1
SP-CCE-BLG-11065-
B-37
TEAM BUILDING B-
INSULATION, AND PRE-INSTALLATION INSPECTION
FOR EAST SIDE WALLS OF ROOM # 123 & 126 AT SATIP-M-100-05 SAIC-M-1037 3.1 BA-157860-001 REV-00B FARHAN 0830 HRS 23-Jan-20
resched
2 0701
TEAM BUILDING B-0701 AS PER HIGHLIGHTED AREA ule
(QCI-FARHAN)
SP-CCE-BLG-11082 - INSTALLATION OF FBE COATED
REBARS, EMBEDDED ITEMS & FORM CLOSURE
TEAM BUILDING B-
2 SP-CCE-BLG-11082 B-37
0701
INSPECTION FOR LINTEL BEAMS OF DOOR D14, D20, SATIP-Q-001-02 SAIC-Q-1013 3.3 BA-157862-004-00AF3 FARHAN 0930 HRS 23-Jan-20 NEW
D26, D29, D31 & D33 FOR TEAM BUILDING B-0701 (QCI
FARHAN)