APPENDIX D

SAUDI ARAMCO SPARE PARTS DATA PACKAGE (SPDP) CHECKLIST

1.0 Scope
This checklist describes the technical and catalog data comprising the Spare Parts Data Package
(SPDP) information that is to be provided by Suppliers of new equipment for Mechanical, Electrical
and Instruments discipline. SPDP Checklist tables are attached as Exhibit A –Mechanical, B-
Instrumentation, and C- Electrical.

2.0 General Information

2.1 A SPDP Checklist (Appendix D) in a table format illustrates the required document and technical data
for each type of main equipment and auxiliary.

2.2 When equipment is furnished as a packaged (skid-mounted) unit it includes several individual
equipment items or fully functional assemblies, subassemblies, auxiliary equipment, accessories and
systems. Technical and catalog data are required for each type/model/style/size of all the individual
equipment items, functional assemblies, subassemblies, auxiliary equipment, accessories and systems
furnished.

2.3 For equipment not otherwise classified on this SPDP checklist (Appendix D), the nearly similar
equipment, function and system must be used as a guiding principle in providing the technical and
catalog data.

2.4 Attachment to Appendix D is “Exhibit S” form SA7970, shall be accomplished by supplier to list all
recommended spare parts must include Original Equipment Manufacturer (OEM) and Original
Component Manufacturer (OCM) unique part number, budgetary price, parts complete description,
material of construction, unit of measure and etc

Copyright©Saudi Aramco 2015. All rights reserved.

Saudi Aramco: Company General Use


29 October 2008
APPENDIX D
Spare Parts Data Package (SPDP) Cheklist
Exhibit A - Mechanical Equipment - Spare Parts Requirements

OCM Part Numbers *

OCM Part Numbers *

Catalog Cut Sheets **


Recommended Priced
Parts List with OEM/
Dimensional/Outline)

Materials with OEM/


Complete Equipment
Certified Data Sheets

Model/Type Number

Kit Breakdown and


Certified Drawings

Name Plate Details

Equipment Serial
(Cross-Sectional/

Complete Bill Of
Certified P&IDs

Equipment Tag
Copy of the PO
Equipment Auxiliary Equipment Remarks

Part Number
Numbers

Numbers
Spares parts information for all Auxiliary
Equipment must be provided. Additionally, Tubes
Boilers (Industrial water Forced Draft Fans, Drivers, Specifications, Refractory Lining Drawings,
√ √ √ √ √ √ √ √ √ √ √ √
tube) Ignitors & Burners, etc. Refractory Materials Type, Data Sheets and all
related Mechanical/Instrumentation/Electrical
Equipment information must be provided.

Inlet Air Filtration Systems,


Torque Converters, Shaft Spares parts information for all Auxiliary
Couplings, Lube Oil Equipment as well as all related
Combustion Gas Turbines √ √ √ √ √ √ √ √ √ √ √ √
Systems, Gear Box Mechanical/Instrumentation/Electrical Equipment
Assemblies, Speed Control must be provided.
Systems, etc.

Shaft Couplings, Spares parts information for all Auxiliary


Compressors (Gas Process Mechanical Seals, Gear Box Equipment as well as all related
√ √ √ √ √ √ √ √ √ √ √ √
& Air compressors) Assemblies, Lube Oil Mechanical/Instrumentation/Electrical Equipment
Systems, etc. must be provided.

Spares parts information for all auxiliary


Control Panel, Pendant
Cranes, Overhead √ √ √ √ √ √ √ √ √ √ equipment as well as all related Electrical
switch, etc.
Equipment must be provided.

For Continuous Service Diesel Engines: Spare


Parts information for a complete engine
repair/overhaul is required. These items includes
all wearing and consumable items. Additionally,
spare parts information for all Auxiliary Systems
such as Cooling System, Fuel System and
Lube Oil Systems, Cooling Lubricating System must be provided as well.
Diesel Engines √ √ √ √ √ √ √ √ √ √ √ √
Systems, etc. For Standby Diesel
Engines: Only Preventive Maintenance spare
parts information is required. These spare parts
includes Filters, Belts, Hoses, Gaskets, etc.
Additionally, spare parts information for all
related Mechanical/Instrumentation/ Electrical
Equipment must be provided as well.

