Note: Rigging Plans are to be submitted to the BNL Hoisting & Rigging Inspector for
review and approval at least 4 working days prior to the lift. All lifting equipment and
operations must be conducted in accordance with applicable ANSI standards and DOE
and OSHA requirements.
Total Weight of Lift: (includes load weight, and all rigging equipment, & load block)
Communication and Signals: Hand signals, two-way radio, emergency signal, voice commands
4.0/3b07e011.pdf 1 (11/2006)
Equipment List
Equipment List Type Quantity Dimensions Capacity Configuration Weight of
(size) (WLL) (Hitch Used) Lift
Slings:
Rigging Hardware:
(shackles, eyebolts, rings etc.)
Mobile Crane:
Cribbing/Shoring/Matting:
Transportation Vehicles:
4.0/3b07e011.pdf 2 (11/2006)
Equipment List Type Quantity Dimensions Capacity Configuration Weight of
(size) (WLL) (Hitch Used) Lift
Roller/Skates:
Jacks:
PPE/Hazmat:
will be in accordance with the OSHA, ASME and DOE-STD-1090 requirements for
inspection and load test.
4.0/3b07e011.pdf 3 (11/2006)