SAC INSPECTION CHECKLIST SACIC NUMBER DATE APPROVED QR NUMBER

Review of Positive Material Identification Program and


SACIC-L-2004 2-Oct-20 PIPING-
Testing Procedure
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES 25-00053,0004, 0005, CONSORTIUM of BRANCH OF SINOHYDRO
CORPORATION COMPANY LTD and
AND SERVICES (MYP) PACKAGE # 4, 5 & 6 0006, 0007 SEPCO ARABIA COMPANY

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME

SACTIP NUMBER SAC ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A PMI Program & Testing procedure shall contain the elements listed below as minimum:

The procedure is identified and traceable to the project's updated list of


Project
quality documents.
Document
A1 (Note: Detailed requirement for document identification shall be listed as
Control
addition or supplementary to this checkpoint upon approval of the Project
Procedure
Document Control Procedure.)

B PMI program identifies the following, conforming to Sec. 7 of SAES-A-206 as follows:

SAES-A-206,
B1 Pre-approval of the PMI operators.
Para. 8.6

The PMI program covers the following:


 Alloy materials
 Shop and field-fabricated pressure-retaining components (base metal, SAES-A-206,
B2
welds and cladding) Para. 7.1
 Materials used for repair or replacement of pressure-retaining
components.

SAES-A-206,
B3 Required Number of PMI tests (Per Application) based on Scope.
Para. 7.4

SAES-A-206,
Elements of the basic alloy materials to be verified and shall be in
B4 Para. 7.5, Table
accordance with Table 2 of SAES-A-206.
-2

SAES-A-206,
B5 PMI testing of Welding Consumables
Para. 7.7

SAES-A-206,
B6 Acceptance Criteria.
Sec. 10,

SAES-A-206,
B7 Rejection Procedures
Sec. 11

SAES-A-206,
B8 Records and Reports.
Sec. 12

SAES-A-206,
B9 Inspection requirements.
Sec. 13

SAES-A-206,
B10 Marking and color coding.
Sec. 14

Saudi Aramco: Company General Use


SAC- (Standards Cutoff - May 31 2016 ) REV 2

SAC INSPECTION CHECKLIST SACIC NUMBER DATE APPROVED QR NUMBER

Review of Positive Material Identification Program and


SACIC-L-2004 2-Oct-20 PIPING-
Testing Procedure
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

225-00053,0004, 0005, CONSORTIUM of BRANCH OF SINOHYDRO


KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES
0006, 0007/ CORPORATION COMPANY LTD and
AND SERVICES (MYP) PACKAGE # 4, 5 & 6 SEPCO ARABIA COMPANY
6600042823(IK)

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

C The PMI Test Method shall contain the following as minimum:

Identified the instrument and method to be used suitable to test the SAES-A-206,
C1
applicable material specification. Par 9.2 to 9.4
SAES-A-206,
C2 Verification of operator's qualification prior to PMI testing.
Para. 9.5
SAES-A-206,
C3 Calibration/verification of equipment performance.
Para. 9.6
Specified frequency interval & calibration procedure for SAES-A-206,
C4
calibration/verification of the test equipment. Para. 9.6

SAES-A-206,
C5 Location of test on welds.
Para. 9.8

SAES-A-206,
C6 Surface Preparation of material to be tested.
Para. 9.9

REMARKS:

NOTES:

ATTACHMENTS:

REFERENCE DOCUMENTS: 1. SAES-A-206, Positive Material Identification, (5 May 2016)

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED