REVISION CERTIFICATE
REVISIONCERTIFICATION VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________ 00
00 12/2019 BBJ/SAS
OF THIS DRAWING IS COVERED, FOR ALL ISSUED FOR CONSTRUCTION
CONTROL NUMBER 00
APPROVAL/CERTIFICATION REQUIREMENTS,
AGENCY
BY:
PROJECT
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
DISCIPLINE
12/2019
CERTIFIED
OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ 743300-JO-2002-0008-
DATE:
QSWP
QURAYYAH
Saudi Aramco 2616-ENG (03/99)
DOC
SAUDI ARABIA
October 03, 2021
CONSTRUCTION
496
/
E
D
W
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY
NA
DRAWING NO.
SWED/PCU-0022/2021
S EDSD/2616-0399.doc
8
1
OF
CONSTRUCTION SCOPE OF WORK
SHT.NO.
00
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
BBJ/SAS
TABLE OF CONTENTS
ISSUED FOR CONSTRUCTION
12/2019
3.4 References 5
NO.
REV
00
00
DATE:
PROJECT
ENGINEER 5.0 DETAILED DESCRIPTION OF WORK - PHASE 900 6
COATING AND PAINTING
DATE: 6.1 General 6
CERTIFIED
DATE:
CONTROL NUMBER
VERIFICATION
00
EDSD
743300-JO-2002-0008-
DATE:
BY:
REVISIONCERTIFICATION
CIVIL SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DOC
OF THIS DRAWING IS COVERED, FOR ALL
OF 00
SDGM Trunk Line, Between D-801 & D-811, R 8
QSWP SAUDI ARABIA SWED/PCU-0022/2021
S EDSD/2616-0399.doc
W
E
REVISION
D
/
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
BBJ/SAS
ISSUED FOR CONSTRUCTION
DESCRIPTION
This Scope of Work describes clearly the work needed to construct new Lube Oil Storage Shelter to house
the lube oil containers (filled & empty containers) at Qurayyah Plant.
1.1.1 Excavate and compact the soil at the area under the new lube oil shelter in accordance with
SAES-A-114 Excavation and Compaction as indicated in the attached design drawing.
12/2019
DATE
12/2019 1.1.2 Construction of new shelter will be structural steel shade with an open side at north and be
divided into three parts, with one for used oil drums, filled drums & empty drums and with
NO.
REV
00
DISCIPLINE 1.1.3 The shelter floor should have dike in order to contain any spillage.
ENGINEER
1.1.4 The proposed sunshade shelter will be situated near the existing emergency eyewash with
DATE:
shower and reel hose. However, contractor to modify the existing support structures of the
PROJECT
ENGINEER
eyewash and reel hose.
1.1.5 Lightings shall be provided for this Lube Oil Storage Facility.
DATE:
1.1.6 Painting Works.
CERTIFIED
1.2 Description of phases
DATE:
CONSTRUCTION
AGENCY
The WORK phases shall be:
DATE:
Phase 200 - Civil
OPERATIONS Phase 900 - Coating & Painting
DATE:
1.3 Work Permits and Safety Requirements
CONTROL NUMBER
VERIFICATION
1.3.1 CONTRACTOR shall obtain work permits (refer to Section 3.2 of this Scope of
00
EDSD
CIVIL SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DOC
OF THIS DRAWING IS COVERED, FOR ALL
OF 00
SDGM Trunk Line, Between D-801 & D-811, R 8
QSWP SAUDI ARABIA SWED/PCU-0022/2021
S EDSD/2616-0399.doc
W
E
REVISION
D
/
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.3.2 CONTRACTOR shall comply with all SAUDI ARAMCO CONSTRUCTION
ENGG CERT
The WORK shall conform to the latest edition of the following Industry Codes and
Specifications.
CODE TITLE
ACI American Concrete Institute
JO/EWO
12/2019
The WORK shall conform to the latest revision of the following SAUDI ARAMCO Standards
and Specifications:
NO.
