PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAWING DRAFTING SCHED. PROGRESS
END OF LAST PERIOD
DESIGN ENG. J.O. No. 3000850614
CONTROL EGEC January 6, 2022 START COMPLETE 381 BI-23-10028
TO END OF THIS PERIOD
01/06/22 01/06/22
I. GENERAL
INDEX "A"
HD‐274736 1-23 00 Drawing Control List
HE‐274737 1-86 00 Design Basis Report
HE‐274738 1-586 00 Construction Specifications
HE‐274739 1-24 00 Civil Calculations
HE‐274740 1-386 00 Electrical Calculations
HE‐274741 1-883 00 HVAC Calculations, Boys Elementary School
HE‐274962 1-1176 00 HVAC Calculations, Boys Intermediate & Secondary School
HE‐274963 1-877 00 HVAC Calculations, Girls Elementary School
HE‐274964 1-1187 00 HVAC Calculations, Girls Intermediate & Secondary School
HE‐274954 1-1365 00 HVAC Calculations, early childhood School
HE‐274880 1-32 00 Plumbing Systems Equipment Calculations
HE‐274881 1-5 00 Firefighting Systems Hydrolic Calculation
HE‐274742 1-65 00 Scope of Work
HE‐274743 1-15 00 Schedule Level III
HE‐274744 001 00 ER Estimate
HE‐274745 1-12 00 Site Visit Report (For Boys & Girls Complex)
HE‐274746 1-212 00 Geotechnical Investigation Report
HE‐274747 1-4 00 MSAER List
HE‐274748 001 00 Energy Optimization Study
HE‐274749 001 00 Contracting Strategy
HE‐274750 001 00 Operational Readiness Plan (ORP)
HE‐274751 001 00 Project Charter
HE‐274752 001 00 Target Setting
HE‐274753 001 00 Business Case Assessment
HE‐274754 1-12 00 Boys & Girls School Complex - Occupant Load
HE‐274755 001 00 Project Execution Plan
HE‐274756 1-25 00 Project Interface Plan
HE‐274757 1-8 00 Stakeholder Management Plan
HE‐274758 001 00 Proposed Integrated Staffing Assignment
HE‐274759 001 00 VIP Outcome Implementation Report
HA‐274760 001 00 Location & Vicinity Map
Structural Calculations for Shaded Playground, Basketball and
HE‐274810 1-74 00
Courtyard
HE‐275033 1-6 00 Design of Pavement Structures Calculation Report
HE‐275248 1-320 00 Structural Calculations for Early Childhood School
HE‐275249 1-227 00 Structural Calculations for Elementry Schools
HE‐275250 1-337 00 Structural Calculations for Intermediate and Secondary Schools
HA‐275251 1-93 00 Structural Calculations for Utility and Guard Room Buildings
HE‐274836 1-10 00 Plot Plan Boys & Girls School Complex
II. SITE
INDEX "B"
HA‐274761 001 00 Boys Schools - Master Site Routing and Duct Bank Layout
HA‐274762 001 00 Girls Schools - Master Site Routing and Duct Bank Layout
INDEX "S"
HA‐274814 001 00 Topographic Survey - Boys Site Complex
HA‐274814 002 00 Topographic Survey - Girls Site Complex
HA‐274815 001 00 Demolition Plan - Boys Site Complex
HA‐274815 002 00 Demolition Plan - Girls Site Complex
HA‐274816 001 00 Site Layout & Dimension Plan - Boys Site Complex
HA‐274816 002 00 Site Layout & Dimension Plan - Girls Site Complex
Site Layout & Dimension Setting Out Coordinates - Boys Site
HA‐274816 003 00 Complex
Site Layout & Dimension Setting Out Coordinates - Girls Site
HA‐274816 004 00 Complex
HA‐274817 001 00 Road Site Layout & Dimension Plan - Boys Site Complex
HA‐274817 002 00 Road Site Layout & Dimension Plan - Girls Site Complex
1) List drawings by index in numerical order. DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
NOTES:
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above.
100% Detail Design Engineering for BI-23-10028
PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP DSC 381 A HD-274736 1 OF 23 00
DAMMAM SAUDI ARABIA
DRAFTING OFFICE PERIOD ENDING PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAWING DRAFTING SCHED. PROGRESS
END
TO END
OF LAST
OF THIS
PERIOD
PERIOD
DESIGN ENG. J.O. No. 3000850614
CONTROL EGEC January 6, 2022 START COMPLETE
TO END OF THIS PERIOD 381 BI-23-10028
01/06/22 01/06/22
1) List drawings by index in numerical order. DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
NOTES:
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above.
100% Detail Design Engineering for BI-23-10028
PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP
DSC 381 A HD-274736 2 OF 23 00
DAMMAM SAUDI ARABIA
DRAFTING OFFICE PERIOD ENDING PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAFTING SCHED.
DRAWING PROGRESS
TO END
END OF THIS
OF LAST PERIOD
PERIOD
DESIGN ENG.
CONTROL EGEC January 6, 2022 START COMPLETE
TO END OF THIS PERIOD
381 BI-23-10028 J.O. No. 3000850614
01/06/22 01/06/22
III. BUILDINGS
BOY'S SCHOOL COMPLEX
INDEX "K"
HA‐275195 001 00 HVAC General Notes & Legends
HA‐275196 001 00 HVAC Layout - Ground Floor - Boys Elementary (Gr 4,5,6)
HA‐275197 001 00 HVAC Duct Layout - Roof - Boys Elem. (Gr 4,5,6)
1) List drawings by index in numerical order. DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
NOTES:
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above.
100% Detail Design Engineering for BI-23-10028
PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP DSC 381 A HD-274736 3 OF 23 00
DAMMAM SAUDI ARABIA
DRAFTING OFFICE PERIOD ENDING PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAWING DRAFTING SCHED. PROGRESS
END
TO END
OF LAST
OF THIS
PERIOD
PERIOD
DESIGN ENG.
