JO/EWO

Figure 1.3-b: The schematic illustrates the C2+NGL transfer from Jafurah Gas Plant to Riyas NGL
Fractionation Plant
19/01/23
31/11/22
DATE

1.3.1.1 ETHANE PIPELINE


REV. NO.

DISCIPLINE
The proposed 39.5 km 48” Ethane Pipeline has a scraper launcher located in the Riyas
ENGINEER
NGL Fractionation Plant, runs along the new Riyas corridor, and along existing QBGG
ALI ATYAH

DATE __________
and KRT corridors to the scraper receiver and tie-in point located within a fenced facility
PROJECT
ENGINEER
at Jubail Interface-2. The pipeline has one (1) Emergency Isolation Valve (EIV) Gas
________________ Operated type located at KM27.1. Refer to Route Map JD-835158 for pipeline ROW and
DATE ___________
CERTIFIED
location details.
________________

DATE ___________
CONSTRUCTION UTM Coordinates
AGENCY

________________ EQUIPMENT NORTHERN ESTERN


DATE ___________
OPERATIONS
Scraper Launcher @ RNGLF 2 963 896.338 369 490.089
_______________

DATE ___________
Valve Station KM27.1 2 980 445.825 362 717.643
Scraper Receiver @ Jubail I-2 2 986 075.207 354 398.884
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PLANT
FACILITIES SPECIFICATION DWG.TYPE .NO
INDEX DRAWING NO. SHT. NO. REV. NO.

FEL 3 PROJECT PROPOSAL NARRATIVE DOC 12


- A JD-801400
DOWSTREAM PIPELINES PHASE II OF B
JUFURAH SAUDI ARABIA JO / EWO: BI-10-14245 231
1034-8820-RP-3005_O2 DOC CLASS: DSN: 14327
Saudi Aramco 2616-ENG (10/2002)

SAUDI ARABIAN OIL COMPANY


OPRNS

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT

1.3.1.2 PROPANE PIPELINE


The proposed 44.6 km 20” Propane Pipeline has a scraper launcher located in the Riyas
ENG'G

NGL Fractionation Plant, runs along the new Riyas corridor, and along existing QBGG
and KRT corridors to the scraper receiver and tie-in point located within a fenced facility
at Juaymah NGL Terminal. The pipeline has two (2) Mainline Isolation Valves Gas
Operated type located at KM14.5 and Motor Operated at KM30.6. Refer to Route Map
JD-835159 for pipeline ROW and location details.
DESCRIPTION

UTM Coordinates
EQUIPMENT NORTHERN EASTERN
ISSUED FOR REVIEW

ISSUED FOR REVIEW

Scraper Launcher @ RNGLF 2 963 866.488 369 418.026


Valve Station KM14.5 2 965 224.630 380 682.456
Valve Station KM30.6 2 962 853.842 392 972.193
Scraper Receiver @ JNGLF 2 962 913.581 401 207.822
10-14245

10-14245
JO/EWO

1.3.1.3 BUTANE PIPELINE


The proposed 44.6 km 16” Butane Pipeline has a scraper launcher located in the Riyas
NGL Fractionation Plant, runs along the new Riyas corridor, and along existing QBGG
19/01/23
31/11/22
DATE

and KRT corridors to the scraper receiver and tie-in point located within a fenced facility
at Juaymah NGL Terminal. The pipeline has two (2) Mainline Isolation Valves Gas
REV. NO.

Operated type located at KM14.5 and Motor Operated at KM30.6. Refer to Route Map
DISCIPLINE
ENGINEER JD-835160 for pipeline ROW and location details.
ALI ATYAH

DATE __________
PROJECT UTM Coordinates
ENGINEER

________________
EQUIPMENT NORTHERN EASTERN
DATE ___________ Scraper Launcher @ RNGLF 2 963 860.748 369 444.168
CERTIFIED

________________
Valve Station KM14.5 2 965 215.666 380 681.652
DATE ___________ Valve Station KM30.6 2 962 841.369 392 976.063
CONSTRUCTION
AGENCY Scraper Receiver @ JNGLF 2 962 924.728 401 219.300
________________

DATE ___________
OPERATIONS

_______________
1.3.1.4 PENTANE + COLORED BODIES PIPELINE
DATE ___________ The proposed 39.9 km 10” Pentane + Colored Bodies Pipeline has a scraper launcher
located in the Riyas NGL Fractionation Plant, runs along the new Riyas corridor, and
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

along existing QBGG and KRT corridors to the scraper receiver in Qatif GOSP-1. The
EDSD

pipeline has two (2) Main Line Isolation Valves Gas Operated type located at KM14.5
and at KM30.6. Refer to Route Map JD-835198 for pipeline ROW and location details.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PLANT
FACILITIES SPECIFICATION DWG.TYPE .NO
INDEX DRAWING NO. SHT. NO. REV. NO.

FEL 3 PROJECT PROPOSAL NARRATIVE DOC 13


- A JD-801400
DOWSTREAM PIPELINES PHASE II OF B
JUFURAH SAUDI ARABIA JO / EWO: BI-10-14245 231
1034-8820-RP-3005_O2 DOC CLASS: DSN: 14327
Saudi Aramco 2616-ENG (10/2002)

SAUDI ARABIAN OIL COMPANY


OPRNS

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

UTM Coordinates
CERT

EQUIPMENT NORTHERN EASTERN


ENG'G

Scraper Launcher @ RNGLF 2 963 872.229 369 431.884


Valve Station KM14.3 2 965 246.542 380 684.421
Valve Station KM30.3 2 962 874.541 392 994.599
Scraper Receiver @ Qatif GOSP-1 2 963 727.863 395 557.226

1.3.1.5 NG A180 PIPELINE


DESCRIPTION

The proposed 7.94 km 8” NG A180 Pipeline has a scraper launcher located in the Riyas
NGL Fractionation Plant, runs along the new Riyas pipeline corridor to the scraper
receiver in a new fenced scraper trap area located at the edge of QBGG corridor and
ISSUED FOR REVIEW

ISSUED FOR REVIEW

tie-in point with TNRTNG-1 pipeline in the QBGG corridor (i.e., at KM 170 of TNRTNG-
1). There are no Main Line Isolation Valves on this new NG A180 pipeline. Refer to Route
Map JD-835199 for pipeline ROW and location details.
In addition, TNRTNG-1 pipeline will have a new scraper launcher & receiver trap
10-14245

10-14245
JO/EWO

installed at KM 170 of TNRTNG-1 pipeline as part of BI 10-14245 scope of work.

UTM Coordinates
19/01/23
31/11/22

EQUIPMENT NORTHERN EASTERN


DATE

Scraper Launcher @ RNGLF 2 963 883.709 369 459.601


REV. NO.

Scraper Receiver @ QBGG Trap Area 2 967 478.111 374 923.672


A

DISCIPLINE
ENGINEER

ALI ATYAH
1.3.1.6 SALES GAS PIPELINE
DATE __________
PROJECT
ENGINEER
The proposed 8 km 12” Sales Gas Pipeline has a tie-in with both UBTG-1 and SJGT-1
________________ pipelines in QBGG corridor. The pipeline has a scraper launcher located in a new fenced
DATE ___________
CERTIFIED
scraper trap area at the edge of QBGG corridor, runs along new pipeline corridor to the
________________ scraper receiver located in the Riyas NGL Fractionation Plant. There are no Main Line
DATE ___________ Isolation Valves on this pipeline. Refer to Route Map JD-835157 for pipeline ROW and
CONSTRUCTION
AGENCY location details.
________________

DATE ___________
OPERATIONS UTM Coordinates
_______________
EQUIPMENT NORTHERN EASTERN
DATE ___________
Scraper Launcher @ QBGG Trap Area 2 967 465.749 374 915.175
CONTROL NUMBER

DATE _____________
BY: ______________

Scraper Receiver @ RNGLF 2 963 877.969 369 445.742


VERIFICATION
EDSD

1.3.1.7 C2+NGL TO KJNGL-1S PIPELINE


The proposed 8 km 24” C2+NGL Pipeline has a tie-in with KJNGL-1S pipeline in QBGG
THIS INDICATES THAT REV. NO. ____________

corridor. The pipeline has a scraper launcher located in a new fenced scraper trap area
APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

at the edge of QBGG corridor, runs along new pipeline corridor to the scraper receiver
located in the Riyas NGL Fractionation Plant.

PLANT
FACILITIES SPECIFICATION DWG.TYPE .NO
INDEX DRAWING NO. SHT. NO. REV. NO.

FEL 3 PROJECT PROPOSAL NARRATIVE DOC 14


- A JD-801400
DOWSTREAM PIPELINES PHASE II OF B
JUFURAH SAUDI ARABIA JO / EWO: BI-10-14245 231
1034-8820-RP-3005_O2 DOC CLASS: DSN: 14327
Saudi Aramco 2616-ENG (10/2002)

SAUDI ARABIAN OIL COMPANY


OPRNS

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

There are no Main Line Isolation Valves on this pipeline. Refer to Route Map JD-835231
CERT

for pipeline ROW and location details. This pipeline is designed for bi-directional
service.
ENG'G

UTM Coordinates
EQUIPMENT NORTHERN EASTERN
Scraper Launcher @ RNGLF 2 963 889.449 369 473.459
Scraper Receiver @ QBGG Trap Area 2 967 490.472 374 932.169
DESCRIPTION

1.3.1.8 C2+NGL TO RNGLF PLANT PIPELINE


The proposed 260 km 36” C2+NGL Pipeline has a scraper launcher located in Jafurah
ISSUED FOR REVIEW

ISSUED FOR REVIEW

Gas Plant, runs along existing SHBAB, ABGP, and QBGG corridors, and along the new
corridor from QBGG to the scraper receiver and tie-in point located in Riyas NGL
Fractionation Plant. The pipeline has eight (8) Mainline Isolation Valves located at
KM36, KM52, KM68, KM126.5, KM140.4, KM160, KM208, and KM234. The pipeline has
an intermediate scraper facility at KM100.3 where it has hot tap tie-ins with SHJNGL-1
10-14245

10-14245
JO/EWO

& 2 pipelines. These hot tap tie-ins shall be executed by an approved vendor for hot
tapping installations. Refer to Route Map JD-835229 for pipeline ROW and location
details.
19/01/23
31/11/22
DATE

UTM Coordinates
REV. NO.

EQUIPMENT NORTHERN EASTERN


A

DISCIPLINE Scraper Launcher @ JFGP 2 803 358.061 421 051.037


ENGINEER

ALI ATYAH
Valve Station KM36 (EIV, GOV) 2 826 828.734 418 242.646
DATE __________ Valve Station KM52 (MLIV, GOV) 2 840 395.710 409 765.381
PROJECT
ENGINEER
Valve Station KM68 (EIV, GOV) 2 853 598.464 400 759.066
________________

DATE ___________
Scraper Receiver KM100.3 2 865 777.220 373 505.940
CERTIFIED
Scraper Launcher KM100.3 2 865 789.489 373 537.157
________________

DATE ___________
Valve Station KM126.5 (EIV, MOV) 2 890 453.428 376 440.222
CONSTRUCTION
AGENCY
Valve Station KM140.4 (MLIV, GOV) 2 899 461.346 367 907.760
________________ Valve Station KM160 (EIV, GOV) 2 914 702.934 357 578.912
DATE ___________
OPERATIONS
Valve Station KM208 (EIV, GOV) 2 962 195.651 352 569.091
_______________ Valve Station KM234 (EIV, GOV) 2 977 832.312 362 461.592
DATE ___________
Scraper Receiver @ RNGLF 2 963 903.226 369 506.718
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD

1.3.2 FACILITY/PROCESS DESCRIPTION, DESIGN BASIS AND PERFORMANCE


SPECIFICTION DESCRIPTION OF FACILITIES
The basis of design for the pipeline under this BI is to meet the Sales gas and C2+NGL
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

requirement of RNGLF facilities, in addition the pipeline for the fractionated products
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PLANT
FACILITIES SPECIFICATION DWG.TYPE .NO
INDEX DRAWING NO. SHT. NO. REV. NO.

FEL 3 PROJECT PROPOSAL NARRATIVE DOC 15


- A JD-801400
DOWSTREAM PIPELINES PHASE II OF B
JUFURAH SAUDI ARABIA JO / EWO: BI-10-14245 231
1034-8820-RP-3005_O2 DOC CLASS: DSN: 14327
Saudi Aramco 2616-ENG (10/2002)

SAUDI ARABIAN OIL COMPANY


OPRNS

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

meets the production level of RNGLF facility. The starting point for each pipeline in this
CERT

BI is the source for that stream.


The termination point for the fractionated products is based on the demand forecast
ENG'G

analysis for that stream. The Propane and Butane from RNGLF will be transferred to
Juaymah NGL Terminal for export, and Natural Gasoline (NG A-180) to Ras Tanura
Terminal (RTT) for export. Ethane will be transferred to Jubail Interface-II for domestic
composition. Pentane and coloured bodies will be disposed by injecting into the AL
crude oil pipeline; JT-1 near Qatif GOSP-1. C2+NGL need to be transferred from JFGP to
DESCRIPTION

RNGLF facility for fractionation. Sales gas needs to be transferred from MGS to RNGFL
to meet the energy requirements.
Pipeline In BI Start Point End Point capacity
ISSUED FOR REVIEW

ISSUED FOR REVIEW

RJBETH-1 RNGLF Jubail Interface-2 719.1 MMSCFD


RJPRP-1 RNGLF JNGLF 202.5 MBOD
RJBUT-1 RNGLF JNGLF 106.4 MBOD
RJT1-1 RNGLF JT-1 at Qatif GOSP- 34.6 MBOD
1
10-14245

10-14245
JO/EWO

RRTNG-1 RNGLF TNRTNG-1 at 41.3 MBOD


QBGG
RFG-1 UBTG-1 at QBGG RNGLF 135 MMSCFD
19/01/23
31/11/22
DATE

JFRNGL JfGP RNGLF 510 MBOD


24” C2+NGL RNGLF KJNGL-1S at QBGG 255 MBOD
REV. NO.

