Professional Documents
Culture Documents
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
DESCRIPTION
0001
CONSTRUCTION SPECIFICATIONS
06/01/22
DATE
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
January 06 2022
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Construction Specifications
ENGG CERT
List of Sections
Division 2 - Sitework
0001
02200 Earthwork
02210 Excavating, Trenching, Backfilling and Compacting
06/01/22
DATE
02231 Geotextile
02444 Chain Link Fence and Gates
02480 Landscaping
NO.
REV
00
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Division 3 - Concrete
Division 4 – Masonry
DESCRIPTION
Division 5 - Metals
0001
00
DISCIPLINE
ENGINEER 07100 Damp proofing and Waterproofing
07110 Sheet Membrane Waterproofing
DATE:
07210 Building Insulation
PROJECT
ENGINEER 07220 Roof Deck Insulation
07256 Sprayed Fireproofing
DATE: 07531 Roofing System
CERTIFIED
07620 Sheet Metal Flashing and Trim
07631 Roof Walkway Treads
DATE:
CONSTRUCTION
07810 Unit Skylights
AGENCY 07920 Sealants and Caulking
DATE:
Division 8 - Doors and Windows
OPERATIONS
08710 Hardware
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Division 9 - Finishes
09900 Painting
Issued for IFC
Division 10 - Specialties
0001
10350 Flagpoles
10442 Photomurals
06/01/22
00
DISCIPLINE
ENGINEER Division 11 - Equipment
DATE:
11000 General Equipment
PROJECT
ENGINEER 11900 Kitchen Units and Appliances
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Construction Specifications
ENGG CERT
List of Sections
Division 15 - Mechanical
0001
00
DISCIPLINE
15530 Refrigerant Piping and Accessories
ENGINEER 15540 Chilled Water Pumps
15545 Chemical Dosing Pot for Water Chiller System
DATE:
PROJECT
15604 Fiberglass Reinforced Plastic (FRP) Storage Tank
ENGINEER
15680 Air Cooled Chillers
15782 Close Control Air Conditioning Units
DATE:
CERTIFIED
15831 Air Curtains
15840 Electric Duct Heaters
DATE:
15855 Air Handling Unit
CONSTRUCTION 15860 Exhaust Fans
AGENCY
15890 Ductwork
15910 Ductwork Accessories
DATE:
OPERATIONS 15930 Variable Air Volume Terminals
15940 Air Inlets and Outlets
15950 HVAC Controls
DATE:
15960 Variable Frequency Drive
CONTROL NUMBER
VERIFICATION
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Division 16 – Electrical/Telecommunications
ENGG CERT
16160 Panelboards
Issued for IFC
0001
00
DISCIPLINE
IT Equipment
ENGINEER
DATE:
PROJECT
ENGINEER - END OF VOLUME 2 LIST –
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 01000
ENGG CERT
GENERAL SPECIFICATIONS
SUBSECTION INDEX
1.0 Definitions
2.0 Abbreviations
3.0 Construction and Materials Standards
DESCRIPTION
0001
00
DISCIPLINE
19.0 As-Built Drawings
ENGINEER
DATE:
1.0 Definitions: Refer to Schedule "A" of the Contract.
PROJECT
ENGINEER
2.0 Abbreviations
DATE:
CERTIFIED
A. Where any of the following abbreviations are used in the Contract Documents, they
shall have the meaning set forth opposite each: -
DATE:
CONSTRUCTION
AGENCY 1. Standards:
DATE:
AASHTO American Association State Highway and Transportation
OPERATIONS
Officials
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
BS British Standards
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AISC American Institute of Steel Construction
ENGG CERT
0001
00
DISCIPLINE
ENGINEER
IEC International Electrical Commission
DATE:
ISO International Organization for Standardization
PROJECT
ENGINEER MOT Ministry of Transport
DATE:
CERTIFIED MOPTT Ministry of Post, Telegraph and Telephone
DATE:
MSS Manufacturers Standardization Society
CONSTRUCTION
AGENCY
NEC National Electrical Code (USA)
DATE:
OPERATIONS NEMA National Electrical Manufacturers Association
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
UBC Uniform Building Code
ENGG CERT
2. Miscellaneous:
mm Millimeter
cm Centimeter
DESCRIPTION
m Meter
Issued for IFC
LM Linear meter
in. Inch
ft. Foot
0001
00
DISCIPLINE
ENGINEER cu.m Cubic meters
DATE:
g Grams
PROJECT
ENGINEER
kg Kilogram
DATE:
CERTIFIED
lb Pound
DATE:
CONSTRUCTION
C Centigrade (Celsius)
AGENCY
F Fahrenheit
DATE:
OPERATIONS
A Ampere
DATE: v Volt
CONTROL NUMBER
VERIFICATION
kv Kilovolt
EDSD
DATE:
Hz Hertz
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
hr Hour
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
KN/m Kilonewton per meter
ENGG CERT
kPa Kilopascal
DB Direct Burial
Issued for IFC
AC Alternating current
DC Direct current
23-10028-
JO/EWO
0001
GE General Electric
06/01/22
No. Number
DATE
min. minimum
NO.
REV
00
DISCIPLINE
ENGINEER max. maximum
DATE:
% percent
PROJECT
ENGINEER
certificates, records and data for installed equipment shall be submitted or performed
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5.0 Contractor's Shop and Working Drawings
A. Contractor shall comply with requirements of the Contract and as herein specified.
ENGG CERT
B. Contractor shall submit shop and working drawings complete as follows but not
necessarily limited to:
Aramco Representative.
Issued for IFC
3. The shop drawings shall include but not limited to the following:
0001
type of soil, reinforced concrete items like lintels, thurst blocks, pipe
directional changes, fire hose/fire reel installations, HVAC systems,
06/01/22
00
DISCIPLINE
4. Civil and architectural and all other works as required.
ENGINEER
C. Such drawings shall show the principal dimensions, weight, structural and operating
DATE:
features, space required, clearances, type and/or brand of finish and shop coat,
PROJECT
ENGINEER grease fittings, etc. depending on the subject of the drawing. When it is customary to
do so, when the dimensions are of particular importance, or when so specified, the
DATE: drawings shall be certified by the manufacturer or fabricator as corrected for the
CERTIFIED
Contract. All submittals shall be checked, approved and certified by the Contractor.
DATE:
CONSTRUCTION
D. Contractor shall submit complete manufacturer's specifications, catalog data,
AGENCY descriptive matter, illustrations, etc., marked up to show only data related to this
Contract. Submission shall be in quadruplicate including minimum one original copy.
DATE:
OPERATIONS
E. Contractor shall be responsible for the prompt and timely submittal of all shop and
working drawings so that there shall be no delay to the Work due to the absence of
DATE: such drawings. Prior to the submittal of any shop drawings, Contractor shall submit a
CONTROL NUMBER
schedule of proposed shop drawing transmittals. The schedule shall identify the
VERIFICATION
and the proposed date of submission. During the progress of the Work the schedule
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
F. No material or equipment shall be purchased or fabricated for the Contract until the
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
required shop and working drawings have been submitted as herein above provided
(DCC) NO. _____________________
and reviewed and approved by Saudi Aramco Representative for conformance to the
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Contract requirements. All such materials and equipment and the work involved in
their installation or incorporation into the Work shall then be as shown in and
represented by the said drawings.
ENGG CERT
G. Only shop and working drawings, approved by Saudi Aramco Representative shall be
used for fabrication, installation or supervision of the Work.
H. Until the necessary review has been made, Contractor shall not proceed with any
approved portion of the Work (such as the construction of foundations), the design or
details of which are dependent upon the design or details of work, materials,
equipment or other features for which review is required.
DESCRIPTION
I. All shop and working drawings shall be submitted to Saudi Aramco Representative by
and/or through Contractor, who shall be responsible for obtaining shop and working
drawings prepared on standard size, (A, B, C, D and E) or metric equivalent sheets,
except those which are made by changing existing standard shop or working
drawings. All drawings shall be clearly marked with the names of Saudi Aramco,
Contractor, and building, equipment, or structure to which the drawing applies, and
shall be suitably numbered. Each shipment of drawings shall be accompanied by a
letter of transmittal giving a list of the drawing numbers and the names mentioned
above.
23-10028-
JO/EWO
0001
J. Only drawings which have been checked and corrected by the fabricator shall be
06/01/22
drawings to Saudi Aramco Representative, Contractor shall check thoroughly all such
drawings to satisfy himself that the subject matter thereof conforms to the Drawings
NO.
REV
00
DISCIPLINE
and Specifications in all respects. All drawings which are correct shall be marked with
ENGINEER the date, checker's name, and indication of Contractor's approval, and then shall be
submitted to Saudi Aramco Representative; other drawings shall be returned for
DATE:
correction.
PROJECT
ENGINEER
K. If a shop drawing shows any deviation from the Contract requirements, Contractor
DATE: shall make specific mention of the deviations in his letter of transmittal.
CERTIFIED
L. The review of shop and working drawings hereunder will be general only, and nothing
DATE:
CONSTRUCTION
contained in this General Specification shall relieve, diminish or alter in any respect
AGENCY the responsibilities of Contractor under the Contract Documents and in particular, the
specific responsibility of Contractor for details of design and dimensions necessary for
DATE:
proper fitting and construction of the Work as required by the Contract and for
OPERATIONS
achieving the result and performance specified thereunder.
DATE: M. One marked-up copy of the shop and working drawings and one marked-up copy of
CONTROL NUMBER
catalog cuts will be returned to Contractor. Contractor shall furnish additional copies
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Products Specified by Naming One or More Manufacturers: Products of
manufacturers named and meeting specifications, no options or substitutions allowed.
ENGG CERT
7.0 Substitution
2. Will provide the same warranty for the Substitution as for the specified
product.
23-10028-
JO/EWO
0001
3. Will coordinate installation and make changes to other Work which may be
06/01/22
4. Waives claims for additional costs or time extension which may subsequently
NO.
REV
00
DISCIPLINE
become apparent.
ENGINEER
D. Substitutions will not be considered when they are indicated or implied on shop
DATE: drawing or product data submittals, without separate written request, or when
CERTIFIED
acceptance will require revision to the Contract Documents.
DATE:
CONSTRUCTION
E. Substitutions Submittal Procedure:
AGENCY
1. Submit three copies of request for Substitution for consideration. Limit each
DATE:
request to one proposed Substitution.
OPERATIONS
2. Submit shop drawings, product data, and certified test results for both the
DATE: originally specified item and the proposed substitution, so that Saudi Aramco
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.0 Interface With Other Contracts
Representative, afford access to the site for other Contractors to complete their work
as and when necessary and directed by Saudi Aramco Representative.
11.0 Safety
23-10028-
JO/EWO
0001
A. Contractor shall comply with the requirements of Schedules `B’ and `D’ and all other
Contract Documents.
06/01/22
DATE
00
DISCIPLINE
A. Contractor shall comply with the requirements of the Contract and Saudi Arabian
ENGINEER Standards Organization (SASO).
DATE:
13.0 Lines, Grades and Measurements
PROJECT
ENGINEER
A. Contractor shall deploy a competent full time Civil Engineer. Contractor shall require
DATE: said Engineer to establish all lines, elevations, reference marks, batter boards, etc.,
CERTIFIED
needed by Contractor during the progress of the Work, and from time to time to verify
such marks by instrument or other appropriate means. Contractor shall deploy a
DATE:
CONSTRUCTION
qualified surveying team capable enough to carryout Works related to all surveying
AGENCY Works (specifically having thorough know how of coordinates, as most of the Work is
done with coordinates).
DATE:
OPERATIONS
B. Saudi Aramco Representative shall be permitted at all times to check the lines,
elevations, reference marks, batter boards, etc., set by Contractor, who shall correct
DATE: any errors in lines, elevations, reference marks, batter boards, etc., disclosed by such
CONTROL NUMBER
and shall not relieve or diminish in any way the responsibility of Contractor for the
EDSD
C. Contractor shall make all measurements and check all dimensions necessary for the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
proper construction of the Work called for by the Drawings and Specifications. During
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
the execution of the Work, Contractor shall make all necessary measurements to
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. Contractor shall provide at his own expense batter boards, forms, materials, and labor
as may be required or directed. If Contractor for any reason removes, or permits to
ENGG CERT
remove, any reference marks established, the replacement of such reference marks
shall be set at Contractor's expense.
F. This will require the part-time services of one or two men of Contractor's organization.
DESCRIPTION
Such help shall be furnished promptly, whenever needed, in order not to delay the
Issued for IFC
Work.
A. During its progress and on its completion, the Work shall conform truly to the lines,
levels, and grades indicated on the Drawings or given by Saudi Aramco
Representative and shall be built in a thoroughly substantial and workmanlike
manner, in strict compliance with the Drawings, Specifications, and other Contract
Documents and the directions given from time to time by Saudi Aramco
23-10028-
JO/EWO
0001
00
DISCIPLINE
A. All necessary bolts, anchor bolts, nuts, washers and plates shall be furnished by
ENGINEER Contractor in accordance herewith. Anchor bolts shall have suitable washers and,
where so required, their nuts shall be hexagonal.
DATE:
PROJECT
ENGINEER B. All anchor bolts, nuts, washers and plates shall be galvanized unless otherwise
indicated or specified.
DATE:
CERTIFIED
C. Expansion bolts shall have malleable iron and lead composition elements of the
required number of units and size.
DATE:
CONSTRUCTION
AGENCY D. Unless otherwise specified, stud, tap, and machine bolts, and nuts shall conform to
the requirements of ASTM Standard Specification for High-Strength Bolts for
DATE:
Structural Steel Joints, Designation A325 and A490 as applicable. Hexagonal nuts of
OPERATIONS
the same quality of metal as the bolts shall be used. All thread shall be clean cut and
shall conform to ANSI Standard B1.1-1974 for Unified inch Screw Threads (UN and
DATE: UNR Thread Form).
CONTROL NUMBER
VERIFICATION
E. Bolts, anchor bolts, nuts, and washers, specified to be galvanized, shall be zinc
EDSD
coated, after being threaded, by the hot-dip process in conformity with the ASTM
DATE:
from Rolled, Pressed, and Forged Steel Shapes, Plates, Bars, and Strip, Designation
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
A123, or the ASTM Standard Specifications for Zinc Coating (Hot-Dip) on Iron and
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
F. Bolts, anchor bolts, nuts, and washers specified to be stainless steel shall be Type
316 stainless steel.
ENGG CERT
G. Anchor bolts and expansion bolts shall be set accurately. If anchor bolts are set
before the concrete has been placed, they shall be carefully held in suitable templates
of acceptable design. Where indicated on the Drawings, specified, or required,
anchor bolts shall be provided with square plates at least 100 mm (4 in) by 100 mm (4
in) by 10 mm (3/8 in) or shall have square heads and washers and be set in the
concrete forms with suitable pipe sleeves, or both. If anchor or expansion bolts are
set after the concrete has been placed, all necessary drilling and grouting or caulking
shall be done by Contractor and care shall be taken not to damage the structure or
DESCRIPTION
finish by cracking, chipping, spalling, or otherwise during the drilling and caulking.
Issued for IFC
A. Contractor shall leave all chases or openings for the installation of his own work or
any other Contractors and Sub Contractors work concerned in reference to this Work.
B. In case of his failure to leave or cut all such openings or have all such sleeves
provided and set in proper time, he shall cut them or set them afterwards at his own
expense, but in doing so he shall confine the cutting to the smallest extent possible
23-10028-
JO/EWO
0001
consistent with the work to be done. In no case shall piers or structural members be
cut without the written consent of Saudi Aramco Representative.
06/01/22
DATE
C. Contractor shall carefully fit around, close up, repair, patch, and point around the work
specified herein to the satisfaction of Saudi Aramco Representative.
NO.
REV
00
DISCIPLINE
ENGINEER D. All of this Work shall be done by careful workmen competent to do such work and
with the proper small hand tools. Power tools shall not be used except where, in the
DATE:
opinion of Saudi Aramco Representative the type of tool proposed can be used
PROJECT
ENGINEER without damage to any work or structures and without inconvenience or interference
with the operation of any facilities. Saudi Aramco Representative's concurrence with
DATE: the type of tools shall not in any way relieve or diminish the responsibility of
CERTIFIED
Contractor for such damage, inconvenience, or interference resulting from the use of
such tools.
DATE:
CONSTRUCTION
AGENCY E. Contractor shall not cut or alter the work of any sub-Contractor or any other
Contractor, nor permit any of his sub-Contractors to cut or alter the work of any other
DATE:
Contractor or sub-Contractor, except with the written consent of Contractor or sub-
OPERATIONS
Contractor whose work is to be cut or altered or with the written consent of Saudi
Aramco Representative. All cutting and patching or repairing made necessary by the
DATE: negligence, carelessness, or incompetence of Contractor or any of his sub-
CONTROL NUMBER
responsibility of Contractor.
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
A. Where dissimilar metals are used in conjunction with each other, suitable insulation
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
any resultant electrolysis. The insulation shall be bituminous impregnated felt, heavy
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
bituminous coatings, non-metallic separators or washers, or other acceptable
materials.
ENGG CERT
A. Contractor shall perform additional soil investigation to confirm suitability of the soil for
the buildings. Availability of the attached geotechnical report shall in no way relieve
Contractor from his responsibility to determine or verify actual site conditions.
- END OF SECTION -
23-10028-
JO/EWO
0001
06/01/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 01005
ENGG CERT
MISCELLANEOUS REQUIREMENTS
SUBSECTION INDEX
1.0 General
2.0 Traffic Control
3.0 Voltage Ratings of Motors
DESCRIPTION
1.0 General
0001
any responsibility or liability which is his, under the terms of the Contract.
NO.
REV
00
DISCIPLINE
C. Contractor shall provide detour signs, barricades, etc., as and where required.
ENGINEER
DATE:
CONTROL NUMBER
B. Shipping:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1. Ship equipment, material and specified spare parts complete except where
partial disassembly is required by transportation regulations or for protection
of components.
ENGG CERT
2. Pack spare parts in containers bearing labels clearly designating contents and
pieces of equipment for which intended.
C. Receiving:
DESCRIPTION
0001
- END OF SECTION -
NO.
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 01010
ENGG CERT
SUMMARY OF WORK
SUBSECTION INDEX
Part 1 - General
1.01 Introduction
DESCRIPTION
Part 1 - General
23-10028-
JO/EWO
0001
1.01 Introduction
06/01/22
A. The construction specification together with the Drawings listed in the project
DATE
documents constitute the basis for the complete Works to be performed by the
Contractor.
NO.
REV
00
DISCIPLINE
ENGINEER B. The Scope of Work comprises five (5) schools, and supporting buildings such as gate
entrances with guardrooms, substations, electrical rooms, garbage enclosures RO
DATE:
and FW/PW pump room, FW/RW tanks area, chiller yard, chiller pump shed, shaded
PROJECT
ENGINEER waiting areas, and outdoor sports facilities.
C. This section shall be read in conjunction with and is part of Schedule B of the
DATE: Construction Contract.
CERTIFIED
D. In case of any conflict between the Contract documents, the Contractor shall inform
DATE:
CONSTRUCTION
Saudi Aramco Representative and receive his directions before taking any further
AGENCY action.
DATE:
E. Construction Contractor is responsible for supplying all additional materials missed or
OPERATIONS
short of quantities as required during construction to complete the Work.
The Work as specified herein and shown on the Drawings generally includes but not
EDSD
A. Site:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1. Site preparation including site surveys, clearing and rough grading as
required.
ENGG CERT
3. Provision for paved asphalt service parking, landscaped areas and concrete
walkways within the school lot area.
5. Provision for site development including curbing, planting, irrigation and site
DESCRIPTION
furniture, etc.
B. Buildings:
1. Provision for permanent (1) single-storey school with rigid steel frame and
pre-cast concrete perimeter wall cladding with dry wall internal partitions,
and fully air-conditioned by variable air flow central DX system.
2. Provision for permanent (2) two-storey school with rigid steel frame and
23-10028-
JO/EWO
0001
pre-cast concrete perimeter wall cladding with dry wall internal partitions,
and fully air-conditioned by variable air flow central DX system.
06/01/22
DATE
3. Provision for a permanent typical single storey guardhouse with rigid steel
frames and precast concrete perimeter wall cladding for each school
NO.
REV
00
DISCIPLINE
entrances.
ENGINEER
DATE:
4. Provision for permanent outdoor and indoor Basketball / Volleyball courts.
PROJECT
ENGINEER
5. Provision of outdoor soccer field play area, shaded seating, and all
DATE: essentials to complete the work.
CERTIFIED
7. Provision for RO & RW/FW Pump Room in precast concrete panel bearing
DATE:
OPERATIONS
walls and precast hollow core slab.
DATE:
10. Provision of waiting shed for every school building located in front
BY:
entrances.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
11. Provision of precast concrete panel for Chiller Plant and FW/RW Tanks
Area enclosures.
ENGG CERT
12. Provision of trash enclosure located at the back of the schools respectively.
13. Provision of internal parking with fence and access gates at Boys school
complex.
14. Provision for an electrical room with rigid steel frames and precast concrete
perimeter wall cladding.
DESCRIPTION
C. Utilities:
0001
3. Provision of drinking water, fire water, irrigation water and waste water
NO.
REV
00
D. The Work to be performed by Contractor includes, but shall not be limited to the
DATE:
following:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
1. Site preparation, site survey and layout, site grading and excavation
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and foundations of all structures, transportation of any needed borrow
materials, and disposal of excess and unsuitable materials at a
Government approved dumping area or at location designated by Saudi
ENGG CERT
Aramco Representative.
E. Contractor shall provide all required personnel and equipment and all other work
required to provide complete operational facilities.
23-10028-
JO/EWO
0001
F. The Contractor shall furnish three (3) sets of reproducible final as-built drawings
06/01/22
G. The Contractor shall perform continuous site clean-up during the project and after
NO.
REV
00
DISCIPLINE
demobilization and shall adhere to Saudi Aramco Quality and Safety Procedures.
ENGINEER
DATE: I. Testing and commissioning of all the works by Contractor shall be done by
CERTIFIED
qualified personnel.
DATE:
CONSTRUCTION
AGENCY Part 2 - Products - Not Used
DATE:
OPERATIONS
Part 3 - Execution - Not Used
DATE:
CONTROL NUMBER
VERIFICATION
- END OF SECTION -
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 01051
ENGG CERT
SURVEYING
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 2 - Products
2.01 Stakes
23-10028-
JO/EWO
0001
Part 3 - Execution
06/01/22
00
DISCIPLINE
PART 1 - GENERAL
ENGINEER
1.01 Description
DATE:
PROJECT
ENGINEER A. Work in this Section includes, but is not limited to; furnishing survey crew, setting up
reference points and bench marks, vertical and horizontal setting out of all grading,
DATE: trench work, utility installations, roadways, asphalt paving, walkways and other works
CERTIFIED
forming part of the Contract.
DATE:
CONSTRUCTION
B. Work is to be performed in accordance with the conditions set forth in subsection 1.03
AGENCY of Section 02000 General Instructions.
DATE:
1.02 Related Work
OPERATIONS
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.03 Reference Standards
ENGG CERT
1. Performing all surveys for the duration of the Contract to ensure that levels
and locations conform to the design Drawings, and shop/working drawings
DESCRIPTION
2. Making formal requests to Saudi Aramco for data on survey control points
related to the project prior to construction.
3. Verifying the figures on all Saudi Aramco furnished data and documents
before laying out the Work. Contractor shall be responsible for any errors or
inaccuracies resulting from his failure to do so.
0001
00
DISCIPLINE
ENGINEER 6. Maintaining all established reference points and bench marks at all times
during construction. Under the direction of Saudi Aramco Representative,
DATE:
replace any survey monuments damaged or disturbed by construction activity.
PROJECT
ENGINEER
B. Contractor will be provided with survey controls (refer to benchmark data shown on
DATE: the drawings). These control points shall be tied from any Established survey
CONTROL NUMBER
controls and closed to another established survey control. All survey field notes must
VERIFICATION
DATE:
1.06 Submittals
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
A. Submit to Saudi Aramco Representative all data and grade sheets at least 48 hours
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
prior to construction. Show on the grade sheets the vertical and horizontal
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
relationships between the stakes and the design reference points shown on the
Drawings.
ENGG CERT
PART 2 - PRODUCTS
2.01 Stakes
specifications.
Issued for IFC
PART 3 - EXECUTION
A. Contractor Survey Controls: From the provided survey controls (refer to bench mark
data shown on the Drawings), Contractor shall establish additional survey controls
with an accuracy as stipulated in this Specification.
23-10028-
JO/EWO
0001
least three (3) reference or witness markers for each point likely to be disturbed.
DATE
Submit survey notes listing the relative positions of the reference markers to each
other, and to the points they are referencing at least 48 hours prior to disturbing or
NO.
REV
00
DISCIPLINE
threatening the validity of the monument.
ENGINEER
C. Road Works:
DATE:
PROJECT
ENGINEER 1. General: Prior to the start of grading, and during the progress of the Work, set
and maintain sufficient stakes to show conformance with the Drawings.
DATE: Locate all stakes in such a way that they will not be disturbed by construction
CERTIFIED
operations.
DATE:
CONSTRUCTION
2. Stake Placement: Construction stakes shall be placed at the left and right of
AGENCY center lines, at shoulders, edge of paving, grade breaks, beginning and
ending of curves, angle points and intersections of flow lines.
DATE:
OPERATIONS
3. Stake Spacings:
DATE:
Item Curve Straight Vertical
CONTROL NUMBER
VERIFICATION
Grade
EDSD
Subgrade 30 m 10 m
Base 20 m 10 m
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
controlled by string-line
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. Utility Work:
the Work, set and maintain sufficient stakes to show conformance with the
Drawings. Locate all stakes in such a way that they will not be disturbed by
construction operations.
2. Stake Placement: Construction stakes are to be place at, but not limited to,
the following locations;
E. Park Work: Prior to beginning of grading, and during the progress of the Work, set
and maintain sufficient stakes to show conformance with the Drawings. Locate all
stakes in such a way that they will not be damaged or disturbed by construction
operations.
F. Contractor shall protect the stakes in areas where pedestrians and children may
enter.
23-10028-
JO/EWO
0001
- END OF SECTION -
06/01/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 01400
ENGG CERT
QUALITY CONTROL
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
0001
00
DISCIPLINE
PART 1 - GENERAL
ENGINEER
1.01 Description
DATE:
PROJECT
ENGINEER A. Quality assurance and control of installation.
DATE: B. References.
CERTIFIED
C. General requirements.
DATE:
CONSTRUCTION
AGENCY D. Field samples.
DATE:
E. Manufacturers' field services and reports.
OPERATIONS
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.03 Quality Control Requirements
A. Contractor shall prepare a Quality Control plan as per "Schedule Q" to ensure the
ENGG CERT
Contract Specifications were met. The plan, including proposed testing laboratory,
methods, rates of testing, etc. shall be submitted to Saudi Aramco Representative for
approval prior to the start of construction.
D. Comply with specified standards as a minimum quality for the Work except when
more stringent tolerances, codes, or specified requirements indicate higher standards
or more precise workmanship.
23-10028-
JO/EWO
0001
F. Secure Products in place with positive anchorage devices designed and sized to
withstand stresses, vibration, physical distortion or disfigurement.
NO.
REV
00
DISCIPLINE
ENGINEER 1.05 References
DATE:
A. Conform to the latest issue of the applicable reference standards.
PROJECT
ENGINEER
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1. Site layout and layout of building.
8. Backfill.
10. Roof surface prior to insulation and roof water proofing Work.
0001
E. Cooperation: The testing laboratory shall prepare, cure, store, etc, all job-made
samples.
NO.
REV
00
DISCIPLINE
ENGINEER F. Identification: Materials passing test shall be marked or tagged by the Testing
Laboratory and shall thereafter be kept separate and stored so as to facilitate
DATE:
identification. Any such material not identifiable by Saudi Aramco Representative
PROJECT
ENGINEER shall be rejected and removed from storage location or the site.
C. Where field sample is specified in individual Sections to be removed, clear area after
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.08 Inspection and Inspectors
for this purpose will periodically inspect the work and Contractor will provide facilities
and access to the work at all times as required to facilitate this inspection.
B. All testing, including requests, reports, etc., are the responsibility of Contractor, or an
agency employed by Contractor. Saudi Aramco reserves the right to verify the tests
with Saudi Aramco testing laboratory or independent agency approved by Saudi
Aramco.
DESCRIPTION
0001
00
DISCIPLINE
ENGINEER B. Verify all measurements before ordering of fabricated items.
DATE:
PROJECT
ENGINEER PART 2 - PRODUCTS - Not Used.
DATE:
CERTIFIED
PART 3 - EXECUTION - Not Used.
DATE:
CONSTRUCTION
AGENCY
- END OF SECTION -
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 01710
ENGG CERT
CLEANING UP
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 3 - Execution
3.01 Cleaning Up
3.02 Disposal and Hauling
23-10028-
JO/EWO
0001
PART 1 - GENERAL
06/01/22
1.01 Description
DATE
A. Work in this Section includes, but is not limited to; removal and disposal of
NO.
REV
00
DISCIPLINE
construction and miscellaneous debris from the site during and after construction until
ENGINEER handing over. Such debris includes, but is not limited to, paper, cardboard, plastics,
rubbish, rocks, stones, excess/waste asphalt and concrete, excess/waste materials,
DATE:
shipping materials, rebar and other metallic debris generated by the project or placed
PROJECT
ENGINEER by Contractor, inside and outside the Project Boundary.
DATE: B. On or before the completion of the work, tear down and remove all temporary
CERTIFIED
buildings and structures built by Contractor; remove all temporary works, tools, and
machinery or other construction equipment furnished by Contractor; and leave the
DATE:
CONSTRUCTION
roads and all parts of the premises and adjacent property affected by Contractor's
AGENCY operations in a neat and satisfactory condition.
DATE:
1.02 Related Work
OPERATIONS
DATE:
BY:
PART 3 - EXECUTION
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
3.01 Cleaning Up
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A. During the progress of the Work, the Work-site shall be kept clean. All rubbish,
surplus materials and unneeded construction equipment shall be removed, and all
damage repaired so that inconvenience is reduced to a minimum. The Work-site
ENGG CERT
shall be kept in a sanitary condition. Rodent and vector controls shall be undertaken,
as directed by Saudi Aramco Representative.
B. Where material or debris has washed, flowed into or been placed in drains, pipes, or
structures, whether existing or installed under this Contract such material or debris
shall be entirely removed and satisfactorily disposed of. The drains, pipes, structures,
and Works, etc., shall, be left in a clean and neat condition.
DESCRIPTION
3. Remove all rubbish from any ground which he has occupied; and
23-10028-
JO/EWO
0001
4. Leave the Work-site and all adjacent property affected by his operations in a
neat and satisfactory condition.
06/01/22
DATE
D. Contractor, upon completion of the Work, shall deliver materials and equipment
undamaged and in fresh and new-appearing condition.
NO.
REV
00
DISCIPLINE
ENGINEER E. Contractor shall restore or replace any of Municipality or private property damaged by
his work, equipment, or employees, to a condition at least equal to that existing
DATE:
immediately prior to the beginning of operations. Suitable materials, equipment, and
PROJECT
ENGINEER methods shall be used for such restoration which shall be done as promptly as
practicable, as Work progresses, and shall not be left until the end of the Contract
DATE: period.
CERTIFIED
C. Waste material shall not be allowed to blow or spill into any public or private property
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
Representative for approval and have Industrial Hygiene approval for each removal of
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
asbestos.
(DCC) NO. _____________________
- END OF SECTION -
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02000
ENGG CERT
GENERAL INSTRUCTIONS
SUBSECTION INDEX
Part 1 - General
0001
06/01/22
PART 1 - GENERAL
DATE
00
DISCIPLINE
ENGINEER A. Submittals: Prior to purchasing materials, Contractor shall provide, for approval, a
complete materials list of all items proposed to be furnished and installed. No
DATE:
equipment shall be purchased/ shipped from the manufacturer/vendor without
PROJECT
ENGINEER approved submittals.
DATE: B. Materials Delivery: Prior to delivery of any material to the job site, Contractor shall
CERTIFIED
provide the manufacturer's recommended method of handling, storage and
installation, which shall become the basis for inspecting and accepting or rejecting
DATE:
CONSTRUCTION
actual installation methods used on the Work.
AGENCY
1. Store products immediately on delivery, and protect until installed in the Work.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3. Store products subject to damage by elements in substantial weather-tight
enclosures.
ENGG CERT
0001
Saudi Aramco.
NO.
REV
00
DISCIPLINE
G. Shop and Working Drawing Submittals: Contractor shall prepare shop and working
ENGINEER drawings in an approved format and submit them to Saudi Aramco Representative for
approval prior to the commencement of fabrication.
DATE:
PROJECT
ENGINEER H. Material Substitutions: Equivalent products of other manufacturers than those
specified may be acceptable provided that the equivalent product meets or exceeds
DATE: the requirements of the Specification. Contractor shall submit all manufacturers data
CERTIFIED
and information required to verify that the proposed substitution is equivalent to the
specified item. All submittals for substitutions shall include the manufacturers
DATE:
CONSTRUCTION
information for the specified item along with the information for the proposed
AGENCY substitution. Failure to provide sufficient information to the satisfaction of Saudi
Aramco Representative will result in rejection of the submittal.
DATE:
OPERATIONS
I. Protection After Installation:
DATE: 1. Provide protection for installed products to prevent damage from subsequent
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
A. Sampling and Testing: Sampling and testing shall be the responsibility of Contractor
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
that the specified testing requirements of the applicable sections are met. Saudi
Aramco reserves the right to verify and approve the test results.
ENGG CERT
A. Survey Work: Contractor shall provide his own survey team and adequate survey
equipment during the entire construction period in accordance with Drawings and
Specifications.
A. Contractor shall establish his own source of material at a location acceptable to Saudi
Issued for IFC
Aramco and shall construct and maintain his own access to these areas unless
otherwise instructed by Saudi Aramco Representative.
C. All materials shall be subject to the written approval of Saudi Aramco Representative
throughout their use on this Work. In order to confirm the quality of materials, Saudi
23-10028-
JO/EWO
0001
Aramco Representative shall, at his sole discretion, take samples of any material for
testing at Saudi Aramco's independent laboratory approved by Saudi Aramco. It shall
06/01/22
to use of any materials. Contractor shall give adequate advance notice to allow Saudi
Aramco to obtain samples and to carry out its own testing and inspection of materials
NO.
REV
00
DISCIPLINE
and construction if required. Any materials not complying with appropriate
ENGINEER specifications and either used or stockpiled prior to use in any construction layer shall
be rejected by Saudi Aramco and removed by Contractor from the Work Site before
DATE:
any subsequent construction activity proceeds. Such activity shall be at no cost to
PROJECT
ENGINEER Saudi Aramco.
DATE: D. Contractor shall satisfy itself by personal examination of the site and by such means
CERTIFIED
as he may wish as to the actual geological conditions there existing.
DATE:
CONSTRUCTION
1.05 Work Requirements
AGENCY
A. Contractor shall supply all the equipment, manpower, and supervision necessary for
DATE:
the successful completion of the Work. Contractor shall operate, transport, maintain,
OPERATIONS
service, lubricate, fuel and repair all of the equipment required under this Contract.
Contractor shall also provide any other equipment to successfully complete the Work.
DATE:
CONTROL NUMBER
B. Contractor shall provide all necessary potable and construction water, water pumps,
VERIFICATION
pipelines, cooling, treatment, storage, distribution and other related facilities as well as
EDSD
C. Contractor shall provide all the necessary vehicles for transportation of personnel,
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. Contractor shall supply all protective articles such as, safety helmets, safety boots,
eye and face shields, gloves, etc. required for safe and proper execution of the Work.
ENGG CERT
E. Contractor shall secure and protect all equipment, tools, and materials at the job site
until installation is complete including all stock materials issued by Saudi Aramco for
use on this Contract.
F. Contractor shall obtain all the required work permits from Saudi Aramco prior to
performing any work.
G. Contractor shall check and verify field dimensions, sizes and conditions before
DESCRIPTION
H. Contractor shall observe and follow all requirements of the latest issue of applicable
Standards and Specifications or any other applicable standards and specifications for
the construction of this job.
I. Contractor shall provide water for the construction work and supply his own electrical
power source.
J. Contractor shall provide and maintain one air conditioned field mobile office for the
23-10028-
JO/EWO
0001
use of Saudi Aramco Representatives and one for his own use. The mobile office
shall have a minimum area of 200m2 Additional requirements are found in Schedule
06/01/22
00
DISCIPLINE
ENGINEER A. The Drawings provided for the Work reflect the data available for the existing site
conditions and facilities, however there might be differences between the Drawings
DATE:
and existing conditions. Contractor shall check, verify and make the necessary
PROJECT
ENGINEER adjustments to the Drawings to conform to such differences and shall submit the
Drawings to Saudi Aramco for approval.
DATE:
CERTIFIED
B. In case of any conflicts and discrepancies between the referred specifications,
standards and the construction documents, the most stringent standards/
DATE:
CONSTRUCTION
specifications as defined by Saudi Aramco Representative shall govern and his
AGENCY decision shall be binding on Contractor.
DATE:
C. In the event of any conflict between the provisions of this Scope of Work and
OPERATIONS
Contractor obligations as set forth in the Contract Schedules, the Conditions of
Contract shall govern.
DATE:
CONTROL NUMBER
A. Noise Control: Contractor shall comply with the applicable requirements pertaining to
DATE:
this project will not be permitted between the hours of 10 pm and 6 am.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
B. Air Control:
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1. Dust shall be kept down at all times, including non-working hours, weekends,
and holidays. Soil at the site, haul roads, and other areas disturbed by
Contractor's operations and materials stockpiled for the project shall be
ENGG CERT
2. Contractor shall inspect all vehicles for dirt prior to their leaving the
construction site. Dirt, soil, and rubble likely to be dislodged during transit
DESCRIPTION
shall be removed from the trucks and other vehicles prior to leaving the site.
Issued for IFC
3. Contractor shall ensure that equipment transporting materials, to and from the
site, that may become airborne is covered.
C. Dust Control: Water shall be applied to all areas as required to prevent blowing of
dust. The amount of water to be used and the frequency of application shall be
sufficient to prevent dust nuisance. Saudi Aramco Representative has the right in this
Contract to require additional watering whenever it is needed for dust control.
23-10028-
JO/EWO
0001
All existing roads and existing facilities shall be kept clean and dust free at all
times. All sand blown to the roads and facilities from the construction area and
06/01/22
00
DISCIPLINE
PART 2 - PRODUCTS - NOT USED
ENGINEER
DATE:
PART 3 - EXECUTION - NOT USED
PROJECT
ENGINEER
DATE:
CERTIFIED
- END OF SECTION -
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02050
ENGG CERT
SUBSECTION INDEX
PART 1 - GENERAL
1.02 Submittals
Issued for IFC
PART 3 - EXECUTION
0001
3.02 Clean-Up
06/01/22
DATE
PART 1 - GENERAL
NO.
REV
00
DISCIPLINE
1.01 Description of Work
ENGINEER
DATE: A. The procedures proposed for the accomplishment of demolition and removal work
CERTIFIED
shall be submitted to Saudi Aramco and approved before work is started. The
procedures shall provide for careful removal and coordination with other work in
DATE:
CONSTRUCTION
progress, and disconnection schedule of utility services. The procedures shall include
AGENCY a detailed description of the methods and equipment to be used for each operation
and the sequence of operations.
DATE:
OPERATIONS
1.03 General Requirements
DATE: A. The Work includes the demolition or removal of all construction indicated in the
CONTROL NUMBER
1. Relocate existing trees (and its associated irrigation if any) and replant to an
DATE:
Aramco appointed agency or Contractor to cut and trim the trees (plants),
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
digging the ground, to remove the plants, transportation and assists in the
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. Road modification as per new Drawing.
3. All items on the ground affected by grading shall be reset to new elevation
ENGG CERT
required.
B. Trash and debris shall be removed daily, unless otherwise directed, and shall not be
allowed to accumulate either inside or outside the site.
A. Dust resulting from site clearing and demolition activities shall be controlled to prevent
DESCRIPTION
buildings and roads sites and to avoid creation of a nuisance in the surrounding area.
1.05 Protection
A. Protect existing work to remain in place by temporary covers, shoring, bracing, and
supports. Repair such items that are damaged during performance of the work or
replace with new material. Do not overload structural elements. Provide new
supports or reinforcement for existing construction which is weakened by demolition
or removal work.
23-10028-
JO/EWO
0001
B. Where safety to pedestrians and drivers is endangered in the area of removal work,
06/01/22
00
DISCIPLINE
PART 2 - PRODUCTS – Not Used
ENGINEER
DATE:
PART 3 - EXECUTION
PROJECT
ENGINEER
asphalt is sound. At locations where the broken face cannot be concealed, it shall be
VERIFICATION
ground smooth or the saw cut shall be made entirely through the concrete or the
EDSD
asphalt.
DATE:
BY:
3.02 Clean-Up
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
A. Debris and Rubbish Control: Debris and rubbish shall be removed and transported in
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Regulations: Comply with Saudi Aramco requirements regarding hauling and disposal
of materials to an approved location.
ENGG CERT
- END OF SECTION –
DESCRIPTION
0001
06/01/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02110
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 3 - Execution
0001
PART 1 - GENERAL
06/01/22
DATE
1.01 Description
NO.
REV
00
DISCIPLINE
A. Work in this Section includes, but is not limited to:
ENGINEER
1. Removal and disposal of vegetation, brush, rubbish, loose rocks and large
DATE:
stones occurring within the Work-site areas.
PROJECT
ENGINEER
2. Removal of roots and organic material to a depth of not less than 0.45 m
DATE: below the original surface level of the ground or beneath the roots level of the
CERTIFIED
removed trees whichever is greater. Other areas, only topsoil having
vegetation shall be removed.
DATE:
CONSTRUCTION
AGENCY 1.02 Related Work
DATE:
A. Section 02200 Earthwork
OPERATIONS
PART 3 - EXECUTION
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A. All unsuitable material to be disposed shall be transported in accordance with the
local laws to a Government approved dump site or as directed by Saudi Aramco
Representative.
ENGG CERT
B. Waste material shall not be allowed to blow or spill into any public or private property
during the transporting.
A. Clear the working sites and support facilities of shrubs and other vegetations.
Issued for IFC
1. Completely remove stumps, roots and other debris protruding through the
ground surface.
B. Fill depressions caused by clearing and grubbing operations with satisfactory surface
soil material unless further excavation or earthwork is indicated.
1. Place fill material in horizontal layers not exceeding 150 mm loose depth, and
thoroughly compacted to a density equal to adjacent original ground in
23-10028-
JO/EWO
0001
00
DISCIPLINE
excavated until the complete removal of this debris is accomplished to the satisfaction
ENGINEER of Saudi Aramco Representative. Backfilling of such areas shall be in accordance
with Section 02200 - Earthwork.
DATE:
PROJECT
ENGINEER B. Unsuitable material includes, but is not limited to, rocks larger than 30 cm, debris or
vegetation, organic clay, top soil, foundations, or any specific material so designated,
DATE: in writing by Saudi Aramco Representative.
CERTIFIED
C. All loose rocks within the project site shall be cleared out prior to starting construction.
DATE:
CONSTRUCTION
AGENCY
DATE:
- END OF SECTION -
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02200
ENGG CERT
EARTHWORK
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 2 - Products
Part 3 - Execution
23-10028-
JO/EWO
0001
3.01 Excavation
3.02 Fill
06/01/22
3.04 Tolerance
NO.
REV
00
DISCIPLINE
ENGINEER PART 1 - GENERAL
DATE:
1.01 Description
PROJECT
ENGINEER
A. Work in this Section includes, but is not limited to; performing all operations in
DATE: connection with the stripping of topsoil, excavation of soil and rock, removal and
CERTIFIED
disposal of all unsuitable soil and rock material from the Work site, placing and
compacting of fill materials from Work site excavations and/or imported from a borrow
DATE:
CONSTRUCTION
pit, and grading and improving the site to the required elevations shown on the
AGENCY Drawings.
DATE:
1.02 Related Work
OPERATIONS
and Compacting
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. American Association of State Highway and Transportation Officials (AASHTO):
ENGG CERT
1. AASHTO - T 180, Moisture - Density Relations of Soils Using a 4.54 kg (10 lb)
Rammer and a 457 mm (18 in) Drop.
2. AASHTO - T 224, Correction for Course Particles in the Soil Compaction Test.
1. ASTM D 421, Practice for Dry Preparation of Soil Samples for Particle-Size
DESCRIPTION
4. ASTM D 1556, Test Method for Density and Unit Weight of Soil in Place by
the Sand-Cone Method.
23-10028-
JO/EWO
0001
00
DISCIPLINE
ENGINEER 7. ASTM D 2487, Classification of Soils for Engi-neering Purposes.
DATE:
8. ASTM D 2922, Test Methods for Density of Soil and Soil-Aggregate in Place
PROJECT
ENGINEER by Nuclear Methods (Shallow Depth).
DATE: 9. ASTM D 4253, Test Methods for Maximum Index Density and Unit Weight of
CERTIFIED
Soil Using a Vibratory Table.
DATE:
CONSTRUCTION
10. ASTM D 4254, Test Methods for Minimum Index Density and Unit Weight of
AGENCY Soils and Calculation of Relative Density.
DATE:
11. ASTM D 4318, Test Method for Liquid Limit, Plastic Limit and Plasticity Index
OPERATIONS
of Soils.
A. Contractor shall submit samples of fill material for evaluation and approval by Saudi
EDSD
Aramco prior to delivery to the site. Additional submittals of fill material shall be made
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PART 2 - PRODUCTS
A. General: `Fill Material' shall be used for all fills except where `Select Fill Material' is
specified. In general `select fill material' shall be used within 0.6 m of the bottom
elevation of pavement sub-base course, foundations, or slabs on grade.
B. On Site `Fill Material': All approved satisfactory material removed from excavations
shall be used as far as practicable for fill. Soil/rock mixture free from organic matter,
containing no rocks or lumps over 150 mm in diameter or half the lift thickness,
DESCRIPTION
Fill materials shall be poorly graded gravels and sands, silty gravels and sands, little
to moderate fines having plasticity index: non-plastic to 4.
0001
C. `Select Fill Material': `Select Fill Material' shall be composed only of inorganic
06/01/22
DATE
material and shall have 100% passing the 50 mm sieve and from 5-20% passing the
No. 200 sieve. That portion of the material passing the No. 40 sieve shall have a
maximum liquid limit of 35 and maximum plasticity index of 12. Atterberg's limits are
NO.
REV
00
DISCIPLINE
not required for select fill material with less than 15% fines passing the No. 200 sieve.
ENGINEER Select fill can either be sand or marl if they meet the requirement of both gradation
and physical properties as mentioned above. Materials shall be mixed and stockpiled
DATE:
PROJECT
for testing prior to use.
ENGINEER
marl cap evenly mixed and compacted firmly to finish elevations shown on drawings.
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PART 3 - EXECUTION
3.01 Excavation
ENGG CERT
organic material, soils containing large amount of rock, roots, grasses and other
Issued for IFC
0001
D. Excavation for Structures: Excavation shall be made accurately to the lines, grades
and elevations shown on the Drawings. Trenches and foundation pits shall be of
06/01/22
sufficient size to permit the placement and removal of forms for the full length and
DATE
width of structure footings and foundations shown. Loose disintegrated rock and thin
strata shall be removed. When concrete or masonry is to be placed in an excavated
NO.
REV
00
DISCIPLINE
area, special care shall be taken not to disturb the bottom of the excavation.
ENGINEER Excavation to the final grade level shall not be made until just before the concrete or
masonry is to be placed.
DATE:
PROJECT
ENGINEER E. Bracing and Shoring: For excavation of 1.2 m or deeper, the sides of pits and
trenches shall be sloped back to a safe angle of repose. Excavations shall not be
DATE: sloped at an angle greater than one horizontal to one vertical (45o measured from the
CERTIFIED
horizontal).
DATE:
CONSTRUCTION
F. Drainage and Dewatering: To ensure proper drainage conditions throughout
AGENCY construction, the Contractor shall provide and maintain devices (including spares) to
intercept, remove promptly and properly dispose of all water entering the excavation
DATE:
or trenches. Dewatering system shall work uninterruptedly maintaining the trench
OPERATIONS
and all excavated areas dry at all times. The dewatering system shall not be
removed till the backfilling of trench has reached the height of 300 mm above
DATE: groundwater table. Contractor shall provide an engineered dewatering plan for
CONTROL NUMBER
responsible for any failure of the existing structures as a result of the dewatering
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
H. Excavation Below Duct Bank: Contractor shall provide structural support to hold
existing and or constructed electrical power, telephone, traffic signal and street
ENGG CERT
I. Hand Excavation: Hand excavation will be required for work adjacent to the existing
utilities as specified by the utility agency's requirements.
3.02 Fill
A. Fill: Fill Work shall consist of hauling, placing, compacting and finishing fill areas to
DESCRIPTION
B. Preparation to Ground Surface for Fill: The areas to receive the fill shall be proof-
rolled and any areas that fail to densify or that rut excessively shall be cut to the depth
of the loose material and that loose material removed. Prior to fill placement, the
natural subgrade on which the fill is to be placed shall be scarified, and moistened as
necessary; thoroughly mixed; and compacted to not less than 95% of the maximum
dry density as determined by ASTM D 698 for cohesive materials. Granular soils that
exhibits no well-defined moisture-density relationship shall be compacted to 80%
relative density, as determined by ASTM 4253 and ASTM 4254.
23-10028-
JO/EWO
0001
C. Placing Fill: Fill materials shall be placed in successive horizontal lifts or layers not to
06/01/22
exceed 300 mm in depth before compaction. Each layer, before starting the next,
DATE
shall be levelled and smoothed by means of power driven graders, bulldozers or other
suitable equipment. Hauling and spreading equipment shall be operated over the full
NO.
REV
00
DISCIPLINE
width of each layer. Stones greater than 80 mm maximum size shall be removed
ENGINEER from the top surface of any embankment prior to compaction.
DATE:
D. Compaction: Each layer of fill material shall be moistened or dried to a uniform
PROJECT
ENGINEER moisture content suitable for maximum compaction and then thoroughly compacted
by rolling with tamping or pneumatic tired rollers or through wheel power rollers. At
DATE: least one roller shall be operated continuously for each 100 cu.m, or fraction thereof,
CERTIFIED
per hour. When several embankments, each of small area, are so isolated from each
other that one roller cannot compact them satisfactorily, additional rollers shall be
DATE:
CONSTRUCTION
provided. All fills shall be compacted to 95% of the maximum density as determined
AGENCY by ASTM D 698 for cohesive materials. For cohesion less free draining soils, 70%
relative density as determined by ASTM 4253 and ASTM D 4254 shall be used.
DATE:
OPERATIONS
E. Drainage: Good drainage shall be maintained at all times and ponding of water on
the fill shall be prevented.
DATE:
CONTROL NUMBER
F. Borrow Pit: Borrow pits shall be established and maintained. Prior to importing
VERIFICATION
borrow materials and/or transporting fill material to Work site areas requiring fill, Saudi
EDSD
Aramco Representative reserves the right to inspect and test the fill material for
DATE:
conformity with the Specifications. Fill material which does not meet the requirements
BY:
of Specifications shall not be used and, if on the Work site, shall be removed from the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
G. If dune sand is used for fill, surface protection will be required. A cap layer of
compacted cohesive material 150 to 300 mm (6 to 12 in) in thickness generally is
sufficient. Capping material shall have a maximum size of one-half lift thickness, and
ENGG CERT
shall have between 11-35% passing the No. 200 sieve. The capping material shall
have a maximum liquid limit of 35 and maximum plasticity index of 12, per ASTM
D4318. Final slopes shall be protected from erosion.
A. Methods: To verify that the specified degree of compaction has been achieved,
Contractor shall perform in-place density tests ASTM D 1556, D 2922. Tests shall be
DESCRIPTION
made after compaction of each lift of fill regardless of size and performed at least one
Issued for IFC
B. Number of Tests: For projects with less than 3820 cu.m fill, at least one in-place
density test shall be made for every 382 cu.m of compacted soil. For projects in
excess of 3820 cu.m and where consistent compaction results can be achieved, the
frequency of testing can be reduced to one test for every 1530 cu.m of compacted
soil. During the progress of Work, Saudi Aramco Representative may require
additional tests in order to verify the degree of compaction.
23-10028-
JO/EWO
0001
3.04 Tolerance
06/01/22
A. Fill shall be placed and compacted to the grades shown on the Drawings to within a
DATE
00
DISCIPLINE
fill slopes if approved by Saudi Aramco Representative.
ENGINEER
DATE:
PROJECT
ENGINEER - END OF SECTION -
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02210
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 2 - Products
0001
Part 3 - Execution
06/01/22
3.01 Excavation
DATE
00
DISCIPLINE
3.04 Placing Warning Tape and Concrete Tile for Utilities System
ENGINEER 3.05 Reinstatement
3.06 Compaction Testing
DATE:
PROJECT
ENGINEER
PART 1 - GENERAL
DATE:
CERTIFIED
1.01 Description
DATE:
CONSTRUCTION
A. Work in this Section includes, but is not limited to; trenching, excavation, dewatering,
AGENCY backfilling and compacting for utility lines; storage tank; cables; removal and disposal
of excess excavation material and importing required bedding and fill material,
DATE:
installation of cable tiles and warning tapes, boards and posts.
OPERATIONS
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.03 Reference Standards
2. ASTM D 1556: Test Method for Density and Unit Weight of Soil in place by
the Sand-cone Method.
3. ASTM D 2922: Test Methods for Density of Soil and Soil-Aggregate in place
DESCRIPTION
4. ASTM D 4253: Test Method for Maximum Index Density and Unit Weight of
Soils Using a Vibratory Table.
5. ASTM D 4254: Test Methods for Minimum Index Density and Unit Weight of
Soils and Calculation of Relative Density.
1.04 Submittals
23-10028-
JO/EWO
0001
project.
NO.
REV
00
DISCIPLINE
ENGINEER PART 2 - PRODUCTS
DATE:
2.01 Bedding Materials
PROJECT
ENGINEER
A. Clean Sand: Clean Sand shall consist of natural sand, manufactured sand, or a
DATE: combination thereof and shall conform to requirements of fine aggregates specified in
CERTIFIED
ASTM C33, Standard Specification for Concrete Aggregate.
