JIZAN REFINERY & MARINE TERMINAL PROJECT (EPC-PACKAGE 14)

LOG MECHANICAL/PIPING AND COATING INSULATION


INSPEC
SAUDI ARAMCO LEVEL Subcontr
Contractor QMIS DESCRIPTION OF ACTIVITY TO BE PLANT TION HENC QC Without PID
DRAWING NO. DATE OF
SUBMITTED TO
SN SATIP SAIC LOCATION Contract Saudi actor QC PMT DOCUMENT
RFI No. No. INSPECTED/TESTED CODE INSPECTIO TIME Name Name REMARKS
CONTROL
or Aramco Name PMT SIGN PID SIGN
N
RFI FOR 29-Dec-2018
Mr.Liam
Pre-application installation of insulation of 42" FO SATIP- SAIC-N- East VB-371359-
1 INS-HENC-078 103260 T15 29-Dec-18 08:30:00 AM H W Mr.Jenny Mr.Raja Mr.Javed O
VB-371359-806/807 N-001-02 2006 Corridor 806/807
Sullivan

Visual Inspection for Verification of Corrective Action


Mr.Liam
Prior To Closure of LBE No. 19290 for improper
2 INS-HENC-079 103261 Berth#03 T15 VB-371359-304 29-Dec-18 10:30:00 AM Mr.Jenny Mr.Raja Mr.Javed O
protection of installed insulation for 42” FO line at
Sullivan
berth-3
Inspection of completed second layer application of
Mr.Liam
42" FO VB-371359-504/505/601 prior to prior to SATIP- SAIC-N- South VB-371359-
3 INS-HENC-080 103262 T15 29-Dec-18 5:00PM H H Mr.Jenny Mr.Raja Mr.Sunder O
cladding in south corridor excluding valves and N-001-02 2015 Corridor 504/505/601
Sullivan
flanges

Mr.Liam
Inspection of completed second layer application of SATIP- SAIC-N- VB-370814-
4 INS-HENC-081 103263 PR#01 T15 29-Dec-18 04:30:00 PM H H Mr.Jenny Mr.Raja Mr.Javed O
24" VGO VB-370814-404/405 prior to Cladding N-001-02 2015 404/405
Sullivan

Inspection of first layer application 42" FO VB- Mr.Liam


SATIP- SAIC-N- VB-371359-
5 INS-HENC-082 103264 371359-401/402 in PR#01 prior to second layer PR#01 T15 29-Dec-18 04:15:00 PM H H Mr.Jenny Mr.Raja Mr.Sunder O
N-001-02 2015 401/402
insulation Sullivan