CUSTOMER:
PROJECT:
Maneuver to perform:
General Requirements
Check list NO Does not
apply
Does the crane operator have current certification?
Does the Rigger have current certification?
Does the crane have a current operational certification?
Do the lifting elements have current certification?
Was the crane pre-use inspection carried out?
Was the pre-use inspection of the lifting accessories carried out?
Is the area free of electrical transmission lines?
Are there signaling devices for the lifting area?
Is the ground for the crane position and load compact and level?
Will the crane be located more than 2.00 meters away? from the edge of an excavation?
Is there enough space for the operator to perform the maneuver without obstacles?
Will cargo lifting be done during the day shift?
Do wind conditions exceed recommended limits?
Will the operator's position allow him a clear view of the maneuver and the rigger? Observations: