You are on page 1of 63

Saudi Aramco

PMT OPRNS
ARAMCO SERVICES COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

SRP
YHH
ISSUED FOR CONSTRUCTION

ETHANE DEEP RECOVERY FACILITY PROJECT(EDRF)


DESCRIPTION

Contract No. : 6600038223 (OOK) / 6600038277 (IK)


BI No. : 10-01760

TIE-IN PACKAGE FOR TIP-0128


JO/EWO

10-01760
JAN-2018
DATE
REV.
NO.

00

DISCIPLINE
ENGINEER
YHH
DATE JAN-2018

PROJECT
ENGINEER
HJL
DATE JAN-2018

CERTIFIED

SRP
DATE JAN-2018

CONSTRUCTION
AGENCY

DATE
OPERATIONS

DATE
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISION CERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.

JO / EWO
TIE-IN PACKAGE FOR TIP-0128 DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT NO. REV NO.

ETHANE DEEP RECOVERY FACILITY DOC


R37 L BE-487915
JO NO.
(DCC) NO.

EWO NO.
UTHMANIYAH GAS PLANT 1 OF 2 00
UTHMANIYAH SAUDI ARABIA JO / EWO BI-10-01760
EDSD/2616-0399.doc
Saudi Aramco
PMT OPRNS
ARAMCO SERVICES COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

SRP

TABLE OF CONTENTS
YHH

1. TIE-IN CONFIRMATION SHEET

1.1. TIE-IN FLOW SHEET


ISSUED FOR CONSTRUCTION

2. ENGINEERING DATA & PROJECT DWG


DESCRIPTION

2.1. TIE-IN SUMMARY

2.2. TIE-IN INDEX

2.3. P&ID

2.4. ISOMETRIC DRAWING

2.5. VALVE DATASHEET


2.6. SAFETY INSTRUCTION SHEET
JO/EWO

10-01760

2.7. REFERENCE DRAWING


JAN-2018
DATE

2.7.1. TIE-IN LOCATION PLAN


2.7.2. 3D MODEL SNAPSHOT
REV.
NO.

00

DISCIPLINE 3. SCOPE OF WORK BETWEEN CONTRACTOR AND SAUDI ARAMCO


ENGINEER
YHH 4. TIE-IN CHECK LIST
DATE JAN-2018

PROJECT 5. ATTACHMENTS
ENGINEER
HJL 5.1. JOB SAFETY ANALYSIS (JSA)
DATE JAN-2018

CERTIFIED 5.2. TIE-IN EXECUTION SCHEDULE


SRP 5.3. BLINDING DIAGRAM & ISOLATION LIST
DATE JAN-2018

CONSTRUCTION 5.4. BILL OF MATERIAL


AGENCY

5.5. WPS & WELDERS QUALIFICATION RECORDS


DATE
OPERATIONS 5.6. ULTRASONIC TEST (UT)
5.7. COATING & INSULATION
DATE
CONTROL NUMBER

5.8. TIE-IN EXCEPTION LIST


VERIFICATION
EDSD

5.9. PRESSURE TEST PACKAGE


DATE:

5.10. WAIVER
BY:
REVISION CERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS

5.11. MATERIAL CERTIFICATES


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

5.12. WORK PROCEDURE


THIS INDICATES THAT REV. NO.

JO / EWO
TIE-IN PACKAGE FOR TIP-0128 DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT NO. REV NO.

ETHANE DEEP RECOVERY FACILITY DOC


R37 L BE-487915
JO NO.
(DCC) NO.

EWO NO.
UTHMANIYAH GAS PLANT 2 OF 2 00
UTHMANIYAH SAUDI ARABIA JO / EWO BI-10-01760
EDSD/2616-0399.doc
ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

1. TIE-IN CONFIRMATION SHEET


ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

1.1. TIE-IN FLOW SHEET


Attachment 1 - Tie-In Flow Sheet
TIE- IN FLOW SHEET
BI-10-01760
B.I. / J. O. Number:
Project Description: ETHANE DEEP RECOVERY FACILITIES -EDRF

Contractor: HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD.

TIE - IN NUMBER: TIP-0128


_____________________
LOCATION: R37 TYPE OF TIE-IN: THREAD
Description :

Fluid Condition: Op. Temp: 100 (°F) Op. Pressure: 116 (Psig) Fluid Service: UTILITY WATER

APPROVALS
Design/ Engg. Approval:

Contractor/Date SAPMT/Date PROPONENT/Date Projects Insp/Date

Approval For Construction:

Contractor/Date SAPMT/Date PROPONENT/Date Projects Insp/Date

Inspection & Testing : (Completion of NDE, Visual, Pressure Testing, etc)

Contractor/Date SAPMT/Date Projects Insp./Date

Completion / Acceptance:

Contractor/Date SAPMT/Date Projects Insp. / Date Proponent / Date

Saudi Aramco: Company General Use


ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

2. ENGINEERING DATA
& PROJECT DWG
ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

2.1. TIE-IN SUMMARY


TIE-IN SUMMARY

TIE-IN NO. : - TIP-0128

BI NO. : - 10-01760

REFERENCE DRAWING

TIE-IN INDEX - BB-039803


P&ID - XA-A29349-008
ISO DWG - R37-01-UW-XXXX-001
VALVE DATA SHEET - BE-237266 VG1AB03

SERVICE - UTILITY WATER

TIE-IN PURPOSE
- Utility Water for the utility station for R37 CPI Separator Area

TIE-IN TYPE - SCREWED


EXISTING LINE NO. : - 2"-W-3601-1D1A
NEW LINE NO. : - 2"-UW-XXXX-1BD0U

SYSTEM RELATED TIE-IN'S : - N/A


PRECEDING TIE-IN WORK : - N/A

CONCURRENT TIE-IN : - N/A


FOLLOWING TIE-IN : - N/A

TIE-IN SHUTDOWN & ISOLATION


- Temporary shutdown to be required.
- Close Block Valve on up stream and down stream of the tie in point.

CONTRACTOR will
- Install the tie -in as per dwg. R37-01-UW-XXXX-001

TIE-IN CONSEQUENCE : - NONE


TIE-IN MEDIUM : - N/A
ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

2.2. TIE-IN INDEX


ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

2.3. P&ID
0127

0128

0126
ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

2.4. ISOMETRIC DRAWING


STRESS PKG : -

UP STANDARD DETAIL REFERENCE DRAWINGS


BILL OF MATERIALS
N
DETAIL OF HEAVY WELDING BOSSES FOR THREADED CONNECTIONS AE-036175
CONSTRUCTION-NOTES AND DETAILS FOR ISOMETRIC PIPING AD-036627
AWAY AWAY
INSULATION DETAILS FOR HOT PIPING AA-036911
INSULATION DETAILS FOR COLD PIPING AA-036913
INSTALLATION OF JACK SCREWS FOR FLANGED JOINTS AC-036630
SHOP MATERIALS
TOWARD TOWARD
PT SIZE MATERIAL MAT'L
NO DESCRIPTION (IN) CODE QTY CLASS
DOWN

1 PIPE, CS API-5L-B-PSL2 SMLS TE 2 I27921965 0.4 M 1CG0U NOTES


B36.10M HOT DIP GALV. 1. MATERIAL SHOWN WITH A BROKEN LINE AND SPOOLS LISTED IN THE SAUDI ARAMCO
S-80 FABRICATION LIST ARE NOT TO BE FURNISHED BY THE VENDOR.

2 SO FLG, CA 90/10 Cu-Ni FF 2 I83797027 1 1BD0U 2. PIPING DETAILS SHALL BE CUT AT ALL POINTS MARKED F.W. (FIELD WELD).

EEMUA Pub. NO.145 CL150 16 3. EACH FABRICATED SECTION SHALL BE CLEARLY MARKED WITH ITS CODE NUMBER.