Saudi Aramco: Company General Use Page 2 of 13


29 October 2008
APPENDIX D
Spare Parts Data Package (SPDP) Cheklist
Exhibit A - Mechanical Equipment - Spare Parts Requirements

OCM Part Numbers *

OCM Part Numbers *

Catalog Cut Sheets **


Recommended Priced
Parts List with OEM/
Dimensional/Outline)

Materials with OEM/


Complete Equipment
Certified Data Sheets

Model/Type Number

Kit Breakdown and


Certified Drawings

Name Plate Details

Equipment Serial
(Cross-Sectional/

Complete Bill Of
Certified P&IDs

Equipment Tag
Copy of the PO
Equipment Auxiliary Equipment Remarks

Part Number
Numbers

Numbers
Spares parts information for all Auxiliary
Equipment must be provided. Additionally, Tubes
Specifications, Refractory Lining Drawings,
Furnaces/Heaters Ignitors & Burners √ √ √ √ √ √ √ √ √ √ √ √
Refractory Materials Type, Data Sheets and all
related Instrumentation and Electrical Control
Systems information must be provided as well.

Spare parts information for Fan Assemblies, Gear


Air-Cooled (Fin Fan) √ √ √ √ √ √ √ √ √ √ √ √ Box, Belts, Motor, Sheaves, Finned Tube
Bundles, etc. must be provided.
Heat Exchangers Spare parts information for Gaskets, Bolts, Tube
Sheets and Tubes must be provided. Additionally,
Shell and Tube √ √ √ √ √ √ √ √ √ √ √ √ Heat Exchangers Head Gaskets drawings must be
provided as well.

Spares parts information for all Auxiliary


Equipment must be provided. This includes
Direct Expansion Type
√ √ √ √ √ √ √ √ √ √ √ √ Refrigerant Systems with Air Handling Units,
Units
Refrigerant Compressors, Couplings, Motors,
Electrical/Instrumentation Controls, etc.
Heat, Ventilation, Air
Conditioning (HVAC)
Package Type Units √ √ √ √ √ √ √ √ √ √
Equipment and Chiller
Packages
Spares parts information for all Auxiliary
Equipment must be provided. This includes
Water or Air-Cooled
√ √ √ √ √ √ √ √ √ √ √ √ Liquid/Water-Cooled Condensers, Fans, Motors,
Chillers
Relief Valves, Electrical/Instrumentation Controls,
etc.

Loading Arms √ √ √ √ √ √ √ √ √ √ √

Gauge Hatch, Emergency


Vents, Relief Valves, Tank Spares parts information for all Auxiliary
Pressure Vessels, Storage
gauge, Ventilator, Vacuum √ √ √ √ √ √ √ √ √ Equipment as well as all related Instrumentation
Tanks, Columns & Trays
Vent, Level Indicator, Flame and Electrical Equipment must be provided.
Arrester, etc.

Saudi Aramco: Company General Use Page 3 of 13


29 October 2008
APPENDIX D
Spare Parts Data Package (SPDP) Cheklist
Exhibit A - Mechanical Equipment - Spare Parts Requirements

OCM Part Numbers *

OCM Part Numbers *

Catalog Cut Sheets **


Recommended Priced
Parts List with OEM/
Dimensional/Outline)

Materials with OEM/


Complete Equipment
Certified Data Sheets

Model/Type Number

Kit Breakdown and


Certified Drawings

Name Plate Details

Equipment Serial
(Cross-Sectional/

Complete Bill Of
Certified P&IDs

Equipment Tag
Copy of the PO
Equipment Auxiliary Equipment Remarks

Part Number
Numbers

Numbers
Lube Oil Systems,
Spares parts information for all Auxiliary
Mechanical Seals, Shaft
Pumps √ √ √ √ √ √ √ √ √ √ √ √ Equipment as well as all related Instrumentation
Couplings, Drivers, Gear
and Electrical Equipment must be provided.
Boxes, etc.
Governor, Shaft Couplings,
Spares parts information for all Auxiliary
Lube Oil Systems, Gear Box
Steam turbines √ √ √ √ √ √ √ √ √ √ √ √ Equipment as well as all related Instrumentation
Assemblies, Speed Control
and Electrical Equipment must be provided.
Systems, etc.

Valves - Manual (hand Spare parts for manual gear operator must be
Manual Gear operator √ √ √ √ √ √ √
operated) provided.

* Recommended priced spare parts lists and Bill of Materials (BOM) must contain Original Equipment Manufacturer's part numbers (OEM) as well as Original Component Manufacturer's (OCM) part numbers.
These recommended spare parts lists should include all spare parts required for the first two (2) years of operation.
** Catalog cut sheets are manufacturer's literatures containing ordering information, part number, equipment pictures, sketches, exploded views, specifications and descriptive information.

General Remarks:
Provide separate spare parts information for each main equipment and auxiliary equipment. Unit price must be provided for any equipment or component the manufacturer is not recommending spare parts for.

Saudi Aramco: Company General Use Page 4 of 13


29 October 2008
APPENDIX D
Spare Parts Data Package (SPDP) Cheklist
Exhibit B - Instrumentation Equipment - Spare Parts Requirements

OCM Part Numbers *

OCM Part Numbers *

Catalog Cut Sheets **


Recommended Priced
Parts List with OEM/
Dimensional/Outline)

Complete Equipment

Materials with OEM/


Certified Data Sheets

Model/Type Number

Kit Breakdown and


Certified Drawings

Name Plate Details

Equipment Serial
(Cross-Sectional/

Complete Bill Of

Test/Calibration
Certified P&IDs

Equipment Tag
Copy of the PO
Equipment Auxiliary Equipment Remarks

Part Number

Certificate
Numbers

Numbers
Actuator (Valves or other Serial numbers for the Actuators are required only
Devices: Air, Nitrogen, √ √ √ √ √ √ √ √ √ √ if it is fitted on a valve from a different
Hydraulic Powered, etc.) manufacturer.
Actuator, Valve (Motor
Operated) √ √ √ √ √ √ √ √ √ √ √2

Analyzers, Monitors, Refer to individual SPDP requirements for each


Transmitters, Sensors, Analyzer Shelter Auxiliary Equipment. Spare
Analyzer Shelters
Sampling/Utilities/ HVAC/ √ √ √ √ √ √ √ √ √ √ √ √ √ 2
Parts information for all related Mechanical and
Electrical Systems, etc. Electrical Equipment must be provided as well.

Analyzers (Oxygen, pH,


Hydrogen Sulfide, Trace
Moisture, Conductivity,
Process Colors, Bottom √ √ √ √ √ √ √ √ √ √ √
Sediment, Water, Chlorine,
etc.)

Annunciators (Cabinets,
Panels, Alarm Systems, etc.) √ √ √ √ √ √ √ √ √ √

Regulators, Switches,
Cabinets, Shutdown (Local, Refer to individual SPDP requirements for each
Pneumatic and/or Electric)
Valves, Pilot Lights, Relays, √ √ √ √ √ √ √1 √ √ √ √ √ Cabinet Auxiliary Equipment.
Circuit Breakers, etc.
Cabinets/Boxes (Relay,
Marshalling, etc.) √ √ √ √ √ √ √ √ √ √

Chlorinators √ √ √ √ √1 √ √ √ √ √

Chromatographs √ √ √ √ √1 √ √ √ √ √

Circuit Breakers √ √ √

Controllers, Recorders, Pilot


Control Panels (Instrument: Refer to individual SPDP requirements for each
Indoor & Outdoor)
Lights, Switches, Relays, √ √ √ √ √ √1 √ √ √ √ √ √2 Control Panel Auxiliary Equipment.
Fuses, Transducers, etc.

Saudi Aramco: Company General Use Page 5 of 13


29 October 2008
APPENDIX D
Spare Parts Data Package (SPDP) Cheklist
Exhibit B - Instrumentation Equipment - Spare Parts Requirements

OCM Part Numbers *

OCM Part Numbers *

Catalog Cut Sheets **


Recommended Priced
Parts List with OEM/
Dimensional/Outline)

Complete Equipment

Materials with OEM/


Certified Data Sheets

Model/Type Number

Kit Breakdown and


Certified Drawings

Name Plate Details

Equipment Serial
(Cross-Sectional/

Complete Bill Of

Test/Calibration
Certified P&IDs

Equipment Tag
Copy of the PO
Equipment Auxiliary Equipment Remarks

Part Number

Certificate
Numbers

Numbers
Complete SPDP is required for all Third Party
Display Consoles, Control
Control Systems (DCS, Components. The manufacturer should identify all
Panels, Marshalling Boxes, √ √ √ √ √ √ √ √ √ √
ESD, VMS, BMS) items existing in current PMP Agreement, if any.
Relay Boxes, etc.
No ESP entry is required for such PMP items.

