SAUDI ARAMCO TEST REPORT SATIP NUMBER SATR NUMBER DATE APPROVED QR NUMBER DATE
WELD SUMMARY, WELDER PERFORMANCE and NON-DESTRUCTIVE (NDT) TRACKING SYSTEM SATIP-W-011-01 SATR-W-2008 30/Apr/13 2/3/2020
PROJECT TITLE HYDRO-TEST PACKAGE NUMBER WBS / BI / JO NU,MBER CONTRACTOR / SUBCONTRACTOR LOCATION
RT REQUEST DATE 1
NDT REQUEST 2
RT REPORT NO1
SPOOL NUMBER
NDT REQUEST3
WELD PROCESS
PWHT REPORT
PT REPORT NO
DATE WELDED
RTFI REPORT3
RT REPORT 2#
RT REQUEST 1
RT REPORT3#
LINE NUMBER
RT RESULT 1
RT RESULT 3
PMI REPORT
DATE PWHT
PT MT DATE
RT RESULT2
VISUAL QRN
WELD TYPE
HT REPORT
WELDER ID
HT RESULT
LINE CLASS
FITUP QRN
HEAT NO A
HEAT NO B
MATERIAL
PMI DATE
REMARKS
DRAWING
WELD NO
RTFI NO1
RTFI NO2
QC NAME
HT DATE
FW/SW
TYPE A
TYPE B
GRADE
BLOCK
SL.No.
PT%
WPS
RT%
SIZE
PMI
SCH
VB-072208-301- 3/4''-HO-30009- A312 GR EQUIPME SEPCO-A- SEP- SEPCO-WPS- SEPCO- PMI-S-
1 01B FW 01 15SA0P1 15SA0P1 TP304/TP304L TP B207 82161 VS 001 PIPE NT BW 0.75 3.91 GTAW FPIP-7731 840 ASME-022 07/11/2019 Yes Acc A-Fweld- BILAL 3 10 N/A 3494 26/01/2020
7578
SEPCO-
VB-072208-301- 3/4''-HO-30009- 15SA0P1 A312 GR A312 GR SEPCO-A- SEP- SEPCO-WPS- 07/11/2019 Yes Acc A-Fweld- BILAL PMI-S-
2 01B FW 01A 15SA0P1 TP304/TP304L TP304/TP304L 82161 82161 001 PIPE PIPE BW 0.75 3.91 GTAW FPIP-7731 840 ASME-022 3 10 N/A 3494 26/01/2020
7578
SEPCO-
VB-072208-301- FW 04 3/4''-HO-30009- 15SA0P1 A312 GR A312 GR 82161 82161 001 PIPE PIPE BW 0.75 3.91 SEPCO-A- SEP- SEPCO-WPS- 05/11/2019 Yes
GTAW FPIP-7697 Acc A-Fweld- BILAL 3 10 N/A PMI-S- 26/01/2020
4 01B 15SA0P1 TP304/TP304L TP304/TP304L 840 ASME-022 3494
7578
Muham
VB-072208-301- 3/4''-HO-30009- 15SA0P1 A312 GR A312 GR SEPCO-A- SEP- SEP-WPS- SEPCO- mad PMI-F-
5 FW 05 82161 82161 001 PIPE PIPE BW 0.75 3.91 GTAW 02/11/2019 YES ACC A-Fweld- 3 10 N/A 07/11/2019
01B 15SA0P1 TP304/TP304L TP304/TP304L FPIP-7165 852 ASME-022 7578 Bilal 1507
Asghar
SEPCO- Muham
VB-072208-302- FW 05A 3/4''-HO-30009- 15SA0P1 A312 GR A312 GR 82161 82161 001 PIPE PIPE BW 0.75 3.91 SEPCO-A- SEP-
GTAW FPIP-7165 SEP-WPS- 02/11/2019 YES ACC A-Fweld- mad 3 10 N/A DJC-F- 27/01/2020
6 01B 15SA0P1 TP304/TP304L TP304/TP304L 852 ASME-022 Bilal 0262
7578 Asghar
Muham
VB-072208-302- 3/4''-HO-30009- 15SA0P1 A312 GR A312 GR SEPCO-A- SEP- SEP-WPS- SEPCO- mad DJC-F-
7 FW 06 82161 82161 001 PIPE PIPE BW 0.75 3.91 GTAW 03/11/2019 YES ACC A-Fweld- 3 10 N/A 27/01/2020
01B 15SA0P1 TP304/TP304L TP304/TP304L FPIP-7009 840 ASME-022 7578 Bilal 0262
Asghar
Muham
VB-072208-303- 3/4''-HO-30009- A312 GR A312 GR SEPCO-A- SEP- SEP-WPS- SEPCO- mad DJC-F-
8 01B FW 06A 15SA0P1 15SA0P1 TP304/TP304L TP304/TP304L 82161 82161 001 PIPE PIPE BW 0.75 3.91 GTAW FPIP-7009 840 ASME-022 03/11/2019 YES ACC A-Fweld- Bilal 3 10 N/A 0262 27/01/2020
7578
Asghar
SEPCO-
VB-072208-303- FW 07A 3/4''-HO-30009- 15SA0P1 A312 GR A312 GR 82161 82161 001 PIPE PIPE BW 0.75 3.91 SEPCO-A- SEP- SEPCO-WPS- 12/11/2019 YES
