected to oily water sewer network. Neutralization pit shall be coated
DATE:
CONSTRUCTION with, acid resistant material. The pit shall be sized for the expected waste
AGENCY
acid flow and dilution or wash-down water. The pit shall be in a readily
SHAHZAD YAZDANI
accessible location, and shall be vented to the outside. The minimum vent
DATE: 12/11/16
OPERATIONS size shall be 63 mm (2 in) OD as per SAES-S-060 para. 811.9C.
ALI H GHAMDI

12/11/16 • Provide oily water connection from foam skid, fire water pump house,
DATE:
metering skid, CPI separator and all pumps containment area.
CONTROL NUMBER
VERIFICATION


EDSD

Provide clean out at maximum spacing of 30 meter distance and in every


change of direction.
DATE:
BY:

• CONTRACTOR shall consider the latest revision of the Royal Commission


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Environmental Regulations (RCER) in validating the design for Industrial


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Waste.
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 189


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Refer to drawing: CI-A00119 sheet 001-015
SAY
SAY
SAY

• The lift station construction shall be in accordance with ACI 350 as a water
ENGG CERT

ASH
ASH
ASH

tight structure. Concrete compressive strength shall be 34.474 MPa (5000


LEADS

PSI) minimum.
LEADS
LEADS
ALL

ALL
ALL

• LSTK CONTRACTOR shall consider the no. of drain points of tanks as per
P&ID VA-247904-001.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

C. MECHANICAL – ROTATING EQUIPMENT


DESCRIPTION

Oily water sumps at YDH will be provided with following sets of pumps:

1. Oily Water Normal Flow Pumps for OWS -1 & 2


2. Oily Water Maximum Flow Pump for OWS-1 & 2

Each Oily Water Sump will be provided with 02 sets of normal flow pumps and 01
maximum flow pumps. Vertical discharge through column type pumps in
accordance with 31-SAMSS-004 shall be selected for this service. This is due to
the reason that latest update of SAES-G-005 prohibits the use of self-priming
pumps for Oily Water Sump services if flammable liquids are going to be drained to
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

these sumps.
12/11/16
08/04/16

09/08/16

Reference shall be made to Index-G of FEL-3 package for pump datasheets.


DATE

Below are the pump tag numbers and datasheet numbers.


NO.
REV

D
C
B

DISCIPLINE OWS LIFT STATION NO.1 -


ENGINEER
ALL LEADS X40-G-0027 A/B RE-E00110 NORMAL FLOW
DATE: 12/11/16
PROJECT
OWS LIFT STATION NO.1 -
ENGINEER X40-G-0028 RE-E00111 MAXIMUM FLOW
A M ALMATROOK

DATE: 12/11/16 OWS LIFT STATION NO.2 -


CERTIFIED X40-G-0033 A/B RE-E00116 NORMAL FLOW
AMR EL SHARKAWY

DATE:
12/11/16 OWS LIFT STATION NO.2 -
CONSTRUCTION
AGENCY
X40-G-0017 RE-E00117 MAXIMUM FLOW
SHAHZAD YAZDANI .
DATE: 12/11/16
OPERATIONS MISCELLANEOUS REQUIREMENTS
ALI H GHAMDI

DATE:
12/11/16 • Reference shall be made to technical specifications for pumps included in
Index-A of FEL-3 package for further details of these pumps.
CONTROL NUMBER
VERIFICATION
EDSD

• Pump Datasheets provided in FEL-3 package are preliminary only. These will
DATE:

be further verified by CONTRACTOR during detailed design phase of the


BY:

project before issuing for procurement activities.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

• CONTRACTOR shall be responsible for producing equipment datasheet, SIS


(DCC) NO. _____________________

sheets, Noise Datasheets in accordance with SAUDI ARAMCO standard forms


`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 190


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and datasheets.
SAY
SAY
SAY


ENGG CERT

ASH
ASH
ASH

All pumps will be procured by CONTRACTOR from SAUDI ARAMCO approved


manufacturer for each Commodity Classification Code (CCC). SAUDI
LEADS

LEADS
LEADS
ALL

ALL
ALL

ARAMCO will provide the list of approved manufacturers after award of


Contract.
a
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

• CONTRACTOR shall prepare Material Requisition Package for all the pumps
and shall obtain approvals from relevant SAUDI ARAMCO Departments before
issuing to Vendors.
DESCRIPTION

• Material take-offs have been prepared for reference only and will not be
considered as contractual documents and cannot be used as a basis for any
change order.

• Technical quotations obtained from vendors will list all exceptions and /or,
additions to applicable project Drawings and SAUDI ARAMCO Specifications. If
there is no exception to specifications, CONTRACTOR will make a statement
10-02399-
JO/EWO

10-02399-
10-02399-
0001

to that effect.
0001
0001

12/11/16
08/04/16

09/08/16


DATE

CONTRACTOR shall be responsible for Technical Bid Evaluation, placing the


Purchase Order to technically approved Vendors.
NO.
REV

D
C
B

DISCIPLINE • CONTRACTOR shall be responsible for review and approval of NMRs 601, 602
ENGINEER
ALL LEADS and 603.
DATE: 12/11/16
PROJECT
ENGINEER • Inspection and Testing of CONTRACTOR supplied materials will be performed
A M ALMATROOK
as per applicable SAUDI ARAMCO Inspection Requirement form A-175.
DATE: 12/11/16
CERTIFIED CONTRACTOR will arrange with his sub suppliers to comply with these
AMR EL SHARKAWY
requirements by stating on all sub suppliers’ purchase order SAUDI ARAMCO’s
12/11/16
DATE: intention to inspect material.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
• Equipment installation and Commissioning shall be in accordance with
DATE: 12/11/16
OPERATIONS
approved Vendor’s installation and commissioning procedures.
ALI H GHAMDI

DATE:
12/11/16 • Supply of Commissioning and Start-up spares and first fill of all the lubricants
and chemicals is in the scope of CONTRACTOR. CONTRACTOR shall obtain
CONTROL NUMBER
VERIFICATION

approval of Aramco Operations before filling of lubricants and chemicals.


EDSD

DATE:

• CONTRACTOR will provide all Non Material Requirement (NMR-602/603),


BY:

Operation and Instruction Manuals of CONTRACTOR supplied material in


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

electronic format (Latest Acrobat Reader).


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

• CONTRACTOR will provide critical spare parts for CONTRACTOR supplied

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 191


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
items in accordance with SAEP-3101. Contractor will develop list of critical
SAY
SAY
SAY

plant equipment spares and identification


ENGG CERT

ASH
ASH
ASH

D. MECHANICAL- STATIC EQUIPMENT


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall be responsible for supply, procurement, fabrication,


transportation handling, storage at site, erection, inspection, testing and
commissioning of all equipment and packages.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall take necessary precautions in handling the equipment to


prevent any damage during transportation and loading/unloading.
DESCRIPTION

CONTRACTOR shall develop and submit for SAUDI ARAMCO acceptance rigging
plans and transportation calculations for all major equipment.

CONTRACTOR shall supply spreader bars, shackles, and slings for the lifting of
equipment.

All equipment shall be installed and commissioned as per SAUDI ARAMCO


Standards and Manufacturer recommendations.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall be responsible for insulation (where specified on the data


sheet or P&IDs) and fireproofing (where specified on the data sheet or P&IDs).
12/11/16
08/04/16

09/08/16
DATE

All skid packages design shall be vendor proven design. Skid packages shall be
suitable for the specific application by meeting all the process design requirements
NO.
REV

D
C
B

and environmental, safety and Industry standards.


DISCIPLINE
ENGINEER
ALL LEADS

DATE: 12/11/16 Reference Documents for Oily Water Treatment System


PROJECT
ENGINEER Document # Description
A M ALMATROOK EQ-E00030 Datasheet for Oily Water Treatment System
DATE: 12/11/16 EQ-E00009 Technical Specification for Oily Water
CERTIFIED Treatment System
AMR EL SHARKAWY

12/11/16
DATE: CONTRACTOR shall provide oily water treatment package as per above
CONSTRUCTION
AGENCY reference documents.
SHAHZAD YAZDANI

DATE: 12/11/16
OPERATIONS
E. INSTRUMENTATION
ALI H GHAMDI

12/11/16
DATE: CONTRACTOR shall provide and install oil-in-water analyzer at the inlet and outlet
CONTROL NUMBER

of CPI Separator skid as indicated in P & ID and IPL. The skid instrumentation
VERIFICATION

shall be provided by skid vendor.


EDSD

CONTRACTOR shall provide and install field junction boxes to connect CPI skid
DATE:

instrument to DCS for remote monitoring and control.


BY:
REVISIONCERTIFICATION

Provide and install homerun cables from CPI skid X40-X-1101 to remote I/O
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

cabinet located in RIB-2. The cable shall be routed on the cable trays.
(DCC) NO. _____________________

Hydro carbon detectors to be provided at the sump for the oily water sumps.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 192


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Reference drawings
SAY
SAY
SAY

Drawing # Description
ENGG CERT

ASH
ASH
ASH

IN-A00001 System Block Diagrams


LEADS

IN-A00002 Instrument Block Diagrams


LEADS
LEADS
ALL

ALL
ALL

IN-A00027 Instrument Points & Lines


IN-D00201 Instrument Installation Schedule-Flow
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

IN-D00202 Instrument Installation Schedule-Pressure


IN-D00203 Instrument Installation Schedule-Level
IN-D00204 Instrument Installation Schedule-Temperature
DESCRIPTION

IN-D00205 Instrument Installation Schedule-Misc


IN-D00206 Instrument Installation Schedule-MOV/GOV/HOV/AOV
IN-D00207 Instrument Installation Schedule-Relief Valves
IN-A00004 Equipment Layouts
IN-A00003 Cable Routing Plan
IN-D00005 Cable and Conduit Schedule
.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

4.19 GRADING & STORM WATER DRAINAGE


12/11/16
08/04/16

09/08/16

A. CIVIL
DATE

A. CONTRACTOR shall achieve the finish grade level as per required


NO.
REV

D
C
B

design in all the proposed tank farm, all access road areas with fill
DISCIPLINE
ENGINEER as per the requirements specified under SAES-A-114.
ALL LEADS

DATE: 12/11/16 B. CONTRACTOR shall prepare finish grade level in reference to the
PROJECT
ENGINEER latest rough grading drawing.
A M ALMATROOK

DATE: 12/11/16 C. CONTRACTOR shall re-evaluate/validate the design requirement


CERTIFIED and possible improvement on layout design storm water drainage
AMR EL SHARKAWY

12/11/16
system. CONTRACTOR shall evaluate the cost with possible
DATE: provision of concrete channel and box culvert, if necessary in
CONSTRUCTION
AGENCY accordance with SAUDI ARAMCO Engineering Standard, SAES-S-
SHAHZAD YAZDANI 030.
DATE: 12/11/16
OPERATIONS
D. CONTRACTOR shall consider data of rain fall intensity to be used
ALI H GHAMDI
as reference for the propose storm water drainage design based on
12/11/16
DATE: the requirements as per SAES- A-112.
CONTROL NUMBER
VERIFICATION

E. CONTRACTOR shall provide storm water open drain concrete


EDSD

channel trapezoidal/rectangular type to collect surface water outside


DATE:

the tank farm and other unpaved non-process area. The water shall
BY:

flow thru gravity open drain direct the new drain channel outside the
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

plant and tie-in to the future RC storm drain channel.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall assess the final disposal of the accumulated


(DCC) NO. _____________________

storm water considering the Royal Commission Environmental


Regulations.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 193


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

F. CONTRACTOR shall provide box culvert and junction box as


required where channel passes thru road and security fence.
ENGG CERT

ASH
ASH
ASH

G. CONTRACTOR shall establish finished grade and invert elevation of


LEADS

LEADS
LEADS
ALL

ALL
ALL

drain and box culvert as per the project requirements that will
provide more economical concept.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

H. Refer to drawing: CI-A00111 sheet 001-021

I. Storm water inside the tank farm area is considered contaminated


water and will be collected by a separated oily water pipe system
DESCRIPTION

network

4.20 UTILITY WATER SUPPLY

A. CONTRACTOR shall install the utility water pipe network from the
equipment pumps to each building, eye washers, and other
locations where utility water is required. The utility water pipe
10-02399-
JO/EWO

10-02399-
10-02399-
0001

network shall be installed with RTR pipe, 12FEOU, using


0001
0001

appropriate manufacture fittings, valves, connections, reducers, and


manufacturer recommendations for a proper installation.
12/11/16
08/04/16

09/08/16
DATE

B. A control gate valve shall be installed before the connection to each


NO.
REV

D
C
B

building or supply point.


DISCIPLINE
ENGINEER
ALL LEADS C. The Utility water pipe network shall have gate valves for appropriate
DATE: 12/11/16 maintenance for the main pipe and for each section.
PROJECT
ENGINEER

A M ALMATROOK
D. Installation of utility water shall follow SAES S 40, SAES S 70 and
DATE: 12/11/16
pipe line classification.
CERTIFIED
AMR EL SHARKAWY
E. The water pipe network shall be tested using the methodology and
12/11/16
DATE: guidelines of SAES S 70.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI 4.21 SANITARY WASTE WATER
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI A. CONTRACTOR shall install the sanitary waste water network from each
DATE:
12/11/16 building to the lift stations and from the lift stations to the tie-in point
connection to MARAFIQ.
CONTROL NUMBER
VERIFICATION
EDSD

B. The gravity sanitary waste water network to lift stations will be


constructed with 8” diameter RTR pipe, 80FEOD. These will include
DATE:
BY:

the provision of sanitary manholes, cleanouts and other fixtures.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

C. The forced sanitary waste water pipes from the lift stations will be
C

constructed with 3” diameter RTR pipe, 12FEOU. These will include


(DCC) NO. _____________________

the provision of fittings, valves, and flanges.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 194


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

D. Installation of sanitary waste water shall follow SAES S 10 and SAES S


104 where applicable.
ENGG CERT

ASH
ASH
ASH

4.22 OVERALL SITE DEVELOPMENT AND FACILITIES:


LEADS

LEADS
LEADS
ALL

ALL
ALL

• CONTRACTOR shall re-evaluate/validate the design requirement and include


any other possible improvement / requirements not spelled out but are
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

essential on layout design of civil works for bulk plant area, access roads,
traffic scheme, main gate layout and temporary construction facility that
includes but not limited to the following:
DESCRIPTION

• CONTRACTOR shall revalidate and re-establish all the finish grade elevations
in reference to the latest existing topographic survey drawing and to the latest
rough grading drawing.

