Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
DESCRIPTION

100% DETAIL DESIGN ENGINEERING FOR


Issued for IFC

BI-23-10028 PUBLIC SCHOOLS – EAST DAMMAM II HOME OWNERSHIP

FIVE (5) SCHOOLS - DAMMAM


23-10028-
JO/EWO

0001
06/01/22
DATE

SCOPE OF WORK
NO.
REV

00

DISCIPLINE BOYS & GIRLS SCHOOL COMPLEX


ENGINEER

DATE:
PROJECT
ENGINEER

DATE:
CERTIFIED

DATE:
CONSTRUCTION
January 06 2022
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:

Al Khobar Saudi Arabia


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 1


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SCOPE OF WORK – DAMMAM

TABLE OF CONTENTS
ENGG CERT

Contents 
1.  INTRODUCTION ................................................................................................................................................... 3 
2.  GENERAL DESCRIPTION OF THE WORK ........................................................................................................ 3 
3.  SAFETY .................................................................................................................................................................. 8 
4.  SPECIFIC DESCRIPTION OF WORK ................................................................................................................ 10 
DESCRIPTION

4.1.  Site Preparation ............................................................................................................................................. 10 


Issued for IFC

4.2.  Excavation ..................................................................................................................................................... 11 


4.3.  Backfilling and Compaction .......................................................................................................................... 11 
4.4.  Subbase ......................................................................................................................................................... 12 
4.5.  Base ............................................................................................................................................................... 13 
4.6.  Prime Coat ..................................................................................................................................................... 13 
4.7.  Tack Coat ...................................................................................................................................................... 14 
23-10028-
JO/EWO

4.8.  Asphalt Concrete ........................................................................................................................................... 14 


0001

4.9.  Hardscape and Landscape ............................................................................................................................. 15 


06/01/22
DATE

4.10.  Water System ................................................................................................................................................ 16 


4.11.  Fire Water System ......................................................................................................................................... 17 
NO.
REV

00

4.12.  Sewer System ................................................................................................................................................ 18 


DISCIPLINE
ENGINEER
4.13.  Irrigation System ........................................................................................................................................... 18 
DATE: 4.14.  Storm Drainage System ................................................................................................................................. 19 
PROJECT
ENGINEER 4.15.  Applicable Codes and Standards ................................................................................................................... 20 
4.16.  Architectural Work ........................................................................................................................................ 20 
DATE:
CERTIFIED 4.17.  Structural Work ............................................................................................................................................. 25 
4.18.  Electrical Works ............................................................................................................................................ 27 
DATE:
CONSTRUCTION
AGENCY
4.19.  Mechanical Works......................................................................................................................................... 38 
4.20.  Telecommunication Work ............................................................................................................................. 48 
DATE:
OPERATIONS 4.21.  Instrumentation.............................................................................................................................................. 62 
5.  ADDITIONAL STUDIES & ENGINEERING DELIVERABLES ....................................................................... 64 
DATE: Engineering Deliverables................................................................................................................................................ 65 
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 2


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SCOPE OF WORK

1. INTRODUCTION
ENGG CERT

1.1 The Scope of the Work to be performed by CONTRACTOR pursuant to this


Contract, and describes or references, in the applicable drawings, Standards and
Specifications, the technical requirements that CONTRACTOR shall satisfy or
adhere to in accomplishing the WORK.

1.2 CONTRACTOR shall work on the basis of this Scope of Work, together with the
DESCRIPTION

Issued for IFC

Drawings, applicable standards and Construction Specifications listed in the project


documents.

1.3 CONTRACTOR shall perform a site survey to fully understand the project facilities
to be provided. Particular attention shall be paid to identifying any underground
utilities or any other obstructions encountered during the execution of the project
which are not shown on the Project Drawings.
23-10028-
JO/EWO

1.4 CONTRACTOR is responsible for the protection of the existing utilities adjacent to
0001

project site whereas to be used for tapping-in and any required to complete the
work. Any damage caused by the CONTRACTOR to the existing utilities and or
06/01/22
DATE

facilities shall be made good to Saudi Aramco at no cost.


NO.
REV

00

DISCIPLINE
1.5 CONTRACTOR shall be responsible for performing surveys to verify all
ENGINEER
dimensions, angles, and elevations before fabrication. This is especially important
DATE:
for all dimensions and angles stipulated and shown in the Project Drawings.
PROJECT
ENGINEER
2. GENERAL DESCRIPTION OF THE WORK
DATE:
CERTIFIED
2.1 The scope of work of this Contract are (5) school buildings consists of Boys & Girls
DATE:
Elementary, Intermediate, Secondary, and Kindergarten. Supported with outdoor
CONSTRUCTION facilities which are to be built in an empty land each respectively. Designated as
AGENCY
vast natural deserted lot area of 35,400 square meters for Boys school complex
DATE: and 40,900 square meters for the girls and kindergarten school complex. These (2)
OPERATIONS
two complexes were surrounded and will support Saudi Aramco housing
community project.
DATE:
CONTROL NUMBER
VERIFICATION

The site development plan indicating proposed school building locations, outdoor
EDSD

facilities and internal circulation is shown and indicated in Drawing HA-275036 for
boy’s complex and HA-275037 for girl’s complex, both sheet 001.
DATE:
BY:
REVISIONCERTIFICATION

The drawings and specification provided with this contract are 30% Detailed
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Design Engineering Package. LSPB Contractor has to undertake detailed design


(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 3


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
for both boys and girls school complexes through Saudi Aramco approved
engineering consultant to develop a complete detailed engineering package for
ENGG CERT

construction.

There are no existing utilities expected to be encountered during the construction


within the school’s site under this contract. There are existing utilities to tie-in
adjacent and outside each school site. See drawing no. HA-275036 & HA-275037.
CONTRACTOR shall identify tie-in points as per design required. CONTRACTOR
shall coordinate with Municipality, MOWE, STC and other government agencies to
identify and locate existing utilities within the proposed school site.
DESCRIPTION

Issued for IFC

CONTRACTOR shall be responsible for Government coordination, approval, and


final permit and fees including Arabic drawing.

2.1.1 CONTRACTOR shall furnish all plant, tools, equipment, temporary facilities, labor,
supervision, technical and professional services, consumables, materials and shall
perform all operations and incidentals required to complete the construction
activities as outlined in the scope of work. The WORK shall be carried out in
accordance with the terms and conditions of this Contract, the Technical
Specifications and Drawings, and all standards referenced in the Scope of Work.
23-10028-
JO/EWO

0001

2.2 The WORK to be performed by CONTRACTOR includes, but shall not be limited
to, the following:
06/01/22
DATE

2.2.1 Site preparation, site detailed surveys, clearing, grading, site and road excavation
whether in common soil or in rock and backfilling, compaction of trenches and
NO.
REV

00

DISCIPLINE pavement reinstatement, foundations of all structures, transportation of any needed


ENGINEER
borrow materials, and disposal of excess and unsuitable materials at a
DATE:
Government approved dumping area or at location designated by Saudi Aramco.
PROJECT
ENGINEER
2.2.2 Utilities:
DATE:
CERTIFIED 2.2.2.1 Provision of electrical utility systems including indoor lighting, power
distribution equipment, receptacles, wiring, above and underground
DATE: cabling, power supply, transformers and service equipment, power
CONSTRUCTION
AGENCY
cabling inside and outside buildings, and power source for the proposed
schools.
DATE:
OPERATIONS 2.2.2.2 Provision of SEC & Electrical room for each school building located
nearby as support respectively.
DATE:
2.2.2.3 Provision for drinking water, fire water, irrigation water, raw water and
CONTROL NUMBER
VERIFICATION

waste water piping with all required accessories and appurtenances to


EDSD

serve the schools, including trench excavation, dewatering if necessary,


bedding, installation of utilities, backfilling and compaction of backfill to
DATE:

specified standards, in addition to testing and disinfection of pipes prior


BY:

to use.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

2.2.2.4 Provision for a plumbing system including drinking water system.


(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 4


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.2.2.5 Provision of chilled water system and associated equipment for
each building to serve.
ENGG CERT

2.2.2.6 Provision of chiller yard and chiller pump shed separately to serve
each school building respectively.

2.2.2.7 Provision of RO & FW/RW pump rooms separately to serve each


school building respectively.

2.2.2.8 Provision of a fire fighting system including sprinkler system and all
DESCRIPTION

necessary equipment, portable fire extinguishers, fire hose cabinets,


Issued for IFC

fire pumps and fire water tank areas.

2.2.2.9 Provision of designated service/emergency access to utilities with


gate for each school building.

2.2.2.10 Provision of fire detection system to both Boys and Girls school
buildings.

2.2.2.11 Provision for a complete VoIP/data communications system, Master


23-10028-
JO/EWO

0001

Synchronized Digital Clock and Bells System and CCTV system to


serve the schools including cabling and equipment inside the
06/01/22

building and analog telephone infrastructure of the building.


DATE

Provision for telecommunications cables inside and outside


buildings with all accessories and appurtenances. Note that the
NO.
REV

00

DISCIPLINE
LSPB CONTRACTOR will provide infrastructure for the following IT
ENGINEER equipment; computers, smart boards, copy machines, printers and
projectors and the equipment itself shall be provided by others.
DATE:
PROJECT
ENGINEER 2.2.3 Site:

DATE: 2.2.3.1 Provision of site imported fill to achieve higher elevation than the
CERTIFIED
surroundings to have positive drainage system that discharges
towards the road.
DATE:
CONSTRUCTION
AGENCY 2.2.3.2 Provision for paved asphalt parking and concrete sidewalks on the
front and sides of the (2) two school complexes.
DATE:
OPERATIONS
2.2.3.3 Provision for paved concrete sidewalks and walkways network
system that connects all the proposed facilities within the school lot
DATE: areas.
CONTROL NUMBER
VERIFICATION

2.2.3.4 Installation of area illumination within the school lot areas.


EDSD

DATE:

2.2.3.5 Provision of pre-cast concrete solid panel boundary/perimeter walls


BY:

with steel grilles on the front side of the proposed boys and girls
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

school site complexes.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 5


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.2.3.6 Provision for site development including planting, irrigation, site
furniture, benches, waiting shed, assembly points, entrance gate,
flag pole, play grounds, etc.
ENGG CERT

2.2.3.7 Provision of backfilling and necessary marl capping and landscaping


in the area of the proposed school complexes both boys & girls.

2.2.3.8 Provision and construction of concrete apron around the proposed


school buildings.

2.2.3.9 Provision of pavement striping, markings, parking lines, and


DESCRIPTION

associated traffic signage and informative signs for cars and bus
Issued for IFC

drop-off/pick-up zones as per MOT standard.

2.2.3.10 Provision and construction of pedestrian across the road width


including raised median to separate drop-off/ pick-up zone from the
roadway.

2.2.3.11 Provision of 8.00 meters wide fire truck service entry and exit
access gate within the school site for both complexes.
23-10028-
JO/EWO

0001

2.2.3.12 Provision of Emergency parking area along the asphalted fire truck
access way road.
06/01/22
DATE

2.2.3.13 Provision of asphalted access way along 2.40 meters high precast
wall for fire truck.
NO.
REV

00

DISCIPLINE
ENGINEER 2.2.3.14 Provision of drop-off and pick-up points for cars and buses situated
at front side of the school complexes
DATE:
PROJECT
ENGINEER 2.2.3.15 Installation of emergency access in between school buildings.

DATE: 2.2.3.16 Provision of asphalted internal parking area situated at boys’ school
CERTIFIED
complex and early childhood school site.
DATE:
CONSTRUCTION
2.2.4 Buildings and Outdoor Structures:
AGENCY

2.2.4.1 Provision for permanent (3) 2-storey school buildings such Early
DATE:
Childhood, Boys Intermediate & Secondary, Girls Intermediate &
OPERATIONS
Secondary with rigid steel frame and precast concrete perimeter
wall cladding with dry wall internal partitions. For indoor gym's
DATE: external wall is pre-cast and internal wall concrete masonry unit the
CONTROL NUMBER

buildings are fully air-conditioned by variable air flow chilled water


VERIFICATION

system.
EDSD

DATE:

2.2.4.2 Provision for permanent (2) 1-storey school buildings such Boys
BY:

Elementary & Girls Elementary with rigid steel frame and precast
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

concrete perimeter wall cladding with dry wall internal partitions. For
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Indoor Gym’s external and internal walls are concrete masonry unit.
(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 6


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The buildings are fully air-conditioned by variable air flow chilled
water system.
ENGG CERT

2.2.4.3 Provision for permanent outdoor and indoor Basketball Volleyball


courts.

2.2.4.4 Provision of outdoor soccer field play area, shaded seating, and all
essentials to complete the work.

2.2.4.5 Provision for permanent Shaded Playground including play


structure/equipment with space frame structure.
DESCRIPTION

Issued for IFC

2.2.4.6 Provision for permanent single storey Guard Room in precast


concrete insulated panel bearing walls and precast hollow core slab
located along each main entrance.

2.2.4.7 Provision for electrical room in precast concrete panel bearing walls
and precast hollow core slab.

2.2.4.8 Provision for RO & RW/FW Pump Room in precast concrete panel
bearing walls and precast hollow core slab.
23-10028-
JO/EWO

0001

2.2.4.9 Provision for chiller yard and FW/RW tanks area.


06/01/22
DATE

2.2.4.10 Provision for shaded chiller pump shed.


NO.
REV

00

DISCIPLINE
2.2.4.11 Provision of waiting shed for every school building located within
ENGINEER and outside main entrance of the project complexes.

DATE:
2.2.4.12 Provision of guard rooms for each school buildings located in front
PROJECT
ENGINEER entrances.

DATE: 2.2.4.13 Provision of precast concrete panel for Chiller Plant and FW/RW
CERTIFIED
Tanks Area enclosures.
DATE:
CONSTRUCTION
2.2.4.14 Provision of trash enclosure located at the back of the schools
AGENCY respectively.
DATE:
2.2.4.15 Provision of internal parking with fence and access gates at Boys
OPERATIONS
school complex.

DATE: 2.3 CONTRACTOR shall provide all required personnel and equipment and all other
CONTROL NUMBER

work required to provide complete operational facilities.


VERIFICATION
EDSD

2.4 CONTRACTOR shall furnish three (3) sets of reproducible final as-built drawings
DATE:

and electronic files related to this project.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

2.5 CONTRACTOR shall perform continuous site clean-up during the project and after
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

demobilization.
(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 7


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.6 CONTRACTOR to check permeability test/infiltration rate of the existing ground.

2.7 Testing all materials shall be done at CONTRACTOR’s expense by an independent


ENGG CERT

Saudi Aramco approved laboratory or independent laboratory chosen by Saudi


Aramco.
2.8 Testing and commissioning of all the works by CONTRACTOR shall be done by
qualified personnel.

3. SAFETY

All work to be carried out in accordance with the Saudi Aramco Construction Safety
DESCRIPTION

Manual and Saudi Aramco Safety Handbook. Furthermore, CONTRACTOR shall provide
Issued for IFC

safety plan and Hazard Identification Plan (HIP) for Loss Prevention approval.

3.1 CONTRACTOR shall comply at all times with SAUDI ARAMCO safety, health and
environmental (SH&E) requirements, specifications, regulations, procedures and
standards, but not limited to the following:

1. SAUDI ARAMCO General Instructions (GIs) and Environmental Impact


Assessment Procedure (SAEP-13);
23-10028-
JO/EWO

0001

2. The SAUDI ARAMCO Construction Safety Administrative Requirements (CSAR),


which is Volume One of the SAUDI ARAMCO Construction Safety Manual (CSM);
06/01/22
DATE

3. The SAUDI ARAMCO Work Site Safety Manual (WSSM), which is Volume two of
the CSM;
NO.
REV

00

DISCIPLINE
ENGINEER 4. The SAUDI ARAMCO Environmental Health Code (SAEHC),
DATE:
PROJECT
5. GI. 151.006 for Saudi Aramco Environmental Health Code (SAEHC)
ENGINEER

6. The SAUDI ARAMCO Safety Handbook;


DATE:
CERTIFIED
7. The SAUDI ARAMCO Minimum Medical Requirements Standards Requirement
Manual (MMSR);
DATE:
CONSTRUCTION
AGENCY
8. COVID-19 Prevention Protocol by JHAH & MOH.
DATE:
OPERATIONS
9. All applicable Saudi Arab Government SH&E regulations and, where applicable,
International Treaties and conventions ratified by the Saudi Arabian Government;
and All additional requirements specified in this contract.
DATE:
CONTROL NUMBER

Furthermore, CONTRACTOR is responsible to the following;


VERIFICATION
EDSD

a. Establish and implement programs and procedures relating to Safety, Quality and
DATE:

Environmental Management systems, job site records, labor relations and progress
BY:

reports.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 8


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
b. CONTRACTOR supervisory personnel or other qualified staff shall be present at
the WORK Site at all times while WORK is in progress.
ENGG CERT

c. CONTRACTOR shall provide qualified Safety staff as described in the CSAR,


applicable to their staffing levels at any given time. Safety staff shall be present at
the WORK Site at all times while CONTRACTOR Personnel are working, including
nights, weekends, holidays and extended working hours, as described in the
CSAR. CONTRACTOR safety staff shall not be assigned dual roles (e.g., not also
be work permit receivers, scaffold inspectors, etc.).

d. CONTRACTOR shall, as a minimum, provide, maintain and enforce use of the


DESCRIPTION

personal protective equipment (PPE) described in “Chapter I-3: Personal Protective


Issued for IFC

Equipment” of the CSM. Minimum PPE for this project consists of: head protection
(hard hat), safety eye-protection, gloves, safety footwear and high visibility vest
which shall be worn inside the work sites perimeter fences and entrance gates at
all times by all personnel. PPE shall be suitable to control the task risks, selected
and used based upon the results of a documented risk-based PPE needs analysis,
which shall consider the exposure hazards, materials handled, and activities
performed by personnel. Contractor’s documented PPE needs analysis shall be
made available to the SA proponent organization (SAPO) upon request.
23-10028-
JO/EWO

0001

e. CONTRACTOR Personnel shall comply with all Saudi Arab Government and
SAUDI ARAMCO traffic safety rules, laws and regulations, including GI 6.030,
06/01/22

Traffic and Vehicle Safety, paying particular attention to the Vehicle Condition and
DATE

Driver Responsibilities listed in Supplement-I of GI 6.030.


NO.
REV

00

DISCIPLINE
f. CONTRACTOR shall ensure that passengers travel only in vehicles that are
ENGINEER provided with passenger seats. Seat belts shall be installed for all seats and used
in all vehicles carrying personnel as described in the SAUDI ARAMCO Contractor
DATE:
Safety Administrative Requirements (CSAR).
PROJECT
ENGINEER

g. SAUDI ARAMCO reserves the right to require removal of any CONTRACTOR


DATE: Personnel or other personnel from the WORK Site if it is believed, in SAUDI
CERTIFIED
ARAMCO’s reasonable discretion that such person is not suitable for the job. Costs
incurred by CONTRACTOR as a result of such removal shall be solely
DATE:
CONSTRUCTION
CONTRACTOR’s responsibility, and any resultant CONTRACTOR performance
AGENCY delays shall not be deemed excusable hereunder.
DATE:
h. CONTRACTOR shall comply with the incident reporting requirements of SAUDI
OPERATIONS
ARAMCO GI 6.007, Reporting of Contractor On-Job Injuries/Occupational
Illnesses, which includes an immediate written report of all on-job injuries or
DATE: occupational illnesses regardless of severity.
CONTROL NUMBER
VERIFICATION

i. CONTRACTOR shall ensure that an immediate oral report and preliminary written
EDSD

report is made to the Company Representative in the case of any incident with:
DATE:
BY:

i. Damage over SR10,000 to CONTRACTOR's plant or equipment,


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

ii. Damage, in any amount, to SAUDI ARAMCO equipment or property,


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

iii. Damage and all incidents involving cranes and heavy equipment, or
(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 9


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
iv. Fire, explosion or hazardous materials release.
ENGG CERT

j. For an incident resulting in CONTRACTOR Personnel fatality, serious injury to


CONTRACTOR Personnel or damage to SAUDI ARAMCO equipment or property,
the CONTRACTOR shall conduct an incident investigation, including a structural
root cause analysis. CONTRACTOR shall submit a copy of the draft incident
investigation report and the final report to the Company Representative for review
in a timely manner. In addition, SAUDI ARAMCO reserves the right to convene an
investigation committee in accordance with GI 6.003, Incident Investigation.
DESCRIPTION

k. CONTRACTOR shall maintain a current record showing all:


Issued for IFC

i. WORK injuries/illnesses/fatalities
ii. Motor vehicle collisions
iii. Incidents to CONTRACTOR's plant or equipment over SR10,000
iv. Incidents involving damage to SAUDI ARAMCO equipment and property
v. Damage and all incidents involving cranes and heavy equipment
vi. Fires, explosions, toxic releases.
vii. Near miss incidents
23-10028-
JO/EWO

0001

l. CONTRACTOR shall submit to the Company Representative electronic and


hardcopy copies of this record as required by GI 6.007, Chapter I-2, Incident
06/01/22
DATE

Reporting and Investigation, of the SAUDI ARAMCO Construction Safety Manual


(CSM) and as requested by the Company Representative.
NO.
REV

00

DISCIPLINE
m. The CONTRACTOR shall provide trained and competent staff and shall comply
ENGINEER with project training requirements by making staff readily available for training
events deemed necessary to ensure continued competency.
DATE:
PROJECT
ENGINEER
4. SPECIFIC DESCRIPTION OF WORK
DATE:
CERTIFIED 4.1. Site Preparation

DATE:
The WORK shall include but shall not be limited to the following:
CONSTRUCTION
AGENCY
4.1.1 CONTRACTOR shall perform all the surveys necessary to layout the
DATE:
project facilities (HVAC for chiller water room, pump room and electrical
OPERATIONS room).

4.1.2 CONTRACTOR shall field verify the existing conditions. If any deviations on
DATE:
the Drawings from the existing situation are observed, the discrepancy shall
CONTROL NUMBER
VERIFICATION

be brought to the attention of Saudi Aramco Representative before any


work is to commence.
EDSD

DATE:

4.1.3 CONTRACTOR shall remove all unsuitable materials from within the
BY:

construction limits. Areas where unsuitable materials are encountered shall


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

be excavated until the complete removal of debris is accomplished.


23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Unsuitable materials include, rocks larger than 30 cm, debris or vegetation,


(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 10


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
organic clay, top soil, or any specific material so designated in writing by
Saudi Aramco Representative.
ENGG CERT

4.1.4 CONTRACTOR shall clear the site in advance of earthwork construction.

4.1.5 Prior to placing any fill material on the natural subgrade levels,
CONTRACTOR shall clear the area of all vegetation, debris and any other
deleterious material, and fill all ruts, soft areas, localized depressions and
other defects with suitable material.

4.2. Excavation
DESCRIPTION

Issued for IFC

The WORK shall include but shall not be limited to the following:

4.2.1 CONTRACTOR shall excavate for the required foundations at the locations
specified on the drawings.

4.2.2 CONTRACTOR shall excavate trenches for underground electric and non-
electric utility lines and cables as shown on the drawings.

4.2.3 All excavations for structures, utility pipes, cables shall be made to such an
23-10028-
JO/EWO

0001

extent that will provide sufficient space to work conveniently around the
structure or utility pipes.
06/01/22
DATE

4.2.4 Excavated material shall be designated as suitable or unsuitable for use as


fill by Saudi Aramco Representative. Suitable excavated material shall be
NO.
REV

00

DISCIPLINE
used to construct fill layers. Unsuitable material shall be disposed of off-site
ENGINEER in conformance with the Specifications.
DATE:
PROJECT
4.2.5 CONTRACTOR shall dewater all trenches and excavations before installing
ENGINEER
below grade foundations, or laying underground utilities. All excavation and
trenches shall be kept dry until the structures, pipes and appurtenances to
DATE:
CERTIFIED
be built/installed are completed and backfilled.
CONTRACTOR shall verify any existing underground utilities prior to
excavation. Existing underground utilities encountered during excavation
DATE:
CONSTRUCTION shall be directly notified to Saudi Aramco Representative.
AGENCY

4.3. Backfilling and Compaction


DATE:
OPERATIONS
The WORK shall include but shall not be limited to the following:
DATE:
4.3.1 Preparation of Subgrade: Prior to placing any fill material on the natural
CONTROL NUMBER
VERIFICATION

subgrade, the existing subgrade shall be compacted as per construction


specifications.
EDSD

CONTRACTOR shall construct the subgrade conforming to the cross


DATE:

section shown on the plans and maintain the finished surface in a smooth
BY:

and compacted condition until covered by subsequent construction layers.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 11


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.3.2 Fill Material: Locally available material that satisfies Specifications for fill
shall be used, subject to Saudi Aramco Representative approval, prior to
importing borrow fill or transporting fill material to WORK site areas. Saudi
ENGG CERT

Aramco Representative reserves the right to inspect and test the fill material
for conformity with Specifications.

Fill materials shall be placed in layers as per construction specifications


before compaction. Each layer of fill material shall be moistened or dried to
a uniform moisture content suitable for maximum compaction.

All fill materials shall be compacted as per construction specifications.


DESCRIPTION

Issued for IFC

CONTRACTOR shall perform in-place density tests ASTM D1556, D4703.


Tests shall be made after compaction of each layer of fill.4.3.3 Structure
Backfilling: Backfilling around foundations shall be in accordance with
specifications. Fill and backfill under structures and adjacent to structures
shall be select fill as per Specifications - Section 02200 Earthwork. Fill and
backfill materials shall be placed in layers not exceeding 15 cm in thickness
after compaction.

4.3.4 Trench Backfill: The bottom of trench shall be free of material that causes
23-10028-
JO/EWO

0001

damage to pipes, cables or other new construction.


06/01/22

Cables, utility pipes shall be laid on a ground bed in accordance with


DATE

specifications unless otherwise specified in the drawings. All trenches shall


be inspected by Saudi Aramco Representative prior to backfilling.
NO.
REV

00

DISCIPLINE
ENGINEER Fill material shall be placed in successive layers, and compacted until it has
reached the required elevation. The layers shall not exceed 200 mm in
DATE:
thickness before compaction.
PROJECT
ENGINEER

All fill materials shall be compacted as per construction specifications.


DATE:
CERTIFIED
CONTRACTOR shall perform in-place density tests ASTM D1556, D4703.
Tests shall be made after compaction of each layer of fill.
DATE:
CONSTRUCTION
AGENCY 4.4. Subbase
DATE:
OPERATIONS
The WORK shall include but shall not be limited to the following:

4.1.1 Subbase course material shall consist of mixture of gravel and stone
DATE:
fragments with sand, silt and clay. Individual sizes of materials shall be
CONTROL NUMBER

blended by a mixing plant as necessary to meet grading requirements of


VERIFICATION

specifications.
EDSD

DATE:

4.1.2 The subbase material shall not be placed until the subgrade upon which it is
BY:

to be placed has been approved by Saudi Aramco Representative.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

4.1.3 Subbase course shall be compacted to not less than 95% of the maximum
(DCC) NO. _____________________

density as determined by ASTM D-1557.

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 12


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.4.4 Following the construction of subbase, the compacted subbase course shall
be maintained by the CONTRACTOR until such time as other surface is
ENGG CERT

applied.

4.5. Base

The WORK shall include but shall not be limited to the following:

4.5.1 Aggregates for base course material shall consist of clean, tough, durable,
DESCRIPTION

sharp angle fragments free from any excess of thin or elongated pieces,
Issued for IFC

and free of decomposed stone, dirt, organic matter, shale, clay, clay lump
or other deleterious matter. Base course material shall be crushed rock or
crushed gravel, mixed with fine material, of suitable binding quality as per
specifications.

4.5.2 The base course material shall not be placed until the subbase upon which
it is to be placed has been approved by Saudi Aramco Representative.

4.5.3 Base course shall be compacted to not less than 100% of the maximum
23-10028-
JO/EWO

0001

density as determined by ASTM D-1557.


06/01/22

4.5.4 Following the construction of aggregate base, the compacted base course
DATE

shall be maintained by the CONTRACTOR until such time as the


bituminous prime or other surface is applied.
NO.
REV

00

DISCIPLINE
ENGINEER 4.6. Prime Coat
DATE:
PROJECT
The WORK shall include but shall not be limited to the following:
ENGINEER

4.6.1 Prime coat shall be MCC-70 conforming to specification requirements or as


DATE: approved by Saudi Aramco Representative.
CERTIFIED

4.6.2 Prior to applying primer bituminous material, the surface shall be cleaned of
DATE:
CONSTRUCTION
all loose dirt and other objectionable materials. Prime coat shall be applied
AGENCY
only when the surface to be treated is dry. Bituminous material shall be
applied at a rate of 1.75 liters per square meters. and at a temperature
DATE:
OPERATIONS
between 50 degrees to 80 degrees C.

DATE:
4.6.3 The primed surface shall be kept free from all traffic and in a clean condition
CONTROL NUMBER

pending placement of covering asphalt concrete. A minimum period of 24


VERIFICATION

hours shall be allowed for the absorption and curing of prime coat prior to
EDSD

placement of covering pavement.


DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 13


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.7. Tack Coat
ENGG CERT

The WORK shall include but shall not be limited to the following:

4.7.1 Liquid asphalt for tack coat shall be rapid curing type cutback grades RC-
250 conforming to specifications or as approved by Saudi Aramco
Representative.

4.7.2 Tack coat shall be applied to all concrete surfaces that will be in contact
with the asphalt pavement. Tack coat shall be applied between the base
course and the surface course, new and old asphalt surface, and vertical
DESCRIPTION

cut adjacent to new asphalt.


Issued for IFC

4.7.3 If application of the surface is delayed by more than 3 days, or if dirt, sand
or other impurities have contaminated the tack coat, then a new tack coat
shall be applied after the original one has been swept clean.

4.7.4 The bituminous material shall be applied on the binder course by means of
a bituminous distributor at a maximum rate of 0.25 liters per square meters
or as directed by Saudi Aramco Representative.
23-10028-
JO/EWO

0001
06/01/22
DATE

4.8. Asphalt Concrete


NO.
REV

00

DISCIPLINE
ENGINEER
The WORK shall include but shall not be limited to the following:

DATE: 4.8.1 Asphalt mixture: Polymer-Modified Hot Mix Asphalt Concrete considering
PROJECT
ENGINEER the asphalt cement shall be modified by mixing SBS (Styrene-Butadiene-
Styrene) polymer, grade 75-80 penetration, conforming to AASHTO Test
DATE: methods described in the Specifications.
CERTIFIED

4.8.2 Mineral Aggregate: The combined mineral aggregate shall conform to the
DATE: grading requirements of the Specifications.
CONSTRUCTION
AGENCY
4.8.3 Job Mix: The job-mix formula shall combine the mineral aggregates and
DATE: asphalt in such proportion as to produce a mixture conforming to the
OPERATIONS
composition limits by weight in ASTM D2172 or ASTM D6307. The
CONTRACTOR shall submit asphalt mix design to Saudi Aramco
DATE: Representative for review and approval at least 30 days prior to use. The
asphalt concrete shall be graded from approved batch plant.
CONTROL NUMBER
VERIFICATION
EDSD

4.8.4 Placement and Compaction of Asphaltic Concrete: The bituminous mixture


shall be placed and compacted in sections not more than 90 m in length.
DATE:
BY:

The asphaltic concrete shall not be placed when the atmospheric


temperature is below 4 degrees C, nor during fog, rain, wind or other
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

unsuitable conditions. The nominal thickness of the compacted bituminous


00

wearing course is 50 mm to 70 mm per layer for bituminous base course.


(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 14


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.9. Hardscape and Landscape
ENGG CERT

The WORK shall include but shall not be limited to the following:

4.9.1 CONTRACTOR shall construct and provide concrete walkways, sidewalks


and concrete apron in the school’s site complexes as shown on the drawing
HA-275036 and HA-275037 both Sheet no. 001.

4.9.2 The CONTRACTOR shall construct and provide the following:

Hardscape:
DESCRIPTION

 Concrete joints (control/scoring, expansion and construction)


Issued for IFC

 Concrete curbs.
 Flag pole
 Drop curbs and / or ramps
 Rubberize Tiles (Recycled)

Landscape:
 Palms
 Trees
23-10028-
JO/EWO

0001

 Shrubs
 Ground Cover / Grass
 Synthetic Turf / Grass
06/01/22
NO. DATE
REV

00

4.9.3 The CONTRACTOR shall construct and provide tree wells and planting
DISCIPLINE
ENGINEER strips / areas, walkway network concrete paving as shown on the drawing.

DATE: 4.9.4 The CONTRACTOR shall construct and provide concrete drop curb for
PROJECT
ENGINEER service access as shown on the drawings.

DATE: 4.9.5 The CONTRACTOR shall construct and provide drop-off and pick-up zones
CERTIFIED
for cars and school bus as shown and indicated on the drawing.

DATE:
4.9.6 The CONTRACTOR shall provide and construct precast concrete seat walls
CONSTRUCTION
AGENCY / benches as shown on the drawings.

DATE: 4.9.7 CONTRACTOR shall construct and provide a new precast concrete fence,
OPERATIONS
precast concrete columns, fence grilles, steel gates, precast main gate
structure, electrical room, SEC substation, RO & RW/FW Pump Room,
DATE: CMU and precast boundary walls enclosure in utilities area.
CONTROL NUMBER
VERIFICATION

4.9.8 The CONTRACTOR shall provide and construct shaded playground as


EDSD

indicated and shown on the Drawings.


DATE:
BY:

4.9.9 The CONTRACTOR shall provide and construct covered


REVISIONCERTIFICATION

basketball/volleyball/handball court as indicated and shown on the


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Drawings.
(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 15


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.9.10 The CONTRACTOR shall provide and construct soccer field (synthetic
grass) with shaded bleachers and 1.20m high chain link fence ball stopper
enclosure as indicated and shown on the Drawing.
ENGG CERT

4.9.11 The CONTRACTOR shall provide site furniture and amenities but not
limited to the following:

a. Precast trash receptacles


b. Precast concrete benches
c. Drinking fountain (Basketball Court and Playground Areas)
DESCRIPTION

4.9.12 The CONTRACTOR shall provide complete landscaping such as trees,


Issued for IFC

shrubs, grass and other ground cover plants with associated irrigation
system as shown on the Drawings. Planting soil mix for the plants shall be
provided as per the specifications. Land form, shapes and final ground
elevations shall be as shown on the Drawings.

4.9.13 The CONTRACTOR shall provide and construct dumpster and trash
enclosure as indicated and shown in the Drawings.
23-10028-
JO/EWO

0001

4.9.14 The CONTRACTOR shall provide and construct shaded courtyard as


indicated and shown on the Drawings.
06/01/22
DATE

4.10. Water System


NO.
REV

00

DISCIPLINE
ENGINEER The work shall include but shall not be limited to the following:
DATE:
PROJECT
4.10.1 For each school, CONTRACTOR shall install water system including water
ENGINEER
storage tank, pumps, and various sizes of pipes, fittings, supports, valves
and other equipment. Pipes shall start from the tie-in point within the site as
DATE:
CERTIFIED
designated on the drawings to the served buildings. Pipes and fittings shall
be as per MTO and as shown on the drawings.
DATE:
CONSTRUCTION 4.10.2 Installation of all water appurtenances shall be in accordance with the
AGENCY
manufacturer’s instruction manuals and as specified in the construction
specifications.
DATE:
OPERATIONS
4.10.3 CONTRACTOR shall coordinate water works with the works of others and
shall provide shop drawings for all crossings with other utilities and for all
DATE:
required appurtenances (valves, valve boxes, storage tanks, pumps etc.).
CONTROL NUMBER
VERIFICATION

4.10.4 CONTRACTOR shall layout the pipes (pipes shall be encased in concrete if
EDSD

close to sewer line) as shown on the Drawings and as approved by the


DATE:

Saudi Aramco Representative.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

4.10.5 CONTRACTOR shall verify all horizontal and vertical site dimensions prior
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

to staking the system.


(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 16


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.10.6 CONTRACTOR shall provide concrete thrust blocks at all bends, tees,
reducers and caps and as specified by the Saudi Aramco Representative.
ENGG CERT

4.10.7 CONTRACTOR shall test the water system after installation, adjust the
proper operation and disinfect the network as mentioned in the Construction
Specifications.