CONTROL EGEC January 6, 2022 START COMPLETE
TO END OF THIS PERIOD 381 BI-23-10028 J.O. No. 3000850614
01/06/22 01/06/22
HA‐275198 001 00 HVAC Layout - Ground Floor - Boys Intermediate & Secondary
HA‐275198 002 00 HVAC Layout - First Floor - Boys Intermediate & Secondary
HA‐275199 001 00 HVAC Duct Layout - Roof - Boys Intermediate & Secondary
HA‐275200 001 00 Chilled Water Piping Layout - Ground - Boys Elem. (Gr 4,5,6)
HA‐275200 002 00 Chilled Water Piping Layout - Roof - Boys Elem. (Gr 4,5,6)
HA‐275201 001 00 Chilled Water Piping Layout - Ground - Boys Intermediate & Secondary
HA‐275201 002 00 Chilled Water Piping Layout - Roof - Boys Intermediate & Secondary
HA‐275202 001 00 HVAC Zoning - Boys Elem. (Gr 4,5,6)
HA‐275203 001 00 HVAC Zoning - Ground Floor - Boys Intermediate & Secondary
HA‐275203 002 00 HVAC Zoning - First Floor - Boys Intermediate & Secondary
HA‐275203 003 00 Composite Building Section - Boys Intermediate & Secondary
HA‐275204 001 00 HVAC Equipment Schedule-1 - Boys Elem. (Gr 4,5,6)
HA‐275204 002 00 HVAC Equipment Schedule-2 - Boys Elem. (Gr 4,5,6)
HA‐275205 001 00 HVAC Equipment Schedule-1 - Boys Intermediate & Secondary
HA‐275205 002 00 HVAC Equipment Schedule 2 - Boys Intermediate & Secondary
HA‐275206 001 00 Chilled Water Flow Diagram-1 - Boys Elem. (Gr 4,5,6)
HA‐275206 002 00 Chilled Water Flow Diagram-2 - Boys Elem. (Gr 4,5,6)
HA‐275207 001 00 Chilled Water Flow Diagram-1 - Boys Intermediate & Secondary
HA‐275207 002 00 Chilled Water Flow Diagram-2 - Boys Intermediate & Secondary
HA‐275208 001 00 HVAC Airflow & Control Diagram -1 Boys Elem. (Gr 4,5,6)
HA‐275208 002 00 HVAC Airflow & Control Diagram 2 - Boys Elem. (Gr 4,5,6)
HA‐275208 003 00 HVAC Airflow & Control Diagram 3 - Boys Elem. (Gr 4,5,6)
HA‐275208 004 00 HVAC Airflow & Control Diagram 4 - Boys Elem. (Gr 4,5,6)
HA‐275209 001 00 HVAC Airflow & Control Diagram 1 - Boys Intermediate & Secondary
HA‐275209 002 00 HVAC Airflow & Control Diagram 2 - Boys Intermediate & Secondary
HA‐275209 003 00 HVAC Airflow & Control Diagram 3 - Boys Intermediate & Secondary
HA‐275209 004 00 HVAC Airflow & Control Diagram 4 - Boys Intermediate & Secondary
HA‐275209 005 00 HVAC Airflow & Control Diagram 5 - Boys Intermediate & Secondary
HA‐275209 006 00 HVAC Airflow & Control Diagram 6 - Boys Intermediate & Secondary
HA‐275210 001 00 Chilled Water Plant Layout - Boys Elem. (Gr 4,5,6)
HA‐275211 001 00 Chilled Water Plant Layout - Boys Intermediate & Secondary
HA‐275212 001 00 HVAC Standard Details-1
HA‐275212 002 00 HVAC Standard Details-2
HA‐275212 003 00 HVAC Standard Details-3
HA‐275212 004 00 HVAC Standard Details-4
INDEX "P"
HA‐274894 001 00 Electrical single line Diagram - Boys Elem. (Gr 4,5,6)
HA‐274894 002 00 Electrical single line Diagram-2 - Boys Elem. (Gr 4,5,6)
HA‐274895 001 00 Lighting Layout - Boys Elem. (Gr 4,5,6)
HA‐274896 001 00 Main Power Layout - Boys Elem. (Gr. 4,5,6)
HA‐274897 001 00 Receptacle Power Layout - Boys Elementary (Gr 4,5,6)
HA‐274898 001 00 Roof Power Layout - Boys Elementary (Gr 4,5,6)
HA‐274899 001 00 Grounding Layout - Boys Elementary (Gr 4,5,6)
HA‐274900 001 00 Roof Lightning Protection Layout - Boys Elem
HA‐274901 001 00 Panel Boards load schedule-1- Boys Elem. (Gr 4,5,6)
HA‐274901 002 00 Panel Boards load schedule-2- Boys Elem. (Gr 4,5,6)
HA‐274901 003 00 Panel Boards load schedule-3- Boys Elem. (Gr 4,5,6)
HA‐274901 004 00 Panel Boards load schedule-4- Boys Elem. (Gr 4,5,6)
HA‐274901 005 00 Panel Boards load schedule-5- Boys Elem. (Gr 4,5,6)
HA‐274901 006 00 Panel Boards load schedule-6- Boys Elem. (Gr 4,5,6)
HA‐274902 001 00 Cables and conduit Schedules - Boys Elem. (Gr 4,5,6)
1) List drawings by index in numerical order. DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
NOTES:
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above.
100% Detail Design Engineering for BI-23-10028
PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP
DSC 381 A HD-274736 4 OF 23 00
DAMMAM SAUDI ARABIA
DRAFTING OFFICE PERIOD ENDING PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAWING DRAFTING SCHED. PROGRESS
TO END
END OF THIS
OF LAST PERIOD
PERIOD
DESIGN ENG.
CONTROL EGEC January 6, 2022 START COMPLETE 381 BI-23-10028 J.O. No. 3000850614
01/06/22 01/06/22 TO END OF THIS PERIOD
1) List drawings by index in numerical order. DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
NOTES:
100% Detail Design Engineering for BI-23-10028
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above. PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP
DSC 381 A HD-274736 6 OF 23 00
DAMMAM SAUDI ARABIA
DRAFTING OFFICE PERIOD ENDING PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAWING DRAFTING SCHED. PROGRESS
TO
ENDEND
OF OF
LAST
THIS
PERIOD
PERIOD
DESIGN ENG. J.O. No. 3000850614
CONTROL EGEC January 6, 2022 START COMPLETE
TO END OF THIS PERIOD 381 BI-23-10028
01/06/22 01/06/22
INDEX "T"
HA‐274965 001 00 Telecommunication Miscellaneous Details-01
HA‐274965 002 00 Telecommunication Miscellaneous Details-02
HA‐274965 003 00 Telecommunication Miscellaneous Details-03
HA‐274966 001 00 Cameras Plan - CCTV system - GF - Boys Elem. (Gr 4,5,6)
HA‐274966 002 00 Cameras Field of View - CCTV system - GF - Boys Elem. (Gr 4,5,6)
Cableway Plan -Digital Clock & Bell & Signage & AV system - GF - Boys Elem.
HA‐274967 001 00
(Gr 4,5,6)
1) List drawings by index in numerical order. DRAWING CONTROL FOR
NOTES: DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
100% Detail Design Engineering for BI-23-10028
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above. PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP DSC 381 A HD-274736 8 OF 23 00
DAMMAM SAUDI ARABIA
DRAFTING OFFICE PERIOD ENDING PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAFTING SCHED.
DRAWING PROGRESS
END
TO END
OF LAST
OF THIS
PERIOD
PERIOD
DESIGN ENG.
CONTROL EGEC January 6, 2022 START COMPLETE
TO END OF THIS PERIOD 381 BI-23-10028 J.O. No. 3000850614
01/06/22 01/06/22
HA‐274968 001 00 Cableway Plan - LAN AND Analog System - GF - Boys Elem. (Gr 4,5,6)
HA‐274969 001 00 Cableway Plan - BMS System - GF -Boys Elem. (Gr 4,5,6)
HA‐274970 001 00 Cableway Plan - BMS System - RF - Boys Elem. (Gr 4,5,6)
HA‐274971 001 00 Cableway Plan - BMS System - Utility GF- Boys Elem. (Gr 4,5,6)
HA‐274977 003 00 Cableway Plan - BMS System - RF- Boys Inter. & Sec.
HA‐274978 001 00 Cableway Plan - BMS System - UTILITY GF- Boys Inter. & Sec.
HA‐274979 001 00 BMS Single Line Diagram - Boys Inter. & Sec.
HA‐274980 001 00 BMS-Input Output List - Boys Inter. & Sec.
HA‐274980 002 00 BMS-Input Output List - Boys Inter. & Sec.
HA‐274980 003 00 BMS-Input Output List - Boys Inter. & Sec.
HA‐274981 001 00 CCTV System Single Line Diagram - Boys Elem. (Gr 4,5,6)
HA‐274982 001 00 CCTV System Single Line Diagram - Boys Inter. & Sec.
HA‐274982 002 00 CCTV System Single Line Diagram - Boys Inter. & Sec.
HA‐274983 001 00 Digital Clock & Bell & Signage System Single Line Diagram - Boys Elem.
HA‐274984 001 00 Digital Clock & Bell & Signage System Single Line Diagram - Boys Inter. &
HA‐274984 002 00 Digital Clock & Bell & Signage System Single Line Diagram - Boys Inter. &
HA‐274985 001 00 LAN & Analog System Single Line Diagram - Boys Elem. (Gr 4,5,6)
HA‐274986 001 00 LAN & Analog System Single Line Diagram - Boys Inter. & Sec.
HA‐274986 002 00 LAN & Analog System Single Line Diagram - Boys Inter. & Sec.
HA‐274987 001 00 Smartboard System Single Line Diagram - Boys Elem. (Gr 4,5,6)
HA‐274988 001 00 Smartboard System Single Line Diagram - Boys Inter. & Sec.
HA‐274988 002 00 Smartboard System Single Line Diagram - Boys Inter. & Sec.
HA‐274989 001 00 A/V System Single Line Diagram - Boys Elem. (Gr 4,5,6)
HA‐274990 001 00 A/V System Single Line Diagram - Boys Inter. & Sec.
INDEX "B"
HA‐274763 001 00 Fire Protection General Notes & Legends
HA‐274763 002 00 Fire Protection General Details 01
HA‐274763 003 00 Fire Protection General Details 02
HA‐274763 004 00 Fire Alarm General Details 01
HA‐274763 005 00 Fire Alarm General Details 02
HA‐274764 001 00 Fire Protection Layout - Ground Floor - Boys Elem. (Gr 4,5,6)
HA‐274765 001 00 Fire Protection Layout - Ground Floor - Boys Inter. & Sec.
HA‐274765 002 00 Fire Protection Layout - First Floor - Boys Int. & Sec.
HA‐274766 001 00 Fire Alarm Layout - GF - Boys Elem. (Gr 4,5,6)
HA‐274766 002 00 Fire Alarm Layout - Roof Floor - Boys Elem. (Gr 4,5,6)
HA‐274767 001 00 Fire Alarm System Single Line Diagram - Boys Elem. (Gr 4,5,6)
HA‐274767 002 00 Sound System Single Line Diagram - Boys Elem. (Gr 4,5,6)
HA‐274767 003 00 Fire Alarm Cause And Effect Matrix - Boys Elem. (Gr 4,5,6)
HA‐274768 001 00 Fire Alarm Layout - GF - Boys Inter.& Sec.
HA‐274768 002 00 Fire Alarm Layout - 1F - Boys Inter. & Sec.
HA‐274768 003 00 Fire Alarm Layout - Roof Floor - Boys Inter. & Sec.
HA‐274769 001 00 Fire Alarm System Single Line Diagram - Boys Inter.& Sec.
HA‐274769 002 00 Fire Alarm Cause And Effect Matrix - Boys Inter.& Sec.
HA‐274770 001 00 Sound System Single Line Diagram - Boys Inter.& Sec.
HA‐274771 001 00 Fire Protection Flow Diagram Boys Elem. (Gr 4,5,6)
HA‐274771 002 00 Water Supply Flow Diagram Boys Elem. (Gr 4,5,6)
HA‐274772 001 00 Fire Protection Flow Diagram Boys Int. & Sec.
HA‐274772 002 00 Water Supply Flow Diagram Boys Int. & Sec.
HA‐274773 001 00 Fire/Raw Water Pump/Tanks Piping Layout - Boys Elem. (Gr. 4,5,6)
HA‐274774 001 00 Fire Alarm Layout -UTILITY Ground FLOOR- Boys Elem. (Gr. 4,5,6)
HA‐274775 001 00 Fire/Raw Water Pump/Tanks Piping Layout - Boys Inter. & Sec.
HA‐274775 002 00 Fire Alarm Layout -UTILITY Ground FLOOR - Boys Inter. & Sec.
HA‐274777 001 00 Fire/Raw Water Pump - Boys Elem. (Gr. 4,5,6)
HA‐274778 001 00 Fire/Raw Water Pump - Boys Inter. & Sec.
INDEX "M/Q"
HA‐275252 001 00 General Notes - Boys School Complex
HA‐275253 001 00 General Details - Boys School Complex
HA‐275253 002 00 General Details - Boys School Complex
1) List drawings by index in numerical order. DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
NOTES:
100% Detail Design Engineering for BI-23-10028
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above. PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP DSC 381 A HD-274736 9 OF 23 00
DAMMAM SAUDI ARABIA
DRAFTING OFFICE PERIOD ENDING PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAFTING SCHED.
DRAWING PROGRESS
TO
ENDEND
OF OF THIS
LAST PERIOD
PERIOD
DESIGN ENG. J.O. No. 3000850614
CONTROL EGEC January 6, 2022 START COMPLETE 381 BI-23-10028
TO END OF THIS PERIOD
01/06/22 01/06/22
INDEX "Q"
HA‐275255 002 00 Foundation Plan - Boys Elementary
HA‐275256 002 00 Foundation Plan - Boys Intermediate & Secondary
HA‐275259 001 00 Schedules - Boys Elementary
HA‐275261 001 00 Schedules - Boys Intermediate & Secondary
HA‐275264 001 00 Foundation Plan-Utlity BLDS-Boys INT.& SEC.
HA‐275266 002 00 Sections and Details-Utlity BLDS-Early Childhood
INDEX "M"
HA‐275255 001 00 Columns And Axes Layout - Boys Elementary
HA‐275256 001 00 Columns And Axes Layout - Boys Intermediate & Secondary
HA‐275257 001 00 Grade Plan - Boys Elementary
HA‐275258 001 00 Grade Plan - Boys Intermediate & Secondary
HA‐275260 001 00 Base Plate Details - Boys Elementary
HA‐275262 001 00 Base Plate Details - Boys Intermediate & Secondary
HA‐275263 002 00 Sections nad Details-Boys Elementary-Utlity BLDS
HA‐275265 001 00 Grade Plan-Utlity BLDS-Boys INT.& SEC.