DATE:
CONSTRUCTION
B. Gravel: Gravel shall consist of clean, hard and durable particles or fragments free
AGENCY from dirt, vegetation and other objectionable matter. Gravel shall be either well
graded (with a gradation as per Section 02513, paragraph 2.05, Class B, hot asphalt
DATE:
surface course) or uniformly graded, with a particle size of 13 mm.
OPERATIONS
A. Selected Backfill Material: For backfilling, the material shall be selected fill material as
VERIFICATION
DATE:
B. Fill Material: For backfilling the remainder of trenches use on-site excavated fill or
BY:
imported fill material free of stones larger than 150 mm or one-half the lift thickness
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Fill Material for Structural Concrete Members: Based on soil chemical analysis of
Geotechnical Investigation Report, the type of concrete used shall be finalized
accordingly.
ENGG CERT
A. Electrical Warning Tape: PVC yellow warning tape 450 mm wide, 0.15 mm thick with
black lettering in Arabic and English stating "Caution, Buried Electrical Cables".
B. Electrical Cable Tile: Red calcium silicate or concrete tile, size 400 mm x 200 mm x
50 mm.
DESCRIPTION
C. Telephone warning Tape: PVC orange warning tape 152 mm wide, 0.203 mm thick
with black lettering in Arabic and English stating "Caution, Buried Telephone Cables".
PART 3 - EXECUTION
3.01 Excavation
23-10028-
JO/EWO
0001
A. Excavated material shall be directly placed to dump trucks, transported away from
06/01/22
00
DISCIPLINE
B. Unclassified Excavation: Contractor shall perform excavation as indicated on the
ENGINEER plans and standard details in whatever material encountered. All excavations for
structures, utility pipes, appurtenances or cables shall be made to such an extent that
DATE:
will provide sufficient space to work conveniently around the structure or pipe to be
PROJECT
ENGINEER installed.
E. Bracing and Shoring: For excavation of 1.2 m or deeper, the sides of pits and
VERIFICATION
trenches shall be sloped back to a safe angle of repose. Excavations shall not be
EDSD
sloped at an angle greater than one and one-half horizontal to one vertical (34o
DATE:
measured from the horizontal). Excavation which cannot be sloped and are 1.2 m in
BY:
depth or deeper, or when soil banks are greater than 1.5 , shall be provided with
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
suitable shoring.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
F. Drainage and Dewatering: To ensure proper drainage conditions throughout
construction, the Contractor shall provide and maintain devices (including spares) to
intercept, remove promptly and properly dispose of all water entering the excavation
ENGG CERT
Monitoring plan shall include, but shall not be limited to, installation of piezometers
and continuous inspection of the existing facilities. All excavation and trenches shall
be kept dry until the structures, pipes and appurtenances to be built/installed are
completed.
0001
Aramco Representative.
06/01/22
H. Excavation Below Duct Bank: Contractor shall provide structural support to hold
DATE
existing and or constructed electrical power, telephone, traffic signal and street
lighting cables ductwork.
NO.
REV
00
DISCIPLINE
ENGINEER 3.02 Structure Fill and Backfill
DATE:
A. Backfilling compaction around and beneath concrete foundation shall have a
PROJECT
ENGINEER minimum of 70% relative density as defined by ASTM D 4254 (for cohesionless
materials) or 95% of the maximum density as determined by ASTM D 698 (for
DATE: cohesive materials).
CERTIFIED
B. Fill and backfill under structures and concrete pavements adjacent to structures shall
DATE:
CONSTRUCTION
be select fill as per Section 02200 Earthwork, or coarse aggregate and fine aggregate
AGENCY when indicated or specified for use under structures, and conforming to requirements
for coarse and fine aggregate specified under Section 03300 Cast-In-Place Concrete.
DATE:
OPERATIONS
C. Place fill and backfill materials in layers not exceeding 15 cm in thickness after
compaction. Unless otherwise indicated or specified, each layer shall be compacted
DATE: to the density as specified in A. above.
CONTROL NUMBER
VERIFICATION
D. Do not place backfill against or on structures until they have attained sufficient
EDSD
strength to support the loads (including construction loads) to which they will be
DATE:
subjected, without distortion, cracking, or other damage. Provide special leak tests, if
BY:
required, as soon as practicable after structures are structurally adequate and other
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
necessary work has been done. Start backfilling promptly after completion of tests.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
E. The sides of all concrete foundations shall be coated with thin film of epoxy primer
sealer followed by filler and three coats of Bituminous paint prior to backfilling. Before
coating, concrete surfaces must be well cured and dry. Concrete shall be allowed to
ENGG CERT
A. Preparation of Trench Bottom: The bottom of the trench shall be free of rock, sharp
debris or foreign matter that could cause damage to pipes, cables or other new
construction. Where subgrade consists of Subkha, provide a foundation layer of 150
mm thick well graded and compacted crushed stone with 38 mm maximum size.
DESCRIPTION
B. Placement of Bedding Material: Cables, UPVC, CPVC, HDPE, ductile iron, FRP and
RTR pipes, except as specified in C. below shall be laid on a ground bed consisting of
a layer of clean sand (150 mm) compacted to 70% relative density ASTM D 4254
unless otherwise noted on the Drawings.
The bed shall be compacted uniformly to provide even bearing for pipes. After pipes
have been laid, tested and approved, fill equally on both sides of the pipe and
periodically compact to maintain equal pressure on the pipe. Backfilling shall be done
in 110 mm lifts or half the pipe diameter whichever is less until a depth of 300 mm of
23-10028-
JO/EWO
0001
C. Backfill at Trenches: Place the select fill material above pipe zone thereon and build it
DATE
00
DISCIPLINE
layers to exceed 200 mm in thickness before compaction. Compact each layer of
ENGINEER material by the use of rollers or other means so as to secure a dense, stable and
thoroughly compacted mass. Where mobile mechanical equipment cannot be used,
DATE:
compact the materials thoroughly by the use of power-driven tampers.
PROJECT
ENGINEER
Duct banks shall be placed after all utilities underneath the duct banks have been
DATE: installed and backfill has been compacted to the required density. Contractor shall
CERTIFIED
provide shop drawings, compaction methods and method statement for duct bank
construction. If duct bank are to be installed before other utilities, Contractor shall
DATE:
CONSTRUCTION
justify the reason and obtain prior approval from Saudi Aramco Representative to
AGENCY install duct banks prior to other utilities.
DATE:
"Select Fill Material" as specified in Section 02200, Earthwork, shall be used within
OPERATIONS
0.60 m of the bottom of pavement subbase, base course, foundations and slabs-on-
grade.
DATE:
CONTROL NUMBER
E. Compaction: Cable or pipes shall be bedded and filled all (unless otherwise indicated
VERIFICATION
in the Drawings) around with compacted backfill materials to the dimension indicated
EDSD
in typical trench details, having a minimum 70% relative density per ASTM D 4254 or
DATE:
95% of the maximum density per ASTM D698. Using a machine compactor or hand
BY:
tamping, in traffic areas the remaining backfill material shall be compacted to 70%
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
relative density per ASTM D 4254 for cohesionless material. This shall be consistent
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
with 95% of the maximum density as determined by ASTM D 698 for cohesive soil.
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
F. Backfill surrounding manholes, valve chambers, inspection boxes, and other utility
appurtenances shall be done similar to filling above pipes, in layers not exceeding
150 mm till a level of 300 mm above pipe (pipe zone) and in layers not exceeding 300
ENGG CERT
mm above the pipe zone; all layers in pipe zone shall be compacted by manual
tamping boards and above pipe zone using ramming-compactors or plate
compactors.
3.04 Placing Warning Tape and Concrete Tile for Utilities System
A. Place continuous PVC warning tape, boards and/or concrete tile as specified in the
Drawings for all utilities.
DESCRIPTION
3.05 Reinstatement
A. To install pipe, cable or conduits under existing pavement, Contractor shall saw cut
pavement with setback minimum 400 mm beyond the limit of damage on either sides
of trench as applicable for the area and restore it back to condition consistent or better
from the original conditions.
0001
A. Method and Frequency: To verify that the specified degree of compaction has been
achieved Contractor shall perform in-place density test in accordance with ASTM
06/01/22
D1556, D2922 after compaction of each lift of fill. Perform at least one in-place
DATE
density test for every 400 cu.m of compacted soil in fill areas and at a frequency of
one test per 30 m along pipe trenches or as directed by Saudi Aramco
NO.
REV
00
DISCIPLINE
Representative. Spacing between all test locations shall be approximately equal.
ENGINEER
B. Extra Test: Shall the work in question fail to meet the densities, Contractor shall
DATE:
perform remedial work as required and re-test in accordance with Paragraph A, at no
PROJECT
ENGINEER cost to Saudi Aramco.
DATE:
CERTIFIED
- END OF SECTION –
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02231
ENGG CERT
GEOTEXTILE
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 2 - Products
2.01 Geotextile
Part 3 - Execution
23-10028-
JO/EWO
0001
3.01 Placement
06/01/22
DATE
PART 1 - GENERAL
NO.
REV
00
DISCIPLINE
1.01 Description
ENGINEER
A. Work in this Section includes, but is not limited to; the furnishing and placement of
DATE:
geotextile as a filter layer for gravel trench drain.
PROJECT
ENGINEER
A. ASTM D 5261 or EN 965, Test Method for Measuring Mass Per Unit Area of
DATE:
Geotextiles.
OPERATIONS
C. ASTM D 4632 and EN ISO-10319, Test Method for Grab Breaking Load and
EDSD
Elongation of Geotextiles.
DATE:
BY:
D. ASTM D 4751, Test Method for Determining Apparent Opening Size of a Geotextile.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.04 Submittals
A. A sample of the geotextile along with certifications that the physical requirements of
ENGG CERT
these specifications have been met shall be submitted for approval by Saudi Aramco
Representative.
PART 2 - PRODUCTS
2.01 Geotextile
DESCRIPTION
A. The geotextile felt shall be of 100% polypropylene needle punched, non-woven type.
Issued for IFC
1. A mass per unit area (weight) of 250 g/m2 in accordance with ASTM D 5261
or EN 965.
0001
00
DISCIPLINE
ENGINEER 6. Strip Tensile Strength (CD) of minimum 14KN/m in accordance with EN
29073-3.
DATE:
PROJECT
ENGINEER 7. A minimum permeability of 0.25 cm/s in accordance with ASTM D 4491.
DATE:
CERTIFIED
PART 3 - EXECUTION
DATE:
CONSTRUCTION
3.01 Placement
AGENCY
C. The time lag between installation of the geotextile and installation of the cover
VERIFICATION
DATE:
manufacturers recommendations.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
E. All tears, punctures, seam separation, or other damage shall be promptly corrected.
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
F. The geotextile must not be damaged during installation or during the placement of the
aggregate on or adjacent to the geotextile.
ENGG CERT
G. The geotextile must not form an artificial slip plane. A high degree of flexibility and
elongation is therefore required to provide interlocking of the geotextile/aggregate
system.
- END OF SECTION –
DESCRIPTION
0001
06/01/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02444
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Definitions
DESCRIPTION
Part 2 - Products
Part 3 - Execution
23-10028-
JO/EWO
0001
3.01 Installation
06/01/22
DATE
PART 1 - GENERAL
NO.
REV
00
DISCIPLINE
ENGINEER 1.01 Definitions
DATE:
A. Work in this Section includes, but is not limited to; furnishing and erecting of vinyl-clad
PROJECT
ENGINEER galvanized chain link fence and gates; as indicated in the drawings.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.04 Submittals
A. Shop and erection drawings of fence and gates, and manufacturer's recommended
ENGG CERT
PART 2 - PRODUCTS
A. Fence and gates shall be as shown on the Drawings. All metallic fencing materials
Issued for IFC
like wire fabric, top and bottom tension wires, tie wire, posts, winding bracket,
stretcher bar, supports, gates, hinges, truss rod and all other hardware shall be
galvanized unless otherwise defined.
2.02 Concrete
A. Concrete for post anchor foundations, plunger rod catch, gate holder, etc. shall be
in accordance with Section 03300 Cast-In-Place Concrete.
23-10028-
JO/EWO
0001
PART 3 - EXECUTION
06/01/22
DATE
3.01 Installation
NO.
REV
00
DISCIPLINE A. Install new fences and gates in accordance with the construction drawings.
ENGINEER
DATE:
PROJECT
ENGINEER
- END OF SECTION -
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02480
ENGG CERT
LANDSCAPING
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 2 - Products
23-10028-
JO/EWO
0001
2.01 Materials
06/01/22
Part 3 - Execution
DATE
3.01 Inspection
NO.
REV
00
DISCIPLINE
3.02 Preparation of Planting Soil
ENGINEER 3.03 Preparation of Planted Areas
3.04 Preparation of Planting Beds
DATE:
3.05 Installation
PROJECT
ENGINEER 3.06 Maintenance of Planted Areas
3.07 Clean-Up, Protection and Acceptance
DATE:
CERTIFIED
PART 1 - GENERAL
DATE:
CONSTRUCTION
AGENCY 1.01 Description
DATE:
A. Work in this Section includes, but is not limited to; the furnishing, installation, and
OPERATIONS
short-term maintenance of sweet sand.
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. Furnishing and spreading new topsoil.
ENGG CERT
A. Standard: Comply with the applicable provisions of the following standards and
23-10028-
JO/EWO
0001
00
DISCIPLINE
sizes.
ENGINEER
C. The landscape supervisor shall have a minimum of seven (7) years experience in
DATE: landscape Work similar to the Work of this project and three (3) of which shall have
CERTIFIED
been in a supervisory capacity.
DATE:
CONSTRUCTION
1.04 Submittals
AGENCY
A. Product Certification:
DATE:
OPERATIONS
1. Submit certificates of inspection as may be required to accompany shipments.
For standard products, submit the manufacturer's certified analysis. For other
DATE: materials, submit analysis by a recognized laboratory made in accordance
CONTROL NUMBER
wherever applicable.
EDSD
DATE:
B. Topsoil Report:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
1. General: Before delivery of all topsoil, furnish Saudi Aramco with a written
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
statement giving the location of the properties from which the topsoil is to be
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
obtained, the names and addresses of the owners, the depth to be stripped
and the crops grown during the past 2 years, if any.
ENGG CERT
2. Planting Beds and Pits: Before delivery of topsoil, furnish soil analysis made
by an approved soil testing laboratory stating the percentages of silt, clay,
sand and organic matter, the pH and the mineral and plant nutrient content of
the topsoil.
3. The soil analysis shall also include requirements for fertilizers and other
amendment which when mixed with the sweet sand soil mixes will provide the
specific nutrient levels specified (see para 2.01 - C).
DESCRIPTION
D. Maintenance Schedule:
0001
2. Written instructions for maintenance and care of the plants for three (3) years.
06/01/22
DATE
00
DISCIPLINE
A. Contractor is responsible for the procurement, acceptance and shipping of the plant
ENGINEER material from a nursery approved by Saudi Aramco .
DATE:
B. Contractor is responsible for inspecting the plant material and ensuring it's conformity
PROJECT
ENGINEER to specification requirements.
DATE: C. Contractor shall dig and prepare all plants for transport according to Section 1.06 - A-
CERTIFIED
1.
DATE:
CONSTRUCTION
D. Contractor shall care for the plant material during shipment according to Section 1.06-
AGENCY A-2 through A-4.
DATE:
1.06 Delivery, and Handling of Plants
OPERATIONS
prepared, and packed with care and skill, in accordance with recognized
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
Tarpaulins or other cover shall be placed over plants when they are
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3. Root systems of plants shall not be permitted to dry out at any time and shall
not be exposed to excessive heat.
ENGG CERT
B. On-site Storage of Plants: all plant material shall be properly protected against injury
at all times. Plants which are not planted or which are not to be planted immediately
shall be given special protection as follows:
DESCRIPTION
1. All plants shall be protected from excessive heat or cold and stored in an
Issued for IFC
approved well ventilated and shaded place, protected from wind and sun.
1. Sand shall be thoroughly protected from salts and drying out during storage.
Compaction and molding of stored sand shall not exceed depths of 1500 mm.
0001
name of trademark and warranty of the producer and shall be protected form
becoming wet during storage and shall be stored in shade.
06/01/22
DATE
00
DISCIPLINE
during storage and shall be stored in shade.
ENGINEER
4. Composed sewage sludge, peat moss, or other approved organic matter shall
DATE:
be delivered to the site in manufacturer's fully identified unopened containers
PROJECT
ENGINEER and shall be protected from becoming wet during storage and shall be stored
in shade.
DATE:
CERTIFIED
1.07 Job Conditions
DATE:
CONSTRUCTION
A. Planting Time:
AGENCY
warranted.
EDSD
DATE:
1.08 Guarantee
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
A. From the Mechanical Completion date, a 90 day maintenance period shall begin.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
During this period the Contractor is responsible for maintaining the planting and
(DCC) NO. _____________________
landscaping.
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. At the end of the 90 day maintenance period, the Contractor and Saudi Aramco shall
conduct a final maintenance review. All noted dead, dying or diseased plants as
ENGG CERT
C. When the Work is accepted in part, the guarantee periods extend from each of the
partial acceptance to the terminal date of the last guarantee period. Thus, all
guarantee periods terminate at one time.
D. The Contractor shall replace, without cost to Saudi Aramco, and within a specified
DESCRIPTION
planting period, all dead landscape materials and all landscape material not in
Issued for IFC
E. The Contractor shall make all necessary repairs due to landscape material
replacements. Such repair shall be done at no extra cost to Saudi Aramco.
23-10028-
JO/EWO
0001
PART 2 - PRODUCTS
06/01/22
DATE
2.01 Materials
NO.
REV
00
DISCIPLINE
A. Plants:
ENGINEER
1. All plants provided by the Contractor shall be free from pests and diseases
DATE:
and be representative of their normal species or variety. All plants shall have
PROJECT
ENGINEER well branched heads and vigorous root systems and shall be injury free. Only
nursery grown plants shall be used, unless otherwise specifically noted on the
DATE: Drawings or in these Specifications.
CERTIFIED
2. Plants shall be true in botanical name and one plant of each lot shall be
DATE:
CONSTRUCTION
tagged with the name and size of plants in accordance with the standards of
AGENCY practice of the American Association of Nurserymen. In all cases botanical
names shall take precedence over common names. Plants shall be as
DATE:
specified in the Plant Schedules.
OPERATIONS
B. Planting Soil Mix: Planting soil mix for planting operations shall contain the following
DATE: ingredients as a percentage of volume, thoroughly admixed with fertilizers.
CONTROL NUMBER
VERIFICATION
1. Sand: 75%
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Nitrates: Less than 75 ppm in saturation
extract.
ENGG CERT
Potassium: 100-400 ppm in 1.5 ammonium nitrate extractant: 1/2 hour shake.
C. Sand (Sweet Sand): Sand shall be from an approved source and shall be free of
weeds, stones or other foreign matter. Surface crusts and gypsiferous accumulations
DESCRIPTION
saturation extract.
6. Exchangeable sodium : Less than 15% in neutral
06/01/22
DATE
00
DISCIPLINE
nitrates extractant: 1/2 hour
ENGINEER shake.
DATE:
8. Boron : Less than 1.0 ppm, hot water
PROJECT soluble.
ENGINEER
9. Sodium absorption ratio : Less than 5
DATE: (SAR)
CERTIFIED
10. Physical Characteristics Loamy sand made up by
particle size as follows:
DATE:
CONSTRUCTION Sand 2 mm-0.05 mm 85%
AGENCY
minimum
DATE: Silt 0.05 mm - 0.002 mm 10 %
OPERATIONS minimum
: Clay less than 0.002 mm 5%
DATE: maximum
CONTROL NUMBER
VERIFICATION
At the discretion of the Contractor a green manure crop may be grown on stored sand
EDSD
D. New Topsoil:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1. Topsoil to be furnished by the Contractor shall consist of loose, friable, sandy
loam free of admixture of subsoil, refuse, stumps, roots, rocks, brush, weeds,
or other material which would be detrimental to the proper development of
ENGG CERT
vegetative growth. The minimum and maximum Ph value shall be 6 and 7.5
respectively.
1 in. 100
1/4 in. 97-100
No. 10 80-100
23-10028-
JO/EWO
0001
Particle Sizes:
06/01/22
DATE
00
DISCIPLINE
Clay 0.2 mm or less
ENGINEER
Ratio:
DATE:
PROJECT
ENGINEER Sand 85%
Silt 10%
DATE: Clay 5%
CERTIFIED
DATE: F. Soil Sulfur: Soil sulfur(s) shall be powdered, natural sulfur, commercially prepared for
CONTROL NUMBER
agricultural use and application. It shall be at least 99% pure. Sulfur shall be supplied
VERIFICATION
in a closed damp proof container or bag with the manufacturer's label giving chemical
EDSD
G. Fertilizer:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1. Superphosphate: Soluble mixture of phosphates obtained from treated
mineral phosphates with a minimum amount of 20% available phosphoric
acid.
ENGG CERT
c. For trees and shrubs, provide fertilizer with not less than 10%
23-10028-
JO/EWO
0001
d. For lawns and ground covers, provide fertilizer with not less than 4%
phosphoric acid and not less than 2% potassium, and the percentage
NO.
REV
00
DISCIPLINE
of nitrogen required to provide not less than 0.5 kg. of actual nitrogen
ENGINEER per 100 sq. m of lawn area. Provide nitrogen in a form that will be
available to the lawn during the initial period of growth. Apply to
DATE:
topsoil mix at rate of 1 kg/sq.m.
PROJECT
ENGINEER
H. Water: Water used in planting or care of vegetation shall be free from oils, acids,
DATE:
CONSTRUCTION
alkalis, salts, or any substance injurious to plant life.
AGENCY
I. Trees Stakes: Tree stakes shall be 50 x 75 x 600 wood. Stakes shall extend
DATE:
minimum of 300 mm into undisturbed site soil. Tree shall be fastened to stakes using
OPERATIONS
No. 10 galvanized tie wire attached through a holed drilled in the stake. Wire shall be
covered with 2 ply reinforced rubber or plastic hose (green color) at least 12.5 mm
DATE: diameter at tree trunk.
CONTROL NUMBER
VERIFICATION
J. Jute Mesh: Jute mesh shall be of a uniform, plain weave with warp and weft yarns of
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Range in Weight of Cloth: 1.80 lb (average) per running yard with a 5% minimum
tolerance to 1.22 lb (average) per running yard with a 5% minimum tolerance at
standard atmospheric conditions.
ENGG CERT
2. Subsurface Drainage Gravel: Clean round stones shall meet the following
gradation requirements: 25 mm to 50 mm.
0001
00
DISCIPLINE
the vigors of construction. The polyethylene plastic shall be 50% recycled with UV
ENGINEER inhibitors and are 0.085 in. thickness. Panels feature ninety-degree root-deflecting
ribs that are 6 inch apart and self-inter locking panel to panel connections to
DATE:
eliminates joiner strips and gluing. As well as being a root-impervious the root panels
PROJECT
ENGINEER shall direct roots downward to prevent damage to surrounding hoodscaps and
landscaps.
DATE:
CERTIFIED
Root barrier panels shall be manufactured by Century Products, Inc. Orange,
California or approved equal.
DATE:
CONSTRUCTION
AGENCY
PART 3 - EXECUTION
DATE:
OPERATIONS
3.01 Inspection
DATE: A. Examine the subgrade upon which Work is to be performed, verify subgrade
CONTROL NUMBER
elevations and observe the conditions under which Work is to be performed. Do not
VERIFICATION
proceed with the Work until unsatisfactory conditions have been corrected.
EDSD
DATE:
B. Determine location of underground utilities and perform Work in a manner which will
BY:
avoid possible damage. Do not permit heavy equipment such as trucks, rollers or
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.02 Preparation of Planting Soil
A. Mix specified soil amendments and fertilizers with topsoil at the rate of 2 parts loam to
ENGG CERT
1 part peat moss to obtain required planting soil mixture. Delay mixing of fertilizer if
planting will not follow placing of planting soil within 3 days.
B. For pit and trench type backfill, mix planting soil prior to backfilling and stockpile at the
site.
C. For bed type planting, thoroughly mix planting soil prior to placement or mix within
excavated bed area.
DESCRIPTION
A. The Contractor shall notify Saudi Aramco at least 5 days before he intends to start
topsoil spreading, planting, and related landscape operations.
B. Whenever slope areas to be top-soiled are steeper than 3:1, these slopes shall be
disked or scarified parallel to the contours and to a depth of 150 mm prior to placing
topsoil.
23-10028-
JO/EWO
0001
C. All areas to be seeded (for lawn or other plant seeding) shall be treated with gypsum
and sulfur at the following rates prior to disking:
06/01/22
DATE
00
DISCIPLINE
ENGINEER Gypsum and sulfur shall be worked into the subgrade surface by disking prior to the
placement and spreading of any soil mix or sweet sand to lines, grades and depth
DATE:
shown on the Drawings.
PROJECT
ENGINEER
Work gypsum and sulfur into the 150 mm deep loosened subgrade.
EDSD
DATE:
stones)
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
potable water prior to backfilling and shall be performed for two days at rates
(DCC) NO. _____________________
of 80 mm per day.
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. After preparation of pit subgrade apply sand and planting soil mix. All
irrigation equipment shall be laid above the membrane.
ENGG CERT
6. For excavation of plant pits in hard rock or in areas with hard, rocky or
compacted soil, excavate the plant pits two times the require pit width and one
and one half the required pit depth. Scarify the sides and bottom of the pit.
DESCRIPTION
this section.
A. Prepare planting beds during the planting period and when ground is relatively dry.
B. Loosen subgrade of planting bed areas to a minimum depth of 150 mm (6 in.) using a
cultivator/mulcher or similar equipment. Remove stones over 38 mm (1-1/2 in.) in any
dimension, and rubbish, and other extraneous matter.
23-10028-
JO/EWO
0001
150 mm (6 in.) and remove all stone, rock or foreign matter exceeding 38 mm
DATE
00
DISCIPLINE
ENGINEER Gypsum 5.0 kg/m2.
Sulfur 0.2 kg/m2
DATE:
PROJECT
ENGINEER Work gypsum and sulfur into the 150 mm deep loosened subgrade.
DATE: If water Table is within 1.0 m of pit bed use aggregate (25 mm to 50 mm stones).
CERTIFIED
D. Spread planting soil mixture to the minimum depth required to meet lines, grades, and
DATE:
CONSTRUCTION
elevations shown, after light rolling and natural settlement. Place approximately 1/2
AGENCY of the total amount of planting soil required. Work into the top of the loosened
subgrade to create a transition layer, and then place the remainder of the planting
DATE:
soil.
OPERATIONS
3.05 Installation
DATE:
CONTROL NUMBER
A. General:
VERIFICATION
EDSD
1. Proceed with and complete the landscaping Work as portions of the site
DATE:
become available, working within the seasonal limitations for each kind of
BY:
planted material.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
2. Planting Period: The Contractor shall submit his planting schedule for plants
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
exceeding 8 km/hr) or when the ground is excessively wet or otherwise
untillable.
ENGG CERT
3. Cooperate with other trades working in and adjacent to the landscape work
area. Examine drawings which show the development of the entire site and
become familiar with the scope of work required.
4. Place gravel beds where shown. Compact soil subgrades before placing
gravel unless otherwise noted. Fill or remove excess as necessary to bring
thickness of bed as shown to required elevation.
DESCRIPTION
practices:
1. Plants shall be set plumb and at such a level or elevation that after settlement
they will bear same relation to level of surrounding ground as they bore to
ground from which they were dug. All plants shall be planted on and in soil
mix. The soil mix will be properly compacted before the placement of trees
with a heavy root ball.
0001
eliminate air voids around the roots and watered regularly as required for the
plants to become established.
06/01/22
DATE
00
DISCIPLINE
1. Space plants as shown on the Drawings.
ENGINEER
2. Dig holes large enough to allow for spreading of roots and backfill with
DATE:
planting soil.
PROJECT
ENGINEER
3. Work soil around roots to eliminate air pockets and leave a slight saucer
DATE: indentation around plants to hold water.
CERTIFIED
4. Water thoroughly after planting, taking care not to cover crowns of plants with
DATE:
CONSTRUCTION
wet soils.
AGENCY
5. Protect from hot sun and wind for several days. Remove protection when
DATE:
plants show evidence of recovery from transplanting shock.
OPERATIONS
DATE:
1. After Saudi Aramco Representative has approved graded areas, topsoil shall
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
elevation which, after settlement, will provide the nominal elevation shown on
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
the Drawings.
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. Spreading shall not be done when the ground or topsoil is excessively wet or
in a condition detrimental to the Work.
ENGG CERT
4. After spreading has been completed, large clods, stones larger than one inch
and any roots, stumps, and other undesirable materials shall be raked up and
removed and disposed off at an approved location.
C. Periodically, remove weeds from planted areas, apply selective chemical weed killers
as required. Apply a bedding mulch, if required to maintain moist condition.
23-10028-
JO/EWO
0001
E. The Contractor shall be responsible for protecting and caring for areas. He shall
repair at his own expense any damage to planted areas caused by pedestrian and
NO.
REV
00
DISCIPLINE
vehicular traffic and other construction related causes.
ENGINEER
F. Before final acceptance of the project, Saudi Aramco may direct that supplemental
DATE:
applications of fertilizer, plants, mulch, and water be made to areas that were
PROJECT
ENGINEER previously planted.
A. During landscape Work, store materials and equipment where directed. Keep
DATE:
CONSTRUCTION
pavements clean and work area in an orderly condition.
AGENCY
B. Protect landscape Work from loss damage and deterioration during storage,
DATE:
installation and maintenance periods. Protect from unauthorized persons
OPERATIONS
(trespassers), as well as from operations by other tradesmen. Wherever possible,
replace the damaged work by treating or repairing the work to an acceptable
DATE: condition as directed by Saudi Aramco.
CONTROL NUMBER
VERIFICATION
C. Final Inspection: At the end of the guarantee period, Saudi Aramco shall inspect all
EDSD
work, upon written request of the Contractor. The request shall be received at least
DATE:
ten calendar days before the anticipated date for final inspection.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
- END OF SECTION -
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02513
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
1.02 Related Work
DESCRIPTION
Part 2 - Products
0001
Part 3 - Execution
06/01/22
DATE
00
DATE:
CONSTRUCTION
PART 1 - GENERAL
AGENCY
1.01 Description
DATE:
OPERATIONS
A. Work in this Section includes, but is not limited to; site grading, granular sub-base,
aggregate base course, prime coat, tack coat, asphalt concrete paving, sampling and
DATE: testing for the new construction (asphalt road travel lines and asphalted parkings
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.03 Reference Standards
A. Ministry of Transport, The Technical Administration for Roads and Ports - General
ENGG CERT
0001
Soils.
NO.
REV
00
DISCIPLINE
7. T 176 (latest edition) - Plastic Fines in Graded Aggregate and Soils by Use of
ENGINEER the Sand Equivalent Test.
DATE:
8. T 179 (latest edition) - Effect of Heat and Air on Asphalt Materials (Thin-film
PROJECT
ENGINEER oven test).
3. ASTM D 4254 - Test Method for Minimum Index Density and Unit Weight of
VERIFICATION
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PART 2 - PRODUCTS
A. General: Sub-base course material shall consist of mixture of gravel and stone
fragments with sand, silt and clay.
C. Gradation Requirements: Sub-base course material shall be gravel, mixed with fine
Issued for IFC
The combined materials shall consist of a mixture of well graded gravel or uniformly
graded from coarse to fine to conform to the following gradation requirements:
0001
1 in. - 55-85
DATE
00
DISCIPLINE
No. 4 35-70 30-60
ENGINEER No. 10 - 20-50
No. 40 - 10-30
DATE:
No. 200 0-15 5-15
PROJECT
ENGINEER
* If less than 30% of the sample is retained on a ¾ in. sieve use (ASTM
DATE: D1557). If 30% or more of the sample is retained on a ¾ in. sieve use
CERTIFIED
(AASHTO T180).
DATE:
CONSTRUCTION
D. Physical Requirements: Sub-base course aggregate shall conform to the following
AGENCY physical requirements:
DATE:
1. Loss of Magnesium Sulfate Soundness Test (ASTM C88):
OPERATIONS
2. Loss by Abrasion Test (ASTM C131 or ASTM C535)- 50% maximum for
DATE:
Classes A&B.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
E. CBR Ratio: When tested in accordance with ASTM D-1883, California Bearing Ratio,
after four days soaking, shall not be less than 25 for Class `A' and Class 'B' of the
ENGG CERT
A. General: All aggregates for base course shall consist of clean, tough, durable, sharp
angle fragments free of any excess of thin or elongated pieces, and reasonably free
of soft, disintegrated or decomposed stone, dirt, organic matter, shale, clay, clay lump
or other deleterious matter.
DESCRIPTION
B. Production: Crushed gravel or stone fragments for base shall consist of the product
obtained by crushing gravel that has first been screened in such a manner that not
less than 90% of the material to be crushed is retained on a one-quarter (1/4) in
sieve. The amount of crushing shall be regulated so that at least 80%, by weight, of
the pieces retained on the No. 4 sieve have at least one (1) mechanically fractured
face.
C. Aggregate Mix and Gradation Requirements: Base Course material shall be crushed
rock or crushed gravel, mixed with fine material consisting of quarry screening, or
23-10028-
JO/EWO
0001
The combined materials shall consist of a mixture of all aggregate uniformly graded
DATE
00
DISCIPLINE
AASHTO-Sieve % Passing % Passing
ENGINEER Class A Class B
DATE:
2-1/2 in. 100 -
PROJECT
ENGINEER 2- in. 90-100 -
1-1/2 in. 60-90 100
DATE: 1 in. 42-77 60-100
CERTIFIED
3/4 in. 35-70 55-85
1/2 in. 25-60 -
DATE:
CONSTRUCTION
No. 4 15-40 35-60
AGENCY No. 10 10-26 25-50
No. 40 5-15 15-30
DATE:
No. 200 2-9 8-15
OPERATIONS
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. Loss by Abrasion Test (ASTM C131 or ASTM C535)- 40% maximum for
Classes A&B.
ENGG CERT
3. Thin and Elongated Pieces, by Weight (larger than 1 in., thickness less than
1/5 length) - Maximum 5% for Classes A&B.
E. CBR Ratio: When tested in accordance with ASTM D-1883, California Bearing Ratio,
after four days soaking, shall not be less than 50 for Class `B' and 100 for Class 'A'.
0001
A. Liquid asphalt for tack coat shall be rapid curing type cutback grades RC-250
conforming to Ministry of Transport.
06/01/22
DATE
00
DISCIPLINE
A. Asphalt mixture: Asphalt shall be petroleum asphalt cement, grade 60-70
ENGINEER penetration, conforming to the requirements in the following table:
DATE:
General Requirements AASHTO Test Method
PROJECT
ENGINEER Grade 60-70 and Acceptable Limits
5 seconds percent of
VERIFICATION
original T 49 52 min.
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
Solubility in organic
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The asphalt shall be prepared by the refining of petroleum. It shall be uniform in
character and shall not foam when heated to 176.7 degrees C.
ENGG CERT
B. Mineral Aggregate:
1. Gradation: When tested according to ASTM C-117 and ASTM C-136, the
combined mineral aggregate shall conform to the following grading:
a. Class A:
0001
00
DISCIPLINE
b. Class B:
ENGINEER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Sand Equivalent
(ASTM D-2419) 50 minimum
Plasticity Index
ENGG CERT
Loss by Abrasion %
(ASTM C-131) 40% maximum
0001
A. The job-mix formula shall combine the mineral aggregates and asphalt in such
proportion as to produce a mixture conforming to the following composition limits by
NO.
REV
00
DISCIPLINE
weight in accordance with ASTM D2172 or ASTM D6307:
ENGINEER
Mix Item %
DATE:
PROJECT
ENGINEER Total Mineral Aggregates 93-96
Asphaltic Binder 4-7
DATE:
CERTIFIED
When tested according to the Marshall Method, the bituminous mixture shall conform
to the following requirements:
DATE:
CONSTRUCTION
AGENCY Characteristics Asphalt Base Surface
DATE:
Stability (kg) 700 min. 800 min.
OPERATIONS
Flow (mm) 2.4-5.0 2.4-4.0
stability by sub-merging
VERIFICATION
specimens in water at
EDSD
compared to stability
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Voids in total
mix % 3.0-7.0 3.0-5.0
ENGG CERT
B. Maximum Variation: Upon receiving the job-mix formula, approved by Saudi Aramco
Representative, Contractor shall adjust his plant to proportion the individual
aggregates, mineral filler and asphalt to produce a final mix that, when compared to
the job-mix formula, shall be within the following limits:
Tolerance
Material Sieve Size Asphalt Base Wearing
23-10028-
0001
½” + 5.0% + 6.0%
06/01/22
DATE
00
DISCIPLINE
ENGINEER No. 80 + 3% + 3%
DATE:
No. 200 + 1.5% + 1.5%
PROJECT
ENGINEER Asphalt Content + 0.4% + 0.4%
DATE:
CERTIFIED Submit asphalt mix design to Saudi Aramco Representative for review and approval
at least 30 days prior to use. The asphalt concrete shall be graded from a
DATE: Government approved batch plant.
CONSTRUCTION
AGENCY
C. The mixture temperature shall have a temperature between 139 degrees C and 163
DATE:
degrees C when it leaves the plant and shall be transported from the mixing plant to
OPERATIONS the point of use in pneumatic-tired vehicles having tight bodies, previously cleaned of
all foreign materials. The mixture shall be delivered on the road or surface to be
DATE:
paved, between the temperature of 139 degrees C and 163 degrees C.
CONTROL NUMBER
VERIFICATION
EDSD
PART 3 - EXECUTION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
A. Demolition and Existing Material Cuts: Existing asphalt, or other materials identified
OF THIS DRAWING IS COVERED, FOR ALL
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
commencement of subgrade cut/fill and asphalt overlay operation. Asphalt is to be
saw cut, providing clean, neat vertical edges that will provide a suitable surface for
matching of new asphalt.
ENGG CERT
B. Subgrade preparation: Contractor shall, as a part of the Work and prior to delivery of
materials for the sub-base course, prepare the roadbed surface including parking
areas by sprinkling, blading, rolling and lightly scarifying where necessary, until the
proper crown is obtained. When compacted and ready for sub-base course
construction, the roadbed shall be well compacted, smooth hard and uniform, all
irregularities having been bladed out and rolled smooth.
DESCRIPTION
C. Sub-grade Compaction: Subgrade shall be compacted to not less than 95% of ASTM
Issued for IFC
0001
A. Sub-Base Course Placement: Do not place any sub-base course material until the
06/01/22
Representative.
NO.
REV
00
DISCIPLINE
B. The sub-base course shall be compacted to not less than 95% of the maximum
ENGINEER laboratory density as determined by ASTM D-1557, Method D, or AASHTO- T180.
DATE:
C. Sub-Base Course Maintenance: Following the construction of the granular sub-base,
PROJECT
ENGINEER the compacted sub-base course shall be maintained by Contractor. Contractor shall
blade, broom and otherwise maintain the sub-base, keeping it free from raveling, and
DATE: other defects until such time as the other surface is applied. Water shall be applied at
CERTIFIED
such time and in such quantities as directed by Saudi Aramco Representative.
DATE:
CONSTRUCTION
3.03 Base Course Placement, Compaction and Maintenance
AGENCY
A. Base Course Placement: Do not place any base course material until the sub-base
DATE:
upon which it is to be placed has been approved by Saudi Aramco Representative.
OPERATIONS
B. The base course shall be compacted to not less than 100% of the maximum
DATE: laboratory density as determined by ASTM D-1557, Method D, or AASHTO- T180.
CONTROL NUMBER
VERIFICATION
C. Base Course Maintenance: Following the construction of the aggregate base, the
EDSD
broom and otherwise maintain the base, keeping it free from raveling, and other
BY:
defects until such time as the bituminous prime or other surface is applied. Water
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
shall be applied at such time and in such quantities as directed by Saudi Aramco
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
Representative.
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.04 Prime Coat Application
A. A prime coat consists of the initial application of liquid asphalt onto the surface of a
ENGG CERT
B. Cleaning Surface: Immediately before applying the bituminous primer material, the
surface shall be cleaned of all loose dirt and other objectionable materials with a
power broom, hand broom, or blower. If so ordered by Saudi Aramco Representative,
the surface shall be lightly bladed and rolled immediately prior to the application of the
bituminous material, in which case brooming or blowing will not be required. Saudi
Aramco Representative may order a light application of water, just before application
DESCRIPTION
C. Application: Prime coat shall be applied only when the surface to be treated is dry
and when the temperature in the shade is 8 degrees C and rising. Bituminous
material shall be applied by means of a distributor at a rate of 1.75 liters per sq.m and
at a temperature between 50 degrees to 80 degrees C. If the material is applied in
two lanes, there shall be an overlap of at least 200 mm. Any prescribed application
may be divided into two applications to prevent flowing of the surface and additional
bituminous material shall be applied where surface conditions indicate it is required.
23-10028-
JO/EWO
0001
D. Drying Time: The primed surface shall be kept free from all traffic and in a clean
condition pending placement of the covering asphaltic concrete pavement. A
06/01/22
minimum period of 24 hours shall be allowed for the absorption and curing of the
DATE
00
DISCIPLINE
3.05 Tack Coat Application
ENGINEER
A. 1. Concrete Surfaces: Tack coat shall be applied to all concrete surfaces that
DATE:
will be in contact with the asphalt pavement. Tack coat applications shall take
PROJECT
ENGINEER place prior to the paving operations and shall include contact surfaces of
concrete gutters and other drainage structures.
DATE:
CERTIFIED
2. Asphalt Surfaces: Tack coat shall be applied between the binder course and
the surface course; new and old asphalt surface, and vertical cut of adjacent
DATE:
CONSTRUCTION
to a new asphalt. If application of the surface is delayed by more than 3 days,
AGENCY or if dirt, sand or other impurities have contaminated the tack coat, then a new
tack coat shall be applied after the original one has been swept clean.
DATE:
OPERATIONS
B. Method of Application: The bituminous material shall be applied on the binder course
by means of a bituminous distributor at a maximum rate of 0.25 liters per sq.m or as
DATE: directed by Saudi Aramco Representative. A hand broom shall be used for
CONTROL NUMBER
application of the tack coat to concrete surfaces not covered by the bituminous
VERIFICATION
distributor.
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
with tarpaulins until unloaded, and unless it has a temperature of at least 139 degrees
(DCC) NO. _____________________
C.
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Placement and Compaction: Placement and compaction of the bituminous mixture
shall progress in sections not more than 90 m in length. The bituminous mixture shall
ENGG CERT
be spread, shaped and finished with the power machine with automatic adjustable
grade controlled by a ski or a straight line. The mixture shall be placed one-half width
or one traffic lane at a time. After the first width has been compacted, the second
width shall be placed, finished and compacted as specified for the first width. Do not
place asphaltic concrete when the atmosphere temperature is below 4 degrees C, nor
during fog, rain, wind or other unsuitable conditions.
C. Spreading: Spread material in a placement thickness so that after rolling the nominal
DESCRIPTION
thickness of the compacted bituminous material shall not be more than 80 mm per
Issued for IFC
D. Rolling: After a layer has been placed the full width, the surface shall be rolled.
Rolling shall be longitudinal, and shall commence at the outer edge of the road
overlapping it and progress towards the center. Rolling shall continue until the
surface is of uniform texture and degree of compaction is achieved, and is true to
grade and cross section. Under no circumstances shall the center of the surface
course be rolled first.
23-10028-
JO/EWO
0001
E. Asphalt Compaction Density: The requirement shall be equal to or greater than 96%
of the Marshall density of each day production.
06/01/22
DATE
F. Protection of Work: Protect those portions of curbs, manholes, valve boxes and other
structures, that will be visible upon completion of the project, from bituminous
NO.
REV
00
DISCIPLINE
material. Remove any bituminous material from asphalt fouled surfaces and clean
ENGINEER these surfaces to the satisfaction of Saudi Aramco Representative.
DATE:
3.07 Compaction Sampling and Testing
PROJECT
ENGINEER
APPROVAL/CERTIFICATION REQUIREMENTS,
- END OF SECTION -
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02515
ENGG CERT
SUBSECTION INDEX
PART 1 - GENERAL
1.01 Description
1.02 Quality Assurance
DESCRIPTION
1.03 Submittals
PART 2 - PRODUCTS
2.01 Materials
PART 3 - EXECUTION
0001
3.05 Joints
3.06 Concrete Finishing
NO.
REV
00
3.07 Curing
DISCIPLINE
ENGINEER 3.08 Repair and Protection
DATE:
PROJECT
ENGINEER PART 1 - GENERAL
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
A. Referenced Standards:
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1. American Concrete Institute (ACI): 301.
2. American Standard for Testing and Materials ASTM A185 - Specification for
ENGG CERT
1.03 Submittals
certifications as required in referenced sections for concrete work and joint fillers.
Issued for IFC
PART 2 - PRODUCTS
2.01 Materials
0001
00
DISCIPLINE
D. Welded Wire Fabric: ASTM A185; gauge, spacing, and dimensions as indicated on
ENGINEER the Drawings.
DATE:
E. Sub-base and backfill: Shall conform to requirements of Section 02200.
PROJECT
ENGINEER
DATE: A. Set forms to the required grades and lines, rigidly braced and secured.
CONTROL NUMBER
VERIFICATION
B. Check completed formwork for grade and alignment to the following tolerances:
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Clean forms after each use, and coat with form release agent.
D. Provide 0.15 mm (or 6 mil.) plasticized sheet vapor barrier beneath the concrete
ENGG CERT
foundation.
3.03 Reinforcement
A. Comply with the requirements of Section 03300 for mixing and placing concrete, and
Issued for IFC
as herein specified.
B. Do not place concrete until subgrade and forms have been checked for line and
grade. Moisten subgrade to provide a uniform dampened condition at the time
concrete is placed. Do not place concrete around structures or frames until they have
been brought to the required grade and alignment.
C. Place concrete in one course monolithic construction for the full width and depth of
walks.
23-10028-
JO/EWO
0001
prevent segregation of the mix. Consolidate concrete along the face of forms and
DATE
adjacent to transverse joints with an internal vibrator. Keep vibrator away from joint
assemblies, reinforcement, or side forms. Use only square-faced shovels for hand-
NO.
REV
00
DISCIPLINE
spreading and consolidation. Consolidate with care to prevent dislocation of
ENGINEER reinforcing and joint materials.
DATE:
E. Refer to Section 03300 for hot weather placing.
PROJECT
ENGINEER
3.05 Joints
DATE:
CERTIFIED
A. General
DATE:
CONSTRUCTION
1. Construct expansion, isolation, and contraction joints true-to-line with face
AGENCY perpendicular to surface of the walks.
DATE:
2. Construct transverse joints at right angles to the pavement centerline, unless
OPERATIONS
otherwise indicated.
DATE: 3. When the walkway is abutting existing walks, place transverse joints to align
CONTROL NUMBER
B. Contraction Joints:
DATE:
BY:
1. Provide contraction joints, to section the walkway and sidewalks into areas as
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
shown on the Drawings. Joints shall not be placed more than 6 meters apart
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(length or width). Locate joints exactly at the scoring pattern shown on the
(DCC) NO. _____________________
Drawings.
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. Construct weakened-plane joints to a depth equal to at least 1/4 the walkway
thickness, as follows:
ENGG CERT
b. Saw Cut Joints: Saw cut to width equal to 1/2 depth and fill with joint
filler.
DESCRIPTION
C. Construction Joints:
Issued for IFC
1. Place joints at the end of pours and at locations where placement operations
are stopped for a period of more than 1/2 hour, except where such pours
terminate at expansion joints.
2. Construct joints as shown on the Drawings or, if not shown, use standard
metal keyway-section forms.
0001
1. Provide premolded joint filler for expansion joints and isolation joints abutting
06/01/22
concrete paving and curbs, manholes, structures, walks, and other fixed
DATE
objects.
NO.
REV
00
DISCIPLINE
2. Locate expansion joints at approximately 24 meters on center for sidewalk
ENGINEER and each walkway lane, unless otherwise indicated. Subsequently, expansion
joints shall be placed not more than 30 meters apart.
DATE:
PROJECT
ENGINEER 3. Extend joint fillers full width and depth of the joint, and not less than 12 mm or
more than 25 mm below the finished pavement surface where joint sealer is
DATE: indicated.
CERTIFIED
4. Use joint fillers in one-piece lengths for the full width being placed, wherever
DATE:
CONSTRUCTION
possible. Where more than one length is required, lace or clip joint filler
AGENCY sections together.
DATE:
5. Protect the top edge of the joint filler during concrete placement with a metal
OPERATIONS
cap or other temporary material. Remove protection after both sides of joint
are placed.
DATE:
CONTROL NUMBER
E. Fillers and Sealants: Comply with the requirements of Sections 07100 and 07920 of
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. After striking off and consolidating concrete, smooth the surface by screeding and
floating. Adjust the floating to compact the surface and produce a uniform texture.
ENGG CERT
C. After floating, test surface for trueness with a 3-meter straightedge. Distribute
concrete as required to remove surface irregularities, and refloat repaired areas to
provide a continuous, smooth finish.
E. After completion of floating and when excess moisture or surface sheen has
disappeared, complete surface finishing, as follows:
DESCRIPTION
F. Leave forms in place for at least 24 hours after concrete has been placed. After form
removal, clean ends of joints and point-up any minor honeycombed areas. Remove
23-10028-
JO/EWO
0001
3.07 Curing
DATE
A. Protect and cure finished concrete walks complying with applicable requirements of
NO.
REV
00
DISCIPLINE
Section 03300.
ENGINEER
B. Use moist-curing methods for initial curing whenever possible. After removal of
DATE:
forms, extend curing to exposed edges.
PROJECT
ENGINEER
DATE:
CONTROL NUMBER
- END OF SECTION -
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02516
ENGG CERT
UNIT PAVERS
SUBSECTION INDEX
PART 1 - GENERAL
1.01 Description
DESCRIPTION
PART 2 - PRODUCTS
0001
PART 3 - EXECUTION
DATE
3.01 Inspection
NO.
REV
00
DISCIPLINE
3.02 Surface Preparation
ENGINEER 3.03 Cutting and Fitting
3.04 Color Distribution
DATE:
3.05 Installation
PROJECT
ENGINEER 3.06 Joint Cleaning
3.07 Replacement, Protection, and Cleaning
DATE:
CERTIFIED
PART 1 - GENERAL
DATE:
CONSTRUCTION
AGENCY 1.01 Description
DATE:
A. This section covers fabricating, furnishing, and installing precast unit pavers as shown
OPERATIONS
on the drawings.
DATE: B. Provide exterior pavers at walkways and sidewalks over prepared setting bed.
CONTROL NUMBER
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. Section 03400 - Precast Concrete.
ENGG CERT
A. General:
Comply with local governing codes and regulations. Provide products of acceptable
manufacturers that have been in satisfactory use in similar service for three years.
Use experience installers. Comply with requirements of PCI MNL-117, unless
otherwise specified.
DESCRIPTION
B. Quality:
Unacceptable defects in the unit pavers are outlined and listed below. Replace
unsatisfactory unit pavers.
0001
00
DISCIPLINE
ENGINEER C. Referenced Standards:
DATE:
1. Saudi Arabian Standard: Ministry of Communications General Specifications
PROJECT
ENGINEER for Roads and Bridges.
DATE: 2. ASTM C902; Specification for Pedestrian and Light Traffic Paving Brick.
CERTIFIED
DATE:
A. Protection: Protect materials during storage and construction from soilage or mixing
BY:
with earth and other foreign materials. Protect cement and line from wetting and
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
dampness.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Traffic Control: Maintain access for pedestrian and vehicular traffic during placement
operations, as required for other construction activities.
ENGG CERT
PART 2 - PRODUCTS
A. Saudi Concrete Products Co. Ltd. (SACEP), P.O. Box 55779, Riyadh 11544.
C. Approved equal.
Issued for IFC
2.02 Materials
A. Pavers and Paving Units: Provide solid portland cement concrete pavers and paving
units conforming to the following:
2. Absorption: Six percent maximum by weight when tested per PCI MNL 117,
23-10028-
JO/EWO
0001
00
DISCIPLINE
4. Dimensional Tolerance: +3 mm (1/8 in.) in any direction.
ENGINEER
C. Fine Aggregate for Pavers: As specified in Section 03300 - Cast in Place Concrete.
VERIFICATION
EDSD
Concrete.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
F. Aggregate for Mortar: Sand, ASTM-C-144 or ASTM-C-404, Size No. 2 except for
mortar in joints, all sand shall pass a 1.18 mm (No. 16 sieve.
ENGG CERT
H. Water: Treated (utility water quality), clean, free from materials determined to impair
the strength, bond or appearance of mortar.
I. Expansion Joint and Sealant: 12 mm (1/2 in.) premolded joint filler and sealant
specified in Section 07900 - Sealants.
DESCRIPTION
2.03 Fabrication
Issued for IFC
A. Proportioning: Use methods which ensure that specified proportions are controlled
and accurately maintained. Measure aggregate materials in a damp, loose condition.
23-10028-
JO/EWO
0001
B. Mortar: ASTM-C-270, and the following; Use type S mortar proportioned by volume;
one part portland cement and 3 part sand. Use only the materials specified herein,
06/01/22
00
DISCIPLINE
C. Mixing: Combine and mix cement, lime, water and aggregate for at least five minutes
ENGINEER in a mechanical batch mixer. Add as much water as required for workability. Mortar
may be re-tempered by adding water and remising, as required for workability. Do
DATE:
not use mortar which has begun to set or if more than 60 minutes has elapsed after
PROJECT
ENGINEER initial mixing.
DATE:
CERTIFIED
PART 3 - EXECUTION
DATE:
CONSTRUCTION
3.01 Inspection
AGENCY
A. Examine the substrates, adjoining constructions, and the conditions under which the
DATE:
work is to be installed. Do not proceed with the work until unsatisfactory conditions
OPERATIONS
have been corrected.
A. Remove dirt and loose material from the substrate immediately before placing the
EDSD
setting bed.
DATE:
BY:
B. In vehicular areas, provide 100 mm thick lean concrete layer according to Section
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
03300. Provide leveling sand layer 50 mm thick and mortar setting bed mix according
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. In pedestrians areas, provide 150 mm crushed compacted stone base course and
leveling sand layer 50 mm thick. Pavers are 8 cm. thick for pedestrian areas.
ENGG CERT
A. Cut pavers neatly to line or precast sizes as required to complete the patterns shown
and to fit against other work with uniform joints and edges as shown, including walls,
footings, curbs, drainage, plumbing, and electrical fittings. Provide 12 mm (1/2 in.)
joints where not otherwise shown at such fittings.
A. Where there is a minor variation in color shading among pavers of the same nominal
color, scatter the different shadings randomly.
3.05 Installation
A. Dampening: Ensure that pavers and substrate are damp at time of laying pavers, but
have no free water on their surfaces.
B. Laying: Lay pavers in a full, uniform bed of mortar for vehicular areas and directly
23-10028-
JO/EWO
0001
over leveling sand in pedestrians areas, continuous and free from voids, 50 mm (2 in.)
thick unless otherwise noted. Lay pavers with joint spacing, in patterns as specified,
06/01/22
tamped into position with top surfaces in true uniform places to the grades specified
DATE
and as necessary to provide proper drainage, free from depressions which would
cause puddles. Remove mortar splashes from exposed faces as the work
NO.
REV
00
DISCIPLINE
progresses.
ENGINEER
C. Dry Mix Joint Mortar Only in Vehicular Areas: Allow top surface of pavers to dry. Mix
DATE:
mortar dry and as otherwise specified for mortar in part 2. Brush mortar carefully into
PROJECT
ENGINEER joints to the level the bottom of edges curvature or levels while tops of pavers are dry.
Hold mortar close to joints and avoid spreading it over exposed paver surfaces as
DATE: much as practicable. Dampen mortar lightly. After surfaces have dried again, repeat
CERTIFIED
the process to fill joint where mortar has slumped below the bottom of edge curvature
or levels.
DATE:
CONSTRUCTION
AGENCY D. Expansion Joints: Locate expansion joints as shown and as necessary to divide
paved areas into panels not exceeding 60 square meters. Space expansion joints to
DATE:
match joints in adjacent curbs and to terminate at building corners, offsets or columns
OPERATIONS
but not to exceed a spacing of 9 meters. Install filler material for the full width and
depth of the joint and through the setting bed to + 12 mm (1/2 in.) of the pavement
DATE: finish surface and in one piece lengths for the full width being placed wherever
CONTROL NUMBER
possible. Apply sealant on expansion joints against buildings, walls and where
VERIFICATION
shown.
EDSD
DATE:
submittals. Install materials in proper relation with adjacent construction and with
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.06 Joint Cleaning
A. After filling the joints, remove excess sand and mortar, mortar stains, and other
ENGG CERT
foreign matter by approved means which do not damage the appearance of the work.
Acid cleaning will not be permitted.
C. Final Cleaning: Sweep concrete pavers and wash free of stains, discolorations, dirt,
and other foreign material just prior to final inspection.
- END OF SECTION -
23-10028-
JO/EWO
0001
06/01/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02527
ENGG CERT
STREET MARKINGS
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 2 - Products
Part 3 - Execution
0001
3.02 Application
3.03 Finish
06/01/22
DATE
PART 1 - GENERAL
NO.
REV
00
DISCIPLINE
ENGINEER 1.01 Description
DATE:
A. Work in this Section includes, but is not limited to; apply white or yellow painted traffic
PROJECT
ENGINEER marking for lane lines, center lines, arrows, and edge lines.
PART 2 - PRODUCTS
DATE:
CONTROL NUMBER
A. The material shall consist of a light-colored aggregate, pigment and extender bound
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. Flash point greater than 240.
ENGG CERT
F. Softening point measured by the ring and ball method shall be between 93 and 105
degree.
A. Total of 20% of glass beads to add to the thermoplastic paint. 10% shall be premixed
and the other 10% to be applied by pressure during the spraying. Glass beads shall
have a minimum 1.5 refractive index, be spherical in shape and 100% passing No. 12
sieve.
0001
PART 3 - EXECUTION
06/01/22
DATE
00
DISCIPLINE
A. The pavement surface shall be dry and free from loose sand and mud or other
ENGINEER extraneous matter.
DATE:
3.02 Application
PROJECT
ENGINEER
C. Painting should not be done during rainy, foggy weather or in the presence of blowing
DATE:
sand.
OPERATIONS
D. Painting shall be of thickness not less than 1.5 mm excluding glass beads.
DATE:
CONTROL NUMBER
3.03 Finish
VERIFICATION
EDSD
A. The finished lines shall be free from raggedness on sides and ends and be in true
DATE:
plane with the general alignment of the street. The upper surface of the lines shall be
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
- END OF SECTION -
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02528
ENGG CERT
SUBSECTION INDEX
PART 1 - GENERAL
1.03 Submittals
PART 2 - PRODUCTS
2.01 Materials
2.02 Concrete Mix, Design, and Testing
PART 3 - EXECUTION
23-10028-
JO/EWO
0001
00
3.06 Joints
DISCIPLINE
ENGINEER 3.07 Concrete Finish
3.08 Curing
DATE: 3.09 Repair and Protection
PROJECT
ENGINEER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.02 Quality Assurance
A. Codes and Standards: Comply with local governing regulations regarding precast
ENGG CERT
curbs and cast-in-place curbs, curb and gutter, and edging, if more stringent than
herein specified.
B. Saudi Arabian Standard: Ministry of Transport General Specification for Roads and
Bridges. Refer to Section 6.04 "Curbs and Gutters".
1.03 Submittals
DESCRIPTION
certifications as required in referenced sections for concrete work and joint fillers.
PART 2 - PRODUCTS
2.01 Materials
A. Forms: Steel, wood, or other suitable material of size and strength to resist
movement during concrete placement and retain horizontal and vertical alignment
23-10028-
JO/EWO
0001
2. Use flexible spring steel forms or laminated boards to form radius bends as
NO.
REV
00
DISCIPLINE
required.
ENGINEER
3. Coat forms with a non-staining, clear, form release agent which will not
DATE:
discolor or deface the surface of the concrete.
PROJECT
ENGINEER
DATE: E. Expansion Joint Material: Comply with applicable requirements for preformed
CONTROL NUMBER
A. Comply with requirements of applicable Division 3 sections for concrete mix design,
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Design the mix to produce standard-weight concrete consisting of portland cement,
aggregate and water to produce the following properties:
ENGG CERT
PART 3 - EXECUTION
A. Remove loose material from the compacted base surface immediately before placing
concrete.
A. Set forms to the required grades and lines, rigidly braced and secured. Install
sufficient quantity of forms to allow continuous progress of the Work, and so that
forms can remain in place at least 24 hours after concrete placement.
23-10028-
JO/EWO
0001
B. Check complete formwork for grade and alignment to the following tolerances:
06/01/22
00
DISCIPLINE
ENGINEER C. Clean forms after each use, and coat with form release agent as often as required to
ensure separation from concrete without damage.
DATE:
PROJECT
ENGINEER 3.03 Reinforcement
A. General: Comply with the requirements of applicable Division 3 sections for mixing
DATE:
and placing concrete, and as herein specified.
OPERATIONS
B. Do not place concrete until subgrade and forms have been checked for line and
DATE: grade. Moisten if required to provide a uniform dampened condition at the time
CONTROL NUMBER
concrete is placed. Do not place concrete around structures or frames until they are
VERIFICATION
DATE:
C. Place concrete using methods which prevent segregation of the mix. Consolidate
BY:
concrete along the face of forms with an internal vibrator. Keep vibrator away from
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
joint assemblies, reinforcement, or side forms. Use only square-faced shovels for
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 100
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 101
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1. Deposit and spread concrete in a continuous operation between transverse
joints.
ENGG CERT
D. Extrusion machines shall have vertical forming tubes which are readily adjustable
vertically during forward motion of the machine to provide when necessary, a variable
height of curb conforming to the pre-determined curb or edging grade; and with grade
line gauges or pointers attached to the machine in a manner which will provide a
continual comparison between the curb or edging being placed and the planned curb
or edging at grade indicated by the offset guide line.
DESCRIPTION
1. In lieu of the above, the extrusion machine may be operated on rails or forms
Issued for IFC
set at uniform depth below the pre-determined finished top of curb grade.
E. Feed concrete uniformly to the machine, and of such consistency that, after extrusion,
the concrete depth will maintain the shape of the curb section without support.
0001
2. Units shall have longitudinal reinforcement and shall be cast with dowel/dowel
holes in the ends.
NO.
REV
00
DISCIPLINE
ENGINEER 3.06 Joints
DATE:
A. General: Construct expansion, contraction, and construction joints true-to-line with
PROJECT
ENGINEER face perpendicular to surface of the curb. Construct transverse joints at right angles
to the curb centerline.
DATE:
CERTIFIED
1. When the curb or edging is joining existing pavement, place transverse joints
to align with previously placed joints, unless otherwise indicated.
DATE:
CONSTRUCTION
AGENCY B. Contraction Joints: Provide contraction joints at 3 meters on-center unless otherwise
shown on the Drawings. Construct contraction joints as follows:
DATE:
OPERATIONS
1. Tooled Joints: Form weakened-plane joints in the fresh concrete by grooving
the top portion with a recommended cutting tool and finishing edges with a
DATE: jointer.
CONTROL NUMBER
VERIFICATION
C. Construction Joints: Place construction joints at the end of pours and at locations
EDSD
where placement operations are stopped for a period of more than 1/2 hour, except
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 101
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 102
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. Construct joints between concrete curb and asphalt concrete pavement with
unbonded butt joints, without dowels or sealant grooves.
ENGG CERT
D. Expansion Joints: Provide premolded joint filler for expansion joints and abutting
manholes, structures, walks, and other fixed objects.
2. Extend joint fillers full width and depth of the joint, and not less than 12 mm or
more than 25 mm below the finished surface where joint sealer is indicated.
DESCRIPTION
3. Furnish joint fillers in one-piece lengths for the full-width being placed.
Issued for IFC
4. Protect the top edge of the joint filler during concrete placement with a metal
cap or other temporary material. Remove protection after both sides of joint
are placed.
E. Fillers and Sealants: Comply with the requirements of these specifications for
preparation of joints, materials, installation, and performance.
0001
A. After striking off and consolidating concrete, smooth the exposed surface by
06/01/22
screeding and floating. Adjust floating to compact the surface and produce a uniform
DATE
texture.
NO.
REV
00
DISCIPLINE
B. After floating, test surface for trueness with a 3 meter straightedge. Distribute
ENGINEER concrete as required to remove surface irregularities, and refloat repaired areas to
provide a continuous, smooth finish.
DATE:
PROJECT
ENGINEER C. Work edges of gutter, back top edge of curb, and transverse joints, with an edging
tool, and round to 6 mm radius, unless otherwise indicated.
DATE:
CERTIFIED
D. Concrete edging exposed edges shall be as shown on the Drawing.
DATE:
CONSTRUCTION
E. After completion of floating and when excess moisture or surface sheen has
AGENCY disappeared, complete surface finishing as follows:
DATE:
1. Trowel finish, smooth and free of trowel marks, uniform in texture and
OPERATIONS
appearance.
DATE: F. Leave forms in place for at least 24 hours after concrete has been placed. After form
CONTROL NUMBER
removal, clean ends of joints and point-up minor honeycombed surface areas.
VERIFICATION
Aramco Representative.
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 102
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 103
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.08 Curing
A. Protect and cure finished concrete curbs and gutters complying with applicable
ENGG CERT
B. Protect the curb from damage. Exclude traffic from curb for at least 14 days after
placement.
C. Sweep concrete curb and wash free of stains, discolorations, dirt and other foreign
material as needed.
- END OF SECTION -
23-10028-
JO/EWO
0001
06/01/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 103
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 104
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02575
ENGG CERT
SUBSECTION INDEX
PART 1 - GENERAL
1.01 Description
1.02 Quality Assurance
DESCRIPTION
PART 2 - PRODUCTS
PART 3 - EXECUTION
23-10028-
JO/EWO
0001
00
1.01 Description
DATE:
CERTIFIED
A. The work shall include, but not be limited to, saw cutting of pavement, excavation,
storage of material, disposal of material, bedding and installation of pipe, backfill and
DATE:
CONSTRUCTION
compaction, restoration of asphaltic pavement, and clean up of the site.
AGENCY
B. The Contractor shall provide all labor, materials, and equipment necessary for and
DATE: incidental to excavation and backfill of trench and restoration of pavement.
OPERATIONS
C. Personnel who operate cement cutting machinery, and those who work in the close
DATE: proximity of the machinery, must wear respiratory protection specific for respirable
CONTROL NUMBER
dust.
VERIFICATION
EDSD
A. The work shall be carried out in accordance with these drawings and the following
REVISIONCERTIFICATION
Specification sections:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 104
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 105
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. Section 02513 - Subbase/base Course and Asphaltic Concrete Paving.
ENGG CERT
B. Saudi Arabian Standard: Ministry of Transport General Specifications for Road and
Bridge Construction.
A. The Contractor shall employ an independent, approved, testing laboratory to carry out
all required tests.
B. The Contractor shall obtain Saudi Aramco Representative approval for each step of
construction before commencing the next step.
0001
ASTM D2167. A minimum of four (4) tests shall be carried out for each trench; i.e.
one test per layer of fill.
06/01/22
DATE
E. Compacted subbase and base course shall be tested in accordance with ASTM D
1556 or ASTM D2167. A minimum of two (2) tests shall be carried out for each
NO.
REV
00
DISCIPLINE
trench.
ENGINEER
F. Asphaltic concrete base course and asphaltic concrete wearing course shall be tested
DATE:
in accordance with AASHTO T166 for bulk specific gravity. A minimum of two (2)
PROJECT
ENGINEER tests shall be carried out for each trench.
DATE:
CERTIFIED
PART 2 - PRODUCTS
DATE:
CONSTRUCTION
2.01 Select Fill
AGENCY
A. Selected backfill shall comply with Section 02200 "Earthwork", except that any
DATE:
aggregate which is larger than 20 mm in any direction shall be removed.
OPERATIONS
A. Granular sub-base and aggregate base course shall be in accordance with Section
VERIFICATION
DATE:
B. Asphaltic concrete base course and wearing course shall be in accordance with
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 105
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 106
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.03 Encasement of Pipes
A. Concrete encasement shall be as shown on the Drawings and concrete shall comply
ENGG CERT
PART 3 - EXECUTION
A. Prior to cutting the roadway the Contractor shall develop and submit his plan for
DESCRIPTION
excavating and traffic control for approval by Saudi Aramco Representative and
Issued for IFC
Municipality. In addition to these requirements the Contractor shall limit cut to one
lane at a time, backfilling daily or use cut and cover methods using steel or timber
plates.
B. The trench excavation, backfill, and restoration shall be as shown on the Drawings
and in accordance with this Specification.
0001
A. The pipe shall be bedded as approved by Saudi Aramco Representative and encased
DATE
00
DISCIPLINE
B. After the concrete has set for 24 hours or the pipe properly bedded, the trench shall
ENGINEER be backfilled as per Section 02210 of the Specification.
DATE:
C. After the trench has been backfilled to the level of the sub-grade, the existing asphalt
PROJECT
ENGINEER and base course within the saw cut limits of asphalt (minimum 400 mm) from both
sides of trench shall be removed and compacted prior to placing and compacting of
DATE: new aggregate base course, the asphaltic concrete and the granular sub-base and
CERTIFIED
aggregate base course shall be reconstructed to the dimensions shown on the
Drawings and or per observed existing pavement condition in site in the absence of
DATE:
CONSTRUCTION
any such Drawings.
AGENCY
B. The granular base course shall be sprayed with prime coat and the vertical edges of
VERIFICATION
the asphaltic concrete base course shall be hand brushed with separate tack coat.
EDSD
The asphaltic concrete base course shall then be placed and compacted.
DATE:
BY:
C. The surface of the vertical edges of the asphaltic concrete base and wearing courses
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
shall be hand brushed with tack coat. The surface of the new asphaltic concrete base
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
course shall be sprayed with tack coat. The asphaltic concrete wearing surface shall
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 106
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 107
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
It is a requirement that the new wearing surface shall be smooth and even with the
existing, and that the elevation over the centerline of the trench is five (5) millimeters
ENGG CERT
A. Concrete curbs and gutters shall be removed to an existing joint and shall be placed
to the same line and dimension in accordance with Section 02528 - Concrete Curbs
and Gutters.
DESCRIPTION
A. The site shall be cleaned and excess material shall be disposed of as directed by
Saudi Aramco Representative.
- END OF SECTION -
23-10028-
JO/EWO
0001
06/01/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 107
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 108
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02601
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
1.02 Related Work
DESCRIPTION
Part 2 - Products
0001
2.06 Cleanouts
2.07 Sanitary Sewer Manholes
2.08 Frames and Covers for Sanitary Sewer Manholes, Inspection Chambers, Cleanouts,
06/01/22
DATE
00
Part 3 - Execution
DISCIPLINE
ENGINEER
3.01 Valve Boxes/Surface Boxes
DATE: 3.02 Sanitary Sewer Manholes/Inspection chambers
PROJECT
ENGINEER 3.03 Cleanouts
3.04 Exfiltration Test of Manholes/Inspection Chamber
DATE:
CERTIFIED
PART 1 - GENERAL
DATE:
CONSTRUCTION
AGENCY 1.01 Description
DATE: A. Work in this Section includes, but is not limited to furnishing and constructing/installing
OPERATIONS
gate valves, washout valves, flexible couplings, and valve boxes/surface
boxes/sanitary sewer manholes, inspection chambers and cleanouts as specified and
DATE: as indicated on the Drawings.
CONTROL NUMBER
VERIFICATION
23-10028-0001-008
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 108
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 109
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. Section 02513 – Sub-base/Base Course, and Asphalt Concrete Paving
ENGG CERT
E. Section 02610 - FRP (Fiberglass Reinforced Polyester) Pipes for Gravity Sanitary and
Stormwater Sewer Applications
0001
3. ASTM C32: Specification for Sewer and Manhole Brick (made from clay or
shale).
NO.
REV
00
DISCIPLINE
ENGINEER 4. ASTM C923: Specification for Resilient Connectors between Reinforced
Concrete Manholes Structure and Pipe.
DATE:
PROJECT
ENGINEER 5. ASTM D2583: Test Method for Indentation Hardness of Rigid Plastics by
Means of a Barcol Impresser.
DATE:
CERTIFIED
6. ASTM D3753: Specification for Glass Fiber-Reinforced Polyester Manholes.
DATE:
CONSTRUCTION
B. American Water Works Association (AWWA):
AGENCY
DATE:
Waterworks Purposes.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 109
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 110
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. International Organization for Standardization (ISO):
1. ISO 7005-2: Metal Valve for Use in Flanged Pipe Systems (Face-to-Face and
ENGG CERT
Center-to-Face Dimensions).
PART 2 - PRODUCTS
0001
A. All gate valves (non OS&Y) shall have the following characteristics:
06/01/22
Technical Description:
NO.
REV
00
DISCIPLINE
ENGINEER Flanged gate valve to BS5150/5163 Type A.
Flanges are drilled to ISO 7005-2 PN16.
DATE:
PROJECT
Body and bonnet in ductile iron GGG-50, full bore body design.
ENGINEER
Stem in werkst. 4021 ( AISI 420).
Bonnet bolts in A2 stainless steel.
DATE:
CERTIFIED Wedge in ductile iron fully vulcanized inside and outside with EPDM rubber
approved for potable water by WRC.
DATE: Wedge nut fixed and fully enclosed in vulcanization.
CONSTRUCTION
AGENCY
Fusion bonded electro-statically applied epoxy coating internal and external 250
DFD to DIN 30677.
DATE:
OPERATIONS B. OS&Y Gate Valves: OS&Y gate valves shall have the following characteristics:
DATE:
Description: DN100 OS&Y valve, PN16, GS Gulf Standard.
CONTROL NUMBER
VERIFICATION
Body, bonnet, wedge, yoke and gland follower in ductile iron GGG-50.
EDSD
Wedge is fully encapsulated inside and outside with EPDM rubber approved
by WRC for potable water.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 110
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 111
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Bonnet Gasket: EPDM Rubber.
ENGG CERT
C. Gate valves with indicator posts shall be direct buried and shall have the following or
Saudi Aramco approved equivalent characteristics:
Description: DN100 post indicator gate valve PN16 to BS 5150/DIN 3230 part 4/DIN
3352.
0001
The indicator posts relevant to the above-mentioned gate valves shall have the
following characteristics:
NO.
REV
00
DISCIPLINE
ENGINEER Description: Telescopic indicator post for above-mentioned gate valve.
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 111
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 112
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.03 Valve Boxes/Surface Boxes/Water Meter Boxes
A. Concrete and rebar work for valve boxes/surface boxes/water meter boxes and valve
ENGG CERT
B. Aluminum steps shall be provided and installed in the valve boxes/water meter boxes
as shown on Drawings.
C. Waterproofing: The exterior and interior faces of walls of valve boxes/water meter
boxes shall receive three coats of coal tar epoxy.
DESCRIPTION
Meter type:
Woltmann, Compound or Singlejet type.
Multijet and Volumetric are forbidden.
23-10028-
JO/EWO
0001
Regulation:
06/01/22
Manufactured and tested according to EEC council directive N° 75/33 of 17 dec 1974
NO.
REV
00
DISCIPLINE
Accuracy:
ENGINEER
Class C horizontal position.
DATE:
Proven by an EEC approval or equivalent.
PROJECT Meters must conform to the requested accuracy for all the production of the meter type.
ENGINEER
Meter type proposed in a country for a lower accuracy level than the one requested here
will be refused.
DATE:
CERTIFIED
Manufacturer:
DATE:
CONSTRUCTION Manufacturer registered to ISO9001 or ISO9002 international quality certificate.
AGENCY
DATE:
OPERATIONS
Specific requirements:
Body in bronze.
Permanent pressure : 16 bars (proven by EEC model approval or equivalent).
DATE:
Maximum accidental temperature : 50°C
CONTROL NUMBER
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 112
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 113
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The register must be 360° orientable with a full stop. This operation shall not require any
tool and should be performable at any time with hand.
ENGG CERT
- The choice of the pulse value must be independent from the pre-equipment.
- The pre-equipment should allow to deliver one pulse from a wide range of pulse
DESCRIPTION
- The pre-equipment should allow to upgrade the meter with a remote reading device
absolutely trustable in the long term (the register and the remote indicator must
always indicate the same amount of forward volume, hence backflow must not be
computing as forward volume).
0001
The register must be protected with a solid cap in plastic or metal (70kg on the cover
should not break it).
06/01/22
DATE
00
DISCIPLINE
ENGINEER The meter should be able to run at 120 m3/h during 2 hours per day without losing any
accuracy.
DATE:
PROJECT
ENGINEER Maximum reading must be 999 999 m3; minimum reading must be 0.5 liter.
The serial number must be marked on the upper part of the totalizer, near the index, in big
EDSD
letters (1cm minimum) and not on any transparent part of the totalizer.
DATE:
BY:
The serial number of the meter must begin with the 2 last digits of the year of production.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
The meter should be dismountable without breaking any part (like the totalizer casing).
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 113
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 114
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The meter to be provided shall include the meter itself, the hand held remote reading device
and all devices required to establish the communication between the meter and remote
device, in addition to any required hardware and software to transmit the information for data
ENGG CERT
processing.
The Contractor shall provide training for the end users (water authority) regarding the use of
the hand held remote reading device and associated applications.
2.06 Cleanouts
0001
B. FRP steps shall be provided and installed in the manholes as shown on Drawings.
DATE
00
DISCIPLINE
ENGINEER 1000 - 1800 4.96
2000 - 3600 8.69
DATE:
PROJECT
ENGINEER 3800 - 7600 20.82
DATE:
CERTIFIED Manhole Height (mm) Wall Thickness (mm)
1 - 5.5 7.9
DATE:
CONSTRUCTION 5.5 - 9.0 12.2
AGENCY
DATE: C. Quality Control Testing: Quality control testing on manholes shall be conducted in
OPERATIONS strict accordance with this specification. These tests, as a minimum, shall cover: Raw
Materials; Load rating, Stiffness; Soundness; Critical Dimensions; Barcol Hardness;
DATE: Visual Acceptance. Tests shall be performed in accordance with ASTM D 7353 and
ASTM D 2583.
CONTROL NUMBER
VERIFICATION
EDSD
2.08 Frames and Covers for Sanitary Sewer Manholes, Inspection Chambers, Cleanouts, Valve
Boxes, and Surface Boxes
DATE:
BY:
A. Inside roads and parkings, manholes and inspection chambers frames and covers
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
shall be heavy duty cast iron with a combined weight of 250 kg and a test load of 40
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 114
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 115
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Outside roads and parkings, manholes and inspection chambers frames and covers
shall be medium duty cast iron with a minimum combined weight of 160 kg as shown
ENGG CERT
on the Drawings.
C. Cleanouts frames and covers shall be heavy duty cast iron with a combined weight of
not less than 28 kg, as shown on the Drawings.
D. Valve boxes frames and covers shall be medium duty cast iron with a minimum
combined weight of 160 kg as shown on the Drawings.
DESCRIPTION
E. Surface boxes covers and frames shall be cast iron heavy duty with combined weight
Issued for IFC
Covers shall be provided with lifting keys, the key material shall be compatible with
that of the cover. A minimum of 3 sets of keys shall be provided by the Contractor.
Covers shall have the word “Firewater”, “Water”, “Sanitary Sewer”, or “Irrigation” in
English and Arabic as applicable in block letters. The engraving shall be as approved
by the proponent governmental agencies. Contractor shall seek technical
concurrence engraving prior to placing purchase orders.
23-10028-
JO/EWO
0001
All the above covers and frames shall be painted with coal-tar-epoxy, to the
satisfaction of Saudi Aramco Representative.
06/01/22
DATE
PART 3 - EXECUTION
NO.
REV
00
DISCIPLINE
ENGINEER 3.01 Valve Boxes/Surface Boxes
DATE:
A. Construct new valve boxes/surface boxes, on schools service pipes and wherever
PROJECT
ENGINEER indicated on the Drawings.
B. Benching: Use plain concrete for benching. The inverts are to conform accurately to
DATE:
the size of the adjoining pipes. Side inverts are to be curved and main inverts (where
OPERATIONS
direction changes) are to be laid out in smooth curves of the longest possible radius
which is tangential within the manholes, to the centerlines of adjoining pipelines.
DATE:
CONTROL NUMBER
concrete blocks and a reinforced concrete frame to which the cast iron frame is to be
EDSD
embedded. Set manhole/ inspection chamber frames with the tops conforming
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
D. All concrete work shall be performed in accordance with Section 03300 Cast-In-Place
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 115
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 116
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
E. After installation, manholes, and inspection chambers shall be flushed to remove any
materials that may have entered them, and this to the satisfaction of Saudi Aramco
ENGG CERT
Representative.
3.03 Cleanouts
A. Build service connection cleanout as indicated on the Drawings. The pipe is to be set
vertically and fitted in the center of the cover. Fit cast iron frames and covers over the
cleanout and bring to grade. Set the cast iron frame in the concrete.
DESCRIPTION
A. The manholes, inspection chambers shall be filled with water to rim or frame level and
the allowable leakage over 24 hours period shall not exceed 1% of the total volume of
the manhole/inspection chamber. Any such tests shall be carried out at the
Contractor's expense.
- END OF SECTION -
23-10028-
JO/EWO
0001
06/01/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 116
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 117
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02610
ENGG CERT
SUBSECTION INDEX
Part 1 – General
DESCRIPTION
1.01 Description
Issued for IFC
Part 2 - Products
23-10028-
JO/EWO
0001
Part 3 - Execution
DATE
3.01 Inspection
NO.
REV
00
DISCIPLINE
3.02 Pipe work Installation
ENGINEER 3.03 FRP Piping Installation
3.04 Warning Tape for FRP Gravity Sanitary Sewer Pipes
DATE:
3.05 Trenching, Bedding, Backfilling and Compaction
PROJECT
ENGINEER 3.06 Testing
3.07 Connection to Existing Lines
DATE: 3.08 Testing of Backfill
CERTIFIED
3.09 Restoration of Pavements
DATE:
CONSTRUCTION
AGENCY PART 1 - GENERAL
DATE:
1.01 Description
OPERATIONS
A. Work in this Section includes, but is not limited to furnishing and installing
DATE: Fiberglass (Glass Fiber reinforced Thermosetting Resin) Pipe and Fittings for
CONTROL NUMBER
gravity sanitary sewer pipes as indicated on the Drawings and as herein specified.
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 117
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 118
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.03 Reference Standards
ENGG CERT
0001
00
DISCIPLINE
6. ASTM D-1568: Test Methods for Sampling and Chemical Analysis of
ENGINEER Alkaylbenzene Sulfonates.
DATE:
7. ASTM D-2190: Specification for Vinyl Acetate.
PROJECT
ENGINEER
10. ASTM D-2583: Test Method for Indentation Hardness of Rigid Plastics by
DATE:
Means of a Barcol Impressor.
OPERATIONS
11. ASTM D-2992: Practice for Obtaining Hydrostatic or Pressure Design Basis
DATE: for "Fiberglass" (Glass-Fiber-Reinforced Thermo-setting Resin) Pipe and
CONTROL NUMBER
Fittings.
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
13. ASTM D-2290: Test Method for Apparent Tensile Strength of Ring or
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 118
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 119
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.04 Quality Assurance
ENGG CERT
A. Manufacturer should establish and show the quality record of supplying the
FRP/GRP products confirming to ISO 9000 Standards at least over a decade,
ensuring no problems from the local consumers.
B. Quality Control: Establish and maintain quality control to assure compliance with
the specified requirements for all work to the satisfaction of Saudi Aramco
Representative
DESCRIPTION
C. Codes and Standards: Comply with the provisions of the latest editions of the
Issued for IFC
A. All Pipes, Fittings and accessories shall be handled, and stored strictly in
accordance with the manufacturer's latest published handling and storage
procedures.
23-10028-
JO/EWO
0001
1.06 Submittals
06/01/22
A. The Contractor shall submit shop drawings, details and descriptive literature
DATE
00
DISCIPLINE
of installation, testing equipment, recommended methods of cutting pipes and other
ENGINEER relevant details for the type and class of pipe to be furnished for review and
approval by Saudi Aramco Representative.
DATE:
PROJECT
ENGINEER B. Certification that pipe, fittings and all other materials comply with the requirements
of this Specification.
DATE:
CERTIFIED
1.07 Services of Manufacturer’s representative
DATE:
CONSTRUCTION
A. The services of a competent representative of the pipe manufacturer shall be
AGENCY provided to instruct the Contractor’s personnel in the installation of the pipe. Said
representative shall be available on a continuing basis as may be necessary to
DATE:
ensure that pipe jointing are being properly made and that the pipe is being
OPERATIONS
installed and hydrotested as necessary in accordance with the recommendations of
the manufacturer.
DATE:
CONTROL NUMBER
VERIFICATION
PART-2 – PRODUCT
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
A. Pipes, Fittings and Joints: All pipes, fittings and joints shall conform to SASO
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
standard 14/15.
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 119
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 120
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PART-3 – EXECUTION
ENGG CERT
3.01 Inspection
A. The Contractor shall inspect all product for damage immediately before installation.
Any products that are damaged or not in accordance with the specifications shall
immediately be repaired or removed from the site and replaced. The repair
procedure for any items should be as suggested by manufacturer and approved by
Saudi Aramco Representative.
DESCRIPTION
A. General:
1. Only pipe manufacturer certified pipe fitters shall be deployed to install FRP
pipes.
2. All pipes, Fittings and other materials shall be carefully lowered in the
trench.
23-10028-
JO/EWO
0001
4. The full length of each section of pipe and fittings shall rest solidly on the
pipe bed with releases excavated to accommodate bells, joints, and
NO.
REV
00
DISCIPLINE
couplings. Anchors and supports shall be provided where necessary and
ENGINEER as indicated on the contract drawings. Proper provision shall be made for
expansion and contraction of the pipe lines if necessary.
DATE:
PROJECT
ENGINEER 5. Open ends of pipe at the end of each day's work, shall be closed
temporarily with wood blocks or bulkheads. Pipe shall not be laid when the
DATE: conditions of trench or weather are unsuitable.
CERTIFIED
DATE: A. A PVC red colored (sanitary sewers) warning tape 0.15 mm thick and 300 mm
CONTROL NUMBER
wide, shall be installed above the installed pipe as shown on the Drawings. It shall
VERIFICATION
bear the following expression in Arabic and English, and in black letters “Caution,
EDSD
buried sanitary sewer line”. This expression shall be frequently repeated on the
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 120
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 121
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.05 Trenching, Bedding, Backfilling and Compaction
3.06 Testing
A. Before any connection is made to the existing sewer, the Contractor shall inform
Saudi Aramco Representative. Contractor shall check the level of any existing line
where a connection will be made, agree on a suitable procedure for the work, and
execute the work with minimum interference to the normal operation of the system.
0001
00
DISCIPLINE
A. All existing pavements (asphalt and concrete) disturbed during trenching operation
ENGINEER shall be restored to their original condition or better by the Contractor. Cutting and
restoration of pavements shall be done strictly in accordance with Section 02575.
DATE:
PROJECT
ENGINEER
- END OF SECTION -
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 121
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 122
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02615
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
1.02 References
Issued for IFC
Part 2 - Products
2.01 Pipe
2.02 Pipe for Use with Couplings
2.03 Fittings
23-10028-
JO/EWO
0001
2.06 Adapters
DATE
2.07 Joints
2.08 Grooved Couplings
NO.
REV
00
DISCIPLINE
2.09 Fillings Rings
ENGINEER 2.10 Internal Lining
2.11 Gaskets, Bolts and Nuts
DATE:
2.12 Painting
PROJECT
ENGINEER
Part 3 - Execution
DATE:
CERTIFIED
3.01 Inspection Before Installation
3.02 Handling and Cutting
DATE:
CONSTRUCTION
3.03 Installation
AGENCY 3.04 Joints and Couplings
3.05 Testing
DATE:
3.06 Disinfection
OPERATIONS
3.07 Warning Tape
3.08 Connection to Existing Lines
DATE: 3.09 Testing of Backfill
CONTROL NUMBER
DATE:
PART 1 - GENERAL
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
1.01 Description
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 122
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 123
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A. The work in this section includes, but is not limited to providing, installing and
testing ductile iron pipe and fittings, as indicated and specified.
ENGG CERT
B. Options: For piping exposed as in valve boxes, provide flanged pipe and fittings.
1.02 References
A. Ductile iron pipes, fittings and accessories including coating shall comply with the
latest issue of the following standards and other relevant standards noted
elsewhere in this Specification:
DESCRIPTION
2. ISO 887, Plain Washers for Metric Bolts Screws and Nuts.
5. ISO 2531/EN 545, Ductile Iron Pipes, Fittings, Accessories and their Joints
for Water or Gas Applications.
23-10028-
JO/EWO
0001
00
DISCIPLINE
8. ISO 4032, Hexagon Nuts, Style 1 Product Grades A and B.
ENGINEER
9. ISO 4179, Ductile Iron Pipes for Pressure and Non-Pressure Pipeline –
DATE:
Centrifugal Cement Mortar Lining – General Requirements.
PROJECT
ENGINEER
11. ISO 4633, Rubber Seals – Joint Rings for Water Supply, Drainage and
DATE:
CONSTRUCTION
Sewerage Pipeline – Specification for Materials.
AGENCY
12. ISO 6600, Ductile Iron Pipes, Centrifugal Cement Mortar Lining –
DATE:
Composition Controls of Freshly applied Mortar.
OPERATIONS
13. ISO 6506-1, Metallic Materials – Hardness Testing – Brinell Test – Part 1:
DATE: Test Method.
CONTROL NUMBER
VERIFICATION
(nominal size).
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 123
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 124
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
17. ISO 7483, Dimensions of Gaskets for Use with Flanges to ISO 7005.
18. ISO 8179-1, Ductile Iron Pipes – External Coating – Part 1: Metallic Zinc
ENGG CERT
19. ISO 8179-2, Ductile Iron Pipes – External Coating – Part 2: Zinc Rich Paint
with Finishing Layer.
22. ISO 10804, Restrained Joint Systems for Ductile Iron pipelines – Part 1.
Design Rules and Type Testing.
23. EN 1092-2, Circular Flanges for Pipes, valves, Fittings and Accessories, PN
Designated – Part 2: Cast Iron Flanges.
0001
Painting.
DATE
00
DISCIPLINE
ENGINEER 28. BSEN 1563, Founding Spheroidal Graphite Cast Iron.
DATE:
29. BSEN 10025, Hot Rolled Products of Non-alloy Structural Steels.
PROJECT
ENGINEER
30. DIN 30671, Thermoset Plastics Coatings for Buried Steel Pipes.
DATE:
CERTIFIED
31. DIN 30872, Coatings of Corrosion Protection Tapes and Heat Shrinkable
Material.
DATE:
CONSTRUCTION
AGENCY 32. DIN 4226, Aggregates for Concrete.
DATE:
B. American Water Works Association (AWWA) Standards:
OPERATIONS
Manufacture.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 124
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 125
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1. SSPC SP.6, Commercial Blast Cleaning.
ENGG CERT
1.04 Submittals
0001
C. Manufacturer's Literature:
NO.
REV
00
DISCIPLINE
1. Catalog cuts of joints, couplings, harnesses, expansion joints, gaskets,
ENGINEER fasteners and other accessories.
DATE:
2. Brochures and technical data on coatings and lining's and proposed
PROJECT
ENGINEER method of application.
DATE:
CONTROL NUMBER
PART 2 - PRODUCTS
VERIFICATION
EDSD
2.01 Pipe
DATE:
BY:
A. Ductile Iron:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 125
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 126
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1. Design conforming to the following requirements:
ENGG CERT
00
DISCIPLINE
ENGINEER
B. With sleeve couplings, ends cast or machined at right angles to axis.
DATE: A. Provide fittings conforming to ISO 2531 and EN 545 thickness Class K12.
OPERATIONS
B. Face and drill flanged fittings conforming to ISO 7005-2 except special drilling or
DATE: tapping as necessary for correct alignment and bolting.
CONTROL NUMBER
VERIFICATION
C. Provide grooved-end fittings ductile-iron conforming to ISO 2531 and EN 545 for
DATE:
BY:
center-to-face dimensions.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 126
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 127
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.04 Nonstandard Fittings
A. Acceptable design.
ENGG CERT
0001
D. On flanged wall castings, provide space between the wall and flange to permit
06/01/22
E. On flanged wall castings, locate the flange face as shown on the Drawings. Drill
NO.
REV
00
DISCIPLINE
and tap bolt holes. Provide bolts of 316 stainless steel.
ENGINEER
F. Fabricated wall pipe of Schedule 40 Type 316 stainless steel may be substituted
DATE:
for wall castings specified above. Provide with waterstops of above dimensions
PROJECT
ENGINEER and welded continuously on both sides of stop. Flanges of Type 316 stainless
steel. Bolts for connection to buried pipe Type 316 stainless steel. Provide flange
DATE: insulation gaskets, sleeves and washers for all flanges.
CERTIFIED
2.06 Adapters
DATE:
CONSTRUCTION
AGENCY A. Furnish and install for joining pipe of different types, unless solid sleeves indicated.
DATE:
1. Provide ends conforming to above specifications for appropriate type of
OPERATIONS
joint, to receive adjoining pipe.
DATE: 2. Joining two classes of pipe may be of lighter class provided annular space
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
The material of the body end ring and sleeve shall be ductile iron grade
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 127
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 128
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
steel grade 316. The gasket shall be EPDM to ISO 4633 or BSEN 681-1
suitable for drinking water.
ENGG CERT
2.07 Joints
2. Provide 3 mm (1/8 in.) thick, metal reinforced for pressure rating of 16 bar
and higher gaskets suitable for exposure for drinking water conforming to
ISO 4633 and the dimensions of the gaskets shall be ISO 7483.
23-10028-
JO/EWO
0001
B. Minimum pipe wall thickness specified under "Pipe For Use With Couplings."
NO.
REV
00
DISCIPLINE
ENGINEER C. Where grooved couplings are indicated to provide for expansion or flexibility, cut
pipe grooves to provide necessary expansion or flexibility.
DATE:
PROJECT
ENGINEER D. Where grooved couplings are used instead of flanged joints, joint to be of rigid type
with pipe grooves cut to bring pipe ends together. Beam strength of joint shall be
DATE: equal to or greater than that of flanged joint.
CERTIFIED
C. Suitable length with nonparallel faces and corresponding drilling, if necessary, for
DATE: correct assembly of adjoining piping or equipment.
CONTROL NUMBER
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 128
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 129
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.11 Gaskets, Bolts, and Nuts
A. Provide ring rubber gaskets with cloth insertion for flanged joints, neoprene faced
ENGG CERT
1. Gaskets 300 mm (12 in.) in diameter and smaller, 1.5 mm (1/16 in.) thick.
1. Bolts.
Issued for IFC
0001
D. Provide bolts, washers and nuts, except as specified or indicated, having minimum
tensile of 800 N/mm2 hot dipped galvanized or cadmium plated. Nuts and bolts
06/01/22
shall be suitable for the pressure rating of 16 bar or higher. Nuts and bolts shall be
DATE
00
DISCIPLINE
E. Provide bolt studs and studs of same quality as machine bolts.
ENGINEER
F. Submerged flanged joints made up with Type 316 stainless steel bolts and nuts.
DATE:
PROJECT
ENGINEER 2.12 Painting
PART 3 - EXECUTION
DATE:
OPERATIONS
3.01 Inspection Before Installation
B. Hammer test.
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
A. Mark pipe and fittings "Rejected" and remove from site when cracked or has
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 129
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 130
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. If permitted, cut on sound barrel at a point at least 300 mm (12 in.) from visible limit
of crack, at Contractor's expense.
ENGG CERT
C. Machine cut with milling type cutters, knives, or saws. Snap cutters, torch, or
hammer and chisel NOT ALLOWED. Examine for possible cracks.
3.03 Installation
A. Piping Support:
DESCRIPTION
1. Furnish and install supports to hold piping at lines and grades indicated or
specified.
0001
2. Clear of all debris and dirt before installing and keep clean until accepted.
06/01/22
DATE
00
DISCIPLINE
requirements of section 02210.
ENGINEER
2. Coat ends of pipe and outside of gasket with soft soap or silicone and slip
DATE: gasket over one pipe end.
CONTROL NUMBER
VERIFICATION
3. Bring pipes to correct position and center gasket over pipe ends with lips
EDSD
against pipe.
DATE:
BY:
4. Place housing sections, insert bolts and tighten nuts until housing sections
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
in metal-to-metal contact.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 130
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 131
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5. After assembly and inspection and before backfilling, coat exterior surfaces
of buried couplings, including bolts and nuts, with heavy-bodied bituminous
mastic.
ENGG CERT
C. Tapped Connection:
3.05 Testing
A. Clean of all dirt, dust, oil, grease and other foreign material, before conducting
pressure and leakage tests.
0001
00
DISCIPLINE
ENGINEER 1. Install all temporary piping, valving, meters, gauges and equipment required
for testing in accordance with approved working drawings, and Saudi
DATE:
Aramco Sanitary Code. Disposal of hydro-test water shall be done under
PROJECT
ENGINEER the instructions of Saudi Aramco Representative.
DATE: 2. After completing the installation of a section, hydrostatic tests of the line shall
CERTIFIED
be made as soon as possible.
DATE:
CONSTRUCTION
3. The tested sections shall be provided with adequately braced stop ends; the
AGENCY use of valves to close off the tested sections will not be permitted.
DATE:
4. Hydrostatic test at 1035 kPa(ga) (150 psig), or 345 kPa (50 psig) above the
OPERATIONS
maximum operating pressure, whichever is greater, shall be performed on
the piping system in the trench prior to backfilling. Prior to testing, adequate
DATE: concrete thrust blocks shall be placed.
CONTROL NUMBER
VERIFICATION
Pressure shall be maintained for 4 hours without any drop. If pressure falls,
EDSD
the line shall be inspected with particular attention given to each joint until
DATE:
the leaks are located. After the line has been depressurized and repaired,
BY:
the pressure test shall continue for 1 hour, at which time no more leakage
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
shall be present.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 131
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 132
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.06 Disinfection
A. Furnish all equipment and materials necessary to disinfect the new water piping and
ENGG CERT
A. A PVC 300 mm wide by 0.15 mm thick blue colored warning tape shall be laid
above the installed D.I. pipe as shown on the Drawings. This tape shall include the
following expression in Arabic and English and in black letters: “Caution, buried
DESCRIPTION
water line” or “caution, buried firewater line” whatever is applicable. This expression
Issued for IFC
shall be frequently repeated on the tape length to the satisfaction of Saudi Aramco
Representative.
A. Before any connection is made to the existing water system, the Contractor shall
inform Saudi Aramco Representative. Contractor shall check the level of any
existing line where a connection will be made, agree on a suitable procedure for the
work, and execute the work with minimum interference to the normal operation of
23-10028-
JO/EWO
0001
the system.
06/01/22
00
DISCIPLINE
Compacting.
ENGINEER
DATE:
CONSTRUCTION
- END OF SECTION -
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 132
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 133
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02622
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 2 - Products
2.01 Materials
23-10028-
JO/EWO
0001
Part 3 - Execution
06/01/22
DATE
00
DISCIPLINE
3.03 Warning Tape for uPVC Water Pipes
ENGINEER 3.04 Replacement and Connection to Existing Lines
3.05 Field Quality Control
DATE:
3.06 Disinfection of Domestic Water Piping
PROJECT
ENGINEER 3.07 Testing of Backfill
3.08 Restoration of Pavements
DATE:
CERTIFIED
PART 1 - GENERAL
DATE:
CONSTRUCTION
AGENCY 1.01 Description
DATE:
A. Work in this Section includes, but is not limited to; furnishing and installing
OPERATIONS
pressurized uPVC pipe for water applications with the related fittings as indicated on
the Drawings.
DATE:
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 133
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 134
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.03 Reference Standards
0001
A. Codes and Standards: Comply with the provisions of the latest editions of the
codes, Specifications and standards indicated under the sub-section references,
NO.
REV
00
DISCIPLINE
except as otherwise shown or specified.
ENGINEER
B. Pipe Testing: Materials and installed work may require testing as specified or as
DATE:
directed by Saudi Aramco Representative.
PROJECT
ENGINEER
DATE: 1. Submit shop drawings and descriptive literature showing pipe dimensions,
CONTROL NUMBER
joints, joint gaskets, pipe stiffness, and details for each size of pipe indicated.
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
specification.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 134
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 135
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.07 Services of the Manufacturer's Representative
provided to instruct the Contractor’s personnel in the installation of the pipe. Said
representative shall be available on a continuing basis as may be necessary to
ensure that joints are being properly made and that the pipe is being installed in
accordance with the recommendations of the manufacturer.
PART 2 - PRODUCTS
DESCRIPTION
2.01 Materials
Issued for IFC
A. Pipe materials, fittings and joints shall comply to SASO Standard 14/15.
PART 3 - EXECUTION
0001
3.02 Installation
NO.
REV
00
DISCIPLINE
A. Conform to the requirements of applicable International Standards and as specified
ENGINEER herein.
DATE:
B. Inspect pipe and fittings before installation to detect defects. Mark defective
PROJECT
ENGINEER materials with paint and promptly remove from site.
DATE: C. Before any pipe or fitting is lowered into the trench it shall be carefully checked to
CERTIFIED
ensure that it is not cracked or damaged in any way. Damaged pipe shall, after
Saudi Aramco Representative approval, be cut, so that flawless pipe is obtained
DATE:
CONSTRUCTION
with the least possible waste.
AGENCY
D. When placing pipe in the trench, fabric slings shall be used. The pipe shall not be
DATE:
dragged along the bottom of the trench, nor humped, and it shall be supported by
OPERATIONS
the sling while being fitted to the adjacent pipe. No metal tools or heavy objects
should be permitted to come into unnecessary contact with the pipe or fittings.
DATE:
CONTROL NUMBER
E. The pipe shall be laid at the level and gradient stipulated, on a prepared bed as
VERIFICATION
specified in Section 02210 with special hollows made for the joints. The pipe shall
EDSD
be aligned carefully in both the horizontal and vertical planes. Pipe shall be
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
F. Every precaution shall be taken to prevent foreign matter from entering the pipe or
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
fittings. During laying operations, no debris, tools, cloth or other materials are to be
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 135
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 136
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
G. At times when pipe laying is not in progress, the open ends of the pipe shall be
sealed by temporary watertight plugs supplied by the Contractor.
ENGG CERT
I. For pressure piping, construct concrete anchorages and thrust blocks required at all
tees, bends, reducers, plugs and wherever specified by Saudi Aramco
Representative. Concrete shall comply with Section 03300 Cast-In-Place Concrete
and shall be placed as shown on the Drawings.
DESCRIPTION
K. Clear the interior of pipe of dirt and other material as the Work progresses.
A. A PVC 300 mm wide by 0.15 mm thick blue colored warning tape shall be laid
above the installed uPVC pipe as shown on the Drawings. This tape shall include
the following expression in Arabic and English and in black letters: “Caution, buried
23-10028-
JO/EWO
0001
water line”. This expression shall be frequently repeated on the tape length to the
satisfaction of Saudi Aramco Representative.
06/01/22
DATE
00
DISCIPLINE
A. Before any connection is made to the existing water system, the Contractor shall
ENGINEER inform Saudi Aramco Representative. Contractor shall check the level of any
existing line where a connection will be made, agree on a suitable procedure for the
DATE:
work, and execute the work with minimum interference to the normal operation of
PROJECT
ENGINEER the system.
B. Before testing, the pipes shall be thoroughly flushed to the satisfaction of Saudi
DATE:
Aramco Representative.
OPERATIONS
1. Install all temporary piping, valving, meters, gauges and equipment required
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
2. After completing the installation of a section, hydrostatic tests of the line shall
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 136
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 137
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3. The tested sections shall be provided with adequately braced stop ends; the
use of valves to close off the tested sections will not be permitted.
ENGG CERT
4. Hydrostatic test at 1035 kPa(ga) (150 psig), or 345 kPa (50 psig) above the
maximum operating pressure, whichever is greater, shall be performed on
the piping system in the trench prior to backfilling. Prior to testing, adequate
concrete thrust blocks shall be placed.
Pressure shall be maintained for 4 hours without any drop. If pressure falls,
the line shall be inspected with particular attention given to each joint until
the leaks are located. After the line has been depressurized and repaired,
DESCRIPTION
the pressure test shall continue for 1 hour, at which time no more leakage
Issued for IFC
shall be present.
A. Furnish all equipment and materials necessary to disinfect the new water piping and
perform the work in accordance with the procedure outlined in applicable
International Standards.
0001
Compacting.
DATE
00
DISCIPLINE
ENGINEER A. All existing pavements (asphalt and concrete) disturbed during trenching operation
shall be restored to their original condition or better by the Contractor. Cutting and
DATE:
restoration of pavements shall be done strictly in accordance with Section 02575.
PROJECT
ENGINEER
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 137
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 138
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02623
ENGG CERT
SUBSECTION INDEX
Part 1 - General
DESCRIPTION
1.01 Description
Issued for IFC
Part 2 - Products
23-10028-
JO/EWO
0001
Part 3 - Execution
NO.
REV
00
DISCIPLINE
3.01 Excavation, Preparation of Trench and Backfill
ENGINEER 3.02 Installation
3.03 Testing
DATE:
3.04 Disinfection (Water Line Only)
PROJECT
ENGINEER 3.05 Warning Tapes
3.06 Connection to Existing Lines
DATE: 3.07 Testing of Backfill
CERTIFIED
3.08 Restoration of Pavements
DATE:
CONSTRUCTION
AGENCY PART 1 - GENERAL
DATE:
1.01 Description
OPERATIONS
A. Work in this Section includes, but is not limited to; furnishing and installing RTR pipe
DATE: and fittings as indicated on the Drawings and as herein specified.
CONTROL NUMBER
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 138
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 139
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.03 Reference Standards
0001
Fittings.
NO.
REV
00
DISCIPLINE
6. ASTM D2996 - Specification for Filament-Wound, "Fiberglass” (Glass-Fiber-
ENGINEER Reinforced - Thermosetting - Resin) Pipe.
DATE:
7. ASTM D3567 - Practice for Determining Dimensions of "Fiberglass" (Glass-
PROJECT
ENGINEER Fiber-Thermosetting-Resin) Pipe and Fittings.
A. Codes and Standards: Comply with the provisions of the latest editions of the codes,
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 139
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 140
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.05 Delivery, Handling and Storage
A. Pipe or pipe bundles may be stored for extended periods in stacks up to 1.20 m (4 ft.)
ENGG CERT
high. The sides must be stabilized to prevent slumping. A leveled, soft earth surface
free of rocks and other hard or sharp objects is recommended. If stored in racks or
on bearing boards, the supports should be at least 75 mm (3 in.) wide and smooth or
cushioned. The supports should be placed at two locations approximately 1.20 or
1.50 m (4 or 5 ft.) from each end for 6 m (20-ft.) lengths. For 12 m (40-ft.) lengths, 4
supports should be used with two of them placed approximately 1.20 or 1.50 m (4 or
5 ft.) from each end and the other two placed at 3 m (10-ft.) intervals to support the
middle of the pipe.
DESCRIPTION
B. Follow normal procedures for carrying pipe along work site, installing pipe where it will
be protected from traffic and impact.
C. Pipe supplied in 6 m (20-ft.) lengths should be lifted and carried at the center by hand
or using webbed straps or rope. If handled at the ends, avoid touching and
contaminating the joining surfaces.
D. Pipe supplied in 12 m (40-ft.) lengths should be lifted (and carried) at two points about
3 m (10 ft.) from each end. Use rope or web slings for mechanically lifting the pipe.
23-10028-
JO/EWO
0001
E. Small size fittings should be removed from cartons, closely inspected and stored in
06/01/22
shelves, preferably inside a warehouse. Note that extended storage of fittings outside
DATE
their carton and under direct sun will tend to impair their exterior appearance, but will
not affect their physical strength.
NO.
REV
00
DISCIPLINE
ENGINEER F. Flanges should be stored in a manner protecting the sealing rings on the flange face
against damage.
DATE:
PROJECT
ENGINEER G. Nylon locking keys and “O”-rings must be stored indoors in their original shipping
containers, protected from direct sunlight and temperature extremes.
DATE:
CERTIFIED
H. Adhesives should be stored indoors at temperatures below 100oF. Extended storage
at higher temperature will degrade the catalyst and the resin, and reduce adhesive
DATE:
CONSTRUCTION
strength. In order to monitor the remaining storage life and to properly rotate the
AGENCY stock, remove the kits from shipping cartons and stack them upright so that expiration
dates are visible. Ensure that older kits are used first.
DATE:
OPERATIONS
1.06 Submittals
DATE: A. The Contractor shall submit shop drawings, detailed and descriptive literature
CONTROL NUMBER
showing pipe dimensions, pipe layouts in full detail, locations of hangers and
VERIFICATION
manufacturer's quality control and inspection procedures, joint and fitting details,
DATE:
pipes and other relevant details for the type and class of pipe to be furnished, for
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 140
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 141
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Certification that pipe, fittings and all other materials comply with the requirements of
this specification.
ENGG CERT
PART 2 - PRODUCTS
A. RTR pipe and fittings shall comply with International Standards and as described
herein.
23-10028-
JO/EWO
0001
00
DISCIPLINE
ENGINEER 3. RTR pipe and fittings shall be in accordance with applicable International
Standards line Class 12FEOU specification with mechanical key lock joining
DATE:
system for underground pipes. For above ground piping joining shall be
PROJECT
ENGINEER adhesive quick lock and flanged connection as shown on the Drawings. The
flanges shall meet the dimensional requirements of ANSI B16.5 Class 150.
DATE:
CERTIFIED
4. When RTR pipe is connected to or passing through a structure, the Contractor
shall provide at least two mechanical keylock couplings within a distance of
DATE:
CONSTRUCTION
not more than 3 meters each side from the structure.
AGENCY
5. Special fittings shall be provided where necessary and as per RTR pipe
DATE:
manufacturer recommendation.
OPERATIONS
Supports. Contractor shall submit shop drawings for RTR pipe support as
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 141
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 142
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PART 3 - EXECUTION
3.02 Installation
B. Inspect pipe and fittings before installation to detect defects. Mark defective materials
with paint and promptly remove from site.
C. When placing pipe in the trench, fabric slings shall be used. The pipe shall not be
dragged along the bottom of the trench, nor humped, and it shall be supported by the
sling while being fitted to the adjacent pipe. No metal tools or heavy objects shall be
permitted to come into unnecessary contact with the pipe or fittings.
D. The pipe shall be laid at the level and gradient stipulated, on a prepared bed with
23-10028-
JO/EWO
0001
special hollows made for the joints. The pipe shall be aligned carefully in both the
horizontal and vertical planes. Pipe shall be uniformly bedded throughout its length.
06/01/22
DATE
E. Every precaution shall be taken to prevent foreign matter from entering the pipe or
fittings. During laying operations, no debris, tools, cloth or other materials are to be
NO.
REV
00
DISCIPLINE
allowed to enter the pipe.
ENGINEER
F. At times when pipe laying is not in progress, the open ends of the pipe shall be sealed
DATE:
by temporary watertight plugs supplied by the Contractor.
PROJECT
ENGINEER
H. Construct concrete anchorages and thrust blocks required at all tees, bends, reducers
DATE:
CONSTRUCTION
and plugs. Concrete shall be as specified in Section 03300.
AGENCY
I. Pipe and fittings shall not be dropped into trench. Protect from all types of impact and
DATE:
excessive overheating causing deformation or permanent damage to pipe.
OPERATIONS
J. Clear the interior of pipe of dirt and other material as the work progresses.
DATE:
CONTROL NUMBER
DATE:
L. Sand shall be uniformly compacted around the pipe with particular care given to the
BY:
bedding beneath the haunches of the pipe. Sand may be compacted by hydraulic
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
methods if the native soil in which the trench is excavated is free draining. If trench is
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
not free draining, placement of damp sand will facilitate compaction. Sand bedding
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 142
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 143
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
M. Backfill shall be deposited as specified in Section 02210, Excavation, Trenching,
Backfilling and Compacting.
ENGG CERT
In-place tests of soil density shall be made in accordance with ASTM D1556 or ASTM
D2167.
Mechanical compactors may be used provided harmful shock loads are not
transmitted to the pipe. Maintaining a space of at least one foot between tamping feet
and pipe wall should avoid damage to the pipe wall.
DESCRIPTION
N. The minimum earth cover above the pipe crown shall be as per SAES-S-070.
Issued for IFC
O. RTR pipe under structure or with earth cover less than specified shall be encased in
reinforced concrete or laid under a berm as per manufacturer recommendation or as
indicated on Drawings.
3.03 Testing
0001
B. Before testing, the pipes shall be thoroughly flushed to the satisfaction of Saudi
NO.
REV
00
DISCIPLINE
Aramco Representative.
ENGINEER
DATE: 4. Hydrostatic test at 1035 kPa(ga) (150 psig), or 345 kPa (50 psig) above the
CONTROL NUMBER
the piping system in the trench prior to backfilling. Prior to testing, adequate
EDSD
Pressure shall be maintained for 4 hours without any drop. If pressure falls,
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
the line shall be inspected with particular attention given to each joint until
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
the leaks are located. After the line has been depressurized and repaired,
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 143
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 144
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
the pressure test shall continue for 1 hour, at which time no more leakage
shall be present.
ENGG CERT
1. Potable water piping network installed under the School’s contract shall tie-
in with the main potable water network (installed by others) at the interface
points. The interface tie-in joint shall be tested by isolating the piping
between the potable water isolation valve (installed by others) upstream of
the potable water interface tie-in and the backflow preventer (school’s
contract) downstream of the potable water tie-in connection. Alternative
DESCRIPTION
2. School contractor shall connect the waterline at the tie-in point and perform
the hydrostatic testing at the interface after the origin contractor has
received a formal acceptance of the hydrostatic testing from Saudi Aramco
Representative between the tie-in point and the first water isolation valve.
Origin contractor shall perform his hydrostatic tests in open and closed
position of the isolation valve.
23-10028-
JO/EWO
0001
1. Fire water piping network installed under the School’s contract shall tie-in
with the main fire water network (installed by others) at the interface points.
NO.
REV
00
DISCIPLINE
The interface tie-in joint shall be tested by isolating piping between the fire
ENGINEER water isolation valve (installed by others) upstream of the fire water
interface tie-in and a portion of the fire water network (school’s contract)
DATE:
downstream of the fire water tie-in connection. Isolation of piping could be
PROJECT
ENGINEER achieved by removing the isolation valve and installation of blind flange or
closing the isolation valve. Alternative proposal for isolation of piping could
DATE: be proposed by the Contractor for Saudi Aramco review and approval.
CERTIFIED
Hydrostatic test shall be performed in accordance with the requirements of
applicable International Standards.
DATE:
CONSTRUCTION
AGENCY 2. School contractor shall connect the fire waterline at the tie-in point and
perform the hydrostatic testing at the interface after the origin contractor
DATE:
has received a formal acceptance of the hydrostatic testing from Saudi
OPERATIONS
Aramco Representative between the tie-in point and the first fire water
isolation valve. Origin contractor shall perform his hydrostatic tests in open
DATE: and closed position of the isolation valve.
CONTROL NUMBER
VERIFICATION
DATE:
A. Furnish all equipment and materials necessary to disinfect the new water piping and
BY:
perform the work in accordance with the procedure outlined in the Saudi Aramco
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 144
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 145
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.05 Warning Tapes
A. RTR Water Main: A detectable magnetic plastic warning tape shall be laid above
ENGG CERT
the installed water pipes as shown on the Drawings. This tape shall include the
following expression in Arabic and English and in black letters: “Caution, buried
water line”. This expression shall be frequently repeated on the tape length to the
satisfaction of Saudi Aramco Representative.
A. Before any connection is made to the existing system, the Contractor shall inform
DESCRIPTION
Saudi Aramco Representative. Contractor shall check the level of any existing line
Issued for IFC
where a connection will be made, agree on a suitable procedure for the work, and
execute the work with minimum interference to the normal operation of the system.
0001
A. All existing pavements (asphalt and concrete) disturbed during trenching operations
06/01/22
00
DISCIPLINE
- END OF SECTION -
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 145
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 146
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02720
ENGG CERT
DRAINAGE SYSTEM
SUBSECTION INDEX
Part 1 - General
1.02 Submittals
Issued for IFC
Part 2 - Products
Part 3 - Execution
3.01 Examination
23-10028-
JO/EWO
0001
3.02 Installation
06/01/22
DATE
PART 1 - GENERAL
NO.
REV
00
DISCIPLINE
1.01 Related Work
ENGINEER
DATE: C. Section 02622 – UPVC (Unplasticized Polyvinyl Chloride Pipe and Fittings.
CERTIFIED
1.02 Submittals
DATE:
CONTROL NUMBER
Specification Sections.
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
1. Concrete catchbasin with cast iron grating cover and frame connected to 2-
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
200 mm dia. UPVC pipes opening from the wall, discharging by surface
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 146
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 147
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Catchbasin is 1.0 meter x 1.0 meter square (inside dimension) x 1.0 meter
height.
ENGG CERT
2. Concrete catchbasin with cast iron grating cover for shaded courtyard
connected to 300 mm dia. UPVC pipes and 3-200 mm dia. UPVC pipes
opening from the wall, discharging by surface outside the perimeter wall.
3. Concrete channel with FRP grating cover connected to 1.50 meter wide x 1.0
meter height concrete open channel and concrete sump which will serve as
suction point (applicable for Saihat school only).
DESCRIPTION
A. Site Information: Perform site survey, and verify existing utility locations. Verify that
the drainage system may be installed in compliance with the original design and
referenced standards.
PART 2 - PRODUCTS
0001
and 03300).
NO.
REV
00
DISCIPLINE
B. uPVC pipes and fittings shall conform with the requirements of Section 02622.
ENGINEER
DATE:
CONSTRUCTION
PART 3 - EXECUTION
AGENCY
3.01 Examination
DATE:
OPERATIONS
A. Verify that excavation base is ready to receive work and excavations, dimensions,
and elevations are as indicated on the Drawings.
DATE:
CONTROL NUMBER
3.02 Installation
DATE:
BY:
A. Refer to Sections 02231, 2610, 02622, 03100, 03200, 03251, and 03300.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
- END OF SECTION -
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 147
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 148
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02725
SUBSECTION INDEX
Part 1 - General
1.01 Description
1.02 Related Work
DESCRIPTION
Part 2 - Products
0001
Part 3 - Execution
DATE
3.01 General
NO.
REV
00
DISCIPLINE
3.02 Layout and Verification
ENGINEER 3.03 Trenching, Backfilling and Compaction
3.04 Pipe and Fittings, Handling, Transportation, Storage and Installation
DATE:
3.05 Temporary Plug and Protection of uPVC Pipe in Open Trenches
PROJECT
ENGINEER 3.06 Valves and Controllers
3.07 Bubblers/Emitters
DATE: 3.08 Sprinklers
CERTIFIED
3.09 Adjustment of System
3.10 Field Hydrostatic Pressure Test
DATE:
CONSTRUCTION
3.11 Mode of Operation
AGENCY 3.12 Disinfection
3.13 Restoration of Pavements
DATE:
OPERATIONS
PART 1 - GENERAL
DATE:
CONTROL NUMBER
1.01 Description
VERIFICATION
EDSD
A. The extent of irrigation water network is shown on the Drawings and includes
DATE:
furnishing, installing, and testing the networks, and their associated works together
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
Drawings.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 148
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 149
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.02 Related Work
1. AWWA C 500 - Gate Valves, 3 through 48 in. NPS for Water and Sewage
Systems.
DESCRIPTION
0001
00
DISCIPLINE
ENGINEER A. Contractor shall coordinate through Saudi Aramco Representative with all concerned
Agencies to exactly identify and locate all utilities. Contractor If required shall perform
DATE:
trial holes to locate existing utilities.
PROJECT
ENGINEER
B. Hydrotest of the irrigation water lines shall be carried out using clean water.
DATE:
CERTIFIED
C. Electric solenoid valve control wires (300v Class) shall be AWG solid copper direct
burial cable as shown on the Drawings.
DATE:
CONSTRUCTION
AGENCY
PART 2 - PRODUCTS
DATE:
OPERATIONS
2.01 Pipe and Fittings
DATE: A. General: Individual types of pipe and fittings supplied shall be products of one
CONTROL NUMBER
B. Plastic Pipe: All plastic pipe shall be free of blisters, internal striations, cracks, and
DATE:
other defects and imperfections. Pipe shall be continuously and permanently marked
BY:
with the manufacturer's name, material type, size, schedule or class, and quality
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
control identifications.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 149
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 150
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Irrigation pipes diameter 3 inches and smaller shall be UPVC pipes Schedule 40,
solvent welded socket joints and Schedule 80 for exposed pipes.
ENGG CERT
D. Irrigation pipes diameter 110 mm and larger shall be UPVC pipes Class 5,
elastomeric ring joints.
F. Flexible swing joints shall be used for connecting irrigation heads to the irrigation
piping.
DESCRIPTION
A. Gate valve 100 mm (4 in) and larger shall be direct buried as shown on the Drawing.
B. Electric remote control solenoid valves shall be Rainbird Model PEB or approved
equal.
D. Valve boxes shall be Rainbird Model 1419/1324 or approved equal with "Irrigation
23-10028-
JO/EWO
0001
00
DISCIPLINE
F. Electric solenoid valve control cables (300V Class) shall be AWG solid copper direct
ENGINEER burial cable. One common (white) is to connect all valves for each controller. Each
valve shall have one control wire (black) run to the controller.
DATE:
PROJECT
ENGINEER G. Controller Rainbird Model ESP-MC, 120 V, single phase, 60 Hz. or approved equal,
shall be used.
DATE:
CERTIFIED
H. All controllers shall be wall mounted.
DATE:
CONSTRUCTION
2.03 Computer Controllers
AGENCY
B. The solenoid remote control valves shall be compatible with the approved computer
DATE: controller.
CONTROL NUMBER
VERIFICATION
DATE:
A. Pressure Compensating Full Circle Bubblers Rainbird Model 1400 Series or approved
BY:
equal shall be used for all trees and high shrubs as shown on the Drawings.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
B. Pressure compensating single outlet emitters shall be used to irrigate ground cover
(DCC) NO. _____________________
plants and other shrubs. Emitters shall be self-cleaning model Rainbird XB-10, 1.0
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 150
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 151
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
GPH to irrigate ground cover plants, and XB-20 2.0 GPH to irrigate other shrubs, or
approved equal.
ENGG CERT
A. Spray Sprinkler Heads shall be Rainbird Model 1800 series SAM pop-up sprinkler
with plastic match precipitation rate (MPR) nozzle as shown on the Drawings.
Contractor may use equal and approved alternative.
DESCRIPTION
PART 3 - EXECUTION
3.01 General
0001
C. Verify locations of all proposed and existing lines and appurtenances prior to
06/01/22
00
DISCIPLINE
ENGINEER 3.02 Layout and Verification
DATE:
A. Stake the layout of all pipe, valves, sprinklers and bubblers as shown as accurately as
PROJECT
ENGINEER possible. Irrigation lines drawings except main lines’ are diagrammatic. Offsets, and
fittings are not shown.
DATE:
CERTIFIED
B. Verify all horizontal and vertical site dimensions prior to staking the system. Do not
exceed bubbler and sprinkler head spacings as shown. Adjustment to head, as
DATE:
CONSTRUCTION
necessary, shall be reviewed by Saudi Aramco Representative.
AGENCY
E. Where items are relocated without prior permission of Saudi Aramco Representative,
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
remove and reinstall such items at Contractor's expense as necessary and approved
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 151
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 152
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.03 Trenching, Backfilling and Compaction
A. Perform all trenching, backfilling and compaction necessary for this portion of the
ENGG CERT
B. Settlement of backfilled trenches occurring during the first year from final acceptance
shall be repaired by Contractor. This shall include complete restoration of all
damaged planting, paving, and other improvements as required by Saudi Aramco
Representative.
DESCRIPTION
A. All pipes and fittings, handling, transportation, storage, bedding, laying and
assembling shall follow the manufacturer's instructions and recommendations
approved by Saudi Aramco Representative.
A. When pipe laying operation is halted for any reason, ends of pipes shall be capped
temporarily. The plug shall remain in place until the pipe laying operation commences
23-10028-
JO/EWO
0001
B. Do not expose the pipe to direct sunlight. Make provisions for shading pipe joints
DATE
00
DISCIPLINE
3.06 Valve and Controller
ENGINEER
A. Electric solenoid valves shall be installed in standard irrigation valve box shown on
DATE:
the Drawings. Gravel sump shall be minimum 50 mm (2 in) to be placed at the bottom
PROJECT
ENGINEER of valve boxes.
DATE: B. In general, male threads on PVC pipes shall only be allowed for irrigation equipment
CERTIFIED
and clamp connections unless directed otherwise. All threaded connections shall be
wrapped with Teflon thread sealant.
DATE:
CONSTRUCTION
AGENCY C. Station number shall be corresponding to the solenoid valve timing schedules. If the
number of stations connected to the controller is less than the total capacity of the
DATE:
controller, then the unused stations shall remain standby for future connections, if
OPERATIONS
required.
DATE: D. The controllers shall be located as shown on the Drawings. Contractor shall connect
CONTROL NUMBER
3.07 Bubblers/Emitters
DATE:
BY:
A. Bubblers shall be provided to all trees. All palm trees shall be provided with 2.0 gpm
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
bubbler Model 1408, other trees shall be provided with 1.0 gpm bubbler Model 1404,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
and all shrubs shall be provided with 0.5 gpm bubbler Model 1402. Bubblers shall be
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 152
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 153
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Emitters shall be distributed to provide uniform water applications in mass planting of
ground cover plants. Emitters shall be spaced at maximum 0.4 m on center. Emitter
ENGG CERT
3.08 Sprinklers
A. Sprinkler head shall be located near the edge of sidewalks and walls. Sod strip shall
be placed around each head. Sprinklers shall be as described in Section 2.05.
DESCRIPTION
B. Sprinkler heads shall be so spaced to ensure that the grass/ground cover plants area
Issued for IFC
is fully covered with water. In no instance shall the spacing exceed the
manufacturer's recommendation. Locations of sprinkler heads are as shown on
Drawings.
0001
B. Sprinkler head shall be adjusted for proper operation and coverage so that no water is
DATE
thrown onto the structure. Minimum overthrow is permitted unto the sidewalks.
NO.
REV
00
DISCIPLINE
C. In the event manufacturing defects impair proper performance of irrigation equipment,
ENGINEER immediately rectify the condition as approved by Saudi Aramco Representative.
DATE:
3.10 Field Hydrostatic Pressure Test
PROJECT
ENGINEER
A. Flushing: All pipe shall be thoroughly flushed out before installing remote control
DATE: valves or caps/plugs and any other related activities or testing. Flushing procedures
CERTIFIED
shall be submitted to Saudi Aramco Representative for review prior to flushing
operation.
DATE:
CONSTRUCTION
AGENCY B. Pressure Testing: Furnish all equipment and material and make all necessary
provisions for thoroughly bleeding the line of air and debris. Testing shall be as
DATE:
herein specified. The gauge used for pressure test shall be certified and approved by
OPERATIONS
Saudi Aramco Representative.
DATE: 1. A hydrostatic test pressure of 100 psi shall be applied to the irrigation piping.
CONTROL NUMBER
The piping shall be tested for a duration of a 4 hours with the line partially
VERIFICATION
backfilled with all joints exposed. Do not cover the work until it has been
EDSD
2. Carefully examine piping, joints, valves, fittings plugs, caps and other potential
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
leak sources during testing. Ensure the leakage rate at these points does not
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
exceed 2 l/h (0.53 gal/h) per 100 joints, irrespective of pipe diameter size,
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 153
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 154
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3. The hydrostatic test shall be repeated after the repair of any defects until the
system is proved satisfactory. During the test regardless of the amount of
ENGG CERT
5. Method of disposal of water for testing and flushing will be subject to prior
written approval.
DESCRIPTION
A. All equipment and material shall be installed in accordance with the manufacturer's
published instruction and as specified. Deviations from manufacturer's instructions
will be permitted only with the written approval of Saudi Aramco Representative.
0001
D. Each solenoid valve connected to it's respective controller shall have the same
06/01/22
E. Enter program data in accordance with manufacturer's instructions and upon approval
NO.
REV
00
DISCIPLINE
of initial water schedule. Lock the program upon completion. Refer to Drawings for
ENGINEER scheduling information.
DATE:
F. Watering schedule is based on the irrigation control valve schedule for the whole
PROJECT
ENGINEER system as shown on the Drawings. Bubblers, emitters and sprinklers shall be
distributed to provide uniform water application in all planting without over watering
DATE: any plants.
CERTIFIED
3.12 Disinfection
EDSD
DATE:
A. Disinfect and test all lines in accordance with the requirements of applicable
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
Disinfect before final backfill around valves. Remove all disinfection equipment and
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 154
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 155
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Operating Tests: Following approval of the disinfection, conduct operating tests in the
presence of Saudi Aramco Representative and Municipality Representative to verify
that each valve is in proper working condition. Whenever practicable conduct
ENGG CERT
A. All existing pavements (asphalt and concrete disturbed during trenching operation
shall be restored to its original condition or better by the Contractor.
DESCRIPTION
- END OF SECTION -
Issued for IFC
23-10028-
JO/EWO
0001
06/01/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 155
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 156
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02790
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.3 References
Issued for IFC
Part 2 - Products
0001
2.2 Manufacturer
2.3 Materials
06/01/22
00
DISCIPLINE
Part 3 - Execution
ENGINEER
3.1 General
DATE:
3.2 Product Delivery, Storage and Handling
PROJECT
ENGINEER 3.3 Plugs and Fittings
3.4 Turf Installation
DATE: 3.5 Infill Installation
CERTIFIED
3.6 Testing
3.7 Cleaning and Completion
DATE:
CONSTRUCTION
AGENCY
DATE:
PART 1 - GENERAL
OPERATIONS
including under field drainage, field turf, field markings and resilient infill material.
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 156
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 157
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.3 References
ENGG CERT
Covering Materials
Issued for IFC
A. The Contractor shall verify clearing and grubbing operations were adequate prior to
preparing subgrade.
23-10028-
JO/EWO
0001
B. The Contractor, along with the Engineer, Grading Subcontractor (if applicable) and
Synthetic Turf Subcontractor (if applicable), shall attend a joint inspection of the
completed sub-base assembly for the purpose of determining the acceptability of that
06/01/22
DATE
surface prior to installing the synthetic turf product and to confirm actual site
dimensions.
NO.
REV
00
DISCIPLINE
ENGINEER C. The inspection shall include a check for planarity. The finished surface shall not vary
from a true plane more than 1/4” in 10 feet when measured in any direction. The
DATE: Contractor shall provide all required tools and materials needed for the planarity
PROJECT
ENGINEER check, which may include but not be limited to, a laser level, string line, straight edge
and/or other assessment materials. The Contractor shall mark in the field any
DATE: deviations from grade in excess of those specified above, as well as provide a
CERTIFIED
marked up plan locating the deviations. The Contractor shall correct any deviations to
the satisfaction of the Engineer and Synthetic Turf installer.
DATE:
CONSTRUCTION
AGENCY D. The compaction of aggregate base shall be 95% to Standard Proctor and surface
tolerances shall not exceed ¼” over 10 feet.
DATE:
OPERATIONS
E. The Contractor shall have a Saudi Arabia registered surveyor conduct an elevation
survey of the field area in a 25’ grid to determine and verify that subgrade elevations
DATE: and slopes are within previously specified tolerances. This elevation survey may
require further verification of smaller areas within the 25’ grid if determined necessary
CONTROL NUMBER
VERIFICATION
by the Engineer.
EDSD
F. When any or all corrective procedures have been completed, the finished sub-base
DATE:
BY:
23-10028-0001-008
until the subbase surface is deemed acceptable by the Engineer and Synthetic Turf
Installer.
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 157
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 158
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
G. Once the sub-base surface has been deemed acceptable, the Contractor shall submit
a written certificate indicating the acceptance of:
ENGG CERT
H. Commencement of work under this section shall constitute acceptance of the work
completed under other sections by the Contractor, acceptance of dimensions of the
subbase, and hence, no claims for extra work based upon these conditions will be
permitted.
A. Install synthetic turf surfacing only when ambient air temperature is 35 F or above and
the relative humidity is below 35% or as specified by the product manufacturer.
23-10028-
JO/EWO
B. Install product only when prepared base is suitably free of dirt, dust, and petroleum
06/01/22
DATE
00
DISCIPLINE
ENGINEER
1.6 Quality Control
DATE:
1. Must be experienced in the manufacturing of tall pile synthetic infill grass
CERTIFIED systems with the same fiber as specified.
DATE: 2. Must have at least 5 fields of 65,000 sq. ft. or more of the specified material,
CONSTRUCTION
AGENCY
fiber, infill material and backing, or similar system, in play in the United States.
DATE:
B. Installer Qualifications: Company specializing in performing the work of this section.
OPERATIONS
1. The Synthetic Turf Installer must provide competent workmen skilled in this
DATE:
type of synthetic grass installation. All technicians must have installed tall pile
synthetic turf.
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
C. Prior to the beginning of installation, the Synthetic Turf Installer shall inspect the
OF THIS DRAWING IS COVERED, FOR ALL
23-10028-0001-008
subbase. The installer will accept the sub-base in writing when the general contractor
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 158
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 159
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
provides test results for compaction, planarity and permeability that are in compliance
with the synthetic turf manufacturer’s recommendations and as stated herein.
ENGG CERT
D. The Synthetic Turf Installer shall provide the necessary testing data to the Owner that
the finished field meets the required initial shock attenuation, as per ASTM F1936.
E. Remove defective Work, whether the result of poor workmanship, defective products
or damage, which has been rejected by the Engineer as unacceptable. Replace
defective work in conformance with the Contract Documents.
1.7 Submittals
DESCRIPTION
1. Submit the exact product name/description as well as the name and location
of the manufacturers and suppliers of each component. Manufacturers and
suppliers must not be changed after the contract is awarded unless approved
by the Owner in writing.
2. Submit two (2) samples, 12”x12” minimum size, illustrating details of finished
product as bid, including full cross section of subbase, turf, and infill material.
23-10028-
JO/EWO
0001
00
DISCIPLINE
of any activities not recommended relative to the warranty.
ENGINEER
number, for similar projects. These installations must have used the same
DATE:
manufacturer and product, or similar, proposed for this field, including the
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
this project shall be submitted with the proposal. Changes to this assignment
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 159
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 160
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
after contract can only be made if approved in writing by the Owner. Include a
listing of other on-site personnel and their experience.
ENGG CERT
9. The Synthetic Turf Installer and Turf Manufacturer shall provide evidence that
the turf system does not violate any other manufacturer’s patents, patents
allowed or patents pending.
10. The Synthetic Turf Installer and the Turf Manufacturer shall provide complete
information on its warranty/insurance policy and coverage, as noted in Section
1.08. Provide a complete sample copy of all warranty documentation.
DESCRIPTION
2. The Turf Manufacturer must submit the fiber manufacturer’s name, type of
fiber and composition of fiber.
23-10028-
JO/EWO
0001
00
DISCIPLINE
ENGINEER C. Prior to Final Acceptance, the Contractor shall submit to the Owner:
DATE: 1. Two (2) copies of Maintenance Manuals, which will include all necessary
PROJECT
ENGINEER instructions for the proper care and preventative maintenance of the synthetic
turf system, including painting and markings. Also address remedial
DATE: measures for graffiti removal.
CERTIFIED
4. Enter into a contract with the Owner to provide annual operations and
DATE: maintenance assistance for two (2) years. Provide contract, contact
CONTROL NUMBER
information and schedule first visit. Quarterly each year provide operations
VERIFICATION
inserts.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
b. The contractor shall sweep and groom the artificial synthetic turf area
at each quarterly visit.
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 160
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 161
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
c. Synthetic turf report with results of inspection analysis, photos, results
of cleaning process, recommendations for future
ENGG CERT
1.8 Warranty
A. The Contractor shall provide a minimum eight (8) year, 3rd party insured warranty
policy by the manufacturer, against defects in materials and workmanship. Defects
23-10028-
JO/EWO
0001
shall include, but not be limited to ultraviolet ray fading, degradation, or excessive
wear of fiber.
06/01/22
DATE
00
DISCIPLINE
ENGINEER C. Submit information confirming that a 3rd Party Insurance Policy, non-cancelable, non-
prorated, and pre-paid for the entire duration of the warranty is in effect covering this
DATE:
installation, and underwritten by a Best A Rated Insurance Carrier.
PROJECT
ENGINEER
D. Warranty shall be for full replacement of any damaged product within the warranty
DATE: period. Warranty shall be comprehensive and sufficient to replace entire field if
CERTIFIED
necessary.
DATE:
CONSTRUCTION
E. Warranty shall become effective from the date of substantial completion.
AGENCY
H. Submit Manufacturer Warranty and ensure that forms have been completed in
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
Insurance Carrier should a claim need to be made. Warranty insurance policy shall
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 161
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 162
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PART 2 - PRODUCTS
ENGG CERT
A. The Owner has conducted an extensive review of synthetic turf products, including
visiting installed sites and review of other agencies’ review criteria. Based upon their
research, they have established the following criteria for acceptance of a synthetic turf
product. No variation from these criteria shall be allowed. The Owner’s review is
considered final.
DESCRIPTION
B. The Synthetic Turf Installer shall have been in business for a minimum of 5 years.
Issued for IFC
C. The Synthetic Turf Installer shall have prior experience in the installation of synthetic
turf sports applications within the past 5 years in Kingdom of Saudi Arabia.
D. The Synthetic Turf Installer must provide a list of references based on previous
installations.
2.2 Manufacturer
23-10028-
JO/EWO
0001
00
DISCIPLINE
Kingdom of Saudi Arabia
ENGINEER +966 13-812 1919
+966 13 812 1818
DATE:
PROJECT
ENGINEER B. XGRASS
205 Boring Drive
DATE: Dalton, GA 30721
CERTIFIED
USA
Tel. 706-272-0140
DATE:
CONSTRUCTION
877-881-8477
AGENCY
2.3 Materials
DATE:
OPERATIONS
A. Turf Fiber: Performx from XGrass® 110 Howell Rd. Dalton, GA 30721 Phone (877)
881-8477 or approved equal.
DATE:
CONTROL NUMBER
1. The turf fiber must be tufted to the backing with a minimum tuft bind of 6
VERIFICATION
pounds.
EDSD
2. The tufted fiber weight shall be a minimum of 45 ounces per square yard.
DATE:
BY:
REVISIONCERTIFICATION
3. The turf fiber shall be 100% polyethylene with a minimum yarn density of 8000
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
denier.
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 162
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 163
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. The turf fiber shall be non abrasive and a minimum of 100 microns thick.
5. The turf fiber must contain less than 100 ppm of lead in all colors.
ENGG CERT
7. The turf fiber shall be UV resistant and be guaranteed against fading for the
full warranty period of 10 years.
8. The turf fiber must be a minimum of 2 inches in height with a minimum tufting
gauge length of 3/8 of an inch.
DESCRIPTION
9. The turf fiber must retain a minimum of 75% of its original fibril width after
10,000 cycles on the Lisport Studded Roll Test Machine.
B. Backing Material
Primary Backing:
0001
Secondary Backing:
NO.
REV
00
DISCIPLINE
1. Secondary backing system weight must be a minimum of 12 ounces/ square
ENGINEER yard.
DATE:
2. Secondary backing system shall consist of a hot melt application created from
PROJECT
ENGINEER the injection of a thermoplastic polyolefin compound that encapsulates the
tufted bundle before the lamination of a 100% virgin polypropylene nonwoven
DATE: geotextile fabric.
CERTIFIED
3. Secondary backing system shall have minimum tuft bind strength of 6 pounds.
DATE:
OPERATIONS
C. Turf roll seams to be securely joined on site so that no openings larger than the
porous backing mat openings are created. Roll width to coincide with tufted-in artificial
DATE: grass area where possible. All turf fabric edges to be securely bound as per the
CONTROL NUMBER
perimeter detail design. Adhesives for joining seams of turf together shall be Nordot
VERIFICATION
DATE:
D. Fabric surface shall be constructed and installed in minimum widths of 15 feet with no
BY:
longitudinal or transverse seams, except for inlaid lines with a finish roll assembly.
REVISIONCERTIFICATION
Seams shall be 15’-0” apart. Rolls that do not comply with the proper length or
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 163
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 164
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
F. The entire system shall be resistant to weather, including ultra-violet light and heat
degradation; insects, rot, mildew and fungus growth and be non-allergenic and non-
ENGG CERT
toxic.
G. Fiber Colors: Submit samples of the full available color palette for owner approval
prior to placing order for turf including at a minimum the below listed colors:
H. The turf material shall be non-combustible and pass the DIN standard Pill Burn test or
DESCRIPTION
ASTM D 2859.
Issued for IFC
B. Any adhesive products required for the installation of a proposed turf system shall be
purpose-suited to the system. The material and application methods shall be as
recommended by the adhesive manufacturer.
23-10028-
JO/EWO
0001
C. Disposal of adhesive containers and unused adhesives as well as any fees resulting
from such disposal shall be the responsibility of the Contractor.
06/01/22
DATE
00
DISCIPLINE
A. The synthetic infill material shall consist of a blend of graded, silica sand and treated
ENGINEER and mixed ground rubber.
DATE:
1. Sand: specially-graded, dust-free silica sand shall be placed on the turf in a
PROJECT
ENGINEER minimum quantity of 1.5 pounds/ square foot and shall include test results that
demonstrate the following minimum properties:
DATE:
CERTIFIED
a. Color – tan
b. Sand shall be round non-angular in shape
DATE:
CONSTRUCTION
c. Roundness – 0.6+
AGENCY d. Hardness - 0.6-0.8 on the Mohs Scale
e. Size – 1.00 mm ± 0.15 mm
DATE:
f. Density – 90 – 95 lbs/ cu ft
OPERATIONS
g. Dust - < 0.001 %
h. Angle of Repose - < 30°
DATE: i. Sand shall be heavy metal safe
CONTROL NUMBER
VERIFICATION
black, 10-18 mesh, that is 99% fiber free and is heavy metal safe. Rubber
shall be placed on the turf in a minimum quantity of 3.5 pounds/ square foot
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 164
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 165
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Mesh Size % Retained
10 0-15%
ENGG CERT
12 5-30%
16 40-70%
20 15-35%
30 0-10%
40 0-
1% Pan 0-
1%
B. The infill materials shall be installed to allow an exposed fiber of not less than 1/2 inch
DESCRIPTION
C. Sufficient quantities of the top-dressing infill material must be stored on site at the
time of installation to be used 90 days after the completion of the installation to
mitigate the differential settling of high traffic zones on the field. This fill addition must
be carried out by the Contractor within the time specified above.
PART 3 - EXECUTION
23-10028-
JO/EWO
0001
3.1 General
06/01/22
DATE
DISCIPLINE
ENGINEER
B. Perform all work in strict accordance with the Contract Documents and the
DATE: manufacturer’s specifications and instructions. Only those skilled technicians
PROJECT
ENGINEER
proposed in the bid phase are to be assigned to this project by the Contractor.
C. The designated Supervisor for the Synthetic Turf Installer must be present during any
DATE:
CERTIFIED and all construction activity associated with the field installation, including testing,
cleanup and training.
DATE:
CONSTRUCTION
AGENCY
D. All products and equipment are to be from sources approved by the authorized turf
manufacturer and conform to the specifications.
DATE:
OPERATIONS 3.2 Product Delivery, Storage and Handling
DATE:
A. Deliver products to site in original containers and wrappers as agreed between the
Engineer and Contractor. Inspect products upon delivery for damage.
CONTROL NUMBER
VERIFICATION
EDSD
B. Store products in a location and in a position that protects them from crush damage or
any other defects.
DATE:
BY:
C. Handle and store (on and off site) all materials safely to ensure their physical
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
properties are not adversely affected and that they are not subject to vandalism or
OF THIS DRAWING IS COVERED, FOR ALL
23-10028-0001-008
damage.
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 165
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 166
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. Rubber and sand infill shall arrive dry and loose. No rubber shall be accepted that is
bulked or solid.
ENGG CERT
F. Rubber infill shall arrive in large sacks or bags without tears or loose material about.
A. All permanent field fittings penetrating the turf mat indicated on the drawings shall be
securely sealed to the mat surface so that no infill material is allowed to spill to the
DESCRIPTION
substrate.
A. Install synthetic turf system in accordance with the manufacturer’s written installation
instructions.
B. All inlaid areas shall have full fastenings and no loose areas. At no time can pulling on
the section separate the material.
23-10028-
JO/EWO
0001
C. Turf shall be attached to the perimeter edge as shown in the construction plans and
06/01/22
D. All seams and inlaid areas shall be brushed thoroughly before infill materials are
NO.
REV
00
installed.
DISCIPLINE
ENGINEER
DATE: A. The synthetic turf shall be thoroughly brushed prior to installation of infill materials to
CERTIFIED
remove wrinkles.
DATE:
CONSTRUCTION
B. The infill materials shall be installed in layers, in accordance with the turf
AGENCY manufacturer’s installation instructions. Any mix of materials shall be uniform and
even in thickness.
DATE:
OPERATIONS
C. Turf shall remain free draining at all times before, during and after the infill materials
are installed.
DATE:
CONTROL NUMBER
3.6 Testing
VERIFICATION
EDSD
A. At the time of substantial completion and biennially during the life of the warranty, the
DATE:
evaluate the shock absorption characteristics of the field. The tests shall be
REVISIONCERTIFICATION
23-10028-0001-008
with ASTM F1936 and ASTM F355. Test the field at a minimum of 12 points and
(DCC) NO. _____________________
submit the results to the Owner within 30 days of testing. At no point shall any reading
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 166
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 167
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
exceed 175 Gmax during the life of the warranty. If any point exceeds the maximum
deceleration, the Contractor shall make corrections to provide the allowable Gmax
deceleration at the Contractor’s expense.
ENGG CERT
A. Protect all installed work from other construction activities as installation progresses.
B. The Contractor shall keep the area clean through out the construction period and free
from debris.
DESCRIPTION
C. On completion of the installation, thoroughly clean surfaces and site of all refuse
Issued for IFC
D. Any damage to existing fixtures or facilities resulting from the installation of the
synthetic turf system shall be repaired to original condition at the Contractor’s
expense prior to Substantial Completion and commencement of the Warranty Period.
E. A deficiency list will be produced by the Engineer at the conclusion of the project. All
installation project deficiencies not in dispute must be remedied by the Contractor
prior to the issuance of a certificate of Substantial Completion.
23-10028-
JO/EWO
0001
F. Contractor to provide a written acceptance by the turf manufacturer that the turf and
06/01/22
completion.
NO.
REV
00
DISCIPLINE
ENGINEER - END OF SECTION –
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 167
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 168
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 02863
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 2 - Products
0001
2.04 Hardware
2.05 Column Padding
06/01/22
00
DISCIPLINE
Part 3 - Execution
ENGINEER
3.01 Installation
DATE:
PROJECT
ENGINEER
1.01 Description
DATE:
CONSTRUCTION
AGENCY A. Work in this section includes but is not limited to installing complete play equipments
and colored polired in place surface material (aliphatic), as shown on the Drawings
DATE:
and specified herein, complete and acceptable to Saudi Aramco.
OPERATIONS
B. Certain items identified in this section may occur at one “Job Order” but not the other.
DATE:
CONTROL NUMBER
B. Safety Standard:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 168
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 169
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
auspices of IPEMA (International Playground Equipment Manufacturers
Association), through an independent, third party testing laboratory, as
specified by IPEMA.
ENGG CERT
2. All resilient safety surfacing must exceed the requirements of ASTM F1292
standard of safety surfacing and must be tested to same by an independent,
and accredited third party testing organization. Suppliers must provide proof
of such compliance at the time they submit their bids to Saudi Aramco. The
resilient material proposed must be of sufficient thickness and resilency to
protect against injury from falls from the maximum fall height as described in
ASTM F1487 from adjacent equipment.
DESCRIPTION
A. All play area equipment shall meet the latest edition of the United States Consumer
Product Safety Commission Standards. All materials shall be structurally sound and
acceptable for safe play.
B. Contractor shall acquire and review the manufacturer’s specifications for all
equipment that is listed in this Section. Contractor shall provide components,
attachment devices and mechanically oriented equipmented that match the quality of
23-10028-
JO/EWO
0001
00
DISCIPLINE
submitted to Saudi Aramco Representative for approval.
ENGINEER
components for play area equipment structure and colored polired in place
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 169
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 170
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3. Contractor shall review all colors chosen for all items listed in this Section with
Saudi Aramco Representative for approval prior any items are purchased.
ENGG CERT
A. Deliver materials to the Site in their original containers in unopened packages, clearly
labeled with the manufacturer’s name, product identification and lot number, where
appropriate.
DESCRIPTION
B. Protect all materials from damage during transit, handling, storage and installation.
Issued for IFC
PART 2 - PRODUCTS
A. General:
1. All primary fasteners must be tamper proof, stainless steel or carbon steel
23-10028-
JO/EWO
0001
corrosion.
NO.
REV
00
DISCIPLINE
3. No “S” hooks are allowed to attach chains or any other chains, only hardened
ENGINEER steel elements are allowed and all pivot points must have bushing or bearings.
DATE:
4. All painted item must be painted with a polyester powder coating, free of any
PROJECT
ENGINEER toxic elements, as directed by the U.S. Consumer Products Safety
Commission (CPSC).
DATE:
CERTIFIED
5. All coatings and plastics must be fully UV stabilized.
DATE:
CONSTRUCTION
6. All plastic parts must exceed 2,700psi per ASTM D638 and must be
AGENCY warranted for 10 years, by the manufacturer against structural failure.
DATE:
7. All Aluminum structural elements must be warranted, by the manufacturer, for
OPERATIONS
20 years, against structural failure and deterioration.
DATE: 8. All clamping mechanism must be made from 369.1 aluminum alloy and be
CONTROL NUMBER
9. All deck platforms must have their top surface made from single sheet of
DATE:
Maximum hole size in the top surface of the deck shall be 375” except for
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 170
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 171
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
10. All barriers and guard rails must attach to the face of the decks or in such
away to eliminate any toe spaces that encourage children to climb on the
outside of the structure.
ENGG CERT
11. All slides must include a slide hood that requires the child to begin their slide
from a sitting position. Single bars can be used as turning bars and therefore
not allowed.
13. All arch posts must be made from a single piece of material, no seams will be
DESCRIPTION
allowed.
Issued for IFC
14. All hand loops, guard rails, barriers, decks, step assemblies and chains must
be coated with a coating of baked on PVC that has been bonded to the
underlying material and have a non-slip finish and is UV stabilized with a
minimum thickness of 0.060”and have an 85 durometer hardness.
2.02 Materials
The following Standards for design and materials shall be used for playground equipment
23-10028-
JO/EWO
0001
system components:
06/01/22
A. Steel Components shall comply with ASTM Standards as listed. Provide materials to
DATE
00
DISCIPLINE
1. Pipe Components shall comply with ASTM Standards A-135, A-500 and A-
ENGINEER 515. The pipe components shall have galvanic based on the following
processes:
DATE:
PROJECT
ENGINEER a. Pipes are hot dipped in zinc for uniform galvanization.
DATE: b. The interior of pipes are sprayed with zinc-rich cold galvanizing.
CERTIFIED
DATE: 2. Deck Components shall be manufactured each from a single piece of low
CONTROL NUMBER
integrity. All deck components shall be PVC coated. Color of decks shall be
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
3. No “S” hooks are allowed to attach swing chains or any other chains, only
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
hardened steel elements are allowed and all pivot points must have bushings
(DCC) NO. _____________________
or bearings.
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 171
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 172
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Galvanized Steel: Components other than posts shall receive the same galvanized
coating as described in Paragraph A.1., of this Section.
ENGG CERT
C. Fasteners:
2. All primary fasteners must be tamper proof, stainless steel or carbon steel
plated to withstand an ASTM 1,000 hour salt fog test.
0001
00
DISCIPLINE
ENGINEER 2. Clamps shall be sand cast of 535 aluminum/magnesium alloy with the
following design parameters.
DATE:
PROJECT
ENGINEER a. Ultimate Strength 310 N/mm2 (45,000 psi)
b. Yield Strength 172 N/mm2 (25,000 psi)
DATE: c. Elongation 8% in 51 mm (2 inches)
CERTIFIED
d. Shear Strength 200 N/mm2 (29,000 psi)
Die cast-clamps are also acceptable.
DATE:
CONSTRUCTION
AGENCY All clamps shall be provided according to manufacturer’s design and
specifications. Contractor shall coordinate with manufacturer’s
DATE:
representative to assure quality of components.
OPERATIONS
3. Top Caps for Posts shall be aluminum die castings from 380 alloy, powder
DATE: coated and secured in place with rivets which are self sealing.
CONTROL NUMBER
VERIFICATION
recommended above. Self lubricated rollers, oil impregnated bushings and rubber
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
have molded in color for good color retention. Material shall comply with ASTM-D-
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 172
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 173
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1248, Type 2, Class A. All plastic part must exceed 2700psi per ASTM D638 and
must be warranted for ten years, by the manufacturer against structural failure.
ENGG CERT
to the tunnel slide as well as used independently with other activity pieces.
5. PVC Caps shall be provided at bottom end of posts to form a base and
23-10028-
JO/EWO
moisture barrier.
0001
G. Vinyl Cladding:
06/01/22
DATE
00
DISCIPLINE
ENGINEER
2. The finish shall be no less than 2mm. (0.08 in) with a minimum 85
DATE:
durometer hardness and a matte finish.
PROJECT
ENGINEER
3. All items nit vinyl clad shall be painted.
DATE:
CERTIFIED
H. Painted shall be an electro statically applied polyester powder coating which shall be
cured at a temperature of 230 deg.C (450 deg.F) for 20 minutes free of any toxic
DATE:
CONSTRUCTION
elements, as directed by the U.S. Consumer Products Safety Commission (CPSC).
AGENCY The polyster powder shall comply with ASTM Standards D-1734 (Flexibility Mandrel
Test), D-2794 (impact Resistance Test), B-117 (Salt Spray Test), D-2247 (Humidity
DATE:
Resistance Test), D-822 (Weather ability Test), D-3363 (Pencil Hardness Test), D-
OPERATIONS
2454 (Overbake Resistance Test) and D-3359B (Adhesion Crosshatching Test).
DATE: I. Spring Subassembly & Foot Ring for individual spring mounted units shall be as
CONTROL NUMBER
follows:
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 173
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 174
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Alternate designs shall be submitted to Saudi Aramco Representative for
approval.
ENGG CERT
The following component equipment shall be provided for the outdoor play structures. The
play equipment as shown in the drawings and list is only guidelines for the Contractor.
Contractor shall contact the acceptable manufacturers as mentioned in Section 2.07 prior to
submitting the Saudi Aramco Representative for their approval.
A. Product Name:
Victory Play equipment “Play Mart” (or equal product) consist of the
Mountain following: Transfer Flat form with Barrier, Curved Zip Slide,
(Customized) Curve zip slide Tube, Overhead Climber, Wall Climber, Straight
Product ID: Zip slide, Transfer Bridge, Drivers Panel, Panel Roof and Pole
PS-NVE- climber
Victorya
B. Product Name: Aliphatic colored polired in place recycled rubber granules play
23-10028-
JO/EWO
0001
2.04 Hardware
NO.
REV
00
DISCIPLINE
A. Provide non-corrosive hardware necessary for assembly of items, in sufficient
ENGINEER quantity, sizes, lengths and quality for the intended use.
DATE:
PROJECT
B. Bolt holes shall be pre-drilled and counter-sunk to receive plastic plugs to conceal
ENGINEER connecting hardware where exposed.
Provide padding to all exposed steel columns of covered play area with # 00356-600-6’-0”
DATE:
CONSTRUCTION
column pads with Velcro Fasteners by Porter or approved equal.
AGENCY
1. Material A: (GT IMPAX) rubber tile 400 x 400 x 50 mm thick minimum size (Game
EDSD
time or equal approved product), resin bond tile composed of rubber chunks
DATE:
comprised of 100% recycled tile rubber, non-toxic, and does not leach into
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
Material B: (Rephouse Playflex Basic Plus AMP) rubber tile 505 x 505 x 45 mm
(DCC) NO. _____________________
thick minimum size made from recycled rubber and pigmented binder. Certified to
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 174
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 175
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASTM F1292 / EN 1117 / AS / NZS 1422 and slip resistant (exceed ADA
requirements).
ENGG CERT
2. Strength should have the ability to resist drying and cracking due to heat
exposure.
Warranty: A five (5) year warranty protecting against defects in material and
workmanship shall be provided.
Tel: 0032-9-2825271
0001
Tel.: 03-882-1028
NO.
REV
00
DATE:
G. Saudi Rubber Products Co.
CONSTRUCTION 2nd Industrial City, Makkah Street
AGENCY
Cross Road #98
DATE:
P. O. Box 3869
OPERATIONS Al Khobar-31952
KSA
Tel: (+966 13-812 1919) info@saudirubber.com
DATE:
Fax: (+966 13-812 1818) sales@saudirubber.com
CONTROL NUMBER
VERIFICATION
Email: Info@rephouse.com
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Europe
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
Email: Sales-europa@rephouse.com
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 175
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 176
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
I. Or Approved Equal.
ENGG CERT
PART 3 - EXECUTION
3.01 Installation
B. Footings shall be of concrete for all individual post locations. Footings shall be
DESCRIPTION
C. Prior to the application of surfacing materials, the entire surface should be checked
for minor depressions or irregularities. After the court have been flooded, any
depressions covering a nickel shall be corrected as per manufacturer
specifications.
D. Follow the manufacturer’s printed instructions carefully for the use and installation
of each product.
23-10028-
JO/EWO
0001
F. Save all extra components, attachment devices and tools that are provided. Save
NO.
REV
00
all manuals and instructions. Turn over to the Saudi Aramco Representative upon
DISCIPLINE
ENGINEER
completion of equipment set-up and before final inspection.
DATE: G. Synthetic surface and sports surfacing material shall be installed as per
PROJECT
ENGINEER manufacturer’s recommendations.
DATE:
CERTIFIED
Replace or repair damage materials, equipment and defective WORK as directed
by Saudi Aramco Representative at no additional cost to Saudi Aramco.
DATE:
CONSTRUCTION
AGENCY
- END OF SECTION -
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 176
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 177
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 03100
ENGG CERT
CONCRETE FORMWORK
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 2 - Products
2.01 Materials
Part 3 - Execution
23-10028-
JO/EWO
0001
00
DISCIPLINE
PART 1 - GENERAL
ENGINEER
1.01 Description
DATE:
PROJECT
ENGINEER A. Work in this Section includes, but is not limited to; furnishing, fabricating and erecting
formwork for cast-in-place concrete as indicated on the Drawings and as specified.
DATE:
CERTIFIED
B. Provide formwork and shoring for cast-in-place concrete and installation of items into
formwork such as anchor bolts, setting plates, bearing plates, anchorages, inserts,
DATE:
CONSTRUCTION
frames, nosings, chamfers beadings and other items to be set or embedded in
AGENCY concrete.
DATE:
C. Design of concrete formwork, including all necessary shoring and bracing, shall be
OPERATIONS
the responsibility of the Contractor, and shall provide all specified engineering design
or analysis of formwork requirements.
DATE:
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 177
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 178
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.03 Reference Standards
A. Codes and Standards: Comply with the provisions of the latest editions of the codes,
specifications and standards indicated under the sub-section reference standards, as
applicable except as otherwise indicated or specified.
B. Allowable Tolerances:
23-10028-
JO/EWO
0001
2. Before concrete placement, check the lines and level of erected formwork.
NO.
REV
00
DISCIPLINE
Make corrections and adjustments to ensure proper size and locations of
ENGINEER concrete members and stability of forming systems.
DATE:
3. During concrete placement check formwork and related supports to ensure
PROJECT
ENGINEER that forms are not displaced and that completed work will be within specified
tolerances.
DATE:
CERTIFIED
1.05 Submittals
DATE:
CONSTRUCTION
A. Manufacturer's Data: Submit manufacturer's data and installation instructions for
AGENCY materials including form coatings, manufactured form systems, ties and accessories.
DATE:
B. Shop Drawings: Submit shop drawings showing dimensioned layout of
OPERATIONS
formwork, locations of blockouts, openings, depressions, sleeves, inserts and
anchors.
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 178
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 179
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PART 2 - PRODUCTS
2.01 Materials
ENGG CERT
B. Form Ties:
0001
2. Unless otherwise shown, use ties so that portion remaining within concrete
06/01/22
surface. Unless otherwise shown, use form ties which will not leave a hole
larger than 25 mm diameter in the concrete surface. Ties shall be galvanized
NO.
REV
00
DISCIPLINE
and fully surrounded with concrete.
ENGINEER
4. Form ties fabricated on the project site and wire ties are not acceptable.
DATE:
CERTIFIED
C. Form Coatings: Use commercial formulation form-coating compounds that will not
bond with, stain, nor adversely affect concrete surfaces,and will not impair
DATE:
CONSTRUCTION
subsequent treatment of concrete surface requiring bond or adhesion, nor impede the
AGENCY wetting of surfaces to be cured with water or curing compounds.
DATE:
D. Formwork: Construct formwork sufficiently tight to prevent leakage of cement paste
OPERATIONS
during concrete placement. Solidly butt joints and provide backup material at joints as
required to prevent leakage and fines.
DATE:
CONTROL NUMBER
VERIFICATION
PART 3 - EXECUTION
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
A. Forms: Construct forms to the exact sizes, shapes, lines and dimensions shown, and
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
as required to obtain accurate alignment, location, grades, level and plumb work in
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 179
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 180
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
moldings, rustications, reglets, chamfers, blocking, screeds, bulkheads, anchorages
and inserts, and other features required. Use selected materials to obtain required
finishes.
ENGG CERT
B. Form Fabrication: Fabricate forms for easy removal without hammering or prying
against concrete surfaces. Use crush plates or wrecking plates where stripping may
damage cast concrete surfaces. Use top forms for inclined surfaces where the slope
is too steep to place concrete with bottom forms only. Kerf wood inserts for forming
keyways, reglets, recesses, and the like, to prevent swelling and assure ease of
removal.
DESCRIPTION
inaccessible for cleanout, for inspection before concrete placement, and for
placement of concrete. Brace temporary closures and set tightly to forms to prevent
loss of concrete grout. Locate temporary openings on forms in as inconspicuous
location as possible, consistent with project requirements.
D. Corners: Chamfer all exposed corners (both horizontal and vertical) with 20 mm (3/4
in.) chamfer strips (ref. SAES-Q-001 & ACI 301 - 2.2.3.2).
0001
A. General Forms: Formwork not supporting concrete, such as sides of beams, and
06/01/22
similar parts of the Work, may be removed after cumulatively curing at not less than
DATE
00
DISCIPLINE
curing and protection operations are maintained.