• CONTRACTOR shall provide concrete sidewalks inside the parking area, Gate
House, E&M Building and other Support Building Facilities as provided and
shown on architectural drawings and site development plan as shown in
drawing no. CI-A00106. The sidewalk shall be 100mm thick concrete provided
with 150x150xMW9xMW9 welded wire fabric (WWF) and shall be in
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

accordance with SAUDI ARAMCO Standard drawing no. AB-036260 sheet 001
rev. 05.
12/11/16
08/04/16

09/08/16
DATE

• CONTRACTOR provide 300 mm thick marl capping inside dike area and 150
mm thick marl capping outside the dike peripheral at all non-paved areas
NO.
REV

D
C
B

including the sleeper areas and future tank foundations/apron/yard areas. Dike
DISCIPLINE
ENGINEER fill material shall comply with SAES-Q-006, sub-base material Class, placement
ALL LEADS and compaction shall be in accordance with SAES-Q-006.
DATE: 12/11/16


PROJECT
ENGINEER CONTRACTOR shall provide and develop a total of forty five (45) shaded
A M ALMATROOK parking slots at E&M building and six (6) parking slots at operation building as
DATE: 12/11/16 shown on the drawing CI-A00106. Likewise, a total of thirty (30) shaded
CERTIFIED
AMR EL SHARKAWY
parking slots shall be provided for visitors outside the security fence. Structural
12/11/16
design detailed calculation of the sunshades shall be submitted by the vendor.
DATE:
CONSTRUCTION
Refer to DA-950182-001
AGENCY
SHAHZAD YAZDANI
• CONTRACTOR shall provide HCIS Category I around the tank farm as shown
DATE: 12/11/16
in drawing CI-A00105. Fence shall be in accordance to the requirements as per
OPERATIONS
SAES-O-202 and SEC-02.
ALI H GHAMDI

12/11/16
DATE: • CONTRACTOR shall provide HCIS Category IV around the Support Facility as
CONTROL NUMBER
VERIFICATION

shown in the drawing CI-A00105. Fence shall be in accordance to the


requirements as per SAES-O-202 and SEC-02.
EDSD

DATE:

• The CONTRACTOR shall provide two (2) access gates.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Provide two (2) 9.0 meters wide double leaf decorative metal gates provided
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

with four (4) units of 4.3 meters long hydraulic crash barrier and 8 inches
(DCC) NO. _____________________

diameter bollards at main security gate house and Tank Farm Gate. Each gate
is designed to have a two (2) lanes security access road. Also, provide two (2)
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 195


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.20 meters single leaf decorative metal gates to be utilized as walkway gate
SAY
SAY
SAY

where each located at main entrance and exit gates. Four (4) Drop arms shall
be provided also in each gate. Two (2) shall be installed at the entry lane and
ENGG CERT

ASH
ASH
ASH

the other Two (2) shall be installed at the exit lane.


LEADS

LEADS
LEADS
ALL

ALL
ALL

• CONTRACTOR shall provide turnstile for pedestrian entry and exit access.

• Provide type IV perimeter fence with 4.0 meters wide double leaf drive gate for
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

each heel recovery drum location. The perimeter fences shall be in accordance
with all the requirements specified in SAES-M-006 and referenced as per
SAUDI ARAMCO Standard drawing no. AB-036677 sheet 001 rev. no. 002.
DESCRIPTION

• Provide 5.0m wide lay bay for heel recovery drum/product recovery drum for
truck access.

• Provide non-mountable curb and curb & gutter. curb & gutter shall be in
reference to standard drawing AB-036260-001 rev. 005

• Pavement arrow markings shall be in reference as per standard drawing no.


AD-036512 sheet 001 rev. 00.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

• CONTRACTOR shall provide check point of Facility Security Forces (FSF)


12/11/16
08/04/16

09/08/16
DATE

before the SAUDI ARAMCO main gate. FSF facility shall comply all the
Security requirements, not limited to the following:
NO.
REV

D
C
B

DISCIPLINE
1. FSF Support Building
ENGINEER 2. FSF Sunshade
ALL LEADS
3. FSF shaded parking for FSF guards
DATE: 12/11/16
PROJECT
4. Armor Vehicle shed
ENGINEER 5. Non-Electrical Utility (Water & Sanitary)
A M ALMATROOK

DATE: 12/11/16 VISITOR PARKING ASPHALT PAVEMENT:


CERTIFIED
AMR EL SHARKAWY

12/11/16 CONTRACTOR shall develop design traffic scheme for adequate


DATE:
CONSTRUCTION
maneuvering and clearances at the parking area.
AGENCY
SHAHZAD YAZDANI

DATE: 12/11/16
a. CONTRACTOR shall develop detail design of storm water flow in all the
OPERATIONS
asphalt paved area including applicable storm drain system and surface
ALI H GHAMDI
drain with proper slope.
12/11/16
DATE:
CONTROL NUMBER

b. Provide 100mm thick concrete side walk provided with


VERIFICATION

150x150xMW9xMW9 welded wire fabric (WWF) and shall be in


EDSD

accordance, as applicable, as per SAUDI ARAMCO Standard drawing


DATE:

no. AB-036260 sheet 001 rev. 05.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

c. Provide curb stone with gutter as per SAUDI ARAMCO standard


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

drawing as stated above.


(DCC) NO. _____________________

d. Provide adequate standard traffic regulatory signs (stop signs,


`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 196


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
prohibited signs, yield signs, speed limit signs) and informative signs
SAY
SAY
SAY

showing the direction of bulk plant and access road. Use thermoplastic
paint for road markings.
ENGG CERT

ASH
ASH
ASH

1. Yellow paint line with 200mm wide on walkway edge paint line
LEADS

LEADS
LEADS
ALL

ALL
ALL

2. White paint line with 120mm wide for car parking interval
(separation)
3. White paint line with 500mm wide for stop line
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

4. Regulatory/directional sign board shall be 1.10 meter diameter with


steel post which approximately 2.0 meters high with respect to the
finish grade/road level and to include its foundation.
5. Informative sign board shall be 1.20mx1.20m boards with steel post
DESCRIPTION

which approximately 2.0 meters high with respect to the finish


grade/road level and to include its foundation.

Parking stall layout and wheel stop detail and pavement arrows and
cross walk markings shall be in reference as per standard drawing nos.
DD-950107 sheet 001 rev. 00 and AD-036512 sheet 001 rev. 00
respectively. Likewise, miscellaneous parking related work like
installation of parking bumpers etc. shall refer to standard drawing no.
AE-036254-001
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

MAIN ACCESS AND IN-PLANT ROAD:


12/11/16
08/04/16

09/08/16
DATE

The Plant Access Road traffic scheme shall include but not limited to the
following:
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
• CONTRACTOR shall provide access to the bulk plant that includes necessary
ALL LEADS traffic signs, road markings and sign board as per standard. Plant access roads
DATE: 12/11/16 shall refer to all applicable requirements as per SAES-Q-006, SAES-A-114 and
PROJECT
ENGINEER AASHTO requirements as required.
A M ALMATROOK

DATE: 12/11/16 • CONTRACTOR shall provide drop gates (drop arms) for vehicles control for
CERTIFIED both entrance and exit road lines
AMR EL SHARKAWY

12/11/16
DATE: • The road asphalt structure for 7.0 meter internal road is comprises of the
CONSTRUCTION
AGENCY following materials as per SAES-Q-006;
SHAHZAD YAZDANI

DATE: 12/11/16 1. 50mm thick asphalt concrete wearing/surface course, Class B,


OPERATIONS
2. 90mm thick asphalt concrete binder course, Class B, and provided with
ALI H GHAMDI
Tack Coat, RC-250, on top surface of the binder course
12/11/16
DATE: 3. 230mm thick aggregate base course with provision of prime coat, MC-
CONTROL NUMBER

70, on top surface of the aggregate base course


VERIFICATION

• CONTRACTOR shall Utilize CBR test values given in geotechnical report 2015/104
EDSD

in order to finalize the road structure.


DATE:
BY:

• Filling materials for road subgrade shall comply with SAES Q 006 chapter 5.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Pavement materials shall comply with SAES Q 006 chapter 5.


(DCC) NO. _____________________

• Adequate soil stabilization methods and drainage shall be provided for all
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 197


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
access roadways in order to prevent the erosion or flooding of project road
SAY
SAY
SAY

ways.
ENGG CERT

ASH
ASH
ASH

• Provide adequate standard traffic regulatory signs (stop signs, over-taking


prohibited signs, yield signs, speed limit signs) and informative signs showing
LEADS

LEADS
LEADS
ALL

ALL
ALL

the direction of bulk plant and access road. Use thermoplastic Paint for road
markings.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

1. Yellow paint line with 200mm wide on edge line

2. Regulatory/directional sign board shall be 0.90 meter diameter with


steel post which approximately 2.0 meters high with respect to the finish
DESCRIPTION

grade/road level and to include its foundation.

• Pavement arrow markings shall be in reference as per standard drawing no.


AD-036512 sheet 001 rev. 00.

• Provide adequate standard traffic regulatory signs (stop signs, over-taking


prohibited signs, yield signs, speed limit signs) and informative signs showing
the direction of bulk plant and access road. Use thermoplastic Paint for road
markings. Pavement arrow markings shall be in reference as per standard
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

drawing no. AD-036512 sheet 001 rev. 00.


12/11/16


08/04/16

09/08/16

Provide 6.0m wide access ramps crossing the dike wall to all tanks.
DATE

• Provide ramp for culvert crossing with adequate slope.


NO.
REV

D
C
B

DISCIPLINE
ENGINEER
ALL LEADS
EXTERNAL PATROL Road
DATE: 12/11/16
PROJECT
ENGINEER CONTRACTOR shall re-evaluate/validate the design requirement and include
A M ALMATROOK any other possible improvement/ requirements on layout design of access
DATE: 12/11/16 road, in plant road traffic scheme that includes but not limited to the following:
CERTIFIED
AMR EL SHARKAWY

12/11/16 • Provide 4.6 meters wide external asphalt concrete patrol road shall comprise of
DATE:
CONSTRUCTION
the following structure.
AGENCY
SHAHZAD YAZDANI
1. 50mm thick asphalt concrete wearing/surface course, Class B,
DATE: 12/11/16
OPERATIONS
2. 70mm thick asphalt concrete binder course, Class B, and provided with
ALI H GHAMDI
Tack Coat, RC-250, on top surface of the binder course
12/11/16
150mm thick aggregate base course with provision of prime coat, MC-
DATE:
70, on top surface of the aggregate base course.
CONTROL NUMBER
VERIFICATION

4.23 Process Automation & Controls


EDSD

DATE:

Process Automation shall ensure safe and reliable operation of YDH operations. The
BY:

PCS overview is shown in System Block Diagram IN-A00001.001/002 and Equipment


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

layout IN-A00004.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

The functionality of the major process automation is summarized below:

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 198


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

TMS System
ENGG CERT

ASH
ASH
ASH

• The project shall provide the YDH with a TMS system installed in the
Operation Building, complete with operator workstations, engineering
LEADS

LEADS
LEADS
ALL

ALL
ALL

workstations, servers, and printers, in compliance with SAES-Z-008.


• The TMS system shall be capable of monitoring and controlling
operations associated with product storage tanks, products receipt from
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

refineries and product transfer via pipeline, pumping manifolds, shipper


pumps, booster pumps, and auxiliary systems.
• The TMS shall be interfaced to DCS, ESD, CMS, VMS and RTG
DESCRIPTION

systems.
• The TMS shall include Human-Machine Interface (HMI) and software
capable of providing functions such as; graphic displays with real-time
process data, alarm summaries, trends and displays of historical data.
• The TMS system comprising of DCS & ESD shall be as per the
Function Specification IN-E00017.
10-02399-
JO/EWO

10-02399-
10-02399-

TMS-Distributed Control System (DCS)


0001

0001
0001

• CONTRACTOR shall provide a DCS for control and monitoring of YDH


12/11/16
08/04/16

09/08/16
DATE

facility.
• The DCS system cabinet, I/O and marshalling cabinets shall be
installed in the rack room of O &M building, and in addition the project
NO.
REV

D
C
B

DISCIPLINE shall provide remote I/O cabinets in remote instrument buildings (RIB).
ENGINEER
ALL LEADS • The DCS shall provide regulatory control and supervisory monitoring
DATE: 12/11/16 YDH operations including product pipeline batch receipts, sequencing of
PROJECT
ENGINEER manifold valve line-ups, pump permissive/interlocks, tankage operations
A M ALMATROOK
and batch management operations.
DATE: 12/11/16
CERTIFIED • The DCS shall provide interface to PLC and Third Party Packages, in
AMR EL SHARKAWY
accordance with SAES-Z-001.
12/11/16
DATE: • PCS components that require time synchronization shall be time
CONSTRUCTION
AGENCY synchronized with a master Network Time Protocol (NTP) server such
SHAHZAD YAZDANI
as GPS server.
DATE: 12/11/16
OPERATIONS • Refer system block diagram IN-A00001.001 details.
ALI H GHAMDI

12/11/16
DATE: TMS-Emergency Shutdown System (ESD)
CONTROL NUMBER
VERIFICATION

• A stand-alone ESD shall be provided for safe start-up, operation and


EDSD

shutdown of the plant.


• ESD pushbuttons station shall be provided on Operator console.
DATE:
BY:

• The ESD system, I/O, and marshaling cabinets shall be installed in the
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________

rack room of O& M building and in addition the project shall provide
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

remote I/O cabinets in remote instrument buildings (RIB)


(DCC) NO. _____________________

• The ESD shall provide for the safe and orderly shutdown and isolation

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 199


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
of processes in the event of pre-determined conditions. YDH storage
SAY
SAY
SAY

tanks shall be equipped with independent high-high level instruments


ENGG CERT

ASH
ASH

hardwired to the ESD. The ESD shall be capable of providing storage


ASH

tank isolation via the tank inlet valves.


LEADS

LEADS
LEADS
ALL


ALL
ALL

Activation of ESD system shall not cause activation of any fire


protection system at the respective area.
• The communication between ESD-DCS shall be via dedicated
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

redundant communication paths.


• Refer system block diagram IN-A00001.001 details.
DESCRIPTION

Data Interface with Third-Party Process Automation Systems


• The DCS shall interface with the third-party Process Automation
systems to view data points from (a) YASREF, (b) SAMREF, (c) Yanbu
Refinery Terminal. CONTRACTOR shall be responsible for
modifications of third party Process Automation systems at the Source.
• The CONTRACTOR shall utilize the FOC that is been laid between the
Refineries and YDH, to transfer the data points related to CMS, Pumps
and valve status and tank status.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

• This Contractor shall provide PCS hardware and services required to


integrate new instrumentation in the respective refinery control system.
12/11/16
08/04/16

09/08/16
DATE

• The proper selection of TMS-DCS for the control and logic functions is
required to operate YDH in order to interface with the PCS system at
NO.
REV

D
C
B

source refineries, keeping in mind that SAMREF has Invensys I/A


DISCIPLINE
ENGINEER series, YASREF has Yokogawa DCS system and Yanbu Refinery is
ALL LEADS
using Honeywell DCS system. It is the responsibility of LSTK Contractor
DATE: 12/11/16
PROJECT
to make sure that an appropriate system is selected for YDH which can
ENGINEER
be integrated with the existing systems in other refineries.
A M ALMATROOK

DATE: 12/11/16
This will require a dedicated effort by the LSTK vendor to bring on board
CERTIFIED Yokogawa and Honeywell and discuss with them if their systems is
AMR EL SHARKAWY

12/11/16
capable of integrating with the existing systems currently in operation in
DATE:
CONSTRUCTION
other refineries.
AGENCY
• The data connection with respective refinery is shown in block diagrams
SHAHZAD YAZDANI

DATE: 12/11/16
IN-A00001.004/007/008. LSTK in conjunction with respective PCS
OPERATIONS vendor shall further evaluate the data interface during detail design
ALI H GHAMDI phase
12/11/16
DATE:
CONTROL NUMBER

Fire Detection System


VERIFICATION
EDSD

Addressable fire alarm system shall be provided consisting of smoke


detectors, heat sensors, and manual pull stations wired through to Local
DATE:
BY:

Fire Alarm Panels (LFAP) in each building. Zone alarms and trouble
alarms shall be wired from each LFAP to a Master Fire Alarm Control
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Panel (MFACP) located in YDH control room. Common fire, ground fault
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

indication and common fault alarms shall be transmitted from the


(DCC) NO. _____________________

MFACP to the DCS via redundant communication interface such as

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 200


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
MODBUS or TCP/IP. Interiors of floor-mounted Input/Output, DCS,
SAY
SAY
SAY

ESD, uninterrupted power supply (UPS), and other digital cabinets


containing power supplies shall be monitored by an addressable high-
ENGG CERT

ASH
ASH
ASH

sensitivity air-sampling or point-type smoke detection system. Design


and drawings shall be duly endorsed by Certified Fire Protection
LEADS

LEADS
LEADS
ALL

ALL
ALL

Engineer.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Vibration Monitoring System (VMS)


The shipper and booster pumps and motors shall be provided with a VMS
consistent with SA standards and operating practice. The project shall meet
DESCRIPTION

the below requirements as a minimum:


• Vibration and temperature sensors, wiring and appropriate VMS
monitoring cards shall be provided.
• Shutdown outputs from the VMS shall be hardwired to the ESD to
protect the rotating equipment operation.
• The new VMS equipment shall have Modbus serial or TCP/IP
communication links with DCS for monitoring and control.
• The VMS racks with cabinets shall be installed in RIB-1 & 2 to
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

monitoring VMS signals from shipper and booster pump stations. VMS
workstation shall be installed in Operation building engineering room
12/11/16
08/04/16

09/08/16
DATE

• Refer system block diagram IN-A00001.006 details.


• VMS shall be as per IN-E00018 FSD
NO.
REV

D
C
B

DISCIPLINE
ENGINEER Radar Tank Gauging System (RTG)
ALL LEADS

DATE: 12/11/16
PROJECT • Radar Tank Gauging shall be provided for tank level measurements,
ENGINEER

A M ALMATROOK
temperature data, and total tank inventory calculations. The RTG shall
DATE: 12/11/16
include Human Machine Interfaces (HMI) located in the O & M building,
CERTIFIED and shall include a redundant interface with the DCS.
AMR EL SHARKAWY

12/11/16 • Radar tank gauging system shall be provided with temperature


DATE:
CONSTRUCTION compensated level measurement. Pressure transmitters shall be
AGENCY
SHAHZAD YAZDANI
provided to compute the product density.
DATE: 12/11/16 • Field Communication Units and RTG network devices shall be designed
OPERATIONS considering the future expansions and the RTG network components
ALI H GHAMDI
installed in rack room of OME building.
12/11/16
DATE: • Refer system block diagram IN-A00001.005 details.
CONTROL NUMBER


VERIFICATION

RTG shall be as per IN-E00019 FSD


EDSD

DATE:

Batch Transfer Metering System


BY:

• Batch Detection system shall be part of TMS-DCS to detect the grades


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

of gasoline that is being transferred to/from the YDH. The requirement


C

of standalone Batch tracking system shall be further evaluated during


(DCC) NO. _____________________

detail design.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 201


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• This project shall incorporate best automation practice for the product
SAY
SAY
SAY

transfer to/from YDH. The process automation systems will provide for
ENGG CERT

ASH
ASH
ASH

automated transfer of product batches to/from YDH.


• This project shall optimize interfaces to provide a safe, reliable, and
LEADS

LEADS
LEADS
ALL

ALL
ALL

cost-effective means of managing batch transfers. This application


allows control over motorized valves, pumps, and other equipment
associated with control of products receipt and transfer. It shall also
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

interface with the historian server for long-term data retention

Custody Metering Systems (CMS)


DESCRIPTION

BI-10-02399 CONSTRUCTION CONTRACTOR shall provide for custody


metering systems to measure refined product transfers involving third party.
This project shall make the following provisions:
• YASREF products transfer to YDH: Custody transfer metering shall be
provided by BI-10-00043. This project shall provide interface with
custody metering system (CMS) located at YASREF CCR.
• SAMREF products transfer to YDH:. The CMS shall include a complete
10-02399-

packaged flow computer, PLC, and metering supervisory computer


JO/EWO

10-02399-
10-02399-
0001

0001
0001

(MSC).
• Yanbu’ Distribution Hub : This project shall provide complete CMS flow
12/11/16
08/04/16

09/08/16
DATE

computers, PLC’s, and MSC. The detailed requirement of MSC shall be


determined during detail design, however, the following provides the
NO.
REV

D
C
B

basis for detailed requirement.


DISCIPLINE
ENGINEER o The MSC shall be a packaged unit consisting of MSC Operator
ALL LEADS
workstations, flow computer (FC), PLC’s, and system printers.
DATE: 12/11/16
PROJECT The MSC shall be designed such that it permits easy addition of
ENGINEER

A M ALMATROOK
future flow meters, flow computers, logic controller input/output
DATE: 12/11/16 cards, etc. The system shall be composed, to the maximum
CERTIFIED
AMR EL SHARKAWY
extent possible, of standard hardware, systems software, and
12/11/16 firmware that can be configured to meet the stated objectives.
DATE:
CONSTRUCTION The system shall allow for upgrade of system operating software
AGENCY
SHAHZAD YAZDANI
on all redundant modules of the system without impact on
DATE: 12/11/16 process operations.
OPERATIONS
ALI H GHAMDI
The custody metering system shall comprise of the following:
DATE:
12/11/16 a) FC’s
CONTROL NUMBER

b) PLC
VERIFICATION

c) MSC
EDSD

d) MSC Operator workstations


DATE:
BY:
REVISIONCERTIFICATION

o The redundancy of MSC system shall comply with SA


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

standards.
(DCC) NO. _____________________

o The flow measurement elements, meter run size, and number of


runs should be optimum based on the requirement of flow rate
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 202


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and duty.
SAY
SAY
SAY

o Densitometer skid shall be provided.


ENGG CERT

ASH
ASH

This project shall provide a common meter prover for P91/95,


ASH

o
DO and a separate prover for DPK at the Sources.
LEADS

LEADS
LEADS
ALL

ALL
ALL

o This project shall install new flow computers with the latest
technology flow meters suitable for process fluid and required
delivery flow rates.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

o The PLC provided by this project shall be redundant and at a


minimum perform the following functions:
DESCRIPTION

• Operation of all the meter system’s MOV’s


• Various functions pertaining to interlocks, line-up logic,
valve sequencing control and monitoring alarm points
• Redundant I/O and devices that execute control
interlocks
• The HMI provided by this project shall have a configurable Graphic
User Interface (GUI) comprising of video displays and accessories,
operator control selections, report printing, trending and alarm
10-02399-
JO/EWO

10-02399-
10-02399-
0001

capabilities. At a minimum, the MSC’s shall provide the following


0001
0001

functions:
12/11/16
08/04/16

09/08/16

a) Be capable of reading and collecting all metering and


DATE

process data and valve status from the flow computer, PLC,
and sampling system via MODBUS or TCP/IP protocol link.
NO.
REV

D
C
B

DISCIPLINE b) The HMI’s shall automatically initiate all the valve


ENGINEER
ALL LEADS sequencing operations and associated activities after a
DATE: 12/11/16 meter is selected for proving by the operator,
PROJECT
ENGINEER c) Configurable color video displays with accessories shall
A M ALMATROOK provide the required graphics for display of the meter runs,
DATE: 12/11/16
CERTIFIED
automatic sampling system, and (when required) additional
AMR EL SHARKAWY piping process piping and valves.
DATE:
12/11/16 d) Shall be capable of integrating to Refinery Control system for
CONSTRUCTION
AGENCY
monitoring the metering parameters.
SHAHZAD YAZDANI • Refer system block diagram IN-A00001.003 details.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI Management Information Systems

12/11/16
DATE: The MIS shall be comprised of a Plant Information (PI) Server that runs
CONTROL NUMBER
VERIFICATION

Oil System Incorporation (OSI) PI software. The PI Servers shall act as


EDSD

a data buffer/storage device and is interfaced to the DCS HMI for data
retrieval. The PI Server shall be located in the rack room and connected
DATE:
BY:

to OSPAS through the Saudi Aramco corporate backbone.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Enterprise Systems
(DCC) NO. _____________________

• The project shall provide an OSI PI system with an interface to the

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 203


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DCS. The OSI PI system shall obtain data from the DCS for
SAY
SAY
SAY

transmission to OSPAS over the Saudi Aramco Wide Area Network.


ENGG CERT

ASH
ASH
ASH

Process Automation Networks (PAN) & Systems Security


LEADS

LEADS
LEADS
ALL

ALL
ALL

• The project shall provide all security systems required to protect the
process automation networks and systems against cyber threats. The
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL

security systems shall comply with SA standards.


ISSUED FOR 90% PROJECT PROPOSAL

• The project shall provide DMZ in compliance with SAES-T-566/SAEP-


99. Data diodes shall be provided for data security for every
interface with third parties and Corporate network.
DESCRIPTION

Equipment Rack Room


Equipment Rack room shall be located in Operation building. Rack room shall
serve as the termination and internal distribution point for field instrumentation
wiring. The rack room shall be unmanned and shall be equipped with HVAC
systems and UPS systems. The rack room shall house the following
equipment:
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

• TMS-DCS Servers (Redundant)


• DCS System, FTA & Marshalling Cabinets
12/11/16
08/04/16

09/08/16
DATE

• ESD System, FTA & Marshalling Cabinets


• Cabinets for RTG network components and server
NO.
REV

D
C
B

DISCIPLINE • PSA System Cabinets



ENGINEER
ALL LEADS LAN cabinets etc.
DATE: 12/11/16 • Other Servers as shown in drawing IN-A00001.001.
PROJECT
ENGINEER
Cabinet mounted workstations (where applicable) with KVM switches shall be
A M ALMATROOK
utilized. All field wiring with the exception of Automation communication links
DATE: 12/11/16
CERTIFIED shall be terminated inside marshaling cabinets in accordance with SAES-J-902;
AMR EL SHARKAWY and, all incoming cables must be sealed in accordance with Section 15.4 of
DATE:
12/11/16 SAES-P-104. Refer drawing IN-A00004.002 for preliminary cabinet layout.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Engineering Room
DATE: 12/11/16
OPERATIONS All Engineering workstation shall be located in engineering room of Operations
ALI H GHAMDI building. The engineering workstations such as DCS/ESD/VMS/RTG are to be
12/11/16 installed in this room as shown in drawing IN-A00001.001
DATE:
CONTROL NUMBER
VERIFICATION

Operations Room
EDSD

The process automation requirements of the Operations Room, Equipment


Rack Room and Engineering Room are as follows:
DATE:
BY:

The Operations Room shall be designed within the Operations building. The
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

HMI console shall be provided to control the facility. The Operations Room
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

shall house operator workstations, Printers, FACP, PSA workstation, RTG


(DCC) NO. _____________________

workstation etc.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 204


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The Operations Room shall be designed so that only activities associated with
SAY
SAY
SAY

plant control are performed there. The operation room shall be engineered to
accommodate future planned expansion.
ENGG CERT

ASH
ASH
ASH

The building shall be located to minimize the risk of external damage from fires,
LEADS

LEADS
LEADS
ALL

ALL

explosions, or toxic releases per SAES-B-014 and shall provide essential


ALL

administrative facilities necessary to support the continuous operation of the


YDH.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Refer drawing IN-A00004.001 for preliminary layout.

Remote Instrument Building (RIB)


DESCRIPTION

The project shall provide minimum two (2) remote instrument buildings at the
location indicated in the Plot Plan. The RIB shall house the following as
minimum:
• Remote I/O with FTA & marshalling cabinets for DCS.
• Remote I/O with FTA & marshalling cabinets for ESD.
• Vibration Monitoring System (VMS) racks in cabinets.
• F & G instrumentation & UPS
10-02399-
JO/EWO

The buildings shall be designed considering the future expansions. All


10-02399-
10-02399-
0001

0001
0001

incoming cables must be sealed in accordance with Section 15.4 of SAES-P-


104. The number of cabinets and I/O required for each RIB shall be defined
12/11/16
08/04/16

09/08/16
DATE

during FEL-3 stage.


NO.
REV

D
C
B

Refer drawing IN-A00004.003/004 for preliminary cabinet layout.


DISCIPLINE
ENGINEER
ALL LEADS
4.24 INTEGRATED SECURITY SYSTEM
DATE: 12/11/16
PROJECT
ENGINEER
Purpose
A M ALMATROOK

DATE: 12/11/16
CERTIFIED The purpose of this budget item is to provide an integrated Security System at
AMR EL SHARKAWY the new Yanbu Distribution Hub. The Security System is composed of the
DATE:
12/11/16 following sub-systems:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
a) Security Access Control System (SACS)
DATE: 12/11/16
OPERATIONS
b) Plate Recognition System (PRS)
ALI H GHAMDI
c) Intrusion Detection and Assessment System (IDAS) / Long Range
12/11/16
DATE: Detection and Assessment System (LRDAS)
CONTROL NUMBER
VERIFICATION
EDSD

The PRS System equipment shall be installed at the YDH Main Gatehouse;
The SACS systems shall be installed at the YDH Tank Farm Gatehouse. The
DATE:
BY:

IDAS cameras and field sensors shall be installed in the Yanbu Distribution
REVISIONCERTIFICATION

Hub perimeter to provide full perimeter fence coverage intrusion detection and
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

assessment. CCTV will also encompass the monitoring of Main Gatehouse,


C

Computer Gatehouse and Security Support Building.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 205


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Present Situation
SAY
SAY
SAY

Yanbu Distribution is a grass-root plant with no existing interconnection to any


ENGG CERT

ASH
ASH
ASH

existing facilities. The combined IDAS/LRDAS system shall be installed along


the approximately 5.5 km perimeter fence.
LEADS

LEADS
LEADS
ALL

ALL
ALL

The Yanbu Distribution Hub IDAS/LRDAS system remote monitoring and


control equipment will be installed in the existing Yanbu Regional Security
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Control Center (RSCC).

Related Documents
DESCRIPTION

The following Functional Specification Document (FSD) describes the design


requirements and equipment characteristics for each of the security system as
stated above:

a) GENE0006067 Functional Specification Document - IDAS/LRDAS

b) GENE0007042 Functional Specification Document - PRS

c) GENE0008041 Functional Specification Document - SACS


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

12/11/16
08/04/16

09/08/16
DATE

PROJECT OBJECTIVES
NO.
REV

General
D
C
B

DISCIPLINE
ENGINEER
ALL LEADS This project shall provide a Security Access Control System (SACS) for access
DATE: 12/11/16 control functions, sensor management and monitoring functions. The system
PROJECT
ENGINEER shall interface to the SAUDI ARAMCO Identification System, SAUDI ARAMCO
A M ALMATROOK Active Directory and IDAS.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY The SACS system automatically controls access to the processing facilities.
12/11/16 The SACS is located at the Tank Farm Gatehouse entrance. The system is
DATE:
CONSTRUCTION
AGENCY comprised of card readers on the turnstiles and drop gate for vehicles, SACS
SHAHZAD YAZDANI servers and storage equipment, display and logging devices, single entry
DATE: 12/11/16 device interfaces/controllers. Intercoms and communications interfaces,
OPERATIONS
ALI H GHAMDI
relational databases and data extraction and reporting capabilities.
12/11/16
DATE:
The SACS system shall be connected to the central SAUDI ARAMCO SACS
CONTROL NUMBER
VERIFICATION

system located in Dhahran through the corporate data network.


EDSD

DATE:

This project shall provide a Plate Recognition System (PRS) and CCTV camera
BY:

will also be provided. The PRS also monitors public vehicles accessing the
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

outer Main Gatehouse. The system consists of fixed cameras, illuminators,


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

detector sensors, and computer software for intelligent vehicle license plate
(DCC) NO. _____________________

recognition capabilities.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 206


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

The project shall provide an Intrusion Detection and Assessment System


ENGG CERT

ASH
ASH

(IDAS)/ Long Range Detection and Assessment System (LRDAS) to monitor,


ASH

detect, assess, trace and video record intrusion alarm situations.


