You are on page 1of 5

EDSD REV

REVISION CERTIFICATE
REVISIONCERTIFICATION VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
00
THIS INDICATES THAT REV. NO.__________
00 MAY-20 10-00688 ISSUED OR STAGE 3 DETAILED DESIGN MWA
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER R

NAN
APPROVAL/CERTIFICATION REQUIREMENTS,

MAY 20
MAY 20

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED

OPERATIONS
CONSTRUCTION
_____________________
(DCC) NO.10-00688-0001 DATE:
Saudi Aramco 2616-ENG (03/99)

JUBAIL
GENERAL DESCRIPTION OF THE FACILITY
SULFUR HANDLING AND EXPORT FACILITY
SULFUR FORMING AND EXPORT FACILITIES
(ESHE)

DOC

SAUDI ARABIA
MAY 2020
BI-10-00688

SECTION 01
PREPARED BY

F 13
OF THE FACILITY

JO / EWO:
O
GENERAL DESCRIPTION

DWG.TYPE PLANT NO. INDEX


SAUDI ARABIAN OIL COMPANY

-
BI-10-00688-0001
ISSUED FOR STAGE 3 DETAILED DESIGN

DRAWING NO.

RE -106142
BGP Expand Sulfur Handling and Export Facility

5
1
OF
SHT. NO.

00
REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

TABLE OF CONTENTS
ENGG CERT

MWA

SECTION DESCRIPTION PAGE NO.


R

1. GENERAL DESCRIPTION OF THE FACILITY ......................................................................................... 3

2. GENERAL PROJECT OVERVIEW ............................................................................................................. 4


MAY-20 10-00688 ISSUED OR STAGE 3 DETAILED DESIGN
NO. DESCRIPTION
JO/EWO
DATE
REV

00

DISCIPLINE
ENGINEER
NAN
MAY 20
DATE:
PROJECT
ENGINEER

MAY 20
DATE:
CERTIFIED

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

_____________________
(DCC) NO.10-00688-0001

GENERAL DESCRIPTION OF THE FACILITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
REVISION

SULFUR HANDLING AND EXPORT FACILITY DOC


F 13 RE -106142 2
SULFUR FORMING AND EXPORT FACILITIES O OF 00
JUBAIL SAUDI ARABIA JO / EWO: -
BI-10-00688-0001 5
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT

1. GENERAL DESCRIPTION OF THE FACILITY


MWA
R

Under BI 10-00688, Saudi Aramco will expand the Berri Gas Plant Sulfur Handling & Export
facility to upgrade the Industrial Security countermeasures to be compliant with the HCIS Security
Directives (2017). The BGP Sulfur Handling & Export facility is located inside of King Fahad
Industrial Port in Jubail, Saudi Arabia on the Arabian Gulf coast of the Kingdom of Saudi Arabia.
Its coordinates are Lat: 27.078747 Long: 49.673311.
MAY-20 10-00688 ISSUED OR STAGE 3 DETAILED DESIGN
NO. DESCRIPTION
JO/EWO
DATE
REV

00

DISCIPLINE
ENGINEER
NAN
MAY 20
DATE:
PROJECT
ENGINEER

MAY 20
DATE:
CERTIFIED
FIGURE 1: GEOGRAPHIC LOCATION OF BGP-ESHE

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

_____________________
(DCC) NO.10-00688-0001

GENERAL DESCRIPTION OF THE FACILITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
REVISION

SULFUR HANDLING AND EXPORT FACILITY DOC


F 13 RE -106142 3
SULFUR FORMING AND EXPORT FACILITIES O OF 00
JUBAIL SAUDI ARABIA JO / EWO: -
BI-10-00688-0001 5
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
2. GENERAL PROJECT OVERVIEW
ENGG CERT

The facility has existed since 1982, when the location was rebuilt due to an industrial accident.
The main business of the facility is the solidification, into pelletized form, of liquid sulfur that is
MWA

pumped via pipeline from the main Berri Gas Plant facility, located to the west. Sulfur is a bi-
R

product of the Gas Processing activities in Berri Gas Plant.