BAR 4. UNLESS OTHERWISE NOTED. (A) ALL DIMENSIONS ARE TO C OR FACE OF FLANGES.
(B) BOLT HOLES ON FLANGES STRADDLE C . (C) WELDING ELBOWS ARE LONG RADIUS.
5. FABRICATION SHALL BE IN ACCORDANCE WITH SAUDI ARAMCO SPECIFICATION 01-SAMSS-10.
6. GASKET ALLOWANCE 1.3 MM
FIELD MATERIALS
7. PIPING MATERIAL IS

PIPE SIZE SCHEDULE SPECIFICATION


PT SIZE MATERIAL MAT'L
SEE ISO NO DESCRIPTION (IN) CODE QTY CLASS 2" 1BD0U
2"-UW-10282-1BD0U 2" 1CG0U
SHT : 002
AREA : R37-01 3 TEE, CS A105N FTE B16.11 2X2 I9889106 1 1CG0U
E 2874361 CL3000 HOT DIP GALV.
N 3091799 4 FIG 8 BL, CA 90/10 Cu-Ni FF 2 I83797005 1 1BD0U
CLASS: EL103433 B16.5 & ARAMCO DWG CL150 X

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
8. WELDING STRESS RELIEF - YES NO
1BD0U
CLASS: 7 5 TH FLG, CS A105N FF B16.5 2 I38310075 5 1CG0U 100% X-RAY SPOT X-RAY 01-SAMSS-10

1CG0U CL150 HOT DIP GALV. 9. TESTING SHOP HYDROSTATIC TEST - YES X NO

F2 G6
6 GSKT, SYNTHETIC FIBER FF 2 I14442163 4 1CG0U THE SHOP HYDROSTATIC TEST SHALL BE CARRIED OUT ON PIECES HAVING ALL ENDS
FLANGED. HYDROSTATIC TEST PRESSURE 274.3
4 B16.21 CL150 1.6MM THK FULL
128 TAIL W FACE 10. ALL PIPING MATERIAL IS IN ACCORDANCE WITH SAUDI ARAMCO ENGINEERING SPECIFICATION
SAES-L-105 CLASS 1BD0U . ALL EXCEPTIONS ARE NOTED ON THE ISOMETRIC.
G6 B9 7 ISO KIT, MFG-STD GLASS 2 I83221652 1 1CG0U
REINFORCED EXPOXY CL150 FF 11. INSULATION REQUIRED - YES NO X
INSULATION SHOWN ON DRAWING
F5 G7 3MM THK MFR-STD W/GASKET,
10
STEM WEST WASHERS AND SLEEVES PER
SASD AA-036865 NEMA G10 OR
G11
8 BOLT/NUTS, STUD BOLT W/H HEX 5/8 I5670777 8 1CG0U
NUT AS A193 GR B7 W/A194 GR
2H B18.2.1/B18.2.2, 85MM
BOLT LENGTH
9 BOLT/NUTS, STUD BOLT W/H HEX 5/8 I16105670 4 1BD0U SPOOLS TO BE FABRICATED BY VENDOR
146

NUT W/PL WSHR AS A193 GR B7 NO.


MARK NO. SIZE
WEIGHT NO.
MARK NO. SIZE
WEIGHT
PIECES LBS PIECES LBS
W/A194 GR 2H
1
2 SEE ISO CERAMIC-FLUOROPOLYMER
2"-W-3601-1D1A F5 PD COATED B18.2.1/B18.2.2,
SHT : 001 2"N
100MM BOLT LENGTH
AREA : EXIST
E 2874517
10 (VG1AB03) GATE VA FLGD, CA 2 I83850540 1 1BD0U
N 3091799 B61/B62 B61/B62 TRIM CL150
EL103078 TIP-0128 FF FP SLD WDG UB IS-RS
MSS-SP-80 B16.5 INT. SEAT
F5 G6 B8 HW
1
1

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS SPOOLS TO BE FABRICATED BY SAUDI ARAMCO
44
5 NO (MM) (IN) NO (MM) (IN)
10 NO.
PIECES
MARK NO. SIZE
NO.
PIECES
MARK NO. SIZE

1 100 2 2 142 2
3
2X2"NPD 3 100 2

1
3
45
SEE ISO 44
2"-W-3601-1D1A P&ID NO : XA-A29349-008
SHT : 001 5
AREA : EXIST F5 10 BA-073005-001
GAD NO :
E 2874206
N 3091799 TIP-0128
EL103078
F5 G6 B8

SCREWED END

REVISION VALIDATION

THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-01760-0000-000
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
YHH SRP
01/03/18 01/03/18
REV.NO. DATE REVISION DESCRIPTION

00 01/03/18 ISSUED FOR CONSTRUCTION

JOB ORDER/EWO NO.


THIS REVISION IS NOT TO BE USED FOR
Note 12. ALL DIMENSIONS AROUND TIE-IN POINT SHALL BE VERIFIED AT SITE BEFORE FABRICATION 10-01760-0000 CONSTRUCTION UNTIL CERTIFIED AND DATED

OPER. DESIGN TEST INSULATION


PAINT
RT (%) SAUDI ARABIAN OIL COMPANY
MAT'L
NPS PRESS. TEMP. PRESS. TEMP. (° F) PRESS. MEDIUM TH'K CODE
PWHT
FIELD SHOP ISO 2"-UW-10282-1CG0U
DRAWING TYPE

CLASS ( Psig ) (°F) ( Psig ) MIN MAX ( Psig ) TYPE (MM) ISO
2" 1BD0U 116 100 175 - 175 274.3 H N - - N 10 10 STORM & OILY WATER SEPARATION AREA
2" 1CG0U 116 100 175 - 175 116 S N - - N 0 0 OFFSITE FACILITIES
UTHMANIYAH SAUDI ARABIA
00 01/03/18 ISSUED FOR CONSTRUCTION YHH HJL SRP PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

REV DATE DESCRIPTION BY CHECK'D APPR'D R37 L R37-01-UW-10282 001 00

2018-01-02 19:24:13 Saudi Aramco 2825 ENG. (05/05)

RESTRICTED VECTOR CADD-03


ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

2.5. VALVE DATA SHEET


Saudi Aramco 6233-1-ENG (11/2010)

SAUDI ARABIAN OIL COMPANY

UNTIL CERTIFIED AND DATED


THIS REVISION IS NOT TO BE
USED FOR CONSTRUCTION
VALVE DATA SHEET
REVISION DESCRIPTION

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Notes To Purchaser:

This form shall be used only for Direct Charge (DC) purchase requisitions and orders for valves in Class 04.
Valves shall be in accordance with 04-SAMSS's -035, -048, at minimum, and other 04-SAMSS's as applicable.

Service: Tag No.


UTILITY WATER, FIRE WATER, DRINKING WATER VG1AB03
P. O. # Line Item #
- 1BD0U, 1PU0U
DATE

JOB ORDER/EWO NO.

DESIGN SECTION
REV. NO.

Valve Type: Industrial Standard:

GATE MSS-SP-80
BY/DATE
OTHER

Sub Type: SAMSS's (in addition to 04-SAMSS-035 & 04-SAMSS-048)

SCREWED BONNET IS-RS, FLEXIBLE WEDGE, FULL PORT 04-SAMSS-001

Pressure Class: Size / Port:


CONST. AGENCY/DATE OPERATIONS/DATE

150# 2" - 8"


REVIEW FOR KEY DRAWINGS
REQUIRED (SAUDI ARAMCO)

End Connections: Operator Type:

FF FLANGED END (B16.5) HANDWHEEL

Other: Vendor References:

* *

O O
Firesafe: Maximum Service Temperature 140ºF ( C or F)
O O
YES NO Minimum Service Temperature 32ºF ( C or F)

Installation Orientation MAOP:


Pipe: N/A Valve Stem: N/A 140 PSIG
CERTIFIED/DATE
DESIGN CERTIFICATION
(DESIGN AGENCY)

MATERIALS SECTION
Body / Bonnel: Stem:

ASTM B61/B62 ASTM B61/B62

Seat / Inserts: Wedge / Disc / Ball / Plug:


ENGG./DATE

ASTM B61/B62 ASTM B61/B62

Packing / O-Rings: Bolting:

GRAPHITE ASTM A193 GR B7 W/ASTM A194 GR 2H


IS COVERED, FOR ALL APPROVAL

Gaskets / Seals: Coatings / Linings / Platings:


AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER

SYNTHETIC FIBER AS PER BE-039378 (CLAUSE 6.1)

Sour Service Other:


YES NO *
REVISION VALIDATION

DRAWING COMPLETION CERTIFICATE NO.

