PROJECT TITLE: KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES (MYP) PACKAGE # 4, 5 & 6 WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
25-00053,0004, 0005, CONSORTIUM of BRANCH OF SINOHYDRO
0006, 0007 CORPORATION COMPANY LTD and
SEPCO ARABIA COMPANY
EQUIPMENT I.D. NUMBER EQUIPMENT DESCRIPTION; STEEL PILE WELDING EQPT CODE SYSTEM I.D. PLANT NUMBER
SACTIP NUMBER: SACTIP-W-011-01 SAC ACTIVITY NUMBER 3.3 SAUDI ARAMCO INSPECTION LEVEL W/H MAIN CONT. INSP LEVEL: SUBCONT INSPECTION WORK PERMIT REQ.
H LEVEL: N/A N
DAILY WELD FIT-UP REPORT-for Steel Piling and Miscellaneous Steel Structures
WELDER I.D.
FIT-UP
MATERIAL
JOINT TYPE
THICKNESS
I VISUAL
D
SPOOL
ROOT/HOT
WELD
T DRAWING LINE LINE WPS
NO.
NO.
I REMARKS / OBSERVATIONS
E NUMBER NUMBER CLASS NO.
A F.C
M
ACC
REJ
SPECS & GRADE HEAT No.
10