The intent of Saudi Aramco, under the direction of Saudi Aramco, for this project is to upgrade the
Sulfur Handling & Export Plant located in the King Fahd Industrial Port to meet HCIS Security
Directive 01-19 requirements so that the facility is fully compliant with government requirements.
MAY-20 10-00688 ISSUED OR STAGE 3 DETAILED DESIGN

Saudi Aramco will do this by replacing the perimeter, on all elevations, apart from the seaward
DESCRIPTION

facing elevation as this would impact directly on the ability of the facility loading operations to
function effectively. Furthermore, the intent is to replace the main entrance gate, to be
Classification 3 compliant and install ancillary measures required of a Classification 3 facility.

It should be noted that the proposed facility is located within a high security zone integral to the
wider King Abdullah Industrial Port complex. The port complex was previously classified, by HCIS,
as being Classification 1 and has been built to this specification. Therefore, any vehicles or
pedestrians approaching the Sulfur Handling & Export facility are required to transit through the
checks and procedures required for a Classification 1 facility in order to get to the Aramco facility.
Specifically, to get to the Sulfur Handling & Export facility a vehicle must pass through the Coast
JO/EWO

Guard checkpoint at the entrance on the causeway to the KFIP and then the KFIP Port Authority
Main Access Gate and finally the Saudi Aramco Main Entrance Gate at the facility itself. The
DATE

Sulfur Handling & Export facility is much less attractive than other facilities within the King Fahd
Industrial Port in that the facility is not exporting a material that is critically important to the Saudi
economy. Sulfur produced by Berri Gas Plant is a by-product of the gas plant’s gas processing
NO.
REV

00

operation.
DISCIPLINE
ENGINEER
NAN
Adjacent to the Saudi Aramco Sulfur Handling & Export facility is a loading berth for ships to be
MAY 20
DATE:
loaded with pelletized sulfur. However, this berth is owned and operated by KFIP Port Authority
PROJECT
ENGINEER and is the responsibility of KFIP Port Authority.
MAY 20
DATE:
CERTIFIED

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

_____________________

FIGURE 2: OVERALL LAYOUT OF EXISTING OF BGP-ESHE


(DCC) NO.10-00688-0001

GENERAL DESCRIPTION OF THE FACILITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
REVISION

SULFUR HANDLING AND EXPORT FACILITY DOC


F 13 RE -106142 4
SULFUR FORMING AND EXPORT FACILITIES O OF 00
JUBAIL SAUDI ARABIA JO / EWO: -
BI-10-00688-0001 5
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
The proposed BI-10-00688 BGP Expand Sulfur handling and export facility have been classified
as a Class 3 facility at previous Stage 1 SRA & COD.
ENGG CERT

 BGP-ESHE– Class 3
MWA
R

A comprehensive security system for the following buildings and locations shall be implemented:

Facility Perimeter:

 BGP-ESHE– Category 3
MAY-20 10-00688 ISSUED OR STAGE 3 DETAILED DESIGN

Gates:
DESCRIPTION

 Main Entrance Gate


 Emergency Gate 1 & 2

Protected Assets:

 Security Equipment & Support building


 Sulfur storage building
 New Pelletizer
JO/EWO

 Storage tanks
 New Sulfur transfer pumps
DATE

 Traveling ship loader


 Substation 21,22,23 & 24
NO.
REV

00

DISCIPLINE
ENGINEER
NAN
MAY 20
DATE:
PROJECT
ENGINEER

MAY 20
DATE:
CERTIFIED

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

_____________________
(DCC) NO.10-00688-0001

GENERAL DESCRIPTION OF THE FACILITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
REVISION

SULFUR HANDLING AND EXPORT FACILITY DOC


F 13 RE -106142 5
SULFUR FORMING AND EXPORT FACILITIES O OF 00
JUBAIL SAUDI ARABIA JO / EWO: -
BI-10-00688-0001 5

You might also like