RFI LOG LOG BY FARHAN

Aramco IFC ACCEPTED


Serial RFI CCE Date of Signed By
No.
QMIS No.
No.
Area Location Description SATIP/ SAES SAIC Activity Drawing
Inspector
TIME
Inspection SPSA
PAGE.QMIS REMARKS
No. No. Attached

SP-CCE-BLG-11065-2 - GYPSUM BOARD FRAMING,

1
SP-CCE-BLG-11065-
B-37
TEAM BUILDING B-
INSULATION, AND PRE-INSTALLATION INSPECTION
FOR EAST SIDE WALLS OF ROOM # 123 & 126 AT SATIP-M-100-05 SAIC-M-1037 3.1 BA-157860-001 REV-00B FARHAN 0830 HRS 23-Jan-20
resched
2 0701
TEAM BUILDING B-0701 AS PER HIGHLIGHTED AREA ule
(QCI-FARHAN)
SP-CCE-BLG-11082 - INSTALLATION OF FBE COATED
REBARS, EMBEDDED ITEMS & FORM CLOSURE
TEAM BUILDING B-
2 SP-CCE-BLG-11082 B-37
0701
INSPECTION FOR LINTEL BEAMS OF DOOR D14, D20, SATIP-Q-001-02 SAIC-Q-1013 3.3 BA-157862-004-00AF3 FARHAN 0930 HRS 23-Jan-20 NEW
D26, D29, D31 & D33 FOR TEAM BUILDING B-0701 (QCI
FARHAN)

SP-CCE-BLG-11083 - FORM WORK INSPECTION FOR


TEAM BUILDING B-
3 SP-CCE-BLG-11083 B-37
0701
LINTEL BEAMS OF DOOR D14, D20, D26, D29, D31 & SATIP-Q-001-02 SAIC-Q-1012 3.2 BA-157862-004-00AF3 FARHAN 0940 HRS 23-Jan-20 NEW
D33 FOR TEAM BUILDING B-0701 (QCI FARHAN)

SP-CCE-BLG-11084- FRESH CONCRETE SAMPLING


AND TESTING INSPECTION OF BATCH PLANT FOR
TEAM BUILDING B-
4 SP-CCE-BLG-11084 B-37
0701
STRUCTURAL CONCRETE FOR LINTEL BEAMS OF SATIP-Q-Q001-01 SAIC-Q-1004 3.3 BA-157862-004-00AF3 SIMEON 0900 HRS 23-Jan-20 NEW
DOOR D14, D20, D26, D29, D31 & D33 FOR TEAM
BUILDING B-0701 (QCI-SIMON)

SP-CCE-BLG-11085 - CONCRETE PUMPS TRANSIT / THIS IS


MIXER INSPECTION FOR BATCH PLANT FOR SURVIELEN
TEAM BUILDING B-
5 SP-CCE-BLG-11085 B-37
0701
STRUCTURAL CONCRETE FOR LINTEL BEAMS OF SATIP-Q-Q001-02 SAIC-Q-1010 2.3 BA-157862-004-00AF3 SIMEON 0910 HRS 23-Jan-20 NEW CE RFI. NOT
DOOR D14, D20, D26, D29, D31 & D33 FOR TEAM RAISED IN
BUILDING B-0701 (QCI-SIMON) QMIS

SP-CCE-BLG-11086 - CONCRETE SAMPLING TESTING


AND PLACEMENT INSPECTION FOR STRUCTURAL
TEAM BUILDING B-
6 SP-CCE-BLG-11086 B-37
0701
CONCRETE FOR LINTEL BEAMS OF DOOR D14, D20, SATIP-Q-Q001-02 SAIC-Q-1060 3.4 BA-157862-004-00AF3 FARHAN 0940 HRS 23-Jan-20 NEW
D26, D29, D31 & D33 FOR TEAM BUILDING B-0701 (QCI
FARHAN)

Page 1 of 1 12/04/2023