ENGINEER
DATE:
CERTIFIED
- END OF SECTION -
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 180
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 181
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 03200
ENGG CERT
CONCRETE REINFORCEMENT
SUBSECTION INDEX
Part 1 - General
1.01 Description
1.02 Related Work
DESCRIPTION
Part 2 - Products
2.01 Materials
Part 3 - Execution
23-10028-
JO/EWO
0001
3.01 Fabrication
3.02 Installation
06/01/22
NO. DATE
REV
00
PART 1 - GENERAL
DISCIPLINE
ENGINEER
1.01 Description
DATE:
PROJECT
ENGINEER A. Work in this Section includes, but is not limited to; furnishing, fabrication and
placement of reinforcement for cast-in-place concrete, including rebar, welded steel
DATE: wire fabric, ties and supports.
CERTIFIED
1. ASTM775/A775M
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
2. SASO SSA2
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 181
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 182
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. American Welding Society (AWS):
1. ASTM A 82, Specification for Steel Wire Plain, for Concrete Reinforcement.
2. ASTM A 185, Specification for Steel Welded Wire Fabric Plain, for Concrete
Reinforcement.
23-10028-
JO/EWO
0001
3. ASTM A 706, Specification for Low-Alloy Steel Deformed and Plain Bars for
06/01/22
Concrete Reinforcement.
DATE
00
DISCIPLINE
ENGINEER 5. ASTM A 884 M, Specification for Epoxy-Coated Steel Wire and Welded Wire
Fabric for Reinforcement.
DATE:
PROJECT
ENGINEER 6. ASTM A 1064, Standard specifications of Carbon steel wire & welded wire
reinforcement, Plain and Deformed for Concrete.
DATE:
CERTIFIED
F. Saudi Arabian Standards Organization (SASO):
DATE:
CONSTRUCTION
1. SASO SSA 223, "Methods of Test for Steel Fabric for Concrete
AGENCY Reinforcement".
DATE:
2. SASO SSA 224, "Steel Fabric Reinforcement of Concrete".
OPERATIONS
A. Codes and Standards: Comply with the provisions of the latest editions of the codes,
VERIFICATION
1.05 Submittals
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 182
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 183
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
approved by the CLIENT Engineer, shall verify that the proposed steel meets all the
requirements of these specifications.
ENGG CERT
B. Shop Drawings: Submit shop drawings for fabrication, bending, and placement of
concrete reinforcement. Show details of bars including types, sizes, spacing and
supports. Comply with ACI 315: "Manual of Standard Practice for Detailing
Reinforced Concrete Structures". Submit bar bending schedules, diagrams of bent
bar types, arrangements and assemblies, as required for the fabrication and
placement of concrete reinforcement.
DESCRIPTION
PART 2 - PRODUCTS
Issued for IFC
2.01 Materials
A. Reinforcement Bars:
1. Shall have a yield stress of 422 MPa in accordance with ASTM and SASO
standards.
0001
00
DISCIPLINE
B. Welded Wire Fabric: Shall be electrically welded cold drawn wire in conformance
ENGINEER with ASTM A 185 with a minimum yield strength of 240 MPa. Galvanized welded
wire fabric shall conform to ASTM A767 and shall be acceptable reinforcement in lieu
DATE:
of epoxy coated welded wire fabric coated in accordance to ASTM A884.
PROJECT
ENGINEER
C. Tie Wire:
DATE:
CERTIFIED
1. Tie wires for FBE rebars shall be plastic or nylon coated.
DATE:
CONSTRUCTION
D. Spacers:
AGENCY
PART 3 - EXECUTION
DATE:
CONTROL NUMBER
3.01 Fabrication
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
B. Unacceptable Materials: Reinforcement with any of the following defects will not be
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 183
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 184
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1. Bar lengths, depths, and bends exceeding specified fabrication tolerances.
3.02 Installation
DESCRIPTION
A. General: Comply with the "Concrete Reinforcing Steel Institute (CRSI): "Manual of
Standard Practice for Reinforced Concrete Construction".
B. Placement:
0001
in accordance with ACI 318-08. For liquid retaining structures comply with
DATE
00
DISCIPLINE
accurately in position during concrete placement operations. Set wire ties so
ENGINEER that twisted ends are directed away from exposed concrete surfaces.
DATE:
C. Welded Steel Wire Fabric: Install welded steel wire fabric in as long lengths as
PROJECT
ENGINEER practicable. Lap adjoining pieces at least two full meshes, and lap splices with 1.52
mm wire. Do not make end laps midway between supporting beams, or directly over
DATE: beams of continuous structures. Offset end laps in adjacent widths to prevent
CERTIFIED
continuous laps.
DATE:
CONSTRUCTION
D. Supports: Provide sufficient numbers of supports and of strength to carry
AGENCY reinforcement. Plastic chairs and spacers shall be used as bar supports to FBE
coated rebars. Do not place reinforcing bars more than 50 mm beyond the last leg of
DATE:
any continuous bar support. Do not use supports as bases for runways for concrete
OPERATIONS
conveying equipment and similar construction loads.
DATE: E. Splices:
CONTROL NUMBER
VERIFICATION
contact, and wiring tightly. Comply with requirements of ACI 318 for minimum
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
2. Do not splice reinforcement steel in mats, slabs beams, girders and walls at
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 184
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 185
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
F. Welding: Welding of reinforcing bars permitted only where indicated or approved by
CLIENT Representative. Such welding shall be in accordance with AWS D12.1.
Only steel conforming to chemical requirements specified in AWS D12.1 may be
ENGG CERT
welded.
H. Heat Bending: The use of heat to bend or straighten reinforcing steel is not permitted.
DESCRIPTION
I. The maximum total amount of coating damage on rebars received at the job site shall
Issued for IFC
not exceed 2% of the surface area of each bar. Bars exceeding this amount shall be
rejected. All damaged epoxy coating shall be repaired with an approved patching
materials conforming to relevant ASTM standard and manufacturer's
recommendations, and cut ends of bars shall be coated with the same material used
for repair of coating damaged. Reference SAES-Q-001. The ends of the bars shall
be coated as soon as the bar cutting process is finished.
- END OF SECTION -
23-10028-
JO/EWO
0001
06/01/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 185
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 186
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 03210
ENGG CERT
SUBSECTION INDEX
PART 1 - GENERAL
1.03 Submittals
1.04 Delivery, Handling and Storage
PART 2 - PRODUCTS
2.01 Materials
2.02 Epoxy Coating
2.03 Fabrication
23-10028-
JO/EWO
0001
PART 3 - EXECUTION
3.01 Installation
06/01/22
DATE
00
DISCIPLINE
ENGINEER PART 1 - GENERAL
A. Codes and Standards: Comply with the provisions of the following codes
specifications and standards, except as otherwise shown or specified.
DATE:
BY:
REVISIONCERTIFICATION
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 186
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 187
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. ACI 315, Manual of Standard Practice for Detailing Reinforced Concrete
Structures.
ENGG CERT
4. ASTM A615, Specification for Deformed and Plain Billet-Steel Bars for
Concrete Reinforcement.
8. ASTM A 884M, Specification for Epoxy-Coated Steel Wire and Welded Wire
Fabric for Reinforcement.
0001
1.03 Submittals
06/01/22
DATE
A. Manufacturer's Data:
NO.
REV
00
DISCIPLINE
1. Submit copies of manufacturer's specifications and installation instructions for
ENGINEER all proprietary materials and reinforcement accessories for approval.
DATE:
B. Mill Certificates:
PROJECT
ENGINEER
C. Shop Drawings:
DATE:
OPERATIONS
1. Submit shop drawings for fabrication bending, and placement of concrete
reinforcement. Comply with ACI 315 "Manual of Standard Practice for
DATE: Detailing Reinforced Concrete Structures." Show bar schedules, stirrup
CONTROL NUMBER
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
A. Deliver epoxy coated reinforcement to the project site bundled, tagged and marked.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
Use metal tags indicating bar size, lengths, and other information corresponding to
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 187
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 188
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Store epoxy coated concrete reinforcement materials at the site in protected racks
above ground in an approved manner so as to avoid damage to the coating. Direct
ENGG CERT
C. Equipment for handling epoxy coated bars shall have padded contact areas. Bundles
shall be lifted with strongback or have multiple supports to prevent bar-to-bar abrasion
from sags in the bundle. Bars or bundles shall not be dragged or dropped. Any
coating damaged due to handling, shipment and placing shall be repaired as
described in Section 3.02 B.
DESCRIPTION
PART 2 - PRODUCTS
2.01 Materials
A. All reinforcing bars shall be deformed and shall comply with the requirements of
ASTM A615 and as follows:
0001
C. Column Spirals: Plain, Cold-drawn, wire, ASTM A82, or hot-rolled rods for spirals,
DATE
ASTM A615.
NO.
REV
00
DISCIPLINE
D. Supports for Reinforcement: Bolsters, chairs, spacers and other devices for spacing,
ENGINEER supporting and fastening reinforcement in place shall be coated with a dielectric
material such as nylon, epoxy or plastic.
DATE:
PROJECT
ENGINEER 1. Use wire bar type supports complying with CRSI recommendations, unless
otherwise indicated. Do not use wood, brick, and other unacceptable
DATE: materials.
CERTIFIED
2. The supports shall be used in such a manner that they will not be exposed or
DATE:
CONSTRUCTION
contribute to the discoloration or deterioration of the concrete.
AGENCY
DATE:
A. Material:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
1. The epoxy coating material shall be an organic, powdered epoxy resin that is
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
by CLIENT.
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 188
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 189
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. Patching Material: Patching or repair materials shall be supplied by the epoxy
coating manufacturer. The patching materials shall be compatible with the
ENGG CERT
epoxy coating, inert in concrete, and shall be suitable for use in making field
repairs.
B. Coating Application:
1. Surface Preparation:
0001
00
DISCIPLINE
50 microns. Coating thickness shall be controlled by taking measurement on
ENGINEER a representative number of bars from each production lot. Coating thickness
measurements shall be conducted by the method outlined in ASTM G12.
DATE:
PROJECT
ENGINEER 4. Continuity of Coating:
DATE: a. The coating shall be checked visually after cure for continuity. It shall
CERTIFIED
be free from holes, voids, contamination, cracks and damaged areas.
DATE:
CONSTRUCTION
b. The coating shall not have more than three holidays (pinholes not
AGENCY visible to naked eye) in any 300 mm length of the coated bar. A
holiday detector shall be used in accordance with the manufacturer's
DATE:
instructions, to check the coating for holidays.
OPERATIONS
5. Coating Cure: The coating applicator shall check each production lot to
DATE: determine that the entire production lot of coated bars is in a fully-cured
CONTROL NUMBER
condition.
VERIFICATION
EDSD
6. Flexibility of Coating:
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
of bars selected from each production lot. The coated bar shall be
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
The bend shall be done at a uniform rate and any take up to one
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 189
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 190
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
minute to complete. The test specimens shall be at a thermal
equilibrium between 20 and 30 degrees C at the time of testing.
ENGG CERT
1. Lot Size: For test purposes, a production lot is the smallest number of
reinforcing bars of the same type, heat and size as determined by the
following requirements:
DESCRIPTION
2. Quality Control: The coating applicator shall be responsible for quality control.
This will include inspection for compliance with the requirements of coating
23-10028-
JO/EWO
0001
thickness, continuity of coating, coating cure and the testing required under
Flexibility of Coating.
06/01/22
DATE
3. Plant Inspection:
NO.
REV
00
DISCIPLINE
a. Client reserves the right to have its authorized representative observe
ENGINEER the preparation, coating and testing of the reinforcing bars. The
representative shall free access to the plant and any work done when
DATE:
access has been denied shall be automatically rejected.
PROJECT
ENGINEER
2.03 Fabrication
DATE:
CERTIFIED
A. General: Fabricate reinforcing bars to conform to required shapes and dimensions,
with fabrication tolerances complying with CRSI "Manual of Standard Practice." In
DATE:
CONSTRUCTION
case of fabricating errors, do not re-bend or straighten reinforcement in a manner that
AGENCY will injure or weaken the material.
DATE:
B. Unacceptable Materials: Reinforcement with any of the following defects will not be
OPERATIONS
permitted in the work:
DATE: 1. Bar lengths, depths, and bends exceeding specified fabrication tolerances.
CONTROL NUMBER
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 190
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 191
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PART 3 - EXECUTION
3.01 Installation
ENGG CERT
A. Comply with the Concrete Reinforcing Steel Institute (CRSI) recommended practice
for placing reinforcing bars, for details and methods of reinforcement placement and
supports, and as herein specified for reinforced concrete construction.
B. Clean reinforcement to remove dirt and other materials which reduce or destroy bond
with concrete.
DESCRIPTION
space, and securely tie bars supports and reinforcement together with 1.52 mm
diameter coated wire to hold reinforcement accurately in position during concrete
placement operations. Set wire ties so that twisted ends are directed away from
exposed concrete surfaces.
0001
by CLIENT representative. Minimum lap for bar splices shall be as noted on the
DATE
plans. Bar splices shall be made by lapping ends, placing bars in contact, and
securely wiring together. Epoxy coated reinforcing steel shall not be welded.
NO.
REV
00
DISCIPLINE
ENGINEER 3.02 Repair of Coated Bars
DATE:
A. Epoxy coated reinforcement bars which do not meet the requirements for Coating
PROJECT
ENGINEER Thickness, Continuity of Coating, Coating Cure or Flexibility of Coating shall not be
repaired.
DATE:
CERTIFIED
Reinforcement bars with these defects shall be replaced or alternatively, stripped of
epoxy coating, recleaned and recoated in accordance with the requirements of this
DATE:
CONSTRUCTION
specification.
AGENCY
B. Coating breaks due to fabrication and handling shall be repaired with patching
DATE:
material.
OPERATIONS
The repair of coating breaks shall be limited to bars on which the total of the defective
DATE: coating areas does not exceed 5 percent of the surface area of the reinforcement bar.
CONTROL NUMBER
Bars with greater than 5 percent damage shall be replaced or alternatively, stripped of
VERIFICATION
epoxy coating, recleaned and recoated in accordance with the requirements of the
EDSD
specification.
DATE:
BY:
C. Material Safety Data Sheets shall be provided to Industrial Hygiene for review and
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
comment before bringing any new epoxy coating resins into the area.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
- END OF SECTION -
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 191
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 192
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 03251
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 2 - Products
0001
Part 3 - Execution
06/01/22
DATE
00
DISCIPLINE
3.03 Contraction Joints
ENGINEER 3.04 Isolation Joints in Slabs on Ground
3.05 Pre-molded Joint Filler
DATE:
3.06 Joint Compound
PROJECT
ENGINEER
1.01 Description
DATE:
CONSTRUCTION
AGENCY A. Work in this Section includes, but is not limited to; furnishing and placing construction
joints and expansion joints as indicated on the Drawings and as specified.
DATE:
OPERATIONS
1.02 Related Work
DATE:
A. General:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 192
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 193
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. Construction and expansion joints shall not be added or relocated without
written approval of CLIENT.
ENGG CERT
3. Comply with the provisions of the references indicated under Sub-section 1.04
"Reference Standards", except as otherwise shown or specified.
3. ASTM D 1751, Specification for Preformed Expansion Joint Filler for Concrete
Paving and Structural Construction (Non-extruding and Resilient Bituminous
types).
23-10028-
JO/EWO
0001
1.05 Submittals
06/01/22
DATE
A. Submit the following to the CLIENT Representative for approval prior to ordering of
materials:
NO.
REV
00
DISCIPLINE
ENGINEER 1. Product data for all materials stating the location where product to be used.
DATE:
2. Certification that materials meet the Specifications.
PROJECT
ENGINEER
DATE:
PART 2 - PRODUCTS
OPERATIONS
B. Horizontal Joints: Joint compound for joints in horizontal or nearly horizontal surfaces
DATE:
conform to ASTM C 920, Type S or M, Grade P, Class 25. Use T (traffic sealant) in
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
non-vehicular areas.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 193
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 194
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Wall Joints: Joint compound for joints in walls conform to ASTM C 920, Type S or M,
Grade NS, Class 25.
ENGG CERT
B. Furnish joint filler with thickness equivalent to joint width indicated and of suitable
Issued for IFC
PART 3 - EXECUTION
0001
A. General: Locate and install construction joints, which are not shown on the Drawings,
06/01/22
CLIENT Representative.
NO.
REV
00
DISCIPLINE
B. Provide keyways at least 38 mm deep in all construction joints. Place construction
ENGINEER joints perpendicular to the main reinforcement. Continue all reinforcement across
construction joints.
DATE:
PROJECT
ENGINEER C. Forms: Use slightly tapered key groove forms to permit form removal without
damage to groove after concrete is cured.
DATE:
CERTIFIED
D. Concrete Placement: Consolidate concrete during placement in vicinity of key and
key groove. Do not remove key or key groove forms until after concrete has cured.
DATE:
CONSTRUCTION
AGENCY E. Concrete Cleaning and Protection: Clean key or key groove of laitance, curing
compound, foreign materials, protrusions of hardened concrete and blow out debris
DATE:
and dust with oil-free compressed air. Protect exposed key and key groove from
OPERATIONS
damage.
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
sidewalks and curb and gutter and around all structures in sidewalks. In
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 194
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 195
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
addition, expansion joints shall be provided at not more than 6.0 m maximum
intervals in curbs, gutters, and valley gutters. Sidewalk shall be as detailed.
ENGG CERT
2. Install the joint filler strips vertically and to the full depth and width of the
concrete being placed. Place strips perpendicular to straight curb or
sidewalks and radially to the line of curb or sidewalks on a curve and to the
top of any surface of the concrete. Trim off excess filler strip in a neat
manner. Before placing and vibrating the concrete, fix the filler strip rigidly
and securely in the proper position.
A. General: : Make weakened plane joints of 1/4 times the thickness of slab deep
straight and constructed in accordance with the following, unless shown otherwise in
the Drawings.
1. Sidewalks: Joints transverse to the line of work and at regular intervals not
exceeding 1.5 m apart, with joints radial to the line of work on curves. The
surface of the sidewalk shall contain score lines at intervals not exceeding
0.75 m and of a minimum depth of 3 mm. Score lines shall be parallel to, or
concentric with the lines of work. Sidewalks two meters or more in width shall
23-10028-
JO/EWO
0001
have a longitudinal center scoring line. All work shall be done with a steel
scoring trowel. Match the longitudinal and transverse scoring lines with the
06/01/22
adjacent sidewalks.
DATE
00
DISCIPLINE
trowelling, part the concrete to a depth of 4 cm with a straight edge to create a
ENGINEER division in the course aggregate. Refloat the concrete to fill the parted joint
with mortar. Make the division in order to locate the weakened plane for final
DATE:
joint finishing with a jointer tool having a depth of 3 cm and a radius of 3 cm.
PROJECT
ENGINEER Finished joint is not to be wider than 3 mm.
DATE: B. Placement:
CONTROL NUMBER
VERIFICATION
1. Place filler against the bulkhead form and fasten to the inside of the form with
EDSD
non-corrodible fasteners.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 195
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 196
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Wood Strips and Placement:
2. Use slightly tapered wood strips of the same width as the expansion joint and
of the depth necessary to install the joint compound.
3. Use materials to secure joint filler and wood strips which will not harm
concrete or affect the joint compound bond to concrete.
4. Do not remove wood strips until after the concrete curing period.
DESCRIPTION
0001
B. Compound Placement:
06/01/22
1. Prime concrete, fill flush with joint compound of required thickness, tool to
DATE
concave joint and seal, if required, all in accordance with the manufacturer's
instructions, and ASTM C1193.
NO.
REV
00
DISCIPLINE
ENGINEER 2. Prevent spilling compound over adjoining surfaces. Use tape adjacent to joint
if required. Remove all tape completely from concrete surface.
DATE:
PROJECT
ENGINEER 3. Do not seal when compound, air, or concrete temperature is less than 4.5
degrees C (40 degrees F).
DATE:
CERTIFIED
- END OF SECTION -
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 196
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 197
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 03300
ENGG CERT
CAST-IN-PLACE CONCRETE
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 2 - Products
0001
Part 3 - Execution
NO.
REV
00
DISCIPLINE
3.01 Concrete Mixing
ENGINEER 3.02 Field Quality Control
3.03 Pre-Placement Inspection
DATE:
3.04 Concrete Placement
PROJECT
ENGINEER 3.05 Joints
3.06 Finishes Of Formed Surfaces
DATE: 3.07 Monolithic Slab Finishes
CERTIFIED
3.08 Concrete Curing And Protection
3.09 Concrete Surface Repairs
DATE:
CONSTRUCTION
3.10 Deficiencies
AGENCY 3.11 Painting
DATE:
OPERATIONS
PART 1 - GENERAL
A. Work in this Section includes, but is not limited to; providing cast-in-place concrete
EDSD
consisting of portland cement, fine and coarse aggregates, water, and selected
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 197
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 198
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Section 03100 - Concrete Formwork
ENGG CERT
A. Engineering Standards:
DESCRIPTION
1. ASCE 7-05
Issued for IFC
2. ASCE 37-02
4. ASTM C307,
0001
7. ASTM A775/A775M
DATE
00
DISCIPLINE
ENGINEER 1. ACI 301, Standard Specifications for Structural Concrete.
DATE:
2. ACI 308, Standard Practice for Curing Concrete.
PROJECT
ENGINEER
1. ASTM C31, Practice for Making and Curing Concrete Test Specimens in the
DATE:
Field.
OPERATIONS
Specimens.
EDSD
DATE:
4. ASTM C40, Test Method for Organic Impurities in Fine Aggregates for
BY:
Concrete.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
5. ASTM C42, Test Method for Obtaining and Testing Drilled Cores and Sawed
(DCC) NO. _____________________
Beams of Concrete.
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 198
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 199
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
6. ASTM C94, Specification for Ready-Mixed Concrete.
ENGG CERT
8. ASTM C157, Test Method for Length Change of Hardened Hydraulic Cement
Mortar and Concrete.
11. ASTM C192, Practice for Making and Curing Concrete Test Specimens in the
Laboratory.
12. ASTM C309, Specifications for Liquid Membrane Forming Compounds for
Curing Concrete.
13. ASTM C827, Test Method for Change in Height at Early Ages of Cylindrical
Specimens from Cementitious Mixtures.
23-10028-
JO/EWO
0001
14. ASTM E154, Test Methods for Water Vapor Retarders Used in Contact with
Earth Under Concrete Slabs, on Walls, or as Ground Cover.
06/01/22
DATE
00
DISCIPLINE
1. AASHTO M 182, Burlap Cloth made from Jute or Kenaf.
ENGINEER
2. AASHTO T 277,
DATE:
PROJECT
ENGINEER F. Saudi Arabian Standards Organization (SSA):
DATE: 1. SSA 142, Physical and Mechanical Testing Methods of Portland Cement.
CERTIFIED
DATE: B. Concrete Testing: Materials and installed work may require testing and retesting, as
CONTROL NUMBER
directed by CLIENT Representative, at any time during the progress of the Work.
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
and tested, prior to the start of Work. Provide the project identification name
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 199
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 200
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
service, source of concrete aggregates, material manufacturer and brand
name for manufactured materials, values specified in the referenced
specification for each material, and test results.
ENGG CERT
1.05 Submittals
instructions for proprietary materials and items, including admixtures, bonding agents
Issued for IFC
or joint systems.
B. Laboratory Test Reports: Submit for each design test reports for compressive
strength in accordance with 09-SAMSS-097. The minimum required number of
concrete test cylinders for strength tests shall be 1 tested at 3 days, 1 tested at 7
days, and 2 tested at 28 days.
C. Placement Schedule: Prepare a placement schedule and submit for review prior to
start of concrete placement operations.
23-10028-
JO/EWO
0001
D. Shop Drawings: Submit completely detailed and dimensioned drawings for all
06/01/22
00
DISCIPLINE
mechanical and electrical and shall be submitted to CLIENT Representative for
ENGINEER approval prior to construction.
DATE:
PROJECT
ENGINEER PART 2 - PRODUCTS
A. Concrete material shall be as per ASTM & ACI specifications and as per the following
DATE:
CONSTRUCTION
Table:
AGENCY
Foundations, raft
EDSD
specified otherwise
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
panels with
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 200
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 201
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Intended Use Min. 28-day Min. Max. Max. Cement Required
characteristic Cement W/C Coarse Type Admix-
Compress. Content Ratio Aggr. tures
ENGG CERT
0001
silica
00
DISCIPLINE
ENGINEER B. Fine aggregates for normal weight concrete, consist of well graded sand conforming
to ASTM and shall have fineness modules of 2.50 to 3.10.
DATE:
PROJECT
ENGINEER C. Maximum aggregate size permitted, 25 mm. Use non-reactive aggregate as
determined by the "alkali aggregate reaction test".
DATE:
CERTIFIED D. Cement: It shall be as per the Geotechnical report recommendation. All slabs with
welded wire fabrics, sidewalks and pavements are exempted from microsilica.
DATE:
CONSTRUCTION
AGENCY E. Water: Fresh, potable, clean and free from oil, alkali, acid or vegetable matter. Total
solids should not exceed 500 ppm TDS. The pH value of mixing water shall be from
DATE: 6-8 as required by 09-SAMSS-097.
OPERATIONS
F. Storage: Stockpile aggregate in such a manner that good drainage is provided. Store
DATE: cement to ensure that it stays dry.
CONTROL NUMBER
VERIFICATION
A. Provide moisture barrier cover over prepared base material. Use only materials
DATE:
BY:
which are resistant to decay when tested in accordance with ASTM E 154.
REVISIONCERTIFICATION
Polyethylene sheet shall not be less than 0.25 mm (10 mils.) thick or 50 mm minimum
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
sub-slab (lean concrete) shall be placed beneath the concrete foundations as per
SAES-Q-001 Section 11.
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 201
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 202
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.03 Bonding Agent
ENGG CERT
A. Absorptive Cover: Burlap cloth made from jute or kenaf, weighing approximately 290
g/sq.m and complying with AASHTO M 182, Class 3.
DESCRIPTION
B. Water: Fresh, potable, clean and free from oil, alkali, acid or vegetable matter. Total
Issued for IFC
Dissolved Solids (TDS) 500-1000 ppm. Only water curing shall be used to cure
concrete made with water/cement ratio of 0.4 or ACI 308, Section 3.2.2.
0001
2. The maximum allowable water cement ratio shall be 0.40 by weight for all
concrete. Ref. 09-SAMSS-097 Section 5.4.1.
NO.
REV
00
DISCIPLINE
ENGINEER 3. Coarse aggregates gradation shall be as described in ASTM C 33.
DATE:
C. Both course and fine aggregates to conform to the chemical and physical
PROJECT
ENGINEER requirements of ASTM.
DATE:
CERTIFIED
PART 3 - EXECUTION
DATE:
CONSTRUCTION
3.01 Concrete Mixing
AGENCY
A. General: Concrete shall be mixed at batch plants. Batch plants shall be approved by
DATE:
CLIENT Representative. Batch plants must comply with the requirements of ACI 304,
OPERATIONS
with sufficient capacity to produce concrete of the qualities specified in quantities
required to meet the construction schedule. All plant facilities are subject to testing
DATE: laboratory inspection and acceptance of CLIENT Representative.
CONTROL NUMBER
VERIFICATION
DATE:
charging each batch. Schedule rates of delivery in order to prevent delay of placing
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
the concrete after mixing, or holding dry-mixed materials too long in the mixer before
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 202
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 203
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.02 Field Quality Control
B. Vendor Inspection shall be informed at least 24 hours prior to any concrete batching
as per ASTM/ ACI specifciations.
1. Perform sampling and testing for field quality control during the placement of
concrete, as follows:
b. Slump: ASTM C 143, one test for each concrete load at point of
discharge.
23-10028-
JO/EWO
0001
00
DISCIPLINE
ENGINEER d. Concrete temperature shall not exceed 32 degrees C at time of
placement. All efforts shall be made to maintain a temperature of less
DATE:
than 32 degrees C until completion of placement.
PROJECT
ENGINEER
E. Additional Tests: The testing service will make additional tests of in-place concrete
DATE:
when test results indicate the specified concrete strengths and other characteristics
BY:
have not been attained in the structure, as directed by CLIENT Representative and at
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
no cost to CLIENT.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 203
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 204
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
F. Testing by CLIENT Representative: The CLIENT Representative retains the right to
test concrete or any of its constituent parts at any time. The Contractor is to supply,
at no cost to CLIENT, all required assistance.
ENGG CERT
G. Evaluation of Quality Control Tests: The concrete will be considered acceptable if the
following criteria are met:
1. Not more than 10% of the tests of the 28 day strength shall have values less
than the specified minimum 28 day strength.
3. No individual strength test is more than 3.45 MPa (500 psi) below the
specified minimum 28 day strength.
4. If the test shall fail to meet the requirements of the above clauses the concrete
will be considered to be deficient in strength and will be subject to further
testing or demolition and reconstruction at the Contractor's expense as
decided by CLIENT Representative.
23-10028-
JO/EWO
0001
A. General: The Contractor's Quality Control shall assure the following by providing a
DATE
00
DISCIPLINE
1. Before placing concrete, inspect and complete the formwork installation,
ENGINEER reinforcing steel, and securely install all required inserts, anchors sleeves,
conduits and other items specified under other sections or as shown on the
DATE:
Drawings to be embedded or cast into the concrete.
PROJECT
ENGINEER
3. Soil under cast concrete foundations shall be subject to testing for soil bearing
DATE:
value by the testing laboratory, as directed by CLIENT Representative. Place
OPERATIONS
concrete immediately after approval of foundation excavations and
compaction.
DATE:
CONTROL NUMBER
4. Concrete placed upon or below ground shall have a plasticized sheet vapor
VERIFICATION
barrier, minimum 0.25 mm (10 mils) in thickness, placed beneath and around
EDSD
the sides where concrete comes in direct contact with earth. Outdoor
DATE:
sidewalks subject to foot traffic only are exempted from this requirement.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
5. Thoroughly wet wood forms immediately before placing concrete where form
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 204
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 205
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
6. Coordinate the installation of joint materials and moisture barriers with
placement of forms and reinforcing steel.
ENGG CERT
0001
3. Place all concrete within 90 minutes from the time water added to the
admixture as per ASTM C94 para 10.7.
06/01/22
DATE
4. The unconfined free fall distance of concrete shall not exceed one meter.
NO.
REV
00
DISCIPLINE
5. Concrete which is to receive other construction is to be screeded to the proper
ENGINEER level to avoid excessive skimming or grouting.
DATE:
6. Water shall not be used to re-temper or regain loss of slump. Remove
PROJECT
ENGINEER rejected concrete from the project site and dispose of it in an acceptable
location.
DATE:
CERTIFIED
B. Placement Schedule: Place concrete in conformance with the placement schedule to
ensure an even distribution of loads throughout the entire structure.
DATE:
CONSTRUCTION
AGENCY C. Concrete Conveying:
DATE:
1. Handle concrete from the point of delivery and transfer to the concrete
OPERATIONS
conveying equipment and to the locations of final deposit as rapidly as
practicable by methods which will prevent segregation and loss of concrete
DATE: mix materials.
CONTROL NUMBER
VERIFICATION
flow of concrete at the delivery end. Provide runways for wheeled concrete
DATE:
conveying equipment from the concrete delivery point to the locations of final
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 205
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 206
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1. Concrete mix shall not be deposited into forms from chutes, hoppers and
brackets at a free fall height greater than one meter above horizontal
ENGG CERT
2. Deposit concrete in forms in horizontal layers not deeper than 300 mm unless
additional thickness is permitted by CLIENT Representative, and in a manner
to avoid inclined construction joints. Where placement consists of several
layers, place each layer while preceding layer is still plastic to avoid cold
joints.
DESCRIPTION
4. Do not use vibrators to convey or move concrete inside of forms. Insert and
withdraw vibrators vertically at uniformly spaced locations not farther than the
visible effectiveness of the machine. Place vibrators to rapidly penetrate the
layer of concrete and at least 150 mm into the preceding layer. Do not insert
23-10028-
JO/EWO
0001
vibrators into lower layers of concrete that have begun to set. At each
insertion, limit the duration of vibration to the time necessary to consolidate
06/01/22
00
DISCIPLINE
E. Placing Concrete Slabs:
ENGINEER
F. Bonding:
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 206
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 207
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. Prepare for bonding of fresh concrete to new concrete that has set but is not
fully cured, as follows:
ENGG CERT
b. Use neat cement grout consisting of equal parts portland cement and
fine aggregate by weight and not more than 24 liters of water per sack
of cement. Apply with a stiff broom or brush to a minimum thickness
of 2mm. Deposit fresh concrete before cement grout has attained its
DESCRIPTION
initial set.
Issued for IFC
0001
00
DISCIPLINE
personnel.
ENGINEER
APPROVAL/CERTIFICATION REQUIREMENTS,
so that the steel temperature will not exceed the ambient air temperature
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 207
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 208
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. Wet forms thoroughly before placing concrete.
3.05 Joints
ENGG CERT
1. As-cast rough form finish is permitted for deformed concrete surfaces that are
Issued for IFC
2. Standard rough form finish shall be the concrete surface having the texture
imparted by the form facing material used, with tie holes and defective areas
repaired and patched and all fins and other projections exceeding 6 mm in
height rubbed down or chipped off.
0001
1. Provide as-cast smooth form finish for formed concrete surfaces that are to be
06/01/22
00
DISCIPLINE
ENGINEER 2. Produce smooth form finish by selecting form material to impart a smooth,
hard, uniform texture and arranged in an orderly and symmetric way with a
DATE:
minimum of seams. Repair and patch defective areas with all fins or other
PROJECT
ENGINEER projections completely removed and smoothed.
A. Float Finish:
DATE:
CONSTRUCTION
AGENCY 1. Apply float finish to monolithic slab surfaces that are to receive trowel finish
and other finishes as hereinafter specified, and slab surfaces which are to be
DATE:
covered with membrane or elastic waterproofing, membrane and as otherwise
OPERATIONS
shown on Drawings or in schedules.
DATE: 2. After placing concrete slabs, do not work the surface further until ready for
CONTROL NUMBER
floating. Begin floating when the surface water has disappeared or when the
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
angles. Cut down high spots and fill all low spots. Uniformly slope surfaces to
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 208
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 209
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
drains. Immediately after leveling, re-float the surface to a uniform, smooth,
granular texture.
ENGG CERT
B. Trowel Finish:
1. Apply trowel finish to monolithic slab surfaces that are to be exposed to view,
unless otherwise shown, and slab surfaces that are to be covered with carpet,
resilient flooring, paint, or other thin-film finish coating system.
2. After floating, begin the first trowel finish operation using a power-driven
trowel. Begin final troweling when the surface produces a ringing sound as
DESCRIPTION
3. Consolidate the concrete surface by the final hand troweling operation, free of
trowel marks, uniform in texture and appearance, and with a surface plane
tolerance not exceeding 3 mm in 3 m when tested with 3 m straightedge.
Grind smooth surface defects.
1. Apply non-slip broom finish to exterior concrete platforms, steps, and ramps,
23-10028-
JO/EWO
0001
00
DISCIPLINE
finish with CLIENT Representative before application.
ENGINEER
D. Chemical-Hardener Finish:
DATE:
PROJECT
ENGINEER 1. Apply chemical-hardener finish to dry interior concrete floors where shown on
the Drawings or in schedules. Apply liquid chemical-hardener after complete
DATE: curing and drying of the concrete surface.
CERTIFIED
3. After the final coat of chemical-hardener solution is applied and dried, remove
DATE:
surplus hardener by scrubbing and mopping with water.
OPERATIONS
1. Hand Formed Curb: Strip the front forms as soon as the concrete has set
VERIFICATION
sufficiently. Apply a cement rich mortar to the full exposed curb face,
EDSD
Carefully trowel the face and top of the curb to a smooth, even finish, rounded
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
to the radius shown on the Drawings. Round the edge of the concrete at all
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 209
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 210
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. Extruded Curb: Finish the face and top of curb as described in subsection
above. Do not overwork or distort the cross-section produced by the machine.
Remove any curb which is distressed during the hand finishing or clearly sags
ENGG CERT
due to improper slump. Hand form those portions of the curb where
obstruction or restricted clearance prevents use of the curb extrusion
machine. Match the machine formed curb. The CLIENT reserves the right to
reject any unsatisfactory portion, and the Contractor shall remove and replace
the unsatisfactory portion with no additional compensation.
concrete and bring a thin layer of mortar to the surface and float to a smooth,
Issued for IFC
flat, uniform surface. Edge each concrete panel, give a preliminary trowelling
and provide with contraction joints and score lines.
Steel-trowel the concrete to a smooth and even finish. Round all formed
edges and expansion joints to a radius of 6 mm. Complete preliminary
trowelling with a long handled "FRESNO" type trowel. Finish trowelling with a
steel hand trowel.
After final trowelling and initial set, give the concrete a broom finish transverse
23-10028-
JO/EWO
0001
to the centerline. After the final finish re-mark the concrete as necessary to
assure neat, uniform edges, joints and score lines. Curing shall be as
06/01/22
described in Section 3.08. Contractor shall prevent the use of the sidewalk by
DATE
00
DISCIPLINE
The surface of the sidewalk shall contain score lines as specified on item no.
ENGINEER 3.03 at Section 03251 - Construction, Expansion and Contraction Joints.
DATE:
4. Surface Drainage: All curbs and flow lines are to be constructed with
PROJECT
ENGINEER continuously graded falls. Construction techniques and changes in grade that
would cause standing water will not be accepted.
DATE:
CERTIFIED
3.08 Concrete Curing and Protection
DATE:
CONSTRUCTION
A. General: Initial curing shall begin as soon as free moisture has disappeared from the
AGENCY concrete surface after placing and finishing. Structural concrete shall be cured in
accordance with recommendations of ACI-305R, ACI-308. Maximum total dissolved
DATE:
solids in water used for curing shall not exceed 1000 parts per million. Water curing
OPERATIONS
shall be continuous until the compressive strength has reached 70 percent of the
specified strength, but not less than 7 days after placement.
DATE:
CONTROL NUMBER
B. Curing Method: Provide moisture curing for all concrete by any of the following
VERIFICATION
methods:
EDSD
DATE:
1. Keeping the surface of the concrete continuously wet by covering with water.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 210
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 211
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3. Covering the concrete surface with the specified absorptive cover, thoroughly
saturating the cover with water, and keeping the absorptive cover
continuously wet. Place cover so as to provide coverage of the concrete
ENGG CERT
surfaces and edges with a 100 mm lap over adjacent absorptive covers.
C. Curing Formed Surfaces: Moisture loss from surfaces placed against wooden form or
metal forms exposed to heating by the sun shall be minimized by keeping the forms
continually wet until they can be safely removed. After form removal the concrete
curing period shall continue as specified above.
0001
24 hour period.
DATE
E. Protection From Mechanical Injury: During the curing period, protect concrete from
NO.
REV
00
DISCIPLINE
damaging mechanical disturbances including load stresses, heavy shock, excessive
ENGINEER vibration, and from damage caused by rain or flowing water. Protect all finished
concrete surfaces from damage by subsequent construction operations.
DATE:
PROJECT
ENGINEER 3.09 Concrete Surface Repairs
DATE: A. General: Repair and patch defective areas with repair mortar or grout immediately
CERTIFIED
after removal of forms, but only when directed by CLIENT Representative.
DATE:
CONSTRUCTION
B. Patching: Cut out honeycomb, rock pockets, voids over 12 mm diameter, and holes
AGENCY left by tie rods and bolts, down to solid concrete but, in no case, to a depth of less
than 25 mm. Make edges of cuts perpendicular to the concrete surface. Before
DATE:
placing the cement mortar, thoroughly clean, dampen with water, and brush-coat the
OPERATIONS
area to be patched with neat cement grout. Before placing sand/cement mortar,
apply an approved bonding agent.
DATE:
CONTROL NUMBER
C. Exposed Surfaces: For exposed surfaces, blend white portland cement and standard
VERIFICATION
portland cement so that, when dry, the patching mortar will match the color of the
EDSD
and color match before proceeding with the patching. Compact mortar in place and
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
ACI 503.2.
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 211
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 212
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.10 Deficiencies
ENGG CERT
B. Tests: In the event that additional testing becomes necessary, the Contractor shall
cooperate with and provide assistance to CLIENT Representative in proceeding with
DESCRIPTION
the test.
Issued for IFC
3.11 Painting
A. All exterior buried surfaces of concrete structures shall be painted with a thin film of
Epoxy Primer Sealer followed by filler and Three coats of APCS-3.
- END OF SECTION -
23-10028-
JO/EWO
0001
06/01/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 212
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 213
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 03400
ENGG CERT
PRECAST CONCRETE
SUBSECTION INDEX
Part 1 - General
1.01 Description
1.02 Related Work
DESCRIPTION
Part 2 - Products
2.01 General
23-10028-
JO/EWO
0001
2.02 Cement
2.03 Mixing Water
2.04 Aggregates
06/01/22
DATE
2.05 Admixtures
2.06 Concrete Mix Design
NO.
REV
00
2.07 Formwork
DISCIPLINE
ENGINEER 2.08 Reinforcing Steel
PART 1 - GENERAL
DATE:
OPERATIONS
1.01 Description
DATE: A. Work in this section includes, but is not limited to designing, fabricating, transporting,
CONTROL NUMBER
3. Arch panels.
REVISIONCERTIFICATION
23-10028-0001-008
6. Scuppers.
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 213
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 214
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7. Trellis columns and beams.
8. Splash blocks.
9. Hollow core slab.
ENGG CERT
A. Engineering Standards:
23-10028-
JO/EWO
0001
1. ASCE 7-05
06/01/22
DATE
2. ASCE 37-02
NO.
REV
00
DISCIPLINE
3. ASTM C-150, ASTM C-309, STS 3600
ENGINEER
4. ASTM C307,
DATE:
PROJECT
ENGINEER 5. ASTM C33, ASTM C 127
7. ASTM A775/A775M-97
DATE:
CONSTRUCTION
AGENCY C. American Concrete Institute (ACI):
DATE:
1. ACI 211.1: Standard Practice for Selecting proportions for Normal and Heavy
OPERATIONS
Weight Concrete.
Placing.
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 214
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 215
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
6. ACI 311: Guide for Concrete Inspection.
1. PCI MNL 117: Manual for Quality Control for Production of Architectural
Concrete.
A. Codes and Standards: Quality control for production of precast concrete shall
conform to applicable requirements of latest editions of 09-SAMSS-097 and PCI MNL
117.
23-10028-
JO/EWO
0001
1.05 Submittals
06/01/22
welder with the name of the welder, name and title of persons who conducted the
examination, kind of specimens, positions of welds, the results of the test and the
NO.
REV
00
DISCIPLINE
date of the examination. In addition, the welder’s employer is to certify that each
ENGINEER welder has been engaged in the type of welding for which he is qualified within the
preceding three (3) months period.
DATE:
PROJECT
ENGINEER B. Shop Drawings:
anchorage and details and lift points. Details and notes on the shop drawings
EDSD
loads used in the design of the members. Detail inserts, connections and
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
precast concrete manufacturer, in a neat, compact and orderly form. Reference all
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 215
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 216
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and paragraph number and supply copy of same. Calculations shall include, but are
not necessarily limited to the following:
ENGG CERT
2. Deflection.
4. All calculations used to determine quality, size and type of bolts used for
Issued for IFC
D. Submit all requirements of Section 03200, paragraph 1.05 and Section 03300,
paragraph 1.05 of this Specification.
1.06 Design
0001
in addition to the dead load of panels. Conform to ACI 318, ACI Committee 533 PCI
Design Handbook. A professional engineer duly registered shall design the members
06/01/22
or directly supervise the design and affix his signature to the design calculations.
DATE
B. Design Loads: Wall panel and roof slabs shall be designed for lateral (wind) and live
NO.
REV
00
DISCIPLINE
loads in accordance with IBC 2009/ ASCE 7-05 unless otherwise noted on the
ENGINEER Drawings.
DATE:
C. Bearing and Connection Design: Design bearing and connections to account for
PROJECT
ENGINEER tolerances allowed in the construction and erection of members, stresses due to
shrinkage, creep, thermal expansion and contraction, deflection and rotation of
DATE: members being connected. Contractor shall design all connection details to suit
CERTIFIED
different conditions and submit along with shop drawings for CLIENT Representative
approval.
DATE:
CONSTRUCTION
AGENCY D. For design strength, see paragraph 2.06 “Concrete Mix Design and Testing,” of this
Section.
DATE:
OPERATIONS
E. Design modifications may be made only as necessary to meet field conditions and to
ensure proper fitting of Work and only as acceptable to CLIENT Representative.
DATE: Maintain general design concept shown on the approved shop drawings without
CONTROL NUMBER
DATE:
F. Each precast concrete unit shall be identifiable by markings which may be observed
BY:
prior to, during and after placement for traceability purposes. The markings shall
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 216
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 217
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.07 Product Delivery
A. Deliver “Precast Concrete” units to Work Site in such quantities and at such time as
ENGG CERT
will ensure continuity of installation. Carefully pack precast units for transportation to
destination with exercise of all reasonable and customary precautions against
damage in transit to panels or inserts. Provide adequate protection from damage to
rises and from contact with anything which would result in accumulation of dirt, dust,
mud, grease or other staining or disfiguring elements.
B. Deliver anchorage items which are to be embedded in other construction before the
start of such Work. Provide setting diagrams, templates, instructions as required for
DESCRIPTION
installation.
Issued for IFC
C. All precast units shall be provided with suitable threaded inserts or with recessed
hooks for hoisting.
1. Cladding and fascia units shall be delivered on trailers in a near vertical plane
and shall be provided with lifting inserts in the top edge.
2. All connections to threaded inserts for erection or handling shall utilize high
tensile bolts and swivel plates. The angle of slings shall not be less than 50
23-10028-
JO/EWO
0001
3. Wall units a height greater than their width may be delivered on trailers on
DATE
their side. The erection equipment for such units shall be capable of lifting
and rotating units without damaging them.
NO.
REV
00
DISCIPLINE
ENGINEER 4. Roof units shall be delivered flat and be provided with either four (4) threaded
inserts or four (4) recessed hooks in the top face.
DATE:
PROJECT
ENGINEER D. “Precast Concrete” members shall be lifted and supported during stock piling and
erection operations only at the lifting or support points as shown on the approved
DATE: erection Drawings.
CERTIFIED
Care shall be exercised in handling and erection of the panels to ensure that the
DATE:
CONSTRUCTION
panel and especially the architectural finishes are protected.
AGENCY
DATE:
PART 2 - PRODUCTS
OPERATIONS
2.01 General
DATE:
CONTROL NUMBER
DATE:
2.02 Cement
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
A. Portland Cement: ASTM C150, Type I for building panels, and Type V for boundary
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
wall panels or other members exposed to the earth. White for all exposed exterior
(DCC) NO. _____________________
wall panels, fascia, interior and exterior arches and perimeter privacy wall panels,
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 217
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 218
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
inlcuding interior exposed panels, all cement of same brand and manufacture. Gray
cement may be used for non-exposed surfaces, however, where gray and white
cements are used in the same panel a minimum thickness of 40 mm of white
ENGG CERT
2.04 Aggregates
DESCRIPTION
A. Coarse Aggregate: ASTM C33, and Saudi Aramco Standard, 09-AMSS-088. Quality
Issued for IFC
gradation and color of aggregate must be consistent and match aggregate used in
approved sample. Only durable aggregates with proven service records or
satisfactory laboratory tests are to be used for exposed aggregate Work. Aggregate
for exposed surfaces shall be Riyadh gravel or as approved by CLIENT
Representative. Maximum aggregate size shall be 19 mm (3/4”). Single source shall
be purchased in a quantity to complete the entire project. Changing quarry after the
start of the Work shall not be allowed.
B. Fine Aggregate: Sand conforming to ASTM C33, free of injurious amounts of shale,
23-10028-
JO/EWO
0001
alkali, organic matter, loam or other deleterious substances and obtained from a
single source.
06/01/22
DATE
2.05 Admixtures
NO.
REV
00
DISCIPLINE
A. Shall conform to requirements of Section 03300, paragraph 2.01E of this
ENGINEER Specification.
DATE:
2.06 Concrete Mix Design
PROJECT
ENGINEER
A. Design mixes shall be determined in accordance with the applicable ACI Standards.
DATE: Proportions of ingredients shall be selected in accordance with ACI-211.1
CERTIFIED
B. Maximum water cement ratio and minimum cement content limitations shall be in
DATE:
CONSTRUCTION
accordance with ASTM . The following minimum compressive strengths at 28 days
AGENCY shall be attained.
DATE:
1. All precast members unless and otherwise specified shall be the compressive
OPERATIONS
strength 40 Mpa (5800 psi).
DATE: 2. Precast concrete manhole elements: compressive strength 27.56 MPa (4000
CONTROL NUMBER
psi).
VERIFICATION
EDSD
3. Precast concrete curbs, tiles, etc: compressive strength 27.56 MPa (4000 psi).
DATE:
BY:
C. Slump: Concrete shall be proportioned and mixed to have a slump, tested per ASTM
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
C 143.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 218
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 219
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. Complete concrete design data shall be submitted for review and approval at least 30
days prior to proposed use.
ENGG CERT
2.07 Formwork
A. Forms materials shall comply with requirements of Section 03100 of this Specification
and as modified herein.
B. Construct forms for precast concrete of such materials and in such a manner that
they are completely rigid and strong enough to withstand without deflection,
movement or leakage, high hydraulic pressures which result from rapid filling and
DESCRIPTION
consolidation of concrete. Form ties will not be allowed in exposed faces of precast
Issued for IFC
concrete units.
PART 3 - EXECUTION
23-10028-
JO/EWO
0001
A. General: Equipment for, and production of concrete shall conform to the applicable
DATE
00
DISCIPLINE
B. Inspection: Before placing concrete, inspect and complete formwork installation,
ENGINEER reinforcing steel, and items to be embedded or cast-in. Notify and obtain approvals
for casting as directed by CLIENT Representative.
DATE:
PROJECT
ENGINEER C. Formwork:
DATE: 1. Shall comply with Part 3 - Section 03100 of this Specification and as specified
CERTIFIED
herein.
DATE:
CONSTRUCTION
2. Forms must be true to size and dimensions of concrete members shown on
AGENCY the Drawings and be so constructed that the dimensions of the finished
product will be within the allowable limits.
DATE:
OPERATIONS
3. Design forms for easy removal. Prying against concrete will not be permitted.
Thoroughly clean and recondition forms prior to each use.
DATE:
CONTROL NUMBER
D. Reinforcement:
VERIFICATION
EDSD
modified herein.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
concrete. Arrange, space and securely tie bars and supports to hold
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 219
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 220
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
so that twisted ends are directed into concrete, not toward exposed concrete
surface.
ENGG CERT
3. Locate anchorage and lifting devices where they do not affect the position of
main reinforcement or the placing of concrete.
A. Prior to erection of any member, check elevations and alignment, and any other work
affecting the line and grade of the precast concrete. Notify CLIENT Representative in
writing of any errors and deviations in work which will cause the precast concrete to
exceed the tolerances listed herein. Do not commence erection until such defects
have been corrected and approval has obtained from CLIENT Representative.
23-10028-
JO/EWO
0001
B. Precast elements are designed for dead, live, and lateral loads in place; therefore,
loads and stresses caused by transportation and erection shall be compensated for.
06/01/22
DATE
C. Each element shall be properly code marked to correspond with designation on the
shop drawings, so as to verify curing time as well as final position and orientation in
NO.
REV
00
DISCIPLINE
the construction.
ENGINEER
D. All precast members shall be handled and transported with the supports or pick-up
DATE:
devices as near as practicable to the location of final supports. Pick-up points shall
PROJECT
ENGINEER be shown on shop drawings.
DATE: E. Precast members having cracks, spalls, and other defects will be subject to rejection
CERTIFIED
by CLIENT.
DATE:
CONSTRUCTION
F. Erection shall be defined as including:
AGENCY
2. Placing, aligning and leveling the members in final position in the structure on
VERIFICATION
the specified bearing surfaces. Include the installation of structural steel tie
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 220
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 221
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. Welding: Perform all welding in compliance with AWS D1.1 and D12.1,
including qualification of welders.
ENGG CERT
5. Protect units from damage by field welding or cutting operations and provide
non-combustible shields as required.
6. Remove erection devices, remove lifting hooks, fill recesses with grout or
concrete unless otherwise called for on the Drawings and where exposed,
finish to match adjacent surfaces.
G. Grouting Connections, Joints, and Anchorage Recesses: After precast units have
DESCRIPTION
been placed, positioned, and secured, fill solidly open spaces at connections, joints
Issued for IFC
and anchorages as shown on the Drawings. Use grout of the proper consistency to
provide required bearing or closure of the connection or joint. The space to be
grouted shall be filled with grout by tamping, ramming, pumping or tooling until the
voids are completely filled and the transmission of the load, through the grout, is
ensured. Protect units from being stained by grouting operations. Finish exposed
surfaces to contours shown on the Drawings. The proposed method of grouting shall
be submitted to CLIENT Representative for approval one month prior to the
commencement of Work.
23-10028-
JO/EWO
0001
H. Grouting Connections and Joints: After precast concrete units have been placed and
secured, grout open spaces at connection and joints as follows:
06/01/22
Cement grout consisting of 1 part portland cement, 2 1/2 parts sand, and only enough
DATE
00
DISCIPLINE
Non-Shrinkage grout consisting of premixed compound and only enough water to
ENGINEER provide a flowable mixture without segregation or bleeding.
DATE:
Provide forms or other acceptable method to retain the grout in space until sufficiently
PROJECT
ENGINEER hard to support itself. Pack spaces with stiff grout material, tamping until voids are
completely filled. Place grout to finish smooth, plumb, and level with adjacent
DATE: concrete surfaces. Keep grouted joints damp for not less than 24 hours after it has
CERTIFIED
taken its initial set. Promptly remove any grout material for exposed surfaces before it
hardens.
DATE:
CONSTRUCTION
AGENCY I. Repair damaged metal surfaces by cleaning and applying a coat of liquid galvanizing
repair compound to galvanized surfaces the color of which shall match the galvanize.
DATE:
OPERATIONS
J. Drilled Holes and Drilled-In Inserts: Because of the considerably increased possibility
of damage to reinforcing and concrete, and because the performance of the drilled-in
DATE: inserts can be detrimentally affected by both material and workmanship deficiencies,
CONTROL NUMBER
drilled holes and drilled-in inserts may be used only where approved by CLIENT
VERIFICATION
Representative.
