You are on page 1of 1

A A

PLAN OF CHAMBER COVER SLAB

PLAN

DETAILS OF COVER SLAB

DETAIL-A STEEL & CONCRETE SUPPORT


United Arab Emirates

Directorate of Water Sector


Asset Management Department
Engineering Section
PROJECT
FEWA CONTRACT : 103W/2016

SCHEDULE OF REINFORCEMENT CONSTRUCTION & MAINTENANCE OF WATER


DISTRIBUTION PIPELINE IN
RAK & UAQ EMIRATES.

W.O./ISV/NRV CHAMBER COTRACTOR


BILAD AL SHAM
DN FOOTING WALLS COVER SLAB CONSTRUCTION &DEVALOPMENT .L.L.C
P.O BOX - 11064, RAK. Tel: 07 227 9820 Fax: 07 228 9820
e-mail-bilad@eim.ae

100-300 T12 -200 c/c BOTH WAY T12 -200 c/c BOTH WAY T12- 150 c/c BOTH WAY TITLE TYPICAL DETAILS OF NRV / ISOLATING
TOP & BOTTOM BOTH FACE TOP & BOTTOM VALVE CHAMBER ON HDPE PIPELINE.

SECTION A-A &


STANDARD DETAILS OF REINFORCEMENT
FOR CHAMBERS
400-900 T16- 150 c/c BOTH WAY T12-150 c/c BOTH WAY FOR DN400
T16- 150 c/c BOTH WAY
TOP & BOTTOM BOTH FACE TOP & BOTTOM CAD BY PRAMOD

CHECKED BY SEBASTIAN VARGHESE

DATE 17/10/2018

SCALE DRAWING NO: REV

ALL DIMENSIONS ARE IN MILLIMETER. BILAD/FEWA/103W-C-03 0

You might also like