SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
DESCRIPTION
0001
06/01/22
DATE
SCOPE OF WORK
NO.
REV
00
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
January 06 2022
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SCOPE OF WORK – DAMMAM
TABLE OF CONTENTS
ENGG CERT
Contents
1. INTRODUCTION ................................................................................................................................................... 3
2. GENERAL DESCRIPTION OF THE WORK ........................................................................................................ 3
3. SAFETY .................................................................................................................................................................. 8
4. SPECIFIC DESCRIPTION OF WORK ................................................................................................................ 10
DESCRIPTION
00
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SCOPE OF WORK
1. INTRODUCTION
ENGG CERT
1.2 CONTRACTOR shall work on the basis of this Scope of Work, together with the
DESCRIPTION
1.3 CONTRACTOR shall perform a site survey to fully understand the project facilities
to be provided. Particular attention shall be paid to identifying any underground
utilities or any other obstructions encountered during the execution of the project
which are not shown on the Project Drawings.
23-10028-
JO/EWO
1.4 CONTRACTOR is responsible for the protection of the existing utilities adjacent to
0001
project site whereas to be used for tapping-in and any required to complete the
work. Any damage caused by the CONTRACTOR to the existing utilities and or
06/01/22
DATE
00
DISCIPLINE
1.5 CONTRACTOR shall be responsible for performing surveys to verify all
ENGINEER
dimensions, angles, and elevations before fabrication. This is especially important
DATE:
for all dimensions and angles stipulated and shown in the Project Drawings.
PROJECT
ENGINEER
2. GENERAL DESCRIPTION OF THE WORK
DATE:
CERTIFIED
2.1 The scope of work of this Contract are (5) school buildings consists of Boys & Girls
DATE:
Elementary, Intermediate, Secondary, and Kindergarten. Supported with outdoor
CONSTRUCTION facilities which are to be built in an empty land each respectively. Designated as
AGENCY
vast natural deserted lot area of 35,400 square meters for Boys school complex
DATE: and 40,900 square meters for the girls and kindergarten school complex. These (2)
OPERATIONS
two complexes were surrounded and will support Saudi Aramco housing
community project.
DATE:
CONTROL NUMBER
VERIFICATION
The site development plan indicating proposed school building locations, outdoor
EDSD
facilities and internal circulation is shown and indicated in Drawing HA-275036 for
boy’s complex and HA-275037 for girl’s complex, both sheet 001.
DATE:
BY:
REVISIONCERTIFICATION
The drawings and specification provided with this contract are 30% Detailed
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
for both boys and girls school complexes through Saudi Aramco approved
engineering consultant to develop a complete detailed engineering package for
ENGG CERT
construction.
2.1.1 CONTRACTOR shall furnish all plant, tools, equipment, temporary facilities, labor,
supervision, technical and professional services, consumables, materials and shall
perform all operations and incidentals required to complete the construction
activities as outlined in the scope of work. The WORK shall be carried out in
accordance with the terms and conditions of this Contract, the Technical
Specifications and Drawings, and all standards referenced in the Scope of Work.
23-10028-
JO/EWO
0001
2.2 The WORK to be performed by CONTRACTOR includes, but shall not be limited
to, the following:
06/01/22
DATE
2.2.1 Site preparation, site detailed surveys, clearing, grading, site and road excavation
whether in common soil or in rock and backfilling, compaction of trenches and
NO.
REV
00
to use.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.2.2.5 Provision of chilled water system and associated equipment for
each building to serve.
ENGG CERT
2.2.2.6 Provision of chiller yard and chiller pump shed separately to serve
each school building respectively.
2.2.2.8 Provision of a fire fighting system including sprinkler system and all
DESCRIPTION
2.2.2.10 Provision of fire detection system to both Boys and Girls school
buildings.
0001
00
DISCIPLINE
LSPB CONTRACTOR will provide infrastructure for the following IT
ENGINEER equipment; computers, smart boards, copy machines, printers and
projectors and the equipment itself shall be provided by others.
DATE:
PROJECT
ENGINEER 2.2.3 Site:
DATE: 2.2.3.1 Provision of site imported fill to achieve higher elevation than the
CERTIFIED
surroundings to have positive drainage system that discharges
towards the road.
DATE:
CONSTRUCTION
AGENCY 2.2.3.2 Provision for paved asphalt parking and concrete sidewalks on the
front and sides of the (2) two school complexes.
DATE:
OPERATIONS
2.2.3.3 Provision for paved concrete sidewalks and walkways network
system that connects all the proposed facilities within the school lot
DATE: areas.
CONTROL NUMBER
VERIFICATION
DATE:
with steel grilles on the front side of the proposed boys and girls
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.2.3.6 Provision for site development including planting, irrigation, site
furniture, benches, waiting shed, assembly points, entrance gate,
flag pole, play grounds, etc.
ENGG CERT
associated traffic signage and informative signs for cars and bus
Issued for IFC
2.2.3.11 Provision of 8.00 meters wide fire truck service entry and exit
access gate within the school site for both complexes.
23-10028-
JO/EWO
0001
2.2.3.12 Provision of Emergency parking area along the asphalted fire truck
access way road.
06/01/22
DATE
2.2.3.13 Provision of asphalted access way along 2.40 meters high precast
wall for fire truck.
NO.
REV
00
DISCIPLINE
ENGINEER 2.2.3.14 Provision of drop-off and pick-up points for cars and buses situated
at front side of the school complexes
DATE:
PROJECT
ENGINEER 2.2.3.15 Installation of emergency access in between school buildings.
DATE: 2.2.3.16 Provision of asphalted internal parking area situated at boys’ school
CERTIFIED
complex and early childhood school site.
DATE:
CONSTRUCTION
2.2.4 Buildings and Outdoor Structures:
AGENCY
2.2.4.1 Provision for permanent (3) 2-storey school buildings such Early
DATE:
Childhood, Boys Intermediate & Secondary, Girls Intermediate &
OPERATIONS
Secondary with rigid steel frame and precast concrete perimeter
wall cladding with dry wall internal partitions. For indoor gym's
DATE: external wall is pre-cast and internal wall concrete masonry unit the
CONTROL NUMBER
system.
EDSD
DATE:
2.2.4.2 Provision for permanent (2) 1-storey school buildings such Boys
BY:
Elementary & Girls Elementary with rigid steel frame and precast
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
concrete perimeter wall cladding with dry wall internal partitions. For
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Indoor Gym’s external and internal walls are concrete masonry unit.
(DCC) NO. _____________________
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The buildings are fully air-conditioned by variable air flow chilled
water system.
ENGG CERT
2.2.4.4 Provision of outdoor soccer field play area, shaded seating, and all
essentials to complete the work.
2.2.4.7 Provision for electrical room in precast concrete panel bearing walls
and precast hollow core slab.
2.2.4.8 Provision for RO & RW/FW Pump Room in precast concrete panel
bearing walls and precast hollow core slab.
23-10028-
JO/EWO
0001
00
DISCIPLINE
2.2.4.11 Provision of waiting shed for every school building located within
ENGINEER and outside main entrance of the project complexes.
DATE:
2.2.4.12 Provision of guard rooms for each school buildings located in front
PROJECT
ENGINEER entrances.
DATE: 2.2.4.13 Provision of precast concrete panel for Chiller Plant and FW/RW
CERTIFIED
Tanks Area enclosures.
DATE:
CONSTRUCTION
2.2.4.14 Provision of trash enclosure located at the back of the schools
AGENCY respectively.
DATE:
2.2.4.15 Provision of internal parking with fence and access gates at Boys
OPERATIONS
school complex.
DATE: 2.3 CONTRACTOR shall provide all required personnel and equipment and all other
CONTROL NUMBER
2.4 CONTRACTOR shall furnish three (3) sets of reproducible final as-built drawings
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
2.5 CONTRACTOR shall perform continuous site clean-up during the project and after
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
demobilization.
(DCC) NO. _____________________
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.6 CONTRACTOR to check permeability test/infiltration rate of the existing ground.
3. SAFETY
All work to be carried out in accordance with the Saudi Aramco Construction Safety
DESCRIPTION
Manual and Saudi Aramco Safety Handbook. Furthermore, CONTRACTOR shall provide
Issued for IFC
safety plan and Hazard Identification Plan (HIP) for Loss Prevention approval.
3.1 CONTRACTOR shall comply at all times with SAUDI ARAMCO safety, health and
environmental (SH&E) requirements, specifications, regulations, procedures and
standards, but not limited to the following:
0001
3. The SAUDI ARAMCO Work Site Safety Manual (WSSM), which is Volume two of
the CSM;
NO.
REV
00
DISCIPLINE
ENGINEER 4. The SAUDI ARAMCO Environmental Health Code (SAEHC),
DATE:
PROJECT
5. GI. 151.006 for Saudi Aramco Environmental Health Code (SAEHC)
ENGINEER
a. Establish and implement programs and procedures relating to Safety, Quality and
DATE:
Environmental Management systems, job site records, labor relations and progress
BY:
reports.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
b. CONTRACTOR supervisory personnel or other qualified staff shall be present at
the WORK Site at all times while WORK is in progress.
ENGG CERT
Equipment” of the CSM. Minimum PPE for this project consists of: head protection
(hard hat), safety eye-protection, gloves, safety footwear and high visibility vest
which shall be worn inside the work sites perimeter fences and entrance gates at
all times by all personnel. PPE shall be suitable to control the task risks, selected
and used based upon the results of a documented risk-based PPE needs analysis,
which shall consider the exposure hazards, materials handled, and activities
performed by personnel. Contractor’s documented PPE needs analysis shall be
made available to the SA proponent organization (SAPO) upon request.
23-10028-
JO/EWO
0001
e. CONTRACTOR Personnel shall comply with all Saudi Arab Government and
SAUDI ARAMCO traffic safety rules, laws and regulations, including GI 6.030,
06/01/22
Traffic and Vehicle Safety, paying particular attention to the Vehicle Condition and
DATE
00
DISCIPLINE
f. CONTRACTOR shall ensure that passengers travel only in vehicles that are
ENGINEER provided with passenger seats. Seat belts shall be installed for all seats and used
in all vehicles carrying personnel as described in the SAUDI ARAMCO Contractor
DATE:
Safety Administrative Requirements (CSAR).
PROJECT
ENGINEER
i. CONTRACTOR shall ensure that an immediate oral report and preliminary written
EDSD
report is made to the Company Representative in the case of any incident with:
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
iii. Damage and all incidents involving cranes and heavy equipment, or
(DCC) NO. _____________________
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
iv. Fire, explosion or hazardous materials release.
ENGG CERT
i. WORK injuries/illnesses/fatalities
ii. Motor vehicle collisions
iii. Incidents to CONTRACTOR's plant or equipment over SR10,000
iv. Incidents involving damage to SAUDI ARAMCO equipment and property
v. Damage and all incidents involving cranes and heavy equipment
vi. Fires, explosions, toxic releases.
vii. Near miss incidents
23-10028-
JO/EWO
0001
00
DISCIPLINE
m. The CONTRACTOR shall provide trained and competent staff and shall comply
ENGINEER with project training requirements by making staff readily available for training
events deemed necessary to ensure continued competency.