HA‐275282 001 00 Roof Framing Plan (Lower Roof) - Boys Elementary
HA‐275283 001 00 Framing Plan (First Floor) - Boys Intermediate & Secondary
HA‐275283 002 00 Roof Framing Plan (Lower Roof) - Boys Intermediate & Secondary
HA‐275283 003 00 Roof Framing Plan (Lower Roof-Lower Chord) - Boys Intermediate & Secondary
HA‐275284 001 00 Roof Framing Plan (Upper Roof) - Boys Elementary
HA‐275284 002 00 Roof Framing Plan (Upper Roof - Lower Chord) - Boys Elementary
HA‐275285 001 00 Roof Framing Plan (Upper Roof) - Boys Intermediate & Secondary
HA‐275286 001 00 Sections And Details - Boys Elementary
HA‐275287 001 00 Sections And Details - Boys Intermediate & Secondary
HA‐275263 001 00 Structural Plans-Boys Elementary-Utlity BLDS
HA‐275288 001 00 Roof Framing Plan-Utlity BLDS-Boys INT.& SEC.
INDEX "P"
HA‐274914 001 00 Electrical single line Diagram - Girls Elementary
HA‐274914 002 00 Electrical single line Diagram-2 - Girls Elementary
HA‐274915 001 00 Lighting Layout - Girls Elementary
HA‐274916 001 00 Main Power Layout - Girls Elementary
HA‐274917 001 00 Receptacle Power Layout - Girls Elementary
HA‐274918 001 00 Roof Power Layout - Girls Elementary
HA‐274919 001 00 Grounding Layout - Girls Elementary
HA‐274920 001 00 Roof Lightning Protection Layout - Girls Elementary
HA‐274921 001 00 Panel Boards load schedule-1-Girls Elementary
HA‐274921 002 00 Panel Boards load schedule-2- Girls Elementary
HA‐274921 003 00 Panel Boards load schedule-3-Girls Elementary
HA‐274921 004 00 Panel Boards load schedule-4- Girls Elementary
HA‐274921 005 00 Panel Boards load schedule-5-Girls Elementary
HA‐274921 006 00 Panel Boards load schedule-6- Girls Elementary
HA‐274922 001 00 Cables and conduit Schedules -Girls Elementary
HA‐274923 001 00 Lighting control schematic -Girls Elementary
HA‐274924 001 00 Electrical single line Diagram - GF - Girls Inter. & Sec.
HA‐274924 002 00 Electrical single line Diagram - 2 - Girls Inter. & Sec.
HA‐274924 003 00 Electrical single line Diagram - 3 - Girls Inter. & Sec.
HA‐274925 001 00 Lighting Layout - GF - Girls Inter. & Sec.
HA‐274925 002 00 Lighting Layout - 1F - Girls Inter. & Sec.
HA‐274926 001 00 Main Power Layout - GF - Girls Inter. & Sec.
HA‐274926 002 00 Main Power Layout - 1F - Girls Inter. & Sec.
HA‐274927 001 00 Receptacle Power Layout - GF - Girls Inter. & Sec.
HA‐274927 002 00 Receptacle Power Layout - 1F - Girls Inter. & Sec.
HA‐274928 001 00 Roof Power Layout - Girls Intermediate & Secondary
HA‐274929 001 00 Grounding Layout - GF - Girls Inter. & Sec.
HA‐274930 001 00 Roof Lightning Protection Layout - GF - Girls Inter. & Sec.
HA‐274931 001 00 Roof Lightning Protection Layout - GF - Girls Inter. & Sec.
HA‐274931 002 00 Panel boards load schedule-2- Girls Inter. & Sec.
HA‐274931 003 00 Panel boards load schedule-3- Girls Inter. & Sec.
HA‐274931 004 00 Panel boards load schedule-4- Girls Inter. & Sec.
HA‐274931 005 00 Panel boards load schedule-5- Girls Inter. & Sec.
HA‐274931 006 00 Panel boards load schedule-6- Girls Inter. & Sec.
HA‐274931 007 00 Panel boards load schedule-7- Girls Inter. & Sec.
HA‐274931 008 00 Panel boards load schedule-8- Girls Inter. & Sec.
HA‐274931 009 00 Panel boards load schedule-9- Girls Inter. & Sec.
HA‐274931 010 00 Panel boards load schedule-10- Girls Inter. & Sec.
HA‐274931 011 00 Panel boards load schedule-11- Girls Inter. & Sec.
1) List drawings by index in numerical order. DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
NOTES:
100% Detail Design Engineering for BI-23-10028
A
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above. PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP DSC 381 HD-274736 11 OF 23 00
DAMMAM SAUDI ARABIA
DRAFTING OFFICE PERIOD ENDING PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAFTING SCHED.
DRAWING PROGRESS
TO END
END OF THIS
OF LAST PERIOD
PERIOD
EGEC January 6, 2022 START COMPLETE DESIGN ENG. 381 BI-23-10028 J.O. No. 3000850614
CONTROL 01/06/22 01/06/22
TO END OF THIS PERIOD
HA‐274932 001 00 Cables and conduit Schedules- Girls Inter. & Sec.
HA‐274933 001 00 Lighting control Schematic - Girls Inter. & Sec.