REV
00
00
DISCIPLINE
ENGINEER CODE TITLE
DATE:
SAES-A-113 Geotechnical Engineering Requirements
PROJECT
ENGINEER
743300-JO-2002-0008-
DATE:
SAES-P-123 Lighting
BY:
REVISIONCERTIFICATION
CIVIL SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DOC
OF THIS DRAWING IS COVERED, FOR ALL
OF 00
SDGM Trunk Line, Between D-801 & D-811, R 8
QSWP SAUDI ARABIA SWED/PCU-0022/2021
S EDSD/2616-0399.doc
W
E
REVISION
D
/
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
SAES-Q-010 Cement based, Non-Shrink Grout for Structural and Equipment Grouting
ISSUED FOR CONSTRUCTION
00
00
DISCIPLINE
14-SAMSS-533 Three-Phase Dry-Type Power Transformers
ENGINEER 16-SAMSS-518 Low Voltage Panel Boards
DATE:
PROJECT
CONTRACTOR supplied materials shall conform to the latest issue of the following
ENGINEER
Specifications:
DATE:
CERTIFIED
The Construction Contractor shall provide all quantities of the materials listed on the attached
drawings.
DATE:
CONSTRUCTION
AGENCY
All other materials must be approved by the COMPANY REPRESENTATIVE prior to use.
Samples of these materials must be submitted for approval.
DATE:
OPERATIONS 3.4 References
DATE:
CONTRACTOR shall perform the WORK in accordance with the applicable Codes, Standards and
Specifications listed in 3.1, 3.2 and 3.3 above. Specific reference may be made in the following
CONTROL NUMBER
VERIFICATION
sections of the Scope of Work to sections of these Codes, Standards and Specifications. This does
00
EDSD
not relieve CONTRACTOR of the obligation to comply with the requirements of all applicable
743300-JO-2002-0008-
sections of Codes, Standards and Specifications. Standards and Specifications listed in 3.1, 3.2 and
DATE:
BY:
REVISIONCERTIFICATION
CIVIL SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DOC
OF THIS DRAWING IS COVERED, FOR ALL
OF 00
SDGM Trunk Line, Between D-801 & D-811, R 8
QSWP SAUDI ARABIA SWED/PCU-0022/2021
S EDSD/2616-0399.doc
W
E
REVISION
D
/
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.3 above are not all inclusive; portions of other SAUDI ARAMCO, Industry, National, and
ENGG CERT
The Construction contractor shall perform to meet project objectives and shall consist of following
ISSUED FOR CONSTRUCTION
• Contractor shall verify all dimensions, locations and elevations before proceeding with the
construction work.
• Care shall be taken to avoid damage to existing facilities during excavation and construction.
Any damage to existing structures occurs during construction activities shall be restored to
its original state by the CONTRACTOR at own expense.
• Excavation, back filling and compaction shall be in accordance with SAES-A-114.
• Excavation should be limited to the minimum size necessary to perform the work. Care shall
be taken to avoid damage to existing underground utilities such as buried cables and pipes.
• All structural steel shall be coated as per APCS-26T of SAES-H-001.
JO/EWO
• CONTRACTOR shall maintain the level as shown in drawings and shall verify with existing
site conditions.
•
12/2019
CONTRACTOR shall verify the connection of members and shop welding should be as per
DATE
12/2019
AWS D1.1 standard.
• All structural steel members shall be galvanized as per 12-SMASS-007.
NO.
REV
00
00
DISCIPLINE
• All structural steel materials for wide flange W and WT shapes shall be ASTM-A572/A572M
ENGINEER OR ASTM-A992/A992M. All other structural steel materials shapes shall be ASTM-
A36/A36M as per 12-SAMSS-007.
DATE:
PROJECT
• CONTRACTOR shall provide anchor bolts for all supports as per Standard Drawing AA-
ENGINEER 036322.001. Rev.8
• All Anchor bolt must be hot-dip galvanized as per SAES-Q-005, Para 4.8 & 12-SAMSS- 007,
DATE:
CERTIFIED
Para 5.2.
