SAUDI ARAMCO RAS TANURA REFINERY

CLEAN FUELS PROJECT


(PACKAGE-2-MECH WORKS)

METHOD OF STATEMENT
FOR
TIE-IN NO. 054-067

(EGE-TR-MS-067)
Revision Number 1 Reference EGE-TR-MS-067
Number
Amendment 0 Date 23-Oct-2018
Document Title METHOD STATEMENT OF PIPING TIE-IN NO. 054-067 AT UNIT
054 FOR RASTANURA REFINERY CLEAN FUELS PROJECT

REVIEW & APPROVAL SIGNATURE RECORD BY EGE

ROLE TITLE SIGNATURE DATE

Prepared by Engineering Dept.

Reviewer 1 QA/QC Manager

Reviewer 2 Safety Manager

Approved by Construction Manager

REVIEW & APPROVED BY TR

ROLE TITLE SIGNATURE DATE

Reviewed by Project Engineer

Approved by Construction Manager

RECOD OF REVISION
REVISION DESCRIPTION DATE
0 ISSUED FOR REVIEW & APPROVAL 13-Sep-18
1 ISSUED FOR REVIEW & APPROVAL 23-Oct-18
METHOD STATEMENT OF PIPING TIE-IN NO. 054-067 AT UNIT 054
RASTANURA REFINERY CLEAN FUELS PROJECT

Table of Contents

1.0 SCOPE ................................................................................................................... 2

2.0 PURPOSE ............................................................................................................... 2

3.0 DEFINITION & ABBREVIATIONS ............................................................................. 2

4.0 RESPONSIBILITIES .................................................................................................. 2

5.0 MANPOWER.......................................................................................................... 4

6.0 TOOLS AND EQUIPMENT ....................................................................................... 4

7.0 WORK METHODOLOGY ......................................................................................... 5


7.1 Engineering Preparation...................................................................................................................... 5

7.2 WORK to be executed before Shutdown Time for TIE-IN 054-067 ......................................................... 6

7.3 Work to be executed during the shutdown time for Tie-In Work for 054-067.................................. 8

7.4 Post tie-in Activity ............................................................................................................................. 9

8.0 RFI for Layup & Reinstatement ............................................................................ 9

10.0 SAFETY INSPECTION ............................................................................................ 9

11.0 APPLICABLE REFERENCES................................................................................... 10

12.0 APPENDICES ...................................................................................................... 10

DOCUMENT NO. REVISION PRINT DATE PAGE


EGE-TR-MS-067 1 23-Oct-2018 1 of 11
METHOD STATEMENT OF PIPING TIE-IN NO. 054-067 AT UNIT 054
RASTANURA REFINERY CLEAN FUELS PROJECT

1.0 SCOPE

This Method Statement covers the methodology of Tie-In No. 054-067 pipe spool at unit
054 for Rastanura Refinery Clean Fuel project. The work consists of furnishing of all
supervision, labor, materials, tools and equipment necessary for all Tie-in works.

2.0 PURPOSE

The purpose of this Method Statement is to show the methodology and describe the
sequential steps for execution of Tie-In No. 054-067. It is the intention of this document to
ensure that safe practices are being imposed on the tie-in works considering the protection
and safety of personnel & utilities from hazards that might occur during execution of works.

3.0 DEFINITION & ABBREVIATIONS

TERM DESCRIPTION
A written document that explains the planned execution method
Method Statement to control the work at various stages and to assure quality, and
delivery on time of the work.
Company Saudi Aramco
Contractor TR (Tecnicas Reunidas)
Sub-Contractor EVERGREEN CONTRACTING CO. (EGE)
WPS Welding Procedure Specification
PQR Procedure Qualification Record
ITP Inspection & Test Plan
Work to be performed with piping or equipment out of service,
Cold Tap
depressurized and vented.

4.0 RESPONSIBILITIES

POSITION TITLE ROLE DESCRIPTION OF TASK


Project Manager Coordination & Control Responsible for the over-all direction,
coordination and control of all Tie-In
activities.

DOCUMENT NO. REVISION PRINT DATE PAGE


EGE-TR-MS-067 1 23-Oct-2018 2 of 11
METHOD STATEMENT OF PIPING TIE-IN NO. 054-067 AT UNIT 054
RASTANURA REFINERY CLEAN FUELS PROJECT

Construction Direct management of Implementation and control of construction


Manager activities as planned and scheduled. Over
site construction.
all responsible for on-time completion of
work.
Project Project planning, Responsible for the overall planning and
direction of craftsmen activities related to
Engineer implementation
Tie-In works including determining method
and Monitoring of works, manpower levels, and equipment
requirement & work schedule. Monitoring of
all Tie-In work related activities.

