COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 2 of 57
RECORD OF REVISION
The revision listed below have been incorporated in this copy of the document.
REV PAGE
SECTION DESCRIPTION OF CHANGES
NO NO.
2A All All Updated with the latest of document format
Deleted:
“Steel members and steel piles shall be coated with a system complying
with BS EN ISO 12944 to corrosive class C5 where appropriate, with 15
2A 5 8 years to first maintenance. Planned maintenance recoating shall be
assumed as twice during the design life. Recoating shall be considered
impractical below a low water level”. Which is applied in S-100-13MO-
001_Design Basis for Marine Facility
Rephrase to: to meet applicable local authority and meets international
2A 5 8
health standards.
2A 6.2 9 Rephrase to: power tool cleaning
2A 7.3 11 Added: Recommendation of Approved Brands Manufacture
2A 8.4 14 Rephrase to: Attachment C
2A 9.8 16 Deleted : Fuel Gas or Nitrogen
2A 9.8 16 Deleted : Liquified Petroleum Gas
2A 9.10 18 Rephrase from : Liquified Petroleum Gas to Liquified Natural Gas
2A 9.10 18 Deleted : Fuel Gas or Nitrogen
2A 14 26 Added Wrapping
2A 15 26 Rephrase to: DURABILITY to WARRANTIES
Added: Table Paints Systems for Different Categories Based on Service
2A Attach B 29
Conditions
Added: Table Paints Systems for Different Categories Based on
2A Attach C 30 Requirements Surface Preparations and Primer, Intermediate & Final Coat
DFT
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 3 of 57
Content
1. INTRODUCTION ................................................................................................................... 6
2. SCOPE .................................................................................................................................. 6
3. DEFINITION AND ABBREVIATION ...................................................................................... 6
4. REFERENCE ........................................................................................................................ 6
4.1. COMPANY Document ..................................................................................................................... 6
4.2. Standards ........................................................................................................................................ 6
5. GENERAL REQUIREMENTS................................................................................................ 8
5.1. Steel Substrate Rust Grade ............................................................................................................ 8
5.2. Stainless Steel ................................................................................................................................. 8
5.3. Equipment Surface Not to be Painted ............................................................................................. 8
6. REQUIREMENTS FOR SURFACE PREPARATION ............................................................. 9
6.1. General ............................................................................................................................................ 9
6.2. Blast Cleaning of New Steelwork .................................................................................................... 9
6.3. Wet Abrasive Cleaning of Steelwork ............................................................................................... 9
6.4. Power Tool Cleaning of Steelwork ................................................................................................ 10
6.5. Cleaning of Sound, Previously Painted Steelwork ........................................................................ 10
6.6. Preparation of HOT DIP GALVANIZED Steelwork for Painting .................................................... 10
7. PAINT SYSTEM .................................................................................................................. 10
7.1. General .......................................................................................................................................... 10
7.2. Supplier’s Standard Paint .............................................................................................................. 10
7.3. Recommended Paint Manufacturer .............................................................................................. 11
7.4. Painting Systems ........................................................................................................................... 11
7.5. Packing, Shipment and Storage of Paints..................................................................................... 12
7.6. Execution of Works ....................................................................................................................... 12
7.7. Handling and Storage of Painted Equipment ................................................................................ 13
8. SCHEDULE OF PAINTING SYSTEM.................................................................................. 13
8.1. Symbol .......................................................................................................................................... 13
8.2. Roughness .................................................................................................................................... 14
8.3. Painting Schedule ......................................................................................................................... 14
8.4. Detail Paint System ....................................................................................................................... 14
9. IDENTIFICATION AND COLOR CODE .............................................................................. 14
9.1. General .......................................................................................................................................... 14
9.2. Purpose ......................................................................................................................................... 14
9.3. Detailed Paint Systems ................................................................................................................. 14
9.4. Color Of Lettering and Numbering ................................................................................................ 15
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 4 of 57
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 5 of 57
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 6 of 57
1. INTRODUCTION
PT Amman Mineral Nusa Tenggara (AMNT) plans to build additional combine cycle power generation plant
for their expansion projects including smelter and other new facilities. To provide gas for those facilities
AMNT engaged PT Medco Sumbawa Gas (MSG) to develop and operate a new LNG Terminal and Regas
Facility within AMNT operation area in Benete Bay of Sumbawa Island, West Nusa Tenggara, Indonesia.
The project includes facilities of onshore LNG storage tank with capacity of 50,000 m3 and 160,000 m3,
regasification unit to produces up to 77 mmscfd gas, an LNG-Carrier jetty with trestle, utilities, buildings
and gas sendout pipelines to the power plant and smelter.
2. SCOPE
This document covers the requirement of painting and coating of materials, surface preparation and
application of painting system inspection and test, safety and corrosive protection for piping, pipelines,
valves, buried pipes, equipment and steel structure to be used in the Sumbawa LNG Regasification
Terminal project.
4. REFERENCE
4.1. COMPANY Document
MFS Part C1 Para 6.5.3 General Painting Requirement
MFS Appendix 4 Painting Recommendations and Procedure
4.2. Standards
ASTM A123 Standard Specification for Zinc (Hot Galvanized) Coatings on
Products Fabricated from Rolled and Forged Steel Shapes, Plates,
Bars & Strips
ASTM D3359 Test Methods for Measuring Adhesion by Tape Test
ASTM D4258 Standard Practice for Surface Cleaning Concrete for Coating
ASTM D4541 Test Method for Pull-Off Strength of Coatings Using Adhesion
Testers
ASTM D4752 Standard Test Method for Measuring MEK Resistance of Ethyl
Silicate (Inorganic) Zinc-Rich Primers by Solvent Rub
ASTM D5162 Standard Practice for Discontinuity (Holiday) Testing of
Nonconductive Protective
ISO 2409 Paints and Varnishes - Cross-Cut Test
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 7 of 57
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 8 of 57
5. GENERAL REQUIREMENTS
Insulated or uninsulated equipment, piping and pipelines above ground shall be prepared and coated in
accordance with requirements of this specification and its appendices.
According to ISO12944, the corrosivity of environments of this project can be classified as C5, which is the
basis of painting system design and determination of the paint film thickness. The paint Supplier of the
epoxy painting for the internal surface of potable water tank shall furnish a certificate confirming the
suitability of the system to meet applicable local authority and meets international health standards.
Fixings and fastenings shall be hot-dip galvanized complying with BS EN ISO 1461 with a minimum
average coating weight of 610g/m2.
Small steel components, such as hand railing, etc, shall be galvanized. Safety features shall be finished in
yellow.
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 9 of 57
▪ Carbon steel anchoring items partially embedded in concrete or block work shall be hot dip
galvanized and protected at the junction by a strip of approved alkali resistant mastic filler.
▪ Instrument tubing and it’s accessories.
▪ Electrical and instrument cables and it’s accessories such as Junction Box.
▪ Hose and Hose coupling.
▪ Precautions shall be taken to prevent paint from being applied to equipment nameplates,
instrument glasses and gauge dials, couplings, shafts, valve stems, bearings, and other
machined surfaces (flanges, raised gasket faces except with faces not touched by gasket and
bolt holes).
▪ Concrete wall of LNG Tank
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 10 of 57
7. PAINT SYSTEM
7.1. General
▪ All paint applications shall be recorded in accordance with the inspection requirements.
▪ For tanks, painting shall be applied after hydrotest unless otherwise specified.
▪ Shop-applied primer surfaces shall be cleaned by proven method if they have been severely
contaminated with chlorides, such as due to being immersed in or splashed by seawater during
transportation and storage.
▪ To prevent zinc embrittlement cracking, paint containing a zinc pigment shall not be applied to
stainless steel and high alloy steel surfaces.
▪ “Wet Paint” warning signs shall be posted prominently at locations where painting work in
progress, until the paint has completely dried.
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 11 of 57
After installation, these items shall be touched up and finish coated to match the color scheme
of the plant, if required. Before starting the touch-up, the CONTRACTOR on site shall submit
his proposed system in accordance with the existing paint system of the particular item.
▪ Major electrical equipment such as control panels, electrical cabinets may be completely shop
painted. For outdoor panels, the final coat shall be in accordance with the color scheme of the
plant. If necessary, the Supplier will include cans of adequate paints in the shipment, for on-
site touch up purposes.
▪ In any case, the CONTRACTOR remains fully responsible for the quality of these paints and
shall warrant the painted surfaces for the compatibility of the final coats applied on site with
the shop paints.
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 12 of 57
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 13 of 57
▪ No changes or deviations shall be made from the specifications without written approval from
COMPANY. In the event of discrepancies in the specifications, the CONTRACTOR will
determine the procedure to be applied.
▪ CONTRACTOR shall ensure that all Sub-contractors and Suppliers strictly comply with the
painting specifications.
▪ Unless otherwise specified in the manufacturer's recommendations, or approved by
COMPANY, no blast cleaning or painting work may be performed when any of the following
conditions occurs, or is expected to occur during painting, or drying time:
✓ air temperature drops below 5 °C.
✓ surface temperature is less than 3 C above dew point, or rises above 45°C
✓ relative humidity exceeds 80 %, or specified humidity for each paint system
✓ in general, when weather conditions (rain, sand storm, …) would spoil surface preparation
and/or paint quality.
▪ CONTRACTOR shall provide all required protections to prevent surrounding equipment from
being spoiled during cleaning, blasting and painting works. Should any damage occur due to
the works, the responsible painting Supplier/Sub-contractor shall perform all necessary
cleaning or repair works, and replace the damaged item if it proves to be impossible to restore
it to its original condition.
E Equipment S Shop
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 14 of 57
8.2. Roughness
▪ For CS: Rz between 40 μm to 70 μm, with max. 25% of DFT.
▪ For SS: Rz between 50 to 70 μm.
These value are to be verified by painting manufacturer
9.2. Purpose
The purpose of this specification is to detail the lettering and other markings that indicate equipment
numbers, process fluid names and fluid directions.
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 15 of 57
Equipment numbers shall be positioned where they are easily visible from roads and other
accesses, on the side of a foundation or approximately 1,500 mm above finished grade.
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 16 of 57
If color used for identifying the piping system is indistinguishable because of the finish color of
piping or insulation, a background color coating shall be applied as follows:
Shape and Size of Arrow (W1) and Lettering Height (G)
Nominal Pipe Size W1 (inch) Lettering Height G (mm)
Note: If the piping insulated, the flow arrow size shall be determined by insulation jacketing
outside diameter.
Color Color
AF Air Foam Note 1
AS Air Note 1
BOG Boil-Off Gas Grey
CH Chemical Note 1
CL Hypochlorite Note 1
CW Cooling Water Note 1
DC Dry Chemical Note 1
DO Diesel Oil Brown
DR Drain Yellow Green
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 17 of 57
9.9. Lettering
▪ All lettering shall be colored by Black.
▪ Flow direction
All flow arrows shall be colored black.
If it is alternating direction of flow, the labels should point both ways.
▪ Repeat indication
At important crossings or branches, the arrow and any time, it is appropriate, the line
identification will be repeated.
▪ Firefighting irrespective of line diameter.
Piping for fire water and dry chemical CO2 shall be painted fully in red (see color code).
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 18 of 57
Capri
Structural steel, Platform and ladder 5019
Blue
Structural Light
Hand rail and Cage 1015
Steel Ivory
Bright
Fresh, Potable, Industrial Water 6029
Green
Yellow
Sanitary Sewer 6018
Green
Oily Water Dark Blue 8015
Diesel Oil Brown 8001
Pale
Nitrogen 1018
Yellow
Air Foam Note 1
Air Note 1
Chemical Note 1
Hypochlorite Note 1
Cooling Water Note 1
Dry Chemical Note 1
Liquified Natural Gas Note 1
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 19 of 57
Mouse
Carbon Steel Valve 7005
Grey
Valve
Distant
Stainless Steel Valve 5023
Blue
Coloring of Equipments
Color
No. Description Remarks
Color RAL No.
ORV Supplier’s standard color
BOG Compressor Supplier’s standard color
Loading Arm Supplier’s standard color
Package
Odorization Supplier’s standard color
Equipment
Pump & Motor Supplier’s standard color
Flare Supplier’s standard color
Other skid package Supplier’s standard color
Static Fire Tank Red 3000
Tank Aluminum 9006
Equipment
Vessel Aluminum 9006
Typical Line Identification
The space between lettering and arrows for dangerous internal fluids shall equal letter height.
Note: Color code is not applicable for insulated and fireproofed items.
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 20 of 57
▪ Before any application of paint or coating, compliance of the surface preparation with the
specification shall be checked as well as absence of dust, salt, grease, dirtiness, humidity, and
so on.
▪ Particular care shall be taken to prevent rusting and/or contamination of cleaned or primed
surfaces. Cleaned surfaces shall be coated the same day cleaning is done and before
detrimental corrosion or recontamination occurs.
▪ Blast cleaned steel shall be primed immediately after cleaning.
▪ Containers shall be opened only when about to be used. Paints shall be homogenized in
containers by thorough mixing by mechanical mixer.
▪ The paints supplied shall have sufficient fluidity to allow for normal application. Addition of
solvent or of thinner shall be forbidden unless it is specified by the paint Supplier.
▪ Times for curing or drying times specified in relation to the ambient conditions before the
application of the coatings shall be strictly observed. The same shall apply to drying or
polymerization of finishing coat before commissioning of equipment.
▪ Surfaces that will not be accessible after erection shall be painted and inspected before
assembly. Where high resistance bolts are used, specific requirements shall apply for the
joints, according to standard practice. The joints can be painted by inorganic Zinc rich primer
to decrease anti-slip coefficient.
▪ The paint systems shall be applied in accordance with the paint Supplier requirements.
Particular attention shall be paid to thinning, mixing and curing times between subsequent
coats. The solvent rub test shall be used to verify the curing of inorganic zinc silicate primer
prior to overcoating. Test shall be performed according to ASTM D 4752, and Level 5 is
required.
▪ Any brushing shall be carried out such that a smooth and uniformly thick coat is obtained.
Deep paint or detrimental brush marks are not acceptable. Paint shall be worked into all
crevices and corners. Runs or sags shall be brushed out before drying.
▪ All areas such as external corners and edges, welds, bolts, nuts and interstices (excluding
galvanized surfaces) shall receive a "stripe" coat prior to application of the specified coat
(excluding with inorganic zinc silicate primer) to ensure that these areas have at least the
minimum specified film thickness and to ensure continuity of the coating.
▪ All areas that will be subject to welding after painting shall be masked after blast cleaning.
Masking shall be made with suitable adhesive tape and shall extend at least 50 mm on all
sides of the intended weld area. All masking shall be removed a prior to start welding.
▪ The contact place of steel structure’s joints by bolts shall not be painted. It should be protected
with adhesive tapes after blasted
▪ Coating shall not be conducted:
- When the surfaces temperatures are less than 3°C above the air dew point.
- When the relative humidity of the air is above 85% for epoxy coatings and 90% for zinc
silicate coating (subjected to Supplier’s recommendation compliance) or when there is a
likelihood of a change in weather conditions within two hours after application which would
result in temperatures below those specified (between +10°C and +49°C and/or Supplier’s
recommendations) or deposition of moisture in the form of rain or condensation upon the
surface.
▪ Nameplates shall be suitably masked before blast cleaning to protect them from blasting
abrasive and paint.
▪ The cured coatings shall be visually free of pinholes, voids, bubbles, mud cracking, and other
"holidays".
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 21 of 57
▪ Any inaccessible surfaces for proper coating application and/or inspection shall be coated prior
to final assembly. Specifically, flange and bolt holes shall be coated prior to final installation.
▪ Prior to apply a succeeding coat, all coatings shall be allowed to dry at site ambient conditions
for at least the minimum time specified by the coating Supplier and no longer than the
maximum time for site ambient conditions before overcoating. No coating shall be applied over
a previous coating that is not thoroughly dry, except when a wet on wet coating is
recommended.
▪ Damaged areas of primed surfaces with inorganic zinc shall be painted, after cleaning, with
one coat of zinc rich epoxy primer and the initial system achieved in accordance with
specifications.
▪ Outdoor surface preparation and coating shall be conducted during day light hours (not
applicable to enclosed shop).
▪ Surfaces that are not to be coated shall be properly protected from abrasives blasting and
coating. Any paint deposited on the surfaces shall be removed carefully.
▪ Determination of thickness as per the method in SSPC-PA2, Double 90% control, i.e. the dry
film thickness of more than 90% inspection lot points is not less than the specific film thickness,
and the dry film thickness of other lot points is not less than 90% of specific film thickness.
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 22 of 57
11. REPAIR
11.1. General Repair
▪ Wherever possible, coating defects or damages shall be repaired such that the finished coating
complies with this specification.
▪ Any repair procedure not in compliance with this specification shall be submitted for approval,
in writing to COMPANY prior to commencement of the work.
▪ The procedure shall take into consideration all surfaces preparation requirements to ensure
that full substrate and inter-coat adhesion is achieved.
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 23 of 57
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 24 of 57
reject the paints and require repair works or complete blast cleaning and repainting of the
equipment, as deemed necessary.
▪ Painting Sample for Shop Fabrication Items
A painting sample shall be prepared by Supplier in accordance with the following, prior to start
painting work:
✓ Sample Plate
Dimensions : 75 mm x 150 mm x 2 to 3 mm thick
Material : Hot or cold rolled steel plate
✓ Preparation of Painting Sample
Painting sample shall be made for each painting system, using the same methods and color as
for the actual painting.
Site Painting Works :
✓ An inspection procedure will be agreed upon between CONTRACTOR and COMPANY for
the painting works to be carried out on site.
✓ The inspections shall include, but not limited to:
- Inspection of the painting equipment, blast cleaning and paint material
- Inspection of surface preparation and roughness before each coat
- Inspection of touch up paint before next coat
- Inspection of each coat before application of the next one (visual aspect, thickness)
- Final inspection and acceptance of the painting works (thickness, visual aspect and
adhesion tests)
✓ Further to theses inspections, the performed works shall be daily inspected for quality of
workmanship and compliance with specifications. Painting daily report format states in
Attachment A.
✓ CONTRACTOR may propose any inspection procedure minimizing the disturbance in his
works provided the following conditions are fulfilled:
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 25 of 57
- COMPANY is to be kept informed, on a daily basis, of the works which will be performed.
No work may be started without prior notification to COMPANY.
- CONTRACTOR takes immediate corrective action when a remark is notified by
COMPANY.
✓ Contractor issues, and submits to COMPANY inspection reports and daily sheets recording
weather conditions, works carried out, inspection results and possible remarks as per
Attachment A.
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 26 of 57
painted equipment (resistance to heat, chemicals, seawater spray). These tests shall be
performed at CONTRACTOR’S costs in an approved laboratory.
14. WRAPPING
• All surface preparation and wrapping operations shall be performed by and under the supervision of
personnel skilled in the application of wrapping materials specified. CONTRACTOR shall provide all
the skilled personnel required for execution of this work
• All tape and primer materials shall be kept out of direct sunlight during transportation and storage.
Tape and primer materials shall be stored in a clean, cool, and dry warehouse until required.
• The Wrapping System shall consist of primer applied to bare steel, one or more layers of inner wrap
tape and one layer of outer wrap coating.
15. WARRANTIES
The warranty period shall be of at least 5 years. This period starts for each item at the date of the
Mechanical Completion of Project.
16. SAFETY
16.1. General
▪ All safety rules and regulations of applicable Indonesian national and local laws and insurance
underwriter regulations shall be adhered to in the storing, handling, use and application of
paints, thinners, solvents, etc.
▪ The coating Supplier’s health and safety instructions on the use of their products provided on
data-sheets and warning labels shall be fully understood and complied with before any work is
undertaken. Paint safety data sheets will have to be available on the painting site.
16.3. Ventilation
▪ Ventilation in an amount to provide safe working conditions shall be supplied to the workmen
at all times.
▪ Confined areas that previously contained flammable or volatile materials shall be purged and
ventilated until the vapors will be less than the maximum allowable concentrations.
16.5. Blasting
During blasting and air-spray-painting work, workers shall wear safety goggles, suitable protective
clothing, a face mask and gloves to protect against abrasives, dust and spray moist.
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 27 of 57
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 28 of 57
Painting Report
1 Plant section
2 Client
3 Object
4 1 - EPC Contractor - Person Responsible
5 Surface preparation
6 Painting
7 Paint Supplier
8
Execution as per standard / Code Revision
9 System No. Design temperature
10 2 - Surface Preparation
11 Grade of surface quality: ISO 8501 Blasting profile: ISO 2632 (Ra) μm
12 Type and nature of base - metal
13 3 - Painting System
Pre-Construction
22
Primer
23 Primer
24 Intermediate
25 Finish
26
Note:
Painting report of vendor items may refer to each manufacturer’s/vendor’s standard practice
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.
-Ap ED
PRINT
WHEN
LLED
NCONTRO
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 29 of 57
Table 2. Stainless Steel Piping (Note 1 & 2),Tank, Vessel, Pump, Support and Structure
Service Condition
NO Description
Operating Temperature (°C)
SS1 -170 100 Uninsulated or Unfireproofed
SS2 -170 100 Insulated or Fireproofing
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS CONSORTIUM IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH
-
J14-Apr - 2 0 2
D
IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 30 of 57
Note:
(1). This specification also applicable for other piping component unless otherwise specified
(2). Either Insulated/uninsulated SS 316L will not need any primer coat
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 31 of 57
Repair (Touch-up) for damaged and welded portion. Painting for all surfaces.
At Pipe
Spool
Alkylated Alkylated
Fabrication SP 10 or Sa 2 PMF’s 1 or
Amine 1 100 Amine 100 --- --- ---
Shop or 1/2 recommendation more
Epoxy Epoxy
Field Shop
(Note-4)
Carbon Insulated
0-100 CS2 200
Steel (Note-6)
SP 11 (Note- Alkylated Alkylated
1 or 1 or
1) / SP 2 --- Amine 100 --- --- --- Anime 100
At Field more more
(Note-2) Epoxy Epoxy
Repair (Touch-up) for damaged and welded portion. Painting for all surfaces.
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 32 of 57
Painting System
Surface Surface Min.
Operating Primer Intermediate Coat Top Coat
Painting Work Preparation Roughness Total
Substrate Condition Temp. No. Min. No. Min. No. Min.
System Place Grade (ISO Ry5) DFT
(°C) Type Type Type
(SSPC) (mm) of DFT of DFT of DFT (m)
Coats (m) Coats (m) Coats (m)
1.2 Pipes, Flanges and Fittings (Elbows, Tees, Reducers, Caps, etc.)
At Pipe
Spool
Alkylated
Fabrication SP 7 PMF’s 1 or
--- --- --- Amine 150 --- --- ---
Shop or (Note-3) recommendation more
Epoxy
Field Shop
Stainless (Note-5)
Uninsulated
Steel -170 - 100 SS1 200
(Note-6)
304//316 SP 11 (Note- Alkylated
1 or 1 or
1) / SP 2 --- Amine 150 --- --- --- Polyurethane 50
At Field more more
(Note-2) Epoxy
Repair (Touch-up) for damaged and welded portion. Painting for all surfaces.
At Pipe
Spool
Alkylated
Fabrication SP 7 PMF’s 1 or
Amine 150 --- --- --- --- --- ---
Shop or (Note-3) recommendation more
Epoxy
Field Shop
Stainless (Note-5)
Insulated
Steel -170 - 100 SS2 150
(Note-6)
304//316 SP 11 (Note- Alkylated
1 or
1) / SP 2 --- Amine 150 --- --- --- --- --- ---
At Field more
(Note-2) Epoxy
Repair (Touch-up) for damaged and welded portion. Painting for all surfaces.
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 33 of 57
Painting System
Surface Min.
Operating Surface Primer Intermediate Coat Top Coat Total
Painting Work Preparation
Substrate Condition Temp. Roughness(ISO DFT
System Place Grade
(°C) Ry5) (mm) (m)
(SSPC)
Min. Min. Min.
No. of No. of No. of
Type DFT Type DFT Type DFT
Coats Coats Coats
(mm) (mm) (mm)
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
Alkylated Alkylated
At PMF’s 1 or
SP 10 Amine 1 100 Amine 100 --- --- ---
Shop recommendation more
Epoxy Epoxy
Carbon Insulated 200
0 -100 CS2 SP 11 (Note- Alkylated
Steel (Note-6) 1 or Alkylated 1 or
At 1) / SP 2 --- Anime 100 --- --- --- 100
more Anime Epoxy more
Field (Note-2) Epoxy
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 34 of 57
Painting System
Surface Min.
Operating Surface Primer Intermediate Coat Top Coat
Painting Work Preparation Total
Substrate Condition Temp. Roughness(ISO
System Place Grade DFT
(°C) Ry5) (mm)
(SSPC) (m)
Min. Min. Min.
No. of No. of No. of
Type DFT Type DFT Type DFT
Coats Coats Coats
(mm) (mm) (mm)
SP 7 PMF’s Alkylated
At 1 or
--- --- --- Amine 150 --- --- ---
Shop (Note-3) recommendation more
Epoxy
Stainless
Uninsulated
Steel -170 - 100 SS1 SP 11 (Note- Alkylated 200
(Note-6) 1 or 1 or
304/316 1) / SP 2 --- Amine 150 --- --- --- Polyurethane 50
At more more
Field (Note-2) Epoxy
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
SP 7 PMF’s Alkylated
At 1 or
Amine 150 --- --- --- --- --- ---
Shop (Note-3) recommendation more
Epoxy
Stainless
Insulated
Steel -170 - 100 SS2 SP 11 (Note- Alkylated 150
(Note-6) 1 or
304/316 1) / SP 2 --- Anime 100 --- --- --- --- --- ---
At more
Field (Note-2) Epoxy
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 35 of 57
Painting System
Surface Min.
Operating Surface Primer Intermediate Coat Top Coat Total
Painting Work Preparation
Substrate Condition Temp. Roughness(ISO DFT
System Place Grade
(°C) Ry5) (mm) (m)
(SSPC)
Min. Min. Min.
No. of No. of No. of
Type DFT Type DFT Type DFT
Coats Coats Coats
(mm) (mm) (mm)
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
Alkylated Alkylated
At PMF’s 1 or
SP 10 Amine 1 100 Amine 100 --- --- ---
Shop recommendation more
Epoxy Epoxy
Carbon Insulated 200
0 -100 CS2 SP 11 (Note- Alkylated
Steel (Note-6) 1 or Alkylated 1 or
At 1) / SP 2 --- Anime 100 --- --- --- 100
more Anime Epoxy more
Field (Note-2) Epoxy
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 36 of 57
Painting System
Surface Min.
Operating Surface Primer Intermediate Coat Top Coat
Painting Work Preparation Total
Substrate Condition Temp. Roughness(ISO
System Place Grade DFT
(°C) Ry5) (mm)
(SSPC) (m)
Min. Min. Min.
No. of No. of No. of
Type DFT Type DFT Type DFT
Coats Coats Coats
(mm) (mm) (mm)
SP 7 PMF’s Alkylated
At 1 or
--- --- --- Amine 150 --- --- ---
Shop (Note-3) recommendation more
Epoxy
Stainless
Uninsulated
Steel -170 - 100 SS1 SP 11 (Note- Alkylated 200
(Note-6) 1 or 1 or
304/316 1) / SP 2 --- Amine 150 --- --- --- Polyurethane 50
At more more
Field (Note-2) Epoxy
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
SP 7 PMF’s Alkylated
At 1 or
Amine 150 --- --- --- --- --- ---
Shop (Note-3) recommendation more
Epoxy
Stainless
Insulated
Steel -170 - 100 SS2 SP 11 (Note- Alkylated 150
(Note-6) 1 or
304/316 1) / SP 2 --- Anime 100 --- --- --- --- --- ---
At more
Field (Note-2) Epoxy
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 37 of 57
Painting System
At
Vendor’s Standard.
Shop
Carbon Steel -- 0 - 100 --
At Touch-up works with painting system recommended by paint manufacture who supply the painting materials.
Field Repair (Touch-up) for damaged and welded portion.
At
Vendor’s Standard.
Stainless Shop
Steel -- -170 - 100 --
At Touch-up works with painting system recommended by paint manufacture who supply the painting materials.
304/316
Field Repair (Touch-up) for damaged and welded portion.
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 38 of 57
Painting System
2. STEEL STRUCTURE (Columns, Beams, Braces, Gusset plates, Base plates, bolts and nuts, etc.)
2.1 Pipe Racks, Pipe Stanchions, Equipment Steel Structures , Building Steel Structure, Above Splash Zone
Zinc Rich
At PMF’s
SP 10 Epoxy 1 75 --- --- --- --- --- ---
Shop recommendation
Primer
Carbon SP 11
Unfireproofed 0 - 100 CS1 Zinc Rich High 275
Steel (Note-1) / 1 or 1 or 1 or
At --- Epoxy 75 Build 150 Polyurethane 50
SP 2 (Note- more more more
Field Primer Epoxy
2)
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
At PMF’s
SP 10
Shop recommendation
Carbon SP 11
Fireproofing 0 - 100 CS2 Alkylated 200
Steel (Note-1) / 1 or Alkylated 1 or
At --- Anime 100 --- --- --- 100
SP 2 (Note- more Anime Epoxy more
Field Epoxy
2)
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 39 of 57
Painting System
Carbon SP 11
Unfireproofed 0 - 100 CS1 Zinc Rich High 275
Steel (Note-1) / 1 or 1 or 1 or
At --- Epoxy 75 Build 150 Polyurethane 50
SP 2 (Note- more more more
Field Primer Epoxy
2)
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
At PMF’s
SP 10
Shop recommendation
Carbon SP 11
Fireproofing 0 - 100 CS2 Alkylated 200
Steel (Note-1) / 1 or Alkylated 1 or
At --- Anime 100 --- --- --- 100
SP 2 (Note- more Anime Epoxy more
Field Epoxy
2)
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 40 of 57
Painting System
Carbon SP 11
Unfireproofed 0 - 100 CS1 Zinc Rich High 275
Steel (Note-1) / 1 or 1 or 1 or
At --- Epoxy 75 Build 150 Polyurethane 50
SP 2 (Note- more more more
Field Primer Epoxy
2)
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
At PMF’s
SP 10
Shop recommendation
Carbon SP 11
Fireproofing 0 - 100 CS2 Alkylated 200
Steel (Note-1) / 1 or Alkylated 1 or
At --- Anime 100 --- --- --- 100
SP 2 (Note- more Anime Epoxy more
Field Epoxy
2)
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 41 of 57
At Shop
Carbon Steel Uninsulated 0 - 100 CS1 Refer to S-100-13MO-001 “Design Basis For Marine Facility”
At Field
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 42 of 57
Painting System
At Pipe
Spool
High
Fabrication PMF’s 1 or
SP 10 Zinc Rich Epoxy 1 75 Build 150 --- --- ---
Shop or recommendation more
Epoxy
Field Shop
(Note-5)
Carbon Steel Uninsulated 0 - 100 CS1 275
SP 11
High
(Note-1) / Zinc Rich Epoxy 1 or 1 or 1 or
--- 75 Build 150 Polyurethane 50
At Field SP 2 Primer more more more
Epoxy
(Note-2)
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
At Pipe
Spool
Alkylated
Fabrication SP 10 or PMF’s Alkylated Amine 1 or
1 100 Amine 100 --- --- ---
Shop or Sa 2 1/2 recommendation Epoxy more
Epoxy
Field Shop
(Note-4)
Insulated
Carbon Steel 0-100 CS2 200
(Note-6)
SP 11
Alkylated
(Note-1) / Alkylated Amine 1 or 1 or
--- 100 Amine 100 --- --- ---
At Field SP 2 Epoxy more more
Epoxy
(Note-2)
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 43 of 57
At Pipe
Spool
Alkylated
Fabrication SP 7 PMF’s 1 or
--- --- --- Amine 150 --- --- ---
Shop or (Note-3) recommendation more
Epoxy
Field Shop
(Note-5)
Stainless
Uninsulated -170 -
Steel SS1 200
(Note-6) 100
304//316
SP 11 Alkylated Amine 1 or 1 or
(Note-1) / 150 --- --- --- Polyurethane 50
--- Epoxy more more
At Field SP 2
(Note-2)
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
At Pipe
Spool
Fabrication SP 7 PMF’s Alkylated Amine 1 or
150 --- --- --- --- --- ---
Shop or (Note-3) recommendation Epoxy more
Field Shop
(Note-5)
Stainless
Insulated -170 -
Steel SS2 150
(Note-6) 100
304//316
SP 11
(Note-1) / Alkylated Amine 1 or
--- 150 --- --- --- --- --- ---
At Field SP 2 Epoxy more
(Note-2)
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 44 of 57
Painting System
3. Equipment
3.1 Storage Tank, Columns, Drums, Heat Exchangers, Filters (Shells, Heads, Nozzles, Manholes, Skirts, Legs, Saddles)
High
At PMF’s Zinc Rich 1 or
SP 10 1 75 Build 150 --- --- ---
Shop recommendation Epoxy more
Epoxy
Carbon Uninsulated SP 11
0 - 100 CS1 Zinc Rich High 275
Steel (Note-6) (Note-1) / 1 or 1 or 1 or
At --- Epoxy 75 Build 150 Polyurethane 50
SP 2 more more more
Field Primer Epoxy
(Note-2)
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
Alkylated Alkylated
At PMF’s 1 or
SP 10 Amine 1 100 Amine 100 --- --- ---
Shop recommendation more
Epoxy Epoxy
Carbon Insulated SP 11
0 - 100 CS2 Alkylated Alkylated 200
Steel (Note-6) (Note-1) / 1 or 1 or
At --- Anime 100 --- --- --- Anime 100
SP 2 more more
Field Epoxy Epoxy
(Note-2)
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 45 of 57
Painting System
3.2 Storage Tank, Columns, Drums, Heat Exchangers, Filters (Shells, Heads, Nozzles, Manholes, Skirts, Legs, Saddles)
Alkylated
At SP 7 PMF’s 1 or
--- --- --- Amine 150 --- --- ---
Shop (Note-3) recommendation more
Epoxy
Stainless
Uninsulated SP 11
Steel -170 - 100 SS1 Alkylated 200
(Note-6) (Note-1) / 1 or 1 or
304/316 --- Amine 150 --- --- --- Polyurethane 50
At SP 2 more more
Field Epoxy
(Note-2)
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
Alkylated
At SP 7 PMF’s 1 or
Amine 150 --- --- --- --- --- ---
Shop (Note-3) recommendation more
Epoxy
Stainless
Insulated SP 11
Steel -170 - 100 SS2 Alkylated 150
(Note-6) (Note-1) /
304/316 --- Amine 1 150 --- --- --- --- --- ---
At SP 2
Field Epoxy
(Note-2)
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 46 of 57
Painting System
3.3 Platforms, Stairs, Walkways, Ladders, Handrails, Shells, Davits, Bolts and Nuts (Note-8), Other Accessories
Zinc High
At PMF’s 1 or
SP 10 Rich 1 75 Build 150 --- --- ---
Shop recommendation more
Epoxy Epoxy
Uninsulated
Carbon Zinc
& Insulated 0 - 100 CS1 SP 11 (Note- High 275
Steel Rich 1 or 1 or 1 or
(Note-6) At 1) / SP 2 --- 75 Build 150 Polyurethane 50
Epoxy more more more
Field (Note-2) Epoxy
Primer
Repair (Touch-up) for damaged and field welded portion. Painting for all surfaces.
3.4 Skid Mounted Units & Utility Equipment, Rotating Machinery (including Power Generators, Motors), Shop Assembled Tanks, Overhead Crane (Note-7)
At
Vendor’s Standard.
Uninsulated Shop
Carbon CS1 &
& Insulated 0 - 100
Steel CS2 At Touch-up works with painting system recommended by paint manufacture who supply the painting materials.
(Note-6)
Field Repair (Touch-up) for damaged and welded portion.
At
Vendor’s Standard.
Stainless Uninsulated Shop
SS1 &
Steel & Insulated -170 - 100 SS2 At Touch-up works with painting system recommended by paint manufacture who supply the painting materials.
304/316 (Note-6)
Field Repair (Touch-up) for damaged and welded portion.
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 47 of 57
Painting System
Operating Surface
Temp. Roughness Primer Intermediate Coat Top Coat Min.
(°C) Surface (ISO Ry5)
Painting Work Total
Substrate Condition Preparation
System Place (m) No. Min. Min. No. Min. DFT
Grade (SSPC) No.
of DFT DFT of DFT (m)
Type Type of Type
Coats (m) (m) Coats (m)
Coats
4. Galvanized Touch Up
4.1 Pipes, Flanges and Fittings (Elbows, Tees, Reducers, Caps, etc.)
At
Galvanizing as per ASTM A123 or A153
Shop
For Damaged
At Alkylated
Area Except
ZN3 PMF’s 1 or 1 or
Color SP 11 (Note-1) Amine 175 --- --- --- Polyurethane 50 225
recommendation more more
Identification Field Epoxy
Carbon Steel Repair (Touch-up) for damaged and field welded portion. Min. DFT shall be more than 75 microns.
to be 0 -100 At
galvanized Galvanizing as per ASTM A123 or A153
Shop
At SP 11 (Note-1) Alkylated
For Color PMF’s 1 or
ZN4 Amine 125 --- --- --- --- --- --- 125
Identification / SP 1 & SP 2 recommendation more
Field Epoxy
(Note-3)
Repair (Touch-up) for field welded portion. Min DFT shall be more than
Painting for all surfaces.
75 microns
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 48 of 57
Painting System
Operating Surface
Temp. Roughness Primer Intermediate Coat Top Coat Min.
(°C) Surface (ISO Ry5)
Painting Work Total
Substrate Condition Preparation
System Place (m) No. Min. Min. No. Min. DFT
Grade (SSPC) No.
of DFT DFT of DFT (m)
Type Type of Type
Coats (m) (m) Coats (m)
Coats
4.2 Pipe Racks, Pipe Stanchions, Equipment Steel Structures , Building Steel Structure and above splash zone
At
Galvanizing as per ASTM A123 or A153
Shop
For Damaged
At Alkylated
Area Except
ZN3 PMF’s 1 or 1 or
Color SP 11 (Note-1) Amine 175 --- --- --- Polyurethane 50 225
recommendation more more
Identification Field Epoxy
Carbon Steel Repair (Touch-up) for damaged and field welded portion. Min. DFT shall be more than 75 microns.
to be 0 -100 At
galvanized Galvanizing as per ASTM A123 or A153
Shop
At SP 11 (Note-1) Alkylated
For Color PMF’s 1 or
ZN4 Amine 125 --- --- --- --- --- --- 125
Identification / SP 1 & SP 2 recommendation more
Field Epoxy
(Note-3)
Repair (Touch-up) for field welded portion. Min DFT shall be more than
Painting for all surfaces.
75 microns
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 49 of 57
Painting System
Operating Surface
Temp. Roughness Primer Intermediate Coat Top Coat Min.
(°C) Surface (ISO Ry5)
Painting Work Total
Substrate Condition Preparation
System Place (m) No. Min. Min. No. Min. DFT
Grade (SSPC) No.
of DFT DFT of DFT (m)
Type Type of Type
Coats (m) (m) Coats (m)
Coats
Carbon Steel Repair (Touch-up) for damaged and field welded portion. Min. DFT shall be more than 75 microns.
to be 0 -100 At
galvanized Galvanizing as per ASTM A123 or A153
Shop
At SP 11 (Note-1) Alkylated
For Color PMF’s 1 or
ZN4 Amine 125 --- --- --- --- --- --- 125
Identification / SP 1 & SP 2 recommendation more
Field Epoxy
(Note-3)
Repair (Touch-up) for field welded portion. Min DFT shall be more than
Painting for all surfaces.
75 microns
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 50 of 57
Painting System
Operating Surface
Temp. Roughness Primer Intermediate Coat Top Coat Min.
(°C) Surface (ISO Ry5)
Painting Work Total
Substrate Condition Preparation
System Place (m) No. Min. Min. No. Min. DFT
Grade (SSPC) No.
of DFT DFT of DFT (m)
Type Type of Type
Coats (m) (m) Coats (m)
Coats
Carbon Steel Repair (Touch-up) for damaged and field welded portion. Min. DFT shall be more than 75 microns.
to be 0 -100 At
galvanized Galvanizing as per ASTM A123 or A153
Shop
At SP 11 (Note-1) Alkylated
For Color PMF’s 1 or
ZN4 Amine 125 --- --- --- --- --- --- 125
Identification / SP 1 & SP 2 recommendation more
Field Epoxy
(Note-3)
Repair (Touch-up) for field welded portion. Min DFT shall be more than
Painting for all surfaces.
75 microns
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 51 of 57
Painting System
Operating Surface
Temp. Surface Roughness Primer Intermediate Coat Top Coat Min.
(°C) Painting Work Preparation (ISO Ry5) Total
Substrate Condition
System Place Grade (mm) No. Min. Min. No. Min. DFT
(SSPC) No. (mm)
of DFT DFT of DFT
Type Type of Type
Coats (mm) (mm) Coats (mm)
Coats
Uninsulated At
SP 11 PMF’s Alkylated 1 or 1 or
& ZN1 175 --- --- --- Polyurethane 50 225
(Note-1) recommendation Amine Epoxy more more
Unfireproofed Field
Repair (Touch-up) for damaged and field welded portion. Min. DFT shall be more than 75 microns.
Carbon Steel
to be 0 -100 At Shop Galvanizing as per ASTM A123 or A153
galvanized
SP 11
At
(Note-1)
Insulated & PMF’s Alkylated 1 or
ZN2 / SP 1 & 125 --- --- --- --- --- --- 125
Fireproofing recommendation Amine Epoxy more
Field SP 2
(Note-3)
Repair (Touch-up) for field welded portion. Min DFT shall be more than
Painting for all surfaces.
75 microns
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 52 of 57
Painting System
Operating Surface
Temp. Roughness Primer Intermediate Coat Top Coat Min.
(°C) Surface (ISO Ry5)
Painting Work Total
Substrate Condition Preparation
System Place (m) No. Min. Min. No. Min. DFT
Grade (SSPC) No.
of DFT DFT of DFT (m)
Type Type of Type
Coats (m) (m) Coats (m)
Coats
Carbon Steel Repair (Touch-up) for damaged and field welded portion. Min. DFT shall be more than 75 microns.
to be 0 -100 At
galvanized Galvanizing as per ASTM A123 or A153
Shop
At SP 11 (Note-1) Alkylated
For Color PMF’s 1 or
ZN4 Amine 125 --- --- --- --- --- --- 125
Identification / SP 1 & SP 2 recommendation more
Field Epoxy
(Note-3)
Repair (Touch-up) for field welded portion. Min DFT shall be more than
Painting for all surfaces.
75 microns
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 53 of 57
Painting System
Operating Surface
Temp. Roughness Primer Intermediate Coat Top Coat Min.
(°C) Surface (ISO Ry5)
Painting Work Total
Substrate Condition Preparation
System Place (m) No. Min. Min. No. Min. DFT
Grade (SSPC) No.
of DFT DFT of DFT (m)
Type Type of Type
Coats (m) (m) Coats (m)
Coats
4.7 Storage Tank, Columns, Drums, Heat Exchangers, Filters (Shells, Heads, Nozzles, Manholes, Skirts, Legs, Saddles)
At
Galvanizing as per ASTM A123 or A153
Shop
For Damaged
At Alkylated
Area Except
ZN3 PMF’s 1 or 1 or
Color SP 11 (Note-1) Amine 175 --- --- --- Polyurethane 50 225
recommendation more more
Identification Field Epoxy
Carbon Steel Repair (Touch-up) for damaged and field welded portion. Min. DFT shall be more than 75 microns.
to be 0 -100 At
galvanized Galvanizing as per ASTM A123 or A153
Shop
At SP 11 (Note-1) Alkylated
For Color PMF’s 1 or
ZN4 Amine 125 --- --- --- --- --- --- 125
Identification / SP 1 & SP 2 recommendation more
Field Epoxy
(Note-3)
Repair (Touch-up) for field welded portion. Min DFT shall be more than
Painting for all surfaces.
75 microns
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 54 of 57
Painting System
Operating Surface
Temp. Roughness Primer Intermediate Coat Top Coat Min.
(°C) Surface (ISO Ry5)
Painting Work Total
Substrate Condition Preparation
System Place (m) No. Min. Min. No. Min. DFT
Grade (SSPC) No.
of DFT DFT of DFT (m)
Type Type of Type
Coats (m) (m) Coats (m)
Coats
4.8 Platforms, Stairs, Walkways, Ladders, Handrails, Shells, Davits, Bolts and Nuts (Note-8), Other Accessories
At
Galvanizing as per ASTM A123 or A153
Shop
For Damaged
At Alkylated
Area Except
ZN3 PMF’s 1 or 1 or
Color SP 11 (Note-1) Amine 175 --- --- --- Polyurethane 50 225
recommendation more more
Identification Field Epoxy
Carbon Steel Repair (Touch-up) for damaged and field welded portion. Min. DFT shall be more than 75 microns.
to be 0 -100 At
galvanized Galvanizing as per ASTM A123 or A153
Shop
At SP 11 (Note-1) Alkylated
For Color PMF’s 1 or
ZN4 Amine 125 --- --- --- --- --- --- 125
Identification / SP 1 & SP 2 recommendation more
Field Epoxy
(Note-3)
Repair (Touch-up) for field welded portion. Min DFT shall be more than
Painting for all surfaces.
75 microns
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 55 of 57
Painting System
Operating Surface
Temp. Roughness Primer Intermediate Coat Top Coat Min.
(°C) Surface (ISO Ry5)
Painting Work Total
Substrate Condition Preparation
System Place (m) No. Min. Min. No. Min. DFT
Grade (SSPC) No.
of DFT DFT of DFT (m)
Type Type of Type
Coats (m) (m) Coats (m)
Coats
4.9 Skid Mounted Units & Utility Equipment, Rotating Machinery (including Power Generators, Motors), Shop Assembled Tanks, Overhead Crane (Note-8)
At
Galvanizing as per ASTM A123 or A153
Shop
For Damaged
At Alkylated
Area Except
ZN3 PMF’s 1 or 1 or
Color SP 11 (Note-1) Amine 175 --- --- --- Polyurethane 50 225
recommendation more more
Identification Field Epoxy
Carbon Steel Repair (Touch-up) for damaged and field welded portion. Min. DFT shall be more than 75 microns.
to be 0 -100 At
galvanized Galvanizing as per ASTM A123 or A153
Shop
At SP 11 (Note-1) Alkylated
For Color PMF’s 1 or
ZN4 Amine 125 --- --- --- --- --- --- 125
Identification / SP 1 & SP 2 recommendation more
Field Epoxy
(Note-3)
Repair (Touch-up) for field welded portion. Min DFT shall be more than
Painting for all surfaces.
75 microns
General Note:
- Painting of Package, Actuator, Instrument, electrical items and Fire Fighting as per vendor’s standard
Note-1: Surface Preparation for Metal Surface.
Note-2: Surface Preparation for Film Surface.
Note-3: To remove rust, dirt, dust, chloride contamination and other detrimental foreign matter from austenitic stainless steel surface.
Note-4: Shop weld portions which require painting shall be painted with the following painting systems depend on the substrate individually.
1) Carbon Steel : To be primed only after surface preparation in accordance with SSPC-SP 10.
2) Galvanized Steel: To be primed only after surface preparation in accordance with SSP-SP 11.
3) Austenitic Stainless Steel (type 304//316): To be painted up to intermediate coat only after surface preparation in accordance with SSPC-SP 7.
Note-5: Damaged painting during handling shall be repaired at pipe spool fabrication shop or field shop with the following painting systems depend on the substrate
and painting system individually.
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 56 of 57
1)
Carbon Steel and Painting System CS1 & CS2: Same painting system as shop weld portions as per above Note-4, 1).
2)
Carbon Steel and Painting System CS1 & CS2:
To be painted up to intermediate coat after surface preparation in accordance with SSPC-SP 10 (for damaged painting until primer).
To be painted intermediate coat only after surface preparation in accordance with SSPC-SP 2 (for damaged painting until intermediate coat).
3) Galvanized Steel: Same painting system as shop weld portions as per Note-4, 2).
4) Austenitic Stainless Steel (type 304/316): Same painting system as shop weld portions as per Note-4, 3).
Note-6: Cold and Personnel Protection surfaces shall be considered as uninsulated surfaces.
Note-7: Including Piping, Vessels, Steel structures, motors, interconnecting pipe, included Vendor scope of supply.
Note-8: Bolts and nuts with factory applied Fluoropolymer coating shall not require painting.
D M S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN
-
J14-Apr - 2 0 2
D
PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT MEDCO SUMBAWA GAS.
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-13A0-001
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 2A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-13A0-001
GENERAL SPECIFICATION FOR PAINTING & COATING Page 57 of 57
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO
J-14D Mr -
THIRD PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
2 0 23
PERMITTED BY PT MEDCO SUMBAWA GAS.