INDEX "R"
GIRL'S SCHOOL - ELEMENTARY (Gr. 4,5,6)
HA-275092 001 00 Life Safety General Notes
HA-275092 002 00 Ground Floor Fire Plan / E.E.C
HA-275092 003 00 Ground Floor Fire Safety Plan
HA-275092 004 00 Ground Floor Evacuation Plan
HA-275093 001 00 Ground Floor Plan
HA-275094 001 00 Ground Floor Reflected Ceiling Plan
HA-275095 001 00 Roof Plan
HA-275096 001 00 Building Elevations
HA-275097 001 00 Building Sections
HA-275098 001 00 Finishing Schedule
HA-275099 001 00 Doors Schedule
HA-275100 001 00 Windows Schedule
HA-275101 001 00 Precast Details
HA-275101 002 00 Gypsum board Details
HA-275101 003 00 Gypsum board Details
HA-275101 004 00 Wet Area Details
HA-275101 005 00 Wet Area Details
HA-275101 006 00 Skylight & Canopy Details
HA-275101 007 00 Roof Details
HA-275101 008 00 Roof Details
HA-275101 009 00 Curtain Wall Details
HA-275101 010 00 stairs & ramps Details
HA-275101 011 00 Door Details
HA-275101 012 00 Doors Details (2)
HA-275101 013 00 Doors Details (3)
HA-275101 014 00 Fire Stop Details
HA-275101 015 00 Finish Flooring Details
HA-275101 016 00 Ceiling Details
HA-275101 017 00 Aluminum Sun Screen & GRC. Details
HA-275102 001 00 Ground Floor Furniture Plan
HA-275102 002 00 Furniture Schedule
HA-275103 001 00 Wall Sections
HA-275104 001 00 Ground Floor Flooring Plan
HA-275035 001 00 Stairs Details
HA-275105 001 00 Ground Floor Signage Plan
HA-275105 002 00 Signage Schedule
HA-275105 003 00 Signage Detailes
HA-275105 004 00 Signage Detailes
HA-275106 001 00 Wet Areas Details - Sheet 1
HA-275106 002 00 Wet Areas Details - Sheet 2
HA-275106 003 00 Wet Areas Details - Sheet 3
HA-275106 004 00 Wet Areas Details - Sheet 4
HA-275106 005 00 Wet Areas Details - Sheet 5
HA-275106 006 00 Wet Areas Details - Sheet 6
HA-275107 001 00 Enlarged Plan and Internal Elevations - Indoor Gym - Sheet 1
HA-275107 002 00 Enlarged Plan and Internal Elevations - Indoor Gym - Sheet 2
HA-275107 003 00 Enlarged Plan and Internal Elevations - Indoor Gym - Sheet 3
HA-275107 004 00 Enlarged Plan and Internal Elevations - Indoor Gym - Sheet 4
HA-275107 005 00 Enlarged Plan and Internal Elevations - Indoor Gym - Sheet 5
HA-275107 006 00 Enlarged Plan and Internal Elevations - Indoor Gym - Sheet 6
HA-275108 001 00 Enlarged Plan and Internal Elevations - Classroom - Sheet 1
1) List drawings by index in numerical order. DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
NOTES:
100% Detail Design Engineering for BI-23-10028
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above. PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP DSC 381 A HD-274736 12 OF 23 00
DAMMAM SAUDI ARABIA
DRAFTING OFFICE PERIOD ENDING DRAFTING SCHED. PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAWING PROGRESS
TO END
END OF THIS
OF LAST PERIOD
PERIOD
EGEC January 6, 2022 START COMPLETE DESIGN ENG. 381 BI-23-10028 J.O. No. 3000850614
CONTROL 01/06/22 01/06/22
TO END OF THIS PERIOD
1) List drawings by index in numerical order. DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
NOTES:
100% Detail Design Engineering for BI-23-10028
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above. PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP DSC 381 A HD-274736 13 OF 23 00
DAMMAM SAUDI ARABIA
DRAFTING OFFICE PERIOD ENDING PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAFTING SCHED.
DRAWING PROGRESS
TO END
END OF THIS
OF LAST PERIOD
PERIOD
EGEC January 6, 2022 START COMPLETE DESIGN ENG. 381 BI-23-10028 J.O. No. 3000850614
CONTROL 01/06/22 01/06/22
TO END OF THIS PERIOD
INDEX "S"
HA‐274854 001 00 Plumbing General Notes & Legends
HA‐274854 002 00 Plumbing General Details 01
HA‐274854 003 00 Plumbing General Details 02
HA‐274855 001 00 Water Supply Layout - Ground Floor - Girls Elem.
HA‐274856 001 00 Water Supply Layout - Roof - Girls Elem.
HA‐274857 001 00 Water Supply Layout - Ground Floor - Girls Int. & Sec.
HA‐274857 002 00 Water Supply Layout - First Floor - Girls Int. & Sec.
HA‐274858 001 00 Water Supply Layout - Roof - Girls Int. & Sec.
1) List drawings by index in numerical order. DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
NOTES:
100% Detail Design Engineering for BI-23-10028
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above. PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP DSC 381 A HD-274736 14 OF 23 00
DAMMAM SAUDI ARABIA
DRAFTING OFFICE PERIOD ENDING PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAFTING SCHED.
DRAWING PROGRESS
TO END
END OF THIS
OF LAST PERIOD
PERIOD
EGEC January 6, 2022 START COMPLETE DESIGN ENG. 381 BI-23-10028 J.O. No. 3000850614
CONTROL 01/06/22 01/06/22
TO END OF THIS PERIOD
1) List drawings by index in numerical order. DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
NOTES:
100% Detail Design Engineering for BI-23-10028
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above. PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP DSC 381 A HD-274736 15 OF 23 00
DAMMAM SAUDI ARABIA
DRAFTING OFFICE PERIOD ENDING PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAFTING SCHED.
DRAWING PROGRESS
TO END
END OF THIS
OF LAST PERIOD
PERIOD
EGEC January 6, 2022 START COMPLETE DESIGN ENG. 381 BI-23-10028 J.O. No. 3000850614
CONTROL 01/06/22 01/06/22
TO END OF THIS PERIOD
HA‐275012 002 00 Smartboard System Single Line Diagram - Girls Int. & Sec.
HA‐275013 001 00 A/V System Single Line Diagram - Girls Elementary
HA‐275014 001 00 A/V System Single Line Diagram - Girls Int. & Sec.
INDEX "B"
HA‐274776 001 00 Fire Protection General Notes & Legends
HA‐274776 002 00 Fire Protection General Details 01
HA‐274776 003 00 Fire Protection General Details 02
HA‐274776 004 00 Fire Alarm General Details 01
HA‐274776 005 00 Fire Alarm General Details 02
HA‐274779 001 00 Fire Protection Layout - Ground Floor - Girls Elementary
HA‐274780 001 00 Fire Protection Layout - Ground Floor - Girls Int. & Sec.
HA‐274780 002 00 Fire Protection Layout - First Floor - Girls Int. & Sec.
HA‐274781 001 00 Fire Alarm Layout - GF - Girls Elementary
HA‐274781 002 00 Fire Alarm Layout - Roof Floor - Girls Elem. (Gr. 4,5,6)
HA‐274782 001 00 Fire Alarm System Single Line Diagram - Girls Elem. (Gr. 4,5,6)
HA‐274782 002 00 Fire Alarm Cause And Effect Matrix - Girls Elem. (Gr. 4,5,6)
HA‐274783 001 00 Sound System Single Line Diagram - Girls Elem. (Gr. 4,5,6)
HA‐274784 001 00 Fire Alarm Layout - GF - Girls Int. & Sec.
HA‐274785 001 00 Fire Alarm Layout - 1F - Girls Int. & Sec.
HA‐274786 001 00 Fire Alarm Layout - Roof Floor - Girls Inter. & Sec.
HA‐274787 001 00 Fire Alarm System Single Line Diagram - Girls Inter. & Sec.
HA‐274787 002 00 Fire Alarm Cause And Effect Matrix - Girls Inter. & Sec.
HA‐274788 001 00 Sound System Single Line Diagram - Girls Inter. & Sec.
HA‐274789 001 00 Fire Protection Flow Diagram - Girls Elem. (Gr. 4,5,6)
HA‐274789 002 00 Water Supply Flow Diagram - Girls Elem. (Gr. 4,5,6)
HA‐274790 001 00 Fire Protection Flow Diagram - Girls Inter. & Sec.
HA‐274790 002 00 Water Supply Flow Diagram - Girls Inter. & Sec.
HA‐274791 001 00 Fire/Raw Water Pump/Tanks Piping Layout - Girls Elem. (Gr. 4,5,6)
HA‐274792 001 00 Fire Alarm Layout -Utility Ground Floor - Girls Elem. (Gr. 4,5,6)
HA‐274793 001 00 Fire/Raw Water Pump - Girls Elem. (Gr. 4,5,6)
HA‐274794 001 00 Fire/Raw Water Pump/Tanks Piping Layout - Girls Inter. & Sec.