LEADS

LEADS
LEADS
ALL

ALL
ALL

The IDAS/LRDAS equipment shall be remotely controlled by Yanbu RSCC and


locally controlled in Tank Farm Gatehouse of YDH. The system includes control
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

and monitoring of all the IDAS/LRDAS field equipment.

The IDAS system provided shall monitor the approximately 5.5 kilometer
DESCRIPTION

perimeter fence and critical gates. The IDAS/LRDAS shall be integrated with
the existing C2I system of the existing Yanbu Regional Security Center.

The MIDS sensor shall detect intrusion and transmit data to Yanbu Regional
Security Control Center (YNBRSCC). Failure of one of the field devices
connected to the communications network shall not affect the ability of the
system. Communication network shall be supplied in one-to-one redundant
configuration with automatic changeover.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

The project shall design Shelters and Field Equipment Cabinets to house the
12/11/16

IDAS/LRDAS electronics and network interface equipment. The Security


08/04/16

09/08/16
DATE

Equipment Building shall house the Security System Servers, recorders,


Workstations, Fiber Optic Network termination and related security equipment
NO.
REV

D
C
B

DISCIPLINE
for IDAS/LRDAS, SACS and PRS.
ENGINEER
ALL LEADS

DATE: 12/11/16
DESIGN OBJECTIVES
PROJECT
ENGINEER

A M ALMATROOK Intrusion Detection & Assessment System (IDAS)/ Long Range


DATE: 12/11/16 Detection and Assessment System (LRDAS)
CERTIFIED
AMR EL SHARKAWY

12/11/16 The IDAS system has different types of distinct field sensor technologies for
DATE:
CONSTRUCTION intrusion detection:
AGENCY
SHAHZAD YAZDANI

DATE: 12/11/16 • CCTV which consists of Fixed and PTZ cameras installed along the
OPERATIONS perimeter fence to ensure full coverage of the plant so as to secure it from
ALI H GHAMDI
possible intruders.
12/11/16
DATE:
CONTROL NUMBER

• Microwave Intrusion Detection System (MIDS) which is installed in the


VERIFICATION
EDSD

“sterile” area between the Category 1/Outer fence and the SAUDI
ARAMCO Type III/Inner fence. Sterile area measures 8 meters from the
DATE:
BY:

Outer fence to the Inner fence.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

The distance between the poles will be reduced for areas in the site where
(DCC) NO. _____________________

there are curves and/or corners to ensure no “dead” zones within the area. The

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 207


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
final number of MIDS pairs shall be determined during the detail design.
SAY
SAY
SAY
ENGG CERT

ASH
ASH

For the assessment part, fixed color day/night cameras with at least 5 meter
ASH

high poles with vari-focal lens located in parallel to the perimeter fence and
LEADS

LEADS
LEADS
ALL

ALL
ALL

spaced at a maximum distance 75 meters apart for straight line fence. The
distance between the poles will be reduced for areas in the site where there are
curves and/or corners to ensure no “dead” zones of the “sterile” area. Based on
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

this, it is estimated that the project will utilize approximately 82 fixed cameras.
The final number of fixed cameras will be determined during the detail design
phase.
DESCRIPTION

Pan Tilt Zoom (PTZ) day/night cameras with at least 7 meter high poles facing
perpendicularly to the perimeter fence, set at approximately 300m apart, no
“dead” zones between the camera coverage. Based on this, it is estimated that
the project will utilize approximately 18 PTZ cameras. The final number of
cameras will be determined during the detail design.

For the traceability part of the IDAS/LRDAS, the project shall provide the
10-02399-
JO/EWO

10-02399-
10-02399-

following:
0001

0001
0001

• Network Video Recorders (NVR) with Raid 5 hard disks to


12/11/16
08/04/16

09/08/16

record in real time all video signals from fixed and PTZ cameras.
DATE

The Video Recording systems shall record 5-60 seconds of pre


alarm and 5-60 seconds of post alarm video for the
NO.
REV

D
C
B

DISCIPLINE corresponding cameras.


ENGINEER
ALL LEADS

DATE: 12/11/16
For integrating all these technologies, the project shall provide the following:
PROJECT
ENGINEER

A M ALMATROOK • Alarm Management Software (AMS) with Servers to be installed


DATE: 12/11/16 at the Security Support Building.
CERTIFIED
AMR EL SHARKAWY

DATE:
12/11/16 • Approximately 94 Field Equipment foundations and 94 cabinets
CONSTRUCTION
AGENCY
IP 66/NEMA 4X type with ancillary hardware for mounting.
SHAHZAD YAZDANI

DATE: 12/11/16 • Industrial grade Ethernet switches with dual fiber optic uplink for
OPERATIONS
communications redundancy.
ALI H GHAMDI

12/11/16
DATE:
• Digital Input/output units for signal aggregation and onward
CONTROL NUMBER
VERIFICATION

processing.
EDSD


DATE:

Patch panels, racks and other ancillary hardware.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Provide Alarm Management Software (AMS) system with redundant


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

servers and applications located in the Security Support Building. The AMS
(DCC) NO. _____________________

shall function as follows:

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 208


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

• It shall integrate different IDAS sensors subsystem technologies


ENGG CERT

ASH
ASH
ASH

to manage the alarms such as intrusion/detection, fault and


tamper.
LEADS

LEADS
LEADS
ALL

ALL
ALL

• It shall integrate the relevant site Graphical User Interface (GUI),


NVR’s, PTZ control and Video Wall display for operator
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

functionality.

• It shall provide the infrastructure to function in a real time


DESCRIPTION

environment by being capable to report an alarm within 1


second of the detection system resulting from a sensor and/or
communications equipment digital output (DO) such as a relay
or an alarm data packet.

• It shall have the capability to monitor its sensor subsystems and


related communication hardware via Simple Network
Management Protocol (SNMP) or similar function and report in a
10-02399-
JO/EWO

10-02399-
10-02399-
0001

log.
0001
0001

12/11/16
08/04/16

09/08/16


DATE

It shall have the capability for the application to switch-over from


the primary to the secondary server at a maximum 1 second
with no loss of field alarms.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
ALL LEADS • Given proper communication hardware, the AMS application and
DATE: 12/11/16 its servers shall be redundant and able to switch-over from the
PROJECT
ENGINEER primary to the secondary server at a maximum 1 second. The
A M ALMATROOK
redundancy doesn’t apply to the Operating system since a fault
DATE: 12/11/16
CERTIFIED
in one will render the secondary server also non-functional.
AMR EL SHARKAWY

12/11/16
DATE: The perimeter fence shall be divided into physical zones. The zone size
CONSTRUCTION
AGENCY shall be adjusted within a range of 30-150 meters to accommodate
SHAHZAD YAZDANI
optimum detection by field sensor systems while remaining within minimum
DATE: 12/11/16
assessment requirements. The architecture and zone size shall be
OPERATIONS
ALI H GHAMDI
determined during the preliminary design stage. The larger the zone size
12/11/16 the lesser the Probability of Detection (PD) and the higher the expected
DATE:
Nuisance Alarm Rate (NAR).
CONTROL NUMBER
VERIFICATION
EDSD

Individual field sensor sub-system coverage shall be designed so that there


DATE:

are no “dead zones” along the perimeter fence.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

All IDAS day/night Fixed and PTZ Cameras shall run at 25fps PAL or 30fps
(DCC) NO. _____________________

NTSC requiring approximately 8 Mbps bandwidth per camera. Each

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 209


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
camera shall have a minimum of 525 TVL and run in MJPEG, MPEG-4, and
SAY
SAY
SAY

H.264 format.
ENGG CERT

ASH
ASH
ASH

The radar shall be fully solid state and have a modular construction
LEADS

LEADS
LEADS
ALL

allowing for a limited workshop repair.


ALL
ALL

All components of the radar shall be installed in one assembly with


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

enclosure ready for installation in the field. The antenna with drive motor
can be part of the assembly but can also be detachable for the ease of
transportation and installation.
DESCRIPTION

The System shall be able to detect the vehicles or personnel at the


minimum specified range and at a specified speed (to be finalized during
detailed design).

The System shall interface with the Long Range Surveillance System. It
shall trigger alarms and activate the long range cameras on receipt of a
possible intrusion.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

The IDAS/LRDAS AMS servers shall include a “hot” back up master


computer with automatic switch over capability within a 1 second. No loss
12/11/16
08/04/16

09/08/16
DATE

of IDAS functionality from the field sensor subsystem shall occur during or
after automatic switch over.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER Primary IDAS/LRDAS AMS Servers shall have an availability of 99.99%.
ALL LEADS
Standby or redundant IDAS Servers shall have an availability of 99.99%.
DATE: 12/11/16
PROJECT
The combined availability of the Primary and Standby IDAS/LRDAS shall
ENGINEER
be at least 99.999%.
A M ALMATROOK

DATE: 12/11/16
CERTIFIED The IDAS/LRDAS AMS and sensor subsystems shall be provided based on
AMR EL SHARKAWY
an “open architecture” concept that allows for future inter-operability of
12/11/16
DATE:
other security systems that use standardized systems interfaces and
CONSTRUCTION
AGENCY Commercial off the shelf products (COTS). The system shall have the
SHAHZAD YAZDANI
capability to remotely monitor and manage with these parameters.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI

12/11/16 This project shall provide shelters, typically 32 m2 in size consisting of one
DATE:
security room and one electrical room, approximately positioned one every
CONTROL NUMBER
VERIFICATION

two (2) km for the following reasons:


EDSD


DATE:

It shall house the IDAS and its field sensors systems for this
BY:

particular area of the fence including the video signals from all
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

cameras, control and alarm signals, convert them to IP and


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

transfer them to Security Equipment Building where they would


(DCC) NO. _____________________

be ultimately accessed by the AMS software.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 210


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

• It shall provide UPS based 230VAC power to the IDAS field


ENGG CERT

ASH
ASH
ASH

sensors systems for this particular area of the fence. Each


shelter shall have dual independent power feeds from the
LEADS

LEADS
LEADS
ALL

ALL
ALL

nearby transformer/substations, an ATS and the UPS to regulate


with two (2) hour battery back-up. The UPS shall also function in
the always “on” mode.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CCTV Camera Main Gate and Tank Farm Gate


DESCRIPTION

Main Entry gates shall use IP Fixed cameras for surveillance


and are exclusively use for inbound and outbound vehicles.
These cameras shall be at least 82 degree angle to achieved
maximum view for the entrance and exit lanes.

All CCTV system traffic that is directly connected to an IT


managed switch shall be mapped to a dedicated video VLAN as
per SAES-T-555 Section 6.1.5
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Security Access Control System


12/11/16
08/04/16

09/08/16
DATE

The Security Access Control System (SACS) which shall be installed at the
NO.
REV

D
C
B

Yanbu Distribution Hub’s Computer Gatehouse’s vehicle lanes drop gates,


DISCIPLINE
ENGINEER turnstiles entrance shall be configured as follows:
ALL LEADS

DATE: 12/11/16
PROJECT
• Proximity card readers shall be provided at each drop arm gate
ENGINEER
and turnstile. Proximity Readers shall be capable of reading from
A M ALMATROOK

DATE: 12/11/16
up to 4 centimeters.
CERTIFIED • Access controlled drop gates and turnstiles will be provided with
AMR EL SHARKAWY

12/11/16
electronically controlled locks or opening mechanism. The drop
DATE:
CONSTRUCTION
gate and turnstile shall be provided with a secure mechanical
AGENCY
override to allow operation of the turnstile/drop gate in the event of
SHAHZAD YAZDANI

DATE: 12/11/16
system or power failure
OPERATIONS • The System shall offer consistent read range unaffected by body
ALI H GHAMDI shielding or variable environment conditions.
DATE:
12/11/16
• The System shall be capable of preventing repeated entries
CONTROL NUMBER
VERIFICATION

except when an entry is followed by an exit.


EDSD

Provide Access Control Proximity Card with contact smart chip modules
DATE:
BY:

used for gate card readers. Must have at least 1 second approve or cancel
REVISIONCERTIFICATION

reaction time on smart chip modules.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

The system Administrative Client Work Server, Local Client Server and
(DCC) NO. _____________________

Main Server should be located so that both remote support and local
operation is made available. Except for the client workstation with an
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 211


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
independent card reader and all ancillary equipment necessary to stay in
SAY
SAY
SAY

the gatehouse for the efficient operation of the RFID system, all other
ENGG CERT

ASH
ASH

equipment or devices are to be located in the Security Equipment Building.


ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

Administration should be made available from Yanbu Regional Security


Control Center (YNBRSCC) and YNB Identification (ID) office.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Plate Recognition System

The PRS shall have a minimum 95% Arabic and 95% Latin character
DESCRIPTION

recognition accuracy.

System availability shall be in the order of 98% subject to a mean time


repair of 3 hours.

Failure of any component or system must be automatically notified to the


staff in the gatehouse and in Yanbu Regional Security Control Center
(RSCC).
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

The PRS System shall capture all vehicles entering and leaving at a rate of
12/11/16

100%. These images shall be of the front license plates, together with the
08/04/16

09/08/16
DATE

front of the vehicle.


NO.
REV

D
C
B

DISCIPLINE
The characters recognized by the system will be stored in ASCII (American
ENGINEER
ALL LEADS
Standard Code for Information Interchange), Unicode or USC (Universal
DATE: 12/11/16
Character Set) format. Only one character format will be used throughout
PROJECT
ENGINEER
the system.
A M ALMATROOK

DATE: 12/11/16 The PRS shall read all types of rectangular Saudi number plates (Short and
CERTIFIED
AMR EL SHARKAWY
long). The PRS shall also be capable of Saudi license plate (Red, Blue,
DATE:
12/11/16 White, Yellow, Black and Green) and shall be capable of distinguishing
CONSTRUCTION similar alphanumeric license plates with different background colors.
AGENCY
SHAHZAD YAZDANI

DATE: 12/11/16 The PRS shall read the newly released types of rectangular Saudi number
OPERATIONS
plates, four (4) numbers and three (3) alphabet and added features. The
ALI H GHAMDI
PRS shall also be capable of recognizing all six (6) different colors
12/11/16
DATE:
representing different classes of Saudi License plate (Blue, White, Yellow,
CONTROL NUMBER
VERIFICATION

Black, Grey and Green), and shall be capable of distinguishing similar


EDSD

alphanumeric license plates with different background colors. In addition,


the system shall have the capability of reading the newly added shapes
DATE:
BY:

(triangle, circle) with all direction and configuration.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

The system shall have the capability of capturing images of all retro-
(DCC) NO. _____________________

reflective number plates. Such functionality shall be provided with the

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 212


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
capability of this installation.
SAY
SAY
SAY
ENGG CERT

ASH
ASH

The PRS shall provide full time image capturing capability by use of color
ASH

cameras in addition to the OCR capable cameras.


LEADS

LEADS
LEADS
ALL

ALL
ALL

The PRS shall be able to read any plate tilted or mounted away from a
normal vertical position at an angle of 15º or less.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

The PRS may use additional external system triggers to detect vehicles.
DESCRIPTION

White light illuminators shall be provided for the automatic number plate
recognition (ANPR) cameras.

Cameras and illuminators shall be fixed and housed together to be


protected from deliberate or accidental movement from position.

The Cameras will be positioned in the area below the sunshade/canopy at


the maximum possible distance outward from the security inspection point
10-02399-
JO/EWO

10-02399-
10-02399-

subject to illumination levels.