Piping Engineer Technical Support, Review and interpretation of Codes,


Standards & Specifications, Technical
Monitoring manuals and drawings. Prepare, develop
and/or update work procedure as required.
Provide technical direction to supervisors
assigned to area of work and craftsmen to
ensure work is completed in proper
sequence.
Piping Supervisor Supervision and Involve in the planning, organizing and
execution of all Tie-In activities. Prepare
Execution
safety and quality action plan that must be
implemented and observed during the Tie-
In installation activities.

Piping Foremen Direct execution of the Responsible for the direct execution at site
work. Instruct working and ensure that the work is performed in
accordance with latest approved Tie-In IFC
personnel. drawing and Proper usage of tools,
equipment, wearing of PPE and daily
housekeeping of the work area.

Welding Supervisor Site Supervision Directly in-charge and supervise all welding
work activities. Responsible for the daily
work progress, work quality and safety.
Welding Foremen Take the lead on Directly execute, lead and give instruction to
welders about the assigned work, work
assigned work.
procedure.

Rigging Supervisor Supervision and Responsible for direct execution of the


execution of all rigging rigging works, unloading of materials.
Ensure that lifting plan and procedures are
activities. strictly followed and executed.

DOCUMENT NO. REVISION PRINT DATE PAGE


EGE-TR-MS-067 1 23-Oct-2018 3 of 11
METHOD STATEMENT OF PIPING TIE-IN NO. 054-067 AT UNIT 054
RASTANURA REFINERY CLEAN FUELS PROJECT

QC Manager Site management, Preparation of QC program & guidelines.


Ensure the work has performed in
program & guidelines.
compliance with approved Project Quality
Plan, TRS Quality documents, Saudi
Aramco Standards & Procedures. Monitor
QC personnel mobilization at site as per
Schedule. Over all responsible of project
quality issues.
Implement QC program and policies.
Supervise the daily QC site activities.
QC Supervisor Site Supervision
Responsible for all site QC matters and
issues.

QC Inspector Inspections, record and Responsible for the necessary inspection


and test to be carried out during Tie-In
document reports
activities. Record and document reports of
all inspection & testing in accordance to the
approved QC-ITP and QC Program.
Safety Inspector Ensure safety for the Responsible in inspection and monitoring
safety aspects and ensure that the work is
proper execution of done in accordance with TR/Saudi Aramco
fabrication activities Safety Standards and EGE Safety
guidelines.

5.0 MANPOWER

The Piping Supervisor will control the activities at the site and he will be directly reporting
to the Project Engineer. The basic manpower under him will consist of the following:

5.1 Piping Foreman


5.2 Pipefitters
5.3 Permit Receiver
5.4 Welding Foreman
5.5 Welders
5.6 Rigger 1
5.7 Riggers
5.8 Heavy equipment operators
5.9 Flag men
5.10 Fire watch
5.11 Helpers & Labors

6.0 TOOLS AND EQUIPMENT

Tools and equipment needed should be in good condition and must be checked by
Supervisor prior to use in the Tie-In area. These includes but not limited to:

DOCUMENT NO. REVISION PRINT DATE PAGE


EGE-TR-MS-067 1 23-Oct-2018 4 of 11
METHOD STATEMENT OF PIPING TIE-IN NO. 054-067 AT UNIT 054
RASTANURA REFINERY CLEAN FUELS PROJECT

6.1 Welding Machines


6.2 Cold cutting machine (pneumatic cutting machine)
6.3 Grinders
6.4 Hilti Drilling machine
6.5 Nylon Slings
6.6 Chain Blocks
6.7 Pencil Grinder
6.8 Forklifts
6.9 Crane
6.10 Trailer Truck
6.11 Common Hand Tools
6.12 Air Compressor
6.13 Radiography (Weld Joints)
6.14 Hydro test pump
6.15 Flange Tester
6.16 Impact/Torque Wrenches
6.17 Hydro test manifold
6.18 Portable electrodes oven

7.0 WORK METHODOLOGY

7.1 Engineering Preparation

7.1.1 Review all references such as approved Tie-in Procedure and Packages
(construction drawings, project specifications, work permit requirements, and
work procedures Saudi Aramco standards GI-0002.100)

7.1.2 Ensure WPS, PQR, Tie-In packages are TR /Saudi Aramco approved
documentation prior to any tie-in activities.
7.1.3 Ensure drawings are IFC latest revision approved by TR/Saudi Aramco
prior to start tie-in works.
7.1.4 Conduct site verification to determine actual tie-in location and site condition
in reference to Isometric drawings No. CD-363074 SHT.001 rev.00, P&ID
No. NA-641518 SHT.011 rev.9A1 and Piping Plan NA-815071 SHT.003
rev.02.
7.1.5 Prepare tie-in package with the latest revision of IFC drawings in
reference TR / Saudi Aramco requirements.
7.1.6 Prepare Job Safety Analysis. (shall be submitted separately)

DOCUMENT NO. REVISION PRINT DATE PAGE


EGE-TR-MS-067 1 23-Oct-2018 5 of 11
METHOD STATEMENT OF PIPING TIE-IN NO. 054-067 AT UNIT 054
RASTANURA REFINERY CLEAN FUELS PROJECT

7.1.7 Prepare lifting plan / rigging plan and shall be approved prior to the Tie- In
works.
7.1.8 Ensure that Manifold testing are approved including the verification of the
calculation of the test pressure against existing T min results by Engineering.
7.1.9 Ensure that Relief pressure valves are set as per pressure calibration,
based on the calculated test pressure.
7.1.10 Prepare Hydrotest Procedure for TRS / Saudi Aramco PMT approved
prior to start of Hydro Testing.

7.2 WORK to be executed before Shutdown Time for TIE-IN 054-067

7.2.1 Inspection of Material

Subcontractor / Contractor will perform during the Receiving form TR


facilities warehouse. The inspection shall be based on SAIS-L-2-29 but not
limited to:

7.2.1.1 Tie-ins fitting shall have the material specification and grade stamped.
7.2.1.2 Support material will have inspected and approved.
7.2.1.3 Inspect the existing pipe in order to perform the tie-ins

7.2.2.4 One Support (as shown in figure below) will be prefabricated.

Dimension shall be checked at site

DOCUMENT NO. REVISION PRINT DATE PAGE


EGE-TR-MS-067 1 23-Oct-2018 6 of 11
METHOD STATEMENT OF PIPING TIE-IN NO. 054-067 AT UNIT 054
RASTANURA REFINERY CLEAN FUELS PROJECT

Tie-In Information

NOTE; REFER TO ATTACHED P&ID MARKED-UP HYDRO TEST LIMIT FOR REFERENCE
P&ID dwg. no. NA-641518 Sht.011 Rev. 9A1 & Isometric dwg no.CD-363074 Sht.001 rev. 00.
7.2.3 Pre-Tie-in/Site Activities:
7.2.3.1 Ensure that tie-in site verification has been carried out and tag the tie-
in location.
7.2.3.2 Cleaning and Purging
After final cleaning and purging line will be handover to
Contractor/Sub-Contractor for Execution.
Submit and get the approval for Hot WP from company and follow
DOCUMENT NO. REVISION PRINT DATE PAGE
EGE-TR-MS-067 1 23-Oct-2018 7 of 11
METHOD STATEMENT OF PIPING TIE-IN NO. 054-067 AT UNIT 054
RASTANURA REFINERY CLEAN FUELS PROJECT

Operations Safety’s Instructions.


Mark exact tie-in using approved marking method.
Pipe support POS-001-TP-067 will be installed on foundation.
7.2.3.3 Storage and handling of Tie-ins spools and material
Subcontractor / contractor will perform inspection to ensure all tools
and equipment’s has valid calibration certificate / third party certification.
Tools box shall be placed in designed area in plant included manifold,
hoses.
Ensure equipment operators has valid license/certificate. Crane will
be used to unload the spools at site. After unloading the spools and
material will be inspected by Subcontractor/Contractor and SA
Operations in order to make sure the proper man power for the material
during the transportation from Workshop. Pipe shall be placed on
mounds or sleepers.
Valves, Gaskets, nuts and bolts will be inspected in EGE workshop.
They will be stored in shipping crates or on racks. ALL material will be
handled with care during shifting to site. All documentation MTC,
etc. shall be carried with the material, isolation valves will be tested at
shop.
Below find List of material
Valve
Bolts and nuts
Gaskets Flanges
7.3 Work to be executed during the shutdown time for Tie-In Work for 054-067
(Cold tap Tie-In)

7.3.1 Before any works is done, Work permit must be secured from Saudi
Aramco Operation Department.
7.3.2 Prior to cutting, check that tie-in location is gas free by following HOT
WORK PERMIT pr ocedur e and Operations instructions .
Precaution shall be taken care to prevent ignition of flammable or
combustible materials.
7.3.3 Lift blind flange of 10” (for CD-36307 Sht. 001 rev. 00) will be installed in

DOCUMENT NO. REVISION PRINT DATE PAGE


EGE-TR-MS-067 1 23-Oct-2018 8 of 11
METHOD STATEMENT OF PIPING TIE-IN NO. 054-067 AT UNIT 054
RASTANURA REFINERY CLEAN FUELS PROJECT

proper position using crane as per approved lifting plan and bolted as per
approved Bolt torque procedure.
7.3.4 Bolt torque shall be prepared by referring to Saudi Aramco Standard for
Bolt Torque Procedure, TR bolt torque procedure no approved Bolt torque
procedure.
7.4 Post tie-in Activity

7.4.1 Clean the area of construction debris, waste materials, tools and equipment.
7.4. 2 EGE shall close all related work permits.

8.0 RFI for Layup & Reinstatement

8.1 EGE assigned site QC/QA Inspector will perform quality inspection of tie-in
activities as per approved ITP.
8.2 QC acceptance criteria shall be in accordance to the approved ITP as described in
the project specifications, Saudi Aramco QC Standard.
8.3 EGE assigned QC Inspector shall carry out all the inspection works related to
Tie-In activities and coordinate with TRS-QC representative on daily basis.

