Saudi Aramco 2617-ENG (11/2010) 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 ##

DRAFTING OFFICE PERIOD ENDING DRAFTING SCHED. END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING START COMPL TO END OF THIS PERIOD SAPMT

CONTROL JACOBS ZATE 14-Sep-21 12/1/2019 12/30/2020


DRAWING IS CONSIDERED 65% COMPLETE
WHEN READY FOR CHECKING
DESIGN ENG. K04 103-262 10-00844-0001
JZ PM

STARTING COMPLETION TRANSMITTED


DRAWING SHEET REV. PERCENT COMPLETE HOURS REVISION
DRAWING TITLES DATE DATE* TO FIELD REMARKS
NUMBER NO. NO.
SCHED ACTUAL 10 20 30 40 50 60 70 80 90 SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

DA-730754 005 0A2 HVAC DUCT LAYOUT PLAN - CONTROL BUILDING NO. 6001
DA-730754 008 0D2 HVAC EQUIPMENT SCHEDULE - CONTROL BUILDING NO. 6001 - DEMOLITION
DA-730754 008 0A2 HVAC EQUIPMENT SCHEDULE - CONTROL BUILDING NO. 6001
EAST/WEST PIPELINE PUMP STATION #8
DA-730774 005 0D2 HVAC DUCT LAYOUT PLAN - CONTROL BUILDING NO. 6001 - DEMOLITION
DA-730774 005 0A2 HVAC DUCT LAYOUT PLAN - CONTROL BUILDING NO. 6001
DA-730774 008 0D2 HVAC EQUIPMENT SCHEDULE - CONTROL BUILDING NO. 6001 - DEMOLITION
DA-730774 008 0A2 HVAC EQUIPMENT SCHEDULE - CONTROL BUILDING NO. 6001
EAST/WEST PIPELINE PUMP STATION #9
DA-730793 005 0D3 HVAC DUCT LAYOUT PLAN - CONTROL BUILDING NO. 6001 - DEMOLITION
DA-730793 005 0A3 HVAC DUCT LAYOUT PLAN - CONTROL BUILDING NO. 6001
DA-730793 008 0D2 HVAC EQUIPMENT SCHEDULE - CONTROL BUILDING NO. 6001 - DEMOLITION
DA-730793 008 0A2 HVAC EQUIPMENT SCHEDULE - CONTROL BUILDING NO. 6001
EAST/WEST PIPELINE PUMP STATION #11
DA-730794 005 0D2 HVAC DUCT LAYOUT PLAN - CONTROL BUILDING NO. 6001 - DEMOLITION
DA-730794 005 0A2 HVAC DUCT LAYOUT PLAN - CONTROL BUILDING NO. 6001
DA-730794 008 0D2 HVAC EQUIPMENT SCHEDULE - CONTROL BUILDING NO. 6001 - DEMOLITION
DA-730794 008 0A2 HVAC EQUIPMENT SCHEDULE - CONTROL BUILDING NO. 6001

INDEX 'P' - ELECTRICAL


PE-00PBOD 001 A ELECTRICAL BASIS OF DESIGN
PE-00PCAL 001 C ILLUMINATION CALCULATION
EAST/WEST PIPELINE PUMP STATION #1
DA-506308 001 0D3 LIGHTING AND COMMUNICATION - CONTROL BUILDING 6000 - DEMOLITION
DA-703075 005 0A3 120 VAC SERVICE PANEL SCHEDULE - (ACD1) 480V MCC-VE-10-201-01 VAN #1
DA-703077 005 0A3 120 VAC SERVICE PANEL SCHEDULE - (ACD1) 480V MCC-VE-10-201-02 VAN #2
DA-703079 005 0A3 120 VAC SERVICE PANEL SCHEDULE - (ACD1) 480V MCC-VE-10-201-03 VAN #3
DA-703177 001 0A3 POWER AND LIGHTING DISTRIBUTION PANEL SCHEDULE - E-PP-201-F/E-LP-201-F
DA-727194 001 0A2 ELECTRICAL PANEL SCHEDULE
DA-727199 005 0A3 ELECTRICAL POWER PLAN - 4160V SWITCHGEAR BUILDING NO. 4162
PA-00P101 001 C LIGHTING LAYOUT - CONTROL BUILDING NO. 6000
VA-688141 003 0A3 ELECTRICAL POWER PLAN - CONTROL VAN NO. 1, 2, 3
EAST/WEST PIPELINE PUMP STATION #2
DA-703275 005 0A3 120 VAC SERVICE PANEL SCHEDULE - (ACD1) 480V MCC-VE-10-202-01 VAN #1
DA-703277 005 0A3 120 VAC SERVICE PANEL SCHEDULE - (ACD1) 480V MCC-VE-10-202-02 VAN #2
DA-703279 005 0A3 120 VAC SERVICE PANEL SCHEDULE - (ACD1) 480V MCC-VE-10-202-03 VAN #3
DA-727574 001 0A3 ELECTRICAL LOAD SCHEDULE - CONTROL BUILDING #6001
DA-727580 005 0A3 ELECTRICAL POWER PLAN - 480V MCC BUILDING NO. 4804
DA-727581 003 0D3 LIGHTING / RECEPTACLE PLAN - CONTROL BUILDING NO. 6001 - DEMOLITION
PA-00P102 001 C LIGHTING LAYOUT - CONTROL BUILDING NO. 6001

LEGEND: NOTES: REVISION VALIDATION


SAUDI ARABIAN OIL COMPANY
A- GENERAL / CIVIL / PROCESS / PIPING 1) LIST DRAWINGS BY INDEX IN NUMERICAL ORDER. THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
B- FIRE ALARM AND FIRE PROTECTION
D- VESSELS 2) *NORMALLY THE FIELD ETA OF DRAWINGS CAN BE OBTAINED BY REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO: DRAWING TYPE
DRAWING CONTROL SHEET
G- LIQUID HANDLING EQUIPMENT ADDING 2 TO 3 WEEKS TO THE SCHEDULED COMPLETION DATE ABOVE. DSC
H- PAINTS / COATINGS
10-00844-0001-001
J- INSTRUMENTATION
K- HVAC REPLACE HALON SYSTEM EAST/WEST PIPELINE PUMP STATIONS
L- PIPING
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
M- STEEL STRUCTURE OTHER
O- SECURITY (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
P- ELECTRICAL EAST/WEST PIPELINE PUMP STATION #1
ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
Q- CONCRETE STRUCTURE
R- ARCHITECTURE
S- PLUMBING / CIVIL / UTILITY SERVICES / LANDSCAPING
YANBU SAUDI ARABIA
T- COMMUNICATION
REV. NO. DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO. SHEET NO. REV NO.
X- CATHODIC PROTECTION
U- SPECIAL EQUIPMENT C 07/01/2021 ISSUED FOR 100% - PP
Z- PROCESS CONTROL SYSTEMS
JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND K04 A PD-00ADCL 009 C
10-00844-0001 DATED

EKRD/2617-1110.XLS