4.10.8 CONTRACTOR shall coordinate all his works with MOWE and obtain their
approval prior to start of work.
DESCRIPTION

4.11. Fire Water System


Issued for IFC

The WORK shall include but shall not be limited to the following:

4.11.1 For each school, CONTRACTOR shall install a fire water system including
various sizes of pipes, pumps, fire water tanks, fittings, valves, supports
and other equipment. Pipes shall start from the tie-in point within the school
site, pass through a valve box containing check valves and a washout valve
and Fire Department connection, and finally connect to the school building.
Pipes shall be HDPE pipe (PN 16) in accordance with NFPA 24.
23-10028-
JO/EWO

0001

4.11.2 Installation of all fire water appurtenances shall be in accordance with the
06/01/22

manufacturer’s instruction manuals and as specified in the construction


DATE

specifications.
NO.
REV

00

DISCIPLINE
4.11.3 CONTRACTOR shall coordinate fire water works with the works of others
ENGINEER and shall provide shop drawings for all appurtenances and crossings with
other utilities and shall obtain concerned governmental agencies approval
DATE:
PROJECT
prior to start of work.
ENGINEER

4.11.4 CONTRACTOR shall layout the pipes as shown on the Drawings and as
DATE: approved by the Saudi Aramco Representative.
CERTIFIED

4.11.5 CONTRACTOR shall verify all horizontal and vertical site dimensions prior
DATE:
CONSTRUCTION
to staking the system.
AGENCY

4.11.6 CONTRACTOR shall provide concrete thrust blocks at all bends, tees,
DATE:
OPERATIONS
reducers and dead-ends and as specified by the Saudi Aramco
Representative.

DATE:
4.11.7 CONTRACTOR shall test the fire water system after installation and adjust
CONTROL NUMBER

the proper operation as mentioned in the Construction Specifications.


VERIFICATION
EDSD

4.11.8 CONTRACTOR shall provide fire hydrants connected to the fire pump
DATE:

network as shown on the Drawings.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 17


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.12. Sewer System
ENGG CERT

The WORK shall include but shall not be limited to the following:

4.12.1 For each school, CONTRACTOR shall install a sewer system including
various sizes of pipes, manholes, inspection chambers and cleanouts.
Sewer lines material shall be as per MTO. CONTRACTOR shall connect
the proposed pipes at the designated tie-in points within the sites
boundaries as shown on the drawings.

4.12.2 Sewer manholes shall be fiberglass reinforced polyester (FRP) as detailed


DESCRIPTION

in the Drawings.
Issued for IFC

4.12.3 CONTRACTOR shall layout the pipes, manholes, inspection chambers, and
cleanouts as shown on the Drawings or as directed by the Saudi Aramco
Representative.

4.12.4 CONTRACTOR shall verify all horizontal and vertical site dimensions prior
to staking the system.

4.12.5 CONTRACTOR shall provide dewatering equipment in case water table is


23-10028-
JO/EWO

0001

encountered during excavation.


06/01/22

4.12.6 For each school, the sewer network shall be connected to the tie-in point to
DATE

the external sewer system as shown on the drawings.


NO.
REV

00

DISCIPLINE
4.12.7 CONTRACTOR shall coordinate sewer network works with the works of
ENGINEER others and shall provide shop drawings for all appurtenances and crossings
with other utilities.
DATE:
PROJECT
ENGINEER

DATE:
CERTIFIED
4.12.8 CONTRACTOR shall test the sewer system after installation, as mentioned
in the construction specifications.
DATE:
CONSTRUCTION
AGENCY 4.12.9 CONTRACTOR shall coordinate all his works with MOWE and obtain their
approval prior to start of work.
DATE:
OPERATIONS

4.13. Irrigation System


DATE:
CONTROL NUMBER

The WORK shall include but shall not be limited to the following:
VERIFICATION
EDSD

4.13.1 For each school, CONTRACTOR shall install an irrigation system including
DATE:

various sizes of pipes and valves. Mainline pipes shall start from a tie-in
BY:

point on the proposed water network within the site. A backflow preventer
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

shall be installed downstream of the tie-in point. Mainline pipes shall be


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

looped as shown on the Drawings a. All lateral pipes shall be uPVC Sch. 40
(DCC) NO. _____________________

except all riser pipes for bubblers, which shall be Sch. 80.

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 18


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.13.2 CONTRACTOR shall install lateral piping of various sizes including various
types of irrigation heads and manual control valves including valve boxes.
ENGG CERT

4.13.3 CONTRACTOR shall verify the design by specialist for lateral piping of
various sizes including various types of irrigation heads and manual control
valves including valve boxes.

4.13.4 Installation of all irrigation appurtenances shall be in accordance with the


manufacturer’s instruction manuals and as specified in the construction
specifications.
DESCRIPTION

Issued for IFC

4.13.5 CONTRACTOR shall coordinate irrigation works with the works of others
and shall provide shop drawings for all required appurtenances and
crossings with other utilities.

4.13.6 CONTRACTOR shall layout the pipes and irrigation heads with planting
layout and as approved by the Saudi Aramco Representative.

4.13.7 CONTRACTOR shall verify all horizontal and vertical site dimensions prior
to staking the system.
23-10028-
JO/EWO

0001

4.13.8 CONTRACTOR shall provide concrete thrust blocks at all bends, tees,
06/01/22

reducers and caps and as specified by the Saudi Aramco Representative.


DATE

4.13.9 CONTRACTOR shall test the irrigation system after installation, and adjust
NO.
REV

00

DISCIPLINE
all irrigation heads for proper operation and coverage.
ENGINEER

DATE:
4.14. Storm Drainage System
PROJECT
ENGINEER

The WORK shall include but shall not be limited to the following:
DATE:
CERTIFIED
4.14.1 CONTRACTOR shall install storm drainage system which include concrete
catch basins located adjacent to perimeter wall. The catch basins are
DATE:
CONSTRUCTION
connected to 300 mm dia. uPVC pipe connected to the nearest tie in point
AGENCY out site school.
DATE:
OPERATIONS
4.14.2 CONTRACTOR shall install storm drainage system for school court yard
which include concrete catch basins located low point. The catch basins are
connected to 300 mm dia. uPVC pipe connected to the nearest tie in point
DATE:
out site school.
CONTROL NUMBER
VERIFICATION

4.14.3 CONTRACTOR shall install tie in points for soccer field


EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 19


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.15. Applicable Codes and Standards
ENGG CERT

1. Saudi Aramco Engineering Procedure (SAEP-148)


2. Saudi Arabian Standard Organization (SASO)
3. Ministry of Transportation (MOT)
4. International Building Code (IBC -2015)
5. American Concrete Institute (ACI)
6. American Standard for Testing of Materials (ASTM)
7. American National Standard Institute (ANSI)
8. American Association of Nurserymen (AAN)
9. Association of Office Analytical Chemists (AOAC)
DESCRIPTION

Issued for IFC

10. Americans with Disabilities Act (ADA)


11. Saudi Building Code (SBC)
12. Ministry of Education Standard (MOE)

4.16. Architectural Work

The Project objective is to construct school located in the Eastern Province of Saudi
Arabia as follow:
23-10028-
JO/EWO

0001

1. Boys Elementary (Gr. 4,5,6) School – Dammam


2. Boys Intermediate & Secondary (Gr. 7,8,9,10,11,12) School – Dammam
06/01/22

3. Girls Elementary (Gr. 4,5,6) School – Dammam


DATE

4. Girls Intermediate & Secondary (Gr. 7,8,9,10,11,12) School – Dammam


5. Early Childhood School (KG 1,2,3; Gr. 1,2,3) School – Dammam
NO.
REV

00

DISCIPLINE
ENGINEER The LSPB contractor shall develop a Detail Design Package in addition to
providing Exterior 3D perspectives showing all the project related building
DATE:
PROJECT
structures, site and the surrounding areas.
ENGINEER

The LSPB contractor shall develop an interior Design Package for the school
DATE:
CERTIFIED
building including and not limited to the below mentioned items:

- Colored Floor Plans including Furniture and Equipment


DATE:
CONSTRUCTION - Enlarged Detailed Plans
AGENCY
- Floor Pattern Layout
DATE:
- Cutouts of Finishing Materials, Furniture and Fixtures
OPERATIONS - Interior Colored Elevations for all spaces and activities
- Final colored 3d perspectives for all the space and activities
DATE:
For exterior design elevations wall finishes and colors, final selections shall be
CONTROL NUMBER
VERIFICATION

selected by Saudi Aramco Representative.


EDSD

The architectural work includes, but is not limited to the following:


DATE:
BY:

4.16.1 The schools shall consist of main building with multi-purpose hall and
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008

indoor gymnasium and shall be provided with the following supporting


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

structure and buildings:


(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 20


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
a. Guard Room with entrance gate
b. Shaded Basketball/Volleyball/Handball Court.
ENGG CERT

c. Soccer Field
d. Shaded Courtyard
e. Shaded Playground (except Boys/Girls Intermediate & Secondary School)
f. Electrical room & SEC
g. RO & FW/RW Pump Room
h. Chiller Pump Shed
i. Chiller Yard
j. FW/RW Tanks area
DESCRIPTION

k. Garbage enclosure
Issued for IFC

l. Boundary Wall
m. Shaded waiting area
n. Asphalted on-site Parking Area (except Girls Elementary and
Intermediate/Secondary School site)
o. Service/Emergency Gate Access

4.16.1.1 Main Buildings:


23-10028-
JO/EWO

0001

The project is defined into two (2) types of construction such one (1) storey
and two (2) storey school buildings.
06/01/22
DATE

One-storey buildings such as Girl’s Elementary and Boy’s Elementary with


roof split between the main building and the indoor gymnasium. The Building
NO.
REV

00

DISCIPLINE
shall be rigid steel frame structure with precast concrete perimeter wall
ENGINEER cladding and dry wall internal partitions. Indoor gym internal wall is CMU. All
shall be fabricated and supplied by a recognized and approved subcontractor
DATE:
to the overall sizes, shapes and construction as shown on the drawings and
PROJECT
ENGINEER described in the construction specifications.

DATE: Two-storey buildings such as Early Childhood School, Girl’s Intermediate and
CERTIFIED
Secondary, Boy’s Intermediate and Secondary with roof split between the
main building and the indoor gymnasium. The Building shall be rigid steel
DATE:
CONSTRUCTION
frame structure with precast concrete perimeter wall cladding and dry wall
AGENCY internal partitions. Indoor gym internal wall is CMU. All shall be fabricated and
supplied by a recognized and approved subcontractor to the overall sizes,
DATE:
shapes and construction as shown on the drawings and described in the
OPERATIONS
construction specifications.

DATE: CONTRACTOR shall prepare shop drawings for steel frame structure and
CONTROL NUMBER

precast wall panels and obtain approval of Saudi ARAMCO Representative


VERIFICATION

before starting the work.


EDSD

DATE:

CONTRACTOR shall prepare product data, manufacturer’s installation


BY:

instructions and manufacturer’s certificate for all school furniture, equipment


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

and finishes and obtain approval of Saudi ARAMCO Representative before


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

starting the work.


(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 21


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.16.1.2 Supporting Structures and Buildings:

a. Guard Room: The building shall be precast concrete insulated panel


ENGG CERT

bearing walls with precast hollow core slab as shown on the drawings and
described in the construction specifications.

b. Shaded Basketball/Volleyball/Handball Court: It shall be a space frame


structure covered with single skin metal roof panel supported by concrete
round columns as shown on the drawings and described in the construction
specifications.
DESCRIPTION

c. Shaded Courtyard: It shall be a space frame structure covered with single


Issued for IFC

skin metal roof panel supported by concrete round columns as shown on


the drawings and described in the construction specifications.

d. Shaded Playground: It shall be a space frame structure covered with


single skin metal roof panel supported by concrete round columns as
shown on the drawings and described in the construction specifications.

e. Electrical Room: The building shall be precast concrete insulated panel


bearing walls with precast hollow core slab. The building size shall be
23-10028-
JO/EWO

0001

approximately 4.5 meters width by 6.0 meters depth.

f. RO Plant Room and Pump Room: The building shall be precast concrete
06/01/22
DATE

insulated panel bearing walls with precast hollow core slab. The building
size shall be approximately 11.5 meters width by 5.0 meters depth.
NO.
REV

00

DISCIPLINE
ENGINEER g. Chiller Pump Shed: The building shall be steel structure covered with
single skin metal roof panel. The building size shall be approximately 11.0
DATE: meters width by 5.0 meters depth.
PROJECT
ENGINEER

h. Chiller Yard: The building shall be precast concrete insulated panel


DATE: bearing walls with precast hollow core slab. The building size shall be
CERTIFIED
approximately 17.0 meters by 11.0 meters adjacent to chiller pump shed.
DATE:
CONSTRUCTION
All the above structures and building shall be fabricated and supplied by a
AGENCY recognized and approved subcontractor to the overall sizes, shapes and
construction as shown on the drawings and described in the construction
DATE: specifications.
OPERATIONS

CONTRACTOR shall prepare shop drawings for steel frame structure and
DATE: precast wall panels and obtain approval of Saudi Aramco Representative
CONTROL NUMBER

before starting the work.


VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 22


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.16.2 General:

Perform all architectural work as shown on Drawings and described in the


ENGG CERT

Construction Specifications.

a. Buildings:

Structures as described in “Structural Work” Section with all walls, floors,


partitions, and accessories as shown on Drawings.

b. Thermal and Moisture Protection:


DESCRIPTION

Issued for IFC

1. Provide membrane vapor barrier and bituminous dump proofing.

2. Provide fully adhered reinforced PVC roofing membrane.

3. Provide 100 mm thick polyisocyanurate insulation board mechanically


fastened for roofs.

4. Provide rigid extruded polystyrene board insulation with integral “Foil


Reinforced Kraft” on one side for external walls.
23-10028-
JO/EWO

0001

5. Provide fiberglass noise barrier batt insulation for internal walls as shown
06/01/22

and specified.
DATE

6. Provide construction Joint and sealants.


NO.
REV

00

DISCIPLINE
ENGINEER

c. Doors and Windows:


DATE:
PROJECT
ENGINEER 1. Provide and install personnel doors and all other doors as described
and specified.
DATE:
CERTIFIED
2. Provide and install Solid core hardwood laminated interior doors with
metal steel frames.
DATE:
CONSTRUCTION
AGENCY
3. Provide and install Hollow metal doors with metal steel frames.
DATE:
OPERATIONS
4. Provide and install the complete scheduled hardware to all doors as
shown.
DATE:
5. Provide and install, complete with glazing and hardware, all external
CONTROL NUMBER

and internal windows as shown.


VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 23


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
d. Finishing Work:

1. Fix and lay special and common floor and wall finishes as shown and
ENGG CERT

described including quarry tiling, resilient tiling, ceramic tiling, carpet


tiling, seamless polyurethane athletic indoor flooring and protective
coatings.

2. Provide stud partitions with gypsum board or other finishing as shown.

3. Provide and fix acoustical and gypsum board suspended ceiling as


shown and described.
DESCRIPTION

Issued for IFC

4. Provide and install acoustical wall panels and wall crash panels as
shown and specified.

5. Paint walls, ceiling and floor as shown on the drawings, and specified in
the contract documents.

6. Provide 2400 mm high wood cladding in Telecom Rooms with Fire


Rated Paint.
23-10028-
JO/EWO

0001

7. Provide and consider non-metallic application of oil derivative materials


to be used in this project whereas applicable and necessary.
06/01/22
DATE

e. Specialties:
NO.
REV

00

DISCIPLINE
ENGINEER 1. Provide and install tack board wall covering panels, crash rails, and
corner guard full height at all exposed corners as shown and specified.
DATE:
PROJECT
ENGINEER 2. Provide and install aluminum sunscreen trellis as shown and specified.

DATE: 3. Provide and install laminated plastic toilet partition and toilet
CERTIFIED
accessories as shown and specified.
DATE:
CONSTRUCTION
4. Provide and install internal and external signage to comply with school
AGENCY
design requirements.
DATE:
OPERATIONS
f. Furniture and Appliances:

1. Provide and install furniture and accessories to the proposed buildings


DATE:
as shown and specified.
CONTROL NUMBER
VERIFICATION

2. Provide and install custom wood casework as shown and specified.


EDSD

DATE:

3. Provide and install school equipment as shown and specified.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

4. Provide and install Venetian blinds for all external windows as shown
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

and specified.
(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 24


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5. Provide and install kitchen casework complete with all required
components, services and accessories as shown and specified.
6. Provide and install mechanically operated curtain for the multipurpose
ENGG CERT

hall stage as shown and specified.

7. Toilet Fixtures, Eyewash for laboratories and Furniture final selection


shall consider the difference age categories as per school categories.

4.17. Structural Work

Structural Work shall include but shall not be limited to:


DESCRIPTION

Issued for IFC

4.17.1 Structural Concrete

Structural concrete work shall include but shall not be limited to the following:

p. Foundations for schools.

q. School shaded play areas foundations.

r. School fence foundations.


23-10028-
JO/EWO

0001

s. All utility buildings foundations.


06/01/22
DATE

t. Foundations for equipment.


NO.
REV

00

DISCIPLINE
u. Pre-cast concrete wall panels which includes the fence column Panels, substation,
ENGINEER electrical room, guard house, RO & PW/FW Pump room, dumpster and chiller area
shade.
DATE:
PROJECT
ENGINEER v. Concrete valve boxes, WO & AR valves, trenches, curbs, sumps etc.

DATE: w. All embedded items in the concrete are as per drawings.


CERTIFIED

x. All Structural and non - structural concrete and reinforcement steel works shall be
DATE:
CONSTRUCTION
in conformance with provisions of ACI 318-14 and ASTM.
AGENCY

y. Deck slab of all schools.


DATE:
OPERATIONS
z. All Hollow core slabs of utility buildings.

DATE:
aa. Calculation of all precast panels and drawing details shall be provided by the
CONTROL NUMBER

Vendor.
VERIFICATION
EDSD

bb. Concrete reinforcement schedule and bar bending schedule shall be produced by
DATE:

CONTRACTOR.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

cc. Drawings for fabrication plans, sections, connection details and design between
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

reinforced concrete elements and precast walls and steel elements shall be done
(DCC) NO. _____________________

by the CONTRACTOR.

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 25


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
dd. The waterproofing shall be as per Project Design Drawings.
ENGG CERT

ee. Additional geotechnical study where deemed required shall be conducted by


CONTRACTOR.