EDSD
DATE:
Drilled holes and inserts may be installed only in areas of precast elements
BY:
where permitted in the approved erection Drawings. Drilling of holes and installation
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
of drilled-in inserts shall follow the recommendations of PCI. MNL-121, and of the
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
manufacturer of the inserts and shall not exceed the following limitations:
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 221
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 222
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1. The minimum distance from any edge of the precast element for drilled-in
expansion type anchors shall be at least:
ENGG CERT
a. 5 hole diameters.
2. For epoxy grouted anchors the edge distance may be reduced, subject to the
approval of CLIENT Representative, as shown by test results showing the
DESCRIPTION
3. The minimum distance from any edge of the precast element for drilled holes
shall be at least:
a. 2 hole diameters.
0001
4. The minimum distance for insert or holes from the support or the end of a
06/01/22
00
DISCIPLINE
ENGINEER b. But not less than 305 mm (12 in.).
DATE:
5. The minimum embedment length of any anchor shall be at least:
PROJECT
ENGINEER
a. 6 insert diameters.
DATE:
CERTIFIED
b. But not less than the concrete cover for main reinforcing plus 25.4 mm
(1 in.).
DATE:
CONSTRUCTION
AGENCY 6. The minimum spacing of holes or inserts shall be at least:
DATE:
a. 5 diameters of the larger hole.
OPERATIONS
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
K. Temporary connection on props shall not be removed until the grout used in grouted
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 222
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 223
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
L. Contractor shall be fully responsible for any damage to precast units which occurs
during or after delivery, storage, handling and erection. Such units shall be either
ENGG CERT
M. Repair of Precast Units: CLIENT Representative shall decide if any damaged precast
unit is to be repaired. Contractor shall develop a repair procedure to produce the
same texture and equal strength to the parent concrete. Trial patches and general
DESCRIPTION
mixtures and methods must produce proper strength, bond, texture, and final color
equal to the production units. Ideal end results may require the use of a repair
mixture which may not be identical with that of the parent concrete. CLIENT
Representative shall decide if the final appearance of any repair is satisfactory.
0001
Prior to using epoxy mortars which contain flammable properties in confined spaces,
06/01/22
adequate natural or forced ventilation shall be provided to insure that the vapor
DATE
concentration is kept below the lower explosive limits. “No Smoking” signs, in both
ENGLISH and ARABIC, shall be erected, and smoking or the use of spark or flame
NO.
REV
00
DISCIPLINE
producing devices shall be prohibited within 15 meters (50 ft.) of any mixing or placing
ENGINEER operations.
DATE:
O. Contractor shall be responsible for providing and placing spread anchors for
PROJECT
ENGINEER maintenance as per requirements of CLIENT. Refer to Construction Specifications
Section 05500 – Miscellaneous Metal.
DATE:
CERTIFIED
3.03 Testing and Quality Control
DATE:
CONSTRUCTION
A. Laboratory Testing: Refer to Section 03300 – Cast-In-Place Concrete, for laboratory
AGENCY test and control of concrete that shall be made by a commercial independent testing
laboratory approved by CLIENT and paid for by Contractor.
DATE:
OPERATIONS
Contractor shall allocate a representative at the precast panel manufacturers to
ensure inspection, testing, casting, loading, and storage each carried out to the PCI
DATE: MNL-117-77 Standards.
CONTROL NUMBER
VERIFICATION
C. Mill Test Reports: Certified copies of mill test reports, evidencing compliance with all
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
CLIENT Representative.
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 223
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 224
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. Concrete Temperature: Test hourly when air temperature is 40 degree F and below,
and when 80 degree F and above; and each time a set of compression test
specimens made.
ENGG CERT
F. Storage: Store units above ground on platforms, skids, or other supports. Protect
units from damage and staining.
DESCRIPTION
0001
H. In-Place precast units shall be rejected for any one of the following:
NO.
REV
00
DISCIPLINE
1. Exceeding the specified installation tolerances.
ENGINEER
APPROVAL/CERTIFICATION REQUIREMENTS,
- END OF SECTION -
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 224
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 225
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 04300
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
1.02 Related Sections
DESCRIPTION
Part 2 - Products
2.01 General
23-10028-
JO/EWO
0001
2.05 Lintels
2.06 Joint Reinforcement
NO.
REV
00
DATE:
OPERATIONS
PART 1 - GENERAL
A. Work in this Section includes, but is not limited to; furnishing and installing concrete
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 225
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 226
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Section 09900 - Painting.
1. ASTM A 82, Specification for Steel Wire, Plain, for Concrete Reinforcement.
2. ASTM A 153, Specification for Zinc Coating (Hot-Dip) on Iron and Steel
Hardware.
DESCRIPTION
5. ASTM C 140, Test Methods for Sampling and Testing Concrete Masonry
Units and Related Units.
0001
00
DISCIPLINE
10. ASTM C 404, Specification for Aggregates for Masonry Grout.
ENGINEER
1.05 Submittals
VERIFICATION
EDSD
A. Samples:
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 226
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 227
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Certificate: Submit manufacturer's certification, attesting that masonry materials and
reinforcement meet requirements of this Specification.
ENGG CERT
B. Store masonry units above ground on level platforms that will permit circulation of air
DESCRIPTION
D. Carefully handle masonry units, either individually or in suitable groups, to keep units
whole. Ensure sharp edges and undamaged faces.
A. Do not erect masonry when ambient air is warmer than 90 degree F in shade and has
23-10028-
JO/EWO
0001
relative humidity of less than 40%, unless Work is prevented from drying out for not
less than 48 hours after having been installed.
06/01/22
DATE
00
DISCIPLINE
adequate provisions, during construction, to prevent damage by wind.
ENGINEER
DATE:
PART 2 - PRODUCTS
PROJECT
ENGINEER
2.01 General
DATE:
CERTIFIED
A. Obtain masonry units from one manufacturer.
DATE:
CONSTRUCTION
2.02 Concrete Masonry Units
AGENCY
2. Nominal size: 400 mm (16 in.) long by 200 mm (8 in.) high and thickness as
VERIFICATION
indicated.
EDSD
DATE:
3. Free from iron spots or deleterious material that will stain plaster, corrode
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
4. Texture: Fluted.
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 227
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 228
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5. External Corner Units: Square.
2.03 Mortar
ENGG CERT
A. General:
2. Proportions by Volume: 1 part cement, 1/2 part lime and 4-1/2 parts sand.
DESCRIPTION
0001
2.04 Grout
06/01/22
DATE
00
DISCIPLINE
B. Aggregate: ASTM C 404, Size No. 1. Maximum aggregate size shall not exceed 9.5
ENGINEER mm (3/8 in.).
DATE:
C. Lime: ASTM C 207, Type S.
PROJECT
ENGINEER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 228
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 229
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.06 Joint Reinforcement
A. General:
ENGG CERT
4. Unit width 38 mm to 50 mm less than thickness of wall. Length not less than
3 m.
0001
spacing (#4 bars at 4 ft spacing). The minimum horizontal joint reinforcement shall be
2 longitudinal truss bars of 5 mm diameter placed at 400 mm (16-inch) centers.
06/01/22
DATE
PART 3 - EXECUTION
NO.
REV
00
DISCIPLINE
ENGINEER 3.01 Preparation
DATE:
A. Clean dirt, debris, oil, grease, and other foreign substances which would affect bond
PROJECT
ENGINEER of mortar, from all surfaces to receive mortar.
DATE: B. Lay out walls to establish accurate spacing of bond pattern, to ensure uniform joint
CERTIFIED
widths, and to locate openings, movement type joints, returns and offsets. Arrange
units in manner which will result in few or no units to be cut.
DATE:
CONSTRUCTION
AGENCY 3.02 Protection of Work
DATE:
A. Protect tops of walls with non-staining waterproof coverings when Work not in
OPERATIONS
process.
3.03 Installation
EDSD
DATE:
A. Lay masonry plumb and square, true to dimensions, and with full, tightly bonded
BY:
joints.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
B. Install products indicated to be built into the wall as the masonry work progresses. Fill
(DCC) NO. _____________________
spaces around built-in products with mortar, and allow space for caulking.
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 229
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 230
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Fill backs of metal door frames solid with grout fill.
ENGG CERT
D. Make joint width equal to difference between actual and nominal dimensions of unit
being installed.
E. Lay concrete masonry units in running bond with vertical joints breaking not less than
100 mm (4 in.) over units in course below, unless indicated.
F. Lay vertical cored units with full beds on shells only. Fully batter vertical edges.
DESCRIPTION
J. When resuming masonry Work, clean exposed surface of set or partially set masonry
and remove loose mortar prior to laying fresh masonry.
0001
instructions, and place in every second course. Lap reinforcement not less than 150
mm, and at corners and intersections, connect to prefabricated special reinforcement.
06/01/22
Make splices in manner, and at those points, which will not reduce structural strength
DATE
of wall and in no case shall the length of the lapped splice be less than 40 times bar
diameter for tension.
NO.
REV
00
DISCIPLINE
ENGINEER L. Install vertical reinforcement where indicated and in poured grout studs formed by
vertically aligned cells of masonry unit. The vertical spacing of the joint reinforcement
DATE:
shall not exceed 16 in. and in no case shall the length of the lapped splice be less
PROJECT
ENGINEER than 30 bar diameter for compression, and 40 times bar diameters for tension.
A. Machine mix mortar, except small batches (less than 30 liters), is mixed for not less
DATE:
CONSTRUCTION
than a period of 3 minutes nor more than 10 minutes after all materials are in mixer.
AGENCY Where hand mixing is permitted, mix mortar thoroughly in tight mortar box until
required plasticity is obtained. No hand mixing is allowed on the ground.
DATE:
OPERATIONS
B. Use mortar immediately after mixing.
DATE:
B. For vertically reinforced concrete masonry unit, place grout in all cells containing
BY:
reinforcement, and in lifts of not more than 1200 mm (48 in.). Consolidate grout at
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
plasticity is lost. When grouting is stopped for one hour and longer, form horizontal
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 230
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 231
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
construction joints by stopping grout placement 38 mm below top of uppermost grout
unit.
ENGG CERT
A. Leave slots and opening required for inserts, wires, conduits, and similar items of
construction, open or cut. Provide suitable recesses or openings at junction boxes, or
other locations as required.
A. Repair joints that are unsound, not full of mortar, or which have hairline cracks due to
Issued for IFC
0001
06/01/22
- END OF SECTION -
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 231
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 232
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 05120
ENGG CERT
STRUCTURAL STEEL
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 2 - Products
2.01 Manufacturers
2.02 Structural Steel
23-10028-
JO/EWO
0001
2.03 Fasteners
2.04 Welding
06/01/22
2.06 Fabrication
NO.
REV
00
DISCIPLINE
Part 3 - Execution
ENGINEER
3.01 Erection
DATE:
3.02 High Strength Bolting
PROJECT
ENGINEER 3.03 Welding
3.04 Paint and Coating
DATE: 3.05 Field Painting
CERTIFIED
DATE:
CONSTRUCTION
PART 1 - GENERAL
AGENCY
1.01 Description
DATE:
OPERATIONS
A. Furnish, erect, and fasten structural steel as indicated and specified.
DATE: B. Definition: "Structural Steel" as defined in accordance with AISC Code of Standard
CONTROL NUMBER
Practice.
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 232
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 233
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Section 05500 - Miscellaneous Metal and Fabrication
A. Codes and Standards: Follow the guidelines contained in the latest editions of the
DESCRIPTION
0001
4. AISC, Specification for Structural Joints Using ASTM A 325 or A 490 Bolts.
06/01/22
00
DISCIPLINE
laboratory engaged by the CLIENT. The Contractor shall provide the laboratory
ENGINEER inspector with free access to all places where materials or components are stored or
fabricated and in their erected position. The Contractor shall notify the laboratory in
DATE:
sufficient time prior to fabrication or erection Work to allow testing and inspection
PROJECT
ENGINEER without delaying the Work.
DATE: C. All Work shall be performed by qualified operators experienced in their field of Work
CERTIFIED
as required under this Section.
DATE:
CONSTRUCTION
D. Design of structural parts to be under the direct supervision of a Professional
AGENCY Engineer experienced in the design of such components and shall conform to the
applicable industrial standards.
DATE:
OPERATIONS
E. Tolerances:
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
1. Check calibration device for setting calibrated torque wrenches for accuracy
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
not more than 30 days prior to use on project, and at intervals not more than
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 233
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 234
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. Contractor shall submit to CLIENT Representative certificate of accuracy for
calibration devices from the manufacturer.
ENGG CERT
2. Each welder, tacker, and welding operator shall be certified by test within the
Issued for IFC
past six months to perform type of work required in conformance with AWS
Structural Welding Code.
3. Maintain duplicate qualification and certification records at the job site readily
available for examination of test results.
1.04 References
23-10028-
JO/EWO
0001
00
DISCIPLINE
ENGINEER C. AISC Specification for Structural Steel Buildings, Allowable Stress Design and Plastic
Design.
DATE:
PROJECT
ENGINEER D. AISC Code of Standard Practice for Steel Buildings and Bridges.
DATE: E. AISC Specification for Structural Joints using ASTM A325 or A490 Bolts.
CERTIFIED
I. American Welding Society (AWS) Structural Welding Code Steel, D1.1, with
DATE: amendments to date.
CONTROL NUMBER
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 234
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 235
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. ASTM A36/A36M: Specification for Structural Steel.
3. ASTM A53, Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated
ENGG CERT
4. ASTM A153: Specification for Zinc Coating (Hot-Dip) on Iron and Steel
Hardware.
5. ASTM A307: Specification for Carbon Steel Bolts and Studs, 60,000 PSI
Tensile Strength.
DESCRIPTION
6. ASTM A325: Specification for High-Strength Bolts for Structural Steel Joints.
Issued for IFC
7. ASTM A449: Specification for Quenched and Tempered Steel Bolts and
Studs.
0001
10. ASTM A780: Practice for Repair of Damaged and Uncoated Areas of Hot-Dip
Galvanized Coating.
06/01/22
DATE
00
DISCIPLINE
12. ASTM A193: Specification for Alloy Steel and Stainless Steel Bolting
ENGINEER Materials for High - Temperature Services.
DATE:
13. ASTM E119.
PROJECT
ENGINEER
1.05 Submittals
DATE:
CERTIFIED
A. Shop Drawings: Submit the following in accordance with Section 01000 - General
Specifications:
DATE:
CONSTRUCTION
AGENCY 1. Submit shop drawings for review by CLIENT Representative prior to
fabrication.
DATE:
OPERATIONS
2. Submit complete and checked shop drawings for all structural steel
components. Show materials, anchor bolts, member and connection details,
DATE: piece marks, openings, shop and field bolting and welding, in conformity with
CONTROL NUMBER
AISC Detailing Manual and AISC Manual. Indicate cleaning and shop
VERIFICATION
painting requirements.
EDSD
DATE:
3. Submit, prior to welding, the welding procedure for each type of weld.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 235
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 236
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Shop drawings detailing fabrication of structural steel components.
ENGG CERT
3. Indicate type, size, and length of bolts, distinguishing between shop and field
bolts. Identify high-strength bolted slip-critical, direct-tension, or tensioned
DESCRIPTION
shear/bearing connections.
Issued for IFC
7. Include details of cuts, connections, camber, holes, and other pertinent data.
23-10028-
JO/EWO
0001
Indicate welds by standard AWS A2.1 and A2.4 symbols, and show size,
length, and type of each weld.
06/01/22
DATE
00
DISCIPLINE
ENGINEER C. Qualification data for firms and persons specified in the “Quality Assurance” article
to demonstrate their capabilities and experience. Include lists of completed
DATE:
projects with project names and addresses, names and addresses of
PROJECT
ENGINEER architects/engineers and owners, and other information specified.
1. Structural steel (each type), including certified copies of mill reports covering
DATE:
chemical and physical properties.
OPERATIONS
3. Direct-tension indicators.
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
5. Shop primers.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
6. Nonshrink grout.
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 236
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 237
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7. Welding electrodes.
ENGG CERT
E. Submit mill certificates and certified copy of reports for all analyses and tests required
by referenced ASTM Specifications and AWS Structural Welding Code.
F. Fabricator and Erector: Submit the name of the proposed fabricator and erector with
reference of Work of a similar nature carried out by him on other projects, with
relevant dates.
specifications.
Issued for IFC
0001
H. Submit materials information and data for CLIENT Representative review at least
06/01/22
twenty one (21) calendar days prior to scheduled start date of any fabrication.
DATE
I. Test reports conducted on shop and field-bolted and welded connections. Include
NO.
REV
00
DISCIPLINE
data on type(s) of tests conducted and test results. State compliance or non-
ENGINEER compliance with Specifications.
DATE:
J. Submit certificate of compliance with ASTM Specifications for Zinc-coatings.
PROJECT
ENGINEER
DATE: N. Method Statement: Submit for approval, Quality Control method statement in
CONTROL NUMBER
A. Carefully transport, handle, and store materials, protected from weather, rusting,
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 237
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 238
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Mark all materials delivered to site properly marked to identify the structure location
for which it is intended. Marking shall correspond to marking indicated on shop
drawings.
ENGG CERT
C. Store structural shapes off ground on suitable supports, with webs of flanged shapes
vertical. Protect steel from ground splatter.
PART 2 - PRODUCTS
2.01 Manufacturers
DESCRIPTION
0001
D. Hidada Ltd.
P.O. Box 2449, Al-Khobar 31952, Saudi Arabia
06/01/22
DATE
00
DISCIPLINE
ENGINEER F. International Building Systems Factory Co., Ltd.
P.O. Box 1458, Al Khobar, Saudi Arabia
DATE:
PROJECT
ENGINEER G. Kirby Products
P.O.Box 2768, Dammam 31461, Saudi Arabia
DATE:
CERTIFIED
H. Approved equal.
DATE:
CONSTRUCTION
2.02 Structural Steel
AGENCY
C. All purlins, channels, angles, and plates shall conform to ASTM A36 & beams and
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
D. Steel pipe shall conform to ASTM A53, Type E or S, Grade B or ASTM A500, Grade
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
B.
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 238
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 239
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
E. Steel tube shapes shall conform to ASTM A500, Grade B or C.
F. Built-up structural sections, with physical dimensions and geometrical and structural
ENGG CERT
properties similar or better to the rolled steel sections shown on the Drawings, may be
substituted for the rolled section provided the following requirements are met:
2.03 Fasteners
A. Unfinished Bolts: Conform to ASTM A307 Grade A, nuts to ASTM A536 with
hardened washer.
23-10028-
JO/EWO
0001
B. Higher Strength Bolts: Conform to ASTM A325M Type I, nuts to ASTM A 563M
06/01/22
C. Anchor Bolts: Conform to ASTM A307 and shall comply with the latest Standard
NO.
REV
00
DISCIPLINE
(IBC).
ENGINEER
APPROVAL/CERTIFICATION REQUIREMENTS,
1. All structural steel which is to receive sprayed-on fire proofing materials shall
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
be sand blasted to a Sa-2 1/2 finish and primed with one coat of Hempadur
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 239
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 240
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
applied to attain a minimum dry film thickness of 75 microns, in accordance
with the manufacturers specifications.
ENGG CERT
2. Where steel is to receive subsequent top coats (all locations exposed to view)
the primer shall be of the same manufacturer as the top coats.
4. Apply two coats of paint to surfaces which are inaccessible after assembly or
erection. Change color or second coat to distinguish it from the first.
DESCRIPTION
D. Shop Painting: Shop paint all new structural steel work in accordance with ASTM
23-10028-
JO/EWO
0001
APCS-1C.
DATE
E. All exposed steel members shall be coated in accordance with APCS-1E, unless
NO.
REV
00
DISCIPLINE
otherwise noted.
ENGINEER
DATE: A. After shop drawings are approved by CLIENT Representative, fabricate each element
CERTIFIED
to the size and connection indicated on the fabrication shop drawings. Fabricate and
shop-assemble work, to the greatest practical extent, in accordance with following
DATE:
CONSTRUCTION
publications:
AGENCY
1. AISC Manual.
DATE:
OPERATIONS
2. AISC Specification for Design, Fabrication, and Erection
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
B. Ensure that shearing, manual flame cutting with mechanically guided torch, and
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
chipping will not induce residual stress in metal being cut. Radii of re-entrant corners
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 240
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 241
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
to be not less than 18 mm (3/4 inch) and larger when possible. Perform flame cutting
so that metal being cut is not carrying stress. Finish exposed edges.
ENGG CERT
C. Ensure full cross section bearing on milled ends of columns, crane rails, monorails
and bearing stiffeners.
D. Connect all members with ASTM A325 high strength bolts unless otherwise specified
or indicated on Drawings. Provide clean-cut holes without torn or ragged edges and
remove all outside burrs.
welding for structural strength shall be continuous. Skip welding is not acceptable
Issued for IFC
G. Make connections with ASTM A307 carbon steel (unfinished) bolts as specified or
indicated on Drawings.
0001
PART 3 - EXECUTION
06/01/22
DATE
3.01 Erection
NO.
REV
00
DISCIPLINE
A. Align column bases and bearing plates for beams and similar structural members with
ENGINEER steel wedges or shims. After alignment and positioning anchor nuts tight, fill entire
area under bearing plates with non-shrink, non-metallic grout. Remove steel wedges
DATE:
or shims and grout voids.
PROJECT
ENGINEER
B. Provide anchor bolts and anchors with necessary templates for correct placement into
DATE: concrete, masonry and other supporting materials.
CERTIFIED
C. Hold steelwork securely in place with adequate temporary bracing and stays to resist
DATE:
CONSTRUCTION
all vertical and lateral loads, until members are permanently fastened and floors and
AGENCY roofs completed.
DATE:
D. Use only calibrated wrenches for tensioning high-strength bolts.
OPERATIONS
E. Inspect and torque test field-assembled bolted construction in accordance with AISC
DATE: Specification for Structural Joints.
CONTROL NUMBER
VERIFICATION
G. Align and adjust members forming parts of a complete assembly after assembly and
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 241
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 242
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
H. Fasten splices of compression members after the abutting surfaces have been
brought completely into contact.
ENGG CERT
K. Ensure that holes are not enlarged and that metal in vicinity of holes is not damaged
DESCRIPTION
L. Enlarge holes to admit bolts for connections only if approved in writing by CLIENT
Representative. Make enlargement by reaming and not by burning.
M. Where erection bolts are abandoned in place, remove bolts, completely plug weld
holes, and grind smooth with adjacent surfaces.
0001
P. Gas cutting is prohibited on major members. On minor members, not stressed, such
DATE
00
DISCIPLINE
3.02 High Strength Bolting
ENGINEER
B. Install ASTM A325 bolts with hardened washer under element being turned in
DATE: tightening. When using oversize and slotted holes, install plate washer in both outer
CERTIFIED
plies. When using galvanized bolts, install galvanized washer under bolt head and
nut. A 325 bolts shall be tightened by the turn-of-nut method.
DATE:
CONSTRUCTION
AGENCY 3.03 Welding
DATE:
A. Welding Operations: Provide workmanship and techniques for welded construction in
OPERATIONS
conformance with requirements of AWS Structural Welding Code.
C. Materials and Process: Furnish equipment for welding, electrodes, welding wire, and
DATE:
fluxes capable of producing satisfactory welds when used by certified welders using
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 242
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 243
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.04 Paint and Coating
B. Complete all welding before preparation or painting, except when size of members,
field erection procedures or other approved necessity requires welding after shop
priming.
C. Before cleaning, prepare surfaces of steel by removing all weld spatter, flux and
residue, burrs and metal surface defects.
DESCRIPTION
1. Grind smooth, sharp edges and corners, eliminate pinholes and unevenness
Issued for IFC
0001
1. Before coating, clean surfaces of dirt, oil, grease, dust, moisture, mill scale,
06/01/22
and corrosion, poorly bonded material including spray dust, paint splatter and
DATE
00
DISCIPLINE
2. Remove dust from cleaning operations in dry environment by vacuuming or
ENGINEER dry-air blast, without damaging quality of cleaned surface.
DATE:
E. Before rusting, contamination or deterioration starts, prime clean dry surfaces. Prime
PROJECT
ENGINEER within eight hours of cleaning under ideal conditions, or sooner if conditions are not
ideal. Protect cleaned surfaces to prevent deterioration before coating. If blast
DATE: cleaned area is not primed within eight hours of cleaning, reclean as specified just
CERTIFIED
before priming.
DATE:
CONSTRUCTION
F. Clean and paint surfaces of assembled items, inaccessible after assembly, before
AGENCY assembly, unless such areas are seal welded.
DATE:
G. Apply coatings to suitably prepared, clean, dry surfaces, in accordance with paint
OPERATIONS
manufacturer's current printed recommendations and as herein specified.
DATE: H. Hold back coatings which would be damaged by welding and welding heat from areas
CONTROL NUMBER
for original coats when coated areas have had coating damaged by welding and for
EDSD
I. Perform coating operations only during suitable ambient and surface conditions,
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
moderate temperatures, low humidity, and protection from precipitation, low air
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 243
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 244
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
J. Immediately after surface preparation, properly mix and apply coatings to produce a
complete, tenacious, continuous bonded film, uniform in thickness and without
defects. Provide a coating with film thickness not less than specified and with no
ENGG CERT
cleaning requirements, just before recoating. When small areas of coating need
touch up, surface preparation may be done with suitable power needle gun to match
specified blast cleaning results.
0001
A. Immediately after erection, clean field welds, bolted connections and abraded areas
of shop paint. Wire brush and sand as necessary to obtained a smooth surface.
06/01/22
Apply paint by brush or spray to provide a minimum dry film thickness of 2.0 mils.
DATE
00
DISCIPLINE
ENGINEER - END OF SECTION -
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 244
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 245
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________ 23-10028-
00 06/01/22 Issued for IFC
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
AGENCY
BY:
PROJECT
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
DISCIPLINE
CERTIFIED
OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________
23-10028-0001-008 DATE:
Dammam
Saudi Aramco 2616-ENG (03/99)
SAUDI ARABIA
DOC
381
BI / JO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY
23-10028-0001
---------------------------------------------------------------------------------
DRAWING NO.
HE-274738
of
246
245
SHT.NO.
List of Sections
00
EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 05300
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 2 - Products
2.01 Manufacturers
2.02 Materials
2.03 Fabrication
23-10028-
JO/EWO
0001
Part 3 - Execution
DATE
3.01 Erection
NO.
REV
00
DISCIPLINE
3.02 Completed Work
ENGINEER
DATE:
PROJECT
ENGINEER PART 1 - GENERAL
A. Work under this Section includes, but is not limited to; furnishing and installing of
DATE:
CONSTRUCTION
metal roof panels, and other pertinent accessories.
AGENCY
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 246
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 247
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3. ASTM B-117, Practice for Operating Salt Spray (Fog) Apparatus.
ENGG CERT
Relative Humidity.
8. ASTM E-72, Test Methods for Conducting Strength Tests of Panels for
Building Construction.
1.04 Submittals
23-10028-
JO/EWO
0001
B. Samples: Sheet metal manufacturer shall prepare and submit samples for each
NO.
REV
00
DISCIPLINE
sheet intended to be used for the project representing material thickness, shut ribbed
ENGINEER configuration and color range. Two 300 x 300 mm samples showing panels, panel
side joint conditions, finish coating performance criteria and color chips shall be
DATE:
provided, along with one sample for Saudi Aramco approval prior to purchasing the
PROJECT
ENGINEER material.
DATE: C. Shop Drawings: Submit manufacturer's specifications and shop drawings showing
CERTIFIED
installation and connection details to the steel structure with all accessories to
complete the Work.
DATE:
CONSTRUCTION
AGENCY 1.05 Product Delivery, Handling and Storage
DATE:
A. Delivery: Deliver all materials to conform to erection schedule.
OPERATIONS
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 247
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 248
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PART 2 - PRODUCT
2.01 Manufacturers
ENGG CERT
2.02 Materials
Preformed profiled roof panels shall be as manufactured by HESCO Ltd, Zamil Steel Building
Co. Ltd., Al Khobar, Saudi Arabia, Arabian Profile Limited, Sharjah, United Arab Limited, or
approved equal.
A. Single roof panel shall be an aluminum single skin panel 0.8 mm thick conform to
23-10028-
JO/EWO
0001
1. Base material for zinc/aluminum alloy coated aluminum panels shall have a
DATE
minimum yield strength of 34.5 kN/sq.cm and will conform to the physical
specifications of ASTM B-209 alloy 3105 Tewper H26 or equivalent.
NO.
REV
00
DISCIPLINE
ENGINEER 2. Zinc/aluminum coating shall be a hot dip galvanization process conforming to
ASTM Specification A 525 with a coating class of G-90 (275 g/m2) or its
DATE:
equivalent.
PROJECT
ENGINEER
2. Base material for zinc/aluminum alloy coated galvanized steel panels shall
DATE: have a minimum yield strength of 34.5 KN/sq.m and will conform to the
CONTROL NUMBER
ASTM Specification A 525 with a coating class of G-90 (275 g/m2) or its
BY:
equivalent.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 248
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 249
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. Panel Profile: Panel shall have 20 mm-25 mm deep ribs.
The factory bonded insulated foam both aluminum and G.I. panels shall be
ENGG CERT
1.0 meter wide, 120 mm-125 mm thick single span where required to avoid
the end lap joint, the panel shall present a fluted surface externally and flat
internally. The two metal skins shall sandwich 120 mm-125 mm of
polyisocyanurate foam or polyurethene foam core insulation having a "U"
value of 0.18 w/sq.mm deg. cent. (0.032 btu/hours. ft2, deg. F.) this value
shall be certified by a recognized independent laboratory in accordance with
ASTM C-236 (Ashrae Winter Design) with 15 mile per hour wind outside, still
air inside.
DESCRIPTION
5. Insulation Foam: The insulation foam shall comply with UBC 1712 and UBC
Chapter 32 and the following:
0001
00
DISCIPLINE
in accordance with the procedures specified in ASTM C 365.
ENGINEER
C. Sealer: Sealer for sidelaps and endlaps shall be 12 mm dia. bed caulk filled. The
DATE:
sealer shall be non-asphaltic, non-shrinking, and non-toxic and shall have superior
PROJECT
ENGINEER adhesion to metals, plastic and painted surfaces at temperature from 50 deg. C to +
104 deg. C.
DATE:
CERTIFIED
D. Fasteners: The roof panels shall be secured to the structural frame with a bolted
hexagonal combination washer stainless steel self-tapping screws with combination
DATE:
CONSTRUCTION
washers. Flashings and accessories shall be installed with stainless steel type sheet
AGENCY metal screws and/or stainless steel pop rivets as per manufacturer's standard
practice.
DATE:
OPERATIONS
E. Gutter: Eave gutters shall be box shaped, color-coated, 0.8 mm nominal thickness
aluminum and pre-painted as per panel manufacturer's recommendation.
DATE:
CONTROL NUMBER
F. Flashing, Trim and Closures: Flashing and/or trim shall be furnished at the rake,
VERIFICATION
ridge, corners, eaves, and wherever necessary to provide weather tightness and
EDSD
G. Structural Tests: The panel structural designs shall have been verified by witnessed
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
structural tests for wind loads by the "Chamber Method" as outlined in ASTM E-72.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
Standard test design load shall be 1,000 newton per square meter positive or
(DCC) NO. _____________________
negative simulated wind load and a deflection limit of L/180 under positive loading.
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 249
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 250
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
H. Side Joints: The side joints for roofing shall be of a concealed type covered by a roll-
formed batten strip. This batten strip is fastened on both sides with stainless steel
ENGG CERT
The roofing side joints shall have two lines of field applied sealant # JS 800 butyl
sealant one on each side below the batten strip.
I. Air Infiltration: The side and end lap joints of the panels shall provide virtually no heat
loss and no measurable air infiltration when tested by a recognized independent
testing laboratory in accordance with ASTM E-283 (Test of rate of Air leakage) with a
DESCRIPTION
J. Water Penetration: The side and end lap joints of the panels shall provide virtually no
water penetration when tested by a recognized independent testing laboratory in
accordance with ASTM E-331 (Test of Water Penetration) with a static pressure
difference of 5.0 PSF to 20 PSF.
2.03 Fabrication
0001
00
DISCIPLINE
2.04 Coating for Single Skin Panel
ENGINEER
PART 3 - EXECUTION
EDSD
DATE:
3.01 Erection
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
A. General: Install roof panel units in accordance with approved shop drawings and
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 250
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 251
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Placing Metal Roof Panel: Accurately position deck units on supporting framework
and adjust to final position with proper bearing before permanently securing.
ENGG CERT
D. The panels shall be secured to the structural frame with stainless steel self-tapping
screws with combination washers.
E. Flashings and accessories shall be installed with stainless steel type sheet metal
DESCRIPTION
screws and/or stainless steel pop rivets as per manufacturer's standard practice.
Issued for IFC
- END OF SECTION -
23-10028-
JO/EWO
0001
06/01/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 251
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 252
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 05500
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
1.02 Related Work
DESCRIPTION
Part 2 - Products
2.01 Materials
2.02 Fabrication
2.03 Bollards
23-10028-
JO/EWO
0001
2.04 Steel
2.05 Aluminum
2.06 Galvanizing
06/01/22
DATE
2.07 Manufacturer
NO.
REV
00
Part 3 - Execution
DISCIPLINE
ENGINEER
3.01 General
DATE: 3.02 Painting
PROJECT
ENGINEER
1.01 Description
DATE:
CONSTRUCTION
AGENCY A. Contractor shall furnish, erect, install, set and fasten decorative fences, enclosures
and gate panels, aluminum railings, bollards, aluminum ladder and all miscellaneous
DATE: metal items.
OPERATIONS
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 252
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 253
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.03 Reference Standards
B. American Welding Society "Structural Welding Code" D1.1, with amendments to date.
2. ASTM A 53, Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated
Issued for IFC
4. ASTM A153, Specification for Zinc Coating (Hot-Dip) on Iron and Steel
Hardware.
5. ASTM A 325, Specification for High-Strength Bolts for Structural Steel Joints.
23-10028-
JO/EWO
0001
00
DISCIPLINE
ENGINEER 8. ASTM B137, Test Method for Measurement of Coating Mass Per Unit Area of
Anodically Coated Alumiinum.
DATE:
PROJECT
ENGINEER 9. ASTM B244, Test Method for Measurement of Thickness of Anodic Coatings
on Aluminum and of Other Non-conductive Coatings on Non-magnetic Basis
DATE: Metals with Eddy - Current Instruments.
CERTIFIED
1.04 Submittals
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
B. Shop drawings showing materials, sizes, finishes, locations, attached hardware and
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
fittings, and details for manufactured items and fabricated metal work, including field
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 253
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 254
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
erection details showing cuts, copes, connections, holes, and field, by symbols
conforming to AWS standards. Indicate coating or other protection against corrosion.
ENGG CERT
C. Setting diagrams, erection plans, templates and directions for installation of backing
plates, anchors, and other such similar items.
F. All steel work shall comply with the requirements of SAES-M-001, SAES-W-011, 12-
DESCRIPTION
A. Identify and match-mark, all materials, items and fabrications, for installation and field
assembly.
B. Deliver items to job site as complete units, wherever practicable, ready for installation
or erection, with all anchors, hangers, fasteners and miscellaneous metal items
required for installation.
23-10028-
JO/EWO
0001
C. Carefully handle and store materials, protected from weather, rusting and other
06/01/22
damage.
DATE
D. Store structural shapes, pipes, tubes sheets and aluminum fabrication off the ground,
NO.
REV
00
DISCIPLINE
evenly laid horizontal on sufficient and suitable supports.
ENGINEER
DATE:
PART 2 - PRODUCTS
PROJECT
ENGINEER
2.01 Materials
DATE:
CERTIFIED
A. Steel plates and structural steel shapes shall conform to ASTM A36.
DATE:
CONSTRUCTION
Sheet Steel shall be cold-rolled or hot-rolled carbon sheet steel conforming to ASTM
AGENCY Specification for Steel, Carbon, Cold-Rolled Sheet, Commercial Quality, Designation
A366 or ASTM Standard Specification for Steel, Carbon, (0.15 maximum, percent),
DATE:
Hot-rolled Sheet and Strip, Commercial Quality, Designation A1011, as appropriate.
OPERATIONS
Steel pipe shall conform to ASTM Specifications for Pipe, Steel, Black and Hot-
DATE: Dipped, Zinc-Coated, Welded and Seamless, Designation A53.
CONTROL NUMBER
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 254
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 255
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Extruded Shapes 6063-T5
Plates 6061-T6
Castings 214
ENGG CERT
Contractor shall furnish Saudi Aramco with mill certificates and a signed statement
from the fabricator that all aluminum work furnished is of the proper alloys, as
specified above.
DESCRIPTION
B. Stainless Steel
Issued for IFC
2.02 Fabrication
A. General.
23-10028-
JO/EWO
0001
1. Fabricate true to shape, size and tolerances as indicated and specified with
straight lines, rounds and square corners or smooth bends; free from twists,
06/01/22
shearing or punching.
NO.
REV
00
DISCIPLINE
2. Dress exposed edges and ends of metal smooth, with no sharp edges and
ENGINEER with corners slightly rounded. Construct connections and joints exposed to
weather exclude water.
DATE:
PROJECT
ENGINEER 3. Provide sufficient quantity and size of anchors for the proper fastening of
work.
DATE:
CERTIFIED
B. Fabricated Products:
DATE:
CONSTRUCTION
1. Pipe sleeves in concrete construction: Weld standard weight black steel pipe,
AGENCY with anchors to exterior as required to accommodate passage of conduits,
pipes, ducts and similar items.
DATE:
OPERATIONS
2. All aluminum welding shall be done by the inter-gas shielded - arc as fluxless
resistance techniques.
DATE:
CONTROL NUMBER
anodizing.
EDSD
DATE:
2.03 Bollards
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 255
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 256
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.04 Steel
A. Fences, enclosures and Gates: Fences, enclosures and gates shall be fabricated
ENGG CERT
in panels as indicated on the Drawings. Steel shapes and plates shall conform to
ASTM A36. Nuts, bolts, rivets, washers and anchorage devices shall conform to
ASTM A 325. Thickness for 50 mm square hollow steel shall be 3 mm.
Fabrication shall be as specified in Part 2.02 of this section. All fence steel
members, gates and geometries shall be painted and the color to be used shall be
coordinated with Saudi Aramco. Painting shall conform to Section 09900 of the
Specifications. Shop drawings and fence paint color samples shall be submitted to
Saudi Aramco Representative for approval prior to fabrication.
DESCRIPTION
2.05 Aluminum
The aluminum pipe railings shall be all-welded railings fabricated as indicated and
shall consist of 50 mm (2 in.) IPS, Schedule 80 aluminum pipe, alloy 6063-T6 for
stanchions and 50 mm (2 in.) Schedule 80 aluminum pipe, alloy 6063-T6 for top rails,
40 mm (1-1/2 in.) Schedule 80 aluminum pipe, alloy 6063-T6 intermediate rails and
returns. The railings shall be fabricated in panels with joints made in a neat and
23-10028-
JO/EWO
0001
inconspicuous manner. All exposed welds shall be ground smooth. All pipe rail
stanchions shall be reinforced with 200 mm (8 in.) long 40 mm (1-1/2 in.) diameter
06/01/22
Handrail stanchions mounted on the top of the stair stringers shall be fitted over and
NO.
REV
00
DISCIPLINE
fastened to the reinforcing rods with two 13 mm (1/2 in.) flat head machine screws
ENGINEER and fillet welds at the base. The reinforcing rods shall be welded to aluminum angles
for bolting to the stringers.
DATE:
PROJECT
ENGINEER Guard rail stanchions, side mounted to concrete, shall be welded to 8 mm extruded
aluminum brackets. The brackets shall be secured to the concrete with four, 13 mm
DATE: (1/2 in.) diameter type 316 stainless steel expansion bolts.
CERTIFIED
Railings shall extend 1.075 m (42 in.) above concrete and include a top rail and two
DATE:
CONSTRUCTION
intermediate rails of 40 mm (1-1/2 in.) Schedule 40 aluminum pipe welded to 50 mm
AGENCY (2 in.) Schedule 80 aluminum pipe posts spaced at maximum 2.00 m (5 ft.) on
centers. Railings shall be provided with toe plates of 10.2 cm x 5.72 cm x 0.64 cm (4
DATE:
in. x 2-1/4 in. x 1/4 in.) aluminum bent plate coped at top or 0.64 cm x 10.2 cm (1/4 in.
OPERATIONS
x 4 in.) aluminum plate fastened to post. Bottom of toe plate shall be 0.64 cm (1/4 in.)
above concrete. Distance between railings and top of top plates shall not exceed
DATE: 27.9 cm (11 in.).
CONTROL NUMBER
VERIFICATION
B. Floor Hatch Scuttle: Furnish and install single leaf floor hatch scuttle in sizes indicated
EDSD
on Drawing.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 256
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 257
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
support uniform superimposed load of 100 psf for span with deflection less
than 1/4 in., based on allowable fiber stress of 16,000 psi unless otherwise
indicated. Fit covers neatly and accurately in frames.
ENGG CERT
2. Hinged: Hinge cover to frame with 316 stainless steel, heavy duty plain
bearing hinges and 316 stainless steel pins. Attach hinges to cover and frame
with 316 stainless steel machine screws. Provide flush lift handles made from
1/2 in. dia 061-T6 alloy rod. Maximum size of single-leaf cover plate, 3 ft.
square.
3. Frames: Provide aluminum angle frames. Miter corners, weld joints and grind
DESCRIPTION
smooth where exposed. Weld strap anchors for securing in concrete floor
Issued for IFC
and 1/2 in. diameter stainless steel bolts for securing to concrete wall, where
applicable.
2.06 Galvanizing
23-10028-
JO/EWO
0001
2.07 Manufacturer
DATE
A. Decorative Steel Fences, Enclosures and Gate Panels: Al Khodary Heavy Industries.
NO.
REV
00
DISCIPLINE
ENGINEER B. Or approved equal.
DATE:
PROJECT
ENGINEER PART 3 - EXECUTION
A. Accurately set and properly secure in place. Where bolted connections are used,
DATE:
CONSTRUCTION
draw closely together and draw nuts tightly.
AGENCY
B. Locate anchors and anchor bolts and build into connecting work. Insert expansion
DATE:
holes into drilled holes.
OPERATIONS
C. Set stairs in manholes and other structures prior to pouring concrete in place.
DATE:
CONTROL NUMBER
D. Accurately set anchors and bolts with tie bars at tubular steel framed post embedded
VERIFICATION
DATE:
3.02 Painting
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
- END OF SECTION –
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 257
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 258
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 06100
ENGG CERT
ROUGH CARPENTRY
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 2 - Products
2.01 Materials
2.02 Treated Wood
Part 3 - Execution
23-10028-
JO/EWO
0001
3.01 Installation
06/01/22
NO. DATE
REV
00
DISCIPLINE
PART 1 - GENERAL
ENGINEER
1.01 Description
DATE:
PROJECT
ENGINEER A. Work in this Section includes but is not limited to, wood nailers, blocking, stripping,
sleepers, roof cants and moulding.
DATE:
CERTIFIED
1.02 Related Sections
DATE:
CONSTRUCTION
A. Section 05500, Miscellaneous Metal Fabrications.
AGENCY
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 258
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 259
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. American Plywood Association (APA).
ENGG CERT
B. Coordination: Fit carpentry work to other work: scribe and cope as required for
accurate fit. Correlate location of furring, nailers, blocking, grounds and similar
supports to allow proper attachment of other work.
DESCRIPTION
C. Delivery and Storage: Keep materials dry during delivery and storage. Protect
Issued for IFC
against exposure to weather and contact with damp or wet surfaces. Stack lumber
and plywood, and provide air circulation within stacks.
D. Protection: Protect installed carpentry work from damage by work of other trades until
acceptance of work by Saudi Aramco.
E. Identification: Factory-mark each piece of lumber and plywood to identify the type,
grade, agency providing inspection service, producing mill and other qualities as
specified herein.
23-10028-
JO/EWO
0001
1.04 Submittals
06/01/22
DATE
00
DISCIPLINE
lumber, treatment quality and moisture content at time of delivery.
ENGINEER
C. Pressure Treatment: For each type specified, include certification by treating plant
DATE: stating chemicals and process used, net amount of salts retained and conformance
CERTIFIED
with applicable standards.
DATE:
CONSTRUCTION
D. Shop Drawings: Showing details for counter tops, hanging cabinet, built-in closet,
AGENCY door frames, architrave and moulding.
DATE:
OPERATIONS
PART 2 - PRODUCTS
A. Lumber, General:
EDSD
DATE:
1. Standard: For each use, comply with "American Softwood Lumber Standard"
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
under PS 20.
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 259
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 260
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
a. Provide dressed lumber, S4S.
ENGG CERT
B. Lumber, Grade:
3. Select beechwood.
C. Plywood (Interior): Softwood plywood, interior type APA, Group 1, Grade B-B where
unexposed, Grade A-B, where one side is exposed, identified with DFPA Grade
Treatment of the American Plywood Association meeting USPS, PS 1.
D. Hardware: Nails, spikes, screws, bolts, washers, steel plates, straps and other
carpenter's iron of type, size and finish best suited for the intended use. hardware of
exterior use; galvanized.
23-10028-
JO/EWO
0001
00
DISCIPLINE
ENGINEER A. Preservative Treatment: Pressure-treat above ground lumber and plywood with water
borne preservative comply with applicable requirements of American Wood
DATE:
Preservers Institute (AWPI). Mark each treated item to comply with AWPI Quality
PROJECT
ENGINEER Mark requirements for specified requirements. Pressure-treat above-ground items
with water-borne preservative complying with AWPI LP-2. After treatment, kiln-dry to
DATE: a maximum moisture content of 15%. Treat indicated items and following:
CERTIFIED
3.01 Installation
EDSD
DATE:
lengths and sizes to minimize jointing. Use materials free from warp which cannot be
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
easily corrected by anchoring and attachment. Sort out and discard warped material
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
and material with other defects which would impair quality of work.
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 260
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 261
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. General: Erect all nailers, blocking, grounds, framing, bracing, scaffolding and other
rough carpentry detailed or required to complete the Project. Install all work plumb,
level, in true alignment, closely fitted and rigidly fastened into place. Exercise care in
ENGG CERT
spiking and nailing using spikes and nails of proper size so as not to split the
members. Drill members accurately for bolting. Provide suitable washers under
heads and/or nuts and draw nut and bolt up tight.
E. Plywood: Anchor plywood with nails or anchors of type, size and spacing
recommended by the American Plywood Association.
- END OF SECTION -
23-10028-
JO/EWO
0001
06/01/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 261
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 262
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 06620
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 2 - Products
23-10028-
JO/EWO
0001
2.01 Manufacturers
2.02 Material
06/01/22
2.03 Fabrication
DATE
Part 3 - Execution
NO.
REV
00
DISCIPLINE
ENGINEER 3.01 Examination
3.02 Installation
DATE:
3.03 Cleaning
PROJECT
ENGINEER 3.04 Protection
DATE:
CERTIFIED
PART 1 - GENERAL
DATE:
CONSTRUCTION
1.01 Description
AGENCY
A. Work under this section includes, but is not limited to, furnishing and installing solid
DATE:
polymer products, as indicated and specified herein.
OPERATIONS
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 262
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 263
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A. American Society for Testing and Materials (ASTM):
1. C501, Test Method for Relative Resistance to Wear of Unglazed Ceramic Tile
ENGG CERT
2. D256, Test Method for Determining the Izod Pendulum Impact Resistance
Notched Specimen of Plastics.
0001
1.04 Submittals
NO.
REV
00
DISCIPLINE
A. Samples: Submit manufacturer's standard color book showing colors of actual
ENGINEER material in not smaller than 1-1/2 in. size. Following selection of colors, submit
samples as specified above.
DATE:
PROJECT
ENGINEER B. Shop Drawings: Fabricator shall provide detailed and dimensioned shop drawings
showing all details of fabrication, edging, sink installation, coving, and seams, indicate
DATE: fastener types and locations, sealant proposed for use, and fabrication details of
CERTIFIED
support brackets.
DATE:
CONSTRUCTION
C. Manufacturer's Instructions: Submit complete manufacturer's fabrication and
AGENCY installation instructions.
DATE:
D. Upon completion, furnish Saudi Aramco with one set of manufacturer's recommended
OPERATIONS
cleaning procedure.
installing finish carpentry items similar in type and quality to those required for this
BY:
Project.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
B. The material shall be approved by the National Sanitation Foundation for use in food
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 263
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 264
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.06 Delivery, Storage and Handling
ENGG CERT
A. Transport and handle sheets and fabricated items by methods that will prevent
damage and defacing.
B. Storage: If units are not installed immediately upon delivery to site, store in covered
location, off the ground or floor, and cover with moisture-and stain-resistant paper or
plastic.
A. Obtain and comply with manufacturer advice for optimum temperature and humidity
conditions for the solid polymer during its storage and installation.
1.08 Warranty
A. Furnish the manufacturer's ten year warranty against defective materials and
workmanship.
23-10028-
JO/EWO
0001
PART 2 - PRODUCTS
06/01/22
2.01 Manufacturers
DATE
00
DISCIPLINE
ENGINEER B. I.E. Dupont de Nemours and Co. Inc. of Wilmington, Delaware, USA 19898.
available through Al-Khatt Al-Khaleegiah Co.
DATE:
P. O. Box 8103
PROJECT
ENGINEER Dammam-31482, KSA
Tel: 966-13-833 3501
DATE: Fax: 966-13-833 0972
CERTIFIED
D. Approved equal.
DATE:
CONTROL NUMBER
2.02 Material
VERIFICATION
EDSD
alloy and fillers to create a material that looks like stone, but cuts like wood. The color
BY:
and pattern shall extend throughout the material. The material shall be in 1/4 in., 1/2
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 264
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 265
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Properties: The material shall conform to the following properties:
ENGG CERT
0001
thickness, pounds
Flame spread classification I ASTM E84
NO.
REV
00
DISCIPLINE
ENGINEER
C. Fabrication and Installation Materials:
DATE:
PROJECT 1. Joint Adhesive: Type recommended by manufacturer, in color to match the
ENGINEER
material.
DATE:
CERTIFIED 2. Silicone Sealant: Type recommended by manufacturer.
DATE:
2.03 Fabrication
CONSTRUCTION
AGENCY
A. Countertops shall be thickness as indicated, one piece wherever possible, and with
DATE:
flush joints sealed with joint adhesive where required. Use sheets in consecutive
OPERATIONS order as numbered by manufacturer, whenever possible. Shop fabricate in largest
sections possible for transporting and building access.
DATE:
B. Ease top and front edges and corners.
CONTROL NUMBER
VERIFICATION
C. Material panelling shall be fabricated of 1/4 in. thick material unless otherwise
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
shown on approved shop drawings. Provide seam blocks under all seams where
OF THIS DRAWING IS COVERED, FOR ALL
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 265
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 266
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
E. Edge details shall be as shown on the Drawings.
ENGG CERT
I. Cutouts for sinks furnished by others shall be smooth and uniform without saw marks.
DESCRIPTION
The top and bottom of sink openings shall be finished smooth. Corners of sink
Issued for IFC
PART 3 - EXECUTION
3.01 Examination
A. Verify that counters and supports are suitable for installation in accordance with shop
drawings.
23-10028-
JO/EWO
0001
3.02 Installation
06/01/22
DATE
00
DISCIPLINE
approved submittals.
ENGINEER
B. Use silicone sealant for attaching backsplashes and reveal edges. Seal all joints with
DATE:
sealant.
PROJECT
ENGINEER
DATE: A. Provide suitable protection on counters and other surfaces of the solid polymer to
CONTROL NUMBER
protect the installation from damage until final acceptance. Place temporary covers
VERIFICATION
over the polymer sinks to preclude their use for construction purposes.
EDSD
DATE:
BY:
- END OF SECTION -
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 266
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 267
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 07100
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
1.03 References
1.04 Submittals
1.05 Qualifications
1.06 Regulatory Requirements
1.07 Pre-installation Conference
1.08 Delivery, Storage, and Handling
1.09 Environmental Requirements
1.10 Coordination
1.11 Warranty
23-10028-
JO/EWO
0001
Part 2 - Products
06/01/22
DATE
2.01 Manufacturers
2.02 Materials
NO.
REV
00
DISCIPLINE
ENGINEER Part 3 - Execution
DATE:
3.01 Preparation
PROJECT
ENGINEER 3.02 Application
3.03 Field Quality Control
DATE: 3.04 Cleaning
CERTIFIED
3.05 Protection
DATE:
CONSTRUCTION
AGENCY PART 1 - GENERAL
DATE:
1.01 Description
OPERATIONS
A. Work under this Section includes, but is not limited to; furnishing and applying
DATE: waterproofing membrane as shown on the Drawings and specified herein.
CONTROL NUMBER
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 267
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 268
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. Section 15430 – Plumbing Specialties.
ENGG CERT
1.03 References
B. ASTM D36 - Test Method for Softening Point of Bitumen (Ring-and-Ball Apparatus).
D. ASTM D828 – Test Method for Tensile Properties of Paper and Paperboard Using
Issued for IFC
Constant-Rate-Of-Elongation Apparatus.
F. ASTM E154 – Test Methods for Water Vapor Retarders Used in Contact with Earth
Under Concrete Slabs, on Walls, or as Ground Cover.
G. ASTM G53 – Practice for Operating Light and Water – Exposure Apparatus
(Fluorescent UV-Condensation Type) for Exposure of Non-Metallic Materials.
23-10028-
JO/EWO
0001
Manual.
DATE
00
DISCIPLINE
ENGINEER 1.04 Submittals
DATE:
A. Submit under provisions of Sections 01000 and 02000.
PROJECT
ENGINEER
requirements.
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 268
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 269
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.05 Qualifications
ENGG CERT
B. Applicator: Company specializing in performing the work of this section with 3 years
documented experience and approved by system manufacturer.
A. Convene one week prior to commencing work of this section, under provisions of
Division 1.
23-10028-
JO/EWO
0001
00
DISCIPLINE
A. Deliver, store, protect and handle products to site under provisions of Sections 01000,
ENGINEER 01005 and 02000.
DATE:
B. Deliver products in manufacturer's original containers, dry, undamaged, seals and
PROJECT
ENGINEER labels intact.
DATE: C. Store products in weather protected environment, clear of ground and moisture.
CERTIFIED
DATE:
1.11 Warranty
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 269
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 270
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Warranty: Cover damage to building resulting from failure to prevent penetration of
water.
ENGG CERT
PART 2 - PRODUCTS
2.01 Manufacturers
B. Tremco Limited
P.O. Box 61331
Riyadh-11565, K.S.A.