GTAW FPIP-8418 ACC A-Fweld- BILAL 3 10 N/A PMI-S- 26/01/2020
11 01B 15SA0P1 TP304/TP304L TP304/TP304L 840 ASME-022 3494
7578
SEPCO-
VB-072208-303- 3/4''-HO-30009- 15SA0P1 A312 GR A312 GR SEPCO-A- SEP- SEPCO-WPS- 05/11/2019 Yes PMI-S-
12 01B
FW 08
15SA0P1 TP304/TP304L TP304/TP304L
82161 82161 001 PIPE PIPE BW 0.75 3.91 GTAW
FPIP-7697 840 ASME-022
Acc A-Fweld- BILAL 3 10 N/A
3494
26/01/2020
7578
A403 GR SEPCO-
VB-072208-304- 3/4''-HO-30009- 15SA0P1 A312 GR SEPCO-A- SEP- SEPCO-WPS- 05/11/2019 Yes PMI-S-
13 01B
FW 09
15SA0P1 TP304/TP304L
WP304S/WP30 82161 DC6225 001 PIPE TEE BW 0.75 3.91 GTAW
FPIP-7697 840 ASME-022
Acc A-Fweld- BILAL 3 10 N/A
3495
26/01/2020
4LS 7578
A403 GR SEPCO-
VB-072208-304- 3/4''-HO-30009- 15SA0P1 WP304S/WP30 A312 GR SEPCO-A- SEP- SEPCO-WPS- 05/11/2019 Yes PMI-S-
14 01B
FW 10
15SA0P1 TP304/TP304L
DC6225 82161 001 TEE PIPE BW 0.75 3.91 GTAW
FPIP-7697 840 ASME-022
Acc A-Fweld- BILAL 3 10 N/A
3495
26/01/2020
4LS 7578
VB-072208-304- 3/4''-HO-30009- 15SA0P1 A312 GR A312 GR SEPCO-A- SEP- SEPCO-WPS- 05/11/2019 Yes SEPCO- PMI-S-
15 01B FW 11 15SA0P1 TP304/TP304L TP304/TP304L 82161 82161 001 PIPE PIPE BW 0.75 3.91 GTAW FPIP-7697 840 ASME-022 Acc A-Fweld- BILAL 3 10 N/A 3495 26/01/2020
7578
WELD-
VB-072208-304- 3/4''-HO-30009- A312 GR EQUIPME SEPCO-A- SEP- SEPCO-WPS- SEPCO- PMI-S-
16 01B FW 12 15SA0P1 15SA0P1 TP304/TP304L TP B223 82161 VS 001 PIPE NT BW 0.75 3.91 GTAW FPIP-7697 840 ASME-022 05/11/2019 Yes Acc A- BILAL 3 10 N/A 3495 26/01/2020
FWELD-
8268
WELD-
VB-072207-301- 3/4''-HO-30010- A312 GR A312 GR SEPCO-A- SEP- SEPCO-WPS- SEPCO- PMI-S-
19 01A FW 01B 15SA0P1 15SA0P1 TP304/TP304L TP304/TP304L 82161 82161 001 PIPE PIPE BW 0.75 3.91 GTAW FPIP-8418 852 ASME-022 12/11/2019 YES ACC A- BILAL 3 10 N/A 3496 26/01/2020
FWELD-
8321
SEPCO-
VB-072207-301- FW 01D 3/4''-HO-30010- 15SA0P1 A312 GR A312 GR 82161 82161 001 PIPE PIPE BW 0.75 3.91 SEPCO-A- SEP- SEPCO-WPS- 12/11/2019 YES
GTAW FPIP-8418 ACC A-Fweld- BILAL 3 10 N/A PMI-S- 26/01/2020
20 01A 15SA0P1 TP304/TP304L TP304/TP304L 852 ASME-022 3496
7578
WELD SUMMARY
SAUDI ARAMCO TEST REPORT SATIP NUMBER SATR NUMBER DATE APPROVED QR NUMBER DATE
WELD SUMMARY, WELDER PERFORMANCE and NON-DESTRUCTIVE (NDT) TRACKING SYSTEM SATIP-W-011-01 SATR-W-2008 30/Apr/13 2/3/2020
PROJECT TITLE HYDRO-TEST PACKAGE NUMBER WBS / BI / JO NU,MBER CONTRACTOR / SUBCONTRACTOR LOCATION
RT REQUEST DATE 1
NDT REQUEST 2
RT REPORT NO1
SPOOL NUMBER
NDT REQUEST3
WELD PROCESS
PWHT REPORT
PT REPORT NO
DATE WELDED
RTFI REPORT3
RT REPORT 2#
RT REQUEST 1
RT REPORT3#
LINE NUMBER
RT RESULT 1
RT RESULT 3
PMI REPORT
DATE PWHT
PT MT DATE
RT RESULT2
VISUAL QRN
WELD TYPE
HT REPORT
WELDER ID
HT RESULT
LINE CLASS
FITUP QRN
HEAT NO A
HEAT NO B
MATERIAL
PMI DATE
REMARKS
DRAWING
WELD NO
RTFI NO1
RTFI NO2
QC NAME
HT DATE
FW/SW
TYPE A
TYPE B
GRADE
BLOCK
SL.No.
PT%
WPS
RT%
SIZE
PMI
SCH
SEPCO-
VB-072207-301- 3/4''-HO-30010- 15SA0P1 A312 GR A312 GR SEPCO-A- SEP- SEPCO-WPS- 12/11/2019 YES ACC A-Fweld- BILAL PMI-S-
21 01A FW 01E 15SA0P1 TP304/TP304L TP304/TP304L 82161 82161 001 PIPE PIPE BW 0.75 3.91 GTAW FPIP-8418 852 ASME-022 3 10 N/A 3496 26/01/2020
7578
VB-072207-301- 3/4''-HO-30010- 15SA0P1 A312 GR A312 GR SEPCO-A- SEP- SEPCO-WPS- 07/11/2019 Yes SEPCO- PMI-S-
22 FW 02 82161 82161 001 PIPE PIPE BW 0.75 3.91 GTAW Acc A-Fweld- BILAL 3 10 N/A 26/01/2020
01A 15SA0P1 TP304/TP304L TP304/TP304L FPIP-7731 840 ASME-022 7578 3496
VB-072207-302- 3/4''-HO-30010- 15SA0P1 A312 GR A312 GR SEPCO-A- SEP- SEPCO-WPS- 12/11/2019 YES SEPCO- PMI-S-
23 FW 02A 82161 82161 001 PIPE PIPE BW 0.75 3.91 GTAW ACC A-Fweld- BILAL 3 10 N/A 26/01/2020
01A 15SA0P1 TP304/TP304L TP304/TP304L FPIP-8418 852 ASME-022 7578 3496
WELD NUMBER
BLOCK NUMBER
ISOMETRIC NUMBER
LINE NUMBER
LINE CLASS
PROJECT TITLE
MATERIAL
JIGCC POWER BLOCK-3,EPC-4
GRADE
DATE:
SEPCO CONSTRCUTION:
CONSTRCUTION SINGNATURE:
SPOOL NUMBER
WELD TYPE
SCHEDULE
SAUDI ARAMCO TEST REPORT
DIAMETER
WELD SUMMARY, WELDER PERFORMANCE and NON-DESTRUCTIVE (NDT) TRACKING SYSTEM
WELD PROCESS
HEATNO1 HEATNO2
NUMBER
HYDRO-TEST PACKAGE NUMBER
DATE:
WELDERS SYMBOL
DATE WELDED
SEPCO QC INSPECTOR:
WPS NUMBER
IN PROCESS RFI NO
WBS / BI / JO NU,MBER
SATIP NUMBER
SATIP-W-011-01
NDE REQUIRED(%)
RESULT
TRACER WELDS T1
TRACER WELDS T2
2nd RT REPAIR 1REPORT
NUMBER
RESULT
3rd RT REPAIR 2REPORT
NUMBER
SEPCO 2
CONTRACTOR / SUBCONTRACTOR
30/Apr/13
RESULT
DATE APPROVED
%REVIEWE 100%
ASSESSMENT REPORT NO
SAUDI ARAMCO PID SINGNATURE:
MT REQUEST NUMBER
MT REPORT NUMBER
GRIND
PT REQUEST NUMBER
PWHT
BLOCK#3
LOCATION
HT
HT REQUEST NUMBER
HARDNESS TESTING
DATE
REPORT NUMBER
PMI TEST