4.17.2 Structural Steel and Miscellaneous Metal Works

Structural Steel work shall include, but shall not be limited to, the followings:
DESCRIPTION

a. CONTRACTOR shall furnish all materials, equipment and labor required to


Issued for IFC

perform all the Structural Steel and Miscellaneous Metal Work in accordance
with the Drawings, Specifications and as described in this Scope of work. Steel
Structures shall comply with the requirement of AISC LRFD, AWS and ASTM
where applicable.

b. CONTRACTOR shall install and erect all structural steel and miscellaneous
metal items.

c. CONTRACTOR shall apply primer, paint, intumescent and Sprayed fire proofing
23-10028-
JO/EWO

0001

where applicable for all structural steel and Miscellaneous Metal works.
06/01/22

d. CONTRACTOR shall furnish, erect and set the Space frame and roofing system
DATE

for school play area and where ever applicable.


NO.
REV

00

DISCIPLINE
e. CONTRACTOR shall submit space frame structure and roofing system design
ENGINEER calculations with the shop drawings showing complete analysis of the system,
column loads, member stresses, support reactions and deflections prepared by
DATE:
space frame structure vendor to Saudi Aramco Representative for approval prior
PROJECT
ENGINEER to any fabrication and construction.

DATE: f. CONTRACTOR shall verify the foundation and column design based on the
CERTIFIED
loads and support reactions provided by the space frame vendor.
DATE:
CONSTRUCTION
g. The design criteria of the Space frame structure shall be in compliance with
AGENCY AISC LRFD 13th Edition, IBC 2015 and ASCE 7-10.
DATE:
h. Additional geotechnical study where deemed required shall be conducted by
OPERATIONS
CONTRACTOR.

DATE: i. Drawings for fabrication plans, sections, connection details and design between
CONTROL NUMBER

steel elements and between precast wall and steel elements shall be done by
VERIFICATION

the CONTRACTOR.
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 26


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.18. Electrical Works
ENGG CERT

The WORK shall include but shall not be limited to:

A. Substations:

I. The CONTRACTOR shall supply, install and connect Saudi Electric


Company (SEC) Unit Type Substation as per 56-SDMS-031 and SDCS-02
and other applicable SEC standards including:

1. SF6 Ring Main Units (RMU’s), as per SEC standard 32- SDMS-01.
DESCRIPTION

Issued for IFC

2. Supplementary grounding works of above 1500KVA transformer for


elementary schools & 1000 KVA for intermediate and childhood
schools as per SEC 51-SDMS- 03.

3. Kilowatt-hour meters as per drawings and SEC standards.

4. Medium voltage power cables (15 kV) from SEC supply to Ring
Main Units and between RMU and oil type transformers as per SEC
standards 11-SDMS-03.
23-10028-
JO/EWO

0001

5. Low voltage cables between oil type transformer and the Main
06/01/22
DATE

Switch Board (MSB) of each school as per SEC standard 11-SDMS-


01.
NO.
REV

00

DISCIPLINE
6. Complete grounding network for substation as per SEC standard
ENGINEER SDMS-03.
DATE:
PROJECT
7. Raceway system, including concrete trench with cover in the
ENGINEER
school’s substation room as per SEC standards and specifications,
junctions / pull boxes, conduits, fittings and wirings including
DATE:
CERTIFIED
identification tags and termination.

8. Substation shall be provided with sufficient lighting, socket outlets


DATE:
CONSTRUCTION and weatherproof lighting switches.
AGENCY

All material supply, installation and construction work and testing


DATE:
OPERATIONS
within or related to the substation shall be made in accordance with
SEC latest standards and in close coordination with SEC and Saudi
Aramco Representative for their supervision and approval. It is the
DATE:
contractor responsibility to coordinate with SEC on step by step basis
CONTROL NUMBER

and get their approval for his material and work.


VERIFICATION
EDSD

I. CONTRACTOR shall coordinate with Saudi Electrical Co.


DATE:

(SEC) to connect the RMU to SEC MV loop within the area


BY:

and to provide the power supply.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 27


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
II. Electrical work should be executed by SEC approved
vendor.
ENGG CERT

9. Substations shall provide with pad mounted transformer.

10. Substations shall provide with fire rated walls, fire stopping, fire
sealing as per NFPA 70.

11. Supplementary grounding works of above 1500KVA transformer for


elementary schools & 1000KVA for intermediate and childhood
DESCRIPTION

schools as per IEEE Std 80/81.


Issued for IFC

12. Provide call out drawing references substation, power & control
equipment with demarcation lines for Contractor, Vendors, SA work
scopes for design, equipment & constructions.

13. Provide substation trenches, duct bank, stub entries and fire
stopping work scopes.

B. Main Electrical Room:


23-10028-
JO/EWO

0001

I. 1. Contractor shall construct a concrete trench and coordinate the


06/01/22

trench dimensions with the approved main switchboard MSB) to


DATE

ensure that it’s suitable and provide flush removable covers for
unused openings. Also, contractor shall ensure that the assembly of
NO.
REV

00

DISCIPLINE
the main switchboard units can fit inside the electrical room.
ENGINEER

2. Install underground conduits as per the drawings and coordinate


DATE:
with the exact location of panel boards. Provide extra PVC sleeves as
PROJECT
ENGINEER required between building perimeter wall and concrete trench under
MSB.
DATE:
CERTIFIED
II. 1. CONTRACTOR shall supply, install and terminate: Main
switchboards (MSB) in IP42 enclosure 400/230V, 3Ø, 4W, 60 Hz, with
DATE:
CONSTRUCTION
metering and as per the drawings and specifications.
AGENCY

2. Wireway system including conduits & fittings between MSB and


DATE:
control panels, power panels, lighting panels etc.
OPERATIONS

3. CONTRACTOR shall supply, install and connect all low voltage


DATE: power cables from Main Switch Board (MSB) to:
CONTROL NUMBER
VERIFICATION

- Chillers CH-1/2/3
EDSD

- Chilled Water Pumps Controller CP-CHWP


DATE:

- R.O. Plant Control Panel


BY:

- Jockey Pump Control Panel


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

- Lighting Panel for Services Area (LP-S)


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

- Guard House Power Panel (PP-GH)


(DCC) NO. _____________________

- Sub Main Switch Boards 1 & 2.

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 28


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. Low voltage power and control cables between SEC substation and
MSB and between MSB and LP’s, PP’s, OLCP’s as per the drawings.
ENGG CERT

Cables supply, installation and termination to substation shall be


coordinated and approved by SEC.

5. Each chiller shall be connected through a Disconnecting switch with


ampere ratings as shown in single line diagrams, 3P, IP 65 disconnect
switch.

6. Complete raceway system including conduits, fittings, junction &


DESCRIPTION

pull boxes and wiring including identification tags and termination.


Issued for IFC

7. Lighting fixtures, socket outlets, lighting and power panel boards,


lighting switches and cover plates for wiring devices.

8. Contractor shall evaluate MSB for 1500 kVA transformer for


elementary schools & 1000KVA for intermediate and childhood
schools and comply requirements as per 31- SDMS-01/56-SDMS-04.

9. Contractor shall provide call out reference drawings and details for
23-10028-
JO/EWO

0001

the MSB installations


06/01/22

10. Correct electrical control gears (MSB, SWB, PP, etc.) and cables
DATE

temperature condition ratings/specifications as per SBC/IEC/BS.


NO.
REV

00

DISCIPLINE
11. Provide demand loads of the mentioned items in section II.3.
ENGINEER

12. Provide MSB calculations/ETAP studies information, data sheets,


DATE:
load list, demand loads, schedules, equipment sizing, cabling/wiring
PROJECT
ENGINEER calculations provided. Evaluate, revise changes to the panel board
loads and update DP/PP calculations for main breaker, branch
DATE: breaker, cabling & circuit protections up to point of utilization.
CERTIFIED

13. Evaluate, provide nameplate ratings as per data sheets of


DATE:
CONSTRUCTION
Chillers, AHU's, EWH's, VAV's, EDH's, EF's, AC's as per sequence of
AGENCY operation and update branch circuit breakers, cablings and short
circuit protection ratings.
DATE:
OPERATIONS
All material shall be subject to Saudi Aramco Representative
Approval. Catalogues, Samples, Tech data and shop drawing shall be
DATE: submitted for each item as required by Saudi Aramco Representative.
CONTROL NUMBER
VERIFICATION

All electrical work to be done in a professional manner as per


EDSD

drawings and specifications, International Electro-technical


DATE:

Commission (IEC), British Standards (BS), and Saudi Building Code


BY:

(SBC).
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 29


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. School Building:

CONTRACTOR shall supply, install and connect:


ENGG CERT

1. Two switchboard SWB-01 and 02 in the two electrical rooms within


school. Each switchboard will provide power supply to loads of school within
its area.

- Lighting Panels LP-01/02, 03/04 (for Intermediate & Early Childhood)


- Power Panel (socket outlets) PP-01/02, 03/04 (for Intermediate &
Early Childhood).
DESCRIPTION

Issued for IFC

- Variable Air Volume Panels and Electric Duct Heaters PP-VAV- 01/02,
03/04 (for Intermediate & Early Childhood).
- MCCs of AHU’s and Fans.
- Electrical Water Heater Panel PP-EWH-01/02, 03/04 (for Intermediate
& Early Childhood)
- Telecom Power Load (PP-T) & (UPP-T)
- Outdoor Lighting Load LP-OL

2. CONTRACTOR shall supply, install and connect cables from Main


23-10028-
JO/EWO

Switch Board to switchboard SWB-01 and 02 inside schools’ electrical


0001

rooms. Complete with direct buried cables providing duct banks when
crossing roads or area subject to vehicular traffic as per Project Drawings
06/01/22
DATE

and PVC sleeves near tree roots, at entry to Buildings and as found
necessary by Saudi Aramco Representative.
NO.
REV

00

DISCIPLINE 3. Electrical distribution panel boards for lighting, power and air handling
ENGINEER
units, fans, variable air volumes, electrical duct heaters, electrical water
DATE: heaters, telecom power loads, etc., panel boards shall be 400/230, 3
PROJECT
ENGINEER
phase, 4W, 60 Hz and KAIC ratings as per drawings.

DATE:
4. Complete raceway for main feeder of each panel board from main
CERTIFIED switchboard, clean through prior to cable pulling.

DATE: 5. Power cables shall be 0.6/1 kV, copper, with size & type as per the
CONSTRUCTION
AGENCY
drawings and specifications.

DATE: 6. Lighting fixtures with type, quantity, number of lamps, voltage as per
OPERATIONS the drawings and specifications including complete conduit work, wiring
and termination.
DATE:
- Lighting Fixtures shall be as per lighting schedule or approved equals.
CONTROL NUMBER
VERIFICATION

- For life safety, lighting fixture shall provide emergency back-up in case
EDSD

of power outage in some places as indicated in lighting schedule or


drawing.
DATE:
BY:

7. Wiring devices including lighting switches, occupancy sensors, photo


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008

cells, socket outlets… etc. as per drawings and specification including


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 30


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
complete raceway wiring and termination. Type of wiring devices shall be
subject to the Saudi Aramco Representative approval.
Location of sockets shall be coordinated at site to match with the furniture
ENGG CERT

layout.

8. CONTRACTOR shall supply, install and connect IP 65 disconnect


switches for AHU’s and exhaust fans at School Building Roof on a steel
support near each equipment as per Project Drawings and Specifications.

9. CONTRACTOR shall supply, install and connect cables and wires of


each AHU and exhaust fan from related panel to equipment including
DESCRIPTION

grounding of each equipment.


Issued for IFC

10. Complete fire alarm system, which includes an addressable fire alarm
control panel, battery backup, and a fire alarm repeater panel.
Optical type smoke detectors, duct smoke detectors, heat detectors,
manual pull stations, horns and strobe lights, line isolating modules and
flow water interface modules. Quantity, location and wiring shall be
provided as per drawings, specifications and manufacturer
recommendations.
23-10028-
JO/EWO

0001

11. Complete raceway system including conduits, fittings, junction & pull
boxes, clamps and supports for lighting, sockets, duct heaters, variable
06/01/22

air volumes, fire alarm system, AHU’s, electrical water heaters, exhaust
DATE

fans, etc.
NO.
REV

00

DISCIPLINE
12. Low voltage wiring using CU/PVC wires for inside conduits
ENGINEER lighting, socket outlets, electrical duct heaters... Etc.

DATE:
13. Provide call out reference drawings and details for the power
PROJECT
ENGINEER distribution system installations.

DATE: 14. Indicate stub entries, duct banks, trenches and sleeves sizes for
CERTIFIED
cablings power layout, provide details references on a 1000 KVA &
1500 KVA transformers ratings.
DATE:
CONSTRUCTION
AGENCY 15. Contractor shall provide details for the five electrical rooms, locations
and ensure working space requirements are compiled as per SBC/IEC.
DATE:
OPERATIONS
16. Contractor shall provide details and drawing references for the
connections from MSB to the two (2) switchboards A/B.
DATE:
CONTROL NUMBER

17. Nameplate ratings and call out references as per data sheets
VERIFICATION

of Chillers, AHU's, EWH, VAV, EDH, EF, AC's as per sequence of


EDSD

operation and update branch circuit breakers, cablings and short


DATE:

circuit protection ratings.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

18. Contractor shall indicate and mention undergrounds and all above
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

ground raceways, cable ladders, cable trays, trunking and conduits


(DCC) NO. _____________________

installations.

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 31


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
19. Lighting fixtures with LED in accordance with the Energy Efficiency
requirements as mandated by MSAER, SBC & DBSP.
ENGG CERT

20. Contractor shall supply, install and testing the compatible zonal
lighting switching.

21. RCD & ELCB residual current trips for lighting, small power & HVAC
Power.

22. Variable Frequency Drives, starter control panels and disconnect


DESCRIPTION

switches for air handling units and heaters. Starters shall be suitable for
Issued for IFC

the actual size of AHU’s motors and shall consist of motor circuit
protector, starter and overloads. Feeder of each AHU shall be provided in
a separate conduit as per the drawings.
Variable frequency drives shall be installed separately on walls in
electrical or mechanical room.

23. The required interface control wiring and conduiting between air
handling units, electrical duct heaters, VAV’s, VFD’s, starter panels, and
direct digital controller (DDC).
23-10028-
JO/EWO

0001

24. The required interface between fire alarm system and


06/01/22
DATE

- HVAC systems
- Public address systems
NO.
REV

00

DISCIPLINE
- Audio/Video System
ENGINEER - Fire Fighting System

DATE:
As per drawings, specifications and as recommended by the vendor.
PROJECT
ENGINEER

25. CONTRACTOR shall supply install and terminate a complete


DATE: grounding & lighting protection system consist of:
CERTIFIED

- 120 mm² bare, tinned, soft drawn copper cable ground ring 1000 mm
DATE:
CONSTRUCTION
minimum away from building external wall at minimum of 460 mm
AGENCY depth with ground test pits as shown on the drawings.
DATE:
- Lightning system including lightning rods on the building parapet and
OPERATIONS
rooftop with down conductors made within the building walls down to
lightning ground rod for each down conductor.
DATE:
CONTROL NUMBER

- Bond lightning system to grounding system at ground pit as shown on


VERIFICATION

the drawings.
EDSD

DATE:

- Direct buried ground connections shall be made using a thermite


BY:

welding then painted and taped. Connection within ground test pit shall
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

be made by mechanical ground connectors or split bolts.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 32


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
- Above ground connections shall be made to panelboards, steel
structure columns, transformers etc. using a PVC insulated cables
green with yellow stripes and using a crimped type lugs.
ENGG CERT

- Size of grounding cables shall be as per the drawings and SBC/BS


requirements.

All material shall be subject to Saudi Aramco Representative Approval.


Catalogues, Samples, Tech data and shop drawings shall be submitted for
each item as required by Saudi Aramco Representative.
DESCRIPTION

Issued for IFC

All electrical work shall be done in a professional manner as per drawings


and specifications, International Electro-technical Commission (IEC), British
Standards (BS) and Saudi Building Code (SBC).

D. Guard Room:

CONTRACTOR shall supply, install and terminate:

1. Power panel board PP-GH.


23-10028-
JO/EWO

0001

2. Complete raceway system including conductors and fittings, junction boxes, pull
06/01/22

boxes between PP-GH and lighting fixtures, sockets etc. and shall provide a PVC
DATE

concrete encased duct bank or RGS PVC coated conduit between FACP and
FARP at guard room as per drawings.
NO.
REV

00

DISCIPLINE
ENGINEER 3. Lighting fixtures, sockets, lighting switches and disconnect switches for HVAC
equipment.
DATE:
PROJECT
ENGINEER 4. Contractor shall provide call out reference drawings, details for the power
distribution system, lighting system, fire alarm system and related electrical
DATE: installations.
CERTIFIED

5. Fire alarm Annunciator panel (FAAP), optical type smoke detectors, heat detectors,
DATE:
CONSTRUCTION
horns with beacon light and connect such equipment to the school’s overall fire
AGENCY alarm system through FACP of the school to provide one complete system.
DATE:
6. Fire alarm system having manual pull station, connection to the automatic fire
OPERATIONS
sprinkler system and emergency voice alarm communication system of 24-hour
supervision of facilities Acc. to IBC 907.2.3
DATE:
CONTROL NUMBER
VERIFICATION

All material shall be subject to Saudi Aramco Representative Approval. Catalogues,


EDSD

Samples, Tech data and shop drawings shall be submitted for each item as required
DATE:

by Saudi Aramco Representative.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

All electrical work shall be done in a professional manner as per drawings


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

and specifications, International Electro-technical Commission (IEC), British


(DCC) NO. _____________________

Standards (BS) and Saudi Building Code (SBC).

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 33


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
E. Schools Site Electrical Work:
ENGG CERT

1. Contractor shall supply and install complete conduit raceway (for buildings
entrances & road crossing) including:

- PVC Conduits direct buried or rigid steel PVC coated as per drawings.

- Conduits in concrete encasement to be PVC as per drawings.

2. Contractor shall coordinate with all other mechanical, civil, structural etc. prior to
DESCRIPTION

his excavation to avoid any conflict that may arise Shop drawings showing such
Issued for IFC

coordination shall be submitted.

3. Contractor shall provide call out reference drawings, details for the power
distribution system, lighting system, fire alarm system, lighting poles and related
electrical installations.