HA‐274795 001 00 Fire/Raw Water Pump - Girls Inter. & Sec.
HA‐274796 001 00 Fire Alarm Layout -Utility Ground Floor - Girls Inter. & Sec.
INDEX "Q"
HA‐275269 002 00 Foundation Plan - Girls Elementary
HA‐275270 002 00 Foundation Plan - Girls Int. & Sec.
HA‐275273 001 00 Schedules - Girls Elementary
HA‐275274 001 00 Schedules - Girls Int. & Sec.
INDEX "M"
HA‐275269 001 00 Columns And Axes Layout - Girls Elementary
HA‐275270 001 00 Columns And Axes Layout - Girls Int. & Sec.
HA‐275271 001 00 Grade Plan - Girls Elementary
HA‐275272 001 00 Grade Plan - Girls Int. & Sec.
HA‐275273 002 00 Base Plate Details - Girls Elementary
HA‐275274 002 00 Base Plate Details - Girls Int. & Sec.
HA‐275289 001 00 Roof Framing Plan (Lower Roof) - Girls Elementary
HA‐275290 001 00 Framing Plan (First Floor) - Girls Int. & Sec.
HA‐275290 002 00 Roof Framing Plan (Lower Roof) - Girls Int. & Sec.
HA‐275290 003 00 Roof Framing Plan (Lower Roof - Lower Chord) - Girls Int. & Sec.
HA‐275291 001 00 Roof Framing Plan (Upper Roof) - Girls Elementary
1) List drawings by index in numerical order. DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
NOTES:
100% Detail Design Engineering for BI-23-10028
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above. PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP DSC 381 A HD-274736 16 OF 23 00
DAMMAM SAUDI ARABIA
DRAFTING OFFICE PERIOD ENDING PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAFTING SCHED.
DRAWING PROGRESS
TO END
END OF THIS
OF LAST PERIOD
PERIOD
EGEC January 6, 2022 START COMPLETE DESIGN ENG. 381 BI-23-10028 J.O. No. 3000850614
CONTROL 01/06/22 01/06/22
TO END OF THIS PERIOD
HA‐275291 002 00 Roof Framing Plan (Upper Roof - Lower Chord) - Girls Elementary
HA‐275292 001 00 Roof Framing Plan (Upper Roof) - Girls Int. & Sec.
HA‐274811 001 00 Sections And Details - Girls Elementary
HA‐274811 002 00 Sections And Details- Girls Int. & Sec.
INDEX "R"
EARLY CHILDHOOD SCHOOL
(KG 1,2,3; Boys & Girls Elem. 1,2,3 school)
HA-275147 001 00 Life Safety General Notes
HA-275147 002 00 Ground Floor Fire Plan / E.E.C
HA-275147 003 00 First Floor Fire Plan/ E.E.C.
HA-275147 004 00 Ground Floor Fire Safety Plan
HA-275147 005 00 First Floor Fire Safety Plan
HA-275147 006 00 Ground Floor Evacuation Plan
HA-275147 007 00 First Floor Evacuation Plan
HA-275148 001 00 Ground Floor Plan
HA-275148 002 00 First Floor Plan
HA-275149 001 00 Ground Floor Reflected Ceiling Plan
HA-275149 002 00 First Floor Reflected Ceiling Plan
HA-275150 001 00 Roof Plan
HA-275151 001 00 Building Elevations
HA-275152 001 00 Building Sections
HA-275153 001 00 Finishing Schedule
HA-275153 002 00 Finishing Schedule
HA-275154 001 00 Doors Schedule
HA-275154 002 00 Doors Schedule
HA-275155 001 00 Windows Schedule
HA-275156 001 00 Precast Details
HA-275156 002 00 Gypsum board Details
HA-275156 003 00 Gypsum board Details
HA-275156 004 00 Wet Area Details
HA-275156 005 00 Wet Area Details
HA-275156 006 00 Skylight & Canopy Details
HA-275156 007 00 Roof Details
HA-275156 008 00 Roof Details
HA-275156 009 00 Curtain Wall Details
HA-275156 010 00 stairs & ramps Details
HA-275156 011 00 Door Details
HA-275156 012 00 Doors Details (2)
HA-275156 013 00 Doors Details (3)
HA-275156 014 00 Fire Stop Details
HA-275156 015 00 Finish Flooring Details
HA-275156 016 00 Ceiling Details
HA-275156 017 00 Aluminum Sun Screen & GRC. Details
HA-275157 001 00 Ground Floor Furniture Plan
HA-275157 002 00 First Floor Furniture Plan
HA-275157 003 00 Furniture Schedule
HA-275158 001 00 Wall Sections
HA-275159 001 00 Stair Detailes
HA-275159 002 00 Stair Detailes
HA-275159 003 00 Stair Detailes
HA-275159 004 00 Elevator Details
HA-275160 001 00 Ground Floor Flooring Plan
HA-275160 002 00 First Floor Flooring Plan
HA-275161 001 00 Ground Floor Signage Plan
HA-275161 002 00 First Floor Signage Plan
HA-275161 003 00 Signage Schedule
1) List drawings by index in numerical order. DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
NOTES:
100% Detail Design Engineering for BI-23-10028
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above. PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP DSC 381 A HD-274736 18 OF 23 00
DAMMAM SAUDI ARABIA
DRAFTING OFFICE PERIOD ENDING PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAFTING SCHED.
DRAWING PROGRESS
TO END
END OF THIS
OF LAST PERIOD
PERIOD
DESIGN ENG.