0001

0001
0001

12/11/16

Illuminators matched to the characteristics of the color cameras shall be


08/04/16

09/08/16
DATE

provided as necessary.
NO.
REV

D
C
B

DISCIPLINE
The PRS shall recognize number plates of vehicles traveling at speeds up
ENGINEER
ALL LEADS
to 80Km/h at the capture point.
DATE: 12/11/16
PROJECT
ENGINEER
The width of the camera footprint for the color cameras is to be no greater
A M ALMATROOK than 1.6 meters at the optimum capture point.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
The PRS shall display all characters of a number plate.
12/11/16
DATE:
CONSTRUCTION The PRS should be based on optical character recognition (OCR)
AGENCY
SHAHZAD YAZDANI processing with the capacity to “learn” variation in characters through
DATE: 12/11/16 system input.
OPERATIONS
ALI H GHAMDI
The PRS shall provide both monochrome and color images of the number
12/11/16
DATE:
plate for OCR identification and license color verification purposes.
CONTROL NUMBER
VERIFICATION
EDSD

The system shall process color images to allow the color background of
vehicle licensing class to be determines automatically and a corresponding
DATE:
BY:

ASCII, Unicode or UCS reference added to the relevant vehicle record.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

The PRS software shall be implemented on an open architecture operating


(DCC) NO. _____________________

system and permit multitasking.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 213


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

The PRS shall be compatible with TCP/IP communications architecture.


ENGG CERT

ASH
ASH
ASH

The PRS shall have the capability to alert staff of the approach of a suspect
LEADS

LEADS
LEADS
ALL

ALL
ALL

vehicle by comparing the number plates of approaching vehicles with those


installed in a local or centralized database. This alert will be generated
within one second of the number plate image being captured by the PRS
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Camera.

An alarm shall be triggered if an unrecognized or flagged vehicle is


DESCRIPTION

detected by the system.

The alarm signal shall be both visual and audible, and shall indicate in
which lane the vehicle is traveling.

The alarm type for each category of suspect vehicle (unrecognized or


flagged) shall be different and the system shall allow the alarm notification
for unrecognized vehicles to be disabled from YNB RSCC and not from the
10-02399-
JO/EWO

10-02399-
10-02399-

gatehouse.
0001

0001
0001

12/11/16

The PRS shall be able to simultaneously monitor; process and store the
08/04/16

09/08/16
DATE

information from all lanes approaching the Gates. The system shall be
designed so as to maximize the read performance in each lane.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
ALL LEADS
The local PRS Processing/ Storage Equipment shall fully monitor, store,
DATE: 12/11/16
and send PRS Alarms and Transaction Events to a centralized database.
PROJECT
ENGINEER
The processing unit shall integrate (OCR) information and license plate
A M ALMATROOK color information from each vehicle plate.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
CONTRACTORS shall refer to the provided drawings to identify the position
DATE:
12/11/16 and space requirements for the local PRS Processing Equipment. The form
CONSTRUCTION factor of the equipment at Gatehouse should reflect the limited space at
AGENCY
SHAHZAD YAZDANI these locations. All ancillary equipment necessary for the proper operation
DATE: 12/11/16 of the PRS system shall remain in the gatehouse including the PRS
OPERATIONS
workstation for the local monitoring & control of PRS system. The PRS
ALI H GHAMDI
system shall be able to work independently when a breakdown occurs in
12/11/16
DATE:
the corporate network connectivity.
CONTROL NUMBER
VERIFICATION
EDSD

The Fault Tolerant PRS Main Server shall be provided and installed by
CONTRACTOR as approved and procured thru the specifications of SAUDI
DATE:
BY:

ARAMCO; CONTRACTOR is to provide a Full Specification and


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

configuration of the PRS Main Server. It is this project responsibility to


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

configure and utilize the existing SAUDI ARAMCO server as required by


(DCC) NO. _____________________

the PRS system.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 214


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

The Fault Tolerant Main Server shall have redundancy in terms of storage
ENGG CERT

ASH
ASH

failures.
ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

The PRS Main Server shall be interconnected with all the Local PRS
Processing Equipment located at the gatehouse, Security Equipment
Building and with PRS monitoring workstation located0 at Yanbu RSCC via
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

existing SAUDI ARAMCO corporate network.

The PRS main Server shall distribute the updated hot list inputs concerning
DESCRIPTION

flagged vehicles within (60) seconds to the new local PRS Processing
Equipment automatically.

The PRS Main Server shall have sufficient storage capacity to store
information for the following periods of time:

- Text database of events in Oracle or SQL or PL/SQL ASCII


Format- 3months
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

The PRS Main Server shall have an option to automatically archive records,
12/11/16

and to provide records on Write Once-Read Many (WO-RM) format


08/04/16

09/08/16
DATE

medium.
NO.
REV

D
C
B

DISCIPLINE
The PRS Main Server shall maintain an accurate clock set to local time
ENGINEER
ALL LEADS
using Coordinated Universal Time (UTC) information derived from the
DATE: 12/11/16
SAUDI ARAMCO Master Clock. The local time will be synchronized to all
PROJECT
ENGINEER
Local Processor from the Main Server, by the use of a Network Time
A M ALMATROOK Protocol (NTP). All system transactions will be appended with a tamper-
DATE: 12/11/16 proof time-stamp.
CERTIFIED
AMR EL SHARKAWY

DATE:
12/11/16 The Local PRS Processing Equipment shall distribute its database
CONSTRUCTION transactions events to the PRS Main Server automatically within not more
AGENCY
SHAHZAD YAZDANI than thirty (30) minutes and upon request from local machine at gatehouse.
DATE: 12/11/16 The local PRS Processing Equipment shall automatically distribute its
OPERATIONS
database Alarm within no more than one (1) second to the PRS Main
ALI H GHAMDI
Server.
12/11/16
DATE:
CONTROL NUMBER
VERIFICATION

The Local PRS Processing Equipment shall have sufficient storage


EDSD

capacity to store information for the following periods of time (based upon
throughput of 2000 vehicles per lane per day).
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

– Database transactions events and Alarms in Oracle or SQL or


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

PL/SQL ASCII Format – 30 days.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 215


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
– PRS monochrome and color images linked to above database
SAY
SAY
SAY

entries – 30 days.
ENGG CERT

ASH
ASH
ASH

System Users shall be able to query the PRS System which shall be
LEADS

LEADS
LEADS
ALL

ALL
ALL

capable of generating, saving and printing Local and Site Global reports
listing:
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

- Quantity of Vehicles processed


- Number of Vehicles with unrecognized/flagged plates
(Recorded Alarms)
DESCRIPTION

- Mean processing time


- Time, Date, Location, and Direction of travel for each
transaction.
- The relevant color image and a monochrome number plate
image shall be linked to each vehicle transaction

The PRS system shall ensure that there is a clear view of each vehicle’s
license plate and shall propose measures to ensure vehicle license plates
10-02399-
JO/EWO

10-02399-
10-02399-

are captured and processed in all traffic conditions, which may require
0001

0001
0001

traffic calming measures.


12/11/16
08/04/16

09/08/16
DATE

The PRS System shall be expandable and able to accommodate up to 25%


additional locations without changes to the Main Server.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
ALL LEADS
Outside Plant System (OSP)
DATE: 12/11/16
PROJECT
ENGINEER The Outside Plant Cable and Conduit System shall support the Security Cabling
A M ALMATROOK
connectivity from Security Support Building to various locations of Field
DATE: 12/11/16
CERTIFIED Equipment Cabinets (FECs) through Shelter #1 and Shelter #2 along the
AMR EL SHARKAWY
perimeter fence.
12/11/16
DATE:
CONSTRUCTION
AGENCY
The works includes excavation, installation of buried and underground (in
SHAHZAD YAZDANI conduit) fiber optic cables, construction of conduit facilities, installation of
DATE: 12/11/16 pedestal with guard post, cable splicing, installation of fiber optic patch panels,
OPERATIONS
cutting and replacing of paved and asphalt areas to original condition,
ALI H GHAMDI

12/11/16
installation of marker post, installation of electronic marker, termination of fiber
DATE:
cables, cable testing and tagging.
CONTROL NUMBER
VERIFICATION
EDSD

INTERFACE WITH OTHER SYSTEMS


DATE:

Interface to External Systems


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

The security system shall be capable to interface with external systems.


C

(DCC) NO. _____________________

The Systems design shall use industry standard Application Programming


Interface (API) that permit easy upgrade to new versions of Operating
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 216


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Systems, data bases and device drivers.
SAY
SAY
SAY
ENGG CERT

ASH
ASH

The security systems provided by this project shall provide inter-connection


ASH

to the C2I platform to integrate with the different Security systems installed
LEADS

LEADS
LEADS
ALL

ALL
ALL

under BI-10-00555.

The C2I as compared to an Alarm Management System is the “master”


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

because it provides situational awareness such as location and status of an


adversary from a top level view. It is a necessary component in achieving
superiority in decision making by integrating diverse technologies such as
DESCRIPTION

IDAS, PRS, SACS and others. By combining these technologies into a


comprehensive solution, it takes the mundane tasks of Alarm Management
System from each subsystem, quantifies the risks, minimizes decision
making (such as fatigue, judgment and difficult to assess situation) and
provides plausible outcomes and actions. In addition, it minimizes the
number of facilities that require viewing while allowing for efficient
deployment of Security personnel.
10-02399-
JO/EWO

10-02399-
10-02399-

The C2I application software installed in the Dhahran RSCC under BI-10-
0001

0001
0001

00555 shall have the capability to view each site and when required, a
12/11/16

password protection scheme to take over the application of this site. The
08/04/16

09/08/16
DATE

maximum capability is now dependent on the Video Wall which has


allocated space for the sites that normally report to other RSCCs.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
ALL LEADS
SAUDI ARAMCO Corporate Network
DATE: 12/11/16
PROJECT
ENGINEER
The security system platform shall be capable of utilizing a high-
A M ALMATROOK performance standard IP-based network to establish internal
DATE: 12/11/16 communications between the systems components and to interface with
CERTIFIED
AMR EL SHARKAWY
SAUDI ARAMCO Corporate Data Network.
12/11/16
DATE:
CONSTRUCTION The proposed system shall be connected to the IP-Data network. The
AGENCY
SHAHZAD YAZDANI connection shall utilize Gigabit Ethernet Local Area Network.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI

12/11/16
DATE:
CONTROL NUMBER
VERIFICATION

ENVIRONMENTAL IMPACT
EDSD

DATE:

All work under the Scope of this project shall conform to all SAUDI
BY:

ARAMCO and Saudi Government environmental standards and


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

requirements. In general, any disturbance to the environment caused by


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

this project shall be restored to the original condition at project completion.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 217


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

4.25 STRUCTURAL
ENGG CERT

ASH
ASH
ASH

GENERAL
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR SHALL NOTE that all construction works shall be done in


accordance with latest international and Saudi Aramco Engineering standards
and procedures.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall perform excavation and backfill as per SAES-A-114, and


remove the debris and surplus material to the Saudi Aramco designated site. If
any underground utility encounters during excavation, CONTRACTOR shall
DESCRIPTION

inform Saudi Aramco representative and re-route the facility in agreement of


SAUDI ARAMCO representative.

CONTRACTOR shall provide transportation, storage, conservation, operation,


inspection and maintenance of construction equipment, tools, lifting devices,
scaffolding, temporary facilities, consumable materials, etc. necessary to
execute the Work safely.
10-02399-
JO/EWO

10-02399-
10-02399-

CONTRACTOR shall ensure achieving high safety and security standards and
0001

0001
0001

levels of control throughout all phases of the project. CONTRACTOR shall


perform any other activity, not specifically mentioned above, but necessary to
12/11/16
08/04/16

09/08/16
DATE

achieve Completion of the Work.


NO.
REV

D
C
B

DISCIPLINE CONTRACTOR shall provide earthquake-resistant design and associated


ENGINEER
ALL LEADS detailing to enable designated structures and/or architectural, mechanical,
DATE: 12/11/16 electrical and nonstructural components and their supporting structures to
PROJECT
ENGINEER
respond satisfactory to seismic effects recognizing site seismic hazards such
A M ALMATROOK
as ground motion adjusted for site class amplification, soil
DATE: 12/11/16
liquefaction/foundation settlement, etc. Satisfactory performance objectives
CERTIFIED shall achieved by protecting human life, avoiding structural collapses and
AMR EL SHARKAWY
damages to neighboring facilities, maintaining functionality of essential
12/11/16
DATE: facilities, controlling loss of containment/toxic releases/fire and minimizing
CONSTRUCTION
AGENCY
damages to non-structural components.
SHAHZAD YAZDANI

DATE: 12/11/16 The mapped Maximum Considered Earthquake (MCE) spectral response
OPERATIONS accelerations for the Yanbu area are documented in SAES-A-112 as follows:
ALI H GHAMDI

12/11/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

Criteria Parameter
DATE:

Short Period Acceleration (Ss) in %g 20.4


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

1-Sec Period Acceleration (S1) in %g 5.8


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

Peak Ground Acceleration in %g 4

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 218


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Site Class as per geotechnical D
SAY
SAY
SAY

investigation report 2015/104.


ENGG CERT

ASH
ASH
ASH

Importance factor for seismic design 1.5


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall utilize geotechnical recommendations given in


geotechnical report (Saudi Aramco File Number- 2015/104) for foundation
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

design, for any change in location of equipment, building or facility away from
the given test location contractor shall utilize the nearest test location and
prepare standalone report for utilization of nearest test location and submit it to
DESCRIPTION

SAUDI ARAMCO for approval.

CONTRACTOR shall be responsible for the correctness of all Drawings and


Documents and Software provided from vendors / manufactures / suppliers /
sub-contractors, etc. Approval or Acceptance of these Drawings and
Documents and Software by SAUDI ARAMCO does not relive CONTRACTOR
of the responsibility of correct design, right equipment, proper installation,
testing and commissioning.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall check and verify all Sub-Contractor and Vendor design
and drawings provided comply with the Scope of Work, and documents
12/11/16
08/04/16

09/08/16

provided with this Scope, relevant SAUDI ARAMCO and International


DATE

Standards and are in keeping with “Good Engineering Practices”.


NO.
REV

D
C
B

CONTRACTOR shall refer project proposal drawing ST-A00002.001/002 for


DISCIPLINE
ENGINEER general notes on concrete work. CONTRACTOR shall execute all concrete
ALL LEADS
work in accordance with SAUDI ARAMCO standards.
DATE: 12/11/16
PROJECT
ENGINEER CONTRACTOR shall refer project proposal drawing ST-A00100.001 for
A M ALMATROOK general notes on structural steel work. CONTRACTOR shall execute all
DATE: 12/11/16 structural steel work in accordance with SAUDI ARAMCO standards.
CERTIFIED
AMR EL SHARKAWY

12/11/16
CONTRACTOR shall note that all structural drawings of project proposal are
DATE:
CONSTRUCTION
indicative; CONTRACTOR shall perform detailed structural calculations during
AGENCY detailed design as per vendor data and in accordance with SAUDI ARAMCO
SHAHZAD YAZDANI
standards.
DATE: 12/11/16
OPERATIONS
CONTRACTOR shall finalize all building design incorporating
ALI H GHAMDI
recommendations given in BRA report for all buildings. Blast resistant design
12/11/16
DATE: shall be performed where deemed necessary by using the project Building Risk
CONTROL NUMBER

Assessment (BRA) report.


VERIFICATION
EDSD

DATE:

Yanbu distribution hub (YDH) scope


BY:
REVISIONCERTIFICATION

Receipt pipeline and connection


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Equipment Foundations
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 219


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

CONTRACTOR shall provide concrete foundations for dye injection skid, SDA
injection skid, conductivity enhancer skid, custody metering skid, meter prover
ENGG CERT

ASH
ASH
ASH

and custody metering shelter (vendor package).


