Professional Documents
Culture Documents
SPAR OVERVIEW
April 2003
Euronext
13170
TECHNIP-COFLEXIP FINLAND 2
WELCOME
MW YARD
TECHNIP-COFLEXIP FINLAND 3
REFERENCE LIST
Project Delivery Date Project Delivery Date
Contract Actual Contract Actual
Holstein
Hard Tank & Mooring Sep 13, 03
Mad Dog
Truss Spar Hull Dec 16, 03
TECHNIP-COFLEXIP FINLAND 6
MÄNTYLUOTO WORKS
•Staff 2000 - 580 people
•Staff 2001 - 650 people
•Staff 2002 - 800 people Fabrication
PI-RAUMA
•Staff 2000 - 180 people
•Staff 2001 - 200 people Engineering
•Staff 2002 - 200 people
SPAR CAPABILITIES 7
n Well slots up to 40
è Proven Concept
è CAPEX Competitive
l T-C Delivers on Time
l T-C Delivers on Budget
è OPEX Superior
l More Drilling/Workover Up-Time due to Seafloor Riser Angle
l Smaller Marine Crew
è Unconditional Stability
n Drilling/Workover
è Can start Well Deviation at Seafloor
è Pre-Drill with MODU
l Complete with MODU
l Complete with Spar WO Rig
è Drill and Complete with Spar
l Drilling Rig
è Phased Drilling with MODU
l Pre-Drill Phase 1 Wells with MODU
l Complete and Produce Phase 1 with Spar
l Offset Spar with Mooring System
l Drill Phase 2 Wells with MODU while Spar is Offset and Producing Phase 1 Wells
l Complete and Produce Phase 2 Wells with Spar
n Ballasting
è Unconditional Stability
è Failsafe System
è No Licensed Marine Crew Required
è Operators Option
l Trim for Rig Offset
l Trim for Load Changes
è Adjust Variable Ballast if Significant Weight Changes in the Future
l Neptune increased Topside Weight 17% after installation
SUCCESSFUL PROJECT EXECUTION 11
è Design
l Robust Concept
l Can adopt Changes at late Stage
§ Increase hard Tank Depth
§ Utilize Variable Ballast Margin
è Hull Fabrication
l Mantyluoto Works Experienced Yard Dedicated to Spar Hull Fabrication
l Proven Track Record
è Moorings
l Simple and Rugged
è Topside Fabrication
l Gulf Marine Experienced Yard
l Proven Track Record
è Risers
l TOI Design and Delivery Capability
l Proven Track Record
è Marine Operations
l Heavy Lift Vessel Required
l Topside Lift Critical
TECHNIP-COFLEXIP FINLAND 12
ationship
m er Rel
RESULTS Custo ement
g
Mana
DELIVERY ject
Project Pro
e m ent
g
Mana
CAPACITY C hain
Infrast ly
ructure Supp gement
Mana 9001
PROCESS Quality ISO
Standa
rd
TECHNIP-COFLEXIP FINLAND 13
Procedures
Project
Management
Company Plan - PMP
Procedures
TECHNIP-COFLEXIP FINLAND 14
PROPOSAL
BASIS
Delivery
Commitment
Pricing
Project
Management
Plan
Technical Proposal
Specification
TECHNIP-COFLEXIP FINLAND 15
CUSTOMER
RISK COST
Ownership
Structure
Management Contingency
Systems
Track Record
Execution
Price
Plan
CONTRACTOR
• •Commitment • •Innovation
Innovation
Commitment
• •Communication • •Productivity
Productivity
Communication
• •Profit
ProfitExpectations
Expectations
• •Currency
CurrencyRate
Rate
• •Labor cost
PROJECT COST DRIVERS Labor cost
TECHNIP-COFLEXIP FINLAND 16
FABRICATION ORIENTED
ENGINEERING SERVES
FABRICATION
SEQUENTIAL
Engineering
• Information
Transfer
Fabrication
CONCURRENT
Engineering
• Knowledge Sharing
• Controlled Risk Decisions
Fabrication
CAISSON SPAR VS. TRUSS SPAR 18
SPAR DRILLING OPTIONS 19
TECHNIP-COFLEXIP FINLAND 20
DRY TRANSPORT
PRE-UPEND 23
TOPSIDE LIFT 24
TECHNIP-COFLEXIP FINLAND 25
n Length: 780 ft. (HT: 256 ft., T: 493 ft., ST: 22 ft.)
Status of projects
Project Section Half section Hull erection Outfitting Delivery
fabrication assembling
SPAR PROGRESSION
30
INVESTOR RELATIONS
G. Christopher Welton
Tel. +33 (0) 1 55 91 88 27
e-mail: cwelton@technip-coflexip.com
David-Alexandre Guez
Tel. +33 (0) 1 47 78 27 85
e-mail: daguez@technip-coflexip.com