DISCIPLINE
ENGINEER

ALI ATYAH
1.3.2.1 DESIGN BASIS
DATE __________ For detailed basis of design, refer document JD811010, Additional details for basis of
PROJECT
ENGINEER design related to the composition of fluids, fluid properties are provided in the flow
________________

DATE ___________
assurance report, Flow Assurance Design Basis:
CERTIFIED

________________ Product BOD SS


DATE ___________
CONSTRUCTION Ethane JD-811050 JD-811060
AGENCY

________________ Propane JD-811051 JD-811061


DATE ___________
OPERATIONS Butane JD-811052 JD-811062
_______________

DATE ___________ Pentane + CB JD-811053 JD-811063


NG180 JD-811054 JD-811064
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD

SG JD-811055 JD-811065
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PLANT
FACILITIES SPECIFICATION DWG.TYPE .NO
INDEX DRAWING NO. SHT. NO. REV. NO.

FEL 3 PROJECT PROPOSAL NARRATIVE DOC 16


- A JD-801400
DOWSTREAM PIPELINES PHASE II OF B
JUFURAH SAUDI ARABIA JO / EWO: BI-10-14245 231
1034-8820-RP-3005_O2 DOC CLASS: DSN: 14327
Saudi Aramco 2616-ENG (10/2002)

SAUDI ARABIAN OIL COMPANY


OPRNS

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT

EQUIPMENT LIST (EQUIPMNET CAPACITY, SIZE, DATA SHEETS, TAG NUMBER)


ENG'G

For details of Equipment capacity, size and other details refer document number JD
841003.
1.4 LIST OF MANDATORY SAUDI ARAMCO ENGINEERING REQUIREMENTS
(MSAERS)
LSTK CONTRACTOR shall complete all Work, under this Contract, in accordance with the
DESCRIPTION

applicable SAUDI ARAMCO Standards, Specifications, General Instructions (GIs),


Procedures, Library Drawings, Reports, International Industry Codes, Standards and
Recommended Practices. LSTK CONTRACTOR shall note that any Deviation from above
ISSUED FOR REVIEW

ISSUED FOR REVIEW

SAUDI ARAMCO or International Standards/Specifications/Procedures etc. shall be


approved by the responsible SAUDI ARAMCO Dept. in writing.
This shall include but not limited to the following:
x SAUDI ARAMCO Engineering Standards (SAES)
x
10-14245

10-14245
JO/EWO

SAUDI ARAMCO Safety and Security Standards


x SAUDI ARAMCO Material Specifications (SAMSS)
x SAUDI ARAMCO Standard Library Drawings (SASD)
19/01/23
31/11/22

x
DATE

SAUDI ARAMCO Engineering Procedures (SAEP)


x SAUDI ARAMCO GIs and Procedures
REV. NO.

x SAUDI ARAMCO Engineering Reports


A

DISCIPLINE
ENGINEER x SAUDI ARAMCO Best Practices
ALI ATYAH x SAUDI ARAMCO Inspection Requirement
x
DATE __________
PROJECT SAUDI ARAMCO Nonmaterial Requirements
ENGINEER

________________
x SAUDI ARAMCO Pre-Commissioning Forms, Industry Codes and Standards
DATE ___________
CERTIFIED
x High Commission of Industrial Safety (HCIS)
________________ x Saudi Arabian Standards Organization Documents (SASO)
DATE ___________ x American National Standards Institute (ANSI)
CONSTRUCTION
AGENCY
x American Society of Mechanical Engineers (ASME)
x
________________

DATE ___________
American Society of Testing & Materials (ASTM)
OPERATIONS
x American Petroleum Institute (API)
x
_______________

DATE ___________
American Concrete Institute (ACI)
x American Institute of Steel Construction (AISC)
CONTROL NUMBER

DATE _____________
BY: ______________

x
VERIFICATION

National Electrical Manufacturers Association (NEMA)


EDSD

x National Fire Protection Association (NFPA)


x National Association of Corrosion Engineers (NACE)
x Instrument, Systems & Automation Society (ISA)
x
THIS INDICATES THAT REV. NO. ____________

International Fire Code (IFC)


APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

x International Organization for Standardization (ISO)


x International Electro-Technical Commissions (IEC)
PLANT
FACILITIES SPECIFICATION DWG.TYPE .NO
INDEX DRAWING NO. SHT. NO. REV. NO.

FEL 3 PROJECT PROPOSAL NARRATIVE DOC 17


- A JD-801400
DOWSTREAM PIPELINES PHASE II OF B
JUFURAH SAUDI ARABIA JO / EWO: BI-10-14245 231
1034-8820-RP-3005_O2 DOC CLASS: DSN: 14327

You might also like