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall design foundations as per vendor requirement of size


and loading in accordance with SAUDI ARAMCO standards.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall provide slab on grade and toe wall as per vendor
requirement for equipment’s.

CONTRACTOR shall provide anchor bolts as per vendor requirement in


DESCRIPTION

accordance with SAUDI ARAMCO standards.

CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
IFC drawing for all equipment foundations.

Spur rack, platforms and pipe supports

CONTRACTOR shall provide structural spur rack, platforms, pipe supports at


manifold location as per piping plans and design in accordance with SAUDI
10-02399-
JO/EWO

10-02399-
10-02399-

ARAMCO standards. CONTRACTOR shall provide all structural calculations for


0001

0001
0001

SAUDI ARAMCO approval.


12/11/16
08/04/16

09/08/16
DATE

CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO


approval.
NO.
REV

D
C
B

DISCIPLINE CONTRACTOR shall provide concrete foundations for spur rack, platforms,
ENGINEER
ALL LEADS pipe supports at manifold location as per piping plans. CONTRACTOR shall
DATE: 12/11/16 design foundations as per stress analysis load data in accordance with SAUDI
PROJECT
ENGINEER
ARAMCO standards. CONTRACTOR shall provide all foundation design
A M ALMATROOK
calculations for SAUDI ARAMCO approval.
DATE: 12/11/16
CERTIFIED Tank farm and support infrastructure
AMR EL SHARKAWY

DATE:
12/11/16 Equipment Foundations
CONSTRUCTION
AGENCY
CONTRACTOR shall provide concrete foundations for diesel day tank, 2 No’s
SHAHZAD YAZDANI
of emergency generator set, DPK filtration skid, surge skid (DO/DPK), surge
DATE: 12/11/16
OPERATIONS
skid (GASOLINE), utility water tank, fire water tank, 2 No’s of foam skid, pumps
ALI H GHAMDI
and OWS treatment package.
12/11/16
DATE:
CONTRACTOR shall design foundations as per vendor requirement of size
CONTROL NUMBER
VERIFICATION

and loading in accordance with SAUDI ARAMCO standards.


EDSD

CONTRACTOR shall provide slab on grade and toe wall as per vendor
DATE:

requirement for equipment’s.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

CONTRACTOR shall provide anchor bolts as per vendor requirement in


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

accordance with SAUDI ARAMCO standards.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 220


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
SAY
SAY
SAY

IFC drawing for all equipment foundations.


ENGG CERT

ASH
ASH
ASH

Shelters
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall provide following Shelter in YDH facility


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Foam skid shelter (2 No’s)


Fire water and Utility water pump shelter
Sanitary metering shelter-MARAFIQ
Utility water metering shelter-MARAFIQ
DESCRIPTION

Oily waste water metering shelter-MARAFIQ

CONTRACTOR shall design and detail shelter structures in accordance with


12-SAMSS-014 through Pre Engineering building PEB vendor. PEB structures
shall be designed and fabricated by approved SAUDI ARAMCO vendors.
CONTRACTOR shall coordinate with PEB Vendors for design and fabrication.

CONTRACTOR shall submit the structural calculation for PEB shelters to


10-02399-
JO/EWO

10-02399-
10-02399-

SAUDI ARAMCO for review.


0001

0001
0001

CONTRACTOR shall design shelter foundations as per PEB- vendor load data
12/11/16
08/04/16

09/08/16
DATE

and provide anchor bolts as per vendor requirement.


NO.
REV

CONTRACTOR shall provide slab on grade for foam skid shelter with isolation
D
C
B

DISCIPLINE joint between major foundations and miscellaneous pipe supports shall be
ENGINEER
ALL LEADS provided based on load data and piping plans.
DATE: 12/11/16
PROJECT Oily water lift stations (2 No’s)
ENGINEER

A M ALMATROOK
CONTRACTOR shall design and detail reinforced cement concrete oily water
DATE: 12/11/16
CERTIFIED lift station as per sizing requirement with appropriate coating on inside and
AMR EL SHARKAWY outside face as per SAUDI ARAMCO standards.
12/11/16
DATE:
CONSTRUCTION CONTRACTOR shall provide dewatering system based on the depth of lift
AGENCY
SHAHZAD YAZDANI
station and water table level and shall dispose the water to an approved
DATE: 12/11/16
location by SAUDI ARAMCO.
OPERATIONS
ALI H GHAMDI CONTRACTOR shall take appropriate measures as per SAUDI ARAMCO
12/11/16 standards for deep soil excavations.
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

Sanitary lift stations


DATE:

CONTRACTOR shall design and detail reinforced cement concrete sanitary lift
BY:

station as per sizing requirement with appropriate coating on inside and outside
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

face as per SAUDI ARAMCO standards.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

CONTRACTOR shall provide dewatering system based on the depth of lift


station and water table level and shall dispose the water to an approved
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 221


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
location by SAUDI ARAMCO.
SAY
SAY
SAY

CONTRACTOR shall take appropriate measures as per SAUDI ARAMCO


ENGG CERT

ASH
ASH
ASH

standards for deep soil excavations.


LEADS

LEADS
LEADS
ALL

ALL
ALL

If required CONTRACTOR shall provide steel structure and monorail to handle


sanitary pump.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Dike wall

CONTRACTOR shall design dike wall in accordance with Saudi Aramco


Standard.
DESCRIPTION

CONTRACTOR shall provide vertical expansion joint in dike wall as per figure 2
of SAES-B-005.

CONTRACTOR shall provide 1.5 mm thick HDPE liner below dike area with
appropriate HDPE insert on concrete dike wall inside face.

CONTRACTOR shall weld 1.5 mm thick HDPE liner for dike area with HDPE
liner provided by other CONTRACTOR around the tank foundations.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall provide protective coating APCS-10 on concrete surfaces


below grade.
12/11/16
08/04/16

09/08/16
DATE

CONTRACTOR shall provide protective coating APCS-1B on concrete surfaces


NO.
REV

above grade.
D
C
B

DISCIPLINE
ENGINEER
ALL LEADS CONTRACTOR shall provide minimum 500 mm MARL cover for HDPE liner
DATE: 12/11/16
provided inside dike area.
PROJECT
ENGINEER

A M ALMATROOK
Steel pipe support, pipe sleepers, structural platforms and crossovers
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY CONTRACTOR shall provide structural pipe support, structural platforms and
DATE:
12/11/16 crossovers as per piping plans and design in accordance with SAUDI
CONSTRUCTION ARAMCO standards. CONTRACTOR shall provide all structural calculations for
AGENCY
SHAHZAD YAZDANI
SAUDI ARAMCO approval.
DATE: 12/11/16
OPERATIONS CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO
ALI H GHAMDI approval.
12/11/16
DATE:
CONTRACTOR shall provide concrete foundations for pipe supports, platforms,
CONTROL NUMBER
VERIFICATION

crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
EDSD

foundations as per stress analysis load data in accordance with SAUDI


ARAMCO standards. CONTRACTOR shall provide all foundation design
DATE:

calculations for SAUDI ARAMCO approval.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Culvert
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

CONTRACTOR shall provide reinforcement cement concrete culvert inside


plant for pipe way crossing the plant roads.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 222


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAY
SAY
SAY

CONTRACTOR shall provide clearance from pipe to concrete edges as per


SAES-L-460. CONTRACTOR shall provide minimum 750 mm wide access on
ENGG CERT

ASH
ASH
ASH

either side of sleeper inside the culvert.


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall design RCC culvert for all possible load cases and load
combinations as per SAUDI ARAMCO and AASHTO standards requirement.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall provide culvert design calculations to SAUDI ARAMCO


for review and approval.

Buildings
DESCRIPTION

Main Gate/Tank farm gate House

CONTRACTOR shall pre-engineer space frame structural sunshade as per


SAUDI ARAMCO standard drawing AA-036024-001 for main gate and tank
farm gate.

CONTRACTOR shall provide PEB vendor space frame structural design


calculation for SAUDI ARAMCO review and approval. Space frame design
10-02399-
JO/EWO

10-02399-
10-02399-

shall be in accordance with SAUDI ARAMCO standards.


0001

0001
0001

CONTRACTOR shall provide foundation size as per vendor data. Design of


12/11/16
08/04/16

09/08/16
DATE

foundation shall be as per foundation load data provided by vendor. Anchor


bolts shall be specified by vendor and selection of anchor bolt shall be as per
NO.
REV

SAUDI ARAMCO standards.


D
C
B

DISCIPLINE
ENGINEER
ALL LEADS
Musallah
DATE: 12/11/16
PROJECT CONTRACTOR shall provide reinforced cement concrete frame and roof slab
ENGINEER
as per architectural plans, sections and elevations.
A M ALMATROOK

DATE: 12/11/16
CERTIFIED
CONTACTOR shall perform structural design of Musallah building in
AMR EL SHARKAWY accordance with SAUDI ARAMCO standards and submit design calculations to
DATE:
12/11/16 SAUDI ARAMCO for review and approval.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
CONTRACTOR shall refer to BRA report recommendation during detailed
design of building and shall prepare blast resistant design.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
Security Guard house (2 No’s)
12/11/16
DATE:
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
CONTROL NUMBER
VERIFICATION

as per architectural plans, sections and elevations.


EDSD

CONTACTOR shall perform structural design of security guard house building


DATE:

in accordance with SAUDI ARAMCO standards and submit design calculations


BY:

to SAUDI ARAMCO for review and approval.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall refer to BRA report recommendation during detailed


(DCC) NO. _____________________

design of building.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 223


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Operator shelter (2 No’s)
SAY
SAY
SAY

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
ENGG CERT

ASH
ASH
ASH

as per architectural plans, sections and elevations.


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTACTOR shall perform structural design of operator shelter building in


accordance with SAUDI ARAMCO standards and submit design calculations to
SAUDI ARAMCO for review and approval.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall refer to BRA report recommendation during detailed


design of building.
DESCRIPTION

Smoking shelter

CONTRACTOR shall provide structural steel smoking shelter as per


architectural plans, sections and elevations

CONTACTOR shall perform structural design of smoking shelter in accordance


with SAUDI ARAMCO standards and submit design calculations to SAUDI
ARAMCO for review and approval.
10-02399-
JO/EWO

10-02399-
10-02399-

CONTRACTOR shall provide foundation for smoking shelter as per load data
0001

0001
0001

for structural steel shelter and providing anchor bolts as per SAUDI ARAMCO
standards.
12/11/16
08/04/16

09/08/16
DATE

FSF Support building and Facility Security Forces (FSF) sunshade


NO.
REV

D
C
B

DISCIPLINE CONTRACTOR shall provide reinforced cement concrete frame and roof slab
ENGINEER
ALL LEADS
as per architectural plans, sections and elevations.
DATE: 12/11/16
PROJECT CONTACTOR shall perform structural design of FSF support building in
ENGINEER
accordance with SAUDI ARAMCO standards and submit design calculations to
A M ALMATROOK
SAUDI ARAMCO for review and approval.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY CONTRACTOR shall refer to BRA report recommendation during detailed
DATE:
12/11/16 design of building.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
CONTRACTOR shall pre-engineered space frame structural sunshade for FSF
sunshade.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI CONTRACTOR shall provide PEB vendor space frame structural design
12/11/16 calculation for SAUDI ARAMCO review and approval. Space frame design
DATE:
shall be in accordance with SAUDI ARAMCO standards.
CONTROL NUMBER
VERIFICATION
EDSD

CONTRACTOR shall provide foundation size as per vendor data. Design of


DATE:

foundation shall be as per foundation load data provided by vendor. Anchor


BY:

bolts shall be specified by vendor and selection of anchor bolt shall be as per
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

SAUDI ARAMCO standards.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

Receiving substation

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 224


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR during detail design shall validate the use of SAUDI ARAMCO
SAY
SAY
SAY

library drawing for receiving substation and adopt appropriate structural


arrangement to support overhead crane for GIS room.
ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall perform structural design as per SAUDI ARAMCO


LEADS

LEADS
LEADS
ALL

ALL
ALL

standards and provide design calculations to SAUDI ARAMCO for review and
approval.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall co-ordinate with SAUDI ARAMCO approved precast


vendors for the design and fabrication of precast walls and double tee slabs.
Necessary loading on roof shall be considered for the design of double tee.
DESCRIPTION

CONTRACTOR shall provide transformer foundation as per Vendor data.

CONTRACTOR shall provide reinforced cement concrete fire walls for


transformers as per vendor data, per SAES-P-119.

CONTRACTOR shall provide slab on grade and toe/curb wall around the slab
on grade with required slopes towards oily water catch basins.

Utility power substation


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall provide substation as per SAUDI ARAMCO library


drawings.
12/11/16
08/04/16

09/08/16
DATE

CONTRACTOR shall co-ordinate with SAUDI ARAMCO approved precast


vendors for the design and fabrication of precast walls and double tee slabs.
NO.
REV

D
C
B

DISCIPLINE Necessary loading on roof shall be considered for the design of double tee.
ENGINEER
ALL LEADS
CONTRACTOR shall provide transformer foundation as per Vendor data.
DATE: 12/11/16
PROJECT
ENGINEER
CONTRACTOR shall provide reinforced cement concrete fire walls for
A M ALMATROOK
transformers as per vendor data.
DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY CONTRACTOR shall provide slab on grade and toe/curb wall around the slab
DATE:
12/11/16 on grade with required slopes towards oily water catch basins.
CONSTRUCTION
AGENCY
Engineering & Maintenance (E & M) building
SHAHZAD YAZDANI

DATE: 12/11/16
OPERATIONS
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
ALI H GHAMDI
as per architectural plans, sections and elevations.
12/11/16
DATE:
CONTACTOR shall perform structural design of E & M building in accordance
CONTROL NUMBER
VERIFICATION

with SAUDI ARAMCO standards and submit design calculations to SAUDI


ARAMCO for review and approval.
EDSD

DATE:

CONTRACTOR shall refer to BRA report recommendation during detailed


BY:

design of building and shall prepare blast resistant design.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Security support building (2 No’s)


(DCC) NO. _____________________

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 225


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
as per architectural plans, sections and elevations.
SAY
SAY
SAY

CONTACTOR shall perform structural design of security support building in


ENGG CERT

ASH
ASH
ASH

accordance with SAUDI ARAMCO standards and submit design calculations to


SAUDI ARAMCO for review and approval.
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall refer to BRA report recommendation during detailed


design of building and shall prepare blast resistant design for main gate
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

security support building.

Temporary construction facility


DESCRIPTION

CONTRACTOR shall provide all required foundations for facilities, equipment’s,


structural pipe supports and structural platform in accordance with SAUDI
ARAMCO standards.

CONTRACTOR shall provide structural pipe support and platforms for TCF
facility as required in accordance with SAUDI ARAMCO standards.

X-Ray Building
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.
12/11/16
08/04/16

09/08/16
DATE

CONTACTOR shall perform structural design of X-Ray building in accordance


with SAUDI ARAMCO standards and submit design calculations to SAUDI
NO.
REV

D
C
B

DISCIPLINE
ARAMCO for review and approval.
ENGINEER
ALL LEADS
CONTRACTOR shall refer to BRA report recommendation during detailed
DATE: 12/11/16
PROJECT
design of building.
ENGINEER

A M ALMATROOK Covered car parking sheds


DATE: 12/11/16
CERTIFIED
AMR EL SHARKAWY
CONTRACTOR shall provide structural framing for covered car parking as per
12/11/16 SAUDI ARAMCO library drawings DA-950182.001, DA-950183.001 and DA-
DATE:
CONSTRUCTION
950185.001.
AGENCY
SHAHZAD YAZDANI
CONTRACTOR shall provide foundation for covered car parking as per SAUDI
DATE: 12/11/16
ARAMCO library drawings DA-950184.001, DA-950185.001.
OPERATIONS
ALI H GHAMDI

12/11/16
DATE:
CONTROL NUMBER

Chemical shelter
VERIFICATION
EDSD

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.
DATE:
BY:
REVISIONCERTIFICATION

CONTACTOR shall perform structural design of Chemical shelter building in


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

accordance with SAUDI ARAMCO standards and submit design calculations to


(DCC) NO. _____________________

SAUDI ARAMCO for review and approval.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 226


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall refer to BRA report recommendation during detailed
SAY
SAY
SAY

design of building and shall prepare blast resistant design.