Controllers (Field or Panel


Mounted, Pneumatic,
Microprocessor-Based, √ √ √ √ √1 √ √ √ √ √
Programmable Logic/PLC,
etc.)
Density Meters (Gas and
Liquid) √ √ √ √ √ √ √ √ √ √

Detectors, Leak
(Flow/Pressure Differential, √ √ √ √ √ √ √ √ √
Acoustic, etc.)
ESD (Solid State Logic Complete SPDP is required for all Third Party
Systems, Relay Systems, Components. The manufacturer should identify all
Programmable Controller √ √ √ √ √ √ √ √ √ items existing in current PMP Agreement, if any.
Systems) No ESP entry is required for such PMP items.

Flame Arrestors √ √ √ √ √

Flame Monitoring Systems √ √ √ √ √ √ √ √ √

Flow Meters (Magnetic,


Ultrasonic, Multi-Path,
Vortex Shedding, Turbine, √ √ √ √ √1 √ √ √ √ √ √2
Thermal, Coriolis Mass,
Positive Displacement)

Bill of Materials and Priced Spare Parts List


Flow Meters (Annubar, Pilot should be provided for the Flowmeter Electronics
Tube, Venturi Tube, etc.) √ √ √ √ √ 1 √ √ √ √ √ only; however, complete model number of the
Flow Element must be specified.

Ratings, dimensions, and characteristic of the fuse


Fuses √ √ √ must be specified.

Saudi Aramco: Company General Use Page 6 of 13


29 October 2008
APPENDIX D
Spare Parts Data Package (SPDP) Cheklist
Exhibit B - Instrumentation Equipment - Spare Parts Requirements

OCM Part Numbers *

OCM Part Numbers *

Catalog Cut Sheets **


Recommended Priced
Parts List with OEM/
Dimensional/Outline)

Complete Equipment

Materials with OEM/


Certified Data Sheets

Model/Type Number

Kit Breakdown and


Certified Drawings

Name Plate Details

Equipment Serial
(Cross-Sectional/

Complete Bill Of

Test/Calibration
Certified P&IDs

Equipment Tag
Copy of the PO
Equipment Auxiliary Equipment Remarks

Part Number

Certificate
Numbers

Numbers
Gravitometers √ √ √ √ √ √ √ √ √ √

Indicators (Differential
Pressure Unit Element, √ √ √ √ √1 √ √ √ √ √
Scraper Passage, etc.)

Indicators (Panel-Mounted,
Multi-Point/ Digital) √ √ √ √ √ √ √ √ √

Indicators (Pressure Gauges,


Dial Thermometers, etc.) √ √ √ √ √

Level Gauge Glass Illuminator, Valves √ √ √ √ √ √ √ √ √

Level Instruments
(Displacer, Ultrasonic, √ √ √ √ √ √ √ √ √ √
Radiation, Capacitance, etc.)

Manifolds (Instrument or
Pressure) √ √ √ √ √ √

Monitors (Bearing Complete SPDP is required for all Third Party


Temperature, Vibration - Components. The manufacturer should identify all
Seismic and Non- √ √ √ √ √ 1 √ √ √ √ √ items existing in current PMP Agreement, if any.
ContactingTypes, etc.) No ESP entry is required for such PMP items.
Monitors (Combustible Gas,
Hydrogen Sulfide) √ √ √ √ √1 √ √ √ √ √

Orifice Fittings (Single/Dual


Chamber) √ √ √ √ √ √ √

Orifice Plates √ √ √ √ √

Unique OCM part numbers and unit price must be


Pilot Lights (Indicating) √ √ √ provided for the replacement lamp.
Positioners (Pneumatic,
Electro-Pneumatic) √ √ √ √ √ √ √ √ √ √