• Cast-in-place concrete shall attain a minimum compressive strength of 32 Mpa at 28 days.
DATE:
• All Excavations, Backfill and Compact soil for foundations shall be in accordance with SAES-
CONSTRUCTION A-114. All excavation shall be done by hand tools only. If any machinery tools are required,
AGENCY
first take the approval from Saudi Aramco Project Engineer.
DATE:
• Backfill with select fill material as per SAES-A-114 and compact to 95% relative density as
OPERATIONS per ASTM-D698.
• Conduct compaction test to verify that the specified degree of compaction has been achieved.
DATE:
• Comply with the safety requirements and procedures specified in SAES-B-014 and SAES-H-
102.
CONTROL NUMBER
VERIFICATION
•
00
CONTRACTOR shall provide above ground and below ground protective coating for
EDSD
Foundation with APCS-1B and APCS-3 respectively as per Aramco Standard SAES-H- 101V.
743300-JO-2002-0008-
DATE:
BY:
REVISIONCERTIFICATION
CIVIL SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DOC
OF THIS DRAWING IS COVERED, FOR ALL
OF 00
SDGM Trunk Line, Between D-801 & D-811, R 8
QSWP SAUDI ARABIA SWED/PCU-0022/2021
S EDSD/2616-0399.doc
W
E
REVISION
D
/
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• CONTRACTOR to provide the required corrugated Aluminum sheet roofing and walls (siding
ENGG CERT
sheet) for new lube oil storage shelter (refer to BA-000167-sheet-01, Note-04).
• The 8” Ø RTR pipe from surface drainage shall be connected to the existing concrete
BBJ/SAS
containment dike opposite the new shelter. Likewise, existing holes (drain pit) inside the
containment dike (flooring) shall be repaired/covered to prevent leak.
• CONTRACTOR to maintain the existing eye wash with shower and fire hose reel near the
new storage shelter and repair all the existing corroded steel structures when needed.
• Provide new security fence Type-V (ref. AB-036677-001-02) with main gate (6.0m) and walk
ISSUED FOR CONSTRUCTION
gate (1.0m). Refer to the attached drawing details (Fence Gate & Walk Gate Lay-out Details
and DB-950238-001)
DESCRIPTION
• Remove waste materials promptly and dispose of debris to SAUDI ARAMCO designated
dumping area.
• CONTRACTOR shall verify the underground utilities by trial excavation, during Construction
stage. Contractor shall also confirm any underground obstructions before starting any
construction.
• CONTRACTOR shall construct the new storage shelter building as per project drawing no.
BA-000167.001, BA-000168.001 and BA-000169.001. This shelter shall be pre-engineered
building (PEB). This PEB shall be designed, fabricated and supplied by vendor.
JO/EWO
12/2019
5.1 General
NO.
REV
00
00
DISCIPLINE
ENGINEER 5.1.1 CONTRACTOR shall perform all works in accordance with the requirement of this project.
Any deviation must first be approved by COMPANY Representative prior to its
DATE: implementation.
PROJECT
ENGINEER
5.1.2 Cable routing shown in the drawings are diagrammatic. However, during construction phase,
DATE: some rerouting/modification may have to be done in order to avoid interferences with the
CERTIFIED
existing underground facilities. Any such rerouting / modifications arising due to site
condition shall be part of CONTRACTOR responsibility.
DATE:
5.1.3 Complete cabling and installation shall be performed by CONTRACTOR in conformance
CONSTRUCTION
AGENCY with the COMPANY approved Engineering Design. COMPANY Electrical inspector shall
inspect cable laying, testing and complete inspection in compliance with the latest
DATE: COMPANY Pre-commissioning forms and guide lines.
OPERATIONS
5.1.4 All electrical installation work shall be carried out in compliance with the latest National
Electrical Code (NEC) and applicable Saudi Aramco Engineering Standard SAES-P-104 &
DATE: SAES-P-111.