SPECIAL NOTES SECTION


1. *Indicates information to be provided by vendor.
2. Valve Data Sheet is based on Project Specification for Piping Material Specification no. BE-056357.
3. Positive Material Identification (PMI) shall be in accordance with SAES-A-206.
THIS REVISION NO.

PROJECT SPECIFICATION DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

DATA SHEET FOR MANUAL VALVES DAT


ETHAN DEEP RECOVERY FACILITY M39 L BE-237266 100 D
UTHMANIYAH SAUDI ARABIA
EKRD/6233-1-1110.XLS
ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)
TIE-IN PACKAGE FOR TIP-0128

2.6. SAFETY INSTRUCTION SHEET


To be submitted
ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)
TIE-IN PACKAGE FOR TIP-0128

2.7. REFERENCE DRAWING


ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)
TIE-IN PACKAGE FOR TIP-0128

2.7.1. TIE-IN LOCATION PLAN


ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)
TIE-IN PACKAGE FOR TIP-0128

2.7.2. 3D MODEL SNAPSHOT


ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

3. SCOPE OF WORK BETWEEN


CONTRACTOR AND SAUDI ARAMCO
SCOPE OF WORK BETWEEN CONTRACTOR AND SAUDI ARAMCO

Scope of Tie-in Work between CONTRACTOR and SAUDI ARAMCO is to be divided in


accordance with the following category.

SAUDI CONTRACTOR
ARAMCO
1. Before Tie-in work
Job Safety Analysis (JSA) X
System Isolation X S
Flush and Purge for water free condition X S
Work Permit – Preparation X
Work Permit – Approval X
Material Check and Control X
Provide Fire Extinguisher X
Install Scaffolding (if required) X

2. During Tie-in Work at the Field


Provide a Stand-by Man during Tie-in Execution X
Provide Necessary Tools and Materials (including X
consumable
Preparation of Test and Inspection X
Tie-in Fit-up, Bonding/Welding Inspection X X
3. After Tie-in Work
Removal of Isolation X S
System Operation X
Arrange and Clear-up the Site X

Legend: X – Action by, S – Assistance, N/A – Not Applicable


ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

4. TIE-IN CHECK LIST


TIE-IN CHECK LIST

Contractor’s Name : HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD.


Location : UTHMANIYAH
Identification Information : BI-10-01760-R37-0128
Type of Tie-in : Threaded
Drawing Nos. : R37-01-UW-XXXX Sht 001
This checklist shall be used to accomplish the necessary steps to efficiently and safely
complete tie-in work.

BEFORE TIE-IN WORK Yes No N/A Signature

1. Ensure that all materials, relevant drawings and


procedures are available to perform the tie-in work.

2. Has package been forwarded to Operations for


review / comment?

3. Has the JSA been prepared, reviewed and approved


in accordance with procedures?

4. Have all materials been inspected and accepted?

5. Have PZVs and gauges been calibrated for all


pressure ranges of test?

6. Have scaffolding and staging platforms been erected


for the site work?

7. Has the tie-in location been approved and tie-in tag


installed?

8. Has UT been completed to verify wall thickness?

9. Have all necessary materials been prepared at tie-in


location?

10. Are the Fire Watchman on standby?


START TIE-IN WORKS Yes No N/A Signature
1. Ensure that WPS is approved and welders are
qualified in accordance with procedures.

2. Obtain work permit before commencement of work


activities.

3. Ensure that the lines have been isolated and


flush/purge have been completed by SAUDI ARAMCO
UGP Operations.

4. Prior to any welding works, ensure that no hazardous


or combustible gas present inside the existing pipeline.

5. Conduct the cold cut to the existing pipeline at tie-in


locations as shown in the attached drawings. Clean and
re-bevel the existing pipeline and fit-up new piping
spools. Ensure that orientations are located as per the
drawings.

6. Weld the joints in accordance with the approved


WPS and install valve, spectacle flange using new
gasket, bolts and nuts.

7. All NDE requirements have been completed

8. Perform the inspection with SAUDI ARAMCO.

9. Repair and touch-up the field weld joints.

10. Clear up all disposable materials from the work site


prior to handover.

11. Clean the Tie-in location prior to turnover to SAUDI


ARAMCO.
ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

5. ATTACHMENTS
ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

5.1. JOB SAFETY ANALYSIS(JSA)


ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

5.2. TIE-IN EXECUTION SCHEDULE


TIE-IN Installation Schedule rev2 Crew A
Crew B
Ethane Deep Recovery Project at Uthmaniyah Gas Plant 1/21/2018

MANPOWER
Year (2018 & 2019)
Equipment
Tie-In No, Unit Size/Rating Line Type Type Target START FINISH Crew Safety Reciver Gas detector Fire Watch F/M P/F W/D H/P Regger Scaffolder
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 BoomTruck Crain 50t
SYS Connection Equipment (Team) 4 0 24 24 24 24 24 24 24 24 6 0

TIP-0119 R33 2"/#150 N Welded Cold May 5/3/2018 5/5/2018 A A 4 DIA May 11EA N N 1 1 1 1 1 1 1 1

TIP-0121 R33 3"/#150 UW Screwed Cold May 5/7/2018 5/9/2018 A A 6 DIA Total DIA 68 N N 1 1 1 1 1 1 1 1

TIP-0122 R33 3"/#150 S Welded Cold May 5/4/2018 5/6/2018 B B 6 DIA N N 1 1 1 1 1 1 1 1

TIP-0132 R37 3"/#150 IA Screwed Cold May 5/8/2018 5/10/2018 B B 6 DIA N N 1 1 1 1 1 1 1 1

TIP-0113 R37 2"/#150 UW Flanged Cold May 5/12/2018 5/14/2018 A A 4 DIA N N 1 1 1 1 1 1 1 1

TIP-0127 R37 2"/#150 S Welded Cold May 5/13/2018 5/15/2018 B B 4 DIA N N 1 1 1 1 1 1 1 1

TIP-0128 R37 2"/#150 UW Screwed Cold May 5/17/2018 5/19/2018 B B 4 DIA N N 1 1 1 1 1 1 1 1

TIP-0137 R37 2"/#150 IA Screwed Cold May 5/21/2018 5/23/2018 B B 4 DIA N N 1 1 1 1 1 1 1 1

TIP-0022 R35 6"/#150 IA Welded Cold May 5/16/2018 5/19/2018 A A 12 DIA N N 1 1 1 1 1 1 1 1

TIP-0023 R35 6"/#150 IA Welded Cold May 5/21/2018 5/24/2018 A A 12 DIA N N 1 1 1 1 1 1 1 1

TIP-0008 R37 6"/#150 UW Flanged Bolting May 5/26/2018 5/29/2018 B B 6 N N 1 1 1 1 1 1 1 1


ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

5.3. BLINDING DIAGRAM & ISOLATION


LIST
BLIND & ISOLATION LIST

TIE-IN No. S/N P&ID No. Plant No. Type of Valve Size Material Spec. Basic Material Line No. Spectacle Blind Remark
TIP-0128 1 XA-A29349-008 R37 GATE 2" 1D1A Galvanized CS 2"-W-3601-1D1A
TIP-0128 2 XA-A29349-008 R37 GLOBE 1" 1D1A Galvanized CS 2"-W-3601-1D1A UTILITY STATION 1
TIP-0128 3 XA-A29349-008 R37 GLOBE 1" 1D1A Galvanized CS 2"-W-3601-1D1A UTILITY STATION 2
ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

5.4. BILL OF MATERIAL


ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

5.5. WPS & QUALIFICATION RECORDS


ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

5.6. MATERIAL CETIFICATE


ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

5.7. WORK PROCEDURE


ETHANE DEEP RECOVERY

FACILITY PROJECT(EDRF)

TIE-IN PACKAGE FOR TIP-0128

5.8. INSPECTION CHECK LIST


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Inspection of Tie-In Materials SAIC-L-2029 30-Apr-17 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ETHANE DEEP RECOVERY FACILITIES (EDRF) PROJECT 10-01760-0000 HYUNDAI E&C CO., LTD.
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A. Tie-In Information:
a. Tie-In Number: ________________________
b. Line Class of header: __________________
c. Line Class of Branch connection:___________________
A d. Fluid Sevice : _____________________
B. Tie-In Materials (Description):
_________________________________________________
_________________________________________________
_________________________________________________

Note: To be
incorporated as
Tie-in materials are physically present in their respective tie-in location
A1 mandatory in the
and properly identified at the time of this inspection.
proposed Tie-In
Procedure.

