Doc.

No 2485-1-HYA-CUR-001
OVERFLUXING WITHSTAND
Revision No 4
DURATION CURVE Revision Date 28/May/2014
(GTG ASSOCIATED GSU) Page 1 of 2

DISTRIBUTION

CLIENT

HEAD QUARTER

WORK SITE

ENGINEERING

SAMSUNG

OVERFLUXING WITHSTAND PROJECT

DURATION CURVE SYSTEM

PIPING

(GTG ASSOCIATED GSU) MECHANICAL

ELECTRICAL

INSTRUMENT

CIVIL

ARCH & STR

APPROVED WITH COMMENT HVAC / F&F

PROCUREMENT
REVIEWED RESUBMIT
CONSTRUCTION
This approval or review does not relieve the
QA / QC
vendor / subcontractor of his responsibilities
of the contract. HSE

ORIGINAL CHECKED APRD(PRJ) COMMISSION’G

SIGN SITE

DATE GSIM

SAMSUNG ENGINEERING CO., LTD. SEI

4 28/May/2014 For Record B.H.CHEN X.Q.ZHOU A.J.YANG F.ZHAO


3 25/Feb/2014 For Final B.H.CHEN X.Q.ZHOU A.J.YANG F.ZHAO
2 22/Sep/2013 As per Comments B.H.CHEN X.Q.ZHOU A.J.YANG F.ZHAO
1 27/Aug/2013 As per Comments B.H.CHEN X.Q.ZHOU A.J.YANG F.ZHAO
0 26/Jul/2013 For Review B.H.CHEN X.Q.ZHOU A.J.YANG F.ZHAO
Rev. Date Description Prepared Checked Reviewed Approved

Energia San Luis de la Paz, S.A. de C.V


SLP CCGT Power Plant

Department : Project No. : Document No.: Rev. No.


Electrical SP2485 2485-1-HYA-CUR-001 4

This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. and its use is
conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon nor to use the document
for any purpose other than specifically permitted in writing by Samsung Engineering Co., Ltd.
Doc. No 2485-1-HYA-CUR-001
OVERFLUXING WITHSTAND
Revision No 4
DURATION CURVE Revision Date 28/May/2014
(GTG ASSOCIATED GSU) Page 2 of 2

Project: SLP CCGT Power Plant Project (GTG)


Type: Generator Step-up Transformer
Spec: 3ph 60Hz 120/160MVA 230/18kV YNd1 ONAF/OFAF with OLTC on HV

U/f Duration Time Duration Time


Over Flux Multiple ( )
U N /f N (No-load) (Full-load)
1.05 Continuous Continuous
1.10 Continuous 20 min
1.15 30 min 9 min
1.20 5 min 1 min
1.25 1 min 13 sec
1.30 20 sec 12 sec
1.40 10 sec 8 sec
1.45 5 sec 3 sec

Over Flux Curve for 230kV Transformer


OVEREXCITATION IN PERCENT

No Load

Load

TIME DURATION IN MINUTES

FULL-LOAD WORK POINT

NO-LOAD WORK POINT

This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. and its use is
conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon nor to use the document
for any purpose other than specifically permitted in writing by Samsung Engineering Co., Ltd.

You might also like