CONTROL EGEC January 6, 2022 START COMPLETE
TO END OF THIS PERIOD 381 BI-23-10028 J.O. No. 3000850614
01/06/22 01/06/22
INDEX "S"
HA‐274867 001 00 Plumbing General Notes & Legends - Early Childhood
HA‐274867 002 00 Plumbing General Details 01 - Early Childhood
HA‐274867 003 00 Plumbing General Details 02 - Early Childhood
HA‐274870 001 00 Water Supply Layout - GF - Early Childhood
HA‐274870 002 00 Water Supply Layout - 1F - Early Childhood
HA‐274871 001 00 Water Supply Layout - Roof - Early Childhood
HA‐274872 001 00 Drainage Layout - GF - Early Childhood
HA‐274872 002 00 Drainage Layout - 1F - Early Childhood
HA‐274873 001 00 Drainage Layout - Roof - Early Childhood
HA‐274874 001 00 Enlarged Water Supply & Details 1 - Early Childhood
HA‐274874 002 00 Enlarged Water Supply & Details 2 - Early Childhood
HA‐274875 001 00 Enlarged Drainage & Details 1 - Early Childhood
HA‐274875 002 00 Enlarged Drainage & Details 2 - Early Childhood
INDEX "T"
HA‐275015 001 00 Telecommunication Miscellaneous Details-01
HA‐275015 002 00 Telecommunication Miscellaneous Details-02
HA‐275015 003 00 Telecommunication Miscellaneous Details-03
HA‐275016 001 00 Cameras Plan - CCTV system - GF - Early Childhood
HA‐275016 002 00 Cameras Plan - CCTV system -1F - Early Childhood
HA‐275016 003 00 Cameras Field of View - CCTV system - GF - Early Childhood
HA‐275016 004 00 Cameras Field of View - CCTV system - 1F - Early Childhood
HA‐275017 001 00 Cableway Plan - Digital Clock & Bell & Signage & AV system - GF - Early Childhood
HA‐275017 002 00 Cableway Plan - Digital Clock & Bell & Signage & AV system -1F - Early Childhood
1) List drawings by index in numerical order. DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
NOTES:
100% Detail Design Engineering for BI-23-10028
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above. PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP DSC 381 A HD-274736 19 OF 23 00
DAMMAM SAUDI ARABIA
DRAFTING OFFICE PERIOD ENDING PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAWING DRAFTING SCHED. PROGRESS
END
TO END
OF LAST
OF THIS
PERIOD
PERIOD
EGEC January 6, 2022 START COMPLETE DESIGN ENG. 381 BI-23-10028 J.O. No. 3000850614
CONTROL 01/06/22 01/06/22
TO END OF THIS PERIOD
HA‐275018 001 00 Cableway Plan - LAN & Analog System - GF - Early Childhood
HA‐275018 002 00 Cableway Plan - LAN & Analog System -1F -Early Childhood
HA‐275019 001 00 Cableway Plan -BMS System - GF - Early Childhood
HA‐275019 002 00 Cableway Plan - Bms System -1F - Early Childhood
HA‐275019 003 00 Cableway Plan -Bms System - RF - Early Childhood
HA‐275019 004 00 Cableway Plan - BMS System - Utility GF- Early Childhood
HA‐275020 001 00 BMS Single Line Diagram - Early Childhood
HA‐275021 001 00 BMS-Input Output List - Early Childhood
HA‐275021 002 00 BMS-Input Output List - Early Childhood
HA‐275021 003 00 BMS-Input Output List - Early Childhood
HA‐275022 001 00 CCTV System Single Line Diagram - Early Childhood
HA‐275022 002 00 CCTV System Single Line Diagram - Early Childhood
Digital Clock & Bell & Signage System Single Line Diagram - Early
HA‐275023 001 00
Childhood
Digital Clock & Bell & Signage System Single Line Diagram - Early
HA‐275023 002 00 Childhood
HA‐275024 001 00 LAN & Analog System Single Line Diagram - Early Childhood
HA‐275024 002 00 LAN & Analog System Single Line Diagram - Early Childhood
HA‐275025 001 00 Smartboard System Single Line Diagram - Early Childhood
HA‐275025 002 00 Smartboard System Single Line Diagram - Early Childhood
HA‐275026 001 00 A/V System Single Line Diagram - Early Childhood
INDEX "B"
HA‐274797 001 00 Fire Protection General Notes & Legends - Early Childhood
HA‐274797 002 00 Fire Protection General Details 01 - Early Childhood
HA‐274797 003 00 Fire Protection General Details 02 - Early Childhood
HA‐274797 004 00 Fire Alarm General Details 01
HA‐274797 005 00 Fire Alarm General Details 02
HA‐274798 001 00 Fire Protection Layout - GF - Early Childhood
HA‐274798 002 00 Fire Protection Layout - 1F - Early Childhood
HA‐274799 001 00 Fire Alarm Layout - GF - Early Childhood
HA‐274799 002 00 Fire Alarm Layout - 1F - Early Childhood
HA‐274799 003 00 Fire Alarm Layout - RF - Early Childhood
HA‐274800 001 00 Fire Alarm System Single Line Diagram - Early Childhood
HA‐274800 002 00 Fire Alarm Cause And Effect Matrix - Early Childhood
HA‐274801 001 00 Sound System Single Line Diagram - Early Childhood
HA‐274802 001 00 Fire Protection Flow Diagram Early Childhood
HA‐274802 002 00 Water Supply Flow Diagram Early Childhood
HA‐274803 001 00 Fire/Raw Water Pump/Tanks Piping Layout - Early Childhood
HA‐274804 001 00 Fire Alarm Layout -Utility Ground Floor - Early Childhood
HA‐274805 001 00 Fire/Raw Water Pump - Early Childhood
INDEX "M/Q"
HA‐275254 001 00 General Notes - Girls School Complex
HA‐275254 002 00 General Details - Girls School Complex
HA‐275254 003 00 General Details - Girls School Complex
INDEX "Q"
HA‐275275 002 00 Foundation Plan - Early Childhood
HA‐275276 002 00 Schedules - Early Childhood
HA‐275267 002 00 Sections and Details-Girls Elementary-Utlity BLDS
HA‐275268 002 00 Sections and DetailS-Girls Intermediate & Secondary-Utlity BLDS
1) List drawings by index in numerical order. DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
NOTES:
100% Detail Design Engineering for BI-23-10028
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above. PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP
DSC 381 A HD-274736 20 OF 23 00
DAMMAM SAUDI ARABIA
DRAFTING OFFICE PERIOD ENDING DRAFTING SCHED. PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAWING PROGRESS
TO END
END OF THIS
OF LAST PERIOD
PERIOD
EGEC January 6, 2022 START COMPLETE DESIGN ENG. 381 BI-23-10028 J.O. No. 3000850614
CONTROL 01/06/22 01/06/22
TO END OF THIS PERIOD
INDEX "M"
HA‐275275 001 00 Columns And Axes - Early Childhood
HA‐275276 001 00 Grade Plan - Early Childhood
HA‐275277 001 00 Base Plate Details - Early Childhood
HA‐275266 001 00 Structural Plans-Utlity BLDS-Early Childhood
HA‐275267 001 00 Structural Plans-Girls Elementary-Utlity BLDS
HA‐275268 001 00 Structural Plans-Girls Intermediate & Secondary-Utlity BLDS
HA‐274812 001 00 Framing Plan (First Floor) - Early Childhood
HA‐274812 002 00 Roof Framing Plan (Lower Roof) - Early Childhood
HA‐274812 003 00 Roof Framing Plan (Lower Roof - Lower Chord) - Early Childhood
HA‐274812 004 00 Roof Framing Plan (Upper Roof) - Early Childhood
HA‐274813 001 00 Sections And Details - Early Childhood
INDEX "R"
GUARD ROOM (5) typical for all schools
HA-275177 001 00 Boys Complex - Plans, Elevation, Section, & Details
HA-275177 002 00 Girls Complex - Plans, Elevation, Section, & Details
INDEX "Q"
HA‐275278 001 00 Guard Room Structural Detailing - Girls Complex
HA‐275278 002 00 Guard Room Structural Detailing - Boys Complex
INDEX "S"
HA‐274876 001 00 Water Supply Layout - Guard Room - Boys Complex
HA‐274877 001 00 Water Supply Layout - Guard Room - Girls Complex
HA‐274878 001 00 Drainage Layout - Guard Room - Boys Complex
HA‐274879 001 00 Drainage Layout - Guard Room - Girls Complex
INDEX "K"
HA‐275241 001 00 HVAC Layout, Section, Schedule - Guard Room - Boys Complex
HA‐275242 001 00 HVAC Layout, Section, Schedule -Guard Room - Girls Complex
HA‐275243 001 00 HVAC Layout, utility building - boys elementary school
HA‐275244 001 00 HVAC Layout, utility building - boys intermediate & secondary school
HA‐275245 001 00 HVAC Layout, utility building - girls elementary school
HA‐275246 001 00 HVAC Layout, utility building - girls intermediate & secondary school
HA‐275247 001 00 HVAC Layout, utility building - early childhood school
INDEX "P"
HA‐274944 001 00 Lighting, Power & Grounding Layout - Guard Room - Boys Complex
HA‐274944 002 00 Panel Schedule - Boys Guard Room
HA‐274945 001 00 Lighting, Power & Grounding Layout - Guard Room - Girls Complex
HA‐274945 002 00 Panel Schedule - Girls Guard Room
INDEX "T"
HA‐275028 001 00 Cableway Plan - Guard - Boys School Complex
HA‐275029 001 00 Cableway Plan - Guard - Girls School Complex
HA‐275030 001 00 Access control System Single Line Diagram - Boys School Complex
HA‐275031 001 00 Access control System Single Line Diagram - Girls School Complex
INDEX "B"
HA‐274806 001 00 Fire Alarm Layout Guard @ Boys School Complex
HA‐274807 001 00 Fire Alarm Layout Guard @ Girls School Complex
HA‐274808 001 00 Fire Protection Layout - Boys School Complex
HA‐274809 001 00 Fire Protection Layout - Girls School Complex
1) List drawings by index in numerical order. DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
NOTES:
100% Detail Design Engineering for BI-23-10028
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above. PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP DSC 381 A HD-274736 21 OF 23 00
DAMMAM SAUDI ARABIA
DRAFTING OFFICE PERIOD ENDING PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAFTING SCHED.