DATE:
PROJECT
ENGINEER
4. SPECIFIC DESCRIPTION OF WORK
DATE:
CERTIFIED 4.1. Site Preparation
DATE:
The WORK shall include but shall not be limited to the following:
CONSTRUCTION
AGENCY
4.1.1 CONTRACTOR shall perform all the surveys necessary to layout the
DATE:
project facilities (HVAC for chiller water room, pump room and electrical
OPERATIONS room).
4.1.2 CONTRACTOR shall field verify the existing conditions. If any deviations on
DATE:
the Drawings from the existing situation are observed, the discrepancy shall
CONTROL NUMBER
VERIFICATION
DATE:
4.1.3 CONTRACTOR shall remove all unsuitable materials from within the
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
organic clay, top soil, or any specific material so designated in writing by
Saudi Aramco Representative.
ENGG CERT
4.1.5 Prior to placing any fill material on the natural subgrade levels,
CONTRACTOR shall clear the area of all vegetation, debris and any other
deleterious material, and fill all ruts, soft areas, localized depressions and
other defects with suitable material.
4.2. Excavation
DESCRIPTION
The WORK shall include but shall not be limited to the following:
4.2.1 CONTRACTOR shall excavate for the required foundations at the locations
specified on the drawings.
4.2.2 CONTRACTOR shall excavate trenches for underground electric and non-
electric utility lines and cables as shown on the drawings.
4.2.3 All excavations for structures, utility pipes, cables shall be made to such an
23-10028-
JO/EWO
0001
extent that will provide sufficient space to work conveniently around the
structure or utility pipes.
06/01/22
DATE
00
DISCIPLINE
used to construct fill layers. Unsuitable material shall be disposed of off-site
ENGINEER in conformance with the Specifications.
DATE:
PROJECT
4.2.5 CONTRACTOR shall dewater all trenches and excavations before installing
ENGINEER
below grade foundations, or laying underground utilities. All excavation and
trenches shall be kept dry until the structures, pipes and appurtenances to
DATE:
CERTIFIED
be built/installed are completed and backfilled.
CONTRACTOR shall verify any existing underground utilities prior to
excavation. Existing underground utilities encountered during excavation
DATE:
CONSTRUCTION shall be directly notified to Saudi Aramco Representative.
AGENCY
section shown on the plans and maintain the finished surface in a smooth
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.3.2 Fill Material: Locally available material that satisfies Specifications for fill
shall be used, subject to Saudi Aramco Representative approval, prior to
importing borrow fill or transporting fill material to WORK site areas. Saudi
ENGG CERT
Aramco Representative reserves the right to inspect and test the fill material
for conformity with Specifications.
4.3.4 Trench Backfill: The bottom of trench shall be free of material that causes
23-10028-
JO/EWO
0001
00
DISCIPLINE
ENGINEER Fill material shall be placed in successive layers, and compacted until it has
reached the required elevation. The layers shall not exceed 200 mm in
DATE:
thickness before compaction.
PROJECT
ENGINEER
4.1.1 Subbase course material shall consist of mixture of gravel and stone
DATE:
fragments with sand, silt and clay. Individual sizes of materials shall be
CONTROL NUMBER
specifications.
EDSD
DATE:
4.1.2 The subbase material shall not be placed until the subgrade upon which it is
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
4.1.3 Subbase course shall be compacted to not less than 95% of the maximum
(DCC) NO. _____________________
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.4.4 Following the construction of subbase, the compacted subbase course shall
be maintained by the CONTRACTOR until such time as other surface is
ENGG CERT
applied.
4.5. Base
The WORK shall include but shall not be limited to the following:
4.5.1 Aggregates for base course material shall consist of clean, tough, durable,
DESCRIPTION
sharp angle fragments free from any excess of thin or elongated pieces,
Issued for IFC
and free of decomposed stone, dirt, organic matter, shale, clay, clay lump
or other deleterious matter. Base course material shall be crushed rock or
crushed gravel, mixed with fine material, of suitable binding quality as per
specifications.
4.5.2 The base course material shall not be placed until the subbase upon which
it is to be placed has been approved by Saudi Aramco Representative.
4.5.3 Base course shall be compacted to not less than 100% of the maximum
23-10028-
JO/EWO
0001
4.5.4 Following the construction of aggregate base, the compacted base course
DATE
00
DISCIPLINE
ENGINEER 4.6. Prime Coat
DATE:
PROJECT
The WORK shall include but shall not be limited to the following:
ENGINEER
4.6.2 Prior to applying primer bituminous material, the surface shall be cleaned of
DATE:
CONSTRUCTION
all loose dirt and other objectionable materials. Prime coat shall be applied
AGENCY
only when the surface to be treated is dry. Bituminous material shall be
applied at a rate of 1.75 liters per square meters. and at a temperature
DATE:
OPERATIONS
between 50 degrees to 80 degrees C.
DATE:
4.6.3 The primed surface shall be kept free from all traffic and in a clean condition
CONTROL NUMBER
hours shall be allowed for the absorption and curing of prime coat prior to
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.7. Tack Coat
ENGG CERT
The WORK shall include but shall not be limited to the following:
4.7.1 Liquid asphalt for tack coat shall be rapid curing type cutback grades RC-
250 conforming to specifications or as approved by Saudi Aramco
Representative.
4.7.2 Tack coat shall be applied to all concrete surfaces that will be in contact
with the asphalt pavement. Tack coat shall be applied between the base
course and the surface course, new and old asphalt surface, and vertical
DESCRIPTION
4.7.3 If application of the surface is delayed by more than 3 days, or if dirt, sand
or other impurities have contaminated the tack coat, then a new tack coat
shall be applied after the original one has been swept clean.
4.7.4 The bituminous material shall be applied on the binder course by means of
a bituminous distributor at a maximum rate of 0.25 liters per square meters
or as directed by Saudi Aramco Representative.
23-10028-
JO/EWO
0001
06/01/22
DATE
00
DISCIPLINE
ENGINEER
The WORK shall include but shall not be limited to the following:
DATE: 4.8.1 Asphalt mixture: Polymer-Modified Hot Mix Asphalt Concrete considering
PROJECT
ENGINEER the asphalt cement shall be modified by mixing SBS (Styrene-Butadiene-
Styrene) polymer, grade 75-80 penetration, conforming to AASHTO Test
DATE: methods described in the Specifications.
CERTIFIED
4.8.2 Mineral Aggregate: The combined mineral aggregate shall conform to the
DATE: grading requirements of the Specifications.
CONSTRUCTION
AGENCY
4.8.3 Job Mix: The job-mix formula shall combine the mineral aggregates and
DATE: asphalt in such proportion as to produce a mixture conforming to the
OPERATIONS
composition limits by weight in ASTM D2172 or ASTM D6307. The
CONTRACTOR shall submit asphalt mix design to Saudi Aramco
DATE: Representative for review and approval at least 30 days prior to use. The
asphalt concrete shall be graded from approved batch plant.
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.9. Hardscape and Landscape
ENGG CERT
The WORK shall include but shall not be limited to the following:
Hardscape:
DESCRIPTION
Concrete curbs.
Flag pole
Drop curbs and / or ramps
Rubberize Tiles (Recycled)
Landscape:
Palms
Trees
23-10028-
JO/EWO
0001
Shrubs
Ground Cover / Grass
Synthetic Turf / Grass
06/01/22
NO. DATE
REV
00
4.9.3 The CONTRACTOR shall construct and provide tree wells and planting
DISCIPLINE
ENGINEER strips / areas, walkway network concrete paving as shown on the drawing.
DATE: 4.9.4 The CONTRACTOR shall construct and provide concrete drop curb for
PROJECT
ENGINEER service access as shown on the drawings.
DATE: 4.9.5 The CONTRACTOR shall construct and provide drop-off and pick-up zones
CERTIFIED
for cars and school bus as shown and indicated on the drawing.
DATE:
4.9.6 The CONTRACTOR shall provide and construct precast concrete seat walls
CONSTRUCTION
AGENCY / benches as shown on the drawings.
DATE: 4.9.7 CONTRACTOR shall construct and provide a new precast concrete fence,
OPERATIONS
precast concrete columns, fence grilles, steel gates, precast main gate
structure, electrical room, SEC substation, RO & RW/FW Pump Room,
DATE: CMU and precast boundary walls enclosure in utilities area.
CONTROL NUMBER
VERIFICATION
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Drawings.
(DCC) NO. _____________________
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.9.10 The CONTRACTOR shall provide and construct soccer field (synthetic
grass) with shaded bleachers and 1.20m high chain link fence ball stopper
enclosure as indicated and shown on the Drawing.
ENGG CERT
4.9.11 The CONTRACTOR shall provide site furniture and amenities but not
limited to the following:
shrubs, grass and other ground cover plants with associated irrigation
system as shown on the Drawings. Planting soil mix for the plants shall be
provided as per the specifications. Land form, shapes and final ground
elevations shall be as shown on the Drawings.
4.9.13 The CONTRACTOR shall provide and construct dumpster and trash
enclosure as indicated and shown in the Drawings.
23-10028-
JO/EWO
0001
00
DISCIPLINE
ENGINEER The work shall include but shall not be limited to the following:
DATE:
PROJECT
4.10.1 For each school, CONTRACTOR shall install water system including water
ENGINEER
storage tank, pumps, and various sizes of pipes, fittings, supports, valves
and other equipment. Pipes shall start from the tie-in point within the site as
DATE:
CERTIFIED
designated on the drawings to the served buildings. Pipes and fittings shall
be as per MTO and as shown on the drawings.
DATE:
CONSTRUCTION 4.10.2 Installation of all water appurtenances shall be in accordance with the
AGENCY
manufacturer’s instruction manuals and as specified in the construction
specifications.
DATE:
OPERATIONS
4.10.3 CONTRACTOR shall coordinate water works with the works of others and
shall provide shop drawings for all crossings with other utilities and for all
DATE:
required appurtenances (valves, valve boxes, storage tanks, pumps etc.).
CONTROL NUMBER
VERIFICATION
4.10.4 CONTRACTOR shall layout the pipes (pipes shall be encased in concrete if
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
4.10.5 CONTRACTOR shall verify all horizontal and vertical site dimensions prior
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.10.6 CONTRACTOR shall provide concrete thrust blocks at all bends, tees,
reducers and caps and as specified by the Saudi Aramco Representative.
ENGG CERT
4.10.7 CONTRACTOR shall test the water system after installation, adjust the
proper operation and disinfect the network as mentioned in the Construction
Specifications.
4.10.8 CONTRACTOR shall coordinate all his works with MOWE and obtain their
approval prior to start of work.
DESCRIPTION
The WORK shall include but shall not be limited to the following:
4.11.1 For each school, CONTRACTOR shall install a fire water system including
various sizes of pipes, pumps, fire water tanks, fittings, valves, supports
and other equipment. Pipes shall start from the tie-in point within the school
site, pass through a valve box containing check valves and a washout valve
and Fire Department connection, and finally connect to the school building.
Pipes shall be HDPE pipe (PN 16) in accordance with NFPA 24.
23-10028-
JO/EWO
0001
4.11.2 Installation of all fire water appurtenances shall be in accordance with the
06/01/22
specifications.
NO.
REV
00
DISCIPLINE
4.11.3 CONTRACTOR shall coordinate fire water works with the works of others
ENGINEER and shall provide shop drawings for all appurtenances and crossings with
other utilities and shall obtain concerned governmental agencies approval
DATE:
PROJECT
prior to start of work.
ENGINEER
4.11.4 CONTRACTOR shall layout the pipes as shown on the Drawings and as
DATE: approved by the Saudi Aramco Representative.
CERTIFIED
4.11.5 CONTRACTOR shall verify all horizontal and vertical site dimensions prior
DATE:
CONSTRUCTION
to staking the system.
AGENCY
4.11.6 CONTRACTOR shall provide concrete thrust blocks at all bends, tees,
DATE:
OPERATIONS
reducers and dead-ends and as specified by the Saudi Aramco
Representative.
DATE:
4.11.7 CONTRACTOR shall test the fire water system after installation and adjust
CONTROL NUMBER
4.11.8 CONTRACTOR shall provide fire hydrants connected to the fire pump
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.12. Sewer System
ENGG CERT
The WORK shall include but shall not be limited to the following:
4.12.1 For each school, CONTRACTOR shall install a sewer system including
various sizes of pipes, manholes, inspection chambers and cleanouts.
Sewer lines material shall be as per MTO. CONTRACTOR shall connect
the proposed pipes at the designated tie-in points within the sites
boundaries as shown on the drawings.
in the Drawings.
Issued for IFC
4.12.3 CONTRACTOR shall layout the pipes, manholes, inspection chambers, and
cleanouts as shown on the Drawings or as directed by the Saudi Aramco
Representative.
4.12.4 CONTRACTOR shall verify all horizontal and vertical site dimensions prior
to staking the system.
0001
4.12.6 For each school, the sewer network shall be connected to the tie-in point to
DATE
00
DISCIPLINE
4.12.7 CONTRACTOR shall coordinate sewer network works with the works of
ENGINEER others and shall provide shop drawings for all appurtenances and crossings
with other utilities.
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
4.12.8 CONTRACTOR shall test the sewer system after installation, as mentioned
in the construction specifications.
DATE:
CONSTRUCTION
AGENCY 4.12.9 CONTRACTOR shall coordinate all his works with MOWE and obtain their
approval prior to start of work.
DATE:
OPERATIONS
The WORK shall include but shall not be limited to the following:
VERIFICATION
EDSD
4.13.1 For each school, CONTRACTOR shall install an irrigation system including
DATE:
various sizes of pipes and valves. Mainline pipes shall start from a tie-in
BY:
point on the proposed water network within the site. A backflow preventer
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
looped as shown on the Drawings a. All lateral pipes shall be uPVC Sch. 40
(DCC) NO. _____________________
except all riser pipes for bubblers, which shall be Sch. 80.
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.13.2 CONTRACTOR shall install lateral piping of various sizes including various
types of irrigation heads and manual control valves including valve boxes.
ENGG CERT
4.13.3 CONTRACTOR shall verify the design by specialist for lateral piping of
various sizes including various types of irrigation heads and manual control
valves including valve boxes.
4.13.5 CONTRACTOR shall coordinate irrigation works with the works of others
and shall provide shop drawings for all required appurtenances and
crossings with other utilities.
4.13.6 CONTRACTOR shall layout the pipes and irrigation heads with planting
layout and as approved by the Saudi Aramco Representative.
4.13.7 CONTRACTOR shall verify all horizontal and vertical site dimensions prior
to staking the system.
23-10028-
JO/EWO
0001
4.13.8 CONTRACTOR shall provide concrete thrust blocks at all bends, tees,
06/01/22
4.13.9 CONTRACTOR shall test the irrigation system after installation, and adjust
NO.
REV
00
DISCIPLINE
all irrigation heads for proper operation and coverage.
ENGINEER
DATE:
4.14. Storm Drainage System
PROJECT
ENGINEER
The WORK shall include but shall not be limited to the following:
DATE:
CERTIFIED
4.14.1 CONTRACTOR shall install storm drainage system which include concrete
catch basins located adjacent to perimeter wall. The catch basins are
DATE:
CONSTRUCTION
connected to 300 mm dia. uPVC pipe connected to the nearest tie in point
AGENCY out site school.
DATE:
OPERATIONS
4.14.2 CONTRACTOR shall install storm drainage system for school court yard
which include concrete catch basins located low point. The catch basins are
connected to 300 mm dia. uPVC pipe connected to the nearest tie in point
DATE:
out site school.
CONTROL NUMBER
VERIFICATION
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.15. Applicable Codes and Standards
ENGG CERT
The Project objective is to construct school located in the Eastern Province of Saudi
Arabia as follow:
23-10028-
JO/EWO
0001
00
DISCIPLINE
ENGINEER The LSPB contractor shall develop a Detail Design Package in addition to
providing Exterior 3D perspectives showing all the project related building
DATE:
PROJECT
structures, site and the surrounding areas.
ENGINEER
The LSPB contractor shall develop an interior Design Package for the school
DATE:
CERTIFIED
building including and not limited to the below mentioned items:
4.16.1 The schools shall consist of main building with multi-purpose hall and
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
a. Guard Room with entrance gate
b. Shaded Basketball/Volleyball/Handball Court.
ENGG CERT
c. Soccer Field
d. Shaded Courtyard
e. Shaded Playground (except Boys/Girls Intermediate & Secondary School)
f. Electrical room & SEC
g. RO & FW/RW Pump Room
h. Chiller Pump Shed
i. Chiller Yard
j. FW/RW Tanks area
DESCRIPTION
k. Garbage enclosure
Issued for IFC
l. Boundary Wall
m. Shaded waiting area
n. Asphalted on-site Parking Area (except Girls Elementary and
Intermediate/Secondary School site)
o. Service/Emergency Gate Access
0001
The project is defined into two (2) types of construction such one (1) storey
and two (2) storey school buildings.
06/01/22
DATE
00
DISCIPLINE
shall be rigid steel frame structure with precast concrete perimeter wall
ENGINEER cladding and dry wall internal partitions. Indoor gym internal wall is CMU. All
shall be fabricated and supplied by a recognized and approved subcontractor
DATE:
to the overall sizes, shapes and construction as shown on the drawings and
PROJECT
ENGINEER described in the construction specifications.
DATE: Two-storey buildings such as Early Childhood School, Girl’s Intermediate and
CERTIFIED
Secondary, Boy’s Intermediate and Secondary with roof split between the
main building and the indoor gymnasium. The Building shall be rigid steel
DATE:
CONSTRUCTION
frame structure with precast concrete perimeter wall cladding and dry wall
AGENCY internal partitions. Indoor gym internal wall is CMU. All shall be fabricated and
supplied by a recognized and approved subcontractor to the overall sizes,
DATE:
shapes and construction as shown on the drawings and described in the
OPERATIONS
construction specifications.
DATE: CONTRACTOR shall prepare shop drawings for steel frame structure and
CONTROL NUMBER
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.16.1.2 Supporting Structures and Buildings:
bearing walls with precast hollow core slab as shown on the drawings and
described in the construction specifications.
0001
f. RO Plant Room and Pump Room: The building shall be precast concrete
06/01/22
DATE
insulated panel bearing walls with precast hollow core slab. The building
size shall be approximately 11.5 meters width by 5.0 meters depth.
NO.
REV
00
DISCIPLINE
ENGINEER g. Chiller Pump Shed: The building shall be steel structure covered with
single skin metal roof panel. The building size shall be approximately 11.0
DATE: meters width by 5.0 meters depth.
PROJECT
ENGINEER
CONTRACTOR shall prepare shop drawings for steel frame structure and
DATE: precast wall panels and obtain approval of Saudi Aramco Representative
CONTROL NUMBER
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.16.2 General:
Construction Specifications.
a. Buildings:
0001
5. Provide fiberglass noise barrier batt insulation for internal walls as shown
06/01/22
and specified.
DATE
00
DISCIPLINE
ENGINEER
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
d. Finishing Work:
1. Fix and lay special and common floor and wall finishes as shown and
ENGG CERT
4. Provide and install acoustical wall panels and wall crash panels as
shown and specified.
5. Paint walls, ceiling and floor as shown on the drawings, and specified in
the contract documents.
0001
e. Specialties:
NO.
REV
00
DISCIPLINE
ENGINEER 1. Provide and install tack board wall covering panels, crash rails, and
corner guard full height at all exposed corners as shown and specified.
DATE:
PROJECT
ENGINEER 2. Provide and install aluminum sunscreen trellis as shown and specified.
DATE: 3. Provide and install laminated plastic toilet partition and toilet
CERTIFIED
accessories as shown and specified.
DATE:
CONSTRUCTION
4. Provide and install internal and external signage to comply with school
AGENCY
design requirements.
DATE:
OPERATIONS
f. Furniture and Appliances:
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
4. Provide and install Venetian blinds for all external windows as shown
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
and specified.
(DCC) NO. _____________________
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5. Provide and install kitchen casework complete with all required
components, services and accessories as shown and specified.
6. Provide and install mechanically operated curtain for the multipurpose
ENGG CERT
Structural concrete work shall include but shall not be limited to the following:
0001
00
DISCIPLINE
u. Pre-cast concrete wall panels which includes the fence column Panels, substation,
ENGINEER electrical room, guard house, RO & PW/FW Pump room, dumpster and chiller area
shade.
DATE:
PROJECT
ENGINEER v. Concrete valve boxes, WO & AR valves, trenches, curbs, sumps etc.
x. All Structural and non - structural concrete and reinforcement steel works shall be
DATE:
CONSTRUCTION
in conformance with provisions of ACI 318-14 and ASTM.
AGENCY
DATE:
aa. Calculation of all precast panels and drawing details shall be provided by the
CONTROL NUMBER
Vendor.
VERIFICATION
EDSD
bb. Concrete reinforcement schedule and bar bending schedule shall be produced by
DATE:
CONTRACTOR.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
cc. Drawings for fabrication plans, sections, connection details and design between
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
reinforced concrete elements and precast walls and steel elements shall be done
(DCC) NO. _____________________
by the CONTRACTOR.
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
dd. The waterproofing shall be as per Project Design Drawings.
ENGG CERT
Structural Steel work shall include, but shall not be limited to, the followings:
DESCRIPTION
perform all the Structural Steel and Miscellaneous Metal Work in accordance
with the Drawings, Specifications and as described in this Scope of work. Steel
Structures shall comply with the requirement of AISC LRFD, AWS and ASTM
where applicable.
b. CONTRACTOR shall install and erect all structural steel and miscellaneous
metal items.
c. CONTRACTOR shall apply primer, paint, intumescent and Sprayed fire proofing
23-10028-
JO/EWO
0001
where applicable for all structural steel and Miscellaneous Metal works.
06/01/22
d. CONTRACTOR shall furnish, erect and set the Space frame and roofing system
DATE
00
DISCIPLINE
e. CONTRACTOR shall submit space frame structure and roofing system design
ENGINEER calculations with the shop drawings showing complete analysis of the system,
column loads, member stresses, support reactions and deflections prepared by
DATE:
space frame structure vendor to Saudi Aramco Representative for approval prior
PROJECT
ENGINEER to any fabrication and construction.
DATE: f. CONTRACTOR shall verify the foundation and column design based on the
CERTIFIED
loads and support reactions provided by the space frame vendor.
