Saudi Aramco 2617-ENG (11/2010) 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 ##

DRAFTING OFFICE PERIOD ENDING DRAFTING SCHED. END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING START COMPL TO END OF THIS PERIOD SAPMT

CONTROL JACOBS ZATE 14-Sep-21 12/1/2019 12/30/2020


DRAWING IS CONSIDERED 65% COMPLETE
WHEN READY FOR CHECKING
DESIGN ENG. K04 103-262 10-00844-0001
JZ PM

STARTING COMPLETION TRANSMITTED


DRAWING SHEET REV. PERCENT COMPLETE HOURS REVISION
DRAWING TITLES DATE DATE* TO FIELD REMARKS
NUMBER NO. NO.
SCHED ACTUAL 10 20 30 40 50 60 70 80 90 SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

INDEX 'A'
PD-00ADCL 001 C DRAWING CONTROL SHEET
PD-00ADCL 002 C DRAWING CONTROL SHEET
PD-00ADCL 003 C DRAWING CONTROL SHEET
PD-00ADCL 004 C DRAWING CONTROL SHEET
PD-00ADCL 005 C DRAWING CONTROL SHEET
PD-00ADCL 006 C DRAWING CONTROL SHEET
PD-00ADCL 007 C DRAWING CONTROL SHEET
PD-00ADCL 008 C DRAWING CONTROL SHEET
PD-00ADCL 009 C DRAWING CONTROL SHEET
PD-00ADCL 010 C DRAWING CONTROL SHEET
PD-00ADCL 011 C DRAWING CONTROL SHEET
PD-00ADCL 012 C DRAWING CONTROL SHEET
PD-00ADCL 013 C DRAWING CONTROL SHEET
PE-00ASOW 001 C DESIGN SCOPE OF WORK

INDEX 'B' - FIRE PROTECTION


PE-10BBOD 001 C FIRE PROTECTION BASIS OF DESIGN
PE-10BSPC 001 B CO2 FP SYSTEM - FUNCTIONAL SPECIFICATIONS
EAST/WEST PIPELINE PUMP STATION #1
PA-00B101 001 C CO2 SYSTEM FP SCHEMATIC LAYOUT, FT-4 TURBINE ENCLOSURE (ML-1/2/3)
PA-00B102 001 C CO2 FIRE SUPPRESSION SYSTEM PIPING LAYOUT, FT-4 TURBINE ENCLOSURE (ML-1/2/3)
PA-00B103 001 C HALON SYSTEM FP LAYOUT, FT-4, TURBINE ENCL.(ML-1,2,3) - DEMOLITION
PA-00B104 001 C HALON SYSTEM FP LAYOUT, CONTROL VAN (1/2/3) - DEMOLITION
PA-00B106 001 C CO2 SYSTEM FP SCHEMATIC LAYOUT, DIESEL GENERATOR
PA-00B107 001 C CO2 FIRE SUPPRESSION SYSTEM PIPING LAYOUT, DIESEL GENERATOR
PE-01BCAL 001 C CO2 FIRE SUPPRESSION SYSTEM CALCULATIONS
EAST/WEST PIPELINE PUMP STATION #2
PA-00B108 001 C CO2 SYSTEM FP SCHEMATIC LAYOUT, FT-4 TURBINE ENCLOSURE (ML-1/2/3)
PA-00B109 001 C CO2 FIRE SUPPRESSION SYSTEM PIPING LAYOUT, FT-4 TURBINE ENCLOSURE (ML-1/2/3)
PA-00B110 001 C HALON SYSTEM FP LAYOUT, FT-4, TURBINE ENCL.(ML-1,2,3) - DEMOLITION
PA-00B111 001 C HALON SYSTEM FP LAYOUT, CONTROL VAN (1/2/3) - DEMOLITION
PA-00B113 001 C CO2 SYSTEM FP SCHEMATIC LAYOUT, DIESEL GENERATOR
PA-00B114 001 C CO2 FIRE SUPPRESSION SYSTEM PIPING LAYOUT, DIESEL GENERATOR
PE-02BCAL 001 C CO2 FIRE SUPPRESSION SYSTEM CALCULATIONS
EAST/WEST PIPELINE PUMP STATION #3
PA-00B115 001 C CO2 SYSTEM FP SCHEMATIC LAYOUT, FT-4 TURBINE ENCLOSURE (ML-1/2/3)
PA-00B116 001 C CO2 FIRE SUPPRESSION SYSTEM PIPING LAYOUT, FT-4 TURBINE ENCLOSURE (ML-1/2/3)
PA-00B117 001 C HALON SYSTEM FP LAYOUT, FT-4, TURBINE ENCL.(ML-1,2,3) - DEMOLITION
PA-00B118 001 C HALON SYSTEM FP LAYOUT, CONTROL VAN (1/2/3) - DEMOLITION

LEGEND: NOTES: REVISION VALIDATION


SAUDI ARABIAN OIL COMPANY
A- GENERAL / CIVIL / PROCESS / PIPING 1) LIST DRAWINGS BY INDEX IN NUMERICAL ORDER. THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
B- FIRE ALARM AND FIRE PROTECTION
D- VESSELS 2) *NORMALLY THE FIELD ETA OF DRAWINGS CAN BE OBTAINED BY REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO: DRAWING TYPE
DRAWING CONTROL SHEET
G- LIQUID HANDLING EQUIPMENT ADDING 2 TO 3 WEEKS TO THE SCHEDULED COMPLETION DATE ABOVE. DSC
H- PAINTS / COATINGS
10-00844-0001-001
J- INSTRUMENTATION
K- HVAC REPLACE HALON SYSTEM EAST/WEST PIPELINE PUMP STATIONS
L- PIPING
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
M- STEEL STRUCTURE OTHER
O- SECURITY (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
P- ELECTRICAL EAST/WEST PIPELINE PUMP STATION #1
ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
Q- CONCRETE STRUCTURE
R- ARCHITECTURE
S- PLUMBING / CIVIL / UTILITY SERVICES / LANDSCAPING
YANBU SAUDI ARABIA
T- COMMUNICATION
REV. NO. DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO. SHEET NO. REV NO.
X- CATHODIC PROTECTION
U- SPECIAL EQUIPMENT C 07/01/2021 ISSUED FOR 100% - PP
Z- PROCESS CONTROL SYSTEMS
JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND K04 A PD-00ADCL 001 C
10-00844-0001 DATED

EKRD/2617-1110.XLS