Tel. 966-11-544-07379
Fax: 966-11-416-0940
C. DWI
Dermabit, Waterproofing Industries Co. Ltd.
Al Khobar, K.S.A.
23-10028-
JO/EWO
0001
Tel. 966-13-882-3986
Fax: 966-13-887-8025
06/01/22
DATE
D. Or approved equal.
NO.
REV
00
DISCIPLINE
2.02 Materials
ENGINEER
B. Finishes:
DATE:
CONSTRUCTION
AGENCY 1. For covered applications, the waterproofing membrane shall have fine sanded
upper surface.
DATE:
OPERATIONS
2. For exposed applications, the waterproofing membrane shall have a coloured
slate granule surfacing colour as approved by Saudi Aramco Representative
DATE: from manufacturer’s standard range.
CONTROL NUMBER
VERIFICATION
EDSD
PART 3 - EXECUTION
DATE:
BY:
3.01 Preparation
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
A. Insure that surfaces are clean, dry and free from dust and dirt, and otherwise
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 270
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 271
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.02 Application
ENGG CERT
A. Field inspection and testing will be performed under provisions of Section 01400.
3.04 Cleaning
A. In areas where finished surfaces are soiled by Work of this section, consult
manufacturer of surfaces for cleaning advice and conform to their instructions.
0001
3.05 Protection
06/01/22
DATE
00
DISCIPLINE
B. Where traffic must continue over finished roof membrane, protect surfaces.
ENGINEER
DATE:
- END OF SECTION -
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 271
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 272
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 07110
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
1.02 Applicable Codes and Standards
DESCRIPTION
Part 2 - Products
2.01 General
2.02 Materials
23-10028-
JO/EWO
0001
Part 3 - Execution
3.01 Installation
06/01/22
DATE
3.02 Protection
3.03 Inspection
NO.
REV
00
DISCIPLINE
ENGINEER
PART 1 - GENERAL
DATE:
PROJECT
ENGINEER 1.01 Description
DATE: A. General: All underground reinforced concrete structures when located within the
CERTIFIED
water table and the capillary fringe and as shown on the Drawings shall be totally
enveloped (tanked) with waterproofing membrane.
DATE:
CONSTRUCTION
AGENCY This section does not cover reinforced concrete structures above the water table and
out of capillary fringe.
DATE:
OPERATIONS
B. Work Included: This section covers the furnishing and installation of membrane
waterproofing materials as required on concrete structures. Contractor shall furnish
DATE: all labor, materials, tools and equipment required to complete the Work.
CONTROL NUMBER
VERIFICATION
23-10028-0001-008
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 272
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 273
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. Section 03300 - Cast-in-Place Concrete.
ENGG CERT
A. The following codes and standards are intended to provide an acceptable level of
quality for materials and products. The requirements of latest editions of these codes
and standards shall apply. In case of conflict between these standards and text of
this Specification, the Specification text shall govern:
0001
00
DISCIPLINE
A. Contractor shall be responsible for the quality of all work and materials to be used in
ENGINEER the Work and shall propose quality control program for review. The program shall
cover shop inspection, field supervision and the installation procedures in compliance
DATE:
with Section 01400 - Quality Control.
PROJECT
ENGINEER
1.04 Submittals
DATE:
CERTIFIED
Contractor shall submit the following information, data and drawings, to the Saudi Aramco
Representative:
DATE:
CONSTRUCTION
AGENCY A. Before Commencing Work:
DATE:
1. Manufacturer's recommended specification and instructions for transporting,
OPERATIONS
handling and storage of materials.
DATE: 2. Certificate of compliance stating that the materials used and the installation
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 273
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 274
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5. Manufacturer's Quality Control and Quality Assurance Program related to the
production, testing and handling.
ENGG CERT
6. Catalog data sheets related to proposed materials and 3 sets of samples for
all proposed materials.
pallets. Each container and pallet shall include a packing list in a waterproof envelop.
B. The materials shall be checked against packing lists on delivery to the work site and
shall be inspected for damage. Damaged materials shall be removed from the site.
C. Each container and individual roll of membrane sheet shall be labeled to show brand
name, type of material, lot and shelf life, date of manufacture, batch number and
instructions for storage and handling, if any.
23-10028-
JO/EWO
0001
D. All materials shall be adequately protected during shipment, loading and unloading,
storage and installation against incidental damage, sunlight and UV radiation, rain,
06/01/22
E. The materials shall be stored in dry, shaded and covered areas. In open areas the
NO.
REV
00
DISCIPLINE
material shall be covered with a heavy duty black PVC sheet. The rolls of membrane
ENGINEER shall be stored vertically on a smooth hard surface.
DATE:
F. All necessary precautions shall be taken to prevent fire hazards in the storage area
PROJECT
ENGINEER and during installations.
DATE:
CERTIFIED
PART 2 - PRODUCT
DATE:
CONSTRUCTION
2.01 General
AGENCY
A. All materials and products covered by these Specifications shall be procured from an
DATE:
in-Kingdom manufacturer. Procurement of materials and products from an out-of-
OPERATIONS
Kingdom manufacturer/supplier must be approved by the Saudi Aramco
Representative.
DATE:
CONTROL NUMBER
2.02 Materials
VERIFICATION
EDSD
membrane. The laminate shall consist of glass fiber core coated on both side with a
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
polypropylene film bonded on one side and a siliconized release paper backing on the
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
adhesive side. The nominal thickness off the laminate shall be 1.5 mm. Moisture
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 274
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 275
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
vapor transmission rate shall not exceed 0.2 gm/m2/24 hours measured according to
ASTM E96.
ENGG CERT
The glass fiber core shall be nonwoven mat with minimum mass of 50 gms/m2.
B. Solar Reflective Membrane: Shall have similar construction as the membrane above
but the exposed face shall have solar reflective properties.
C. Primer: Shall be solvent based bituminous primer conforming to ASTM D41. The
primer shall be compatible with the membrane and shall ensure proper adhesion.
DESCRIPTION
D. Flashing Compound: Shall be trowel grade, cold applied rubberized bitumen cement,
Issued for IFC
1. 6 mm thick sandwich board. The core shall consist of fine aggregate bounded
in modified bitumen covered with 2 layers of tough asphalt paper.
23-10028-
JO/EWO
0001
2. 12 mm thick sandwich board. The core shall consist of granulated cork bound
06/01/22
00
DISCIPLINE
3. 3 mm thick tempered masonite boards incorporating resin and impregnating
ENGINEER with hot drying oils.
DATE:
PROJECT
ENGINEER PART 3 - EXECUTION
A. Typical installation details shall be in accordance with the Drawings, and Details for
DATE:
CONSTRUCTION
Membrane Waterproofing of Concrete Structure.
AGENCY
1. The concrete surfaces shall be dry and free of all dust and debris. All sharp
DATE:
protrusions shall be ground smooth and all hollows and honeycomb voids,
OPERATIONS
and similar surface defects shall be filled with approved concrete fillers in
accordance with Section 03300, Cast-in-Place Concrete.
DATE:
CONTROL NUMBER
2. The concrete surfaces shall be painted with one coat of bitumen primer and
VERIFICATION
DATE:
surfaces after progressively peeling back the protective release paper. The
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 275
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 276
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. A minimum lap of 75 mm shall be provided at the edges and 150 mm at the
ends between the adjacent sheets. Edge and end laps shall be rolled with
pressure to ensure complete adhesion.
ENGG CERT
5. One layer of membrane shall be laid directly over the horizontal surface of
blinding under the footings and a layer of sand/cement screed 25 mm thick
shall be cast over it before erecting forms for footings.
6. All angles and corners, external or internal, shall be reinforced with an extra
strip of 300 wide membrane sheet. The external and internal corners shall
have cut and cloaked membrane pieces.
DESCRIPTION
9. At the location of pipes through the walls and floor slabs, reinforcing strips and
collars shall be used.
23-10028-
JO/EWO
0001
10. For structures projecting above ground, the membrane shall be extended at
least 150 mm above grade and terminated and finished in a 20 x 20 mm
06/01/22
chase in the concrete. The chase shall be pointed immediately with bitumen
DATE
00
DISCIPLINE
11. Portions of membrane exposed to sunlight and UV radiation shall be of solar
ENGINEER reflective construction and shall have an end lap of 200 mm.
DATE:
3.02 Protection
PROJECT
ENGINEER
A. All below ground membrane surfaces shall be protected with protection boards before
DATE: the backfilling operations can begin.
CERTIFIED
C. Areas with membrane shall be protected either with screed or protection board at the
DATE: end of a working day. No storage of materials or traffic shall be allowed on the
CONTROL NUMBER
D. Care shall be exercised during the backfilling operations so as not to dislocate the
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
3.03 Inspection
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 276
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 277
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A. Before covering the installed membrane, a careful inspection shall be made of all
areas where membrane work has been completed. Any damaged to the membrane
shall be repaired by patching.
ENGG CERT
- END OF SECTION -
DESCRIPTION
0001
06/01/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 277
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 278
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 07210
ENGG CERT
BUILDING INSULATION
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 2 - Products
23-10028-
JO/EWO
0001
2.01 Manufacturers
06/01/22
2.02 Materials
DATE
2.03 Adhesives
NO.
REV
00
DISCIPLINE
Part 3 - Execution
ENGINEER
3.01 Examination
DATE:
3.02 Installation
PROJECT
ENGINEER
1.01 Description
DATE:
CONSTRUCTION
AGENCY A. Work under this Section includes, but is not limited to, furnishing and installing thermal
and acoustical insulation for exterior and interior walls respectively, as shown on the
DATE:
Drawings and specified herein, including all pertinent accessories required to
OPERATIONS
complete the Work.
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 278
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 279
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.03 Quality Assurance
ENGG CERT
1.04 References
B. ASTM C612 - Specification for Mineral Fiber Block and Board Thermal Insulation.
Issued for IFC
D. ASTM D2842 - Test Method for Water Absorption of Rigid Cellular Plastics.
E. ASTM E84 - Test Method for Surface Burning Characteristics of Building Materials.
0001
00
DISCIPLINE
ENGINEER A. Materials of This Section: Provide continuity of thermal barrier at building enclosure
elements in conjunction with thermal insulating materials.
DATE:
PROJECT
ENGINEER 1.06 Submittals
B. Product Data: Provide data on product characteristics and performance criteria, and
DATE:
CONSTRUCTION
limitations.
AGENCY
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
1.08 Sequencing
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 279
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 280
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A. Sequence work under the provisions of Section 01000 and Contract Schedules.
1.09 Coordination
PART 2 - PRODUCTS
DESCRIPTION
2.01 Manufacturers
A. Carlisle Product
Available through
Isam Kabbani & Partners
Tel. 966-13-857-0034
Fax: 966-13-858-0331
0001
Tel. 966-13-857-1519/2301
06/01/22
Tel. 966-13-847-2956
NO.
REV
00
DISCIPLINE
D. Or approved equal.
ENGINEER
2.02 Materials
DATE:
PROJECT
ENGINEER A. Thermal Insulation shall be foamular 400, rigid extruded polystyrene board insulation
with integral “Foil Reinforced Kraft (FRK)” vapor barrier on one side as manufactured
DATE: by Carlisle or approved equal. Comply with ASTM C578 and conforming to the
CERTIFIED
following:
DATE:
CONSTRUCTION 1. Board Density: 2.2 pcf.
AGENCY
B. Acoustical insulation shall be fiberglass noise barrier batt insulation to comply with
REVISIONCERTIFICATION
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 280
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 281
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.03 Adhesives
B. Apply adhesive in three continuous beads per board length to full bed 3 mm (1/8 inch)
thick. Daub adhesive tight to protrusions.
PART 3 - EXECUTION
Issued for IFC
3.01 Examination
B. Verify that substrate, adjacent materials, and insulation boards are dry and ready to
receive insulation.
3.02 Installation
23-10028-
JO/EWO
0001
A. Install insulation only when construction has advanced to the point that remaining
06/01/22
00
DISCIPLINE
accordance with the manufacturer’s instructions, with the integral vapor/radiant barrier
ENGINEER of thermal insulation installed to the weather side. Fasten and support flanges to the
sides of the framing members to form a continuous vaportight seal.
DATE:
PROJECT
ENGINEER C. Friction-fit or otherwise secure insulation to insure a continuous vaportight or
acoustical seal.
DATE:
CERTIFIED
D. A separate vapor/radiant barrier membrane shall be installed concurrently with the
erection of the metal stud system. Apply membrane to the weather side of the
DATE:
CONSTRUCTION
studwork, wrapped over top and bottom plates to form a continuous seal. Use tape to
AGENCY join adjacent sheets splice vapor barrier 75 mm minimum. Tape around window and
door openings.
DATE:
OPERATIONS
E. Fill cracks with insulation around exterior and interior window frames and exterior
door frames. An additional vapor/radiant barrier shall be applied to insure a
DATE: continuous seal to window and door barriers.
CONTROL NUMBER
VERIFICATION
F. Cleaning: Remove trash, debris, equipment and parts from Work Site.
EDSD
DATE:
BY:
- END OF SECTION -
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 281
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 282
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 07220
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 2 - Products
23-10028-
JO/EWO
0001
2.01 Manufacturers
06/01/22
2.02 Materials
DATE
2.03 Adhesives
NO.
REV
00
DISCIPLINE
Part 3 - Execution
ENGINEER
3.01 Installation
DATE:
3.02 Cleaning
PROJECT
ENGINEER 3.03 Protection
DATE:
CERTIFIED
PART 1 - GENERAL
DATE:
CONSTRUCTION
1.01 Description
AGENCY
A. Work under this Section include, but is not limited to furnishing and installing roof deck
DATE:
insulation consisting of “Rigid Board Insulation” over entire roof area, 100% fastened
OPERATIONS
directly to the metal roof deck with structural concrete or hollow core slab with
mechanical fasteners and coordinated with the single ply membrane roofing system
DATE: attachment devices, etc., as shown on the Drawings and as specified herein,
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 282
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 283
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Section 07531, Roofing System.
C. Fire Ratings: Comply with fire resistance ratings as shown on the Drawings, and as
required by governing Authorities Codes and Standards, and comply with following
roof insulation requirements:
1.04 References
0001
B. ASTM C612 - Specification for Mineral Fiber Block and Board Thermal Insulation.
06/01/22
DATE
00
DISCIPLINE
D. ASTM D2842 - Test Method for Water Absorption of Rigid Cellular Plastics.
ENGINEER
E. ASTM E84 - Test Method for Surface Burning Characteristics of Building Materials.
DATE:
PROJECT
ENGINEER F. ASTM E96 - Test Methods for Water Vapor Transmission of Materials.
B. Product Data: Provide data on product characteristics and performance criteria, and
VERIFICATION
limitations.
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
requirements.
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 283
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 284
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.06 Environmental Requirements
ENGG CERT
1.07 Sequencing
A. Sequence work under the provisions of Section 01000 and Contract Schedules.
1.08 Coordination
0001
B. Storage: Store insulation on wood blocking and under a weathertight cover. Do not
DATE
00
DISCIPLINE
ENGINEER PART 2 - PRODUCTS
DATE:
2.01 Manufacturers
PROJECT
ENGINEER
D. Or approved equal.
VERIFICATION
EDSD
2.02 Materials
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
the following:
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 284
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 285
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
a. Board Density: 1.5 pcf.
b. Board Size: 1200 x 2400 mm.
ENGG CERT
B. Miscellaneous Materials:
roof areas with required heads, washers or plates, of manufacturer and type
Issued for IFC
2.03 Adhesives
0001
06/01/22
PART 3 - EXECUTION
DATE
3.01 Installation
NO.
REV
00
DISCIPLINE
ENGINEER A. General: Keep insulation dry during and after application, and protect against
excessive foot and wheel traffic. Cut insulation to fit neatly around projections, pipes
DATE:
and vents through roofing. Lay insulation with joints over center of top flanges of
PROJECT
ENGINEER metal roof decking. Install only as much insulation as can be covered by roofing
membrane on the same day. Do not leave insulation exposed to sunlight or weather.
DATE: Seal all edges of insulation adjoining vertical surfaces as recommended by the
CERTIFIED
membrane roofing manufacturer.
DATE:
CONSTRUCTION
B. Mechanically fasten the insulation (100%) using one fastener per every 0.60 sq.m of
AGENCY board and fastener spacing recommended by roof insulation manufacturer. Lay
insulation with long dimension at right angles to deck ribs with long joints continuous
DATE:
and end joints staggered. Ends and edges must abut over a deck rib to provide
OPERATIONS
support.
DATE: C. 0.06 inch EPDM membrane to be fully adhered over the insulation (refer to Section
CONTROL NUMBER
07531).
VERIFICATION
EDSD
3.02 Cleaning
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 285
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 286
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.03 Protection
construction.
- END OF SECTION -
DESCRIPTION
0001
06/01/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 286
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 287
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 07256
ENGG CERT
SPRAYED FIREPROOFING
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
1.03 Submittals
1.04 Product Delivery, Storage and Handling.
1.05 Site Condition
Part 2 - Products
2.01 Manufactures.
2.02 Materials
2.03 Mixes.
23-10028-
JO/EWO
0001
Part 3 - Execution
06/01/22
DATE
3.01 Preparation
3.02 Application
NO.
REV
00
DISCIPLINE
3.03 Patching and Cleaning
ENGINEER
DATE:
PART 1 - GENERAL
PROJECT
ENGINEER
1.01 Description
DATE:
CERTIFIED
A. Work under this section includes, but not limited to provide and apply sprayed – on
cementitious aggregate of fireproofing for structural members and underside of metal
DATE:
CONSTRUCTION
decking as shown on Drawings, specified herein and required, complete and
AGENCY acceptable to Saudi Aramco Representative.
DATE:
1.02 Quality Assurance:
OPERATIONS
A. Qualification of Applicator:
DATE:
CONTROL NUMBER
B. Codes and Standards Requirements: Comply with applicable Codes and Standards
DATE:
Specified herein:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 287
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 288
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. Underwriter’s Laboratories, Inc.: Fire Resistance Directory.
C. Testing:
ENGG CERT
1.03 Submittals
0001
B. Test Reports: Certified test reports of acceptable testing agencies which perform
testing in accordance with ASTM E119.
06/01/22
DATE
C. Certificates:
NO.
REV
00
DISCIPLINE
Manufacturer’s certification that materials meet or exceed specification
ENGINEER requirements which include UL design numbers of members or sections being
fireproofed.
DATE:
PROJECT
ENGINEER 1. Applicator’s certification that material has been as specified to meet fire
resistance ratings. Thickness requirements, and application requirements
DATE: in conformance to UL Fire-Resistive Directives/Fire-Resistance Directory
CERTIFIED
Design.
DATE:
CONSTRUCTION
1.04 Product Delivery, Storage, and Handling
AGENCY
B. Reject damaged package found unsuitable for use and remove from the Work Site.
DATE:
CONTROL NUMBER
C. Store Materials above the ground, under cover, and away from damp surfaces.
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
materials is below 5 degrees C and the Surrounding air temperature is below 5 degrees C.
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 288
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 289
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Protection:
ENGG CERT
C. Protect adjacent surface and equipment from damaged from over spray fall-out, and
dusting off of sprayed fireproofing materials.
DESCRIPTION
D. Provide fire extinguishers and post caution signs warning against smoking and open
flames when working with flammable materials.
PART 2 - PRODUCTS
2.01 Manufacture’s
0001
P. O. Box 7137,
Dammam 31462, Saudi Arabia
06/01/22
00
DISCIPLINE
P. O. Box 30019,
ENGINEER Al-Khobbar – 3195, KSA
Tel. No. 857-7054
DATE:
Fax 857-9337
PROJECT
ENGINEER
and additives, for spray-on-cap application. Mix with water and with air at spray
VERIFICATION
nozzle to form a rigid, porous, noncombustible (passes ASTM E136 test) covering of
EDSD
uniform density and thickness as indicated. Apply in one or more courses, to provide
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
1. Dry Density: The field density shall be measured in accordance with ASTM E-
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
605. Minimum average density shall be that listed in the UL. Fir resistance
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 289
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 290
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. Compressive Strength: The fire proofing shall not deflect more than 10%
when subjected to compressive forces of 24 kN/sq.m (500 psf) when tested in
ENGG CERT
3. Corrosion Resistance: Fire proofing shall not promote corrosion of steel when
tested in accordance with ASME E-937.
4. Bond Strength: 9.6 kN/sq.m (200 psf) minimum (ASTM E-736) for each
application substrate.
DESCRIPTION
B. Provide fire proofing to the thickness required by UL Fire Resistance Directory Design
Issued for IFC
No. S715 to provide a one-hour fire proof rating. Unless otherwise noted provide
spray-on fire proofing to the following minimum thickness:
0001
2.03 Mixes
06/01/22
00
DISCIPLINE
PART 3 - EXECUTION
ENGINEER
3.01 Preparation
DATE:
PROJECT
ENGINEER A. Sand blast members to receive sprayed fireproofing to remove all paint and
incompatible materials. Metal surface cleanliness shall be grade SA2 (Commercial
DATE: through blast cleaning) in accordance with Saudi Aramco Standard SAES-H-101.
CERTIFIED
Metals shall be primed with paint compatible with fireproofing, see Section 05120 -
Structural Steel.
DATE:
CONSTRUCTION
AGENCY
B. Assure that clips, hangers, supports, sleeves, and other items required to penetrate
DATE: the sprayed fireproofing are placed before installing fireproofing.
OPERATIONS
C. Verify that ducts, piping equipment, or other items, which would interfere with
DATE: application of fireproofing, are positioned until sprayed fireproofing Work is
CONTROL NUMBER
completed.
VERIFICATION
EDSD
D. Ensure that radiant barrier is provided to areas which need sprayed-on fireproofing.
DATE:
BY:
3.02 Application
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 290
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 291
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A. Apply sprayed fireproofing in accordance with the manufacturer’s
recommendations, complying with fire rating requirements.
ENGG CERT
D. Maintain ambient conditions during installation and for the cure period following
installation, as recommended by the manufacturer. Provide ventilation and avoid
an excessive rate of drying. Protect from exposure to the sun.
E. Immediately upon completion of the spraying operation of fire proofing, request for
23-10028-
JO/EWO
0001
00
DISCIPLINE
3.03 Patching and Cleaning
ENGINEER
APPROVAL/CERTIFICATION REQUIREMENTS,
Saudi Aramco.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
- END OF SECTION -
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 291
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 292
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 07531
ENGG CERT
ROOFING SYSTEM
SUBSECTION INDEX
Part 1 - General
1.01 Description
1.02 Related Sections
DESCRIPTION
1.03 References
1.04 Submittals
1.05 Qualifications
1.06 Regulatory Requirements
1.07 Mockup
1.08 Pre-installation Conference
1.09 Delivery, Storage, and Handling
1.10 Environmental Requirements
1.11 Coordination
23-10028-
JO/EWO
0001
1.12 Warranty
Part 2 - Products
06/01/22
DATE
2.01 Manufacturers
NO.
REV
00
DATE:
CONSTRUCTION
PART 1 - GENERAL
AGENCY
1.01 Description
DATE:
OPERATIONS
A. Work under this Section includes, but is not limited, to furnishing and applying a fully
adhered non-reinforced “Membrane Roofing System” as shown on the Drawings and
DATE: specified herein, including all equipment, material and accessories required to
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 292
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 293
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Section 07620 - Sheet Metal Flashing and Trim.
1.03 References
A. ASTM C177, Test Method for Steady-State Heat Flux Measurement and Thermal
Transmission Properties by Means of the Guarded Hot Plate Apparatus.
0001
H. ASTM D822, Practice for Conducting Tests on Paint and Related Coatings and
Materials Using Filtered Open-Flame Carbon-Arc Light and Water Exposure
06/01/22
Apparatus.
DATE
00
DISCIPLINE
Chamber.
ENGINEER
K. ASTM D2137, Test Methods for Rubber Property - Brittleness Point of Flexible
DATE: Polymers and Coated Fabrics.
CERTIFIED
Manual.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 293
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 294
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.04 Submittals
ENGG CERT
E. “Membrane Roofing System” will not be approved unless it is part of a submittal which
includes required technical information on all components of the roofing that are to be
used including roof insulation, non-reinforced membrane, mechanical fasteners,
splicing cement, beading adhesive fastening strips, etc. Manufacturer must certify
that all these components are compatible.
23-10028-
JO/EWO
0001
1.05 Qualifications
06/01/22
00
DISCIPLINE
B. Applicator: Company specializing in performing the work of this section with 3 years
ENGINEER documented experience and approved by system manufacturer.
DATE:
C. Work of this section to conform to manufacturer's instructions.
PROJECT
ENGINEER
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 294
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 295
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.08 Pre-installation Conference
ENGG CERT
A. Convene one week prior to commencing work of this section, under provisions of
Division 1.
A. Deliver, store, protect and handle products to site under provisions of Sections 01000,
DESCRIPTION
0001
C. Do not expose materials vulnerable to water or sun damage in quantities greater than
can be weatherproofed during same day.
NO.
REV
00
DISCIPLINE
ENGINEER 1.11 Coordination
DATE:
A. Coordinate work under provisions of Section 01000.
PROJECT
ENGINEER
B. Coordinate the work with the installation of associated metal flashings, as the work of
DATE: this section proceeds.
CERTIFIED
1.12 Warranty
DATE:
CONSTRUCTION
AGENCY A. For warranty, refer to Schedule “A”.
DATE:
B. Warranty: Cover damage to building resulting from failure to prevent penetration of
OPERATIONS
water.
DATE:
CONTROL NUMBER
PART 2 - PRODUCTS
VERIFICATION
EDSD
2.01 Manufacturers
DATE:
BY:
A. Carlisle Product
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
Tel. 966-13-857-0034
(DCC) NO. _____________________
Fax: 966-13-858-0331
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 295
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 296
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. CELOTEX, Roofing Products Division
ENGG CERT
C. Or approved equal.
0001
Tensile Strength, min, psi (Mpa) ASTM D412 1305 (9) 1685 (11.6)
Elongation, Ultimate, min, % ASTM D412 350 550
06/01/22
DATE
Tear Resistance, min, lbf/in (kN/m) ASTM D624 150 (26.3) 200 (350)
(Die C)
NO.
REV
00
DISCIPLINE
Factory Seam Strength, min. Modified Membrane Membrane
ENGINEER ASTM D816 Rupture Rupture
DATE:
Resistance to Heat Aging* ASTM D573
PROJECT
ENGINEER Properties after 1 week @ 2400F
(1160C)
DATE:
CERTIFIED
Tensile Strength, min, psi (Mpa) ASTM D412 1205 (8.3) 1550 (10.7)
Elongation, Ultimate, min, % ASTM D412 200 250
DATE:
CONSTRUCTION
AGENCY
Tear Resistance, min, lbs/in (kN/m) ASTM D624 125 (21.9) 185 (32.4)
DATE:
Linear Dimensional Change, max, ASTM D1204 +1.0 -0.5
OPERATIONS %
Ozone Resistance* ASTM D1149 No Cracks No Cracks
DATE:
Condition after exposure to 100
CONTROL NUMBER
pphm
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
Brittleness Temp., max, deg. F (deg. ASTM D746 -75 (-59) -75 (-59)
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
C)*
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 296
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 297
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Physical Property Test Method Specification Typical
Properties
ENGG CERT
BW)
Issued for IFC
0001
B. Rubber Fastening Strips: 38 mm (1-1/2 in.) wide, 3.0 (10 ft) long fastening strip to
secure the reinforced roofing membrane or approved equal.
06/01/22
DATE
C. Pre-fabricated Pipe Flashing: White, uncured elasto foam flashing for pipes up to 200
mm in diameter.
NO.
REV
00
DISCIPLINE
ENGINEER
D. Cleaners Adhesives and Sealants:
DATE:
PROJECT 1. Splice Cleaner: Blue tinted splice cleaner.
ENGINEER
2. Splicing Cement: A cold applied white splicing cement for splicing adjoining
DATE:
CERTIFIED
sections of EPDM membrane.
DATE:
3. Lap Sealant: A heavy bodied white sealant used to seal exposed edges of a
CONSTRUCTION membrane or splice.
AGENCY
various surfaces.
EDSD
DATE:
PART 3 - EXECUTION
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
3.01 General
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 297
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 298
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A. When feasible, begin the application at the highest point of the highest roof level and
work to the lowest point to prevent moisture infiltration and to minimize construction
traffic on completed sections. This will include completion of all flashings and
ENGG CERT
terminations.
B. Follow criteria outlined in the “Design Criteria” Section of the manufacturer technical
manual to prepare the roof deck of the existing substrate prior to the application of the
new roofing system.
B. The substrate must be even without noticeable high spots or depressions, and must
be free of accumulated water, ice or snow to prevent the absorption of moisture in the
new roofing components and roofing system.
23-10028-
JO/EWO
0001
C. Prior to the placement of the membrane underpayment, clear the substrate of debris
and foreign material which may be harmful to the roofing system. Fresh bitumen
06/01/22
3.03 Installation
NO.
REV
00
DISCIPLINE
ENGINEER A. Membrane Installation:
DATE:
1. Fully adhere the EPDM membrane to the substrate with 90-8-30A bonding
PROJECT
ENGINEER adhesive at the rate specified on the container label.
DATE: 2. Overlap adjacent EPDM membrane sheets a minimum of 3 inches and clean
CERTIFIED
the splice area with splice cleaner. Apply splicing cement at the rate of
approximately 150 liner feet per gallon. Just prior to closing the splice, apply a
DATE:
CONSTRUCTION
head on In-Seam Sealant no less than 1/8 inch and no more than ¼ inch in
AGENCY diameter a minimum of ½ inch from the inside edge of the bottom membrane
sheet and a minimum of 2 inches from the lead edge. After adjoining
DATE:
membrane sheets have been spliced together, wait a minimum of 2 hours and
OPERATIONS
clean the exposed edge of the splice with Splice Cleaner and apply a 5/16-
inch diameter head of Lap Sealant. Feature the Lap Sealant to completely
DATE: cover the splice edge.
CONTROL NUMBER
VERIFICATION
perimeter of each roof level, roof section, expansion joint, curb, skylight, interior wall,
DATE:
penthouse, etc., at any angle change which exceeds 2 inches in one horizontal foot,
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 298
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 299
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Membrane Flashing: When feasible, flash all penetrations and walls with cured EPDM
membrane. Uncured Elastoform Flashing shall be limited to overlay vertical scams
(as required at angle changes) or to flash inside and outside corners, scuppers,
ENGG CERT
pourable sealer pockets and other penetrations or unusually shaped walls where the
use of cured membrane flashing is not practical. Prefabricated accessories (Pre-
Molded Pipe Boots and Pressure-Sensitive Products such as Pourable Sealer
Pockets, Pipe Boots, Flashing and Inside/Outside Corners) should be used, when
feasible, in lieu of uncured Elastoform Flashing.
- END OF SECTION -
DESCRIPTION
0001
06/01/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 299
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 300
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 07620
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
1.03 References
1.04 Submittals
1.05 Quality Assurance
1.06 Qualifications
1.07 Pre-Installation Conference
1.08 Delivery, Storage and Handling
1.09 Coordination
Part 2 - Products
23-10028-
JO/EWO
0001
2.01 Manufacturers
06/01/22
2.02 Materials
DATE
2.03 Fabrication
NO.
REV
00
DISCIPLINE
Part 3 - Execution
ENGINEER
3.01 Examination
DATE:
3.02 Preparation
PROJECT
ENGINEER 3.03 Installation
3.04 Field Quality Control
DATE: 3.05 Dissimilar Materials
CERTIFIED
DATE:
CONSTRUCTION
PART 1 - GENERAL
AGENCY
1.01 Description
DATE:
OPERATIONS
A. Work under this Section includes, but is not limited to installing and providing roof
equipment flashing, piping and conduit flashing, and sheet metal Work as shown on
DATE: the Drawing, and specified herein, including all pertinent accessories.
CONTROL NUMBER
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 300
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 301
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.03 References
ENGG CERT
A. AISI (American Iron and Steel Institute) - Stainless Steel - Uses in Architecture.
E. ASTM B209 - Specification for Aluminum and Alloy Sheet and Plate.
F. ASTM B370 - Specification for Copper Sheet and Strip for Building Construction.
G. ASTM D226 - Specification for Asphalt-Saturated Organic Felt Used in Roofing and
Waterproofing.
0001
00
DISCIPLINE
ENGINEER L. FS O-F-506 - Flux, Soldering, Paste and Liquid.
DATE:
M. NRCA (National Roofing Contractors Association) - Roofing Manual.
PROJECT
ENGINEER
1.04 Submittals
DATE:
CERTIFIED
A. Submit under provisions of Sections 01000 and 02000.
DATE:
CONSTRUCTION
B. Shop Drawings: Indicate material profile, jointing pattern, jointing details, fastening
AGENCY methods, flashings, terminations, and installation details.
DATE:
C. Samples: Submit samples as sufficient in size, illustrating typical external corner,
OPERATIONS
internal corner, valley, ridge, junction to vertical dissimilar surface, material and finish.
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 301
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 302
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.06 Qualifications
A. Fabricator and Installer: Company specializing in sheet metal flashing work with 3
ENGG CERT
A. Convene one week prior to commencing work of this section, under provisions of
Division 1.
A. Deliver, store, protect and handle products to site under provisions of Sections 01000,
01005 and 02000.
1.09 Coordination
23-10028-
JO/EWO
0001
PART 2 - PRODUCTS
NO.
REV
00
DISCIPLINE
ENGINEER 2.01 Manufacturers
DATE:
A. Fry Reglet Corporation
PROJECT
ENGINEER 625, South Palm Avenue
Alhambra, California – 91803, USA
DATE: Fax No. (818) 289-0537
CERTIFIED
D. Or approved equal.
DATE:
CONTROL NUMBER
2.02 Materials
VERIFICATION
EDSD
A. Aluminized Zinc Coated Steel Sheet: Flashing materials shall be 0.5 mm (26 gauge
DATE:
Base metal shall be coated on both sides with a layer of aluminum-zinc alloy
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
composed of approximately 55% aluminum and 45% zinc applied by the continuous
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
hot dipped method. Coating shall be 150 g/m2 (total both sides) by triple spot test
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 302
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 303
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Sheet Lead: Provide sheets formed from common desilverized pig lead, complying
with ASTM B29 and weighing 20 kg/sq.m (4.0 lbs. Per sq. ft.).
ENGG CERT
C. Fasteners:
3. Washers: Neoprene.
Issued for IFC
E. Metal Reglet and Cap Flashings: Fry Reglet Corporation “SM Type” 26 gauge
aluminized zinc alloy coated steel, aluminum or equal. Flashing to be surface
mounted as approved by SAUDI ARAMCO Representative.
2.03 Fabrication
23-10028-
JO/EWO
0001
A. Aluminized Zinc Alloy Coated Steel Sheet: Fabricate Work from the following
minimum thickness:
06/01/22
DATE
00
DISCIPLINE
ENGINEER B. General:
DATE:
1. SMACNA Details: Except as otherwise shown or specified, comply with
PROJECT
ENGINEER applicable recommendations and details of “Architectural Sheet Metal
Manual” by SMACNA.
DATE:
CERTIFIED
2. Separate dissimilar metals from each other by painting each metal surface in
area of contact, with a heavy application of bituminous coating, or by other
DATE:
CONSTRUCTION
permanent separation as recommended by the manufacturers of metals.
AGENCY
3. Fabricate and install work with lines and corners of exposed units true and
DATE:
accurate. Form exposed faces flat and free of buckles, excessive waves and
OPERATIONS
avoidable tool marks, considering the temper and reflectivity of metal. Provide
uniform, neat seams with minimum exposure of solder, welds and sealant.
DATE: Except as otherwise shown on the Drawings, fold back sheet metal to form a
CONTROL NUMBER
work, and locate so as to minimize the possibility of leakage. Cover and seal
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 303
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 304
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Pipe Penetration Flashings: See Section 07531 –Roofing System.
ENGG CERT
PART 3 - EXECUTION
3.01 Examination
A. Verify roof openings, curbs, pipes, and conduits sleeves, ducts, or vents through roof
are solidly set, reglets in place, and nailing strips located.
DESCRIPTION
B. Verify roofing termination and base flashings are in place, sealed, and secure.
Issued for IFC
3.02 Preparation
A. Install starter and edge strips, and cleats prior starting installation.
3.03 Installation
A. General:Comply with details and profiles as shown on the Drawings, and comply with
SMACNA “Architectural Sheet Metal Manual” recommendations, for installation of the
23-10028-
JO/EWO
0001
Work.
06/01/22
B. Performance: Coordinate related Work with other Work for the correct sequencing of
DATE
00
DISCIPLINE
permanently watertight and not deteriorate in excess of manufacturer’s published
ENGINEER limitations.
DATE:
C. Counter and Cap Flashing: Anchor as shown on the Drawings. Lap ends 100 mm (4
PROJECT
ENGINEER inches) and fill lap with roofing cement. Flashing shall be snapped into reglet
receiver, except when installing surfaced mounted flashings to conform to
DATE: manufacturer’s directions. Seal reglets with sealant as specified in Section 07920 –
CERTIFIED
Sealants and Caulkings.
DATE:
CONSTRUCTION
D. Curb Flashing: Carry flashing the full height and over the top of curbs and cover with
AGENCY metal flashing. Anchor as shown on the Drawings.
DATE:
E. Vent Flashing: Install as shown on the Drawings.
OPERATIONS
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 304
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 305
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
I. Fasteners:
1. Exposed Fasteners: Fasteners for anchoring exterior face panels and trim
ENGG CERT
shall be nylon hex head with a plastic sealing flange (integral with head) and
stainless steel shank.
J. Finish: Paint all exposed flashing unless prefinished a beige color to match Precast
Concrete Panels. See Section 09900 – Painting.
DESCRIPTION
A. Where sheet metal abuts or members into dissimilar materials, the junction shall be
constructed in such a manner as to present electrolysis between the two materials.
Paint aluminum surfaces in contact with dissimilar metals with a heavy coat of
23-10028-
JO/EWO
0001
bitumastic enamel.
06/01/22
DATE
- END OF SECTION -
NO.
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 305
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 306
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 07631
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
1.02 Submittals
DESCRIPTION
Part 2 - Products
2.01 Manufacturers
2.02 Materials
Part 3 - Execution
23-10028-
JO/EWO
0001
3.01 Installation
06/01/22
DATE
PART 1 - GENERAL
NO.
REV
00
1.01 Description
DISCIPLINE
ENGINEER
A. This Section cover providing roof walkway treads where shown on the Construction
DATE: Drawing, providing materials, accessories and services specified herein and required
PROJECT
ENGINEER for a complete and acceptable to Saudi Aramco Representative.
A. Submit to Saudi Aramco Representative one (1) full size sample of a walkway tread
DATE:
CONSTRUCTION
for approval.
AGENCY
PART 2 - PRODUCTS
EDSD
2.01 Manufacturers
DATE:
BY:
REVISIONCERTIFICATION
B. Carlisle Product
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 306
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 307
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Fax: 966-13-858 0331
B. Or approved equal.
ENGG CERT
2.02 Materials
A. Provide 762 mm (30 in) x 762 (30 in.) rubber non-skid roof walkway treads.
PART 3 - EXECUTION
3.01 Installation
DESCRIPTION
3.02 Replace or repair damage materials and defective Work as directed by Saudi Aramco
Representative at no additional cost to Saudi Aramco.
23-10028-
JO/EWO
0001
06/01/22
- END OF SECTION -
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 307
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 308
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 07810
ENGG CERT
UNIT SKYLIGHTS
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
Part 2 - Products
2.01 Manufacturer’s
2.02 Materials
23-10028-
JO/EWO
0001
2.03 Fabrication
06/01/22
Part 3 - Execution
DATE
3.01 Inspection
NO.
REV
00
DISCIPLINE
3.02 Surface Preparation
ENGINEER 3.03 Installation
3.04 Cleaning
DATE:
3.05 Protection
PROJECT
ENGINEER
1.01 Description
DATE:
CONSTRUCTION
AGENCY A. Contractor shall furnish and install dome and round skylights at locations and sizes as
shown on the Drawings and specified herein, including design, materials, fabrication,
DATE:
erection and all pertinent accessories.
OPERATIONS
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 308
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 309
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A. Reference Codes and Standards: Comply with UBC Chapter 34.
D. U-factor, solar heat gain coefficient (SHGC) and air leakage rate:
1. Air leakage for fenestration and doors shall be determined in accordance with
NFRC 400. Air leakage shall be determined by a laboratory accredited by a
nationally recognized accreditation organization such as the National
DESCRIPTION
Fenestration Rating Council (NFRC) and shall be labeled and certified by the
Issued for IFC
manufacturer. Air leakage shall not exceed 1.0 cfm/ ft2 for glazed swinging
entrance doors and for revolving doors and 0.4 cfm / ft2 for all other products.
2. The U-factor, solar heat gain coefficient (SHGC) and the ai9r leakage rate for
all fenestrations shall be determined by a laboratory accredited by a nationally
recognized accreditation organization such as the National Fenestration
Rating Council (NFRC).
0001
manufacturer, listing the U-factor, solar heat gain coefficient (SHGC) and the
air leakage rate. When the fenestration product do not have such a
06/01/22
nameplate, the supplier of any such product shall provide a signed and dated
DATE
certification for the installed fenestration listing the listing the U-factor, solar
heat gain coefficient and the air leakage rte.
NO.
REV
00
DISCIPLINE
ENGINEER 4. U-factor shall be determined in accordance with NFRC 100. U-factors for
skylights shall be determined for a slope of 20 degrees above the horizontal.
DATE:
PROJECT
ENGINEER 5. The solar heat gain coefficient for the overall fenestration area shall be
determined in accordance with NFRC 200.
DATE:
CERTIFIED
6. Shading coefficient of the center of glass multiplied by 0.86 shall be an
acceptable alternative for determining compliance with the SHGC
DATE:
CONSTRUCTION
requirements for the overall fenestration area. Shading coefficient shall be
AGENCY determined using a spectral data file determined in accordance with NFRC
300. Shading coefficient shall be verified and certified by the manufacturer.
DATE:
OPERATIONS
7. SHGC of the center of glass shall be an acceptable alternat9ive for
determining compliance with the SHGC requirements for the overall
DATE: fenestration area. SHGC shall be determined using a spectral data file
CONTROL NUMBER
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 309
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 310
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.04 Submittals
B. Contractor shall submit for Saudi Aramco Representative’s approval the following
test:
1.05 Warranty
A. A written warranty will be presented that certifies “Skylights” shall be free of defects in
design, materials, and construction and will not leak for the period of two (2) years
from date “Skylights” are completed.
0001
A. Delivery: Deliver materials to the project site crated and packed in such a manner as
06/01/22
B. Storage: Store materials under cover and in such a manner as to prevent damage
NO.
REV
00
DISCIPLINE
from construction activities or other causes.
ENGINEER
DATE:
PART 2 - PRODUCTS
PROJECT
ENGINEER
2.01 Manufacturers
DATE:
CERTIFIED
C. Tanami Holding Company
P.O. Box 4988
DATE:
CONSTRUCTION
Al Khobar
AGENCY Kingdom of Saudi Arabia
Tel.: (+966) 13 3310000
DATE:
Fax: (+966) 13 8010303
OPERATIONS
Email: info@tanamiholdingcom
Riyadh-11371
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 310
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 311
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. National Aluminum Factory Co. (NAFCO)
2nd Industrial Area
ENGG CERT
D. Or approved equal.
2.02 Materials
DESCRIPTION
A. Size and design as shown on the Drawings for the prefabricated frames.
B. Skylight shall be fully factory assembled consisting of a cast double glazed lexan
skylight.
C. Fire Rating: The lexan GE skylight shall be sealed by interior and exterior gasketing to
a 6063-T5 heliarc welded aluminum frame.
D. Lexan outer layer shall be bronze tinted. Lexan inner layer shall be clear.
23-10028-
JO/EWO
0001
E. Maximum acceptable U-factor is 0.5 Btu/h.ft2. deg.F. Solar heat gain coefficient
06/01/22
(SHGC) – 0.34.
DATE
2.03 Fabrication
NO.
REV
00
DISCIPLINE
ENGINEER A. Frames:
DATE:
1. The frame is to have an integral condensation channel to carry moisture to the
PROJECT
ENGINEER exterior. The aluminum retaining cap fasteners are to be corrosive resistant.
All units are to be guaranteed against defective workmanship and materials.
DATE:
CERTIFIED
2. Provide units complete with curbs and flashing, for mounting on the roof as
shown on the Drawings.
DATE:
CONSTRUCTION
AGENCY 3. “Skylight” assembly shall be made of supporting 137 kg/sq.m (28 psf) live
load.
DATE:
OPERATIONS
PART 3 - EXECUTION
DATE:
CONTROL NUMBER
3.01 Inspection
VERIFICATION
EDSD
A. The installer shall inspect all mounting surfaces and determine that the area is in
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 311
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 312
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.02 Surface Preparation
A. Aluminum structure of “Skylights” must be protected from contact with dissimilar metal
ENGG CERT
and concrete.
3.03 Installation
B. Set frames accurately in position and securely attach to the curbs to maintain a
watertight condition as per manufacturers instructions.
3.04 Cleaning
A. Clean the completed system, inside and outside, promptly after installation exercising
care to avoid damage.
23-10028-
JO/EWO
0001
B. Clean double glazed lexan GE skylight surfaces after installation, complying with
06/01/22
requirements contained in the “Glass and Glazing” Section for cleaning and
DATE
maintenance. Remove excess glazing and sealant compounds, dirt and other
substance from aluminum surfaces.
NO.
REV
00
DISCIPLINE
ENGINEER 3.05 Protection
DATE:
A. Institute protective measures required throughout the remainder of the construction
PROJECT
ENGINEER period to ensure that skylight will be without damage or deterioration, other than
normal weathering, at time of acceptance.
DATE:
CERTIFIED
- END OF SECTION -
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 312
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 313
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 07920
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
1.02 Related Sections
DESCRIPTION
1.06 References
1.07 Quality Assurance
1.08 Qualifications
1.09 Submittal
1.10 Environmental Requirements
1.11 Coordination
1.12 Warranty
Part 2 - Products
23-10028-
JO/EWO
0001
2.04 Manufactures
2.05 Materials
06/01/22
DATE
Part 3 - Execution
NO.
REV
00
DISCIPLINE
ENGINEER 3.04 Preparation
3.05 Application
DATE: 3.06 Cleaning
PROJECT
ENGINEER
1.01 Description
DATE:
CONSTRUCTION
AGENCY A. Contractor shall provide and apply sealant caulking as shown on the Drawings, and
specified herein.
DATE:
OPERATIONS
B. The required applications of sealants include, but are not limited to the followings
general locations:
DATE:
CONTROL NUMBER
3. Exterior wall joints, including the exterior and interior perimeter of metal door,
REVISIONCERTIFICATION
23-10028-0001-008
(DCC) NO. _____________________
4. Flooring joints.
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 313
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 314
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5. Other exterior joints noted on the Drawings.
ENGG CERT
6. Joints at penetrations of walls, decks and floors by piping and other services
and equipments.
7. Fire rated sealant as required or any penetrations of fire rated walls, decks
and floors.
C. The required applications of caulking include, but are not limited to, the followings
general locations:
DESCRIPTION
0001
00
DISCIPLINE
E. Section 08400- Aluminum Storefront.
ENGINEER
1.03 References
DATE:
PROJECT
ENGINEER A. ASTM C1193 – Guide for use of Joint Sealants.
E. Reference Codes and Standards: Comply with the ASTM C-919 and C-920
EDSD
F. Perform Work in accordance with SWRI requirements for materials and installation.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 314
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 315
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.07 Qualifications
ENGG CERT
1.08 Submittals
DESCRIPTION
A. System Selection: submit the name of system selected for use to Saudi Aramco
Issued for IFC
B. Color Samples: Submit the manufacture’s full range palette of caulking and sealant
colors to Saudi Aramco Representative for review and approval.
Maintain temperature and humidity recommended by the sealant manufacture during and
after installation.
23-10028-
JO/EWO
0001
1.10 Coordination
06/01/22
DATE
00
DISCIPLINE
Coordinate the work with all sections referencing this section.
ENGINEER
1.11 Warranty
DATE:
PROJECT
ENGINEER A. For warranty, refer to Schedule “A”.
DATE: B. Warranty: include coverage for installed sealants and accessories which fail to
CERTIFIED
achieve air tight seal, or exhibit loss of adhesion or cohesion, or do not cure.
DATE:
CONSTRUCTION
AGENCY PART 2 - PRODUCTS
DATE:
2.04 Manufactures
OPERATIONS
Tel: 966-11-446-5555
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
Tel: 966-13-881-2025
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 315
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 316
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
H. FOSROC Fosam Company Ltd.
Tel.: 966-13-857-2929
ENGG CERT
I. Dow-Corning.
J. Or approved equal.
2.05 Materials
DESCRIPTION
C. General: Use the same caulking and sealant system materials throughout the Project.
Issued for IFC
D. Colors: Colors of caulking and sealant materials will be approved by Saudi Aramco
Representative from the manufacturer’s standard colors.
Provide only materials which are known to be fully compatible with the actual
installation condition, as shown by manufacturer’s published data or certification.
23-10028-
JO/EWO
0001
jacketed polyurethane foam, butyl rubber foam, neoprene foam or other flexible,
DATE
00
DISCIPLINE
break bond of sealant at bottom of the joint, form optimum shape of sealant bead on
ENGINEER the back side, and provide a highly compressible backer to minimize the possibility of
sealant extrusion when the joint is compressed.
DATE:
PROJECT
ENGINEER G. Sealant: Silicon based, single component, chemical, complying with ASTM C-920 for
single part elastomeric sealants, curing to withstand movement of up to 50 percent of
DATE: the joint width and to be satisfactorily applied throughout a temperature range of4 to
CERTIFIED
49 deg. C shall be used for roof flashing, interior glazing, duct Work and any general
interior usage for sealant. General Electric Silicon Sealant 1200 or a suitable equal,
DATE:
CONSTRUCTION
approved by Saudi Aramco Representative, shall be used.
AGENCY
H. Sealant: Polyurethane conforming to ASTM C-920 or ASTM C-920 for two part
DATE:
elastomeric sealant. Use for precast panels, exterior control joint, exterior glazing,
OPERATIONS
anodized window systems, door frames and any other exterior application, not
mentioned previously. Polyurethane shall be similar to TREMCO Dynamic as
DATE: distributed by Unitech (Tel. No. 857-0034) SIPCO, Brimo-kol sealant or equal,
CONTROL NUMBER
for pipe/duct penetrations in fire rated walls. Equivalent sealant shall be approved by
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 316
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 317
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PART 3 - EXECUTION
E. Inspection: examine joint surface to receive caulking and sealant materials report
to Saudi Aramco Representative all unacceptable conditions.
F. Cleaning:
present or resulting from cleaning operations, by blowing out joints with oil
free compressed air. All traces of bituminous materials must be removed.
If surface treatment are present, test for adhesion before proceeding with
0001
sealing Work.
06/01/22
DATE
00
solvents that leave are residue. Apply and remove solvents with clean
DISCIPLINE
ENGINEER white cloths. Do non allow solvents to air dry without wiping.
DATE:
PROJECT G. Protection: Prior to priming, apply masking taps to adjusting surfaces. Leave,
ENGINEER
asking tape in place until tooling operation is complete.
DATE:
CERTIFIED 3.02 Application
DATE: F. General: Employee only proven installation techniques which will insure that
CONSTRUCTION sealants will be deposited in uniform, continuous ribbons without gaps or air
AGENCY
pockets and with complete “wetting” of the joint bond surface equally on opposite
DATE:
sides. Except as otherwise shown, fill sealant rabbet to a slightly concave surface,
OPERATIONS slightly below adjoining surface. Where horizontal joints are between a horizontal
surface and a vertical surface, fill joint to form a light cover, so that the joint will not
DATE:
trap moisture and dirt.
CONTROL NUMBER
VERIFICATION
G. Back-Up: Install back-up materials to a proper depth in all joints. Use back-up
EDSD
material of a suitable size and shape, so that when compresses (25to 50%), it will
fit in all joints as required. When using a back-up of hose or rod stock, roll the
DATE:
material into the joint to avoid lengthwise stretching. Do not twist or braid the hose
BY:
or rod stock. Use bond-breaker strips in all joint where sufficient room for back-up
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 317
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 318
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
H. Primer: Primer surfaces in accordance with manufacturer’s recommendations and
allow to dry before applying sealing material.
ENGG CERT
I. Caulking and Sealing: Follow manufacturer’s instructions regarding mixing, pot life
and application procedure. Do not apply sealing materials when the temperature of
the material, air or substrate is below 7. Deg. C or during wet or humid weather.
Apply sealing materials in full bead and force into joint.
K. Tooling: Tool joint to compress the compound into the joint. Except as
recommended by the sealing material manufacturer, do not use liquid solutions to
moisten tools. Remove masking tape immediately after cooling.
L. All sleeve penetrating roof or fire rate walls or partitions shall have on approved
sealant requirement to the roof/wall partitions.
M. All ducts, conduits and pipes which pass through fire walls and/or roof shall have
metal sleeve around them.
23-10028-
JO/EWO
0001
3.03 Cleaning
06/01/22
DATE
A. Remove excess sealing materials from adjacent surfaces. Clean surfaces using
procedures recommended by the sealing material manufacturer.
NO.
REV
00
DISCIPLINE
ENGINEER
- END OF SECTION -
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 318
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 319
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 08100
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
1.13 References
1.14 Quality Assurance
1.15 Qualifications
1.16 Regulatory Requirements
1.17 Submittals
1.18 Product Delivery, Storage and handling
1.19 Field Measurements
1.20 Coordination
23-10028-
JO/EWO
0001
Part 2 - Products
06/01/22
2.06 Manufacturers
DATE
2.07 Materials
2.08 Fabrication
NO.
REV
00
DISCIPLINE
2.09 Doors
ENGINEER 2.10 Frame
DATE:
Part 3 - Execution
PROJECT
ENGINEER
3.07 Examination
DATE: 3.08 Installation
CERTIFIED
3.09 Adjust and Clean
DATE:
CONSTRUCTION
AGENCY PART 1 - GENERAL
DATE:
1.01 Description
OPERATIONS
A. Work under this Section includes, but is not limited to installing and providing welded
DATE: hollow steel doors, welded steel frames for steel and wood doors as shown on the
CONTROL NUMBER
Drawings and specified herein, primed and painted for finish painting on Site,
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 319
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 320
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
H. Section 08710 – Hardware.
ENGG CERT
1.03 References
DESCRIPTION
H. DHI – Door Hardware Institute: The Installation of Commercial Steel Doors and Steel
Frames, Insulates Steel Doors in Wood Frames and Builder’s Hardware.
