HSE Management System

Operations Safety Standards Lifting


and Hoisting OperationsLifting
Plan Template APPENDIX 10

Company Name Amana Contracting Facility/ Project title Mobilization


Location AGP Laydown-BuHasa Contract No. 4700017248
Date of lifting operation From 10/06/2023 To 31/12/2023 Specific / /
Lift Plan Reference Number AGP-TH-LP-01 Rev-00 Number of Lifts to be done Multiple
Lift Plan Category ✓ Non-Routine Simple Non-Routine Complicated Non-Routine Complex
Task Risk Assessment RSK-4700017248-0005
Number
Method Statement Number MS-4700017248 -0005
Required Number of ✓ Appointed Person Crane Operator 1 Rigger 1 Banksman 2
Personnel to attend the
Lifting Operation and their Helper 2 ✓ Safety Rep. Third party
designation
LOAD DETAILS
Net Weight of Load Gross Weight of Load
Dimension of Load Load COG Location
Other Details (center of Gravity, Lifting points, Packaging, Palette etc.)
Reference shall be made to Lifting Data Tables which are required for all Lifts Categories (Refer to Appendix 11)
DESCRIPTION AND SEQUENCE OF LIFTING OPERATION
List the sequence of operation in a way to do the task safely e.g. (crane comes first or trailer, lift load #2 before load #1
etc.)
➢ Loading and unloading of Concrete foundation block and miscellaneous items.
➢ Escort the Telehandler into the site and set it up on firm-level ground make a trial lift to check any obstruction and
verify the radius,
➢ Toolbox talk to be carried out prior to starting work about specific to the job,
➢ Banksman to make the area clear from people and barricade the area and control entry and exit,
➢ Riggers to start rigging up the crane hook using mentioned rigging gear capacity then rig up the load,
➢ Signaler to give signals to the crane operator to lift the load from pick up point and drop on the desired location
LIFTING ACCESSORIES AND CONFIGURATION
Type and required Number Webbing sling 6m x 2 No’s, Bow Shackles x 2 No’s
(for example, spreader beam)
Safe Working Load (SWL) 6T, 6.5t
(Note: will configuration affect SWL?)
Method of Communication Radio ✓ Hand Signals
Indicate whether hand signals or radios are to be used. Also indicate signalling source and radio frequency/channel. This
section can also include any unique slinger/signaler identification (that is, different colour helmet/hi-vis) if required.
Contingency Plan
Note1: Basically it is Plan B, should things changed i.e. (Crane 1 break-down and Crane 2 can be used with some changes in
the Plan)
Note2: Emergency Response Team availability at site or nearest Hospital / Clinic …etc.
Emergency response team stand by, emergency vehicle standby, first aid kit available on site, alternate Telehandler with same
capacity can be hired in case of breakdown
DETAILS OF CRANE
Manufacturer’s Name Manitou Model # MTX1840 Crane Type R-T
Max. Crane’s Capacity 4000kg ID/No. / Plate # AD2/94639 Required Crane Capacity 2000kg
Required Max. Radius 8m Required Number of FallsN/A Required Boom Length 3m
Required Hook Block N/A Required Counterweights N/A Required Anemometer N/A
Required Fly Jib N/A Outrigger Spread N/A Max. Crane’s Wind Speed 20 Knots
Length & Angle
Required Ballast N/A Required Tie-back / N/A Outrigger Mat Dimension N/A
Weight / Full Tank Revolving (Barges)
(Barges)
Outrigger Mat Material N/A Outrigger Load on N/A Ground Bearing Pressure 14 t/m2
Ground (t) (t/m2)
Site Ultimate Bearing 28t/m2 Height from Hook to 3.5m Height from Load Bottom to 3.5m
Pressure (t/m2) Ground/Deck/Sea Level Ground /Deck /Sea Level
Required Lifting Area Land Crawler Crane Pad Dim. N/A Required Lifting Area Front
(Off-board /On-board (Over-front/ Rear / Side)
/Subsea)

ADNOC Group Lifting Plan: Non-Routine Lifts Page 1 of 2

Standard No.: HSE-OS-ST19 Version No.: 1 Effective date: August 2019 Page 1 of 301
HSE Management System
Operations Safety Standards Lifting
and Hoisting OperationsLifting
Plan Template APPENDIX 10

ADNOC Group Lifting Plan: Non-Routine Lifts (Contd.)


Note1: Reference shall be made to Lifting Data Tables which are required for all Lifts Categories (Refer to
Appendix 11).
Note2: Ground Condition- Temporary works design in place and checked off where appropriate. Compaction
Test shall be carried out by Soil Specialist.
Note3: where operating jib height equals or exceeds 10m above surrounding structures at any time, the appointed
person must advise and consult with the manager from any airport/ airfield within 6 km of the site.
Site and Crane Layout Pan
Include crane position, lay-down/rigging area, position of delivery vehicles, landing points, banksman positions,
ground and overhead hazards and exclusion zones. If required use elevation drawings.