B Tie-In Pipe/Pup piece/Pipe Nipples/Fabricated Pipe spools

Pipe shall have the material specification and grade stamped, stenciled,
or otherwise clearly marked with permanent marking method. SAES-L-350,
B1
(Note: Proof of verification conducted at material receiving shall be readily Para. 6.1
available upon request, ie: SAIC-L-2005).

Pipe sections (pipe pieces) and/or pipe nipples has identification for
SAES-L-350,
B2 material traceability to the original pipe that were inspected and cleared at
Para. 6.1
the Material Receiving Inspection using SAIC-L-2005.

Positive material identification (PMI) of pressure-containing alloy pipe was


SAES-A-206,
B3 performed, except non-pressure components and pipes in Category D
Para. 5.2.1
fluid service in ASME B31.3.

Tie-In pipe materials conform with the piping line class specified in the
Tie-In Schedule and/or Approved Tie-In Package. (Refer to Tie-In info
above.)
NOTE: Use or obtain the respective Line Class Index in Table 1 of SAES- IFC Construction
B4 L-105 in verifying the pipe material for the following: Drawings and Tie-
a. Pipe size In Schedule
b. Minimum pipe WT unless specified in the Tie-In Package
c. Pipe Specification
d. Type of pipe (seamless or welded)

Saudi Aramco: Company General Use


ERW pipe shall not be used in the following application:
a) ERW welded pipe shall not used for On-plot piping in Designed in
accordance with ASME B31.3 or ASME B31.1 except for firewater
systems.
b) ASME B31.8 Gas pipelines in sour or corrosive services, as defined in
SAES-L-133, in locations Class 3 and Class 4 as defined in SAES-B-064. SAES-L-136,
B5
c) ASME B31.8 Gas pipelines within 500 meters of the battery limits of Para. 6.6.2
plants and permanently manned facilities.
d) Grade X70 and above in sour service.
e) In low temperature service (below 0°C).
f) For offshore applications.
g) Backing Carbon Steel Material for Lined or Weld Overlayed Pipes.

Restrictions on use of Spiral Weld Pipe


1.Spiral weld pipe shall not be used in sour services, either for ASME SAES-L-136,
B6
B31.3 in-plant piping or for ASME B31.4 or ASME B31.8 pipelines. Para. 6.7
2. Spiral welded pipe shall not be used for on-plot piping

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Inspection of Tie-In Materials SAIC-L-2029 30-Apr-17 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ETHANE DEEP RECOVERY FACILITIES (EDRF) PROJECT 10-01760-0000 HYUNDAI E&C CO., LTD.
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Pipe sizes: 1¼", 2½", 3½" and 5" shall not be used except for SAES-L-310,
B7
connections to equipment requiring these sizes. Para. 10.1

Pipe/nipple is free of handling and fabrication damages and


manufacturing defects, external and internal, such as:
a. Dents (per API 5L, Para. 7.8.1)
1. Dents exceeding 1/4" (6.4 mm)
2. Dents 1/4" and less with lenghts more than 1/2 of pipe dia.
3. Dents deeper than 1/8" (3.2mm) with sharp SAES-L-350,
B8
b. Laminations or inclusions extending into the face or bevel of the pipe Para. 8.1
and having a visually determined length in the circumferential direction >
6,4 mm (0.250 in) shall be classified as defects. (API 5L, Para. 9.10.4)
c. Other surface imperfections (gouges, slivers, surface
laminations) on the ID and OD of the pipe exceeding 12.5% of
the specified wall thickness. (API 5L, Para. 9.10.7)

Reinforcing pad material shall be of the same pipe material unless SAES-L-350,
B9
otherwise approved in writing by the SAPMT. Para. 10.7

Reinforcement pad and saddles shall meet the following requirements:


a. Multiple segment pad or saddles are attached by full
penetration welds. (ASME B31.3 Section 328.5.4g)
b. Each segment has 1 vent hole (ASME B31.3 Section 328.5.4g)
01-SAMSS-010,
B10 c. Reinforcing pad or saddle shall have a good fit with the
Para. 6.2
surface of the header pipe per ASME B31.3 Para. 328.5.4g.
(NOTE: Gaps shall not exceed WPS tolerances).
d. All reinforcing pads have a minimum outer radius of 51 mm.
A 3-6 mm weep hole shall be provided for each reinforcing pad.

All structural attachments, which transfer loads to the pipe through welds,
shall be welded to full encirclement sleeves or saddle pads per ASME SAES-L350 para
B11
B31.4 paragraph 421.1(d) and ASME B31.8 paragraph 834.5(b) 11.2
requirements.

Fabricated pipe spool for tie-in connections shall be marked with the
spool number painted at the ends as shown on the drawings not be less 01-SAMSS-010,
B12
than 25 mm in height. In addition, the spool number shall be die-stamped Para. 10.1.1
on the rim of each flange..

QC documentation for the fabricated pipe spools were completed and


released for installation as per Inspection Checklist SAIC-L-2039.
QC documents shall be readily available upon request foe verification. As
minimum these are:
a. Verification of Pipe and fitting materials
b. Welding Procedure used in welding Note: To be
b. Visual acceptance of Weld Joints incorporated as
B13 c. Non-Destructive Test Reports Complete mandatory in the
d. PWHT Reports proposed Tie-In
e. Hardness Test Report Procedure.
f. Weld map (with Isometric Drawings)
g. Pressure test Report
h. Paint/Coating Report
i. Wall thickness
j. PMI

Cement mortar lined pipes and fittings at both ends are free from damage
01-SAMSS-005,
B14 or cracks more than 1.6mm (1/16in).
Sec. IV
(AWWA C205-00, Para. 4.4.6.2)

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Inspection of Tie-In Materials SAIC-L-2029 30-Apr-17 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ETHANE DEEP RECOVERY FACILITIES (EDRF) PROJECT 10-01760-0000 HYUNDAI E&C CO., LTD.
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
SAES-H-002,
Internal epoxy coating on pipe and fittings are free from visible holidays,
B15 Para. 5.2.4
including physical damages. (09-SAMSS-091, Para. 10.6.4 & 10.6.6)
&5.2.5

All prefabricated pipe spools shall be visually inspected for cleanliness, SAES-L-350,
B16
and shall have foreign material removed from the inside. Para. 15.2.2

C Tie-In Fittings (Tee/Elbows/Reducers/Weld-O-Let/Flange)

Tie-In Fittings (elbows/tees/reducers/welding outlets) shall have the


material specification and grade stamped, stenciled, or otherwise clearly
marked with permanent marking method. This shall include material SAES-L-350,
C1
traceability markings. Para. 6.1
(Note: Proof of verification conducted at material receiving shall be readily
available upon request, ie: SAIC-L-2005).

Tie-In fitting materials conform with the piping line class specified in the
Tie-In Schedule and/or Approved Tie-In Package. (Refer to Tie-In info
above.)
NOTE: Use or obtain the respective Line Class Index in Table
SAES-L-105,
8.1,9.1,10.1 of SAES-L-105 in verifying the pipe material for the
C2 Para. 7.1.1 AND
following:
7.1.2
a. Size/Diameter
b. Minimum pipe WT (Schedule) unless specified in the Tie-In
Package
c. Fitting material specification

Locknuts, street elbows (one end with female threads and the other end SAES-L-105,
C3
with male threads), street tees and reducing elbows are not permitted. Para. 5.5.2

Pipe/nipple is free of handling and fabrication damages and SAES-L-350,


C4
manufacturing defects, external and internal. Para. 8.1

The material, type and class of flanges meet the line class specification of
the header pipe. SAES-L-350,
C5
(NOTE: Use or obtain the respective Line Class Index in Table Para. 12.2
8.1,9.1,10.1 of SAES-L-105 in verifying the required flange material.)