DRAWING PROGRESS
TO END
END OF THIS
OF LAST PERIOD
PERIOD
EGEC January 6, 2022 START COMPLETE DESIGN ENG. 381 BI-23-10028 J.O. No. 3000850614
CONTROL 01/06/22 01/06/22
TO END OF THIS PERIOD
INDEX "R"
SHADED COURTYARD
HA-275178 001 00 Plans
HA-275179 001 00 Elevations, Sections, & Details
INDEX "Q"
HA‐275279 001 00 Foundation Plan & Section Details
INDEX "R"
SHADED BASKETBALL COURT
HA-275180 001 00 Plans
HA-275181 001 00 Elevations, Sections & Details
INDEX "Q"
HA‐275280 001 00 Foundation Plan & Section Details
INDEX "R"
SHADED PLAYGROUND
HA-275182 001 00 Plan - Typical
HA-275182 002 00 Plan - Early Childhood School
HA-275183 001 00 Elevations, Sections & Details
HA-275183 002 00 Elevations, Sections & Details - Early Childhood School
INDEX "Q"
HA‐275281 001 00 Foundation Plan & Section Details
HA‐275281 002 00 Foundation Plan & Section Details
INDEX "R"
BOY'S SCHOOL - ELEMENTARY (Grade 4,5,6)
UTILTY BUILDINGS
HA-275186 001 00 Utility Building details
INDEX "P"
Lighting, Power ,Grounding Layouts and panel schedule - Utility buildings - Boys Elem.
HA‐274946 001 00
(Gr 4,5,6)
HA‐274946 002 00 Electrical Panel board schedule -01- Utility buildings - Boys Elem. (Gr 4,5,6)
HA‐274946 003 00 Electrical Panel board schedule -02- Utility buildings - Boys Elem. (Gr 4,5,6)
INDEX "R"
BOY'S SCHOOL - INTERMEDIATE & SECONDARY
UTILTY BUILDINGS
HA-275187 001 00 Utility Building details
INDEX "P"
Lighting, Power ,Grounding Layouts and panel schedule - Utility buildings - Boys
HA‐274947 001 00
Intermediate & Secondary
HA‐274947 002 00 Electrical Panel board schedule -01 - Utility buildings - Boys Intermediate & Secondary
HA‐274947 003 00 Electrical Panel board schedule -02 - Utility buildings - Boys Intermediate & Secondary
INDEX "R"
GIRL'S SCHOOL - ELEMENTARY (Gr. 4,5,6)
UTILTY BUILDINGS
HA-275188 001 00 Utility Building Details
INDEX "P"
Lighting, Power ,Grounding Layouts and panel schedule - Utility buildings - GIRLS Elem.
HA‐274948 001 00
(Gr. 4,5,6)
HA‐274948 002 00 Electrical Panel board schedule -01 - Utility buildings - GIRLS Elem. (Gr. 4,5,6)
HA‐274948 003 00 Electrical Panel board schedule -02 - Utility buildings - GIRLS Elem. (Gr. 4,5,6)
1) List drawings by index in numerical order. DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
NOTES:
100% Detail Design Engineering for BI-23-10028
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above. PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP DSC 381 A HD-274736 22 OF 23 00
DAMMAM SAUDI ARABIA
DRAFTING OFFICE PERIOD ENDING PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRAFTING SCHED.
DRAWING PROGRESS
TO END
END OF THIS
OF LAST PERIOD
PERIOD
EGEC January 6, 2022 START COMPLETE DESIGN ENG. 381 BI-23-10028 J.O. No. 3000850614
CONTROL 01/06/22 01/06/22
TO END OF THIS PERIOD
INDEX "R"
GIRL'S SCHOOL - INTERMEDIATE & SECONDARY
UTILTY BUILDINGS
HA-275189 001 00 Utility Building details
INDEX "P"
Lighting, Power ,Grounding Layouts and panel schedule - Utility buildings -GIRLs
HA‐274949 001 00
Intermediate & Secondary
Electrical Panel board schedule -01 - Utility buildings -GIRLs Intermediate &
HA‐274949 002 00
Secondary
Electrical Panel board schedule -02 - Utility buildings -GIRLs Intermediate &
HA‐274949 003 00
Secondary
INDEX "R"
EARLY CHILDHOOD SCHOOL
(KG 1,2,3; Boys & Girls Elem. 1,2,3 school)
UTILTY BUILDINGS
HA-275190 001 00 Utility Building details
INDEX "P"
Lighting, Power ,Grounding Layouts and panel schedule - Utility buildings -GIRLs
HA‐274950 001 00
Early Childhood
HA‐274950 002 00 Electrical Panel board schedule -01- Utility buildings -GIRLs Early Childhood
HA‐274950 003 00 Electrical Panel board schedule -02- Utility buildings -GIRLs Early Childhood
1) List drawings by index in numerical order. DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
NOTES:
100% Detail Design Engineering for BI-23-10028
2) *Normally the field ETA of drawings can be obtained by adding 2 to 3 weeks
to the scheduled completion date above. PUBLIC SCHOOLS - EAST DAMMAM II HOME OWNERSHIP DSC 381 A HD-274736 23 OF 23 00
DAMMAM SAUDI ARABIA