4. CONTRACTOR shall supply, install and terminate all site electrical work including
excavation of trenches, sand bedding, cable laying, sand backfill and cable tile
and warning tape then complete backfill work include but not limited to:
23-10028-
JO/EWO

0001
06/01/22

a. Power cables and raceways between substation and MSB in schools’


DATE

electrical room.
NO.
REV

00

DISCIPLINE
b. Power cables and raceways between MSB and SWB-01 and 02.
ENGINEER

c. Power cables and raceways to PP-GH and LP-S (lighting for service area).
DATE:
PROJECT
ENGINEER d. Disconnect switches for chillers, IP 65, 3P, 600V, rating as per drawings to
be installed next to each unit on a galvanized steel support or wall mounted.
DATE:
CERTIFIED
e. Power cables for chillers, chilled water pumps, R.O. plant, fire water pumps
and pump rooms.
DATE:
CONSTRUCTION
AGENCY f. Control panels for chilled water pump, R.O. plant and fire water as per
mechanical and electrical drawings and specifications. And lighting &
DATE:
socket outlets for pump rooms.
OPERATIONS

g. Lighting fixtures including power cable, wiring and conduit wall for court
DATE: yard, playground, volley ball/basketball court, soccer field lighting on wall of
CONTROL NUMBER

school and other external lighting from outdoor lighting panel to each
VERIFICATION

fixture.
EDSD

DATE:

h. Lighting poles with miniature circuit breakers and lighting fixtures,


BY:

foundation with sleeves for lighting poles and terminate to lighting pole,
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

outdoor lighting cables, and fixtures complete with grounding installation


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

and connections.
(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 34


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
i. Outdoor lighting shall be controlled by a photo-electric cell and
ON/OFF/AUTO selector switch, sport lighting shall be controlled by push
button station for each field.
ENGG CERT

All material shall be subject to Saudi Aramco Representative Approval. Catalogues,


Samples, Tech data and shop drawing shall be submitted for each item as required by
Saudi Aramco Representative.

All electrical work shall be done in a professional manner as per drawings and
specifications, International Electro-technical Commission (IEC), British Standards (BS)
DESCRIPTION

and Saudi Building Code (SBC).


Issued for IFC

F. Fire Alarm and Detection System

a. The following general characteristics has been considered during design and
construction of fire detection and alarm system of the project.

- Fire Detection and Alarm system shall be designed, installed, tested and
commissioned in accordance with all requirements of applicable clauses of
23-10028-
JO/EWO

0001

Saudi Building Code (SBC), NFPA 72, and other applicable international
standards.
06/01/22

- All Fire Detection and Alarm System components shall be UL Listed,


DATE

addressable and shall include but not be limited to Fire Alarm Control Panel,
Smoke Alarms, Heat Detectors, Multi Detectors, Duct Detectors, Fire alarm
NO.
REV

00

DISCIPLINE
notification (horn/strobes), and Pull Stations, …. ETC (ref. to drawings)
ENGINEER - All Fire Detection and Alarm System shall be electrically supervised against
short, ground and open wiring faults in the detection circuit, alarm circuit,
DATE:
alarm and trouble relay coils.
PROJECT
ENGINEER - All Fire Detection and Alarm System design shall ensure that an alarm signal
from any manual station (fire condition) overrides a trouble signal (fault
DATE: condition).
CERTIFIED
- All related wiring, fittings, conduits, trays, boxes and supports accessories
required to install, test, and commission the complete Fire Detection and
DATE:
CONSTRUCTION
Alarm Systems shall be provided.
AGENCY

b. School Buildings:
DATE:
OPERATIONS
CONTRACTOR shall supply, install and connect:
- Complete fire alarm system, which includes an addressable fire alarm control
DATE: panel, battery backup and workstation completed with GUI (graphic user
CONTROL NUMBER

interface).
VERIFICATION

- Optical type smoke detectors, duct smoke detectors, heat detectors, manual
EDSD

pull stations, horns and strobe lights, line isolating modules and flow water
DATE:

interface modules. Quantity, location and wiring shall be provided as per


BY:

drawings, specifications and manufacturer recommendations.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

- The required interface between fire alarm system and the following systems
(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 35


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
HVAC system
Public address system
Audio/Video System
ENGG CERT

Fire Fighting System


Elevator system
Telephone system
BMS system
Access control system

Related Drawings:
DESCRIPTION

HA-274966-001 FOR BOYS ELEMENTARY


Issued for IFC

HA-274992-001 FOR GIRLS ELEMENTARY


HA-274974-001 FOR BOYS INT.& SECONDARY
HA-274974-002 FOR BOYS INT.& SECONDARY
HA-274998-001 FOR GIRLS INT.& SECONDARY
HA-274998-002 FOR GIRLS INT.& SECONDARY
HA-275016-001 FOR EARLY CHILDHOOD
HA-275016-002 FOR EARLY CHILDHOOD
HA-274761-001 FOR BOY'S SITE SCHOOL
HA-274762-001 FOR GIRL'S SITE SCHOOL
23-10028-
JO/EWO

0001

In additional to the other drawings (as mentioned in List of drawings)


06/01/22
DATE

c. Guard Room:
NO.
REV

00

DISCIPLINE
CONTRACTOR shall supply, install and connect:
ENGINEER - Fire alarm Annunciator panel (FAAP), optical type smoke detectors, heat
detectors, horns with beacon light and connect such equipment to the school’s
DATE:
overall fire alarm system through FACP of the school to provide one complete
PROJECT
ENGINEER system.
- Fire alarm system having manual pull station, connection to the automatic fire
DATE: sprinkler system and emergency voice alarm communication system of 24-
CERTIFIED
hour supervision of facilities Acc. to IBC 907.2.3
DATE:
CONSTRUCTION
AGENCY d. Utility buildings:
DATE:
CONTRACTOR shall supply, install and connect:
OPERATIONS
- optical type smoke detectors, heat detectors, horns with beacon light and
connect such equipment to the school’s overall fire alarm system through
DATE: FACP of the school to provide one complete system.
CONTROL NUMBER

- Fire alarm system having manual pull station, connection to the automatic fire
VERIFICATION

sprinkler system and emergency voice alarm communication system of 24-


EDSD

hour supervision of facilities Acc. to IBC 907.2.3


DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 36


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
e. Schools Site Fire Alarm Work:

CONTRACTOR shall supply, install and connect:


ENGG CERT

- conduit raceway for connecting the fire alarm control panel with fire alarm
repeater panel in guard room in additional to fire alarm devices in utilities,
electrical and other buildings including all needed devices and accessories as
per provided drawings.

G. Testing and Commissioning:


DESCRIPTION

CONTRACTOR shall conduct complete testing and commissioning as per Saudi


Issued for IFC

Aramco Standards and specifications of each electrical equipment such as but not
limited to:

- Ring Main Units (RMU’s)


- Distribution Oil Type Transformers
- Main Switchboards
- Panelboards and circuit breakers.
- VFD’s and Starter Panel of AHU’s
23-10028-
JO/EWO

- Fire Alarm System


0001

- Cables and Wires


- Grounding and Lightning Protection
06/01/22
DATE

In order to demonstrate that each system is functional, safe and reliable.


NO.
REV

00

DISCIPLINE
ENGINEER CONTRACTOR shall perform all tests using calibrated equipment by a third party with a
traceable certificate for the instruments and tools in the presence of Saudi Aramco
DATE: Representative and the related authority like SEC or Ministry of Water and Electricity
PROJECT
ENGINEER and Municipality Representatives.

DATE: CONTRACTOR shall make the coordination for performing such tests and advise the
CERTIFIED
concern persons of the tests at least one week in advance or as per the project
management requirements.
DATE:
CONSTRUCTION
AGENCY Original and a minimum of two copies of test results shall be submitted to Saudi
Aramco Representative.
DATE:
OPERATIONS
Provide and comply NMR 601/602/603, ITP's, SAT/FAT's, MSAER's requirements and
International Electro-technical Committee Conformance Assessment.
DATE:

H. Reference Standards
CONTROL NUMBER
VERIFICATION
EDSD

- Saudi Building Code (SBC).


DATE:
BY:

- International Electro-technical Commission (IEC).


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

- British Standards.
(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 37


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
- National Fire Protection Association NFPA-72.

- National Fire Protection Association NFPA-170.


ENGG CERT

- Underwriters' Laboratories, Inc (UL).

- International Electro-technical Committee Conformance Assessment.

- Life Safety Code – NFPA 101.

4.19. Mechanical Works


DESCRIPTION

Issued for IFC

A. Mechanical General:

1- CONTRACTOR shall furnish all material, tools, equipment and labor to


install all mechanical work as shown on the drawings, specified in the
constructions specifications and described in this Scope of Work.

2- CONTRACTOR shall provide complete detailed design and shop


drawings for the complete mechanical scope of work.
23-10028-
JO/EWO

0001

3- CONTRACTOR shall design, supply, install, inspect, test, pre-


commission and provide commissioning works for HVAC, Fire Protection &
06/01/22

Plumbing systems for building/ facilities and as shown on the drawings,


DATE

specified in the constructions specifications.


NO.
REV

00

DISCIPLINE
4- CONTRACTOR shall ensure that project drawings and specifications
ENGINEER related to this document meet applicable codes and standards.
DATE:
PROJECT
5- CONTRACTOR shall ensure that system and equipment design
ENGINEER parameters are, as a minimum.

DATE: B. HVAC:
CERTIFIED

1- CONTRACTOR shall provide workshop drawings, procure, supply,


DATE:
CONSTRUCTION
fabricate, construct, inspect, install, test, pre-commission and provide
AGENCY commissioning for the buildings HVAC systems. The scope of this work
shall include but not be limited to the following.
DATE:
OPERATIONS
2- CONTRACTOR shall verify the chiller yard and pump shed area overall
dimensions and make the necessary changes to accommodate the final
DATE:
equipment selection during the detailed design.
CONTROL NUMBER
VERIFICATION

3- CONTRACTOR shall supply and install, as a minimum the following


EDSD

HVAC systems and equipment as shown on the drawings and project


DATE:

specifications.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

4- CONTRACTOR shall supply and install Air Cooled Chillers (ACWC)


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

complete with all necessary accessories as per drawings, specifications


(DCC) NO. _____________________

and applicable standards.

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 38


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5- CONTRACTOR shall supply and install Central Air Handling System
(AHU): Central ducted air handling units (AHU), modular double skin type
ENGG CERT

shall be provided for the buildings where indicated. Units shall consist of
mixing box, pre-filter, final filter, chilled water-cooling coil with three-way
control valve, (electrical heating coil downstream of the cooling coil with
SCR control for constant air volume AHUs), belt driven fan/motor,
condensate drain pan and all necessary accessories. VFD shall be
provided for the variable air volume AHU units. AHU units are to be located
on roof as shown on the drawings and all VFD's shall be located in
electrical rooms as per drawings, specifications and applicable standards.
DESCRIPTION

Issued for IFC

6- CONTRACTOR shall supply and install Chilled Water Pump (CHWP):


Three chilled water distribution pumps, two duties and one standby, shall be
provided. Pumps shall be located on the ground floor pump shed. The
pump shall be closed-coupled centrifugal (end-suction type) with cast iron
casing and cast bronze impeller as per drawings, specifications and
applicable standards.

7- CONTRACTOR shall supply and install Air Separator (AS) complete with
all necessary accessories as per drawings, specifications and applicable
23-10028-
JO/EWO

0001

standards.
06/01/22

8- CONTRACTOR shall supply and install Expansion Tank (ET) complete


DATE

with all necessary accessories as per drawings, specifications and


applicable standards.
NO.
REV

00

DISCIPLINE
ENGINEER 9- CONTRACTOR shall supply and install Chemical Dosing System
complete with all necessary accessories as per drawings, specifications
DATE:
and applicable standards.
PROJECT
ENGINEER

10- CONTRACTOR shall supply and install Mini Split Air Conditioning Unit:
DATE: Split fan coil units (FCU) ceiling/wall mounted decorative type shall be
CERTIFIED
provided for Guard House, electrical rooms and LC rooms. Units shall
consist of filters, evaporator coil (direct expansion), condensate drain, wall
DATE:
CONSTRUCTION
mount thermostat and all necessary accessories. The respective air-cooled
AGENCY condensing units (ACCU) shall consist of compressors, condenser coil, fans
and all necessary accessories, floor or wall mounted type complete with
DATE:
anti-vibration rubber pads located outdoor. FCU and ACCU units shall be
OPERATIONS
complete with refrigerant piping and all accessories as per drawings,
specifications and applicable standards.
DATE:
CONTROL NUMBER

11- CONTRACTOR shall supply and install Air Conditioning System for
VERIFICATION

telecommunication Rooms (TR): Computer room type precision air


EDSD

conditioning unit shall be installed in TR with stand-by unit to ensure


DATE:

continuous operation, 24 hours per day and 365 days per year. precision
BY:

unit shall be of high reliability type and shall have its local temperature and
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

humidity controller. Units shall be provided with humidifier section, reheat


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

section and other related accessories as per drawings, specifications and


(DCC) NO. _____________________

applicable standards.

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 39


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
12- CONTRACTOR shall supply and install Variable Air Volume Terminal
Units (VAV Box), pressure independent type complete with control,
ENGG CERT

thermostat and all necessary accessories as per drawings, specifications


and applicable standards.

13- CONTRACTOR shall supply and install Electric Duct Heaters (EDH),
UL Listed complete with air flow switch, control, thermostat and all
necessary accessories as per drawings, specifications and applicable
standards.
DESCRIPTION

14- CONTRACTOR shall supply and install Fume Hood exhaust fan,
Issued for IFC

explosion proof, corrosion and acid resistance type complete with pre-
fabricated roof curbs.

15- CONTRACTOR shall supply and install roof mounted exhaust fans for
toilet, locker, ablution, janitor room, kitchenette. Exhaust fans shall be
provided with back draft damper as per drawings, specifications and
applicable standards.

16- CONTRACTOR shall supply and install Canteen Kitchen Hood exhaust
23-10028-
JO/EWO

0001

fan, explosion proof type with grease collector, containment device, and
with pre-fabricated roof curbs. The fan type and capacity shall meet the
06/01/22

kitchen hood operation requirement as per drawings, specifications and


DATE

applicable standards.
NO.
REV

00

DISCIPLINE
17- CONTRACTOR shall supply and install Supply, Return, Exhaust and
ENGINEER fresh air ductwork complete with insulation, hangers and supports as per
SMACNA latest edition, Drawings and
DATE:
specifications.
PROJECT
ENGINEER

DATE: 18- CONTRACTOR shall supply and install Stainless steel 316L exhaust air
CERTIFIED
ducts for fume hood exhaust, kitchen hood exhaust, Art lab exhaust duct,
science lab exhaust duct completes with insulation, hangers and supports
DATE:
CONSTRUCTION
as per SMACNA latest edition, Drawings and specifications.
AGENCY

19- CONTRACTOR shall supply and install round spiral supply air ducts for
DATE:
indoor gym complete with insulation, hangers and supports as per
OPERATIONS
SMACNA latest edition, Drawings and specifications.

DATE: 20- CONTRACTOR shall supply and install aluminum cladding for all
CONTROL NUMBER

exposed supply/return air ducts as per SMACNA latest edition, Drawings


VERIFICATION

and specifications.
EDSD

DATE:

21- CONTRACTOR shall supply and install fire dampers when the duct or
BY:

an opening is passing through a fire rated wall or partition. A smoke damper


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

shall be provided when a duct or an opening is passing through a smoke


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

barrier. Fire/smoke dampers or fire dampers shall be provided when a duct


(DCC) NO. _____________________

or an opening passing through a fire rated wall or partition which is a smoke

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 40


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
barrier as well. These three different types of dampers shall be UL labeled
in accordance with UL 555 or UL 555S as per drawings, specifications and
applicable standards.
ENGG CERT

22- CONTRACTOR shall supply and install manual volume control


dampers, motorized dampers, back draft dampers, turning vanes and duct
access door complete with all accessories as per SMACNA latest edition,
Drawings and specifications.

23- CONTRACTOR shall supply and install fresh air intake for all AHU's
through a sand-trap louver with insect screen as per SMACNA latest
DESCRIPTION

edition, Drawings and specifications. The maximum face velocity of the


Issued for IFC

sand trap louver shall be 1.5 m/s.

24- CONTRACTOR shall supply and install sound attenuators for main
supply air duct and main return air duct on the AHUs where required in
actual equipment selection to meet noise levels requirements as per
ASHRAE standards and SMACNA latest edition.

25- CONTRACTOR shall supply and install duct-mounted smoke detectors


in the main air duct per NFPA -90A code requirement.
23-10028-
JO/EWO

0001

26- CONTRACTOR shall supply and install supply and return registers,
06/01/22

grilles, perforated ceiling diffusers, linear slot diffusers, linear bar grilles
DATE

exhaust diffusers and supply jet diffusers complete with all accessories as
per specifications.
NO.
REV

00

DISCIPLINE
ENGINEER 27- CONTRACTOR shall supply and install per-insulated Flexible ducts
interconnecting the branch duct and supply air outlets as per SMACNA
DATE:
latest edition, Drawings and specifications.
PROJECT
ENGINEER

28- CONTRACTOR shall supply and install condensate drain pipe for air
DATE: handling unit and mini split unit, discharge to the nearest floor drain, gravel
CERTIFIED
pit or soak away pit. condensate drain pipe size shall be one size more that
IMC code requirements.
DATE:
CONSTRUCTION
AGENCY 29- CONTRACTOR shall supply and install ductwork insulation with
approved insulation material shall be applied after leak test approval. The
DATE:
insulation material shall have maximum flame spread index of 25 and
OPERATIONS
maximum smoke developed index of 50 as per SMACNA latest edition,
Drawings and specifications and applicable standards.
DATE:
CONTROL NUMBER

30- CONTRACTOR shall supply and install flexible duct connection piece
VERIFICATION

when the duct is crossing a building expansion joint.


EDSD

DATE:

31- CONTRACTOR shall supply and install goose neck with insect screen
BY:

for any exhaust air outlet above the roof.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

32- CONTRACTOR shall supply and install aboveground Chilled water


(DCC) NO. _____________________

pipes ERW black steel pipe, schedule 40, conforming to ASTM A53 grade

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 41


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B, pipes & fittings, Insulation and aluminum jacketing for exposed pipes
including supports & necessary valves & fittings, insulation and all
accessories as per Drawings and specifications.
ENGG CERT

33- CONTRACTOR shall supply and install underground Pre-Insulated


chilled water pipes (ERW black steel pipe, schedule 40, conforming to
ASTM A53, polyurethane insulations & HDPE protected (jacketing)
including supports, necessary valves & fittings and all accessories as per
Drawings and specifications.

34- Underground chilled water pipe fittings shall be butt-welded, standard


DESCRIPTION

weight seamless steel. Pipe fittings shall be factory welded to sections of


Issued for IFC

straight pipe and factory insulated and jacketing.

35- CONTRACTOR shall supply and install flexible pipe connection when
the pipe is crossing a building expansion joint.

36- CONTRACTOR shall supply and install Ball valves, gate valve, global
valve, check valve, control valve, strainers, tee, elbow, union, gauges and
thermometer with all accessories as per Drawings and specifications.
23-10028-
JO/EWO

0001

37- CONTRACTOR shall supply and install flexible pipe connection when
the pipe is crossing a building expansion joint.
06/01/22
DATE

38- CONTRACTOR shall supply and install Direct digital control (DDC)
complete with all instrument control, equipment monitoring, temperature
NO.
REV

00

DISCIPLINE
thermostat/sensors, pressure differential switches and all other necessary
ENGINEER accessories. DDC panels are to be located in Electrical room. Control wires
and accessories between HVAC equipment and main direct digital
DATE:
controller panels (DDC), and associated related interface equipment with all
PROJECT
ENGINEER necessary accessories as per Drawings and specifications.

DATE: 39- CONTRACTOR shall test, commission and balance the complete
CERTIFIED
HVAC System as described in the construction specifications and
applicable standards.
DATE:
CONSTRUCTION
AGENCY C. Plumbing:
DATE:
1- CONTRACTOR shall design, procure, supply and install, as a minimum
OPERATIONS
the following plumbing systems and equipment as applicable to the
building/ facilities and as specified in the IFB 30% drawings and
DATE: specifications: All plumbing work shall be provided as required by the
CONTROL NUMBER

International Plumbing Code and applicable codes.


VERIFICATION
EDSD

2- CONTRACTOR shall supply and install full automation RO unit (no


DATE:

human intervention) including pumps, pipes, valves, control, filters,


BY:

chemicals and all necessary accessories as shown on the drawings,


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

specifications and in accordance with IPC code and applicable standards.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 42


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3- CONTRACTOR shall supply and install water booster pump set &
drinking water pump set including pipes, valves, control, pressure tanks and
all necessary accessories as shown on the drawings, specifications and in
ENGG CERT

accordance with IPC code and applicable standards.

4- CONTRACTOR shall supply and install (2) above ground fiber glass
water tanks, complete with level alarms, overflow, drain and all necessary
accessories as shown on the drawings, specifications and in accordance
with IPC code and applicable standards.

5- CONTRACTOR shall supply and install above ground (PE) polyethylene


DESCRIPTION

tanks for sweet water, complete with level alarms, overflow, drain and all
Issued for IFC

necessary accessories as shown on the drawings, specifications and in


accordance with IPC code and applicable standards.

6- CONTRACTOR shall supply and install complete plumbing system for


guard hose including water heater, water supply pipes, drainage pipes, vent
pipes, valves and all accessories.

7- CONTRACTOR shall supply and install water piping from water booster
pumps to corresponding plumbing fixtures as shown on the drawings
23-10028-
JO/EWO

0001

complete with all accessories and valves in accordance with IPC code and
applicable standards
06/01/22
DATE

8- CONTRACTOR shall supply and install stand-alone drinking water


chillers C/W drinking fountains with capacities as indicated in the equipment
NO.
REV

00

DISCIPLINE
schedules and as shown on the drawings complete with all accessories.
ENGINEER

9- CONTRACTOR shall supply and install drinking water outlets as


DATE:
described in the constructions specifications and shown on the drawings.
PROJECT
ENGINEER

10- CONTRACTOR shall supply and install drinking water supply to


DATE: corresponding drinking water outlets as shown on the drawings complete
CERTIFIED
with all accessories and valves
DATE:
CONSTRUCTION
11- CONTRACTOR shall supply and install electric water heaters of
AGENCY different capacities and hot water piping as shown on the drawings
complete with all accessories and valves.
DATE:
OPERATIONS
12- CONTRACTOR shall supply and install one free standing drinking water
fountain in the guard room.
DATE:
CONTROL NUMBER

13- CONTRACTOR shall supply and install an isolation valve near the inlet
VERIFICATION

and outlet of each device or piece of equipment including but not limited to
EDSD

water meters, backflow devices, circuit setters, water heaters, thermostatic


DATE:

mixing valves, pressure reducing valves, and circulating pumps.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

14- CONTRACTOR shall supply and install sanitary drainage piping


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

network from corresponding fixtures to site sewer tie-in points complete with
(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 43


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
all accessories as shown on drawings, specifications and in accordance
with applicable standards.
ENGG CERT

15- CONTRACTOR shall supply and install floor drains and floor cleanouts
as shown on the drawings and as required by international Plumbing Code.
Floor drains and Floor cleanouts in the science labs shall be acid resistant
type.

16- CONTRACTOR shall supply and install drainage venting piping for all
plumbing fixtures complete from corresponding fixtures to roof complete
with all vent cowls and accessories as shown on drawings, specifications
DESCRIPTION

and in accordance with applicable standards.


Issued for IFC

17- CONTRACTOR shall supply and install acid resistant sanitary drainage
piping network complete from the science lab to site sewer tie-in points
through an acid neutralization tank complete with all accessories as shown
on drawings, specifications and in accordance with applicable standards.

18- CONTRACTOR shall supply and install one acid neutralization tank on
the main drainage pipe of science lab.
23-10028-
JO/EWO

0001

19- CONTRACTOR shall supply and install roof drains and/or overflow roof
drains complete with all accessories as shown on drawings, specifications
06/01/22

and in accordance with applicable standards.


DATE

20- CONTRACTOR shall supply and install rainwater down pipes from roof
NO.
REV

00

DISCIPLINE
to ground level complete with all accessories.
ENGINEER

21- CONTRACTOR shall supply and install hot water pipes including
DATE:
valves, fittings, hangers, supports, insulations and all accessories as shown
PROJECT
ENGINEER on drawings, specifications and in accordance with applicable standards.

DATE: 22- CONTRACTOR shall supply and install separate hot and cold-water
CERTIFIED
supplies and accessible isolation valves for each bathroom to make it fully
independent.
DATE:
CONSTRUCTION
AGENCY 23- CONTRACTOR shall supply and install electric water heaters floor
mounted type and ceiling mounted type complete with and all accessories
DATE:
as shown on drawings, specifications and in accordance with applicable
OPERATIONS
standards. electric water heater shall be UL listed.

DATE: 24- CONTRACTOR shall supply and install various plumbing fixtures, water
CONTROL NUMBER

closets, ablution hoses, lavatories, kitchen sinks, lab sinks and janitor sinks.
VERIFICATION
EDSD

25- CONTRACTOR shall provide a check valve near each device or piece
DATE:

of equipment namely circuit setters, circulating pumps and water heaters


BY:

shall be provided.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 44


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
26- CONTRACTOR shall provide a strainer near the inlet of each device or
piece of equipment namely water meters, pressure reducing valves and
circulating pumps.
ENGG CERT

27- CONTRACTOR shall provide pressure gauges near the inlet and outlet
of each device namely pressure reducing valves.

28- CONTRACTOR shall provide thermometers near the inlet and outlet of
water heaters.

29- CONTRACTOR shall supply and install reduced pressure type principle
DESCRIPTION

backflow preventers with strainer and isolation valves downstream of water


Issued for IFC

meter.

30- CONTRACTOR shall supply and install floor sinks and floor drains with
primed traps in mechanical rooms, water heater rooms, and chiller plant
pump shed (where applicable). Pressure drop activated trap primers to
serve floor drains and floor sinks in water heater shall be provided.
Electronic type trap primer to serve floor drains and floor sinks in chiller
plant pump shed and mechanical rooms (where applicable).
23-10028-
JO/EWO

0001

31- CONTRACTOR shall supply and install condensate drainage system for
HVAC equipment indirectly to floor drains.
06/01/22
DATE

32- CONTRACTOR shall supply and install water hammer arrestors to


suppress surge pressure in water supply system as shown on drawings,
NO.
REV

00

DISCIPLINE
specifications and in accordance with applicable standards.
ENGINEER

33- CONTRACTOR shall supply and install Vacuum breakers in ablution


DATE:
hoses for water closets to prevent backflow/ back-siphoning.
PROJECT
ENGINEER

34- CONTRACTOR shall supply and install Under counter type grease
DATE: interceptor for canteen waste pipe.
CERTIFIED

35- CONTRACTOR shall use Di-electric unions at dissimilar piping material


DATE:
CONSTRUCTION
connections
AGENCY

36- CONTRACTOR shall supply and install indirect waste connections for
DATE:
drinking fountains.
OPERATIONS

37- CONTRACTOR shall supply and install "Flush valves" flushing


DATE: mechanism for all EWCs, WWCs, and urinals.
CONTROL NUMBER
VERIFICATION

38- CONTRACTOR shall ensure, confirm and/or co-ordinate with the


EDSD

Aramco Representative for all required tie-in connections at the interface


DATE:

points.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 45


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. Fire Protection:

1- CONTRACTOR shall employ a certified Fire Protect professional and


ENGG CERT

affix a professional seal or stamp to documents prepared under the


Engineer’s direct supervision and control. All sprinkler & standpipe hydraulic
calculations shall be reviewed and stamped per local civil defense
requirements or as directed by client representative.

2- CONTRACTOR shall carry out the following mechanical Fire Protection


Works indicated on the drawings and specifications, which includes, but is
not limited, to the following:
DESCRIPTION

Issued for IFC

3- CONTRACTOR shall provide fire protection drawings and construction


documents that have been reviewed and stamped per local civil defense
requirements or as directed by client representative.

4- CONTRACTOR shall ensure that all firefighting systems and equipment


design and installation work is performed by those persons who are
qualified in compliance with International standards.

5- CONTRACTOR shall perform all work in accordance with international


23-10028-
JO/EWO

0001

standards and procedures and ensure adherence to safety best practices


as approved by local civil defense authority
06/01/22
DATE

6- CONTRACTOR shall supply and install Diesel fire pump including all
necessary valves, pipes, fittings, supports, control panel and accessories
NO.
REV

00

DISCIPLINE
and supports as per drawings, specifications and in accordance with NFPA-
ENGINEER 20 and any other applicable standards.

DATE:
7- CONTRACTOR shall supply and install Electric fire pump including all
PROJECT
ENGINEER necessary valves, pipes, fittings, supports, control panel and accessories
and supports as per drawings, specifications and in accordance with NFPA-
DATE: 20 and any other applicable standards.
CERTIFIED

8- CONTRACTOR shall supply and install Jockey fire pump including all
DATE:
CONSTRUCTION
necessary valves, pipes, fittings, supports, control panel and accessories
AGENCY and supports as per drawings, specifications and in accordance with NFPA-
20 and any other applicable standards.
DATE:
OPERATIONS
9- CONTRACTOR shall supply and install fuel tank and exhaust ventilation
system of diesel pump as per NFPA-20 and any other applicable standards.
DATE:
CONTROL NUMBER

10- CONTRACTOR shall supply and install fire pump room piping, valves
VERIFICATION

and accessories as per fire flow diagram, specifications, NFPA-20 and any
EDSD

other applicable standards.


DATE:
BY:

11- CONTRACTOR shall supply and install above ground two fire water
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

tanks, steel type complete with valves, pipes, fittings, supports, overflow
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

line, drain, water levels alarms and all necessary accessories as per
(DCC) NO. _____________________

drawings, specifications and in accordance with NFPA-22

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 46


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
12- CONTRACTOR shall install new portable fire extinguishers in all
buildings within the scope of work complete with mounting bracket,
ENGG CERT

necessary signage and accessories. Portable fire extinguishers selection


and installation shall be designed as required by NFPA 10 latest edition.

13- CONTRACTOR shall design, supply and install Automatic Sprinkler


System including piping, supports, and accessories as per drawings,
specifications in compliance with NFPA 13 latest edition and any other
applicable standards.
DESCRIPTION

14- CONTRACTOR shall supply and install sprinklers (Pendent, Upright


Issued for IFC

and side wall type) in all areas unless otherwise noted as per drawings,
specifications and applicable standards.

15- CONTRACTOR shall supply and install sprinklers under fixed


obstructions over 4 feet wide per NFPA 13.

16- All Sprinkler systems shall be monitored by the building Fire alarm
system. Interface the flow switch and supervisory switch of OS&Y Gate
valve to the proposed fire alarm system in compliance with NFPA 13, NFPA
23-10028-
JO/EWO

0001

72 and any other applicable standards


06/01/22

17- CONTRACTOR shall design and install standpipe including FHC's,


DATE

piping, supports, and accessories as per drawings, specifications and in


accordance with NFPA-14 and any other applicable standards.
NO.
REV

00

DISCIPLINE
ENGINEER 18- CONTRACTOR shall supply and install alarm check valve assembly
and fire department connection including valves, fittings and necessary
DATE:
accessories as per drawings, specifications and in accordance with NFPA-
PROJECT
ENGINEER 13 and any other applicable standards.

DATE: 19- All firewater piping, valves and accessories shall be painted with
CERTIFIED
approved red color in accordance with NFPA and applicable standards.
DATE:
CONSTRUCTION
20- All fire protection system equipment and components shall be UL Listed
AGENCY and/or FM approved.
DATE:
21- All firewater piping, valves, fittings and sprinklers shall withstand a
OPERATIONS
minimum working pressure of not less than 1206 kPa (175 psi).

DATE: 22- CONTRACTOR shall provide fire protection valves signage in


CONTROL NUMBER

accordance with NFPA and applicable standards


VERIFICATION
EDSD

23- CONTRACTOR shall consider adequate spacing for installation,


DATE:

servicing and inspection of all equipment’s and valves in accordance with


BY:

NFPA and applicable standards.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 47


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
24- CONTRACTOR shall seal any penetration made to a fire rated wall or
ceiling shall be using appropriate fire stopping materials in accordance with
NFPA and applicable standards.
ENGG CERT

25- CONTRACTOR shall prepare Shop Drawings and submit for approval
to local Civil Defense Authority or as directed by client representative before
the work commence.

26- CONTRACTOR shall supply and install all pipes, fittings, Piping
supports in accordance with NFPA13, NFPA-14 & NFPA-20 and any other
applicable standards. Sprinkler hangers must be of listed components, per
DESCRIPTION

NFPA 13.
Issued for IFC

27- CONTRACTOR shall perform inspection, testing and commissioning of


all firewater system, piping, valves and sprinklers shall be per

28- NFPA 13, NFPA 24, NFPA 25 and any other applicable standards.

4.20. Telecommunication Work

Contractor shall provide call out reference drawings, details for the
23-10028-
JO/EWO

0001

IT/Communication and related telecommunication installations.


06/01/22

4.20.1 The following is a general description of the major telecommunication systems


DATE

for the Kindergarten, Elementary, Intermediate, and Secondary Schools:


NO.
REV

00

DISCIPLINE
1. Voice over IP (VoIP) and Data System:
ENGINEER

This project will provide for the construction and implementation of the
DATE:
PROJECT
communication transport infrastructure necessary for creation of a modern
ENGINEER high – speed data network for five new school buildings (i.e., Elementary /
Intermediate, girl’s and boy’s schools). Two widely employed concepts:
DATE: Structured cabling system and local area networking (LAN) will be applied
CERTIFIED
to meet the VoIP and data communications requirements of these schools.
All materials necessary to implement the system of structural cabling will
DATE:
CONSTRUCTION
be identified, specified, procured and installed by this project.
AGENCY Contractor shall provide call out reference drawings, details for the OSP,
ISP, SCS, DNS, WAN, LAN and related IT/Communication installations.
DATE:
OPERATIONS
The construction scope of work covers the provision and installation of
communication equipment, voice and data cables, cable pathway and
cross-connection facilities in the telecommunication equipment room /
DATE:
telecommunication closet, of the school buildings.
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:

2. Digital Clock, Bell and Digital Signage System:


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

This project will provide for the construction and implementation of the
(DCC) NO. _____________________

Master Synchronized Digital Clock and Digital Signage system as per

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 48


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
BICSI-TDMM. The work undertaken in this Scope of Work details the
provision and Installation and Termination and Testing & Commissioning
“but not limited to” and shall be provided equipped with:
ENGG CERT

Contractor shall provide & install in the Telecom Room one (1) 19” rack
mounted Master Synchronized Clock with four (4) relay output utilizing the
SCS (by-SCS) cable tray for supporting clock system, conduits and routing
with the required 2-wiring 16AWG as shown in the drawings.

Contractor shall provide & install in the Telecom Room one (1) 19” rack
mounted digital signage player utilizing the SCS (by-SCS) cable tray for
DESCRIPTION

supporting digital signage system, conduits and routing with the required
Issued for IFC

co-axial cables as shown in the drawings.

Contractor shall provide & install in each Telecom Closet/Room 19” rack
mounted Converter Box with the related Transformer 2-Wire System
including the required 2-wiring 16AWG as shown in the drawings for Digital
Clock, bell and Digital Signage System.

Contractor shall provide & install 4”, 4 Digit, Red Display Digital
Synchronized Clock surface/flush mounted with the required 2-wiring
23-10028-
JO/EWO

0001

16AWG are provided at the Classrooms & Labs, all other offices, Canteen,
Multi-Purpose Hall & Indoor Gym & the Entrance Lobby of the school Bldg.
06/01/22

as shown in the drawings for Digital Clock, bell and Digital signage
DATE

System.
NO.
REV

00

DISCIPLINE
Contractor shall provide & install 4”, 4 Digit, Red Display Digital
ENGINEER Synchronized Clock Wall/Ceiling Pole Double mounted with the required 2-
wiring 16AWG are provided at the Corridors of the school Bldg. as shown
DATE:
in the drawings.
PROJECT
ENGINEER

Contractor shall provide & install Digital signage Wall/Ceiling Pole Double
DATE: mounted with the required cables are provided at the Corridors of the
CERTIFIED
school Bldg. as shown in the drawings.
DATE:
CONSTRUCTION
Contractor shall provide & install the needed interfaces with public address
AGENCY system for the sound speakers to be acting as bells in case of belling
status as per school schedules.
DATE:
OPERATIONS
Provide call out reference drawings, details for the SCS, interfaces and
related clock/Digital Signage systems installations.
DATE:
CONTROL NUMBER

Related Drawings:
VERIFICATION
EDSD

HA-274967-001 FOR BOYS ELEMENTARY


DATE:

HA-274993-001 FOR GIRLS ELEMENTARY


BY:

HA-274975-001 FOR BOYS INT.& SECONDARY


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

HA-274975-002 FOR BOYS INT.& SECONDARY


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

HA-274999-001 FOR GIRLS INT.& SECONDARY


(DCC) NO. _____________________

HA-274999-002 FOR GIRLS INT.& SECONDARY

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 49


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
HA-275017-001 FOR EARLY CHILDHOOD
HA-275017-002 FOR EARLY CHILDHOOD
And other drawings as mentioned in list of drawings.
ENGG CERT

3. IP CCTV System:

This project will provide for the construction and implementation of the IP
CCTV System as per BICSI-TDMM, the IP CCTV System shall be
provided for the purpose of the Security, Surveillance & Monitoring with the
provision of the IP IR CCTV Cameras Bullet/Dome type for the inside of
DESCRIPTION

the school’s Entrance Lobby, Corridors and the Computer & Modern
Issued for IFC

Science Lab, Art Room & Home Economics Room, Multi-purpose Hall,
Indoor Gym, other spaces as mentioned in drawings and also for the
Outdoor of the School’s to cover the Gate Entrance & Exit, as well as
around the fence & Under Shaded Patio. The Screen Monitoring station,
monitoring screen shall be located at the Principal Office, while Video
Recording NVR numbers as needed shall be located inside the main
telecom rack at the main telecom room.

The work undertaken in this section details the provision and Installation
23-10028-
JO/EWO

0001

and Termination and Testing & Commissioning “but not limited to” the IP
CCTV system for the inside and outside of the School’s Building, the IP
06/01/22

CCTV system shall be provided equipped with:


DATE

- Contractor shall provide & install each IP IR Bullet day/night cameras


NO.
REV

00

DISCIPLINE
(Watertight/Weatherproof & Vandal Proof) as shown in the drawings
ENGINEER for CCTV system.

DATE:
- Contractor shall provide & install each IP IR Dome day/night cameras
PROJECT
ENGINEER (Watertight/Weatherproof & Vandal Proof) as shown in the drawings
for CCTV system.
DATE:
CERTIFIED
- Contractor shall provide all cameras with motion detectors, night
vision and connected all cameras to cloud base server.
DATE:
CONSTRUCTION
AGENCY - Contractor shall provide & install 19” rack mounted 1U RJ-45 Data
Patch Panel CAT.6A (24-ports), as shown in the drawings for CCTV
DATE:
system.
OPERATIONS

- Contractor shall provide & install NVR network Video Recording; the
DATE: NVR shall be installed inside the main telecom rack at the telecom
CONTROL NUMBER

Room and patched to the allocated Data Outlet, as shown in the


VERIFICATION

drawings for CCTV system.


EDSD

DATE:

- Contractor shall provide/establish the data storage servers, NVR for


BY:

IP-CCTV, network Firewalls, etc.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

- Contractor shall provide & install and terminate cameras each (of
(DCC) NO. _____________________

different lengths of each span that shall be less than 90 meters) 4

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 50


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
pairs 24 AWG category 6A UTP plenum cable from each of the IP IR
Bullet/Dome CCTV Cameras to the 1U RJ-45 Data Patch Panel which
eventually shall be patched to the proposed PoE Switches.
ENGG CERT

respectively (by-SCS) inside the Telecom Closet/Room respectively,


the contractor shall run the cables by utilizing and occupying the SCS
Structured Cabling System Cable Trays, Conduit routing, the work
includes termination and testing of cables, as shown in the drawings
for CCTV system.

- Contractor shall provide & install inside the Telecom Closet/Room


needed outlets each RJ-45-RJ-45, CAT.6A patch cords between
DESCRIPTION

1URJ-45 Data Patch Panel & the allocated RJ-45 ports in the PoE
Issued for IFC

Switch and for patching the LAN port of the NVR to the Data Outlet
and inside the Telecom Room for the NVR connectivity from SCS
Data Patch Panel (by-SCS) to the PoE Switch, as shown in the
drawings for CCTV system.

- Contractor shall provide & install one (1) each Desktop APC Smart –
UPS and Surge protection power strip in the Principal Room, as
shown in the drawings for CCTV system.
23-10028-
JO/EWO

0001

- Contractor shall provide & install one (1) each 52” 4K LED Monitor
inside the Principal Room with the connectivity of the HDMI cable to
06/01/22

the NVR at main telecom rack, in additional to that the contractor


DATE

provide & install one (1) each 52” 4K LED Monitor with the
connectivity of the HDMI cable to the NVR, inside the Guard Room as
NO.
REV

00

DISCIPLINE
shown in the drawings for CCTV system.
ENGINEER

- Contractor shall provide & install one (1) each Wireless Keyboard and
DATE:
Mouse with USB Wireless Interface Bluetooth module, inside the
PROJECT
ENGINEER Principal Room, and as shown in the drawings for CCTV system.

DATE: - Contractor shall provide call out reference drawings, details for the
CERTIFIED
OSP, ISP, SCS, interfaces and related CCTV systems installations.
DATE:
CONSTRUCTION
Related Drawings:
AGENCY

HA-274966-001 FOR BOYS ELEMENTARY


DATE:
HA-274992-001 FOR GIRLS ELEMENTARY
OPERATIONS
HA-274974-001 FOR BOYS INT.& SECONDARY
HA-274974-002 FOR BOYS INT.& SECONDARY
DATE: HA-274998-001 FOR GIRLS INT.& SECONDARY
CONTROL NUMBER

HA-274998-002 FOR GIRLS INT.& SECONDARY


VERIFICATION

HA-275016-001 FOR EARLY CHILDHOOD


EDSD

HA-275016-002 FOR EARLY CHILDHOOD


DATE:

HA-274956-001 FOR BOY'S SITE SCHOOL


BY:

HA-274959-001 FOR GIRL'S SITE SCHOOL


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 51


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. Sound and Paging System:

The Contractor shall provide & install with tests all wiring. Conduits,
ENGG CERT

fittings, necessary supports, and any other applicable standards for:

Speakers

- Ceiling Mounted Loud Speaker 6 watts 6 inch 230 Volts with Max SPL
(rated/1m) = 102 dB Protec Brand
DESCRIPTION

Amplifier
Issued for IFC

- QSC 1/2RU 2 channel 200 watts @8ohm.

Stand Microphone

- AKG Microphone PRO+3200, completed with stand unites

Wireless Microphone
23-10028-
JO/EWO

0001

- wireless Microphone, completed with receiver unites.


06/01/22

Rack
DATE

- Wall mounted rack 19” include (radio A/m FM tuners, antenna, power
units, CD/USB/SD- card audio player. Multi-channel monitors programmer
NO.
REV

00

DISCIPLINE
timer unit, wireless microphone UHF receiver …. etc. and all required
ENGINEER accessories as mentioned in drawings.

DATE:
PROJECT
ENGINEER The contractor shall provide the required interfaces with fire alarm system
to be evacuation in case of fire, in additional to that it shall be interfaced
DATE: with digital clock system to be acting as bells tones in case of belling
CERTIFIED
status as per recently Armco requirements.
DATE:
CONSTRUCTION
AGENCY Related Drawings:
DATE:
HA-274766-001 FOR BOYS ELEMENTARY
OPERATIONS
HA-274781-001 FOR GIRLS ELEMENTARY
HA-274768-001 FOR BOYS INT.& SECONDARY
DATE: HA-274768-002 FOR BOYS INT.& SECONDARY
CONTROL NUMBER

HA-274784-001 FOR GIRLS INT.& SECONDARY


VERIFICATION

HA-274785-001 FOR GIRLS INT.& SECONDARY


EDSD

HA-274799-001 FOR EARLY CHILDHOOD


DATE:

HA-274799-002 FOR EARLY CHILDHOOD


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

In additional to other drawings (ref. to list of drawings)


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 52


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5. AV system

- The Contractor shall provide & install Standard audio jack connection
ENGG CERT

from computer to the sound system for frequent presentation of video


clips. Power supply to computer and back-up speakers. Cordless lavaliere
(belt clip or pin) microphone, for hands-free movement throughout the
room

- The contractor shall provide and install and tests all audio-visual system
technology components for:
 Comprehensive video presentation systems.
DESCRIPTION

Issued for IFC

 Touchscreen control systems.


 Unified communication platforms.
 Network operations centers.
 Sound reinforcement systems.

- The contractor shall provide and install and tests all audio-visual system
components include the followings:
23-10028-
JO/EWO

0001

Projector
06/01/22
DATE

- Epson Projector with USB 1.1 and 2.0 compliant for USB display or
external mouse
NO.
REV

00

DISCIPLINE
ENGINEER - Display: Poly-silicon TFT active matrix

DATE: - Resolution: Bright Link 480i:1024 × 768 pixels (XGA)


PROJECT
ENGINEER Bright Link 475Wi/485Wi:1280 × 800 pixels (WXGA)

DATE: - Lens: F= 1.80, Focal length: 3.71 mm


CERTIFIED

- Color reproduction: Full color, 16.77 million colors.


DATE:
CONSTRUCTION
AGENCY
- Wall speakers
- Celling speakers
DATE:
OPERATIONS
- A/V racks include all needed accessories (ref. to A/V drawings)

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 53


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.20.2 The detailed scope of work of VoIP and data System shall include but shall not
be limited to the following:
ENGG CERT

1. Cable Entrance Facilities:

CONTRACTOR shall provide, install conduit duct banks from


telecommunication equipment room floor to 1.5 meters away from the
outside wall of the building as shown on drawing. Work includes trenching
and backfill. Outside plant works, beyond 1.5 meters away from the
building, shall be provided by telecom service provider.
DESCRIPTION

2. Backbone Cabling:
Issued for IFC

CONTRACTOR shall provide, install terminate and tests fiber optic cable
between telecommunication equipment room and telecommunication
closet. This includes supply and installation of fiber patch panel at each
end.

3. Inside Plant (ISP) / Structured Cabling System (SCS):

a. CONTRACTOR shall construct a fully designed telecommunications


23-10028-
JO/EWO

0001

equipment room (TER) and telecommunication closet (TC) in


accordance with the detailed drawings. This includes the covering of
06/01/22

¾” thick plywood backboard to all sides of TER/TC walls. These walls


DATE

shall be painted with 2-coats of white fire-retardant paint.


NO.
REV

00

DISCIPLINE
b. CONTRACTOR shall provide and install all the components of
ENGINEER overhead cable trays, EMT conduits, under floor conduits, pull boxes,
wall flush mounted boxes and outlets with the necessary bonding and
DATE:
grounding of all the components in accordance with the detailed
PROJECT
ENGINEER drawings.

DATE: c. Installations shall be carried out in accordance with the manufacturer


CERTIFIED
instructions, other relevant standards and as per BICSI-TDM and
EIA/TIA-568,569 and 606.
DATE:
CONSTRUCTION
AGENCY d. CONTRACTOR shall provide install, terminate tests and label all the
UTP cables and outlets at the locations shown on the cableway plan
DATE:
drawings.
OPERATIONS

e. CONTRACTOR shall provide and install equipment racks and


DATE: includes fiber and data patch panels for the termination of fiber optic
CONTROL NUMBER

cable and category 6 A UTP cable accordingly as shown on drawings.


VERIFICATION
EDSD

f. CONTRACTOR shall provide and install a telecommunication


DATE:

grounding system by installing #4/0 AWG main ground wire to be


BY:

connected to main building ground grid. This includes the installation


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

of the Telecommunication Main Ground Bus Bar / Telecommunication


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Ground Bar (TMGB/TGB). Cable ladders, equipment racks, cable


(DCC) NO. _____________________

runway, cable trays and metallic conduits shall be bonded and

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 54


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
grounded to this ground bus bar as shown by drawings. All grounding
shall be in accordance with BICSI chapter 18 and EIA/TIA-607.
ENGG CERT

g. CONTRACTOR shall provide call out reference drawings, details for


the DCO/Building ISP, Interfaces and related system installations.

4.20.3 Data Network Facilities:

CONTRACTOR shall provide and install Local Area Network (LAN) switch in the
TER/TC as shown on the drawings. This includes supply and installation of UPS
DESCRIPTION

with one-hour battery backup time.


Issued for IFC

Connection of each individual user of the schools to LAN services via 10/100
mbps Fast Ethernet Switch.

Internet connection of each school buildings to telecom service provider via fiber
optic cable with speed 50mbps.

Contractor shall provide call out reference drawings, details for the
DCO/Building ISP, DNS, interfaces and related systems installations.
23-10028-
JO/EWO

0001

Wireless network system:


06/01/22
DATE

- The Wireless LAN active infrastructure equipment and components will be


telecom and another low current network only and are mainly used to:
NO.
REV

00

DISCIPLINE
ENGINEER 1- Wireless Connection for Data, Voice and other Services

DATE:
PROJECT
2- To track assets or specific individuals via active tags using Real Time
ENGINEER
Locating System.

DATE:
CERTIFIED
3- Every point should be covered by at least 3-4 access points for Real Time
Locating System. “subject to client requirement”
DATE:
CONSTRUCTION - The Wireless LAN equipment shall be capable of operating to current industry
AGENCY
standards, being monitored by the network management team and have the
DATE:
capability to be upgraded to accommodate future wireless technologies.
OPERATIONS
- The following design parameters shall be adhered to:
DATE:
1- Signal coverage in all areas 100%.
CONTROL NUMBER
VERIFICATION

2- Signal strength in all areas -73dBm = 54Mbps.


EDSD

3- Signal strength for overlapping channels min -67dBm


4- Minimum power level 35-50mW.
DATE:
BY:

5- Minimum signal to noise ratio (SNR) 25dB.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 55


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.20.3.1 Analog Telephone System:

CONTRACTOR shall provide install and commission a complete analog


ENGG CERT

telephone system as a backup to the VoIP and Data network system in times
of failure.

Contractor shall provide call out reference drawings, details for the
DCO/Building MDF, SDF, Subscriber's Loop, LAG, etc. interfaces and related
systems installations.

The analog telephone system is a copper cable connection to telecom service


DESCRIPTION

provider. The system shall include facilities, equipment and services below.
Issued for IFC

 Analogue telephone PABX

 3 Analog lines, 1 for principal office and 2 for supervisor’s room)

 Main Cross-connect (110 wiring block and jumper trough) by using MDF
and SDF.

 Copper cable and protector terminal block by telecom service provider.


23-10028-
JO/EWO

0001

4.20.3.2 IP Telephone:
06/01/22
DATE

CONTRACTOR shall provide install and commission a complete IP telephone


system include interfaces and all related systems installations.
NO.
REV

00

DISCIPLINE
ENGINEER
The IP telephone system is a fiber connection to telecom service provider. The
system shall include facilities, equipment and services below. In additional to
DATE:
PROJECT that the contractor shall coordinated with service provided for providing the
ENGINEER
connection with the closed TIE-IN.
DATE:
CERTIFIED
The following features shall be included:

DATE:
1. IP station support: The system must manage, control and support a range of IP
CONSTRUCTION telephone stations for both voice and telephony applications as well as IP
AGENCY
application stations for voice, telephony, and Web services support. IP telephone
and IP application telephone stations will be referred herein as “IP stations,” and
DATE:
OPERATIONS when necessary, the type of IP station will be clearly stated.

2. Quality of Service: The proposed system supports native IP communications in


DATE:
direct or "peer-to-peer" with only the telephone signaling transiting back toward
CONTROL NUMBER
VERIFICATION

the controlling communications server.


The speech will be switched over the IP network and exchanged directly from
EDSD

client to client. The voice and signaling frames should be marked [tagged] in
DATE:

order to be recognized and should be classified by the network. The standards of


BY:

marking supported will be:


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

 Level 2: IEEE 802.1p /Q


(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 56


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 Level 3: TOS / DiffServ
ENGG CERT

In the case of a PC connected to an IP station, (IP telephone or IP application


telephone), the frames transmitted by the PC, tagged or untagged, must be
treated by the IP station in a transparent manner.

3. Client DHCP: The client IP Media Gateway (the IP stations) will support either a
static IP address or a dynamic address (manageable from the terminal) by the
Client’s compatible DHCP within their server.

4. Automatic VLAN Assignment: Although voice and data traffic flow over different
DESCRIPTION

VLANs, they will be managed simultaneously because of their distribution over


Issued for IFC

one network. When a user station is moved, it’s possible to perform the IP
activation for a VLAN voice connection that is different from the one initially
programmed in the terminal. In this case, the telecommunications system should
have the capability to support a procedure, based on standard mechanisms, to
assign the corresponding VLAN number to the IP station clients during IP station
initialization.

5. IP Communication Zones: An IP communication zone (IP domain) is defined by


IP stations and / or media gateways within a geographical area. Because
23-10028-
JO/EWO

0001

bandwidth is shared by the data and voice communications, it’s necessary to


limit the bandwidth assigned. The goal is to consider the underlying IP
06/01/22

infrastructure to avoid congestion in the WAN links and maintain good quality
DATE

voice communications.
NO.
REV

00

DISCIPLINE
The system must be able to control and limit the number of simultaneous
ENGINEER communications between the different communication zones. In addition, the
compression algorithms used for the communications inside the same IP
DATE:
PROJECT
communication zone and between different IP communication zones can be
ENGINEER different and must be activated on a call-by-call basis. For example, inside the
same IP communication zone (same LAN), communications will not be
DATE: compressed but digitized in G.711 in order to have toll quality voice; whereas
CERTIFIED
inter-zone communications will use the compression algorithm defined by the
administrator: G723.1 or G.729A.
DATE:
CONSTRUCTION
AGENCY System Availability: In the distributed IP architecture with a soft switch
controlling the IP stations and the media gateways, their operation must be
DATE:
OPERATIONS
maintained by an emergency arrangement. In case the IP network goes down,
the link with the soft switch must recover automatically via the analog public
network or ISDN. In this case, the media gateway will behave like an
DATE:
autonomous PBX, and if some IP stations are located on the same site as the
CONTROL NUMBER

media gateway, they will also recover their signaling to the communication
VERIFICATION

server through the MG


EDSD

DATE:

4.20.4 Building Management System:


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

• CONTRACTOR shall provide install and commission a fully integrated Building


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Management System (BMS), instrumentation and controls, incorporating Direct


(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 57


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Digital Control (DDC) automatic temperature control systems and equipment. For
building management integration software
ENGG CERT

• The Contractor shall provide stand-alone, distributed control system for building
mechanical and electrical systems. The direct digital control system shall include
an operator workstation, microprocessor-based control unit’s panels,
instrumentation, and end control devices, wiring, piping, and related systems to
control / monitor the following systems:

o HVAC Control System.


o Motors & Pumps.
DESCRIPTION

Fire Alarm System.


Issued for IFC

o
o CCTV System.
o Electric dampers & valve operators.
o Data System.
o Central Digital Clock System.
o Speakers System.
o Elevator
o Other systems as mentioned in schematic diagrams
23-10028-
JO/EWO

• All the BMS work shall be installed, wired, tested and calibrated by factory
0001

certified technicians qualified for this work and in the regular employment of the
temperature control system manufacturer. Supervision, calibration and checkout
06/01/22
DATE

of the system shall be by the employees of the local factory owned temperature
control contracting field office. Supplier shall have an in-place support facility
within 50 miles of the project site with technical staff, spare parts inventory and all
NO.
REV

00

DISCIPLINE necessary test and diagnostic equipment. Local office as well as the factory shall
ENGINEER
be ISO 9000 certified.
DATE:
PROJECT
ENGINEER
• The Scope shall include also Product Data and Shop' Drawings which meet
requirements of Shop Drawings, Product Data, and Samples. In addition,
DATE:
Contractor shall provide shop drawings or other submittals on all hardware,
CERTIFIED software, and installation to be provided. No work may begin on any segment of
this project until Engineer has reviewed submittals for conformity with the design
DATE: intent.
CONSTRUCTION
AGENCY
• The Scope shall include also Programming, testing, Commissioning, for the
DATE: Building Management system including all the interface modules and all wires,
OPERATIONS devices & connections.

DATE: • Contractor shall prepare perform the Work for the Building Automation System
(BAS) in accordance with Saudi Aramco requirements with applicable standards.
CONTROL NUMBER
VERIFICATION

Contractor shall develop the specifications and Project drawings/documents.


EDSD

Related Drawings:
DATE:
BY:

HA-274969-001&002 FOR BOYS ELEMENTARY


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008

HA-274995-001&002 FOR GIRLS ELEMENTARY


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

HA-274977-001&002&003 FOR BOYS INT.& SECONDARY


(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 58


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
HA-275002-001&002&003 FOR GIRLS INT.& SECONDARY
HA-275019-001&002&003 FOR EARLY CHILDHOOD
And other drawings (ref. to the list of drawings)
ENGG CERT

4.20.5 IT Equipment:

• CONTRACTOR shall provide install and commission a portable podium with i7 pc


for a fully IT Equipment for the school, the Equipment consist of the following:

- Computers
DESCRIPTION

- Smart board
Issued for IFC

- Printer

- Copy machine

- Sound System

- Laptop
23-10028-
JO/EWO

0001

- Charging stations
06/01/22

- Ceiling projector
DATE

- Projector screen
NO.
REV

00

DISCIPLINE
ENGINEER - Fax

DATE:
- Standard phone
PROJECT
ENGINEER

- Advance phone
DATE:
CERTIFIED
- Conference phone
DATE:
CONSTRUCTION
- Fingerprint device “cloud base”
AGENCY

• The Scope shall include also Product Data and Shop' Drawings which meet
DATE:
OPERATIONS
requirements of Shop Drawings, Product Data, and Samples. In addition,
Contractor shall provide shop drawings or other submittals on all hardware,
software, and installation to be provided. No work may begin on any segment of
DATE:
this project until Engineer has reviewed submittals for conformity with the design
CONTROL NUMBER

intent.
VERIFICATION
EDSD

• The Scope shall include also Programming, testing, Commissioning, for the
DATE:

Equipment system including all the interface modules and all wires, devices &
BY:

connections.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

• The below IT equipment for guidance (in case will not be supplied by contractor
(DCC) NO. _____________________

in next stages)

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 59


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Computer PCs
ENGG CERT

8th Gen SFF i7-8700 / 8GB / 1TB HDD HDD / W10p64 / DVD-WR / 3YW / USB Slim
kbd / USB mouse / VGA Port / Office ProPlus2019 / MFE EP Threat Protection P:1
BZ [P+]
Monitors

EliteDisplay E243 Monitor 23.8''

SMART BOARD
DESCRIPTION

Issued for IFC

Active Panel Titanium 70" V7 4K, built-in Android 8, with Vellum fine writing
technology & with pre-installed applications

Intel Core i7-7700T QC 2.9GHz Processor 8GB DDR4 2400MHz Memory Intel HD
Graphics 630 Maximum Resolution support 3840x2160@60Hz Dual Display support
with Front HDMI2.0 port 802.11n Wireless Network

MS Windows 10 Pro 64bit License


Additional specifications (as mentioned in drawings)
23-10028-
JO/EWO

0001

Copy machine Black Printers


06/01/22
DATE

LaserJet Enterprise printer


NO.
REV

Multifunction Printer 4 in 1
00

DISCIPLINE
ENGINEER
COLOR PAGEWIDE MANAGED A3 MFP MODEL P77760Z + 2Yrs NBD CARE
DATE: PACK WITH PRINT /SCAN / FAX / NFC/ BT / WIFI /ADF/ DUPLEX/ BYPASS PAPER
PROJECT
ENGINEER
TRAY 1 x 550 SHEETS

DATE:
/ SUPPLIES BLACK & COLOR 1 0K/8K/220 VOLTS PART #WlB39B
CERTIFIED

PAPER TRAY 1 x 550 SHEETS + CABINET FLOOR ST ANDING FOR HP


DATE: PAGEWIDE A3 MFP MODEL P77740DN I P77740Z I P77760Z
CONSTRUCTION
AGENCY Belkin Family Rock Star USB Home Charger "CHARGING STATIONS "

DATE: Universal compatibility / 4 USB ports / 10 ft. cable / 5.4A power


OPERATIONS

Laptop
DATE: 8th Generation Intel® Core™ processor / Micro-edge display with edge-to-edge
CONTROL NUMBER

keyboard / Fingerprint reader / All metal chassis / Dual 4K support / USB-C™/ Fast
VERIFICATION

Charge / operating system windos10 64bit / Processor Intel® Core™ i7-8550U (1.8
EDSD

GHz base frequency, up to 4 GHz with Intel® Turbo Boost Technology, 8 MB cache, 4
cores) Processor family: 8th Generation Intel® Core™ i7 processor / Memory 8 GB
DATE:
BY:

LPDDR3-2133 SDRAM (onboard) Transfer rates up to 2133 MT/s. / Storage 512 GB


REVISIONCERTIFICATION

PCIe® NV Me™ M.2 SSD Dropbox / Graphics Discrete: NVIDIA® GeForce® MX150
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(2 GB GDDR5 dedicated) / Audio Bang & Olufsen, quad speakers, Audio Boost /
(DCC) NO. _____________________

Display 33.8 cm (13.3") diagonal FHD IPS BrightView micro-edge WLED-backlit

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 60


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
edge-to-edge glass (1920 x 1080).
ENGG CERT

Projector
projector technology Laser Illumination / brightness (ANSI lumens) 4000 ANSI
Lumens / native resolution 1920 X 1200 (WUXGA) / power source 100 - 240 Volts /
aspect ratio 16:10 / contrast ratio 2,500,000:1 / image size (diagonal) 70" to 130" /
projection throw distance 0.41 m - 0.78 m (90 inch screen) / keystone adjustment
Manual: Vertical -/+ 3 deg, Horizontal -/+ 3 deg / ports USB 2.0A/USB
2.0B/RS232C,RJ-45/VGA / in/out/HDMI/Composite/MHL / lens type Manual Focus
Lens / lamp life up to 20000 Hours / control system Remote Control / speakers Built-in
Mono Speaker.
DESCRIPTION

Issued for IFC

Additional specifications (as mentioned in drawings)


Lega master Electric Projector Screen
product type Electric Projector Screen / screen width 280.00 cm ( 9.19 ft ) / screen
length 179.00 cm ( 5.87 ft ) / color Black/White / material Aluminum/Matte
Fabric/Metal / adjustable height Yes
Additional specifications (as mentioned in drawings)
Advance IP Phone
Audio codec support G.711a-law and mu-law, G.722, G.729a, Internet Low Bitrate
Codec (iLBC), and Internet Speech Audio Codec (iSAC) / Call features: + Dialing /
23-10028-
JO/EWO

Abbreviated dialing / Adjustable ring tones and volume levels / Adjustable display
0001

brightness / Agent greeting / Auto-answer / Auto-detection of headset / cBarge / Busy


Lamp Field (BLF) / Busy Lamp Field (BLF) Pickup / Busy Lamp Field (BLF) speed dial
06/01/22
DATE

/ Callback / Call forward / Call forward notification / Call filter / Call history lists / Call
park / Call pickup / Call timer /Call waiting / Call chaperone / Caller ID /Corporate
directory / Conference, including traditional Join feature / Cross Cluster Ex Extension
NO.
REV

00

DISCIPLINE Mobility (EMCC) / Language support / Security features / Network features.


ENGINEER
standard phone
DATE: ● Compact footprint design with 360-degree room coverage and no less than 7-ft
PROJECT
ENGINEER
(2.1-m) microphone pickup.
● 3.4-inch (8.6-cm), 384x128-pixel monochrome LCD with backlit LED and antiglare
DATE:
bezel.
CERTIFIED ● Large mute button for easy access from all sides of the device.
● Single line with a user experience of multiple calls per line, as on other 7800
DATE: Series phones.
CONSTRUCTION
AGENCY
● Codec support including G.711(u/A), G.729a, G.729ab, iLBC, G.722, and OPUS.
● Secure Hash Algorithm (SHA)-256 enabled for advanced security features.
DATE: ● IEEE 802.3af Power over Ethernet (PoE) Class 2 for low power consumption. An
OPERATIONS optional external universal AC power supply kit is available. The product is qualified
by the Energy Star organization.
DATE:
Fax Multi-Function Printer
CONTROL NUMBER
VERIFICATION

Printing Process Laser / Recording Paper Size -Input Tray: A4, LTR, LGL,
EDSD

B5(JIS/ISO), Folio (216 x 330 mm), Oficio (216 x 340 mm), 16K / Manual tray: A5, A4,
LTR, LGL, B5(JIS/ISO), Folio (216 x 330 mm), Oficio (216 x 340 mm), 16K / Envelope
DATE:
BY:

#10/DL/YOUKEI #4/CHOUKEI #3/CHOUKEI #4 / Custom (W: 210-216 mm, L: 279-


REVISIONCERTIFICATION

356 mm) / LCD Display 16 digits / 2 lines with back-light / Memory Size 128 MB / Print
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Speed Up to 26 ppm (A4)


00

/ Duplex Printing Yes (A4, LTR, LGL, 216 x 330 mm, 216 x 340 mm) / Supported OS
(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 61


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Windows® XP, Windows Vista®, Windows® 7, Windows® 8, Windows® 8.1,
Windows Server® 2008, Windows Server® 2012, Mac OS X 10.5 - 10.10*4, Linux®*.
ENGG CERT

Conference phone Station


UNIFIED IP CONFERENCE STATION VOIP PHONE - SCCP
Fingerprint device “cloud base”
Face Detection and Identification / Auto Tilt Camera / Live & Fake Finger Detection /
FBI PIV Certified Scanner / 21mm (W) x 21mm (H) Sensor Platen Area / 5” Touch
Color LCD / Enhanced Touch Sensitivity / Large Memory Capacity / 250,000 Users /
250,000 Cards / 250,000 Fingers (1:1) / 25,000 Fingers (1:N) / 10,000 Faces (1:1) /
2,000 Faces (1:N) / 10,000,000 Logs / 20,000 Image Logs / Dual Card Reader
DESCRIPTION

Issued for IFC

Support / (125 KHz Proxy & 13.56 MHz Mifare) / TCP/IP, Wi-Fi (Optional), Wiegand.

4.21. Instrumentation

4.21.1 Raw Water Pumps

 The Contractor shall supply/install Level Transmitter on each raw water tanks as
23-10028-
JO/EWO

per P&ID.
0001

 The Contractor shall supply/install pressure gauges, pressure switches at


06/01/22
DATE

suction & Discharge of pumps

 The Contractor shall supply/install cables from pressure switches to CP-Control


NO.
REV

00

DISCIPLINE Panel
ENGINEER

DATE:
 The Contractor shall supply/install panel support for CP- Control Panel.
PROJECT
ENGINEER
 The Contractor shall supply/install cable from CP- Control Panel to DDC panel
DATE:
for pumps monitoring.
CERTIFIED
4.21.2 RO Plant
DATE:
CONSTRUCTION
AGENCY
 The Contractor shall supply/install CP-Control Panel to control filter
feed/backwash pumps, RO High pressure pump and chemical/chlorine Dosing
DATE: set
OPERATIONS

 The Contractor shall supply/install pressure gauges, flow meter, temperature


DATE: gauges, etc.
CONTROL NUMBER
VERIFICATION

 The Contractor shall supply/install cables from field instruments to CP-Control


EDSD

Panel.
DATE:
BY:

 The Contractor shall supply/install cable from CP- Control Panel signals to DDC
panel for RO Plant monitoring.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

 The Contractor shall supply/install panel support for CP- Control Panel.
(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 62


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.21.3 Booster Water Pumps
ENGG CERT

 The Contractor shall supply/install level transmitter on the new drinking water
storage tanks

 The Contractor shall supply/install CP- Control Panel near to the booster pumps
to control the pumps as per sequence of operation

 The Contractor shall supply/install cables from pressure switches to CP-Control


Panel
DESCRIPTION

Issued for IFC

 The Contractor shall supply/install new instruments at suction/discharge of


pumps this includes pressure gauges and pressure switches

 The Contractor shall supply/install panel support for CP-Control Panel.

 The Contractor shall supply/install cables from CP- Control Panel to DDC panel
for pumps monitoring.

4.21.4 Fire Water Pumps


23-10028-
JO/EWO

0001

 The Contractor shall supply/install level gauge, level transmitter, and flame
06/01/22

arrestor on the fuel tank


DATE

 The Contractor shall supply/install CP-Control Panel to control diesel, electric


NO.
REV

00

DISCIPLINE
and jockey pumps as per control description
ENGINEER

 The Contractor shall supply/install new instruments at the suction/discharge


DATE:
PROJECT
pumps. This includes pressure gauges, flow meter, and flow gauge
ENGINEER

 The Contractor shall supply/install cables from the new instruments to CP-
DATE: Control Panel.
CERTIFIED

 The Contractor shall supply/install panel support for CP- Control Panel.
DATE:
CONSTRUCTION
AGENCY
 The Contractor shall supply/install cables from CP- Control Panel to DDC panel
for fuel tank/pumps monitoring.
DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 63


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5. ADDITIONAL STUDIES & ENGINEERING DELIVERABLES
ENGG CERT

5.1.1 Additional Studies

The following studies and assessments shall be performed and developed during the project
Engineering Design Stage to be carried over to LSPB contractor:

1. Topographic Site Survey


2. Environmental Impact Assessment – Groundwater Monitoring Wells
3. Power System Studies (ETAP)
DESCRIPTION

4. Solid Waste Management Plan


Issued for IFC

5. Storm Water Management Plan


6. HVAC System Evaluation
7. Value Improvement Practices Studies
8. Energy Optimization and Green Energy report
9. Constructability Assessment
10. Value Engineering
11. Water Supply Assessment
12. Power Supply Assessment
13. Finishes and Material specifications
23-10028-
JO/EWO

0001

14. Stakeholder Management Plan


15. Plot plans
06/01/22
DATE

16. Site Visit Report (for Boy’s Complex)


17. Site Visit Report (for Girl’s Complex)
18. Project Execution Plan
NO.
REV

00

DISCIPLINE
19. Fire Risk Assessment – to be deleted
ENGINEER 20. Schedule Level III
21. Project Close-out
DATE:
PROJECT
22. Gate Outcome Report
ENGINEER
23. Finalize FEL Brief and presentation
24. ER estimate
DATE:
CERTIFIED
25. ORP Level II
26. Project Charter
27. Target Setting
DATE:
CONSTRUCTION 28. Proposed ISA (Integrated Staffing Assignment)
AGENCY
29. Project Quality Plan
30. Building Risk Assessment
DATE:
OPERATIONS
31. Contracting Strategy
32. Project Interface Plan
33. Pre-commissioning and Mechanical Completion
DATE:
34. Procurement Strategy
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 64


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65
EDSD/2616-0399.doc
EGEC – BI-23-10028 Specs – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Engineering Deliverables
ENGG CERT

Based on above studies and assessments, the following deliverables shall be developed
during the Engineering Design Stage:

i. Site Plans and Layouts

- Overall Site Plans, proposed new building, support facilities, utilities, roads, and
landscaping
- Layouts and plans of proposed new school buildings
- Grading and storm water layout plans, connections and the interface points
DESCRIPTION

- Power layout plans of connections and interface points including irrigation


Issued for IFC

- Communications networks

ii. Detailed Engineering for utilities, including:

- Potable water network and demand calculations


- Waste water network and demand calculations
- Storm water network and demand calculations
- Utilities (Electrical & Non-Electrical) demand calculations and supply sources
- Wet utilities networks hydraulic and performance calculation (water piping, sewer)
23-10028-
JO/EWO

0001

- Irrigation water network and demand calculations


- Coordination with utilities supply and facilities
06/01/22
DATE

iii. Road Network and Parking Plans


NO.
REV

00

DISCIPLINE
- Internal and access Points
ENGINEER - Parking requirements and locations
DATE:
PROJECT
iv. Buildings Drawings, including:
ENGINEER

- (5) School buildings


DATE:
CERTIFIED
- Landscaping
- Finishes and Material specifications
- Furniture layout and specifications
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS
- END OF SCOPE -

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

100% Detail Design Engineering for BI-23-10028 Public Schools DOC 65


East Dammam II Home Ownership
381 A HE-274742
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 65