The gasket contact area of the flanges using spiral wound gaskets shall SAES-L-109,
C6
not be coated. Para 12.10

1. Gasket contact surface of raised face flanges shall have as-machined


roughness of 3.2 to 6.4 micro-meters Ra (see ANSI B46.1). This area
02-SAMSS-011,
shall be free from physical damages.
C7 Para 10 & SAEP
2. The gasket contact surface shall be examined for compliance with the
351 para 6.3.1
recommended surface finish and for damage to surface finish such as
scratches, nicks, gouges and burrs.

Jack screws are drilled and tapped on flanges where a spectacle plate is SAES-L-350,
C8
required by the design drawings. Para. 10.5

Tie-In Valve Info:


Make / S. Number: ____________________
Valve type: ______________ Rating: ________________
D
Valve ID or Traceability No.: ________________________
Size : ______________ Material: ______________
Flange Facing: ____________

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Inspection of Tie-In Materials SAIC-L-2029 30-Apr-17 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ETHANE DEEP RECOVERY FACILITIES (EDRF) PROJECT 10-01760-0000 HYUNDAI E&C CO., LTD.
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
SAES-L-108 Para
8.3
SAIC-L-2040
D1 All valves have been received, tested and preserved per SATIP-L-108-01
SAIC-L-2041
SAIC-L-2042

Tie-In Valve conformed with the piping specification of header and


branch piping and as detailed in the Tie-In Schedule and tie-in approved
construction drawings. The required valve specifications are: SAES-L-108,
D2
Valve type : ________________ Diameter: ____________ Para. 5
Pressure Rating : ___________ Flange Type: __________
Valve Material: ________________

Tie-In Valve used as isolation valve shall be strength tested (body Test)
and Seat tested on site prior to installation.
Notes:
a. Manufacturer's tests are not considered in lieu of field test
requirements. SAES-L-108,
D3
b. Body and seat test shall follow the original test conducted by Para. 4.7
the manufacturer or with the test requirements of ASME
B16.34 and/or API 598.
c. Test shall be conducted per Inspection Checklist #
SAIC-L-2042.

Valve ends and valve cavities are internally clean and free of moisture or
water. (NOTE: As minimum, ambient lay-up shall be performed per SAES-A-004,
D4
SAES-A-007, Para. 5.2.5, which requires complete removal of hydrotest Para. 9.2
water.)

Upon completion of the testing, valves shall be restored to the original


SAEP 35 section
D5 packing condition if installation time is not immediately after the testing as
8.3 (x)
per 04-SAMSS-035 and/or SAIC-L-2041.

Pressure seal bonnet valves shall be used only in steam or other clean SAES-L-108,
D6
non-corrosive services. Para. 5.1.1

Welded bonnet valves in hydrocarbon services shall be limited to NPS 4


SAES-L-108,
D7 inch and smaller provided it is approved by the Manager of the
Para. 5.1.3
responsible operating department.

Screwed bonnet and screwed body valves shall not be used in any
SAES-L-108,
D8 hydrocarbon or hazardous material services unless the bonnets and body
Para. 5.1.4
end connections are tack welded to the body or provided with locking pin.

Union bonnet valves shall not be used in any hydrocarbon or hazardous SAES-L-108,
D9
material services. Para. 5.1.6

The need for power actuation of all valves NPS 12 inch and larger in all
SAES-L-108,
D10 pressure classes has been reviewed with the responsible operating
Para. 5.6.1
organization.

All threaded connections on valve bodies and associated piping shall be SAES-L-108,
D11
seal welded. Para. 5.7.2.1

Concentric butterfly valves, such as the API STD 609 Category A type
SAES-L-108,
D12 (typically with internal rubber linings), are permitted only in non-
Para. 6.2.1
hydrocarbon applications.

High performance butterfly valves in hydrocarbon service shall be limited SAES-L-108,


D13
to a maximum rating of Class 900. Para. 6.2.2

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Inspection of Tie-In Materials SAIC-L-2029 30-Apr-17 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ETHANE DEEP RECOVERY FACILITIES (EDRF) PROJECT 10-01760-0000 HYUNDAI E&C CO., LTD.
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Flanged plug valves in hydrocarbon service shall be of the inverted
lubricated pressure balanced design, except that Class 150 valves NPS 6 SAES-L-108,
D14 inch and smaller may have a standard plug with springs for balancing the Para. 6.4
plug.

SAES-L-108,
D15 All valves in service below -100°C shall have an extended bonnet.
Para. 7.1.3
Tie-In valves NPS 2 inch and larger used as isolation valve in Class 600
SAES-L-108,
D16 and higher rated steam service shall be parallel slide gate valves
Para. 7.12
equipped with a cavity pressure relief system.

Bolts and Nuts supplied:


E Material Spec/Stamp: Bolt___________/Nut __________
Diameter: ________________ Length: ______________

Flange bolts and nuts conform with the piping line class specified in the
SAES-L-105,
E1 Tie-In Schedule and/or Approved Tie-In Package. (Refer to the
Para. 5.6.1
respective Line Class Index in Table 1 of SAES-L-105).

Bolt and Nut materials for process and general services shall be ASTM SAES-L-109,
E2 A193 Grade B7 stud bolts with ASTM A194 Grade 2H nuts for service Para. 13.2 .1
temperatures from minus 40 to plus 450°C. TABLE 4

Stud bolts conforming to ASTM A320 Grade L7 with nuts to ASTM A194 SAES-L-109,
E3 Grade 4 or 7 shall be used for bolt service temperatures from minus 101 Para. 13.2.1
to plus 343 °C. TABLE 4

SAES-L-109,
ASTM A320 Grade L7M studs and A194 Grade 7M nuts may be used for
E4 Para. 13.2 .1
low temperature services from minus 73 to plus 450 °C .
1TABLE 4

ASTM A193 Grade B7 bolts with A194 Grade 2H nuts may be used at SAES-L-109,
E5 bolt service temperatures as low as minus 30°C with approval by the Para. 13.2.1
Chairman of Piping Standards Committee in CSD. TABLE 4
A193 Grade B7 bolts with A194 Grade 7M nuts may be used at minus SAES-L-109,
E6 45°C with approval by the Chairman of Piping Standards Committee in Para. 13.2.1
CSD. TABLE 4

SAES-L-109,
ASTM A193 Grade B7 or B7M studs with A194 Grade 7 or 7M nuts for
E7 Para. 13.2 .1
services up to 450°C
TABLE 4

ASTM A193 Grade B16 stud bolts with A194 Grade 7 nuts, for bolt SAES-L-109,
E8 service temperatures from 450 to 510°C. For higher temperatures, Para. 13.2
contact the Materials Engineering Unit in CSD. TABLE 4

ASTM A193 Grade B7 stud bolts with 2H nuts shall be used for sour wet
services at the following conditions:
(a) not directly exposed to hydrogen sulfide,
SAES-L-109,
(b) not buried or insulated,
E9 Para. 13.2 .3
(c) not equipped with flange protectors, or not deprived of direct
TABLE 4
atmospheric exposure.
(NOTE: ASTM A320 Grade L7 stud bolts with Grade 4 or 7 nuts can be
used under the same conditions.)

ASTM A193 grade B7M stud bolts with nuts to A194 Grade 2HM shall be
used under the following conditions:
(a) direct exposure to sour environments, or
SAES-L-109,
(b) when the bolting will be buried or insulated, or
E10 Para. 13.2
(c) equipped with flange protectors, or otherwise deprived of
TABLE 4
direct atmospheric exposure.
(NOTE: ASTM A320 Grade L7M bolts and Grade 7M nuts can be used
under the same conditions.)