DATE:
CONSTRUCTION
g. The design criteria of the Space frame structure shall be in compliance with
AGENCY AISC LRFD 13th Edition, IBC 2015 and ASCE 7-10.
DATE:
h. Additional geotechnical study where deemed required shall be conducted by
OPERATIONS
CONTRACTOR.
DATE: i. Drawings for fabrication plans, sections, connection details and design between
CONTROL NUMBER
steel elements and between precast wall and steel elements shall be done by
VERIFICATION
the CONTRACTOR.
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.18. Electrical Works
ENGG CERT
A. Substations:
1. SF6 Ring Main Units (RMU’s), as per SEC standard 32- SDMS-01.
DESCRIPTION
4. Medium voltage power cables (15 kV) from SEC supply to Ring
Main Units and between RMU and oil type transformers as per SEC
standards 11-SDMS-03.
23-10028-
JO/EWO
0001
5. Low voltage cables between oil type transformer and the Main
06/01/22
DATE
00
DISCIPLINE
6. Complete grounding network for substation as per SEC standard
ENGINEER SDMS-03.
DATE:
PROJECT
7. Raceway system, including concrete trench with cover in the
ENGINEER
school’s substation room as per SEC standards and specifications,
junctions / pull boxes, conduits, fittings and wirings including
DATE:
CERTIFIED
identification tags and termination.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
II. Electrical work should be executed by SEC approved
vendor.
ENGG CERT
10. Substations shall provide with fire rated walls, fire stopping, fire
sealing as per NFPA 70.
12. Provide call out drawing references substation, power & control
equipment with demarcation lines for Contractor, Vendors, SA work
scopes for design, equipment & constructions.
13. Provide substation trenches, duct bank, stub entries and fire
stopping work scopes.
0001
ensure that it’s suitable and provide flush removable covers for
unused openings. Also, contractor shall ensure that the assembly of
NO.
REV
00
DISCIPLINE
the main switchboard units can fit inside the electrical room.
ENGINEER
- Chillers CH-1/2/3
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. Low voltage power and control cables between SEC substation and
MSB and between MSB and LP’s, PP’s, OLCP’s as per the drawings.
ENGG CERT
9. Contractor shall provide call out reference drawings and details for
23-10028-
JO/EWO
0001
10. Correct electrical control gears (MSB, SWB, PP, etc.) and cables
DATE
00
DISCIPLINE
11. Provide demand loads of the mentioned items in section II.3.
ENGINEER
(SBC).
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. School Building:
- Variable Air Volume Panels and Electric Duct Heaters PP-VAV- 01/02,
03/04 (for Intermediate & Early Childhood).
- MCCs of AHU’s and Fans.
- Electrical Water Heater Panel PP-EWH-01/02, 03/04 (for Intermediate
& Early Childhood)
- Telecom Power Load (PP-T) & (UPP-T)
- Outdoor Lighting Load LP-OL
rooms. Complete with direct buried cables providing duct banks when
crossing roads or area subject to vehicular traffic as per Project Drawings
06/01/22
DATE
and PVC sleeves near tree roots, at entry to Buildings and as found
necessary by Saudi Aramco Representative.
NO.
REV
00
DISCIPLINE 3. Electrical distribution panel boards for lighting, power and air handling
ENGINEER
units, fans, variable air volumes, electrical duct heaters, electrical water
DATE: heaters, telecom power loads, etc., panel boards shall be 400/230, 3
PROJECT
ENGINEER
phase, 4W, 60 Hz and KAIC ratings as per drawings.
DATE:
4. Complete raceway for main feeder of each panel board from main
CERTIFIED switchboard, clean through prior to cable pulling.
DATE: 5. Power cables shall be 0.6/1 kV, copper, with size & type as per the
CONSTRUCTION
AGENCY
drawings and specifications.
DATE: 6. Lighting fixtures with type, quantity, number of lamps, voltage as per
OPERATIONS the drawings and specifications including complete conduit work, wiring
and termination.
DATE:
- Lighting Fixtures shall be as per lighting schedule or approved equals.
CONTROL NUMBER
VERIFICATION
- For life safety, lighting fixture shall provide emergency back-up in case
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
complete raceway wiring and termination. Type of wiring devices shall be
subject to the Saudi Aramco Representative approval.
Location of sockets shall be coordinated at site to match with the furniture
ENGG CERT
layout.
10. Complete fire alarm system, which includes an addressable fire alarm
control panel, battery backup, and a fire alarm repeater panel.
Optical type smoke detectors, duct smoke detectors, heat detectors,
manual pull stations, horns and strobe lights, line isolating modules and
flow water interface modules. Quantity, location and wiring shall be
provided as per drawings, specifications and manufacturer
recommendations.
23-10028-
JO/EWO
0001
11. Complete raceway system including conduits, fittings, junction & pull
boxes, clamps and supports for lighting, sockets, duct heaters, variable
06/01/22
air volumes, fire alarm system, AHU’s, electrical water heaters, exhaust
DATE
fans, etc.
NO.
REV
00
DISCIPLINE
12. Low voltage wiring using CU/PVC wires for inside conduits
ENGINEER lighting, socket outlets, electrical duct heaters... Etc.
DATE:
13. Provide call out reference drawings and details for the power
PROJECT
ENGINEER distribution system installations.
DATE: 14. Indicate stub entries, duct banks, trenches and sleeves sizes for
CERTIFIED
cablings power layout, provide details references on a 1000 KVA &
1500 KVA transformers ratings.
DATE:
CONSTRUCTION
AGENCY 15. Contractor shall provide details for the five electrical rooms, locations
and ensure working space requirements are compiled as per SBC/IEC.
DATE:
OPERATIONS
16. Contractor shall provide details and drawing references for the
connections from MSB to the two (2) switchboards A/B.
DATE:
CONTROL NUMBER
17. Nameplate ratings and call out references as per data sheets
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
18. Contractor shall indicate and mention undergrounds and all above
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
installations.
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
19. Lighting fixtures with LED in accordance with the Energy Efficiency
requirements as mandated by MSAER, SBC & DBSP.
ENGG CERT
20. Contractor shall supply, install and testing the compatible zonal
lighting switching.
21. RCD & ELCB residual current trips for lighting, small power & HVAC
Power.
switches for air handling units and heaters. Starters shall be suitable for
Issued for IFC
the actual size of AHU’s motors and shall consist of motor circuit
protector, starter and overloads. Feeder of each AHU shall be provided in
a separate conduit as per the drawings.
Variable frequency drives shall be installed separately on walls in
electrical or mechanical room.
23. The required interface control wiring and conduiting between air
handling units, electrical duct heaters, VAV’s, VFD’s, starter panels, and
direct digital controller (DDC).
23-10028-
JO/EWO
0001
- HVAC systems
- Public address systems
NO.
REV
00
DISCIPLINE
- Audio/Video System
ENGINEER - Fire Fighting System
DATE:
As per drawings, specifications and as recommended by the vendor.
PROJECT
ENGINEER
- 120 mm² bare, tinned, soft drawn copper cable ground ring 1000 mm
DATE:
CONSTRUCTION
minimum away from building external wall at minimum of 460 mm
AGENCY depth with ground test pits as shown on the drawings.
DATE:
- Lightning system including lightning rods on the building parapet and
OPERATIONS
rooftop with down conductors made within the building walls down to
lightning ground rod for each down conductor.
DATE:
CONTROL NUMBER
the drawings.
EDSD
DATE:
welding then painted and taped. Connection within ground test pit shall
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
- Above ground connections shall be made to panelboards, steel
structure columns, transformers etc. using a PVC insulated cables
green with yellow stripes and using a crimped type lugs.
ENGG CERT
D. Guard Room:
0001
2. Complete raceway system including conductors and fittings, junction boxes, pull
06/01/22
boxes between PP-GH and lighting fixtures, sockets etc. and shall provide a PVC
DATE
concrete encased duct bank or RGS PVC coated conduit between FACP and
FARP at guard room as per drawings.
NO.
REV
00
DISCIPLINE
ENGINEER 3. Lighting fixtures, sockets, lighting switches and disconnect switches for HVAC
equipment.
DATE:
PROJECT
ENGINEER 4. Contractor shall provide call out reference drawings, details for the power
distribution system, lighting system, fire alarm system and related electrical
DATE: installations.
CERTIFIED
5. Fire alarm Annunciator panel (FAAP), optical type smoke detectors, heat detectors,
DATE:
CONSTRUCTION
horns with beacon light and connect such equipment to the school’s overall fire
AGENCY alarm system through FACP of the school to provide one complete system.
DATE:
6. Fire alarm system having manual pull station, connection to the automatic fire
OPERATIONS
sprinkler system and emergency voice alarm communication system of 24-hour
supervision of facilities Acc. to IBC 907.2.3
DATE:
CONTROL NUMBER
VERIFICATION
Samples, Tech data and shop drawings shall be submitted for each item as required
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
E. Schools Site Electrical Work:
ENGG CERT
1. Contractor shall supply and install complete conduit raceway (for buildings
entrances & road crossing) including:
- PVC Conduits direct buried or rigid steel PVC coated as per drawings.
2. Contractor shall coordinate with all other mechanical, civil, structural etc. prior to
DESCRIPTION
his excavation to avoid any conflict that may arise Shop drawings showing such
Issued for IFC
3. Contractor shall provide call out reference drawings, details for the power
distribution system, lighting system, fire alarm system, lighting poles and related
electrical installations.
4. CONTRACTOR shall supply, install and terminate all site electrical work including
excavation of trenches, sand bedding, cable laying, sand backfill and cable tile
and warning tape then complete backfill work include but not limited to:
23-10028-
JO/EWO
0001
06/01/22
electrical room.
NO.
REV
00
DISCIPLINE
b. Power cables and raceways between MSB and SWB-01 and 02.
ENGINEER
c. Power cables and raceways to PP-GH and LP-S (lighting for service area).
DATE:
PROJECT
ENGINEER d. Disconnect switches for chillers, IP 65, 3P, 600V, rating as per drawings to
be installed next to each unit on a galvanized steel support or wall mounted.
DATE:
CERTIFIED
e. Power cables for chillers, chilled water pumps, R.O. plant, fire water pumps
and pump rooms.
DATE:
CONSTRUCTION
AGENCY f. Control panels for chilled water pump, R.O. plant and fire water as per
mechanical and electrical drawings and specifications. And lighting &
DATE:
socket outlets for pump rooms.
OPERATIONS
g. Lighting fixtures including power cable, wiring and conduit wall for court
DATE: yard, playground, volley ball/basketball court, soccer field lighting on wall of
CONTROL NUMBER
school and other external lighting from outdoor lighting panel to each
VERIFICATION
fixture.
EDSD
DATE:
foundation with sleeves for lighting poles and terminate to lighting pole,
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
and connections.
(DCC) NO. _____________________
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
i. Outdoor lighting shall be controlled by a photo-electric cell and
ON/OFF/AUTO selector switch, sport lighting shall be controlled by push
button station for each field.
ENGG CERT
All electrical work shall be done in a professional manner as per drawings and
specifications, International Electro-technical Commission (IEC), British Standards (BS)
DESCRIPTION
a. The following general characteristics has been considered during design and
construction of fire detection and alarm system of the project.
- Fire Detection and Alarm system shall be designed, installed, tested and
commissioned in accordance with all requirements of applicable clauses of
23-10028-
JO/EWO
0001
Saudi Building Code (SBC), NFPA 72, and other applicable international
standards.
06/01/22
addressable and shall include but not be limited to Fire Alarm Control Panel,
Smoke Alarms, Heat Detectors, Multi Detectors, Duct Detectors, Fire alarm
NO.
REV
00
DISCIPLINE
notification (horn/strobes), and Pull Stations, …. ETC (ref. to drawings)
ENGINEER - All Fire Detection and Alarm System shall be electrically supervised against
short, ground and open wiring faults in the detection circuit, alarm circuit,
DATE:
alarm and trouble relay coils.
PROJECT
ENGINEER - All Fire Detection and Alarm System design shall ensure that an alarm signal
from any manual station (fire condition) overrides a trouble signal (fault
DATE: condition).
CERTIFIED
- All related wiring, fittings, conduits, trays, boxes and supports accessories
required to install, test, and commission the complete Fire Detection and
DATE:
CONSTRUCTION
Alarm Systems shall be provided.
AGENCY
b. School Buildings:
DATE:
OPERATIONS
CONTRACTOR shall supply, install and connect:
- Complete fire alarm system, which includes an addressable fire alarm control
DATE: panel, battery backup and workstation completed with GUI (graphic user
CONTROL NUMBER
interface).
VERIFICATION
- Optical type smoke detectors, duct smoke detectors, heat detectors, manual
EDSD
pull stations, horns and strobe lights, line isolating modules and flow water
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
- The required interface between fire alarm system and the following systems
(DCC) NO. _____________________
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
HVAC system
Public address system
Audio/Video System
ENGG CERT
Related Drawings:
DESCRIPTION
0001
c. Guard Room:
NO.
REV
00
DISCIPLINE
CONTRACTOR shall supply, install and connect:
ENGINEER - Fire alarm Annunciator panel (FAAP), optical type smoke detectors, heat
detectors, horns with beacon light and connect such equipment to the school’s
DATE:
overall fire alarm system through FACP of the school to provide one complete
PROJECT
ENGINEER system.
- Fire alarm system having manual pull station, connection to the automatic fire
DATE: sprinkler system and emergency voice alarm communication system of 24-
CERTIFIED
hour supervision of facilities Acc. to IBC 907.2.3
DATE:
CONSTRUCTION
AGENCY d. Utility buildings:
DATE:
CONTRACTOR shall supply, install and connect:
OPERATIONS
- optical type smoke detectors, heat detectors, horns with beacon light and
connect such equipment to the school’s overall fire alarm system through
DATE: FACP of the school to provide one complete system.
CONTROL NUMBER
- Fire alarm system having manual pull station, connection to the automatic fire
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
e. Schools Site Fire Alarm Work:
- conduit raceway for connecting the fire alarm control panel with fire alarm
repeater panel in guard room in additional to fire alarm devices in utilities,
electrical and other buildings including all needed devices and accessories as
per provided drawings.
Aramco Standards and specifications of each electrical equipment such as but not
limited to:
00
DISCIPLINE
ENGINEER CONTRACTOR shall perform all tests using calibrated equipment by a third party with a
traceable certificate for the instruments and tools in the presence of Saudi Aramco
DATE: Representative and the related authority like SEC or Ministry of Water and Electricity
PROJECT
ENGINEER and Municipality Representatives.
DATE: CONTRACTOR shall make the coordination for performing such tests and advise the
CERTIFIED
concern persons of the tests at least one week in advance or as per the project
management requirements.
DATE:
CONSTRUCTION
AGENCY Original and a minimum of two copies of test results shall be submitted to Saudi
Aramco Representative.
DATE:
OPERATIONS
Provide and comply NMR 601/602/603, ITP's, SAT/FAT's, MSAER's requirements and
International Electro-technical Committee Conformance Assessment.
DATE:
H. Reference Standards
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
- British Standards.
(DCC) NO. _____________________
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
- National Fire Protection Association NFPA-72.
A. Mechanical General:
0001
00
DISCIPLINE
4- CONTRACTOR shall ensure that project drawings and specifications
ENGINEER related to this document meet applicable codes and standards.
DATE:
PROJECT
5- CONTRACTOR shall ensure that system and equipment design
ENGINEER parameters are, as a minimum.
DATE: B. HVAC:
CERTIFIED
specifications.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5- CONTRACTOR shall supply and install Central Air Handling System
(AHU): Central ducted air handling units (AHU), modular double skin type
ENGG CERT
shall be provided for the buildings where indicated. Units shall consist of
mixing box, pre-filter, final filter, chilled water-cooling coil with three-way
control valve, (electrical heating coil downstream of the cooling coil with
SCR control for constant air volume AHUs), belt driven fan/motor,
condensate drain pan and all necessary accessories. VFD shall be
provided for the variable air volume AHU units. AHU units are to be located
on roof as shown on the drawings and all VFD's shall be located in
electrical rooms as per drawings, specifications and applicable standards.
DESCRIPTION
7- CONTRACTOR shall supply and install Air Separator (AS) complete with
all necessary accessories as per drawings, specifications and applicable
23-10028-
JO/EWO
0001
standards.
06/01/22
00
DISCIPLINE
ENGINEER 9- CONTRACTOR shall supply and install Chemical Dosing System
complete with all necessary accessories as per drawings, specifications
DATE:
and applicable standards.
PROJECT
ENGINEER
10- CONTRACTOR shall supply and install Mini Split Air Conditioning Unit:
DATE: Split fan coil units (FCU) ceiling/wall mounted decorative type shall be
CERTIFIED
provided for Guard House, electrical rooms and LC rooms. Units shall
consist of filters, evaporator coil (direct expansion), condensate drain, wall
DATE:
CONSTRUCTION
mount thermostat and all necessary accessories. The respective air-cooled
AGENCY condensing units (ACCU) shall consist of compressors, condenser coil, fans
and all necessary accessories, floor or wall mounted type complete with
DATE:
anti-vibration rubber pads located outdoor. FCU and ACCU units shall be
OPERATIONS
complete with refrigerant piping and all accessories as per drawings,
specifications and applicable standards.
DATE:
CONTROL NUMBER
11- CONTRACTOR shall supply and install Air Conditioning System for
VERIFICATION
continuous operation, 24 hours per day and 365 days per year. precision
BY:
unit shall be of high reliability type and shall have its local temperature and
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
applicable standards.
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
12- CONTRACTOR shall supply and install Variable Air Volume Terminal
Units (VAV Box), pressure independent type complete with control,
ENGG CERT
13- CONTRACTOR shall supply and install Electric Duct Heaters (EDH),
UL Listed complete with air flow switch, control, thermostat and all
necessary accessories as per drawings, specifications and applicable
standards.
DESCRIPTION
14- CONTRACTOR shall supply and install Fume Hood exhaust fan,
Issued for IFC
explosion proof, corrosion and acid resistance type complete with pre-
fabricated roof curbs.
15- CONTRACTOR shall supply and install roof mounted exhaust fans for
toilet, locker, ablution, janitor room, kitchenette. Exhaust fans shall be
provided with back draft damper as per drawings, specifications and
applicable standards.
16- CONTRACTOR shall supply and install Canteen Kitchen Hood exhaust
23-10028-
JO/EWO
0001
fan, explosion proof type with grease collector, containment device, and
with pre-fabricated roof curbs. The fan type and capacity shall meet the
06/01/22
applicable standards.
NO.
REV
00
DISCIPLINE
17- CONTRACTOR shall supply and install Supply, Return, Exhaust and
ENGINEER fresh air ductwork complete with insulation, hangers and supports as per
SMACNA latest edition, Drawings and
DATE:
specifications.
PROJECT
ENGINEER
DATE: 18- CONTRACTOR shall supply and install Stainless steel 316L exhaust air
CERTIFIED
ducts for fume hood exhaust, kitchen hood exhaust, Art lab exhaust duct,
science lab exhaust duct completes with insulation, hangers and supports
DATE:
CONSTRUCTION
as per SMACNA latest edition, Drawings and specifications.
AGENCY
19- CONTRACTOR shall supply and install round spiral supply air ducts for
DATE:
indoor gym complete with insulation, hangers and supports as per
OPERATIONS
SMACNA latest edition, Drawings and specifications.
DATE: 20- CONTRACTOR shall supply and install aluminum cladding for all
CONTROL NUMBER
and specifications.
EDSD
DATE:
21- CONTRACTOR shall supply and install fire dampers when the duct or
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
barrier as well. These three different types of dampers shall be UL labeled
in accordance with UL 555 or UL 555S as per drawings, specifications and
applicable standards.
ENGG CERT
23- CONTRACTOR shall supply and install fresh air intake for all AHU's
through a sand-trap louver with insect screen as per SMACNA latest
DESCRIPTION
24- CONTRACTOR shall supply and install sound attenuators for main
supply air duct and main return air duct on the AHUs where required in
actual equipment selection to meet noise levels requirements as per
ASHRAE standards and SMACNA latest edition.
0001
26- CONTRACTOR shall supply and install supply and return registers,
06/01/22
grilles, perforated ceiling diffusers, linear slot diffusers, linear bar grilles
DATE
exhaust diffusers and supply jet diffusers complete with all accessories as
per specifications.
NO.
REV
00
DISCIPLINE
ENGINEER 27- CONTRACTOR shall supply and install per-insulated Flexible ducts
interconnecting the branch duct and supply air outlets as per SMACNA
DATE:
latest edition, Drawings and specifications.
PROJECT
ENGINEER
28- CONTRACTOR shall supply and install condensate drain pipe for air
DATE: handling unit and mini split unit, discharge to the nearest floor drain, gravel
CERTIFIED
pit or soak away pit. condensate drain pipe size shall be one size more that
IMC code requirements.
DATE:
CONSTRUCTION
AGENCY 29- CONTRACTOR shall supply and install ductwork insulation with
approved insulation material shall be applied after leak test approval. The
DATE:
insulation material shall have maximum flame spread index of 25 and
OPERATIONS
maximum smoke developed index of 50 as per SMACNA latest edition,
Drawings and specifications and applicable standards.
DATE:
CONTROL NUMBER
30- CONTRACTOR shall supply and install flexible duct connection piece
VERIFICATION
DATE:
31- CONTRACTOR shall supply and install goose neck with insect screen
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
pipes ERW black steel pipe, schedule 40, conforming to ASTM A53 grade
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B, pipes & fittings, Insulation and aluminum jacketing for exposed pipes
including supports & necessary valves & fittings, insulation and all
accessories as per Drawings and specifications.
ENGG CERT
35- CONTRACTOR shall supply and install flexible pipe connection when
the pipe is crossing a building expansion joint.
36- CONTRACTOR shall supply and install Ball valves, gate valve, global
valve, check valve, control valve, strainers, tee, elbow, union, gauges and
thermometer with all accessories as per Drawings and specifications.
23-10028-
JO/EWO
0001
37- CONTRACTOR shall supply and install flexible pipe connection when
the pipe is crossing a building expansion joint.
06/01/22
DATE
38- CONTRACTOR shall supply and install Direct digital control (DDC)
complete with all instrument control, equipment monitoring, temperature
NO.