9.0 SAFETY ACTION PLAN


9.1 Prior to Start the Job, Supervisor /Foreman have to share the work scope,
identification of work location, associated hazards and mitigation with crew.
9.2 Equipment and Tools should be inspected prior to use and replace if found
defective.
9.3 Supervisor / Foreman / Safety Officer have to ensure the working crew are
wearing the right PPE as per the associated hazards with activities
9.4 Supervisor / Foreman have to ensure continues supply of drinking water at site
and Working crew are drinking the water and taking the rest frequently.
9.5 Supervisor / Foreman / Safety Officer / Permit receive should be available at site to
ensure work is going on safely as per the work permit requirement / JSA
requirement.
9.6 Review the attached JSA

10.0 SAFETY INSPECTION

EGE assigned Site Safety Officer will implement safety program and policies at site in

DOCUMENT NO. REVISION PRINT DATE PAGE


EGE-TR-MS-067 1 23-Oct-2018 9 of 11
METHOD STATEMENT OF PIPING TIE-IN NO. 054-067 AT UNIT 054
RASTANURA REFINERY CLEAN FUELS PROJECT

accordance to Saudi Aramco Safety Standards. A Job Safety Analysis will be prepared by
EGE site safety representative for submission to TRS and for review and approval by Saudi
Aramco Ras Tanura Refinery Safety Department before start of tie-in works.

11.0 APPLICABLE REFERENCES

REFERENCE AUTHOR TITLE


SAES-A-004 Saudi Aramco General Requirements for Pressure Testing
Applicable Codes and Standards for Pressure
SAES-L-100 Saudi Aramco
Piping
SAES-L-105 Saudi Aramco Piping Line Class
SAES-L-109 Saudi Aramco Selection of Flanges, Stud Bolts and Gaskets
SAES-L-110 Saudi Aramco Limitations on Pipe Joints and Components
SAES-L-150 Saudi Aramco Pressure Testing of Plant Piping and Pipelines
SAES-L-310 Saudi Aramco Design of Plant Piping
SAES-L-350 Saudi Aramco Construction of Plant Piping.
API 598 API Valve Inspection and Testing
ASME B31.3 ASME Process Piping
ASME Section IX ASME Welding and Brazing Qualifications
SAES-W-011 Saudi Aramco Welding requirements for On-Plot Piping.
01-SAMSS-010 Saudi Aramco Fabricated Steel Piping.
01-SAMSS-048 Saudi Aramco Valve Inspection and Testing Requirements.
Disposal of Waste water from Cleaning,
SAEP-327 Saudi Aramco Flushing, and Dewatering Pipelines and
Vessels
SAEP-351 Saudi Aramco Bolted Flange Joints Assembly
SATIP-L-350-02 Saudi Aramco Saudi Aramco Typical Inspection Plan
GI-0002.100 Saudi Aramco Work Permit System
GI-0002.102 Saudi Aramco Pressure Testing Safely
GI-0002.711 Saudi Aramco Fire and Safety Watch

12.0 APPENDICES
CD-363074 Sht.001 rev. 00 -TIE IN ISOMETRIC DRAWING
NA-641518 Sht.011 Rev. 9A1 - P&ID
ATTACHMENT 2 - Limits mark P&ID
ATTACHMENT 3 - Welder JCC
SATR-L-2001 - Flange Joint Tightening Inspection Report
SATR-W-2006 - Fit-Up Report
DOCUMENT NO. REVISION PRINT DATE PAGE
EGE-TR-MS-067 1 23-Oct-2018 10 of 11
METHOD STATEMENT OF PIPING TIE-IN NO. 054-067 AT UNIT 054
RASTANURA REFINERY CLEAN FUELS PROJECT

SATR-W-2007 - Welding Report


SATR-W-2008 - Welding Summary
JSA - Job Safety Analysis
SIS - Safety Instruction Sheet.

DOCUMENT NO. REVISION PRINT DATE PAGE


EGE-TR-MS-067 1 23-Oct-2018 11 of 11
CONT. NOTES: NOTES:
LAHH= 42' 9"
054-T-1445 054-T-1545 LAH=39' 3"
19. EXISTING TANK CHANGE OF SERVICE FROM HEAVY 1. P&ID RE-DRAWN FROM NA-641518.007.
GASOLINE TANK LAHH= 42' 6" GASOLINE TANK LC/TC SAFE HIGH= 38' 9"
SIZE : 164 FT X 48 FT LAH=40' 9" SAFE LOW = 7' 6"
REFORMATE TO GASOLINE UNDER BI-10-00742. 2. DELETED.
9A1 9A1 SIZE : 164 FT X 48 FT 1545 A
CAPACITY :180,600 BBL SAFE HIGH= 40' 3" LAL= 7' 2" LA 20. ALL INSTRUMENTATION OF T-1545 DETACH FROM HEAVY
LC/TC SAFE LOW = 7' 9" CAPACITY :180,000 BBL 3. DELETED.
TRIM: VT-11572-1CS1P LA TRIM: VT-11573-1CS1P LALL= 6' 10" 1545 REFORMATE SYSTEM AND ATTACH WITH GASOLINE SYSTEM.
1445 A LAL= 7' 3" (PUMP HOUSE #1). 9A1 4. FOR TYPICAL INSTRUMENTATION DETAIL SEE PLANT
1445 LALL= 7' DRAWING RA-409145.001.
21. AS-BUILT PER SITE OBSERVATION. 9A1

HH DAU HH 5. DELETED.
DAU 22. MOV 12661 & 11969 SHALL BE REUSED IN SAME SERVICE.
LS LI TI LT TE LS 6. DELETED. 9A1
SET @ 42' 6" LT TE LI TI 23. DELETED.
1445 1545 A 1545 A 1545 A 1545 A 1545 SET @ 42' 9" 7. FOR TYPICAL INSTRUMENTATION
1445 A 1445 A 1445 A 1445 A 24. VALVE TO BE INSTALLED WITH STEM IN HORIZONTAL POSITION
OR 45º DOWNWARDS. DETAILS DWG. 194002 SH.001 & SH.002.
TANK
3/4" 25. FOR PVRV DETAILS REFER TO DWG. CA-359435 SHT.009. 8. FOR OILY WATER DRAIN CONNECTION SEE DA-100490SH.025.
12" 9A1 9. FOR OILY WATER DRAIN CONNECTION SEE DA-100490SH.024.
NA-641518.017
54-T-1445 54-T-1545 10. SEE RA-528865.001 FOR INSTRUMENTATION DETAILS.
4" V 11. DELETED.
NOTE 12 16"
NOTE 21 GENERAL NOTES:
9A1

SEE DETAIL "B"


NA-641518.009 9A1 12. EXISTING VALVE ON THIS LINE TO BE CLOSED FOR
- REFER TO GENERAL NOTES ON P&ID J99-A-PID-CA-350456-002. NAPHTHA ISOLATION.
NOTE 25 SEE DETAIL "B"
NOTES 19,20,25
- FOR LEGEND AND SYMBOLOGY SEE J99-A-PID-CA-350456-001 TO 018. 13. FOR T-1445: MOV-12661,11969,12703 &12704 TO BE INTERLOCKED
SO THAT ONLY ONE MOV CAN BE OPENED AT A TIME.
CLOUDED ITEMS ARE PART OF BI-10-00742 14. FOR TYPICAL INSTRUMENTATION SEE DWG. CA-359434 SH.010.
4" CONTRACTOR'S SCOPE.
NOTE 8 15. HIGH POINT VENTS & LOW POINT DRAINS TO BE PROVIDED
TYPICAL SAMPLE BOX
GASOLINE
1"D2" 9A1 DASH-DOT CLOUD SHOWS CHANGES FROM BY PIPING. THE LOW POINT DRAIN SHOULD BE 4" DIA.
12" SET @ 270.0 PSIG 12"
NOTE 9 LCS
9A1 PREVIOUS REVISION INCLUDING SITE SURVEY. 16. ALL UNDERGROUND LINES UNDER BI-10-00742 SCOPE WILL
MOV DCS DETAIL "B" HAVE CATHOTIC PROTECTION.
BLD + PZV 2"-RL-10644-1CS1P13
1445 -2
BI-10-00742 SET @ 270.0 PSIG 53 +
17. DELETED. 9A1
6608 3/4"
BI-10-00742 054 326 1"D2" 2" 9A1 18. FOR T-1545: MOV-12994,12995,12996,12997 AND HV-13070
MOV PZV 16" BLD TO BE INTERLOCKED SO THAT ONLY ONE VALVE CAN BE 9A1

M
M
054 064 +
9A1 +
9A1 CL300 CSO
3991 3/4" 6622 1445 -3 OPENED AT A TIME.
9A1 2" NOTE 24 MOV

1"-P-09190-1CS1P13
1" 9A1 +

55
24" CSO CL300 3/4" NOTE 14 LEGEND
9A1 PIPING MATERIAL
NOTE 24 16"