ENGG CERT

ASH
ASH
ASH

Remote I/O Buildings (2 No’s)


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTACTOR shall perform structural design of Remote I/O building in


accordance with SAUDI ARAMCO standards and submit design calculations to
SAUDI ARAMCO for review and approval.
DESCRIPTION

CONTRACTOR shall refer to BRA report recommendation during detailed


design of building.

IDAS Shelter (2 No’s)

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.

CONTACTOR shall perform structural design of IDAS shelter building in


10-02399-
JO/EWO

10-02399-
10-02399-

accordance with SAUDI ARAMCO standards and submit design calculations to


0001

0001
0001

SAUDI ARAMCO for review and approval.


12/11/16
08/04/16

09/08/16
DATE

CONTRACTOR shall refer to BRA report recommendation during detailed


design of building.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER Operation building
ALL LEADS

DATE: 12/11/16
PROJECT
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
ENGINEER as per architectural plans, sections and elevations.
A M ALMATROOK

DATE: 12/11/16 CONTACTOR shall perform structural design of Operation building in


CERTIFIED
AMR EL SHARKAWY accordance with SAUDI ARAMCO standards and submit design calculations to
12/11/16 SAUDI ARAMCO for review and approval.
DATE:
CONSTRUCTION
AGENCY CONTRACTOR shall refer to BRA report recommendation during detailed
SHAHZAD YAZDANI
design of building.
DATE: 12/11/16
OPERATIONS
Security Support foundations
ALI H GHAMDI

12/11/16
DATE: CONTRACTOR shall provide continuous concrete anchor constructed
CONTROL NUMBER

according to Standard Drawing AC-036680.001 for SAUDI ARAMCO General


VERIFICATION

Purpose Fencing.
EDSD

DATE:

CONTRACTOR shall provide foundations for fixed camera, PTZ camera, field
BY:

equipment cabinet, MIDS poles and PRS supports.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Lighting pole foundations


(DCC) NO. _____________________

CONTRACTOR shall provide concrete foundations as per vendor data for


`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 227


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
lighting pole and design of foundation shall be done as per vendor load data
SAY
SAY
SAY

and shall be in compliance with SAUDI ARAMCO standards. Anchor bolts shall
be specified by vendor in accordance with SAUDI ARAMCO standards.
ENGG CERT

ASH
ASH
ASH

Electrical switch racks and junction box foundations


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall provide concrete foundations as per vendor data for


switch racks and junction box. Design of foundation shall be done as per
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

vendor load data and shall be in compliance with SAUDI ARAMCO standards.
Anchor bolts shall be specified by vendor in accordance with SAUDI ARAMCO
standards.
DESCRIPTION

Miscellaneous Structural Works

CONTRACTOR shall construct concrete paving slab at entrance near Security


Guardhouse and wherever indicated on civil drawings. CONTRACTOR shall
provide construction, contraction and isolation/expansion joints as per ACI 224
in order to transfer traffic loads across the joints.

CONTRACTOR shall construct concrete duct banks for cable routing as shown
in electrical drawings.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall construct crash rated barriers, crash rated beams and
valve boxes.
12/11/16
08/04/16

09/08/16
DATE

CONTRACTOR shall construct all required concrete sanitary manholes and


NO.
REV

catch basins.
D
C
B

DISCIPLINE
ENGINEER
ALL LEADS CONTRACTOR shall construct all required oily water manholes.
DATE: 12/11/16
PROJECT Contractor shall provide all HVAC equipment foundation including foundation
ENGINEER

A M ALMATROOK
for air stack as per HVAC drawings.
DATE: 12/11/16
CERTIFIED Contractor shall provide 18 No’s ground water monitoring well in accordance
AMR EL SHARKAWY with Royal Commission Environmental Regulation 2015 Volume II and satisfy
DATE:
12/11/16 minimum construction requirement as stated in Royal commission standard
CONSTRUCTION
AGENCY
drawing RC-EN-1. For proposed location of ground water monitoring wells refer
SHAHZAD YAZDANI SKETCH-ST-001. Contractor shall take prior approval from royal commission
DATE: 12/11/16
on final locations of ground water monitoring well during detailed design.
OPERATIONS
ALI H GHAMDI

12/11/16 SAMREF refinery scope


DATE:
CONTROL NUMBER
VERIFICATION

General
EDSD

CONTRACTOR shall conduct detailed geotechnical investigation for all


DATE:

foundation required inside SAMREF refinery, as per SAES-A-113.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

CONTRACTOR shall conduct site survey to finalize the locations of


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

equipment’s and routing of piping, location of pipe supports, platforms and


(DCC) NO. _____________________

crossovers inside SAMREF refinery.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 228


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Equipment Foundations
SAY
SAY
SAY

CONTRACTOR shall provide concrete foundations for surge relief pumps,


ENGG CERT

ASH
ASH
ASH

custody metering skid, meter prover and custody metering shelter (vendor
package).
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall design foundations as per vendor requirement of size


and loading in accordance with SAUDI ARAMCO standards.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall provide slab on grade and toe wall as per vendor
requirement for equipment’s.
DESCRIPTION

CONTRACTOR shall provide anchor bolts as per vendor requirement in


accordance with SAUDI ARAMCO standards.

CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
IFC drawing for all equipment foundations.

Surge relief tank

CONTRACTOR shall conduct detailed geotechnical investigation at tank


10-02399-
JO/EWO

10-02399-
10-02399-

location to access tank settlement (immediate and long term) and soil bearing
0001

0001
0001

capacity for foundation design.


12/11/16
08/04/16

09/08/16
DATE

Foundation sizes shown in project proposal drawings are indicative and


CONTRACTOR shall design tank foundations for all loadings as per final IFC
NO.
REV

load data. IFC load data shall cover all loadings for tank including tank shell,
D
C
B

DISCIPLINE tank roof and bottom plates, Empty weight, operating weight, hydro test weight,
ENGINEER
ALL LEADS corroded weight, wind load and seismic loading etc. and all loading shall be
DATE: 12/11/16
reported as per API-650 standard.
PROJECT
ENGINEER

A M ALMATROOK
CONTRACTOR is fully responsible for the design of tank foundations. E.g. type
of foundation, materials, quantities etc. the drawings those are being provided
DATE: 12/11/16
CERTIFIED to CONTRACTOR are for their reference and for cost estimate purpose. It is
AMR EL SHARKAWY CONTRACTOR’s responsibility to ensure that adequate tank foundations are
DATE:
12/11/16 designed and built, including any soil improvement/replacement resulting from
CONSTRUCTION
AGENCY
soil investigation/geotechnical report.
SHAHZAD YAZDANI

DATE: 12/11/16
In case anchor bolts are required for tank anchorage to the foundations, then
OPERATIONS anchor bolts shall as per SASD AA-036322-001 Rev 08. Coating requirement
ALI H GHAMDI of anchor bolts shall be as per 32-SAMSS-005 and bolts shall be coated with
DATE:
12/11/16 fluoropolymer/ceramic; galvanized bolts shall not be used.
Fluoropolymer/ceramic coating shall be in accordance with 09-SAMSS-107.
CONTROL NUMBER
VERIFICATION
EDSD

CONTRACTOR shall work in close coordination with cathodic protection and


leak detection sub-contractor regarding the scheduling and sequence of
DATE:

construction.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

CONTRACTOR shall submit allowable settlement limits for tanks foundations


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

as per tank vendor specifications for SAUDI ARAMCO review and approval. In
(DCC) NO. _____________________

case actual settlements are more than recommended and not acceptable to

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 229


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco, CONTRACTOR shall improve the soil to ensure that edge and
SAY
SAY
SAY

differential settlements are within the limits concurred by SAUDI ARAMCO.


ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall coordinate with his Cathodic Protection Subcontractor


(CPS) to keep sleeves for conduits.
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall fulfill all requirements specified in Appendix B of 32-


SAMSS-005 for foundation design and construction.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall provide complete system for leak detection. Tanks in


services other than water shall be provided with an under tank leak detection
and sub-grade protection according to API STD 650, Appendix I.
DESCRIPTION

CONTRACTOR shall develop procedure and monitor tank settlement as per


API 650 standard and shall submit method statement to Saudi Aramco for
approval.

Dike wall for surge relief tank

CONTRACTOR shall design dike wall in accordance with Saudi Aramco


10-02399-
JO/EWO

10-02399-
10-02399-

Standard.
0001

0001
0001

CONTRACTOR shall provide vertical expansion joint in dike wall as per figure 2
12/11/16
08/04/16

09/08/16
DATE

of SAES-B-005.
NO.
REV

CONTRACTOR shall provide 1.5 mm thick HDPE liner below dike area with
D
C
B

DISCIPLINE appropriate HDPE insert on concrete dike wall inside face and outer face of
ENGINEER
ALL LEADS tank ring beam.
DATE: 12/11/16
PROJECT CONTRACTOR shall provide protective coating APCS-10 on concrete surfaces
ENGINEER

A M ALMATROOK
below grade.
DATE: 12/11/16
CERTIFIED CONTRACTOR shall provide protective coating APCS-1B on concrete surfaces
AMR EL SHARKAWY above grade.
12/11/16
DATE:
CONSTRUCTION
AGENCY
CONTRACTOR shall provide minimum 500 mm MARL cover for HDPE liner
SHAHZAD YAZDANI provided inside dike area.
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI Steel pipe support, pipe sleepers, structural platforms and crossovers
12/11/16
DATE:
CONTRACTOR shall provide structural pipe support, structural platforms and
CONTROL NUMBER
VERIFICATION

crossovers as per piping plans and design in accordance with SAUDI


EDSD

ARAMCO standards. CONTRACTOR shall provide all structural calculations for


SAUDI ARAMCO approval.
DATE:
BY:

CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

approval.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

CONTRACTOR shall provide concrete foundations for pipe supports, platforms,

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 230


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
SAY
SAY
SAY

foundations as per stress analysis load data in accordance with SAUDI


ARAMCO standards. CONTRACTOR shall provide all foundation design
ENGG CERT

ASH
ASH
ASH

calculations for SAUDI ARAMCO approval.


LEADS

LEADS
LEADS
ALL

ALL
ALL

Yanbu refinery scope

General
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall conduct detailed geotechnical investigation for all


foundation required inside Yanbu refinery as per SAES-A-113.
DESCRIPTION

CONTRACTOR shall conduct site survey to finalize the locations of


equipment’s and routing of piping, location of pipe supports, platforms and
crossovers inside Yanbu refinery.

CONTRACTOR shall conduct site visits to finalize the piping road crossing
inside Yanbu refinery plant as per piping plans. CONTRACTOR shall check
available space inside existing culverts to cross pipes for proposed lines and if
space is not adequate to cross the proposed lines CONTRACTOR shall
propose modifications of Existing culvert or new culverts with prior approval
10-02399-
JO/EWO

10-02399-
10-02399-

from SAUDI ARAMCO.


0001

0001
0001

Equipment Foundations
12/11/16
08/04/16

09/08/16
DATE

CONTRACTOR shall provide concrete foundations for surge relief pumps.


NO.
REV

D
C
B

DISCIPLINE CONTRACTOR shall design foundations as per vendor requirement of size


ENGINEER
ALL LEADS
and loading in accordance with SAUDI ARAMCO standards.
DATE: 12/11/16
PROJECT CONTRACTOR shall provide slab on grade and toe wall as per vendor
ENGINEER
requirement for equipment’s.
A M ALMATROOK

DATE: 12/11/16
CERTIFIED
CONTRACTOR shall provide anchor bolts as per vendor requirement in
AMR EL SHARKAWY accordance with SAUDI ARAMCO standards.
12/11/16
DATE:
CONSTRUCTION CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
AGENCY
SHAHZAD YAZDANI
IFC drawing for all equipment foundations.
DATE: 12/11/16
OPERATIONS
Surge relief tank
ALI H GHAMDI

12/11/16
CONTRACTOR shall conduct detailed geotechnical investigation at tank
DATE:
location to access tank settlement (immediate and long term) and soil bearing
CONTROL NUMBER
VERIFICATION

capacity for foundation design.


EDSD

Foundation sizes shown in project proposal drawings are indicative and


DATE:

CONTRACTOR shall design tank foundations for all loadings as per final IFC
BY:

load data. IFC load data shall cover all loadings for tank including tank shell,
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

tank roof and bottom plates, Empty weight, operating weight, hydro test weight,
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

corroded weight, wind load and seismic loading etc. and all loading shall be
(DCC) NO. _____________________

reported as per API-650 standard.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 231


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR is fully responsible for the design of tank foundations. E.g. type
SAY
SAY
SAY

of foundation, materials, quantities etc. the drawings those are being provided
to CONTRACTOR are for their reference and for cost estimate purpose. It is
ENGG CERT

ASH
ASH
ASH

CONTRACTOR’s responsibility to ensure that adequate tank foundations are


designed and built, including any soil improvement/replacement resulting from
LEADS

LEADS
LEADS
ALL

ALL
ALL

soil investigation/geotechnical report.

In case anchor bolts are required for tank anchorage to the foundations, then
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

anchor bolts shall as per SASD AA-036322-001 Rev 08. Coating requirement
of anchor bolts shall be as per 32-SAMSS-005 and bolts shall be coated with
fluoropolymer/ceramic; galvanized bolts shall not be used.
Fluoropolymer/ceramic coating shall be in accordance with 09-SAMSS-107. All
DESCRIPTION

anchor bolts shall be torqued to specified requirements.

CONTRACTOR shall work in close coordination with cathodic protection and


leak detection sub-contractor regarding the scheduling and sequence of
construction.

CONTRACTOR shall submit allowable settlement limits for tanks foundations


as per tank vendor specifications for SAUDI ARAMCO review and approval. In
case actual settlements are more than recommended and not acceptable to
10-02399-
JO/EWO

10-02399-
10-02399-
0001

Saudi Aramco, CONTRACTOR shall improve the soil to ensure that edge and
0001
0001

differential settlements are within the limits concurred by SAUDI ARAMCO.