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Inspection of Tie-In Materials SAIC-L-2029 30-Apr-17 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ETHANE DEEP RECOVERY FACILITIES (EDRF) PROJECT 10-01760-0000 HYUNDAI E&C CO., LTD.
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Steel machine bolts ASTM A307 Grade B may be used on flat-faced cast-
SAES-L-109,
E11 iron or non-metallic flanges in non-sour environment; nuts shall conform
Para. / 13.1
to ASTM A563 Grade D.

Flat washers under the nuts are required for special cases only, such as SAES-L-109,
E12
on insulating flanges and under the nuts bearing against plastic flanges. Para. 13.4.1

For offshore and underground piping, ASTM A193-B7/ASTM A194-2H


SAES-L-105,
E13 with ceramic-fluoropolymer coating per 09-SAMSS-107 or DURABOLT
Para. 5.6.2
(by Saudi Conduit Coating Company; Al Khobar, KSA) shall be used.

Gasket Information (supplied):


Type: __________________ Diameter: _________________
F
Material: ___________________________________________
Other: ____________________________________________

Gasket materials conform with the piping line class specified in the Tie-In
Schedule and/or Approved Tie-In Package. (Refer to the respective Line
Class Index in Table 1 of SAES-L-105).
SAES-L-109,
F1
Gasket required per line class of header and branch piping: Para. 12.1
Type: _________________ Diameter: ______________
Material (Winding/Inner & outer Guide rings for spiral wound):
___________/______________/________________

Octagonal, pressure energized Type R, low carbon steel ring joint


SAES-L-109,
F2 gaskets per API SPEC 6A shall be used with API SPEC 6A Type 6B
Para. 12.2.1
flanges.

Spiral wound type 316 stainless steel winding, flexible graphite filled, with
SAES-L-109,
F3 carbon steel guide ring, per ASME B16.20, for raised face flanges in most
Para. 12.3.3
services, including steam and process hydrocarbons.

Spiral wound gasket to be used in temperatures below minus 45°C shall SAES-L-109,
F4
have guide ring made of type 304 stainless steel material. Para. 12.3.4
SAES-L-109,
F5 Teflon filler material shall not be used in hydrocarbon services.
Para. 12.3.2.2
Compressed synthetic fiber with oil resistant binder, 1.6mm thick per
ASME B16.21 shall be used for Class 125 and 150 flat face flanges in SAES-L-109,
F6
non-hazardous services up to a maximum temperature of 230°C. Para. 12.8.2
(Example: Lube oil piping per API STD 610.)

PIKOTEK gaskets, or approved equal, with isolating sleeves and


washers shall be used for isolating dissimilar metal flanged joints (i.e.
SAES-L-109,
F7 electrical isolation), and insulting joints for cathodic protection.
Para. 12.6.1
Proprietary approved equal gaskets shall be submitted to the Chairman of
Piping Standards Committee in CSD for approval.

Spiral-wound gaskets shall be specified with inner rings for vacuum and SAES-L-105,
F8
catalyst services. Para. 5.8.2

Outer rings are required for all pipe sizes. Inner rings are required for the
following flanges:
 Flanges size 24” and larger; SAES-L-109 para
F9
 Flange class 900# and above where applicable; 12.3.5
 Spiral wound gaskets with PTFE filler materials;
 Flanges in vacuum services.

G Storage and handling of Tie-In Materials

The piping ends shall be covered after inspection to prevent unauthorized


SAES-L-350,
G1 removal of the end cover prior to making the joint to the succeeding
Para. 15.2.3
section of piping.

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Inspection of Tie-In Materials SAIC-L-2029 30-Apr-17 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ETHANE DEEP RECOVERY FACILITIES (EDRF) PROJECT 10-01760-0000 HYUNDAI E&C CO., LTD.
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
When spools are supplied with blind flanges, the blinds shall be bolted
01-SAMSS-010,
G2 on with the specified gaskets and stud bolts. Other flange faces shall be
Para. 10.4.1
protected by a suitable cover bolted to the flange.

Welding ends shall be protected against damage during handling and 01-SAMSS-010,
G3
shipment by means of a securely fastened bevel protector. Para. 10.4.3

Pipe shall not be stored directly on the ground. Pipe shall be placed on SAES-L-350,
G4
mounds or sleepers. Para. 7.1
Stacking of pipes shall be made in a manner to avoid damage to pipes or SAES-L-350,
G5
coatings. Refer to SAES-H-200. Para. 7.2
SAES-L-350,
G6 Fittings and valves shall be stored in shipping crates or on racks.
Para. 7.3

1. End protectors on pipes, flanges, weld bevels, threads, and socket


SAES-L-350,
ends shall be firmly attached.
G7 Para. 7.4 & SAES-
2, For pipelines in sales gas piping systems, each joint shall be cleaned
L-450 para 8.9
and capped with durable plastic sheet prior to transportation to the field.

01-SAMSS-010,
G8 Threaded bosses shall be fitted with steel bar stock plugs.
Para. 10.4.2
Threaded pipe ends shall be provided with steel or malleable iron pipe 01-SAMSS-010,
G9
caps as temporary closure. Para. 10.4.2
01-SAMSS-010,
G10 Threads shall be coated with a graphite and oil paste.
Para. 10.4.2
Stainless steel material shall be protected against exposure to seawater SAES-L-350,
G11
splash during storage. Para. 7.5
All materials shall be handled with care during fabrication and installation SAES-L-350,
G12
to prevent damage. Para. 8.1
Lined and coated pipes and fittings shall be lifted with wide fabric or SAES-L-350,
G13
rubber-covered slings and padding. Para. 8.2

REMARKS:

REFERENCE DOCUMENTS:
1. Project Tie-In Procedure
2. AWWA C205-00 (Y2000 Issue), Cement-Mortar Protective Lining and Coating for Steel Water Pipe-4" and larger-Shop Applied
3. ASME B16.5 (29 October, 2004) Pipe Flanges and Flanged Fittings
4. SAES-A-004 (30-Jan 2011), General Requirements for Pressure Testing
5. SAES-A-206 (30 April 2011), Positive Material Identification
6. SAES-A-007 (24-July. 2012), Hydrostatic Testing Fluids and Lay-Up Procedures
7. SAES-H-002 (2-June-2012), Internal and External Coatings for Steel Pipelines and Piping
8. SAES-L-105 (22 December 2012), Piping Material Specifications
9. SAES-L-108(11 Oct 2010), Selection of Valves
10. SAES-L-350 (March 11, 2014), Construction of Plant Piping
11. 01-SAMSS-005 (7-May 2011), Shop Applied, Internal Cement Mortar Lining of Steel Pipe
12. 01-SAMSS-010 (25-May-2011), Fabricated Carbon Steel Piping
13. SAES-L-109 (13 October 2012)- Selection of Flanges, Stud Bolts and Gaskets
14. 02-SAMSS-011 (21-June 2011), Forged Steel Weld Neck Flanges for Low and Intermediate Temperature Service
15. SAES-L-450 Construction of onshore and near shore pipeline (Nov 10, 2012)

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Inspection of Tie-In Materials SAIC-L-2029 30-Apr-17 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ETHANE DEEP RECOVERY FACILITIES (EDRF) PROJECT 10-01760-0000 HYUNDAI E&C CO., LTD.
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Final Punchlisting for Tie-In Works (Re-Instatement) SAIC-L-2028 30-Apr-17 PIPING-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM


PLANT
ID. NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

Instructions on use of this checklist:


1. Any Item marked as "Fail" requires to be identified with the specific description and location of the descripancy/violation and shall be
listed in the Contractor's Re-Instatement Punchlist Form, SATR-A-2011.
2. Column "Y/N" is used to pre-determine each respective item as required for start-up (Y), or not required for start-up (N). Final
designation of "Y/N" items will be at the Mechanical Completion Punchlisting by Saudi Aramco Inspection.
3. This Checklist along with the Re-Instatement Punchlist, with or with out cleared items, shall be submitted to Saudi Aramco on or before
the requested time for Mechanical Completion Punchlisting.

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Documentation:

Mechanical Scope of Works are complete. Any exceptions were GI-2.710


A1
identified and listed in the Sytem punchlist. Para. 4.1.1.2

Test and Inspection Plan (SATIPs) and Inspection Checklists for field
GI-2.710
A2 installation as detailed in SATIP-L-350-02 have been verified to be
Para. 4.1.1.2
complete and accepted.

Tie-In Package(s) are complete and Tie-In Flow Chart signed GI-2.710
A3
accordingly. Para. 4.1.1.2

All non-conformance reports and worksheets have been resolved to the GI-2.710
A4
satisfaction of Inspection Department. Para. 4.1.1.4

All log book entries have been resolved to the satisfaction of Inspection GI-2.710
A5
Department. Para. 4.1.1.4

All equipment fabrication documents, inspection record books and GI-2.710


A6
Equipment Instrument Schedules (EIS) are available for review. Para. 4.1.1.6

B P&ID Check/Walkthrough:

All piping components are installed or re-installed in their respective


P&ID #
B1 locations as shown in the P&ID. (i.e: piping, removable pipe spools,
____________
valves, vents, drains, spectacle plates, blinds, flange spacers, etc)

All in-line equipment & Instruments are installed or re-installed in the


respective locations as shown in the P&ID. (i.e Strainer, meter tube, P&ID #
B2
straightening vanes, flow meter, orifice fitting, Pressure Indicators, ____________
Temperature, temperature indicators, sample probes, etc)
New piping connections are stenciled with the following:
SAES-L-350
B3 a. Flow directional arrows and fluid service
Sec. 20 a & b
b. Line designation number, size, class and specification
Installed Relief Valves were verified and the corresponding Form 3099A SAES-J-600,
B4
per SATIP-J-600-01 and signed. Sec. 10
Delete if covered
Pressure and temprature gages installed are of the same range as P&ID #
B5 by
shown in the P&ID. ____________
Instrumentation

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Final Punchlisting for Tie-In Works (Re-Instatement) SAIC-L-2028 30-Apr-17 PIPING-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Flow direction of Control valves and globe valves follow the process flow P&ID #
B6
direction. ____________

C Piping:

SAES-L-310,
C1 Pipes are in full contact with the supports. (Fully Restrained)
Para. 14.2.2

All welds to the pipe shall be continuous with smooth finish. Spot SAES-L-350,
C2
welding is not acceptable. Para. 11.3

Jack screw bolts installed in flanges with spectacle plates. SAES-L-350,


C3
(NOTE: Not required if flange spreaders are supplied .) Para. 10.5

A 6 mm weep hole shall be drilled for all dummy supports and shall be
SAES-L-350,
C4 located near the base plate for all vertical dummy supports, and near the
Para. 13.2.3
run pipe at 6 o'clock position for all horizontal dummy supports.

Atmospheric drain and vent valves are provided with a plug or blind on SAES-L-108,
C5 the discharge side. Para. 7.7
GI-2.710-5
C6 Pressure test of field installed piping and components are complete.
Item 4a
GI-2.710-5
C7 All nuts and bolts of flange connections are fully engaged.
Item 1.j.
Flange joints for piping Class ANSI 600# and above were verified to be GI-2.710- 5
C8
tightened using the applicable Torquing procedure. Item 1.j.

A minimum clearance of 50 mm shall be provided for inspection and


freedom of pipe movement between above ground piping crossing with SAES-L-310,
C9
any structure (including pipe support structure). This clearance is also Para. 12.4
required for above ground piping crossing with another pipe.

Branch connections, 4 inch and smaller, including drain and vent valves
SAES-L-310,
C10 and drip legs of all sizes, are not located at a horizontal distance less
Para. 12.5
than 610 mm (24 inches) from any fixed obstruction.

D Pipe Supports

The free movement of unrestrained piping, both in axial and lateral


SAES-L-310,
D1 directions, shall be controlled and limited by properly located guides and
Para. 15.2.1
anchoring points to within acceptable bounds

Details of the installed pipe supports conforms with the Pipe Support SAES-L-350,
D2
Detail per project specification. Para. 13.6
Intermediate anchors or axial line stops are provided for above-ground
SAES-L-310,
D3 unrestrained piping between and/or at the center of expansion loops or
Para. 15.2.2
offsets.
Axial line stops and guides shall be provided for above ground
unrestrained lines subject to slug forces in services listed below.
• Two-phase flow lines
• Liquid intermittent lines, such those used to control liquid level in the
SAES-L-310,
D4 drums
Para. 15.2.3
• Pressurized drain lines
• Relief and blow-down lines
• Flare lines
• High-pressure gas lines
SAES-L-310,
D5 Travel stops of spring supports are removed after hydrotest.
Para. 14.4.4

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Final Punchlisting for Tie-In Works (Re-Instatement) SAIC-L-2028 30-Apr-17 PIPING-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

The pipe shall not be used to support other pipes and structures without SAES-L-310,
D6
an appropriate analysis. Para. 16.1.2

E Structural Items:

Access is provided for equipment regularly operated or maintained or


SAES-B-054,
E1 operated in an emergency, such as valve hand wheels, instrumentation,
Para. 4.2
controls, and their associated manifolds,

Edges of all tightly contacting surfaces of steel structures are seal SAES-M-001,
E2
welded. Para. 7.1.13.3

Access gratings are firmly anchored with a minimum of 2 fasteners at


each support with a minimum of 4 fasteners per panel. 12-SAMSS-007,
E3
(Note: Non-compliance shall be identified as "YES" item in the Facility Para. 6.1.17
Exception Item List for the MCC.)

F Painting:

Line Color coding per SAES-B-067 shall apply and Lines shall be SAES-L-350
F1
painted in accordance with SAES-H-002 and SAES-H-100. Para. 20c & 21.1

Coating on structural items is complete and conforms with the project


F2 Scope of Work
coating requirements.
Safety yellow-and-black stripes are painted on obstructions that present
bump hazards. (concrete supports at the base of stairways or ladders, SAES-B-067,
F3
passageway pinch points, unguarded edges, tripping hazards). Stripes Para. 4.2.3 a
shall be 100 mm wide.
Lifting equipment and devices shall be painted safety yellow and clearly
SAES-B-067,
F4 marked with the rated capacity of the equipment in Arabic and English in
Para. 4.4
metric tons.

F5 Insulation is complete per SATIP-N-001-01 or SATIP-N-001-02 Scope of Work

All lines shall be clearly marked to easily identify the following as a


minimum: Flow direction and service,Line designation number, size,
class and specification,Process equipments connected to the line as
applicable and practical
SAES-L-350,
F6
Sec. 20

REMARKS:

REFERENCE DOCUMENTS:
1. G.I.-2.710 Mechanical Completion and Performance Acceptance of Facilities
2. SAES-L-310, Design of Plant Piping, (25 July 2012)
3. SAES-L-108(11 Oct 2010), Selection of Valves
4. SAES-M-001(19 Dec.2010) Structural Design Criteria for Non-Building Structures
5. SAES-L-350 (22 April 2009), Construction of Plant Piping
8. SAES-B-054 (29 August 2010) Access, Egress, and Materials Handling for Plant Facilities
8. SAES-B-067, Safety Identification and Safety Colors, (01 March 2015)

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: QC Record
T&I Witnessed Work Verified
Reviewed
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


QC Record
Performed Inspection Work / Rework May Proceed T&I Witnessed Work Verified
Reviewed
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: QC Record
T&I Witnessed Work Verified
Name, Organization, Reviewed
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Inspect Post-Cutting & Pre-Welding on Tie-Ins for Existing
SAIC-L-2027 30-Apr-17 PIPING-
Hydrocarbon Pipelines/Piping (Fitness for Service)
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
1. SAEP-310, Pipeline Repair and
Maintenance,
LAYOUT DRAWING(22 April 2009) (14-March-2012)
NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A Post Cut & Pre-Welding Inspection … May be used for Pipelines or Plant Piping
If welding is required on opened hydrocarbon pipelines, the line shall be SAEP- 310,
A1
cleaned, by scraping, and vented. Para. 6.6
When the repair of a pipeline requires cutting an existing line or unbolting
SAEP- 310,
flanged connections, a flexible bonding cable, no less than No. 2 AWG,
A2 Appendex B Para
shall be attached across the section of line to be separated prior to
B-2.4
cutting or unbolting.
All work on exposed underground pipelines shall be carried out from a SAEP- 310,
A3 wire mat that is electrically bonded to the pipeline at each end of the Appendex B Para
repair area. See Std. Dwg. AB-036788. B-2.1
Exposed underground pipelines electric arc welding operations shall be SAEP- 310,
A4 carried out with the welding machine bonded to the ground mat and Appendex B Para
pipeline, with the welder working on the ground mat. B-2.5
When working on lines supported on steel structures, such as at road SAEP- 310,
A5 crossings, etc., the lines should be bonded to the steel structure. (NOTE: Appendex B Para
Ground mats are not necessary .) B-2.6
Pipe ends for welding are beveled to form an included angle of at least SAES-W-011,
A6
30 degrees or more. Para. 9.7
Bevelled ends or cut holes (for branch connection) of the existing pipe SAES-W-011,
A7
were ground smooth and free of irregularities. Para. 11.3.2.1
Fittings that are re-cut or re-beveled shall have the cut surface
SAES-W-011,
A8 examined for laminations before welding. The NDT method to be
Para. 11.3.3
used shall be determined by Saudi Aramco Inspection
Surface Cleanliness methods consider existing service.
A) Internal surface is cleaned back to 100mm or more to shiny metal
Approved
A9 B) Residual process saturation of internal surfaces does not affect
Procedure
weldability. Note: Hydrogen, catacarb, caustics, acid gas, & other
services require special cleaning measures to assure weldability.
Internal of the existing pipe were checked for corrosion. Proponent is Approved
A10
informed if severe corrosion or deep pitting is found. Procedure
Verify applicability of Approved Welding Procedure Specification (WPS) SAES-W-011,
A11
to the Tie-In Conditions and that it is availablity on site. Para. 7.1.5
Pipe/pipe or pipe/branch joint fit-up inspected conform with the approved
A12 Approve WPS
WPS.

Distance between pressure containing welds (Weld encroachment) is not


SAES-W-011,
A13 less than 20mm or 3/4" of the joint thickness. Whichever is greater
Para. 11.16.2
(Pipe/pipe or pipe/branch joint fit-up) SAIC-L-2026

Verify qualification of the welder and/or his corresponding Job Clearance SAES-W-011,
A14
Card (JCC). Para. 8.1
Portable electrode heaters are available at the weld station and SAES-W-011,
A15
maintained at 65°C. Att 1

REMARKS:

TIE-IN WELD JOINT #/s____________________ IS (ARE) CLEARED / NOT CLEARED FOR WELDING.

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Inspect Post-Cutting & Pre-Welding on Tie-Ins for Existing
SAIC-L-2027 30-Apr-17 PIPING-
Hydrocarbon Pipelines/Piping (Fitness for Service)
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

REFERENCE DOCUMENTS:
1. SAEP-310, Pipeline Repair and Maintenance, (10-March-2012)
2. SAES-W-011, Welding Requirements for On-Plot Piping, (4 October 2009)
3. Project Approved WPS

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Preparatory Tie-In Requirements (Plant Piping) SAIC-L-2026 30-Apr-17 PIPING-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Preparatory Tie-In Requirements

The following minimum requirements have been met for preparation:


A) Tie-In Procedure & Package has been approved.
B) Tie-In matls & tools are all on site, properly segregated from other Sch Q, Att. VI
matl's, visually inspected, with pre-tests completed as required. Note 1: Table
A1 Tie-In Matl's shall be uniquely marked & identified per Tie-In. Special Process
Note 2: Small segments (repads, small piping pieces, etc) shall bear a Tie-Ins
unique ID (Heat number or other matl ID number) traceable to their (Procedure)
material test certificates. Complete Traceability shall be maintained.
Discard or quarantine untraceable matls to prevent their use.
Sch Q, Att. VI
Weld summary sheet for fabricated tie-in spools was verified for
A2 Table Special
Construction completeness (Welding, NDE, etc). (Procedure step)
Process
SAES-L-350,
A3 Tie-In Spools were pressure tested and internally cleaned.
Para. 15.2

B Tie-In Location Verification Requirements … See notes & attachments

Location of Tie-In to be executed has been confirmed to be correct & is


acceptable to the Authorized Saudi Aramco Welding Inspector.
System for marking & ID of Tie-Ins exists (Procedure item).
A) Exact tie-in is marked using an approved marking method. IFC Drawing &
B) Any cut lines shall be layed out & checked by Inspection. Procedure,
B1
C) Any new weld (cut line) shall be located following Saudi Aramco SAEP-311,
encroachment rules (SAES-W-011, Par 11.16). See Attachment 1 Para. 5..4
D) Cutting method & Safety Precautions for cutting into existing systems
is detailed in package (cold cut, hot work, precautions,etc)
Work Permits and Package are located at the site (control work).

Inspect and determine the minimum pipe wall thickness at the tie-in
SAEP-311,
B2 weld areas by a continuous UT scan along the lines to be welded and
Para. 5.4.3
record this on the applicable form. Use SATR-NDT-2007

If welding does not begin within Sixty (60) days of the initial UT thickness
exam, the weld area wall thickness shall be re-examined. Procedure
B3 Note: Certain Plant facilities require a 30-day rule. This shall be agreed Requirement
upon with the Proponent. In no case may the 60 day rule be violated as (Agreement)
conditions (thickness) may change.

Package has been reviewed and approved for Construction by all 4


Procedure
B4 stakeholders listed in Attachment 2 (Approval for Construction).
Requirement
Signatures of approval are listed and the Tie-In is approved

All equipment listed in the package for work is available and in good
Procedure
B5 condition before the start of work. Check bonding & install ground mats
Requirement
for safety as required. Bond lines to steel structures as req'd.
Verify Package Instructions for Safe Work have been followed:
A) Blinds have been installed (Isolation per Package Drawings) Procedure
B6
B) Process Cleaning of system has been performed/accepted. Requirement
C) Safe Work Permit has been issued & all Precautions are known

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Preparatory Tie-In Requirements (Plant Piping) SAIC-L-2026 30-Apr-17 PIPING-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

REMARKS:

ATTACHMENTS:
1 - Tie-In Prep Requirements
2 - Tie-In Flow Sheet
REFERENCE DOCUMENTS: 1. Contract Schedule Q
2. SAEP-311, Installation of Hot Tapped and Stopple Connections (13 September 2009). See Note 6 of SAIC-L-2025.
3. SAES-L-350 -- Construction of Plant Piping 22 April 2009
4. SAES-W-011 -- Welding Requirements for On-Plot Piping 4 October 2009

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Preparatory Tie-In Requirements (Plant Piping) SAIC-L-2026 30-Apr-17 PIPING-

ATTACHMENT 1 - Tie-In Prep Requirements

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Preparatory Tie-In Requirements (Plant Piping) SAIC-L-2026 30-Apr-17 PIPING-

Attachment 2 - Tie-In Flow Sheet


TIE- IN FLOW SHEET
B.I. / J. O. Number:
Project Description:

Contractor:

TIE - IN NUMBER: ______________________

LOCATION: TYPE OF TIE-IN:


Description :

Fluid Condition: Op. Temp: Op. Pressure: Fluid Service:

APPROVALS
Design/ Engg. Approval:

Contractor/Date SAPMT/Date PROPONENT/Date Projects Insp/Date

Approval For Construction:

Contractor/Date SAPMT/Date PROPONENT/Date Projects Insp/Date

Inspection & Testing : (Completion of NDE, Visual, Pressure Testing, etc)

Contractor/Date SAPMT/Date Projects Insp./Date

Completion / Acceptance:

Contractor/Date SAPMT/Date Projects Insp. / Date Proponent / Date

Saudi Aramco: Company General Use