‫الشركة السعودية للكهرباء‬

Saudi Electricity Company


DRAWING CONTROL SHEET ‫فرع المنطقة الشرقية‬
SEC-ERB-16758 (2002/07) Eastern Region Branch
PROJECT TITLE PROJECT MANAGER / ENGINEER CONTRACT NO. JOB ORDER NO. DRAFTING OFFICE
IMPROVEMENTS OF HVAC SYSTEM FOR
A. A. TURKI CORPORATION
KHALADIYAH 115/34.5kV SUBSTATION YOUSEF G. AL-GHUWAINEM/AHMAD S. AL-MUROHEN 83794/00 2230802
Engineering & Contracting Division
AL-HASA SAUDI ARABIA
INITIAL FURTHER REV.
DRAWING NO. SHEET NO. DRAWING TITLE REMARKS
REV. NO. NO. DATE

INDEX - K
KB-497580 1 of 1 00 LAYOUT OF NEW PACU-1 & 2 & SECTION
KB-497581 1 of 2 00 HVAC MISCELLANEOUS DETAILS & SCHEDULES
2 of 2 00 HVAC MISCELLANEOUS DETAILS & SCHEDULES
KB-497582 1 of 7 00 HVAC CONTROL PANEL AND WIRING DIAGRAM
KB-497582 2 of 7 00 HVAC CONTROL PANEL AND WIRING DIAGRAM
KB-497582 3 of 7 00 HVAC CONTROL PANEL AND WIRING DIAGRAM
KB-497582 4 of 7 00 HVAC CONTROL PANEL AND WIRING DIAGRAM
KB-497582 5 of 7 00 HVAC CONTROL PANEL AND WIRING DIAGRAM
KB-497582 6 of 7 00 HVAC CONTROL PANEL AND WIRING DIAGRAM
KB-497582 7 of 7 00 HVAC CONTROL PANEL AND WIRING DIAGRAM

INDEX - P
KB-497583 1 of 1 00 NEW PACU-1 & 2 POWER LAYOUT
KB-497584 1 of 1 00 ELECTRICAL SCHEMATIC DIAGRAM & DETAILS

INDEX - Q
KB-497585 1 of 1 00 PACU-1 & 2 CONC. PAD & CRASH BARRIER LAYOUT
KB-497586 1 of 1 00 CONC. PAD & CRASH BARRIER DETAIL & SECTION

PROJECT COMPLETION DATE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
AS BUILT A. A. TURKI CORPORATION
BY Engineering & Contracting Division 23RAMADAN1425 (07NOV2004) HA432 X KE-401659 1 OF 1 2
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.