0001
00
DISCIPLINE
ENGINEER 1.12 Quality Assurance
DATE:
H. Fire-Rated Assemblies:
PROJECT
ENGINEER
3. Construct and install assemblies to comply with NFPA Standard No. 80 and
DATE: as herein specified.
CONTROL NUMBER
VERIFICATION
DATE:
1. Air leakage for fenestration and doors shall be determined in accordance with
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 320
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 321
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
manufacturer. Air leakage shall not exceed 1.0 cfm/ft2 for glazed swinging
entrance doors and for revolving doors and 0.4 cfm/ft2 for all other products.
ENGG CERT
2. The U-factor and the air leakage rate for all doors shall be identified on a
permanent nameplate installed on the product by the manufacturer. When
doors do not have such a nameplate, the supplier of any such door shall
provide a signed and dated certification for the installed doors listing the UI-
factor and the air leakage rate.
1.13 Qualifications
Issued for IFC
D. Installed Frame Assembly: Conform to NFPA 80 for fire rated class same as fire door.
23-10028-
JO/EWO
0001
1.15 Submittals
06/01/22
DATE
00
DISCIPLINE
A. Shop Drawings: Complete fabrication and erection drawings of hollow steel doors and
ENGINEER frames. Include details, in metric dimensions, for each frame type, elevation of door
design types, conditions at openings, details of constructions, location and installation
DATE:
requirements of finish hardware and reinforcements and scaled and dimensions
PROJECT
ENGINEER elevation. Show anchorage and accessory items. Provide a schedule of doors and
frames using the same reference numbers for details and opening as shown on the
DATE: Drawings.
CERTIFIED
C. Samples: Submit two (2) samples of doors face metal, 4 x 4 inch 10 x 10 mm) in size
DATE:
illustrating pre-finished door thickness and quality.
OPERATIONS
requirements.
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
A. Deliver, store, protect, and handle products to site under provisions of Sections
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 321
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 322
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Protect hollow steel units against damage during transit and storage.
C. Store hollow steel units on raised platforms, in vertical positions with blocking
ENGG CERT
between units, to allow air circulation. Keep stored material covered and protected
from damage.
C. Field verify that measurements are as shown on the approved shop drawings.
1.18 Coordination
DESCRIPTION
A. Coordinate the Work with door opening construction, door frame and door hardware
installation requirements.
PART 2 - PRODUCTS
2.06 Manufacturers
0001
Tel.: 966-13-847-2777
06/01/22
00
DISCIPLINE
ENGINEER M. Fenestra Corp.
Available through AICS Al-Dress Dammam
DATE:
Tel.: 966-13-857-6468
PROJECT
ENGINEER
N. Binex
DATE: Tel.: 966-13-857-2080
CERTIFIED
Fax: 966-13-857-8034
DATE:
CONSTRUCTION
O. Or approved equal.
AGENCY
2.07 Materials
DATE:
OPERATIONS
J. Hot-Rolled Steel Sheets and Strips: Conform to ASTM A1011/A1011M commercial
quality carbon steel.
DATE:
CONTROL NUMBER
carbon steel.
EDSD
DATE:
L. Supports and Anchors: Fabrication of not less than 16 gauge sheet steel.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
M. Inserts, Bolts and Fasteners: Manufacturers standard units suitable for the function
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
required.
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 322
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 323
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
N. Shop-Applied Paint: Rust-inhibitive primers, either by air-drying or backing, suitable
as a base for specified finish paints, see Section 09900 - Painting.
ENGG CERT
2.08 Fabrication
H. Fabricate hollow steel units to be rigid, neat in appearance and free from defects,
warp or buckle. Accurately form steel to required sizes and profiles. Wherever
practical, fit and assemble units in the manufacturers plant. Clearly identify Work
that cannot be permanently factory assembled before shipment, to ensure proper
assembly at the project site. Weld exposed joints continuously, grind, dress and
make smooth, flush and invisible. Metallic filler to conceal manufacturing defects is
DESCRIPTION
not acceptable.
Issued for IFC
J. Finish Hardware Preparation: Prepare hollow steel units to receive mortised and
concealed finish hardware, including cutouts, reinforcing, drilling and tapping in
accordance with final finish hardware schedule and templates provided by the
hardware supplier. Comply with applicable requirements of ANSI A115 Series and
ANSI A151.1.
23-10028-
JO/EWO
0001
L. Shop Painting:
NO.
REV
00
DISCIPLINE
ENGINEER
1. Clean, treat and paint surfaces of fabricated hollow steel units, whether
DATE:
concealed or exposed in the finished work.
PROJECT
ENGINEER
2. Clean steel surfaces of mill scale, rust, oil, grease, dirt and other foreign
DATE: materials before application of shop paint.
CERTIFIED
DATE:
3. Apply pretreatment to cleaned steel surfaces, using cold phosphate solution
CONSTRUCTION (SSPC-PT2), hot phosphate solution (SSPC-PT4) or basic zinc chromate-
AGENCY
vinyl butyral solution (SSPC-PT3).
DATE:
OPERATIONS
4. Apply a shop coat of prime paint within limits recommended by the
pretreatment manufacturers. Apply a smooth coat of even consistency to
DATE: provide a uniform dry film thickness of not less than 0.05 mm (0.002 in; 2
mils).
CONTROL NUMBER
VERIFICATION
EDSD
2.09 Doors
DATE:
BY:
N. Provide flush design doors with 44 mm (1-3/4 in.) thickness of cold-rolled steel
REVISIONCERTIFICATION
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 323
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 324
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
O. Provide thermal insulation filler of fiberboard, mineral-wool board or glass fiber
solidly packed to full door height to fill the voids between the inner core reinforcing
members. Fire rated doors shall have mineral-wool cores only. Maximum
ENGG CERT
P. Reinforce doors with a rigid tubular frame, where louvers are shown. Form tubular
frames with 16 gauge steel, welded to outer sheets.
Q. Fabricate doors with two (2) outer cold-rolled steel sheets of not less than 18
gauge. Construct doors with smooth, flush surfaces, without visible joints or seams
one exposed faces or stile edges, except around glazed or louvered panel inserts.
DESCRIPTION
S. Reinforce tops and bottoms of doors with 18 gauge horizontal steel channels
welded continuously to outer sheets. Close top and bottom edges of exterior doors
to provide a weather seal, as an integral part of door construction or by addition of
flush closing steel channels.
23-10028-
JO/EWO
0001
T. Door louvers, where shown on the Drawing or in “Door and Louver Schedule,” shall
06/01/22
be fabricated integrally with the door. Non fire-rated louvers shall be constructed of
DATE
spot welded 16 gauge (minimum) cold rolled steel sections, comprising semi-
concealed perimeter frame and inverted “v” louver blades. Louvers shall be of size
NO.
REV
00
DISCIPLINE
and height as shown on the Drawings or in “Door and Louver Schedule” and
ENGINEER located centrally in door width.
DATE:
U. Reinforce each door for finish hardware conforming to CHM-1-69.
PROJECT
ENGINEER
2.10 Frames
DATE:
CERTIFIED
A. Provide pressed steel frames for steel and wood doors, glazed openings and other
openings, of size and profiles as shown on the Drawings. Unless otherwise
DATE:
CONSTRUCTION
specified in Section 08710 - Finish Hardware, provide removable mullions for
AGENCY multiple or special nonlabeled door/window frames.
DATE:
B. Fabricate frames of full-welded unit construction, with corners mitered, reinforced
OPERATIONS
and continuously welded to the full depth and width of frame, unless otherwise
shown on the Drawings. Knock-down type frames are not acceptable.
DATE:
CONTROL NUMBER
C. Form frames of either cold or hot-rolled sheets, not less than 16 gauge for
VERIFICATION
openings up to 1.22 m wide. For openings over 1.22 m wide, increase thickness
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
conforming to CHM-1-69 and provide cover boxes at the back of all hardware
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
cutouts.
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 324
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 325
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
E. Wall Anchors: Furnish wall anchors as required to secure frames to adjacent
construction, formed of not less than 18 gauge galvanized steel. Spacing shall
conform to CHM 1-69.
ENGG CERT
F. Floor: Provide floor anchors for each jamb which extended to the floor, formed of
not less than 16 gauge galvanized steel and as follows:
1. Monolithic Concrete Slabs: Clip type anchors, with two (2) holes to receive
DESCRIPTION
G. Head Anchors: Provide two (2) anchors at head of frames exceeding 107 cm (42
in.) wide for frame mounted in precast concrete walls or metal studs.
H. Head Reinforcing: For frames over 1.22 m (4 ft.) wide, provide two (2) continuous
steel angles not less than 50 mm x 50.mm (2 in.) x 12 gauge and to the width of
23-10028-
JO/EWO
0001
opening. Weld to back of frame at the head, unless otherwise shown on the
Drawings.
06/01/22
DATE
I. Spreader Bars: Provide two (2) removable spread bars across the bottom of
frames, back welded to jambs and mullions
NO.
REV
00
DISCIPLINE
ENGINEER J. Rubber Door Silencers: Drill stops to receive three (3) silencers on single door
frames and two (2) silencers, each side on double-door frames. Install plastic
DATE:
plugs to keep hole clean during construction.
PROJECT
ENGINEER
3.01 Examination
DATE:
CONSTRUCTION
AGENCY A. Field verify that opening sizes tolerance are acceptable.
DATE:
3.02 Installation
OPERATIONS
B. Install hollow steel units and accessories in accordance with approved shop
DATE: drawings and manufacturers data, and as herein specified.
CONTROL NUMBER
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 325
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 326
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. Set anchorage devices opposite of each anchor location, in accordance
with details on final drawings and anchorage device manufacturers
instructions. Leave drilled holes rough, not reamed, and free from dust and
ENGG CERT
debris.
E. Placing Frames: Set frames accurately in position. Plumb, align and brace securely
unit permanent anchor are set. Place fire-rated frames in accordance with NFPA
Standards No. 80. All frames shall be grouted solid after installation.
DESCRIPTION
F. Fill dimples in frames, screws and bolts using metal filler. Grind sooth and apply
primer paint. Dimples shall not show in the finished Work.
G. Door Installation:
1. Fit hollow steel doors accurately in their respective frames, within the
following clearances:
0001
00
DISCIPLINE
2. Place fire-rated doors with the clearance as specified in NFPA Standard
ENGINEER No. 80.
DATE:
3. See Section 08710 - Finish Hardware for finish hardware installation.
PROJECT
ENGINEER
DATE:
D. Ensure that UL or other applicable fire rating labels are not painted over.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
- END OF SECTION -
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 326
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 327
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 08120
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
1.03 References
1.04 Performance Requirements
1.05 Submittals
1.06 Quality Assurance
1.07 Qualifications
1.08 Pre-installation Conference
1.09 Delivery, Storage, and Handling
1.10 Environmental Requirements
1.11 Field Measurements
23-10028-
JO/EWO
0001
1.12 Coordination
1.13 Warranty
06/01/22
DATE
Part 2 - Products
NO.
REV
00
DISCIPLINE
2.01 Manufacturers
ENGINEER 2.02 Materials
2.03 Fabrication
DATE:
2.04 Aluminum Finishes
PROJECT
ENGINEER
Part 3 - Execution
DATE:
CERTIFIED
3.01 Examination
3.02 Installation
DATE:
CONSTRUCTION
3.05 Cleaning and Protection
AGENCY
DATE:
OPERATIONS
PART 1 - GENERAL
A. Work under this section includes, but is not limited to; installing and providing
EDSD
aluminum doors, frames and exterior aluminum wall framing systems as shown on
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 327
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 328
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Section 07920 – Sealants and Caulkings.
ENGG CERT
1.03 References
A. AAMA - Metal Curtain Wall, Window, Store Front and Entrance - Guide Specifications
Manual.
DESCRIPTION
B. AAMA - Curtain Wall Manual #10 - Care and Handling of Architectural Aluminum
From Shop to Site.
0001
F. AAMA 606.1 - Specifications and Inspection Methods for Integral Color Anodic
DATE
00
DISCIPLINE
G. AAMA 607.1 - Specifications and Inspection Methods for Clear Anodic Finishes for
ENGINEER Architectural Aluminum.
DATE:
H. AAMA 608.1 - Specification and Inspection Methods for Electrolytically Deposited
PROJECT
ENGINEER Color Anodic Finishes for Architectural Aluminum.
N. ANSI/ASTM B209 - Specification for Aluminum and Aluminum-Alloy Sheet and Plate.
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 328
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 329
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
P. ANSI/ASTM E283 – Test Method for Determining the Rate of Air Leakage Through
Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences
Across the Specimen.
ENGG CERT
R. ANSI/ASTM E331 - Test Method for Water Penetration of Exterior Windows, Curtain
Walls, and Doors by Uniform Static Air Pressure Difference.
A. Design and size components to withstand dead and live loads caused by positive and
negative wind pressure acting normal to plane of wall as calculated in accordance
with UBC code to a design pressure of 20 lb/sq ft (1 KPa) and as measured in
accordance with ANSI/ASTM E330.
23-10028-
JO/EWO
0001
B. Limit mullion deflection to flexure limit of glass or to 1/500 span, whichever is more
restrictive, with full recovery of glazing materials.
06/01/22
DATE
00
DISCIPLINE
dynamic loading and release of loads, deflection of structural support framing, and
ENGINEER building expansion joints.
DATE:
D. Air Leakage for fenestration and doors shall be determined in accordance with NFRC
PROJECT
ENGINEER 400. Air Leakage shall be determined by a laboratory accredited by a nationally
recognized accreditation organization such as the National Fenestration Rating
DATE: Council (NFRC) and shall be labeled and certified by the manufacturer. Air Leakge
CERTIFIED
shall not exceed 1.0 cfm / ft2 for glazed swinging entrance doors and for revolving
doors and 0.4 cfm / ft2 for all other products.
DATE:
CONSTRUCTION
AGENCY E. Water Leakage: None, when measured in accordance with ASTM E331 with a test
pressure difference of 2.86 lbf/sq ft (136.85 N/sq m).
DATE:
OPERATIONS
F. Maintain continuous air and vapor barrier throughout assembly, primarily in line with
[inside] pane of glass and inner sheet of infill panel and heel bead of glazing
DATE: compound.
CONTROL NUMBER
VERIFICATION
G. System to provide for expansion and contraction within system components caused
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 329
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 330
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.05 Submittals
correct details for aluminum doors, door frames and wall frames. Include fabrication,
finishing, accessories and other components of the Work.
B. Shop Drawings: Complete for fabrication, details and erection drawings of aluminum
frame system doors, door and wall frames, and associated components or Work.
Include, in metric dimensions, wall elevations, sections and full sized detail sections.
Show anchors, joint system and expansion provisions.
DESCRIPTION
C. Samples: Two (2) samples of required aluminum finish, on 150 mm (6 in) long
Issued for IFC
extrusions from stock to be used for Work. Where normal color and texture variations
are to be expected, include 2 or more units of each sample, showing the range of
such variations. Samples will be reviewed by Saudi Aramco Representative for color
and texture only. Compliance with other requirements is the exclusive responsibility
of the Contractor.
A. Perform Work in accordance with AAMA SFM-1 and Metal Curtain Wall, Window,
23-10028-
JO/EWO
0001
1.07 Qualifications
NO.
REV
00
DISCIPLINE
ENGINEER A. Manufacturer and Installer: Company specializing in manufacturing aluminum glazing
systems with minimum three years documented experience.
DATE:
PROJECT
ENGINEER 1.08 Pre-installation Conference
DATE: A. Convene one week prior to commencing work of this Section, under provisions of
CERTIFIED
Division 1.
DATE:
CONSTRUCTION
1.09 Delivery, Storage, and Handling
AGENCY
A. Deliver, store, protect and handle products to site under provisions of Section 01005.
DATE:
OPERATIONS
B. Handle work of this section in accordance with AAMA - Curtain Wall Manual #10.
DATE: C. Protect pre-finished aluminum surfaces with wrapping. Do not use adhesive papers
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 330
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 331
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.11 Field Measurements
1.12 Coordination
B. Coordinate the Work with installation of automatic sliding doors and precast
components materials.
DESCRIPTION
1.13 Warranty
Issued for IFC
B. Warranty: Include coverage for complete system for failure to meet specified
requirements.
PART 2 - PRODUCTS
23-10028-
JO/EWO
0001
2.01 Manufacturers
06/01/22
A. Alupco
DATE
00
DISCIPLINE
Tel.: 966-13-847 1300
ENGINEER Fax: 966-13-847 3010
DATE:
B. Al Zamil Aluminum
PROJECT
ENGINEER Dammam 31451, KSA
Tel.: 966-13-847 1555
DATE: Fax: 966-13-844 7282
CERTIFIED
C. Alumaco
DATE:
CONSTRUCTION
P.O. Box 8602
AGENCY Dammam 31492, KSA
Tel.: 966-13-847 2555
DATE:
Fax: 966-13-847 2081
OPERATIONS
E. Or approved equal.
DATE:
BY:
2.02 Materials
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
A. Frames: Framing systems shall be true thermal core, 46 mm wide by 108 mm deep
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 331
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 332
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Doors: Doors shall be of a medium stile design similar to the Kawneer 350 series,
complete with flexible non-porous weatherstripping on all exterior doors.
ENGG CERT
1. Provide sealants for use inside of the weatherproofing system that have a
VOC content of 250 g/L or less when calculated according to 40 CFR 59,
Subpart D (EPA Method 24).
E. Hardware: Hardware for aluminum doors shall be provided by the door manufacturer
and shall include the following:
1. Thresholds: Metal threshold with built-in stop strip with wool pile weather
23-10028-
JO/EWO
0001
2. Butt Hinges: Extra heavy weight, four ball bearing, five knuckle hinges, ANSI
Type A2111. Size 127 x 115 mm (5 x 4-1/2 in) wide with non-removable
NO.
REV
00
DISCIPLINE
stainless steel pins. Similar to Stanley Model #FBB-199-SSP, NRP, or Hager
ENGINEER BB-199-SSP, NRP, or Mckinney T4B 3386 SSP-NRP.
DATE:
3. Panic Device: For single doors, Yale 7200 Rim Exit Device, Yale 501 Exit
PROJECT
ENGINEER Device Trim (ANSI function F03), and Yale 757 Rim Strike. For double doors,
Yale 7220 CVR Exit Device, Yale 501 Exit Device Trim (ANSI function F03)
DATE: Yale 791 top strike, and Yale 794 Floor strike. All devices shall have key
CERTIFIED
cylinder dogging.
DATE:
CONSTRUCTION
4. Concealed overhead combination holder-stop; Glynn-Johnson 100 or Sargent
AGENCY 690 Series, Rixson No. 1 Series or Corbin 490 Series, US10B (dark bronze).
DATE:
5. Door Closers: LCN 4040 “Super Smoothee” or Rixson 2020 or Corbin 120,
OPERATIONS
interior application, surface mounted, for mounting on head of door frame.
Painted finish to match door finish.
DATE:
CONTROL NUMBER
6. Door Pulls: Solid offset tubular pulls, 25 mm (1 in) diameter, 305 mm (12 in)
VERIFICATION
long, similar to Quality No. 521-12”, Trimco NO. 1191-4 Hiawatha No. 658B.
EDSD
DATE:
08710 – Hardware.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
8. Door Bumpers: Trimco 1270 series wall bumper equipment Yale or approved
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 332
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 333
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
9. Hardware Sets:
ENGG CERT
1 Threshold
3 Butt hinges
1 Concealed O.H. holder/stop
1 Closer
1 Pull
1 Panic exit device
DESCRIPTION
1 Cylinder
Issued for IFC
2 Bumpers
1 Threshold
6 Butt hinges
2 Panic exit device
2 Closer
2 Concealed O.H. holder/stop
23-10028-
JO/EWO
0001
2 Pull
1 Cylinder
06/01/22
2 Bumpers
DATE
00
DISCIPLINE
ENGINEER 1. Fasteners: Aluminum, non-magnetic stainless steel or hardened, tempered
aluminum fasteners guaranteed by manufacturer to be compatible with
DATE:
frames, anchors and other items being fastened. For exposed fasteners (if
PROJECT
ENGINEER any), provide countersunk aluminum flathead screws with finish matching the
item fastened.
DATE:
CERTIFIED
2. Do not use exposed fasteners except where unavoidable for assembly of
units.
DATE:
CONSTRUCTION
AGENCY 2.03 Fabrication
DATE:
A. General:
OPERATIONS
1. Complete cutting, fitting, forming, drilling and grinding of all metal Work prior to
DATE: cleaning, finishing, treatment and application of coatings.
CONTROL NUMBER
VERIFICATION
DATE:
Provide secure attachment and support at mechanical joints, with hairline fit of
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
contracting members.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 333
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 334
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. Reinforce Work as necessary for performance requirements and for support
with the structure. Separate dissimilar metals with bituminous paint or
preformed separators which will prevent corrosion.
ENGG CERT
0001
2. Provide members of the size, shape and profile shown on the Drawings.
06/01/22
00
DISCIPLINE
other suitable permanent, separator, on the concealed contact surfaces of
ENGINEER dissimilar materials, or surfaces in contact with concrete or concrete masonry
units, before assembly or installation, wherever there is possibility of corrosive
DATE:
or chemical reaction between dissimilar materials or metals.
PROJECT
ENGINEER
C. Color and Texture: Saudi Aramco Representative reserves the right to reject
EDSD
aluminum units because of color or texture variations which are visually objectionable,
DATE:
but only where variation exceeds range of variations established by the manufacturer
BY:
prior to installation of Work, by means of range samples which have been approved
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 334
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 335
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. Prepare and submit to Saudi Aramco Representative for review range samples on
extrusions of profiles and shapes similar to, and at least 50% as large as the actual
members of Work.
ENGG CERT
E. For the aluminum frames, provide powder coated paint comply with AAMA 605.2 as
shown on the Drawings.
PART 3 - EXECUTION
Issued for IFC
3.01 Examination
C. Field verify wall openings and adjoining air and vapor seal materials are ready to
receive Work of this Section.
23-10028-
JO/EWO
0001
3.02 Installation
06/01/22
DATE
00
DISCIPLINE
the electrical requirements shown on the Drawings and specified in these
ENGINEER Specifications.
DATE:
B. Set plumb, level and true to line, without warp or rack of frames. Anchor securely in
PROJECT
ENGINEER place. Separate aluminum and other corrosive metal surfaces from sources of
corrosion or electrolytic action at points of contact with other materials.
DATE:
CERTIFIED
3.03 Cleaning and Protection
DATE:
CONSTRUCTION
A. Clean aluminum surfaces promptly after installation of frames, exercising care to
AGENCY avoid damage of protective coating. When protective coatings have served their
purpose, clean the aluminum surfaces thoroughly following manufacturer’s
DATE:
recommendations. Do not use abrasive, caustic or acid cleaning agents.
OPERATIONS
B. Provide protective treatment and other precautions required through the remainder of
DATE: the construction period, to ensure that frames will be without damage or deterioration
CONTROL NUMBER
at time of acceptance.
VERIFICATION
EDSD
DATE:
- END OF SECTION -
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 335
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 336
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 08211
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
1.03 References
1.04 Submittals
1.05 Quality Assurance
1.06 Qualifications
1.07 Regulatory Requirements
1.08 Delivery, Storage and Handling
1.09 Field Measurements
1.10 Coordination
1.11 Warranty
23-10028-
JO/EWO
0001
Part 2 - Products
06/01/22
DATE
2.01 Manufacturers
2.02 General Requirements for Materials and Fabrication
NO.
REV
00
DISCIPLINE
2.03 Interior Flush Wood Doors
ENGINEER 2.04 Flush Door Facing
DATE:
Part 3 - Execution
PROJECT
ENGINEER
3.01 Examination
DATE: 3.02 Installation
CERTIFIED
3.03 Adjusting and Cleaning
DATE:
CONSTRUCTION
AGENCY PART 1 - GENERAL
DATE:
1.01 Description
OPERATIONS
A. Work under this Section includes, but is not limited to, installing and providing non-fire
DATE: rated/fire rated and acoustical flush mounted wood doors, as shown on the Drawing
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 336
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 337
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Section 08810 - Glass and Glazing.
1.03 References
0001
1.04 Submittals
06/01/22
DATE
00
DISCIPLINE
B. Shop Drawings: Illustrate door opening criteria, elevations, sizes, types, swings,
ENGINEER undercuts required, special blocking for hardware, and identify cutouts.
DATE:
C. Product Data: Indicate door core materials and construction; hardwood face veneer
PROJECT
ENGINEER medium density overlays (painted door) or high-pressure plastic laminate, type and
characteristics, and factory finishing criteria.
DATE:
CERTIFIED
D. Samples: Submit two samples of door construction, 6 x 6 inch (150 x 150 mm) in size
cut from corner of door.
DATE:
CONSTRUCTION
AGENCY E. Samples: Submit two samples of each type of door facing, 12 x 12 inch (300 x 300
mm) in size illustrating wood grain, stain color, and sheen, or plastic laminate color
DATE:
and sheen.
OPERATIONS
A. Identification:
DATE:
BY:
1. Factory mark each door with the NWMA, “Quality Certified” Seal of Approval,
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 337
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 338
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. Transparent Finish: Where doors are shown on the Drawings or scheduled to
receive transparent finish, omit factory markings. Provide a certification of
door quality for each door, if markings will be visible after finishing.
ENGG CERT
2. Standard I.S.I-87 “Wood Core Doors” of the National Wood Window and Door
Association (NWWDA).
DESCRIPTION
0001
1.06 Qualifications
06/01/22
DATE
00
DISCIPLINE
ENGINEER 1.07 Regulatory Requirements
DATE:
A. Fire Door Construction: Conform to NFPA 252, and UL 10B.
PROJECT
ENGINEER
B. Installed Fire Rated Door and Transom Panel Assembly: Conform to NFPA 80 for fire
DATE: rated class as scheduled.
CERTIFIED
1.10 Coordination
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 338
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 339
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Coordinate the work with door opening construction, door frame and door hardware
installation.
ENGG CERT
1.11 Warranty
PART 2 - PRODUCTS
2.01 Manufacturers
0001
00
DISCIPLINE
C. Kricger Steel Products (Supplier: Al Shadi Trading Establishment).
ENGINEER Tel.: 966-13-895 3322
DATE:
D. Fenestra.
PROJECT
ENGINEER
E. Eggers.
DATE:
CERTIFIED
F. Or approved equal.
DATE:
CONSTRUCTION
2.02 General Requirements for Materials and Fabrication
AGENCY
A. Exposed Face Materials: Provide same material on both faces of individual doors,
DATE:
unless otherwise shown on the Drawings.
OPERATIONS
B. Openings: Cut and trim openings through doors as shown. Comply with applicable
DATE: requirements of NWMA IS-1 for kind and quality of doors shown and specified.
CONTROL NUMBER
Unless otherwise shown, trim openings with solid wood moldings of the profile shown.
VERIFICATION
Comply with all requirements for construction of openings in fire rated doors and
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 339
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 340
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.03 Interior Flush Wood Doors
A. Solid Core Flush Wood Doors: Materials and Fabrication – provide door construction
ENGG CERT
for non-fire rated doors in compliance with reference codes and standards and
requirements as follow:
1. Core Construction: Solid wood-block of wood particle with wood lock blocks
conforming to NWMA IS-1.
B. Fire-Rated Mineral Core Flush Wood Doors: Where wood doors with fire-resistance
classifications are shown on the Drawings or in “Door Schedule”, provide face finish
to match non-fire rated wood doors in the same areas of the building, unless
otherwise shown on the Drawings or in the “Door Schedule”. Where required, door
construction shall comply with the requirements specified under “Quality Assurance”
for fire-rated wood finish, mineral core doors.
23-10028-
JO/EWO
0001
A. Plastic Laminate Facing : U.L. approved high pressure plastic laminate from Formica,
DATE
00
DISCIPLINE
ENGINEER PART 3 - EXECUTION
DATE:
3.01 Examination
PROJECT
ENGINEER
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 340
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 341
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1. Fit doors to frame for proper fit and uniform clearance at each edge and
machine for hardware. Seal cut surfaces after fitting and machining.
ENGG CERT
2. Bovel doors 3 mm (1/8 in) 500 mm (2 in) at lock edges and at hinge edges.
E. Clearances: For non-fire rated doors, provide clearances of 2.4 mm (3/32 in) at jambs
and heads; 3 mm (1/8 in) at meeting stiles for pairs of doors and 9.5 mm (3/8 in) from
bottom of door to top of decorative floor finish or covering. Where threshold is shown
or scheduled, provide 6 mm (1/4 in) clearance from bottom of door to top of threshold.
with requirements of NFPA No. 80, which includes lockset with 19 mm (3/4 in)
Issued for IFC
minimum latch throw at double doors and where required by manufacturer label
procedure. Install door with heavy weight grade 1 half surface hinges thru-bolted with
backplate.
G. Restore shop sealer on edges of doors after fitting and machining, at Work site and
prior to installation.
H. See Painting, Section 09900 – Painting of these Specifications, for the requirements
for finishing wood doors.
23-10028-
JO/EWO
0001
I. Door closures and exit devices shall be thru-bolted at mineral core doors using “Hex
06/01/22
00
DISCIPLINE
ENGINEER A. Operation: Re-hang or replace doors which do not swing or operate freely, as
directed by Saudi Aramco Representative at no additional cost to Saudi Aramco.
DATE:
PROJECT
ENGINEER B. Protection:
DATE: 1. Protect installed wood doors from damage or deterioration until acceptance of
CERTIFIED
Work.
DATE:
CONSTRUCTION
2. If doors are hung prior to finish painting, carpeting or vinyl wall covering
AGENCY application, then the doors must be kept completely wrapped with
polyethylene or paper.
DATE:
OPERATIONS
3. If veneer on doors becomes damaged and repairs cannot be made, which
blend in to the satisfaction of Saudi Aramco Representative, the entire door
DATE: shall be replaced by Contractor at no additional cost to Saudi Aramco.
CONTROL NUMBER
VERIFICATION
EDSD
- END OF SECTION -
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 341
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 342
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 08520
ENGG CERT
ALUMINUM WINDOWS
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
1.03 References
1.04 Submittals
1.05 Quality Assurance
1.06 Delivery, Storage, and Handling
1.07 Environmental Requirements
1.08 Field Measurements
1.09 Coordination
1.10 Warranty
23-10028-
JO/EWO
0001
Part 2 - Products
06/01/22
2.01 Manufacturers
DATE
2.02 Materials
2.03 Windows Types
NO.
REV
00
DISCIPLINE
2.04 Fabrication
ENGINEER
Part 3 - Execution
DATE:
PROJECT
ENGINEER 3.02 Installation
3.03 Cleaning and Protection
DATE:
CERTIFIED
PART 1 - GENERAL
DATE:
CONSTRUCTION
AGENCY 1.01 Description
DATE:
A. Work under this Section includes, but is not limited to, installing and providing design,
OPERATIONS
materials and equipment of windows and window frames, as shown on the Drawings
and specified herein, including all accessories.
DATE:
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 342
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 343
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
E. Section 09260 - Gypsum Board Systems.
1.03 References
ENGG CERT
A. AAMA - Metal Curtain Wall, Window, Store Front and Entrance - Guide Specifications
Manual.
B. AAMA - Curtain Wall Manual #10 - Care and Handling of Architectural Aluminum
From Shop to Site.
E. AAMA 607.1 - Specifications and Inspection Methods for Clear Anodic Finishes for
Architectural Aluminum.
0001
00
DISCIPLINE
or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process.
ENGINEER
J. ANSI/ASTM B209 - Specification for Aluminum and Aluminum-Alloy Sheet and Plate.
DATE:
PROJECT
ENGINEER K. ANSI/ASTM B221 - Specification for Aluminum-Alloy Extruded Bars, Rods, Wire,
Profiles, and Tubes.
DATE:
CERTIFIED
L. ANSI/ASTM E283 – Test Method for Determining the Rate of Air Leakage Through
Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences
DATE:
CONSTRUCTION
Across the Specimen.
AGENCY
N. ANSI/ASTM E331 - Test Method for Water Penetration of Exterior Windows, Curtain
DATE: Walls, and Doors by Uniform Static Air Pressure Difference.
CONTROL NUMBER
VERIFICATION
DATE:
1.04 Submittals
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 343
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 344
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A. Shop Drawings which indicate the location, size, hardware requirements and details
of material connections, installation and operation of all windows.
ENGG CERT
D. Tests: Submit certification of tests as specified in Paragraph 1.05, A., of this Section.
Issued for IFC
A. The design, materials and execution procedures shall be in accordance with this
Specifications and the manufacturer’s recommendations.
23-10028-
JO/EWO
0001
B. There shall be no leakage when unit is subjected to a pressure drop of 0.3 kPa in
accordance with ASTM E 3310-70 and ASTM E 283-73.
06/01/22
DATE
00
DISCIPLINE
A. Deliver, store, protect and handle products to Site under provisions of Sections
ENGINEER 01000, 01005 and 02000.
DATE:
B. Protect pre-finished aluminum surfaces with wrapping. Do not use adhesive papers
PROJECT
ENGINEER or sprayed coatings which bond when exposed to sunlight or weather.
DATE:
B. Coordinate the Work with installation of revolving doors air and vapor barrier and
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
1.10 Warranty
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 344
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 345
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A. Provide three year warranty under provisions of Division 1, Schedule “A”.
B. Warranty: Include coverage for complete system for failure to meet specified
ENGG CERT
requirements.
PART 2 - PRODUCTS
2.01 Manufacturers
A. Alupco
DESCRIPTION
B. Al Zamil Aluminum
Dammam 31451, KSA
Tel.: 966-13-847 1555
Fax: 966-13-844 7282
23-10028-
JO/EWO
0001
C. Alumaco
P.O. Box 8602
06/01/22
00
DISCIPLINE
ENGINEER D. Abdullah Ali-Al Wakeel and Bros. Co.
Tel.: 966-13-856 1431/856 2616
DATE:
Fax: 966-13-856 2013
PROJECT
ENGINEER
E. Or approved equal.
DATE:
CERTIFIED
2.02 Materials
DATE:
CONSTRUCTION
A. All aluminum windows and related materials shall be high grade Architectural
AGENCY aluminum extruded from aluminum alloy, 6063-T5, or an approved equal.
DATE:
B. All principal frame sections shall be of special extruded aluminum, produced from
OPERATIONS
architectural grade homogenized aluminum primary billet. Width to be 46mm and
thickness 2.2mm (minimum).
DATE:
CONTROL NUMBER
C. All exposed surfaces of aluminum assemblies shall be given a powder coated paint
VERIFICATION
DATE:
D. All access frames shall be mitered and sealed forming a hairline, watertight joint.
BY:
Corners shall be reinforced with aluminum gusset blocks and chemically welded,
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 345
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 346
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
E. The weatherstripping shall be neoprene and installed in dovetail grooves. All
weatherstripping shall be replaceable.
ENGG CERT
1. Provide sealants for use inside of the weatherproofing system that have a
VOC content of 250 g/L or less when calculated according to 40 CFR 59,
Subpart D (EPA Method 24).
G. Glass and Glazing Materials: Refer to Section 08810 “Glass and Glazing”.
DESCRIPTION
I. Hinges shall be manufactured from stainless steel Type 304, 2.5 mm thick with cold
rolled track and edge dressed strip links. The slide mechanism incorporates and
adjustable screw bracing onto a thermoplastic friction pad. Hinges shall be heavy
duty type and weatherproof. Hinges should pass the test requirements of AAMA for
such hinges.
23-10028-
JO/EWO
0001
J. Insect screens shall be supplied and fitted at all opening sashes. Screen unit shall be
a removable single piece consisting of a perimeter aluminum frame finished to match
06/01/22
00
DISCIPLINE
ENGINEER A. General: Drawings show which panels of each window unit are operable sashes and
which are fixed. Where two or more types of operating sash are included in the same
DATE:
window unit, the operation of each unit is shown on the Drawings.
PROJECT
ENGINEER
2.04 Fabrication
DATE:
CERTIFIED
A. Windows frames shall be fabricated in the shop, including all cutouts for hardware,
in conformance with manufacturer’s recommendations. Fasteners and connectors
DATE:
CONSTRUCTION
shall be concealed wherever possible. Any fasteners exposed to view shall be
AGENCY color matched to frames.
DATE:
OPERATIONS
PART 3 - EXECUTION
B. Units shall be set plumb, level and true to line, without warp or rack of frames.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Anchor securely in place. Separate aluminum and other corrodible metal surfaces
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
materials.
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 346
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 347
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Contractor is not allowed to use wood shims; only metal or plastic shims should be
ENGG CERT
A. Clean aluminum surfaces promptly after the installation of frames exercising care to
avoid damage of the protective coating
B. When protective coating have served their purpose, clean the aluminum surfaces
DESCRIPTION
C. Provide protective treatment and other precautions required, through the remainder of
the construction period, to ensure that frames will be without damage or deterioration
at the time of acceptance.
D. Remove excess sealant by moderate use of use mineral spirits or other solvent
acceptable to sealant manufacturer.
23-10028-
JO/EWO
0001
- END OF SECTION -
06/01/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 347
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 348
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 08665
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.04 Description
DESCRIPTION
1.06 References
1.06 Submittals
1.05 Product Delivery, Storage, and Handling
Part 2 - Products
0001
2.04 Fabrication
06/01/22
Part 3 - Execution
DATE
3.01 Inspection
NO.
REV
00
DISCIPLINE
3.02 Installation
ENGINEER 3.03 Cleaning and Protection
DATE:
PROJECT
ENGINEER PART 1 - GENERAL
F. Work under this Section consists of installing and providing design, materials,
DATE:
CONSTRUCTION
equipment and fabricating, of vertical sliding serving windows as shown on the
AGENCY Drawings and specified herein, including all accessories.
DATE:
1.02 Related Sections
OPERATIONS
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 348
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 349
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.03 References
A. AAMA 606.1 - Specifications and Inspection Methods for Integral Color Anodic
ENGG CERT
G. AAMA 607.1 - Specifications and Inspection Methods for Clear Anodic Finishes for
Architectural Aluminum.
J. ANSI/ASTM E283 – Test Method for Determining the Rate of Air Leakage Through
Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences
Across the Specimen.
0001
L. ANSI/ASTM E331 - Test Method for Water Penetration of Exterior Windows, Curtain
Walls, and Doors by Uniform Static Air Pressure Difference.
06/01/22
DATE
1.04 Submittals
NO.
REV
00
DISCIPLINE
A. Submit the following to Saudi Aramco Representative for approval:
ENGINEER
DATE: c. A corner sample, 300 mm x 300 mm; hardware units may also be requested
CERTIFIED
by Saudi Aramco Representative.
DATE:
CONSTRUCTION
1.05 Product Delivery, Storage, and Handling
AGENCY
A. Crate, pack, deliver to the site, store, and handle window units so as to protect it from
DATE:
damage and defacement. Replace damaged or defaced unit at no additional cost to
OPERATIONS
Saudi Aramco.
DATE:
CONTROL NUMBER
PART 2 - PRODUCTS
VERIFICATION
EDSD
A. General: Provide vertical sliding serving window assembly of the size shown on the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Drawings.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 349
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 350
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Type: Vertical sliding windows assembly single hung operating one side and one is
fixed.
ENGG CERT
2.02 Manufacturer
DESCRIPTION
manufactured by Nissen and Co. Inc., 9508 Rush Street, South EI Monte CA-91733-
1574, USA or approved equal.
2.03 Materials
A. Frame and Glass Channels: Frame and glass channel shall be of heavy type 6063-
T5 aluminum extrusions.
0001
00
DISCIPLINE
E. Overhead Tracks and Track Brackets: As recommended by the manufacturer.
ENGINEER
B. Workmanship: Cut, form, and shape pieces to sizes and working points shown.
VERIFICATION
Machine-cut, shear, or grind edges exposed in the finished Work. Form Work true
EDSD
line and level with accurate angles and surfaces and straight edges. Ease exposed
DATE:
edges free from burrs, sharp edges, and sharp corners. Form bent-metal corners to
BY:
the smallest radius possible without causing grain separation or otherwise impairing
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
the Work.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 350
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 351
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Joining and Fastening: Form connections exposed to view with hairline joints
which are flush and smooth, using concealed fasteners wherever possible. Fit
other joints sung and flush.
ENGG CERT
PART 3 - EXECUTION
3.01 Inspection
D. Examine the substrates, adjoining construction, and the conditions under which the
windows are to be installed. Do not proceed with the Work until unsatisfactory
DESCRIPTION
3.02 Installation
0001
operation and make adjustments so that windows operate smoothly and fit closely on
all sides when locked.
06/01/22
DATE
C. Clean rust other foreign matter from shop coated surfaces which have been damaged
in shipment, handling, or erection.
NO.
REV
00
DISCIPLINE
ENGINEER D. Lubricate operating parts as recommended by the manufacturer.
DATE:
3.03 Cleaning and Protection
PROJECT
ENGINEER
A. Cleaning: Upon completion the installation of windows and adjacent finishes, clean
DATE: exposed metal surfaces as recommended by the manufacturer.
CERTIFIED
B. Protection: Protect the Work. Repair or replace damaged Work as required by Saudi
DATE:
CONSTRUCTION
Aramco Representative at no additional cost to Saudi Aramco.
AGENCY
DATE:
- END OF SECTION -
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 351
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 352
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 08710
ENGG CERT
HARDWARE
SUBSECTION INDEX
Part 1 - General
1.01 Description
DESCRIPTION
0001
Part 2 - Products
06/01/22
2.01 Suppliers
DATE
2.02 Keying
2.03 Materials and Fabrication
NO.
REV
00
DISCIPLINE
2.04 Packing and Marking
ENGINEER 2.05 Sizing Hardware
2.06 Hardware Finishes
DATE:
2.07 Hardware Items
PROJECT
ENGINEER 2.08 Masterkeying
A. Work under this Section includes, but is not limited to; furnishing and installing all door
EDSD
finish hardware, except as supplied as part of other assemblies such entrance doors,
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 352
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 353
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Section 08211 - Flush Wood Doors.
ENGG CERT
A. Manufacturer: Insofar as possible obtain each kind of hardware from only one
manufacturer; even though several may be indicated as acceptable manufacturers.
0001
one manufacturer's numeric designation system in schedules does not imply that
another manufacturer's products will not be acceptable, unless they are not
06/01/22
acceptable in design, or not equal in size, weight, finish, function, or other quality of
DATE
significance.
NO.
REV
00
DISCIPLINE
1.05 Submittals
ENGINEER
DATE: C. Keying Schedule: A master keying schedule for review and approval. Schedule shall
CONTROL NUMBER
D. Samples: Prior to submittal of the final hardware schedule and prior to delivery of
DATE:
hardware, submit one sample of each exposed hardware unit, finished as required,
BY:
and tagged with full description for coordination with the schedule. Sample will be
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
reviewed by Saudi Aramco Representative for design, color and texture only.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
Contractor. Units which are acceptable and remain undamaged through submittal,
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 353
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 354
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
review and field comparison procedures may, after final check of operation, be used
in the Work, within limitations of keying coordination requirements.
ENGG CERT
E. Shop Drawings: Indicate hardware component dimensions, location. Provide full set
of detailed schedule of hardware for each door including manufacturer, finish,
reference. Relate and coordinate with other trades.
A. Provide secure lock-up for hardware delivered to the project, but not yet installed.
Control the handling and installation of hardware items which are not immediately
DESCRIPTION
replaceable, so that the completion of the Work will not be delayed by hardware
Issued for IFC
A. Coordination: Coordinate hardware with other work. Tag each item or package
separately, with identification related to the final hardware schedule, and include basic
installation instructions in the package. Furnish hardware items of proper design for
use on doors and frames of the thicknesses, profile, swing, security and similar
requirements indicated, as necessary for proper installation and function. Deliver
23-10028-
JO/EWO
0001
individually packaged hardware items at the proper times to the proper locations
(shop or project site) for installation.
06/01/22
DATE
00
DISCIPLINE
check the shop drawings of such other work, to confirm that adequate provisions are
ENGINEER made for the proper installation of hardware.
DATE:
1.08 Warranty
PROJECT
ENGINEER
A. Provide standard warranty. Include coverage for door closers and latch sets.
DATE:
CERTIFIED
1.09 Maintenance Materials
DATE:
CONSTRUCTION
A. Provide special wrenches and tools applicable to each different or special hardware
AGENCY component.
DATE:
B. Provide maintenance tools and accessories supplied by hardware component
OPERATIONS
manufacturer.
A. Provide five key lock cylinders for each master keyed group.
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 354
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 355
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PART 2 - PRODUCTS
2.01 Suppliers
ENGG CERT
A. AICS
P.O. Box 369
Dammam-31411, KSA
Tel. No. 966-13-857 6468
Fax No. 966-13-857 0356
Dammam-31421, KSA
Tel. No. 966-13-857 2777
Fax No. 966-13-857 2591
D. Or approved equal.
23-10028-
JO/EWO
0001
2.02 Keying
06/01/22
DATE
A. Lock Cylinders and Keying: Provide factory six (6) pin Master key system. Provide
one master key system for. Provide keys from blanks that cannot be duplicated at a
NO.
REV
00
DISCIPLINE
key shop.
ENGINEER
1. Provide all locks with cylinders or key cores, and padlocks from one
DATE:
manufacturer.
PROJECT
ENGINEER
B. Provide individual change key for each lock, which is not designated to be keyed alike
DATE: with group of related locks.
CERTIFIED
C. Key Identification: Provide all keys with identification markings identifying each
DATE:
CONSTRUCTION
specific facility and building. Provide key tags by room number. Provide also a key
AGENCY log by number and room number.
DATE:
D. Key Material: Provide keys in nickel silver only.
OPERATIONS
E. Keying Quantity: Provide three (3) keys for each lock and three (3) keys for each
DATE: master system. Provide one extra key blank for each lock.
CONTROL NUMBER
VERIFICATION
F. Construction Keying: Construction masterkey all locks for use during construction.
EDSD
Remove construction masterkey system and replace with Saudi Aramco key system
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 355
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 356
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
G. Provide a key control system including envelopes, labels, tags with self-locking key
clips, receipt forms, 3-way visible card index, temporary markers and permanent
markers.
ENGG CERT
1. Provide a hinged-panel type cabinet, for wall mounting. See Section 11000 –
General Equipment.
A. General:
1. Hand of Door: The Drawings show swing or hand of each door leaf (left, right,
reverse bevel, etc.). Finish each item of hardware for proper installation and
operation of door swing.
0001
00
DISCIPLINE
specifically indicated.
ENGINEER
4. Furnish screws for installation, with each hardware item. Provide flathead
DATE:
screws except as otherwise indicated. Finish exposed (exposed under any
PROJECT
ENGINEER condition) screws to match hardware finish of such other work as closely as
possible except as otherwise indicated.
DATE:
CERTIFIED
5. Provide concealed fasteners for hardware units which are exposed when door
is closed, except to extent no standard manufacturer units of type specified
DATE:
CONSTRUCTION
are available with concealed fasteners. Do not use through bolt for installation
AGENCY where bolt head or nut on opposite face is exposed in other work under any
condition, except where it is not possible to adequately reinforce work and use
DATE:
machine screws or concealed fasteners of another standard type, to
OPERATIONS
satisfactorily avoid use of through bolts.
DATE: 6. Closers: Provide hex nuts and bolts with all closers.
CONTROL NUMBER
VERIFICATION
7. Provide fasteners which are compatible with bolt unit to be fastened and
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
8. All exterior doors shall have weather stripping and aluminum thresholds.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 356
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 357
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.04 Packing and Marking
A. Packing: Wrap all fasteners and hardware in paper and pack in boxes. Pack
ENGG CERT
B. Identification: Label each box of hardware to indicate that portion of the work for
which it is intended.
A. General:
1. Match finish of every hardware unit at each door or opening, to the greatest
extent possible, except as otherwise indicated. Reduce differences in color
and textures as much as commercially possible, where base metal or metal
forming process is different for individual units of hardware exposed at same
door or opening. In general, match all items to manufacturer's standard finish
23-10028-
JO/EWO
0001
for latch and lock set (or push-pull units if not latch/lock sets) for color and
texture.
06/01/22
DATE
2. The Saudi Aramco Representative will be the sole judge of whether hardware
units match accepted samples and match each other satisfactorily.
NO.
REV
00
DISCIPLINE
ENGINEER 3. Provide quality of finish, including thickness of plating or coating (if any),
composition, hardness and other qualities in compliance with manufacturer's
DATE:
standards. Provide finish for each type of hardware.
PROJECT
ENGINEER
1. Manufacturer: Schlage “D” series, extra heavy duty grade 1 ANSI A156.2,
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
3. Box strikes, ANSI 32 x 124 mm (1-1/4 x 4-7/8 in), 30 mm (1-3/6 in) LIP, 10-
(DCC) NO. _____________________
025 Standard.
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 357
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 358
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. Latch Throw: 13 mm (1/2 in) Standard. Fire rated single doors may be 12.5
mm (1/2 in) latch throw in lieu of 19 mm (3/4 in) as specified elsewhere if
ENGG CERT
approved by UL. At fire rated double doors latch throw shall be 19 mm (3/4
in).
C. Deadlock:
D. Closers:
0001
4. Closers: All closers shall be provided with a solid stop in the closer to limit
door opening 85 to 110 degrees, adjustable, LCN Cush-N-Stop. For door
NO.
REV
00
DISCIPLINE
#164 (Boy’s Intermediate) and #158 (Boy’s Elementary) provide LCN Model
ENGINEER 4115 Cush, UL listed, non-hold open arm with dead stop at 100o closers,
complete with back-check cushion, drop plates, mounting supports, etc.
DATE:
PROJECT
ENGINEER E. Push Plates and Pulls:
DATE: 1. Manufacturer: Hiawatha #210 push and pull plates and #523A pull bar,
CERTIFIED
equivalent Yale or approved equal.
DATE:
CONSTRUCTION
F. Wall and Floor Stops:
AGENCY
receive carpet and areas where floor slopes may require shims.
EDSD
DATE:
3. Omit wall or floor stops, where limited stop is provided on the closer, even if
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 358
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 359
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
G. Panic/Exit Devices: Heavy duty touch bar type, Yale #7100 Series or approved equal.
Knob and trim on opposite side similar in design to Door Locks. For rated pairs of
doors provide following type of fire exit hardware panic/exit devices.
ENGG CERT
1. Active Leaf: Mortise type exit devices similar to Von Duprin 9875 KF, Monarch
F-18-M-KE, Precision FL-1308x9, Sargent 12-8313-PRK, Arrow F-S3908-
SK08 or approved equal.
2. Inactive Leaf: Surface vertical rod type exit devices similar to Von Duprin 9827
EO-F, Monarch F-18-V-N, Precision FL-1201, Sargent 12-8710, Arrow F-
S3701 or approved equal.
DESCRIPTION
3. For non-rated doors provide devices which are UL listed Accident Hazard.
Devices shall be sized for 1220 mm wide doors where required. Provide
mortise floor strikes similar to Von Duprin 304L for recessing into the floor at
all double doors.
H. Silencers: Silencers specified herein are Yale or approved equal and shall be
provided for all doors. Furnish three (3) per single door and two (2) per pair of doors.
I. Kick Plates:
23-10028-
JO/EWO
0001
stainless steel.
DATE
2. 1.25 mm thick x 200 mm (0.050 x 8 in) size, 50 mm (2 in) less than door width
NO.
REV
00
DISCIPLINE
for single doors and 25 mm (1 in) less than door width for pairs of doors.
ENGINEER
1. Gaskets or Draftstops: Provide for all fire doors. Unit shall provide tight-fitting
DATE: smoke and draft quality assembly with a rating to match the rating of the door
CONTROL NUMBER
2. Manufacturer: PEMKO Model #s88D smoke seals at all fire doors and corridor
DATE:
doors.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
List of Sections
Construction Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 359
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 360
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
L. Door Coordinators:
2. Similar to Model 469, UL. Listed, surface mounted. Reversible type and
automatic coordinating device for use on pairs of doors to prevent the active
door leaf from closing ahead of the inactive one.
0001
2. With Solid Neoprene Tube provided for each leaf with both doors active.
06/01/22
O. Padlocks:
DATE
1. Manufacturer: Yale Model No. 7315 or Schlage Model No. PL2000 or P&F
NO.
REV
00
DISCIPLINE
Corbin Model No. 2863A or Sargent Model No. 756 or Arrow Model NO. EPC-
ENGINEER 1 or Russwin Model No. 2863A. Used in all service buildings like in R.O.
Building, MDS building, Chiller Plant Enclosure, Trash Bin, and all pedestrian
DATE:
and vehicular gates.
PROJECT
ENGINEER
P. Flush Bolts:
DATE:
CERTIFIED
1. Manufacturer: HB, Ives, USA or equal Model No. 358 for labeled wood doors,
Model No. 258 for non-labeled doors, Model No. 458 for labeled metal doors.
DATE:
CONSTRUCTION
AGENCY 2. Made of extruded brass plate with brass slide and bolt head (for labeled bolts)
and aluminum slide and bolt head (for non-labeled doors).
DATE:
OPERATIONS
Q. Dust-Proof Strikes:
DATE: 1. Manufacturer: HB Ives, USA or equal Model No. 489, spring tension
CONTROL NUMBER
calibrated for positive closing with Model No. 487 plate for flush floor
VERIFICATION
conditions.
EDSD
DATE:
2.08 Masterkeying
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
23-10028-0001-008
(DCC) NO. _____________________
90% Detail Design Engineering for BI-23-10028 Public Schools DOC 360
East Dammam II Home Ownership
381 A HE-274738
of 00
Dammam SAUDI ARABIA BI / JO: 23-10028-0001 361
EDSD/2616-0399.doc
EGEC – BI-23-10028 –Construction Specifications – Dammam
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. Cleaning Masterkey: Will open all doors except mechanical. Communication
and electrical rooms.
ENGG CERT
3. Maintenance Masterkey: Will open all doors except Managers and Division
Heads.
PART 3 - EXECUTION
3.02 Installation
0001
item completely and then remove and store in a secure place during the finish
DATE
application. After completion of each finish, reinstall each item. Do not install surface
mounted items until finishes have been completed and substrate prepared in a proper
NO.
REV
00
DISCIPLINE
fashion.
ENGINEER
A. Adjust and check each operating item of hardware and each door to ensure proper
EDSD
operation or function of every unit. Lubricate moving parts with type lubrication
DATE:
units which cannot be adjusted and lubricated to operate freely and smoothly as
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,