PAMAPERSADA NUSANTARA 02/11/2023


INDOMINCO COAL MINNING PROJECT - BONTANG
MACHINE
MODEL CODE UNIT S/N JOB SCHEDULE SHEET LEAD TIME MONITORING GRAPH
PS 250 + BACKLOG
REPLACE BUSHING FOOT BOOM RH LH
REPLACE ARM
PC20008 EX1805

JOB DESCRIPTION Plan Actual 1 2 3 4 5 6 7 8 9 10


N
ACC ACC
O Main Job Detail Days % ACC % Days % ACC % I II I II I II I II I II I II I II I II I II I II REMARK
Days Days
0
Final Inspection & Commisioning
Washing unit
5 FINAL CHECK Ground Test Running 0,5 13% 4,0 100% 0% 2,1 52%
PPM
Ground Test and check kebocoran
0

Cleaning unit
INSTALL Levelling Oil Hydraulic
4 0,5 13% 3,5 88% 0% 2,1 52%
ATTACHTEMENT Greasing Attachtement
Bleeding hydraulic cylinder
Completed Autolube Line Arm
install Bucket
Install Arm
1,0769

Install Autolube Link Bucket


Install Hose A
FABRICATION
Install Boom Cylinder LH & RH TADANO CN 043
ACTIVITY , BREAKDOWN
Install Boom Assy
REBUSHING, CAN’T RUNNING
Running Unit 2 50% 3,0 75% 0,1538 27% 2,1 52%
INSTALL
Balik Arm Baru
ATTACHMENT,
Install Bushing Bracket Foot Boom 0,1538
PAINTING UNIT
Painting Unit
Install Bushing Foot Boom 0,1538
Install Bushing Head Boom 0,1538
Remove & Install Bucket Cylinder 0,1538
Remove & Install Link Bucket Assy 0,1538
Check & Repair Crack Attachment 0,1538
0,75
Check & Repair Crack Attachment 0,0625
Remove Bushing Foot Boom & Head Boom 0,0625
Remove Bushing Bracket Foot boom 0,0625
Action PS 250 + Backlog 0,0625
REMOVE BOOM,
Balik Arm Unit 0,0625
REMOVE PLATE
Cleaning Area Bracket Foot Boom 0,75 19% 1,0 25% 0,0625 19% 1,0 25%
BRACKET, RE O
Reposisi unit 0,0625
RING FAN PUMP
Remove Boom Assy 0,0625
Remove Hose A & Block piping 0,0625
Remove Cylinder Boom Rh,Lh 0,0625
Remove Arm 0,0625
Remove Bucket 0,0625
Parkir posisi unit
Action Proker
1 INCOMING UNIT 0,25 6% 0,25 6% 0,25 6% 0,25 6%
Pre Inspection
Washing U/carriage,Attachtement
MONTH OKTOBER 2023 November-2023
TOTAL LEAD TIME 4 100% 2 52%
DATE 30-Oct-23 31-Oct-23 01-Nov-23 02-Nov-23 03-Nov-23 04-Nov-23 05-Nov-23 06-Nov-23 07-Nov-23 08-Nov-23
SECTION : LOADER MAN HOURS
MAN POWER OVER TIME
NO SHIFT I SHIFT II CODE
DELAYED
1 HOURS
2 PARTS ORDER ITEM
3 (NORMAL) PCS
4 ITEM
RE-ORDER
5 PCS
6
7
8
9

TANGGAL KENDALA TANGGAL ADDITIONAL ACTIVITY

01 Nov 23 TADANO CN 043 CAN'T RUNNING DARI AWAL SHIFT,RFU JAM 15.30
FIRST DAY