Sketch of Slinging Method (Scaled Rigging Plan Drawing is required in case Non-Routine-Complex Lift Plan)
Drwaing Attached

Note: Reference shall be made to Lifting Data Tables which are required for all Lifts Categories (Refer to Appendix 11).
Access
Include travelling routes, road closures/highways notifications, and access problems.
All access point identified; vehicle movement route identified

SAFE SYSTEM OF WORK- METHODOLOGY


➢ Identify presence of hoses cables and other temporary fixtures in work site and include in TBT,
➢ Stop all lifting activity beyond wind speed 20 knot,
➢ Using of tag line to control load movement
➢ Escort all heavy vehicle to and from site,
➢ Competent and TPI certified rigger, & operator,
➢ Use radio communication for all blind lifts,
➢ Area should be barricaded until lifting operation completed and Telehandler is dismounted and leave the
area,
➢ All equipment’s and lifting gears have a third-party certificate on hand,
➢ Visual inspection is carried out prior to use of accessories and has color coded,
Lift Team
The details of this lift plan, along with any other associated risk assessment, method statement or safe system of
work,have been brought to the attention of, and explained to, the persons listed below, who have acknowledged that
they understand the contents, hazards and associated control measures.
LOAD DETAILS
Name of Person Preparing this plan Signature & Date
Chokkalingam M

09-06-2023
Name of Person Reviewing this plan Balram Kumar Pandey Signature & Date 09-06-2023
Name of Person Endorsing this plan Signature & Date

Page 2 of 2

Standard No.: HSE-OS-ST19 Version No.: 1 Effective date: August 2019 Page 2 of 301
HSE Management System
Operations Safety Standards
Lifting and Hoisting Operations
Lifting Data Table

APPENDIX 11

LIFTING DATA TABLE (ONSHORE CRANES)

LOAD DETAILS - Mobile Crane with Single Hook


Item Net weight Contingency Gross Weight Hook Block Rigging weight DAF Dynamic Lift Load (DLL)
Factor (Net weight X Weight (Sling, Shackle (Gross wt. + Hook Block wt. + Rigging
(1.1 for calculated, Contingency Spreader bar) wt.) X DAF
1.03 for weighed) Factor)
Concrete
Foundation 1.25 1.1 1.4 0.25 0.1t NA 1.75t
Block

CRANE DETAILS – Mobile Crane/Crawler Crane with Single Hook

Reference outrigger load or Track load in


Outrigger Load on Ground in MT
MT Outrigger Mat Dimension (Mobile)
Tracks load on Ground in MT Ground bearing pressure MT/m2
(Maximum Outrigger or Track load X 1.5 Tracks Pad Dimension (Crawler)
(from manufacturer software)
factor of safety)
1)
2)
N/A N/A N/A
3)
4)
Crane Utilization Ratio
Position Radius Crane capacity
(DLL X 100)/Crane Capacity
Pick-up 2m 4000kg 43.75%
Revolving 2m 4000kg 43.75%

Drop-off 2m 4000kg 43.75%

Page 1 of 2

Page 3 of 301
HSE Management System
Operations Safety Standards
Lifting and Hoisting Operations
Lifting Data Table

APPENDIX 11

RIGGING DETAILS
Leg Tension
(As per Lift Rigging Utilization Ratio
Description Rigging SWL* (Leg Tension X 100)/SWL Remarks
Analysis)

Shackle
Sling
Item-1 Spreader beam 6.5t 1.625t 25%
Pad eye
Pad ear
Trunnion

* The following factors to be


Shackle considered for SWL of each item
Sling
Item-2 Spreader beam 6t 1.625t 27.2% Mode Factor
Pad eye D/d Ratio
Pad ear Choker Hitch
Trunnion Basket Hitch

Shackle
Sling
Items-3 N/A N/A N/A
Spreader beam
Pad eye
Pad ear Trunnion

Page 1 of 2

Page 4 of 301
HSE Management System
Operations Safety Standards
Lifting and Hoisting Operations
Lifting Data Table

APPENDIX 11

Standard No.: HSE-OS-ST19 Version No.: 1 Effective date: August 2019


HSE Management System
Operations Safety Standards
Lifting and Hoisting Operations
Lifting Data Table

APPENDIX 11

Standard No.: HSE-OS-ST19 Version No.: 1 Effective date: August 2019


HSE Management System
Operations Safety Standards
Lifting and Hoisting Operations
Lifting Data Table

APPENDIX 11

Standard No.: HSE-OS-ST19 Version No.: 1 Effective date: August 2019


HSE Management System
Operations Safety Standards
Lifting and Hoisting Operations
Lifting Data Table

APPENDIX 11

Standard No.: HSE-OS-ST19 Version No.: 1 Effective date: August 2019


HSE Management System
Operations Safety Standards
Lifting and Hoisting Operations
Lifting Data Table

APPENDIX 11

Standard No.: HSE-OS-ST19 Version No.: 1 Effective date: August 2019


HSE Management System
Operations Safety Standards
Lifting and Hoisting Operations
Lifting Data Table

APPENDIX 11

Standard No.: HSE-OS-ST19 Version No.: 1 Effective date: August 2019


HSE Management System
Operations Safety Standards
Lifting and Hoisting Operations
Lifting Data Table

APPENDIX 11

Standard No.: HSE-OS-ST19 Version No.: 1 Effective date: August 2019


HSE Management System
Operations Safety Standards
Lifting and Hoisting Operations
Lifting Data Table

APPENDIX 11

Standard No.: HSE-OS-ST19 Version No.: 1 Effective date: August 2019


HSE Management System
Operations Safety Standards
Lifting and Hoisting Operations
Lifting Data Table

APPENDIX 11

Standard No.: HSE-OS-ST19 Version No.: 1 Effective date: August 2019


HSE Management System
Operations Safety Standards
Lifting and Hoisting Operations
Lifting Data Table

APPENDIX 11

Standard No.: HSE-OS-ST19 Version No.: 1 Effective date: August 2019


HSE Management System
Operations Safety Standards
Lifting and Hoisting Operations
Lifting Data Table

APPENDIX 11

Standard No.: HSE-OS-ST19 Version No.: 1 Effective date: August 2019


HSE Management System
Operations Safety Standards
Lifting and Hoisting Operations
Lifting Data Table

APPENDIX 11

SLINGING ARRANGEMENT

Hook
Attachment

Webbing sling
6t 6m 2 No’s

Bow Shackles
6.5t 2 No’s

Standard No.: HSE-OS-ST19 Version No.: 1 Effective date: August 2019