M
24" INSTRUMENT DEFINITION & SYMBOLS SAES-J-003
BI-10-00742 BLD 9A1 NOTE 14 SPECIFICATION SAES-L-105
9A1 AC/AFO -AIR TO CLOSE/ VE
9A1 3/4" LCS -VIBRATION ELEMENT
054 066 1545 -3 MOV BI-10-00742
AIR FAILURE OPEN VS -VIBRATION SWITCH
1" CSO 9A1 1" CSO 9A1 DCS +
PROCESS LINE AC/AFS -AIR TO CLOSE/AIR VT -VIBRATION TRANSMITTER
9A1 11967 FAILURE STEADY
1"-P-09189-1CS1P13 NOTE 24 NOTE 24 BI-10-00742 054 073 -AIR TO OPEN/
XL -PILOT LIGHT
1" V 9A1 INSTRUMENT AO/AFC (NOT FOR MOTOR)
9A1 1" V 9A1 054 072 AIR LINE AIR FAILURE CLOSE XS -LIMIT SWITCH
9A1
36"-P-09102-1CS1P13 36"-P-09107-1CS1P13 INSTRUMENT
AO/AFS -AIR TO OPEN/AIR ZV -SAFETY SHUTDOWN VALVE
FAILURE STEADY
ELECTRICAL LINE DATA LOGGER POINT
AOV -AIR OPERATED VALVE
F-FLOW P-PRESS.
9A1 9A1

INPUTS
CLOSED
OPENED AT -ANALYZER TRANSMITTER
6" D XL XL 6" D 9A1 DT -DENSITY TRANSMITTER
L-LEVEL T-TEMP.
9A1 2"-RL-10598-1CS1P13

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
X-MISC. A-ALARM
2"-RL-10592-1CS1P13 13070 A 13070 B REDUCER ESD -EMER. SHUTDOWN SYSTEM
LOCAL PANEL
FC - FLOW CONTROLLER

2"-RL-10594-1CS1P13
MOUNTED INSTR.
NOTE 14 SPECTACLE
9A1 9A1 NOTE 14 NOTE 14 NOTE 14 FV -FLOW CONTROL VALVE
36"-P-09108-1CS1P13
20"-P-09020-1CS1P13

2"-RL-10597-1CS1P13

2"-RL-10595-1CS1P13
PLATE-OPEN

2"-RL-10951-1CS1P13

2"-RL-10596-1CS1P13

NOTE 24
NOTE 24 NOTE 24 FCV -FLOW CONTROL VALVE
2"-RL-10593-1CS1P13

2"

36"-P-09106-1CS1P13
2"-RL-10590-1CS1P13

BOARD MOUNTED
2" MOV MOV
18"-P-09100-1CS1P13

XLS XLS 2" MOV 2" MOV (SELF-ACTUATED) INSTRUMENT


9A1 CSO
+ +
+
CSO + SPECTACLE FE -FLOW ELEMENT
13070 A 13070 B 12994 9A1 CSO 12995 9A1 CSO 12996 12997 PLATE-CLOSED
2"-RL-10643-1CS1P13

9A1 R/G
NOTE 24 FL /TSO 24" 9A1 36" FG -FLOW SIGHT GLASS
FL /TSO STATUS LIGHTS
2" CSO 9A1 9A1 3/4" 3/4" 20" CL150 3/4" FL /TSO 3/4" FL /TSO GATE VALVE FHV -FLOW MANUAL CONT. VALVE XL R=RED, G=GREEN

M
HV 8"

M
9A1 20" CL150 CL150 CL150 FHTD -FLOW MANUAL TRANSDUCER PILOT LIGHT (DO NOT
9A1 +

9A1 GLOBE VALVE


9A1 3/4" NOTE 24 13070
9A1 9A1
FIC -FLOW INDICATOR CONTROLLER USE FOR MOTOR STATUS)
9A1 9A1 CHECK VALVE FM -FLOW METER
MOTOR STATUS

NOTE 24
9A1 9A1 9A1 9A1 FO -RESTRICTION ORIFICE
PILOT LIGHT
9A1 3/4" 3/4" 3/4" 3/4"

MIN.

MIN.

MIN.

MIN.
PLUG VALVE

MIN.
FQI -FLOW TOTALIZER INDICATOR
9A1 9A1 NOTE 24 PZV NOTE 24 9A1 NOTE 24

1-1/2"-P-09104-1CS1P13
3/4" + FR -FLOW RECORDER
1-1/2" 1-1/2" 1-1/2" 9A1 1" BALL VALVE LOCAL MOUNTED
1-1/2"-P-09105-1CS1P13

4013 ML
FT -FLOW TRANSMITTER
NOTE 14 NOTES 14, 22 1" NOTE 24 DOUBLE DISC FY -FLOW RELAY
INSTRUMENT

CSO 2" 9A1 CSO 2" 9A1 9A1 1-1/2"x1" 1-1/2"x1" CSO 1"E2" CL300 1-1/2"x1" CSO GATE VALVE
9A1 2" CSO CSO CL300 CSO HIC -HAND INDICATOR CONTROLLER
MOV 9A1 MOV CSO 2" CL300 CSO PZV MOUNTED BEHIND
NOTE 24 NOTE 24 PZV CL300 NOTE 24 PZV CL300 SET @ 270.0 PSIG ANGLE VALVE HS -HAND SWITCH LOCAL PANEL
9A1 1"-P-09109-1CS1P13
+
+
CL150 NOTE 24 11969 9A1 9A1 +

12704 9A1 PZV 1"-P-09113-1CS1P13


+
+
4014 LA -LEVEL ALARM
FL /TSO + 4" D 4011 9A1 6" D 4012 6" D 6" D 6" D LV -LEVEL CONTROL VALVE
NOTES 14,22 NOTE 14 4010 9A1 9A1 1-1/2"-P-09110-1CS1P13 1"D2" 9A1 PRESS.RELIEF VALVE RACK MOUNTED
20" 3/4" 24" LCV -LEVEL CONTROL VALVE (OR BACK OF PANEL)
M

M
3/4" 3/4" 9A1 1"E2" SET @ 270.0 PSIG
18" 36" 9A1 1"E2" (SELF-ACTUATED)

NOTE 24
3/4"
NOTE 24

FL FL / TSO FL /TSO 1"D2" SET @ 270.0 PSIG


M

SET @ 270.0 PSIG LG -LEVEL GAUGE GLASS ELECTRICAL


NOTE 24

CL300 CL150 SET @ 270.0 PSIG 9A1 SUCTION LINE LIC -LEVEL INDICATOR CONTROLLER SUPPLY REQUIRED
9A1 MOV 9A1 DCS 9A1 1-1/2"-P-09112-1CS1P13 36"-P-09042-1CS1P13 VACUUMRELIEF VALVE -LEVEL INDICATOR
LI
MOV 1-1/2"-P-09111-1CS1P13 CA-359435.001
MIN.

+
-LEVEL RECORDER INSTRUMENT
12661 NOTE 24 +
9A1 9A1 MIN. LR
12703 1-1/2"x1" AIR SUPPLY REQUIRED

8"-P-09098-1CS1P13
1-1/2" 1-1/2" 1" BI-10-00742 FROM T-1544 M MOTOR OPERATED LS -LEVEL SWITCH
9A1
MIN.

LT -LEVEL TRANSMITTER
MIN.

9A1 36"x24" VALVE H


1-1/2"x1" 9A1 054 071 LTD -LEVEL TRANSDUCER HIGH LOW
CSO 1-1/2"x1" CSO CSO CL300 1-1/2" CL300
3/4" CL300 PZV PZV PZV ML -MOTOR STATUS LIGHT L
CL300 PZV + CSO 3/4" +
MOV -MOTOR OPERATED VALVE
+
3/4" + 3/4" 4017 4016
P

9A1 1"E2" 4015 4018 1"D2" 1"E2" NOTE 21


PISTON OPERATED NA -ANNUNCIATOR TWO PEN RECORDER
6" D 4" D 6" D 6" D VALVE PB -PUSHBUTTON
1"E2" SET @ 270.0 PSIG SET @ 270.0 PSIG
SET @ 270.0 PSIG SET @ 270.0 PSIG PC -PRESSURE CONTROLLER FF
FOUNDATION
BI-10-00742 CONTROL VALVE PV -PRESS. CONTROL VALVE
FIELDBUS INSTRUMENT
PCV -PRESS. CONTROL VALVE
1-1/2"-P-09101-1CS1P13 9A1
054 059 1"-P-09103-1CS1P13 BI-10-00742 (SELF ACTUATED)
P
BALL TYPE PDC -PRESS. DIFF. CONTROLLER DISTRIBUTED CONTROL/SHARED
FROM T-3,T-8,T-11 054 148 CONTROL VALVE PDI -PRESS. DIFF. INDICATOR DISPLAY SYMBOLS
WITH POSITIONER PDIC -PRESSURE DIFFERENTIAL
NA-M23663.001 24" (DCS) DISTRIBUTED CONTROL
INDICATOR CONTROLLER

M
S SYSTEM, OPERATOR ACCESSIBLE
18"-P-7026-3CS1P1 FS
20"-P-09020-1CS1P13

BI-10-00742 SOLENOID VALVE PDIS -PRESSURE DIFFERENTIAL IN CONTROL ROOM


NOTE 10 INDICATOR SWITCH (DCS) DISTRIBUTED CONTROL
3CS1P1 1CS1P13 054 061 MOV MOV DETAIL 1 PDT -PRESS. DIFF. TRANSMITTER
+ VALVE NORMALLY SYSTEM, OPERATOR INACCESSIBLE
+
12663 PDTD -PRESS. DIFF. TRANSDUCER
12662 24"-P-7147-1CS1P1 CLOSED IN CONTROL ROOM
PG -PRESSURE GAGE
M (DCS) DISTRIBUTED CONTROL
PI -PRESSURE INDICATOR
1" V 24"-P-8334-1CS1P13 24" PIC -PRESS. INDICATOR CONTROLLER
SYSTEM, OPERATOR INACCESSIBLE
IN FIELD
36"x24" PR -PRESSURE RECORDER
NA-M23661.001 PS -PRESSURE SWITCH
PT -PRESSURE TRANSMITTER DISTRIBUTED CONTROL
24" TO GASOLINE INTERCONNECTING LOGIC
NP-8 FS
PX -PRESSURE POINT
24"-P-09004-1CS1P13 PUMPS 054-G-0823A/B PY -PRESS. COMPUTATION MOD. CONTROLLER WITH BINARY
CA-359435.007 PZV -PRESSURE RELIEF VALVE OR SEQUENTIAL FUNCTIONS
9A1 RTD -RESIST. TEMP. DETECTOR
FROM HEADER SI -SPEED INDICATOR
(PLC) PROGRAMMABLE LOGIC
CONTROLLER, NORMALLY
SS -SPEED SWITCH INACCESSIBLE OR BEHIND THE
9A1 TC -TEMP. CONTROLLER PANEL DEVICE OR FUNCTIONS
NP-7
20"-P-09017-1CS1P13 20" 20"-P-09021-1CS1P13 TV -TEMP. CONTROL VALVE (PLC) PROGRAMMABLE LOGIC
NA-M23669.001 TCV -TEMP. CONTROL VALVE CONTROLLER FUNCTION,
(SELF-ACTUATED) CAN BE NORMALLY
CSO NP-8
FROM HEADER 24"-P-09003-1CS1P13 TE -TEMP. ELEMENT DISPLAYED ON CRT

CA-359435.007 TSO -TIGHT SHUT OFF TG -THERMOMETER LOCAL DCS OR AUXILIARY


S.C. - SAMPLE CONN. THS -TEMP. HAND SWITCH DCS LOCATION NORMALLY
FILL LINE 9A1 FROM HEADER
20"-P-09099-1CS1P13 BI-10-00742 S -DRAIN TO TI -TEMP. INDICATOR ACCESSIBLE TO OPERATOR
TR -TEMP. RECORDER
NA-M23663.001 PRESSURE SEWER (PLC) PROGRAMMABLE LOGIC
054 074 TS -TEMP. SWITCH
CONTROLLER I/O POINT
OWS -OILY WATER SEWER
FROM T-3, T-8, T-11 9A1 TT -TEMP. TRANSMITTER NORMALLY INACCESSIBLE
30" D -DRAIN TTD -TEMP. TRANSDUCER BY OPERATOR
30" V -VENT TW -THERMOWELL
30" X-SUCTION
NA-641518.007 NA-641518.009
BI-10-00742 REFERENCE DRAWINGS
BI-10-00742
16" 16" LETTER IDENTIFICATION OF LINES AE-036204
054 138 054 068 1" V 3" D
4" D PIPING SYMBOLS AB-036227
20" T-26 20"
NA-641518.007 EQUIPMENT SYMBOLS AB-036305
BLD 20" INSTRUMENT SYMBOLS AC-036950
T9-10A PIPING LAYOUT INDEX

12" T-9 PLOT PLAN


12" T-4
NA-641518.013 LCS PROCESS FLOW DIAGRAM
BLD TO PH-1 MOV HYDROSTATIC TEST DIAGRAM
+
DCS
T9-12 4000
M

BLD M
HV XLS HV BLD DRAWING CONTROL FOR J.O.
+

XLS HV T9-11 4196 4218 4218 T4-6


INSTRUMENT INSTALLATION SCHEDULES
20"

M
+

4145 A/B 4195 BLD


HV RCY-10
+

3825
HV BLD
M

3829 BLD T4-4


INTER TANK TRANSFER 9 A1 14-Jun-2018 ISSUED FOR CONSTRUCTION MMG JYM JLT
8"-P-09097-1CS1P13
T4-5 TO T-1544
NA-M23663.001 09 16-Nov-2017 ISSUED FOR CONSTRUCTION ARV FFM JLT
CA-359435.001
FROM HEADER 10" BI-10-00742 INTER TANK TRANSFER Rev. Date Description By Chk Appr
REVISION VALIDATION
054 067
HV THIS REVISION NO. 9A1 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
3824 10" T-9 REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
NA-641518.015 10-00742-0006-001
1" V
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
BLD BLD (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
T9-13 T9-14 BI-10-00742 ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
054 070
9A1
10" T-9
4" REV.NO. DATE REVISION DESCRIPTION
NA-641518.010 9A1 14-JUN-2018 ISSUED FOR CONSTRUCTION

HV
TO RECYCLE JOB ORDER/EWO NO.
3828 THIS REVISION IS NOT TO BE USED FOR
10-00742-0006 CONSTRUCTION UNTIL CERTIFIED AND DATED
BI-10-00742 NA-641518.007
T-4
NA-641518.007
8"
TOW. DIESEL 054 069 SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
PIPING & INSTRUMENTATION DIAGRAM PID
8" 8" 9A1
10" T-17 GASOLINE SYS. T-1445 &T-1545
NA-641518.007 NA-641518.009
10"x8"
8" TERM.SOUTH SHIPPING PUMPHOUSE -1, 2
9A1
RAS TANURA SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

054 A NA-641518 011 9A1


Saudi Aramco 5994 ENG. (09/03)
SMART CADD-05

You might also like