Saudi Aramco: Company General Use Page 7 of 13


29 October 2008
APPENDIX D
Spare Parts Data Package (SPDP) Cheklist
Exhibit B - Instrumentation Equipment - Spare Parts Requirements

OCM Part Numbers *

OCM Part Numbers *

Catalog Cut Sheets **


Recommended Priced
Parts List with OEM/
Dimensional/Outline)

Complete Equipment

Materials with OEM/


Certified Data Sheets

Model/Type Number

Kit Breakdown and


Certified Drawings

Name Plate Details

Equipment Serial
(Cross-Sectional/

Complete Bill Of

Test/Calibration
Certified P&IDs

Equipment Tag
Copy of the PO
Equipment Auxiliary Equipment Remarks

Part Number

Certificate
Numbers

Numbers
Recorders (Chart, Multi-
Point) √ √ √ √ √1 √ √ √ √ √

Regulators (Air-Filter) √ √ √ √ √ √

Regulators (Pressure, Flow,


Temperature, etc.) √ √ √ √ √ √ √ √ √ √

Relays (Electro-Mechanical,
Solid-State, etc.) √ √ √

Relays (Pneumatic) √ √ √ √ √ √ √ √ √

Remote Terminal Units √ √ √ √ √ √ √ √ √ √ √

Rotameters √ √ √ √ √ √ √ √ √

Rupture Disc Assemblies √ √ √ √ √

Sight Glasses (Flow) √ √ √ √ √ √ √

Skid Mounted Instrument Control/On-Off/Relief


Refer to individual SPDP requirements for each
Packages (Royalty/ Custody Valves, Transmitters,
Skid Auxiliary Equipment. Spare Parts
Metering Systems, Meter Switches, Temperature √ √ √ √ √ √ √ √ √ √ √ √ √ 2
information for all related Mechanical and
Provers - Liquid and Small Elements, Gauges,
Electrical Equipment must be provided as well.
Volume, Scraper Traps, etc.) Flowmeters, etc.

Speed Sensors √ √ √ √ √ √

Switches, Panel Mounted


(Selector, Push Button, etc.) √ √ √

Switches (Flow, Target,


Differential Pressure Unit √ √ √ √ √1 √ √ √ √ √
Element)

Switches (Level) √ √ √ √ √ √ √ √ √ √

Saudi Aramco: Company General Use Page 8 of 13


29 October 2008
APPENDIX D
Spare Parts Data Package (SPDP) Cheklist
Exhibit B - Instrumentation Equipment - Spare Parts Requirements

OCM Part Numbers *

OCM Part Numbers *

Catalog Cut Sheets **


Recommended Priced
Parts List with OEM/
Dimensional/Outline)

Complete Equipment

Materials with OEM/


Certified Data Sheets

Model/Type Number

Kit Breakdown and


Certified Drawings

Name Plate Details

Equipment Serial
(Cross-Sectional/

Complete Bill Of

Test/Calibration
Certified P&IDs

Equipment Tag
Copy of the PO
Equipment Auxiliary Equipment Remarks

Part Number

Certificate
Numbers

Numbers
Switches (Pressure,
Temperature) √ √ √ √ √ √
Tank Gauging Equipment
(Automatic) √ √ √ √ √ √ √ √ √

Temperature Elements
Unique OCM part number and unit price must be
(Thermocouples, Resistance √ √ √ √ √ √ √ provided for the element (without Fittings).
Temperature Detectors, etc.)

Thermowells √ √ √ √ √ √

Transducers (Signal
Conversion) √ √ √ √ √ √ √ √ √

Transmitters (Pressure,
Differential Pressure,
Temperature, Flow, Multi- √ √ √ √ √1 √ √ √ √ √
Variable, etc.)

Valves, Control (Globe,


Actuators, Positioners, Filter
Ball, Butterfly, Plug, Choke,
Regulators, Shut-Off Refer to individual SPDP requirements for each
Automatic Recirculation, √ √ √ √ √ √ √ √ √ √
Valves, Solenoid Valves, Control Valve Auxiliary Equipment.
Desuperheating, Deluge,
etc.
Diaphragm, etc.)

Actuators, Positioners, Filter


Valves (On-Off: Straight Regulators, Shut-Off Refer to individual SPDP requirements for each
Thru Conduit, etc.) Valves, Solenoid Valves, √ √ √ √ √ √ √ √ √ √ Control Valve Auxiliary Equipment.
etc.

Saudi Aramco: Company General Use Page 9 of 13


29 October 2008
APPENDIX D
Spare Parts Data Package (SPDP) Cheklist
Exhibit B - Instrumentation Equipment - Spare Parts Requirements

OCM Part Numbers *

OCM Part Numbers *

Catalog Cut Sheets **


Recommended Priced
Parts List with OEM/
Dimensional/Outline)

Complete Equipment

Materials with OEM/


Certified Data Sheets

Model/Type Number

Kit Breakdown and


Certified Drawings

Name Plate Details

Equipment Serial
(Cross-Sectional/

Complete Bill Of

Test/Calibration
Certified P&IDs

Equipment Tag
Copy of the PO
Equipment Auxiliary Equipment Remarks

Part Number

Certificate
Numbers

Numbers
Valves (Pilot, Solenoid
Operated, Check: Level √ √ √ √ √ √ √ √ √
Gauge, Flow Shut-Off, etc.)

Valves (Surge Relief, Safety


Relief - Flanged
Conventional and Balanced, √ √ √ √2
Pilot Operated, Vent,
Backflow Preventer, etc.)

* Recommended priced spare parts lists and Bill of Materials (BOM) must contain Original Equipment Manufacturer's part numbers (OEM) as well as Original Component Manufacturer's (OCM) part numbers.
These recommended spare parts lists should include all spare parts required for the first two (2) years of operation.
** Catalog cut sheets are manufacturer's literatures containing ordering information, part number, equipment pictures, sketches, exploded views, specifications, and descriptive information.
1 Serial Numbers are required only for special types of equipment manufactured for Saudi Aramco. Not mandatory if complete model number is provided.
2 Test Certificates are not mandatory requirements. It can be waived if the complete model number and serial numbers (where required) were provided in other documents.
3 PMP means Parts Management Program.

General Remarks:
Provide separate spare parts information for each main equipment and auxiliary equipment. Unit price must be provided for any equipment or component the manufacturer is not recommending spare parts for.

Saudi Aramco: Company General Use Page 10 of 13


APPENDIX D 29 October 2008
Spare Parts Data Package (SPDP) Cheklist
Exhibit C - Electrical Equipment - Spare Parts Requirements

OCM Part Numbers *


OCM Part Numbers *

Catalog Cut Sheets **


Recommended Priced
Parts List with OEM/
Dimensional/Outline)

Materials with OEM/


Complete Equipment
Certified Data Sheets

Model/Type Number

Kit Breakdown and


Certified Drawings

Name Plate Details

Equipment Serial
(Cross-Sectional/

Complete Bill Of
Certified P&IDs

Equipment Tag
Copy of the PO
Equipment Auxiliary Equipment Remarks

Part Number
Numbers

Numbers
Battery Chargers √ √ √ √ √ √ √ √ √ √ √

Circuit Breakers
√ √ √ √ √ √ √ √ √ √ √
(Air/Vacuum/Oil/Gas)

Control Panels / Controllers √ √ √ √ √ √ √ √ √ √ √

Electrical Panelboards √ √ √ √ √ √ √ √ √ √ √

Spares parts information including catalog cuts for


Control Panels, Instrument
Generators √ √ √ √ √ √ √ √ √ √ √ all Auxiliary Equipment as well as all related
Panels
Instrumentation items must be provided.

Lighting Fixtures √ √ √ √ √ √ √ √

Motors (Induction/
Synchronous/AC/DC etc.) √ √ √ √ √ √ √ √ √ √ √

Circuit Breakers Spares parts information including catalog cuts for


Motor Control Centers (Vacuum/Air/Oil/Gas), √ √ √ √ √ √ √ √ √ √ √ all Auxiliary Equipment as well as all related
Vacuum Contactors, etc. Instrumentation items must be provided.