REV
00
DISCIPLINE
thermostat/sensors, pressure differential switches and all other necessary
ENGINEER accessories. DDC panels are to be located in Electrical room. Control wires
and accessories between HVAC equipment and main direct digital
DATE:
controller panels (DDC), and associated related interface equipment with all
PROJECT
ENGINEER necessary accessories as per Drawings and specifications.
DATE: 39- CONTRACTOR shall test, commission and balance the complete
CERTIFIED
HVAC System as described in the construction specifications and
applicable standards.
DATE:
CONSTRUCTION
AGENCY C. Plumbing:
DATE:
1- CONTRACTOR shall design, procure, supply and install, as a minimum
OPERATIONS
the following plumbing systems and equipment as applicable to the
building/ facilities and as specified in the IFB 30% drawings and
DATE: specifications: All plumbing work shall be provided as required by the
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3- CONTRACTOR shall supply and install water booster pump set &
drinking water pump set including pipes, valves, control, pressure tanks and
all necessary accessories as shown on the drawings, specifications and in
ENGG CERT
4- CONTRACTOR shall supply and install (2) above ground fiber glass
water tanks, complete with level alarms, overflow, drain and all necessary
accessories as shown on the drawings, specifications and in accordance
with IPC code and applicable standards.
tanks for sweet water, complete with level alarms, overflow, drain and all
Issued for IFC
7- CONTRACTOR shall supply and install water piping from water booster
pumps to corresponding plumbing fixtures as shown on the drawings
23-10028-
JO/EWO
0001
complete with all accessories and valves in accordance with IPC code and
applicable standards
06/01/22
DATE
00
DISCIPLINE
schedules and as shown on the drawings complete with all accessories.
ENGINEER
13- CONTRACTOR shall supply and install an isolation valve near the inlet
VERIFICATION
and outlet of each device or piece of equipment including but not limited to
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
network from corresponding fixtures to site sewer tie-in points complete with
(DCC) NO. _____________________
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
all accessories as shown on drawings, specifications and in accordance
with applicable standards.
ENGG CERT
15- CONTRACTOR shall supply and install floor drains and floor cleanouts
as shown on the drawings and as required by international Plumbing Code.
Floor drains and Floor cleanouts in the science labs shall be acid resistant
type.
16- CONTRACTOR shall supply and install drainage venting piping for all
plumbing fixtures complete from corresponding fixtures to roof complete
with all vent cowls and accessories as shown on drawings, specifications
DESCRIPTION
17- CONTRACTOR shall supply and install acid resistant sanitary drainage
piping network complete from the science lab to site sewer tie-in points
through an acid neutralization tank complete with all accessories as shown
on drawings, specifications and in accordance with applicable standards.
18- CONTRACTOR shall supply and install one acid neutralization tank on
the main drainage pipe of science lab.
23-10028-
JO/EWO
0001
19- CONTRACTOR shall supply and install roof drains and/or overflow roof
drains complete with all accessories as shown on drawings, specifications
06/01/22
20- CONTRACTOR shall supply and install rainwater down pipes from roof
NO.
REV
00
DISCIPLINE
to ground level complete with all accessories.
ENGINEER
21- CONTRACTOR shall supply and install hot water pipes including
DATE:
valves, fittings, hangers, supports, insulations and all accessories as shown
PROJECT
ENGINEER on drawings, specifications and in accordance with applicable standards.
DATE: 22- CONTRACTOR shall supply and install separate hot and cold-water
CERTIFIED
supplies and accessible isolation valves for each bathroom to make it fully
independent.
DATE:
CONSTRUCTION
AGENCY 23- CONTRACTOR shall supply and install electric water heaters floor
mounted type and ceiling mounted type complete with and all accessories
DATE:
as shown on drawings, specifications and in accordance with applicable
OPERATIONS
standards. electric water heater shall be UL listed.
DATE: 24- CONTRACTOR shall supply and install various plumbing fixtures, water
CONTROL NUMBER
closets, ablution hoses, lavatories, kitchen sinks, lab sinks and janitor sinks.
VERIFICATION
EDSD
25- CONTRACTOR shall provide a check valve near each device or piece
DATE:
shall be provided.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
26- CONTRACTOR shall provide a strainer near the inlet of each device or
piece of equipment namely water meters, pressure reducing valves and
circulating pumps.
ENGG CERT
27- CONTRACTOR shall provide pressure gauges near the inlet and outlet
of each device namely pressure reducing valves.
28- CONTRACTOR shall provide thermometers near the inlet and outlet of
water heaters.
29- CONTRACTOR shall supply and install reduced pressure type principle
DESCRIPTION
meter.
30- CONTRACTOR shall supply and install floor sinks and floor drains with
primed traps in mechanical rooms, water heater rooms, and chiller plant
pump shed (where applicable). Pressure drop activated trap primers to
serve floor drains and floor sinks in water heater shall be provided.
Electronic type trap primer to serve floor drains and floor sinks in chiller
plant pump shed and mechanical rooms (where applicable).
23-10028-
JO/EWO
0001
31- CONTRACTOR shall supply and install condensate drainage system for
HVAC equipment indirectly to floor drains.
06/01/22
DATE
00
DISCIPLINE
specifications and in accordance with applicable standards.
ENGINEER
34- CONTRACTOR shall supply and install Under counter type grease
DATE: interceptor for canteen waste pipe.
CERTIFIED
36- CONTRACTOR shall supply and install indirect waste connections for
DATE:
drinking fountains.
OPERATIONS
points.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. Fire Protection:
0001
6- CONTRACTOR shall supply and install Diesel fire pump including all
necessary valves, pipes, fittings, supports, control panel and accessories
NO.
REV
00
DISCIPLINE
and supports as per drawings, specifications and in accordance with NFPA-
ENGINEER 20 and any other applicable standards.
DATE:
7- CONTRACTOR shall supply and install Electric fire pump including all
PROJECT
ENGINEER necessary valves, pipes, fittings, supports, control panel and accessories
and supports as per drawings, specifications and in accordance with NFPA-
DATE: 20 and any other applicable standards.
CERTIFIED
8- CONTRACTOR shall supply and install Jockey fire pump including all
DATE:
CONSTRUCTION
necessary valves, pipes, fittings, supports, control panel and accessories
AGENCY and supports as per drawings, specifications and in accordance with NFPA-
20 and any other applicable standards.
DATE:
OPERATIONS
9- CONTRACTOR shall supply and install fuel tank and exhaust ventilation
system of diesel pump as per NFPA-20 and any other applicable standards.
DATE:
CONTROL NUMBER
10- CONTRACTOR shall supply and install fire pump room piping, valves
VERIFICATION
and accessories as per fire flow diagram, specifications, NFPA-20 and any
EDSD
11- CONTRACTOR shall supply and install above ground two fire water
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
tanks, steel type complete with valves, pipes, fittings, supports, overflow
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
line, drain, water levels alarms and all necessary accessories as per
(DCC) NO. _____________________
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
12- CONTRACTOR shall install new portable fire extinguishers in all
buildings within the scope of work complete with mounting bracket,
ENGG CERT
and side wall type) in all areas unless otherwise noted as per drawings,
specifications and applicable standards.
16- All Sprinkler systems shall be monitored by the building Fire alarm
system. Interface the flow switch and supervisory switch of OS&Y Gate
valve to the proposed fire alarm system in compliance with NFPA 13, NFPA
23-10028-
JO/EWO
0001
00
DISCIPLINE
ENGINEER 18- CONTRACTOR shall supply and install alarm check valve assembly
and fire department connection including valves, fittings and necessary
DATE:
accessories as per drawings, specifications and in accordance with NFPA-
PROJECT
ENGINEER 13 and any other applicable standards.
DATE: 19- All firewater piping, valves and accessories shall be painted with
CERTIFIED
approved red color in accordance with NFPA and applicable standards.
DATE:
CONSTRUCTION
20- All fire protection system equipment and components shall be UL Listed
AGENCY and/or FM approved.
DATE:
21- All firewater piping, valves, fittings and sprinklers shall withstand a
OPERATIONS
minimum working pressure of not less than 1206 kPa (175 psi).
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
24- CONTRACTOR shall seal any penetration made to a fire rated wall or
ceiling shall be using appropriate fire stopping materials in accordance with
NFPA and applicable standards.
ENGG CERT
25- CONTRACTOR shall prepare Shop Drawings and submit for approval
to local Civil Defense Authority or as directed by client representative before
the work commence.
26- CONTRACTOR shall supply and install all pipes, fittings, Piping
supports in accordance with NFPA13, NFPA-14 & NFPA-20 and any other
applicable standards. Sprinkler hangers must be of listed components, per
DESCRIPTION
NFPA 13.
Issued for IFC
28- NFPA 13, NFPA 24, NFPA 25 and any other applicable standards.
Contractor shall provide call out reference drawings, details for the
23-10028-
JO/EWO
0001
00
DISCIPLINE
1. Voice over IP (VoIP) and Data System:
ENGINEER
This project will provide for the construction and implementation of the
DATE:
PROJECT
communication transport infrastructure necessary for creation of a modern
ENGINEER high – speed data network for five new school buildings (i.e., Elementary /
Intermediate, girl’s and boy’s schools). Two widely employed concepts:
DATE: Structured cabling system and local area networking (LAN) will be applied
CERTIFIED
to meet the VoIP and data communications requirements of these schools.
All materials necessary to implement the system of structural cabling will
DATE:
CONSTRUCTION
be identified, specified, procured and installed by this project.
AGENCY Contractor shall provide call out reference drawings, details for the OSP,
ISP, SCS, DNS, WAN, LAN and related IT/Communication installations.
DATE:
OPERATIONS
The construction scope of work covers the provision and installation of
communication equipment, voice and data cables, cable pathway and
cross-connection facilities in the telecommunication equipment room /
DATE:
telecommunication closet, of the school buildings.
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
This project will provide for the construction and implementation of the
(DCC) NO. _____________________
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
BICSI-TDMM. The work undertaken in this Scope of Work details the
provision and Installation and Termination and Testing & Commissioning
“but not limited to” and shall be provided equipped with:
ENGG CERT
Contractor shall provide & install in the Telecom Room one (1) 19” rack
mounted Master Synchronized Clock with four (4) relay output utilizing the
SCS (by-SCS) cable tray for supporting clock system, conduits and routing
with the required 2-wiring 16AWG as shown in the drawings.
Contractor shall provide & install in the Telecom Room one (1) 19” rack
mounted digital signage player utilizing the SCS (by-SCS) cable tray for
DESCRIPTION
supporting digital signage system, conduits and routing with the required
Issued for IFC
Contractor shall provide & install in each Telecom Closet/Room 19” rack
mounted Converter Box with the related Transformer 2-Wire System
including the required 2-wiring 16AWG as shown in the drawings for Digital
Clock, bell and Digital Signage System.
Contractor shall provide & install 4”, 4 Digit, Red Display Digital
Synchronized Clock surface/flush mounted with the required 2-wiring
23-10028-
JO/EWO
0001
16AWG are provided at the Classrooms & Labs, all other offices, Canteen,
Multi-Purpose Hall & Indoor Gym & the Entrance Lobby of the school Bldg.
06/01/22
as shown in the drawings for Digital Clock, bell and Digital signage
DATE
System.
NO.