12/11/16
08/04/16

09/08/16
DATE

CONTRACTOR shall coordinate with his Cathodic Protection Subcontractor


(CPS) to keep sleeves for conduits.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER
CONTRACTOR shall fulfill all requirements specified in Appendix B of 32-
ALL LEADS SAMSS-005 for foundation design and construction.
DATE: 12/11/16
PROJECT
ENGINEER
CONTRACTOR shall provide complete system for leak detection. Tanks in
A M ALMATROOK
services other than water shall be provided with an under tank leak detection
DATE: 12/11/16
and sub-grade protection according to API STD 650, Appendix I.
CERTIFIED
AMR EL SHARKAWY
CONTRACTOR shall develop procedure and monitor tank settlement as per
12/11/16
DATE: API 650 standard and shall submit method statement to Saudi Aramco for
CONSTRUCTION
AGENCY
approval.
SHAHZAD YAZDANI

DATE: 12/11/16 Dike wall for surge relief tank


OPERATIONS
ALI H GHAMDI

12/11/16 CONTRACTOR shall design dike wall in accordance with Saudi Aramco
DATE:
Standard.
CONTROL NUMBER
VERIFICATION
EDSD

CONTRACTOR shall provide vertical expansion joint in dike wall as per figure 2
of SAES-B-005.
DATE:
BY:

CONTRACTOR shall provide 1.5 mm thick HDPE liner below dike area with
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

appropriate HDPE insert on concrete dike wall inside face and outer face of
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

tank ring beam.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 232


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall provide protective coating APCS-10 on concrete surfaces
SAY
SAY
SAY

below grade.
ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall provide protective coating APCS-1B on concrete surfaces


above grade.
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall provide minimum 500 mm MARL cover for HDPE liner
provided inside dike area.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Steel pipe support, pipe sleepers, structural platforms and crossovers


DESCRIPTION

CONTRACTOR shall provide structural pipe support, structural platforms and


crossovers as per piping plans and design in accordance with SAUDI
ARAMCO standards. CONTRACTOR shall provide all structural calculations for
SAUDI ARAMCO approval.

CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO


approval.

CONTRACTOR shall provide concrete foundations for pipe supports, platforms,


10-02399-
JO/EWO

10-02399-
10-02399-
0001

crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
0001
0001

foundations as per stress analysis load data in accordance with SAUDI


ARAMCO standards. CONTRACTOR shall provide all foundation design
12/11/16
08/04/16

09/08/16
DATE

calculations for SAUDI ARAMCO approval.


NO.
REV

D
C
B

DISCIPLINE Pipeline from SAMREF and Yanbu refinery to YDH scope


ENGINEER
ALL LEADS

DATE: 12/11/16
General
PROJECT
ENGINEER

A M ALMATROOK
CONTRACTOR shall conduct site survey to finalize the pipeline routing
DATE: 12/11/16
CERTIFIED proposed during detailed design.
AMR EL SHARKAWY

DATE:
12/11/16 CONTRACTOR shall provide all adequate civil /structural arrangements for
CONSTRUCTION road crossings as proposed in pipeline drawings and this shall include but not
AGENCY
SHAHZAD YAZDANI
limited to soil excavation, backfilling, concrete lining, dewatering if required and
DATE: 12/11/16
detour for open cut road crossings.
OPERATIONS
ALI H GHAMDI CONTRACTOR shall conduct detailed geotechnical investigation at road
12/11/16 crossing location to assess soil condition to determine methodology to be used
DATE:
for thrust boring option.
CONTROL NUMBER
VERIFICATION
EDSD

If CONTRACTOR intends to use existing geotechnical report for sleeper


foundation designs along the route of pipelines, CONTRACTOR shall take prior
DATE:

approval from SAUDI ARAMCO and prepare standalone report indicating use
BY:

of existing borehole for deriving bearing capacity for foundation design.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall utilize project proposal geotechnical report 2015/104 for


(DCC) NO. _____________________

assessing soil conditions for Yanbu –Jiddah Highway crossing and Yanbu

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 233


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
refinery exit crossing.
SAY
SAY
SAY

Steel pipe support, pipe sleepers, structural platforms and crossovers


ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall provide structural pipe support, structural platforms and


LEADS

LEADS
LEADS
ALL

ALL
ALL

crossovers as per piping plans and design in accordance with SAUDI


ARAMCO standards. CONTRACTOR shall provide all structural calculations for
SAUDI ARAMCO approval.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO


approval.
DESCRIPTION

CONTRACTOR shall provide concrete foundations for pipe supports, platforms,


crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
foundations as per stress analysis load data in accordance with SAUDI
ARAMCO standards. CONTRACTOR shall provide all foundation design
calculations for SAUDI ARAMCO approval.

SECTION 5.0 – BUILDINGS


10-02399-
JO/EWO

10-02399-
10-02399-

GENERAL DESCRIPTION
0001

0001
0001

• All Fire Protection Equipment and Appurtenances shall be purchased as


12/11/16
08/04/16

09/08/16
DATE

specified in the SAUDI ARAMCO Materials System and SAES-U-101


NO.
REV

D
C
B

GENERAL ARCHITECTURAL BASIS OF DESIGN


DISCIPLINE
ENGINEER
ALL LEADS

DATE: 12/11/16 • All exterior walls will be CMU and insulated and cladded with drywalls from
PROJECT
ENGINEER
inside the buildings (Except Substation Building which will have precast panels
A M ALMATROOK walls as per SA standards) as per the BRA recommendations.
DATE: 12/11/16
CERTIFIED • All interior walls will be CMU and drywalls as per the standards and codes
AMR EL SHARKAWY
requirements.
12/11/16
DATE:
CONSTRUCTION
AGENCY • All exterior walls (Except Substation Building) will have plaster with paint
SHAHZAD YAZDANI finish.
DATE: 12/11/16 • All interior wall surfaces and exposed structures shall be painted and finished
OPERATIONS
in accordance with SAES-H-101V.
ALI H GHAMDI

DATE:
12/11/16
• Buildings will have acoustical ceiling tiles where allowed by standards and
CONTROL NUMBER

codes.
VERIFICATION
EDSD

• All roofs shall have waterproofing membrane system including complete


DATE:

insulation and roof accessories in compliance with SAES-M-100.


BY:
REVISIONCERTIFICATION


APPROVAL/CERTIFICATION REQUIREMENTS,

All buildings will have finishing materials as per Building Design and Finishing
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Guidelines (SAES-R-004) and as per the applicable standards.


(DCC) NO. _____________________

• Smoking Shelter is open (No walls) covered by steel structure shelter and
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 234


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
including 4 wooden bench.
SAY
SAY
SAY

• Substation Building design (Precast concrete Structure) shall be as per SAES-


ENGG CERT

ASH
ASH
ASH

M-009.
LEADS

LEADS
LEADS
ALL

ALL
ALL

• Fire barriers shall be provided to separate different use area. Fire walls shall
be provided to the Control room, equipment Room, Rack/Server room,
Telecom, HVAC, Electrical /UPS and Battery rooms. All fire barriers shall be
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

extending up to the underside of the roof.

• Interior framing, members, finishes, partition, cabinets, doors, and trim, shall
DESCRIPTION

be non-combustible.

• Provide gypsum board (fire rated and moisture resistant) drywall partitions
with insulation on metal studs with painted finish and ceramic tiles at wet
areas where required.

• All ceramic wall tiles finished shall be full height extended to under face of
ceiling. Ceramic wall base shall be cove and rounded edges at exposed
corner angles.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

• All separating wall shall be constructed to achieve a giving fire rating where
necessary exposed internal concrete surfaces shall be paint finished.
12/11/16
08/04/16

09/08/16
DATE

• Provide 19 mm thick plywood and finished with 2 coats of fire retardant paint
to Telecommunication Room. Plywood shall be installed on a fire resistive wall
NO.
REV

D
C
B

DISCIPLINE
assembly such as type ‘X’ fire rated gypsum board or concrete wall.
ENGINEER


ALL LEADS
Raised Access Floor shall be heavy grade access floor system with coated
DATE: 12/11/16
PROJECT
steel and durable anti-static pressure laminate floor. Where required this shall
ENGINEER
be chemical resistant and anti-static floor compound.
A M ALMATROOK

DATE: 12/11/16
CERTIFIED
• Provide anti-static vinyl tiles to Telecommunication Room and Electrical
AMR EL SHARKAWY Room.
12/11/16
DATE:
CONSTRUCTION • Provide non-slip acid resistant quarry tiles to Battery Room.
AGENCY
SHAHZAD YAZDANI

DATE: 12/11/16
• The ceiling at the Telecommunication Room, Mechanical and
OPERATIONS Electrical/Instrument Workshop shall be exposed smooth surface structure
ALI H GHAMDI and paint finished.
12/11/16
DATE:
• Battery Room shall be exposed smooth surface concrete structure with acid
CONTROL NUMBER
VERIFICATION

resistant paint finished.


EDSD

• All fire rated doors assemblies shall be labeled by an approved international


DATE:
BY:

testing agency. The labels shall comply with NFPA-80 and shall be
permanently affixed to the door frame. The label shall be applied at the factory
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

and shall show the following:


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

Name of manufacturer.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 235


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Trademark of the third-party inspection agency.
SAY
SAY
SAY

Fire-protection rating.
Maximum transmitted temperature end point for fire door exit enclosure and
ENGG CERT

ASH
ASH
ASH

exit passageway.
Smoke and draft control door shall show the letter “S” on the label.
LEADS

LEADS
LEADS
ALL

ALL
ALL

• All fire rated doors shall be provided with required fire rating including smoke
and draft seals in accordance with IBC Chapter 7, and UL listed, with
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

complete door assemblies and shutters according to IBC, under Section


715.3, and NFPA 80. Fire rated door shall not be provided with stoppers.
Double door shall be provided with dust proof and astragal, weather strip and
door bottom sweep.
DESCRIPTION

• Provide all exit doors with panic devices as per IBC 2009, Section 1008.1.10
and SAES-B-014, Section 5.13 and SAES-P-103 , Section 6.2.4

• All fire rated doors shall be provided with door closers and with smoke/in
tumescent seals to heads and both sides. Closer shall be specified to operate
for individual door size/weight and for particular internal and external.

• Provide all internal door sets paint finished galvanized steel and providing fire
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

and sound resistance where necessary. Doors with vision glass panel shall be
wired-glass. All ironmongery shall be stainless steel.
12/11/16
08/04/16

09/08/16
DATE

• Provide all external door paint finished, thermally insulated and fire-resistant
galvanized steel door with gas, dust and weather seals. Entrance door to air
NO.
REV

D
C
B

lock shall be safety tempered clear glass on powder coated aluminum


DISCIPLINE
ENGINEER finished.
ALL LEADS

DATE: 12/11/16
PROJECT
• Provide handrail and guard or combination of handrail and guard in
ENGINEER accordance with all requirements set forth in IBC-2009, Section 1012 and
A M ALMATROOK 1013 respectively.
DATE: 12/11/16
CERTIFIED
• Provide Emergency eyewash and shower to each Battery Room according to
AMR EL SHARKAWY SAES-B-069. (Typical for all the buildings which include Battery Room)
12/11/16
DATE:
CONSTRUCTION • All buildings windows must have, LOW-E (on 2nd. Face) double glazed (6mm,
AGENCY
16mm, 6mm), reflective heat strengthen exterior & clear tempered interior
SHAHZAD YAZDANI
glazing set in powder-coated (PVDF)-Thermally Broken aluminum window
DATE: 12/11/16
OPERATIONS
ALI H GHAMDI
5.1. MAIN GATEHOUSE
12/11/16
DATE:
CIVIL
CONTROL NUMBER
VERIFICATION


EDSD

For civil scope refer to section 4.22.


DATE:

STRUCTURAL
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

For structural scope refer to section 4.25.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 236


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
FIRE PROTECTION
SAY
SAY
SAY

• Placement of portable extinguisher in building shall comply with section


ENGG CERT

ASH
ASH
ASH

906, SAES-M-100.
LEADS

LEADS
LEADS
ALL

ALL
ALL

• Hand-type portable extinguisher shall be mounted in easily accessible


locations at grade. Their location shall be marked in RED in a way that will
attract attention, and otherwise meet the requirements of NFPA 10, Chapter
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

6.

• CONTRACTOR shall provide and Install Portable type Fire Extinguisher


DESCRIPTION

inside the Buildings as per Table -1, SAES-B-019.

• CONTRACTOR shall install all fire Extinguisher units less than 18 kg shall
be mounted so that the extinguisher top is not more than 1.5 m above the
floor level. Extinguisher units weighing over 18 Kg shall be mounted so that
extinguisher top is not more than 1.0 m above the floor level.

TELECOMMUNICATION

• CONTRACTOR shall procure, install, test and commission 1 basic IP


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

phone and 2 analog phones.


12/11/16
08/04/16

09/08/16


DATE

CONTRACTOR shall provide this building 4 outlets for voice and data
communication. UTP Cat 6 4-pr x 23 ga. Cable will be used going to each
RJ45 modules in each faceplate outlets.
NO.
REV

D
C
B

DISCIPLINE
ENGINEER • CONTRACTOR shall procure, install, test and commission one (1) Radio
ALL LEADS
Frequency Dispatch Terminal (RFDT) at the Guardhouse. The transceiver
DATE: 12/11/16
PROJECT
shall be located at the Security Support Building and the control head at the
ENGINEER Guardhouse.
A M ALMATROOK

DATE: 12/11/16
CERTIFIED
• Outdoor type Cat 6 4-pr x 23ga cable will be extended from the Support
AMR EL SHARKAWY Facility building for the connectivity required in the gatehouse. Cat 6
12/11/16 protector modules shall be provided by the Contactor.
DATE:
CONSTRUCTION
AGENCY
ELECTRICAL
SHAHZAD YAZDANI

DATE: 12/11/16
OPERATIONS • For Building electrical scope refer to section 4.15.
ALI H GHAMDI

DATE:
12/11/16 5.2. MUSALLAH
CONTROL NUMBER
VERIFICATION

CIVIL
EDSD

• Provide 8” diameter RTR pipe, 80FEOD, for sanitary waste water from
DATE:
BY:

the support buildings toilet sanitary pipe and shall be connected to


REVISIONCERTIFICATION

sanitary sewer network then heading to the sanitary lift station area.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

These will include the provision of sanitary manholes, cleanouts and other
C

fixtures.
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 237


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of D
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 296
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Provide 2” diameter RTR pipe, 12FEOU, from water supply network loop
SAY
SAY
SAY

to support building facilities toilet.


ENGG CERT

ASH
ASH
ASH

• Provide concrete sidewalks as required around the Support Building


LEADS

Facilities as shown site development plan. The sidewalk shall be 100mm


LEADS
LEADS
ALL

ALL
ALL

thick concrete provided with 150x150xMW9xMW9 welded wire fabric


(WWF) and shall be in accordance, as applicable, as per SAUDI
ARAMCO Standard drawing no. AB-036260 sheet 001 rev. 05.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

ARCHITECTURAL


DESCRIPTION

CONTRACTOR shall provide a 110 m2 air-conditioned building with


ablution, janitor store and toilets which shall be constructed to serve as the
main Musallah near the E & M building. The proposed Musallah capacity
shall be for approximately 45 persons with an ablution area and toilets.

` 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DESCRIPTION
REV
NO.
JO/EWO
DATE
OPRNS
ENGG
PMT
CERT
DATE
` 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DESCRIPTION
REV
NO.
JO/EWO
DATE
OPRNS
ENGG
PMT
CERT
DATE
` 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DESCRIPTION
REV
NO.
JO/EWO
DATE
OPRNS
ENGG
PMT
CERT
DATE
` 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DESCRIPTION
REV
NO.
JO/EWO
DATE
OPRNS
ENGG
PMT
CERT
DATE
` 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DESCRIPTION
REV
NO.
JO/EWO
DATE
OPRNS
ENGG
PMT
CERT
DATE
` 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DESCRIPTION
REV
NO.
JO/EWO
DATE
OPRNS
ENGG
PMT
CERT
DATE
` 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DESCRIPTION
REV
NO.
JO/EWO
DATE
OPRNS
ENGG
PMT
CERT
DATE
` 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DESCRIPTION
REV
NO.
JO/EWO
DATE
OPRNS
ENGG
PMT
CERT
DATE
` 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DESCRIPTION
REV
NO.
JO/EWO
DATE
OPRNS
ENGG
PMT
CERT
DATE
` 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DESCRIPTION
REV
NO.
JO/EWO
DATE
OPRNS
ENGG
PMT
CERT
DATE

You might also like