CONTROL NUMBER
5.1.5 Contractor shall connect the electrical supply to the existing store building opposite to the
VERIFICATION
00
5.1.6 CONTRACTOR shall install & route new cable from the existing electrical room (refer to
743300-JO-2002-0008-
DATE:
CIVIL SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DOC
OF THIS DRAWING IS COVERED, FOR ALL
OF 00
SDGM Trunk Line, Between D-801 & D-811, R 8
QSWP SAUDI ARABIA SWED/PCU-0022/2021
S EDSD/2616-0399.doc
W
E
REVISION
D
/
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
BBJ/SAS
6.1 General
ISSUED FOR CONSTRUCTION
6.1.1 CONTRACTOR shall provide above ground and below ground protective coating for Foundation
with APCS-1B and APCS-3 respectively as per Aramco Standard SAES-H- 101V
DESCRIPTION
6.1.2 be coated with two coats of coal tar or bitumen coating that confirms to APSC-10 or SAES-H-101.
6.1.4 Incorporate the coating Subcontractor's QA/QC procedure into CONTRACTOR’s QA/QC/
procedure.
7.1.1 Contractor shall verify the condition of the existing eyewash with shower.
12/2019
DATE
00
DISCIPLINE
ENGINEER
8.1 As-Built Drawings
DATE:
PROJECT
ENGINEER CONTRACTOR shall keep a complete and accurate record of all As-Built changes made during
construction of this Project. Within 30 days of completion of construction, CONTRACTOR shall
DATE: submit to the COMPANY REPRESENTATIVE three complete sets of construction packages
CERTIFIED marked up with all As-Built changes and dated, including material take-off (MTO) list. The As-
Built mark ups shall be done in a professional manner utilizing the green color for all deletions and
DATE: the red for all additions or changes. CONTRACTOR’s surveyor field books shall be included with
CONSTRUCTION
AGENCY the As-Built Drawings. Four copies of all QA/QC documentation (indexed and bound) shall be
submitted to SAUDI ARAMCO on the completion of this Project. All drawings shall have a revised
DATE: copy of the material take off (MTO) list, reflecting all changes made during construction in regard
OPERATIONS
to quantities, substitutions or deletions.
DATE:
CONTROL NUMBER
8.2.1 Issuing
743300-JO-2002-0008-
DATE:
BY:
REVISIONCERTIFICATION
CIVIL SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DOC
OF THIS DRAWING IS COVERED, FOR ALL
OF 00
SDGM Trunk Line, Between D-801 & D-811, R 8
QSWP SAUDI ARABIA SWED/PCU-0022/2021
S EDSD/2616-0399.doc
W
E
REVISION
D
/
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall request and SAUDI ARAMCO shall issue, Work Permits, Cold
ENGG CERT
Work Permits and all other permits in accordance with Section 29 of the SAUDI
ARAMCO Construction Safety Manual. Work Permits shall only be issued to
BBJ/SAS
8.2.2 Initiating
CONTRACTOR shall initiate timely requests for Work Permits as per G.I. 2.100 to avoid
ISSUED FOR CONSTRUCTION
unnecessary delay.
DESCRIPTION
8.2.3 CONTRACTOR shall obtain a Work Permit before working in any area and shall obtain
dual signatures where work encroaches within 30 meters or less of existing facilities.
8.2.4 CONTRACTOR shall notify COMPANY REPRESENTATIVE and apply for Hot Work
permit one (1) week in advance and Cold Work permits twenty-four (24) hours in advance.
9.0 CLEAN UP
It is the Contractor’s responsibility to leave the work site clean and orderly upon completion of the
JO/EWO
job.
12/2019
DATE
12/2019
- END OF WORK -
NO.
REV
00
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
00
EDSD
743300-JO-2002-0008-
DATE:
BY:
REVISIONCERTIFICATION
CIVIL SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DOC
OF THIS DRAWING IS COVERED, FOR ALL
OF 00
SDGM Trunk Line, Between D-801 & D-811, R 8
QSWP SAUDI ARABIA SWED/PCU-0022/2021
S EDSD/2616-0399.doc
W
E
REVISION
D
/