REV
00
DISCIPLINE
Contractor shall provide & install 4”, 4 Digit, Red Display Digital
ENGINEER Synchronized Clock Wall/Ceiling Pole Double mounted with the required 2-
wiring 16AWG are provided at the Corridors of the school Bldg. as shown
DATE:
in the drawings.
PROJECT
ENGINEER
Contractor shall provide & install Digital signage Wall/Ceiling Pole Double
DATE: mounted with the required cables are provided at the Corridors of the
CERTIFIED
school Bldg. as shown in the drawings.
DATE:
CONSTRUCTION
Contractor shall provide & install the needed interfaces with public address
AGENCY system for the sound speakers to be acting as bells in case of belling
status as per school schedules.
DATE:
OPERATIONS
Provide call out reference drawings, details for the SCS, interfaces and
related clock/Digital Signage systems installations.
DATE:
CONTROL NUMBER
Related Drawings:
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
HA-275017-001 FOR EARLY CHILDHOOD
HA-275017-002 FOR EARLY CHILDHOOD
And other drawings as mentioned in list of drawings.
ENGG CERT
3. IP CCTV System:
This project will provide for the construction and implementation of the IP
CCTV System as per BICSI-TDMM, the IP CCTV System shall be
provided for the purpose of the Security, Surveillance & Monitoring with the
provision of the IP IR CCTV Cameras Bullet/Dome type for the inside of
DESCRIPTION
the school’s Entrance Lobby, Corridors and the Computer & Modern
Issued for IFC
Science Lab, Art Room & Home Economics Room, Multi-purpose Hall,
Indoor Gym, other spaces as mentioned in drawings and also for the
Outdoor of the School’s to cover the Gate Entrance & Exit, as well as
around the fence & Under Shaded Patio. The Screen Monitoring station,
monitoring screen shall be located at the Principal Office, while Video
Recording NVR numbers as needed shall be located inside the main
telecom rack at the main telecom room.
The work undertaken in this section details the provision and Installation
23-10028-
JO/EWO
0001
and Termination and Testing & Commissioning “but not limited to” the IP
CCTV system for the inside and outside of the School’s Building, the IP
06/01/22
00
DISCIPLINE
(Watertight/Weatherproof & Vandal Proof) as shown in the drawings
ENGINEER for CCTV system.
DATE:
- Contractor shall provide & install each IP IR Dome day/night cameras
PROJECT
ENGINEER (Watertight/Weatherproof & Vandal Proof) as shown in the drawings
for CCTV system.
DATE:
CERTIFIED
- Contractor shall provide all cameras with motion detectors, night
vision and connected all cameras to cloud base server.
DATE:
CONSTRUCTION
AGENCY - Contractor shall provide & install 19” rack mounted 1U RJ-45 Data
Patch Panel CAT.6A (24-ports), as shown in the drawings for CCTV
DATE:
system.
OPERATIONS
- Contractor shall provide & install NVR network Video Recording; the
DATE: NVR shall be installed inside the main telecom rack at the telecom
CONTROL NUMBER
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
- Contractor shall provide & install and terminate cameras each (of
(DCC) NO. _____________________
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
pairs 24 AWG category 6A UTP plenum cable from each of the IP IR
Bullet/Dome CCTV Cameras to the 1U RJ-45 Data Patch Panel which
eventually shall be patched to the proposed PoE Switches.
ENGG CERT
1URJ-45 Data Patch Panel & the allocated RJ-45 ports in the PoE
Issued for IFC
Switch and for patching the LAN port of the NVR to the Data Outlet
and inside the Telecom Room for the NVR connectivity from SCS
Data Patch Panel (by-SCS) to the PoE Switch, as shown in the
drawings for CCTV system.
- Contractor shall provide & install one (1) each Desktop APC Smart –
UPS and Surge protection power strip in the Principal Room, as
shown in the drawings for CCTV system.
23-10028-
JO/EWO
0001
- Contractor shall provide & install one (1) each 52” 4K LED Monitor
inside the Principal Room with the connectivity of the HDMI cable to
06/01/22
provide & install one (1) each 52” 4K LED Monitor with the
connectivity of the HDMI cable to the NVR, inside the Guard Room as
NO.
REV
00
DISCIPLINE
shown in the drawings for CCTV system.
ENGINEER
- Contractor shall provide & install one (1) each Wireless Keyboard and
DATE:
Mouse with USB Wireless Interface Bluetooth module, inside the
PROJECT
ENGINEER Principal Room, and as shown in the drawings for CCTV system.
DATE: - Contractor shall provide call out reference drawings, details for the
CERTIFIED
OSP, ISP, SCS, interfaces and related CCTV systems installations.
DATE:
CONSTRUCTION
Related Drawings:
AGENCY
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. Sound and Paging System:
The Contractor shall provide & install with tests all wiring. Conduits,
ENGG CERT
Speakers
- Ceiling Mounted Loud Speaker 6 watts 6 inch 230 Volts with Max SPL
(rated/1m) = 102 dB Protec Brand
DESCRIPTION
Amplifier
Issued for IFC
Stand Microphone
Wireless Microphone
23-10028-
JO/EWO
0001
Rack
DATE
- Wall mounted rack 19” include (radio A/m FM tuners, antenna, power
units, CD/USB/SD- card audio player. Multi-channel monitors programmer
NO.
REV
00
DISCIPLINE
timer unit, wireless microphone UHF receiver …. etc. and all required
ENGINEER accessories as mentioned in drawings.
DATE:
PROJECT
ENGINEER The contractor shall provide the required interfaces with fire alarm system
to be evacuation in case of fire, in additional to that it shall be interfaced
DATE: with digital clock system to be acting as bells tones in case of belling
CERTIFIED
status as per recently Armco requirements.
DATE:
CONSTRUCTION
AGENCY Related Drawings:
DATE:
HA-274766-001 FOR BOYS ELEMENTARY
OPERATIONS
HA-274781-001 FOR GIRLS ELEMENTARY
HA-274768-001 FOR BOYS INT.& SECONDARY
DATE: HA-274768-002 FOR BOYS INT.& SECONDARY
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5. AV system
- The Contractor shall provide & install Standard audio jack connection
ENGG CERT
- The contractor shall provide and install and tests all audio-visual system
technology components for:
Comprehensive video presentation systems.
DESCRIPTION
- The contractor shall provide and install and tests all audio-visual system
components include the followings:
23-10028-
JO/EWO
0001
Projector
06/01/22
DATE
- Epson Projector with USB 1.1 and 2.0 compliant for USB display or
external mouse
NO.
REV
00
DISCIPLINE
ENGINEER - Display: Poly-silicon TFT active matrix
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.20.2 The detailed scope of work of VoIP and data System shall include but shall not
be limited to the following:
ENGG CERT
2. Backbone Cabling:
Issued for IFC
CONTRACTOR shall provide, install terminate and tests fiber optic cable
between telecommunication equipment room and telecommunication
closet. This includes supply and installation of fiber patch panel at each
end.
0001
00
DISCIPLINE
b. CONTRACTOR shall provide and install all the components of
ENGINEER overhead cable trays, EMT conduits, under floor conduits, pull boxes,
wall flush mounted boxes and outlets with the necessary bonding and
DATE:
grounding of all the components in accordance with the detailed
PROJECT
ENGINEER drawings.
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
grounded to this ground bus bar as shown by drawings. All grounding
shall be in accordance with BICSI chapter 18 and EIA/TIA-607.
ENGG CERT
CONTRACTOR shall provide and install Local Area Network (LAN) switch in the
TER/TC as shown on the drawings. This includes supply and installation of UPS
DESCRIPTION
Connection of each individual user of the schools to LAN services via 10/100
mbps Fast Ethernet Switch.
Internet connection of each school buildings to telecom service provider via fiber
optic cable with speed 50mbps.
Contractor shall provide call out reference drawings, details for the
DCO/Building ISP, DNS, interfaces and related systems installations.
23-10028-
JO/EWO
0001
00
DISCIPLINE
ENGINEER 1- Wireless Connection for Data, Voice and other Services
DATE:
PROJECT
2- To track assets or specific individuals via active tags using Real Time
ENGINEER
Locating System.
DATE:
CERTIFIED
3- Every point should be covered by at least 3-4 access points for Real Time
Locating System. “subject to client requirement”
DATE:
CONSTRUCTION - The Wireless LAN equipment shall be capable of operating to current industry
AGENCY
standards, being monitored by the network management team and have the
DATE:
capability to be upgraded to accommodate future wireless technologies.
OPERATIONS
- The following design parameters shall be adhered to:
DATE:
1- Signal coverage in all areas 100%.
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.20.3.1 Analog Telephone System:
telephone system as a backup to the VoIP and Data network system in times
of failure.
Contractor shall provide call out reference drawings, details for the
DCO/Building MDF, SDF, Subscriber's Loop, LAG, etc. interfaces and related
systems installations.
provider. The system shall include facilities, equipment and services below.
Issued for IFC
Main Cross-connect (110 wiring block and jumper trough) by using MDF
and SDF.
0001
4.20.3.2 IP Telephone:
06/01/22
DATE
00
DISCIPLINE
ENGINEER
The IP telephone system is a fiber connection to telecom service provider. The
system shall include facilities, equipment and services below. In additional to
DATE:
PROJECT that the contractor shall coordinated with service provided for providing the
ENGINEER
connection with the closed TIE-IN.
DATE:
CERTIFIED
The following features shall be included:
DATE:
1. IP station support: The system must manage, control and support a range of IP
CONSTRUCTION telephone stations for both voice and telephony applications as well as IP
AGENCY
application stations for voice, telephony, and Web services support. IP telephone
and IP application telephone stations will be referred herein as “IP stations,” and
DATE:
OPERATIONS when necessary, the type of IP station will be clearly stated.
client to client. The voice and signaling frames should be marked [tagged] in
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Level 3: TOS / DiffServ
ENGG CERT
3. Client DHCP: The client IP Media Gateway (the IP stations) will support either a
static IP address or a dynamic address (manageable from the terminal) by the
Client’s compatible DHCP within their server.
4. Automatic VLAN Assignment: Although voice and data traffic flow over different
DESCRIPTION
one network. When a user station is moved, it’s possible to perform the IP
activation for a VLAN voice connection that is different from the one initially
programmed in the terminal. In this case, the telecommunications system should
have the capability to support a procedure, based on standard mechanisms, to
assign the corresponding VLAN number to the IP station clients during IP station
initialization.
0001
infrastructure to avoid congestion in the WAN links and maintain good quality
DATE
voice communications.
NO.
REV
00
DISCIPLINE
The system must be able to control and limit the number of simultaneous
ENGINEER communications between the different communication zones. In addition, the
compression algorithms used for the communications inside the same IP
DATE:
PROJECT
communication zone and between different IP communication zones can be
ENGINEER different and must be activated on a call-by-call basis. For example, inside the
same IP communication zone (same LAN), communications will not be
DATE: compressed but digitized in G.711 in order to have toll quality voice; whereas
CERTIFIED
inter-zone communications will use the compression algorithm defined by the
administrator: G723.1 or G.729A.