Rectifiers √ √ √ √ √ √ √ √ √ √ √

Starter, Motor √ √ √ √ √ √ √ √ √ √ √

Switch, Automatic Trasnfer √ √ √ √ √ √ √ √ √ √ √

Circuit Breakers Spares parts information including catalog cuts for


Switchgears (Vacuum/Air/Oil/Gas), √ √ √ √ √ √ √ √ √ √ √ all Auxiliary Equipment as well as all related
Vacuum Contactors, etc. Instrumentation items must be provided.
Complete Transformer unit price and catalog
Transformers (Dry) √ √ √ √ √ √ √ √ number must be provided.

Saudi Aramco: Company General Use Page 11 of 13


APPENDIX D 29 October 2008
Spare Parts Data Package (SPDP) Cheklist
Exhibit C - Electrical Equipment - Spare Parts Requirements

OCM Part Numbers *


OCM Part Numbers *

Catalog Cut Sheets **


Recommended Priced
Parts List with OEM/
Dimensional/Outline)

Materials with OEM/


Complete Equipment
Certified Data Sheets

Model/Type Number

Kit Breakdown and


Certified Drawings

Name Plate Details

Equipment Serial
(Cross-Sectional/

Complete Bill Of
Certified P&IDs

Equipment Tag
Copy of the PO
Equipment Auxiliary Equipment Remarks

Part Number
Numbers

Numbers
Control Panels, On Load
Spares parts information including catalog cuts for
Transformers, Oil Immersed Tap Changers, Neutral
√ √ √ √ √ √ √ √ √ √ √ all Auxiliary Equipment as well as all related
(Power/Distribution) Grounding Resistors, Motor
Instrumentation items must be provided.
Drives, etc.
Uninterruptible Power
√ √ √ √ √ √ √ √ √ √ √
Supply

Variable Frequency Drive √ √ √ √ √ √ √ √ √ √ √

* Recommended priced spare parts lists and Bill of Materials (BOM) must contain Original Equipment Manufacturer's part numbers (OEM) as well as Original Component Manufacturer's (OCM) part numbers.
These recommended spare parts lists should include all spare parts required for the first two (2) years of operation.
** Catalog cut sheets are manufacturer's literatures containing ordering information, part number, equipment pictures, sketches, exploded views, specifications, and descriptive information.

General Remarks:
Provide separate spare parts information for each main equipment and auxiliary equipment. Unit price must be provided for any equipment or component the manufacturer is not recommending spare parts for.

Saudi Aramco: Company General Use Page 12 of 13


Attachment to Appendix D - Exhibit "S"

AFFIX YOUR COMPANY LOGO HERE REQUIRED FORMAT


EQUIPMENT PRICED SPARE PARTS LIST

(This form is required for each separate type /model /size of equipment) Saudi Aramco SA7970
DESCRIPTION OF PARENT EQUIPMENT ORIGINAL EQUIPMENT MANUFACTURER (OEM) REFERENCE INFORMATION
SAUDI ARAMCO
EQUIPMENT NAME: OEM NAME: OEM REF #:
MODEL: TYPE: ADDRESS:
PART#: SERIAL #: B.I. #:
DRAWING #: TAG #: CONTACT NAME:
SAUDI ARAMCO / CONTRACTOR P.O. #: E-MAIL: J.O. #:
TELEPHONE:
P.O. ITEM #: P.O. QTY: FACSIMILE:
DWG SPARE PART COMPLETE DESCRIPTION OEM PART NO. OCM NAME OCM PART NO. QTY USED UNIT STOCK? REPAIR?
ITEM# *(1) *(2) *(3) *(2) PER EQPT. PRICE*(4) *(5) *(6)

*Notes: (1) Provide complete generic description and include material designation & size. If the item is a "Kit" , a "Set", or an "Assembly", CERTIFIED TRUE & CORRECT:
'list its contents and associated part numbers.
(2) This part number/identification number must be "unique" to facilitate interchangeability. (Submit OCM part no. supporting document or catalog).
(3) OCM = Original Component Manufacturer.
(4) Unit price shall be entered in US$ dollar value.
(5) Is it necessary for Saudi Aramco to stock this item?. If so, indicate the recommended quantity. Name & Signature / Affix company stamp
(6) Is this item repairable?. Indicate with "Y" for yes, or "N" for no.