Saudi Aramco 2617-ENG (11/2010) 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 ##

DRAFTING OFFICE PERIOD ENDING DRAFTING SCHED. END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING START COMPL TO END OF THIS PERIOD SAPMT

CONTROL JACOBS ZATE 14-Sep-21 12/1/2019 12/30/2020


DRAWING IS CONSIDERED 65% COMPLETE
WHEN READY FOR CHECKING
DESIGN ENG. K04 103-262 10-00844-0001
JZ PM

STARTING COMPLETION TRANSMITTED


DRAWING SHEET REV. PERCENT COMPLETE HOURS REVISION
DRAWING TITLES DATE DATE* TO FIELD REMARKS
NUMBER NO. NO.
SCHED ACTUAL 10 20 30 40 50 60 70 80 90 SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

EAST/WEST PIPELINE PUMP STATION #11


PA-00B184 001 C CO2 SYSTEM FP SCHEMATIC LAYOUT, FT-4 TURBINE ENCLOSURE (ML-1/2/3)
PA-00B185 001 C CO2 FIRE SUPPRESSION SYSTEM PIPING LAYOUT, FT-4 TURBINE ENCLOSURE (ML-1/2/3)
PA-00B186 001 C HALON SYSTEM FP LAYOUT, FT-4, TURBINE ENCL.(ML-1,2,3) - DEMOLITION
PA-00B187 001 C HALON SYSTEM FP LAYOUT, CONTROL VAN (1/2/3) - DEMOLITION
PA-00B188 001 C HALON SYSTEM FP LAYOUT, CONTROL ROOM - DEMOLITION
PA-00B189 001 C CO2 SYSTEM FP SCHEMATIC LAYOUT, DIESEL GENERATOR
PA-00B190 001 C CO2 FIRE SUPPRESSION SYSTEM PIPING LAYOUT, DIESEL GENERATOR
PA-00B191 001 C CO2 SYSTEM FP SCHEMATIC LAYOUT, SOLAR POWER GENERATOR (1/2/4)
PA-00B192 001 C CO2 FIRE SUPPRESSION SYSTEM PIPING LAYOUT, SOLAR POWER GENERATOR (1/2/4)
PA-00B193 001 C HALON SYSTEM FP LAYOUT, SOLAR POWER GEN. (1/2/4) - DEMOLITION
PE-11BCAL 001 C CO2 FIRE SUPPRESSION SYSTEM CALCULATIONS

INDEX 'B' - FIRE ALARM


EAST/WEST PIPELINE PUMP STATION #1
PA-00B301 001 C FIRE SUPPRESSION SYSTEM RISER DIAGRAM - CONTROL VAN
PA-00B302 001 C FIRE SUPPRESSION SYSTEM RISER DIAGRAM - DIESEL GENERATORS
PA-00B305 001 C FIRE SUPPRESSION BLOCK DIAGRAM - CONTROL VAN
PA-00B305 002 B FIRE SUPPRESSION BLOCK DIAGRAM - DIESEL GENERATOR
PD-00B308 001 B CABLE & CONDUIT SCHEDULE
PD-00B308 002 B CABLE & CONDUIT SCHEDULE
PD-00B308 003 B CABLE & CONDUIT SCHEDULE
PD-00B308 004 B CABLE & CONDUIT SCHEDULE
PD-00B308 005 B CABLE & CONDUIT SCHEDULE
PD-00B308 006 B CABLE & CONDUIT SCHEDULE
PD-00B308 007 B CABLE & CONDUIT SCHEDULE
PA-00B316 001 C ELECTRICAL EQUIPMENT LAYOUT - 4160V SWITCHGEAR BUILDING #4162
PA-00B328 001 0D3 FIRE ALARM RISER DIAGRAM - BULDING #6000 - DEMOLITION
PA-00B343 001 C CAUSE & EFFECT MATRIX - M/L TURBINE ENCLOSURE
PA-00B343 002 B CAUSE & EFFECT MATRIX - MDIESEL GENERATOR ENCLOSURE
PA-00B344 001 C CAUSE & EFFECT MATRIX - GENERATORS (SOLAR / ALLISON) ENCLOSURE
PA-00B345 001 C FIRE DETECTION AND ALARM LAYOUT - TURBINE ENCLOSURE
PA-00B346 001 C FIRE DETECTION AND ALARM LAYOUT - DIESEL GENERATOR
EAST/WEST PIPELINE PUMP STATION #2
PA-00B317 001 C ELECTRICAL EQUIPMENT LAYOUT - 480V MCC BUILDING #4804
PA-00B329 001 0D3 FIRE ALARM RISER DIAGRAM - BULDING #6001 - DEMOLITION
EAST/WEST PIPELINE PUMP STATION #3
PA-00B318 001 C ELECTRICAL EQUIPMENT LAYOUT - 4160V SWITCHGEAR BUILDING #4162
PA-00B341 001 0D3 FIRE DETECTION AND ALARM SYSTEM - CONTROL VAN #1 - DEMOLITION
PA-00B341 001 0A3 FIRE DETECTION AND ALARM SYSTEM - CONTROL VAN #1

LEGEND: NOTES: REVISION VALIDATION


SAUDI ARABIAN OIL COMPANY
A- GENERAL / CIVIL / PROCESS / PIPING 1) LIST DRAWINGS BY INDEX IN NUMERICAL ORDER. THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
B- FIRE ALARM AND FIRE PROTECTION
D- VESSELS 2) *NORMALLY THE FIELD ETA OF DRAWINGS CAN BE OBTAINED BY REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO: DRAWING TYPE
DRAWING CONTROL SHEET
G- LIQUID HANDLING EQUIPMENT ADDING 2 TO 3 WEEKS TO THE SCHEDULED COMPLETION DATE ABOVE. DSC
H- PAINTS / COATINGS
10-00844-0001-001
J- INSTRUMENTATION
K- HVAC REPLACE HALON SYSTEM EAST/WEST PIPELINE PUMP STATIONS
L- PIPING
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
M- STEEL STRUCTURE OTHER
O- SECURITY (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
P- ELECTRICAL EAST/WEST PIPELINE PUMP STATION #1
ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
Q- CONCRETE STRUCTURE
R- ARCHITECTURE
S- PLUMBING / CIVIL / UTILITY SERVICES / LANDSCAPING
YANBU SAUDI ARABIA
T- COMMUNICATION
REV. NO. DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO. SHEET NO. REV NO.
X- CATHODIC PROTECTION
U- SPECIAL EQUIPMENT C 07/01/2021 ISSUED FOR 100% - PP
Z- PROCESS CONTROL SYSTEMS
JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND K04 A PD-00ADCL 004 C
10-00844-0001 DATED

EKRD/2617-1110.XLS