DATE:
CONSTRUCTION
AGENCY System Availability: In the distributed IP architecture with a soft switch
controlling the IP stations and the media gateways, their operation must be
DATE:
OPERATIONS
maintained by an emergency arrangement. In case the IP network goes down,
the link with the soft switch must recover automatically via the analog public
network or ISDN. In this case, the media gateway will behave like an
DATE:
autonomous PBX, and if some IP stations are located on the same site as the
CONTROL NUMBER
media gateway, they will also recover their signaling to the communication
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Digital Control (DDC) automatic temperature control systems and equipment. For
building management integration software
ENGG CERT
• The Contractor shall provide stand-alone, distributed control system for building
mechanical and electrical systems. The direct digital control system shall include
an operator workstation, microprocessor-based control unit’s panels,
instrumentation, and end control devices, wiring, piping, and related systems to
control / monitor the following systems:
o
o CCTV System.
o Electric dampers & valve operators.
o Data System.
o Central Digital Clock System.
o Speakers System.
o Elevator
o Other systems as mentioned in schematic diagrams
23-10028-
JO/EWO
• All the BMS work shall be installed, wired, tested and calibrated by factory
0001
certified technicians qualified for this work and in the regular employment of the
temperature control system manufacturer. Supervision, calibration and checkout
06/01/22
DATE
of the system shall be by the employees of the local factory owned temperature
control contracting field office. Supplier shall have an in-place support facility
within 50 miles of the project site with technical staff, spare parts inventory and all
NO.
REV
00
DISCIPLINE necessary test and diagnostic equipment. Local office as well as the factory shall
ENGINEER
be ISO 9000 certified.
DATE:
PROJECT
ENGINEER
• The Scope shall include also Product Data and Shop' Drawings which meet
requirements of Shop Drawings, Product Data, and Samples. In addition,
DATE:
Contractor shall provide shop drawings or other submittals on all hardware,
CERTIFIED software, and installation to be provided. No work may begin on any segment of
this project until Engineer has reviewed submittals for conformity with the design
DATE: intent.
CONSTRUCTION
AGENCY
• The Scope shall include also Programming, testing, Commissioning, for the
DATE: Building Management system including all the interface modules and all wires,
OPERATIONS devices & connections.
DATE: • Contractor shall prepare perform the Work for the Building Automation System
(BAS) in accordance with Saudi Aramco requirements with applicable standards.
CONTROL NUMBER
VERIFICATION
Related Drawings:
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
HA-275002-001&002&003 FOR GIRLS INT.& SECONDARY
HA-275019-001&002&003 FOR EARLY CHILDHOOD
And other drawings (ref. to the list of drawings)
ENGG CERT
4.20.5 IT Equipment:
- Computers
DESCRIPTION
- Smart board
Issued for IFC
- Printer
- Copy machine
- Sound System
- Laptop
23-10028-
JO/EWO
0001
- Charging stations
06/01/22
- Ceiling projector
DATE
- Projector screen
NO.
REV
00
DISCIPLINE
ENGINEER - Fax
DATE:
- Standard phone
PROJECT
ENGINEER
- Advance phone
DATE:
CERTIFIED
- Conference phone
DATE:
CONSTRUCTION
- Fingerprint device “cloud base”
AGENCY
• The Scope shall include also Product Data and Shop' Drawings which meet
DATE:
OPERATIONS
requirements of Shop Drawings, Product Data, and Samples. In addition,
Contractor shall provide shop drawings or other submittals on all hardware,
software, and installation to be provided. No work may begin on any segment of
DATE:
this project until Engineer has reviewed submittals for conformity with the design
CONTROL NUMBER
intent.
VERIFICATION
EDSD
• The Scope shall include also Programming, testing, Commissioning, for the
DATE:
Equipment system including all the interface modules and all wires, devices &
BY:
connections.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
• The below IT equipment for guidance (in case will not be supplied by contractor
(DCC) NO. _____________________
in next stages)
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Computer PCs
ENGG CERT
8th Gen SFF i7-8700 / 8GB / 1TB HDD HDD / W10p64 / DVD-WR / 3YW / USB Slim
kbd / USB mouse / VGA Port / Office ProPlus2019 / MFE EP Threat Protection P:1
BZ [P+]
Monitors
SMART BOARD
DESCRIPTION
Active Panel Titanium 70" V7 4K, built-in Android 8, with Vellum fine writing
technology & with pre-installed applications
Intel Core i7-7700T QC 2.9GHz Processor 8GB DDR4 2400MHz Memory Intel HD
Graphics 630 Maximum Resolution support 3840x2160@60Hz Dual Display support
with Front HDMI2.0 port 802.11n Wireless Network
0001
Multifunction Printer 4 in 1
00
DISCIPLINE
ENGINEER
COLOR PAGEWIDE MANAGED A3 MFP MODEL P77760Z + 2Yrs NBD CARE
DATE: PACK WITH PRINT /SCAN / FAX / NFC/ BT / WIFI /ADF/ DUPLEX/ BYPASS PAPER
PROJECT
ENGINEER
TRAY 1 x 550 SHEETS
DATE:
/ SUPPLIES BLACK & COLOR 1 0K/8K/220 VOLTS PART #WlB39B
CERTIFIED
Laptop
DATE: 8th Generation Intel® Core™ processor / Micro-edge display with edge-to-edge
CONTROL NUMBER
keyboard / Fingerprint reader / All metal chassis / Dual 4K support / USB-C™/ Fast
VERIFICATION
Charge / operating system windos10 64bit / Processor Intel® Core™ i7-8550U (1.8
EDSD
GHz base frequency, up to 4 GHz with Intel® Turbo Boost Technology, 8 MB cache, 4
cores) Processor family: 8th Generation Intel® Core™ i7 processor / Memory 8 GB
DATE:
BY:
PCIe® NV Me™ M.2 SSD Dropbox / Graphics Discrete: NVIDIA® GeForce® MX150
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
(2 GB GDDR5 dedicated) / Audio Bang & Olufsen, quad speakers, Audio Boost /
(DCC) NO. _____________________
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
edge-to-edge glass (1920 x 1080).
ENGG CERT
Projector
projector technology Laser Illumination / brightness (ANSI lumens) 4000 ANSI
Lumens / native resolution 1920 X 1200 (WUXGA) / power source 100 - 240 Volts /
aspect ratio 16:10 / contrast ratio 2,500,000:1 / image size (diagonal) 70" to 130" /
projection throw distance 0.41 m - 0.78 m (90 inch screen) / keystone adjustment
Manual: Vertical -/+ 3 deg, Horizontal -/+ 3 deg / ports USB 2.0A/USB
2.0B/RS232C,RJ-45/VGA / in/out/HDMI/Composite/MHL / lens type Manual Focus
Lens / lamp life up to 20000 Hours / control system Remote Control / speakers Built-in
Mono Speaker.
DESCRIPTION
Abbreviated dialing / Adjustable ring tones and volume levels / Adjustable display
0001
/ Callback / Call forward / Call forward notification / Call filter / Call history lists / Call
park / Call pickup / Call timer /Call waiting / Call chaperone / Caller ID /Corporate
directory / Conference, including traditional Join feature / Cross Cluster Ex Extension
NO.
REV
00
Printing Process Laser / Recording Paper Size -Input Tray: A4, LTR, LGL,
EDSD
B5(JIS/ISO), Folio (216 x 330 mm), Oficio (216 x 340 mm), 16K / Manual tray: A5, A4,
LTR, LGL, B5(JIS/ISO), Folio (216 x 330 mm), Oficio (216 x 340 mm), 16K / Envelope
DATE:
BY:
356 mm) / LCD Display 16 digits / 2 lines with back-light / Memory Size 128 MB / Print
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
/ Duplex Printing Yes (A4, LTR, LGL, 216 x 330 mm, 216 x 340 mm) / Supported OS
(DCC) NO. _____________________
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Windows® XP, Windows Vista®, Windows® 7, Windows® 8, Windows® 8.1,
Windows Server® 2008, Windows Server® 2012, Mac OS X 10.5 - 10.10*4, Linux®*.
ENGG CERT
Support / (125 KHz Proxy & 13.56 MHz Mifare) / TCP/IP, Wi-Fi (Optional), Wiegand.
4.21. Instrumentation
The Contractor shall supply/install Level Transmitter on each raw water tanks as
23-10028-
JO/EWO
per P&ID.
0001
00
DISCIPLINE Panel
ENGINEER
DATE:
The Contractor shall supply/install panel support for CP- Control Panel.
PROJECT
ENGINEER
The Contractor shall supply/install cable from CP- Control Panel to DDC panel
DATE:
for pumps monitoring.
CERTIFIED
4.21.2 RO Plant
DATE:
CONSTRUCTION
AGENCY
The Contractor shall supply/install CP-Control Panel to control filter
feed/backwash pumps, RO High pressure pump and chemical/chlorine Dosing
DATE: set
OPERATIONS
Panel.
DATE:
BY:
The Contractor shall supply/install cable from CP- Control Panel signals to DDC
panel for RO Plant monitoring.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
The Contractor shall supply/install panel support for CP- Control Panel.
(DCC) NO. _____________________
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.21.3 Booster Water Pumps
ENGG CERT
The Contractor shall supply/install level transmitter on the new drinking water
storage tanks
The Contractor shall supply/install CP- Control Panel near to the booster pumps
to control the pumps as per sequence of operation
The Contractor shall supply/install cables from CP- Control Panel to DDC panel
for pumps monitoring.
0001
The Contractor shall supply/install level gauge, level transmitter, and flame
06/01/22
00
DISCIPLINE
and jockey pumps as per control description
ENGINEER
The Contractor shall supply/install cables from the new instruments to CP-
DATE: Control Panel.
CERTIFIED
The Contractor shall supply/install panel support for CP- Control Panel.
DATE:
CONSTRUCTION
AGENCY
The Contractor shall supply/install cables from CP- Control Panel to DDC panel
for fuel tank/pumps monitoring.
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5. ADDITIONAL STUDIES & ENGINEERING DELIVERABLES
ENGG CERT
The following studies and assessments shall be performed and developed during the project
Engineering Design Stage to be carried over to LSPB contractor:
0001
00
DISCIPLINE
19. Fire Risk Assessment – to be deleted
ENGINEER 20. Schedule Level III
21. Project Close-out
DATE:
PROJECT
22. Gate Outcome Report
ENGINEER
23. Finalize FEL Brief and presentation
24. ER estimate
DATE:
CERTIFIED
25. ORP Level II
26. Project Charter
27. Target Setting
DATE:
CONSTRUCTION 28. Proposed ISA (Integrated Staffing Assignment)
AGENCY
29. Project Quality Plan
30. Building Risk Assessment
DATE:
OPERATIONS
31. Contracting Strategy
32. Project Interface Plan
33. Pre-commissioning and Mechanical Completion
DATE:
34. Procurement Strategy
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Engineering Deliverables
ENGG CERT
Based on above studies and assessments, the following deliverables shall be developed
during the Engineering Design Stage:
- Overall Site Plans, proposed new building, support facilities, utilities, roads, and
landscaping
- Layouts and plans of proposed new school buildings
- Grading and storm water layout plans, connections and the interface points
DESCRIPTION
- Communications networks
0001
00
DISCIPLINE
- Internal and access Points
ENGINEER - Parking requirements and locations
DATE:
PROJECT
iv. Buildings Drawings, including:
ENGINEER
DATE:
OPERATIONS
- END OF SCOPE -
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
OF THIS DRAWING IS COVERED, FOR ALL
Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION